DELAWARE VALLE 590401
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Junior-Senior High School:
05-1065 Reconstruction 0-001-016 05/03/06 DONE DONE DONE 03/31/06 03/27/06 08/22/05 09/26/05 2,4,7 1,503,900 1,503,900 DDJ 0 0 300,780
Silverman & Cosentino, Assoc.
Benjamin Cosor Elementary:
03-1479 Reconstruction 0-007-013 05/10/04 DONE DONE DONE 04/28/04 04/28/04 03/05/04 05/02/02 7 88,562 88,562 DDJ 0 0 0
Ashley McGraw Architects
- Reconstruction 0-007-014 / / / / 08/22/05 / / 2,7 0 13,705,411 DDJ 0 0 0
05-1066 Reconstruction 0-007-015 05/03/06 DONE DONE DONE 03/31/06 03/27/06 03/31/06 09/26/05 2,996,100 2,996,100 DDJ 0 0 599,220
Silverman & Cosentino, Assoc.
Concession Stand:
04-1022DB Discovered Building 7-020-001 UNREVIEWED 03/22/05 03/22/05 11/05/04 / / 02 - 16 0 0 DDJ 0 0 0
Hoffman-Grayson Arch.
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Eldred School:
03-0558 Reconstruction 0-001-008 03/15/04 DONE DONE DONE 10/27/03 10/20/03 09/06/02 12/10/02 2,4,7,8,9,155,15,16 125,000 125,000 MAC 0 0 0
Foit-Albert Associates
- Reconstruction 0-001-009 / / / / 12/19/05 / / 2 0 3,876,642 JOD 0 0 0
07-2039 Additions and Alterations 0-001-010 STARTED STARTED UNREVIEWED04/30/08 04/21/08 03/24/06 / / 02 - 16 0 11,144,530 JOD 0 0 0
FOIT-ALBERT
07-1869 Reconstruction 0-001-011 09/19/08 DONE DONE DONE 03/25/08 03/25/08 06/04/07 / / 2,16 13,370 0 JOD 0 0 0
FOIT-ALBERT
07-2090 Reconstruction 0-001-012 DONE ADD. REQ'D STARTED 05/07/08 05/06/08 12/17/07 10/08/07 8,155,16 0 0 JOD 0 0 0
FOIT-ALBERT
RELOCATABLE WEIGHT TRAINING ROOM:
07-2272 Reconstruction 0-002-002 UNREVIEWED
STARTED UNREVIEWED04/30/08 04/30/08 03/28/06 / / 2,7,8,155,15 0 0 JOD 0 0 0
FOIT-ALBERT
Mackenzie Elementary School:
03-0559 Reconstruction 0-009-003 03/15/04 DONE DONE DONE 10/27/03 10/20/03 10/19/01 12/10/02 4 1,125,000 1,125,000 MAC 0 0 0
FOIT-ALBERT
05-0057 Reconstruction 0-009-005 09/01/05 DONE DONE DONE 07/19/05 07/15/05 06/10/05 02/10/05 2 380,000 380,000 JOD 0 0 0
Thomas Associates
07-1543 Reconstruction 0-009-006 03/27/08 DONE DONE DONE 02/05/08 02/05/08 03/24/06 / / 2,4,7,8,9,155,15,16 2,259,168 2,259,168 JOD 0 0 0
FOIT-ALBERT
07-2091 Reconstruction 0-009-007 DONE ADD. REQ'D STARTED 05/07/08 05/06/08 12/17/07 10/08/07 8,155,16 0 0 JOD 0 0 0
FOIT-ALBERT
Transportation Garage:
07-0855TQ Temporary Quarters 5-016-001 10/09/08 DONE DONE DONE 11/20/07 11/16/07 12/29/06 / / 0 0 JOD 0 0 0
Thomas Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Elementary School:
03-0686 Reconstruction 0-002-012 10/07/05 DONE DONE DONE 11/13/03 11/07/03 08/22/03 04/29/03 155,15,16 602,253 602,253 RDR 0 0 0
Ashley McGraw Architects
06-1043 Reconstruction 0-002-013 04/25/07 DONE DONE DONE 03/06/07 03/05/07 12/21/06 01/08/07 2,9 115,000 0 MGL 0 0 20,700
Ashley McGraw Architects
08-0189PR Additions and Alterations 0-002-014 UNREVIEWED 08/19/08 08/11/08 07/23/07 / / 02 - 16 0 0 MGL 0 0 0
Ashley McGraw Architects
08-0395 Additions and Alterations 0-002-014 UNREVIEWED 09/26/08 09/24/08 07/23/07 11/28/07 02 - 16 0 0 MGL 0 0 0
Ashley McGraw Architects
Jr/Sr High School:
03-0687 Reconstruction 0-009-008 10/07/05 DONE DONE DONE 11/13/03 11/07/03 08/22/03 04/29/03 155,15,16 838,857 838,857 RDR 0 0 0
Ashley McGraw Architects
06-1044 Reconstruction 0-009-009 04/25/07 DONE DONE DONE 03/06/07 03/05/07 12/21/06 01/08/07 2,4,9,10 755,000 0 MGL 0 0 135,900
Ashley McGraw Architects
08-0190PR Additions and Alterations 0-009-010 UNREVIEWED 08/19/08 08/11/08 07/24/07 / / 02 - 16 0 0 MGL 0 0 0
Ashley McGraw Architects
08-0396 Additions and Alterations 0-009-010 UNREVIEWED 09/26/08 09/24/08 07/24/07 11/28/07 02 - 16 0 0 MGL 0 0 0
Ashley McGraw Architects
07-0206 Reconstruction 0-009-011 08/22/07 DONE DONE DONE 08/17/07 08/17/07 07/27/07 07/24/07 10,155 125,000 125,000 MGL 0 0 0
Ashley McGraw Architects
03-0109FP Reconstruction 0-009-FP1 10/14/03 DONE DONE DONE 08/01/03 / / / / / / 16 4,890 4,890 JOD 0 0 0
Middle School:
03-0688 Reconstruction 0-013-004 10/07/05 DONE DONE DONE 11/13/03 11/07/03 08/22/03 04/29/03 155,15,16 570,272 570,272 RDR 0 0 0
Ashley McGraw Architects
05-0105 Reconstruction 0-013-005 11/04/05 DONE DONE DONE 08/05/05 08/01/05 07/13/05 05/17/05 2,4,7,8,9,10,13,14,1 375,000 375,000 RDR 0 0 67,500
Ashley McGraw Architects
03-0108FP Reconstruction 0-013-FP1 10/14/03 DONE DONE DONE 08/01/03 / / / / / / 16 4,890 4,890 JOD 0 0 0
Administration Bldg.:
03-0689 Reconstruction 1-010-003 10/07/05 DONE DONE DONE 11/13/03 11/07/03 08/22/03 04/29/03 155,15,16 32,665 0 RDR 0 0 0
Ashley McGraw Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building (High School):
07-2032 Reconstruction 0-001-022 06/25/08 DONE DONE DONE 04/25/08 04/16/08 12/19/07 05/20/07 155 2,146,000 0 MGL 0 0 392,000
Smith Miller Associates
- Reconstruction 0-001-023 / / / / 12/19/07 / / 7 0 0 MGL 0 0 0
08-0104 Reconstruction 0-001-024 09/04/08 DONE DONE DONE 07/31/08 07/29/08 07/16/08 06/19/08 7 205,500 0 JOD 0 0 0
Bertsche Engineering,Inc
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Roscoe School:
- Reconstruction 0-001-009 / / / / 06/20/08 / / 2,155,15,16 0 0 HCM 0 0 0
PE Storage Shed:
- XX New Construction 2-008-001 CANCELLED / / / / 03/10/04 / / 02 - 16 0 0 HCM 0 0 0
Athletic Field Storage:
- XX New Construction 2-009-001 CANCELLED / / / / 03/10/04 / / 02 - 16 0 0 HCM 0 0 0
PRESSBOX/CONCESSION STAND:
- Reconstruction 7-005-002 / / / / 02/17/06 / / 2,4,7,8,16 0 0 HCM 0 0 0
- PR New Construction 7-005-003 / / / / / / / / 02 - 16 0 0 HCM 0 0 0
PRESSBOX:
- PR New Construction 7-010-001 / / / / 05/10/06 / / 02 - 16 0 0 HCM 0 0 0
05-1227 New Construction 7-010-001 05/02/06 DONE DONE DONE 05/01/06 05/01/06 05/10/06 04/04/06 02 - 16 30,000 0 HCM 0 0 0
Ashley McGraw Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Livingston Manor Central:
04-1256 Reconstruction 0-001-018 06/23/05 DONE DONE DONE 05/11/05 05/09/05 01/20/05 05/17/05 7 100,000 100,000 HCM 0 0 0
Bearsch Compeau Knudson
06-0667 Reconstruction 0-001-019 04/02/07 DONE DONE DONE 12/27/06 12/22/06 08/21/06 11/14/06 2,7,8,9,10,155,15,16 900,000 900,000 HCM 0 0 303,142
Bearsch Compeau Knudson
07-0861 Reconstruction 0-001-020 04/07/08 DONE DONE DONE 11/20/07 11/19/07 03/07/07 03/20/07 2,8,9,155,16 510,000 0 HCM 0 0 159,120
Bearsch Compeau Knudson
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Emma C Chase School:
03-0110 Reconstruction 0-001-008 11/14/03 DONE DONE DONE 07/29/03 07/23/03 04/14/03 04/09/03 2,7,8,9,155,15,16 519,285 519,285 RDR 0 0 0
Thomas Associates
03-0917 Reconstruction 0-001-009 04/23/04 DONE DONE DONE 12/30/03 12/23/03 09/12/03 04/09/03 2,4,8,9,10,155,15,16 917,914 917,914 RDR 0 0 0
Thomas Associates
07-0047 Reconstruction 0-001-010 08/23/07 DONE DONE DONE 07/12/07 07/12/07 06/14/07 05/15/07 15 96,000 0 MGL 0 0 0
Thomas Associates
07-1003 Reconstruction 0-001-011 05/29/08 DONE DONE DONE 12/03/07 11/29/07 06/22/07 05/15/07 2,9,155,15,16 710,000 0 MGL 0 0 267,000
Thomas Associates
07-1887 Reconstruction 0-001-012 STARTED ADD. REQ'D STARTED 03/31/08 03/21/08 07/16/07 09/07/07 155,15,16 0 5,693,965 DDJ 0 0 0
Thomas Associates
Middle School(6-8):
03-0111 Reconstruction 0-003-010 11/14/03 DONE DONE DONE 07/29/03 07/23/03 04/14/03 04/09/03 2,7,8 536,712 536,712 RDR 0 0 0
Thomas Associates
03-0918 Reconstruction 0-003-011 04/23/04 DONE DONE DONE 12/30/03 12/23/03 09/12/03 04/09/03 8 118,167 118,167 RDR 0 0 0
Thomas Associates
- Reconstruction 0-003-012 / / / / 03/06/07 / / 155 0 9,098,540 MGL 0 0 0
07-1004 Reconstruction 0-003-013 05/29/08 DONE DONE DONE 12/03/07 11/29/07 06/22/07 05/15/07 2,9,155,16 1,100,000 0 MGL 0 0 412,000
Thomas Associates
- Reconstruction 0-003-014 / / / / 07/16/07 / / 16 0 0 MGL 0 0 0
Cornelius Duggan School:
03-0919 Reconstruction 0-004-011 04/23/04 DONE DONE DONE 12/30/03 12/23/03 04/14/03 04/09/03 2,7,16 963,323 963,323 RDR 0 0 0
Thomas Associates
07-1005 Reconstruction 0-004-012 05/29/08 DONE DONE DONE 12/03/07 11/29/07 06/22/07 05/15/07 2,8,9,155,15,16 590,000 0 MGL 0 0 221,000
Thomas Associates
07-1888 Reconstruction 0-004-013 STARTED ADD. REQ'D STARTED 03/31/08 03/21/08 07/16/07 09/07/07 9,155,16 0 5,156,310 DDJ 0 0 0
Thomas Associates
George L Cooke School:
03-0920 Reconstruction 0-005-008 04/23/04 DONE DONE DONE 12/30/03 12/23/03 04/14/03 04/09/03 2,7,8,9,10,155,15,16 1,561,209 1,561,209 RDR 0 0 0
Thomas Associates
07-0048 Reconstruction 0-005-009 08/23/07 DONE DONE DONE 07/12/07 07/12/07 06/14/07 05/15/07 15 107,000 0 MGL 0 0 0
Thomas Associates
07-1006 Reconstruction 0-005-010 05/29/08 DONE DONE DONE 12/03/07 11/29/07 06/22/07 05/15/07 2,9,155,15,16 520,000 0 MGL 0 0 195,000
Thomas Associates
07-1889 Reconstruction 0-005-011 DONE ADD. REQ'D STARTED 03/31/08 03/21/08 07/16/07 09/07/07 8,155,16 0 8,019,000 0 0 0
Thomas Associates
Kenneth Rutherford School:
03-0921 Reconstruction 0-006-007 04/23/04 DONE DONE DONE 12/30/03 12/23/03 04/14/03 04/09/03 2,7,16 2,375,839 2,375,839 RDR 0 0 0
Thomas Associates
07-0049 Reconstruction 0-006-008 08/23/07 DONE DONE DONE 07/12/07 07/12/07 06/14/07 05/15/07 15 96,000 0 MGL 0 0 0
Thomas Associates
07-1007 Reconstruction 0-006-009 05/29/08 DONE DONE DONE 12/03/07 11/29/07 06/22/07 05/15/07 2,8,9,155,15,16 575,000 0 MGL 0 0 215,000
Thomas Associates
07-1890 Reconstruction 0-006-010 DONE ADD. REQ'D STARTED 03/31/08 03/21/08 07/16/07 09/07/07 8,155,15,16 0 0 MGL 0 0 0
Thomas Associates
Middle/High School:
03-0922 Additions and Alterations 0-007-008 04/23/04 DONE DONE DONE 12/30/03 12/23/03 04/14/03 04/09/03 02 - 16 4,720,239 4,670,840 RDR 0 0 0
Thomas Associates
05-0558 Reconstruction 0-007-009 02/09/07 DONE DONE DONE 01/17/06 01/10/06 10/24/05 04/09/03 8,155,16 104,399 104,399 MGL 0 0 0
Thomas Associates
07-0050 Reconstruction 0-007-010 08/23/07 DONE DONE DONE 07/12/07 07/12/07 06/14/07 05/15/07 15 118,000 0 MGL 0 0 0
Thomas Associates
07-1008 Reconstruction 0-007-011 05/29/08 DONE DONE DONE 12/03/07 11/29/07 06/22/07 05/15/07 2,8,9,155,15,16 2,600,000 2,600,000 MGL 0 0 974,000
Thomas Associates
07-1891 Reconstruction 0-007-012 DONE ADD. REQ'D STARTED 03/31/08 03/21/08 07/16/07 09/07/07 155,16 0 0 MGL 0 0 0
Thomas Associates
07-1405 Reconstruction 0-007-013 06/25/08 DONE DONE DONE 01/17/08 01/16/08 10/17/07 04/09/03 4,8,9,155,15,16 360,000 0 MGL 0 0 0
Thomas Associates
Administration Bldg:
07-1892 Reconstruction 1-002-002 DONE ADD. REQ'D STARTED 03/31/08 03/21/08 07/16/07 09/07/07 155,16 0 0 MGL 0 0 0
Thomas Associates
Bus Garage:
03-0923 Reconstruction 5-010-006 04/23/04 DONE DONE DONE 12/30/03 12/23/03 04/14/03 04/09/03 2,14,16 1,035,255 1,035,255 RDR 0 0 0
Thomas Associates
07-1009 Reconstruction 5-010-007 05/29/08 DONE DONE DONE 12/03/07 11/29/07 06/22/07 05/15/07 155,16 0 0 MGL 0 0 0
Thomas Associates
07-1893 Reconstruction 5-010-008 DONE ADD. REQ'D STARTED 03/31/08 03/21/08 07/16/07 09/07/07 155,16 0 0 MGL 0 0 0
Thomas Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Sullivan West Elementary:
- Reconstruction 0-001-003 / / / / 01/08/08 / / 7 0 0 HCM 0 0 0
- Reconstruction 0-001-004 / / / / 01/08/08 / / 10,155,16 0 0 HCM 0 0 0
- Reconstruction 0-001-005 / / / / 01/08/08 / / 2,4 0 0 HCM 0 0 0
- Reconstruction 0-001-006 / / / / 01/08/08 / / 9,10 0 0 HCM 0 0 0
- Reconstruction 0-001-007 / / / / 01/08/08 / / 2,15 0 0 HCM 0 0 0
- Reconstruction 0-001-008 / / / / 01/08/08 / / 16 0 0 HCM 0 0 0
- Reconstruction 0-001-009 / / / / 04/14/08 / / 2,10 0 0 HCM 0 0 0
03-0947FP Reconstruction 0-001-FP1 04/29/04 DONE DONE DONE 01/30/04 / / / / / / 16 9,090 9,090 JOD 0 0 0
Delaware Main School:
- Reconstruction 0-017-003 / / / / 06/28/04 / / 4 0 9,026,436 HCM 0 0 0
New High School:
04-0576 Reconstruction 0-026-002 12/24/04 DONE DONE DONE 12/22/04 12/20/04 12/22/04 06/22/00 13 19,250 19,250 HCM 0 0 0
- Reconstruction 0-026-003 / / / / 12/27/07 / / 2,10,155,15 0 0 HCM 0 0 0
SHED #1:
- PR New Construction 2-027-001 / / / / 06/13/06 / / 02 - 16 0 0 HCM 0 0 0
Mfd. Storage @ High School:
- New Construction 2-028-001 / / / / 12/27/07 / / 02 - 16 0 0 HCM 0 0 0
Storage-Main Bldg.:
- New Construction 2-030-001 / / / / 04/14/08 / / 02 - 16 0 0 HCM 0 0 0
Bus Garage:
- Reconstruction 5-018-001 / / / / 03/30/06 / / 155 0 0 HCM 0 0 0
Press Box @ High School:
- New Construction 7-029-001 / / / / 12/27/07 / / 02 - 16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Rubin Pollack Ed. Ctr.:
03-1047 Reconstruction 0-013-008 05/13/04 DONE DONE DONE 01/29/04 01/27/04 07/18/03 10/17/03 8,10 208,901 114,302 MAC 0 0 0
Clark Patterson Associates
03-1048XX Reconstruction 0-013-009 CANCELLED ***MULTIPLE PROBLEMS*** 2,517,300 MAC 0 0 0
Clark Patterson Associates
03-1049XX Reconstruction 0-013-010 CANCELLED ***MULTIPLE PROBLEMS*** 2,517,300 MAC 0 0 0
Clark Patterson Associates
- PR Additions and Alterations 0-013-011 / / / / 12/13/04 / / 02 - 16 0 0 JOD 0 0 0
- Reconstruction 0-013-012 / / / / 10/16/06 / / 8,9,155,15,16 0 2,517,300 JOD 0 0 0
06-1038 Reconstruction 0-013-013 06/08/07 DONE DONE DONE 03/06/07 03/01/07 01/03/07 02/20/07 8,9,15,16 345,000 345,000 JOD 0 0 0
HBMA Architecture Engineering & Land
Youngsville Elementary:
- Alterations 0-030-001 / / / / / / / / 0 0 MAC 0 0 0
05-0422 Reconstruction 0-030-002 03/01/06 DONE DONE DONE 12/07/05 12/06/05 07/27/05 11/15/05 7 19,600 0 JOD 0 0 0
HBMA Architecture Engineering & Land
HI Tech Mobile:
- New Construction 0-031-001 / / / / / / / / 02 - 16 0 0 MAC 0 0 0
White Sulphur Springs Elementary:
06-1303TQ Temporary Quarters 8-032-001 02/26/08 DONE DONE DONE 04/10/07 04/10/07 07/27/06 / / 0 0 JOD 0 0 0
06-1039 Reconstruction 8-032-002 03/15/07 DONE DONE DONE 03/06/07 03/01/07 12/29/06 02/20/07 2,7 1,250,000 0 JOD 0 0 0
HBMA Architecture Engineering & Land
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED