REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Cassavant Elementary:
04-0268 Reconstruction 0-001-006 12/21/04 DONE DONE DONE 10/05/04 10/04/04 08/11/03 11/18/03 2,4,7,8,9,10,155,15, 1,514,605 1,511,962 HCM 0 0 0
Highland Associates
Dryden Elementary:
04-0269 Reconstruction 0-003-015 12/21/04 DONE DONE DONE 10/05/04 10/04/04 08/21/03 11/18/03 2,4,7,8,9,10,155,15, 9,929,981 9,929,981 HCM 0 0 0
Highland Associates
07-1587 Reconstruction 0-003-016 03/13/08 DONE DONE DONE 02/11/08 02/05/08 12/05/07 05/20/07 4,7 100,000 0 HCM 0 0 0
joseph/rominski/architectue
Freeville Elementary:
04-0270 Reconstruction 0-004-007 12/22/04 DONE DONE DONE 10/05/04 10/04/04 08/11/03 11/18/03 2,4,7,8,9,10,155,15, 1,255,414 1,255,414 HCM 0 0 0
Highland Associates
Junior Senior High:
- XX Reconstruction 0-005-016 CANCELLED / / / / 03/31/04 / / 2,4,7,8,9,155,15,16 0 27,175,559 HCM 0 0 0
05-0119 Reconstruction 0-005-017 08/19/05 DONE DONE DONE 08/10/05 08/10/05 06/08/05 05/17/05 7 90,000 90,000 HCM 0 0 0
Highland Associates
05-1197 Reconstruction 0-005-018 08/28/06 DONE DONE DONE 04/24/06 04/24/06 12/01/05 05/16/06 8,9,155,15,16 100,000 100,000 HCM 0 0 0
Highland Associates
07-0835 Reconstruction 0-005-019 06/10/08 DONE DONE DONE 11/16/07 11/15/07 01/16/07 04/03/07 2,4,7,8,9,10,14,155, 3,432,377 3,432,377 HCM 0 0 446,209
joseph/rominski/architectue
Storage Shed @ High School Campus:
- DB Discovered Building 2-016-001 / / / / 11/16/07 / / 0 0 HCM 0 0 0
Storage Shed @ Cassavant Elementary:
- DB Discovered Building 2-017-001 / / / / 11/16/07 / / 0 0 HCM 0 0 0
Concession Stand @ High School:
03-1302 New Construction 7-015-001 UNREVIEWED 03/22/04 03/22/04 04/26/01 / / 02 - 16 0 0 MGL 0 0 0
District Wide:
07-1940 Reconstruction 7-999-003 UNREVIEWED 04/08/08 04/02/08 10/01/07 04/03/07 10,13,16 0 0 HCM 0 0 0
joseph/rominski/architectue
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Education Unit #1:
07-0328PR Additions and Alterations 0-001-005 STARTED 09/07/07 / / 03/26/07 / / 02 - 16 0 0 DDJ 0 0 0
George Lukaszewicz Arch.
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Junior Senior High:
07-0138 Reconstruction 0-002-009 12/24/07 DONE DONE DONE 08/07/07 08/06/07 09/08/06 12/12/06 2,4,8,9,155,15,16 8,194,091 0 MGL 0 0 208,726
Ashley McGraw Architects
Elementary School:
07-0139 Reconstruction 0-003-007 12/24/07 DONE DONE DONE 08/07/07 08/06/07 09/08/06 12/12/06 2,4,7,8,9,155,15,16 4,918,056 0 MGL 0 0 130,000
Ashley McGraw Architects
Bus Garage Maint. Storage:
07-0140 Reconstruction 5-001-005 12/24/07 DONE DONE DONE 08/07/07 08/06/07 01/19/07 12/12/06 2,4,7,9,10,15,16 664,249 0 MGL 0 0 0
Ashley McGraw Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Alternative Community School (6-12):
- PR Additions and Alterations 0-003-008 / / / / 11/22/06 / / 02 - 16 0 0 DDJ 0 0 0
Enfield Elem School (K-5):
03-1591 Reconstruction 0-004-010 06/10/04 DONE DONE DONE 06/01/04 05/28/04 05/03/04 05/18/04 7 69,250 69,250 DDJ 0 0 0
Egner Architectural Associates LLC
- PR Additions and Alterations 0-004-011 / / / / 11/22/06 / / 02 - 16 0 0 DDJ 0 0 0
Sherman Elem School(K-5):
- PR Additions and Alterations 0-007-009 / / / / 11/22/06 / / 02 - 16 0 0 DDJ 0 0 0
Cayuga Heights Elem.(K-5):
07-1818SR Reconstruction 0-011-004 03/20/08 DONE DONE DONE 03/17/08 03/04/08 11/22/06 03/06/07 2,155,16 2,975,669 0 DDJ 0 0 0
Clark Patterson Associates
Martin ES(K-5)(f'ly Central ES):
07-0950 Reconstruction 0-012-008 04/23/08 DONE DONE DONE 11/27/07 11/26/07 11/22/06 03/06/07 2,4,7,155,16 4,332,759 0 DDJ 0 0 0
Hunt Engineers,
- Reconstruction 0-012-009 / / / / 08/20/07 / / 2,7,155,16 0 0 DDJ 0 0 0
Fall Creek Elem School(K-5):
- Reconstruction 0-013-006 / / / / 11/22/06 / / 2,7,8,155,16 0 4,350,105 DDJ 0 0 0
South Hill Elem School(K-5):
- Reconstruction 0-014-008 / / / / 11/22/06 / / 2,8,155 0 4,930,119 DDJ 0 0 0
High School(9-12):
04-1324 Reconstruction 0-015-012 07/05/05 DONE DONE DONE 05/24/05 05/20/05 05/03/04 05/18/04 7 384,128 384,128 DDJ 0 0 0
Egner Architectural Associates LLC
05-0023 Reconstruction 0-015-013 09/15/05 DONE DONE DONE 07/07/05 07/06/05 03/23/05 05/17/05 2,13,16 359,400 359,400 DDJ 0 0 0
IBC Engineering, P.C
05-0669 Reconstruction 0-015-014 05/02/06 DONE DONE DONE 01/30/06 01/30/06 06/29/05 05/18/04 2,4,8,9,16 188,720 188,720 DDJ 0 0 0
Egner Architectural Associates LLC
05-0553 Reconstruction 0-015-015 04/13/06 DONE DONE DONE 01/11/06 / / 08/23/05 05/18/04 4,15 285,500 285,500 DDJ 0 0 0
05-0860 Reconstruction 0-015-016 03/31/06 DONE DONE DONE 03/01/06 03/01/06 01/19/06 05/17/05 7 232,000 232,000 DDJ 0 0 0
Kingsbury Architecture LLC
07-1729PR Additions and Alterations 0-015-017 UNREVIEWED 03/04/08 02/28/08 08/10/06 / / 02 - 16 0 33,759,160 DDJ 0 0 0
Egner Architectural Associates LLC
- PR Additions and Alterations 0-015-018 / / / / 11/22/06 / / 02 - 16 0 0 DDJ 0 0 0
07-0921 Reconstruction 0-015-019 06/06/08 DONE DONE DONE 11/23/07 11/21/07 08/01/07 03/06/07 7,155 2,151,904 0 DDJ 0 0 0
Clark Patterson Associates
05-0265SC Visual Structural Inspection 0-015-SC1 10/17/05 DONE DONE DONE 10/17/05 10/17/05 / / / / 16 53,535 28,000 JOD 0 0 0
Caroline Elem School(K-5):
06-1558SR Reconstruction 0-017-008 06/01/07 DONE DONE DONE 05/31/07 05/21/07 11/22/06 / / 2,7,8,155,15,16 5,851,000 5,821,181 DDJ 0 0 0
Clark Patterson Associates
07-0922 Reconstruction 0-017-008 06/06/08 DONE DONE DONE 11/23/07 11/21/07 11/22/06 / / 2,7,8,155,15,16 5,851,000 5,830,820 DDJ 0 0 0
Clark Patterson Associates
Northeast Elem School(K-5):
03-1592 Reconstruction 0-024-005 06/10/04 DONE DONE DONE 06/01/04 05/28/04 05/03/04 05/18/04 7 515,500 515,500 DDJ 0 0 0
Egner Architectural Associates LLC
- Reconstruction 0-024-006 / / / / 11/22/06 / / 2,8,155 0 8,700,210 DDJ 0 0 0
Boynton MS (6-8):
07-0951 Reconstruction 0-026-012 04/23/08 DONE DONE DONE 11/27/07 11/26/07 11/22/06 03/06/07 2,7,10,155,15,16 9,274,724 0 DDJ 0 0 865,242
Hunt Engineers,
- Reconstruction 0-026-013 / / / / 08/20/07 / / 2,155,16 0 0 DDJ 0 0 0
Dewitt MS (6-8):
03-1593 Reconstruction 0-027-011 06/10/04 DONE DONE DONE 06/01/04 05/28/04 05/03/04 05/18/04 7 81,450 81,450 DDJ 0 0 0
Egner Architectural Associates LLC
07-0952 Reconstruction 0-027-012 04/23/08 DONE DONE DONE 11/27/07 11/26/07 11/22/06 03/06/07 2,7,10,155,15,16 9,098,352 0 DDJ 0 0 865,242
Hunt Engineers,
- Reconstruction 0-027-013 / / / / 08/20/07 / / 155,16 0 0 DDJ 0 0 0
Wilson Annex @ Sherman School(K-5):
- Reconstruction 0-028-006 / / / / 11/22/06 / / 2,7,155,16 0 2,577,840 DDJ 0 0 0
New Athletic Storage Building:
04-0144 New Construction 2-049-001 12/10/04 DONE DONE DONE 08/20/04 08/19/04 05/11/04 05/18/04 02 - 16 125,860 0 DDJ 0 0 0
Egner Architectural Associates LLC
Athletic Field Storage Bldg. #2:
04-0145 New Construction 2-050-001 12/10/04 DONE DONE DONE 08/20/04 08/19/04 06/28/04 05/18/04 02 - 16 24,350 0 DDJ 0 0 0
Egner Architectural Associates LLC
Vehicle Maintenance Center:
03-1641 Reconstruction 5-002-006 07/06/04 DONE DONE DONE 06/22/04 06/18/04 05/03/04 05/18/04 2,16 249,872 249,872 DDJ 0 0 0
Egner Architectural Associates LLC
07-0124 Reconstruction 5-002-007 08/15/07 DONE DONE DONE 08/03/07 08/02/07 11/22/06 03/06/07 7 350,000 0 DDJ 0 0 0
Hunt Engineers,
Athletic Fields Restroom Facility:
07-0923 New Construction 7-051-001 06/06/08 DONE DONE DONE 11/23/07 11/21/07 08/01/07 03/06/07 02 - 16 603,466 0 DDJ 0 0 0
Clark Patterson Associates
Districtwide Technology:
- Reconstruction 7-999-003 / / / / 01/17/08 / / 16 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Lansing Middle:
05-0022 Reconstruction 0-001-012 07/12/05 DONE DONE DONE 07/07/05 07/06/05 01/10/03 06/09/05 4 250,000 250,000 DDJ 0 0 0
King & King, Architects
04-0936 Reconstruction 0-001-013 03/28/05 DONE DONE DONE 03/10/05 03/08/05 09/16/04 12/14/04 4,7,8,16 649,543 649,543 DDJ 0 0 0
Thomas Associates
- PR Additions and Alterations 0-001-014 / / / / 10/07/05 / / 02 - 16 0 0 DDJ 0 0 0
School Shop:
- Reconstruction 0-002-003 / / / / 10/07/05 / / 2 0 0 DDJ 0 0 0
Lansing Elementary:
04-0937 Reconstruction 0-003-008 03/28/05 DONE DONE DONE 03/10/05 03/08/05 09/16/04 12/14/04 8,10,16 23,697 23,697 DDJ 0 0 0
Thomas Associates
- Reconstruction 0-003-009 / / / / 10/07/05 / / 2,7,8,9,155,15,16 0 7,044,714 DDJ 0 0 0
- Reconstruction 0-003-010 / / / / 10/04/06 / / 4,8,16 0 7,044,714 HCM 0 0 0
Senior High:
03-0247 Reconstruction 0-004-008 09/26/03 DONE DONE DONE 09/03/03 08/28/03 03/29/99 06/03/03 2,9,155,15,16 49,755 49,755 MAC 0 0 0
Bearsch Compeau Knudson
04-0938 Reconstruction 0-004-011 03/28/05 DONE DONE DONE 03/10/05 03/08/05 09/16/04 12/14/04 7,8,16 493,889 493,889 DDJ 0 0 0
Thomas Associates
- PR Additions and Alterations 0-004-012 / / / / 10/07/05 / / 02 - 16 0 0 DDJ 0 0 0
06-0592 Reconstruction 0-004-013 01/02/07 DONE DONE DONE 12/06/06 12/05/06 09/13/06 12/14/04 10,155,15,16 51,500 51,500 DDJ 0 0 0
King & King, Architects
District Office:
- Reconstruction 1-005-004 / / / / 10/07/05 / / 2 0 0 DDJ 0 0 0
TO BE DETERMINED:
- TQ Temporary Quarters 1-014-001 / / / / 09/12/06 / / 0 0 DDJ 0 0 0
Bus Maintenance Garage:
04-0939 Reconstruction 5-006-007 03/28/05 DONE DONE DONE 03/10/05 03/08/05 09/16/04 12/14/04 7,10,155,16 112,311 112,311 DDJ 0 0 0
Thomas Associates
- Reconstruction 5-006-008 / / / / 12/21/05 / / 2,4,8,9,10,13,14,155 0 0 DDJ 0 0 0
- Reconstruction 5-006-009 / / / / 09/12/06 / / 10 0 0 DDJ 0 0 0
District-Wide Project:
- Reconstruction 7-999-001 / / / / 09/16/04 / / 16 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Newfield Elementary:
07-1106 Reconstruction 0-001-010 05/07/08 DONE DONE DONE 12/12/07 12/11/07 01/16/07 03/20/07 2,4,7,8,9,155,15,16 2,504,400 0 DDJ 0 0 210,000
Thomas Associates
Junior/Senior High School:
07-1107 Additions and Alterations 0-005-006 05/07/08 DONE DONE DONE 12/12/07 12/11/07 01/16/07 03/20/07 02 - 16 6,130,314 0 DDJ 0 0 524,500
Thomas Associates
Maintenance Bldg:
07-1108 Reconstruction 3-004-001 05/07/08 DONE DONE DONE 12/12/07 12/11/07 01/24/07 03/20/07 4,7,8,9,155,15,16 289,500 0 DDJ 0 0 0
Thomas Associates
New Field House:
07-1109 New Construction 7-009-001 05/07/08 DONE DONE DONE 12/12/07 12/11/07 01/24/07 03/20/07 02 - 16 300,000 0 DDJ 0 0 0
Thomas Associates
Newfield Fire Station:
07-2092TQ Temporary Quarters 8-010-001 05/20/08 DONE DONE DONE 05/07/08 05/06/08 05/06/08 / / 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Russell I Doig Middle School:
- Reconstruction 0-001-008 / / / / 01/02/07 / / 2,4,7,8,9,155,15,16 0 7,591,218 HCM 0 0 0
- PR Additions and Alterations 0-001-009 / / / / 01/02/07 / / 02 - 16 0 0 HCM 0 0 0
07-0019 Reconstruction 0-001-010 08/23/07 DONE DONE DONE 07/06/07 07/06/07 05/02/07 05/16/06 4,7,8 95,000 95,000 HCM 0 0 0
Beardsley Design Associates Arch.
- Reconstruction 0-001-011 / / / / 07/25/07 / / 2,4,7,8,9,155,15,16 0 0 HCM 0 0 0
Trumansburg Elementary:
05-0836 Reconstruction 0-003-007 03/10/06 DONE DONE DONE 03/01/06 02/28/06 09/20/05 12/13/05 2,7,9,155,15,16 94,000 94,000 HCM 0 0 0
Bearsch Compeau Knudson
- Reconstruction 0-003-008 / / / / 01/02/07 / / 2,4,7,8,9,155,15,16 0 8,665,283 HCM 0 0 0
- PR Additions and Alterations 0-003-009 / / / / 01/02/07 / / 02 - 16 0 0 HCM 0 0 0
Dickerson High School:
03-0604 Reconstruction 0-006-007 12/29/03 DONE DONE DONE 11/04/03 11/03/03 08/22/03 06/03/03 7 50,000 50,000 MAC 0 0 0
- Reconstruction 0-006-008 / / / / 01/02/07 / / 2,4,7,8,9,155,15,16 0 9,431,484 HCM 0 0 0
- PR Additions and Alterations 0-006-009 / / / / 01/02/07 / / 02 - 16 0 0 HCM 0 0 0
Maintenance Storage:
- PR New Construction 2-009-001 / / / / 04/03/08 / / 02 - 16 0 0 HCM 0 0 0
Storage Buiding:
- DB Discovered Building 2-010-001 / / / / 04/03/08 / / 0 0 HCM 0 0 0
Maintenance Bldg:
- Reconstruction 3-005-001 / / / / 07/25/07 / / 8,155,16 0 0 HCM 0 0 0
Bus Garage:
- Reconstruction 5-004-004 / / / / 07/25/07 / / 2,7,8,155,15,16 0 0 HCM 0 0 0
District Wide:
- XX Reconstruction 7-999-004 CANCELLED / / / / 08/18/03 / / 16 0 0 MAC 0 0 0
- Reconstruction 7-999-005 / / / / 07/25/07 / / 10,13,16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
F Bldg Greenhouse:
05-0816 Reconstruction 0-008-003 03/28/06 DONE DONE DONE 02/24/06 02/23/06 11/18/05 12/07/05 2,7,155,15,16 29,490 29,490 JOD 0 0 0
Ashley McGraw Architects
06-0359 Reconstruction 0-008-004 11/29/06 DONE DONE DONE 10/27/06 10/23/06 06/21/06 06/07/06 8,16 16,089 0 JOD 0 0 0
Ashley McGraw Architects
G Powell Bldg B:
05-0817 Reconstruction 0-009-005 03/28/06 DONE DONE DONE 02/24/06 02/23/06 11/18/05 12/07/05 2,7,155,15,16 492,309 492,309 JOD 0 0 0
Ashley McGraw Architects
06-0360 Reconstruction 0-009-006 11/29/06 DONE DONE DONE 10/27/06 10/23/06 06/20/06 06/07/06 8,16 56,430 41,050 JOD 0 0 0
Ashley McGraw Architects
Occ Ed Bldg C:
05-0818 Reconstruction 0-010-004 03/28/06 DONE DONE DONE 02/24/06 02/23/06 11/18/05 12/07/05 2,7,155,15,16 352,399 352,399 JOD 0 0 0
Ashley McGraw Architects
06-0361 Reconstruction 0-010-005 11/29/06 DONE DONE DONE 10/27/06 10/23/06 06/20/06 06/07/06 8,16 37,192 27,350 JOD 0 0 0
Ashley McGraw Architects
Occ Ed Bldg D:
05-0819 Reconstruction 0-011-004 03/28/06 DONE DONE DONE 02/24/06 02/23/06 11/18/05 12/07/05 2,7,155,15,16 465,528 465,528 JOD 0 0 0
Ashley McGraw Architects
06-0362 Reconstruction 0-011-005 11/29/06 DONE DONE DONE 10/27/06 10/23/06 / / 06/07/06 8,16 38,522 34,650 JOD 0 0 0
Ashley McGraw Architects
Smith Special Ed Blg:
- PR Additions and Alterations 0-012-008 / / / / 10/19/05 / / 02 - 16 0 0 JOD 0 0 0
05-0820 Reconstruction 0-012-009 03/28/06 DONE DONE DONE 02/24/06 02/23/06 11/18/05 12/07/05 2,7,155,15,16 723,774 723,774 JOD 0 0 0
Ashley McGraw Architects
06-0363 Reconstruction 0-012-010 11/29/06 DONE DONE DONE 10/27/06 10/23/06 06/21/06 06/07/06 8,16 22,520 35,900 JOD 0 0 0
Ashley McGraw Architects
Relocatable/Adult Ed./Adm.:
06-0364 Reconstruction 0-014-002 11/29/06 DONE DONE DONE 10/27/06 10/23/06 06/21/06 06/07/06 8,16 16,651 0 JOD 0 0 0
Ashley McGraw Architects
Admin Bldg:
05-0821 Reconstruction 1-001-004 03/28/06 DONE DONE DONE 02/24/06 02/23/06 11/18/05 12/07/05 2,7,155,15,16 319,300 0 JOD 0 0 0
Ashley McGraw Architects
06-0365 Reconstruction 1-001-005 11/29/06 DONE DONE DONE 10/27/06 10/23/06 06/20/06 06/07/06 8,16 32,834 0 JOD 0 0 0
Ashley McGraw Architects
G Bldg Warehouse:
- Reconstruction 2-007-003 / / / / 10/19/05 / / 2,13 0 0 JOD 0 0 0
G BLDG Warehouse/Bus Maint.:
05-0822 Reconstruction 5-007-001 03/28/06 DONE DONE DONE 02/24/06 02/23/06 11/18/05 12/07/05 2,7,155,15,16 117,200 117,200 JOD 0 0 0
Ashley McGraw Architects
- Reconstruction 5-007-002 / / / / / / / / 8,16 0 0 JOD 0 0 0
06-0366 Reconstruction 5-007-002 11/29/06 DONE DONE DONE 10/27/06 10/23/06 06/21/06 06/07/06 8,16 43,961 0 JOD 0 0 0
Ashley McGraw Architects
Spec.Ed. Train & Resource Library:
06-0367 Reconstruction 6-003-002 11/29/06 DONE DONE DONE 10/27/06 10/23/06 06/21/06 06/07/06 8,16 15,301 0 JOD 0 0 0
Ashley McGraw Architects
Alternative Educ. Ctr. -Annex South:
- Reconstruction 8-013-002 / / / / 06/21/06 / / 8,16 0 0 JOD 0 0 0
Southside Community Center, Inc.:
05-0069TQ Temporary Quarters 8-015-001 03/01/07 DONE DONE DONE 07/29/05 07/28/05 08/24/92 / / 0 0 JOD 0 0 0
Adult Ed @ First Presbyterian Church:
- TQ Temporary Quarters 8-018-001 / / / / 02/01/07 / / 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED