REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Junior-Senior High School:
- Reconstruction 0-001-011 / / / / 07/22/05 / / 2,16 0 27,002,238 HCM 0 0 0
06-0653 Reconstruction 0-001-012 05/17/07 DONE DONE DONE 12/21/06 12/20/06 07/17/06 05/15/07 2,4,7,8,9,155,15,16 609,514 609,514 HCM 0 0 609,514
John A Grillo
07-2342 Reconstruction 0-001-013 07/16/08 DONE DONE DONE 07/08/08 06/30/08 04/09/08 05/20/08 2,16 90,000 0 HCM 0 0 0
John A Grillo
08-0607 Reconstruction 0-001-014 07/14/09 DONE DONE DONE 10/29/08 10/28/08 08/01/08 05/20/08 8,9,155,16 2,087,820 0 HCM 0 0 0
John A Grillo
08-0760 Reconstruction 0-001-015 11/21/08 DONE DONE DONE 11/14/08 11/13/08 09/16/08 09/08/08 9,16 200,000 200,000 HCM 0 0 0
John A Grillo
08-1588 Reconstruction 0-001-016 05/20/09 DONE DONE DONE 05/05/09 04/30/09 03/24/09 03/09/09 2 40,000 40,000 HCM 0 0 0
John A Grillo
Memorial Grade School:
- Reconstruction 0-002-010 / / / / 07/17/06 / / 2,4,9,155,16 0 9,860,238 HCM 0 0 0
08-0608 Reconstruction 0-002-011 07/14/09 DONE DONE DONE 10/29/08 10/28/08 08/01/08 05/20/08 8,9,155,16 602,471 0 HCM 0 0 0
John A Grillo
Elementary School:
06-0654XX Reconstruction 0-003-010 05/17/07 CANCELLED 12/21/06 12/20/06 07/17/06 / / 2,7,9,15 903,408 0 HCM 0 0 0
John A Grillo
08-0609 Reconstruction 0-003-011 07/14/09 DONE DONE DONE 10/29/08 10/28/08 08/01/08 05/20/08 8,9,155,16 815,210 0 HCM 0 0 0
John A Grillo
Storage@Babylon Memorial Gr.School:
06-1437DB Discovered Building 2-011-001 05/22/07 DONE DONE DONE 05/07/07 05/07/07 04/24/07 / / 0 0 HCM 0 0 0
Storage @ Babylon Elementary School:
06-1533DB Discovered Building 2-012-001 05/22/07 DONE DONE DONE 05/21/07 05/07/07 04/24/07 / / 0 0 HCM 0 0 0
Storage @ JR/SR HSxxcancld-see 2011:
- DB Discovered Building 2-013-001 STARTED / / / / 04/24/07 / / 0 0 HCM 0 0 0
Storage Cont#2xxcancld-see 2012:
- DB Discovered Building 2-014-001 STARTED / / / / 05/10/07 / / 0 0 HCM 0 0 0
Storage Container @ Babylon Library:
08-1663DB Discovered Building 2-015-001 07/30/09 DONE DONE DONE 06/08/09 05/27/09 05/10/07 / / 0 0 HCM 0 0 0
John A Grillo
Press Box @ Babylon HS Football Stad:
09-0270DB Discovered Building 7-010-001 10/09/09 DONE DONE DONE 09/28/09 09/28/09 03/18/04 / / 0 0 MAC 0 0 0
James M. Campbell Architects Pc
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Senior High School:
- Reconstruction 0-001-023 / / / / 08/12/08 / / 2,9,10,16 0 0 JOD 0 0 0
Junior High School:
06-1407 Reconstruction 0-002-018 06/18/07 DONE DONE DONE 05/03/07 04/27/07 08/23/04 03/24/99 15 28,200 28,200 MGL 0 0 0
BurtonBehrendt Smith and O'Callaghan
07-2037 Reconstruction 0-002-019 11/14/08 DONE DONE DONE 04/30/08 04/21/08 10/27/04 04/12/99 2,4,8,9,155,15,16 741,097 0 MGL 0 0 0
BurtonBehrendt Smith and O'Callaghan
06-1424 Reconstruction 0-002-020 05/31/07 DONE DONE DONE 05/07/07 05/04/07 06/29/06 03/24/99 7 2,266,995 2,266,995 MGL 0 0 563,266
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-002-021 / / / / 03/07/08 / / 2,9,10,16 0 0 MGL 0 0 0
Forest Avenue School:
06-1408 Reconstruction 0-003-016 06/18/07 DONE DONE DONE 05/03/07 04/27/07 08/23/04 03/24/99 15 28,200 28,200 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
06-1425 Reconstruction 0-003-017 05/31/07 DONE DONE DONE 05/07/07 05/04/07 06/29/06 03/24/99 7 560,713 560,713 MGL 0 0 142,422
BurtonBehrendt Smith and O'Callaghan
Santapogue Elementary School:
06-1409 Reconstruction 0-005-015 06/18/07 DONE DONE DONE 05/03/07 04/27/07 08/23/04 03/24/99 15 28,200 28,200 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
07-2304 Reconstruction 0-005-016 01/29/09 DONE DONE DONE 07/03/08 06/18/08 10/27/04 04/12/99 2,4,8,9,155,15,16 452,420 0 MGL 0 0 114,915
BurtonBehrendt Smith and O'Callaghan
06-1426 Reconstruction 0-005-017 05/31/07 DONE DONE DONE 05/07/07 05/04/07 06/29/06 03/24/99 7 857,096 857,096 MGL 0 0 0
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-005-018 / / / / 03/07/08 / / 2,9,15,16 0 0 MGL 0 0 0
South Bay School:
06-1410 Reconstruction 0-006-019 06/18/07 DONE DONE DONE 05/03/07 04/27/07 08/23/04 03/24/99 15 28,200 28,200 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
07-2305 Reconstruction 0-006-020 01/29/09 DONE DONE DONE 07/03/08 06/18/08 10/27/04 04/12/99 2,4,8,9,155,15,16 443,228 443,228 MGL 0 0 112,580
BurtonBehrendt Smith and O'Callaghan
06-1427 Reconstruction 0-006-021 05/31/07 DONE DONE DONE 05/07/07 05/04/07 06/29/06 03/24/99 7 858,079 858,079 MGL 0 0 0
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-006-022 / / / / 03/07/08 / / 2,9,10,16 0 0 MGL 0 0 0
Tooker Avenue Elementary:
06-1411 Reconstruction 0-007-015 06/18/07 DONE DONE DONE 05/03/07 04/27/07 08/23/04 03/24/99 15 28,200 0 MAC 0 0 0
BurtonBehrendt Smith and O'Callaghan
06-1428 Reconstruction 0-007-016 05/31/07 DONE DONE DONE 05/07/07 05/04/07 06/29/06 03/24/99 7 610,502 610,502 MGL 0 0 0
BurtonBehrendt Smith and O'Callaghan
John F Kennedy Elementary School:
06-1412 Reconstruction 0-008-018 06/18/07 DONE DONE DONE 05/03/07 04/27/07 08/23/04 03/24/99 15 28,200 28,200 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
07-2038 Reconstruction 0-008-019 11/14/08 DONE DONE DONE 04/30/08 04/21/08 10/27/04 04/12/99 2,4,8,9,155,15,16 502,088 0 MGL 0 0 275,000
BurtonBehrendt Smith and O'Callaghan
06-1429 Reconstruction 0-008-020 05/31/07 DONE DONE DONE 05/07/07 05/04/07 06/29/06 03/24/99 7 593,350 593,350 MGL 0 0 0
BurtonBehrendt Smith and O'Callaghan
Bus Garage:
06-1430 Reconstruction 5-004-009 05/31/07 DONE DONE DONE 05/07/07 05/04/07 06/29/06 03/24/99 7 103,703 103,703 MGL 0 0 0
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 5-004-010 / / / / 03/07/08 / / 2,10,155,15,16 0 0 MGL 0 0 0
West Babylon Public Library:
05-1019 Reconstruction 6-010-003 06/23/06 DONE DONE DONE 03/24/06 03/16/06 02/10/06 / / 7 972,958 0 RDR 0 0 0
Beatty Harvey & Associates
Drivers Building:
- Reconstruction 7-009-001 / / / / 06/30/06 / / 7 0 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Senior High School:
04-0365 Reconstruction 0-002-032 12/23/04 DONE DONE DONE 11/04/04 11/03/04 03/10/00 05/21/02 2,15,16 250,000 250,000 DDJ 0 0 0
Weiedersum Associates Architects, PL
08-0332 Reconstruction 0-002-035 03/05/09 DONE DONE DONE 09/16/08 09/12/08 01/30/08 11/20/07 2,4,9,155,16 1,275,000 0 DDJ 0 0 578,916
Weiedersum Associates Architects, PL
Belmont Elementary:
03-1092 Reconstruction 0-003-018 04/29/05 DONE DONE DONE 02/09/04 02/09/04 08/29/03 10/28/03 2,9,16 157,277 157,277 DDJ 0 0 0
Weiedersum Associates Architects, PL
08-0333 Reconstruction 0-003-019 03/05/09 DONE DONE DONE 09/16/08 09/12/08 01/30/08 11/20/07 2,16 191,000 0 DDJ 0 0 86,724
Weiedersum Associates Architects, PL
M. G. Vedder Elementary:
08-0334 Reconstruction 0-004-025 03/05/09 DONE DONE DONE 09/16/08 09/12/08 01/30/08 11/20/07 7,9,13,155,16 195,000 0 DDJ 0 0 88,540
Weiedersum Associates Architects, PL
Woods Road Elementary School:
03-1093 Additions and Alterations 0-007-018 04/29/05 DONE DONE DONE 02/09/04 02/09/04 09/23/02 10/28/03 02 - 16 243,628 243,628 DDJ 0 0 0
Weiedersum Associates Architects, PL
08-0335 Reconstruction 0-007-019 03/05/09 DONE DONE DONE 09/16/08 09/12/08 01/30/08 11/20/07 2,16 200,000 0 DDJ 0 0 90,810
Weiedersum Associates Architects, PL
Parliament Place Elementary:
03-1094 Reconstruction 0-008-018 04/29/05 DONE DONE DONE 02/09/04 02/09/04 08/29/03 10/28/03 2,9,16 387,816 387,816 DDJ 0 0 0
Weiedersum Associates Architects, PL
08-0336 Reconstruction 0-008-019 03/05/09 DONE DONE DONE 09/16/08 09/12/08 01/30/08 11/20/07 2,9,16 50,000 0 DDJ 0 0 22,702
Weiedersum Associates Architects, PL
P.J. Brennan - Boces:
04-0366 Reconstruction 0-009-002 12/23/04 DONE DONE DONE 11/04/04 11/03/04 02/17/95 05/21/02 2,15 124,500 124,500 DDJ 0 0 0
Weiedersum Associates Architects, PL
04-0473 Reconstruction 0-009-008 12/09/04 DONE DONE DONE 12/02/04 12/02/04 / / 10/31/05 2,7,8,155 401,000 401,000 DDJ 0 0 0
Weiedersum Associates Architects, PL
04-1034 Reconstruction 0-009-009 04/22/05 DONE DONE DONE 03/25/05 03/23/05 12/29/04 10/28/03 2,4,7,8 4,495,736 4,495,736 DDJ 0 0 0
Weiedersum Associates Architects, PL
William DeLuca Elementary:
04-0367 Reconstruction 0-010-015 12/23/04 DONE DONE DONE 11/04/04 11/03/04 12/21/95 05/21/02 2,15,16 124,500 124,500 DDJ 0 0 0
Weiedersum Associates Architects, PL
04-0413 Reconstruction 0-010-021 01/19/05 DONE DONE DONE 11/17/04 11/16/04 08/29/03 10/28/03 2,9,16 1,794,798 1,794,798 DDJ 0 0 0
Weiedersum Associates Architects, PL
08-0337 Reconstruction 0-010-022 03/05/09 DONE DONE DONE 09/16/08 09/12/08 01/30/08 11/20/07 9,16 65,000 0 DDJ 0 0 29,513
Weiedersum Associates Architects, PL
Robert Moses Jr. High:
04-0368 Reconstruction 0-011-020 12/23/04 DONE DONE DONE 11/04/04 11/03/04 11/04/04 05/21/02 2,15,16 151,000 151,000 DDJ 0 0 0
Weiedersum Associates Architects, PL
04-0482 Additions and Alterations 0-011-022 03/29/05 DONE DONE DONE 12/06/04 12/02/04 01/18/01 10/28/03 02 - 16 13,359,765 13,075,355 DDJ 0 0 0
Weiedersum Associates Architects, PL
08-0338 Reconstruction 0-011-024 03/05/09 DONE DONE DONE 09/16/08 09/12/08 01/30/08 11/20/07 9,155,16 260,000 0 DDJ 0 0 118,054
Weiedersum Associates Architects, PL
Metal Shed #1:
- DB Discovered Building 2-019-001 / / / / 09/06/07 / / 0 0 DDJ 0 0 0
Metal Shed # 2:
- DB Discovered Building 2-020-001 / / / / 09/06/07 / / 0 0 DDJ 0 0 0
Metal Shed # 3:
- DB Discovered Building 2-021-001 / / / / 09/07/07 / / 0 0 DDJ 0 0 0
Metal Shed #4:
- DB Discovered Building 2-022-001 / / / / 09/07/07 / / 0 0 DDJ 0 0 0
MASORY SHED:
- DB Discovered Building 2-023-001 / / / / 09/10/07 / / 0 0 DDJ 0 0 0
Bus Garage:
08-0339 Additions and Alterations 5-012-006 03/05/09 DONE DONE DONE 09/16/08 09/12/08 08/13/08 11/20/07 02 - 16 1,343,000 0 DDJ 0 0 0
Weiedersum Associates Architects, PL
North Babylon Public Library:
06-0574 Reconstruction 6-005-014 12/01/06 DONE DONE DONE 11/30/06 11/29/06 11/30/06 07/18/06 8 14,457 0 DDJ 0 0 0
VNA Architects,PC
07-1699 Additions and Alterations 6-005-015 09/02/08 DONE DONE DONE 02/25/08 02/15/08 10/17/07 / / 02 - 16 160,000 0 DDJ 0 0 0
VNA Architects,PC
- Reconstruction 6-005-016 / / / / 04/24/08 / / 7 0 0 DDJ 0 0 0
07-2160 Reconstruction 6-005-016 06/18/08 DONE DONE DONE 05/27/08 05/19/08 02/21/08 / / 8,10,13 300,000 0 DDJ 0 0 0
VNA Architects,PC
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Kellum School:
04-0510 Reconstruction 0-001-004 01/26/05 DONE DONE DONE 12/10/04 12/06/04 06/18/02 05/18/04 2,9,155 645,381 645,381 MGL 0 0 0
John A Grillo
04-0922 Reconstruction 0-001-005 06/24/05 DONE DONE DONE 03/09/05 03/07/05 10/14/04 11/30/04 10,155,16 386,822 386,822 JOD 0 0 0
ECG ENGINEERING,LLC
06-0841 Reconstruction 0-001-006 06/01/07 DONE DONE DONE 01/30/07 01/29/07 09/12/06 11/15/06 8 295,000 295,000 JOD 0 0 0
John A Grillo
07-1580SC Visual Structural Inspection 0-001-SC1 02/19/08 DONE DONE DONE 02/01/08 02/01/08 / / / / 16 20,292 0 JOD 0 0 0
Junior High School:
04-0511 Reconstruction 0-002-020 01/26/05 DONE DONE DONE 12/10/04 12/06/04 05/27/04 05/18/04 2,7 3,033,293 3,033,293 JOD 0 0 0
John A Grillo
04-0923 Reconstruction 0-002-021 06/24/05 DONE DONE DONE 03/09/05 03/07/05 10/14/04 11/30/04 2,10,155,16 1,374,422 1,374,422 JOD 0 0 0
ECG ENGINEERING,LLC
06-0842 Reconstruction 0-002-022 06/01/07 DONE DONE DONE 01/31/07 01/29/07 09/12/06 11/15/06 2,4,8,9,10,155,15,16 246,069 246,069 JOD 0 0 75,543
John A Grillo
07-0220 Reconstruction 0-002-023 12/18/07 DONE DONE DONE 08/22/07 08/22/07 02/22/07 11/15/06 4,8,9,155,15,16 371,357 495,314 JOD 0 0 114,006
John A Grillo
04-0406 Visual Structural Inspection 0-002-SC1 11/16/04 DONE DONE DONE 11/09/04 11/09/04 / / / / 84,000 84,000 JOD 0 0 0
07-1582SC Visual Structural Inspection 0-002-SC2 02/19/08 DONE DONE DONE 02/01/08 02/01/08 / / / / 16 44,607 0 JOD 0 0 0
Alleghany Ave. Elementary:
04-0512 Reconstruction 0-004-013 01/26/05 DONE DONE DONE 12/10/04 12/06/04 05/27/04 05/18/04 2 192,623 192,623 JOD 0 0 0
John A Grillo
04-0924 Reconstruction 0-004-014 06/24/05 DONE DONE DONE 03/09/05 03/07/05 10/14/04 11/30/04 10,155,16 195,421 195,421 JOD 0 0 0
ECG ENGINEERING,LLC
06-0843 Reconstruction 0-004-015 06/01/07 DONE DONE DONE 01/31/07 01/29/07 09/12/06 11/15/06 10,155,16 241,543 241,543 JOD 0 0 74,154
John A Grillo
07-0221 Reconstruction 0-004-016 12/18/07 DONE DONE DONE 08/22/07 08/22/07 02/22/07 11/15/06 16 156,663 118,000 JOD 0 0 48,095
John A Grillo
08-1689SC Visual Structural Inspection 0-004-SC1 06/18/09 DONE DONE DONE 03/16/09 03/16/09 / / / / 16 19,494 0 JOD 0 0 0
Edward Bower Elementary:
04-0513 Additions and Alterations 0-005-013 01/26/05 DONE DONE DONE 12/10/04 12/06/04 05/27/04 05/18/04 02 - 16 649,465 649,465 JOD 0 0 0
John A Grillo
04-0925 Reconstruction 0-005-014 06/24/05 DONE DONE DONE 03/09/05 03/07/05 10/14/04 11/30/04 10,155,16 519,373 519,373 JOD 0 0 0
ECG ENGINEERING,LLC
06-0844 Reconstruction 0-005-015 06/01/07 DONE DONE DONE 01/31/07 01/29/07 09/12/06 11/15/06 2,8,10,16 165,347 165,347 JOD 0 0 50,762
John A Grillo
07-0222 Reconstruction 0-005-016 12/18/07 DONE DONE DONE 08/22/07 08/22/07 02/22/07 11/15/06 2,8,16 193,817 193,817 JOD 0 0 193,817
John A Grillo
07-2345 Reconstruction 0-005-017 12/18/07 DONE DONE DONE 08/22/07 08/22/07 / / 11/15/06 2,8 377,250 377,250 JOD 0 0 0
John A Grillo
07-1584SC Visual Structural Inspection 0-005-SC1 02/19/08 DONE DONE DONE 02/01/08 02/01/08 / / / / 16 18,344 0 JOD 0 0 0
Daniel Street Elementary:
04-0514 Reconstruction 0-006-016 01/26/05 DONE DONE DONE 12/10/04 12/06/04 05/27/04 05/18/04 2 558,836 558,836 JOD 0 0 0
John A Grillo
04-0926 Reconstruction 0-006-017 06/24/05 DONE DONE DONE 03/09/05 03/07/05 10/14/04 11/30/04 2,10,155,16 719,860 719,860 JOD 0 0 0
ECG ENGINEERING,LLC
06-0845 Reconstruction 0-006-018 06/01/07 DONE DONE DONE 01/31/07 01/29/07 09/12/06 11/15/06 7,8,16 186,495 186,495 JOD 0 0 57,254
John A Grillo
07-0223 Reconstruction 0-006-019 12/18/07 DONE DONE DONE 08/22/07 08/22/07 02/22/07 11/15/06 16 138,499 118,000 JOD 0 0 42,519
John A Grillo
08-1687SC Visual Structural Inspection 0-006-SC1 06/18/09 DONE DONE DONE 03/16/09 03/16/09 / / / / 16 19,654 0 JOD 0 0 0
William Rall Elementary:
04-0515 Reconstruction 0-007-013 01/26/05 DONE DONE DONE 12/10/04 12/06/04 05/27/04 05/18/04 2 304,489 304,489 JOD 0 0 0
John A Grillo
04-0927 Reconstruction 0-007-014 06/24/05 DONE DONE DONE 03/09/05 03/07/05 10/14/04 11/30/04 10,155,16 364,813 364,813 JOD 0 0 0
ECG ENGINEERING,LLC
06-0846 Reconstruction 0-007-015 06/01/07 DONE DONE DONE 01/31/07 01/29/07 09/12/06 11/15/06 8,10,155,16 256,164 256,164 JOD 0 0 78,642
John A Grillo
07-0224 Reconstruction 0-007-016 12/18/07 DONE DONE DONE 08/22/07 08/22/07 02/22/07 11/15/06 16 138,499 118,000 JOD 0 0 42,519
John A Grillo
Senior High School:
04-0928 Reconstruction 0-009-019 06/24/05 DONE DONE DONE 03/09/05 03/07/05 10/14/04 11/30/04 10,155,16 970,152 970,152 JOD 0 0 0
ECG ENGINEERING,LLC
04-0516 Reconstruction 0-009-020 01/26/05 DONE DONE DONE 12/10/04 12/06/04 / / 05/18/04 2,4 1,526,274 1,526,274 JOD 0 0 0
John A Grillo
06-0847 Reconstruction 0-009-021 06/01/07 DONE DONE DONE 01/31/07 01/29/07 09/12/06 11/15/06 8,9,155,15,16 756,182 756,182 JOD 0 0 232,148
John A Grillo
07-0225 Reconstruction 0-009-022 12/18/07 DONE DONE DONE 08/22/07 08/22/07 02/22/07 11/15/06 2,9,15,16 909,386 501,486 JOD 0 0 279,182
John A Grillo
07-0745 Reconstruction 0-009-023 11/20/07 DONE DONE DONE 11/06/07 11/05/07 10/24/07 05/15/07 9 99,684 99,684 JOD 0 0 0
John A Grillo
07-1204 Reconstruction 0-009-024 01/03/08 DONE DONE DONE 12/24/07 12/20/07 11/23/07 11/15/06 10 75,000 0 JOD 0 0 0
John A Grillo
07-2218 Reconstruction 0-009-025 08/21/08 DONE DONE DONE 06/05/08 05/28/08 04/23/08 05/15/07 9 60,000 60,000 JOD 0 0 0
John A Grillo
09-0266 Reconstruction 0-009-026 10/07/09 DONE DONE DONE 09/28/09 09/25/09 05/20/09 05/19/09 2,15 100,000 0 JOD 0 0 0
John A Grillo
07-1586SC Visual Structural Inspection 0-009-SC2 02/19/08 DONE DONE DONE 02/01/08 02/01/08 / / / / 16 44,167 0 JOD 0 0 0
West Gates Elementary:
04-0517 Reconstruction 0-010-008 01/26/05 DONE DONE DONE 12/10/04 12/06/04 05/27/04 05/18/04 2 331,090 331,090 JOD 0 0 0
John A Grillo
04-0929 Reconstruction 0-010-009 06/24/05 DONE DONE DONE 03/09/05 03/07/05 10/14/04 11/30/04 10,16 185,575 185,575 JOD 0 0 0
ECG ENGINEERING,LLC
06-0848 Reconstruction 0-010-010 06/01/07 DONE DONE DONE 01/31/07 01/29/07 09/12/06 11/15/06 8,155,16 725,721 725,721 JOD 0 0 222,796
John A Grillo
07-0226 Reconstruction 0-010-011 12/18/07 DONE DONE DONE 08/22/07 08/22/07 02/22/07 11/15/06 16 138,999 118,000 JOD 0 0 138,999
John A Grillo
- Reconstruction 0-010-012 / / / / 05/20/09 / / 2,4,15 0 0 JOD 0 0 0
07-1581SC Visual Structural Inspection 0-010-SC1 02/19/08 DONE DONE DONE 02/01/08 02/01/08 / / / / 16 16,243 0 JOD 0 0 0
Earding Elementary School:
04-0518 Reconstruction 0-011-012 01/26/05 DONE DONE DONE 12/10/04 12/06/04 05/27/04 05/18/04 2 344,897 344,897 JOD 0 0 0
John A Grillo
04-0930 Reconstruction 0-011-013 06/24/05 DONE DONE DONE 03/09/05 03/07/05 10/14/04 11/30/04 10,16 189,268 189,268 JOD 0 0 0
ECG ENGINEERING,LLC
06-0849 Reconstruction 0-011-014 06/01/07 DONE DONE DONE 01/31/07 01/29/07 09/12/06 11/15/06 8,155,15,16 678,399 678,399 JOD 0 0 208,268
John A Grillo
07-0227 Reconstruction 0-011-015 12/18/07 DONE DONE DONE 08/22/07 08/22/07 / / 11/15/06 16 179,651 118,000 JOD 0 0 55,153
John A Grillo
07-1579SC Visual Structural Inspection 0-011-SC1 02/19/08 DONE DONE DONE 02/01/08 02/01/08 / / / / 16 17,434 0 JOD 0 0 0
Albany Avenue Elementary School:
04-0519 Additions and Alterations 0-012-011 01/26/05 DONE DONE DONE 12/10/04 12/06/04 05/27/04 05/18/04 02 - 16 853,102 853,102 JOD 0 0 0
John A Grillo
04-0931 Reconstruction 0-012-012 06/24/05 DONE DONE DONE 03/09/05 03/07/05 10/14/04 11/30/04 10 212,630 212,630 JOD 0 0 0
ECG ENGINEERING,LLC
06-0850 Reconstruction 0-012-013 06/01/07 DONE DONE DONE 01/31/07 01/29/07 09/12/06 11/15/06 4,8,9,16 254,339 254,339 JOD 0 0 78,082
John A Grillo
07-0228 Reconstruction 0-012-014 12/18/07 DONE DONE DONE 08/22/07 08/22/07 02/21/07 11/15/06 16 234,994 265,800 JOD 0 0 72,143
John A Grillo
- Reconstruction 0-012-015 / / / / 02/22/07 / / 9,16 0 7,830,189 JOD 0 0 0
07-1583SC Visual Structural Inspection 0-012-SC1 02/19/08 DONE DONE DONE 02/01/08 02/01/08 / / / / 16 17,434 0 JOD 0 0 0
Niagara Ave. School & Admin.:
04-0520 Reconstruction 0-013-005 01/26/05 DONE DONE DONE 12/10/04 12/06/04 05/27/04 05/18/04 2 286,488 286,488 JOD 0 0 0
John A Grillo
04-0932 Reconstruction 0-013-006 06/24/05 DONE DONE DONE 03/09/05 03/07/05 10/14/04 11/30/04 10,16 114,391 114,391 JOD 0 0 0
ECG ENGINEERING,LLC
06-0851 Reconstruction 0-013-007 06/01/07 DONE DONE DONE 01/31/07 01/29/07 09/12/06 11/15/06 8 165,200 0 JOD 0 0 0
John A Grillo
McKenna former Niagara Administratio:
08-1688SC Visual Structural Inspection 1-013-SC1 06/18/09 DONE DONE DONE 03/16/09 03/16/09 / / / / 16 16,833 0 JOD 0 0 0
Inter-Modal Shipping Containter #1:
09-0034DB Discovered Building 2-021-001 UNREVIEWED 07/16/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0
John A Grillo
Masonry Storage Shed (Memorial Shed):
09-0035DB Discovered Building 2-022-001 UNREVIEWED 07/16/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0
John A Grillo
Inter-Modal Shipping Containter #1:
09-0036DB Discovered Building 2-023-001 UNREVIEWED 07/16/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0
John A Grillo
Inter-Modal Shipping Container #2:
09-0037DB Discovered Building 2-024-001 UNREVIEWED 07/16/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0
John A Grillo
Inter-Modal Shipping Container:
09-0038DB Discovered Building 2-025-001 UNREVIEWED 07/16/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0
John A Grillo
Athletic Field Storage Building:
09-0039DB Discovered Building 2-026-001 UNREVIEWED 07/16/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0
John A Grillo
Courtyard Storage Shed #1:
09-0040DB Discovered Building 2-027-001 UNREVIEWED 07/16/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0
John A Grillo
Courtyard Storage Shed #2:
09-0042DB Discovered Building 2-028-001 UNREVIEWED 07/17/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0
John A Grillo
Grounds Department Shop (Storage Bl):
09-0041DB Discovered Building 2-029-001 UNREVIEWED 07/17/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0
John A Grillo
Inter-Modal Shipping Container #2:
09-0043DB Discovered Building 2-030-001 UNREVIEWED 07/17/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0
John A Grillo
Inter-Modal Shipping Container #3:
09-0044DB Discovered Building 2-031-001 UNREVIEWED 07/17/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0
John A Grillo
Inter-Modal Shipping Container #4:
09-0045DB Discovered Building 2-032-001 UNREVIEWED 07/17/09 07/09/09 08/14/08 / / 0 0 JOD 0 0 0
John A Grillo
Grounds Shed (see#2029):
- XX New Construction 2-033-001 CANCELLED / / / / 11/14/08 / / 02 - 16 0 0 JOD 0 0 0
District Wide:
08-1640 Reconstruction 7-999-001 05/19/09 DONE DONE DONE 05/19/09 05/15/09 04/23/09 11/15/06 10,13,16 450,000 0 JOD 0 0 138,150
John A Grillo
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Deauville Gardens Elementary:
06-1542 Reconstruction 0-001-019 11/19/07 DONE DONE DONE 05/25/07 05/24/07 11/06/06 01/25/07 4,7,15 1,597,996 0 DDJ 0 0 519,349
John A Grillo
Great Neck Rd. Elementary:
- Reconstruction 0-002-015 / / / / 02/13/06 / / 16 0 5,596,061 DDJ 0 0 0
06-0619 Reconstruction 0-002-016 02/13/07 DONE DONE DONE 12/13/06 12/12/06 11/06/06 01/25/07 4,7,15 822,966 822,966 DDJ 0 0 267,463
John A Grillo
06-1543 Reconstruction 0-002-017 11/19/07 DONE DONE DONE 05/25/07 05/24/07 01/30/07 01/25/07 9,16 168,593 168,593 DDJ 0 0 54,793
John A Grillo
Copiague Jr High School:
06-1544 Reconstruction 0-004-018 11/19/07 DONE DONE DONE 05/25/07 05/24/07 11/06/06 01/25/07 4,7,15 3,546,315 0 DDJ 0 0 1,152,552
John A Grillo
07-2000 Reconstruction 0-004-019 ADDENDUM REQ'D 04/21/08 04/11/08 / / 01/25/07 10,13 0 0 DDJ 0 0 0
John A Grillo
- Reconstruction 0-004-020 / / / / 04/25/08 / / 15 0 0 DDJ 0 0 0
Susan E. Wiley Elementary:
06-1545 Reconstruction 0-005-019 11/19/07 DONE DONE DONE 05/25/07 05/24/07 11/06/06 01/25/07 4,7,15 1,490,386 0 DDJ 0 0 484,375
John A Grillo
Senior High School:
- Reconstruction 0-006-016 / / / / 12/15/04 / / 2,4,7 0 27,639,954 DDJ 0 0 0
- Reconstruction 0-006-017 / / / / 02/13/06 / / 2,4,16 0 27,639,954 DDJ 0 0 0
06-0620 Reconstruction 0-006-018 02/13/07 DONE DONE DONE 12/13/06 12/12/06 11/06/06 01/25/07 4,7,15 3,185,719 3,185,719 DDJ 0 0 1,035,359
John A Grillo
07-0729 Reconstruction 0-006-019 12/11/07 DONE DONE DONE 11/06/07 11/05/07 01/30/07 05/15/07 2,15 100,000 0 DDJ 0 0 0
John A Grillo
08-0068 Reconstruction 0-006-020 09/11/08 DONE DONE DONE 07/21/08 07/11/08 04/22/08 01/25/07 15 162,875 0 DDJ 0 0 52,934
John A Grillo
- Reconstruction 0-006-021 / / / / 04/22/08 / / 15 0 0 DDJ 0 0 0
Public Library:
06-0601 Reconstruction 6-007-003 12/14/06 DONE DONE DONE 12/06/06 12/06/06 10/18/06 06/30/06 8,9 91,800 0 DDJ 0 0 0
John A Grillo
07-0255 Reconstruction 6-007-004 08/30/07 DONE DONE DONE 08/29/07 08/28/07 08/03/07 08/22/07 7,16 423,578 0 DDJ 0 0 0
John A Grillo
- PR Additions and Alterations 6-007-005 / / / / 04/23/09 / / 02 - 16 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Memorial High School:
06-0636 Reconstruction 0-001-009 05/17/07 DONE DONE DONE 12/18/06 12/18/06 06/12/06 05/16/06 2,7,10,13,155 3,091,998 3,091,998 MGL 0 0 1,635,668
Thornton-Tomasetti,Inc
07-0099 Reconstruction 0-001-010 09/11/07 DONE DONE DONE 07/26/07 07/24/07 05/10/07 / / 15 45,000 0 MGL 0 0 0
Thornton-Tomasetti,Inc
- Reconstruction 0-001-011 / / / / 05/14/08 / / 9,155,15,16 0 0 JOD 0 0 0
06-1627SC Visual Structural Inspection 0-001-SC1 06/19/07 DONE DONE DONE 06/15/07 06/15/07 / / / / 16 81,517 0 JOD 0 0 0
Northeast Elementary School:
06-0194 Reconstruction 0-003-009 03/14/07 DONE DONE DONE 08/28/06 08/17/06 06/12/06 05/16/06 2 75,000 75,000 MGL 0 0 0
Thornton-Tomasetti,Inc
06-1388 Reconstruction 0-003-010 09/12/07 DONE DONE DONE 05/02/07 04/11/07 04/02/07 05/16/06 15 45,000 0 MGL 0 0 0
Thornton-Tomasetti,Inc
- XX Reconstruction 0-003-011 CANCELLED / / / / 05/03/07 / / 15 0 0 MGL 0 0 0
Northwest Elementary School:
06-0193 Reconstruction 0-004-008 03/14/07 DONE DONE DONE 08/30/06 08/17/06 06/12/06 05/16/06 2 105,000 105,000 MGL 0 0 0
Thornton-Tomasetti,Inc
06-1389 Reconstruction 0-004-009 09/12/07 DONE DONE DONE 05/02/07 04/11/07 04/02/07 05/16/06 15 45,000 0 MGL 0 0 0
Thornton-Tomasetti,Inc
- XX Reconstruction 0-004-010 CANCELLED / / / / 05/03/07 / / 15 0 0 MGL 0 0 0
Edmund Miles Middle School:
- Reconstruction 0-008-011 / / / / 06/12/06 / / 7,10 0 22,587,488 MGL 0 0 0
06-1085 Reconstruction 0-008-012 05/11/07 DONE DONE DONE 03/12/07 03/09/07 06/12/06 05/16/06 4,7 1,457,862 1,076,000 MGL 0 0 439,844
07-0100 Reconstruction 0-008-013 09/11/07 DONE DONE DONE 07/26/07 07/24/07 05/10/07 / / 15 45,000 0 MGL 0 0 0
Thornton-Tomasetti,Inc
- Reconstruction 0-008-014 / / / / 05/14/08 / / 9,155,15,16 0 0 JOD 0 0 0
07-0995SC Visual Structural Inspection 0-008-SC1 11/30/07 DONE DONE DONE 11/30/07 11/30/07 / / / / 16 151,783 0 JOD 0 0 0
Container #1 @ Memorial HS:
- DB Discovered Building 2-022-001 / / / / 09/25/06 / / 0 0 MGL 0 0 0
Container #2 Memorial HS:
- DB Discovered Building 2-023-001 / / / / 09/25/06 / / 0 0 MGL 0 0 0
Field Garage @ Memorial HS:
- DB Discovered Building 2-024-001 / / / / 10/04/06 / / 0 0 MGL 0 0 0
Amityville Public Library:
04-1328 Reconstruction 6-015-003 08/19/05 DONE DONE DONE 05/25/05 05/23/05 12/09/04 / / 4,9,10,15,16 87,480 0 RDR 0 0 0
William D. Pisa, Architect
06-0498 Reconstruction 6-015-004 05/07/07 DONE DONE DONE 11/13/06 11/13/06 08/14/06 / / 9,14,155,16 467,975 0 MGL 0 0 0
Thomas Vulpis Jr. Architect,P.C.
Dist. Wide Secuirty Cameras/Phones:
- Reconstruction 7-999-002 / / / / 06/12/06 / / 16 0 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Abraham Lincoln Elementary:
- Reconstruction 0-001-008 / / / / 11/20/06 / / 8,9 0 2,385,830 JOD 0 0 0
08-1353SC Visual Structural Inspection 0-001-SC2 03/16/09 DONE DONE DONE 03/09/09 03/09/09 / / / / 16 7,647 0 JOD 0 0 0
JF Kennedy Junior High:
04-0966SC Visual Structural Inspection 0-002-SC1 03/17/05 DONE DONE DONE 03/14/05 03/14/05 / / / / 16 23,142 23,142 JOD 0 0 0
08-1354SC Visual Structural Inspection 0-002-SC2 03/16/09 DONE DONE DONE 03/09/09 03/09/09 / / / / 16 25,227 0 JOD 0 0 0
Memorial Elementary:
08-1352SC Visual Structural Inspection 0-003-SC1 03/16/09 DONE DONE DONE 03/09/09 03/09/09 / / / / 16 4,019 0 JOD 0 0 0
May Moore Elementary School:
08-1351SC Visual Structural Inspection 0-004-SC1 03/16/09 DONE DONE DONE 03/09/09 03/09/09 / / / / 16 9,460 0 JOD 0 0 0
G. Washington School:
08-1355SC Visual Structural Inspection 0-005-SC1 03/16/09 DONE DONE DONE 03/09/09 03/09/09 / / / / 16 5,833 0 JOD 0 0 0
Senior High School:
07-1096 Reconstruction 0-006-045 11/26/08 DONE DONE DONE 12/12/07 12/11/07 09/11/07 03/20/07 9,155,15,16 589,326 377,000 JOD 0 0 400,012
Bartlett,Amoruso, & Recce-Architects
- Reconstruction 0-006-046 / / / / / / / / 0 0 JOD 0 0 0
07-1394SC Visual Structural Inspection 0-006-SC2 01/16/08 DONE DONE DONE 12/24/07 12/24/07 / / / / 16 33,984 0 JOD 0 0 0
08-1357SC Visual Structural Inspection 0-006-SC3 03/16/09 DONE DONE DONE 03/09/09 03/09/09 / / / / 16 89,656 0 JOD 0 0 0
John Q. Adams Elementary:
04-0965SC Visual Structural Inspection 0-007-SC1 03/17/05 DONE DONE DONE 03/14/05 03/14/05 / / / / 16 20,420 20,420 JOD 0 0 0
08-1356SC Visual Structural Inspection 0-007-SC2 03/16/09 DONE DONE DONE 03/09/09 03/09/09 / / / / 16 13,790 0 JOD 0 0 0
Robert Frost Junior High:
04-0964SC Visual Structural Inspection 0-008-SC1 03/17/05 DONE DONE DONE 03/14/05 03/14/05 / / / / 16 23,142 23,142 JOD 0 0 0
08-1350SC Visual Structural Inspection 0-008-SC2 03/16/09 DONE DONE DONE 03/09/09 03/09/09 / / / / 16 69,356 64,000 JOD 0 0 0
Deer Park Public Library:
07-0103 Additions and Alterations 6-010-003 08/03/07 DONE DONE DONE 07/26/07 07/25/07 01/30/07 11/29/06 02 - 16 189,508 0 JOD 0 0 0
h2m group
Districtwide:
05-0339 Reconstruction 7-999-001 06/14/06 DONE DONE DONE 11/10/05 11/07/05 09/24/03 06/15/04 16 424,530 424,530 MAC 0 0 0
Bartlett,Amoruso, & Recce-Architects
07-1095 Reconstruction 7-999-002 11/18/08 DONE DONE DONE 12/12/07 12/11/07 09/11/07 03/20/07 8,10,13,16 706,719 698,750 JOD 0 0 706,719
Bartlett,Amoruso, & Recce-Architects
07-1154 Reconstruction 7-999-003 11/05/08 DONE DONE DONE 12/18/07 12/18/07 09/11/07 03/20/07 10,16 358,874 275,992 JOD 0 0 275,269
Bartlett,Amoruso, & Recce-Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
ML King ES/LaFrancis Hardiman/Admin.:
05-0657 Reconstruction 0-002-017 02/07/06 DONE DONE DONE 01/17/06 01/17/06 / / 12/21/05 15 32,500 32,500 DDJ 0 0 0
ECG ENGINEERING,LLC
05-1181 Reconstruction 0-002-018 07/05/06 DONE DONE DONE 04/21/06 04/20/06 02/22/06 02/08/06 155,15 27,000 27,000 DDJ 0 0 0
ECG ENGINEERING,LLC
- Reconstruction 0-002-019 / / / / 05/31/06 / / 15 0 8,684,061 DDJ 0 0 0
06-1040 Reconstruction 0-002-020 06/22/07 DONE DONE DONE 03/06/07 03/05/07 11/06/06 05/09/06 8,9,10,15,16 428,000 428,000 DDJ 0 0 428,000
ECG ENGINEERING,LLC
07-0412 Reconstruction 0-002-021 03/19/08 DONE DONE DONE 09/25/07 09/24/07 07/30/07 06/20/07 2,155,15,16 1,821,116 0 DDJ 0 0 0
ECG ENGINEERING,LLC
- Reconstruction 0-002-022 / / / / 03/30/09 / / 2,9 0 0 DDJ 0 0 0
08-1547 Reconstruction 0-002-023 05/13/09 DONE DONE DONE 04/27/09 04/22/09 04/06/09 04/15/09 2,9 100,000 0 DDJ 0 0 0
ECG ENGINEERING,LLC
04-0719FP Reconstruction 0-002-FP1 03/10/05 DONE DONE DONE 02/09/05 / / / / / / 16 3,390 3,390 JOD 0 0 0
Wyandanch Memorial High School:
05-0159 Reconstruction 0-004-013 02/07/06 DONE DONE DONE 08/29/05 08/25/05 07/22/05 07/27/05 15 32,500 32,500 DDJ 0 0 0
ECG ENGINEERING,LLC
05-1182 Reconstruction 0-004-014 07/06/06 DONE DONE DONE 04/21/06 04/20/06 02/22/06 02/08/06 2,155,15 51,400 35,400 DDJ 0 0 0
ECG ENGINEERING,LLC
- Reconstruction 0-004-015 / / / / 05/31/06 / / 15 0 14,600,340 DDJ 0 0 0
06-1041 Reconstruction 0-004-016 06/22/07 DONE DONE DONE 03/06/07 03/05/07 11/06/06 05/09/06 2,7 772,400 772,400 DDJ 0 0 772,400
ECG ENGINEERING,LLC
07-0413 Reconstruction 0-004-017 03/19/08 DONE DONE DONE 09/25/07 09/24/07 07/30/07 06/20/07 2,7,155,15,16 1,434,358 0 DDJ 0 0 0
ECG ENGINEERING,LLC
Olive Middle School:
04-0271 Reconstruction 0-005-013 11/17/04 DONE DONE DONE 10/05/04 10/04/04 06/18/04 04/05/95 2,16 325,000 325,000 DDJ 0 0 0
ThomasAssociates, PC
05-0160 Reconstruction 0-005-014 02/07/06 DONE DONE DONE 08/29/05 08/25/05 07/22/05 07/27/05 15 32,500 32,500 DDJ 0 0 0
ECG ENGINEERING,LLC
05-1183 Reconstruction 0-005-015 07/06/06 DONE DONE DONE 04/21/06 04/20/06 02/22/06 02/08/06 155,15,16 8,800 0 DDJ 0 0 0
ECG ENGINEERING,LLC
- Reconstruction 0-005-016 / / / / 05/31/06 / / 15 0 9,766,204 DDJ 0 0 0
06-1042 Reconstruction 0-005-017 06/22/07 DONE DONE DONE 03/06/07 03/05/07 11/06/06 05/09/06 8,13 374,500 374,500 DDJ 0 0 374,500
ECG ENGINEERING,LLC
07-0414 Reconstruction 0-005-018 03/19/08 DONE DONE DONE 09/25/07 09/24/07 07/30/07 06/20/07 2,155,15,16 1,167,594 0 DDJ 0 0 0
ECG ENGINEERING,LLC
Central Admin connected to 0002:
- XX Reconstruction 1-001-001 CANCELLED / / / / 12/08/04 / / 2,155,16 0 0 DDJ 0 0 0
Bus Garage:
05-1184 Reconstruction 5-007-005 07/05/06 DONE DONE DONE 04/21/06 04/20/06 02/22/06 02/08/06 2 22,300 22,300 DDJ 0 0 0
ECG ENGINEERING,LLC
07-0415 Reconstruction 5-007-006 03/19/08 DONE DONE DONE 09/25/07 09/24/07 07/30/07 06/20/07 155,16 58,066 0 DDJ 0 0 0
ECG ENGINEERING,LLC
Wyandanch Public Library:
- PR Additions and Alterations 6-008-002 / / / / 10/16/06 / / 02 - 16 0 0 DDJ 0 0 0
06-0826 Additions and Alterations 6-008-002 01/31/07 DONE DONE DONE 01/30/07 01/29/07 10/16/06 03/22/06 02 - 16 579,000 0 DDJ 0 0 0
Robert St. C Gaskin, Architects
08-0412 Reconstruction 6-008-003 09/30/08 DONE DONE DONE 09/26/08 09/26/08 09/26/08 09/24/08 10,15 81,389 0 DDJ 0 0 0
Robert St. C Gaskin, Architects
Wyandanch Youth Center:
- TQ Temporary Quarters 8-009-001 / / / / 02/04/05 / / 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Setauket Elementary School:
05-0954 Reconstruction 0-001-024 03/27/06 DONE DONE DONE 03/14/06 03/10/06 02/15/06 06/21/05 4,7,8 29,927 29,927 DDJ 0 0 0
John A Grillo
07-1212 Reconstruction 0-001-025 04/02/08 DONE DONE DONE 12/26/07 12/24/07 09/29/06 10/16/07 2,4,8,9,10,155,15,16 714,026 714,026 DDJ 0 0 0
John A Grillo
06-1596 Reconstruction 0-001-026 10/25/07 DONE DONE DONE 06/12/07 06/08/07 10/02/06 01/30/07 2,8,9,10,155,15,16 567,130 567,130 DDJ 0 0 99,249
John A Grillo
06-0775 Reconstruction 0-001-027 02/09/07 DONE DONE DONE 01/17/07 01/17/07 10/02/06 05/16/06 2 435,749 435,749 DDJ 0 0 0
John A Grillo
08-0464 Reconstruction 0-001-028 03/18/09 DONE DONE DONE 10/06/08 10/03/08 10/06/06 10/10/06 8,155,15,16 626,618 0 DDJ 0 0 0
John A Grillo
08-0032 Reconstruction 0-001-029 12/17/08 DONE DONE DONE 07/21/08 07/02/08 10/06/06 10/16/07 2 5,822,957 5,822,957 DDJ 0 0 0
John A Grillo
08-1238 Reconstruction 0-001-030 06/30/09 DONE DONE DONE 02/19/09 02/13/09 12/05/07 10/16/07 2,4,7,8,9,155,15,16 1,258,234 0 DDJ 0 0 0
John A Grillo
Nassakeag Elementary School:
05-0955 Reconstruction 0-002-018 03/27/06 DONE DONE DONE 03/14/06 03/10/06 / / 06/21/05 4,8,9 34,946 34,946 DDJ 0 0 0
John A Grillo
07-1213 Reconstruction 0-002-019 04/02/08 DONE DONE DONE 12/26/07 12/24/07 09/29/06 10/16/07 2,4,7,8,9,10,155,15, 1,751,407 1,751,407 DDJ 0 0 0
John A Grillo
06-1597 Reconstruction 0-002-020 10/25/07 DONE DONE DONE 06/12/07 06/08/07 10/02/06 01/30/07 2,8,9,10,155,15,16 614,102 614,102 DDJ 0 0 107,469
John A Grillo
08-0465 Reconstruction 0-002-021 03/18/09 DONE DONE DONE 10/06/08 10/03/08 10/06/06 10/10/06 8,155,15,16 889,939 0 DDJ 0 0 0
John A Grillo
08-0033 Reconstruction 0-002-022 12/17/08 DONE DONE DONE 07/21/08 07/02/08 02/25/08 10/16/07 2,4,7,8,9,155,15,16 1,574,205 1,574,205 DDJ 0 0 0
John A Grillo
08-1239 Reconstruction 0-002-023 06/30/09 DONE DONE DONE 02/19/09 02/13/09 08/11/08 10/16/07 2,4,7 894,685 0 DDJ 0 0 0
John A Grillo
Mount Elementary School:
05-0956 Reconstruction 0-006-018 03/27/06 DONE DONE DONE 03/14/06 03/10/06 02/15/06 06/21/05 4,8,10 66,087 66,087 DDJ 0 0 0
John A Grillo
07-1214 Reconstruction 0-006-019 04/02/08 DONE DONE DONE 12/26/07 12/24/07 09/29/06 10/16/07 2,4,7,8,9,10,155,15, 1,001,081 1,001,081 DDJ 0 0 0
John A Grillo
06-1598 Additions and Alterations 0-006-020 10/25/07 DONE DONE DONE 06/12/07 06/08/07 10/02/06 01/30/07 02 - 16 330,854 330,854 DDJ 0 0 57,901
John A Grillo
08-0466 Reconstruction 0-006-021 03/18/09 DONE DONE DONE 10/06/08 10/03/08 10/06/06 10/10/06 2,8,155,15,16 1,295,340 0 DDJ 0 0 0
John A Grillo
08-1240 Reconstruction 0-006-022 06/30/09 DONE DONE DONE 02/19/09 02/13/09 03/11/08 10/16/07 2,4,9,155,15,16 1,641,866 0 DDJ 0 0 0
John A Grillo
Arrowhead Lane Elementary:
05-0180 Reconstruction 0-007-016 09/13/05 DONE DONE DONE 09/12/05 / / 07/01/05 03/21/05 4,155 34,450 34,450 DDJ 0 0 0
BurtonBehrendt Smith and O'Callaghan
05-0957 Reconstruction 0-007-017 03/27/06 DONE DONE DONE 03/14/06 03/10/06 02/15/06 06/21/05 7,10 46,694 46,694 DDJ 0 0 0
John A Grillo
07-1215 Reconstruction 0-007-018 04/02/08 DONE DONE DONE 12/26/07 12/24/07 09/29/06 10/16/07 2,4,7,8,9,10,155,15, 796,592 796,592 DDJ 0 0 0
John A Grillo
06-1599 Additions and Alterations 0-007-019 10/25/07 DONE DONE DONE 06/12/07 06/08/07 10/02/06 01/30/07 02 - 16 2,355,300 2,355,300 DDJ 0 0 412,178
John A Grillo
08-0467 Reconstruction 0-007-020 03/18/09 DONE DONE DONE 10/06/08 10/03/08 10/06/06 10/10/06 8,9,155,15,16 634,650 0 DDJ 0 0 0
John A Grillo
08-0034 Reconstruction 0-007-021 12/17/08 DONE DONE DONE 07/21/08 07/02/08 03/11/08 10/16/07 2,4,9,155,15,16 1,668,575 1,668,575 DDJ 0 0 0
John A Grillo
08-1241 Reconstruction 0-007-022 06/30/09 DONE DONE DONE 02/19/09 02/13/09 08/11/08 10/16/07 2,4,7 244,732 0 DDJ 0 0 0
John A Grillo
Paul J Gelinas Junior High:
05-0958 Reconstruction 0-008-021 03/27/06 DONE DONE DONE 03/14/06 03/10/06 03/13/06 06/21/05 155 48,636 48,636 DDJ 0 0 0
John A Grillo
06-0613 Reconstruction 0-008-022 12/28/06 DONE DONE DONE 12/12/06 12/08/06 07/25/06 05/16/06 15,16 19,916 19,916 DDJ 0 0 0
John A Grillo
08-0468 Additions and Alterations 0-008-023 03/18/09 DONE DONE DONE 10/06/08 10/03/08 09/29/06 10/10/06 02 - 16 1,545,175 0 DDJ 0 0 0
John A Grillo
06-1600 Reconstruction 0-008-024 10/25/07 DONE DONE DONE 06/12/07 06/08/07 10/02/06 01/30/07 16 663,160 663,160 DDJ 0 0 116,054
John A Grillo
07-1216 Reconstruction 0-008-025 04/02/08 DONE DONE DONE 12/26/07 12/24/07 10/06/06 10/16/07 2,8,155,15,16 115,143 115,143 DDJ 0 0 0
John A Grillo
08-0035 Additions and Alterations 0-008-026 12/17/08 DONE DONE DONE 07/21/08 07/02/08 03/11/08 10/16/07 02 - 16 395,122 395,122 DDJ 0 0 0
John A Grillo
08-1242 Additions and Alterations 0-008-027 06/30/09 DONE DONE DONE 02/19/09 02/13/09 05/27/08 10/16/07 02 - 16 6,004,468 0 DDJ 0 0 0
John A Grillo
- Reconstruction 0-008-028 / / / / 07/22/09 / / 7 0 0 DDJ 0 0 0
Ward Melville Senior High:
05-0191 Reconstruction 0-009-025 10/18/05 DONE DONE DONE 09/13/05 09/13/05 09/01/04 05/18/04 2,155,15 103,219 103,219 DDJ 0 0 0
BurtonBehrendt Smith and O'Callaghan
05-0187 Reconstruction 0-009-026 09/14/05 DONE DONE DONE 09/13/05 09/12/05 07/13/05 06/21/05 155 60,000 60,000 DDJ 0 0 0
BurtonBehrendt Smith and O'Callaghan
05-0959 Reconstruction 0-009-027 03/27/06 DONE DONE DONE 03/14/06 03/10/06 02/15/06 06/21/05 4,7,8,9,155,15 141,606 141,606 DDJ 0 0 0
07-1217 Additions and Alterations 0-009-028 04/02/08 DONE DONE DONE 12/26/07 12/24/07 / / 10/16/07 02 - 16 4,379,145 4,379,145 DDJ 0 0 0
John A Grillo
06-1601 Additions and Alterations 0-009-029 10/25/07 DONE DONE DONE 06/12/07 06/08/07 10/02/06 01/30/07 02 - 16 1,089,939 1,089,939 DDJ 0 0 190,741
John A Grillo
08-0469 Reconstruction 0-009-030 03/18/09 DONE DONE DONE 10/06/08 10/03/08 10/06/06 10/10/06 2,8,155,15,16 3,354,585 0 DDJ 0 0 0
John A Grillo
08-1243 Reconstruction 0-009-031 06/30/09 DONE DONE DONE 02/19/09 02/13/09 12/29/06 10/16/07 155 4,028,460 0 DDJ 0 0 0
John A Grillo
07-2150PR Additions and Alterations 0-009-032 UNREVIEWED 05/23/08 05/14/08 12/05/07 / / 02 - 16 24,678,579 19,305,745 DDJ 0 0 0
John A Grillo
08-0036 Additions and Alterations 0-009-032 12/17/08 DONE DONE DONE 07/21/08 07/02/08 12/05/07 10/16/07 02 - 16 25,761,745 23,325,991 DDJ 0 0 0
John A Grillo
- Reconstruction 0-009-033 / / / / 07/28/09 / / 7 0 0 DDJ 0 0 0
Minnesauke Elementary:
05-0960 Reconstruction 0-014-017 03/27/06 DONE DONE DONE 03/14/06 03/10/06 02/15/06 06/21/05 8,9 15,868 15,868 DDJ 0 0 0
John A Grillo
07-1218 Reconstruction 0-014-018 04/02/08 DONE DONE DONE 12/26/07 12/24/07 09/29/06 10/16/07 2,4,7,8,9,10,155,15, 807,696 807,696 DDJ 0 0 0
John A Grillo
06-1602 Reconstruction 0-014-019 10/25/07 DONE DONE DONE 06/12/07 06/08/07 10/02/06 01/30/07 2,8,9,10,155,15,16 288,587 288,587 DDJ 0 0 50,504
John A Grillo
08-0470 Reconstruction 0-014-020 03/18/09 DONE DONE DONE 10/06/08 10/03/08 10/06/06 10/10/06 155,15,16 498,397 0 DDJ 0 0 0
John A Grillo
08-1244 Reconstruction 0-014-021 06/30/09 DONE DONE DONE 02/19/09 02/13/09 03/11/08 10/16/07 2,4,9,155,15,16 2,548,852 0 DDJ 0 0 0
John A Grillo
Murphy Jr. High School:
05-0192 Reconstruction 0-015-018 10/18/05 DONE DONE DONE 09/13/05 09/13/05 09/02/04 05/18/04 2,155,15 40,475 40,475 DDJ 0 0 0
BurtonBehrendt Smith and O'Callaghan
05-0961 Reconstruction 0-015-019 03/27/06 DONE DONE DONE 03/14/06 03/10/06 02/15/06 06/21/05 4,8,9 39,216 39,216 DDJ 0 0 0
John A Grillo
06-0614 Reconstruction 0-015-020 12/28/06 DONE DONE DONE 12/12/06 12/08/06 07/25/06 05/16/06 15,16 19,916 19,916 DDJ 0 0 0
John A Grillo
07-1219 Additions and Alterations 0-015-021 04/02/08 DONE DONE DONE 12/26/07 12/24/07 09/29/06 10/16/07 02 - 16 310,893 310,893 DDJ 0 0 0
John A Grillo
06-1603 Reconstruction 0-015-022 10/25/07 DONE DONE DONE 06/12/07 06/08/07 10/02/06 01/30/07 16 552,240 552,240 DDJ 0 0 96,643
John A Grillo
08-0471 Reconstruction 0-015-023 03/18/09 DONE DONE DONE 10/06/08 10/03/08 10/06/06 10/10/06 2,155,15,16 1,523,641 0 DDJ 0 0 0
John A Grillo
08-0037 Additions and Alterations 0-015-024 12/17/08 DONE DONE DONE 07/21/08 07/02/08 03/11/08 10/16/07 02 - 16 375,720 375,720 DDJ 0 0 0
John A Grillo
08-1245 Additions and Alterations 0-015-025 06/30/09 DONE DONE DONE 02/19/09 02/13/09 05/27/08 10/16/07 02 - 16 5,976,619 0 DDJ 0 0 0
John A Grillo
- Reconstruction 0-015-026 / / / / 07/22/09 / / 7 0 0 DDJ 0 0 0
North Country Learning Ctr.:
07-1220 Reconstruction 0-018-011 04/02/08 DONE DONE DONE 12/26/07 12/24/07 09/29/06 10/16/07 2,4,7,8,9,155,15,16 137,881 0 DDJ 0 0 0
John A Grillo
- Reconstruction 0-018-012 / / / / 10/02/06 / / 16 0 23,104,400 DDJ 0 0 0
08-0472 Reconstruction 0-018-013 03/18/09 DONE DONE DONE 10/06/08 10/03/08 10/06/06 10/10/06 2,155,15,16 708,648 708,648 DDJ 0 0 0
John A Grillo
07-1824 Reconstruction 0-018-014 09/11/08 DONE DONE DONE 03/17/08 03/11/08 12/26/07 10/16/05 2,4,7,8,9,155,15,16 2,966,048 0 DDJ 0 0 0
John A Grillo
Administration Bldg.:
06-0615 Reconstruction 1-012-009 12/28/06 DONE DONE DONE 12/12/06 12/08/06 07/25/06 05/16/06 15,16 19,916 0 DDJ 0 0 0
John A Grillo
Maintenance Building:
07-1859 New Construction 3-032-001 09/22/08 DONE DONE DONE 03/24/08 03/20/08 10/02/06 10/16/07 02 - 16 1,937,230 0 DDJ 0 0 0
John A Grillo
Setauket Storage Building:
05-0134DB Discovered Building 7-031-001 02/16/06 DONE DONE DONE 08/16/05 08/15/05 11/21/02 / / 0 0 DDJ 0 0 0
Districtwide:
08-0456 Reconstruction 7-999-004 12/11/08 DONE DONE DONE 10/06/08 10/01/08 09/29/06 01/30/07 13,16 1,156,400 0 DDJ 0 0 393,176
John A Grillo
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Terryville Elementary:
04-0062 Reconstruction 0-002-012 04/01/05 DONE DONE DONE 07/19/04 07/16/04 03/26/04 03/01/04 155,16 411,557 411,557 MAC 0 0 0
ECG ENGINEERING,LLC
06-1538 Reconstruction 0-002-013 06/13/07 DONE DONE DONE 05/24/07 05/23/07 12/04/06 05/15/07 8,155,15,16 370,000 370,000 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
07-0440 Reconstruction 0-002-014 03/10/08 DONE DONE DONE 10/01/07 09/27/07 04/26/07 05/15/07 155 1,566,637 1,093,000 DDJ 0 0 275,110
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-002-015 / / / / 10/08/09 / / 7 0 0 DDJ 0 0 0
John F Kennedy Jr. Middle:
04-0063 Reconstruction 0-003-009 04/01/05 DONE DONE DONE 07/19/04 07/16/04 03/26/04 03/01/04 155,16 633,450 633,450 MAC 0 0 0
ECG ENGINEERING,LLC
05-0552 Reconstruction 0-003-010 03/31/06 DONE DONE DONE 01/11/06 / / 06/29/05 02/05/03 155 109,513 109,513 DDJ 0 0 0
ThomasAssociates, PC
05-0962 Additions and Alterations 0-003-011 05/25/06 DONE DONE DONE 03/14/06 03/13/06 11/23/05 02/05/03 02 - 16 264,500 264,500 DDJ 0 0 0
ThomasAssociates, PC
07-0441 Reconstruction 0-003-012 03/10/08 DONE DONE DONE 10/01/07 09/27/07 12/04/06 05/15/07 8,155,15,16 3,021,969 3,159,000 JOD 0 0 300,000
BurtonBehrendt Smith and O'Callaghan
Norwood Avenue Elem. School:
04-0064 Reconstruction 0-004-008 04/01/05 DONE DONE DONE 07/19/04 07/16/04 03/26/04 03/01/04 2,155,16 1,250,703 1,250,703 MAC 0 0 0
ECG ENGINEERING,LLC
07-0442 Reconstruction 0-004-009 03/10/08 DONE DONE DONE 10/01/07 09/27/07 12/04/06 05/15/07 8,155,15,16 643,718 821,000 JOD 0 0 50,000
BurtonBehrendt Smith and O'Callaghan
Boyle Road Elementary:
04-0065 Reconstruction 0-005-009 04/01/05 DONE DONE DONE 07/19/04 07/16/04 03/26/04 03/01/04 155,16 197,895 197,895 MAC 0 0 0
ECG ENGINEERING,LLC
07-0443 Reconstruction 0-005-010 03/10/08 DONE DONE DONE 10/01/07 09/27/07 12/04/06 05/15/07 8,155,15,16 906,823 906,823 JOD 0 0 100,000
BurtonBehrendt Smith and O'Callaghan
Comsewogue Senior High School:
04-0066 Reconstruction 0-010-012 04/01/05 DONE DONE DONE 07/19/04 07/16/04 03/26/04 03/01/04 155,16 493,924 493,924 MAC 0 0 0
ECG ENGINEERING,LLC
05-0658 Reconstruction 0-010-013 05/08/06 DONE DONE DONE 01/19/06 01/19/06 04/21/05 02/05/03 155 123,842 123,842 DDJ 0 0 0
Thomas Associates
05-0963 Additions and Alterations 0-010-014 05/25/06 DONE DONE DONE 03/14/06 03/13/06 11/23/05 02/05/03 02 - 16 188,033 188,033 DDJ 0 0 0
ThomasAssociates, PC
07-0444 Reconstruction 0-010-015 03/10/07 DONE DONE DONE 10/01/07 09/27/07 12/04/06 05/15/07 8,155,15,16 3,926,856 3,926,856 JOD 0 0 450,000
BurtonBehrendt Smith and O'Callaghan
Clinton Avenue Elementary:
04-0067 Reconstruction 0-011-007 04/01/05 DONE DONE DONE 07/19/04 07/16/04 03/26/04 03/01/04 155,16 188,466 188,466 MAC 0 0 0
ECG ENGINEERING,LLC
07-0445 Reconstruction 0-011-008 03/10/08 DONE DONE DONE 10/01/07 09/27/07 12/04/06 05/15/07 8,155,15,16 937,473 920,000 JOD 0 0 100,000
BurtonBehrendt Smith and O'Callaghan
New Field House:
05-0484 New Construction 7-016-001 DONE ADD. REQ'D DONE 12/21/05 12/19/05 04/25/05 / / 02 - 16 0 0 JOD 0 0 0
ThomasAssociates, PC
District Wide:
08-1258 Reconstruction 7-999-002 06/03/09 DONE DONE DONE 02/23/09 02/13/09 10/20/08 05/15/07 10,16 350,000 350,000 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Sachem HS Union Campus(fmly admin):
06-0143 Reconstruction 0-001-002 09/08/06 DONE DONE DONE 08/04/06 08/03/06 06/20/06 05/16/06 2,15 20,956 0 DDJ 0 0 0
h2m group
- XX Reconstruction 0-001-004 CANCELLED / / / / 07/24/07 / / 155 0 0 DDJ 0 0 0
08-1552 Reconstruction 0-001-005 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 0 0 DDJ 0 0 0
ECG ENGINEERING,LLC
Lynwood Avenue School:
07-0735 Reconstruction 0-002-013 04/08/08 DONE DONE DONE 11/06/07 11/05/07 08/14/07 05/15/07 10 13,000 13,000 DDJ 0 0 0
John A Grillo
08-0705 Reconstruction 0-002-014 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,4,7,9,155,15,16 1,314,520 0 DDJ 0 0 307,598
John A Grillo
- Reconstruction 0-002-015 / / / / 09/24/08 / / 2,8,155,15,16 0 10,932,502 DDJ 0 0 0
08-1553 Reconstruction 0-002-016 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 0 0 DDJ 0 0 0
ECG ENGINEERING,LLC
Waverly Ave. Elementary:
- PR Additions and Alterations 0-003-014 / / / / 05/22/06 / / 02 - 16 0 0 DDJ 0 0 0
08-0706 Reconstruction 0-003-015 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,9,155,15,16 393,519 0 DDJ 0 0 92,083
John A Grillo
- Reconstruction 0-003-016 / / / / 09/24/08 / / 2,155,16 0 9,161,104 DDJ 0 0 0
08-1554 Reconstruction 0-003-017 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/13/09 12/03/08 2,155,15,16 0 9,161,104 DDJ 0 0 0
ECG ENGINEERING,LLC
Nokomis School:
08-0398 Reconstruction 0-004-012 02/05/09 DONE DONE DONE 09/26/08 09/24/08 10/26/07 03/18/08 2,155,15,16 169,920 169,920 DDJ 0 0 0
John A Grillo
- Reconstruction 0-004-013 / / / / 09/24/08 / / 2,155,16 0 8,911,668 DDJ 0 0 0
08-1555 Reconstruction 0-004-014 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 0 8,911,668 DDJ 0 0 0
ECG ENGINEERING,LLC
Grundy Avenue Elementary:
07-0736 Reconstruction 0-006-010 04/08/08 DONE DONE DONE 11/06/07 11/05/07 07/24/07 05/15/07 155 175,000 0 DDJ 0 0 0
John A Grillo
08-0707 Reconstruction 0-006-011 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,9,155,15,16 295,000 0 DDJ 0 0 69,030
John A Grillo
- Reconstruction 0-006-012 / / / / / / / / 2,9,155,16 0 10,026,875 DDJ 0 0 0
08-1556 Reconstruction 0-006-013 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 0 10,026,875 DDJ 0 0 0
ECG ENGINEERING,LLC
Gatelot Ave. School:
08-0708 Reconstruction 0-007-013 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,8,9,155,15,16 621,860 0 DDJ 0 0 145,515
John A Grillo
- Reconstruction 0-007-014 / / / / 09/24/08 / / 2,8,9,155,16 0 9,727,875 DDJ 0 0 0
08-1557 Reconstruction 0-007-015 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 0 0 DDJ 0 0 0
ECG ENGINEERING,LLC
Samoset M.S.(fmly HS South):
06-0142 Reconstruction 0-008-021 09/08/06 DONE DONE DONE 08/04/06 08/03/06 06/20/06 05/16/06 2 328,796 328,796 DDJ 0 0 0
h2m group
08-0709 Reconstruction 0-008-022 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,4,7,8,9,10,155,15, 2,866,856 0 DDJ 0 0 670,844
John A Grillo
- Reconstruction 0-008-023 / / / / 09/24/08 / / 2,8,9,155,15,16 0 0 DDJ 0 0 0
08-1558 Reconstruction 0-008-024 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,16 0 0 DDJ 0 0 0
ECG ENGINEERING,LLC
Sagamore Jr. High:
06-0144 Reconstruction 0-010-016 10/16/06 DONE DONE DONE 08/04/06 08/03/06 06/20/06 05/16/06 16 189,457 189,457 DDJ 0 0 0
h2m group
08-0710 Reconstruction 0-010-017 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,9,10,155,15,16 548,700 0 DDJ 0 0 128,396
John A Grillo
- Reconstruction 0-010-018 / / / / 09/24/08 / / 2,155,16 0 0 DDJ 0 0 0
08-1559 Reconstruction 0-010-019 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 0 0 DDJ 0 0 0
ECG ENGINEERING,LLC
Hiawatha Elementary:
07-0737 Reconstruction 0-011-012 04/08/08 DONE DONE DONE 11/06/07 11/05/07 07/24/07 05/15/07 10 13,000 13,000 DDJ 0 0 0
John A Grillo
08-0399 Reconstruction 0-011-013 02/05/09 DONE DONE DONE 09/26/08 09/24/08 10/26/07 03/18/08 2,155,15,16 138,060 138,060 DDJ 0 0 0
John A Grillo
- Reconstruction 0-011-014 / / / / 09/24/08 / / 2,155,16 0 9,342,512 DDJ 0 0 0
08-1560 Reconstruction 0-011-015 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 0 9,342,512 DDJ 0 0 0
ECG ENGINEERING,LLC
Chippewa School:
08-0400 Reconstruction 0-012-010 02/05/09 DONE DONE DONE 09/26/08 09/24/08 10/26/07 03/18/08 2,155,15,16 174,640 96,168 DDJ 0 0 0
John A Grillo
- Reconstruction 0-012-011 / / / / 09/24/08 / / 2,155,16 0 9,342,512 DDJ 0 0 0
08-1561 Reconstruction 0-012-012 STARTED DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 0 9,342,512 DDJ 0 0 0
ECG ENGINEERING,LLC
Wenonah Elementary:
06-0123 Reconstruction 0-013-012 08/01/06 DONE DONE DONE 07/27/06 07/26/06 11/22/04 05/16/06 2,7 860,292 860,292 DDJ 0 0 0
h2m group
- Reconstruction 0-013-013 / / / / 06/20/06 / / 2,4,7,8 0 10,630,691 DDJ 0 0 0
07-0738 Reconstruction 0-013-014 04/08/08 DONE DONE DONE 11/06/07 11/05/07 07/24/07 05/15/07 13,155 188,000 188,000 DDJ 0 0 0
John A Grillo
08-0401 Reconstruction 0-013-015 02/05/09 DONE DONE DONE 09/26/08 09/24/08 10/26/07 03/18/08 2,155,15,16 152,221 96,021 DDJ 0 0 0
John A Grillo
- Reconstruction 0-013-016 / / / / 09/24/08 / / 2,155,16 0 10,630,691 DDJ 0 0 0
08-1562 Reconstruction 0-013-017 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/13/09 12/03/08 2,155,15,16 0 10,630,691 DDJ 0 0 0
ECG ENGINEERING,LLC
Merrimac School:
08-0711 Reconstruction 0-014-013 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,155,15,16 158,120 83,283 DDJ 0 0 0
John A Grillo
- Reconstruction 0-014-014 / / / / 09/24/08 / / 2,155,16 0 0 DDJ 0 0 0
08-1563 Reconstruction 0-014-015 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 0 0 HCM 0 0 0
ECG ENGINEERING,LLC
Cayuga School:
07-0739 Reconstruction 0-015-011 04/08/08 DONE DONE DONE 11/06/07 11/05/07 07/24/07 05/15/07 10 13,000 13,000 DDJ 0 0 0
John A Grillo
08-0402 Reconstruction 0-015-012 02/05/09 DONE DONE DONE 09/26/08 09/24/08 10/26/07 03/18/08 2,155,15,16 152,220 93,624 DDJ 0 0 0
John A Grillo
- Reconstruction 0-015-013 / / / / 09/24/08 / / 2,155,16 0 9,489,906 DDJ 0 0 0
08-1564 Reconstruction 0-015-014 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 0 9,489,906 DDJ 0 0 0
ECG ENGINEERING,LLC
Sachem North High School:
08-0712 Reconstruction 0-016-022 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,4,7,8,9,10,155,15, 10,525,600 0 DDJ 0 0 2,462,990
John A Grillo
- Reconstruction 0-016-023 / / / / 09/24/08 / / 2,155,16 0 0 DDJ 0 0 0
08-1565 Reconstruction 0-016-024 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 0 0 DDJ 0 0 0
ECG ENGINEERING,LLC
Seneca Jr. High:
08-0713 Reconstruction 0-017-012 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,9,10,155,15,16 905,060 0 DDJ 0 0 211,784
John A Grillo
- Reconstruction 0-017-013 / / / / 09/24/08 / / 2,9,155,15,16 0 17,403,773 DDJ 0 0 0
08-1566 Reconstruction 0-017-014 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 0 17,403,773 DDJ 0 0 0
ECG ENGINEERING,LLC
Tecumseh Elementary:
08-0403 Reconstruction 0-018-010 02/05/09 DONE DONE DONE 09/26/08 09/24/08 10/26/07 03/18/08 2,155,15,16 136,880 83,240 DDJ 0 0 0
John A Grillo
- Reconstruction 0-018-011 / / / / 09/24/08 / / 2,155,16 0 9,372,173 DDJ 0 0 0
08-1567 Reconstruction 0-018-012 STARTED DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 0 9,372,173 DDJ 0 0 0
ECG ENGINEERING,LLC
Tamarac Elementary:
07-0740 Reconstruction 0-019-012 04/08/08 DONE DONE DONE 11/06/07 11/05/07 07/24/07 05/15/07 155 175,000 0 DDJ 0 0 0
John A Grillo
08-0404 Reconstruction 0-019-013 02/05/09 DONE DONE DONE 09/26/08 09/24/08 10/26/07 03/18/08 2,155,15,16 126,260 126,260 DDJ 0 0 0
John A Grillo
- Reconstruction 0-019-014 / / / / 09/24/08 / / 2,155,16 0 0 DDJ 0 0 0
08-1568 Reconstruction 0-019-015 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 0 0 DDJ 0 0 0
ECG ENGINEERING,LLC
Sachem East High School:
08-0714 Reconstruction 0-050-002 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,8,155,16 4,006,100 0 DDJ 0 0 0
John A Grillo
08-1569 Reconstruction 0-050-003 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 0 0 DDJ 0 0 0
ECG ENGINEERING,LLC
Sequoya Middle School:
07-0741 Reconstruction 0-051-002 04/08/08 DONE DONE DONE 11/06/07 11/05/07 07/24/07 05/15/07 2 135,000 135,000 DDJ 0 0 0
John A Grillo
08-1570 Reconstruction 0-051-004 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,15,16 0 0 DDJ 0 0 0
ECG ENGINEERING,LLC
Walter C. Dunham Admin Bldg:
07-0390 Reconstruction 1-001-003 09/25/07 DONE DONE DONE 09/20/07 09/19/07 07/24/07 07/02/07 4,7 324,090 0 DDJ 0 0 0
John A Grillo
- Reconstruction 1-001-005 UNREVIEWED 05/18/04 05/17/04 03/26/96 06/13/00 2,155 0 0 DDJ 0 0 0
Sammel Architecture PLLC
07-0742 Reconstruction 1-001-006 04/08/08 DONE DONE DONE 11/06/07 11/05/07 10/26/07 05/15/07 2,9,155,16 135,000 0 DDJ 0 0 0
John A Grillo
Administrative Annex:
08-0716 Reconstruction 1-005-003 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2,7 396,480 0 DDJ 0 0 0
John A Grillo
08-1571 Reconstruction 1-005-004 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,8,155,15,16 0 0 DDJ 0 0 0
ECG ENGINEERING,LLC
Maintenance Building:
07-0743 New Construction 3-076-001 04/08/08 DONE DONE DONE 11/06/07 11/05/07 11/22/04 05/15/07 02 - 16 841,875 0 DDJ 0 0 0
John A Grillo
Transportation Office Bus Garage:
08-1572 Reconstruction 5-021-007 DONE DONE ADD. REQ'D04/29/09 04/24/09 02/11/09 12/03/08 2,155,16 0 0 DDJ 0 0 0
ECG ENGINEERING,LLC
Public Library:
06-0372XX Reconstruction 6-022-006 10/26/06 CANCELLED 10/27/06 10/24/06 09/22/06 09/18/06 16 200,000 0 DDJ 0 0 0
McClave Engineering
09-0180 Reconstruction 6-022-007 09/02/09 DONE DONE DONE 08/31/09 08/27/09 08/31/09 08/06/09 16 60,000 0 DDJ 0 0 0
McClave Engineering,P.C
Soccer Bldg./Concession @ Waverly:
07-1970 New Construction 7-070-001 09/24/08 DONE DONE DONE 04/15/08 04/07/08 06/25/02 06/19/07 02 - 16 40,000 0 DDJ 0 0 0
John A Grillo
Press Box @ East High School:
08-0717 New Construction 7-074-001 04/28/09 DONE DONE DONE 11/07/08 11/05/08 04/01/04 03/18/08 02 - 16 236,000 0 DDJ 0 0 0
John A Grillo
Pressbox @ North High School:
08-0718 New Construction 7-075-001 04/28/09 DONE DONE DONE 11/07/08 11/05/08 04/01/04 03/18/08 02 - 16 147,500 0 DDJ 0 0 0
John A Grillo
Accessory Bldg @ Library site:
- DB Discovered Building 7-077-001 / / / / 01/16/08 / / 02 - 16 0 0 DDJ 0 0 0
07-1511 Reconstruction 7-077-002 02/27/08 DONE DONE DONE 02/01/08 01/23/08 02/01/08 08/30/07 2 18,500 0 DDJ 0 0 0
Beatty Harvey & Associates
District Wide:
08-0719 Reconstruction 7-999-005 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 10,13,16 1,000,000 1,000,000 DDJ 0 0 234,000
John A Grillo
08-1746 Reconstruction 7-999-007 ADDENDUM REQ'D 06/26/09 06/18/09 04/23/09 03/18/08 10,13,16 0 0 DDJ 0 0 0
John A Grillo
:
08-0715 Reconstruction 0-051-003 04/28/09 DONE DONE DONE 11/07/08 11/05/08 10/26/07 03/18/08 2 133,000 133,000 DDJ 0 0 0
John A Grillo
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Earl Vandermeulen High School:
05-0164 Reconstruction 0-001-009 11/18/05 DONE DONE DONE 08/31/05 08/29/05 05/25/04 05/17/05 2,4,7,8,9,10,14,155, 2,280,858 2,280,858 MAC 0 0 0
John A Grillo
05-0555 Reconstruction 0-001-010 04/18/06 DONE DONE DONE 01/17/06 01/06/06 09/08/04 05/17/05 4,10,155 752,411 752,411 MAC 0 0 0
John A Grillo
- Reconstruction 0-001-011 / / / / 03/27/07 / / 2,8,9,10,16 0 17,119,746 HCM 0 0 0
07-0457 Reconstruction 0-001-012 01/22/08 DONE DONE DONE 10/01/07 09/28/07 06/07/07 05/15/07 2,8,9,155,15,16 596,000 596,000 HCM 0 0 268,340
John A Grillo
Edna Louise Spear ES (Pt.Jeff ES):
04-0775 Additions and Alterations 0-002-011 04/07/05 DONE DONE DONE 02/04/05 02/02/05 05/25/04 05/18/04 02 - 16 563,999 124,810 HCM 0 0 0
John A Grillo
05-0556 Reconstruction 0-002-012 04/18/06 DONE DONE DONE 01/17/06 01/06/06 09/08/04 05/17/05 10 875,516 875,516 MAC 0 0 0
John A Grillo
07-0458 Reconstruction 0-002-013 01/22/08 DONE DONE DONE 10/01/07 09/28/07 06/07/07 05/15/07 8,9,155,16 254,000 254,000 HCM 0 0 136,400
John A Grillo
Port Jefferson Jr High School:
06-0731 Reconstruction 0-003-008 04/09/07 DONE DONE DONE 01/10/07 01/10/07 11/01/06 05/16/06 8 365,000 365,000 HCM 0 0 0
John A Grillo
07-1098 Reconstruction 0-003-009 03/07/08 DONE DONE DONE 12/12/07 12/11/07 08/09/07 06/27/07 4,8,9,155,15,16 5,225,400 5,225,400 HCM 0 0 0
John A Grillo
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Elementary School:
03-1388 Additions and Alterations 0-001-008 01/05/05 DONE DONE DONE 04/14/04 04/13/04 10/07/02 02/04/03 02 - 16 1,492,646 1,492,646 DDJ 0 0 0
h2m group
05-1353 Reconstruction 0-001-010 07/14/06 DONE DONE DONE 06/08/06 06/07/06 02/15/06 05/01/06 7 922,389 922,389 DDJ 0 0 204,368
h2m group
06-0307 Reconstruction 0-001-011 12/28/06 DONE DONE DONE 10/12/06 10/05/06 06/21/06 05/01/06 2,4,7,8,9,10,155,15, 931,998 931,998 DDJ 0 0 205,909
h2m group
Mt. Sinai Jr. High School:
03-0791 Additions and Alterations 0-002-005 12/15/04 DONE DONE DONE 12/05/03 12/03/03 10/07/02 02/04/03 02 - 16 3,735,875 3,735,875 DDJ 0 0 0
h2m group
06-0309 Reconstruction 0-002-007 12/28/06 DONE DONE DONE 10/12/06 10/05/06 06/21/06 05/01/06 2,4,7,8,9,10,155,15, 721,847 721,847 DDJ 0 0 147,027
h2m group
08-1302 Additions and Alterations 0-002-008 07/06/09 DONE DONE DONE 02/27/09 02/24/09 02/02/09 02/11/09 02 - 16 3,600,000 1,719,581 DDJ 0 0 151,253
H2M Group
Senior High School:
06-0202 Reconstruction 0-006-009 09/15/06 DONE DONE DONE 09/05/06 09/01/06 06/21/06 05/01/06 2,4,7,8,9,10,15 167,396 167,396 DDJ 0 0 40,150
h2m group
06-0308 Reconstruction 0-006-010 12/25/06 DONE DONE DONE 10/12/06 10/05/06 09/08/06 05/01/06 2,4,7,9,15,16 234,180 234,180 DDJ 0 0 54,686
h2m group
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
No.Country Road MS(former ES):
08-0825 Reconstruction 0-001-012 04/29/09 DONE DONE DONE 12/01/08 11/26/08 04/23/04 05/20/08 8,9,155,15,16 486,979 486,979 DDJ 0 0 134,447
John A Grillo
09-0303PR Reconstruction 0-001-013 UNREVIEWED 10/14/09 10/09/09 01/28/05 / / 8,9,155,15,16 0 8,120,196 DDJ 0 0 0
John A Grillo
- PR Additions and Alterations 0-001-014 / / / / 03/18/09 / / 02 - 16 0 0 DDJ 0 0 0
- PR Additions and Alterations 0-001-015 / / / / 03/18/09 / / 02 - 16 0 0 DDJ 0 0 0
- PR Additions and Alterations 0-001-016 / / / / 03/18/09 / / 02 - 16 0 0 DDJ 0 0 0
04-0663FP Reconstruction 0-001-FP1 07/05/05 DONE DONE DONE 01/11/05 / / / / / / 16 4,350 4,350 JOD 0 0 0
A. Muller Primary School:
06-0824 Additions and Alterations 0-002-010 02/13/07 DONE DONE DONE 01/30/07 01/29/07 05/20/02 05/31/06 02 - 16 148,200 148,200 DDJ 0 0 0
John A Grillo
08-0826 Reconstruction 0-002-011 04/29/09 DONE DONE DONE 12/01/08 11/26/08 04/23/04 05/20/08 8,9,155,15,16 868,750 868,750 DDJ 0 0 237,746
John A Grillo
09-0304PR Additions and Alterations 0-002-012 UNREVIEWED 10/14/09 10/09/09 11/21/07 / / 02 - 16 0 0 DDJ 0 0 0
John A Grillo
- PR Additions and Alterations 0-002-013 / / / / 03/18/09 / / 02 - 16 0 0 DDJ 0 0 0
- PR Additions and Alterations 0-002-014 / / / / 03/18/09 / / 02 - 16 0 0 DDJ 0 0 0
04-0664FP Reconstruction 0-002-FP1 07/05/05 DONE DONE DONE 01/11/05 / / / / / / 16 4,350 4,350 JOD 0 0 0
Sound Beach School:
04-0709 Additions and Alterations 0-003-009 03/01/05 DONE DONE DONE 01/21/05 01/20/05 05/20/02 05/18/04 02 - 16 636,396 636,396 DDJ 0 0 0
John A Grillo
08-0827 Reconstruction 0-003-010 04/29/09 DONE DONE DONE 12/01/08 11/26/08 04/23/04 05/20/08 8,9,155,15,16 664,500 664,500 DDJ 0 0 175,867
John A Grillo
09-0305PR Reconstruction 0-003-011 UNREVIEWED 10/14/09 10/09/09 02/25/05 / / 8,9,155,15,16 0 8,120,196 DDJ 0 0 0
John A Grillo
- PR Additions and Alterations 0-003-012 / / / / 03/18/09 / / 02 - 16 0 0 DDJ 0 0 0
- PR Additions and Alterations 0-003-013 / / / / 03/18/09 / / 02 - 16 0 0 DDJ 0 0 0
Miller Place High School:
04-0710 Reconstruction 0-006-019 03/01/05 DONE DONE DONE 01/21/05 01/20/05 04/23/04 05/18/04 15,16 116,015 116,015 DDJ 0 0 0
John A Grillo
06-0825SR Reconstruction 0-006-020 02/13/07 DONE DONE DONE 01/30/07 01/29/07 01/28/05 05/31/06 8,9,155,15,16 233,222 233,222 DDJ 0 0 0
John A Grillo
08-0828 Reconstruction 0-006-021 04/29/09 DONE DONE DONE 12/01/08 11/26/08 01/28/05 05/20/08 8,9,155,15,16 1,755,771 1,755,771 DDJ 0 0 452,416
John A Grillo
09-0306PR Additions and Alterations 0-006-022 UNREVIEWED 10/14/09 10/09/09 11/21/07 / / 02 - 16 0 0 DDJ 0 0 0
John A Grillo
- PR Additions and Alterations 0-006-023 / / / / 03/18/09 / / 02 - 16 0 0 DDJ 0 0 0
- PR Additions and Alterations 0-006-024 / / / / 03/18/09 / / 02 - 16 0 0 DDJ 0 0 0
04-0661FP Reconstruction 0-006-FP1 07/05/05 DONE DONE DONE 01/11/05 / / / / / / 16 4,350 4,350 JOD 0 0 0
04-0662FP Reconstruction 0-006-FP2 07/05/05 DONE DONE DONE 01/11/05 / / / / / / 16 9,900 9,900 JOD 0 0 0
Facilities Trailer:
05-1167DB Discovered Building 1-022-001 02/16/07 DONE DONE DONE 04/18/06 04/10/06 01/07/05 / / 0 0 DDJ 0 0 0
- PR Additions and Alterations 1-022-002 / / / / 10/18/06 / / 02 - 16 0 0 DDJ 0 0 0
Administration Building:
05-1168TQ Temporary Quarters 1-025-001 04/17/07 DONE DONE DONE 04/18/06 04/10/06 01/07/05 / / 0 0 DDJ 0 0 0
High School Field Storage Container:
05-1169DB Discovered Building 2-023-001 02/16/07 DONE DONE DONE 04/18/06 04/10/06 01/07/05 / / 0 0 DDJ 0 0 0
North Country Barn:
05-1170DB Discovered Building 2-027-001 02/16/07 DONE DONE DONE 04/18/06 04/10/06 01/11/05 / / 0 0 DDJ 0 0 0
- PR Additions and Alterations 2-027-002 / / / / 10/18/06 / / 02 - 16 0 0 DDJ 0 0 0
Maintenance Barn:
05-1171DB Discovered Building 3-026-001 02/16/07 DONE DONE DONE 04/18/06 04/10/06 01/07/05 / / 0 0 DDJ 0 0 0
- PR Additions and Alterations 3-026-002 / / / / 10/18/06 / / 02 - 16 0 0 DDJ 0 0 0
Press Box:
05-0199DB Discovered Building 7-016-001 09/19/05 DONE DONE DONE 09/19/05 09/19/05 01/07/94 / / 0 0 DDJ 0 0 0
Concession Stand/Storage Container:
- DB Discovered Building 7-024-001 / / / / 01/07/05 / / 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Joseph A Edgar School:
07-0720 Reconstruction 0-001-010 04/09/08 DONE DONE DONE 11/06/07 11/02/07 / / 05/15/07 2,8,9,155,15,16 1,101,786 1,101,786 DDJ 0 0 300,000
John A Grillo
08-1290 Reconstruction 0-001-011 04/23/09 DONE DONE DONE 02/25/09 02/19/09 10/07/08 05/15/07 8,155,16 182,404 0 DDJ 0 0 54,356
John A Grillo
Rocky Point High:
06-0554 Reconstruction 0-005-019 02/15/07 DONE DONE DONE 11/29/06 11/28/06 09/18/06 06/05/00 2,10,155,15,16 407,789 407,789 DDJ 0 0 0
John A Grillo
07-0721 Reconstruction 0-005-020 04/09/08 DONE DONE DONE 11/06/07 11/02/07 01/04/07 05/15/07 2,9,155,15,16 597,946 597,946 DDJ 0 0 158,783
John A Grillo
07-1387 Reconstruction 0-005-021 06/25/08 DONE DONE DONE 01/16/08 01/16/08 11/09/07 06/05/00 2,9,10,155,15,16 472,000 472,000 DDJ 0 0 0
John A Grillo
08-1291 Reconstruction 0-005-022 04/23/09 DONE DONE DONE 02/25/09 02/19/09 10/07/08 05/15/07 2,9,15,16 456,707 0 DDJ 0 0 136,099
John A Grillo
08-0963 Reconstruction 0-005-023 04/20/09 DONE DONE DONE 12/24/08 12/17/08 10/07/08 06/05/00 2,9,155,15,16 472,000 0 DDJ 0 0 0
John A Grillo
- Reconstruction 0-005-024 / / / / 05/20/09 / / 4,7 0 0 DDJ 0 0 0
04-0334SC Visual Structural Inspection 0-005-SC1 12/01/04 DONE DONE DONE 10/26/04 10/26/04 / / / / 16 52,000 52,000 JOD 0 0 0
Frank J. Carasiti Elementary School:
- Reconstruction 0-006-011 / / / / 06/14/06 / / 2,15 0 10,440,252 DDJ 0 0 0
07-0722 Reconstruction 0-006-012 04/09/08 DONE DONE DONE 11/06/07 11/02/07 01/04/07 05/15/07 4,7,155,15,16 2,495,396 2,495,396 DDJ 0 0 700,000
John A Grillo
08-1292 Reconstruction 0-006-013 04/23/09 DONE DONE DONE 02/25/09 02/19/09 10/07/08 05/15/07 2,8,155,16 197,721 0 DDJ 0 0 58,921
John A Grillo
08-1489 Reconstruction 0-006-014 07/16/09 DONE DONE DONE 04/13/09 04/08/09 02/02/09 05/15/07 2,8,9,155,15,16 505,158 0 DDJ 0 0 0
John A Grillo
District Office:
04-0748TQ Temporary Quarters 1-010-001 04/07/05 DONE DONE DONE 02/01/05 02/01/05 01/05/05 / / 0 0 DDJ 0 0 0
Storage Container #1:
- DB Discovered Building 2-012-001 / / / / 10/07/08 / / 0 0 DDJ 0 0 0
Storage Container #2:
- DB Discovered Building 2-013-001 / / / / 10/07/08 / / 0 0 DDJ 0 0 0
Storage Container # 3:
- DB Discovered Building 2-014-001 / / / / 10/07/08 / / 0 0 DDJ 0 0 0
Maintenance Bldg.:
07-1914 New Construction 3-011-001 09/19/08 DONE DONE DONE 04/03/08 03/25/08 01/04/07 05/15/07 02 - 16 565,220 0 DDJ 0 0 0
John A Grillo
Press Box @ High School:
06-1352DB Discovered Building 7-009-001 05/03/07 DONE DONE DONE 04/24/07 04/15/07 05/12/04 / / 0 0 DDJ 0 0 0
Districtwide:
06-0744 Reconstruction 7-999-003 01/25/07 DONE DONE DONE 01/11/07 01/11/07 11/20/06 08/28/06 10,16 350,000 350,000 DDJ 0 0 0
John A Grillo
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Oxhead Road Elementary:
05-0401 Reconstruction 0-001-015 01/19/06 DONE DONE DONE 12/01/05 11/30/05 10/15/04 01/25/05 2,7,8,9,14,155,15,16 3,247,350 3,247,350 JOD 0 0 0
Weiedersum Associates Architects, PL
06-0792 Reconstruction 0-001-016 05/18/07 DONE DONE DONE 01/19/07 01/19/07 03/15/05 01/25/05 2,7,14,155,15,16 422,250 0 JOD 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-001-017 / / / / 10/09/09 / / 2,155,15,16 0 0 JOD 0 0 0
Holbrook Road Elementary:
05-0402 Reconstruction 0-002-011 01/19/06 DONE DONE DONE 12/01/05 11/30/05 10/15/04 01/25/05 2,7,14,155,15,16 2,848,000 2,848,000 JOD 0 0 0
Weiedersum Associates Architects, PL
05-0927 Reconstruction 0-002-012 07/20/06 DONE DONE DONE 03/13/06 03/10/06 03/15/05 01/25/05 2,7,14,155,15,16 545,500 545,500 JOD 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-002-013 / / / / 10/08/09 / / 2,155,15,16 0 0 JOD 0 0 0
- Reconstruction 0-002-014 / / / / 10/08/09 / / 2,8,155,15,16 0 0 JOD 0 0 0
Unity Dr. Pre-K Kdgtn. Ctr.:
05-0403 Reconstruction 0-003-010 01/19/06 DONE DONE DONE 12/01/05 11/30/05 10/15/04 01/25/05 2,7,9,14,155,15,16 3,680,350 3,680,350 JOD 0 0 0
Weiedersum Associates Architects, PL
06-0793 Reconstruction 0-003-011 05/18/07 DONE DONE DONE 01/19/07 01/19/07 03/15/05 01/25/05 2,7,8,9,14,155,15,16 328,850 0 JOD 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-003-012 / / / / 10/09/09 / / 2,155,15,16 0 0 JOD 0 0 0
Bicycle Path Pre-K Kdgtn. Ctr.:
05-0404 Reconstruction 0-005-008 01/19/06 DONE DONE DONE 12/01/05 11/30/05 10/15/04 01/25/05 2,7,155,15,16 3,299,150 3,299,150 JOD 0 0 0
Weiedersum Associates Architects, PL
05-0928 Reconstruction 0-005-009 07/20/06 DONE DONE DONE 03/13/06 03/10/06 03/15/05 01/25/05 2,7,155,15,16 15,000 15,000 JOD 0 0 0
Weiedersum Associates Architects, PL
08-0824 Additions and Alterations 0-005-010 02/27/09 DONE DONE DONE 11/26/08 11/26/08 10/23/07 05/20/08 02 - 16 2,100,000 0 JOD 0 0 2,100,000
Weiedersum Associates Architects, PL
- Reconstruction 0-005-011 / / / / 10/08/09 / / 2,155,15,16 0 0 JOD 0 0 0
Newfield High School:
05-0405 Reconstruction 0-006-017 01/19/06 DONE DONE DONE 12/01/05 11/30/05 10/15/04 01/25/05 2,7,8,9,155,15,16 3,976,750 3,976,750 JOD 0 0 0
Weiedersum Associates Architects, PL
06-0816 Reconstruction 0-006-018 05/17/07 DONE DONE DONE 01/29/07 01/26/07 03/23/05 01/25/05 2,7,8,9,155,15,16 1,357,750 0 JOD 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-006-019 / / / / 10/09/09 / / 2,8,155,15,16 0 0 DDJ 0 0 0
Dawnwood Middle School:
05-0406 Reconstruction 0-008-015 01/19/06 DONE DONE DONE 12/01/05 11/30/05 10/15/04 01/25/05 2,7,9,14,155,15,16 1,751,000 1,751,000 JOD 0 0 0
Weiedersum Associates Architects, PL
06-0817 Reconstruction 0-008-016 05/17/07 DONE DONE DONE 01/29/07 01/26/07 03/23/05 01/25/05 2,7,9,14,155,15,16 750,000 0 JOD 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-008-017 / / / / 10/08/09 / / 2,8,155,15,16 0 0 JOD 0 0 0
Hawkins Path Elementary:
05-0407 Reconstruction 0-009-007 01/19/06 DONE DONE DONE 12/01/05 11/30/05 10/15/04 01/25/05 2,4,7,8,14,155,15,16 887,250 887,250 JOD 0 0 0
Weiedersum Associates Architects, PL
05-0929 Reconstruction 0-009-008 07/20/06 DONE DONE DONE 03/13/06 03/10/06 03/15/05 01/25/05 2,7,8,14,155,15,16 343,500 343,500 JOD 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-009-009 / / / / 10/08/09 / / 2,155,15,16 0 0 JOD 0 0 0
Selden Middle School:
05-0408 Reconstruction 0-010-014 01/19/06 DONE DONE DONE 12/01/05 11/30/05 10/15/04 01/25/05 2,7,9,155,15,16 1,470,000 1,470,000 JOD 0 0 0
Weiedersum Associates Architects, PL
06-0818 Reconstruction 0-010-015 05/17/07 DONE DONE DONE 01/29/07 01/26/07 03/15/05 01/25/05 2,7,9,155,15,16 1,371,300 0 JOD 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-010-016 / / / / 10/09/09 / / 2,8,155,15,16 0 0 JOD 0 0 0
North Coleman Elementary:
05-0409 Reconstruction 0-011-011 01/19/06 DONE DONE DONE 12/01/05 11/30/05 10/15/04 01/25/05 2,7,9,155,15,16 2,163,850 2,163,850 JOD 0 0 0
Weiedersum Associates Architects, PL
05-0930 Reconstruction 0-011-012 07/20/06 DONE DONE DONE 03/13/06 03/10/06 03/15/05 01/25/05 2,7,9,155,15,16 599,800 599,800 JOD 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-011-013 / / / / 10/08/09 / / 2,155,15,16 0 0 JOD 0 0 0
Stagecoach Rd. Elementary:
05-0410 Reconstruction 0-012-008 01/19/06 DONE DONE DONE 12/01/05 11/30/05 10/15/04 01/25/05 2,7,9,15,16 3,748,500 3,748,500 JOD 0 0 0
Weiedersum Associates Architects, PL
06-0794 Reconstruction 0-012-009 05/18/07 DONE DONE DONE 01/19/07 01/19/07 03/15/05 01/25/05 2,7,9,15,16 535,500 0 JOD 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-012-010 / / / / 10/08/09 / / 2,155,15,16 0 0 JOD 0 0 0
Auer Elementary:
05-0411 Reconstruction 0-013-010 01/19/06 DONE DONE DONE 12/01/05 11/30/05 10/15/04 01/25/05 2,7,9,155,15,16 2,210,250 2,210,250 JOD 0 0 0
Weiedersum Associates Architects, PL
05-0931 Reconstruction 0-013-011 07/20/06 DONE DONE DONE 03/13/06 03/10/06 03/15/05 01/25/05 2,7,9,155,15,16 565,300 565,300 JOD 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-013-012 / / / / 10/08/09 / / 2,155,15,16 0 0 JOD 0 0 0
Jericho Elementary:
05-0412 Reconstruction 0-014-008 01/19/06 DONE DONE DONE 12/01/05 11/30/05 10/15/04 01/25/05 2,7,8,9,14,155,15,16 4,181,500 4,181,500 JOD 0 0 0
Weiedersum Associates Architects, PL
06-0795 Reconstruction 0-014-009 05/18/07 DONE DONE DONE 01/19/07 01/19/07 03/15/05 01/25/05 2,7,8,9,14,155,15,16 326,300 0 JOD 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-014-010 / / / / 10/08/09 / / 2,155,15,16 0 0 JOD 0 0 0
Centereach High School:
05-0413 Reconstruction 0-015-015 01/19/06 DONE DONE DONE 12/01/05 11/30/05 10/15/04 01/25/05 2,7,8,9,155,15,16 3,549,938 3,549,938 JOD 0 0 0
Weiedersum Associates Architects, PL
06-0819 Reconstruction 0-015-016 05/17/07 DONE DONE DONE 01/29/07 01/26/07 03/23/05 01/25/05 2,7,8,9,155,15,16 4,251,000 0 JOD 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-015-017 / / / / 10/08/09 / / 2,8,155,15,16 0 0 JOD 0 0 0
New Lane Memorial Elementary:
05-0414 Reconstruction 0-016-011 01/19/06 DONE DONE DONE 12/01/05 11/30/05 10/15/04 01/25/05 2,7,8,9,155,15,16 3,823,300 3,823,300 JOD 0 0 0
Weiedersum Associates Architects, PL
05-0932 Reconstruction 0-016-012 07/20/06 DONE DONE DONE 03/13/06 03/10/06 03/15/05 01/25/05 2,7,8,9,155,15,16 61,500 61,500 JOD 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-016-013 / / / / 10/08/09 / / 2,155,15,16 0 0 JOD 0 0 0
Trans Admin Bldg:
- Reconstruction 1-004-005 / / / / 10/09/09 / / 2,155,15,16 0 0 JOD 0 0 0
Administration Building:
- Reconstruction 1-022-004 / / / / 10/08/09 / / 2,155,15,16 0 0 JOD 0 0 0
Double Modular #1 @ Transp. Bldg.:
- Reconstruction 1-024-002 / / / / 10/09/09 / / 2,155,16 0 0 JOD 0 0 0
Double Modular #2 @ Transp. Bldg.:
- Reconstruction 1-025-002 / / / / 10/09/09 / / 2,155,16 0 0 JOD 0 0 0
Trans./Student Services:
- Reconstruction 1-028-002 / / / / 10/09/09 / / 2,155,16 0 0 JOD 0 0 0
Transportation Garage:
- Reconstruction 3-007-004 / / / / 10/09/09 / / 2,155,15,16 0 0 JOD 0 0 0
Grounds/Maintenance Storage Bldg.:
05-0415 New Construction 3-017-001 01/19/06 DONE DONE DONE 12/01/05 11/30/05 10/15/04 01/25/05 02 - 16 40,000 0 JOD 0 0 0
Weiedersum Associates Architects, PL
Transporation Garage(was 3-007):
06-1289 Reconstruction 5-007-001 12/10/07 DONE DONE DONE 04/09/07 04/06/07 11/21/06 03/10/04 2,155,16 606,000 606,000 JOD 0 0 0
Weiedersum Associates Architects, PL
- PR Additions and Alterations 5-007-002 / / / / 10/06/08 / / 02 - 16 0 0 JOD 0 0 0
- Reconstruction 5-007-003 / / / / 10/09/09 / / 15 0 0 JOD 0 0 0
Middle Country Public Library:
07-0104 Reconstruction 6-020-003 07/30/07 DONE DONE DONE 07/27/07 07/26/07 05/25/07 07/18/07 2 150,000 0 JOD 0 0 0
Beatty Harvey & Associates
08-1503 Reconstruction 6-020-004 07/17/09 DONE DONE DONE 04/14/09 04/10/09 12/09/08 04/08/08 8,9,16 362,000 0 JOD 0 0 0
Beatty, Harvey & Associates
Press Box @ Centereach High School:
05-0416 New Construction 7-029-001 01/19/06 DONE DONE DONE 12/01/05 11/30/05 04/26/04 01/25/05 02 - 16 136,000 0 JOD 0 0 0
Weiedersum Associates Architects, PL
Press Box @ Newfield HS:
05-0417 New Construction 7-030-001 01/19/06 DONE DONE DONE 12/01/05 11/30/05 10/15/04 01/25/05 02 - 16 136,000 0 JOD 0 0 0
Weiedersum Associates Architects, PL
:
05-0418 New Construction 7-031-001 01/19/06 DONE DONE DONE 12/01/05 11/30/05 09/28/05 01/25/05 02 - 16 100,000 0 JOD 0 0 0
Weiedersum Associates Architects, PL
Districtwide:
05-1253 Reconstruction 7-999-006 07/07/06 DONE DONE DONE 05/09/06 05/08/06 02/21/06 01/25/05 10 1,643,000 1,643,000 JOD 0 0 0
Weiedersum Associates Architects, PL
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Chas. E. Walters Elementary:
07-0984 Reconstruction 0-002-010 12/13/07 DONE DONE DONE 11/29/07 11/28/07 11/05/07 09/27/07 155 1,272,447 1,272,447 DDJ 0 0 377,906
Weiedersum Associates Architects, PL
08-0164 Reconstruction 0-002-011 01/05/09 DONE DONE DONE 08/14/08 08/07/08 / / 09/27/07 7 674,095 674,095 DDJ 0 0 182,870
Weiedersum Associates Architects, PL
- Reconstruction 0-002-012 / / / / 07/14/09 / / 155,16 0 0 DDJ 0 0 0
West Middle Island Elem.:
07-0985 Reconstruction 0-004-013 12/13/07 DONE DONE DONE 11/29/07 11/28/07 11/05/07 09/27/07 16 1,178,766 1,178,766 DDJ 0 0 300,355
Weiedersum Associates Architects, PL
08-0172 Reconstruction 0-004-014 01/05/09 DONE DONE DONE 08/14/08 08/07/08 01/30/08 09/27/07 4,7 436,324 436,324 DDJ 0 0 113,385
Weiedersum Associates Architects, PL
- Reconstruction 0-004-015 / / / / 07/14/09 / / 155,16 0 0 DDJ 0 0 0
Coram Elementary:
07-0986 Reconstruction 0-007-011 12/13/07 DONE DONE DONE 11/29/07 11/28/07 11/05/07 09/27/07 16 914,880 914,880 DDJ 0 0 273,656
Weiedersum Associates Architects, PL
08-0165 Reconstruction 0-007-012 01/05/09 DONE DONE DONE 08/14/08 08/07/08 / / 09/27/07 7 418,631 418,631 DDJ 0 0 124,254
Weiedersum Associates Architects, PL
- Reconstruction 0-007-013 / / / / 07/14/09 / / 155,16 0 0 DDJ 0 0 0
Ridge Elementary:
07-0987 Reconstruction 0-008-011 12/13/07 DONE DONE DONE 11/29/07 11/28/07 11/05/07 09/27/07 16 521,977 521,977 DDJ 0 0 153,831
Weiedersum Associates Architects, PL
08-0163 Reconstruction 0-008-012 01/05/09 DONE DONE DONE 08/14/08 08/07/08 / / 09/27/07 10,16 491,927 491,927 DDJ 0 0 131,724
Weiedersum Associates Architects, PL
- Reconstruction 0-008-013 / / / / 07/14/09 / / 155,16 0 0 DDJ 0 0 0
Longwood Junior High School:
05-0137 Reconstruction 0-009-008 08/29/05 DONE DONE DONE 08/17/05 08/16/05 07/22/05 05/17/05 155 438,057 438,057 DDJ 0 0 0
Weiedersum Associates Architects, PL
- PR Additions and Alterations 0-009-009 / / / / 11/05/07 / / 02 - 16 0 0 DDJ 0 0 0
08-0170 Reconstruction 0-009-010 01/05/09 DONE DONE DONE 08/14/08 08/07/08 11/05/07 09/27/07 16 1,882,570 1,882,570 DDJ 0 0 267,351
Weiedersum Associates Architects, PL
- Reconstruction 0-009-011 / / / / 12/02/08 / / 8,9,15 0 0 DDJ 0 0 0
- Reconstruction 0-009-012 / / / / 07/14/09 / / 155,16 0 0 DDJ 0 0 0
Longwood Middle School:
08-0169 Reconstruction 0-010-010 01/05/09 DONE DONE DONE 08/14/08 08/07/08 11/05/07 09/27/07 155 1,114,503 1,114,503 DDJ 0 0 246,225
Weiedersum Associates Architects, PL
- Reconstruction 0-010-011 / / / / 07/14/09 / / 155,16 0 0 DDJ 0 0 0
Ridge Elem.Annex 1(Intermediate):
- Reconstruction 0-011-006 / / / / 03/14/05 / / 7 0 9,441,309 DDJ 0 0 0
- Reconstruction 0-011-007 / / / / 11/05/07 / / 7 0 0 DDJ 0 0 0
08-0167 Reconstruction 0-011-008 01/05/09 DONE DONE DONE 08/14/08 08/07/08 11/05/07 09/27/07 16 253,286 253,286 DDJ 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-011-009 / / / / 07/14/09 / / 155,16 0 0 DDJ 0 0 0
Coram Elem Annex:
- Reconstruction 0-012-004 / / / / 11/05/07 / / 7 0 0 DDJ 0 0 0
08-0166 Reconstruction 0-012-005 01/05/09 DONE DONE DONE 08/14/08 08/07/08 11/05/07 09/27/07 16 176,250 176,250 DDJ 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-012-006 / / / / 07/14/09 / / 155,16 0 0 DDJ 0 0 0
Charles E. Walters Annex 1:
08-0168 Reconstruction 0-014-006 01/05/09 DONE DONE DONE 08/14/08 08/07/08 11/05/07 09/27/07 7 228,424 228,424 DDJ 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-014-007 / / / / 11/05/07 / / 155 0 0 DDJ 0 0 0
- Reconstruction 0-014-008 / / / / 07/14/09 / / 155,16 0 0 DDJ 0 0 0
Longwood Sr High School:
04-0493 Reconstruction 0-015-007 02/09/05 DONE DONE DONE 12/09/04 12/07/04 10/14/03 03/05/97 155,16 236,675 236,675 DDJ 0 0 0
Weiedersum Associates Architects, PL
07-0988 Reconstruction 0-015-008 12/13/07 DONE DONE DONE 11/29/07 11/28/07 11/05/07 09/27/07 2,4,7 3,622,202 3,622,202 DDJ 0 0 912,870
Weiedersum Associates Architects, PL
07-2128 Reconstruction 0-015-009 07/16/08 DONE DONE DONE 05/19/08 05/15/08 11/05/07 05/15/07 155 350,000 0 DDJ 0 0 0
Weiedersum Associates Architects, PL
08-0173 Reconstruction 0-015-010 01/05/09 DONE DONE DONE 08/14/08 08/07/08 05/29/08 09/27/07 16 1,765,815 1,765,815 DDJ 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-015-011 / / / / 12/02/08 / / 2 0 0 DDJ 0 0 0
09-0296 Reconstruction 0-015-012 UNREVIEWED 10/09/09 10/09/09 07/14/09 05/19/09 155,16 0 0 DDJ 0 0 0
Weiedersum Associates Architects, PL
W. Middle Island Annex:
- Reconstruction 0-018-003 / / / / 11/05/07 / / 2,7 0 0 DDJ 0 0 0
08-0171 Reconstruction 0-018-004 01/05/09 DONE DONE DONE 08/14/08 08/07/08 11/05/07 09/27/07 16 238,868 238,868 DDJ 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-018-005 / / / / 07/14/09 / / 155,16 0 0 DDJ 0 0 0
Central Office Annex East:
06-0296DB Discovered Building 1-019-001 01/29/08 DONE DONE DONE 10/04/06 10/03/06 12/21/04 / / 0 0 DDJ 0 0 0
- Reconstruction 1-019-002 / / / / 07/14/09 / / 155,16 0 0 DDJ 0 0 0
Public Library:
05-0195 Additions and Alterations 6-016-003 12/21/05 DONE DONE DONE 09/16/05 09/13/05 07/17/01 08/04/05 02 - 16 360,000 0 DDJ 0 0 0
Barrett, Bonacci & Van Weele, PC
07-0456 Reconstruction 6-016-004 10/11/07 DONE DONE DONE 10/01/07 09/27/07 05/24/07 06/19/07 15 152,000 0 DDJ 0 0 0
P.W. Grosser Consulting Engineer
- Reconstruction 6-016-005 / / / / 05/31/07 / / 15 0 0 DDJ 0 0 0
09-0072 Reconstruction 6-016-006 08/11/09 DONE DONE DONE 07/22/09 07/20/09 06/19/09 06/17/09 7,16 180,000 0 DDJ 0 0 0
Beatty, Harvey & Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Bay Avenue School:
04-1416 Additions and Alterations 0-001-007 01/25/06 DONE DONE DONE 06/15/05 06/13/05 12/10/99 03/28/00 02 - 16 5,753,770 4,651,723 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
07-0087 Reconstruction 0-001-015 12/12/07 DONE DONE DONE 07/25/07 07/24/07 06/01/07 03/28/00 2,4,8,9,10,155,15,16 2,963,402 0 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
08-0056 Additions and Alterations 0-001-016 12/08/08 DONE DONE DONE 07/21/08 07/08/08 07/15/08 / / 02 - 16 942,414 0 JOD 0 0 251,625
BurtonBehrendt Smith and O'Callaghan
Medford Avenue School:
05-0933 Reconstruction 0-002-010 08/11/06 DONE DONE DONE 03/13/06 03/10/06 09/14/05 03/28/00 2,4,8,9,13,16 467,420 467,420 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
River Avenue Elem. School:
- PR Additions and Alterations 0-003-008 / / / / 05/29/08 / / 02 - 16 0 0 JOD 0 0 0
South Ocean Middle School:
04-0897 Reconstruction 0-004-010 06/22/05 DONE DONE DONE 03/09/05 03/07/05 07/09/01 03/28/00 155,16 2,351,926 2,351,926 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
05-0946 Reconstruction 0-004-014 04/12/06 DONE DONE DONE 03/14/06 03/13/06 05/13/05 03/28/00 2,8,9,155,15,16 417,652 417,652 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
08-0492 Reconstruction 0-004-015 03/04/09 DONE DONE DONE 10/09/08 10/06/08 02/27/08 12/11/07 8 578,911 0 JOD 0 0 154,569
BurtonBehrendt Smith and O'Callaghan
08-0086 Reconstruction 0-004-016 08/28/08 DONE DONE DONE 07/22/08 07/18/08 02/27/08 12/11/07 16 269,262 0 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
Saxton Middle School:
04-0839 Reconstruction 0-005-009 04/05/05 DONE DONE DONE 02/23/05 02/22/05 09/08/00 03/28/00 2,10,16 2,661,902 2,661,902 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
04-0849 Reconstruction 0-005-015 07/07/05 DONE DONE DONE 02/24/05 02/24/05 01/19/05 03/28/00 2,9,155,15,16 3,711,123 3,711,123 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-005-016 / / / / 02/27/08 / / 10 0 0 JOD 0 0 0
08-0493 Reconstruction 0-005-017 03/04/09 DONE DONE DONE 10/09/08 10/06/08 02/27/08 12/11/07 8 1,682,879 0 JOD 0 0 449,328
BurtonBehrendt Smith and O'Callaghan
09-0313 Reconstruction 0-005-018 UNREVIEWED 10/19/09 10/14/09 02/27/08 12/11/07 4,155,16 0 0 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
Oregon Avenue Junior High:
02-1701 Additions and Alterations 0-009-005 06/13/05 DONE DONE DONE 03/14/03 / / 12/10/99 03/28/00 02 - 16 11,382,940 9,673,871 BJB 0 0 0
BurtonBehrendt Smith and O'Callaghan
Tremont Ave School:
05-0934 Reconstruction 0-010-010 08/11/06 DONE DONE DONE 03/13/06 03/10/06 09/14/05 03/28/00 4,8,9,13,16 496,251 496,251 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
Eagle Drive Elementary:
03-0535 Additions and Alterations 0-011-006 04/01/05 DONE DONE DONE 10/14/03 10/14/03 12/10/99 03/28/00 02 - 16 7,551,825 5,044,988 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
05-0000XX Additions and Alterations 0-011-009 CANCELLED / / / / 09/14/05 / / 02 - 16 0 0 JOD 0 0 0
05-0935 Reconstruction 0-011-010 08/11/06 DONE DONE DONE 03/13/06 03/10/06 09/14/05 03/28/00 4,8,9,13,16 479,326 479,326 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
08-0606 Reconstruction 0-011-011 DONE DONE ADD. REQ'D10/29/08 10/28/08 02/27/08 12/11/07 16 0 0 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
Canaan Elementary School:
02-2382 Additions and Alterations 0-013-005 05/03/05 DONE DONE DONE 06/12/03 / / 12/10/99 03/28/00 02 - 16 8,331,717 6,232,782 HCM 0 0 0
BurtonBehrendt Smith and O'Callaghan
05-0936 Reconstruction 0-013-010 08/11/06 DONE DONE DONE 03/13/06 03/10/06 09/14/05 03/28/00 2,4,8,9,13,16 469,819 469,819 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
Patchogue-Medford High School:
05-0463 Reconstruction 0-015-016 06/19/06 DONE DONE DONE 12/20/05 12/19/05 12/13/04 03/28/00 2,155,16 639,800 639,800 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
Storage Container:
- DB Discovered Building 2-025-001 / / / / 04/10/07 / / 0 0 JOD 0 0 0
Storage Container I:
- DB Discovered Building 2-027-001 / / / / 04/10/07 / / 0 0 JOD 0 0 0
Storage Container II:
- DB Discovered Building 2-028-001 / / / / 04/10/07 / / 0 0 JOD 0 0 0
Storage Container III:
- DB Discovered Building 2-029-001 / / / / 04/10/07 / / 0 0 JOD 0 0 0
Storage Container III Baseball:
- DB Discovered Building 2-030-001 / / / / 04/10/07 / / 0 0 JOD 0 0 0
Storage @ Concession Stand:
- DB Discovered Building 2-031-001 / / / / 04/10/07 / / 0 0 JOD 0 0 0
Public Library:
06-0330 Reconstruction 6-021-007 11/06/06 DONE DONE DONE 10/16/06 10/16/06 09/06/06 02/21/06 2,8,9,10,15,16 286,000 0 JOD 0 0 0
BH&A Architects
07-0089 Reconstruction 6-021-008 08/01/07 DONE DONE DONE 07/25/07 07/24/07 06/22/07 07/17/07 2,4 100,000 0 JOD 0 0 0
h2m group
08-1463 Reconstruction 6-021-009 04/13/09 DONE DONE DONE 04/07/09 03/06/09 01/08/09 12/16/08 155,15,16 340,000 0 JOD 0 0 0
EMTEC Consultants, P.C.
Press Box @ High School:
- DB Discovered Building 7-026-001 / / / / 04/10/07 / / 0 0 JOD 0 0 0
District Wide:
07-2127 Reconstruction 7-999-007 07/14/08 DONE DONE DONE 05/19/08 05/15/08 11/21/06 12/11/07 10,16 4,376,496 0 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 7-999-008 / / / / 02/27/08 / / 10,13,16 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Nathaniel Woodhull Elementary:
08-0584 Reconstruction 0-003-010 04/08/09 DONE DONE DONE 10/23/08 10/22/08 12/05/05 12/12/07 2,8,155,16 1,603,500 0 HCM 0 0 186,006
ThomasAssociates, PC
William Floyd Elementary:
04-1026 Reconstruction 0-004-013 05/23/05 DONE DONE DONE 03/23/05 03/21/05 09/29/04 12/16/99 2,4,8,9,155,15,16 299,388 299,388 HCM 0 0 0
ThomasAssociates, PC
08-0585 Reconstruction 0-004-014 04/08/09 DONE DONE DONE 10/23/08 10/22/08 12/05/05 12/12/07 2,4,16 260,500 0 HCM 0 0 30,218
ThomasAssociates, PC
William Floyd Jr/Sr High:
04-1027 Reconstruction 0-005-019 05/23/05 DONE DONE DONE 03/23/05 03/21/05 09/29/04 12/16/99 2,4,8,9,15,16 2,330,352 3,475,000 HCM 0 0 0
ThomasAssociates, PC
08-1622 Additions and Alterations 0-005-020 11/05/09 DONE DONE DONE 05/12/09 05/11/09 07/05/05 12/12/07 02 - 16 0 0 HCM 0 0 0
Tetra Tech Architects & Engineers
05-0325 Visual Structural Inspection 0-005-SC2 11/07/05 DONE DONE DONE 04/12/05 04/12/05 / / / / 16 50,775 50,775 JOD 0 0 0
Moriches Elementary School:
04-1028 Reconstruction 0-009-008 05/23/05 DONE DONE DONE 03/23/05 03/21/05 / / 12/16/99 8,9,15,16 78,870 78,870 HCM 0 0 0
ThomasAssociates, PC
08-0586 Reconstruction 0-009-009 04/08/09 DONE DONE DONE 10/23/08 10/22/08 02/17/05 12/12/07 9 135,500 0 HCM 0 0 15,718
ThomasAssociates, PC
- Reconstruction 0-009-010 / / / / 12/14/05 / / 2,16 0 13,628,927 HCM 0 0 0
Tangier Smith Elementary:
- Reconstruction 0-010-011 / / / / 12/05/05 / / 2,155,16 0 15,563,619 HCM 0 0 0
05-1406 Reconstruction 0-010-012 DONE DONE ADD. REQ'D06/22/06 06/21/06 05/18/06 12/16/99 4,8 0 15,563,619 HCM 0 0 0
ThomasAssociates, PC
Wm. Paca Jr. HS/7-9:
04-1029 Reconstruction 0-011-011 05/23/05 DONE DONE DONE 03/23/05 03/21/05 09/29/04 12/16/99 2,4,8,9,155,15,16 1,375,000 1,375,000 HCM 0 0 0
ThomasAssociates, PC
08-0587 Reconstruction 0-011-012 04/08/09 DONE DONE DONE 10/23/08 10/22/08 12/05/05 12/12/07 2,8 429,500 0 HCM 0 0 49,822
ThomasAssociates, PC
05-1407 Reconstruction 0-011-013 04/06/07 DONE DONE DONE 06/22/06 06/21/06 05/18/06 12/16/99 2 297,750 297,750 HCM 0 0 0
ThomasAssociates, PC
Hobart Elementary School:
08-0588 Reconstruction 0-012-010 04/08/09 DONE DONE DONE 10/23/08 10/22/08 / / 12/12/07 2,16 135,500 0 HCM 0 0 15,718
ThomasAssociates, PC
New Middle School:
08-0589 Reconstruction 0-053-002 04/08/09 DONE DONE DONE 10/23/08 10/22/08 12/05/05 12/12/07 2,16 135,500 0 HCM 0 0 15,718
ThomasAssociates, PC
Storage Building @ Tangier Elem:
06-1269 Reconstruction 2-054-001 04/06/07 DONE DONE DONE 04/04/07 03/12/07 12/07/06 / / 145,500 0 HCM 0 0 0
Thomas Associates
Mastics Moriches Shirley Comu. Libr.:
07-0972 Reconstruction 6-007-003 01/24/08 DONE DONE DONE 11/28/07 11/27/07 05/10/07 04/10/07 7 578,000 0 HCM 0 0 0
Weiedersum Associates Architects, PL
07-0969 Reconstruction 6-007-004 12/14/07 DONE DONE DONE 11/28/07 11/27/07 11/27/07 07/23/07 155,16 255,000 0 HCM 0 0 0
Weiedersum Associates Architects, PL
09-0026 Reconstruction 6-007-005 07/07/09 DONE DONE DONE 07/03/09 07/03/09 01/08/09 08/25/08 9,16 143,500 0 HCM 0 0 0
Weiedersum Associates Architects, PL
District Wide:
08-0100 Reconstruction 7-999-007 12/08/08 DONE DONE DONE 07/25/08 07/24/08 05/14/08 12/12/07 10,13,16 5,400,000 0 HCM 0 0 626,400
ThomasAssociates, PC
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Street School:
- Reconstruction 0-001-010 / / / / 08/29/06 / / 7 0 8,753,915 MGL 0 0 0
06-0248 Reconstruction 0-001-011 10/24/06 DONE DONE DONE 09/28/06 09/26/06 09/06/06 04/19/06 7 120,024 120,024 MGL 0 0 42,587
James M. Campbell Architects Pc
- Reconstruction 0-001-012 / / / / 05/24/07 / / 4,8,9,155,15,16 0 0 MGL 0 0 0
08-1496 Reconstruction 0-001-013 08/28/09 DONE DONE DONE 04/14/09 04/09/09 01/15/09 05/20/08 2,4,8,9,155,15,16 925,000 925,000 JOD 0 0 352,980
James M. Campbell Architects Pc
- Reconstruction 0-001-014 / / / / 09/09/09 / / 2,8,155,15,16 0 0 JOD 0 0 0
High School:
06-0100 Reconstruction 0-006-007 08/18/06 DONE DONE DONE 07/21/06 07/20/06 05/09/06 04/19/06 8,10,16 163,332 163,332 RDR 0 0 55,320
James M. Campbell Architects Pc
- Reconstruction 0-006-008 / / / / 01/09/09 / / 2,4,8,9,155,15,16 0 0 JOD 0 0 0
- Reconstruction 0-006-009 / / / / 09/09/09 / / 2,8,155,15,16 0 0 JOD 0 0 0
Administration Building:
- Reconstruction 1-003-002 / / / / 09/09/09 / / 2,155,16 0 0 JOD 0 0 0
Shed #11 Maintenance Storage:
08-0750DB Discovered Building 2-021-001 11/25/08 DONE DONE DONE 11/12/08 10/20/08 09/23/08 / / 0 0 JOD 0 0 0
Enviroscience Consultants, Inc.
High School Field:
- DB Discovered Building 2-024-001 / / / / 10/26/09 / / 0 0 JOD 0 0 0
Maintenance Building:
- Reconstruction 3-016-002 / / / / 09/09/09 / / 2,155,16 0 0 JOD 0 0 0
Public Library:
08-0061 Reconstruction 6-003-005 07/25/08 DONE DONE DONE 07/21/08 07/10/08 08/10/07 11/26/07 4,9,16 66,000 0 MGL 0 0 0
Weiedersum Associates Architects, PL
- XX Reconstruction 6-003-006 CANCELLED / / / / 08/10/09 / / 2,4,8,10,155,15,16 0 0 JOD 0 0 0
Moriches Community Center:
04-1486XX New Construction 7-017-001 CANCELLED 06/29/05 06/24/05 05/07/02 / / 02 - 16 0 0 MGL 0 0 0
Lemmen Paul Architects
CONCESSION TRAILER:
- DB Discovered Building 7-019-001 / / / / 09/12/06 / / 0 0 MGL 0 0 0
Community Center:
07-2088 New Construction 7-020-001 05/13/09 DONE DONE DONE 05/05/08 05/05/08 03/26/08 / / 02 - 16 287,125 0 JOD 0 0 0
Lemmen Paul Architects
High School Field Press Box:
- DB Discovered Building 7-022-001 / / / / 10/26/09 / / 0 0 JOD 0 0 0
High School Concession Stand:
- DB Discovered Building 7-023-001 / / / / 10/26/09 / / 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
East Moriches School:
08-1075 Reconstruction 0-001-014 02/27/09 DONE DONE DONE 01/09/09 01/09/09 07/09/08 05/20/08 2,7,155 569,083 0 JOD 0 0 188,366
John A Grillo
08-1652 Reconstruction 0-001-015 06/25/09 DONE DONE DONE 06/01/09 05/18/09 02/10/09 05/20/08 2,155 200,600 0 JOD 0 0 66,397
John A Grillo
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
South Haven Primary School:
05-0806 Reconstruction 0-001-004 06/30/06 DONE DONE DONE 02/23/06 02/17/06 01/24/05 05/15/05 2,7,8,9,155,15,16 3,929,850 2,473,745 MGL 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-001-005 / / / / 08/05/09 / / 9,155,16 0 0 DDJ 0 0 0
Kreamer Street Elementary:
05-0546 Additions and Alterations 0-002-007 04/19/06 DONE DONE DONE 01/06/06 12/30/05 01/21/05 05/15/05 02 - 16 4,808,800 4,808,800 RDR 0 0 0
Weiedersum Associates Architects, PL
07-1775 Reconstruction 0-002-008 01/09/09 DONE DONE DONE 03/09/08 03/05/08 08/14/07 05/15/07 2,8,155,16 1,462,000 0 DDJ 0 0 73,100
Weiedersum Associates Architects, PL
- Reconstruction 0-002-009 / / / / 08/05/09 / / 9,155,16 0 0 DDJ 0 0 0
Brookhaven Elementary:
- PR Additions and Alterations 0-003-007 / / / / 01/21/05 / / 02 - 16 0 0 MGL 0 0 0
05-0807 Additions and Alterations 0-003-007 06/30/06 DONE DONE DONE 02/23/06 02/17/06 01/21/05 05/15/05 02 - 16 4,881,800 4,756,800 MGL 0 0 0
Weiedersum Associates Architects, PL
07-1776 Reconstruction 0-003-008 01/09/09 DONE DONE DONE 03/09/08 03/05/08 08/14/07 05/15/07 8,9,155,16 2,830,000 2,830,000 DDJ 0 0 141,500
Weiedersum Associates Architects, PL
- Reconstruction 0-003-009 / / / / 08/05/09 / / 9,155,16 0 0 DDJ 0 0 0
Bellport Middle School:
05-0151PR Additions and Alterations 0-004-009 UNREVIEWED
STARTED UNREVIEWED08/24/05 08/24/05 01/24/05 / / 02 - 16 0 0 MGL 0 0 0
Weiedersum Associates Architects, PL
05-0808 Additions and Alterations 0-004-009 06/30/06 DONE DONE DONE 02/23/06 08/24/05 01/24/05 05/15/05 02 - 16 23,044,800 23,044,800 MGL 0 0 0
Weiedersum Associates Architects, PL
07-1777 Reconstruction 0-004-010 01/09/09 DONE DONE DONE 03/09/08 03/05/08 08/14/07 05/15/07 2,4,8,10,155,16 3,130,800 0 DDJ 0 0 156,540
Weiedersum Associates Architects, PL
- Reconstruction 0-004-011 / / / / 08/05/09 / / 2,9,155,16 0 0 DDJ 0 0 0
Frank P Long Inter.(frmr Hampton):
05-0547 Additions and Alterations 0-005-007 04/19/06 DONE DONE DONE 01/06/06 12/30/05 01/24/05 05/15/05 02 - 16 7,089,420 7,089,420 RDR 0 0 0
Weiedersum Associates Architects, PL
07-1778 Reconstruction 0-005-008 01/09/09 DONE DONE DONE 03/09/08 03/05/08 08/14/07 05/15/07 8,9,155,16 4,375,000 0 DDJ 0 0 218,950
Weiedersum Associates Architects, PL
Senior High School:
- PR Additions and Alterations 0-006-007 / / / / 01/21/05 / / 02 - 16 0 0 MGL 0 0 0
05-0915 Additions and Alterations 0-006-007 06/30/06 DONE DONE DONE 03/10/06 03/07/06 01/21/05 05/17/05 02 - 16 15,815,000 15,355,000 RDR 0 0 0
Weiedersum Associates Architects, PL
07-1779 Reconstruction 0-006-008 01/09/09 DONE DONE DONE 03/09/08 03/05/08 08/14/07 05/15/07 2,4,8,10,155,16 12,683,920 0 DDJ 0 0 634,196
Weiedersum Associates Architects, PL
- Reconstruction 0-006-009 / / / / 08/05/09 / / 4,9,155,15,16 0 0 DDJ 0 0 0
Verne W. Critz Elementary:
05-0548 Additions and Alterations 0-007-007 04/19/06 DONE DONE DONE 01/06/06 12/30/05 01/21/05 05/15/05 02 - 16 5,650,490 5,650,490 RDR 0 0 0
Weiedersum Associates Architects, PL
07-1780 Reconstruction 0-007-008 01/09/09 DONE DONE DONE 03/09/08 03/05/08 08/14/07 05/15/07 2,4,8,9,155,15,16 2,925,000 0 DDJ 0 0 146,250
Weiedersum Associates Architects, PL
- Reconstruction 0-007-009 / / / / 08/05/09 / / 9,155,16 0 0 DDJ 0 0 0
Bellport Lidcs (Old Adm.):
- Reconstruction 0-008-002 / / / / 01/28/05 / / 2,8,9,155,15,16 0 0 MGL 0 0 0
Brookhaven Elem. Annex:
- Reconstruction 0-010-003 / / / / 01/21/05 / / 2,9,16 0 1,718,560 MGL 0 0 0
Administration Bldg (New):
05-0809 Reconstruction 1-018-002 06/30/06 DONE DONE DONE 02/23/06 02/17/06 01/24/05 05/15/05 2,4,7,8,9,155,15,16 852,240 0 MGL 0 0 0
Weiedersum Associates Architects, PL
Maintenance/Storage Building:
05-0810 New Construction 2-023-002 06/30/06 DONE DONE DONE 02/23/06 02/17/06 02/03/05 05/15/05 02 - 16 500,000 0 MGL 0 0 0
Weiedersum Associates Architects, PL
Garage Rental (lease):
04-1347 Reconstruction 5-021-L02 05/27/05 DONE DONE DONE 05/27/05 05/27/05 05/05/05 / / 162,500 165,000 RDR 0 0 0
High School Press Box:
- New Construction 7-024-001 / / / / 02/03/05 / / 02 - 16 0 0 MGL 0 0 0
Districtwide:
07-1781 Reconstruction 7-999-003 04/24/08 DONE DONE DONE 03/09/08 03/05/08 08/14/07 05/15/07 10,13,16 6,000,000 6,000,000 MGL 0 0 300,000
Weiedersum Associates Architects, PL
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School:
07-0296 Reconstruction 0-003-016 02/22/08 DONE DONE DONE 09/04/07 08/31/07 02/18/05 03/21/06 2,4,7,8,9,10,14,15,1 7,786,001 7,786,001 HCM 0 0 0
Beatty Harvey & Associates
- Reconstruction 0-003-017 / / / / 07/15/08 / / 4 0 0 HCM 0 0 0
John Marshall Elementary:
06-0075 Reconstruction 0-004-013 11/09/06 DONE DONE DONE 07/19/06 07/14/06 12/05/05 05/01/05 4,8 150,000 150,000 HCM 0 0 0
Weiedersum Associates Architects, PL
07-0297 Additions and Alterations 0-004-014 02/22/08 DONE DONE DONE 09/04/07 08/31/07 01/19/06 03/21/06 02 - 16 13,382,006 5,980,840 HCM 0 0 643,163
Beatty Harvey & Associates
06-1494 Reconstruction 0-004-015 06/29/07 DONE DONE DONE 05/15/07 05/11/07 04/18/07 03/21/06 2,16 1,112,240 961,000 HCM 0 0 0
Beatty Harvey & Associates
High School/Modular @ HS:
07-0375 Additions and Alterations 0-006-021 04/08/08 DONE DONE DONE 09/18/07 09/17/07 03/23/05 03/21/06 02 - 16 53,535,478 31,033,809 HCM 0 0 0
Beatty Harvey & Associates
- PR Additions and Alterations 0-006-022 / / / / 12/01/05 / / 02 - 16 0 0 HCM 0 0 0
05-1244 Additions and Alterations 0-006-022 10/10/06 DONE DONE DONE 05/08/06 05/04/06 12/01/05 05/16/06 02 - 16 1,710,507 0 HCM 0 0 0
Beatty Harvey & Associates
06-0313 Reconstruction 0-006-023 11/12/06 DONE DONE DONE 10/13/06 10/10/06 09/08/06 03/21/06 2 2,410,887 2,160,723 HCM 0 0 0
Beatty Harvey & Associates
- Reconstruction 0-006-024 / / / / 09/08/06 / / 10 0 18,628,020 HCM 0 0 0
06-1491 Reconstruction 0-006-025 07/03/07 DONE DONE DONE 05/15/07 05/11/07 04/18/07 03/21/06 2,155,15,16 1,647,167 1,258,600 HCM 0 0 0
Beatty Harvey & Associates
08-1476 Reconstruction 0-006-026 04/29/09 DONE DONE DONE 04/09/09 04/07/09 06/20/08 03/21/06 15 73,561 0 HCM 0 0 0
Beatty, Harvey & Associates
New Middle School:
- PR New Construction 0-019-001 / / / / 02/18/05 / / 02 - 16 0 0 HCM 0 0 0
:
- PR New Construction 0-020-001 / / / / 12/01/05 / / 02 - 16 0 0 HCM 0 0 0
Administration Building:
04-1289DB Discovered Building 1-018-001 10/13/05 DONE DONE DONE 05/19/05 05/10/05 02/03/05 / / 0 0 HCM 0 0 0
Beatty Harvey & Associates
Pantigo Professional Center:
- TQ Temporary Quarters 1-033-001 / / / / 03/12/08 / / 0 0 HCM 0 0 0
Football Storage Shed @ High School:
- DB Discovered Building 2-021-001 / / / / 03/11/08 / / 0 0 HCM 0 0 0
Soccer Shed @ High School:
- DB Discovered Building 2-022-001 / / / / 03/11/08 / / 0 0 HCM 0 0 0
Softball Storage @ High School:
- DB Discovered Building 2-024-001 / / / / 03/11/08 / / 0 0 HCM 0 0 0
Technology Shop Storage Shed:
- DB Discovered Building 2-025-001 / / / / 03/12/08 / / 0 0 HCM 0 0 0
Large Pole Barn - High School:
- DB Discovered Building 2-027-001 / / / / 03/11/08 / / 0 0 HCM 0 0 0
Softball Dugout / Storage (3rd Base):
- DB Discovered Building 2-028-001 / / / / 03/11/08 / / 0 0 HCM 0 0 0
Baseball Dugout / Storage (3rd Base):
- DB Discovered Building 2-030-001 / / / / 03/11/08 / / 0 0 HCM 0 0 0
Transportation Building #1 - Office:
- TQ Temporary Quarters 5-031-001 / / / / 03/12/08 / / 0 0 HCM 0 0 0
Transportation Building #2- Bus Main:
- TQ Temporary Quarters 5-032-001 / / / / 03/12/08 / / 0 0 HCM 0 0 0
Press Box @ High School:
- DB Discovered Building 7-022-001 / / / / 03/11/08 / / 0 0 HCM 0 0 0
- DB Discovered Building 7-023-001 / / / / 03/12/08 / / 0 0 HCM 0 0 0
Softball Dugout (1st base) @ High:
- DB Discovered Building 7-026-001 / / / / 03/11/08 / / 0 0 HCM 0 0 0
Baseball Dugout (1st Base):
- DB Discovered Building 7-029-001 / / / / 03/11/08 / / 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
New Wainscott School:
- PR New Construction 0-002-001 / / / / 09/20/05 / / 02 - 16 0 0 HCM 0 0 0
05-1383 New Construction 0-002-001 09/22/06 DONE DONE DONE 06/19/06 06/07/06 09/20/05 05/17/05 02 - 16 3,100,000 366,968 HCM 0 0 0
BurtonBehrendt Smith and O'Callaghan
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Elementary School:
04-0814 Reconstruction 0-001-007 03/01/05 DONE DONE DONE 02/11/05 02/10/05 05/12/04 06/30/04 7 190,008 190,008 RDR 0 0 0
BurtonBehrendt Smith and O'Callaghan
04-0813 Reconstruction 0-001-008 05/12/05 DONE DONE DONE 02/11/05 02/10/05 05/12/04 06/30/04 10,16 140,000 140,000 RDR 0 0 0
BurtonBehrendt Smith and O'Callaghan
06-0230 Reconstruction 0-001-009 12/18/06 DONE DONE DONE 09/20/06 09/18/06 05/10/06 05/16/06 8,9 107,163 107,163 MGL 0 0 0
BurtonBehrendt Smith and O'Callaghan
06-1256 Reconstruction 0-001-010 07/12/07 DONE DONE DONE 04/03/07 04/02/07 12/15/06 05/16/06 2,4 120,138 120,138 MGL 0 0 0
BurtonBehrendt Smith and O'Callaghan
06-1385 Reconstruction 0-001-011 06/12/07 DONE DONE DONE 05/02/07 05/01/07 02/13/07 05/16/06 155,16 123,300 123,300 MGL 0 0 0
BurtonBehrendt Smith and O'Callaghan
08-1130 Reconstruction 0-001-012 01/27/09 DONE DONE DONE 01/27/09 01/23/09 08/01/08 01/21/09 155 350,000 0 DDJ 0 0 0
BurtonBehrendt Smith and O'Callaghan
08-1665 Reconstruction 0-001-013 06/26/09 DONE DONE DONE 06/09/09 06/01/09 03/24/09 05/19/09 7,10 85,725 0 DDJ 0 0 0
BurtonBehrendt Smith and O'Callaghan
Superintendent's Residence:
06-1577 Reconstruction 7-005-002 01/30/08 DONE DONE DONE 06/05/07 06/05/07 03/29/07 05/16/06 7,8 62,778 0 MGL 0 0 0
BurtonBehrendt Smith and O'Callaghan
09-0257 Reconstruction 7-005-003 DONE STARTED STARTED 09/22/09 09/22/09 08/28/09 05/19/09 2,155 0 0 DDJ 0 0 0
BurtonBehrendt Smith and O'Callaghan
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Springs School:
- Reconstruction 0-001-008 / / / / 11/21/06 / / 13,16 0 9,336,603 MGL 0 0 0
06-0863 Reconstruction 0-001-009 09/07/07 DONE DONE DONE 01/31/07 01/31/07 01/02/07 05/16/06 2 422,000 422,000 MGL 0 0 0
Araiys Design,L.A., P.C
- Reconstruction 0-001-010 / / / / 02/16/07 / / 2,13 0 9,336,603 MGL 0 0 0
09-0171 Reconstruction 0-001-011 10/22/09 DONE DONE DONE 08/27/09 08/25/09 03/26/09 02/13/07 2,16 250,000 0 JOD 0 0 0
ECG ENGINEERING,LLC
07-2206SC Visual Structural Inspection 0-001-SC1 10/01/08 DONE DONE DONE 05/27/08 05/27/08 / / / / 16 6,000 0 JOD 0 0 0
Greenhouse:
08-1530 New Construction 0-011-001 UNREVIEWED 04/22/09 03/17/09 12/04/08 / / 02 - 16 0 0 JOD 0 0 0
D.B. Bennett Consulting engineer
Dispatch Office:
- PR New Construction 1-010-001 / / / / 02/16/07 / / 02 - 16 0 0 MGL 0 0 0
Bus Maintenance Garage:
- PR New Construction 5-007-001 / / / / 11/06/06 / / 02 - 16 0 0 MGL 0 0 0
Baseball Field Dugout #1:
06-0864XX New Construction 7-006-001 CANCELLED 01/31/07 01/31/07 11/03/06 05/16/06 02 - 16 0 0 MGL 0 0 0
Araiys Design,L.A., P.C
Baseball Field Dugout #2:
06-0865XX New Construction 7-008-001 CANCELLED 01/31/07 01/31/07 01/02/07 05/16/06 02 - 16 0 0 MGL 0 0 0
Araiys Design,L.A., P.C
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Pierson High School:
04-1172 Reconstruction 0-001-016 05/19/05 DONE DONE DONE 04/15/05 04/15/05 02/17/05 01/25/05 7 82,125 82,125 RDR 0 0 0
Weiedersum Associates Architects, PL
06-1037 Reconstruction 0-001-017 04/06/07 DONE DONE DONE 03/05/07 03/01/07 10/03/06 11/27/06 2,8,9,16 70,000 70,000 MGL 0 0 0
Weiedersum Associates Architects, PL
07-1592 Reconstruction 0-001-018 03/10/08 DONE DONE DONE 02/11/08 02/08/08 / / 01/10/08 415,000 415,000 0 0 0
BurtonBehrendt Smith and O'Callaghan
- PR Additions and Alterations 0-001-019 / / / / 10/24/07 / / 02 - 16 0 0 MGL 0 0 0
08-1446 Reconstruction 0-001-020 05/19/09 DONE DONE DONE 03/31/09 03/30/09 03/12/08 05/20/08 155 62,274 0 DDJ 0 0 62,274
BurtonBehrendt Smith and O'Callaghan
07-2161 Reconstruction 0-001-021 09/18/08 DONE DONE DONE 05/27/08 05/19/08 03/12/08 05/15/07 16 50,000 50,000 DDJ 0 0 0
BurtonBehrendt Smith and O'Callaghan
08-1384 Reconstruction 0-001-022 05/29/09 DONE DONE DONE 03/16/09 03/10/09 01/26/09 05/20/08 10 55,854 0 DDJ 0 0 55,854
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-001-023 / / / / 05/27/09 / / 155 0 19,201,503 DDJ 0 0 0
09-0242 Reconstruction 0-001-023 UNREVIEWED
STARTED STARTED 09/17/09 09/16/09 / / 05/19/09 10 0 0 DDJ 0 0 0
BurtonBehrendt Smith and O'Callaghan
Sag Harbor Elementary:
07-1605 Reconstruction 0-003-014 03/25/08 DONE DONE DONE 02/12/08 02/08/08 08/13/07 01/10/08 9 160,000 0 DDJ 0 0 0
BurtonBehrendt Smith and O'Callaghan
08-1447 Reconstruction 0-003-015 05/19/09 DONE DONE DONE 03/31/09 03/30/09 03/12/08 05/20/08 155 195,810 0 DDJ 0 0 195,810
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-003-016 / / / / 04/24/08 / / 7 0 0 DDJ 0 0 0
08-1385 Reconstruction 0-003-017 05/29/09 DONE DONE DONE 03/16/09 03/10/09 02/12/09 05/20/08 10 32,100 0 DDJ 0 0 32,100
BurtonBehrendt Smith and O'Callaghan
Greenhouse @ Sag Harbor Elem.:
04-0117 New Construction 0-012-001 01/24/05 DONE DONE DONE 08/10/04 08/06/04 02/11/03 06/16/04 02 - 16 0 0 RDR 0 0 0
David H. Sherwood Architect
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Montauk School K-8:
06-0310 Reconstruction 0-001-007 01/12/07 DONE DONE DONE 10/12/06 10/10/06 02/02/01 09/28/05 8,9,155,15,16 875,796 875,796 MGL 0 0 0
Island Structures Engineering,P.C.
08-1653 Reconstruction 0-001-008 ADDENDUM REQ'D 06/01/09 05/19/09 10/26/04 12/09/08 2 0 6,500,994 JOD 0 0 0
Island Structures Engineering,P.C.
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
James Boyd Elem. Primary:
04-0341 Alterations 0-003-012 03/01/05 DONE DONE DONE 10/28/04 10/27/04 12/18/03 10/14/04 02 - 16 102,185 102,185 JOD 0 0 0
the Baldassano Architectural Group
- Reconstruction 0-003-013 / / / / 04/19/05 / / 16 0 11,020,266 JOD 0 0 0
John H. Glen High School:
06-1245 Reconstruction 0-004-016 05/10/07 DONE DONE DONE 04/02/07 03/28/07 01/25/02 01/30/07 4 234,972 234,972 MGL 0 0 85,765
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-004-017 / / / / 04/19/05 / / 16 0 21,416,220 JOD 0 0 0
- Reconstruction 0-004-018 / / / / 10/31/07 / / 4,8,9,155,16 0 0 JOD 0 0 0
- Reconstruction 0-004-019 / / / / 05/19/08 / / 2,9,10,155,16 0 0 JOD 0 0 0
08-1510 Reconstruction 0-004-020 ADDENDUM REQ'D 04/16/09 04/15/09 10/06/08 05/20/08 8,9,155,16 0 0 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
Harley Avenue Elementary:
- Reconstruction 0-005-011 / / / / 04/19/05 / / 16 0 9,280,224 JOD 0 0 0
07-1306 Reconstruction 0-005-012 06/03/08 DONE DONE DONE 01/02/08 12/31/07 10/31/07 05/15/07 4,8,9,16 147,660 0 JOD 0 0 53,896
BurtonBehrendt Smith and O'Callaghan
Elwood Jr High:
06-1246 Reconstruction 0-006-013 05/10/07 DONE DONE DONE 04/02/07 03/28/07 12/18/03 01/30/07 4 165,636 0 JOD 0 0 60,457
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-006-014 / / / / 04/19/05 / / 16 0 19,110,080 JOD 0 0 0
Districtwide:
07-1305 Reconstruction 7-999-001 05/14/08 DONE DONE DONE 01/02/08 12/31/07 10/31/07 05/15/07 10,13,16 448,200 448,200 JOD 0 0 163,720
BurtonBehrendt Smith and O'Callaghan
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Lloyd Harbor School:
08-0518 Reconstruction 0-002-020 02/17/09 DONE DONE DONE 10/14/08 10/09/08 06/22/07 09/25/07 2,4,16 329,277 329,277 DDJ 0 0 172,870
John A Grillo
07-1330 Reconstruction 0-002-021 03/03/08 DONE DONE DONE 01/04/08 01/03/08 06/26/07 02/06/01 10 30,380 30,380 DDJ 0 0 0
John A Grillo
Goosehill Primary School:
04-0389 Reconstruction 0-003-022 12/24/04 DONE DONE DONE 11/10/04 11/09/04 04/23/04 05/18/04 2,4,7,9,16 57,353 57,353 DDJ 0 0 0
John A Grillo
06-1202 Reconstruction 0-003-023 08/07/07 DONE DONE DONE 03/22/07 03/20/07 01/11/07 02/06/01 9,155,15,16 900,000 900,000 DDJ 0 0 0
John A Grillo
07-1149 Reconstruction 0-003-024 01/03/08 DONE DONE DONE 12/17/07 12/14/07 06/22/07 01/25/07 7 597,080 0 DDJ 0 0 0
John A Grillo
07-1331 Reconstruction 0-003-025 03/03/08 DONE DONE DONE 01/04/08 01/03/08 06/26/07 02/06/01 10 20,676 20,676 DDJ 0 0 0
John A Grillo
Westside Elementary:
07-1150 Reconstruction 0-006-020 01/03/08 DONE DONE DONE 12/17/07 12/14/07 06/20/07 01/25/07 4,7,8 289,572 0 DDJ 0 0 151,512
John A Grillo
07-1332 Reconstruction 0-006-021 03/03/08 DONE DONE DONE 01/04/08 01/03/08 06/26/07 02/06/01 10 30,972 30,972 DDJ 0 0 0
John A Grillo
Junior/Senior High:
04-1290 Reconstruction 0-007-028 09/22/05 DONE DONE DONE 05/19/05 05/18/05 02/17/05 02/06/01 7,15,16 354,416 354,416 DDJ 0 0 0
04-1441 Reconstruction 0-007-029 07/12/05 DONE DONE DONE 06/20/05 06/17/05 03/18/05 04/12/05 9,16 409,477 409,477 DDJ 0 0 0
John A Grillo
06-0124 Reconstruction 0-007-030 10/16/06 DONE DONE DONE 07/27/06 07/25/06 07/27/06 02/06/01 2 191,160 191,160 DDJ 0 0 0
John A Grillo
06-1638 Reconstruction 0-007-031 10/24/07 DONE DONE DONE 06/21/07 06/20/07 05/10/07 02/06/01 8,9,10,155,16 91,800 0 DDJ 0 0 0
John A Grillo
08-0519 Reconstruction 0-007-032 02/17/09 DONE DONE DONE 10/14/08 10/09/08 06/22/07 09/25/07 2,4,8,10,155,15,16 1,170,412 1,170,412 DDJ 0 0 311,520
John A Grillo
07-1333 Reconstruction 0-007-033 03/03/08 DONE DONE DONE 01/04/08 01/03/08 06/26/07 02/06/01 10 75,972 75,972 DDJ 0 0 0
John A Grillo
07-1230 Additions and Alterations 0-007-034 05/30/08 DONE DONE DONE 12/26/07 12/24/07 08/09/07 12/11/07 02 - 16 1,500,000 0 DDJ 0 0 0
John A Grillo
- PR Additions and Alterations 0-007-035 / / / / 07/14/09 / / 02 - 16 0 0 DDJ 0 0 0
09-0199 Reconstruction 0-007-036 10/26/09 DONE DONE DONE 09/14/09 09/08/09 07/30/09 09/25/07 16 130,000 0 DDJ 0 0 0
John A Grillo
06-1308SC Visual Structural Inspection 0-007-SC1 04/16/07 DONE DONE DONE 03/26/07 03/26/07 / / / / 16 6,370 0 JOD 0 0 0
Athletic Storage Shed @ High School:
04-0209 New Construction 2-014-001 11/08/04 DONE DONE DONE 09/14/04 09/14/04 06/16/04 02/10/04 02 - 16 35,000 0 DDJ 0 0 0
John A Grillo
Guard Booth:
- PR New Construction 7-015-001 / / / / 06/22/07 / / 02 - 16 0 0 DDJ 0 0 0
Districtwide:
- Reconstruction 7-999-005 / / / / 06/20/07 / / 10 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Huntington High School:
04-0134 Reconstruction 0-001-026 11/09/04 DONE DONE DONE 08/17/04 08/13/04 03/03/01 05/19/98 9,10,155,15,16 94,547 94,547 BJB 0 0 0
ThomasAssociates, PC
03-0672 Reconstruction 0-001-029 01/21/05 DONE DONE DONE 11/12/03 11/06/03 02/03/03 01/13/03 155,15,16 380,524 380,524 JOD 0 0 0
ThomasAssociates, PC
04-0734 Reconstruction 0-001-031 03/01/05 DONE DONE DONE 01/28/05 01/27/05 06/01/04 05/18/04 8 85,102 85,102 JOD 0 0 0
ThomasAssociates, PC
04-1077 Reconstruction 0-001-032 06/30/05 DONE DONE DONE 04/04/05 04/01/05 06/17/04 05/18/04 2,9 116,488 116,488 JOD 0 0 0
ThomasAssociates, PC
05-0802 Reconstruction 0-001-034 07/25/06 DONE DONE DONE 02/22/06 02/21/06 12/12/05 12/06/05 2,8,9,10,155,15,16 3,365,000 3,365,000 JOD 0 0 0
ThomasAssociates, PC
06-1296 Reconstruction 0-001-035 09/05/07 DONE DONE DONE 04/09/07 04/09/07 06/05/06 05/16/06 4,7,9,155,15,16 800,000 800,000 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
07-1482 Reconstruction 0-001-036 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 2 620,000 0 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
07-1483 Reconstruction 0-001-037 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 2,4,7,8,9,10,15,16 340,624 346,714 JOD 0 0 340,624
BurtonBehrendt Smith and O'Callaghan
07-1712 Reconstruction 0-001-038 04/24/08 DONE DONE DONE 02/28/08 02/26/08 04/14/08 05/20/07 4,8,9,155,16 490,490 0 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-001-039 / / / / 08/14/08 / / 8,9 0 0 JOD 0 0 0
06-0234SC Visual Structural Inspection 0-001-SC1 09/21/06 DONE DONE DONE 09/18/06 09/18/06 / / / / 16 11,880 11,880 JOD 0 0 0
Flower Hill Elementary:
03-0673 Reconstruction 0-002-009 01/21/05 DONE DONE DONE 11/12/03 11/06/03 02/03/03 01/13/03 155,15,16 147,769 147,769 JOD 0 0 0
ThomasAssociates, PC
04-0816 Reconstruction 0-002-012 06/22/05 DONE DONE DONE 02/14/05 02/11/05 06/01/04 05/18/04 15,16 25,562 25,562 JOD 0 0 0
ThomasAssociates, PC
04-1078 Reconstruction 0-002-013 06/30/05 DONE DONE DONE 04/04/05 04/01/05 06/17/04 05/18/04 2,8,16 216,367 216,367 JOD 0 0 0
ThomasAssociates, PC
07-1488 Reconstruction 0-002-015 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 2,16 157,000 0 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
07-1489 Reconstruction 0-002-016 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 16 73,388 55,000 JOD 0 0 73,388
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-002-017 / / / / 08/12/08 / / 8,9 0 0 JOD 0 0 0
Southdown Elementary:
03-0674 Reconstruction 0-003-008 01/21/05 DONE DONE DONE 11/12/03 11/06/03 02/03/03 01/13/03 155,15,16 128,948 128,948 JOD 0 0 0
ThomasAssociates, PC
04-1079 Reconstruction 0-003-010 06/30/05 DONE DONE DONE 04/04/05 04/01/05 06/17/04 05/18/04 8,15 89,149 89,149 JOD 0 0 0
ThomasAssociates, PC
- Reconstruction 0-003-012 / / / / 01/14/05 / / 15 0 6,090,147 JOD 0 0 0
05-0529 Reconstruction 0-003-013 03/31/06 DONE DONE DONE 01/03/06 12/30/05 07/22/05 05/17/05 15 90,000 90,000 JOD 0 0 0
ThomasAssociates, PC
- Reconstruction 0-003-014 / / / / 07/26/05 / / 15 0 6,090,147 JOD 0 0 0
07-1491 Reconstruction 0-003-015 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 16 83,944 65,000 JOD 0 0 83,944
BurtonBehrendt Smith and O'Callaghan
08-1473 Reconstruction 0-003-016 05/20/09 DONE DONE DONE 04/09/09 04/07/09 05/29/08 05/20/08 16 112,000 0 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-003-017 / / / / 08/12/08 / / 8,9 0 0 JOD 0 0 0
Woodhull K / Admin Building:
03-0675 Reconstruction 0-004-008 01/21/05 DONE DONE DONE 11/12/03 11/06/03 02/03/03 01/13/03 155,15,16 184,034 184,034 JOD 0 0 0
ThomasAssociates, PC
04-0735 Reconstruction 0-004-009 03/01/05 DONE DONE DONE 01/28/05 01/27/05 06/01/04 05/18/04 2,4,7,8 1,417,000 1,417,000 JOD 0 0 0
ThomasAssociates, PC
04-1080 Reconstruction 0-004-010 06/30/05 DONE DONE DONE 04/04/05 04/01/05 06/17/04 05/18/04 15 440,793 440,793 JOD 0 0 0
ThomasAssociates, PC
07-1487 Reconstruction 0-004-011 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 9,16 506,435 524,000 JOD 0 0 180,435
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-004-012 / / / / 05/24/07 / / 2,8,9,16 0 0 JOD 0 0 0
07-1944 Reconstruction 0-004-013 09/26/08 DONE DONE DONE 04/14/08 04/03/08 01/31/08 05/20/07 2,4,7,8,9,155,16 848,679 848,679 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
Washington Elementary:
- Reconstruction 0-009-004 10/30/08 DONE DONE DONE 01/30/08 01/28/08 11/20/90 05/15/07 7 21,304 21,304 MGL 0 0 6,900
BurtonBehrendt Smith and O'Callaghan
03-0676 Reconstruction 0-009-010 01/21/05 DONE DONE DONE 11/12/03 11/06/03 02/03/03 01/13/03 155,15,16 147,987 147,987 JOD 0 0 0
ThomasAssociates, PC
04-1081 Reconstruction 0-009-011 06/30/05 DONE DONE DONE 04/04/05 04/01/05 06/17/04 05/18/04 8 47,801 47,801 JOD 0 0 0
ThomasAssociates, PC
05-0530 Reconstruction 0-009-012 03/31/06 DONE DONE DONE 01/03/06 12/30/05 07/22/05 05/17/05 15 90,000 90,000 JOD 0 0 0
ThomasAssociates, PC
- Reconstruction 0-009-013 / / / / 07/26/05 / / 15 0 6,090,147 JOD 0 0 0
07-1492 Reconstruction 0-009-014 10/30/08 DONE DONE DONE 01/28/08 01/28/08 05/24/07 05/15/07 2,15,16 21,304 0 JOD 0 0 6,900
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-009-015 / / / / 05/24/07 / / 16 0 0 JOD 0 0 0
08-1405 Reconstruction 0-009-016 05/12/09 DONE DONE DONE 03/20/09 03/17/09 05/29/08 05/20/08 2 64,000 0 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-009-017 / / / / 08/12/08 / / 8,9 0 0 JOD 0 0 0
Jefferson Elementary:
03-0677 Reconstruction 0-013-007 01/21/05 DONE DONE DONE 11/12/03 11/06/03 02/03/03 01/13/03 155,15,16 795,612 795,612 JOD 0 0 0
ThomasAssociates, PC
04-0817 Reconstruction 0-013-009 06/22/05 DONE DONE DONE 02/14/05 02/11/05 06/01/04 05/18/04 15,16 25,044 25,044 JOD 0 0 0
ThomasAssociates, PC
04-1082 Reconstruction 0-013-010 06/30/05 DONE DONE DONE 04/04/05 04/01/05 06/17/04 05/18/04 2,9 90,180 90,180 JOD 0 0 0
ThomasAssociates, PC
07-1490 Reconstruction 0-013-011 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 15,16 208,316 202,000 JOD 0 0 208,316
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-013-012 / / / / 08/12/08 / / 8,9,10,14,15,16 0 0 JOD 0 0 0
J. Taylor Finley:
03-0678 Reconstruction 0-014-014 01/21/05 DONE DONE DONE 11/12/03 11/06/03 02/03/03 01/13/03 155,15,16 383,819 383,819 JOD 0 0 0
ThomasAssociates, PC
04-0818 Reconstruction 0-014-016 06/22/05 DONE DONE DONE 02/14/05 02/11/05 06/01/04 05/18/04 155,15 598,528 598,528 JOD 0 0 0
ThomasAssociates, PC
04-1083 Reconstruction 0-014-017 06/30/05 DONE DONE DONE 04/04/05 04/01/05 06/17/04 05/18/04 15 90,000 90,000 JOD 0 0 0
ThomasAssociates, PC
05-0531 Reconstruction 0-014-018 03/31/06 DONE DONE DONE 01/03/06 12/30/05 07/22/05 05/17/05 15 44,717 44,717 JOD 0 0 0
ThomasAssociates, PC
- Reconstruction 0-014-019 / / / / 07/26/05 / / 8 0 16,008,608 JOD 0 0 0
07-1485 Reconstruction 0-014-020 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 2,15,16 260,960 276,000 JOD 0 0 260,960
BurtonBehrendt Smith and O'Callaghan
Huntington Inter. School:
03-0679 Reconstruction 0-017-007 01/21/05 DONE DONE DONE 11/12/03 11/06/03 02/03/03 01/13/03 155,15,16 296,117 296,117 JOD 0 0 0
ThomasAssociates, PC
04-1084 Reconstruction 0-017-008 06/30/05 DONE DONE DONE 04/04/05 04/01/05 06/17/04 05/18/04 15 37,129 37,129 JOD 0 0 0
ThomasAssociates, PC
05-0532 Reconstruction 0-017-009 03/31/06 DONE DONE DONE 01/03/06 12/30/05 07/22/05 05/17/05 8 1,270,000 1,270,000 JOD 0 0 0
ThomasAssociates, PC
- Reconstruction 0-017-010 / / / / 07/26/05 / / 8 0 11,020,266 JOD 0 0 0
06-1415 Reconstruction 0-017-011 10/11/07 DONE DONE DONE 05/03/07 05/02/07 06/05/06 05/16/06 14,16 352,000 0 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
07-1486 Reconstruction 0-017-012 10/30/08 DONE DONE DONE 01/30/08 01/28/08 05/24/07 05/15/07 16 133,331 150,000 JOD 0 0 133,331
BurtonBehrendt Smith and O'Callaghan
08-1477 Reconstruction 0-017-013 05/08/09 DONE DONE DONE 04/09/09 04/07/08 05/29/08 05/20/08 2 72,000 0 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
Security Booth at High School:
07-1484 New Construction 7-020-001 10/30/08 DONE DONE DONE 01/30/08 01/28/08 11/16/07 05/15/07 02 - 16 25,000 0 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Dickenson Ave. Elementary:
07-1185 Reconstruction 0-002-015 06/05/08 DONE DONE DONE 12/21/07 12/19/07 05/21/07 05/15/07 9,15,16 128,000 128,000 HCM 0 0 93,440
BurtonBehrendt Smith and O'Callaghan
East Northport Middle School:
04-0729 Reconstruction 0-003-013 03/16/05 DONE DONE DONE 01/28/05 01/27/05 06/19/03 06/03/03 7 1,798,747 1,798,747 HCM 0 0 0
McDonald & Monterose LLP
07-1186 Reconstruction 0-003-016 06/05/08 DONE DONE DONE 12/21/07 12/19/07 05/21/07 05/15/07 9,16 78,200 78,200 HCM 0 0 57,086
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-003-017 / / / / 07/10/08 / / 8 0 0 HCM 0 0 0
Fifth Ave. Elementary:
05-1282 Reconstruction 0-004-016 06/23/06 DONE DONE DONE 05/22/06 05/18/06 08/05/05 05/17/05 155 40,000 40,000 HCM 0 0 0
Bartlett,Amoruso, & Recce-Architects
05-1363 Reconstruction 0-004-017 07/10/06 DONE DONE DONE 06/09/06 06/09/06 08/05/05 05/17/05 2,9 28,950 28,950 HCM 0 0 0
Bartlett,Amoruso, & Recce-Architects
07-1187 Reconstruction 0-004-018 06/05/08 DONE DONE DONE 12/21/07 12/19/07 05/21/07 05/15/07 9,16 157,000 157,000 HCM 0 0 114,610
BurtonBehrendt Smith and O'Callaghan
Norwood Ave. Elementary:
05-1283 Reconstruction 0-005-015 06/23/06 DONE DONE DONE 05/22/06 05/18/06 08/05/05 05/17/05 155 40,000 40,000 HCM 0 0 0
Bartlett,Amoruso, & Recce-Architects
05-0667 Reconstruction 0-005-016 05/09/06 DONE DONE DONE 01/30/06 01/30/06 08/05/05 05/17/05 8 212,000 0 HCM 0 0 0
BurtonBehrendt Smith and O'Callaghan
07-0908 Reconstruction 0-005-017 04/25/08 DONE DONE DONE 11/23/07 11/20/07 / / 05/15/07 8,9,16 324,000 324,000 HCM 0 0 114,610
BurtonBehrendt Smith and O'Callaghan
Laurel Ave School:
06-0660 Reconstruction 0-006-018 03/09/07 DONE DONE DONE 12/27/06 12/22/06 06/01/06 05/16/06 155 600,000 600,000 HCM 0 0 0
McDonald & Monterose LLP
- Reconstruction 0-006-019 / / / / 05/21/07 / / 2,16 0 0 HCM 0 0 0
Ocean Avenue Elementary:
06-0661 Reconstruction 0-007-013 03/09/07 DONE DONE DONE 12/27/06 12/22/06 06/01/06 05/16/06 4 90,000 90,000 HCM 0 0 0
McDonald & Monterose LLP
07-0909 Reconstruction 0-007-014 04/25/08 DONE DONE DONE 11/23/07 11/20/07 05/21/07 05/15/07 8,16 333,000 0 HCM 0 0 0
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-007-015 / / / / 07/10/08 / / 8 0 0 HCM 0 0 0
Northport Middle School:
- Reconstruction 0-008-017 / / / / 08/05/05 / / 10 0 0 HCM 0 0 0
07-0910 Reconstruction 0-008-018 04/25/08 DONE DONE DONE 11/23/07 11/20/07 05/21/07 05/15/07 2,8,16 875,000 875,000 HCM 0 0 592,250
BurtonBehrendt Smith and O'Callaghan
Pulaski Rd. Elementary:
05-1284 Reconstruction 0-009-014 06/23/06 DONE DONE DONE 05/22/06 05/18/06 08/05/05 05/17/05 155 40,000 40,000 HCM 0 0 0
Bartlett,Amoruso, & Recce-Architects
07-1188 Reconstruction 0-009-015 06/05/08 DONE DONE DONE 12/21/07 12/19/07 05/21/07 05/15/07 9,16 160,000 160,000 HCM 0 0 160,000
BurtonBehrendt Smith and O'Callaghan
Northport High School:
06-1201 Reconstruction 0-010-021 06/18/07 DONE DONE DONE 03/21/07 03/08/07 06/01/06 05/16/00 155 105,587 105,587 HCM 0 0 0
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-010-022 / / / / 06/30/06 / / 16 0 50,614,512 HCM 0 0 0
07-1861 Additions and Alterations 0-010-023 05/21/08 DONE DONE DONE 03/24/08 03/20/08 07/16/07 01/28/08 02 - 16 34,400 0 HCM 0 0 0
BurtonBehrendt Smith and O'Callaghan
- PR Additions and Alterations 0-010-024 / / / / 03/04/09 / / 02 - 16 0 0 HCM 0 0 0
Bellerose Elementary:
04-0730 Reconstruction 0-019-012 03/16/05 DONE DONE DONE 01/28/05 01/27/05 06/19/03 06/03/03 7 1,178,780 1,178,780 HCM 0 0 0
McDonald & Monterose LLP
- Reconstruction 0-019-013 / / / / 05/21/07 / / 16 0 0 HCM 0 0 0
Northport Public Library:
06-0740 Reconstruction 6-001-002 02/13/07 DONE DONE DONE 01/11/07 01/10/07 12/04/06 11/15/06 13 100,152 0 HCM 0 0 0
Beatty, Harvey & Associates
08-0160 Reconstruction 6-001-003 09/19/08 DONE DONE DONE 08/13/08 08/07/08 07/05/95 07/17/08 4 100,000 0 HCM 0 0 0
Beatty, Harvey & Associates
District Wide:
07-1548 Reconstruction 7-999-003 04/25/08 DONE DONE DONE 02/06/08 02/04/08 09/27/07 05/15/07 16 1,306,800 1,306,800 HCM 0 0 954,423
BurtonBehrendt Smith and O'Callaghan
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Sunquam School:
06-0970 Reconstruction 0-001-012 06/21/07 DONE DONE DONE 02/22/07 02/20/07 12/13/06 02/07/07 16 50,128 50,128 HCM 0 0 30,027
Weiedersum Associates Architects, PL
- Reconstruction 0-001-013 / / / / 07/20/09 / / 2,155,15,16 0 0 HCM 0 0 0
Forest Park Elementary:
- PR Additions and Alterations 0-002-017 / / / / 01/06/06 / / 02 - 16 0 0 HCM 0 0 0
05-1120 Additions and Alterations 0-002-017 08/28/06 DONE DONE DONE 04/12/06 04/07/06 01/06/06 03/29/00 02 - 16 4,861,187 4,331,051 HCM 0 0 0
BurtonBehrendt Smith and O'Callaghan
06-0971 Reconstruction 0-002-018 06/21/07 DONE DONE DONE 02/22/07 02/20/07 12/13/06 02/07/07 16 50,128 50,128 HCM 0 0 30,027
Weiedersum Associates Architects, PL
- Reconstruction 0-002-019 / / / / 07/20/09 / / 2,155,15,16 0 0 HCM 0 0 0
High School East:
06-0955 Reconstruction 0-006-027 06/08/07 DONE DONE DONE 02/21/07 02/20/07 06/29/06 05/16/06 2,9,10,15,16 2,152,244 2,152,244 HCM 0 0 0
Weiedersum Associates Architects, PL
06-1216 Additions and Alterations 0-006-028 10/04/07 DONE DONE DONE 03/26/07 03/23/07 12/13/06 02/07/07 02 - 16 4,309,572 4,309,572 HCM 0 0 2,581,434
Weiedersum Associates Architects, PL
07-1198 Reconstruction 0-006-029 05/15/08 DONE DONE DONE 12/24/07 12/21/07 04/26/07 05/21/07 8,16 220,000 0 HCM 0 0 0
Weiedersum Associates Architects, PL
07-1196 Reconstruction 0-006-030 05/15/08 DONE DONE DONE 12/24/07 12/21/07 04/26/07 05/17/05 10,16 181,600 181,600 HCM 0 0 0
Weiedersum Associates Architects, PL
07-2166 Reconstruction 0-006-031 12/24/08 DONE DONE DONE 05/27/08 05/22/08 02/21/08 03/29/00 2,8,9,10,13,155,15,1 1,012,827 1,012,827 HCM 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-006-032 / / / / 07/20/09 / / 2,8,155,15,16 0 0 HCM 0 0 0
06-1559SC Visual Structural Inspection 0-006-SC1 06/04/07 DONE DONE DONE 05/16/07 05/16/07 / / / / 16 2,620 0 JOD 0 0 0
07-1541SC Visual Structural Inspection 0-006-SC2 02/05/08 DONE DONE DONE 01/23/08 01/23/08 / / / / 16 2,703 0 JOD 0 0 0
Manasquan School:
- Reconstruction 0-007-011 / / / / 01/09/07 / / 16 0 8,990,217 HCM 0 0 0
- Reconstruction 0-007-012 / / / / 07/20/09 / / 2,155,15,16 0 0 HCM 0 0 0
- Reconstruction 0-007-013 / / / / 08/19/09 / / 2,8,9,155,15,16 0 0 HCM 0 0 0
Candlewood Junior High:
06-0958 Reconstruction 0-008-016 06/06/07 DONE DONE DONE 02/21/07 02/20/07 12/13/06 02/07/07 2 600,660 600,660 HCM 0 0 0
Weiedersum Associates Architects, PL
07-1197XX Reconstruction 0-008-017 05/15/08 CANCELLED 12/24/07 12/21/07 04/26/07 05/18/99 8 100,000 100,000 HCM 0 0 0
Weiedersum Associates Architects, PL
07-1424 Reconstruction 0-008-018 07/07/08 DONE DONE DONE 01/22/08 01/18/08 09/13/07 05/15/07 16 193,611 139,875 HCM 0 0 5,444
Weiedersum Associates Architects, PL
- Reconstruction 0-008-019 / / / / 07/20/09 / / 2,155,15,16 0 0 HCM 0 0 0
- Reconstruction 0-008-020 / / / / 08/18/09 / / 2,8,9,10,155,15,16 0 0 HCM 0 0 0
Otsego Avenue Elementary:
06-0972 Reconstruction 0-011-015 06/21/07 DONE DONE DONE 02/22/07 02/20/07 12/13/06 02/07/07 16 50,128 50,128 HCM 0 0 30,027
Weiedersum Associates Architects, PL
- Reconstruction 0-011-016 / / / / 07/20/09 / / 2,155,15,16 0 0 HCM 0 0 0
Paumanok School:
06-0973 Reconstruction 0-014-016 06/21/07 DONE DONE DONE 02/22/07 02/20/07 12/13/06 02/07/07 16 50,128 50,128 HCM 0 0 30,027
Weiedersum Associates Architects, PL
08-0561 Reconstruction 0-014-017 02/12/09 DONE DONE DONE 10/20/08 10/16/08 09/13/07 05/15/07 2,4,7,8,9,10,155,15, 316,500 0 HCM 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-014-018 / / / / 07/20/09 / / 2,155,15,16 0 0 HCM 0 0 0
Signal Hill School:
06-0974 Reconstruction 0-015-017 06/21/07 DONE DONE DONE 02/22/07 02/20/07 12/13/06 02/07/07 16 50,128 50,128 HCM 0 0 30,027
Weiedersum Associates Architects, PL
- Reconstruction 0-015-018 / / / / 07/20/09 / / 2,155,15,16 0 0 HCM 0 0 0
- Reconstruction 0-015-019 / / / / 08/19/09 / / 2,8,9,13,155,15,16 0 0 HCM 0 0 0
Vanderbilt Elementary School:
05-1121 Reconstruction 0-016-014 08/28/06 DONE DONE DONE 04/12/06 04/07/06 03/14/02 03/29/00 2,4,8,9,155,15,16 3,462,297 3,462,297 HCM 0 0 0
BurtonBehrendt Smith and O'Callaghan
06-0975 Reconstruction 0-016-016 06/21/07 DONE DONE DONE 02/22/07 02/20/07 12/13/06 02/07/07 16 50,128 50,128 HCM 0 0 30,027
Weiedersum Associates Architects, PL
- Reconstruction 0-016-017 / / / / 07/20/09 / / 2,155,15,16 0 0 HCM 0 0 0
West Hollow Jr. High:
06-0725 Reconstruction 0-017-012 04/19/07 DONE DONE DONE 01/10/07 01/08/07 06/29/06 05/16/06 2,9,10 310,000 310,000 HCM 0 0 0
Weiedersum Associates Architects, PL
06-1221 Reconstruction 0-017-013 06/29/07 DONE DONE DONE 03/26/07 03/23/07 12/13/06 02/07/07 2,8 1,365,903 1,365,903 HCM 0 0 470,343
Weiedersum Associates Architects, PL
07-1425 Reconstruction 0-017-014 07/07/08 DONE DONE DONE 01/22/08 01/18/08 09/13/07 05/15/07 16 173,875 139,875 HCM 0 0 0
Weiedersum Associates Architects, PL
08-0559 Reconstruction 0-017-015 01/21/09 DONE DONE DONE 10/20/08 10/16/08 08/11/08 05/20/08 8,9,155 389,400 319,500 HCM 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-017-016 / / / / 07/20/09 / / 2,155,15,16 0 0 HCM 0 0 0
Chestnut Hill:
05-1122 Reconstruction 0-018-013 08/28/06 DONE DONE DONE 04/12/06 04/07/06 03/14/02 03/29/00 2,4,8,9,155,15,16 3,629,237 3,629,237 HCM 0 0 0
BurtonBehrendt Smith and O'Callaghan
06-0976 Reconstruction 0-018-015 06/21/07 DONE DONE DONE 02/22/07 02/20/07 12/13/06 02/07/07 16 50,128 50,128 HCM 0 0 30,027
Weiedersum Associates Architects, PL
- Reconstruction 0-018-016 / / / / 07/20/09 / / 2,155,15,16 0 0 HCM 0 0 0
Natatorium:
- XX Reconstruction 0-020-007 CANCELLED / / / / 08/13/08 / / 7,16 0 0 HCM 0 0 0
- Reconstruction 0-020-008 / / / / 07/20/09 / / 2,155,15,16 0 0 HCM 0 0 0
High School West:
05-0025 Reconstruction 0-021-011 09/01/05 DONE DONE DONE 07/08/05 07/07/05 10/25/02 05/21/02 155 141,326 141,326 HCM 0 0 0
BurtonBehrendt Smith and O'Callaghan
06-0959 Reconstruction 0-021-013 06/06/07 DONE DONE DONE 02/21/07 02/20/07 12/13/06 02/07/07 2 1,320,132 1,320,132 HCM 0 0 0
Weiedersum Associates Architects, PL
07-1195 Reconstruction 0-021-014 05/15/08 DONE DONE DONE 12/24/07 12/21/07 04/26/07 05/17/05 4,16 300,000 0 HCM 0 0 0
Weiedersum Associates Architects, PL
- Reconstruction 0-021-015 / / / / 07/20/09 / / 2,155,15,16 0 0 HCM 0 0 0
06-1560SC Visual Structural Inspection 0-021-SC1 06/04/07 DONE DONE DONE 05/16/07 05/16/07 / / / / 16 4,965 0 JOD 0 0 0
07-1542SC Visual Structural Inspection 0-021-SC2 02/06/08 DONE DONE DONE 01/23/08 01/23/08 / / / / 16 5,868 0 JOD 0 0 0
Storage Container #1 - Paumanok:
- DB Discovered Building 2-048-001 / / / / 10/31/07 / / 0 0 HCM 0 0 0
Storage Container #1 - Sunquam:
- DB Discovered Building 2-049-001 / / / / 10/31/07 / / 0 0 HCM 0 0 0
Storage Container #2 - Sunquam:
- DB Discovered Building 2-050-001 / / / / 10/31/07 / / 0 0 HCM 0 0 0
Storage Container #3 - Sunquam:
- DB Discovered Building 2-051-001 / / / / 10/31/07 / / 0 0 HCM 0 0 0
Storage Container #1 - Transporation:
- DB Discovered Building 2-052-001 / / / / 10/31/07 / / 0 0 HCM 0 0 0
Storage Container #2 - Transportatio:
- DB Discovered Building 2-053-001 / / / / 10/31/07 / / 0 0 HCM 0 0 0
Storage Container #3 - Transporation:
- DB Discovered Building 2-054-001 / / / / 10/31/07 / / 0 0 HCM 0 0 0
Storage Container #4 - Transportatio:
- DB Discovered Building 2-055-001 / / / / 10/31/07 / / 0 0 HCM 0 0 0
Storage Container #5 - Transporation:
- DB Discovered Building 2-056-001 / / / / 10/31/07 / / 0 0 HCM 0 0 0
Storage Container #6 - Transportatio:
- DB Discovered Building 2-057-001 / / / / 10/31/07 / / 0 0 HCM 0 0 0
Storage Container #1 - Chestnut Hill:
- DB Discovered Building 2-058-001 / / / / 10/31/07 / / 0 0 HCM 0 0 0
Storage Container #2 - Chestnut Hill:
- DB Discovered Building 2-059-001 / / / / 10/31/07 / / 0 0 HCM 0 0 0
Storage Container #1 - HSE:
- DB Discovered Building 2-060-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #2 - HSE:
- DB Discovered Building 2-061-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #3 - HSE:
- DB Discovered Building 2-062-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #4 - HSE:
- DB Discovered Building 2-063-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #5 - HSE:
- DB Discovered Building 2-064-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #6:
- DB Discovered Building 2-065-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #7 - HSE:
- DB Discovered Building 2-066-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #8 - HSE:
- DB Discovered Building 2-067-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage container #9 - HSE:
- DB Discovered Building 2-068-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #10 - HSE:
- DB Discovered Building 2-069-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #1 - Forest Park:
- DB Discovered Building 2-070-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #2 - Forest Park:
- DB Discovered Building 2-071-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #3 - Forest Park:
- DB Discovered Building 2-072-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #4 - Forest Park:
- DB Discovered Building 2-073-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #5 - Forest Park:
- DB Discovered Building 2-074-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #6 - Forest Park:
- DB Discovered Building 2-075-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #1 - Otsego:
- DB Discovered Building 2-076-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #2 - Otsego:
- DB Discovered Building 2-077-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #3 - Otsego:
- DB Discovered Building 2-078-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #1 - Signal Hill:
- DB Discovered Building 2-079-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #2 - Signal Hill:
- DB Discovered Building 2-080-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #3 - Signal Hill:
- DB Discovered Building 2-081-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #1 Vanderbilt:
- DB Discovered Building 2-082-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Conatiner #2 - Vanderbilt:
- DB Discovered Building 2-083-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #1 - Manasquan:
- DB Discovered Building 2-084-001 / / / / 11/01/07 / / 0 0 HCM 0 0 0
Storage Container #2 - Manasquan:
- DB Discovered Building 2-085-001 / / / / 11/02/07 / / 0 0 HCM 0 0 0
Storage Container #3 - Manasquan:
- DB Discovered Building 2-086-001 / / / / 11/02/07 / / 0 0 HCM 0 0 0
Storage Container #1 - HSW:
- DB Discovered Building 2-087-001 / / / / 11/02/07 / / 0 0 HCM 0 0 0
Storage Container #2 - HSW:
- DB Discovered Building 2-088-001 / / / / 11/02/07 / / 0 0 HCM 0 0 0
Storage Container #3 - HSW:
- DB Discovered Building 2-089-001 / / / / 11/02/07 / / 0 0 HCM 0 0 0
Storage Contianer #4 - HSW:
- DB Discovered Building 2-090-001 / / / / 11/02/07 / / 0 0 HCM 0 0 0
Storage Container #5 - HSW:
- DB Discovered Building 2-091-001 / / / / 11/02/07 / / 0 0 HCM 0 0 0
Storage Container #6 - HSW:
- DB Discovered Building 2-092-001 / / / / 11/02/07 / / 0 0 HCM 0 0 0
Storage Container #7 - HSW:
- DB Discovered Building 2-093-001 / / / / 11/02/07 / / 0 0 HCM 0 0 0