Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 07/24/08 at 08:56:34




DRYDEN CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-03-01-06
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Cassavant Elementary:
04-0268   Reconstruction               0-001-006  12/21/04     DONE    DONE       DONE      10/05/04   10/04/04   08/11/03   11/18/03   2,4,7,8,9,10,155,15,   1,514,605     1,511,962  HCM             0           0            0
                                                                                                                                                                                                                                 Highland Associates                 

          Dryden Elementary:
04-0269   Reconstruction               0-003-015  12/21/04     DONE    DONE       DONE      10/05/04   10/04/04   08/21/03   11/18/03   2,4,7,8,9,10,155,15,   9,929,981     9,929,981  HCM             0           0            0
                                                                                                                                                                                                                                 Highland Associates                 
07-1587   Reconstruction               0-003-016  03/13/08     DONE    DONE       DONE      02/11/08   02/05/08   12/05/07   05/20/07   4,7                      100,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 joseph/rominski/architectue         

          Freeville Elementary:
04-0270   Reconstruction               0-004-007  12/22/04     DONE    DONE       DONE      10/05/04   10/04/04   08/11/03   11/18/03   2,4,7,8,9,10,155,15,   1,255,414     1,255,414  HCM             0           0            0
                                                                                                                                                                                                                                 Highland Associates                 

          Junior Senior High:
  -    XX Reconstruction               0-005-016                         CANCELLED            /  /       /  /     03/31/04     /  /     2,4,7,8,9,155,15,16            0    27,175,559  HCM             0           0            0
                                                                                                                                                                                                                                                                     
05-0119   Reconstruction               0-005-017  08/19/05     DONE    DONE       DONE      08/10/05   08/10/05   06/08/05   05/17/05   7                         90,000        90,000  HCM             0           0            0
                                                                                                                                                                                                                                 Highland Associates                 
05-1197   Reconstruction               0-005-018  08/28/06     DONE    DONE       DONE      04/24/06   04/24/06   12/01/05   05/16/06   8,9,155,15,16            100,000       100,000  HCM             0           0            0
                                                                                                                                                                                                                                 Highland Associates                 
07-0835   Reconstruction               0-005-019  06/10/08     DONE    DONE       DONE      11/16/07   11/15/07   01/16/07   04/03/07   2,4,7,8,9,10,14,155,   3,432,377     3,432,377  HCM             0           0      446,209
                                                                                                                                                                                                                                 joseph/rominski/architectue         

          Storage Shed @ High School Campus:
  -    DB Discovered Building          2-016-001                                              /  /       /  /     11/16/07     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Storage Shed @ Cassavant Elementary:
  -    DB Discovered Building          2-017-001                                              /  /       /  /     11/16/07     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Concession Stand @ High School:
03-1302   New Construction             7-015-001                         UNREVIEWED         03/22/04   03/22/04   04/26/01     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          District Wide:
07-1940   Reconstruction               7-999-003                         UNREVIEWED         04/08/08   04/02/08   10/01/07   04/03/07   10,13,16                       0             0  HCM             0           0            0
                                                                                                                                                                                                                                 joseph/rominski/architectue         


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GEORGE JR UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-03-27-02
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Education Unit #1:
07-0328PR Additions and Alterations    0-001-005                       STARTED              09/07/07     /  /     03/26/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 George Lukaszewicz Arch.            


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GROTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-05-01-04
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Junior Senior High:
07-0138   Reconstruction               0-002-009  12/24/07     DONE    DONE       DONE      08/07/07   08/06/07   09/08/06   12/12/06   2,4,8,9,155,15,16      8,194,091             0  MGL             0           0      208,726
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Elementary School:
07-0139   Reconstruction               0-003-007  12/24/07     DONE    DONE       DONE      08/07/07   08/06/07   09/08/06   12/12/06   2,4,7,8,9,155,15,16    4,918,056             0  MGL             0           0      130,000
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Bus Garage Maint. Storage:
07-0140   Reconstruction               5-001-005  12/24/07     DONE    DONE       DONE      08/07/07   08/06/07   01/19/07   12/12/06   2,4,7,9,10,15,16         664,249             0  MGL             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ITHACA CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-06-00-01
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Alternative Community School (6-12):
  -    PR Additions and Alterations    0-003-008                                              /  /       /  /     11/22/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Enfield Elem School (K-5):
03-1591   Reconstruction               0-004-010  06/10/04     DONE    DONE       DONE      06/01/04   05/28/04   05/03/04   05/18/04   7                         69,250        69,250  DDJ             0           0            0
                                                                                                                                                                                                                                 Egner Architectural Associates LLC  
  -    PR Additions and Alterations    0-004-011                                              /  /       /  /     11/22/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Sherman Elem School(K-5):
  -    PR Additions and Alterations    0-007-009                                              /  /       /  /     11/22/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Cayuga Heights Elem.(K-5):
07-1818SR Reconstruction               0-011-004  03/20/08     DONE    DONE       DONE      03/17/08   03/04/08   11/22/06   03/06/07   2,155,16               2,975,669             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Martin ES(K-5)(f'ly Central ES):
07-0950   Reconstruction               0-012-008  04/23/08     DONE    DONE       DONE      11/27/07   11/26/07   11/22/06   03/06/07   2,4,7,155,16           4,332,759             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers,                     
  -       Reconstruction               0-012-009                                              /  /       /  /     08/20/07     /  /     2,7,155,16                     0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Fall Creek Elem School(K-5):
  -       Reconstruction               0-013-006                                              /  /       /  /     11/22/06     /  /     2,7,8,155,16                   0     4,350,105  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          South Hill Elem School(K-5):
  -       Reconstruction               0-014-008                                              /  /       /  /     11/22/06     /  /     2,8,155                        0     4,930,119  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          High School(9-12):
04-1324   Reconstruction               0-015-012  07/05/05     DONE    DONE       DONE      05/24/05   05/20/05   05/03/04   05/18/04   7                        384,128       384,128  DDJ             0           0            0
                                                                                                                                                                                                                                 Egner Architectural Associates LLC  
05-0023   Reconstruction               0-015-013  09/15/05     DONE    DONE       DONE      07/07/05   07/06/05   03/23/05   05/17/05   2,13,16                  359,400       359,400  DDJ             0           0            0
                                                                                                                                                                                                                                 IBC Engineering, P.C                
05-0669   Reconstruction               0-015-014  05/02/06     DONE    DONE       DONE      01/30/06   01/30/06   06/29/05   05/18/04   2,4,8,9,16               188,720       188,720  DDJ             0           0            0
                                                                                                                                                                                                                                 Egner Architectural Associates LLC  
05-0553   Reconstruction               0-015-015  04/13/06     DONE    DONE       DONE      01/11/06     /  /     08/23/05   05/18/04   4,15                     285,500       285,500  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
05-0860   Reconstruction               0-015-016  03/31/06     DONE    DONE       DONE      03/01/06   03/01/06   01/19/06   05/17/05   7                        232,000       232,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Kingsbury Architecture LLC          
07-1729PR Additions and Alterations    0-015-017                         UNREVIEWED         03/04/08   02/28/08   08/10/06     /  /     02 - 16                        0    33,759,160  DDJ             0           0            0
                                                                                                                                                                                                                                 Egner Architectural Associates LLC  
  -    PR Additions and Alterations    0-015-018                                              /  /       /  /     11/22/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
07-0921   Reconstruction               0-015-019  06/06/08     DONE    DONE       DONE      11/23/07   11/21/07   08/01/07   03/06/07   7,155                  2,151,904             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
05-0265SC Visual Structural Inspection 0-015-SC1  10/17/05     DONE    DONE       DONE      10/17/05   10/17/05     /  /       /  /     16                        53,535        28,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Caroline Elem School(K-5):
06-1558SR Reconstruction               0-017-008  06/01/07     DONE    DONE       DONE      05/31/07   05/21/07   11/22/06     /  /     2,7,8,155,15,16        5,851,000     5,821,181  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0922   Reconstruction               0-017-008  06/06/08     DONE    DONE       DONE      11/23/07   11/21/07   11/22/06     /  /     2,7,8,155,15,16        5,851,000     5,830,820  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Northeast Elem School(K-5):
03-1592   Reconstruction               0-024-005  06/10/04     DONE    DONE       DONE      06/01/04   05/28/04   05/03/04   05/18/04   7                        515,500       515,500  DDJ             0           0            0
                                                                                                                                                                                                                                 Egner Architectural Associates LLC  
  -       Reconstruction               0-024-006                                              /  /       /  /     11/22/06     /  /     2,8,155                        0     8,700,210  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Boynton MS (6-8):
07-0951   Reconstruction               0-026-012  04/23/08     DONE    DONE       DONE      11/27/07   11/26/07   11/22/06   03/06/07   2,7,10,155,15,16       9,274,724             0  DDJ             0           0      865,242
                                                                                                                                                                                                                                 Hunt Engineers,                     
  -       Reconstruction               0-026-013                                              /  /       /  /     08/20/07     /  /     2,155,16                       0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Dewitt MS (6-8):
03-1593   Reconstruction               0-027-011  06/10/04     DONE    DONE       DONE      06/01/04   05/28/04   05/03/04   05/18/04   7                         81,450        81,450  DDJ             0           0            0
                                                                                                                                                                                                                                 Egner Architectural Associates LLC  
07-0952   Reconstruction               0-027-012  04/23/08     DONE    DONE       DONE      11/27/07   11/26/07   11/22/06   03/06/07   2,7,10,155,15,16       9,098,352             0  DDJ             0           0      865,242
                                                                                                                                                                                                                                 Hunt Engineers,                     
  -       Reconstruction               0-027-013                                              /  /       /  /     08/20/07     /  /     155,16                         0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Wilson Annex @ Sherman School(K-5):
  -       Reconstruction               0-028-006                                              /  /       /  /     11/22/06     /  /     2,7,155,16                     0     2,577,840  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          New Athletic Storage Building:
04-0144   New Construction             2-049-001  12/10/04     DONE    DONE       DONE      08/20/04   08/19/04   05/11/04   05/18/04   02 - 16                  125,860             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Egner Architectural Associates LLC  

          Athletic Field Storage Bldg. #2:
04-0145   New Construction             2-050-001  12/10/04     DONE    DONE       DONE      08/20/04   08/19/04   06/28/04   05/18/04   02 - 16                   24,350             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Egner Architectural Associates LLC  

          Vehicle Maintenance Center:
03-1641   Reconstruction               5-002-006  07/06/04     DONE    DONE       DONE      06/22/04   06/18/04   05/03/04   05/18/04   2,16                     249,872       249,872  DDJ             0           0            0
                                                                                                                                                                                                                                 Egner Architectural Associates LLC  
07-0124   Reconstruction               5-002-007  08/15/07     DONE    DONE       DONE      08/03/07   08/02/07   11/22/06   03/06/07   7                        350,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers,                     

          Athletic Fields Restroom Facility:
07-0923   New Construction             7-051-001  06/06/08     DONE    DONE       DONE      11/23/07   11/21/07   08/01/07   03/06/07   02 - 16                  603,466             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Districtwide Technology:
  -       Reconstruction               7-999-003                                              /  /       /  /     01/17/08     /  /     16                             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LANSING CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-08-01-04
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Lansing Middle:
05-0022   Reconstruction               0-001-012  07/12/05     DONE    DONE       DONE      07/07/05   07/06/05   01/10/03   06/09/05   4                        250,000       250,000  DDJ             0           0            0
                                                                                                                                                                                                                                 King & King, Architects             
04-0936   Reconstruction               0-001-013  03/28/05     DONE    DONE       DONE      03/10/05   03/08/05   09/16/04   12/14/04   4,7,8,16                 649,543       649,543  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -    PR Additions and Alterations    0-001-014                                              /  /       /  /     10/07/05     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          School Shop:
  -       Reconstruction               0-002-003                                              /  /       /  /     10/07/05     /  /     2                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Lansing Elementary:
04-0937   Reconstruction               0-003-008  03/28/05     DONE    DONE       DONE      03/10/05   03/08/05   09/16/04   12/14/04   8,10,16                   23,697        23,697  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -       Reconstruction               0-003-009                                              /  /       /  /     10/07/05     /  /     2,7,8,9,155,15,16              0     7,044,714  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-003-010                                              /  /       /  /     10/04/06     /  /     4,8,16                         0     7,044,714  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Senior High:
03-0247   Reconstruction               0-004-008  09/26/03     DONE    DONE       DONE      09/03/03   08/28/03   03/29/99   06/03/03   2,9,155,15,16             49,755        49,755  MAC             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
04-0938   Reconstruction               0-004-011  03/28/05     DONE    DONE       DONE      03/10/05   03/08/05   09/16/04   12/14/04   7,8,16                   493,889       493,889  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -    PR Additions and Alterations    0-004-012                                              /  /       /  /     10/07/05     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0592   Reconstruction               0-004-013  01/02/07     DONE    DONE       DONE      12/06/06   12/05/06   09/13/06   12/14/04   10,155,15,16              51,500        51,500  DDJ             0           0            0
                                                                                                                                                                                                                                 King & King, Architects             

          District Office:
  -       Reconstruction               1-005-004                                              /  /       /  /     10/07/05     /  /     2                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          TO BE DETERMINED:
  -    TQ Temporary Quarters           1-014-001                                              /  /       /  /     09/12/06     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Maintenance Garage:
04-0939   Reconstruction               5-006-007  03/28/05     DONE    DONE       DONE      03/10/05   03/08/05   09/16/04   12/14/04   7,10,155,16              112,311       112,311  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -       Reconstruction               5-006-008                                              /  /       /  /     12/21/05     /  /     2,4,8,9,10,13,14,155           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               5-006-009                                              /  /       /  /     09/12/06     /  /     10                             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          District-Wide Project:
  -       Reconstruction               7-999-001                                              /  /       /  /     09/16/04     /  /     16                             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NEWFIELD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-09-01-04
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Newfield Elementary:
07-1106   Reconstruction               0-001-010  05/07/08     DONE    DONE       DONE      12/12/07   12/11/07   01/16/07   03/20/07   2,4,7,8,9,155,15,16    2,504,400             0  DDJ             0           0      210,000
                                                                                                                                                                                                                                 Thomas Associates                   

          Junior/Senior High School:
07-1107   Additions and Alterations    0-005-006  05/07/08     DONE    DONE       DONE      12/12/07   12/11/07   01/16/07   03/20/07   02 - 16                6,130,314             0  DDJ             0           0      524,500
                                                                                                                                                                                                                                 Thomas Associates                   

          Maintenance Bldg:
07-1108   Reconstruction               3-004-001  05/07/08     DONE    DONE       DONE      12/12/07   12/11/07   01/24/07   03/20/07   4,7,8,9,155,15,16        289,500             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          New Field House:
07-1109   New Construction             7-009-001  05/07/08     DONE    DONE       DONE      12/12/07   12/11/07   01/24/07   03/20/07   02 - 16                  300,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Newfield Fire Station:
07-2092TQ Temporary Quarters           8-010-001  05/20/08     DONE    DONE       DONE      05/07/08   05/06/08   05/06/08     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




TRUMANSBURG CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-10-01-04
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Russell I Doig Middle School:
  -       Reconstruction               0-001-008                                              /  /       /  /     01/02/07     /  /     2,4,7,8,9,155,15,16            0     7,591,218  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -    PR Additions and Alterations    0-001-009                                              /  /       /  /     01/02/07     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
07-0019   Reconstruction               0-001-010  08/23/07     DONE    DONE       DONE      07/06/07   07/06/07   05/02/07   05/16/06   4,7,8                     95,000        95,000  HCM             0           0            0
                                                                                                                                                                                                                                 Beardsley Design Associates Arch.   
  -       Reconstruction               0-001-011                                              /  /       /  /     07/25/07     /  /     2,4,7,8,9,155,15,16            0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Trumansburg Elementary:
05-0836   Reconstruction               0-003-007  03/10/06     DONE    DONE       DONE      03/01/06   02/28/06   09/20/05   12/13/05   2,7,9,155,15,16           94,000        94,000  HCM             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
  -       Reconstruction               0-003-008                                              /  /       /  /     01/02/07     /  /     2,4,7,8,9,155,15,16            0     8,665,283  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -    PR Additions and Alterations    0-003-009                                              /  /       /  /     01/02/07     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Dickerson High School:
03-0604   Reconstruction               0-006-007  12/29/03     DONE    DONE       DONE      11/04/03   11/03/03   08/22/03   06/03/03   7                         50,000        50,000  MAC             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-006-008                                              /  /       /  /     01/02/07     /  /     2,4,7,8,9,155,15,16            0     9,431,484  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -    PR Additions and Alterations    0-006-009                                              /  /       /  /     01/02/07     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Maintenance Storage:
  -    PR New Construction             2-009-001                                              /  /       /  /     04/03/08     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Storage Buiding:
  -    DB Discovered Building          2-010-001                                              /  /       /  /     04/03/08     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Maintenance Bldg:
  -       Reconstruction               3-005-001                                              /  /       /  /     07/25/07     /  /     8,155,16                       0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
  -       Reconstruction               5-004-004                                              /  /       /  /     07/25/07     /  /     2,7,8,155,15,16                0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          District Wide:
  -    XX Reconstruction               7-999-004                         CANCELLED            /  /       /  /     08/18/03     /  /     16                             0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               7-999-005                                              /  /       /  /     07/25/07     /  /     10,13,16                       0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES TOMPKINS-SENECA-TIOGA STATUS REPORT ON CAPITAL PROJECTS
District No.: 61-90-00-00
last updated on 07/24/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          F Bldg Greenhouse:
05-0816   Reconstruction               0-008-003  03/28/06     DONE    DONE       DONE      02/24/06   02/23/06   11/18/05   12/07/05   2,7,155,15,16             29,490        29,490  JOD             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            
06-0359   Reconstruction               0-008-004  11/29/06     DONE    DONE       DONE      10/27/06   10/23/06   06/21/06   06/07/06   8,16                      16,089             0  JOD             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          G Powell Bldg B:
05-0817   Reconstruction               0-009-005  03/28/06     DONE    DONE       DONE      02/24/06   02/23/06   11/18/05   12/07/05   2,7,155,15,16            492,309       492,309  JOD             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            
06-0360   Reconstruction               0-009-006  11/29/06     DONE    DONE       DONE      10/27/06   10/23/06   06/20/06   06/07/06   8,16                      56,430        41,050  JOD             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Occ Ed Bldg C:
05-0818   Reconstruction               0-010-004  03/28/06     DONE    DONE       DONE      02/24/06   02/23/06   11/18/05   12/07/05   2,7,155,15,16            352,399       352,399  JOD             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            
06-0361   Reconstruction               0-010-005  11/29/06     DONE    DONE       DONE      10/27/06   10/23/06   06/20/06   06/07/06   8,16                      37,192        27,350  JOD             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Occ Ed Bldg D:
05-0819   Reconstruction               0-011-004  03/28/06     DONE    DONE       DONE      02/24/06   02/23/06   11/18/05   12/07/05   2,7,155,15,16            465,528       465,528  JOD             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            
06-0362   Reconstruction               0-011-005  11/29/06     DONE    DONE       DONE      10/27/06   10/23/06     /  /     06/07/06   8,16                      38,522        34,650  JOD             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Smith Special Ed Blg:
  -    PR Additions and Alterations    0-012-008                                              /  /       /  /     10/19/05     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
05-0820   Reconstruction               0-012-009  03/28/06     DONE    DONE       DONE      02/24/06   02/23/06   11/18/05   12/07/05   2,7,155,15,16            723,774       723,774  JOD             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            
06-0363   Reconstruction               0-012-010  11/29/06     DONE    DONE       DONE      10/27/06   10/23/06   06/21/06   06/07/06   8,16                      22,520        35,900  JOD             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Relocatable/Adult Ed./Adm.:
06-0364   Reconstruction               0-014-002  11/29/06     DONE    DONE       DONE      10/27/06   10/23/06   06/21/06   06/07/06   8,16                      16,651             0  JOD             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Admin Bldg:
05-0821   Reconstruction               1-001-004  03/28/06     DONE    DONE       DONE      02/24/06   02/23/06   11/18/05   12/07/05   2,7,155,15,16            319,300             0  JOD             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            
06-0365   Reconstruction               1-001-005  11/29/06     DONE    DONE       DONE      10/27/06   10/23/06   06/20/06   06/07/06   8,16                      32,834             0  JOD             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          G Bldg Warehouse:
  -       Reconstruction               2-007-003                                              /  /       /  /     10/19/05     /  /     2,13                           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          G BLDG Warehouse/Bus Maint.:
05-0822   Reconstruction               5-007-001  03/28/06     DONE    DONE       DONE      02/24/06   02/23/06   11/18/05   12/07/05   2,7,155,15,16            117,200       117,200  JOD             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            
  -       Reconstruction               5-007-002                                              /  /       /  /       /  /       /  /     8,16                           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0366   Reconstruction               5-007-002  11/29/06     DONE    DONE       DONE      10/27/06   10/23/06   06/21/06   06/07/06   8,16                      43,961             0  JOD             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Spec.Ed. Train & Resource Library:
06-0367   Reconstruction               6-003-002  11/29/06     DONE    DONE       DONE      10/27/06   10/23/06   06/21/06   06/07/06   8,16                      15,301             0  JOD             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Alternative Educ. Ctr. -Annex South:
  -       Reconstruction               8-013-002                                              /  /       /  /     06/21/06     /  /     8,16                           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Southside Community Center, Inc.:
05-0069TQ Temporary Quarters           8-015-001  03/01/07     DONE    DONE       DONE      07/29/05   07/28/05   08/24/92     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Adult Ed @ First Presbyterian Church:
  -    TQ Temporary Quarters           8-018-001                                              /  /       /  /     02/01/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED