REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Congers Elementary:
03-0416 Reconstruction 0-001-006 10/08/04 DONE DONE DONE 10/06/03 08/07/03 03/30/00 01/09/03 16 1,741,252 1,741,252 HCM 0 0 0
Fellenzer Engineering
04-0386 Reconstruction 0-001-009 12/17/04 DONE DONE DONE 11/09/04 11/08/04 / / 09/14/04 4,7 195,000 195,000 HCM 0 0 0
Michael Shilale Architects,LLp
07-0036 Additions and Alterations 0-001-010 02/04/08 DONE DONE DONE 07/10/07 07/06/07 09/13/05 / / 02 - 16 70,000 0 HCM 0 0 0
Metropolis Architecture,PLLc
07-0627 Reconstruction 0-001-011 04/15/08 DONE DONE DONE 10/26/07 10/24/07 08/15/07 05/15/07 2,8,9,13,16 226,285 208,036 HCM 0 0 0
Ward Associates
07-1363 Reconstruction 0-001-012 ADDENDUM REQ'D 01/15/08 01/11/08 08/23/07 05/16/06 155 0 0 HCM 0 0 0
Fellenzer Engineering
- Reconstruction 0-001-013 / / / / 11/16/07 / / 0 0 HCM 0 0 0
Birchwood School:
03-0417 Reconstruction 0-002-007 10/08/04 DONE DONE DONE 10/06/03 08/07/03 03/30/00 01/09/03 16 353,800 353,800 HCM 0 0 0
Fellenzer Engineering
07-0628 Reconstruction 0-002-009 04/15/08 DONE DONE DONE 10/26/07 10/24/07 08/20/07 05/15/07 2,9,13,16 132,810 0 HCM 0 0 0
Ward Associates
- Reconstruction 0-002-010 / / / / 11/16/07 / / 13 0 0 HCM 0 0 0
New City Elementary:
03-0418 Reconstruction 0-003-006 10/08/04 DONE DONE DONE 10/06/03 08/07/03 03/30/00 01/09/03 16 151,702 151,702 HCM 0 0 0
Fellenzer Engineering
- PR Additions and Alterations 0-003-010 / / / / 09/23/03 / / 02 - 16 0 0 HCM 0 0 0
06-0625 Additions and Alterations 0-003-010 03/09/07 DONE DONE DONE 12/15/06 12/14/06 09/23/03 05/01/03 02 - 16 1,680,000 284,149 HCM 0 0 0
Michael Shilale Architects,LLp
05-0678 Reconstruction 0-003-011 05/23/06 DONE DONE DONE 02/09/06 01/24/06 12/21/05 10/27/05 2,155,15,16 1,333,524 1,333,524 HCM 0 0 0
Fellenzer Engineering
07-0629 Reconstruction 0-003-012 04/15/08 DONE DONE DONE 10/26/07 10/24/07 08/20/07 05/15/07 2,8,9,13 213,280 0 HCM 0 0 0
Ward Associates
- Reconstruction 0-003-013 / / / / 11/16/07 / / 13 0 0 HCM 0 0 0
02-1213FP Reconstruction 0-003-FP1 09/25/03 DONE DONE DONE 02/07/03 / / / / / / 16 3,630 3,630 MGL 0 0 0
Little Tor Elementary School:
03-0419 Reconstruction 0-004-009 10/08/04 DONE DONE DONE 10/06/03 08/07/03 03/30/00 01/09/03 16 103,014 103,014 HCM 0 0 0
Fellenzer Engineering
05-0679 Reconstruction 0-004-011 05/23/06 DONE DONE DONE 02/09/06 01/24/06 12/21/05 10/27/05 2,155,15,16 960,603 960,603 HCM 0 0 0
Fellenzer Engineering
- PR Additions and Alterations 0-004-012 / / / / 04/11/06 / / 02 - 16 0 0 HCM 0 0 0
07-0630 Reconstruction 0-004-013 04/15/08 DONE DONE DONE 10/26/07 10/24/07 08/20/07 05/15/07 2,9,13,15 140,740 0 HCM 0 0 0
Ward Associates
- Reconstruction 0-004-014 / / / / 11/16/07 / / 13 0 0 HCM 0 0 0
Chestnut Grove(Data Center):
03-0420 Reconstruction 0-005-009 10/08/04 DONE DONE DONE 10/06/03 08/07/03 03/30/00 01/09/03 16 108,667 108,667 HCM 0 0 0
Fellenzer Engineering
02-2340FP Reconstruction 0-005-FP1 08/26/03 DONE DONE DONE 06/05/03 / / / / / / 16 0 360,000 MGL 0 0 0
West Nyack Elementary School:
03-0421 Reconstruction 0-006-008 10/08/04 DONE DONE DONE 10/06/03 08/07/03 03/30/00 01/09/03 16 135,805 135,805 HCM 0 0 0
Fellenzer Engineering
05-0680 Reconstruction 0-006-014 05/23/06 DONE DONE DONE 02/09/06 01/24/06 12/21/05 10/27/05 2,155,15,16 1,081,587 1,081,587 HCM 0 0 0
Fellenzer Engineering
07-0631 Reconstruction 0-006-015 04/15/08 DONE DONE DONE 10/26/07 10/24/07 08/20/07 05/15/07 2,7,8,10 229,400 0 HCM 0 0 0
Ward Associates
- Reconstruction 0-006-016 / / / / 11/16/07 / / 13 0 0 HCM 0 0 0
Bardonia Elementary School:
03-0422 Reconstruction 0-007-007 10/08/04 DONE DONE DONE 10/06/03 08/07/03 03/30/00 01/09/03 16 586,509 586,509 HCM 0 0 0
Fellenzer Engineering
- Reconstruction 0-007-009 / / / / 04/19/05 / / 2 0 7,830,189 HCM 0 0 0
- Reconstruction 0-007-010 / / / / 06/09/05 / / 2,9 0 7,830,189 HCM 0 0 0
06-0564 Reconstruction 0-007-011 05/17/07 DONE DONE DONE 11/30/06 11/27/06 07/13/05 05/17/05 2,15 35,000 0 HCM 0 0 0
Fellenzer Engineering
05-0681 Reconstruction 0-007-012 05/23/06 DONE DONE DONE 02/09/06 01/24/06 12/21/05 10/27/05 2,9,155,15,16 1,074,114 1,074,114 HCM 0 0 0
Fellenzer Engineering
- PR Additions and Alterations 0-007-013 / / / / 04/11/06 / / 02 - 16 0 0 HCM 0 0 0
07-0632 Reconstruction 0-007-014 04/15/08 DONE DONE DONE 10/26/07 10/24/07 08/20/07 05/15/07 4,9,13,16 256,680 0 HCM 0 0 0
Ward Associates
07-1364 Reconstruction 0-007-015 ADDENDUM REQ'D 01/15/08 01/11/08 08/20/07 05/16/06 155 0 0 HCM 0 0 0
Fellenzer Engineering
- Reconstruction 0-007-016 / / / / 09/11/07 / / 13,16 0 0 HCM 0 0 0
- Reconstruction 0-007-017 / / / / 11/16/07 / / 13,16 0 0 HCM 0 0 0
02-1212FP Reconstruction 0-007-FP1 09/25/03 DONE DONE DONE 02/06/03 / / / / / / 16 3,630 3,630 MGL 0 0 0
High School North Annex:
04-0158 Reconstruction 0-009-004 10/08/04 DONE DONE DONE 08/26/04 08/24/04 06/30/04 01/09/03 8,155,16 199,253 199,253 HCM 0 0 0
Fellenzer Engineering
- Reconstruction 0-009-005 / / / / 11/16/07 / / 13 0 0 HCM 0 0 0
Senior High School North:
03-0423 Reconstruction 0-010-013 10/08/04 DONE DONE DONE 10/06/03 08/07/03 03/30/00 01/09/03 16 485,646 485,646 HCM 0 0 0
Fellenzer Engineering
- PR Additions and Alterations 0-010-015 / / / / 08/06/04 / / 02 - 16 0 0 HCM 0 0 0
06-0626 Additions and Alterations 0-010-015 03/09/07 DONE DONE DONE 12/15/06 12/14/06 08/06/04 05/01/03 02 - 16 250,000 250,000 HCM 0 0 0
Michael Shilale Architects,LLp
07-0543 Reconstruction 0-010-016 ADDENDUM REQ'D 10/12/07 10/12/07 06/29/06 10/27/05 8,155,16 0 14,281,482 HCM 0 0 0
Metropolis Architecture,PLLc
07-0633 Reconstruction 0-010-017 04/15/08 DONE DONE DONE 10/26/07 10/24/07 08/23/07 05/15/07 2,9,13,15 1,240,000 0 HCM 0 0 0
Ward Associates
07-0641 Reconstruction 0-010-018 04/15/08 DONE DONE DONE 10/26/07 10/24/07 08/23/07 05/15/07 2,13,16 2,620,850 0 HCM 0 0 0
Ward Associates
02-1216FP Reconstruction 0-010-FP1 09/25/03 DONE DONE DONE 02/07/03 / / / / / / 16 7,260 7,260 MGL 0 0 0
Laurel Plains Elementary:
03-0424 Reconstruction 0-011-006 10/08/04 DONE DONE DONE 10/06/03 08/07/03 03/30/00 01/09/03 16 246,906 246,906 HCM 0 0 0
Fellenzer Engineering
05-0682 Reconstruction 0-011-007 05/23/06 DONE DONE DONE 02/09/06 01/24/06 12/21/05 10/27/05 2,155,15,16 1,238,413 1,238,413 HCM 0 0 0
Fellenzer Engineering
07-0634 Reconstruction 0-011-008 04/15/08 DONE DONE DONE 10/26/07 10/24/07 08/20/07 05/15/07 2,9,13,16 106,640 0 HCM 0 0 0
Ward Associates
- Reconstruction 0-011-009 / / / / 11/16/07 / / 13 0 0 HCM 0 0 0
03-0934FP Reconstruction 0-011-FP1 02/02/04 DONE DONE DONE 01/09/04 / / / / / / 16 4,500 4,500 JOD 0 0 0
Felix Festa Junior High:
03-0425 Reconstruction 0-012-014 10/08/04 DONE DONE DONE 10/06/03 08/07/03 03/30/00 01/09/03 16 1,499,750 1,499,750 HCM 0 0 0
Fellenzer Engineering
03-1440 Reconstruction 0-012-016 04/13/05 DONE DONE DONE 04/21/04 04/20/04 01/30/03 06/03/03 4,155 120,000 120,000 HCM 0 0 0
Fellenzer Engineering
- Reconstruction 0-012-018 / / / / 06/20/05 / / 2,9 0 44,125,488 HCM 0 0 0
05-0287 Reconstruction 0-012-019 12/28/06 DONE DONE DONE 10/24/05 10/21/05 07/11/05 05/18/04 13 244,000 244,000 HCM 0 0 0
Fellenzer Engineering
05-1419 Reconstruction 0-012-020 01/24/07 DONE DONE DONE 06/28/06 06/26/06 04/11/06 05/17/05 9 154,000 154,000 HCM 0 0 0
Metropolis Architecture,PLLc
07-0635 Reconstruction 0-012-021 04/15/08 DONE DONE DONE 10/26/07 10/24/07 08/23/07 05/15/07 2,8,9,155,15 2,204,116 0 HCM 0 0 0
Ward Associates
07-0642 Reconstruction 0-012-022 04/15/08 DONE DONE DONE 10/26/07 10/24/07 08/23/07 05/15/07 2,13 1,610,945 0 HCM 0 0 0
Ward Associates
- Reconstruction 0-012-023 / / / / 11/16/07 / / 13 0 0 HCM 0 0 0
02-1263FP Reconstruction 0-012-FP1 09/25/03 DONE DONE DONE 02/07/03 / / / / / / 16 10,890 10,890 MGL 0 0 0
Dina Link Elementary:
03-0426 Reconstruction 0-013-006 10/08/04 DONE DONE DONE 10/06/03 08/07/03 03/30/00 01/09/03 16 236,404 236,404 HCM 0 0 0
Fellenzer Engineering
02-1695 Additions and Alterations 0-013-009 03/16/04 DONE DONE DONE 03/10/03 03/06/03 04/24/02 05/15/01 02 - 16 885,260 860,260 HCM 0 0 0
Perkins Eastman & Partners
- XX Additions and Alterations 0-013-010 CANCELLED / / / / 09/23/03 / / 02 - 16 0 0 HCM 0 0 0
- Reconstruction 0-013-011 / / / / 07/11/05 / / 2,9 0 8,120,196 HCM 0 0 0
07-0636 Reconstruction 0-013-012 04/15/08 DONE DONE DONE 10/26/07 10/24/07 08/20/07 05/15/07 2,8,9,13,16 230,640 0 HCM 0 0 0
Ward Associates
- Reconstruction 0-013-013 / / / / 11/16/07 / / 13 0 0 HCM 0 0 0
Wood Glen Elementary:
03-0427 Reconstruction 0-016-008 10/08/04 DONE DONE DONE 10/06/03 08/07/03 03/30/00 01/09/03 16 419,265 419,265 HCM 0 0 0
Fellenzer Engineering
07-0637 Reconstruction 0-016-010 04/15/08 DONE DONE DONE 10/26/07 10/24/07 08/20/07 05/15/07 4,8 154,380 0 HCM 0 0 0
Ward Associates
- Reconstruction 0-016-011 / / / / 11/16/07 / / 13 0 0 HCM 0 0 0
02-1214FP Reconstruction 0-016-FP1 09/25/03 DONE DONE DONE 02/07/03 / / / / / / 16 3,630 3,630 MGL 0 0 0
Lakewood Elementary School:
03-0428 Reconstruction 0-017-007 10/08/04 DONE DONE DONE 10/06/03 08/07/03 03/30/00 01/09/03 16 411,257 411,257 HCM 0 0 0
Fellenzer Engineering
07-0638 Reconstruction 0-017-009 04/15/08 DONE DONE DONE 10/26/07 10/24/07 08/20/07 05/15/07 2,4,155,16 166,408 0 HCM 0 0 0
Ward Associates
02-1211FP Reconstruction 0-017-FP1 09/25/03 DONE DONE DONE 02/07/03 / / / / / / 16 3,630 3,630 MGL 0 0 0
Senior High School South:
03-0429 Reconstruction 0-018-013 10/08/04 DONE DONE DONE 10/06/03 08/07/03 03/30/00 01/09/03 16 606,705 606,705 HCM 0 0 0
Fellenzer Engineering
03-1441 Reconstruction 0-018-014 04/13/05 DONE DONE DONE 04/21/04 04/20/04 01/30/03 03/26/02 8,9,155,16 56,500 56,500 HCM 0 0 0
Fellenzer Engineering
05-0389 Reconstruction 0-018-015 02/21/06 DONE DONE DONE 11/29/05 11/28/05 08/22/05 05/18/04 9,14,16 45,475 45,475 HCM 0 0 0
Fellenzer Engineering
06-0936 Reconstruction 0-018-016 05/04/07 DONE DONE DONE 02/13/07 02/08/07 07/06/06 05/16/06 7 901,100 0 HCM 0 0 0
Metropolis Architecture,PLLc
07-0639 Reconstruction 0-018-017 04/15/08 DONE DONE DONE 10/26/07 10/24/07 08/23/07 05/15/07 8,13,15 1,232,808 0 HCM 0 0 0
Ward Associates
07-0643 Reconstruction 0-018-018 04/15/08 DONE DONE DONE 10/26/07 10/24/07 08/23/07 05/15/07 2,155 1,911,400 0 HCM 0 0 0
Ward Associates
02-1215FP Reconstruction 0-018-FP1 09/25/03 DONE DONE DONE 02/07/03 / / / / / / 16 36,300 36,300 MGL 0 0 0
Strawtown Road Elementary:
03-0430 Reconstruction 0-019-008 10/08/04 DONE DONE DONE 10/06/03 08/07/03 03/30/00 01/09/03 16 158,183 158,183 HCM 0 0 0
Fellenzer Engineering
07-0640 Reconstruction 0-019-011 04/15/08 DONE DONE DONE 10/26/07 10/24/07 08/20/07 05/15/07 2,8,9 193,812 0 HCM 0 0 0
Ward Associates
- Reconstruction 0-019-012 / / / / 11/16/07 / / 13 0 0 HCM 0 0 0
Observatory:
- XX New Construction 0-026-001 CANCELLED / / / / 10/29/03 / / 02 - 16 0 0 HCM 0 0 0
Storage Shed:
03-1080 New Construction 2-027-001 03/16/04 DONE DONE DONE 02/05/04 02/05/04 02/05/04 05/15/02 02 - 16 25,000 0 HCM 0 0 0
Bus Garage:
03-0431 Reconstruction 5-022-004 10/08/04 DONE DONE DONE 10/06/03 08/07/03 09/06/02 01/09/03 155,15,16 76,947 76,947 HCM 0 0 0
Fellenzer Engineering
Dugout @ South High School:
04-1332DB Discovered Building 7-028-001 11/29/05 DONE DONE DONE 05/25/05 05/25/05 04/09/04 / / 02 - 16 0 0 HCM 0 0 0
Dugout @ North High School:
04-1333DB Discovered Building 7-029-001 11/29/05 DONE DONE DONE 05/25/05 05/25/05 04/09/04 / / 02 - 16 0 0 HCM 0 0 0
Press Box @ South High School:
06-0369 New Construction 7-030-001 10/19/07 DONE DONE DONE 10/27/06 10/25/06 09/13/05 / / 02 - 16 51,000 0 HCM 0 0 0
Fellenzer Engineering
Field Electrical Building:
- PR New Construction 7-031-001 / / / / 05/01/08 / / 02 - 16 0 0 HCM 0 0 0
Districtwide-Elementary:
06-0484 Reconstruction 7-999-006 ADDENDUM REQ'D 11/13/06 11/13/06 08/29/05 09/08/05 16 0 0 HCM 0 0 0
Fellenzer Engineering
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Miller Elementary:
03-0334 Reconstruction 0-001-010 10/15/04 DONE DONE DONE 09/22/03 09/17/03 02/04/02 05/21/02 2 830,895 830,895 HCM 0 0 0
Perkins Eastman & Partners
03-0447 Reconstruction 0-001-011 01/21/04 DONE DONE DONE 10/10/03 09/30/03 05/19/03 05/21/02 15,16 246,279 246,279 HCM 0 0 0
Perkins Eastman & Partners
03-1060 Reconstruction 0-001-012 02/12/04 DONE DONE DONE 01/30/04 01/29/04 05/19/03 05/21/02 2 184,270 184,270 HCM 0 0 0
Perkins Eastman & Partners
07-0065 Reconstruction 0-001-013 07/24/07 DONE DONE DONE 07/16/07 07/16/07 05/07/07 / / 8,10,13,155,16 18,800 0 HCM 0 0 0
KSQ Architects,P.C
07-0989 Reconstruction 0-001-014 05/09/08 DONE DONE DONE 11/29/07 11/28/07 11/14/07 03/30/07 7,8,155,16 37,950 0 HCM 0 0 0
KSQ Architects,P.C
Highview Elementary:
03-0064 Additions and Alterations 0-002-008 05/07/04 DONE DONE DONE 07/17/03 07/16/03 02/04/02 05/21/02 02 - 16 5,972,825 1,854,869 HCM 0 0 0
Perkins Eastman & Partners
03-0448 Reconstruction 0-002-009 01/21/04 DONE DONE DONE 10/10/03 09/30/03 05/19/03 05/21/02 155,15,16 209,382 209,382 HCM 0 0 0
Perkins Eastman & Partners
03-1061 Reconstruction 0-002-010 02/12/04 DONE DONE DONE 01/30/04 01/29/04 05/19/03 05/21/02 2 7,954 0 HCM 0 0 0
Perkins Eastman & Partners
07-0990 Reconstruction 0-002-011 05/09/08 DONE DONE DONE 11/29/07 11/28/07 05/07/07 03/30/07 8,10,13,155,16 38,761 0 HCM 0 0 0
KSQ Architects,P.C
Nanuet Senior High:
03-0335 Additions and Alterations 0-003-012 07/13/04 DONE DONE DONE 09/22/03 09/17/03 02/04/02 05/21/02 02 - 16 4,751,518 4,751,518 HCM 0 0 0
Perkins Eastman & Partners
03-0449 Reconstruction 0-003-014 01/21/04 DONE DONE DONE 10/10/03 09/30/03 05/19/03 05/21/02 155,16 851,586 851,586 HCM 0 0 0
Perkins Eastman & Partners
03-1062 Reconstruction 0-003-015 02/12/04 DONE DONE DONE 01/30/04 01/29/04 05/19/03 05/21/02 2 178,936 178,936 HCM 0 0 0
Perkins Eastman & Partners
04-1427 Reconstruction 0-003-016 07/19/05 DONE DONE DONE 06/17/05 06/14/05 06/08/05 05/21/02 2,9,16 304,000 304,000 HCM 0 0 0
Perkins Eastman & Partners
07-0991 Reconstruction 0-003-017 05/09/08 DONE DONE DONE 11/29/07 11/28/07 05/07/07 03/30/07 8,10,13,155,16 767,625 0 HCM 0 0 0
KSQ Architects,P.C
Nanuet Middle:
03-0065 Reconstruction 0-004-008 05/07/04 DONE DONE DONE 07/17/03 07/16/03 02/04/02 05/21/02 2,8,9,16 8,991,161 5,077,860 HCM 0 0 0
Perkins Eastman & Partners
03-0450 Reconstruction 0-004-009 01/21/04 DONE DONE DONE 10/10/03 09/30/03 05/19/03 05/21/02 155,16 307,474 307,474 HCM 0 0 0
Perkins Eastman & Partners
07-0992 Reconstruction 0-004-011 05/09/08 DONE DONE DONE 11/29/07 11/28/07 05/07/07 03/30/07 8,10,13,155,16 69,345 0 HCM 0 0 0
KSQ Architects,P.C
George Miller ES - Portable Trailer:
- DB Discovered Building 0-008-001 / / / / 09/22/03 / / 0 0 HCM 0 0 0
Storage Building:
- New Construction 7-009-002 / / / / / / / / 02 - 16 0 0 HCM 0 0 0
New Press Box @ HS:
06-1677 New Construction 7-010-001 06/30/08 DONE DONE DONE 06/28/07 06/27/07 10/18/06 04/11/07 02 - 16 0 0 HCM 0 0 0
Lineworks Architecture and design LL
Land Purchse w/23 Structures(See L):
- PR New Construction 7-011-001 / / / / 11/06/06 / / 02 - 16 0 0 HCM 0 0 0
06-0690 New Construction 7-011-001 03/21/07 DONE DONE DONE 12/28/06 12/27/06 11/06/06 01/10/06 02 - 16 17,200,000 0 HCM 0 0 0
Perkins Eastman & Partners
Field House:
- DB Discovered Building 7-012-001 / / / / 08/24/07 / / 0 0 HCM 0 0 0
Horse Stables:
- DB Discovered Building 7-013-001 / / / / 08/24/07 / / 0 0 HCM 0 0 0
Pavillion #1:
- DB Discovered Building 7-014-001 / / / / 08/24/07 / / 0 0 HCM 0 0 0
Pavillion #2:
- DB Discovered Building 7-015-001 / / / / 08/24/07 / / 0 0 HCM 0 0 0
District Wide:
- Reconstruction 7-999-002 / / / / 06/02/08 / / 10,13,14,155,16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Farley Middle School:
03-1549 Reconstruction 0-003-007 06/01/04 DONE DONE DONE 05/13/04 05/13/04 12/18/03 06/30/03 7 181,000 181,000 MAC 0 0 0
Michael Shilale Architects,LLp
Haverstraw Middle School:
- XX Reconstruction 0-009-011 CANCELLED / / / / 11/24/03 / / 9 0 13,900,225 MAC 0 0 0
- Reconstruction 0-009-012 / / / / 06/05/06 / / 16 0 13,900,225 HCM 0 0 0
Gerald F. Neary Elementary:
- Reconstruction 0-011-005 / / / / 12/03/03 / / 9 0 4,060,098 HCM 0 0 0
Railroad Avenue School (Alt. Ed. Bld:
03-0770 Reconstruction 0-013-001 02/20/04 DONE DONE DONE 12/04/03 12/01/03 06/18/03 06/03/03 155,16 208,089 0 MAC 0 0 0
Fellenzer Engineering
04-1389 Reconstruction 0-013-002 10/21/05 DONE DONE DONE 06/09/05 06/06/05 02/18/05 04/05/05 7 154,250 0 HCM 0 0 0
Michael Shilale Architects,LLp
Stony Point Elementary:
- Reconstruction 0-014-006 / / / / 05/14/08 / / 15 0 0 HCM 0 0 0
North Rockland High School:
03-1071 Reconstruction 0-016-017 05/24/04 DONE DONE DONE 02/04/04 02/03/04 08/28/03 10/07/03 2 327,000 0 MAC 0 0 0
Michael R.Shilale Architects
04-0319 Reconstruction 0-016-018 11/05/04 DONE DONE DONE 10/25/04 10/22/04 08/28/03 05/18/04 2 151,000 0 MAC 0 0 0
Michael Shilale Architects,LLp
03-1550 Reconstruction 0-016-019 07/16/04 DONE DONE DONE 05/13/04 05/13/04 03/24/04 05/03/04 16 181,872 107,000 MAC 0 0 0
Michael Shilale Architects,LLp
- Reconstruction 0-016-020 / / / / 05/31/05 / / 10,16 0 44,841,504 HCM 0 0 0
- Reconstruction 0-016-021 / / / / 07/21/05 / / 10,16 0 44,841,504 HCM 0 0 0
06-0139 Visual Structural Inspection 0-016-SC1 08/07/06 DONE DONE DONE 07/14/06 07/14/06 / / / / 16 52,000 52,000 JOD 0 0 0
West Haverstraw Elementary:
04-1388 Reconstruction 0-024-008 10/21/05 DONE DONE DONE 06/08/05 06/06/05 01/20/05 04/05/05 7 948,000 948,000 HCM 0 0 0
Michael Shilale Architects,LLp
- Reconstruction 0-024-009 / / / / 05/14/08 / / 15 0 0 HCM 0 0 0
Thiells Elementary School:
03-1192 Reconstruction 0-025-011 04/09/04 DONE DONE DONE 03/03/04 03/01/04 06/18/03 05/20/02 7 895,000 895,000 MAC 0 0 0
Michael R.Shilale Architects
8/9th Grade Ctr. @ Letchworth:
05-0346SC Visual Structural Inspection 0-031-SC1 11/15/05 DONE DONE DONE 11/14/05 11/14/05 / / / / 16 14,291 14,291 JOD 0 0 0
8/9 Grade Ctr-Mechanical Bldg.(#28):
03-1651 Reconstruction 0-042-002 01/26/05 DONE DONE DONE 06/25/04 06/23/04 03/03/01 12/11/01 8 580,295 580,295 MAC 0 0 0
Thomas Associates
06-1525 Reconstruction 0-042-003 06/05/07 DONE DONE DONE 05/22/07 05/21/07 08/16/06 12/11/01 7 425,000 0 HCM 0 0 0
Michael Shilale Architects,LLp
Land Acquisit./demo.Storrs H.:
- New Construction 7-057-001 / / / / 08/09/04 / / 02 - 16 0 0 HCM 0 0 0
Willow Grove Middle School:
- XX Reconstruction 8-030-007 CANCELLED / / / / / / / / 8,16 0 0 MAC 0 0 0
03-1541 Reconstruction 8-030-008 07/16/04 DONE DONE DONE 05/11/04 05/10/04 / / 05/18/04 8,9,16 300,000 300,000 MAC 0 0 0
Michael Shilale Architects,LLp
03-1563 Reconstruction 8-030-009 07/23/04 DONE DONE DONE 05/19/04 05/17/04 03/24/04 10/26/99 155 50,000 50,000 MAC 0 0 0
Thomas Associates
07-1769 Reconstruction 8-030-010 ADDENDUM REQ'D 03/08/08 03/05/08 07/27/07 / / 2 0 0 HCM 0 0 0
Michael Shilale Architects,LLp
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Tappan Zee High School:
04-1478 Additions and Alterations 0-006-015 06/28/05 DONE DONE DONE 06/27/05 06/27/05 11/25/02 10/20/04 02 - 16 2,866,691 2,866,691 RDR 0 0 0
05-0523 Reconstruction 0-006-016 02/23/06 DONE DONE DONE 12/29/05 12/27/05 11/26/02 10/20/04 2,4,7,9,155,15,16 10,696,895 10,626,907 RDR 0 0 0
Cannon Design
07-0580 Reconstruction 0-006-017 10/18/07 DONE DONE DONE 10/17/07 10/16/07 04/10/07 02/16/07 2,4,7,155,15,16 1,553,189 1,553,189 MGL 0 0 0
Collins & Scoville Architects,P.C.
- Reconstruction 0-006-018 / / / / 08/14/07 / / 2,15,16 0 0 MGL 0 0 0
02-2170FP Reconstruction 0-006-FP1 09/04/03 DONE DONE DONE 05/15/03 / / / / / / 16 11,781 11,781 MGL 0 0 0
Tappan Zee Elementary:
05-0524 Additions and Alterations 0-007-012 02/23/06 DONE DONE DONE 12/29/05 12/27/05 11/26/02 10/20/04 02 - 16 2,317,024 2,317,024 RDR 0 0 0
Cannon Design
02-2166FP Reconstruction 0-007-FP1 09/04/03 DONE DONE DONE 05/15/03 / / / / / / 16 3,616 3,616 MGL 0 0 0
Cottage Lane Elementary:
05-0525 Additions and Alterations 0-010-011 02/23/06 DONE DONE DONE 12/29/05 12/27/05 11/29/02 10/20/04 02 - 16 3,401,193 3,381,520 RDR 0 0 0
Cannon Design
04-1075 Reconstruction 0-010-013 04/12/05 DONE DONE DONE 04/04/05 04/01/05 12/13/04 10/20/04 2,15 120,908 120,908 RDR 0 0 0
Cannon Design
02-2168FP Reconstruction 0-010-FP1 09/04/03 DONE DONE DONE 05/15/03 / / / / / / 16 3,616 3,616 MGL 0 0 0
William Schaefer Elementary:
05-0526 Additions and Alterations 0-012-008 02/23/06 DONE DONE DONE 12/29/05 12/27/05 11/29/02 10/20/04 02 - 16 450,254 450,254 RDR 0 0 0
Cannon Design
04-1076 Reconstruction 0-012-010 04/12/05 DONE DONE DONE 04/04/05 04/01/05 12/13/04 10/20/04 2,15 121,061 121,061 RDR 0 0 0
Cannon Design
02-2169FP Reconstruction 0-012-FP1 09/04/03 DONE DONE DONE 05/15/03 / / / / / / 16 3,616 3,616 MGL 0 0 0
Middle School:
04-1160 Reconstruction 0-013-014 05/10/05 DONE DONE DONE 04/13/05 04/13/05 11/26/02 10/20/04 2,4,7,8,9,155,15,16 4,155,342 3,056,110 RDR 0 0 0
04-0037XX Reconstruction 0-013-016 07/13/04 CANCELLED 07/06/04 07/02/04 04/23/04 06/03/03 8,9,16 30,000 30,000 RDR 0 0 0
Cannon Design
04-1096 Reconstruction 0-013-017 04/12/05 DONE DONE DONE 04/06/05 04/06/05 12/09/04 10/20/04 2,15 124,272 124,272 RDR 0 0 0
Cannon Design
07-1076 Additions and Alterations 0-013-018 07/21/08 DONE DONE DONE 12/07/07 12/06/07 08/14/07 / / 02 - 16 0 0 MGL 0 0 0
Collins & Scoville Architects,P.C.
02-2167FP Reconstruction 0-013-FP1 09/04/03 DONE DONE DONE 05/15/03 / / / / / / 16 3,616 3,616 MGL 0 0 0
Press Box:
- New Construction 7-018-001 / / / / 02/04/05 / / 02 - 16 0 0 MGL 0 0 0
Field House:
04-1479 New Construction 7-019-001 06/28/05 DONE DONE DONE 06/27/05 06/27/05 02/04/05 10/20/04 02 - 16 259,895 0 RDR 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Valley Cottage Elementary:
03-1502 Reconstruction 0-001-005 04/21/05 DONE DONE DONE 05/04/04 05/03/04 08/15/03 12/09/03 7,8,155,15,16 405,271 405,271 DDJ 0 0 0
March Associates
- Reconstruction 0-001-006 / / / / 03/24/06 / / 7 0 6,138,459 DDJ 0 0 0
07-0800 Reconstruction 0-001-007 12/10/07 DONE DONE DONE 11/14/07 11/13/07 07/19/07 07/16/07 16 56,165 56,165 DDJ 0 0 0
Michael Shilale Architects,LLp
- Reconstruction 0-001-008 / / / / 09/13/07 / / 2,4,7,155,15,16 0 0 DDJ 0 0 0
Nyack High School:
03-1194 Reconstruction 0-003-009 06/30/04 DONE DONE DONE 03/03/04 03/02/04 05/02/03 12/09/03 155 4,326,000 4,326,000 DDJ 0 0 0
Hewitt Monahan Associates, PLLC
03-1503 Reconstruction 0-003-010 04/21/05 DONE DONE DONE 05/04/04 05/03/04 08/15/03 12/09/03 7,8,155,15,16 346,620 346,620 DDJ 0 0 0
March Associates
- Reconstruction 0-003-011 / / / / 09/13/07 / / 2,4,8,15,16 0 0 DDJ 0 0 0
Nyack Jr. High School:
03-1504 Reconstruction 0-004-004 04/21/05 DONE DONE DONE 05/04/04 05/03/04 08/15/03 12/09/03 7,8,155,15,16 573,566 573,566 DDJ 0 0 0
March Associates
05-0103 Reconstruction 0-004-005 03/03/06 DONE DONE DONE 08/04/05 08/04/05 04/13/05 05/17/05 2,10 163,000 163,000 DDJ 0 0 0
Fellenzer Engineering
- Reconstruction 0-004-006 / / / / 03/24/06 / / 2 0 10,432,224 DDJ 0 0 0
- Reconstruction 0-004-007 / / / / 06/28/07 / / 10,13,15 0 0 DDJ 0 0 0
07-0801 Reconstruction 0-004-008 12/10/07 DONE DONE DONE 11/14/07 11/13/07 07/19/07 / / 16 56,165 56,165 DDJ 0 0 0
Michael Shilale Architects,LLp
- Reconstruction 0-004-009 / / / / 09/13/07 / / 2,7,8,155,15,16 0 0 DDJ 0 0 0
Hilltop Intermediate:
03-1505 Reconstruction 0-005-004 04/21/05 DONE DONE DONE 05/04/04 05/03/04 08/15/03 12/09/03 7,8,155,15,16 1,176,649 0 DDJ 0 0 0
March Associates
07-0802 Reconstruction 0-005-005 12/10/07 DONE DONE DONE 11/14/07 11/13/07 07/19/07 / / 16 56,165 0 DDJ 0 0 0
Michael Shilale Architects,LLp
- Reconstruction 0-005-006 / / / / 09/13/07 / / 2,4,7,8,155,15,16 0 0 DDJ 0 0 0
Liberty Elementary School:
03-1506 Reconstruction 0-006-007 04/21/05 DONE DONE DONE 05/04/04 05/03/04 08/15/03 12/09/03 7,8,155,15,16 349,403 349,403 DDJ 0 0 0
March Associates
07-0803 Reconstruction 0-006-008 12/10/07 DONE DONE DONE 11/14/07 11/13/07 07/19/07 07/16/07 16 56,165 56,165 DDJ 0 0 0
Michael Shilale Architects,LLp
- Reconstruction 0-006-009 / / / / 09/13/07 / / 2,4,7,8,15,16 0 0 DDJ 0 0 0
Upper Nyack Elementary:
03-1507 Reconstruction 0-007-010 04/21/05 DONE DONE DONE 05/04/04 05/03/04 08/15/03 12/09/03 7,8,155,15,16 163,921 163,921 DDJ 0 0 0
March Associates
05-0024 Reconstruction 0-007-011 07/12/05 DONE DONE DONE 07/07/05 07/06/05 05/11/05 05/24/05 2,10 73,920 73,920 DDJ 0 0 0
Fellenzer Engineering
07-0804 Reconstruction 0-007-012 12/10/07 DONE DONE DONE 11/14/07 11/13/07 07/19/07 07/16/07 16 56,175 56,175 DDJ 0 0 0
Michael Shilale Architects,LLp
- Reconstruction 0-007-013 / / / / 09/13/07 / / 2,4,7,8,155,15,16 0 0 DDJ 0 0 0
New High School:
03-1508 Reconstruction 0-021-003 04/21/05 DONE DONE DONE 05/04/04 05/03/04 08/15/03 12/09/03 7,8,155,15,16 267,878 267,878 DDJ 0 0 0
March Associates
- Reconstruction 0-021-004 / / / / 03/24/06 / / 2 0 18,711,978 DDJ 0 0 0
07-0805 Reconstruction 0-021-005 12/10/07 DONE DONE DONE 11/14/07 11/13/07 07/19/07 07/16/07 16 56,165 56,165 DDJ 0 0 0
Michael Shilale Architects,LLp
- Reconstruction 0-021-006 / / / / 09/13/07 / / 2,4,8,155,15,16 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Evans Park School:
04-0624 Additions and Alterations 0-002-008 04/07/05 DONE DONE DONE 01/06/05 12/13/04 11/05/03 05/04/04 02 - 16 2,234,346 2,205,626 HCM 0 0 0
Clark Patterson Associates
- Reconstruction 0-002-009 / / / / 05/29/08 / / 4,9,15 0 0 HCM 0 0 0
Lincoln Ave.Elementary School:
04-0625 Additions and Alterations 0-003-009 04/07/05 DONE DONE DONE 01/06/05 12/13/04 11/05/03 05/04/04 02 - 16 1,187,938 0 HCM 0 0 0
Clark Patterson Associates
03-1448 Reconstruction 0-003-010 06/01/04 DONE DONE DONE 04/22/04 04/22/04 03/29/04 05/04/04 155 534,800 534,800 HCM 0 0 0
Clark Patterson Associates
Senior High School:
04-0626 Additions and Alterations 0-009-014 04/07/05 DONE DONE DONE 01/06/05 12/13/04 11/05/03 05/04/04 02 - 16 7,019,754 6,739,437 HCM 0 0 0
Clark Patterson Associates
03-1447 Reconstruction 0-009-015 06/01/04 DONE DONE DONE 04/22/04 04/22/04 03/29/04 05/04/04 2,7 709,200 709,200 HCM 0 0 0
Clark Patterson Associates
- Reconstruction 0-009-016 / / / / 01/31/08 / / 16 0 0 HCM 0 0 0
Franklin Ave. Elementary:
04-0627 Additions and Alterations 0-010-007 04/07/05 DONE DONE DONE 01/06/05 12/13/04 11/05/03 05/04/04 02 - 16 1,949,747 1,949,747 HCM 0 0 0
Clark Patterson Associates
- Reconstruction 0-010-008 / / / / 05/29/08 / / 4,8,9,10,15 0 0 HCM 0 0 0
Middle School:
04-0628 Additions and Alterations 0-011-012 04/07/05 DONE DONE DONE 01/06/05 12/13/04 11/05/03 05/04/04 02 - 16 3,686,400 3,686,400 HCM 0 0 0
Clark Patterson Associates
- Reconstruction 0-011-013 / / / / 01/31/08 / / 16 0 0 HCM 0 0 0
- Reconstruction 0-011-014 / / / / 05/29/08 / / 7 0 0 HCM 0 0 0
William St. Bldg. (Admin.):
04-0623 Additions and Alterations 1-001-005 04/07/05 DONE DONE DONE 12/13/04 12/13/04 11/05/03 05/04/04 02 - 16 189,619 0 HCM 0 0 0
Clark Patterson Associates
New Storage Shed:
- New Construction 2-016-001 / / / / 02/18/05 / / 02 - 16 0 0 HCM 0 0 0
Nauraushaun Building:
04-0629 Additions and Alterations 3-004-008 04/07/05 DONE DONE DONE 01/06/05 12/13/04 11/05/03 05/04/04 02 - 16 491,389 0 HCM 0 0 0
Clark Patterson Associates
District Wide:
- Reconstruction 7-999-002 / / / / 11/24/03 / / 16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Suffern Middle School:
02-2242 Reconstruction 0-002-017 10/06/03 DONE DONE DONE 05/19/03 05/02/03 12/04/02 05/16/00 8,16 42,614 42,614 RDR 0 0 0
Clark Patterson Associates
03-1031 Reconstruction 0-002-018 05/20/04 DONE DONE DONE 01/23/04 01/14/04 08/29/03 05/16/00 2,4,8,9,10,155,15,16 600,000 600,000 RDR 0 0 0
Clark Patterson Associates
04-0462 Additions and Alterations 0-002-019 05/19/05 DONE DONE DONE 12/01/04 11/30/04 09/18/03 03/03/03 02 - 16 5,864,569 5,864,569 RDR 0 0 0
Clark Patterson Associates
05-0353 Reconstruction 0-002-020 03/30/06 DONE DONE DONE 11/17/05 11/16/05 06/29/05 05/11/05 2,4,8,9,155,16 109,768 109,768 HCM 0 0 0
Clark Patterson Associates
07-0156 Reconstruction 0-002-021 09/05/07 DONE DONE DONE 08/14/07 08/14/07 05/24/07 07/31/07 2,4,8,9,155,16 175,000 175,000 MGL 0 0 0
Clark Patterson Associates
07-1441 Reconstruction 0-002-022 DONE DONE ADD. REQ'D01/26/08 01/22/08 06/19/07 05/15/07 10,16 0 19,636,632 MGL 0 0 0
Clark Patterson Associates
- Reconstruction 0-002-023 / / / / 06/11/08 / / 2,8,10,16 0 0 HCM 0 0 0
RP Connor Elementary School:
02-2243 Reconstruction 0-005-013 10/06/03 DONE DONE DONE 05/19/03 05/02/03 12/04/02 05/16/00 8,16 27,495 27,495 RDR 0 0 0
Clark Patterson Associates
04-0463 Reconstruction 0-005-014 05/19/05 DONE DONE DONE 12/01/04 11/30/04 09/18/03 03/03/03 2,4,7,8,9,155,15,16 1,337,593 1,337,593 RDR 0 0 0
Clark Patterson Associates
07-1442 Reconstruction 0-005-015 DONE DONE ADD. REQ'D01/26/08 01/22/08 06/19/07 05/15/07 155,16 0 8,316,000 MGL 0 0 0
Clark Patterson Associates
- Reconstruction 0-005-016 / / / / 06/11/08 / / 7 0 0 HCM 0 0 0
Sloatsburg Elementary:
02-2244 Reconstruction 0-007-013 10/06/03 DONE DONE DONE 05/19/03 05/02/03 12/04/02 05/16/00 8,16 27,495 27,495 RDR 0 0 0
Clark Patterson Associates
04-0464 Reconstruction 0-007-014 05/19/05 DONE DONE DONE 12/01/04 11/30/04 09/18/03 03/03/03 2,4,7,155,15,16 1,064,906 1,064,906 RDR 0 0 0
Clark Patterson Associates
07-1443 Reconstruction 0-007-015 DONE DONE ADD. REQ'D01/26/08 01/22/08 06/19/07 05/15/07 155,16 0 6,776,000 MGL 0 0 0
Clark Patterson Associates
- Reconstruction 0-007-016 / / / / 06/11/08 / / 7 0 0 HCM 0 0 0
Cherry Lane Elementary:
02-2245 Reconstruction 0-011-014 10/06/03 DONE DONE DONE 05/19/03 05/02/03 12/04/02 05/16/00 8,16 27,495 27,495 RDR 0 0 0
Clark Patterson Associates
04-0465 Reconstruction 0-011-015 05/19/05 DONE DONE DONE 12/01/04 11/30/04 09/18/03 03/03/03 2,4,7,8,9,155,15,16 1,115,536 1,115,536 RDR 0 0 0
Clark Patterson Associates
07-1444 Reconstruction 0-011-016 DONE DONE ADD. REQ'D01/26/08 01/22/08 06/19/07 05/15/07 155,16 0 6,237,000 MGL 0 0 0
Clark Patterson Associates
- Reconstruction 0-011-017 / / / / 06/11/08 / / 2,4,8,9,10,155,15,16 0 0 HCM 0 0 0
Montebello Elementary:
02-2246 Reconstruction 0-019-011 10/06/03 DONE DONE DONE 05/19/03 05/02/03 12/04/02 05/16/00 8,16 27,495 27,495 RDR 0 0 0
Clark Patterson Associates
04-0466 Reconstruction 0-019-012 05/19/05 DONE DONE DONE 12/01/04 11/30/04 09/18/03 03/03/03 2,4,7,9,155,15,16 1,386,501 1,386,501 RDR 0 0 0
Clark Patterson Associates
- Reconstruction 0-019-013 / / / / 06/19/07 / / 16 0 0 MGL 0 0 0
Suffern High School:
03-0211 Reconstruction 0-020-022 02/18/04 DONE DONE DONE 08/20/03 08/13/03 12/04/02 05/16/00 2,8,9,10,16 268,345 246,346 RDR 7,912 3,525 0
Clark Patterson Associates
04-0467 Additions and Alterations 0-020-023 05/19/05 DONE DONE DONE 12/01/04 11/30/04 09/18/03 03/03/03 02 - 16 5,937,521 5,521,894 RDR 0 0 0
Clark Patterson Associates
05-0354 Reconstruction 0-020-024 03/30/06 DONE DONE DONE 11/17/05 11/16/05 06/29/05 05/11/05 2,8,9,10,155,15,16 185,212 185,212 HCM 0 0 0
Clark Patterson Associates
06-0434 Reconstruction 0-020-025 03/26/07 DONE DONE DONE 11/06/06 11/03/06 07/25/06 05/11/05 2,8,9,10,155,15,16 300,000 300,000 HCM 0 0 0
Clark Patterson Associates
07-1445 Reconstruction 0-020-026 DONE DONE ADD. REQ'D01/26/08 01/22/08 06/19/07 05/15/07 10,16 0 52,082,670 MGL 0 0 0
Clark Patterson Associates
- Reconstruction 0-020-027 / / / / 06/11/08 / / 10 0 0 HCM 0 0 0
Viola Elementary:
02-2247 Reconstruction 0-026-011 10/06/03 DONE DONE DONE 05/19/03 05/02/03 12/04/02 05/16/00 8,16 27,495 27,495 RDR 0 0 0
Clark Patterson Associates
04-0468 Reconstruction 0-026-012 05/19/05 DONE DONE DONE 12/01/04 11/30/04 09/18/03 03/03/03 2,4,8,9,155,15,16 832,378 832,378 RDR 0 0 0
Clark Patterson Associates
- Reconstruction 0-026-013 STARTED / / / / / / / / 2,15 0 7,583,146 MGL 0 0 0
07-1446 Reconstruction 0-026-014 DONE DONE ADD. REQ'D01/26/08 01/22/08 06/19/07 05/15/07 155,16 0 7,766,000 MGL 0 0 0
Clark Patterson Associates
Hillburn Administration Building:
- Reconstruction 1-006-007 / / / / 10/03/07 / / 16 0 0 MGL 0 0 0
Salt Storage Shed:
- New Construction 2-035-001 / / / / 06/13/08 / / 02 - 16 0 0 HCM 0 0 0
Guard House @ High School:
03-1032DB Discovered Building 7-031-001 06/30/04 DONE DONE DONE 01/23/04 01/22/04 02/22/02 / / 0 0 RDR 0 0 0
Clark Patterson Associates
Comfort Station:
06-1248 New Construction 7-032-001 07/20/07 DONE DONE DONE 04/02/07 03/22/07 12/21/04 03/03/03 02 - 16 341,940 0 MGL 0 0 0
Clark Patterson Associates
Electric Building:
07-0146DB Discovered Building 7-033-001 07/08/08 DONE DONE DONE 08/08/07 08/07/07 04/05/07 / / 0 0 MGL 0 0 0
Press Box:
- New Construction 7-034-001 / / / / 06/13/08 / / 02 - 16 0