Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 07/25/08 at 09:00:02




DUANESBURG CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 53-01-01-04
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          HIGH MIDDLE SCHOOL:
05-0450   Reconstruction               0-001-011  04/26/06     DONE    DONE       DONE      12/19/05   12/14/05   05/02/05   05/17/05   10,15,16                 100,000       100,000  JOD             0           0            0
                                                                                                                                                                                                                                 CWG Architects.P.C.                 
05-0646   Reconstruction               0-001-012  05/26/06     DONE    DONE       DONE      01/24/06   01/24/06   05/02/05   05/17/05   10,16                     88,022        88,022  JOD             0           0            0
                                                                                                                                                                                                                                 CWG Architects.P.C.                 
  -    PR Additions and Alterations    0-001-013                                              /  /       /  /     03/24/06     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0773   Reconstruction               0-001-014  04/24/07     DONE    DONE       DONE      01/17/07   01/17/07   09/19/06   12/12/06   2,4,7,8,9,10,13,155,   1,329,000             0  JOD             0           0      279,090
                                                                                                                                                                                                                                 CWG Architects.P.C.                 

          Elementary:
04-0284   Additions and Alterations    0-002-009  12/16/04     DONE    DONE       DONE      10/13/04   10/08/04   01/28/03   12/09/03   02 - 16                4,172,025     3,952,344  MAC             0           0            0
                                                                                                                                                                                                                                 Cataldo, Waters and Griffith Arch.  

          Annex former Bus. Off. 1-003:
  -       New Construction             0-003-001                                              /  /       /  /     04/05/05     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-003-002                                              /  /       /  /     07/11/05     /  /     2,4,8,9                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          High School Relocata:
06-0774   Reconstruction               0-004-001  04/24/07     DONE    DONE       DONE      01/17/07   01/17/07   09/20/06   12/12/06   2,9,15,16                 69,000        69,000  JOD             0           0       14,490
                                                                                                                                                                                                                                 CWG Architects.P.C.                 
  -       Reconstruction               0-004-002                                              /  /       /  /     09/22/06     /  /     2,9,15,16                      0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Athletic Traliler @ Elem. School:
  -    DB Discovered Building          2-009-001                                              /  /       /  /     09/02/04     /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Maintenance Shed @ Elementary School:
  -    DB Discovered Building          2-010-001                                              /  /       /  /     09/02/04     /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Tractor Shed @ Elementary School:
  -    DB Discovered Building          2-011-001                                              /  /       /  /     09/02/04     /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Tire Shed @ Bus Garage:
  -    DB Discovered Building          2-012-001                                              /  /       /  /     09/03/04     /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SCOTIA GLENVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 53-02-02-06
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Glendaal School:
  -       Reconstruction               0-001-011                                              /  /       /  /       /  /       /  /     2,7                            0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
07-1328   Reconstruction               0-001-012  01/17/08     DONE    DONE       DONE      01/04/08   01/03/08   10/31/07   05/15/07   2,7                      800,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.

          High School:
03-0221FP Reconstruction               0-002-FP1  10/15/03     DONE    DONE       DONE      09/12/03     /  /       /  /       /  /     16                             0     7,470,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Lincoln School:
05-1365   Reconstruction               0-005-009  06/15/06     DONE    DONE       DONE      06/13/06   06/09/06   06/01/06   05/16/06   2,9                       46,742        46,742  HCM             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.

          Sacandaga School:
03-0222FP Reconstruction               0-007-FP1  10/15/03     DONE    DONE       DONE      09/12/03     /  /       /  /       /  /     16                         3,850         3,850  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Junior High School:
03-0223   Reconstruction               0-009-FP1  10/15/03     DONE    DONE       DONE      09/12/03     /  /       /  /       /  /     16                         4,350         4,350  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          District Office:
07-2089   Reconstruction               1-006-003  05/07/08     DONE    DONE       DONE      05/06/08   04/29/08   03/31/08     /  /     155                       70,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.

          Drama Storage Building:
  -    DB Discovered Building          2-022-001                                              /  /       /  /     11/23/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Dugout Storage:
  -    DB Discovered Building          2-025-001                                              /  /       /  /     11/23/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Storage Shed @ Beukendaal:
  -    DB Discovered Building          2-028-001                                              /  /       /  /     11/23/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Ticket Boot #1:
  -    DB Discovered Building          7-023-001                                              /  /       /  /     11/23/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Ticket Booth #2:
  -    DB Discovered Building          7-024-001                                              /  /       /  /     11/23/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Concession Building @ Beukendaal:
  -    DB Discovered Building          7-026-001                                              /  /       /  /     11/23/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Storage & Bathroom Bldg. @Beukendaal:
  -    DB Discovered Building          7-027-001                                              /  /       /  /     11/23/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NISKAYUNA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 53-03-01-06
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Van Antwerp Middle School:
  -    PR Alterations                  0-001-011                                              /  /       /  /     07/22/05     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0598   Alterations                  0-001-011  04/04/07     DONE    DONE       DONE      12/06/06   12/05/06   07/22/05   01/24/06   02 - 16                8,041,501     8,041,501  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1310   Reconstruction               0-001-012               DONE    ADD. REQ'D DONE      01/02/08   12/28/07   01/30/07   02/27/07   2,4,7,8,9,10,13,155,           0     7,158,448  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
03-0443FP Reconstruction               0-001-FP1  10/20/03     DONE    DONE       DONE      10/20/03     /  /       /  /       /  /     16                         4,300         4,300  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Craig Elementary School:
  -    PR Additions and Alterations    0-002-013                                              /  /       /  /     07/22/05     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0599   Additions and Alterations    0-002-013  04/04/07     DONE    DONE       DONE      12/06/06   12/05/06   07/22/05   01/24/06   02 - 16                6,414,749     5,024,841  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1311   Reconstruction               0-002-014               STARTED ADD. REQ'D DONE      01/02/08   12/28/07   01/30/07   02/27/07   2,4,7,8,9,10,13,155,           0     5,800,140  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Glencliff Elementary:
  -    PR Additions and Alterations    0-003-010                                              /  /       /  /     07/22/05     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0600   Additions and Alterations    0-003-010  04/04/07     DONE    DONE       DONE      12/06/06   12/05/06   07/22/05   01/24/06   02 - 16                5,617,802     4,371,670  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1312   Additions and Alterations    0-003-011               STARTED ADD. REQ'D DONE      01/02/08   12/28/07   02/12/07   02/27/07   02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Rosendale Elementary:
07-0780   Additions and Alterations    0-004-011  05/14/08     DONE    DONE       DONE      11/13/07   11/08/07   07/22/05   01/24/06   02 - 16                5,382,710             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1313   Reconstruction               0-004-012               STARTED ADD. REQ'D DONE      01/02/08   12/28/07   01/30/07   02/28/07   2,4,7,8,9,10,13,155,           0     4,930,119  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
03-0445FP Reconstruction               0-004-FP1  10/20/03     DONE    DONE       DONE      10/20/03     /  /       /  /       /  /     16                         3,750         3,750  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          High School:
07-0527   Alterations                  0-006-021  03/25/08     DONE    DONE       DONE      10/11/07   10/05/07   07/22/05   01/24/06   02 - 16               24,272,497             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
05-0521   Reconstruction               0-006-022  12/20/05     DONE    DONE       DONE      12/28/05   12/27/05   12/09/05   12/05/05   7                        300,000       300,000  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
06-0695   Additions and Alterations    0-006-023  05/24/07     DONE    DONE       DONE      12/29/06   12/28/06     /  /     01/24/06   02 - 16               29,000,000    28,661,274  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1314   Reconstruction               0-006-024               STARTED ADD. REQ'D DONE      01/02/08   12/28/07   01/30/07   02/27/07   2,4,7,8,9,10,13,155,           0    26,196,702  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-2343   Reconstruction               0-006-025               STARTED DONE       DONE      07/08/08   06/30/08   06/30/08   01/28/08   2,15                           0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Hillside Elementary:
07-0782   Additions and Alterations    0-007-011  05/09/08     DONE    DONE       DONE      11/13/07   11/07/07   07/22/05   01/24/06   02 - 16                5,706,010             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1315   Reconstruction               0-007-012               DONE    ADD. REQ'D DONE      01/02/08   12/28/07   01/30/07   02/27/07   2,4,7,8,9,10,13,155,           0     5,220,126  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
03-0444FP Reconstruction               0-007-FP1  10/20/03     DONE    DONE       DONE      10/20/03     /  /       /  /       /  /     16                         3,750         3,750  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Iroquois Middle School:
07-0781   Alterations                  0-008-013  05/14/08     DONE    DONE       DONE      11/13/07   11/08/07   07/22/05   01/24/06   02 - 16                4,335,639             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1316   Reconstruction               0-008-014               DONE    ADD. REQ'D DONE      01/02/08   12/28/07   01/30/07   02/28/07   2,4,7,8,9,10,13,155,           0    11,967,296  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
03-0477FP Reconstruction               0-008-FP1  10/20/03     DONE    DONE       DONE      10/20/03     /  /       /  /       /  /     16                         8,720         8,720  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Birchwood Elementary:
07-0783   Additions and Alterations    0-021-007  05/09/08     DONE    DONE       DONE      11/13/07   11/08/07   07/22/05   01/24/06   02 - 16                5,379,093             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1317   Additions and Alterations    0-021-008               STARTED ADD. REQ'D DONE      01/02/08   12/28/07   02/12/07   02/27/07   02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Leased Bus Facility:
  -       Reconstruction               5-023-004                                              /  /       /  /       /  /       /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
05-0066TQ Temporary Quarters           5-023-L02  07/22/05     DONE    DONE       DONE      03/04/05   03/04/05     /  /       /  /     02 - 16                  419,328       419,328  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          District-wide Energy Management Syst:
07-1161   Reconstruction               7-999-002  03/26/08     DONE    DONE       DONE      12/19/07   12/18/07   07/25/07   01/24/07   10,13,14,16            3,126,114     3,126,114  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SCHALMONT CSD-ROTTERDAM STATUS REPORT ON CAPITAL PROJECTS
District No.: 53-05-01-06
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          High School/Middle School:
04-1477   Reconstruction               0-001-011  06/30/05     DONE    DONE       DONE      06/27/05   06/27/05   08/27/04   06/21/05   2,9,155,15,16            935,000       935,000  HCM             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           
04-0961   Reconstruction               0-001-012  04/28/05     DONE    DONE       DONE      03/11/05   03/11/05   08/30/04   03/09/05   2,9,155,15,16            690,125       690,125  HCM             0           0            0
                                                                                                                                                                                                                                                                     
07-1620   Reconstruction               0-001-013  07/08/08     DONE    DONE       DONE      02/14/08   02/12/08   07/05/07   10/15/07   2,4,7,8,9,10,155,15,   2,067,000             0  HCM             0           0      676,811
                                                                                                                                                                                                                                 Griffith Dardanelli,Architects,PC   
  -       Reconstruction               0-001-014                                              /  /       /  /     02/04/08     /  /     2,4,15                         0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-001-015                                              /  /       /  /     02/04/08     /  /     2,7,8,155,15,16                0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-001-016                                              /  /       /  /     02/04/08     /  /     2,4,7,8,155,15,16              0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
02-2037FP Reconstruction               0-001-FP1  12/04/03     DONE    DONE       DONE      04/29/03     /  /       /  /       /  /     16                        11,615        11,615  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Schonowe School:
06-0965   Reconstruction               0-003-004  02/23/07     DONE    DONE       DONE      02/21/07   02/20/07   02/05/07   02/12/07   2,9                       40,000        40,000  HCM             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           
  -       Reconstruction               0-003-005                                              /  /       /  /     02/06/07     /  /     2,9                            0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-003-006                                              /  /       /  /     03/01/07     /  /     2                              0        67,130  HCM             0           0            0
                                                                                                                                                                                                                                                                     
07-1622   Reconstruction               0-003-007  06/04/08     DONE    DONE       DONE      02/14/08   02/12/08   07/05/07   10/16/07   2,9,155,15,16            388,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Griffith Dardanelli,Architects,PC   

          Jefferson Elementary:
  -       Reconstruction               0-005-012                                              /  /       /  /     07/05/07     /  /     2,7,8,9,155,16                 0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
02-2038FP Reconstruction               0-005-FP1  12/04/03     DONE    DONE       DONE      04/29/03     /  /       /  /       /  /     16                         5,928         5,928  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Pine Grove School:
  -       Reconstruction               0-006-007                                              /  /       /  /     11/09/07     /  /     2,4,15                         0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ROTTERDAM-MOHONASEN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 53-05-15-06
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Senior High School:
05-0443   Additions and Alterations    0-001-011  03/21/06     DONE    DONE       DONE      12/14/05   12/12/05   02/02/04   05/18/04   02 - 16                3,161,724     2,704,784  RDR             0           0            0
                                                                                                                                                                                                                                 CWG Architects.P.C.                 
  -    PR Additions and Alterations    0-001-012                                              /  /       /  /     03/08/07     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Herman L Bradt Elementary:
04-0476   Reconstruction               0-004-012  02/15/05     DONE    DONE       DONE      12/03/04   12/02/04   02/02/04   03/22/04   2,7,155,15,16          1,578,000     1,578,000  RDR             0           0            0
                                                                                                                                                                                                                                 Cataldo, Waters and Griffith Arch.  
05-0674   Reconstruction               0-004-013  05/05/06     DONE    DONE       DONE      02/09/06   01/30/06   11/10/05   05/18/04   7                      1,064,000     1,064,000  RDR             0           0            0
                                                                                                                                                                                                                                 CWG Architects.P.C.                 
  -       Reconstruction               0-004-014                                              /  /       /  /     03/08/07     /  /     2,4,7,8,9,10,155,15,           0     9,011,699  MGL             0           0            0
                                                                                                                                                                                                                                                                     
07-1937   Reconstruction               0-004-015  04/16/08     DONE    DONE       DONE      04/08/08   03/28/08   01/30/08   10/16/07   155                      231,000             0  MGL             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Pinewood Elementary School:
04-0477   Reconstruction               0-005-009  02/15/05     DONE    DONE       DONE      12/03/04   12/02/04   02/02/04   03/22/04   2,7,9,155,15,16        1,222,000     1,222,000  RDR             0           0            0
                                                                                                                                                                                                                                 Cataldo, Waters and Griffith Arch.  
  -    PR Additions and Alterations    0-005-010                                              /  /       /  /     03/08/07     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Draper Junior High:
05-0444   Additions and Alterations    0-007-010  03/21/06     DONE    DONE       DONE      12/14/05   12/12/05   02/02/04   05/18/04   02 - 16                  944,800       527,985  RDR             0           0            0
                                                                                                                                                                                                                                 CWG Architects.P.C.                 
  -    PR Additions and Alterations    0-007-011                                              /  /       /  /     03/08/07     /  /     02 - 16                        0    17,126,570  MGL             0           0            0
                                                                                                                                                                                                                                                                     
07-1791   Reconstruction               0-007-012  03/25/08     DONE    DONE       DONE      03/15/08   03/11/08   01/30/08   10/16/07   7                      1,965,600             0  MGL             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Bus Garage:
04-0475   Additions and Alterations    5-002-006  02/15/05     DONE    DONE       DONE      12/03/04   12/02/04   02/02/04   03/22/04   02 - 16                  450,000       450,000  RDR             0           0            0
                                                                                                                                                                                                                                 Cataldo, Waters and Griffith Arch.  

          Concession Stand:
03-1303   New Construction             7-010-001  06/29/04     DONE    DONE       DONE      03/23/04   03/22/04   11/24/03   11/03/03   02 - 16                  215,113             0  RDR             0           0            0
                                                                                                                                                                                                                                 CWG Architects.P.C.                 

          District Wide:
04-0478   Reconstruction               7-999-002  02/15/05     DONE    DONE       DONE      12/03/04   12/02/04   02/02/04   03/22/04   16                     1,550,000     1,550,000  RDR             0           0            0
                                                                                                                                                                                                                                 Cataldo, Waters and Griffith Arch.  
  -       Reconstruction               7-999-003                                              /  /       /  /     03/08/07     /  /     16                             0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SCHENECTADY CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 53-06-00-01
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Central Park School:
05-1044   Reconstruction               0-002-009  03/02/07     DONE    DONE       DONE      03/29/06   03/29/06   09/10/03   01/27/04   7,8,9,155,15,16        1,338,971     1,338,971  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
  -    PR Additions and Alterations    0-002-010                                              /  /       /  /       /  /       /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0042SC Visual Structural Inspection 0-002-SC1  08/09/06     DONE    DONE       DONE      06/08/06   06/08/06     /  /       /  /     16                         2,556         2,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Elmer Ave. School:
05-0965   Reconstruction               0-003-008  03/22/07     DONE    DONE       DONE      03/15/06   03/14/06   09/10/03   01/27/04   7,8,9,155,15,16        1,382,386     1,382,386  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
04-0410   Reconstruction               0-003-009  04/04/05     DONE    DONE       DONE      11/16/04   11/12/04   06/18/04   01/27/04   15                       297,614       297,614  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
  -    PR Additions and Alterations    0-003-010                                              /  /       /  /     04/20/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Fulton School:
06-0964   Reconstruction               0-006-004  05/04/07     DONE    DONE       DONE      02/21/07   02/14/07   09/10/03   01/27/04   7,8,9,155,15,16        1,999,908     1,686,461  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
  -       Reconstruction               0-006-005                                              /  /       /  /     04/20/07     /  /     2,4,8,9,155,15,16              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Hamilton School:
03-1583   Reconstruction               0-009-006  06/09/04     DONE    DONE       DONE      05/24/04   05/21/04   09/10/03   01/27/04   7,8,9,155,15,16          899,596       899,596  MAC             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
04-0956   Reconstruction               0-009-007  06/09/05     DONE    DONE       DONE      03/10/05   03/09/05   07/30/04   01/27/04   2,155                    230,404       230,404  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
  -       Reconstruction               0-009-008                                              /  /       /  /     04/20/07     /  /     2,8,9,155,15,16                0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Howe School:
03-1582   Reconstruction               0-011-007  06/09/04     DONE    DONE       DONE      05/24/04   05/21/04   09/10/03   01/27/04   7,8,9,155,15,16        1,235,334     1,235,334  MAC             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
04-0411   Reconstruction               0-011-008  04/04/05     DONE    DONE       DONE      11/16/04   11/12/04   06/18/04   01/27/04   2,155,15,16              373,344       373,344  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
04-1030   Reconstruction               0-011-009  06/03/05     DONE    DONE       DONE      03/23/05   03/22/05   07/30/04   01/27/04   2,4,8,9,155              844,963       844,963  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
  -    PR Additions and Alterations    0-011-010                                              /  /       /  /     04/20/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Lincoln School:
05-0966   Reconstruction               0-012-007  03/22/07     DONE    DONE       DONE      03/15/06   03/14/06   09/10/03   01/27/04   7,8,9,155,15,16          660,000       660,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
  -       Reconstruction               0-012-008                                              /  /       /  /     04/20/07     /  /     2,4,9,155,16                   0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Schenectady High:
03-1586   Reconstruction               0-013-011  06/10/04     DONE    DONE       DONE      05/26/04   05/25/04   09/10/03   01/27/04   7,8,9,155,15,16        1,077,119     1,077,119  MAC             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
04-0407   Reconstruction               0-013-012  12/10/04     DONE    DONE       DONE      11/16/04   11/12/04   06/18/04   01/27/04   155                      149,107       149,107  MAC             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects.LLp            
04-1065   Reconstruction               0-013-013  06/02/05     DONE    DONE       DONE      04/01/05   03/31/05   07/30/04   01/27/04   2,7,8,9,155            5,171,290     5,171,290  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
06-0806   Reconstruction               0-013-014               DONE    DONE       ADD. REQ'D01/24/07   01/23/07   03/07/06   01/27/04   2,8,9,155,16                   0    34,101,024  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
08-0070PR Additions and Alterations    0-013-015                         UNREVIEWED         07/21/08   07/15/08   04/20/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
03-1291MD Reconstruction               0-013-MD1  03/18/04     DONE    DONE       DONE      03/18/04   03/18/04     /  /       /  /     16                         8,634         8,634  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0035SC Visual Structural Inspection 0-013-SC2  08/09/06     DONE    DONE       DONE      06/08/06   06/08/06     /  /       /  /     16                       157,880        80,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Steinmetz School:
05-0938   Reconstruction               0-014-007  10/04/06     DONE    DONE       DONE      03/13/06   03/10/06   09/10/03   01/27/04   7,8,9,155,15,16        1,630,000     1,630,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
  -       Reconstruction               0-014-008                                              /  /       /  /     04/20/07     /  /     4,9,10,155,15,16               0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0045SC Visual Structural Inspection 0-014-SC1  08/09/06     DONE    DONE       DONE      06/08/06   06/08/06     /  /       /  /     16                         8,195         8,195  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Mont Pleasant Middle School:
04-1136   Reconstruction               0-015-011  07/01/05     DONE    DONE       DONE      04/11/05   04/11/05   09/10/03   01/27/04   7,8,9,155,15,16        1,940,000     1,940,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects.LLp            
  -       Reconstruction               0-015-012                                              /  /       /  /     04/20/07     /  /     2,4,7,9,155,15,16              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Oneida School:
05-0790   Reconstruction               0-017-010  08/07/06     DONE    DONE       DONE      02/21/06   02/17/06   09/10/03   01/27/04   7,8,9,155,15,16        1,189,151     1,189,151  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
  -       Reconstruction               0-017-011                                              /  /       /  /     04/20/07     /  /     2,7,9,155,15,16                0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-017-012                                              /  /       /  /     03/10/08     /  /     15,16                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0041SC Visual Structural Inspection 0-017-SC1  08/09/06     DONE    DONE       DONE      06/08/06   06/08/06     /  /       /  /     16                         2,556         2,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Paige School:
05-0896   Reconstruction               0-018-012  10/19/06     DONE    DONE       DONE      03/08/06   03/07/06   09/10/03   01/27/04   7,8,9,155,15,16        1,290,000       857,908  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
07-0374PR Additions and Alterations    0-018-013               DONE                         09/18/07     /  /     04/20/07     /  /     02 - 16                        0     6,677,751  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
07-0397   Additions and Alterations    0-018-013  02/27/08     DONE    DONE       DONE      09/21/07   09/20/07   04/20/07   01/30/07   02 - 16                2,662,000     2,651,523  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
06-0040SC Visual Structural Inspection 0-018-SC1  08/09/06     DONE    DONE       DONE      06/08/06   06/08/06     /  /       /  /     16                         2,556         2,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Pleasant Valley School:
04-1134   Reconstruction               0-019-009  07/15/05     DONE    DONE       DONE      04/11/05   04/11/05   09/10/03   01/27/04   7,8,9,155,15,16          510,000       510,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
  -       Reconstruction               0-019-010                                              /  /       /  /     04/20/07     /  /     2,4,7,9,10,155,15,16           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0039SC Visual Structural Inspection 0-019-SC1  08/09/06     DONE    DONE       DONE      06/08/06   06/08/06     /  /       /  /     16                         2,556         2,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Van Corlaer School:
05-1045   Reconstruction               0-021-008  03/02/07     DONE    DONE       DONE      03/29/06   03/29/06   09/10/03   01/27/04   7,8,9,155,15,16          600,000       600,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
  -       Reconstruction               0-021-009                                              /  /       /  /     04/20/07     /  /     2,4,7,8,9,155,15,16            0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0043SC Visual Structural Inspection 0-021-SC1  08/09/06     DONE    DONE       DONE      06/08/06   06/08/06     /  /       /  /     16                         2,556         2,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Washington Irving S:
04-1037   Reconstruction               0-022-004  06/03/05     DONE    DONE       DONE      03/28/05   03/25/05   09/10/03   01/27/04   7,8,9,155,15,16          322,800       322,800  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
  -       Reconstruction               0-022-005                                              /  /       /  /     07/14/06     /  /     15                             0       580,014  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-022-006                                              /  /       /  /     04/20/07     /  /     2,4,7,8,9,155,15,16            0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Yates School:
05-0791   Reconstruction               0-024-008  08/07/06     DONE    DONE       DONE      02/21/06   02/17/06   09/10/03   01/27/04   7,8,9,155,15,16        1,390,000     1,390,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
  -       Reconstruction               0-024-009                                              /  /       /  /     04/20/07     /  /     2,9,155,15,16                  0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0036SC Visual Structural Inspection 0-024-SC1  08/09/06     DONE    DONE       DONE      06/08/06   06/08/06     /  /       /  /     16                         2,556         2,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Zoller School:
04-0989   Reconstruction               0-025-005  06/14/05     DONE    DONE       DONE      03/16/05   03/15/05   09/10/03   01/27/04   7,8,9,155,15,16        3,620,000     3,472,914  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects.LLp            
  -    PR Additions and Alterations    0-025-006                                              /  /       /  /     04/20/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0038SC Visual Structural Inspection 0-025-SC1  08/09/06     DONE    DONE       DONE      06/08/06   06/08/06     /  /       /  /     16                         2,556         2,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Dr. Martin L. King School:
04-1036   Reconstruction               0-027-007  06/30/05     DONE    DONE       DONE      03/28/05   03/25/05   09/10/03   01/27/04   7,8,9,155,15,16        2,120,000     2,120,000  MAC             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
07-0544PR Reconstruction               0-027-008               DONE                         10/12/07     /  /     04/20/07     /  /     2,4,7,8,9,10,155,15,   6,005,300             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
07-2117   Reconstruction               0-027-008                         UNREVIEWED         05/16/08   05/09/08   04/20/07   01/30/07   2,4,7,8,9,10,155,15,   6,005,300             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
06-0044SC Visual Structural Inspection 0-027-SC1  08/09/06     DONE    DONE       DONE      06/08/06   06/08/06     /  /       /  /     16                         2,556         2,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Woodlawn E.S (fmly M.S.):
04-0712   Reconstruction               0-032-007  02/22/05     DONE    DONE       DONE      01/24/05   01/20/05   09/10/03   01/27/04   7,8,9,155,15,16          450,000       450,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects.LLp            
07-2006   Reconstruction               0-032-008  05/22/08     DONE    DONE       DONE      04/22/08   04/14/08   04/20/07   01/30/07   2,4,7,9,14,155,15,16   1,213,700             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
06-0037SC Visual Structural Inspection 0-032-SC1  08/09/06     DONE    DONE       DONE      06/08/06   06/08/06     /  /       /  /     16                         2,556         2,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          LEASE @ STEINMERTZ INVESTMENT CNTR.:
  -    TQ Temporary Quarters           8-035-001                                              /  /       /  /     08/22/06     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -    TQ Temporary Quarters           8-035-L01                                              /  /       /  /     08/22/06     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          St. Luke's School:
07-1031   Reconstruction               8-036-001  02/27/08     DONE    DONE       DONE      12/04/07   11/29/07   05/03/07   10/09/07                          1,600,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         
07-1030   New Construction             8-036-L01  01/24/08     DONE    DONE       DONE      12/04/07   11/29/07   05/09/07   10/09/07   02 - 16                  720,000       720,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Synthesis Architects,L.L.P.         

          Immaculate Conception School:
  -    TQ Temporary Quarters           8-037-001                                              /  /       /  /     07/15/08     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          St. Adalberts School:
  -    TQ Temporary Quarters           8-038-001                                              /  /       /  /     07/16/08     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED