REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Maintenance Storage Building:
00-0188DB Discovered Building 2-010-001 09/21/09 DONE DONE DONE 08/22/00 / / 07/24/00 / / 0 0 BJB 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Frank T. Meagher Elementary:
05-1095 Reconstruction 0-001-008 06/12/06 DONE DONE DONE 04/10/06 04/07/06 02/16/06 05/05/05 155 108,973 108,973 JOD 0 0 0
Collins & Scoville Architects
08-0845 Reconstruction 0-001-009 05/19/09 DONE DONE DONE 12/03/08 12/01/08 07/30/07 03/20/07 2,8,16 125,000 0 JOD 0 0 35,500
Collins & Scoville Architects
Sophie Finn Elementary School:
07-0931 Reconstruction 0-002-010 07/03/08 DONE DONE DONE 11/23/07 11/21/07 02/17/06 03/20/07 8 694,000 0 JOD 0 0 197,096
Collins & Scoville Architects
07-1801 Reconstruction 0-002-011 05/01/08 DONE DONE DONE 03/15/08 03/14/08 01/30/08 03/20/07 741,976 437,500 JOD 0 0 210,721
Collins & Scoville Architects
John F. Kennedy Elem School:
07-0932 Reconstruction 0-003-006 07/03/08 DONE DONE DONE 11/23/07 11/21/07 02/16/06 03/20/07 8 125,000 0 JOD 0 0 35,500
Collins & Scoville Architects
08-0846 Reconstruction 0-003-007 05/19/09 DONE DONE DONE 12/03/08 12/01/08 07/09/08 03/20/07 2,7,8,155,15,16 1,932,500 0 JOD 0 0 548,830
Collins & Scoville Architects
George Washington School:
07-0933 Reconstruction 0-004-008 07/03/08 DONE DONE DONE 11/23/07 11/21/07 02/16/06 03/20/07 2,8,9,13,14,15,16 860,000 860,000 JOD 0 0 244,240
Collins & Scoville Architects
07-1802 Reconstruction 0-004-009 05/01/08 DONE DONE DONE 03/15/08 03/14/08 01/30/08 03/20/07 7 677,421 600,000 JOD 0 0 192,387
Collins & Scoville Architects
Myron J. Michael Building:
05-1096 Reconstruction 0-005-010 06/12/06 DONE DONE DONE 04/10/06 04/07/06 02/16/06 05/05/05 155 112,785 112,785 JOD 0 0 0
Collins & Scoville Architects
07-0934 Reconstruction 0-005-011 07/24/08 DONE DONE DONE 11/23/07 11/21/07 / / 03/20/07 575,800 0 JOD 0 0 163,527
Collins & Scoville Architects
- Reconstruction 0-005-012 / / / / 07/30/07 / / 2,4,7,8,9,10,14,15,1 0 0 JOD 0 0 0
Kingston High School:
07-0935 Reconstruction 0-006-014 07/03/08 DONE DONE DONE 11/23/07 11/21/07 07/30/07 03/20/07 2,4,7,8,9,15,16 1,058,000 0 JOD 0 0 300,472
Collins & Scoville Architects
07-1803 Reconstruction 0-006-015 05/01/08 DONE DONE DONE 03/15/08 03/14/08 01/30/08 03/20/07 7 819,000 0 JOD 0 0 232,596
Collins & Scoville Architects
- Reconstruction 0-006-016 / / / / 02/06/09 / / 10 0 0 JOD 0 0 0
Vocational Bldg(Whiston Bldg.):
07-0936 Reconstruction 0-007-006 07/03/08 DONE DONE DONE 11/23/07 11/21/07 07/30/07 03/20/07 155,16 75,600 0 JOD 0 0 21,470
Collins & Scoville Architects
Kate Walton Field House:
07-0937 Reconstruction 0-008-010 07/03/08 DONE DONE DONE 11/23/07 11/21/07 02/16/06 03/20/07 7 446,000 0 JOD 0 0 126,664
Collins & Scoville Architects
06-1244 Reconstruction 0-008-011 06/20/07 DONE DONE DONE 03/29/07 03/28/07 03/05/07 05/15/07 2,7 358,344 358,344 JOD 0 0 0
Collins & Scoville Architects
Chambers Elementary:
08-0847 Reconstruction 0-009-010 05/19/09 DONE DONE DONE 12/03/08 12/01/08 02/16/06 03/20/08 7,8,155,16 1,437,500 0 JOD 0 0 408,250
Collins & Scoville Architects
eeea Devine School:
07-0938 Reconstruction 0-010-005 07/03/08 DONE DONE DONE 11/23/07 11/21/07 02/16/06 03/20/07 2,8 387,500 0 JOD 0 0 110,050
Collins & Scoville Architects
07-1804 Reconstruction 0-010-006 05/01/08 DONE DONE DONE 03/15/08 03/14/08 01/30/08 03/20/07 7 874,276 662,500 JOD 0 0 248,294
Collins & Scoville Architects
Louis A Salzmann Bldg.:
07-0939 Reconstruction 0-011-006 07/03/08 DONE DONE DONE 11/23/07 11/21/07 07/30/07 03/20/07 9,16 589,000 0 JOD 0 0 167,276
Collins & Scoville Architects
Robert Graves Ptbldg:
- Reconstruction 0-012-002 / / / / 02/17/06 / / 8,155 0 279,266 JOD 0 0 0
Ernest C. Myer Elementary:
08-0848 Reconstruction 0-013-007 05/19/09 DONE DONE DONE 12/03/08 12/01/08 02/16/06 03/20/08 8 957,500 0 JOD 0 0 271,930
Collins & Scoville Architects
Edward R.Crosby Elementary:
05-1097 Reconstruction 0-014-006 06/12/06 DONE DONE DONE 04/10/06 04/07/06 02/17/06 05/05/05 2,8,155 107,780 107,780 JOD 0 0 0
Collins & Scoville Architects
08-0849 Reconstruction 0-014-007 05/19/09 DONE DONE DONE 12/03/08 12/01/08 07/30/07 03/20/07 2,7,8,16 1,314,000 0 JOD 0 0 373,176
Collins & Scoville Architects
Robert Graves Elem. School:
07-0940 Reconstruction 0-016-005 07/03/08 DONE DONE DONE 11/23/07 11/21/07 07/30/07 03/20/07 2,4,7,9,15,16 220,000 0 JOD 0 0 62,480
Collins & Scoville Architects
07-1805 Reconstruction 0-016-006 05/01/08 DONE DONE DONE 03/15/08 03/14/08 01/30/08 03/20/07 7 1,005,070 819,000 JOD 0 0 285,440
Collins & Scoville Architects
Tobin Learning Center:
07-0941 Reconstruction 0-017-004 07/03/08 DONE DONE DONE 11/23/07 11/21/07 07/30/07 03/20/07 155,16 74,000 0 JOD 0 0 21,016
Collins & Scoville Architects
J. Watson Bailey Jr High proj.advent:
06-0235 Alterations 0-026-007 09/21/06 DONE DONE DONE 07/05/06 07/05/06 / / / / 02 - 16 0 0 JOD 0 0 0
07-0942 Reconstruction 0-026-008 07/03/08 DONE DONE DONE 11/23/07 11/21/07 07/30/07 03/20/07 2,4,7,8,9,10,155,15, 1,130,994 0 JOD 0 0 321,202
Collins & Scoville Architects
07-1806 Reconstruction 0-026-009 05/01/08 DONE DONE DONE 03/15/08 03/14/08 01/30/08 03/20/07 7 2,839,382 1,227,600 JOD 0 0 806,385
Collins & Scoville Architects
08-0850 Reconstruction 0-026-010 05/19/09 DONE DONE DONE 12/03/08 12/01/08 07/09/08 03/20/07 2,8,155,16 2,000,000 0 JOD 0 0 568,000
Collins & Scoville Architects
Harry L. Edson Elem. School:
07-0943 Reconstruction 0-027-005 07/03/08 DONE DONE DONE 11/23/07 11/21/07 02/16/06 03/20/07 8 665,000 0 JOD 0 0 188,860
Collins & Scoville Architects
M. Clifford Miller Middle:
08-0851 Reconstruction 0-028-008 05/19/09 DONE DONE DONE 12/03/08 12/01/08 02/16/06 03/20/07 8 1,487,500 0 JOD 0 0 422,450
Collins & Scoville Architects
06-0236 Alterations 0-028-009 09/21/06 DONE DONE DONE 07/05/06 07/05/06 / / / / 02 - 16 0 0 JOD 0 0 0
Zena Elementary:
08-0852 Reconstruction 0-031-005 05/19/09 DONE DONE DONE 12/03/08 12/01/08 07/30/07 03/20/07 2,7,8,15,16 412,500 0 JOD 0 0 117,150
Collins & Scoville Architects
Carnegie Learning Center:
09-0380 Reconstruction 0-041-001 STARTED STARTED UNREVIEWED11/02/09 11/02/09 / / 11/19/08 2,4,7,8,9,10,14,155, 0 0 JOD 0 0 0
KSQ Architects,P.C
Central Administration:
- Reconstruction 1-029-005 / / / / 02/16/06 / / 9,155 0 0 JOD 0 0 0
Buildings and Grounds Dept. Leased:
07-1066TQ Temporary Quarters 1-048-001 01/25/08 DONE DONE DONE 12/06/07 11/27/07 10/17/07 / / 0 0 JOD 0 0 0
Carnegie Library Annex:
- Additions and Alterations 6-041-002 UNREVIEWED 11/03/09 11/02/09 05/14/09 11/19/08 02 - 16 0 0 JOD 0 0 0
KSQ Architects,P.C
09-0119PR Additions and Alterations 6-041-002 09/22/09 DONE DONE DONE 08/12/09 08/11/09 05/14/09 11/19/08 02 - 16 0 0 JOD 0 0 0
KSQ Architects,P.C
Gray Building:
- TQ Temporary Quarters 8-049-001 / / / / 11/10/09 / / 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School:
07-1102 Reconstruction 0-001-003 01/11/08 DONE DONE DONE 12/12/07 12/11/07 06/19/07 10/30/07 4,7,8,16 198,116 156,000 JOD 0 0 49,920
Dodge Chamberlin Luzine Weber, Arch.
07-2019 Reconstruction 0-001-004 11/24/08 DONE DONE DONE 04/24/08 04/16/08 02/04/08 10/30/07 2,4,8,10,16 299,635 650,000 JOD 0 0 66,010
Dodge Chamberlin Luzine Weber, Arch.
Junior/Senior High School:
05-0158 Reconstruction 0-009-006 09/30/05 DONE DONE DONE 08/29/05 08/25/05 07/22/05 05/17/05 155 51,177 51,177 JOD 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-1103 Reconstruction 0-009-007 01/11/08 DONE DONE DONE 12/12/07 12/11/07 06/19/07 10/30/07 7,8,9,155,15,16 502,449 504,000 JOD 0 0 160,281
Dodge Chamberlin Luzine Weber, Arch.
07-2020 Reconstruction 0-009-008 11/24/08 DONE DONE DONE 04/24/08 04/16/08 02/04/08 10/30/07 2,8,10,155,16 797,317 530,000 JOD 0 0 178,227
Dodge Chamberlin Luzine Weber, Arch.
Elementary School:
07-1104 Reconstruction 0-010-007 01/11/08 DONE DONE DONE 12/12/07 12/11/07 06/19/07 10/30/07 4,7,8,155,15,16 258,315 322,400 JOD 0 0 82,402
Dodge Chamberlin Luzine Weber, Arch.
07-2021 Reconstruction 0-010-008 11/24/08 DONE DONE DONE 04/24/08 04/16/08 02/04/08 10/30/07 2,4,8,10,155,16 444,168 444,168 JOD 0 0 85,813
Dodge Chamberlin Luzine Weber, Arch.
Bus Garage:
07-2022 Reconstruction 5-002-004 11/24/08 DONE DONE DONE 04/24/08 04/16/08 06/19/07 10/30/07 2,7,15 0 100,000 JOD 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-2106 Reconstruction 5-002-005 05/12/08 DONE DONE DONE 05/08/08 05/07/08 08/20/07 / / 2,15 124,406 124,406 JOD 0 0 0
Chazen Engineering & Land Surveying
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Rondout Valley High:
08-0285PR Additions and Alterations 0-002-007 UNREVIEWED 09/09/08 09/04/08 01/10/06 / / 02 - 16 0 0 MGL 0 0 0
Einhorn Yaffee Prescott P.C.
08-0593 Additions and Alterations 0-002-007 05/14/09 DONE DONE DONE 10/24/08 10/22/08 01/10/06 10/21/07 02 - 16 25,736,500 23,368,940 MGL 0 0 871,330
Einhorn Yaffee Prescott P.C.
- PR Additions and Alterations 0-002-008 / / / / 08/27/08 / / 02 - 16 0 0 JOD 0 0 0
Kerhonkson Elementary:
- PR Additions and Alterations 0-006-006 / / / / 04/06/06 / / 02 - 16 0 0 MGL 0 0 0
Middle School:
08-0594 Reconstruction 0-007-010 05/14/09 DONE DONE DONE 10/24/08 10/22/08 11/06/06 10/21/07 2,8,9,10,15,16 1,688,500 0 MGL 0 0 0
Einhorn Yaffee Prescott P.C.
- Reconstruction 0-007-011 / / / / 03/24/09 / / 10,15 0 0 JOD 0 0 0
Rosendale Elementary:
- Reconstruction 0-012-007 / / / / 03/24/09 / / 2,7 0 0 JOD 0 0 0
Metak Storage Building:
- PR New Construction 2-018-001 / / / / 12/06/06 / / 02 - 16 0 0 MGL 0 0 0
Bus Garage:
- Reconstruction 5-008-003 / / / / 03/24/09 / / 2,7 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School:
08-1730 Reconstruction 0-001-007 07/15/09 DONE DONE DONE 06/22/09 06/12/09 03/24/09 05/11/09 15 325,000 0 HCM 0 0 0
Fellenzer Engineering
Middle Hope ES:
04-0704 Additions and Alterations 0-003-003 02/11/05 DONE DONE DONE 01/21/05 01/20/05 05/01/01 12/17/02 02 - 16 5,011,491 2,424,004 BJB 0 0 0
Einhorn Yaffee Prescott P.C.
Milton Elementary:
04-0705 Additions and Alterations 0-006-004 02/11/05 DONE DONE DONE 01/21/05 01/20/05 05/01/01 12/17/02 02 - 16 4,844,745 2,384,484 BJB 0 0 0
Einhorn Yaffee Prescott P.C.
Marlboro High School:
07-0541 Reconstruction 0-007-004 01/21/08 DONE DONE DONE 10/12/07 10/11/07 09/03/04 03/20/07 2 3,187,500 3,187,500 HCM 0 0 684,823
ThomasAssociates, PC
07-1263 Additions and Alterations 0-007-005 09/26/08 DONE DONE DONE 12/31/07 12/26/07 09/07/04 03/20/07 02 - 16 20,878,500 0 HCM 0 0 870,000
ThomasAssociates, PC
09-0311 Reconstruction 0-007-006 STARTED STARTED UNREVIEWED***SHPO RESPONSE*** 0 HCM 0 0 0
Tetra Tech Architects & Engineers
Marlboro CSD - Central Offices:
08-0675TQ Temporary Quarters 1-020-001 11/03/08 DONE DONE DONE 11/04/08 10/31/08 04/03/08 / / 0 0 HCM 0 0 0
Thomas Associates
Lattintown School:
07-2292 Reconstruction 2-005-001 07/07/08 DONE DONE DONE 07/01/08 06/16/08 04/03/08 04/17/08 2 90,000 0 HCM 0 0 0
ThomasAssociates, PC
Central Storage:
- PR Additions and Alterations 3-004-001 / / / / 06/08/06 / / 02 - 16 0 0 HCM 0 0 0
Residential Building (1 Fam Rental):
04-1074DB Discovered Building 7-018-001 05/23/05 DONE DONE DONE 04/01/05 03/31/05 02/20/03 / / 0 0 HCM 0 0 0
Residential Building #4 (1 Fam Rent):
08-1303DB Discovered Building 7-019-001 04/30/09 DONE DONE DONE 03/02/09 02/26/09 04/23/07 / / 0 0 HCM 0 0 0
Concession Stand at Middle High:
09-0400 New Construction 7-021-001 STARTED STARTED UNREVIEWED***SHPO RESPONSE*** 0 HCM 0 0 0
Tetra Tech Architects & Engineers
Press Box at Middle High School:
- PR New Construction 7-022-001 / / / / 03/26/09 / / 02 - 16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School:
06-0004 Reconstruction 0-001-010 05/11/07 DONE DONE DONE 07/06/06 07/06/06 05/19/06 03/01/06 2,4,8,9,155,15,16 126,200 0 DDJ 0 0 0
Hewitt Monahan Associates,PLLC
- PR Additions and Alterations 0-001-011 / / / / 11/06/09 / / 02 - 16 0 0 DDJ 0 0 0
Duzine Elementary School:
06-0005 Reconstruction 0-004-008 05/11/07 DONE DONE DONE 07/06/06 07/06/06 05/19/06 03/01/06 2,4,7,8,9,155,15,16 12,400 0 DDJ 0 0 0
Hewitt Monahan Associates,PLLC
07-0579 Reconstruction 0-004-009 10/17/07 DONE DONE DONE 10/17/07 09/18/07 06/26/07 05/15/07 2,4,7 200,000 200,000 DDJ 0 0 0
Collins & Scoville Architects,P.C.
07-1282 Reconstruction 0-004-010 04/15/09 DONE DONE DONE 01/02/08 12/28/07 09/27/07 05/15/07 2,4,7,155,15,16 803,555 0 DDJ 0 0 315,418
Collins & Scoville Architects,P.C.
- Reconstruction 0-004-011 / / / / 08/12/08 / / 2,4,10,13,14,15,16 0 0 DDJ 0 0 0
High School:
07-1283 Reconstruction 0-005-014 04/15/09 DONE DONE DONE 01/02/08 12/28/07 09/27/07 05/15/07 2,4,7,8,9,10,155,15, 927,257 0 DDJ 0 0 364,566
Collins & Scoville Architects,P.C.
- Reconstruction 0-005-015 / / / / 01/20/09 / / 2,4,8,9,10,155,15,16 0 0 DDJ 0 0 0
- PR Additions and Alterations 0-005-016 / / / / 11/06/09 / / 02 - 16 0 0 DDJ 0 0 0
Lenape Elementary School:
- Reconstruction 0-008-007 / / / / 05/19/06 / / 2,4,7,8,9,155,15,16 0 13,018,017 DDJ 0 0 0
07-1284 Reconstruction 0-008-008 04/15/09 DONE DONE DONE 01/02/08 12/28/07 09/27/07 05/15/07 2,4,7,8,9,10,13,14,1 135,688 0 DDJ 0 0 53,548
Collins & Scoville Architects,P.C.
08-1610 Reconstruction 0-008-009 05/12/09 DONE DONE DONE 05/11/09 05/05/09 01/20/09 01/20/09 2,4,8,9,10,155,15,16 20,000 0 DDJ 0 0 0
AlFandre Architecture
District Office (Leased):
- TQ Temporary Quarters 1-016-001 / / / / 12/07/06 / / 0 0 DDJ 0 0 0
Transportation Facility:
- XX New Construction 5-015-001 CANCELLED / / / / 01/05/05 / / 02 - 16 0 0 DDJ 0 0 0
- PR Additions and Alterations 5-015-002 / / / / 11/06/09 / / 02 - 16 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Jr/Sr High School:
07-1199 Reconstruction 0-001-016 08/04/08 DONE DONE DONE 12/24/07 12/21/07 04/18/07 03/29/07 4,8,9,10,13,14,155,1 1,587,060 1,587,060 DDJ 0 0 321,010
KSQ Architects,P.C
08-1391 Reconstruction 0-001-017 03/18/09 DONE DONE DONE 03/18/09 03/18/09 01/09/09 12/02/08 2,15,16 181,329 181,329 DDJ 0 0 0
Clark Patterson Associates
08-1546 Reconstruction 0-001-018 07/06/09 DONE DONE DONE 04/27/09 04/21/09 01/12/09 05/20/08 2,7 1,079,100 0 DDJ 0 0 0
KSQ Architects,P.C
- PR Additions and Alterations 0-001-019 / / / / 06/04/09 / / 02 - 16 0 0 DDJ 0 0 0
08-1707 Reconstruction 0-001-019 09/03/09 DONE DONE DONE 06/18/09 06/18/09 01/14/09 05/20/08 2,15,16 171,000 0 0 0 0
KSQ Architects,P.C
Woodstock Elementary:
05-1230 Reconstruction 0-009-009 06/13/06 DONE DONE DONE 05/08/06 05/01/06 03/21/06 01/31/06 13 116,000 116,000 DDJ 0 0 0
Warren & Panzer Engineers, P.C.
06-1391 Reconstruction 0-009-010 05/10/07 DONE DONE DONE 05/02/07 05/01/07 04/18/07 03/29/07 9,155,15,16 495,219 0 DDJ 0 0 341,701
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Riccardi School (F'mlyGlasco):
05-0651 Alterations 0-004-005 04/13/06 DONE DONE DONE 01/24/06 01/24/06 / / 03/15/05 02 - 16 2,181,995 2,181,995 DDJ 0 0 0
Glynn Spillane Griffing Architests,P
Cahill Elementary School:
05-0652 Reconstruction 0-005-015 04/13/06 DONE DONE DONE 01/24/06 01/24/06 09/01/04 03/15/05 7,9,155,16 286,168 286,168 DDJ 0 0 0
Glynn Spillane Griffing Architests,P
Mt Marion Elementary:
05-0653 Alterations 0-008-011 04/13/06 DONE DONE DONE 01/24/06 01/24/06 09/01/04 03/15/05 02 - 16 2,867,631 2,867,631 DDJ 0 0 0
Glynn Spillane Griffing Architests,P
Jr/Sr High School:
05-0772 Additions and Alterations 0-009-016 06/08/06 DONE DONE DONE 02/15/06 02/07/06 09/01/04 03/15/05 02 - 16 19,961,954 19,961,954 DDJ 0 0 1,081,872
Glynn Spillane Griffing Architests,P
Grant D Morse Elem. School:
05-0654 Alterations 0-010-008 04/13/06 DONE DONE DONE 01/24/06 01/24/06 09/01/04 03/15/05 02 - 16 2,371,513 2,371,513 DDJ 0 0 0
Glynn Spillane Griffing Architests,P
Multi-purpose Bldg:
- Reconstruction 2-002-002 / / / / 12/21/04 / / 4,7,8,9,10,155,15,16 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Leptondale Elementary:
04-1187 Reconstruction 0-001-012 06/21/05 DONE DONE DONE 04/25/05 04/22/05 03/23/04 03/21/00 2,15 357,420 357,420 DDJ 0 0 0
Clark Patterson Associates
05-1213 Reconstruction 0-001-013 06/22/06 DONE DONE DONE 04/28/06 04/26/06 02/16/06 05/16/06 62,800 62,800 DDJ 0 0 11,932
Clark Patterson Associates
07-0775 Reconstruction 0-001-014 04/16/08 DONE DONE DONE 11/13/07 11/08/07 03/20/07 02/27/07 2,4,7,8,9,10,13,155, 2,036,067 2,036,067 DDJ 0 0 199,754
Thomas Associates
09-0414 Reconstruction 0-001-015 DONE STARTED UNREVIEWED11/10/09 11/09/09 05/07/09 02/27/07 2,4,7,8,9,155,15,16 0 0 DDJ 0 0 0
TEtra Tech Engineers,Architects,& La
John G. Borden Middle(fmly Wallkill):
07-0776 Reconstruction 0-002-008 04/16/08 DONE DONE DONE 11/13/07 11/08/07 03/20/07 02/27/07 2,4,7,8,9,10,13,14,1 2,807,885 2,807,885 DDJ 0 0 275,475
Thomas Associates
09-0415 Reconstruction 0-002-009 DONE STARTED UNREVIEWED11/10/09 11/09/09 05/07/09 02/27/07 2,4,7,8,9,155,15,16 0 0 DDJ 0 0 0
TEtra Tech Engineers,Architects,& La
06-0679SC Visual Structural Inspection 0-002-SC1 12/28/06 DONE DONE DONE 12/14/06 12/14/06 / / / / 16 3,006 2,000 JOD 0 0 0
Ostrander Elementary:
07-0777 Reconstruction 0-003-009 04/16/08 DONE DONE DONE 11/13/07 11/08/07 03/20/07 02/27/07 2,4,7,8,9,10,13,155, 1,790,585 1,790,585 DDJ 0 0 175,670
Thomas Associates
09-0416 Reconstruction 0-003-010 DONE STARTED UNREVIEWED11/10/09 11/09/09 05/07/09 02/27/07 2,4,7,8,9,155,15,16 0 0 DDJ 0 0 0
TEtra Tech Engineers,Architects,& La
06-0680SC Visual Structural Inspection 0-003-SC1 12/28/06 DONE DONE DONE 12/14/06 12/14/06 / / / / 16 2,406 2,000 JOD 0 0 0
Plattekill Elementary:
07-0778 Reconstruction 0-005-010 04/16/08 DONE DONE DONE 11/13/07 11/08/07 03/20/07 02/27/07 2,4,7,8,9,10,13,155, 1,967,961 1,967,961 DDJ 0 0 193,072
Thomas Associates
09-0417 Reconstruction 0-005-011 DONE STARTED UNREVIEWED11/10/09 11/09/09 05/07/09 02/27/07 2,4,7,8,9,155,15,16 0 0 DDJ 0 0 0
TEtra Tech Engineers,Architects,& La
06-0681SC Visual Structural Inspection 0-005-SC1 12/28/06 DONE DONE DONE 12/14/06 12/14/06 / / / / 16 2,406 2,000 JOD 0 0 0
Wallkill High School:
05-1214 Reconstruction 0-007-013 06/22/06 DONE DONE DONE 04/28/06 04/26/06 02/16/06 05/16/06 7 67,483 67,483 DDJ 0 0 16,663
Clark Patterson Associates
07-0779 Reconstruction 0-007-014 04/16/08 DONE DONE DONE 11/13/07 11/08/07 03/20/07 02/27/07 2,4,7,8,9,10,13,14,1 3,012,082 3,012,082 DDJ 0 0 295,509
Thomas Associates
06-0249SC Visual Structural Inspection 0-007-SC1 10/03/06 DONE DONE DONE 09/25/06 09/25/06 / / / / 16 8,593 8,593 JOD 0 0 0
Lacrosse Storage:
06-0375DB Discovered Building 2-022-001 11/15/07 DONE DONE DONE 10/30/06 10/30/06 10/24/06 / / 0 0 DDJ 0 0 0
Soccer Storage:
06-0376DB Discovered Building 2-023-001 11/15/07 DONE DONE DONE 10/30/06 10/30/06 10/24/06 / / 0 0 DDJ 0 0 0
Athletic Storage @ Ostrander ES:
06-0377DB Discovered Building 2-024-001 11/15/07 DONE DONE DONE 10/30/06 10/30/06 10/24/06 / / 0 0 DDJ 0 0 0
Pump House @ HS Soccer Field:
06-0378DB Discovered Building 7-025-001 11/15/07 DONE DONE DONE 10/30/06 10/30/06 10/24/06 / / 0 0 DDJ 0 0 0
Concession Bldg. @ Soccer Field:
06-0379DB Discovered Building 7-026-001 11/15/07 DONE DONE DONE 10/30/06 10/30/06 10/24/06 / / 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
MS/HS 5-12:
05-0172 Reconstruction 0-001-019 06/02/06 DONE DONE DONE 09/01/05 09/01/05 09/23/04 05/17/05 4 632,000 651,478 DDJ 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
08-0002 Reconstruction 0-001-020 07/14/08 DONE DONE DONE 07/11/08 07/07/08 05/14/08 05/22/08 155,16 341,376 341,376 DDJ 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
ES K-4:
- Reconstruction 0-008-004 / / / / 02/27/06 / / 4,9,16 0 11,456,591 DDJ 0 0 0
08-1654 Reconstruction 0-008-005 06/26/09 DONE DONE DONE 06/01/09 05/20/09 03/26/09 05/13/08 2,9 56,599 56,599 DDJ 0 0 0
Mosaic Associates
Ellenville Public Library:
06-0563 Reconstruction 6-007-003 12/04/06 DONE DONE DONE 11/29/06 11/28/06 11/28/06 11/15/06 7,13 141,250 0 DDJ 0 0 0
Bryan Zelnik Architect
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Port Ewen Ed Center (Votec):
05-0638 Reconstruction 0-014-012 05/19/06 DONE DONE DONE 01/19/06 01/19/06 07/21/05 05/17/05 2,4,8,9,10,155,15,16 699,585 699,585 JOD 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
05-0909 Reconstruction 0-014-013 07/21/06 DONE DONE DONE 03/09/06 03/07/06 02/08/06 05/17/05 4,8,9,10,155,15,16 755,528 755,528 JOD 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
08-1422 Reconstruction 0-014-014 04/13/09 DONE DONE DONE 03/24/09 03/20/09 01/21/09 05/11/08 7 241,188 324,000 JOD 0 0 0
Mosaic Associates
08-1421 Reconstruction 0-014-015 04/21/09 DONE DONE DONE 03/24/09 03/20/09 01/26/09 05/11/08 4,8,9 170,972 211,500 JOD 0 0 0
Mosaic Associates
- Reconstruction 0-014-016 / / / / 06/04/09 / / 4,8,9,10,155,15,16 0 0 JOD 0 0 0
09-0390 Reconstruction 0-014-017 UNREVIEWED 11/05/09 11/04/09 09/04/09 05/19/08 4,9,155 0 0 JOD 0 0 0
Mosaic Associates
Instructional Center:
05-0139 Reconstruction 1-002-002 09/06/05 DONE DONE DONE 08/18/05 08/17/05 07/20/05 05/17/05 7,10,155,15,16 50,000 0 JOD 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Administration Building:
05-0186 Reconstruction 1-003-010 11/10/05 DONE DONE DONE 09/13/05 09/10/05 07/21/05 05/17/05 2,4,8,9,10 94,000 0 JOD 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
06-0550 Reconstruction 1-003-011 11/30/06 DONE DONE DONE 11/22/06 11/22/06 / / 05/16/06 2,10 160,000 0 JOD 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Route 9W Bus Garage:
04-1469TQ Temporary Quarters 4-030-001 07/14/05 DONE DONE DONE / / / / 09/30/02 / / 0 0 JOD 0 0 0
District-Wide Project:
08-1131 Reconstruction 7-999-002 03/16/09 DONE DONE DONE 01/27/09 01/23/09 12/04/08 05/20/08 16 356,904 420,250 JOD 0 0 0
Mosaic Associates
:
- TQ Temporary Quarters 8-034-001 / / / / 07/11/05 / / 0 0 JOD 0 0 0
ULSTER CCC-ALQONQUIN BUILDING:
06-0203TQ Temporary Quarters 8-035-001 02/13/07 DONE DONE DONE 09/06/06 08/21/06 07/25/06 / / 0 0 JOD 0 0 0
KINGSTON SD-GEORGE WASHINGTON ELEMNT:
06-0204TQ Temporary Quarters 8-036-001 ADDENDUM REQ'D 09/06/06 08/21/06 07/25/06 / / 0 0 JOD 0 0 0
Business Resource:
07-1385TQ Temporary Quarters 8-037-001 01/24/08 DONE DONE DONE 01/16/08 01/16/08 06/05/07 / / 0 0 JOD 0 0 0
MRB GROUP
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED