CLYDE-SAVANNAH 650301
GANANDA 650902
LYONS 650501
MARION 650701
NEWARK 650101
N. ROSE-WOLCOT 651501
PALMYRA-MACEDO 650901
RED CREEK 651503
SODUS 651201
WAYNE 650801
WILLIAMSON 651402
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Lincoln School:
06-0673 Reconstruction 0-001-008 03/21/08 DONE DONE DONE 12/27/06 12/21/06 04/24/06 12/21/05 8,155,16 53,527 53,527 DDJ 0 0 0
IBC Engineering,P.C.
Perkin School:
06-0674 Reconstruction 0-002-012 03/21/08 DONE DONE DONE 12/22/06 12/21/06 04/24/06 12/21/05 8,155,16 367,867 367,867 DDJ 0 0 0
IBC Engineering,P.C.
High School:
06-0675 Reconstruction 0-003-013 03/21/08 DONE DONE DONE 12/27/06 12/21/06 04/24/06 12/21/05 8,155,16 1,568,215 1,568,215 DDJ 0 0 0
IBC Engineering,P.C.
Newark Middle School:
06-0676 Reconstruction 0-006-012 03/21/08 DONE DONE DONE 12/22/06 12/21/06 04/24/06 12/21/05 8,155,16 575,568 575,568 DDJ 0 0 0
IBC Engineering,P.C.
Kelly Middle School:
06-0677 Reconstruction 0-008-009 03/21/08 DONE DONE DONE 12/27/06 12/21/06 04/24/06 12/21/05 8,155,16 80,312 80,312 DDJ 0 0 0
IBC Engineering,P.C.
Bus Garage:
06-0678 Reconstruction 5-009-004 03/21/08 DONE DONE DONE 12/27/06 12/21/06 04/24/06 12/21/05 155,16 15,506 15,506 DDJ 0 0 0
IBC Engineering,P.C.
Street of Shops:
03-0415XX Reconstruction 8-017-001 CANCELLED 09/17/03 / / 08/21/03 / / 0 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Jr/Sr High School:
03-1117 Reconstruction 0-001-007 04/26/04 DONE DONE DONE 02/17/04 02/13/04 02/05/04 12/03/01 2,4,16 449,600 449,600 MAC 0 0 0
Beardsley Design Associates Arch.
05-0173 Reconstruction 0-001-008 09/02/05 DONE DONE DONE 09/02/05 09/02/05 08/29/05 08/10/05 15 196,452 196,452 HCM 0 0 0
Ashley McGraw Architects
- PR Additions and Alterations 0-001-009 / / / / 11/09/07 / / 02 - 16 0 0 HCM 0 0 0
03-0072FP Reconstruction 0-001-FP1 10/06/03 DONE DONE DONE 07/23/03 / / / / / / 16 4,350 4,350 JOD 0 0 0
04-1398SC Visual Structural Inspection 0-001-SC1 06/10/05 DONE DONE DONE 04/19/05 04/19/05 / / / / 16 874 874 JOD 0 0 0
Savannah Elementary:
- Reconstruction 0-014-007 / / / / 11/09/07 / / 8,9,155,15,16 0 0 HCM 0 0 0
Clyde Elementary:
03-1118 Reconstruction 0-015-005 04/26/04 DONE DONE DONE 02/17/04 02/13/04 02/05/04 12/03/01 9 46,000 46,000 MAC 0 0 0
Beardsley Design Associates Arch.
- PR Additions and Alterations 0-015-006 / / / / 11/09/07 / / 02 - 16 0 0 HCM 0 0 0
03-0073FP Reconstruction 0-015-FP1 10/06/03 DONE DONE DONE 07/23/03 / / / / / / 16 4,200 4,200 JOD 0 0 0
Clyde Bus Garage:
- PR Additions and Alterations 4-002-006 / / / / 11/09/07 / / 02 - 16 0 0 HCM 0 0 0
Savannah Bus Garage:
- PR Additions and Alterations 4-003-003 / / / / 11/09/07 / / 02 - 16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Junior Senior High:
03-1365 Additions and Alterations 0-001-005 07/27/04 DONE DONE DONE 04/07/04 04/06/04 03/25/02 12/02/03 02 - 16 3,703,058 3,703,058 MAC 0 0 0
06-1212 Additions and Alterations 0-001-007 06/28/07 DONE DONE DONE 03/23/07 03/16/07 08/14/06 12/12/06 02 - 16 2,877,698 2,776,692 HCM 0 0 181,530
MOSSIEN ASSOCIATES
07-1115PR Reconstruction 0-001-008 UNREVIEWED 12/13/07 12/07/07 09/18/06 / / 2,7 0 14,316,159 HCM 0 0 0
MOSSIEN ASSOCIATES
07-1547 Reconstruction 0-001-008 ADDENDUM REQ'D 02/06/08 02/04/08 09/18/06 12/12/06 2,7 0 14,316,159 HCM 0 0 0
MOSSIEN ASSOCIATES
07-1392SC Visual Structural Inspection 0-001-SC4 01/16/08 DONE DONE DONE 12/24/07 12/24/07 / / / / 16 465 0 JOD 0 0 0
Elementary School:
03-1366 Reconstruction 0-002-007 07/27/04 DONE DONE DONE 04/07/04 04/06/04 03/29/02 12/02/03 9,155,15,16 746,942 746,942 MAC 0 0 0
MOSSIEN ASSOCIATES
06-1213 Additions and Alterations 0-002-008 06/28/07 DONE DONE DONE 03/23/07 03/16/07 08/14/06 12/12/06 02 - 16 2,122,302 1,778,762 HCM 0 0 407,393
MOSSIEN ASSOCIATES
07-1393SC Visual Structural Inspection 0-002-SC2 01/16/08 DONE DONE DONE 12/24/07 12/24/07 / / / / 16 449 0 JOD 0 0 0
Administration Office:
03-1367 Reconstruction 1-004-002 07/27/04 DONE DONE DONE 04/07/04 04/06/04 03/29/02 12/02/03 2 27,000 0 MAC 0 0 0
MOSSIEN ASSOCIATES
Public Library:
06-0074 Additions and Alterations 6-011-001 10/20/06 DONE DONE DONE 07/12/06 07/12/06 03/14/01 12/06/05 02 - 16 1,750,000 0 MAC 0 0 0
Holmes/King & Assoc.
New Concession Stand:
02-1922XX New Construction 7-017-001 09/09/03 CANCELLED 04/07/03 04/07/03 01/31/03 01/14/03 02 - 16 92,800 0 MAC 0 0 0
MOSSIEN ASSOCIATES
Ohmann Press Box:
- DB Discovered Building 7-020-001 / / / / 11/21/06 / / 0 0 HCM 0 0 0
Ohmann Concession Stand:
- DB Discovered Building 7-021-001 / / / / 11/21/06 / / 0 0 HCM 0 0 0
Adult Ed @ Community Center:
- XX Reconstruction 8-018-L01 CANCELLED / / / / 12/15/04 / / 0 0 HCM 0 0 0
Head Start Building:
- TQ Temporary Quarters 8-019-001 / / / / 11/21/06 / / 0 0 HCM 0 0 0
Lyons Community Center:
- TQ Temporary Quarters 8-022-001 / / / / 11/21/06 / / 0 0 HCM 0 0 0
First Presbyterian Church:
- TQ Temporary Quarters 8-023-001 / / / / 08/14/08 / / 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Marion Elementary:
03-1000 Reconstruction 0-001-008 04/07/04 DONE DONE DONE 01/21/04 01/08/04 07/18/03 10/01/97 16 49,216 49,216 DDJ 0 0 0
Ashley McGraw Architects
05-0391 Reconstruction 0-001-009 03/23/06 DONE DONE DONE 11/29/05 11/25/05 11/28/03 03/16/05 2,4,8,9 3,575,531 3,575,531 DDJ 0 0 0
Ashley McGraw Architects
07-2041 Reconstruction 0-001-010 UNREVIEWED 04/30/08 04/23/08 05/08/07 11/28/07 155,16 0 0 DDJ 0 0 0
Design Group Educ. Fac. Dept.
Jr/Sr High School:
05-0392 Additions and Alterations 0-005-010 03/23/06 DONE DONE DONE 11/29/05 11/25/05 11/28/03 03/16/05 02 - 16 7,329,238 6,922,432 DDJ 0 0 0
Ashley McGraw Architects
04-0715 Reconstruction 0-005-011 03/18/05 DONE DONE DONE 01/26/05 01/25/05 12/29/04 03/16/05 155 204,900 204,900 DDJ 0 0 0
Ashley McGraw Architects
07-2042 Reconstruction 0-005-012 UNREVIEWED 04/30/08 04/23/08 05/08/07 11/28/07 155,16 0 14,727,375 DDJ 0 0 0
Design Group Educ. Fac. Dept.
Marion Middle School:
- XX New Construction 0-007-001 CANCELLED / / / / 11/28/03 / / 02 - 16 0 0 DDJ 0 0 0
New Athletic Storage Facility:
05-0393 New Construction 2-008-001 03/23/06 DONE DONE DONE 11/29/05 11/25/05 05/02/05 03/16/05 02 - 16 175,000 0 DDJ 0 0 0
Ashley McGraw Architects
Marion Bus Garage/bus storage facili:
05-0394 Reconstruction 5-002-004 03/23/06 DONE DONE DONE 11/29/05 11/25/05 08/19/04 03/16/05 4 99,447 99,447 DDJ 0 0 0
Ashley McGraw Architects
Press Box @ Marion Jr/Sr High School:
05-0395 New Construction 7-009-001 03/23/06 DONE DONE DONE 11/29/05 11/25/05 05/02/05 03/16/05 02 - 16 41,000 0 DDJ 0 0 0
Ashley McGraw Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
James A Beneway High School:
03-0516 Additions and Alterations 0-001-006 04/06/04 DONE DONE DONE 10/28/03 09/08/03 12/10/01 10/08/02 02 - 16 12,077,475 10,505,142 MAC 0 0 0
Clark Patterson Associates
05-0596 Reconstruction 0-001-007 10/02/06 DONE DONE DONE 01/18/06 01/17/06 10/07/05 08/12/04 155,15 315,846 315,846 RDR 0 0 0
Clark Patterson Associates
- Reconstruction 0-001-008 / / / / 04/03/08 / / 2,4,8,9,155,16 0 0 DDJ 0 0 0
Ontario Elementary School:
03-0517 Reconstruction 0-002-008 04/06/04 DONE DONE DONE 10/28/03 09/08/03 12/10/01 10/08/02 2,9,10,13,14,155,15, 182,000 182,000 MAC 0 0 0
Clark Patterson Associates
05-0597 Reconstruction 0-002-009 10/02/06 DONE DONE DONE 01/18/06 01/17/06 10/07/05 08/12/04 155,15 206,337 206,337 RDR 0 0 0
Clark Patterson Associates
- Reconstruction 0-002-010 / / / / 04/03/08 / / 2,155,15,16 0 0 DDJ 0 0 0
Ontario Primary School:
03-0518 Reconstruction 0-004-009 04/06/04 DONE DONE DONE 10/28/03 09/08/03 12/10/01 10/08/02 2,7,9,15,16 816,000 816,000 MAC 0 0 0
Clark Patterson Associates
05-0598 Reconstruction 0-004-010 10/02/06 DONE DONE DONE 01/18/06 01/17/06 10/07/05 08/12/04 155,15 77,407 77,407 RDR 0 0 0
Clark Patterson Associates
07-2296PR Additions and Alterations 0-004-011 UNREVIEWED 07/01/08 06/16/08 04/03/08 / / 02 - 16 0 17,511,353 DDJ 0 0 0
Clark Patterson Associates
Armstrong Middle School:
03-0519 Reconstruction 0-006-007 04/06/04 DONE DONE DONE 10/28/03 09/08/03 12/10/01 10/08/02 2,8,9,15,16 711,023 711,023 MAC 0 0 0
Clark Patterson Associates
05-0599 Reconstruction 0-006-008 10/02/06 DONE DONE DONE 01/18/06 01/17/06 10/07/05 08/12/04 155,15 680,153 680,153 RDR 0 0 0
Clark Patterson Associates
- PR Additions and Alterations 0-006-009 / / / / 04/03/08 / / 02 - 16 0 0 DDJ 0 0 0
Freewill Elementary:
03-0520 Reconstruction 0-007-006 04/06/04 DONE DONE DONE 10/28/03 09/08/03 12/10/01 10/08/02 2,7,8,9,15,16 955,000 955,000 MAC 0 0 0
Clark Patterson Associates
05-0600 Reconstruction 0-007-007 10/02/06 DONE DONE DONE 01/18/06 01/17/06 10/07/05 08/12/04 155,15 291,241 291,241 RDR 0 0 0
Clark Patterson Associates
- Reconstruction 0-007-008 / / / / 04/03/08 / / 2,4,8,9,16 0 0 DDJ 0 0 0
Maintenance Building:
05-0601 Reconstruction 3-003-007 10/02/06 DONE DONE DONE 01/18/06 01/17/06 10/07/05 08/12/04 155,15 9,406 0 RDR 0 0 0
Clark Patterson Associates
Bus Garage:
05-0602 Reconstruction 5-005-009 10/02/06 DONE DONE DONE 01/18/06 01/17/06 10/07/05 08/12/04 155,15 48,122 48,122 RDR 0 0 0
Clark Patterson Associates
- Reconstruction 5-005-010 / / / / 04/03/08 / / 2,8,9,155,15,16 0 0 DDJ 0 0 0
Press Box:
03-0521 New Construction 7-014-001 04/06/04 DONE DONE DONE 10/28/03 09/08/03 03/22/02 10/08/02 02 - 16 97,752 0 MAC 0 0 0
Clark Patterson Associates
Eagle Ventures Store Front:
04-0647TQ Temporary Quarters 8-015-001 04/21/05 DONE DONE DONE 01/07/05 01/07/05 12/02/04 / / 0 0 MAC 0 0 0
Clark Patterson Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Central Building:
07-0377 Reconstruction 0-001-010 01/31/08 DONE DONE DONE 09/18/07 09/17/07 02/20/07 05/15/07 2,9,10,155,15,16 2,012,566 2,012,566 JOD 0 0 0
SWBR Architects P.C.
06-0410 Visual Structural Inspection 0-001-SC1 11/03/06 DONE DONE DONE 10/20/06 10/20/06 / / / / 16 19,545 12,000 JOD 0 0 0
Palmyra Elementary:
07-0378 Reconstruction 0-002-003 01/31/08 DONE DONE DONE 09/18/07 09/17/07 02/20/07 05/15/07 16 490,641 0 JOD 0 0 0
SWBR Architects P.C.
Macedon Elementary:
04-0823 Reconstruction 0-003-010 04/22/05 DONE DONE DONE 02/14/05 02/11/05 04/01/04 03/16/04 2,8,9,155,15,16 3,123,806 3,033,974 MAC 0 0 0
Beardsley Design Associates Arch.
07-0379 Reconstruction 0-003-011 01/31/08 DONE DONE DONE 09/18/07 09/17/07 02/20/07 05/15/07 16 200,030 0 JOD 0 0 0
SWBR Architects P.C.
Palmyra Macedon Mid.:
04-0824 Reconstruction 0-008-003 04/22/05 DONE DONE DONE 02/14/05 02/11/05 04/01/04 03/16/04 2,4,8,9 701,503 613,790 MAC 0 0 0
Beardsley Design Associates Arch.
07-0380 Reconstruction 0-008-004 01/31/08 DONE DONE DONE 09/18/07 09/17/07 02/20/07 05/15/07 2,4,7,8,9,10,14,155, 7,536,232 0 JOD 0 0 359,627
SWBR Architects P.C.
07-0136 Reconstruction 0-008-005 08/27/07 DONE DONE DONE 08/06/07 08/06/07 06/22/07 05/15/07 8 2,260,531 0 JOD 0 0 325,516
SWBR Architects P.C.
New concession @ Elementary School:
04-0825 New Construction 7-016-001 04/22/05 DONE DONE DONE 02/14/05 02/11/05 04/01/04 03/16/04 02 - 16 98,091 0 MAC 0 0 0
Beardsley Design Associates Arch.
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Central School Bldg:
07-0336 Reconstruction 0-001-014 01/31/08 DONE DONE DONE 09/10/07 09/10/07 01/05/07 03/20/07 7,155,15,16 2,853,938 2,853,938 MGL 0 0 268,270
Clark Patterson Associates
- Reconstruction 0-001-FP1 / / / / / / / / 16 0 4,152,000 JOD 0 0 0
05-0036FP Reconstruction 0-001-FP1 07/14/05 DONE DONE DONE 06/01/06 06/01/06 / / / / 16 3,800 3,800 JOD 0 0 0
Richard Mann Elem (fmly New Primary):
- Reconstruction 0-002-008 / / / / / / / / 0 14,351,283 JOD 0 0 0
07-0337 Reconstruction 0-002-009 01/31/08 DONE DONE DONE 09/10/07 09/10/07 01/05/07 03/20/07 7,16 526,415 526,415 MGL 0 0 49,483
Clark Patterson Associates
- Reconstruction 0-002-FP1 / / / / / / / / 16 0 7,290,000 JOD 0 0 0
05-0035FP Reconstruction 0-002-FP1 07/14/05 DONE DONE DONE 06/01/06 06/01/06 / / / / 16 3,800 3,800 JOD 0 0 0
9-12 High School:
- Reconstruction 0-004-002 / / / / / / / / 155,15,16 0 15,053,484 MGL 0 0 0
07-0338 Reconstruction 0-004-003 01/31/08 DONE DONE DONE 09/10/07 09/10/07 01/05/07 03/20/07 155,15,16 101,873 101,873 MGL 0 0 9,576
Clark Patterson Associates
05-0037FP Reconstruction 0-004-FP1 07/14/05 DONE DONE DONE 07/11/05 / / / / / / 16 3,800 3,800 JOD 0 0 0
TRANS. OPR. @ TOWN OF MACEDON/GANCSD:
07-0381 Reconstruction 5-005-L01 10/03/07 DONE DONE DONE 09/18/07 09/17/07 08/22/06 05/21/02 323,000 323,000 MGL 0 0 0
Equipment Storage 1 Concession Stand:
07-0382DB Discovered Building 7-006-001 ADDENDUM REQ'D 09/18/07 09/17/07 08/20/07 / / 0 0 MGL 0 0 0
Clark Patterson Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Sodus Intermediate/High School:
- Reconstruction 0-001-009 / / / / 03/30/07 / / 2,4,7,8,9,155,15,16 0 0 MGL 0 0 0
- Reconstruction 0-001-010 / / / / 11/27/07 / / 2,4,13,155,15,16 0 0 MGL 0 0 0
07-1513 Reconstruction 0-001-011 03/07/08 DONE DONE DONE 02/01/08 01/31/08 01/17/08 07/10/07 7 342,000 0 MGL 0 0 0
habza architecture
07-1676 Reconstruction 0-001-012 03/19/08 DONE DONE DONE 02/23/08 02/20/08 01/17/08 07/10/07 8 274,000 0 MGL 0 0 0
habza architecture
Sodus Primary:
- Reconstruction 0-004-009 / / / / 03/30/07 / / 4,7,8,9,155,15,16 0 0 MGL 0 0 0
- Reconstruction 0-004-010 / / / / 01/17/08 / / 7 0 0 MGL 0 0 0
07-1514 Reconstruction 0-004-010 03/07/08 DONE DONE DONE 02/01/08 01/31/08 03/30/07 07/10/07 7,8,9,155,15,16 1,355,000 0 MGL 0 0 0
habza architecture
07-1677 Reconstruction 0-004-011 03/19/08 DONE DONE DONE 02/23/08 02/20/08 01/17/08 07/10/07 8 491,000 0 MGL 0 0 0
habza architecture
Pre-Kindergarten Bld:
- Reconstruction 0-009-002 / / / / 04/02/07 / / 7,8,9,155,15,16 0 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Williamson Elementary School:
- PR Additions and Alterations 0-001-006 / / / / / / / / 02 - 16 0 0 JOD 0 0 0
04-1138 Additions and Alterations 0-001-007 05/27/05 DONE DONE DONE 04/13/05 04/12/05 08/26/04 11/30/04 02 - 16 3,862,222 3,862,222 JOD 0 0 0
06-1614 Reconstruction 0-001-008 09/25/07 DONE DONE DONE 06/14/07 06/14/07 11/01/06 12/19/06 2,4,7,8,9,10,155,15, 695,300 695,300 JOD 0 0 65,000
McDonald & Monterose LLP
03-1622SC Visual Structural Inspection 0-001-SC1 06/17/04 DONE DONE DONE 05/21/04 05/21/04 / / / / 16 2,392 2,392 JOD 0 0 0
Williamson Middle School:
04-1139 Additions and Alterations 0-002-006 05/27/05 DONE DONE DONE 04/13/05 04/12/05 08/26/04 11/30/04 02 - 16 1,958,125 1,788,058 JOD 0 0 0
06-1615 Reconstruction 0-002-007 09/25/07 DONE DONE DONE 06/14/07 06/14/07 11/01/06 12/19/06 2,4,7,8,9,10,155,15, 2,322,188 2,329,400 JOD 0 0 205,000
McDonald & Monterose LLP
03-1623SC Visual Structural Inspection 0-002-SC1 06/17/04 DONE DONE DONE 05/21/04 05/21/04 / / / / 16 3,588 3,588 JOD 0 0 0
Williamson Senior High School:
04-1140 Additions and Alterations 0-006-005 05/27/05 DONE DONE DONE 04/13/05 04/12/05 08/26/04 11/30/04 02 - 16 4,095,549 4,095,549 JOD 0 0 0
06-1616 Reconstruction 0-006-006 09/25/07 DONE DONE DONE 06/14/07 06/14/07 11/01/06 12/19/06 2,4,7,8,9,10,155,15, 1,465,264 1,152,300 JOD 0 0 142,432
McDonald & Monterose LLP
03-1624SC Visual Structural Inspection 0-006-SC1 06/17/04 DONE DONE DONE 05/21/04 05/21/04 / / / / 16 7,176 7,176 JOD 0 0 0
Administration Building:
06-1617 New Construction 1-003-001 09/25/07 DONE DONE DONE 06/14/07 06/14/07 11/02/06 12/19/06 02 - 16 30,695 0 JOD 0 0 0
McDonald & Monterose LLP
MAINTENANCE DEPT. STORAGE BUILDING:
- PR New Construction 3-010-001 / / / / 10/02/06 / / 02 - 16 0 0 JOD 0 0 0
06-0343 New Construction 3-010-001 01/02/07 DONE DONE DONE 10/23/06 10/20/06 10/02/06 12/19/06 02 - 16 80,053 0 JOD 0 0 0
McDonald & Monterose LLP
Bus Garage:
04-1141PR Additions and Alterations 5-004-003 / / / / 08/26/04 / / 02 - 16 0 0 JOD 0 0 0
05-0365 Additions and Alterations 5-004-003 01/30/06 DONE DONE DONE 11/22/05 11/21/05 08/26/04 11/30/04 02 - 16 1,192,104 1,192,104 JOD 0 0 0
McDonald & Monterose LLP
District Wide:
04-0140 Reconstruction 7-999-004 09/22/04 DONE DONE DONE 08/19/04 08/17/04 / / 05/18/04 16 89,553 89,553 JOD 0 0 0
IBC Engineering,P.C.
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School:
03-0459 Reconstruction 0-001-012 03/11/04 DONE DONE DONE 10/16/03 09/02/03 11/05/01 04/29/03 2,4,8,9,155,15,16 436,717 436,717 MAC 0 0 0
- Reconstruction 0-001-013 / / / / 08/05/05 / / 16 0 9,293,669 HCM 0 0 0
07-1116 Reconstruction 0-001-014 05/28/08 DONE DONE DONE 12/13/07 12/11/07 10/23/07 03/05/07 2,4,7,8,9,155,15,16 3,469,900 0 HCM 0 0 200,000
Design Group Educ. Fac. Dept.
Florentine-Hendrick Elem.:
03-0460 Reconstruction 0-002-009 03/11/04 DONE DONE DONE 10/16/03 09/02/03 11/05/01 04/29/03 2,8,9,155,15,16 162,940 162,940 MAC 0 0 0
- PR Additions and Alterations 0-002-010 / / / / 08/05/05 / / 02 - 16 0 0 HCM 0 0 0
07-1117 Reconstruction 0-002-011 05/28/08 DONE DONE DONE 12/13/07 12/11/07 10/23/07 03/05/07 2,4,7,8,9,155,15,16 2,777,400 0 HCM 0 0 150,000
Design Group Educ. Fac. Dept.
North Rose Elementary School:
03-0461 Reconstruction 0-007-009 03/11/04 DONE DONE DONE 10/16/03 09/02/03 11/05/01 04/29/03 2,8,9,155,15,16 293,250 293,250 MAC 0 0 0
- Reconstruction 0-007-010 / / / / 08/05/05 / / 16 0 8,893,548 HCM 0 0 0
07-1118 Reconstruction 0-007-011 05/28/08 DONE DONE DONE 12/13/07 12/11/07 10/23/07 03/05/07 2,4,7,8,9,155,15,16 1,959,800 0 HCM 0 0 100,000
Design Group Educ. Fac. Dept.
High School:
03-0462 Reconstruction 0-010-010 03/11/04 DONE DONE DONE 10/16/03 09/02/03 09/04/01 04/29/03 2,4,7,8,9,155,15,16 818,290 818,290 MAC 0 0 0
- PR Additions and Alterations 0-010-011 / / / / 08/05/05 / / 02 - 16 0 0 HCM 0 0 0
07-1119 Additions and Alterations 0-010-012 05/28/08 DONE DONE DONE 12/13/07 12/11/07 10/23/07 03/05/07 02 - 16 12,057,000 0 HCM 0 0 796,708
Design Group Educ. Fac. Dept.
Bd Of Educ Office(District Of.):
- Reconstruction 1-003-004 / / / / 08/05/05 / / 9,16 0 0 HCM 0 0 0
Bus Garage Storage (Mdl Sch):
03-0463 Reconstruction 4-008-007 03/11/04 DONE DONE DONE 10/16/03 09/02/03 11/05/01 04/29/03 2,4,7,8,9,155,15,16 12,901 12,901 MAC 0 0 0
- Reconstruction 4-008-008 / / / / 08/05/05 / / 9,16 0 0 HCM 0 0 0
07-1120 Reconstruction 4-008-009 05/28/08 DONE DONE DONE 12/13/07 12/11/07 10/23/07 03/05/07 2,4,8,9,155,15,16 9,400 0 HCM 0 0 0
Design Group Educ. Fac. Dept.
North Rose Bus Garage (Maint):
03-0464 Reconstruction 5-009-008 03/11/04 DONE DONE DONE 10/16/03 09/02/03 11/05/01 04/29/03 2,4,7,8,9,155,15,16 35,573 35,573 MAC 0 0 0
- Reconstruction 5-009-009 / / / / 08/05/05 / / 16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
K-12 Building:
- PR Additions and Alterations 0-006-004 / / / / 08/21/06 / / 02 - 16 0 0 HCM 0 0 0
06-1398 Reconstruction 0-006-005 05/14/07 DONE DONE DONE 05/03/07 04/30/07 04/18/07 03/29/07 2,7 1,860,611 1,751,000 HCM 0 0 76,286
Glynn Spillane Griffing Architests,P
04-0030SC Visual Structural Inspection 0-006-SC1 07/13/04 DONE DONE DONE 06/25/04 06/25/04 / / / / 16 1,655 1,655 JOD 0 0 0
District Office:
07-0590 Reconstruction 1-003-001 10/19/07 DONE DONE DONE 10/19/07 10/18/07 09/06/07 08/15/07 7 35,000 0 HCM 0 0 0
Glynn Spillane Griffing Architests,P
Bus Garage:
- PR Additions and Alterations 5-004-005 / / / / 08/21/06 / / 02 - 16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED