WESTCHESTER COUNTY

WESTCHESTER COUNTY

ABBOTT 660413
ARDSLEY 660405
BEDFORD 660102
BLIND BROOK-RY 661905
BRIARCLIFF MAN 661402
BRONXVILLE 660303
BYRAM HILLS 661201
CHAPPAQUA 661004
CROTON HARMON 660202
DOBBS FERRY 660403
EASTCHESTER 660301
EDGEMONT 660406
ELMSFORD 660409
GREENBURGH 660407
GREENBURGH-GRA 660410
GREENBURGH 11 660411
HARRISON 660501
HASTINGS ON HU 660404
HAWTHORNE KNOL 660803
HENDRICK HUDSO 660203
IRVINGTON 660402
KATONAH LEWISB 660101
LAKELAND 662401
MAMARONECK 660701
MT PLEAS CENT 660801
MT PLEASANT-CO 660804
MT PLSNT-BLYTH 660806
MOUNT VERNON 660900
NEW ROCHELLE 661100
NORTH SALEM 661301
OSSINING 661401
PEEKSKILL 661500
PELHAM 661601
PLEASANTVILLE 660809
POCANTICO HILL 660802
PORT CHESTER 661904
RYE 661800
RYE NECK 661901
ST. CHRISTOPHE 660412
SCARSDALE 662001
SOMERS 662101
TARRYTOWN 660401
TUCKAHOE 660302
VALHALLA 660805
WESTCHESTER 2 669000
WHITE PLAINS 662200
YONKERS 662300
YORKTOWN 662402

















Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 07/24/08 at 08:56:35




KATONAH - LEWISBORO SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-01-01-03
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          John Jay HS (Bldg A):
02-1765   Additions and Alterations    0-001-008  02/24/04     DONE    DONE       DONE      03/26/03   01/21/03   05/22/01   06/19/02   02 - 16                9,364,494     6,639,451  MGL             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-001-011                                              /  /       /  /     03/24/06     /  /     2,155                          0    21,279,576  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-001-012                                              /  /       /  /     03/26/07     /  /     155                            0    22,552,648  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
07-1856   Reconstruction               0-001-012  05/20/08     DONE    DONE       DONE      03/24/08   03/17/08     /  /     05/17/05                            400,000             0                  0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Lewisboro Elementary:
02-1495   Reconstruction               0-002-007  09/16/03     DONE    DONE       DONE      02/11/03   02/10/03   05/22/01   06/19/02   2,4,7,8,9,155,15,16    3,440,235     1,619,085  MGL             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
04-0552   Reconstruction               0-002-008  03/18/05     DONE    DONE       DONE      12/15/04   12/14/04   10/06/04   11/16/04   10                        93,051        93,051  DDJ             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
06-1109   Reconstruction               0-002-009  05/02/07     DONE    DONE       DONE      03/15/07   03/14/07   11/21/06     /  /     15,16                    207,750       207,750  DDJ             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
07-2102   Additions and Alterations    0-002-010  05/14/08     DONE    DONE       DONE      05/08/08   05/06/08   03/17/08   05/17/05   02 - 16                  127,500       127,500  DDJ             0           0            0
                                                                                                                                                                                                                                 S & B ENVIRONMENTAL,LLC             

          Katonah Elementary:
05-0612   Reconstruction               0-003-008  03/03/06     DONE    DONE       DONE      01/18/06   01/17/06   12/21/05   05/17/05   2,15                     143,500       143,500  DDJ             0           0            0
                                                                                                                                                                                                                                 S&B Enviornmental,LLCj              
07-1854   Reconstruction               0-003-009  05/12/08     DONE    DONE       DONE      03/24/08   03/17/08   03/26/07   05/17/05   155                       60,000        60,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Increase Miller Elem.:
  -    PR Additions and Alterations    0-004-010                                              /  /       /  /     07/23/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          John Jay Jr High School:
02-1766   Additions and Alterations    0-005-005  12/08/03     DONE    DONE       DONE      03/26/03   01/30/03   05/22/01   06/19/02   02 - 16               10,274,463     8,530,446  MGL             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-1853   Reconstruction               0-005-007  05/16/08     DONE    DONE       DONE      03/24/08   03/17/08   03/26/07   05/17/05   155                       55,000        55,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -    PR Additions and Alterations    0-005-008                                              /  /       /  /     07/23/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Meadow Pond Elementary:
07-1855   Reconstruction               0-007-007  05/12/08     DONE    DONE       DONE      03/24/08   03/17/08   03/26/07   05/17/05   155                      120,000       120,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -    PR Additions and Alterations    0-007-008                                              /  /       /  /     07/23/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Modular/Administration:
07-2251DB Discovered Building          1-043-001                       ADDENDUM REQ'D       06/13/08   06/03/08   08/05/98     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Utility Bldg. to house water tank:
03-1277   New Construction             7-049-001  04/21/04     DONE    DONE       DONE      03/12/04   03/10/04   11/05/03   08/18/03   02 - 16                  300,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Waste Water Trtmt Plant@ Lewisboro:
07-1156   New Construction             7-050-001  03/13/08     DONE    DONE       DONE      12/19/07   12/18/07   12/11/07   05/01/98   02 - 16                5,565,901             0  DDJ             0           0            0
                                                                                                                                                                                                                                 O'Brien & Gere Engineers,Inc.       

          Waste Water Trtmt Plant @ Inc Miller:
07-1724   New Construction             7-051-001  06/25/08     DONE    DONE       DONE      03/03/08   02/25/08   12/11/07   05/01/07   02 - 16                5,682,609             0  DDJ             0           0            0
                                                                                                                                                                                                                                 O'Brien & Gere Engineers,Inc.       

          Press Box:
07-2252DB Discovered Building          7-052-001                       ADDENDUM REQ'D       06/13/08   06/03/08   03/19/08     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          District Wide:
07-2294   Reconstruction               7-999-001                         UNREVIEWED         07/01/08   06/16/08   07/20/07   05/15/07   10,13,16                       0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BEDFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-01-02-06
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Pound Ridge Elementary:
02-1531   Additions and Alterations    0-001-008  09/30/03     DONE    DONE       DONE      02/21/03     /  /     07/05/02   01/23/02   02 - 16                7,328,169     4,338,064  RDR             0           0            0
                                                                                                                                                                                                                                 The Geddis Partnership              
04-0009   Reconstruction               0-001-009  07/13/04     DONE    DONE       DONE      07/02/04   07/01/04   09/24/03   06/03/03   2                        320,000       320,000  RDR             0      20,000            0
                                                                                                                                                                                                                                 J. Robert Folchetti & Associates,L.L
  -       Reconstruction               0-001-010                                              /  /       /  /     03/23/05     /  /     2,10,16                        0     6,036,442  MGL             0           0            0
                                                                                                                                                                                                                                                                     
06-1342   Reconstruction               0-001-011  05/17/07     DONE    DONE       DONE      04/23/07   04/18/07   03/23/05   07/14/05   2,10,15,16               350,000             0  MGL             0           0            0
                                                                                                                                                                                                                                 J.Robert Folchetti & Associates,LLC 

          Bedford Village Elementary:
04-1341   Reconstruction               0-002-009  06/24/05     DONE    DONE       DONE      05/27/05   05/25/05   03/23/05   05/18/04   2,9,10                   117,200       117,200  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture PLLC            

          Fox Lane High School:
03-0790   Additions and Alterations    0-003-010  02/03/05     DONE    DONE       DONE      12/05/03   12/02/03   07/05/02   01/23/02   02 - 16               45,388,176    33,864,519  RDR             0           0            0
                                                                                                                                                                                                                                 THE GEDDIS PARTNERSHIP              
03-0789   Reconstruction               0-003-012  04/01/04     DONE    DONE       DONE      12/05/03   12/02/03   09/24/03   01/23/02   2                        335,241       746,160  RDR             0           0            0
                                                                                                                                                                                                                                 THE GEDDIS PARTNERSHIP              
  -       Reconstruction               0-003-013                                              /  /       /  /     05/23/07     /  /     2,4,8                          0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
07-1904   Reconstruction               0-003-014  05/21/08     DONE    DONE       DONE      04/01/08   03/25/08   05/23/07   05/15/07   2,4,7,8,155,16           800,000             0  MGL             0           0      728,043
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Bedford Hills Elementary:
04-0521   Reconstruction               0-004-013  07/14/05     DONE    DONE       DONE      12/10/04   12/06/04   07/05/02   01/23/02   2,4,8,9,155,15,16      2,326,495     1,978,000  RDR             0           0            0
                                                                                                                                                                                                                                 THE GEDDIS PARTNERSHIP              
03-0807   Reconstruction               0-004-014  04/02/04     DONE    DONE       DONE      12/10/03   12/05/03   09/24/03   01/23/02   2,4                      238,515       247,000  RDR             0           0            0
                                                                                                                                                                                                                                 The Geddis Partnership              

          Mt Kisco Elementary:
02-2050   Additions and Alterations    0-006-010  03/04/04     DONE    DONE       DONE      04/23/03   04/16/03   07/05/02   01/23/02   02 - 16               15,741,953     7,075,353  RDR             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
06-0853   Reconstruction               0-006-011  04/26/07     DONE    DONE       DONE      01/31/07   01/30/07   12/18/06   05/16/06   4,7                    1,000,000     1,000,000  MGL             0           0      640,000
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Fox Lane Middle School:
03-0808   Reconstruction               0-007-004  03/26/04     DONE    DONE       DONE      12/10/03   12/05/03   07/05/02   01/23/02   2,4,7,8,9,155,15,16    1,178,813     1,031,106  RDR             0           0            0
                                                                                                                                                                                                                                 The Geddis Partnership              
04-0522   Additions and Alterations    0-007-005  07/14/05     DONE    DONE       DONE      12/10/04   12/06/04   05/06/03   01/23/02   02 - 16                1,087,887     1,736,894  RDR             0           0            0
                                                                                                                                                                                                                                 THE GEDDIS PARTNERSHIP              
05-1014   Reconstruction               0-007-006  06/02/06     DONE    DONE       DONE      03/23/06   03/21/06   12/08/05   05/18/04   2,9                       18,900        18,900  RDR             0           0            0
                                                                                                                                                                                                                                 S&B Enviornmental,LLCj              

          West Patent Rd Elem:
04-1342   Reconstruction               0-009-007  06/24/05     DONE    DONE       DONE      05/27/05   05/25/05   03/23/05   05/18/04   2,9,10                    95,000        95,000  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture PLLC            

          Press Box @ Fox Lane High School:
04-1457   New Construction             7-022-001  08/19/05     DONE    DONE       DONE      06/22/05   06/21/05   03/23/05     /  /     02 - 16                   65,000             0  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture PLLC            

          WASTE WATER TREATMENT PLANT:
07-0306   New Construction             7-023-001  10/23/07     DONE    DONE       DONE      09/06/07   09/05/07   07/27/06   05/01/98   02 - 16                4,738,473             0  MGL             0           0            0
                                                                                                                                                                                                                                 O'Brien & Gere Engineers,Inc.       

          Press Box:
  -       New Construction             7-024-001                                              /  /       /  /     02/04/08     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CROTON HARMON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-02-02-03
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          High School:
03-0002   Additions and Alterations    0-001-015  09/19/03     DONE    DONE       DONE      07/01/03   06/20/03   11/10/99   06/06/00   02 - 16               15,305,005    15,305,005  MAC             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -    XX Reconstruction               0-001-017                         CANCELLED            /  /       /  /     11/20/07     /  /     2,8,9,155,15,16                0     9,847,656  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-001-018                                              /  /       /  /     05/29/08     /  /     8,16                           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Pierre Van Cortlandt:
04-1257   Reconstruction               0-002-015  11/22/05     DONE    DONE       DONE      05/11/05   05/09/05   08/10/04   03/08/04   8,9,155,15,16             60,000        60,000  MAC             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -    XX Reconstruction               0-002-016                         CANCELLED            /  /       /  /     11/20/07     /  /     2,8,9,155,15,16                0     6,308,080  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-002-017                                              /  /       /  /     05/29/08     /  /     8,16                           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Carrie E. Tompkins Elem.:
04-1258   Reconstruction               0-003-018               STARTED DONE       DONE      05/11/05   05/09/05   10/28/04   03/08/04   2,9,155,16                     0     9,908,550  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -    XX Reconstruction               0-003-019                         CANCELLED            /  /       /  /     11/20/07     /  /     2,8,9,155,15,16                0    10,254,456  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-003-020                                              /  /       /  /     05/29/08     /  /     8,16                           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          New Storage Building:
04-1259XX New Construction             2-013-001                         CANCELLED          05/11/05   05/09/05   08/10/04   03/08/04   02 - 16                        0             0  MAC             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HENDRICK HUDSON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-02-03-06
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          High School:
06-0383   Reconstruction               0-001-016  03/09/07     DONE    DONE       DONE      10/30/06   10/27/06   09/19/06   10/24/01   2,4,7,8,9,10,155,15,   1,150,500     1,150,500  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          

          F. G. Lindsey Elementary:
03-1027   Reconstruction               0-002-008  04/13/04     DONE    DONE       DONE      01/23/04   01/20/04   03/01/02   10/24/01   7                        794,382       794,382  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          
03-1473   Reconstruction               0-002-009  07/16/04     DONE    DONE       DONE      04/26/04   04/23/04   03/01/02   10/24/01   2,155,15,16            1,830,685     1,830,685  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          
  -    PR Additions and Alterations    0-002-010                                              /  /       /  /     06/22/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -    PR Additions and Alterations    0-002-011                                              /  /       /  /     09/19/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0384   Additions and Alterations    0-002-011  03/09/07     DONE    DONE       DONE      10/30/06   10/27/06   09/19/06   10/24/01   02 - 16                1,169,832     1,169,832  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          

          Furnace Woods Elementary:
03-0882   Reconstruction               0-006-004  03/10/04     DONE    DONE       DONE      12/23/03   12/15/03   03/01/02   10/24/01   8                        327,500       327,500  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          
03-1475   Reconstruction               0-006-005  07/16/04     DONE    DONE       DONE      04/26/04   04/23/04   03/01/02   10/24/01   2,155,15,16              575,575       575,575  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          
03-1028   Reconstruction               0-006-006  04/13/04     DONE    DONE       DONE      01/23/04   01/20/04   03/01/02   10/24/01   7                        891,000       891,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          
  -    PR Additions and Alterations    0-006-007                                              /  /       /  /     09/19/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0385   Additions and Alterations    0-006-007  03/09/07     DONE    DONE       DONE      10/30/06   10/27/06   09/19/06   10/24/01   02 - 16                  504,500       504,500  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          

          Blue Mountain Middle School:
03-1029   Reconstruction               0-007-006  04/13/04     DONE    DONE       DONE      01/23/04   01/20/04   03/01/02   10/24/01   7                        759,000       759,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          
03-0883   Reconstruction               0-007-007  03/10/04     DONE    DONE       DONE      12/23/03   12/15/03   03/01/02   10/24/01   8                        293,451       293,451  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
03-1476   Reconstruction               0-007-008  07/16/04     DONE    DONE       DONE      04/26/04   04/23/04   04/20/04   10/24/01   155,15,16                142,313       142,313  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          

          Buchanan-Verplanck Elementary:
03-0884   Reconstruction               0-008-007  03/10/04     DONE    DONE       DONE      12/23/03   12/15/03   03/01/02   10/24/01   8                        234,798       234,798  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          
03-1477   Reconstruction               0-008-008  07/16/04     DONE    DONE       DONE      04/26/04   04/23/04   03/01/02   10/24/01   9                        582,382       582,382  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          
03-1030   Reconstruction               0-008-009  04/13/04     DONE    DONE       DONE      01/23/04   01/20/04   03/01/02   10/24/01   7                        585,989       585,989  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          

          Administration Bldg:
03-1474   Reconstruction               1-004-004  07/16/04     DONE    DONE       DONE      04/26/04   04/23/04   03/01/02   10/24/01   155,15,16                241,931             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          
06-0386   Reconstruction               1-004-006  03/09/07     DONE    DONE       DONE      10/30/06   10/27/06   09/19/06   10/24/01   8,9                      117,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          

          Bus Garage:
03-0106   Reconstruction               5-005-004  03/01/04     DONE    DONE       DONE      07/29/03   07/10/03   03/01/02   10/24/01   7,8,155,15,16            902,208       902,208  HCM             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




EASTCHESTER UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-03-01-03
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Anne Hutchinson School:
04-0090   Reconstruction               0-001-014  08/06/04     DONE    DONE       DONE      07/27/04   07/26/04   07/08/04   08/04/04   2                         44,121        44,121  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-1671   Reconstruction               0-001-015  05/07/08     DONE    DONE       DONE      02/23/08   02/20/08   10/29/07   02/06/07   2,4,7,16               1,535,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
04-1403SC Visual Structural Inspection 0-001-SC1  06/10/05     DONE    DONE       DONE      06/09/05   06/09/05     /  /       /  /     16                        10,780        10,780  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Waverly School:
07-1672   Reconstruction               0-002-006  05/07/08     DONE    DONE       DONE      02/23/08   02/20/08   10/25/07   02/06/07   4                        250,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
04-1401SC Visual Structural Inspection 0-002-SC1  06/10/05     DONE    DONE       DONE      06/09/05   06/09/05     /  /       /  /     16                        15,400        15,400  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Eastchester High School:
04-0091   Reconstruction               0-003-016  08/06/04     DONE    DONE       DONE      07/27/04   07/26/04   07/08/04   08/04/04   2                         13,598        13,598  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
06-0956   Reconstruction               0-003-017  03/23/07     DONE    DONE       DONE      02/21/07   02/20/07     /  /     02/06/07   2,7,13                 1,500,000     1,500,000  DDJ             0           0      913,951
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-1673   Reconstruction               0-003-018  05/07/08     DONE    DONE       DONE      02/23/08   02/20/08   10/25/07   02/06/07   16                       322,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-2283   Reconstruction               0-003-019  06/30/08     DONE    DONE       DONE      06/30/08   06/16/08     /  /     04/08/08   2                        125,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-003-021                                              /  /       /  /     07/15/08     /  /     2                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
04-1399SC Visual Structural Inspection 0-003-SC1  06/10/05     DONE    DONE       DONE      06/09/05   06/09/05     /  /       /  /     16                        47,740        47,740  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Middle School:
06-0957   Reconstruction               0-004-015  03/23/07     DONE    DONE       DONE      02/21/07   02/20/07   02/07/07   02/06/07   2,7,13                   740,000       740,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-1674   Reconstruction               0-004-016  05/07/08     DONE    DONE       DONE      02/23/08   02/20/08   11/14/07   02/06/07   16                       153,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
04-1400SC Visual Structural Inspection 0-004-SC1  06/10/05     DONE    DONE       DONE      06/09/05   06/09/05     /  /       /  /     16                        24,640        24,640  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Greenvale Elementary School:
07-1675   Reconstruction               0-006-010  05/07/08     DONE    DONE       DONE      02/23/08   02/20/08   11/14/07   02/06/07   2,4,7,16                 900,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Greenvale MB:
04-1402SC Visual Structural Inspection 0-011-SC1  06/10/05     DONE    DONE       DONE      06/09/05   06/09/05     /  /       /  /     16                        23,100        23,100  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




TUCKAHOE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-03-02-03
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          William E. Cottle Elementary:
06-0103   Reconstruction               0-001-014  01/09/07     DONE    DONE       DONE      07/24/06   07/21/06   12/08/04   01/10/06   2,4,8,9,155,16           323,057       323,057  DDJ             0           0      192,382
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
06-0925   Reconstruction               0-001-015  06/27/08     DONE    DONE       DONE      02/09/07   02/07/07   11/20/06   07/27/06   8                        285,299             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           
07-0484   Reconstruction               0-001-016  12/21/07     DONE    DONE       DONE      10/03/07   10/01/07   08/02/07   07/20/07   10,16                    125,000       125,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            

          Tuckahoe High School:
  -    XX Additions and Alterations    0-002-013                         CANCELLED            /  /       /  /     12/08/04     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0108   Additions and Alterations    0-002-013  01/08/07     DONE    DONE       DONE      07/25/06   07/21/06   12/08/04   01/10/06   02 - 16               13,234,249    11,918,375  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
05-0054   Reconstruction               0-002-014  07/21/05     DONE    DONE       DONE      07/15/05   07/12/05   06/29/05   07/01/05   4                        102,363       102,363  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
06-0926   Reconstruction               0-002-015  06/27/08     DONE    DONE       DONE      02/09/07   02/07/07   11/20/06   07/27/06   8,155                    330,641             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           
07-0017   Reconstruction               0-002-016  07/16/07     DONE    DONE       DONE      07/06/07   07/05/07   06/01/07   06/18/07   2                        104,100       104,100  DDJ             0           0       81,680
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
07-0272   Reconstruction               0-002-017  09/28/07     DONE    DONE       DONE      09/04/07   08/31/07   06/11/07   05/15/07   4                        200,000       200,000  DDJ             0           0      152,800
                                                                                                                                                                                                                                 Peter Gisolfi Associates            

          Administration @ 29 Elm Street:
04-1049TQ Temporary Quarters           1-004-001  04/11/05     DONE    DONE       DONE      03/29/05   03/29/05   03/17/05     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          PRESS BOX @ TUCKAHOE MIDDLE/HIGH:
06-0134   New Construction             7-005-001  01/08/07     DONE    DONE       DONE      07/31/06   07/28/06   07/25/06   01/10/06   02 - 16                   89,500             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            

          CONCES. BUILDING @ TUCK MIDD/HIGH:
  -    PR New Construction             7-006-001                                              /  /       /  /     07/25/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0135   New Construction             7-006-001  01/08/07     DONE    DONE       DONE      07/31/06   07/28/06   07/25/06   01/10/06   02 - 16                  103,500             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BRONXVILLE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-03-03-03
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Bronxville School:
04-1412   Reconstruction               0-001-013  08/31/05     DONE    DONE       DONE      06/14/05   06/10/05   03/24/05   05/18/04   16                       237,882       237,882  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
05-0999   Reconstruction               0-001-014  05/23/06     DONE    DONE       DONE      03/21/06   03/20/06   02/15/06   05/18/05   13                       328,270       328,270  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
05-1080   Reconstruction               0-001-015  04/13/06     DONE    DONE       DONE      03/31/06   03/31/06   02/21/06   02/04/06   2,13                   1,745,570     1,745,570  HCM             0           0            0
                                                                                                                                                                                                                                 WBA Group Inc.                      
06-0963   Reconstruction               0-001-016  05/10/07     DONE    DONE       DONE      02/21/07   02/20/07   02/07/07   02/06/07   2,4,7,13                 800,000       800,000  HCM             0           0      489,662
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-0037   Reconstruction               0-001-017  07/10/07     DONE    DONE       DONE      07/10/07   07/10/07   04/17/07   07/10/07   2,155,15,16              450,000       450,000  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-0201   Reconstruction               0-001-018  08/30/07     DONE    DONE       DONE      08/17/07   08/16/07   08/17/07   07/10/07   4,8,9,155,15,16        6,092,772     6,092,772  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-1229   Reconstruction               0-001-019  02/29/08     DONE    DONE       DONE      12/26/07   12/24/07   11/21/07   07/10/07   4,8,9,155,15,16        4,270,439     2,900,000  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -    PR Additions and Alterations    0-001-020                                              /  /       /  /     05/27/08     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Temporary Quarters - District Office:
07-0114TQ Temporary Quarters           1-006-001  08/01/07     DONE    DONE       DONE      08/01/07   07/31/07   06/22/07     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Football Storage Container:
03-0622DB Discovered Building          2-005-001                       ADDENDUM REQ'D       11/07/03   10/31/03   02/11/03     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




TARRYTOWN UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-01-03
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Tappan Hill Primary:
04-0619   Reconstruction               0-001-009  03/17/05     DONE    DONE       DONE      01/05/05   01/04/05   08/10/04   05/18/04   7                        450,000       450,000  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Washington Irving Jr. High:
05-0786PR Additions and Alterations    0-002-007                         UNREVIEWED         02/17/06   02/14/06   04/09/03     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
05-0997   Additions and Alterations    0-002-007  01/18/08     DONE    DONE       DONE      03/20/06   02/14/06   04/09/03   03/08/05   02 - 16               15,681,600    12,483,440  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
03-0271   Reconstruction               0-002-008  11/14/03     DONE    DONE       DONE      09/15/03   09/10/03   06/24/03   06/03/03   2,7                      614,080       614,080  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
04-0620   Reconstruction               0-002-009  03/17/05     DONE    DONE       DONE      01/05/05   01/04/05   08/10/04   05/18/04   2,8,9,155,15,16          160,000       160,000  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          John Paulding School:
04-0621   Reconstruction               0-004-008  03/17/05     DONE    DONE       DONE      01/05/05   01/04/05   08/10/04   05/18/04   7,8,16                    85,000        85,000  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Sleepy Hollow High School:
05-0419PR Additions and Alterations    0-005-011                         UNREVIEWED         12/01/05   11/23/05   04/09/03     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
05-0522   Additions and Alterations    0-005-011  05/12/06     DONE    DONE       DONE      12/28/05   11/23/05   04/09/03   03/08/05   02 - 16               66,099,817    51,723,979  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Winfield L. Morse Elementary:
04-0622   Reconstruction               0-006-009  03/17/05     DONE    DONE       DONE      01/05/05   01/04/05   08/10/04   05/18/04   7,8,16                   880,537       880,537  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Administration Bldg.:
06-1624   Reconstruction               1-003-005  06/19/07     DONE    DONE       DONE      06/15/07   06/15/07   06/04/07   05/14/04   2,155                     75,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          New Bus Garage-Lease RENEWAL:
04-0000   Reconstruction               5-013-L02  11/30/02     DONE    DONE       DONE      04/04/05   04/04/05   04/07/05   05/21/02                            218,038       218,038  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          The Marymount Center:
  -    TQ Temporary Quarters           8-020-001                                              /  /       /  /     12/12/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




IRVINGTON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-02-02
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Irvington MS:
  -       Reconstruction               0-001-011                                              /  /       /  /     04/27/04     /  /     8                              0     7,304,310  MAC             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-001-012                                              /  /       /  /     04/10/08     /  /     10,155,16                      0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
02-2307FP Reconstruction               0-001-FP1  08/20/03     DONE    DONE       DONE      06/02/03     /  /       /  /       /  /     16                         4,750         4,750  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Dows Lane Elementary:
  -       Reconstruction               0-002-012                                              /  /       /  /     04/27/04     /  /     8                              0     9,783,699  MAC             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-002-013                                              /  /       /  /     04/10/08     /  /     4,16                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
02-2305FP Reconstruction               0-002-FP1  08/20/03     DONE    DONE       DONE      06/02/03     /  /       /  /       /  /     16                         4,750         4,750  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Irvington High School:
  -       Reconstruction               0-007-012                                              /  /       /  /     09/08/05     /  /     2,155                          0    16,060,522  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-007-013                                              /  /       /  /     04/10/08     /  /     10,16                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
02-2306FP Reconstruction               0-007-FP1  08/20/03     DONE    DONE       DONE      06/02/03     /  /       /  /       /  /     16                         4,750         4,750  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          New Middle School:
  -       Reconstruction               0-013-002                                              /  /       /  /     04/10/08     /  /     10,16                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Arts and Athletic Bldg.:
  -       Reconstruction               0-014-002                                              /  /       /  /     06/20/08     /  /     9                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          :
  -       New Construction             2-018-001                                              /  /       /  /     09/08/05     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       New Construction             2-019-001                                              /  /       /  /     09/08/05     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




DOBBS FERRY UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-03-03
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Dobbs Ferry Mid./High School:
03-1590   Reconstruction               0-001-005  07/06/04     DONE    DONE       DONE      05/28/04   05/27/04   03/12/01   05/18/04   8,9,155,15,16          1,524,300     1,524,300  MAC             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
05-1198   Reconstruction               0-001-006  11/28/06     DONE    DONE       DONE      04/24/06   04/24/06   04/24/06   03/30/06   7,15,16                2,410,925     2,410,925  HCM             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
  -       Reconstruction               0-001-007                                              /  /       /  /     03/26/07     /  /     2,4,16                         0    25,844,280  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-001-008                                              /  /       /  /     04/18/07     /  /     2,4,7,8,9,10,155,15,           0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-001-009                                              /  /       /  /     06/20/08     /  /     155                            0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-0780SC Visual Structural Inspection 0-001-SC1  02/27/07     DONE    DONE       DONE      02/16/07   02/16/07     /  /       /  /     16                         1,725         1,725  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0782SC Visual Structural Inspection 0-001-SC2  03/12/07     DONE    DONE       DONE      03/09/07   03/09/07     /  /       /  /     16                           638           638  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Springhurst Elementary:
05-1199   Reconstruction               0-004-011  11/28/06     DONE    DONE       DONE      04/24/06   04/24/06   04/24/06   03/30/06   15,16                    264,596       264,596  HCM             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
  -       Reconstruction               0-004-012                                              /  /       /  /     06/20/08     /  /     155                            0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
08-0074   Reconstruction               0-004-013                         UNREVIEWED         07/22/08   07/16/08   06/20/08   05/20/08   4,8,9,155,15,16                0             0  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
03-1543SC Visual Structural Inspection 0-004-SC1  06/21/04     DONE    DONE       DONE      05/10/04   05/10/04     /  /       /  /     16                        18,000        18,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          DISTRICTWIDE:
  -       Reconstruction               7-999-001                                              /  /       /  /     03/24/06     /  /     16                             0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HASTINGS ON HUDSON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-04-03
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Farragut School Complex:
07-0697   Reconstruction               0-001-025  04/21/08     DONE    DONE       DONE      11/02/07   11/01/07   03/05/07   05/15/07   4,9,10,155,16            378,300       378,300  HCM             0           0      217,912
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
  -       Reconstruction               0-001-026                                              /  /       /  /     10/17/07     /  /     4,13                           0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-1648SC Visual Structural Inspection 0-001-SC1  07/09/07     DONE    DONE       DONE      06/19/07   06/19/07     /  /       /  /     16                         8,725             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Hillside Elementary:
07-0698   Reconstruction               0-002-017  04/21/08     DONE    DONE       DONE      11/02/07   11/01/07   03/05/07   05/15/07   4,9,10,155,16            209,500             0  HCM             0           0      110,000
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
  -    PR Additions and Alterations    0-002-018                                              /  /       /  /     10/17/07     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ARDSLEY UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-05-03
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Concord Road Elementary:
05-0804   Reconstruction               0-002-016  08/25/06     DONE    DONE       DONE      02/22/06   02/22/06   03/14/02   03/11/03   2,4,8,9,155,15,16      1,500,000     1,500,000  MAC             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
07-1112   Reconstruction               0-002-017  05/27/08     DONE    DONE       DONE      12/13/07   12/12/07   11/21/07   05/15/07   2,9,155,15,16            768,651             0  HCM             0           0      520,377
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
07-1615   Reconstruction               0-002-018  02/20/08     DONE    DONE       DONE      02/14/08   02/11/08   01/17/08   01/30/08   2,9                       60,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
03-0437FP Reconstruction               0-002-FP1  10/20/03     DONE    DONE       DONE      10/10/03     /  /       /  /       /  /     16                         1,735         1,735  JOD             0           0            0
                                                                                                                                                                                                                                                                     
03-0372SC Visual Structural Inspection 0-002-SC1  10/21/03     DONE    DONE       DONE      09/03/03   09/03/03     /  /       /  /     16                        28,182        28,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Ardsley Jr/Sr High School:
03-0533   Additions and Alterations    0-003-021  03/22/04     DONE    DONE       DONE      10/28/03   10/08/03   03/14/02   03/11/03   02 - 16               11,942,000    11,942,000  MAC             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
  -       Reconstruction               0-003-022                                              /  /       /  /     04/22/08     /  /     10,13,15,16                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
03-0438   Reconstruction               0-003-FP1  10/20/03     DONE    DONE       DONE      10/10/03     /  /       /  /       /  /     16                         4,570         4,570  JOD             0           0            0
                                                                                                                                                                                                                                                                     
03-0370SC Visual Structural Inspection 0-003-SC1  10/02/03     DONE    DONE       DONE      09/03/03     /  /       /  /       /  /     16                        28,182        28,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Ardsley Middle School:
03-0897   Reconstruction               0-006-019  11/02/04     DONE    DONE       DONE      12/29/03   12/18/03   03/14/02   03/11/03   4,8,9                  8,373,580     8,373,580  MAC             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
  -       Reconstruction               0-006-020                                              /  /       /  /       /  /       /  /     16                             0    16,875,480  MGL             0           0            0
                                                                                                                                                                                                                                                                     
06-1554   Reconstruction               0-006-021  06/21/07     DONE    DONE       DONE      05/30/07   05/29/07   04/10/07   05/15/07   155                      330,000       245,000  HCM             0           0      223,410
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
03-0436FP Reconstruction               0-006-FP1  10/20/03     DONE    DONE       DONE      10/10/03     /  /       /  /       /  /     16                        13,620        13,620  JOD             0           0            0
                                                                                                                                                                                                                                                                     
03-0371SC Visual Structural Inspection 0-006-SC1  10/21/03     DONE    DONE       DONE      09/03/03   09/03/03     /  /       /  /     16                        26,169        26,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Administration Building:
03-1157   Reconstruction               1-007-004  03/22/04     DONE    DONE       DONE      02/20/04   02/20/04   10/27/99   03/11/03   2,155,15,16              515,538             0  MAC             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 

          PRESS BOX:
  -    DB Discovered Building          7-012-001                                              /  /       /  /     05/19/06     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




EDGEMONT UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-06-03
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Seely Place Elementary:
07-1016   Reconstruction               0-001-013               DONE    DONE       ADD. REQ'D12/03/07   12/03/07   10/02/07   01/10/07   16                             0     7,920,000  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          Edgemont High / Building A:
07-1017   Reconstruction               0-002-012               DONE    DONE       ADD. REQ'D12/03/07   12/03/07   10/02/07   01/10/07   2,15,16                        0    15,590,423  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          Edgemont HS/Building B.:
07-0585   Reconstruction               0-004-005                       ADDENDUM REQ'D       10/18/07   10/17/07   02/05/07   05/22/07   2,4,7,8,9,155,15,16            0    15,221,274  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
07-1018   Reconstruction               0-004-006               DONE    DONE       ADD. REQ'D12/03/07   12/03/07   10/02/07   01/10/07   2,7,8,155,15,16                0    15,590,423  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          H. S. Math Unit - Building C:
07-1019   Reconstruction               0-005-004               DONE    DONE       ADD. REQ'D12/03/07   12/03/07   10/02/07   01/10/07   2,7,15,16                      0    15,590,423  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
07-2215   Reconstruction               0-005-005                         UNREVIEWED         06/05/08   05/27/08   03/27/08   05/20/07   2                              0    16,131,902  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
  -       Reconstruction               0-005-006                                              /  /       /  /     03/27/08     /  /     2                              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          High School Building D:
07-0263   Reconstruction               0-006-005  10/29/07     DONE    DONE       DONE      09/04/07   08/30/07   04/30/07   05/22/07   2,7,155                  111,000       111,000  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
07-1020   Reconstruction               0-006-006               DONE    DONE       ADD. REQ'D12/03/07   12/03/07   10/02/07   01/10/07   2,155,15,16                    0    15,590,423  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          Edgemont H S Gym Building:
07-1021   Reconstruction               0-007-005               DONE    DONE       ADD. REQ'D12/03/07   12/03/07   04/30/07   01/10/07   2,4,7,8,155                    0    15,590,423  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
07-1700   Reconstruction               0-007-005                         UNREVIEWED         02/25/08   02/22/08   10/02/07   05/22/07   2,155,15,16                    0    15,590,423  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 

          Greenville Elementary School:
05-1254   Reconstruction               0-008-010  05/30/06     DONE    DONE       DONE      05/09/06   05/05/06   12/18/03   03/07/06   7                        170,250       160,500  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
04-1443   Reconstruction               0-008-011  07/25/05     DONE    DONE       DONE      06/20/05   06/17/05   04/21/05   05/10/05   2                        420,000       420,000  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
07-1022   Reconstruction               0-008-012               DONE    DONE       ADD. REQ'D12/03/07   12/03/07   10/02/07   01/10/07   2,155,15,16                    0     7,243,524  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
07-1942   Reconstruction               0-008-014  04/17/08     DONE    DONE       DONE      04/14/08   04/03/08   03/14/08   05/20/07   2,7                      316,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 

          High School Arts Building:
07-1023   Reconstruction               0-009-005               DONE    DONE       ADD. REQ'D12/03/07   12/03/07   10/02/07   01/10/07   2,15,16                        0    15,590,423  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          High School Resource Building:
07-1024   Reconstruction               0-010-004               DONE    DONE       ADD. REQ'D12/03/07   12/03/07   10/02/07   01/10/07   2,15,16                        0    15,590,423  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          H.S. Administration Building:
03-1551   Reconstruction               0-011-006  05/14/04     DONE    DONE       DONE      05/13/04   05/11/04   04/06/04   05/20/03   2                         62,600        62,600  JOD             0           0            0
                                                                                                                                                                                                                                                                     
04-1442   Reconstruction               0-011-007  07/15/05     DONE    DONE       DONE      06/20/05   06/17/05   04/21/05   05/10/05   2                         30,609        30,609  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
07-1025   Reconstruction               0-011-008               DONE    DONE       ADD. REQ'D12/03/07   12/03/07   10/02/07   01/10/07   2,155,15,16                    0       515,670  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          High School Building E:
07-1026   Reconstruction               0-016-002               DONE    DONE       ADD. REQ'D12/03/07   12/03/07   10/02/07   01/10/07   16                             0     4,262,872  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GREENBURGH CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-07-06
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Richard Bailey Elementary Sch.:
  -       Reconstruction               0-005-010                                              /  /       /  /     12/04/07     /  /     2,7,10                         0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Administration Bldg:
05-1411   Reconstruction               0-012-005  06/30/06     DONE    DONE       DONE      06/22/06   06/21/06   06/01/06   06/06/06   2,4,155                  600,000       498,170  MGL             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ELMSFORD UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-09-02
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Hamilton High School:
03-0929   Reconstruction               0-001-012  03/18/04     DONE    DONE       DONE      01/06/04   12/24/03   09/12/03   06/03/03   9,155,16                  47,140        47,140  HCM             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
03-1019   Reconstruction               0-001-013                       ADDENDUM REQ'D       01/22/04   01/14/04   09/12/03     /  /     2,8,9,155,15,16          863,500       863,500  HCM             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
05-1305   Reconstruction               0-001-014  06/01/06     DONE    DONE       DONE      05/31/06   05/31/06   05/22/06   05/17/06   2,155,15,16              117,808       117,808  HCM             0           0       87,358
                                                                                                                                                                                                                                 Fuller and D'Angelo                 

          Alice E. Grady Elementary:
05-1306   Reconstruction               0-002-008  06/01/06     DONE    DONE       DONE      05/31/06   05/31/06   05/22/06   05/17/06   2,155                    183,583       183,583  HCM             0           0      135,554
                                                                                                                                                                                                                                 Fuller and D'Angelo                 

          Carl L Dixon School:
05-1307   Reconstruction               0-004-005  06/01/06     DONE    DONE       DONE      05/31/06   05/31/06   05/22/06   05/17/06   2,155                    106,044       106,044  HCM             0           0       78,320
                                                                                                                                                                                                                                 Fuller and D'Angelo                 


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GREENBURGH-GRAHAM UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-10-02
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          New Elementary School:
  -       Reconstruction               0-008-003                                              /  /       /  /     05/04/05     /  /     2,8,16                         0     7,552,125  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GREENBURGH-NO.CASTLE(ST. CHRISTOPHER STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-12-02
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Gym:
  -       Reconstruction               0-002-001                                              /  /       /  /     09/14/92     /  /     2                              0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ABBOTT UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-13-02
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Abbott Middle School:
03-0082   Reconstruction               0-002-001  08/13/03     DONE    DONE       DONE      07/24/03   07/22/03   05/19/03   05/22/03   2,4,8,9,14,155,15,16     161,375       161,375  DDJ             0           0            0
                                                                                                                                                                                                                                 Studio Seven Architects             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HARRISON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-05-01-06
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Klein Middle School:
04-0049XX Reconstruction               0-003-022  11/03/04               CANCELLED          07/08/04   07/06/04   03/29/02   05/02/02   4,9,16                    85,000        85,000  MAC             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
03-1672   Reconstruction               0-003-024  07/07/04     DONE    DONE       DONE      06/29/04   06/24/04   03/24/04   05/18/04   2                        144,558       144,558  MAC             0           0            0
                                                                                                                                                                                                                                 S&B Environmental, LLC              
06-1363   Reconstruction               0-003-025  06/19/07     DONE    DONE       DONE      04/26/07   04/25/07   03/30/07   05/15/07   2                         44,376             0  DDJ             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan

          Harrison Ave. School:
04-0050   Reconstruction               0-004-016  11/03/04     DONE    DONE       DONE      07/08/04   07/06/04   03/29/02   05/02/02   4,15,16                  120,000       120,000  MAC             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
05-1319   Reconstruction               0-004-017  06/20/06     DONE    DONE       DONE      06/06/06   06/05/06   03/24/06   05/16/06   2,8,9,155,15,16          352,170       352,170  DDJ             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
  -       Reconstruction               0-004-018                                              /  /       /  /     05/18/06     /  /     8,9,155,15,16                  0     7,518,700  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-004-019                                              /  /       /  /     05/18/06     /  /     2                              0     7,518,700  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Parsons Memorial:
  -       Reconstruction               0-006-022                                              /  /       /  /     11/06/06     /  /     4                              0     5,649,766  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Harrison High School:
03-0840   Reconstruction               0-011-012  12/18/03     DONE    DONE       DONE      12/16/03   12/16/03   03/29/02   06/03/03   2,8,10                    86,577        86,577  MAC             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
06-0461   Reconstruction               0-011-013  12/17/06     DONE    DONE       DONE      11/10/06   11/09/06   11/09/06   09/20/06   2                      1,000,000     1,000,000  DDJ             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
06-1537   Reconstruction               0-011-014  06/11/07     DONE    DONE       DONE      05/24/07   05/23/07   03/30/07   05/15/07   2                         83,900        83,900  DDJ             0           0       75,510