WESTCHESTER COUNTY

WESTCHESTER COUNTY

ABBOTT 660413
ARDSLEY 660405
BEDFORD 660102
BLIND BROOK-RY 661905
BRIARCLIFF MAN 661402
BRONXVILLE 660303
BYRAM HILLS 661201
CHAPPAQUA 661004
CROTON HARMON 660202
DOBBS FERRY 660403
EASTCHESTER 660301
EDGEMONT 660406
ELMSFORD 660409
GREENBURGH 660407
GREENBURGH-GRA 660410
GREENBURGH 11 660411
HARRISON 660501
HASTINGS ON HU 660404
HAWTHORNE KNOL 660803
HENDRICK HUDSO 660203
IRVINGTON 660402
KATONAH LEWISB 660101
LAKELAND 662401
MAMARONECK 660701
MT PLEAS CENT 660801
MT PLEASANT-CO 660804
MT PLSNT-BLYTH 660806
MOUNT VERNON 660900
NEW ROCHELLE 661100
NORTH SALEM 661301
OSSINING 661401
PEEKSKILL 661500
PELHAM 661601
PLEASANTVILLE 660809
POCANTICO HILL 660802
PORT CHESTER 661904
RYE 661800
RYE NECK 661901
ST. CHRISTOPHE 660412
SCARSDALE 662001
SOMERS 662101
TARRYTOWN 660401
TUCKAHOE 660302
VALHALLA 660805
WESTCHESTER 2 669000
WHITE PLAINS 662200
YONKERS 662300
YORKTOWN 662402

















Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 11/20/09 at 16:58:35




KATONAH - LEWISBORO SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-01-01-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          John Jay HS (Bldg A):
08-1451   Reconstruction               0-001-011  05/28/09     DONE    DONE       DONE      04/02/09   03/31/09   03/24/06   05/20/08   2,16                     125,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-1856   Reconstruction               0-001-012  05/20/08     DONE    DONE       DONE      03/24/08   03/17/08     /  /     05/17/05                            400,000       400,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-1379   Reconstruction               0-001-013  05/18/09     DONE    DONE       DONE      03/16/09   03/10/09   08/15/08   05/15/07   13                        75,000             0  DDJ             0           0       75,000
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -    PR Additions and Alterations    0-001-014                                              /  /       /  /     01/22/09     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -    PR Additions and Alterations    0-001-015                                              /  /       /  /     01/22/09     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-001-016                                              /  /       /  /     07/13/09     /  /     2,9                            0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Lewisboro Elementary:
04-0552   Reconstruction               0-002-008  03/18/05     DONE    DONE       DONE      12/15/04   12/14/04   10/06/04   11/16/04   10                        93,051        93,051  DDJ             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
06-1109   Reconstruction               0-002-009  05/02/07     DONE    DONE       DONE      03/15/07   03/14/07   11/21/06   05/16/06   15,16                    205,409       205,409  DDJ             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
07-2102   Additions and Alterations    0-002-010  05/14/08     DONE    DONE       DONE      05/08/08   05/06/08   03/17/08   05/17/05   02 - 16                  127,500       127,500  DDJ             0           0            0
                                                                                                                                                                                                                                 S & B ENVIRONMENTAL,LLC             

          Katonah Elementary:
05-0612   Reconstruction               0-003-008  03/03/06     DONE    DONE       DONE      01/18/06   01/17/06   12/21/05   05/17/05   2,15                     143,500       143,500  DDJ             0           0            0
                                                                                                                                                                                                                                 S&B Enviornmental,LLCj              
07-1854   Reconstruction               0-003-009  05/12/08     DONE    DONE       DONE      03/24/08   03/17/08   03/26/07   05/17/05   155                       60,000        60,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Increase Miller Elem.:
  -    PR Additions and Alterations    0-004-010                                              /  /       /  /     07/23/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-1380   Reconstruction               0-004-011  05/18/09     DONE    DONE       DONE      03/16/09   03/10/09   08/15/08   05/15/07   13                        30,000             0  DDJ             0           0       30,000
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          John Jay Jr High School:
07-1853   Reconstruction               0-005-007  05/16/08     DONE    DONE       DONE      03/24/08   03/17/08   03/26/07   05/17/05   155                       55,000        55,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -    PR Additions and Alterations    0-005-008                                              /  /       /  /     07/23/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-1113   Reconstruction               0-005-009  06/01/09     DONE    DONE       DONE      01/23/09   01/20/09   08/15/08   05/15/07   10                       150,000             0  DDJ             0           0      150,000
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Meadow Pond Elementary:
07-1855   Reconstruction               0-007-007  05/12/08     DONE    DONE       DONE      03/24/08   03/17/08   03/26/07   05/17/05   155                      120,000       120,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -    PR Additions and Alterations    0-007-008                                              /  /       /  /     07/23/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-007-009                                              /  /       /  /     08/19/09     /  /     2,13,15                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Modular/Administration:
07-2251DB Discovered Building          1-043-001                       ADDENDUM REQ'D       06/13/08   06/03/08   08/05/98     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Waste Water Trtmt Plant@ Lewisboro:
07-1156   New Construction             7-050-001  03/13/08     DONE    DONE       DONE      12/19/07   12/18/07   12/11/07   05/01/98   02 - 16                5,565,901             0  DDJ             0           0            0
                                                                                                                                                                                                                                 O'Brien & Gere Engineers,Inc.       

          Waste Water Trtmt Plant @ Inc Miller:
07-1724   New Construction             7-051-001  06/25/08     DONE    DONE       DONE      03/03/08   02/25/08   12/11/07   05/01/07   02 - 16                5,682,609             0  DDJ             0           0            0
                                                                                                                                                                                                                                 O'Brien & Gere Engineers,Inc.       

          Press Box:
07-2252DB Discovered Building          7-052-001  09/04/08     DONE    DONE       DONE      06/13/08   06/03/08   03/19/08     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          District Wide:
07-2294   Reconstruction               7-999-001  09/08/08     DONE    DONE       DONE      07/01/08   06/16/08   07/20/07   05/15/07   10,13,16                 710,000             0  DDJ             0           0      710,000
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BEDFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-01-02-06
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Pound Ridge Elementary:
  -       Reconstruction               0-001-010                                              /  /       /  /     03/23/05     /  /     2,10,16                        0     6,036,442  MGL             0           0            0
                                                                                                                                                                                                                                                                     
06-1342   Reconstruction               0-001-011  05/17/07     DONE    DONE       DONE      04/23/07   04/18/07   03/23/05   07/14/05   2,10,15,16               350,000             0  MGL             0           0            0
                                                                                                                                                                                                                                 J.Robert Folchetti & Associates,LLC 

          Bedford Village Elementary:
04-1341   Reconstruction               0-002-009  06/24/05     DONE    DONE       DONE      05/27/05   05/25/05   03/23/05   05/18/04   2,9,10                   117,200       117,200  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture PLLC            

          Fox Lane High School:
03-0790   Additions and Alterations    0-003-010  02/03/05     DONE    DONE       DONE      12/05/03   12/02/03   07/05/02   01/23/02   02 - 16               45,388,176    33,864,519  RDR             0           0            0
                                                                                                                                                                                                                                 THE GEDDIS PARTNERSHIP              
  -       Reconstruction               0-003-013                                              /  /       /  /     05/23/07     /  /     2,4,8                          0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
07-1904   Reconstruction               0-003-014  05/21/08     DONE    DONE       DONE      04/01/08   03/25/08   05/23/07   05/15/07   2,4,7,8,155,16           800,000       800,000  MGL             0           0      720,000
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Bedford Hills Elementary:
04-0521   Reconstruction               0-004-013  07/14/05     DONE    DONE       DONE      12/10/04   12/06/04   07/05/02   01/23/02   2,4,8,9,155,15,16      2,326,495     1,978,000  RDR             0           0            0
                                                                                                                                                                                                                                 THE GEDDIS PARTNERSHIP              

          Mt Kisco Elementary:
06-0853   Reconstruction               0-006-011  04/26/07     DONE    DONE       DONE      01/31/07   01/30/07   12/18/06   05/16/06   4,7                    1,000,000     1,000,000  MGL             0           0      640,000
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Fox Lane Middle School:
04-0522   Additions and Alterations    0-007-005  07/14/05     DONE    DONE       DONE      12/10/04   12/06/04   05/06/03   01/23/02   02 - 16                1,087,887     1,736,894  RDR             0           0            0
                                                                                                                                                                                                                                 THE GEDDIS PARTNERSHIP              
05-1014   Reconstruction               0-007-006  06/02/06     DONE    DONE       DONE      03/23/06   03/21/06   12/08/05   05/18/04   2,9                       18,900        18,900  RDR             0           0            0
                                                                                                                                                                                                                                 S&B Enviornmental,LLCj              

          West Patent Rd Elem:
04-1342   Reconstruction               0-009-007  06/24/05     DONE    DONE       DONE      05/27/05   05/25/05   03/23/05   05/18/04   2,9,10                    95,000        95,000  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture PLLC            

          Press Box @ Fox Lane High School:
04-1457   New Construction             7-022-001  08/19/05     DONE    DONE       DONE      06/22/05   06/21/05   03/23/05     /  /     02 - 16                   65,000             0  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture PLLC            

          WASTE WATER TREATMENT PLANT:
07-0306   New Construction             7-023-001  10/23/07     DONE    DONE       DONE      09/06/07   09/05/07   07/27/06   05/01/98   02 - 16                4,738,473             0  MGL             0           0            0
                                                                                                                                                                                                                                 O'Brien & Gere Engineers,Inc.       

          Press Box:
  -       New Construction             7-024-001                                              /  /       /  /     02/04/08     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CROTON HARMON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-02-02-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          High School:
  -    XX Reconstruction               0-001-017                         CANCELLED            /  /       /  /     11/20/07     /  /     2,8,9,155,15,16                0     9,847,656  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-1524   Reconstruction               0-001-018  08/11/09     DONE    DONE       DONE      04/20/09   04/17/09   05/29/08   05/20/08   8,16                     142,000             0  JOD             0           0      142,000
                                                                                                                                                                                                                                 Fuller and D'Angelo                 

          Pierre Van Cortlandt:
04-1257   Reconstruction               0-002-015  11/22/05     DONE    DONE       DONE      05/11/05   05/09/05   08/10/04   03/08/04   8,9,155,15,16             60,000        60,000  MAC             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -    XX Reconstruction               0-002-016                         CANCELLED            /  /       /  /     11/20/07     /  /     2,8,9,155,15,16                0     6,308,080  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-1525   Reconstruction               0-002-017  08/11/09     DONE    DONE       DONE      04/20/09   04/17/09   05/29/08   05/20/08   8,16                     166,257             0  JOD             0           0      166,275
                                                                                                                                                                                                                                 Fuller and D'Angelo                 

          Carrie E. Tompkins Elem.:
04-1258   Reconstruction               0-003-018               STARTED DONE       DONE      05/11/05   05/09/05   10/28/04   03/08/04   2,9,155,16                     0     9,908,550  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -    XX Reconstruction               0-003-019                         CANCELLED            /  /       /  /     11/20/07     /  /     2,8,9,155,15,16                0    10,254,456  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-1526   Reconstruction               0-003-020  08/11/09     DONE    DONE       DONE      04/20/09   04/17/09   05/29/08   05/20/08   8,16                     231,700             0  JOD             0           0      231,700
                                                                                                                                                                                                                                 Fuller and D'Angelo                 

          New Storage Building:
04-1259XX New Construction             2-013-001                         CANCELLED          05/11/05   05/09/05   08/10/04   03/08/04   02 - 16                        0             0  MAC             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HENDRICK HUDSON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-02-03-06
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          High School:
06-0383   Reconstruction               0-001-016  03/09/07     DONE    DONE       DONE      10/30/06   10/27/06   09/19/06   10/24/01   2,4,7,8,9,10,155,15,   1,150,500     1,150,500  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          
  -       Reconstruction               0-001-017                                              /  /       /  /     12/09/08     /  /     9,10                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-1206   Reconstruction               0-001-018  06/08/09     DONE    DONE       DONE      02/18/09   02/10/09   12/09/08   06/18/08   2,4,8,9,10,155,15,16     722,530       722,530  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
09-0426   Reconstruction               0-001-019                         UNREVIEWED         11/18/09   11/12/09   11/05/09   06/18/08   155,15,16                      0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  

          F. G. Lindsey Elementary:
  -    PR Additions and Alterations    0-002-010                                              /  /       /  /     06/22/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -    PR Additions and Alterations    0-002-011                                              /  /       /  /     09/19/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0384   Additions and Alterations    0-002-011  03/09/07     DONE    DONE       DONE      10/30/06   10/27/06   09/19/06   10/24/01   02 - 16                1,169,832     1,169,832  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          
08-1207   Reconstruction               0-002-012  06/09/09     DONE    DONE       DONE      02/18/09   02/10/09   12/09/08   06/18/08   2,4,7,8,9,155,15,16      281,762             0  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
09-0427   Reconstruction               0-002-013                         UNREVIEWED         11/18/09   11/12/09   11/05/09   06/18/08   155,15,16                      0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  

          Furnace Woods Elementary:
06-0385   Additions and Alterations    0-006-007  03/09/07     DONE    DONE       DONE      10/30/06   10/27/06   09/19/06   10/24/01   02 - 16                  504,500       504,500  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          
08-1208   Reconstruction               0-006-008  06/09/09     DONE    DONE       DONE      02/18/09   02/10/09   12/09/08   06/18/08   2,8                      223,146       223,146  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
09-0428   Reconstruction               0-006-009                         UNREVIEWED         11/18/09   11/12/09   12/09/08   06/18/08   155,15,16                      0     6,747,840  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
  -       Reconstruction               0-006-010                                              /  /       /  /       /  /       /  /     155,15,16                      0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Blue Mountain Middle School:
09-0429   Reconstruction               0-007-009                         UNREVIEWED         11/18/09   11/12/09   12/09/08   06/18/08   2,8,9                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
  -       Reconstruction               0-007-010                                              /  /       /  /     11/06/09     /  /     155,15,16                      0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Buchanan-Verplanck Elementary:
08-1209   Reconstruction               0-008-010  06/09/09     DONE    DONE       DONE      02/18/09   02/10/09   12/09/08   06/18/08   2,8,16                   204,146             0  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
  -       Reconstruction               0-008-011                                              /  /       /  /     12/09/08     /  /     16                             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-008-012                                              /  /       /  /     11/06/09     /  /     155,15,16                      0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Administration Bldg:
06-0386   Reconstruction               1-004-006  03/09/07     DONE    DONE       DONE      10/30/06   10/27/06   09/19/06   10/24/01   8,9                      117,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          
  -       Reconstruction               1-004-007                                              /  /       /  /     12/09/08     /  /     2,9,155,15,16                  0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               1-004-008                                              /  /       /  /     11/06/09     /  /     155,15,16                      0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
09-0430   Reconstruction               5-005-005                         UNREVIEWED         11/18/09   11/12/09   12/09/08   06/18/08   16                             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
  -       Reconstruction               5-005-006                                              /  /       /  /     11/06/09     /  /     155,15,16                      0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          District Wide:
08-1407   Reconstruction               7-999-002  05/11/09     DONE    DONE       DONE      03/20/09   03/20/09   12/29/08   06/18/08   10,16                    911,708       911,708  DDJ             0           0      911,708
                                                                                                                                                                                                                                 KSQ Architects,P.C                  


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




EASTCHESTER UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-03-01-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Anne Hutchinson School:
07-1671   Reconstruction               0-001-015  05/07/08     DONE    DONE       DONE      02/23/08   02/20/08   10/29/07   02/06/07   2,4,7,16               1,535,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
04-1403SC Visual Structural Inspection 0-001-SC1  06/10/05     DONE    DONE       DONE      06/09/05   06/09/05     /  /       /  /     16                        10,780        10,780  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Waverly School:
07-1672   Reconstruction               0-002-006  05/07/08     DONE    DONE       DONE      02/23/08   02/20/08   10/25/07   02/06/07   4                        250,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
04-1401SC Visual Structural Inspection 0-002-SC1  06/10/05     DONE    DONE       DONE      06/09/05   06/09/05     /  /       /  /     16                        15,400        15,400  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Eastchester High School:
06-0956   Reconstruction               0-003-017  03/23/07     DONE    DONE       DONE      02/21/07   02/20/07     /  /     02/06/07   2,7,13                 1,500,000     1,500,000  DDJ             0           0      913,951
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-1673   Reconstruction               0-003-018  05/07/08     DONE    DONE       DONE      02/23/08   02/20/08   10/25/07   02/06/07   16                       322,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-2283   Reconstruction               0-003-019  06/30/08     DONE    DONE       DONE      06/30/08   06/16/08     /  /     04/08/08   2                        125,000       125,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-003-021                                              /  /       /  /     07/15/08     /  /     2                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
04-1399SC Visual Structural Inspection 0-003-SC1  06/10/05     DONE    DONE       DONE      06/09/05   06/09/05     /  /       /  /     16                        47,740        47,740  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Middle School:
06-0957   Reconstruction               0-004-015  03/23/07     DONE    DONE       DONE      02/21/07   02/20/07   02/07/07   02/06/07   2,7,13                   740,000       740,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-1674   Reconstruction               0-004-016  05/07/08     DONE    DONE       DONE      02/23/08   02/20/08   11/14/07   02/06/07   16                       153,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
04-1400SC Visual Structural Inspection 0-004-SC1  06/10/05     DONE    DONE       DONE      06/09/05   06/09/05     /  /       /  /     16                        24,640        24,640  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Greenvale Elementary School:
07-1675   Reconstruction               0-006-010  05/07/08     DONE    DONE       DONE      02/23/08   02/20/08   11/14/07   02/06/07   2,4,7,16                 900,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Greenvale MB:
04-1402SC Visual Structural Inspection 0-011-SC1  06/10/05     DONE    DONE       DONE      06/09/05   06/09/05     /  /       /  /     16                        23,100        23,100  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




TUCKAHOE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-03-02-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          William E. Cottle Elementary:
06-0103   Reconstruction               0-001-014  01/09/07     DONE    DONE       DONE      07/24/06   07/21/06   12/08/04   01/10/06   2,4,8,9,155,16           323,057       323,057  DDJ             0           0      192,382
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
06-0925   Reconstruction               0-001-015  06/27/08     DONE    DONE       DONE      02/09/07   02/07/07   11/20/06   07/27/06   8                        285,299             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           
07-0484   Reconstruction               0-001-016  08/01/07     DONE    DONE       DONE      10/03/07   10/01/07   08/02/07   07/20/07   10,16                    125,000       125,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            

          Tuckahoe Middle/High School:
06-0108   Additions and Alterations    0-002-013  01/08/07     DONE    DONE       DONE      07/25/06   07/21/06   12/08/04   01/10/06   02 - 16               13,234,249    11,970,450  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
05-0054   Reconstruction               0-002-014  07/21/05     DONE    DONE       DONE      07/15/05   07/12/05   06/29/05   07/01/05   4                        102,363       102,363  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
06-0926   Reconstruction               0-002-015  06/27/08     DONE    DONE       DONE      02/09/07   02/07/07   11/20/06   07/27/06   8,155                    330,641             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           
07-0017   Reconstruction               0-002-016  07/16/07     DONE    DONE       DONE      07/06/07   07/05/07   06/01/07   06/18/07   2                         93,920        93,920  DDJ             0           0       81,680
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
07-0272   Reconstruction               0-002-017  09/28/07     DONE    DONE       DONE      09/04/07   08/31/07   06/11/07   05/15/07   4                        200,000       200,000  DDJ             0           0      152,800
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
08-1170   Reconstruction               0-002-018  02/06/09     DONE    DONE       DONE      02/06/09   02/06/09     /  /     02/03/09   10,13                    126,000       126,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           
  -       Reconstruction               0-002-019                                              /  /       /  /     07/31/09     /  /     10,15                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Administration @ 29 Elm Street:
04-1049TQ Temporary Quarters           1-004-001  04/11/05     DONE    DONE       DONE      03/29/05   03/29/05   03/17/05     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          PRESS BOX @ TUCKAHOE MIDDLE/HIGH:
06-0134   New Construction             7-005-001  01/08/07     DONE    DONE       DONE      07/31/06   07/28/06   07/25/06   01/10/06   02 - 16                   89,500             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            

          CONCES. BUILDING @ TUCK MIDD/HIGH:
  -    PR New Construction             7-006-001                                              /  /       /  /     07/25/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0135   New Construction             7-006-001  01/08/07     DONE    DONE       DONE      07/31/06   07/28/06   07/25/06   01/10/06   02 - 16                  103,500             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BRONXVILLE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-03-03-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Bronxville School:
04-1412   Reconstruction               0-001-013  08/31/05     DONE    DONE       DONE      06/14/05   06/10/05   03/24/05   05/18/04   16                       237,882       237,882  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
05-0999   Reconstruction               0-001-014  05/23/06     DONE    DONE       DONE      03/21/06   03/20/06   02/15/06   05/18/05   13                       320,561       320,561  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
05-1080   Reconstruction               0-001-015  04/13/06     DONE    DONE       DONE      03/31/06   03/31/06   02/21/06   02/04/06   2,13                   1,745,570     1,745,570  HCM             0           0            0
                                                                                                                                                                                                                                 WBA Group Inc.                      
06-0963   Reconstruction               0-001-016  05/10/07     DONE    DONE       DONE      02/21/07   02/20/07   02/07/07   02/06/07   2,4,7,13                 800,000       800,000  HCM             0           0      489,662
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-0037   Reconstruction               0-001-017  07/10/07     DONE    DONE       DONE      07/10/07   07/10/07   04/17/07   07/10/07   2,155,15,16              450,000       450,000  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-0201   Reconstruction               0-001-018  08/30/07     DONE    DONE       DONE      08/17/07   08/16/07   08/17/07   07/10/07   4,8,9,155,15,16        6,092,772     6,092,772  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-1229   Reconstruction               0-001-019  02/29/08     DONE    DONE       DONE      12/26/07   12/24/07   11/21/07   07/10/07   4,8,9,155,15,16        4,270,439     2,900,000  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-1157   Additions and Alterations    0-001-020  05/13/09     DONE    DONE       DONE      02/02/09   01/28/09   05/27/08   05/20/08   02 - 16                6,607,862             0  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-1227   Reconstruction               0-001-021  05/11/09     DONE    DONE       DONE      02/19/09   02/11/09   10/22/08   10/16/08   2,8,9,10,155,15,16       530,000       530,000  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Temporary Quarters - District Office:
07-0114TQ Temporary Quarters           1-006-001  08/01/07     DONE    DONE       DONE      08/01/07   07/31/07   06/22/07     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




TARRYTOWN UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-01-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Tappan Hill Primary:
04-0619   Reconstruction               0-001-009  03/17/05     DONE    DONE       DONE      01/05/05   01/04/05   08/10/04   05/18/04   7                        450,000       450,000  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Washington Irving Jr. High:
05-0786PR Additions and Alterations    0-002-007                         UNREVIEWED         02/17/06   02/14/06   04/09/03     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
05-0997   Additions and Alterations    0-002-007  01/18/08     DONE    DONE       DONE      03/20/06   02/14/06   04/09/03   03/08/05   02 - 16                6,887,873     6,887,873  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
04-0620   Reconstruction               0-002-009  03/17/05     DONE    DONE       DONE      01/05/05   01/04/05   08/10/04   05/18/04   2,8,9,155,15,16          160,000       160,000  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -    PR Additions and Alterations    0-002-010                                              /  /       /  /     04/23/09     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          John Paulding School:
04-0621   Reconstruction               0-004-008  03/17/05     DONE    DONE       DONE      01/05/05   01/04/05   08/10/04   05/18/04   7,8,16                    85,000        85,000  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Sleepy Hollow High School:
05-0419PR Additions and Alterations    0-005-011                         UNREVIEWED         12/01/05   11/23/05   04/09/03     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
05-0522   Additions and Alterations    0-005-011  05/12/06     DONE    DONE       DONE      12/28/05   11/23/05   04/09/03   03/08/05   02 - 16               66,099,817    51,723,979  JOD             0           0      787,690
                                                                                                                                                                                                                                 Thomas Associates                   

          Winfield L. Morse Elementary:
04-0622   Reconstruction               0-006-009  03/17/05     DONE    DONE       DONE      01/05/05   01/04/05   08/10/04   05/18/04   7,8,16                   880,537       880,537  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Administration Bldg.:
06-1624   Reconstruction               1-003-005  06/19/07     DONE    DONE       DONE      06/15/07   06/15/07   06/04/07   05/14/04   2,155                     75,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          New Bus Garage-Lease RENEWAL:
04-0000   Reconstruction               5-013-L02  11/30/02     DONE    DONE       DONE      04/04/05   04/04/05   04/07/05   05/21/02                            218,038       218,038  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          The Marymount Center:
  -    TQ Temporary Quarters           8-020-001                                              /  /       /  /     12/12/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




IRVINGTON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-02-02
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Irvington MS:
08-1504   Reconstruction               0-001-012  07/06/09     DONE    DONE       DONE      04/14/09   04/10/09   04/10/08   05/20/08   10,155,16                156,000             0  DDJ             0           0      156,000
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Dows Lane Elementary:
08-1505   Reconstruction               0-002-013  07/06/09     DONE    DONE       DONE      04/14/09   04/10/09   04/10/08   05/20/08   4,16                      67,781             0  DDJ             0           0       67,781
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Middle School Gymnasium:
08-1506   Reconstruction               0-004-003  07/06/09     DONE    DONE       DONE      04/14/09   04/10/09   02/18/09   05/20/08   8,9,10,13,155,16         303,900       303,900  DDJ             0           0      234,000
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Irvington High School:
  -       Reconstruction               0-007-012                                              /  /       /  /     09/08/05     /  /     2,155                          0    16,060,522  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-007-013                                              /  /       /  /     04/10/08     /  /     10,16                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          New Middle School:
  -       Reconstruction               0-013-002                                              /  /       /  /     04/10/08     /  /     10,16                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Arts and Athletic Bldg.:
  -       Reconstruction               0-014-002                                              /  /       /  /     06/20/08     /  /     9                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          :
  -       New Construction             2-018-001                                              /  /       /  /     09/08/05     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       New Construction             2-019-001                                              /  /       /  /     09/08/05     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




DOBBS FERRY UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-03-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Dobbs Ferry Mid./High School:
05-1198   Reconstruction               0-001-006  11/28/06     DONE    DONE       DONE      04/24/06   04/24/06   04/24/06   03/30/06   7,15,16                2,410,925     2,410,925  HCM             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
  -       Reconstruction               0-001-007                                              /  /       /  /     03/26/07     /  /     2,4,16                         0    25,844,280  HCM             0           0            0
                                                                                                                                                                                                                                                                     
08-1228   Reconstruction               0-001-008  04/28/09     DONE    DONE       DONE      02/19/09   02/13/09   04/18/07   05/15/07   2,4,7,8,9,10,155,15,   1,043,701     1,043,701  HCM             0           0      441,593
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-001-009                                              /  /       /  /     06/20/08     /  /     155                            0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
08-0856   Reconstruction               0-001-010  12/10/08     DONE    DONE       DONE      12/04/08   12/01/08     /  /     11/24/08   2                         49,800        49,800  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-001-011                                              /  /       /  /     01/26/09     /  /     2,8,9,10,155,15,16             0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-0780SC Visual Structural Inspection 0-001-SC1  02/27/07     DONE    DONE       DONE      02/16/07   02/16/07     /  /       /  /     16                         1,725         1,725  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0782SC Visual Structural Inspection 0-001-SC2  03/12/07     DONE    DONE       DONE      03/09/07   03/09/07     /  /       /  /     16                           638           638  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Springhurst Elementary:
05-1199   Reconstruction               0-004-011  11/28/06     DONE    DONE       DONE      04/24/06   04/24/06   04/24/06   03/30/06   15,16                    264,596       264,596  HCM             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
  -       Reconstruction               0-004-012                                              /  /       /  /     06/20/08     /  /     155                            0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
08-0074   Reconstruction               0-004-013  07/25/08     DONE    DONE       DONE      07/22/08   07/16/08   06/20/08   05/20/08   4,8,9,155,15,16           82,900        82,900  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-0785   Reconstruction               0-004-014  04/13/09     DONE    DONE       DONE      11/21/08   11/20/08   10/22/08     /  /     2,16                     365,000       365,000  HCM             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -       Reconstruction               0-004-015                                              /  /       /  /     08/14/09     /  /     2                              0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          DISTRICTWIDE:
  -       Reconstruction               7-999-001                                              /  /       /  /     03/24/06     /  /     16                             0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HASTINGS ON HUDSON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-04-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Farragut School Complex:
07-0697   Reconstruction               0-001-025  04/21/08     DONE    DONE       DONE      11/02/07   11/01/07   03/05/07   05/15/07   4,9,10,155,16            378,300       378,300  HCM             0           0      217,912
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
08-0154   Reconstruction               0-001-026  11/24/08     DONE    DONE       DONE      08/13/08   08/06/08   10/17/07   05/15/07   4,13                      75,600             0  HCM             0           0       43,583
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
  -       Reconstruction               0-001-027                                              /  /       /  /     10/01/09     /  /     2,8,155,15,16                  0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-1648SC Visual Structural Inspection 0-001-SC1  07/09/07     DONE    DONE       DONE      06/19/07   06/19/07     /  /       /  /     16                         8,725             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Hillside Elementary:
07-0698   Reconstruction               0-002-017  04/21/08     DONE    DONE       DONE      11/02/07   11/01/07   03/05/07   05/15/07   4,9,10,155,16            209,500       209,500  HCM             0           0      110,000
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
08-0933   Additions and Alterations    0-002-018  07/28/09     DONE    DONE       DONE      12/16/08   12/11/08   10/17/07   05/15/07   02 - 16                  244,569             0  HCM             0           0      151,495
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
  -       Reconstruction               0-002-019                                              /  /       /  /     10/01/09     /  /     2,155,15,16                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ARDSLEY UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-05-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Concord Road Elementary:
05-0804   Reconstruction               0-002-016  08/25/06     DONE    DONE       DONE      02/22/06   02/22/06   03/14/02   03/11/03   2,4,8,9,155,15,16      1,500,000     1,500,000  MAC             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
07-1112   Reconstruction               0-002-017  05/27/08     DONE    DONE       DONE      12/13/07   12/12/07   11/21/07   05/15/07   2,9,155,15,16            768,651       768,651  HCM             0           0      520,377
                                                                                                                                                                                                                                 Fuller And D'angelo                 
07-1615   Reconstruction               0-002-018  02/20/08     DONE    DONE       DONE      02/14/08   02/11/08   01/17/08   01/30/08   2,9                       60,000        60,000  HCM             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Ardsley Jr/Sr High School:
08-0889   Reconstruction               0-003-022  04/15/09     DONE    DONE       DONE      12/09/08   12/08/08   04/22/08   05/20/08   10,13,15,16              350,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Ardsley Middle School:
06-1554   Reconstruction               0-006-021  06/21/07     DONE    DONE       DONE      05/30/07   05/29/07   04/10/07   05/15/07   155                      330,000       330,000  HCM             0           0      223,410
                                                                                                                                                                                                                                 Fuller and D'Angelo                 

          Press Box:
  -    DB Discovered Building          7-012-001                                              /  /       /  /     05/19/06     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




EDGEMONT UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-06-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Seely Place Elementary:
07-1016   Reconstruction               0-001-013  09/23/08     DONE    DONE       DONE      12/03/07   12/03/07   10/02/07   01/10/07   16                       281,621             0  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          Edgemont High / Building A:
07-1017   Reconstruction               0-002-012  09/23/08     DONE    DONE       DONE      12/03/07   12/03/07   10/02/07   01/10/07   2,15,16                   92,673             0  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          Edgemont HS/Building B.:
07-0585   Reconstruction               0-004-005  11/26/08     DONE    DONE       DONE      10/18/07   10/17/07   02/05/07   05/22/07   2,4,7,8,9,155,15,16      880,000       880,000  JOD             0           0      613,360
                                                                                                                                                                                                                                 Fuller And D'angelo                 
07-1018   Reconstruction               0-004-006  09/23/08     DONE    DONE       DONE      12/03/07   12/03/07   10/02/07   01/10/07   2,7,8,155,15,16          957,643             0  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
  -       Reconstruction               0-004-007                                              /  /       /  /     11/05/09     /  /     2,4,8,9,155,15,16              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          H. S. Math Unit - Building C:
07-1019   Reconstruction               0-005-004  09/23/08     DONE    DONE       DONE      12/03/07   12/03/07   10/02/07   01/10/07   2,7,15,16                279,802             0  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
07-2215   Reconstruction               0-005-005  08/26/08     DONE    DONE       DONE      06/05/08   05/27/08   03/27/08   05/20/07   2                         80,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          High School Building D:
07-0263   Reconstruction               0-006-005  10/29/07     DONE    DONE       DONE      09/04/07   08/30/07   04/30/07   05/22/07   2,7,155                  111,000       111,000  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
07-1020   Reconstruction               0-006-006  09/23/08     DONE    DONE       DONE      12/03/07   12/03/07   10/02/07   01/10/07   2,155,15,16              147,663             0  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          Edgemont H S Gym Building:
07-1021   Reconstruction               0-007-005  09/23/08     DONE    DONE       DONE      12/03/07   12/03/07   04/30/07   01/10/07   2,4,7,8,155              215,806             0  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
07-1700   Reconstruction               0-007-006  11/10/08     DONE    DONE       DONE      02/25/08   02/22/08   10/02/07   05/22/07   2,7                      845,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Greenville Elementary School:
05-1254   Reconstruction               0-008-010  05/30/06     DONE    DONE       DONE      05/09/06   05/05/06   12/18/03   03/07/06   7                        170,250       160,500  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
04-1443   Reconstruction               0-008-011  07/25/05     DONE    DONE       DONE      06/20/05   06/17/05   04/21/05   05/10/05   2                        420,000       420,000  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
07-1022   Reconstruction               0-008-012  09/23/08     DONE    DONE       DONE      12/03/07   12/03/07   10/02/07   01/10/07   2,155,15,16              952,886             0  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
07-1942   Reconstruction               0-008-014  04/17/08     DONE    DONE       DONE      04/14/08   04/03/08   03/14/08   05/20/07   2,7                      251,144       316,000  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
08-1424   Reconstruction               0-008-015  04/10/09     DONE    DONE       DONE      03/24/09   03/23/09   02/18/09     /  /     2,7                      778,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          High School Arts Building:
07-1023   Reconstruction               0-009-005  09/23/08     DONE    DONE       DONE      12/03/07   12/03/07   10/02/07   01/10/07   2,15,16                   63,136             0  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          High School Resource Building:
07-1024   Reconstruction               0-010-004  09/23/08     DONE    DONE       DONE      12/03/07   12/03/07   10/02/07   01/10/07   2,15,16                  119,855             0  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          H.S. Administration Building:
04-1442   Reconstruction               0-011-007  07/15/05     DONE    DONE       DONE      06/20/05   06/17/05   04/21/05   05/10/05   2                         30,609        30,609  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
07-1025   Reconstruction               0-011-008  09/23/08     DONE    DONE       DONE      12/03/07   12/03/07   10/02/07   01/10/07   2,155,15,16              337,399             0  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          High School Building E:
07-1026   Reconstruction               0-016-002  09/23/08     DONE    DONE       DONE      12/03/07   12/03/07   10/02/07   01/10/07   16                        42,152             0  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GREENBURGH CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-07-06
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Richard Bailey Elementary Sch.:
08-1169   Reconstruction               0-005-010  03/11/09     DONE    DONE       DONE      02/06/09   01/30/09   12/04/07   10/02/07   2,7,10                   150,000             0  MGL             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Woodlands Junior Senior High:
08-1340   Reconstruction               0-007-011  06/10/09     DONE    DONE       DONE      03/12/09   03/05/09     /  /     06/03/08   8,9,155,16               296,600             0  JOD             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-1339   Reconstruction               0-007-012  06/10/09     DONE    DONE       DONE      03/12/09   03/05/09     /  /     01/15/08   9,10,16                  590,700             0  JOD             0           0      590,700
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-1345SC Visual Structural Inspection 0-007-SC1  03/16/09     DONE    DONE       DONE      10/21/08   10/21/08     /  /       /  /     16                         2,213             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-1346SC Visual Structural Inspection 0-007-SC2  03/16/09     DONE    DONE       DONE      10/21/08   10/21/08     /  /       /  /     16                         5,892             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Administration Bldg:
05-1411   Reconstruction               0-012-005  06/30/06     DONE    DONE       DONE      06/22/06   06/21/06   06/01/06   06/06/06   2,4,155                  600,000       498,170  MGL             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ELMSFORD UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-09-02
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Hamilton High School:
05-1305   Reconstruction               0-001-014  06/01/06     DONE    DONE       DONE      05/31/06   05/31/06   05/22/06   05/17/06   2,155,15,16              117,808       117,808  HCM             0           0       87,358
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Alice E. Grady Elementary:
05-1306   Reconstruction               0-002-008  06/01/06     DONE    DONE       DONE      05/31/06   05/31/06   05/22/06   05/17/06   2,155                    183,583       183,583  HCM             0           0      135,554
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Carl L Dixon School:
05-1307   Reconstruction               0-004-005  06/01/06     DONE    DONE       DONE      05/31/06   05/31/06   05/22/06   05/17/06   2,155                    106,044       106,044  HCM             0           0       78,320
                                                                                                                                                                                                                                 Fuller And D'angelo                 


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GREENBURGH-GRAHAM UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-10-02
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          New Elementary School:
  -       Reconstruction               0-008-003                                              /  /       /  /     05/04/05     /  /     2,8,16                         0     7,552,125  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GREENBURGH-NO.CASTLE(ST. CHRISTOPHER STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-04-12-02
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Gym:
  -       Reconstruction               0-002-001                                              /  /       /  /     09/14/92     /  /     2                              0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HARRISON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-05-01-06
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Purchase St. Elementary:
08-1642   Reconstruction               0-001-017  05/29/09     DONE    DONE       DONE      05/19/09   05/15/09   03/02/09   05/20/08   2                         30,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan

          Klein Middle School:
06-1363   Reconstruction               0-003-025  06/19/07     DONE    DONE       DONE      04/26/07   04/25/07   03/30/07   05/15/07   2                         44,376             0  DDJ             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
08-1415   Reconstruction               0-003-026  05/21/09     DONE    DONE       DONE      03/23/09   03/23/09   01/26/09   05/20/08   2,9                       20,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
08-1643   Reconstruction               0-003-027  05/29/09     DONE    DONE       DONE      05/19/09   05/15/09   03/02/09   05/20/08   8                         50,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan

          Harrison Ave. School:
05-1319   Reconstruction               0-004-017  06/20/06     DONE    DONE       DONE      06/06/06   06/05/06   03/24/06   05/16/06   2,8,9,155,15,16          262,094       262,094  DDJ             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
  -       Reconstruction               0-004-018                                              /  /       /  /     05/18/06     /  /     8,9,155,15,16                  0     7,518,700  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-004-019                                              /  /       /  /     05/18/06     /  /     2                              0     7,518,700  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-004-020                                              /  /       /  /     03/02/09     /  /     2,4                            0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Parsons Memorial:
  -       Reconstruction               0-006-022                                              /  /       /  /     11/06/06     /  /     4                              0     5,649,766  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-1416   Reconstruction               0-006-023  05/21/09     DONE    DONE       DONE      03/23/09   03/23/09   01/08/09     /  /     2,4,16                    45,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
  -       Reconstruction               0-006-024                                              /  /       /  /     03/02/09     /  /     8                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Preston School:
  -       Reconstruction               0-007-017                                              /  /       /  /     03/02/09     /  /     4                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-007-018                                              /  /       /  /     03/02/09     /  /     10                             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Harrison High School:
06-0461   Reconstruction               0-011-013  12/17/06     DONE    DONE       DONE      11/10/06   11/09/06   11/09/06   09/20/06   2                      1,000,000     1,000,000  DDJ             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
06-1537   Reconstruction               0-011-014  06/11/07     DONE    DONE       DONE      05/24/07   05/23/07   03/30/07   05/15/07   2                         78,627        78,627  DDJ             0           0       75,510
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
07-0084   Reconstruction               0-011-015  08/23/07     DONE    DONE       DONE      07/24/07   07/23/07   04/04/07   05/15/07   9,10,13,16             1,152,563     1,152,563  DDJ             0           0    1,008,493
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
08-0085   Alterations                  0-011-016  09/15/08     DONE    DONE       DONE      07/22/08   07/17/08   05/14/08   09/20/06   02 - 16                   91,900             0  DDJ             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
  -       Reconstruction               0-011-017                                              /  /       /  /     03/10/09     /  /     2                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-1644   Reconstruction               0-011-018  05/29/09     DONE    DONE       DONE      05/19/09   05/15/09   04/27/09   05/20/08   2                         20,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
  -       Reconstruction               0-011-019                                              /  /       /  /     10/22/09     /  /     2,4,8,9,10,155,15,16           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Storage Bldg @ Klein MS:
05-1320   New Construction             2-027-001  06/20/06     DONE    DONE       DONE      06/06/06   06/05/06   03/27/06   05/17/05   02 - 16                1,015,244             0  DDJ             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan

          PURCHASE STORAGE BUILDING:
  -    DB Discovered Building          2-028-001                                              /  /       /  /     05/19/06     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Press Box w/Grandstand @ HS:
06-0606   New Construction             7-029-001  09/22/09     DONE    DONE       DONE      12/11/06   12/11/06   07/20/06   11/01/06   02 - 16                1,322,244             0  DDJ             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MAMARONECK UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-07-01-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Mamaroneck High School:
04-1109   Reconstruction               0-001-020  05/04/05     DONE    DONE       DONE      04/07/05   04/04/05   10/02/98   06/13/01   2,16                     468,974       468,974  DDJ             0           0            0
                                                                                                                                                                                                                                 Quality Environmental Solutions & Te
04-1263   Reconstruction               0-001-024  06/10/05     DONE    DONE       DONE      05/13/05   05/09/05   02/28/01   06/13/01   8,9,10,155,16          1,336,255     1,336,255  DDJ             0           0            0
                                                                                                                                                                                                                                 THE GEDDIS PARTNERSHIP              
04-1327   Reconstruction               0-001-025  09/29/06     DONE    DONE       DONE      05/25/05   05/23/05   04/11/05   06/13/01   8,9,10,155,15,16      10,000,000    10,000,000  DDJ             0           0            0
                                                                                                                                                                                                                                 The Geddis Partnership              
07-1097   Reconstruction               0-001-026  01/23/08     DONE    DONE       DONE      12/12/07   12/11/07   09/13/07   06/19/07   4,10                     222,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      
07-0734   Reconstruction               0-001-027  01/23/08     DONE    DONE       DONE      11/06/07   11/05/07   09/13/07     /  /     7,10                     343,750             0  DDJ             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      
07-0728   Reconstruction               0-001-028  01/23/08     DONE    DONE       DONE      11/06/07   11/05/07   09/13/07     /  /     4,13                     163,350             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-0433   Reconstruction               0-001-029  02/05/09     DONE    DONE       DONE      10/02/08   09/30/08   07/17/08   05/20/08   2,9                       16,825        16,825  DDJ             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      
09-0277   Reconstruction               0-001-030  11/05/09     DONE    DONE       DONE      10/02/09   10/02/09   06/19/09   05/19/09   7                      1,970,137             0  DDJ             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      
09-0264   Reconstruction               0-001-031  10/28/09     DONE    DONE       DONE      09/24/09   09/23/09   08/07/09   05/19/09   155                      232,200             0  DDJ             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      
  -       Reconstruction               0-001-032                                              /  /       /  /     11/06/09     /  /     2,13                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Central School:
04-1304   Reconstruction               0-003-012  08/26/05     DONE    DONE       DONE      05/20/05   05/18/05   02/28/01   04/21/05   155,16                   306,200       306,200  DDJ             0           0            0
                                                                                                                                                                                                                                 LAN Assoc.                          
  -       Reconstruction               0-003-013                                              /  /       /  /     06/19/09     /  /     7,155                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Mamaroneck Ave. Elementary:
04-0005   Additions and Alterations    0-004-012  11/22/04     DONE    DONE       DONE      07/01/04   06/30/04   11/24/92   06/13/01   02 - 16                9,250,250     6,436,135  MAC             0           0            0
                                                                                                                                                                                                                                 The Geddis Partnership              
  -       Reconstruction               0-004-023                                              /  /       /  /     08/12/08     /  /     2,9                            0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Chatsworth Avenue School:
08-0434   Reconstruction               0-005-014  02/05/09     DONE    DONE       DONE      10/02/08   09/30/08   07/17/08   05/20/08   2,9                       34,525             0  DDJ             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      
09-0272   Reconstruction               0-005-015  11/05/09     DONE    DONE       DONE      09/28/09   09/28/09   06/17/09   05/19/09   7                        786,714             0  DDJ             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      

          Murray Avenue Elementary:
08-0435   Reconstruction               0-007-018  02/05/09     DONE    DONE       DONE      10/02/08   09/30/08   07/17/08   05/20/08   2,9                       16,825             0  DDJ             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      

          Hommocks Junior High School:
  -       Reconstruction               0-011-021                                              /  /       /  /     01/21/05     /  /     2,4,7,8,9,10,13,155,           0    25,397,147  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
09-0401   Reconstruction               0-011-022                         UNREVIEWED         11/06/09   11/05/09   06/19/09   05/19/09   7,8,155                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      
  -    PR Additions and Alterations    0-011-023                                              /  /       /  /     10/02/09     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
09-0355   Reconstruction               0-011-024  11/05/09     DONE    DONE       DONE      10/27/09   10/23/09   10/05/09   05/19/09   2                        131,597             0  DDJ             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MOUNT PLEASANT STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-08-01-06
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Hawthorne Elementary:
07-2285   Reconstruction               0-002-009  05/20/09     DONE    DONE       DONE      07/01/08   06/13/08   05/18/06   05/17/05   13                       106,000       106,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Warren & Panzer Engineers, P.C.     

          Westlake HS:
05-1073   Reconstruction               0-005-011                       ADDENDUM REQ'D       03/31/06   03/29/06   07/22/05     /  /     8,9,155,15,16                  0    24,770,232  DDJ             0           0            0
                                                                                                                                                                                                                                 Michael J. Mcgarvey,P.E.,P.C        

          Westlake Middle School:
07-2284   Reconstruction               0-006-008  12/15/08     DONE    DONE       DONE      07/01/08   06/13/08   01/08/07   03/20/07   8,9,155,15,16            300,000       300,000  DDJ             0           0      300,000
                                                                                                                                                                                                                                 Dimovski Architecture PLLC          

          District Wide:
  -       Reconstruction               7-999-002                                              /  /       /  /     02/01/07     /  /     10,16                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




POCANTICO HILLS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-08-02-04
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Pocantico Hills Central:
06-0240   Reconstruction               0-001-025  11/08/06     DONE    DONE       DONE      09/27/06   09/26/06   06/19/06   05/16/06   10                       450,000       450,000  DDJ             0           0      106,392
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
08-1306   Reconstruction               0-001-026  09/18/09     DONE    DONE       DONE      03/02/09   02/25/09   09/13/07   01/23/08   2,4,7,8,9,14,155,15,  18,000,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HAWTHORNE-CEDAR KNOLLS UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-08-03-02
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Cafeteria:
05-0659TQ Temporary Quarters           0-013-001  02/21/06     DONE    DONE       DONE      01/25/06   01/25/06   05/12/89     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MT PLEASANT COTTAGE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-08-04-02
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Cottage School Bldg:
  -       Reconstruction               0-007-008                                              /  /       /  /     03/01/06     /  /     4,8,13,155,16                  0     9,171,252  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Edenwald Diagnostic:
  -       Reconstruction               0-009-002                                              /  /       /  /     03/01/06     /  /     8,13,155,16                    0     2,097,750  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Goodman Cometology Building:
08-1490DB Discovered Building          0-011-001  10/20/09     DONE    DONE       DONE      04/13/09   04/01/09   04/07/09     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




VALHALLA UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-08-05-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Valhalla Jr/Sr High School:
05-1072   Reconstruction               0-001-011  06/12/06     DONE    DONE       DONE      03/31/06   03/27/06   03/31/06   10/25/05                            220,000       220,000  RDR             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-1260   Reconstruction               0-001-012  01/31/08     DONE    DONE       DONE      12/31/07   12/27/07   04/04/07   05/15/07   8,9,10                   300,000       300,000  MGL             0           0      300,000
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-001-013                                              /  /       /  /     07/30/07     /  /     2,7                            0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
07-1707   Reconstruction               0-001-014  06/04/08     DONE    DONE       DONE      02/25/08   02/21/08   10/23/07   10/16/07   2,4,7,10,13,16         3,990,000     3,990,000  MGL             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-1075   Reconstruction               0-001-015  12/31/07     DONE    DONE       DONE      12/07/07   12/06/07   12/06/07   05/15/07   9,16                     185,000       185,000  MGL             0           0      185,000
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-1371SC Visual Structural Inspection 0-001-SC1  03/17/09     DONE    DONE       DONE      02/23/09   02/23/09     /  /       /  /     16                        13,986             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Virginia Road Elementary:
  -       Reconstruction               0-003-010                                              /  /       /  /     04/04/07     /  /     10,16                          0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
08-1464   Reconstruction               0-003-011  04/20/09     DONE    DONE       DONE      04/08/09   04/06/09   02/25/09   05/20/08   2,9                       70,435             0  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Columbus Avenue Elementary:
05-0998XX Reconstruction               0-004-011                         CANCELLED          03/21/06   03/13/06   03/20/06   06/28/05   9                              0     2,277,092  MGL             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          New Elementary Bldg.:
  -       Reconstruction               0-006-002                                              /  /       /  /     04/04/07     /  /     10,16                          0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
  -    PR Additions and Alterations    0-006-003                                              /  /       /  /     12/02/08     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Garage:
07-1957DB Discovered Building          2-007-001  04/08/09     DONE    DONE       DONE      04/14/08   03/28/08   10/01/04     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Storage Bldg. #1:
07-1958DB Discovered Building          2-008-001  04/08/09     DONE    DONE       DONE      04/14/08   03/28/08   10/01/04     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Storage Bldg. #3:
07-1959DB Discovered Building          2-009-001  04/08/09     DONE    DONE       DONE      04/14/08   03/28/08   10/01/04     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Special Education Storage Bldg.:
07-1960DB Discovered Building          2-010-001                       ADDENDUM REQ'D       04/14/08   03/28/08   10/01/04     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Storage #2:
07-1961DB Discovered Building          2-011-001  04/08/09     DONE    DONE       DONE      04/14/08   03/28/08   08/01/07     /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Press Box @ Jr. / Sr. High School:
  -    PR New Construction             7-012-001                                              /  /       /  /     06/20/08     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PLEASANTVILLE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-08-09-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          High School:
05-0067   Reconstruction               0-001-010  08/17/05     DONE    DONE       DONE      07/29/05   07/27/05   05/02/05   05/17/05   7                         90,800        90,800  RDR             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
06-0602   Reconstruction               0-001-011  11/16/06     DONE    DONE       DONE      12/08/06   12/07/06   10/20/06   10/17/06   155                      250,000       250,000  MGL             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-1101PR Additions and Alterations    0-001-012               STARTED                      12/12/07     /  /     08/10/07     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-2213   Additions and Alterations    0-001-012  12/05/08     DONE    DONE       DONE      06/03/08   05/22/08   08/10/07   03/20/07   02 - 16               36,900,000    25,939,648  MGL             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-2212   Reconstruction               0-001-013  08/06/08     DONE    DONE       DONE      06/03/08   05/20/08     /  /     03/20/07   16                       590,000       350,000  JOD             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Middle School:
08-0314   Reconstruction               0-003-015  03/09/09     DONE    DONE       DONE      09/11/08   09/09/08   05/27/08   01/21/08   10,16                    680,000       500,294  JOD             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
08-1187   Reconstruction               0-003-016  06/11/09     DONE    DONE       DONE      02/10/09   02/04/09   07/16/08   03/11/08   2,8,155,16               645,000       645,000  JOD             0           0      393,424
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-1194   Reconstruction               0-003-017  04/02/09     DONE    DONE       DONE      02/10/09   02/04/09   10/07/08   03/11/08   10,16                     87,500        87,500  JOD             0           0       53,401
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Modular @ Pleasantville High School:
05-0188   New Construction             0-010-001  10/10/06     DONE    DONE       DONE      09/13/05   09/10/05   02/04/05   05/17/05   02 - 16                   50,985        50,985  MGL             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-1192   Additions and Alterations    0-010-002  04/22/09     DONE    DONE       DONE      02/10/09   02/04/09   07/17/08   03/20/07   02 - 16                   24,500             0  JOD             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          PLEASANTVILLE RELOCATABLE CLASSROOM:
  -    PR New Construction             0-011-001                                              /  /       /  /     05/10/06     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
05-1376   New Construction             0-011-001  07/24/06     DONE    DONE       DONE      06/19/06   06/08/06   05/10/06   05/17/05   02 - 16                   49,599        49,599  RDR             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
08-1193   Reconstruction               0-011-002  04/22/09     DONE    DONE       DONE      02/10/09   02/04/09   07/17/08   03/20/07   8,9,155,16                11,800             0  JOD             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Middle School / HS Field House (New):
08-1404   New Construction             7-012-001                       ADDENDUM REQ'D       03/20/09   03/16/09   07/16/08   03/11/08   02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MOUNT VERNON CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-09-00-01
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          William Holmes #17:
  -       Reconstruction               0-001-009                                              /  /       /  /     02/18/09     /  /     2,8,155,16                     0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Thornton HS (fmly ES):
05-0719   Additions and Alterations    0-003-007  06/13/06     DONE    DONE       DONE      02/13/06   02/13/06   02/04/00   03/28/00   02 - 16                3,496,993     3,496,993  HCM             0           0            0
                                                                                                                                                                                                                                 D'Amore Design Studio               
  -    PR Additions and Alterations    0-003-009                                              /  /       /  /     04/06/05     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-003-010                                              /  /       /  /     02/18/09     /  /     2,10,14,155,15,16              0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Cecil Parker Elementary:
02-1018   Additions and Alterations    0-004-007  11/24/04     DONE    DONE       DONE      01/02/03   12/24/02   02/04/00   03/28/00   02 - 16                3,591,840     1,547,822  MGL             0           0            0
                                                                                                                                                                                                                                 Mount Vernon School Architects      
  -       Reconstruction               0-004-008                                              /  /       /  /     04/06/05     /  /     7                              0     5,165,069  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-004-009                                              /  /       /  /     02/18/09     /  /     2,7,8,155,15,16                0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Hamilton School #5:
  -       Reconstruction               0-006-007                                              /  /       /  /     02/18/09     /  /     2,155,16                       0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          William Elem(fmly Fulton):
  -       Reconstruction               0-008-008                                              /  /       /  /     02/18/09     /  /     2,4,7,8,155,16                 0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Graham Elem. Magnet:
  -       Reconstruction               0-009-011                                              /  /       /  /     02/18/09     /  /     2,4,7,8,155,15,16              0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Mandela HS (was Columbus):
06-1498   Reconstruction               0-010-007                       ADDENDUM REQ'D       05/15/07   05/15/07   01/08/07   03/19/06   2,10,15,16                     0     5,417,244  HCM             0           0            0
                                                                                                                                                                                                                                 Mount Vernon School Architects      
  -       Reconstruction               0-010-008                                              /  /       /  /     02/18/09     /  /     2,7,10,155,16                  0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          A.B. Davis HS Annex:
  -       Reconstruction               0-011-011                                              /  /       /  /     01/10/05     /  /     2,8,9,155,15,16                0       939,840  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-1353   Reconstruction               0-011-012  04/18/08     DONE    DONE       DONE      04/24/07   04/19/07   01/08/07   03/19/06   7                        500,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Mount Vernon School Architects      
  -       Reconstruction               0-011-013                                              /  /       /  /     02/18/09     /  /     2,7,10,155,16                  0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-0508SC Visual Structural Inspection 0-011-SC1  11/17/06     DONE    DONE       DONE      11/02/06   11/02/06     /  /       /  /     16                        65,062        65,062  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Longfellow Elementary:
  -       Reconstruction               0-013-009                                              /  /       /  /     02/18/09     /  /     2,7,155,16                     0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Columbus ES (was Franko)(was Nichols:
  -    PR Additions and Alterations    0-014-013                                              /  /       /  /     04/06/05     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-014-014                                              /  /       /  /     02/18/09     /  /     2,155,16                       0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Pennington Elementary:
  -    PR Additions and Alterations    0-015-010                                              /  /       /  /     04/24/08     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-015-011                                              /  /       /  /     02/18/09     /  /     2,7,8,155,15,16                0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Mount Vernon High School:
  -    PR Additions and Alterations    0-017-015                                              /  /       /  /     04/06/05     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-1345   Reconstruction               0-017-016  07/12/07     DONE    DONE       DONE      04/23/07   04/19/07   01/08/07   03/19/06   10                     1,500,000     1,500,000  HCM             0           0            0
                                                                                                                                                                                                                                 Mount Vernon School Architects      
07-1716   Reconstruction               0-017-017               DONE    DONE       ADD. REQ'D02/28/08   02/26/08   01/18/07   06/20/06   155                            0    83,221,938  HCM             0           0            0
                                                                                                                                                                                                                                 Mount Vernon School Architects      
  -       Reconstruction               0-017-018                                              /  /       /  /     02/18/09     /  /     2,7,8,13,155,15,16             0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-017-019                                              /  /       /  /     09/15/09     /  /     2,10,16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Traphagen Elementary:
  -       Reconstruction               0-018-007                                              /  /       /  /     02/18/09     /  /     2,155                          0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Lincoln Elementary:
  -       Reconstruction               0-019-005                                              /  /       /  /     02/18/09     /  /     2,155,15,16                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Longfellow Middle School:
  -       Reconstruction               0-025-002                                              /  /       /  /     01/17/08     /  /     155                            0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-025-003                                              /  /       /  /     05/28/09     /  /     10                             0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-0507SC Visual Structural Inspection 0-025-SC1  11/17/06     DONE    DONE       DONE      11/02/06   11/02/06     /  /       /  /     16                        94,956        94,956  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Grimes Elementary School:
05-0193   Additions and Alterations    0-029-002  01/06/06     DONE    DONE       DONE      09/14/05   09/12/05   04/06/05   03/28/00   02 - 16                  778,700             0  HCM             0           0            0
                                                                                                                                                                                                                                 Mount Vernon School Architects      
  -    PR Additions and Alterations    0-029-003                                              /  /       /  /     06/23/06     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
05-1417   Additions and Alterations    0-029-003  03/07/07     DONE    DONE       DONE      06/27/06   06/23/06   06/23/06   03/28/00   02 - 16                2,584,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Mount Vernon School Architects      
  -    PR Additions and Alterations    0-029-004                                              /  /       /  /     02/18/09     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-0506SC Visual Structural Inspection 0-029-SC1  11/17/06     DONE    DONE       DONE      11/02/06   11/02/06     /  /       /  /     16                        55,472        55,472  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Education Center:
  -       Reconstruction               1-002-005                                              /  /       /  /     02/18/09     /  /     16                             0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          :
  -       New Construction             2-033-001                                              /  /       /  /     07/01/05     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          District Wide:
  -       Reconstruction               7-999-004                                              /  /       /  /     08/11/05     /  /     16                             0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               7-999-005                                              /  /       /  /     08/11/05     /  /     16                             0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Rose - Y:
01-0940TQ Temporary Quarters           8-031-001  09/01/05     DONE    DONE       DONE      03/04/02     /  /       /  /       /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Allen Memorial:
06-0084XX Alterations                  8-034-001                         CANCELLED          07/19/06   07/12/06   03/10/06     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CHAPPAQUA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-10-04-06
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Greely HS Building A (Gym Bldg):
07-0547   Reconstruction               0-001-015  03/03/08     DONE    DONE       DONE      10/12/07   10/12/07   03/26/07   05/15/07   2,4,7,8,9,155,15,16    1,813,226     1,369,227  JOD             0           0      900,254
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-0624   Reconstruction               0-001-016  03/03/08     DONE    DONE       DONE      10/26/07   10/24/07   10/11/07   05/15/07   2,8,9,13,16              441,790       720,000  JOD             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-001-017                                              /  /       /  /     07/30/09     /  /     2,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Grafflin Kindergarten:
  -       Reconstruction               0-002-005                                              /  /       /  /     07/30/09     /  /     2,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Bell School:
07-0548   Reconstruction               0-009-013  03/03/08     DONE    DONE       DONE      10/12/07   10/12/07   03/26/07   05/15/07   2,4,7,8,9,155,15,16      917,659       738,773  JOD             0           0      455,612
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-009-014                                              /  /       /  /     07/28/09     /  /     2,155,16                       0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Roaring Brook School:
  -       Reconstruction               0-010-008                                              /  /       /  /     07/28/09     /  /     2,8,155,15,16                  0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Douglas G. Grafflin:
  -       Reconstruction               0-012-006                                              /  /       /  /     07/30/09     /  /     2,8,155,15,16                  0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          West Orchard Elementary:
  -       Reconstruction               0-013-006                                              /  /       /  /     07/30/09     /  /     2,8,155,15,16                  0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-013-007                                              /  /       /  /     09/22/09     /  /     4                              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Greeley HS Bldg.:
  -       Reconstruction               0-015-002                                              /  /       /  /     07/28/09     /  /     2,8,155,15,16                  0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Greeley HS  Bldg. C:
  -       Reconstruction               0-016-004                                              /  /       /  /     07/30/09     /  /     2,8,155,15,16                  0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Greeley HS   Bldg.D:
  -       Reconstruction               0-017-004                                              /  /       /  /     07/30/09     /  /     2,8,155,15,16                  0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Greeley Bldg:
  -       Reconstruction               0-018-004                                              /  /       /  /     07/30/09     /  /     2,8,155,15,16                  0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Greeley HS   Bldg K:
  -       Reconstruction               0-024-003                                              /  /       /  /     07/30/09     /  /     2,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Greeley HS   Bldg L:
  -       Reconstruction               0-025-003                                              /  /       /  /     07/30/09     /  /     2,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Observatory:
  -       Reconstruction               0-026-001                                              /  /       /  /     07/30/09     /  /     2,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          New Middle School:
  -       Reconstruction               0-036-002                                              /  /       /  /       /  /       /  /     2,155,16                       0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Central Administration:
  -       Reconstruction               1-007-002                                              /  /       /  /     07/28/09     /  /     2,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          New Storage Shed:
  -       Reconstruction               2-038-001                                              /  /       /  /     11/06/08     /  /     13                             0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Chappaqua Library:
05-0219   Additions and Alterations    6-022-005  11/28/05     DONE    DONE       DONE      09/27/05   09/23/05   08/02/05   11/30/04   02 - 16                1,155,197             0  JOD             0           0            0
                                                                                                                                                                                                                                 Lothrop Associates                  
07-0917   Reconstruction               6-022-006  02/01/08     DONE    DONE       DONE      11/23/07   11/20/07   05/31/07   06/01/07   15,16                     87,480             0  JOD             0           0            0
                                                                                                                                                                                                                                 ARBPE CONSULTING ENGINEERS          
  -       Reconstruction               6-022-007                                              /  /       /  /     07/30/09     /  /     2,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               6-022-008                                              /  /       /  /     09/02/09     /  /     7,15                           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NEW ROCHELLE CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-11-00-01
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          New Rochelle High School:
06-1366   Reconstruction               0-001-011  12/04/07     DONE    DONE       DONE      04/30/07   04/27/07   03/11/05   05/17/05   2,10,13,155,15,16      6,089,341     6,089,341  HCM             0           0            0
                                                                                                                                                                                                                                 Anthony M. Pucillo                  
07-1935   Reconstruction               0-001-012  04/23/08     DONE    DONE       DONE      04/08/08   03/31/08   08/20/07   08/20/07   9,10                     446,090       215,500  HCM             0           0            0
                                                                                                                                                                                                                                 Anthony M. Pucillo                  
07-1934   Reconstruction               0-001-013  04/09/08     DONE    DONE       DONE      04/08/08   03/31/08   08/20/07   08/20/07   7                        159,609       300,000  HCM             0           0            0
                                                                                                                                                                                                                                 Anthony M. Pucillo                  
08-0770   Reconstruction               0-001-014  06/27/08     DONE    DONE       DONE      11/20/08   11/17/08   04/24/08   09/02/08   4,7,9,16               1,110,157     1,110,157  HCM             0           0            0
                                                                                                                                                                                                                                 Anthony M. Pucillo                  
08-0592   Reconstruction               0-001-015  01/08/09     DONE    DONE       DONE      10/23/08   10/14/08   09/16/08   08/20/07   4,7,8,9,16             1,395,579       874,500  HCM             0           0            0
                                                                                                                                                                                                                                 Anthony M. Pucillo                  
09-0099   Reconstruction               0-001-016               STARTED DONE       DONE      ***SHPO RESPONSE***                                                                      0  HCM             0           0            0
                                                                                                                                                                                                                                 Anthony M. Pucillo                  
05-0212SC Visual Structural Inspection 0-001-SC2  10/11/05     DONE    DONE       DONE      09/22/05   09/22/05     /  /       /  /     16                       284,071       284,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     
07-2182SC Visual Structural Inspection 0-001-SC3  09/26/08     DONE    DONE       DONE      03/14/08   03/14/08     /  /       /  /     16                        38,766             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Albert Leonard Jr. High:
07-1857   Reconstruction               0-002-007  10/22/08     DONE    DONE       DONE      03/24/08   03/17/08   03/14/05   05/17/05   13,16                    294,000       638,000  HCM             0           0            0
                                                                                                                                                                                                                                 Anthony M. Pucillo                  

          Isaac E. Young Jr. High:
06-1413   Reconstruction               0-003-008  10/23/07     DONE    DONE       DONE      05/03/07   05/03/07   03/14/05   05/17/05   13,15,16               1,630,560     1,630,560  HCM             0           0      396,355
                                                                                                                                                                                                                                 Anthony M. Pucillo                  
08-0771   Reconstruction               0-003-009  07/08/09     DONE    DONE       DONE      11/20/08   11/17/08   04/18/07   05/17/05   7                        964,000             0  HCM             0           0      432,000
                                                                                                                                                                                                                                 Anthony M. Pucillo                  
07-2181SC Visual Structural Inspection 0-003-SC1  09/26/08     DONE    DONE       DONE      03/14/08   03/14/08     /  /       /  /     16                        62,622             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Henry Barnard Elementary:
06-1395   Reconstruction               0-004-005  09/27/07     DONE    DONE       DONE      05/02/07   04/27/07   03/14/05   05/17/05   2,15,16                  675,100       675,100  HCM             0           0      341,600
                                                                                                                                                                                                                                 Anthony M. Pucillo                  

          Columbus Elementary:
06-0425   Reconstruction               0-005-006  02/15/07     DONE    DONE       DONE      11/02/06   11/02/06   03/14/05   05/17/05   155,15,16                504,000       504,000  HCM             0           0      504,000
                                                                                                                                                                                                                                 Anthony M. Pucillo                  

          G. Davis Elementary:
06-1397   Reconstruction               0-006-005  01/03/08     DONE    DONE       DONE      05/03/07   04/30/07   03/14/05   05/17/05   2,8,13,16                808,400       808,400  HCM             0           0            0
                                                                                                                                                                                                                                 Anthony M. Pucillo                  

          Jefferson Elementary:
06-1394   Reconstruction               0-007-005  01/18/08     DONE    DONE       DONE      05/02/07   04/30/07   03/14/05   05/17/05   7                      2,811,600     2,811,600  HCM             0           0            0
                                                                                                                                                                                                                                 Anthony M. Pucillo                  
08-1478   Reconstruction               0-007-006  10/13/09     DONE    DONE       DONE      04/10/09   04/10/09   08/29/08   05/20/08   2,4,7,8,9,14,155,15,   1,440,000             0  HCM             0           0      953,330
                                                                                                                                                                                                                                 Anthony M. Pucillo                  

          Trinity Elementary:
06-1390   Reconstruction               0-012-007  12/04/07     DONE    DONE       DONE      05/02/07   05/01/07   03/11/05   05/17/05   7,16                   2,367,600     2,367,600  HCM             0           0            0
                                                                                                                                                                                                                                 Anthony M. Pucillo                  

          W. Ward Elementary:
06-0426   Reconstruction               0-013-007  02/15/07     DONE    DONE       DONE      11/02/06   11/02/06   03/14/05   05/17/05   2,8,155,15,16            525,600       525,600  HCM             0           0      525,600
                                                                                                                                                                                                                                 Anthony M. Pucillo                  
07-0217   Reconstruction               0-013-008  02/07/08     DONE    DONE       DONE      08/22/07   08/22/07   03/27/07   05/17/05   2,10,155,15,16           694,200       694,200  HCM             0           0            0
                                                                                                                                                                                                                                 Anthony M. Pucillo                  

          Daniel Webster Elementary:
06-0427   Reconstruction               0-015-007  02/15/07     DONE    DONE       DONE      11/02/06   11/02/06   03/11/05   05/17/05   155,15,16                153,300       153,300  HCM             0           0      153,300
                                                                                                                                                                                                                                 Anthony M. Pucillo                  

          St. Gabriel's:
07-2180SC Visual Structural Inspection 0-017-SC1  09/26/08     DONE    DONE       DONE      03/14/08   03/14/08     /  /       /  /     16                        26,838             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          New Rochelle Public Library:
07-0256   Reconstruction               6-014-001  01/29/08     DONE    DONE       DONE      08/29/07   08/29/07   02/06/06   05/16/06   4,8,9,13,15,16           200,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Anthony M. Pucillo                  
06-0179   Reconstruction               6-014-002                       ADDENDUM REQ'D       08/16/06   08/15/06   06/19/06   05/16/06   155                            0             0  HCM             0           0            0
                                                                                                                                                                                                                                 Anthony M. Pucillo                  


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BYRAM HILLS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-12-01-06
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Crittenden Middle School 6-8:
04-0996   Additions and Alterations    0-001-011  05/02/05     DONE    DONE       DONE      03/16/05   04/08/95   07/30/04   04/12/04   02 - 16               16,196,055     5,424,836  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          
08-0343   Reconstruction               0-001-012  06/30/09     DONE    DONE       DONE      09/17/08   09/15/08   03/03/08     /  /     16                       204,500       204,500  DDJ             0           0       51,000
                                                                                                                                                                                                                                 KSQ Architects,P.C                  

          Wampus ES 3-5:
04-0707   Additions and Alterations    0-002-011  03/22/05     DONE    DONE       DONE      01/25/05   01/24/05   07/30/04   04/12/04   02 - 16                5,746,198     2,882,877  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          

          Coman Hill ES K-2:
04-0708   Additions and Alterations    0-005-011  03/22/05     DONE    DONE       DONE      01/25/05   01/24/05   07/30/04   04/12/04   02 - 16                7,788,992     7,457,196  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          
07-2214   Reconstruction               0-005-012  06/23/08     DONE    DONE       DONE      06/05/08   05/01/08   03/06/08   05/20/08   7                        378,000       378,000  DDJ             0           0      338,543
                                                                                                                                                                                                                                 KSQ Architects,P.C                  

          Byram Hills High School:
04-0343   Additions and Alterations    0-007-010  01/21/05     DONE    DONE       DONE      11/05/04   11/04/04   07/30/04   04/12/04   02 - 16               15,057,579    13,795,084  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          
  -       Reconstruction               0-007-011                                              /  /       /  /     03/03/08     /  /     16                             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Relocated portables @ Coman Hill:
04-1255   New Construction             0-043-001  07/01/05     DONE    DONE       DONE      05/11/05   05/10/05   02/09/05   01/25/05   02 - 16                  498,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          

          Bus Garage:
  -    PR New Construction             1-044-001                                              /  /       /  /     12/29/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               5-004-002                                              /  /       /  /     03/06/08     /  /     2,4,7,8,9,10,13,155,           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          DistrictWide:
07-2081   Reconstruction               7-999-001  06/10/08     DONE    DONE       DONE      05/05/08   05/01/08   03/03/08   05/20/08   16                       585,500       585,500  DDJ             0           0      511,270
                                                                                                                                                                                                                                 KSQ Architects,P.C                  


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NORTH SALEM CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-13-01-04
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Pequenakonck Elementary:
06-0715   Reconstruction               0-003-009  02/26/07     DONE    DONE       DONE      01/09/07   01/08/07   12/07/06   12/05/06   7                      1,031,571     1,031,571  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-1307   Reconstruction               0-003-010  02/25/08     DONE    DONE       DONE      01/02/08   12/28/07   10/23/07   06/21/07   2,4,7,8,9,10,13,14,1      72,590        72,590  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  
  -       Reconstruction               0-003-011                                              /  /       /  /     08/13/08     /  /     2,4,7,8,9,10,13,14,1           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -    PR Additions and Alterations    0-003-012                                              /  /       /  /     11/04/08     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          MS/HS 6-12:
04-0975   Reconstruction               0-006-011  04/07/05     DONE    DONE       DONE      03/15/05   03/14/05   10/26/04   05/18/04   10,13                    110,000       110,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Anderson-Larocca-Anderson-Haynes    
06-0714   Reconstruction               0-006-012  02/26/07     DONE    DONE       DONE      01/09/07   01/08/07   12/07/06   12/05/06   7                      1,031,570     1,031,570  DDJ             0           0      432,941
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -    PR Additions and Alterations    0-006-013                                              /  /       /  /     05/30/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
07-1308   Reconstruction               0-006-014  02/25/08     DONE    DONE       DONE      01/02/08   12/28/07   08/30/07   06/21/07   2,4,8,15,16               25,694        25,694  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  
07-1309   Reconstruction               0-006-015  02/25/08     DONE    DONE       DONE      01/02/08   12/28/07   10/23/07   06/21/07   2,4,7,8,9,10,13,14,1     228,970       228,970  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  
  -    PR Additions and Alterations    0-006-016                                              /  /       /  /     08/12/08     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-006-017                                              /  /       /  /     08/13/08     /  /     2,4,7,8,9,10,13,14,1           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-006-018                                              /  /       /  /     08/29/08     /  /     2,4,7,8,9,10,13,14,1           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -    PR Additions and Alterations    0-006-019                                              /  /       /  /     11/04/08     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          :
02-1929   New Construction             2-008-001  09/12/05     DONE    DONE       DONE      04/14/03   04/10/03   02/21/02   10/16/02   02 - 16                   63,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Warren & Panzer Engineers, P.C.     

          Bus Garage:
  -       Additions and Alterations    5-002-004                                              /  /       /  /     11/04/08     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          BASEBALL DUGOUTS:
  -    PR New Construction             7-009-001                                              /  /       /  /     05/19/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Wastewater Treatment Plant:
  -       New Construction             7-010-001                                              /  /       /  /     01/31/08     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




OSSINING UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-14-01-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Brookside School:
06-0776   Reconstruction               0-001-012  04/18/07     DONE    DONE       DONE      01/17/07   01/17/07   09/08/06   05/16/06   2,155,15,16              798,312       798,312  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
08-0317   Reconstruction               0-001-013  11/04/08     DONE    DONE       DONE      09/11/08   09/11/08   04/03/08   05/20/08   2,8                      940,000       940,000  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
07-2187SC Visual Structural Inspection 0-001-SC1  09/26/08     DONE    DONE       DONE      03/20/08   03/20/08     /  /       /  /     16                         7,428             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Claremont School:
05-0061   Reconstruction               0-002-009  07/26/05     DONE    DONE       DONE      07/22/05   07/15/05   02/15/00   12/07/04   2,8                      230,012             0  MGL             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
06-0777   Reconstruction               0-002-011  04/18/07     DONE    DONE       DONE      01/17/07   01/17/07   09/08/06   05/16/06   2,13,155                 185,800       185,800  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
07-0581   Reconstruction               0-002-012  02/13/08     DONE    DONE       DONE      10/17/07   10/16/07   05/25/07   05/15/07   2,7,8,15,16            2,225,000             0  JOD             0           0       80,000
                                                                                                                                                                                                                                 Fuller And D'angelo                 
07-2189SC Visual Structural Inspection 0-002-SC1  09/26/08     DONE    DONE       DONE      03/20/08   03/20/08     /  /       /  /     16                         7,100             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Ossining Sr. High:
04-1251   Reconstruction               0-003-011  07/15/05     DONE    DONE       DONE      05/10/05   05/09/05   02/15/00   12/07/04   4,7,9,155,16           1,693,000     1,693,000  MGL             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
05-0586   Reconstruction               0-003-015  04/06/06     DONE    DONE       DONE      01/18/06   01/12/06   03/18/05   12/07/04   2                      1,458,993     1,458,993  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
  -       Reconstruction               0-003-016                                              /  /       /  /     03/18/05     /  /     2,16                           0    18,963,660  JOD             0           0            0
                                                                                                                                                                                                                                                                     
05-0953   Reconstruction               0-003-017  06/02/06     DONE    DONE       DONE      03/14/06   03/13/06   08/11/05   05/17/05   4                        137,052       137,052  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
  -       Reconstruction               0-003-018                                              /  /       /  /     03/27/07     /  /     2,9                            0    18,963,660  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-003-019                                              /  /       /  /     05/25/07     /  /     10                             0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-003-020                                              /  /       /  /     07/31/09     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
07-2186SC Visual Structural Inspection 0-003-SC1  09/26/08     DONE    DONE       DONE      03/20/08   03/20/08     /  /       /  /     16                        26,197             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Park School:
05-0559   Reconstruction               0-004-011  02/24/06     DONE    DONE       DONE      01/17/06   01/09/06   08/11/05   05/17/05   8,15,16                  890,000       890,000  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
  -       Reconstruction               0-004-012                                              /  /       /  /     07/31/09     /  /     7                              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
07-2190SC Visual Structural Inspection 0-004-SC1  09/26/08     DONE    DONE       DONE      03/20/08   03/20/08     /  /       /  /     16                        13,480             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Roosevelt School:
04-1387   Reconstruction               0-005-008  07/28/05     DONE    DONE       DONE      06/08/05   06/06/05   02/15/00   12/07/04   2,4,7,15                 559,854       559,854  MGL             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
  -       Reconstruction               0-005-010                                              /  /       /  /     07/30/09     /  /     7                              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
07-2188SC Visual Structural Inspection 0-005-SC1  09/26/08     DONE    DONE       DONE      03/20/08   03/20/08     /  /       /  /     16                         6,888             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Dorner Middle School:
04-0767   Reconstruction               0-008-008  03/16/05     DONE    DONE       DONE      02/04/05   02/03/05   02/15/00   12/07/04   2,155,16                 314,915       314,915  MGL             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
04-1495   Reconstruction               0-008-011  09/09/05     DONE    DONE       DONE      06/30/05   06/27/05   03/18/05   12/07/04   2,16                   3,147,500     3,147,500  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
05-0605   Reconstruction               0-008-012  04/06/06     DONE    DONE       DONE      01/18/06   01/17/06   03/18/05   12/07/04   2                        206,227       206,227  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
05-0062   Reconstruction               0-008-013  07/26/05     DONE    DONE       DONE      07/22/05   07/15/05   03/18/05   12/07/04   2,16                     250,472       250,472  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
  -       Reconstruction               0-008-014                                              /  /       /  /     07/31/09     /  /     7                              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
07-2185SC Visual Structural Inspection 0-008-SC1  09/26/08     DONE    DONE       DONE      03/20/08   03/20/08     /  /       /  /     16                        11,242             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          New Maintenance Building:
08-0316   New Construction             3-019-001  02/26/09     DONE    DONE       DONE      09/11/08   09/10/08   04/10/08   05/20/08   02 - 16                  650,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          New Library:
04-0048   New Construction             6-014-001  02/04/05     DONE    DONE       DONE      07/08/04   07/02/04   11/10/00   10/21/03   02 - 16               15,841,500             0  JOD             0           0            0
                                                                                                                                                                                                                                 Beatty Harvey & Associates          

          Storage/Concession @ MS-XXXcancelled:
04-1496XX New Construction             7-015-001  09/09/05               CANCELLED          06/27/05   06/27/05   07/11/05   12/07/04   02 - 16                  236,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          :
04-1467XX New Construction             7-016-001  07/15/05               CANCELLED          06/24/05   06/24/05     /  /     12/07/04   02 - 16                   45,500             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
04-1468XX New Construction             7-017-001  07/15/05               CANCELLED          06/24/05   06/24/05   07/26/05   12/07/04   02 - 16                   52,500             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Press Box @ MS-xxxcancelled:
05-0079XX New Construction             7-018-001  09/09/05               CANCELLED          08/02/05   07/26/05   07/19/05   12/07/04   02 - 16                   52,500             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BRIARCLIFF MANOR UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-14-02-02
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Todd Elementary School:
06-0358   Reconstruction               0-002-010  10/24/06     DONE    DONE       DONE        /  /       /  /     06/21/06   05/16/06   2,15                     400,000       400,000  HCM             0           0            0
                                                                                                                                                                                                                                                                     
07-0269   Reconstruction               0-002-011  12/07/07     DONE    DONE       DONE      09/04/07   08/30/07   07/16/07   05/15/07   2,7                      336,340       336,340  HCM             0           0      234,429
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
07-0270   Reconstruction               0-002-012  12/07/07     DONE    DONE       DONE      09/04/07   08/30/07   07/16/07   05/15/07   2,8                      216,255       216,255  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
  -       Reconstruction               0-002-013                                              /  /       /  /     06/30/09     /  /     2,4,8,9,15,16                  0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
08-0440SC Visual Structural Inspection 0-002-SC1  10/02/08     DONE    DONE       DONE      06/26/08   06/26/08     /  /       /  /     16                         1,228             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-1694SC Visual Structural Inspection 0-002-SC2  06/18/09     DONE    DONE       DONE      06/05/09   06/05/09     /  /       /  /     16                         5,390             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Briarcliff Middle/High School:
07-0271   Additions and Alterations    0-004-010  12/07/07     DONE    DONE       DONE      09/04/07   08/30/07   07/16/07   05/15/07   02 - 16                   83,250        83,250  HCM             0           0       58,026
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
  -       Reconstruction               0-004-011                                              /  /       /  /     06/30/09     /  /     2,8                            0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
08-0439SC Visual Structural Inspection 0-004-SC1  10/02/08     DONE    DONE       DONE      06/26/08   06/26/08     /  /       /  /                                6,140             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          New Storage Building:
  -       New Construction             2-012-001                                              /  /       /  /     06/30/09     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PEEKSKILL CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-15-00-01
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Peekskill Middle School:
05-0587   Reconstruction               0-001-010  04/05/06     DONE    DONE       DONE      01/18/06   01/17/06   10/28/04   04/01/04   2,9                      978,458       978,458  HCM             0           0            0
                                                                                                                                                                                                                                 Quality Environmental Solutions & Te

          Hillcrest Elementary:
04-0768   Reconstruction               0-004-007  04/22/05     DONE    DONE       DONE      02/04/05   02/03/05   10/04/04   04/01/04   2,9,16                   550,671       550,671  MAC             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
05-0910   Reconstruction               0-004-008  09/07/06     DONE    DONE       DONE      03/10/06   03/07/06   10/28/04   04/01/04   2,9,155,15,16            542,758       542,758  HCM             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
06-0867   Reconstruction               0-004-009  05/04/07     DONE    DONE       DONE      02/02/07   02/01/07   09/12/06   01/24/07   2,7,15                 1,147,100     1,300,000  HCM             0           0      341,836
                                                                                                                                                                                                                                 Fuller And D'angelo                 
08-0182   Reconstruction               0-004-010  03/13/09     DONE    DONE       DONE      08/19/08   08/08/08   10/17/07   01/24/07   2,8,9,155,15,16          889,425             0  HCM             0           0      265,049
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Oakside Elementary:
04-0769   Reconstruction               0-005-010  04/22/05     DONE    DONE       DONE      02/04/05   02/03/05   09/27/04   04/01/04   2,9,16                   504,675       504,675  MAC             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
05-0911   Reconstruction               0-005-011  09/07/06     DONE    DONE       DONE      03/10/06   03/07/06   10/28/04   04/01/04   2,9,155,15,16            242,127       359,186  HCM             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
  -    PR Additions and Alterations    0-005-012                                              /  /       /  /     03/30/06     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
05-1211XX Additions and Alterations    0-005-012  06/30/06               CANCELLED          04/28/06   04/26/06   03/30/06   04/01/04   02 - 16                  235,910       235,910  HCM             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
08-0183   Reconstruction               0-005-013  03/13/09     DONE    DONE       DONE      08/19/08   08/08/08   10/17/07   01/24/07   2,8,9,14,155,15,16     1,338,215             0  HCM             0           0      398,788
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Uriah Hill School:
04-0770   Reconstruction               0-007-007  04/22/05     DONE    DONE       DONE      02/04/05   02/03/05   09/27/04   04/01/04   2,9,16                   315,759       315,759  MAC             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
05-0912   Reconstruction               0-007-008  09/07/06     DONE    DONE       DONE      03/10/06   03/07/06   10/28/04   04/01/04   2,9,155,15,16            418,340       373,051  HCM             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
08-0184   Reconstruction               0-007-009  03/13/09     DONE    DONE       DONE      08/19/08   08/08/08   10/17/07   01/24/07   2,7,8,9,155,15,16      1,207,170             0  HCM             0           0      359,737
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Woodside Elementary:
04-0771   Reconstruction               0-008-009  04/22/05     DONE    DONE       DONE      02/04/05   02/03/05   09/27/04   04/01/04   2,9,16                   513,964       513,964  MAC             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
05-0913   Reconstruction               0-008-010  09/07/06     DONE    DONE       DONE      03/10/06   03/07/06   10/28/04   04/01/04   2,9,155,15,16            449,066       438,979  HCM             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
08-0185   Reconstruction               0-008-011  03/13/09     DONE    DONE       DONE      08/19/08   08/08/08   10/17/07   01/24/07   2,8,9,155,15,16          877,650             0  HCM             0           0      261,540
                                                                                                                                                                                                                                 Fuller And D'angelo                 
  -       Reconstruction               0-008-012                                              /  /       /  /     08/27/08     /  /     155,16                         0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Admin.Ctr / Special Ed. Classes:
04-0772   Reconstruction               0-009-006  04/22/05     DONE    DONE       DONE      02/04/05   02/03/05   09/27/04   04/01/04   2,9,16                   217,667       217,667  MAC             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
05-0914   Reconstruction               0-009-007  09/07/06     DONE    DONE       DONE      03/10/06   03/07/06   11/10/05   04/01/04   10                       105,737       105,737  HCM             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
07-2124   Reconstruction               0-009-008  11/10/08     DONE    DONE       DONE      05/19/08   05/13/08   10/17/07   05/18/04                            571,277             0  HCM             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Peekskill High School:
05-0920XX Reconstruction               0-010-005  09/08/06               CANCELLED          03/10/06   03/06/06   10/03/03   04/01/04   8                        100,000       100,000  MAC             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
04-0593   Reconstruction               0-010-007  04/07/05     DONE    DONE       DONE      12/27/04   12/23/04   09/27/04   04/01/04   2,8,9,10,155,15,16     3,711,914     3,754,133  MAC             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
05-0921   Reconstruction               0-010-008  09/08/06     DONE    DONE       DONE      03/10/06   03/06/06   10/28/04   04/01/04   2,9,155,15,16          1,435,661     1,435,661  HCM             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
04-0773   Reconstruction               0-010-009  04/22/05     DONE    DONE       DONE      02/04/05   02/03/05   12/23/04   04/01/04   2,9                      671,608       671,608  HCM             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
  -    PR Additions and Alterations    0-010-010                                              /  /       /  /     03/30/06     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
05-1212XX Additions and Alterations    0-010-010  06/30/06               CANCELLED          04/28/06   04/26/06   03/30/06   04/01/04   02 - 16                  196,582       196,582  HCM             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
08-0186   Reconstruction               0-010-011  03/13/09     DONE    DONE       DONE      08/19/08   08/08/08     /  /     01/24/07   2,8,9,155,15,16        1,576,787             0  HCM             0           0      469,883
                                                                                                                                                                                                                                 Fuller And D'angelo                 
05-1052SC Visual Structural Inspection 0-010-SC2  03/30/06     DONE    DONE       DONE      04/07/05   04/07/05     /  /       /  /     16                        48,892        48,892  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          New Peekskill Middle School:
05-0032   New Construction             0-014-001  11/03/05     DONE    DONE       DONE      07/11/05   07/06/05   09/23/03   04/01/04   02 - 16               47,650,000    34,890,555  MAC             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PELHAM UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-16-01-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Pelham High School:
  -    XX Reconstruction               0-001-016                         CANCELLED            /  /       /  /     07/24/98     /  /     7                              0    31,709,046  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
05-1316   Reconstruction               0-001-020  06/21/06     DONE    DONE       DONE      06/05/06   06/01/06     /  /     05/16/06   2                         80,000        80,000  DDJ             0           0            0
                                                                                                                                                                                                                                 S&B Enviornmental,LLCj              
  -       Reconstruction               0-001-021                                              /  /       /  /     06/22/06     /  /     15                             0    29,502,756  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
09-0082   Reconstruction               0-001-022               STARTED ADD. REQ'D DONE      07/23/09   07/20/09   12/27/07   05/20/08   2,4,7,8,9,155,15,16            0    34,936,714  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
  -    XX Reconstruction               0-001-023                         CANCELLED            /  /       /  /     12/27/07     /  /     2                              0    31,267,788  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-001-024                                              /  /       /  /     07/14/08     /  /     2,15,16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-0216   Reconstruction               0-001-025  03/27/09     DONE    DONE       DONE      08/27/08   08/18/08   07/14/08   05/20/08   2,8,9,10,155,15,16     4,837,784     4,837,784  DDJ             0           0      841,527
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
08-0494   Reconstruction               0-001-026  01/09/09     DONE    DONE       DONE      10/09/08   10/06/08   07/14/08   04/22/08   7                      2,795,845     2,795,845  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
09-0020   Reconstruction               0-001-027  07/21/09     DONE    DONE       DONE      07/03/09   07/02/09   07/14/08   05/20/08   4,7,8                  1,816,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
08-0145   Reconstruction               0-001-028  04/02/09     DONE    DONE       DONE      08/12/08   08/05/08   07/14/08   12/09/08   155,15,16              1,280,779       895,767  DDJ             0           0            0
                                                                                                                                                                                                                                 O'Dea Lynch Abbattista Engineers    
08-0422   Reconstruction               0-001-029  10/02/08     DONE    DONE       DONE      09/29/08   09/26/08     /  /     04/22/08   7                        100,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
  -       Reconstruction               0-001-030                                              /  /       /  /     08/12/08     /  /     7                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Hutchinson School:
  -       Reconstruction               0-002-011                                              /  /       /  /     06/20/06     /  /     15                             0     4,930,119  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-1101   Reconstruction               0-002-012  07/21/09     DONE    DONE       DONE      01/21/09   01/15/09   12/27/07   05/20/08   2,4,7,9,155,15,16        350,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
08-0146   Reconstruction               0-002-013  04/02/09     DONE    DONE       DONE      08/12/08   08/05/08   07/14/08   12/09/08   155,15,16                765,730       765,730  DDJ             0           0            0
                                                                                                                                                                                                                                 O'Dea Lynch Abbattista Engineers    
08-0495   Reconstruction               0-002-014  01/09/09     DONE    DONE       DONE      10/09/08   10/06/08   07/14/08   04/22/08   7                        107,919       107,919  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            

          Colonial School:
08-1108   Reconstruction               0-003-012  06/09/09     DONE    DONE       DONE      01/21/09   01/15/09   12/27/07   05/22/08   2,4,7,9,155,15,16      3,082,743     2,484,776  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
08-0147   Reconstruction               0-003-013  04/02/09     DONE    DONE       DONE      08/12/08   08/05/08   07/14/08   12/09/08   155,15,16                256,653       256,653  DDJ             0           0            0
                                                                                                                                                                                                                                 O'Dea Lynch Abbattista Engineers    

          Siwanoy School:
08-1102   Reconstruction               0-004-009  07/21/09     DONE    DONE       DONE      01/21/09   01/15/08   12/27/07   05/20/08   2,4,9,155,15,16          250,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
08-0496   Reconstruction               0-004-010  01/09/09     DONE    DONE       DONE      10/09/08   10/06/08   07/14/08   04/22/08   7                        706,571       706,571  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
08-0148   Reconstruction               0-004-011  04/02/09     DONE    DONE       DONE      08/12/08   08/05/08   07/14/08   12/09/08   155,15,16                287,161       287,161  DDJ             0           0            0
                                                                                                                                                                                                                                 O'Dea Lynch Abbattista Engineers    
  -       Reconstruction               0-004-012                                              /  /       /  /     08/19/09     /  /     2                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Prospect Hill:
08-1103   Reconstruction               0-005-011  07/21/09     DONE    DONE       DONE      01/21/09   01/15/09   03/08/07   05/20/08   2,8,9,155,15,16          430,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
07-1723   Reconstruction               0-005-012  03/12/08     DONE    DONE       DONE      03/03/08   02/08/08   02/27/08   02/04/08   2,9                       32,108        32,108  DDJ             0           0            0
                                                                                                                                                                                                                                 S&B Enviornmental,LLCj              
08-0497   Reconstruction               0-005-013  01/09/09     DONE    DONE       DONE      10/09/08   10/06/08   07/14/08   04/22/08   7                         68,365        68,365  DDJ             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
08-0149   Reconstruction               0-005-014  04/02/09     DONE    DONE       DONE      08/12/08   08/05/08   07/14/08   12/09/08   155,15,16                429,677       429,677  DDJ             0           0            0
                                                                                                                                                                                                                                 O'Dea Lynch Abbattista Engineers    

          Glover Field Sports Complex:
  -       Reconstruction               7-009-007                                              /  /       /  /     12/27/07     /  /     2                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




RYE CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-18-00-01
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Osborn School:
04-0556   Additions and Alterations    0-001-015  04/07/05     DONE    DONE       DONE      12/15/04   12/14/04   07/24/98   06/25/02   02 - 16                3,926,163     3,436,607  MAC             0           0            0
                                                                                                                                                                                                                                 Fletcher-Thompson, Inc.             
06-0517   Reconstruction               0-001-018  01/05/07     DONE    DONE       DONE      11/20/06   11/16/06   08/14/06   10/17/06   2,155,15,16              528,764       528,764  MGL             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
07-1871   Reconstruction               0-001-019  10/16/08     DONE    DONE       DONE      03/25/08   03/20/08   09/27/07   10/17/06   4,8                      116,100             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 

          Milton School:
06-0518   Reconstruction               0-002-007  01/05/07     DONE    DONE       DONE      11/20/06   11/16/06   06/05/96   10/17/06   2                        154,363       154,363  MGL             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
04-0150   Additions and Alterations    0-002-011  03/04/05     DONE    DONE       DONE      08/23/04   08/20/04   05/23/01   06/25/02   02 - 16               14,982,750    10,522,190  MAC             0           0            0
                                                                                                                                                                                                                                 Fletcher-Thompson, Inc.             
06-0437   Additions and Alterations    0-002-012  03/02/07     DONE    DONE       DONE      11/06/06   11/06/06   08/14/06   06/25/02   02 - 16                2,000,000       468,716  MGL             0           0            0
                                                                                                                                                                                                                                 Fletcher-Thompson, Inc.             
07-1545   Reconstruction               0-002-013  03/13/08     DONE    DONE       DONE      02/06/08   02/04/08   09/27/07   10/17/06   7                        199,327       199,327  MGL             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Midland Elementary School:
04-0557   Additions and Alterations    0-003-016  04/07/05     DONE    DONE       DONE      12/15/04   12/14/04   07/24/98   06/25/02   02 - 16                2,984,748     2,480,983  MAC             0           0            0
                                                                                                                                                                                                                                 Fletcher-Thompson, Inc.             
04-1408   Reconstruction               0-003-020  08/01/05     DONE    DONE       DONE      06/10/05   06/09/05   03/24/05   05/17/05   2,7                      294,500       294,500  HCM             0           0            0
                                                                                                                                                                                                                                 Fletcher-Thompson, Inc.             
06-0519   Reconstruction               0-003-021  01/05/07     DONE    DONE       DONE      11/20/06   11/16/06   08/14/06   10/17/06   8,155,15,16              791,256       791,256  MGL             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
  -       Reconstruction               0-003-022                                              /  /       /  /     05/01/07     /  /     4                              0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Rye High School/Middle School:
04-1409   Reconstruction               0-005-021  08/01/05     DONE    DONE       DONE      06/10/05   06/09/05   03/24/05   05/17/05   2,7                      343,000       343,000  HCM             0           0            0
                                                                                                                                                                                                                                 Fletcher-Thompson, Inc.             
06-0520   Reconstruction               0-005-022  01/05/07     DONE    DONE       DONE      11/20/06   11/16/06   08/14/06   10/17/06   2,155,15,16            8,017,496     8,017,496  MGL             0           0      906,581
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-005-023                                              /  /       /  /     08/14/06     /  /     2,4,16                         0    20,054,514  MGL             0           0            0
                                                                                                                                                                                                                                                                     
07-1546   Reconstruction               0-005-024  03/13/08     DONE    DONE       DONE      02/06/08   02/04/08   05/01/07   10/17/06   2,7,8,9,155,15,16        425,758       425,758  MGL             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
07-1872   Reconstruction               0-005-025  10/16/08     DONE    DONE       DONE      03/25/08   03/20/08   02/27/08   10/17/06   2,8,9,155,15,16          726,346             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 

          Highschool Modular Classrooms:
  -    TQ Temporary Quarters           0-023-001                                              /  /       /  /     10/27/09     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Leased Administrative Offices:
07-2159TQ Temporary Quarters           1-022-001  06/10/08     DONE    DONE       DONE      05/27/08   05/20/08   04/03/08     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Harvey Kaufman Architect.P.C        

          Rye School of Leadership:
  -       Alterations                  8-020-L01                                              /  /       /  /     12/28/07     /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




RYE NECK UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-19-01-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          High School:
  -    PR Additions and Alterations    0-002-015                                              /  /       /  /     02/17/05     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
06-0183   Additions and Alterations    0-002-015  03/02/07     DONE    DONE       DONE      08/16/06   08/15/06   02/17/05   12/14/05   02 - 16                  528,092       528,092  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          F E. Bellows Elementary:
  -    PR Additions and Alterations    0-003-015                                              /  /       /  /     02/17/05     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Astronomy Dome @ High School/MS:
04-0372DB Discovered Building          0-013-001  07/03/09     DONE    DONE       DONE      11/08/04   11/08/04   11/08/04     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Storage Shed @ Daniel Warren School:
04-0373DB Discovered Building          2-014-001  09/18/09     DONE    DONE       DONE      11/08/04   11/08/04     /  /       /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Storage Garage @ HS/MS:
04-0374DB Discovered Building          2-015-001  09/18/09     DONE    DONE       DONE      11/08/04   11/08/04     /  /       /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Maintenance Barn:
04-0375DB Discovered Building          3-016-001  09/18/09     DONE    DONE       DONE      11/08/04   11/08/04     /  /       /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Daniel Warren (form. Hallen Center):
  -    PR Additions and Alterations    7-004-014                                              /  /       /  /     02/17/05     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
06-0184   Additions and Alterations    7-004-014  03/02/07     DONE    DONE       DONE      08/16/06   08/15/06   02/17/05   12/14/05   02 - 16                5,560,930     5,080,941  MGL             0           0      460,501
                                                                                                                                                                                                                                 Thomas Associates                   

          Concession Stand / Press Box:
05-0051DB Discovered Building          7-017-001                       ADDENDUM REQ'D       07/15/05   07/15/05   06/15/05     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Districtwide:
04-0329   Reconstruction               7-999-003  01/27/05     DONE    DONE       DONE      10/27/04   10/26/04   05/04/04   05/16/00   16                       354,250       354,250  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PORT CHESTER-RYE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-19-04-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Port Chester High School:
07-2221   Alterations                  0-004-014  10/31/08     DONE    DONE       DONE      06/05/08   05/30/08   01/20/05   05/15/07   02 - 16                1,447,921     1,447,921  DDJ             0           0    1,447,921
                                                                                                                                                                                                                                 Fuller And D'angelo                 
06-0104   Reconstruction               0-004-015  08/15/06     DONE    DONE       DONE      07/24/06   07/21/06   05/02/05   02/16/06   7                      3,113,275     3,113,275  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
06-0189   Reconstruction               0-004-016  11/08/06     DONE    DONE       DONE      08/24/06   08/21/06   03/17/06   02/16/06   16                     1,650,000     1,650,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
06-0094   Reconstruction               0-004-017  09/26/06     DONE    DONE       DONE      07/21/06   07/20/06   06/20/06   02/16/06   2,4,8,9,10,155,15,16   1,219,500     1,219,500  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
06-0516   Reconstruction               0-004-018  02/15/07     DONE    DONE       DONE      11/16/06   11/16/06   06/20/06   02/16/06   2,4,7,8,9,155,15,16    6,215,965     6,215,965  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
07-1591   Additions and Alterations    0-004-019  07/02/08     DONE    DONE       DONE      02/11/08   02/07/08   12/26/07   05/15/07   02 - 16                  804,475       804,475  DDJ             0           0      804,475
                                                                                                                                                                                                                                 Fuller And D'angelo                 
07-1641   Reconstruction               0-004-020  04/18/08     DONE    DONE       DONE      02/19/08   02/15/08   12/27/07   05/15/07   2,10                     397,600       397,600  DDJ             0           0      397,600
                                                                                                                                                                                                                                 Fuller And D'angelo                 
07-1915   Reconstruction               0-004-021  09/09/08     DONE    DONE       DONE      04/03/08   03/26/08   12/28/07   05/15/07   155                      400,000       400,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
  -       Reconstruction               0-004-022                                              /  /       /  /     01/30/08     /  /     8,9,10,155,15,16               0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-004-023                                              /  /       /  /     10/21/09     /  /     2,8,9,155,15,16                0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          JFK K-1 Primary School:
05-1082   Additions and Alterations    0-005-009  04/09/06     DONE    DONE       DONE      03/31/06   03/31/06   01/20/05   02/16/06   02 - 16                  284,041       284,041  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
  -       Additions and Alterations    0-005-010                                              /  /       /  /     03/17/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0241   Alterations                  0-005-010  11/01/06     DONE    DONE       DONE      09/27/06   09/22/06   03/17/06   02/16/05   02 - 16                  350,056       350,056  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
  -       Reconstruction               0-005-011                                              /  /       /  /     10/21/09     /  /     2,155,15,16                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          JF Kennedy Elementary:
06-0242   Reconstruction               0-006-010  11/01/06     DONE    DONE       DONE      09/27/06   09/22/06   01/20/05   02/16/05   2,4,7,8,9,155,15,16      649,684       649,684  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
  -       Reconstruction               0-006-011                                              /  /       /  /     10/21/09     /  /     2,8,9,155,15,16                0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          King Street Elementary School:
06-0243   Reconstruction               0-007-009  11/01/06     DONE    DONE       DONE      09/27/06   09/22/06   01/20/05   02/16/05   2,7,8,9,155,15,16      1,004,357     1,004,357  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
05-0995   Reconstruction               0-007-010  05/03/06     DONE    DONE       DONE      03/17/06   03/17/06   05/02/05   02/16/06   2,4,7                    720,562       720,562  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
  -       Reconstruction               0-007-011                                              /  /       /  /     10/21/09     /  /     2,9,155,15,16                  0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Park Avenue Elementary School:
06-0293   Reconstruction               0-008-008  12/06/06     DONE    DONE       DONE      10/04/06   09/26/06   08/12/04   02/16/05   7                      1,541,316     1,541,316  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
05-0266   Reconstruction               0-008-009  10/24/05     DONE    DONE       DONE      10/18/05   10/18/05   01/20/05   06/22/05   2,7,155,15,16            722,689       722,689  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
  -    PR Additions and Alterations    0-008-010                                              /  /       /  /     03/17/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-008-011                                              /  /       /  /     10/21/09     /  /     2,8,9,155,15,16                0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Edison Elementary School:
05-1392   Reconstruction               0-012-008  09/29/06     DONE    DONE       DONE      06/20/06   06/19/06   01/20/05   02/16/06   8,9,16                   584,798       584,798  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
07-0606   Additions and Alterations    0-012-009  10/26/07     DONE    DONE       DONE      10/23/07   10/22/07   06/11/07   06/06/07   02 - 16                  413,500       413,500  DDJ             0           0      413,500
                                                                                                                                                                                                                                 Fuller And D'angelo                 
  -       Reconstruction               0-012-010                                              /  /       /  /     10/21/09     /  /     2,9,155,15,16                  0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Port Chester Middle School:
06-0295   Reconstruction               0-013-012  12/11/06     DONE    DONE       DONE      10/04/06   10/03/06   01/20/05   02/16/06   2,7,9,155,15,16        1,300,000     1,300,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller and D'Angelo                 
05-0996   Reconstruction               0-013-013  05/03/06     DONE    DONE       DONE      03/17/06   03/17/06   05/02/05   02/16/06   2,4,7                  1,587,100     1,587,100  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
06-0148   Additions and Alterations    0-013-014  11/10/06     DONE    DONE       DONE      08/07/06   08/04/06   03/17/06   02/16/06   02 - 16                2,200,000     1,900,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
  -       Reconstruction               0-013-015                                              /  /       /  /     10/21/09     /  /     2,8,9,155,15,16                0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Modular Classroom @ King Street:
  -    XX New Construction             0-023-001                         CANCELLED            /  /       /  /     01/30/08     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Field Shed @ High School:
06-1320DB Discovered Building          2-022-001  07/10/07     DONE    DONE       DONE      04/13/07   04/12/07   10/16/06     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Holy Rosary School:
07-2269   Reconstruction               8-024-L01  06/30/08     DONE    DONE       DONE      06/19/08   06/19/08   06/13/08     /  /                            1,592,740     1,592,740  DDJ             0           0            0
                                                                                                                                                                                                                                 Acheson Doyle Partners Architects P.


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BLIND BROOK-RYE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-19-05-02
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Ridge Street School:
04-1212   Reconstruction               0-001-009  08/25/05     DONE    DONE       DONE      04/28/05   04/15/05   04/13/04   01/20/05   7,8,9,16               2,799,722     1,943,643  DDJ             0           0            0
                                                                                                                                                                                                                                 Anderson-Larocca-Anderson-Haynes    
  -       Reconstruction               0-001-010                                              /  /       /  /     02/20/07     /  /     2,8,9,10,13,16                 0    11,020,266  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-1202   Reconstruction               0-001-011  03/27/09     DONE    DONE       DONE      02/11/09   02/05/09   11/04/08   05/15/07   7                        667,825       667,825  DDJ             0           0      467,871
                                                                                                                                                                                                                                 KSQ Architects,P.C                  

          Blind Brook High School:
04-1213   Additions and Alterations    0-002-014  08/25/05     DONE    DONE       DONE      04/28/05   04/15/05   04/13/04   01/20/05   02 - 16               15,564,278    12,163,531  DDJ             0           0            0
                                                                                                                                                                                                                                 Anderson-Larocca-Anderson-Haynes    

          :
05-0108DB Discovered Building          0-009-001  08/17/05     DONE    DONE       DONE      08/08/05   08/08/05   07/21/05     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Anderson-Larocca-Anderson-Haynes    


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SCARSDALE UNION FREE SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-20-01-03
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Scarsdale High School:
06-1438   Additions and Alterations    0-001-023  11/19/07     DONE    DONE       DONE      05/08/07   05/07/07   01/16/07   05/15/07   02 - 16                2,999,821     2,504,389  HCM             0           0    1,411,550
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
07-1563   Reconstruction               0-001-024  12/02/08     DONE    DONE       DONE      02/08/08   02/05/08   12/12/07   10/22/07   8,155,15,16            2,951,170             0  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          Scarsdale Jr. High School:
06-1439   Reconstruction               0-002-013  11/19/07     DONE    DONE       DONE      05/08/07   05/07/07   01/16/07     /  /     8,9,10,155,15,16         132,220       225,000  HCM             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
07-1564   Reconstruction               0-002-014  12/02/08     DONE    DONE       DONE      02/08/08   02/05/08   12/12/07   10/22/07   8,155,15,16            1,129,706             0  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          Edgewood Elementary School:
06-1440   Reconstruction               0-003-013  11/19/07     DONE    DONE       DONE      05/08/07   05/07/07   01/16/07   05/15/07   8,9,16                    69,000        69,000  HCM             0           0       69,000
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
07-1565   Reconstruction               0-003-014  12/02/08     DONE    DONE       DONE      02/08/08   02/05/08   12/12/07   10/22/07   155,15,16                508,518             0  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          Fox Meadow Elementary:
06-1441   Reconstruction               0-004-014  11/19/07     DONE    DONE       DONE      05/08/07   05/07/07   01/16/07   05/15/07   8,9,16                    57,500        57,500  HCM             0           0        7,500
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
07-1566   Reconstruction               0-004-015  12/02/08     DONE    DONE       DONE      02/08/08   02/05/08   12/12/07   10/22/07   8,155,15,16              530,371             0  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          Greenacres School:
06-1442   Reconstruction               0-005-013  11/19/07     DONE    DONE       DONE      05/08/07   05/07/07   01/16/07   05/15/07   8,9,16                    60,950        60,950  HCM             0           0       10,950
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
07-1567   Reconstruction               0-005-014  12/02/08     DONE    DONE       DONE      02/08/08   02/05/08   12/12/07   10/22/07   155,15,16                525,991             0  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          Heathcote School:
07-1568   Reconstruction               0-006-012  12/02/08     DONE    DONE       DONE      02/08/08   02/05/08   12/12/07   10/22/07   155,15,16                458,163             0  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          Quaker Ridge School:
05-0668   Additions and Alterations    0-007-013  05/26/06     DONE    DONE       DONE      01/30/06   01/30/06   02/16/00   06/15/05   02 - 16               14,182,000     9,355,475  MGL             0           0            0
                                                                                                                                                                                                                                 Peter Gisolfi Associates            
07-1569   Reconstruction               0-007-017  12/02/08     DONE    DONE       DONE      02/08/08   02/05/08   12/12/07   10/22/07   2,8,155,15,16          1,304,997             0  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          Modular @ Bus Compound:
  -    DB Discovered Building          1-021-001                                              /  /       /  /     06/27/07     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SOMERS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-21-01-06
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Middle School 6-8:
06-0101   Additions and Alterations    0-001-011  12/08/06     DONE    DONE       DONE      07/21/06   07/17/06   02/13/04   10/25/05   02 - 16               22,035,072    11,400,460  HCM             0           0    1,071,938
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-1693SC Visual Structural Inspection 0-001-SC1  06/18/09     DONE    DONE       DONE      06/04/09   06/04/09     /  /       /  /     16                         8,452             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          High School 9-12:
05-0811   Additions and Alterations    0-003-010  11/28/06     DONE    DONE       DONE      08/14/06   07/21/06   02/13/04   10/25/05   02 - 16               26,021,886    19,622,032  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
05-0811SR Additions and Alterations    0-003-010  04/17/06     DONE    DONE       DONE      08/10/06   07/21/06   02/13/04   10/25/05   02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-1512   Reconstruction               0-003-011  04/30/08     DONE    DONE       DONE      02/01/08   01/30/08   10/16/07   10/25/05   2,4,7,8,9,13,155,15,     543,500       543,500  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-1692SC Visual Structural Inspection 0-003-SC1  06/18/09     DONE    DONE       DONE      06/04/09   06/04/09     /  /       /  /     16                        10,536             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Intermediate School 3-5:
05-0870   Reconstruction               0-006-012  06/29/06     DONE    DONE       DONE      03/07/06   03/06/06   03/31/04   10/25/05   8,9,10,16              2,252,844     1,794,691  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Central Administration Building:
04-0659TQ Temporary Quarters           1-012-001  02/02/05     DONE    DONE       DONE      01/11/05   01/06/05   01/05/05     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          building c Adminstration:
05-0805TQ Temporary Quarters           1-013-001  04/07/06     DONE    DONE       DONE      02/22/06   02/22/06   10/14/05     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Storage Unit @ Bus Facility:
  -    DB Discovered Building          2-017-001                                              /  /       /  /     05/01/08     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          New Bus Garage @ Somers High School:
05-1321   New Construction             5-010-001  04/17/06     DONE    DONE       DONE      06/06/06   05/30/06   02/09/04   10/25/05   02 - 16                3,777,576     3,777,576  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Wastewater Pump Station @ Somers IS:
06-0913   New Construction             7-014-001  07/11/07     DONE    DONE       DONE      02/09/07   02/08/07   07/14/06   04/27/98   02 - 16                2,508,953             0  HCM             0           0            0
                                                                                                                                                                                                                                 O'Brien & Gere Engineers,Inc.       

          Wastewater Treatment Plant @ SHS:
07-1706   New Construction             7-015-001  08/06/08     DONE    DONE       DONE      02/25/08   02/21/08   07/14/06   05/01/98   02 - 16                5,809,431             0  HCM             0           0            0
                                                                                                                                                                                                                                 O'Brien & Gere Engineers,Inc.       

          Chlorinator Shed:
  -       New Construction             7-016-001                                              /  /       /  /     08/09/07     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WHITE PLAINS CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-22-00-01
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          White Plains Middle (Eastview):
07-0664   Reconstruction               0-003-010  12/05/08     DONE    DONE       DONE      10/29/07   10/25/07   12/21/06   10/17/06   2,4,8,13,155           2,624,694             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
06-1284   Reconstruction               0-003-011  04/27/07     DONE    DONE       DONE      04/06/07   04/05/07   01/24/07   10/17/06   4,7,13                   294,223       294,223  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-003-012                                              /  /       /  /     09/02/09     /  /     2,155,15,16                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Church Street Elementary:
05-0765   Reconstruction               0-004-012  02/17/06     DONE    DONE       DONE      02/15/06   02/09/06   01/12/06   05/18/05   155                       96,500        96,500  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-0665   Reconstruction               0-004-013  12/05/08     DONE    DONE       DONE      10/29/07   10/25/07   12/21/06   10/17/06   2,4,8,13,155,15,16     2,695,005             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
06-1285   Reconstruction               0-004-014  04/27/07     DONE    DONE       DONE      04/06/07   04/05/07   01/24/07   10/17/06   4,7,13                    14,587        14,587  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-004-015                                              /  /       /  /     09/02/09     /  /     2,155,15,16                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          George Washington School:
07-0666   Reconstruction               0-009-009  12/05/08     DONE    DONE       DONE      10/29/07   10/25/07   12/21/06   10/17/06   9,155,16                 402,610             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-009-010                                              /  /       /  /     09/02/09     /  /     2,155,15,16                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Mamaroneck Avenue Elementary:
07-0160   Additions and Alterations    0-010-010  12/18/07     DONE    DONE       DONE      08/15/07   08/14/07   12/21/06   10/17/06   02 - 16                6,462,294     5,344,570  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-010-011                                              /  /       /  /     09/02/09     /  /     2,155,15,16                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Post Road School:
06-1386SR Reconstruction               0-013-012  07/19/07     DONE    DONE       DONE      05/02/07   04/27/07   12/21/06   10/17/06   2,4,7,8,9,10,13,14,1           0    11,693,161  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-0355   Reconstruction               0-013-012  01/22/08     DONE    DONE       DONE      09/13/07   09/12/07     /  /     10/17/06                         38,669,321    20,094,570  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Ridgeway Elementary School:
07-0667   Reconstruction               0-014-010  12/05/08     DONE    DONE       DONE      10/29/07   10/25/07   12/21/06   10/17/06   2,4,7,8,9,13,155,15,   1,704,235             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
06-1286   Reconstruction               0-014-011  04/27/07     DONE    DONE       DONE      04/06/07   04/05/07   01/24/07   10/17/06   4,7,13                   115,530       115,530  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-014-012                                              /  /       /  /     09/02/09     /  /     2,155,15,16                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Rochambeau School-Alt ED:
07-0668   Reconstruction               0-015-011  12/05/08     DONE    DONE       DONE      10/29/07   10/25/07   12/21/06   10/17/06   4,9,155,15,16          1,262,968             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-015-012                                              /  /       /  /     09/02/09     /  /     2,155,15,16                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          White Plains HS:
07-1084   Additions and Alterations    0-016-015  05/30/08     DONE    DONE       DONE      12/11/07   12/10/07   12/21/06   10/17/06   02 - 16                1,121,922             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
06-0968   Reconstruction               0-016-016  04/27/07     DONE    DONE       DONE      02/21/07   02/21/07   01/11/07   10/17/06   2,4,7,13               8,596,747     8,596,747  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-016-017                                              /  /       /  /     09/02/09     /  /     2,8,155,15,16                  0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0873SC Visual Structural Inspection 0-016-SC1  02/02/07     DONE    DONE       DONE      01/29/07   01/29/07     /  /       /  /     16                        91,222        91,222  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Highlands Middle School:
07-0669   Reconstruction               0-017-012  12/05/08     DONE    DONE       DONE      10/29/07   10/25/07   12/21/06   10/17/06   2,4,7,8,13,15,16       1,314,316             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
06-0969   Reconstruction               0-017-013  04/27/07     DONE    DONE       DONE      02/21/07   02/21/07   01/24/07   10/17/06   2,4,7,13               4,002,386     4,002,386  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-017-014                                              /  /       /  /     09/02/09     /  /     2,8,155,15,16                  0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Education House-Admin. Bldg.:
07-0670   Reconstruction               1-001-008  12/05/08     DONE    DONE       DONE      10/29/07   10/25/07   12/21/06   10/17/06   9,155                    148,151             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               1-001-009                                              /  /       /  /     09/02/09     /  /     2,155,15,16                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Dammann House:
07-1085   Reconstruction               1-020-005  05/30/08     DONE    DONE       DONE      12/11/07   12/10/07   12/21/06   10/17/06   8,9,15,16                206,018             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               1-020-006                                              /  /       /  /     09/02/09     /  /     2,8,155,15,16                  0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Field Storage Bldg:
  -       Reconstruction               2-005-001                                              /  /       /  /     09/02/09     /  /     2,155,15,16                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Storage Bldg:
  -       Reconstruction               2-019-001                                              /  /       /  /     09/02/09     /  /     2,155,16                       0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Press Box @ White Plains H S:
06-1287   New Construction             7-025-001  04/27/07     DONE    DONE       DONE      04/06/07   04/05/07   03/12/07   10/17/06   02 - 16                   40,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Press Box @ Highland Middle School:
06-1288   New Construction             7-026-001  04/27/07     DONE    DONE       DONE      04/06/07   04/05/07   03/12/07   10/17/06   02 - 16                   40,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




YONKERS CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-23-00-01
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          New Elem. Magnet School:
03-1585   Additions and Alterations    0-002-002  12/06/04     DONE    DONE       DONE      05/25/04   05/21/04   11/05/03   10/15/03   02 - 16                   16,703        16,703  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          SCHOOL #5:
04-1229   Reconstruction               0-005-007  06/13/05     DONE    DONE       DONE      05/06/05   05/05/05   01/28/03   01/15/03   2                        120,102       120,102  HCM             0           0            0
                                                                                                                                                                                                                                 Ronald E. Bielinski, P.E., P.C.     
06-0603   Reconstruction               0-005-008  02/16/07     DONE    DONE       DONE      12/11/06   12/08/06   07/11/06   06/21/06   2,4,7,8                  350,000       350,000  HCM             0           0      188,300
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Patricia Di Chiaro School #8:
04-1231   Reconstruction               0-008-004  07/16/05     DONE    DONE       DONE      05/06/05   05/05/05   01/28/03   01/15/03   2                         32,123        32,123  HCM             0           0            0
                                                                                                                                                                                                                                 Ronald E. Bielinski, P.E., P.C.     
05-1377   Reconstruction               0-008-006  10/04/06     DONE    DONE       DONE      06/19/06   06/08/06   06/14/06   05/17/06   7                        600,000       600,000  HCM             0           0      322,800
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-0306   Reconstruction               0-008-007  01/13/09     DONE    DONE       DONE      09/10/08   09/08/08   03/25/08   02/13/08   155                      320,000       270,000  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -    PR Additions and Alterations    0-008-008                                              /  /       /  /     02/27/09     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          School #9:
07-0195   Reconstruction               0-009-005  09/14/07     DONE    DONE       DONE      08/17/07   08/16/07   11/06/06   11/15/06   7                        300,000       300,000  HCM             0           0       73,749
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          School #10:
08-1611   Reconstruction               0-010-006  06/16/09     DONE    DONE       DONE      05/11/09   05/06/09   12/16/08     /  /     2,4,9,13,155,15,16       750,000             0  HCM             0           0       48,757
                                                                                                                                                                                                                                 LAN Associates                      

          School #11  Mark Twain South:
07-0196   Reconstruction               0-011-005  09/14/07     DONE    DONE       DONE      08/17/07   08/16/07   12/18/06   11/15/06   4,7                    1,333,000       700,000  HCM             0           0      603,320
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-1294   Reconstruction               0-011-006  04/22/09     DONE    DONE       DONE      02/25/09   02/20/09   10/20/08   02/25/09   2,8,9,13,155,15,16       250,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           
  -    XX Additions and Alterations    0-011-007                         CANCELLED            /  /       /  /     02/06/09     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          School #14:
08-1152   Reconstruction               0-014-007  03/17/09     DONE    DONE       DONE      02/02/09   01/27/09   11/06/06   11/15/06   7                        957,000       500,000  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          School #16:
05-1020   Reconstruction               0-016-007  07/10/06     DONE    DONE       DONE      03/24/06   03/22/06   02/15/06   01/31/06   7                        800,000       800,000  HCM             0           0      430,400
                                                                                                                                                                                                                                 Ballina design group                
  -       Reconstruction               0-016-008                                              /  /       /  /     10/09/09     /  /     2,8,9                          0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          School #17:
04-1230   Reconstruction               0-017-003  07/11/05     DONE    DONE       DONE      05/06/05   05/05/05   04/13/04   01/15/03   7                         89,904        89,904  HCM             0           0            0
                                                                                                                                                                                                                                 Ronald E. Bielinski, P.E., P.C.     
04-1426   Reconstruction               0-017-004  08/25/05     DONE    DONE       DONE      06/17/05   06/15/05   03/16/05   03/16/05   10                       169,450       169,450  HCM             0           0            0
                                                                                                                                                                                                                                 CIMA Group                          
07-0197   Reconstruction               0-017-005  09/14/07     DONE    DONE       DONE      08/17/07   08/16/07   11/06/06   11/15/06   7                      1,422,000     1,422,000  HCM             0           0      640,573
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          School #18:
06-0149   Reconstruction               0-018-007  09/14/06     DONE    DONE       DONE      08/07/06   08/04/06   01/28/03   01/15/03   2                        150,000       150,000  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-1210   Reconstruction               0-018-008  10/05/07     DONE    DONE       DONE      03/23/07   03/15/07   05/31/06   06/21/06   7                      1,870,000     1,200,000  HCM             0           0      919,055
                                                                                                                                                                                                                                 Ballina design group                

          School #21:
07-0198   Reconstruction               0-021-006  09/14/07     DONE    DONE       DONE      08/17/07   08/16/07   11/06/06   11/15/06   7                      1,547,000     1,547,000  HCM             0           0      504,420
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-1591   Reconstruction               0-021-007  01/09/09     DONE    DONE       DONE      05/05/09   05/05/09   01/12/09   02/28/09   2,4,8,155,15,16        1,500,000     1,500,000  HCM             0           0            0
                                                                                                                                                                                                                                 Damiano Barile Engineers, P.C.      

          School #22:
07-0199   Reconstruction               0-022-006  09/14/07     DONE    DONE       DONE      08/17/07   08/16/07   11/06/06   11/15/06   4,7                    2,500,000     2,500,000  HCM             0           0       90,000
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          School #23:
07-0200   Reconstruction               0-023-006  09/14/07     DONE    DONE       DONE      08/17/07   08/16/07   11/06/06   11/15/06   4                        795,000       250,000  HCM             0           0      100,000
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Paideia School #24:
05-1414   Reconstruction               0-024-006  09/20/06     DONE    DONE       DONE      06/22/06   06/22/06   03/30/06   04/26/06   4,13                     200,000       200,000  HCM             0           0      107,600
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          School #25:
  -       Reconstruction               0-025-007                                              /  /       /  /     11/06/06     /  /     4                              0     6,670,161  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Casimir Pulaski School #26:
05-1420   Reconstruction               0-026-006  08/07/06     DONE    DONE       DONE      06/28/06   06/27/06   03/30/06   04/26/06   7                        750,000       750,000  HCM             0           0      403,500
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-2013   Reconstruction               0-026-007  06/30/08     DONE    DONE       DONE      04/24/08   04/15/08   01/08/08   01/18/08   2,8,155,15,16          3,112,683       764,757  HCM             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           
08-1334   Reconstruction               0-026-008  04/21/09     DONE    DONE       DONE      03/10/09   03/05/09   12/16/08   11/18/08   2,8,9,15,16            1,665,000     1,300,000  HCM             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           

          School #27:
03-0192   Reconstruction               0-027-003  01/18/07     DONE    DONE       DONE      08/15/03     /  /     06/05/03   05/21/03   8                        800,000       800,000  HCM             0           0      333,942
                                                                                                                                                                                                                                 Ronald E. Bielinski, P.E., P.C.     
08-0177   Reconstruction               0-027-005  11/12/09     DONE    DONE       DONE      08/19/08   08/08/08   03/27/08   02/13/08   2,155,15,16              829,027             0  HCM             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.

          School #28 (Kahlil Gibran):
04-0385   Reconstruction               0-028-004  01/04/05     DONE    DONE       DONE      11/09/04   11/08/04   04/13/04   05/19/04   7                        668,649       668,649  HCM             0           0            0
                                                                                                                                                                                                                                 Ronald E. Bielinski, P.E., P.C.     
08-1492   Reconstruction               0-028-005  06/08/09     DONE    DONE       DONE      04/13/09   04/08/09   10/20/08   06/20/07   2,8,9,155,15,16          335,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Mosaic Associates                   

          School #32:
08-1493   Reconstruction               0-032-006  06/08/09     DONE    DONE       DONE      04/13/09   04/08/09   10/20/08   06/20/07   2,8,9,13,155,15,16     2,800,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Mosaic Associates                   

          Dodsen Int Sch (f'ly W Whitman JHS):
08-0178   Reconstruction               0-035-005  11/12/09     DONE    DONE       DONE      08/19/08   08/08/08   03/27/08   02/13/08   2,155,15,16            1,145,406             0  HCM             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
08-1494   Reconstruction               0-035-006  06/08/09     DONE    DONE       DONE      04/13/09   04/08/09   10/20/08   06/20/07   2,8,9,13,155,15,16     2,000,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Mosaic Associates                   

          Emerson Junior - Senior HighSchool45:
07-2014   Reconstruction               0-041-007  06/30/08     DONE    DONE       DONE      04/24/08   04/15/08   01/08/08   01/18/08   2,8,15,16                486,487       398,092  HCM             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           
08-1495   Reconstruction               0-041-008  06/08/09     DONE    DONE       DONE      04/13/09   04/08/09   10/20/08   06/20/07   2,8,9,155,15,16        2,900,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Mosaic Associates                   

          Hawthorne (PEARLS):
07-1936   Reconstruction               0-101-006  08/28/08     DONE    DONE       DONE      04/08/08   03/28/08   11/06/06   11/15/06   2,4,7,9               11,000,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
07-2015   Reconstruction               0-101-007  06/30/08     DONE    DONE       DONE      04/24/08   04/15/07   01/16/08   01/18/08   2,8,15,16                412,050       400,612  HCM             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           

          Riverside High School:
06-0854   Reconstruction               0-102-002  02/26/07     DONE    DONE       DONE      01/31/07   01/30/07   11/06/06   11/15/06   155                      700,000       550,000  HCM             0           0      376,600
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -    XX Reconstruction               0-102-003                         CANCELLED            /  /       /  /     06/20/08     /  /     9,10,15,16                     0    19,393,836  HCM             0           0            0
                                                                                                                                                                                                                                                                     
08-1072   Reconstruction               0-102-004  03/06/09     DONE    DONE       DONE      01/09/09   01/08/09   06/20/08   06/18/08   8                        400,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-102-005                                              /  /       /  /     09/15/09     /  /     2,4,8,9,13,15,16               0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Mark Twain(Cent Ath Facil)#106:
04-0371   Reconstruction               0-106-007  01/04/05     DONE    DONE       DONE      11/08/04   11/05/04   04/13/04   05/19/04   7                      1,193,022     1,193,022  HCM             0           0            0
                                                                                                                                                                                                                                 Robert J. Stahl Architect, PC       
  -       Reconstruction               0-106-009                                              /  /       /  /     11/06/06     /  /     4,7                            0    22,180,224  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-1242   Reconstruction               0-106-010  06/27/07     DONE    DONE       DONE      03/29/07   03/20/07   01/08/07   01/17/07   4,13,16                  250,000       250,000  HCM             0           0       95,452
                                                                                                                                                                                                                                 Cannon Design                       
08-1295   Reconstruction               0-106-011  04/22/09     DONE    DONE       DONE      02/25/09   02/20/09   10/20/08   02/25/09   2,8,9,13,155,15,16     1,500,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           

          Roosevelt High School:
07-0191   Reconstruction               0-201-011  11/19/07     DONE    DONE       DONE      08/16/07   08/16/07   11/06/06   02/21/07   4,7                   11,500,000     6,600,000  HCM             0           0    5,205,855
                                                                                                                                                                                                                                 Cannon Design                       
08-0179   Reconstruction               0-201-012  11/12/09     DONE    DONE       DONE      08/19/08   08/08/08   03/27/08   02/13/08   2,155,15,16            2,835,963             0  HCM             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
  -       Reconstruction               0-201-013                                              /  /       /  /     09/11/08     /  /     9,10,15,16                     0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-201-014                                              /  /       /  /     09/15/09     /  /     4,7,155,16                     0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Lincoln High School (#202):
07-0192   Reconstruction               0-202-009  11/19/07     DONE    DONE       DONE      08/16/07   08/16/07   11/06/06   02/21/07   4                      8,272,162     6,200,000  HCM             0           0    4,036,843
                                                                                                                                                                                                                                 Cannon Design                       
07-2016   Reconstruction               0-202-010  06/30/08     DONE    DONE       DONE      04/24/08   04/15/08   01/09/08   01/18/08   2,8,155,15,16          2,875,753     1,806,963  HCM             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           

          Charles Gorton HS(#204):
05-1360   Reconstruction               0-204-012  07/11/06     DONE    DONE       DONE      06/09/06   06/08/06   03/30/06   05/17/06   4                        650,000       650,000  HCM             0           0      349,700
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-1094   Reconstruction               0-204-013  01/20/09     DONE    DONE       DONE      01/20/09   01/20/09   12/29/08   01/21/09   2,4,7                    635,000       635,000  HCM             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           

          Fermi Performing Arts Sch(205):
03-1557   Reconstruction               0-205-010  12/21/04     DONE    DONE       DONE      05/18/04   05/17/04   01/28/03   01/15/03   7,9                      583,168       583,168  HCM             0           0            0
                                                                                                                                                                                                                                                                     
05-1079   Reconstruction               0-205-011  01/31/06     DONE    DONE       DONE      03/31/06   03/30/06     /  /     01/31/06   2,9                    2,008,693     2,008,693  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-1870   Reconstruction               0-205-012  10/23/08     DONE    DONE       DONE      03/25/08   03/20/08   11/23/07   12/19/07   10                       130,000       130,000  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-0180   Reconstruction               0-205-013  11/12/09     DONE    DONE       DONE      08/19/08   08/08/08   03/27/08   02/13/08   2,155,15,16            1,171,845             0  HCM             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
08-1296   Reconstruction               0-205-014  04/22/09     DONE    DONE       DONE      02/25/09   02/20/09   10/20/08   02/25/09   2,8,9,13,155,15,16     1,200,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           

          Saunders Trades & Tech.:
07-0253   Reconstruction               0-206-008  10/16/07     DONE    DONE       DONE      08/28/07   08/28/07   01/08/07   06/20/07   4,155,15,16            4,500,000     4,500,000  HCM             0           0    2,089,773
                                                                                                                                                                                                                                 Kallen & Lemelson Consulting Enginee
08-1517   Reconstruction               0-206-009                         UNREVIEWED         04/16/09   04/16/09   10/30/07     /  /     2,155,15,16                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                 Kallen & Lemelson Consulting Enginee
08-0181   Reconstruction               0-206-010  11/12/09     DONE    DONE       DONE      08/19/08   08/08/08   03/27/08   02/13/08   2,155,15,16            2,108,178             0  HCM             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
08-1114   Reconstruction               0-206-011  03/05/09     DONE    DONE       DONE      01/23/09   01/20/09   06/20/08   06/18/08   2,4,8,9,10,16          1,000,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-206-012                                              /  /       /  /     12/16/08     /  /     2,9,155,15,16                  0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Yonkers Middle/High School:
07-0254   Reconstruction               0-208-008  10/16/07     DONE    DONE       DONE      08/28/07   08/28/07   01/08/07   06/20/07   4,155,15,16            2,975,000     2,975,000  HCM             0           0    1,157,484
                                                                                                                                                                                                                                 Kallen & Lemelson Consulting Enginee
07-1993   Reconstruction               0-208-009  08/18/08     DONE    DONE       DONE      04/18/08   04/10/08   08/14/07   09/26/07   2,4,7                    120,000       120,000  HCM             0           0       64,560
                                                                                                                                                                                                                                 Ballina design group                
08-1518   Reconstruction               0-208-010                         UNREVIEWED         04/16/09   04/16/09   10/30/07     /  /     2,155,15,16                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                 Kallen & Lemelson Consulting Enginee
07-2017   Reconstruction               0-208-011  06/30/08     DONE    DONE       DONE      04/24/08   04/15/08   01/16/08   01/18/08   2,8,15,16              1,075,097       516,648  HCM             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           
  -       Reconstruction               0-208-012                                              /  /       /  /     12/16/08     /  /     2,8,155,15,16                  0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Martin Luther King School:
08-1297   Reconstruction               0-233-006  04/22/09     DONE    DONE       DONE      02/25/09   02/20/09   10/20/08   02/25/09   2,8,9,13,155,15,16     1,250,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           

          Foxfire (Prek-6) was -8-302:
04-1271   Reconstruction               0-302-004  06/23/05     DONE    DONE       DONE      05/18/05   05/16/05   04/18/03   01/15/03   4                        156,033       156,033  HCM             0           0            0
                                                                                                                                                                                                                                 Antonucci & Associates              
07-1992   Reconstruction               0-302-005  07/21/08     DONE    DONE       DONE      04/18/08   04/10/08     /  /     09/26/07   2,4,7                    850,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Ballina design group                
07-2018   Reconstruction               0-302-006  06/30/08     DONE    DONE       DONE      04/24/08   04/15/08   01/09/08   01/18/08   2,8,155,15,16          2,112,930     1,515,949  HCM             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           
08-1335   Reconstruction               0-302-007  04/21/09     DONE    DONE       DONE      03/10/09   03/05/09     /  /     11/18/08   2,8,9,10,13,16         1,200,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           

          Palisade Preparatory School:
06-0220   Reconstruction               0-307-004  01/19/07     DONE    DONE       DONE      09/14/06   09/13/06   03/30/06   05/17/06   7                        875,000       875,000  HCM             0           0      470,750
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-1073   Reconstruction               0-307-005  03/06/09     DONE    DONE       DONE      01/09/09   01/08/09   06/20/08   06/18/08   8,9                      200,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          House @ Yonkers Middle/High:
  -    DB Discovered Building          1-339-001                                              /  /       /  /     01/17/08     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Town House A & B:
08-0161DB Discovered Building          7-337-001                       ADDENDUM REQ'D       08/13/08   08/07/08   04/15/05     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
08-0753   Reconstruction               7-337-002  07/21/08     DONE    DONE       DONE      07/21/08   07/21/08   12/04/07   11/04/07   2,4,7                    180,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Ballina design group                

          Our Lady of Mt. Carmel:
05-1094XX Reconstruction               8-338-L01                         CANCELLED          ***MULTIPLE PROBLEMS***                                                                  0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LAKELAND CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-24-01-06
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Van Cortlandtville Elementary:
03-1325   Reconstruction               0-001-015  04/13/05     DONE    DONE       DONE      03/25/04   03/24/04   11/24/03   06/05/03   2,4,7,8,9,155,15,16    1,132,377     1,132,377  MAC             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
06-1260   Reconstruction               0-001-016  10/02/07     DONE    DONE       DONE      04/04/07   04/02/07   11/03/06   12/12/06   2,4,8,9,155,15,16        533,600             0  JOD             0           0      210,000
                                                                                                                                                                                                                                 Mach Architecture & Engineering,P.C.
  -       Reconstruction               0-001-017                                              /  /       /  /     10/11/07     /  /     2,4,8,9,10,155,15,16           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Thomas Jefferson Elementary:
03-1323   Reconstruction               0-002-012  04/13/05     DONE    DONE       DONE      03/25/04   03/24/04   11/24/03   06/05/03   2,4,7,8,9,155,15,16      151,130       151,130  MAC             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
06-1261   Reconstruction               0-002-013  10/02/07     DONE    DONE       DONE      04/04/07   04/02/07   11/03/06   12/12/06   8,155,16                 104,400             0  JOD             0           0       40,000
                                                                                                                                                                                                                                 Mach Architecture & Engineering,P.C.
  -       Reconstruction               0-002-014                                              /  /       /  /     10/03/07     /  /     2,4,8,9,10,155,15,16           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          George Washington Elementary:
03-1320   Reconstruction               0-008-014  04/13/05     DONE    DONE       DONE      03/25/04   03/24/04   11/24/03   06/05/03   2,4,7,8,9,155,15,16      120,913       120,913  MAC             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
06-1262   Reconstruction               0-008-015  10/02/07     DONE    DONE       DONE      04/04/07   04/02/07   11/03/06   12/12/06   7,8,155,16               150,800             0  JOD             0           0       60,000
                                                                                                                                                                                                                                 Mach Architecture & Engineering,P.C.
  -       Reconstruction               0-008-016                                              /  /       /  /     10/15/07     /  /     2,4,8,9,10,155,15,16           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Lincoln Titus Elementary:
03-1324   Reconstruction               0-009-012  04/13/05     DONE    DONE       DONE      03/25/04   03/24/04   11/24/03   06/05/03   2,4,7,8,9,155,15,16      151,106       151,106  MAC             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
06-1263   Reconstruction               0-009-013  10/02/07     DONE    DONE       DONE      04/04/07   04/02/07   11/03/06   12/12/06   8,155,16                 104,400             0  JOD             0           0       40,000
                                                                                                                                                                                                                                 Mach Architecture & Engineering,P.C.

          Lakeland Senior High:
03-1322   Reconstruction               0-011-012  04/13/05     DONE    DONE       DONE      03/25/04   03/24/04   11/24/03   06/05/03   2,4,7,8,9,155,15,16    2,065,488     2,065,488  MAC             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
06-1264   Reconstruction               0-011-013  10/02/07     DONE    DONE       DONE      04/04/07   04/02/07   11/03/06   12/12/06   7,8,9,16                 232,000             0  JOD             0           0       92,000
                                                                                                                                                                                                                                 Mach Architecture & Engineering,P.C.
08-1680   Reconstruction               0-011-014  07/10/09     DONE    DONE       DONE      06/18/09   06/08/09   10/03/07   05/19/09   2,8,9,10,155,15,16       554,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Mach Architecture & Engineering,P.C.

          Copper Beech Middle School:
03-1321   Reconstruction               0-012-010  04/13/05     DONE    DONE       DONE      03/25/04   03/24/04   11/24/03   06/05/03   2,4,7,8,9,155,15,16    1,690,090     1,690,090  MAC             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
06-1265   Reconstruction               0-012-011  10/02/07     DONE    DONE       DONE      04/04/07   04/02/07   11/03/06   12/12/06   8,16                     162,400             0  JOD             0           0       65,000
                                                                                                                                                                                                                                 Mach Architecture & Engineering,P.C.
  -       Reconstruction               0-012-012                                              /  /       /  /     10/03/07     /  /     2,8,9,10,155,15,16             0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Lakeland Annex Lhs:
  -       Reconstruction               0-013-001                                              /  /       /  /     10/11/07     /  /     2,4,8,9,10,155,15,16           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Ben Franklin Elementary:
03-1319   Reconstruction               0-014-008  04/13/05     DONE    DONE       DONE      03/25/04   03/24/04   11/24/03   06/05/03   2,4,7,8,9,155,15,16      340,929       340,929  MAC             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
06-1266   Reconstruction               0-014-009  10/02/07     DONE    DONE       DONE      04/04/07   04/02/07   11/03/06   12/12/06   4,7,8,9,155,16           846,800             0  JOD             0           0      338,000
                                                                                                                                                                                                                                 Mach Architecture & Engineering,P.C.
  -       Reconstruction               0-014-010                                              /  /       /  /     10/03/07     /  /     2,8,9,10,155,15,16             0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Walter Panas High School:
03-1326   Reconstruction               0-015-013  04/13/05     DONE    DONE       DONE      03/25/04   03/24/04   11/24/03   06/05/03   2,4,7,8,9,155,15,16    1,399,758     1,399,758  MAC             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
06-0172   Reconstruction               0-015-014  08/10/06     DONE    DONE       DONE      08/10/06   08/10/06   07/18/06   07/06/06   155                      472,947       472,947  JOD             0           0            0
                                                                                                                                                                                                                                 Mach Architecture & Engineering,P.C.
06-1267   Reconstruction               0-015-015  10/02/07     DONE    DONE       DONE      04/04/07   04/02/07   11/03/06   12/12/06   4,7,8,9,155,15,16      3,115,600             0  JOD             0           0    1,138,647
                                                                                                                                                                                                                                 Mach Architecture & Engineering,P.C.
08-1681   Reconstruction               0-015-016  07/10/09     DONE    DONE       DONE      06/18/09   06/08/09   10/11/07   05/19/09   2,4,8,9,10,155,15,16     321,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Mach Architecture & Engineering,P.C.

          Bus Garage:
  -       Reconstruction               5-004-003                                              /  /       /  /     07/18/06     /  /     16                             0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-1422   Additions and Alterations    5-004-004  09/21/07     DONE    DONE       DONE      05/07/07   05/04/07   11/03/06   12/12/06   02 - 16                5,850,000     5,850,000  JOD             0           0            0
                                                                                                                                                                                                                                 Mach Architecture & Engineering,P.C.


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




YORKTOWN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-24-02-06
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Brookside Elementary School:
06-0499   Reconstruction               0-002-010  03/28/07     DONE    DONE       DONE      11/15/06   11/14/06   07/17/06   05/17/06   2,4,8,9,155,15,16        698,444       698,444  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman Architects          
08-0318   Reconstruction               0-002-011  04/30/09     DONE    DONE       DONE      09/11/08   09/10/08   07/06/07   05/17/06   2,9,155,15,16          1,590,814             0  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
  -       Reconstruction               0-002-012                                              /  /       /  /     06/05/08     /  /     2                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-0265   Reconstruction               0-002-013  02/10/09     DONE    DONE       DONE      09/08/08   09/02/08   08/21/08   05/08/06   13                        28,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
  -       Reconstruction               0-002-014                                              /  /       /  /     01/12/09     /  /     16                             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
04-0484FP Reconstruction               0-002-FP1  03/30/09     DONE    DONE       DONE      12/08/04     /  /       /  /       /  /     16                             0     4,104,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Crompond Elementary:
  -       Reconstruction               0-003-009                                              /  /       /  /     02/23/00     /  /                                    0     7,540,182  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0500   Reconstruction               0-003-010  03/28/07     DONE    DONE       DONE      11/14/06   11/13/06   02/10/04   05/17/06   7                        794,742       794,742  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
06-0501   Reconstruction               0-003-011  03/28/07     DONE    DONE       DONE      11/14/06   11/13/06   07/17/06   05/17/06   2,4,8,9,155,15,16        729,575       729,575  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
06-0943   Reconstruction               0-003-012  03/01/07     DONE    DONE       DONE      02/16/07   02/15/07   02/16/07   05/17/06   2                         57,331        57,331  DDJ             0           0            0
                                                                                                                                                                                                                                 Warren & Panzer Engineers, P.C.     
07-0976   Reconstruction               0-003-013  06/17/08     DONE    DONE       DONE      11/29/07   11/23/07   07/06/07   05/17/06   15,16                     14,764        14,764  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
07-1978   Reconstruction               0-003-014  05/20/08     DONE    DONE       DONE      04/16/08   04/04/08     /  /     05/17/06   155                       90,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
  -       Reconstruction               0-003-015                                              /  /       /  /     06/05/08     /  /     2                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-0266   Reconstruction               0-003-016  02/10/09     DONE    DONE       DONE      09/08/08   09/02/08   08/21/08   05/08/06   13                        28,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
  -       Reconstruction               0-003-017                                              /  /       /  /     01/12/09     /  /     16                             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-003-018                                              /  /       /  /     08/19/09     /  /     2,7,8,9,155,15,16              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
04-0485FP Reconstruction               0-003-FP1  03/30/09     DONE    DONE       DONE      12/08/04     /  /       /  /       /  /     16                             0     4,212,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Mohansic Elementary:
06-0502   Reconstruction               0-004-015  03/28/07     DONE    DONE       DONE      11/15/06   11/14/06   07/17/06   05/17/06   2,4,8,9,155,15,16        911,889       911,889  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
06-0944   Reconstruction               0-004-016  03/01/07     DONE    DONE       DONE      02/16/07   02/15/07   02/16/07   05/17/06   2                         77,512        77,512  DDJ             0           0            0
                                                                                                                                                                                                                                 Warren & Panzer Engineers, P.C.     
07-0977   Reconstruction               0-004-017  06/17/08     DONE    DONE       DONE      11/29/07   11/23/07   07/06/07   05/17/06   15,16                     14,764        14,764  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
  -       Reconstruction               0-004-018                                              /  /       /  /     06/05/08     /  /     2                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-0267   Reconstruction               0-004-019  02/10/09     DONE    DONE       DONE      09/08/08   09/02/08   08/21/08   05/08/06   13                        28,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
  -       Reconstruction               0-004-020                                              /  /       /  /     01/12/09     /  /     16                             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-004-021                                              /  /       /  /     08/25/09     /  /     2,4,7,9,10,155,16              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
04-0487FP Reconstruction               0-004-FP1  03/30/09     DONE    DONE       DONE      12/08/04     /  /       /  /       /  /     16                             0     3,690,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Yorktown High School:
04-1273   Additions and Alterations    0-005-017  07/15/05     DONE    DONE       DONE      05/18/05   05/16/05   08/09/04   10/13/04   02 - 16                2,834,077     2,834,077  DDJ             0           0            0
                                                                                                                                                                                                                                 Perkins Eastman & Partners          
  -    PR Additions and Alterations    0-005-018                                              /  /       /  /     07/17/06     /  /     02 - 16                        0    28,227,384  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0503XX Additions and Alterations    0-005-018                         CANCELLED          11/15/06   11/14/06   07/17/06   05/17/06   02 - 16                        0    28,227,384  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
07-0978   Reconstruction               0-005-019  06/17/08     DONE    DONE       DONE      11/29/07   11/23/07   07/06/07   05/17/07   2,4,7,8,9,10,155,15,   4,000,287     4,000,287  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
07-1211   Reconstruction               0-005-020  07/03/08     DONE    DONE       DONE      12/24/07   12/21/07   12/24/07   10/23/07   155,16                   443,300       443,300  DDJ             0           0      217,660
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
08-0038   Reconstruction               0-005-021  07/30/08     DONE    DONE       DONE      07/21/08   07/01/08   06/05/08   10/23/07   8,9,10,155,15,16         178,396       178,396  DDJ             0           0       87,592
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
08-0268   Reconstruction               0-005-022  02/10/09     DONE    DONE       DONE      09/08/08   09/02/08   08/21/08   05/08/06   13                        86,240             0  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
  -       Reconstruction               0-005-023                                              /  /       /  /     01/12/09     /  /     16                             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-005-024                                              /  /       /  /     08/19/09     /  /     2,4,7,8,9,10,14,155,           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Mildred Strang Middle:
06-0504XX Reconstruction               0-007-018                         CANCELLED          11/15/06   11/14/06   07/17/06   05/17/06   2,4,8,9,13,155,15,16           0    21,331,642  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
07-0391   Reconstruction               0-007-019  10/25/07     DONE    DONE       DONE      09/20/07   09/20/07   07/06/07   05/17/06   2,4,7,9,155,15,16        244,200       244,200  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects, PC                  
07-0979   Reconstruction               0-007-020  06/17/08     DONE    DONE       DONE      11/29/07   11/23/07   11/28/07   05/17/06   155,16                   806,377       806,377  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
08-0269   Reconstruction               0-007-021  02/10/09     DONE    DONE       DONE      09/08/08   09/02/08   08/21/08   05/08/06   13                        50,624             0  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
08-0319   Reconstruction               0-007-022  04/30/09     DONE    DONE       DONE      09/11/08   09/10/08   09/11/08   05/17/06   2,4,7,8,9,10,155,15,     493,741             0  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
  -       Reconstruction               0-007-023                                              /  /       /  /     01/12/09     /  /     16                             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-007-024                                              /  /       /  /     08/19/09     /  /     2,8,9,10,155,15,16             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
04-0488FP Reconstruction               0-007-FP1  03/30/09     DONE    DONE       DONE      12/08/04     /  /       /  /       /  /     16                             0     5,784,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          French Hill School:
06-0111   Reconstruction               0-018-010  05/25/05     DONE    DONE       DONE      07/25/06   07/24/06   06/13/06   07/25/05   10                       296,939       296,939  DDJ             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
  -       Reconstruction               0-018-011                                              /  /       /  /     06/14/06     /  /     10                             0     4,640,112  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0505   Reconstruction               0-018-012  04/09/07     DONE    DONE       DONE      11/15/06   11/14/06   07/17/06   05/17/06   2,4,8,9,155,15,16        389,983       389,983  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
07-0980   Reconstruction               0-018-013  06/17/08     DONE    DONE       DONE      11/29/07   11/23/07   04/10/07   05/17/06   2,155,15,16              292,957       292,957  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
08-0270   Reconstruction               0-018-014  02/10/09     DONE    DONE       DONE      09/08/08   09/02/08   08/21/08   05/08/06   13                        29,120             0  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
  -       Reconstruction               0-018-015                                              /  /       /  /     01/12/09     /  /     16                             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-018-016                                              /  /       /  /     08/19/09     /  /     2,4,7,8,9,155,15,16            0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
04-0486FP Reconstruction               0-018-FP1  03/30/09     DONE    DONE       DONE      12/08/04     /  /       /  /       /  /     16                             0     2,592,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Alternative HS- Unit # 3:
07-1906   New Construction             0-025-001  05/19/08     DONE    DONE       DONE      04/03/08   03/07/08   07/20/06     /  /     02 - 16                  789,600             0  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  

          District Wide:
08-0548   Reconstruction               7-999-004  01/20/09     DONE    DONE       DONE      10/17/08   10/14/08   06/05/08     /  /     10,13,16               1,573,292     1,573,292  DDJ             0           0      772,486
                                                                                                                                                                                                                                 KSQ Architects,P.C                  
  -       Reconstruction               7-999-005                                              /  /       /  /     06/05/08     /  /     10,13,16                       0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-0387   Reconstruction               7-999-006  01/08/09     DONE    DONE       DONE      09/24/08   09/23/08   09/10/08   05/17/06   13,16                    799,500             0  DDJ             0           0            0
                                                                                                                                                                                                                                 KSQ Architects,P.C                  


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES SOUTHERN WESTCHESTER STATUS REPORT ON CAPITAL PROJECTS
District No.: 66-90-00-00
last updated on 11/20/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Mid West Bldg I:
07-1067   Reconstruction               0-005-003  12/13/07     DONE    DONE       DONE      12/06/07   12/05/07   11/14/07   04/25/07   7,9                      520,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Rye Lake Campus Bld2:
  -       Reconstruction               0-040-004                                              /  /       /  /     12/26/07     /  /     2,15                           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Mid West Bldg E:
08-1148   Reconstruction               0-047-002  02/05/09     DONE    DONE       DONE      02/02/09   01/27/09   11/12/08   01/07/09   2,10                      15,800             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Mid West. Bldg. B:
08-1149   Reconstruction               0-050-005  02/05/09     DONE    DONE       DONE      02/02/09   01/27/09   11/12/08   01/07/09   2,9                      508,100       508,100  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Mid Westchester C:
08-1150   Reconstruction               0-051-003  02/05/09     DONE    DONE       DONE      02/02/09   01/27/09   11/12/08   01/07/09   2,10                     388,100             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Mid Westchester D:
08-1151   Reconstruction               0-052-003  02/05/09     DONE    DONE       DONE      02/02/09   01/27/09   11/12/08   01/07/09   2,10                     457,700             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Administration Bldg:
05-0589   Reconstruction               1-001-003  04/25/06     DONE    DONE       DONE      01/18/06   01/10/06   08/10/05   07/01/05   4,7                      356,375             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Computer Center:
05-0065   Reconstruction               1-002-001  11/22/05     DONE    DONE       DONE      07/22/05   07/21/05   03/23/05   04/21/04   16                       630,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Current Solutions,PC                
  -       Reconstruction               1-002-002                                              /  /       /  /     11/10/05     /  /     16                             0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Staff Training Offices:
07-0181TQ Temporary Quarters           1-082-001  08/24/07     DONE    DONE       DONE      08/09/07   08/09/07   01/09/03     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Storage @ Building C - Rye Lake Camp:
  -    DB Discovered Building          2-085-001                                              /  /       /  /     02/28/08     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Grnds Storage-Career Services Campus:
08-0879DB Discovered Building          2-086-001  12/08/08     DONE    DONE       DONE      12/08/08   12/03/08   12/02/08     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Bus Garage 13:
  -       Reconstruction               5-016-002                                              /  /       /  /     01/05/07     /  /     13                             0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Districtwide:
08-1376   Reconstruction               7-999-002                       ADDENDUM REQ'D       03/16/09   03/09/09   11/23/07   01/16/08   16                             0     8,941,000  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 
08-0617   Reconstruction               7-999-003  01/23/09     DONE    DONE       DONE      10/30/08   10/28/08   11/23/07   11/02/07   16                       605,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          Holy Trinity School:
07-0182TQ Temporary Quarters           8-066-001  10/29/07     DONE    DONE       DONE      08/09/07   08/09/07   12/30/98     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          St. Vincent's Hospital:
01-1243TQ Temporary Quarters           8-068-001  07/15/08     DONE    DONE       DONE      04/19/02     /  /     12/30/98     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     

          Church of St. Theresa:
07-0179TQ Temporary Quarters           8-070-001  10/29/07     DONE    DONE       DONE      08/09/07   08/09/07   06/01/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Gym @ First United Methodist Church:
07-0180XX Reconstruction               8-079-001  11/10/09               CANCELLED          08/09/07   08/09/07   01/09/03     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Adult Education @ St. Gabriel's HS:
07-0183TQ Temporary Quarters           8-081-001  10/29/07     DONE    DONE       DONE      08/09/07   08/09/07   01/09/03     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Adult Ed @ 85 Exec Blvd:
05-1313TQ Temporary Quarters           8-083-001  06/22/06     DONE    DONE       DONE      06/02/06   05/25/06   05/08/06     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0284   Reconstruction               8-083-002  12/18/06     DONE    DONE       DONE      10/23/06   10/23/06   07/31/06     /  /     8,9,155,15,16            246,520             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-1500   Reconstruction               8-083-003  09/01/09     DONE    DONE       DONE      04/14/09   04/09/09   10/06/08   04/29/09   8,9,155,15,16                  0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fuller And D'angelo                 

          St Mathews Lutheran Church:
06-0303TQ Temporary Quarters           8-084-001  10/11/06     DONE    DONE       DONE      10/06/06   10/06/06   08/16/06     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED