REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Burnt Hills Senior High:
05-0660 Additions and Alterations 0-003-022 03/23/06 DONE DONE DONE 01/25/06 01/25/06 07/10/03 10/28/03 02 - 16 4,990,129 4,984,103 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
04-0613 Reconstruction 0-003-025 02/15/05 DONE DONE DONE 12/31/04 12/30/04 11/22/04 10/28/03 9,15 1,031,330 1,031,330 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
06-1111 Reconstruction 0-003-026 05/18/07 DONE DONE DONE 03/16/07 03/09/07 02/27/07 03/01/07 7 948,000 948,000 HCM 0 0 213,300
Dodge Chamberlin Luzine Weber, Arch.
06-1106 Reconstruction 0-003-027 04/16/07 DONE DONE DONE 03/15/07 03/15/07 02/28/07 03/01/07 15,16 166,442 127,000 HCM 0 0 32,741
Dodge Chamberlin Luzine Weber, Arch.
Stevens Elementary:
06-1112 Reconstruction 0-004-016 05/18/07 DONE DONE DONE 03/16/07 03/09/07 02/28/07 03/01/07 7 401,500 401,500 HCM 0 0 90,338
Dodge Chamberlin Luzine Weber, Arch.
06-1107 Reconstruction 0-004-017 05/22/07 DONE DONE DONE 03/15/07 03/09/07 02/28/07 03/01/07 16 236,760 236,760 HCM 0 0 53,271
Dodge Chamberlin Luzine Weber, Arch.
07-0189 Reconstruction 0-004-018 12/14/07 DONE DONE DONE 08/16/07 08/16/07 02/28/07 03/01/07 2,4,7,8,9,155,15,16 116,000 116,000 HCM 0 0 26,100
Dodge Chamberlin Luzine Weber, Arch.
- Reconstruction 0-004-019 / / / / 10/16/09 / / 8,9 0 0 HCM 0 0 0
Pashley Elementary School:
05-0661 Reconstruction 0-006-014 03/23/06 DONE DONE DONE 01/25/06 01/25/06 07/10/03 10/28/03 2,9,10,16 1,276,500 1,276,500 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
06-1113 Reconstruction 0-006-015 05/18/07 DONE DONE DONE 03/16/07 03/09/07 02/28/07 03/01/07 7 314,000 314,000 HCM 0 0 70,650
Dodge Chamberlin Luzine Weber, Arch.
07-0190 Reconstruction 0-006-016 12/14/07 DONE DONE DONE 08/16/07 08/16/07 02/28/07 03/01/07 2,4,7,8,9,155,15,16 1,966,000 1,966,000 HCM 0 0 442,350
Dodge Chamberlin Luzine Weber, Arch.
Charlton Hghts. Elementary:
04-0614 Reconstruction 0-008-011 02/15/05 DONE DONE DONE 12/31/04 12/30/04 07/10/03 10/28/03 2,9,16 160,408 160,408 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
06-1114 Reconstruction 0-008-015 05/18/07 DONE DONE DONE 03/16/07 03/09/07 02/28/07 03/01/07 7,13 494,000 494,000 HCM 0 0 111,150
Dodge Chamberlin Luzine Weber, Arch.
Middle/Jr High School:
04-0615 Additions and Alterations 0-010-017 02/15/05 DONE DONE DONE 12/31/04 12/30/04 07/10/03 10/28/03 02 - 16 7,032,359 7,032,359 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
06-1115 Reconstruction 0-010-018 05/18/07 DONE DONE DONE 03/16/07 03/09/07 02/27/07 03/01/07 7 319,000 319,000 HCM 0 0 71,775
Dodge Chamberlin Luzine Weber, Arch.
Temporary Office Trailer:
- DB Discovered Building 1-015-001 / / / / 02/05/09 / / 0 0 HCM 0 0 0
Bus Garage:
08-0313 Reconstruction 5-005-005 09/22/08 DONE DONE DONE 09/11/08 09/09/08 08/22/08 08/05/08 2,4,7,8,9,155,15,16 300,000 300,000 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Press Box:
04-0616 Reconstruction 7-009-003 02/15/05 DONE DONE DONE 12/31/04 12/30/04 11/23/04 10/28/03 8,10,16 42,458 0 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
TICKET BOOTH:
06-0069XX Reconstruction 7-014-001 09/16/09 CANCELLED 07/12/06 07/12/06 08/22/05 / / 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Arcadia-Gowana-Koda M.Schools:
05-0420PR Additions and Alterations 0-001-022 UNREVIEWED 12/01/05 11/30/05 04/11/05 / / 02 - 16 0 0 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
05-0776 Additions and Alterations 0-001-022 05/17/06 DONE DONE DONE 02/15/06 11/30/05 04/11/05 01/20/04 02 - 16 10,308,000 10,308,000 RDR 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
- Reconstruction 0-001-023 / / / / 08/23/05 / / 4 0 34,377,982 MGL 0 0 0
07-0054 Reconstruction 0-001-024 09/27/07 DONE DONE DONE 07/13/07 07/13/07 06/12/07 01/16/07 7,9,10,13,155,15,16 364,620 364,620 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-1574 Reconstruction 0-001-025 10/30/08 DONE DONE DONE 02/08/08 02/06/08 08/24/07 05/15/07 7,9,10,155,15,16 557,139 600,000 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
- Reconstruction 0-001-026 / / / / 11/06/09 / / 8,9,155,15,16 0 0 JOD 0 0 0
High School West(fmly Koda):
07-1575 Reconstruction 0-004-018 10/30/08 DONE DONE DONE 02/08/08 02/06/08 06/12/07 05/15/07 155,15 332,341 332,341 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-2073 Reconstruction 0-004-019 12/16/08 DONE DONE DONE 05/05/08 04/29/08 08/09/07 01/16/07 7,10,13,155,15,16 148,446 215,420 MGL 0 0 0
Collins & Scoville Architects
- Reconstruction 0-004-020 / / / / 08/17/07 / / 7,10,13,155,15,16 0 0 MGL 0 0 0
- Reconstruction 0-004-021 / / / / 11/06/09 / / 7,8,9,155,15,16 0 0 JOD 0 0 0
Skano-Tesago E.S.:
04-1161 Reconstruction 0-006-015 05/17/05 DONE DONE DONE 04/14/05 04/12/05 02/23/05 05/01/05 7 1,452,245 1,452,245 RDR 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-2074 Reconstruction 0-006-016 12/16/08 DONE DONE DONE 05/05/08 04/29/08 06/12/07 01/16/07 4,7,13,155 166,692 338,760 MGL 0 0 0
Collins & Scoville Architects
07-1913 Reconstruction 0-006-017 10/30/08 DONE DONE DONE 04/03/08 03/28/08 02/21/08 05/15/07 7 34,188 34,188 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
- Reconstruction 0-006-018 / / / / 11/06/09 / / 8,9,155,15,16 0 0 JOD 0 0 0
02-1593FP Reconstruction 0-006-FP1 12/01/04 DONE DONE DONE 03/12/03 02/26/03 / / / / 16 5,878 5,878 MGL 0 0 0
Karigon Orenda Elementary:
07-0055 Reconstruction 0-007-013 09/27/07 DONE DONE DONE 07/13/07 07/13/07 06/12/07 01/16/07 2,155 364,620 364,620 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-1576 Reconstruction 0-007-014 10/30/08 DONE DONE DONE 02/08/08 02/06/08 08/24/07 05/15/07 4,7,10,155,15,16 634,135 634,135 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
- Reconstruction 0-007-015 / / / / 11/06/09 / / 8,9,155,15,16 0 0 JOD 0 0 0
High School East:
07-1110 Reconstruction 0-008-016 06/09/08 DONE DONE DONE 12/13/07 12/11/07 06/12/07 01/16/07 7,10,14 1,018,069 1,194,750 MGL 0 0 0
Collins & Scoville Architects
07-2075 Reconstruction 0-008-017 12/16/08 DONE DONE DONE 05/05/08 04/29/08 08/17/07 01/16/07 2,155,15 3,653,620 3,400,729 MGL 0 0 0
Collins & Scoville Architects
- Reconstruction 0-008-018 / / / / 11/06/09 / / 8,9,155,15,16 0 0 JOD 0 0 0
05-0396SC Visual Structural Inspection 0-008-SC1 11/29/05 DONE DONE DONE 11/28/05 11/28/05 / / / / 16 678 678 JOD 0 0 0
Chango Elementary:
07-1577 Reconstruction 0-010-008 10/30/08 DONE DONE DONE 02/08/08 02/06/08 06/12/07 05/15/07 155,15,16 145,336 145,336 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Okte Elementary:
07-1578 Reconstruction 0-011-009 10/30/08 DONE DONE DONE 02/08/08 02/06/08 06/12/07 05/15/07 7,155,15,16 44,050 44,050 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Arongen E.S.(fmly ES #8):
05-0233PR Additions and Alterations 0-031-004 04/07/06 DONE DONE DONE 10/05/05 10/04/05 11/05/03 01/20/04 02 - 16 0 19,070,304 RDR 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
05-1134 Additions and Alterations 0-031-004 01/13/06 DONE DONE DONE 10/05/05 10/04/05 11/05/03 01/20/04 02 - 16 19,043,120 16,805,169 RDR 0 0 3,082,825
Dodge Chamberlin Luzine Weber, Arch.
07-1111 Reconstruction 0-031-005 06/09/08 DONE DONE DONE 12/13/07 12/11/07 06/12/07 01/16/07 7,10 418,520 833,232 MGL 0 0 0
Collins & Scoville Architects
- Reconstruction 0-031-006 / / / / 11/06/09 / / 7,8,9,155,15,16 0 0 JOD 0 0 0
Administration:
05-1311DB Discovered Building 1-055-001 08/11/06 DONE DONE DONE 05/31/06 05/04/06 03/12/04 / / 02 - 16 0 0 MGL 0 0 0
NEW ELECTRICAL SHED:
- PR New Construction 2-058-001 / / / / 04/20/06 / / 02 - 16 0 0 MGL 0 0 0
05-1265 New Construction 2-058-001 05/17/06 DONE DONE DONE 05/19/06 04/26/06 04/20/06 01/20/04 02 - 16 15,000 0 RDR 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Storage @ Karigon/Orenda:
06-1470DB Discovered Building 2-059-001 11/16/07 DONE DONE DONE 05/11/07 05/11/07 11/30/06 / / 02 - 16 0 0 MGL 0 0 0
Storage @ Skano/Tesago:
06-1471DB Discovered Building 2-060-001 11/16/07 DONE DONE DONE 07/11/07 05/11/07 11/30/06 / / 02 - 16 0 0 MGL 0 0 0
Storage @ Arongen:
06-1472DB Discovered Building 2-061-001 11/16/07 DONE DONE DONE 05/11/07 05/11/07 12/01/06 / / 0 0 MGL 0 0 0
Storage @ Chango:
06-1473DB Discovered Building 2-062-001 11/16/07 DONE DONE DONE 05/11/07 05/11/07 12/01/06 / / 02 - 16 0 0 MGL 0 0 0
Storage @ OKTE:
06-1474PR New Construction 2-063-001 11/16/07 DONE DONE DONE 05/11/07 05/11/07 12/01/06 / / 02 - 16 0 0 MGL 0 0 0
Storage #1 @ MS:
06-1475DB Discovered Building 2-064-001 11/16/07 DONE DONE DONE 05/11/07 05/11/07 12/01/06 / / 02 - 16 0 0 MGL 0 0 0
Storage #2 @ MS:
06-1476DB Discovered Building 2-065-001 11/16/07 DONE DONE DONE 05/11/07 05/11/07 12/01/06 / / 02 - 16 0 0 MGL 0 0 0
Storage #1 @ HS East:
06-1477DB Discovered Building 2-066-001 11/16/07 DONE DONE DONE 05/11/07 05/11/07 12/01/06 / / 02 - 16 0 0 MGL 0 0 0
Storage #2 @ HS East:
06-1478DB Discovered Building 2-067-001 11/16/07 DONE DONE DONE 05/11/07 05/11/07 12/01/06 / / 0 0 MGL 0 0 0
Storage @ HS West:
06-1479DB Discovered Building 2-068-001 11/16/07 DONE DONE DONE 05/11/07 05/11/07 12/01/06 / / 0 0 MGL 0 0 0
Storage @ District Office:
06-1480DB Discovered Building 2-069-001 11/16/07 DONE DONE DONE 05/11/07 05/11/07 12/20/06 / / 0 0 MGL 0 0 0
Bus Garage:
05-0720 Reconstruction 5-003-009 05/17/06 DONE DONE DONE 02/13/06 02/07/06 11/05/03 01/20/04 16 8,718,000 8,718,000 MAC 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
- Reconstruction 5-003-010 / / / / 11/06/09 / / 8,9,155,15,16 0 0 JOD 0 0 0
Bus Maintenance Center:
05-1266 New Construction 5-054-001 05/17/06 DONE DONE DONE 05/19/06 04/26/05 11/05/03 01/20/04 02 - 16 145,000 145,000 MAC 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
- Reconstruction 5-054-002 / / / / 11/06/09 / / 4,7,8,9,155,15,16 0 0 JOD 0 0 0
House #1:
05-1310DB Discovered Building 7-056-001 07/28/06 DONE DONE DONE 05/31/06 05/04/06 03/15/04 / / 0 0 MGL 0 0 0
House #2:
05-1312DB Discovered Building 7-057-001 07/28/03 DONE DONE DONE 05/31/06 05/04/06 03/15/04 / / 0 0 MGL 0 0 0
Concession Stand @ High School East:
07-2076 New Construction 7-070-001 12/16/08 DONE DONE DONE 05/05/08 04/29/08 08/17/07 01/16/07 02 - 16 509,830 0 MGL 0 0 0
Collins & Scoville Architects
District Wide Tech.:
- Reconstruction 7-999-002 / / / / / / / / 10 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Oak Street Elem/High School:
04-0565 Reconstruction 0-001-022 01/07/05 DONE DONE DONE 12/16/04 12/15/04 04/14/04 05/18/04 10,16 98,486 98,486 RDR 0 0 0
Drb. Architecture
05-0611 Reconstruction 0-001-023 05/30/06 DONE DONE DONE 01/18/06 01/18/06 05/02/05 05/17/05 2,9,10,155,15,16 2,111,352 2,101,162 RDR 0 0 367,375
Smith Pollard Architects
- Reconstruction 0-001-024 / / / / 07/20/06 / / 10 0 18,530,322 MGL 0 0 0
New K-4 Building:
04-0566 Reconstruction 0-015-004 01/07/05 DONE DONE DONE 12/16/04 12/15/04 04/01/04 05/18/04 13,16 69,825 69,825 RDR 0 0 0
Drb. Architecture
- Reconstruction 0-015-005 / / / / 07/20/06 / / 8 0 7,883,894 MGL 0 0 0
Dugouts w/ storage:
- New Construction 2-021-001 / / / / 09/10/08 / / 02 - 16 0 0 HCM 0 0 0
Bus Garage:
- Reconstruction 4-004-004 / / / / 07/20/06 / / 7 0 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Common School:
- Reconstruction 0-001-002 / / / / 01/09/06 / / 15,16 0 1,450,035 MGL 0 0 0
07-1366 Alterations 0-001-003 05/29/08 DONE DONE DONE 01/15/08 01/14/08 06/15/07 11/15/07 02 - 16 20,500 20,500 MGL 0 0 20,500
Sacco & McKinney Architects, PC
New Bus Garage:
- Reconstruction 5-005-002 / / / / 01/09/06 / / 15,16 0 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Galway K-12 Facility:
- PR Additions and Alterations 0-002-019 / / / / 01/09/06 / / 02 - 16 0 0 DDJ 0 0 0
Storage Trailer @ Bus Garage:
08-0143DB Discovered Building 2-009-001 UNREVIEWED 08/12/08 07/17/08 02/01/08 / / 02 - 16 0 0 DDJ 0 0 0
Bus Garage:
- Additions and Alterations 5-003-002 / / / / 01/10/06 / / 02 - 16 0 0 DDJ 0 0 0
Concession Stand:
- PR New Construction 7-010-001 / / / / 10/27/09 / / 02 - 16 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School/High School:
05-0527 Reconstruction 0-006-008 03/20/06 DONE DONE DONE 01/03/06 12/30/05 09/01/05 03/04/04 155,15,16 1,272,438 1,272,438 DDJ 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-2167 Reconstruction 0-006-009 06/06/08 DONE DONE DONE 05/27/08 05/22/08 11/20/07 12/20/07 2,7,8,9,10,13,155,15 1,267,671 1,267,671 DDJ 0 0 213,582
Butler Rowland Mays Architects,LLP
08-0912 Reconstruction 0-006-010 04/27/09 DONE DONE DONE 12/15/08 12/11/08 11/23/07 12/20/07 8,9,10,155,15,16 2,141,497 2,075,736 DDJ 0 0 216,795
Butler Rowland Mays Architects,LLP
- PR Additions and Alterations 0-006-011 / / / / 06/09/09 / / 02 - 16 0 0 DDJ 0 0 0
New Elementary School:
- Reconstruction 0-010-003 / / / / 08/03/06 / / 2 0 13,138,897 DDJ 0 0 0
07-1709FP Reconstruction 0-010-FP1 02/28/08 DONE DONE DONE 02/28/08 02/28/08 02/28/08 / / 16 0 0 JOD 0 0 0
Storage Bldg. @ High School:
08-0913 New Construction 2-012-001 04/27/09 DONE DONE DONE 12/15/08 12/11/08 11/23/07 12/20/07 02 - 16 81,330 0 DDJ 0 0 0
Butler Rowland Mays Architects,LLP
Press Box:
08-0914 Reconstruction 7-011-001 04/27/09 DONE DONE DONE 12/15/08 12/11/08 06/27/07 12/20/07 60,700 0 DDJ 0 0 0
Butler Rowland Mays Architects,LLP
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Ballston Ave. Complex (HS/MS):
04-1489 Reconstruction 0-001-025 12/08/05 DONE DONE DONE 06/30/05 06/29/05 06/08/05 05/17/05 10,16 60,600 60,600 HCM 0 0 0
06-0771 Reconstruction 0-001-026 05/04/07 DONE DONE DONE 01/16/07 01/16/07 12/15/06 05/16/06 9,10,16 190,593 190,593 HCM 0 0 0
Collins & Scoville Architects
- PR Additions and Alterations 0-001-027 / / / / 03/25/08 / / 02 - 16 0 0 HCM 0 0 0
- Reconstruction 0-001-028 / / / / 01/14/09 / / 9,15,16 0 0 HCM 0 0 0
Malta Avenue School:
04-1490 Reconstruction 0-002-018 12/08/05 DONE DONE DONE 06/30/05 06/29/05 06/08/05 05/17/05 7,10,16 73,400 73,400 HCM 0 0 0
05-1220 Reconstruction 0-002-019 05/02/06 DONE DONE DONE 04/28/06 04/27/06 04/20/06 04/25/06 4,9,15 26,000 26,000 HCM 0 0 0
Collins & Scoville Architects
08-1116 Reconstruction 0-002-020 05/20/09 DONE DONE DONE 01/23/09 01/20/09 01/31/08 05/15/08 16 80,000 0 HCM 0 0 0
Collins & Scoville Architects
- Reconstruction 0-002-021 / / / / 01/14/09 / / 9,10,16 0 0 HCM 0 0 0
Wood Rd Complex(Prim. Middle):
04-1491 Reconstruction 0-006-015 12/08/05 DONE DONE DONE 06/30/05 06/29/05 06/08/05 05/17/05 2,155,15 63,500 63,500 HCM 0 0 0
06-1625 Reconstruction 0-006-016 06/22/07 DONE DONE DONE 06/18/07 06/15/07 04/10/07 10/25/06 2,8,9,155,15,16 2,930,300 0 HCM 0 0 0
Collins & Scoville Architects
08-1117 Reconstruction 0-006-017 05/20/09 DONE DONE DONE 01/23/09 01/20/09 01/31/08 05/15/07 16 90,000 0 HCM 0 0 0
Collins & Scoville Architects
- Reconstruction 0-006-018 / / / / 01/14/09 / / 9,10,16 0 0 HCM 0 0 0
03-1184FP Reconstruction 0-006-FP1 07/05/07 DONE DONE DONE 02/26/04 / / / / / / 16 0 7,056,000 JOD 0 0 0
Milton Terrace Primary:
04-1492 Reconstruction 0-009-014 12/08/05 DONE DONE DONE 06/30/05 06/29/05 06/08/05 05/17/05 10,15 5,000 0 HCM 0 0 0
06-1626 Reconstruction 0-009-015 06/22/07 DONE DONE DONE 06/18/07 06/15/07 04/10/07 10/25/06 2,8,9,155,15,16 1,661,900 0 HCM 0 0 0
Collins & Scoville Architects
08-1118 Reconstruction 0-009-016 05/20/09 DONE DONE DONE 01/23/09 01/20/09 11/06/08 05/15/08 16 62,000 0 HCM 0 0 0
Collins & Scoville Architects
- Reconstruction 0-009-017 / / / / 01/14/09 / / 8,9,16 0 0 HCM 0 0 0
03-1185FP Reconstruction 0-009-FP1 07/05/07 DONE DONE DONE 02/26/04 / / / / / / 16 0 4,590,000 JOD 0 0 0
Modular @ Middle School:
- TQ Temporary Quarters 0-021-001 / / / / 02/17/05 / / 0 0 HCM 0 0 0
New Bus Garage-Site B:
04-1493 Reconstruction 5-015-002 12/08/05 DONE DONE DONE 06/30/05 06/29/05 06/08/05 05/17/05 7 20,000 20,000 HCM 0 0 0
06-1307 Additions and Alterations 5-015-003 07/12/07 DONE DONE DONE 04/12/07 04/11/07 11/21/06 03/28/07 02 - 16 37,500 37,500 HCM 0 0 0
Collins & Scoville Architects
- Reconstruction 5-015-004 / / / / 01/14/09 / / 9,16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Senior High School:
06-0621 Reconstruction 0-001-007 01/19/07 DONE DONE DONE 12/14/06 12/13/06 06/01/06 05/16/06 7 780,000 780,000 JOD 0 0 0
Butler Rowland Mays Architects,LLP
- PR Additions and Alterations 0-001-008 / / / / 03/30/07 / / 02 - 16 0 0 JOD 0 0 0
07-1975 Reconstruction 0-001-009 05/02/08 DONE DONE DONE 04/15/08 04/15/08 02/22/08 12/18/07 10 2,610,908 397,950 JOD 0 0 319,292
Butler Rowland Mays Architects,LLP
08-0413 Reconstruction 0-001-010 03/06/09 DONE DONE DONE 09/26/08 09/11/08 02/22/08 12/18/07 10 2,212,958 0 JOD 0 0 0
Butler Rowland Mays Architects,LLP
07-2144 Reconstruction 0-001-011 06/13/08 DONE DONE DONE 05/22/08 05/20/08 02/25/08 12/18/07 2,8,155,15,16 0 0 JOD 0 0 0
Butler Rowland Mays Architects,LLP
- Reconstruction 0-001-012 / / / / 02/25/08 / / 10 0 0 JOD 0 0 0
- Reconstruction 0-001-013 / / / / / / / / 10 0 0 JOD 0 0 0
- Reconstruction 0-001-014 / / / / 02/25/08 / / 10 0 0 JOD 0 0 0
- Reconstruction 0-001-016 / / / / 12/16/08 / / 16 0 0 JOD 0 0 0
09-0314 Reconstruction 0-001-017 DONE STARTED UNREVIEWED10/20/09 10/16/09 02/02/09 09/21/09 10,155,16 0 0 JOD 0 0 0
Einhorn Yaffee Prescott P.C.
- Reconstruction 0-001-018 / / / / 02/19/09 / / 10,155,16 0 0 JOD 0 0 0
05-0798SC Visual Structural Inspection 0-001-SC1 02/23/06 DONE DONE DONE 01/20/06 01/20/06 / / / / 16 10,402 10,000 JOD 0 0 0
Harrison Ave Elementary:
- Reconstruction 0-002-006 / / / / 06/01/06 / / 7 0 6,742,629 JOD 0 0 0
- Reconstruction 0-002-007 / / / / 03/30/07 / / 2,9,10,155,15,16 0 0 JOD 0 0 0
08-0414 Reconstruction 0-002-008 03/06/09 DONE DONE DONE 09/26/08 09/11/08 02/22/08 12/18/07 2,8,9,155,15,16 635,000 635,000 JOD 0 0 89,535
Butler Rowland Mays Architects,LLP
09-0315 Reconstruction 0-002-009 DONE STARTED UNREVIEWED10/20/09 10/16/09 02/02/09 09/21/09 10,155,16 0 0 JOD 0 0 0
Einhorn Yaffee Prescott P.C.
- Reconstruction 0-002-010 / / / / 02/19/09 / / 10,155,16 0 0 JOD 0 0 0
Moreau Elementary School:
- Reconstruction 0-003-009 / / / / 06/01/06 / / 7 0 6,205,579 JOD 0 0 0
- Reconstruction 0-003-010 / / / / 03/30/07 / / 2,9,10,155,15,16 0 0 JOD 0 0 0
08-0415 Reconstruction 0-003-011 03/06/09 DONE DONE DONE 09/26/08 09/11/08 02/25/08 12/18/07 2,8,9,155,15,16 490,000 490,000 JOD 0 0 69,090
Butler Rowland Mays Architects,LLP
09-0316 Reconstruction 0-003-012 DONE STARTED UNREVIEWED10/20/09 10/16/09 02/02/09 09/21/09 10,155,16 0 0 JOD 0 0 0
Einhorn Yaffee Prescott P.C.
- Reconstruction 0-003-013 / / / / 02/19/09 / / 10,155,16 0 0 JOD 0 0 0
Oliver W. Winch Jr High:
06-0622 Reconstruction 0-007-006 01/19/07 DONE DONE DONE 12/14/06 12/13/06 06/01/06 05/16/06 7 520,000 520,000 JOD 0 0 0
Butler Rowland Mays Architects,LLP
- Reconstruction 0-007-007 / / / / 03/30/07 / / 2,9,10,155,15,16 0 0 JOD 0 0 0
08-0416 Reconstruction 0-007-008 03/06/09 DONE DONE DONE 09/26/08 09/11/08 02/25/08 12/18/07 2,4,8,9,155,15,16 1,330,000 1,330,000 JOD 0 0 187,530
Butler Rowland Mays Architects,LLP
09-0317 Reconstruction 0-007-009 DONE STARTED UNREVIEWED10/20/09 10/16/09 02/02/09 09/21/09 10,155,16 0 0 JOD 0 0 0
Einhorn Yaffee Prescott P.C.
- Reconstruction 0-007-010 / / / / 02/19/09 / / 10,155 0 0 JOD 0 0 0
Tanglewood School:
06-0623 Reconstruction 0-008-004 01/19/07 DONE DONE DONE 12/14/06 12/13/06 06/01/06 05/16/06 7 420,000 420,000 JOD 0 0 0
Butler Rowland Mays Architects,LLP
- Reconstruction 0-008-005 / / / / 03/30/07 / / 2,9,10,155,15,16 0 0 JOD 0 0 0
08-0417 Reconstruction 0-008-006 03/06/09 DONE DONE DONE 09/26/08 09/11/08 02/25/08 12/18/07 2,8,9,155,15,16 675,000 675,000 JOD 0 0 95,175
Butler Rowland Mays Architects,LLP
- Reconstruction 0-008-007 / / / / 09/16/08 / / 10,155 0 0 JOD 0 0 0
09-0318 Reconstruction 0-008-008 DONE STARTED UNREVIEWED10/20/09 10/16/09 02/02/09 09/21/09 10,155 0 0 JOD 0 0 0
Einhorn Yaffee Prescott P.C.
- Reconstruction 0-008-009 / / / / 02/19/09 / / 10,155 0 0 JOD 0 0 0
05-0799SC Visual Structural Inspection 0-008-SC1 02/23/06 DONE DONE DONE 01/20/06 01/20/06 / / / / 16 4,269 4,269 JOD 0 0 0
Ballard Road Elementary:
06-0624 Reconstruction 0-009-004 01/19/07 DONE DONE DONE 12/14/06 12/13/06 06/01/06 05/16/06 7 280,000 280,000 JOD 0 0 0
Butler Rowland Mays Architects,LLP
- Reconstruction 0-009-005 / / / / 03/30/07 / / 2,9,10,155,15,16 0 0 JOD 0 0 0
08-0418 Reconstruction 0-009-006 03/06/09 DONE DONE DONE 09/26/08 09/11/08 02/25/08 12/18/07 2,8,9,155,15,16 1,150,000 1,150,000 JOD 0 0 162,150
Butler Rowland Mays Architects,LLP
09-0319 Reconstruction 0-009-007 DONE STARTED UNREVIEWED10/20/09 10/16/09 02/19/09 09/21/09 10,155,16 0 0 JOD 0 0 0
Einhorn Yaffee Prescott P.C.
New Press Box:
07-1976 New Construction 7-016-001 05/02/08 DONE DONE DONE 04/15/08 04/15/08 04/14/08 12/18/07 02 - 16 60,450 0 JOD 0 0 0
Butler Rowland Mays Architects,LLP
Districtwide:
07-2143 Reconstruction 7-999-002 06/30/08 DONE DONE DONE 05/22/08 / / 02/25/08 12/08/07 10 1,000,000 1,000,000 JOD 0 0 145,000
Butler Rowland Mays Architects,LLP
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Jr/Sr High School:
07-1662PR Additions and Alterations 0-001-012 UNREVIEWED 02/21/08 02/11/08 12/01/05 / / 02 - 16 0 0 MGL 0 0 0
SEI Design Group
07-1965 Additions and Alterations 0-001-012 02/13/09 DONE DONE DONE 04/15/08 04/04/08 12/01/05 03/20/07 02 - 16 10,546,288 8,531,716 MGL 0 0 296,105
SEI Design Group
07-1534 Reconstruction 0-001-014 04/24/08 DONE DONE DONE 02/04/08 02/01/08 12/18/07 03/20/07 2,7 915,000 0 MGL 0 0 0
SEI Design Group
Elementary School K - 6:
- Reconstruction 0-002-010 / / / / 01/11/05 / / 2,8 0 6,380,154 MGL 0 0 0
07-1663PR Additions and Alterations 0-002-011 UNREVIEWED 02/21/08 02/11/08 12/01/05 / / 02 - 16 0 0 MGL 0 0 0
SEI Design Group
07-1966 Additions and Alterations 0-002-011 02/13/09 DONE DONE DONE 04/15/08 04/04/08 12/01/05 03/20/07 02 - 16 17,090,640 14,810,999 MGL 0 0 296,105
SEI Design Group
07-1535 Reconstruction 0-002-012 04/24/08 DONE DONE DONE 02/04/08 02/01/08 12/19/07 03/20/07 2,7 790,000 790,000 MGL 0 0 0
SEI Design Group
Concession Stand:
- New Construction 7-013-001 / / / / 12/01/05 / / 02 - 16 0 0 MGL 0 0 0
Cell Tower & Equipment Building:
08-1475 New Construction 7-014-001 07/07/09 DONE DONE DONE 04/09/09 03/23/09 04/03/08 11/13/08 02 - 16 0 0 HCM 0 0 0
Infinigy Engineering & Surveying
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Caroline Street Elementary:
07-1948 Reconstruction 0-001-012 11/25/08 DONE DONE DONE 04/14/08 04/04/08 02/20/07 05/15/07 2,8,9,10,16 402,041 402,041 MGL 0 0 118,602
Collins & Scoville Architects
Maple Ave M.S.(formerly JHS):
07-1949 Reconstruction 0-003-009 11/25/08 DONE DONE DONE 04/14/08 04/04/08 02/20/07 05/15/07 155,16 280,034 280,034 MGL 0 0 82,610
Collins & Scoville Architects
Division Street School:
04-0297 Reconstruction 0-004-010 12/20/04 DONE DONE DONE 10/21/04 10/15/04 02/09/04 05/18/04 2,8,13 725,799 725,799 RDR 0 0 0
07-1950 Reconstruction 0-004-011 11/25/08 DONE DONE DONE 04/14/08 04/04/08 02/20/07 05/15/07 2,4,8,9,10,155,15,16 529,282 529,282 MGL 0 0 156,138
Collins & Scoville Architects
Lake Avenue Elementary School:
07-1951 Reconstruction 0-005-007 11/25/08 DONE DONE DONE 04/14/08 04/04/08 02/20/07 05/15/07 10,15,16 114,661 114,661 MGL 0 0 33,825
Collins & Scoville Architects
Greenfield Center Elementary:
07-1952 Reconstruction 0-014-013 11/25/08 DONE DONE DONE 04/14/08 04/04/08 06/08/00 05/15/07 16 185,771 185,771 MGL 0 0 54,802
Collins & Scoville Architects
07-0848 Reconstruction 0-014-014 11/30/07 DONE DONE DONE 11/19/07 11/16/07 02/20/07 05/15/07 2,7,9,155,16 987,890 987,890 MGL 0 0 291,428
CLough-Harbour Associates
Dorothy Nolan Elementary:
07-1953 Additions and Alterations 0-015-014 11/25/08 DONE DONE DONE 04/14/08 04/04/08 02/20/07 05/15/07 02 - 16 464,096 464,096 MGL 0 0 136,908
Collins & Scoville Architects
08-0758 Reconstruction 0-015-015 04/23/09 DONE DONE DONE 11/14/08 11/12/08 06/05/08 05/20/08 2,10,155 873,629 873,629 HCM 0 0 0
Collins & Scoville Architects
Saratoga Springs High School:
07-1954 Reconstruction 0-016-017 11/25/08 DONE DONE DONE 04/04/08 04/04/08 / / 05/15/07 2,8,10 2,274,295 2,274,295 HCM 0 0 670,917
Collins & Scoville Architects
07-0849 Reconstruction 0-016-018 11/30/07 DONE DONE DONE 11/19/07 11/16/07 02/20/07 05/15/07 7,8,10,155,16 1,980,253 1,980,253 MGL 0 0 584,175
CLough-Harbour Associates
08-0759 Reconstruction 0-016-019 04/23/09 DONE DONE DONE 11/14/08 11/12/08 06/05/08 05/20/08 7,9,10,155,15,16 1,838,151 1,838,151 HCM 0 0 0
Collins & Scoville Architects
08-1216 Reconstruction 0-016-020 02/18/09 DONE DONE DONE 02/18/09 02/09/09 12/29/08 01/13/09 2,15 377,000 0 HCM 0 0 0
CLough-Harbour Associates
05-1329SC Visual Structural Inspection 0-016-SC1 06/08/06 DONE DONE DONE 06/02/06 06/02/06 / / / / 16 35,545 30,000 JOD 0 0 0
Geyser Road Elementary:
- Reconstruction 0-017-009 / / / / 02/20/07 / / 4,10,16 0 7,001,775 MGL 0 0 0
Storage Bldg. @ Division St. School:
04-0298 New Construction 2-066-001 12/20/04 DONE DONE DONE 10/21/04 10/15/04 09/29/04 05/18/04 02 - 16 26,200 0 RDR 0 0 0
Saratoga Springs Public Library:
- Reconstruction 6-046-002 DONE DONE / / / / 10/16/06 / / 2,16 0 0 MGL 0 0 0
- Reconstruction 6-046-003 / / / / 08/17/09 / / 8,9,155,16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
MS/HS 6-12:
07-2163PR Additions and Alterations 0-002-007 UNREVIEWED 05/27/08 05/21/08 08/26/04 / / 02 - 16 0 22,664,818 DDJ 0 0 0
Griffith Dardanelli,Architects,PC
08-0377 Additions and Alterations 0-002-007 03/16/09 DONE DONE DONE 09/23/08 09/22/08 08/26/04 12/13/07 02 - 16 15,187,000 13,166,555 DDJ 0 0 200,000
Griffith Dardanelli,Architects,PC
07-1121 Reconstruction 0-002-008 06/18/08 DONE DONE DONE 12/13/07 12/12/07 07/24/07 06/19/07 2,4,7,155,15,16 2,889,715 2,889,715 DDJ 0 0 0
Griffith Dardanelli,Architects,PC
09-0182 Reconstruction 0-002-009 09/16/09 DONE DONE DONE 09/02/09 08/28/09 07/20/09 05/19/09 4,8,9,10,155,15,16 100,000 0 DDJ 0 0 0
Griffith Dardanelli,Architects,PC
Elementary School:
04-1042 Reconstruction 0-003-005 04/11/05 DONE DONE DONE 03/28/05 03/28/05 09/29/04 01/07/04 8,9,16 100,000 100,000 DDJ 0 0 0
CWG ARCHITECTS
07-0807PR Additions and Alterations 0-003-006 DONE 11/14/07 / / 02/27/06 / / 02 - 16 3,798,000 3,798,000 DDJ 0 0 0
Griffith Dardanelli,Architects,PC
07-1122 Additions and Alterations 0-003-006 06/18/08 DONE DONE DONE 12/13/07 12/12/07 02/27/06 06/19/07 02 - 16 3,732,165 3,732,165 DDJ 0 0 208,906
Griffith Dardanelli,Architects,PC
05-1231 Reconstruction 0-003-007 05/24/06 DONE DONE DONE 05/08/06 05/01/06 03/29/06 05/16/06 8,9 99,900 99,900 DDJ 0 0 0
CWG Architects.P.C.
06-1655 Reconstruction 0-003-008 07/06/07 DONE DONE DONE 06/26/07 06/25/07 06/04/07 05/15/07 9,16 100,000 100,000 DDJ 0 0 0
Griffith Dardanelli,Architects,PC
07-1123 Reconstruction 0-003-009 06/18/08 DONE DONE DONE 12/13/07 12/12/07 07/24/07 06/19/07 2,16 565,000 565,000 DDJ 0 0 0
Griffith Dardanelli,Architects,PC
08-0755 Reconstruction 0-003-010 01/30/09 DONE DONE DONE 11/12/08 11/12/08 10/07/08 05/20/08 7,9,155,16 100,000 100,000 DDJ 0 0 0
Griffith Dardanelli,Architects,PC
- Reconstruction 0-003-011 / / / / 12/02/08 / / 15 0 0 DDJ 0 0 0
Bus Garage:
07-1124 Reconstruction 5-007-003 06/18/08 DONE DONE DONE 12/13/07 12/12/07 01/22/07 06/19/07 2,4,7,8,9,10,13,14,1 35,475 35,475 DDJ 0 0 0
Griffith Dardanelli,Architects,PC
New Bus Garage:
- New Construction 5-013-001 / / / / 03/03/06 / / 02 - 16 0 0 DDJ 0 0 0
Press Box:
08-0378 New Construction 7-014-001 03/16/09 DONE DONE DONE 09/23/08 09/22/08 05/27/08 12/13/07 02 - 16 145,000 0 DDJ 0 0 0
Griffith Dardanelli,Architects,PC
District Wide:
08-0379 Reconstruction 7-999-001 03/16/09 DONE DONE DONE 09/23/08 09/22/08 06/11/08 12/13/07 10,13,16 192,000 0 DDJ 0 0 0
Griffith Dardanelli,Architects,PC
08-0380 Reconstruction 7-999-002 03/16/09 DONE DONE DONE 09/23/08 09/23/08 06/13/08 12/13/07 10,13,16 155,000 0 DDJ 0 0 0
Griffith Dardanelli,Architects,PC
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
05-0170 Additions and Alterations 0-004-016 11/22/05 DONE DONE DONE 09/01/05 08/29/05 03/12/03 03/09/04 02 - 16 10,711,010 10,711,010 DDJ 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
05-0146 Reconstruction 0-004-018 08/30/05 DONE DONE DONE 08/22/05 08/22/05 06/02/05 05/17/05 10 86,464 86,464 DDJ 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-0600 Reconstruction 0-004-019 05/01/08 DONE DONE DONE 10/22/07 10/19/07 01/24/07 05/15/07 2,7,10,155,15,16 4,867,000 4,867,000 DDJ 0 0 287,132
Dodge Chamberlin Luzine Weber, Arch.
07-0605 Reconstruction 0-004-020 11/06/07 DONE DONE DONE 10/23/07 10/22/07 10/17/07 05/15/07 10 100,000 100,000 DDJ 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Public Library:
- Reconstruction 6-005-002 / / / / 11/28/06 / / 8 0 0 DDJ 0 0 0
- Reconstruction 6-005-003 / / / / 11/28/06 / / 15 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED