Go to Main

Go to Learning Context

Go to Procedure

Go to Instructional/Environmental Modifications

Go to Time Required

Go to Resources

Go to Assessment Plan

Go to Student Work

Go to Reflection
The Cathedral Project
Student Work


The project begins with the students taking their problems to the church and neighborhood to collect information towards problem-solving. These students are measuring from the school to the church.

These students have put together presentation pieces and are sharing how they solved their problem with the class

These students are back in the classroom putting together information and working with the teacher to reach solutions to their problems.

 

HEADLINE CATHEDRAL PROJECT

The students created a newspaper and began creative writing assignments like this.

If I Was a Church Mouse

We started of with measure how mush feet it was to get to the church from the school and then we measure from the school to the pizza shop to see what one was shoart. it was 32 feet to get to the pizza shop. Then we measure with are real feet and it was 925f. the wether was kind of chiley. We stater at 12:00 we end at 2:00.









Go to Learning Experience