REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Bolton Central:
- PR Additions and Alterations 0-001-007 / / / / 06/01/06 / / 02 - 16 0 0 MGL 0 0 0
- Reconstruction 0-001-008 / / / / 03/20/07 / / 2,8,9,13,155,15,16 0 9,476,544 MGL 0 0 0
- Reconstruction 0-001-009 / / / / 03/20/07 / / 2,8,9,13,155,15,16 0 9,476,544 MGL 0 0 0
Bus Garage:
06-0405 Reconstruction 5-002-002 11/27/06 DONE DONE DONE 11/01/06 10/31/06 06/01/06 05/16/06 4,13,16 45,000 45,000 MGL 0 0 0
Richard E. Jones Associates
- PR Additions and Alterations 5-002-003 / / / / 06/01/06 / / 02 - 16 0 0 MGL 0 0 0
Land Acquisition:
- PR New Construction 7-004-001 / / / / 02/09/04 / / 02 - 16 0 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
New K-12 Building:
07-1698 Reconstruction 0-014-002 04/30/08 DONE DONE DONE 02/23/08 02/19/08 04/18/07 05/15/07 16 315,182 0 HCM 0 0 0
HA2F Consultants in Engineering
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle/High School:
04-0240 Reconstruction 0-001-016 07/11/06 DONE DONE DONE 09/28/04 09/27/04 06/02/04 09/09/02 8,155,15,16 1,233,146 1,233,146 JOD 0 0 131,958
Peter R. Hoffmann, Architect
06-0685 Reconstruction 0-001-017 04/23/07 DONE DONE DONE 12/28/06 12/22/06 10/07/05 05/16/06 2,7,8,9,13,155,15,16 8,026,697 8,026,697 JOD 0 0 330,000
Dodge Chamberlin Luzine Weber, Arch.
06-0403 Reconstruction 0-001-018 01/04/07 DONE DONE DONE 10/31/06 10/30/06 09/22/06 05/16/06 2,7,8 4,419,805 4,419,805 JOD 0 0 60,000
Dodge Chamberlin Luzine Weber, Arch.
- PR New Construction 0-001-019 / / / / 04/05/07 / / 02 - 16 0 0 JOD 0 0 0
- PR Additions and Alterations 0-001-020 / / / / 07/16/07 / / 02 - 16 0 0 JOD 0 0 0
05-1108SC Visual Structural Inspection 0-001-SC1 04/17/06 DONE DONE DONE 03/30/06 03/30/06 / / / / 16 6,805 4,000 JOD 0 0 0
06-0067SC Visual Structural Inspection 0-001-SC2 08/07/06 DONE DONE DONE 05/11/06 05/11/06 / / / / 16 12,395 4,000 JOD 0 0 0
Big Cross St. Elementary:
04-0241 Reconstruction 0-003-007 07/11/06 DONE DONE DONE 09/28/04 09/27/04 06/02/04 09/09/02 8,155,15,16 159,744 159,744 JOD 0 0 25,000
Peter R. Hoffmann, Architect
06-0686 Reconstruction 0-003-008 04/23/07 DONE DONE DONE 12/28/06 12/22/06 10/07/05 05/16/06 10,155,15,16 198,000 198,000 JOD 0 0 10,000
Dodge Chamberlin Luzine Weber, Arch.
Jackson Heights Elementary:
04-0242 Reconstruction 0-005-006 07/11/06 DONE DONE DONE 09/28/04 09/27/04 06/02/04 09/09/02 8,155,15,16 381,991 381,991 JOD 0 0 75,000
Peter R. Hoffmann, Architect
06-0687 Reconstruction 0-005-007 04/23/07 DONE DONE DONE 12/28/06 12/22/06 10/07/05 05/16/06 2,10,13,155,15,16 1,060,000 1,060,000 JOD 0 0 40,000
Dodge Chamberlin Luzine Weber, Arch.
Sanford St. Elementary:
04-0243 Reconstruction 0-006-007 07/11/06 DONE DONE DONE 09/28/04 09/27/04 06/02/04 09/09/02 8,155,15,16 148,243 148,243 JOD 0 0 25,000
Peter R. Hoffmann, Architect
06-0688 Reconstruction 0-006-008 04/23/07 DONE DONE DONE 12/28/06 12/22/06 10/07/05 05/16/06 4,10,155,15,16 958,000 958,000 JOD 0 0 40,000
Dodge Chamberlin Luzine Weber, Arch.
05-1109SC Visual Structural Inspection 0-006-SC1 04/17/06 DONE DONE DONE 03/30/06 03/30/06 / / / / 16 4,430 2,000 JOD 0 0 0
Kensington Road Elementary:
04-0244 Reconstruction 0-007-006 07/11/06 DONE DONE DONE 09/28/04 09/27/04 06/02/04 09/09/02 8,155,15,16 150,631 150,631 JOD 0 0 25,000
Peter R. Hoffmann, Architect
06-0689 Reconstruction 0-007-007 04/23/07 DONE DONE DONE 12/28/06 12/22/06 10/07/05 05/16/06 2,4,8,10 125,498 125,498 JOD 0 0 5,000
Dodge Chamberlin Luzine Weber, Arch.
06-0404 Reconstruction 0-007-008 01/04/07 DONE DONE DONE 10/31/06 10/30/06 09/22/06 05/16/06 2,8,155 587,000 587,000 JOD 0 0 25,000
Dodge Chamberlin Luzine Weber, Arch.
Administration Bldg:
04-0245 Reconstruction 1-008-002 07/11/06 DONE DONE DONE 09/28/04 09/27/04 06/02/04 / / 8,155,15,16 59,872 0 JOD 0 0 0
Peter R. Hoffmann, Architect
- Additions and Alterations 1-008-003 / / / / 10/07/05 / / 02 - 16 0 0 JOD 0 0 0
Maintenance Facility:
- PR New Construction 3-017-001 / / / / 10/16/07 / / 02 - 16 0 0 JOD 0 0 0
Bus Garage Warehouse:
04-0246 Reconstruction 5-009-002 07/11/06 DONE DONE DONE 09/28/04 09/27/04 06/02/04 09/09/02 8,155,15,16 13,871 13,871 JOD 0 0 0
Peter R. Hoffmann, Architect
Stor/Conc./Toilet/@Middle School /HS:
07-0993 New Construction 7-015-001 12/24/07 DONE DONE DONE 11/29/07 11/29/07 10/15/07 05/15/07 02 - 16 250,000 0 JOD 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Strg./Concession/Toilet/Locker Room:
- PR New Construction 7-016-001 DONE DONE / / / / 10/15/07 / / 02 - 16 0 0 JOD 0 0 0
- New Construction 7-016-002 / / / / / / / / 02 - 16 0 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
04-0617 Additions and Alterations 0-001-005 03/28/05 DONE DONE DONE 12/31/04 12/23/04 02/03/04 05/18/04 02 - 16 3,500,000 3,375,022 MAC 0 0 0
Glynn Spillane Griffing Architests,P
07-0185 Reconstruction 0-001-006 12/04/07 DONE DONE DONE 08/16/07 08/16/07 11/21/06 05/15/07 2,4,7,13,16 399,767 399,767 JOD 0 0 126,581
Glynn Spillane Griffing Architests,P
02-0418FP Reconstruction 0-001-FP1 11/13/03 DONE DONE DONE 11/01/02 / / / / / / 16 0 4,356,000 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Bldg.Jr/Sr High School:
06-1670 Reconstruction 0-004-007 07/27/07 DONE DONE DONE 06/27/07 06/26/07 01/10/07 04/03/07 155,16 434,675 434,675 HCM 0 0 345,578
SEI Design Group
Lake George Elementary School:
06-1671 Reconstruction 0-006-011 07/27/07 DONE DONE DONE 06/27/07 06/26/07 01/10/07 04/03/07 155,16 11,800 11,800 HCM 0 0 1,800
SEI Design Group
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
03-0038 Reconstruction 0-001-013 07/11/03 DONE DONE DONE 07/08/03 07/03/03 04/03/03 06/03/03 7 490,772 490,772 HCM 0 0 0
James D. Smith Asso.
07-1200 Reconstruction 0-001-016 03/24/08 DONE DONE DONE 12/24/07 12/21/07 02/05/07 10/16/07 2,8 671,637 0 HCM 0 0 241,487
Smith Pollard Architects
07-0892SC Visual Structural Inspection 0-001-SC1 12/06/07 DONE DONE DONE 09/18/07 09/18/07 / / / / 16 20,393 0 JOD 0 0 0
Middle School:
03-0039 Reconstruction 0-004-006 07/11/03 DONE DONE DONE 07/08/03 07/03/03 04/03/03 06/03/03 7 326,848 326,848 HCM 0 0 0
James D. Smith Asso.
07-1201 Reconstruction 0-004-008 03/24/08 DONE DONE DONE 12/24/07 12/21/07 10/29/07 10/16/07 155 70,000 0 HCM 0 0 70,000
Smith Pollard Architects
07-0891SC Visual Structural Inspection 0-004-SC1 12/06/07 DONE DONE DONE 09/18/07 09/18/07 / / / / 16 24,586 0 JOD 0 0 0
CONCESSION SHED @ MIDDLE SCHOOL:
- DB Discovered Building 2-018-001 / / / / 05/10/06 / / 0 0 HCM 0 0 0
Liquid Propane Gauge Shed:
03-0104DB Discovered Building 7-017-001 05/10/04 DONE DONE DONE 07/25/03 / / 04/25/03 / / 0 0 HCM 0 0 0
Concession Shed:
07-0250DB Discovered Building 7-018-001 09/05/07 DONE DONE DONE 08/28/07 08/20/07 08/23/07 / / 02 - 16 0 0 HCM 0 0 0
Smith Pollard Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School:
06-1331 Reconstruction 0-001-024 05/21/07 DONE DONE DONE 04/17/07 04/13/07 03/05/07 03/14/07 2,9 100,000 0 MGL 0 0 0
Thomas Associates
Bus Garage B:
03-1295 Reconstruction 5-020-004 05/10/04 DONE DONE DONE 03/19/04 03/18/04 10/30/03 06/03/03 13,15 136,120 136,120 RDR 0 0 0
Thomas Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Abraham Wing School:
- PR Additions and Alterations 0-001-005 / / / / 01/02/07 / / 02 - 16 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
07-0793 Additions and Alterations 0-001-005 04/22/08 DONE DONE DONE 11/13/07 11/09/07 01/20/05 03/06/07 02 - 16 2,269,748 0 DDJ 0 0 718,297
Thomas Associates
Maintenance Storage (Garage):
- Reconstruction 3-004-001 / / / / 04/26/07 / / 4,7 0 0 DDJ 0 0 0
- Reconstruction 3-004-002 / / / / 04/30/07 / / 4,7 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED