RENSSELAER COUNTY

AVERILL PARK 491301
BERLIN 490101
BRUNSWICK COMM 490201
BRUNSWICK CENT 490202
EAST GREENBUSH 490301
HOOSICK FALLS 490501
HOOSIC VALLEY 491401
LANSINGBURGH 490601
NO GREENBUSH C 490801
RENSSELAER 491200
RENSSELAER-COL 499000
SCHODACK 491501
TROY 491700
WYNANTSKILL 490804
















Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 07/03/08 at 10:44:16




BERLIN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-01-01-04
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Stephentown Elementary:
02-2250   Reconstruction               0-005-004  04/15/04     DONE    DONE       DONE      05/19/03   05/01/03   02/28/03   09/17/02   155,15,16                144,479       144,479  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -       Reconstruction               0-005-005                                              /  /       /  /     12/29/04     /  /     2,4,7,8,9,155,15,16            0     2,030,049  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Berlin Elementary-Main Bldg.:
02-2251   Reconstruction               0-007-007  04/15/04     DONE    DONE       DONE      05/19/03   05/01/03   02/28/03   09/17/02   155,15,16                364,513       364,513  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -    PR Additions and Alterations    0-007-008                                              /  /       /  /     12/29/04     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Grafton Elementary:
02-2252   Reconstruction               0-008-003  04/15/04     DONE    DONE       DONE      05/19/03   05/01/03   02/28/03   09/17/02   155,15,16                217,731       217,731  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -       Reconstruction               0-008-004                                              /  /       /  /     12/29/04     /  /     2,4,7,8,9,155,15,16            0     2,610,063  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Cherry Plain Jr/Sr High:
02-2253   Reconstruction               0-009-004  04/15/04     DONE    DONE       DONE      05/19/03   05/01/03   02/28/03   09/17/02   155,15,16                382,629       382,629  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -       Reconstruction               0-009-005                                              /  /       /  /     12/29/04     /  /     2,4,7,8,9,155,15,16            0    12,317,415  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
02-2254   Reconstruction               5-001-004  04/15/04     DONE    DONE       DONE      05/19/03   05/01/03   03/27/03   09/17/02   155,15,16                 78,507        78,507  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -       Additions and Alterations    5-001-005                                              /  /       /  /     12/29/04     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BRUNSWICK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-02-02-04
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Tamarac MS/HS High School:
06-0831   Reconstruction               0-003-020  05/29/07     DONE    DONE       DONE      01/30/07   01/25/07   03/30/06   08/22/06   2,4,7,8,9,10,155,15,   5,421,792     4,469,000  HCM             0           0      301,373
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Parker Elementary School:
05-1012XX Reconstruction               0-006-009  08/14/06               CANCELLED          03/23/06   03/22/06   03/02/06   05/16/06   16                        68,300        68,300  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
06-0832   Reconstruction               0-006-010  05/29/07     DONE    DONE       DONE      01/30/07   01/25/07   06/08/06   08/22/06   2,4,7,8,9,155,15,16    1,768,710     1,686,643  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Tamarac Elementary:
06-0833   Reconstruction               0-009-015  05/29/07     DONE    DONE       DONE      01/30/07   01/25/07   03/30/06   08/22/06   2,4,7,8,9,10,155,15,   1,896,758     2,319,000  HCM             0           0      141,823
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Storage Facility:
04-0247   Reconstruction               2-004-003  09/28/04     DONE    DONE       DONE      09/28/04   09/28/04   08/11/04   08/24/04   13,15                    342,704             0  HCM             0           0            0
                                                                                                                                                                                                                                 C.T. Male Associates, P.C.          

          Field Storage Building:
  -    PR New Construction             2-014-001                                              /  /       /  /     11/06/06     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-0834   New Construction             2-014-001  05/29/07     DONE    DONE       DONE      01/30/07   01/25/07   11/06/06   08/22/06   02 - 16                   84,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Bus Garage:
06-0835   Reconstruction               5-005-005  05/29/07     DONE    DONE       DONE      01/30/07   01/25/07   03/30/06   08/22/06   2,4,7,8,9,155,15,16      928,740     1,166,000  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




EAST GREENBUSH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-03-01-06
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Goff Middle School:
04-1381   Reconstruction               0-001-009  10/07/05     DONE    DONE       DONE      06/08/05   06/06/05   03/23/05   04/04/00   10                        35,696        35,696  HCM             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 
07-1924   Reconstruction               0-001-010                         UNREVIEWED         04/04/08   03/28/08   08/04/06   02/24/07   2,4,8,9,10,155,15,16           0    17,671,616  HCM             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 
02-1443FP Reconstruction               0-001-FP1  08/12/03     DONE    DONE       DONE      02/24/03     /  /       /  /       /  /     16                         3,600         3,600  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Green Meadow School:
04-1382   Reconstruction               0-002-012  10/07/05     DONE    DONE       DONE      06/08/05   06/06/05   03/23/05   04/04/00   8,10                      27,324        27,324  HCM             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 
07-1919   Reconstruction               0-002-013                         UNREVIEWED         04/04/08   03/28/08   08/04/06   02/24/07   2,7,8,10,15,16                 0     6,090,147  HCM             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 
07-0971   Reconstruction               0-002-014  04/11/08     DONE    DONE       DONE      11/28/07   11/27/07   10/01/07   03/20/07   10                        41,041        41,041  HCM             0           0        8,306
                                                                                                                                                                                                                                 Envision Architects                 

          Citizen Genet School:
04-1383   Reconstruction               0-003-010  10/07/05     DONE    DONE       DONE      06/08/05   06/06/05   03/23/05   04/04/00   10,13                     87,321        87,321  HCM             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 
07-1920   Reconstruction               0-003-011                         UNREVIEWED         04/04/08   03/28/08   08/04/06   02/24/07   2,4,7,8,9,10,155,15,           0     6,501,000  HCM             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 

          Sutherland School:
04-1384   Reconstruction               0-006-009  10/07/05     DONE    DONE       DONE      06/08/05   06/06/05   03/23/05   04/04/00   10,13                    100,839       100,839  HCM             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 
  -       Reconstruction               0-006-010                                              /  /       /  /     08/23/05     /  /     4                              0     4,328,623  HCM             0           0            0
                                                                                                                                                                                                                                                                     
07-1925   Reconstruction               0-006-011                         UNREVIEWED         04/04/08   03/28/08   08/04/06   02/24/07   2,4,8,9,10,15,16               0     4,328,623  HCM             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 

          Red Mill School:
04-1385   Reconstruction               0-007-008  10/07/05     DONE    DONE       DONE      06/08/05   06/06/05   03/23/05   04/04/00   10                        17,058        17,058  HCM             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 
07-1926   Reconstruction               0-007-009                         UNREVIEWED         04/04/08   03/28/08   08/04/06   02/24/07   2,8,10,15,16                   0     6,670,161  HCM             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 

          Bell Top School:
04-1386   Reconstruction               0-008-008  10/07/05     DONE    DONE       DONE      06/08/05   06/06/05   03/23/05   04/04/00   10                        26,694        26,694  HCM             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 
07-1927   Reconstruction               0-008-009                         UNREVIEWED         04/04/08   03/28/08   08/04/06   02/24/07   2,8,9,10,15,16                 0     4,060,098  HCM             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 

          Columbia High School:
07-0154   Reconstruction               0-009-006  10/31/07     DONE    DONE       DONE      08/13/07   08/10/07   08/04/06   03/20/07   2,10,15                1,384,800             0  HCM             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 
07-1921   Reconstruction               0-009-007                         UNREVIEWED         04/04/08   03/28/08   07/03/07   02/24/07   4,9,10,155,16                  0             0  HCM             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 
02-1442FP Reconstruction               0-009-FP1  08/12/03     DONE    DONE       DONE      02/24/03     /  /       /  /       /  /     16                         8,900         8,900  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Storage/Shed #1 @ HS Athletic Field:
  -    DB Discovered Building          2-025-001                                              /  /       /  /     12/15/04     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Storage Shed #2 @ HS Athletic Field:
  -    DB Discovered Building          2-026-001                                              /  /       /  /     12/15/04     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Grounds Shop:
07-1928   Reconstruction               3-012-003                         UNREVIEWED         04/04/08   03/28/08   08/04/06   02/24/07   2,7,8,10,155,15,16             0             0  HCM             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 

          Bus Storage:
07-1922   Reconstruction               4-011-001                         UNREVIEWED         04/04/08   03/28/08   03/06/08   02/24/07   13                             0             0  HCM             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 

          Bus Garage:
07-1923   Reconstruction               5-010-006                         UNREVIEWED         04/04/08   03/28/08   08/04/06   02/24/07   2,10,13,15,16                  0             0  HCM             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 

          New Concession Stand @ High School:
03-1034   New Construction             7-021-001  03/03/05     DONE    DONE       DONE      01/26/04   01/23/04   11/19/02   04/04/00   02 - 16                   85,500             0  MAC             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 

          Grandstand/Press Box:
03-1035   New Construction             7-022-001  03/03/05     DONE    DONE       DONE      01/26/04   01/23/04   11/20/02   04/04/00   02 - 16                  266,000             0  MAC             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 

          Ticket Booth #1:
  -    DB Discovered Building          7-023-001                                              /  /       /  /     12/15/04     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Ticket Booth #2:
  -    DB Discovered Building          7-024-001                                              /  /       /  /     12/15/04     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HOOSICK FALLS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-05-01-06
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
06-0133   Reconstruction               0-001-011  09/06/06     DONE    DONE       DONE      07/31/06   07/27/06   05/22/06   06/20/06   155                      210,000       210,000  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
06-1678   Reconstruction               0-001-012  12/07/07     DONE    DONE       DONE      06/28/07   06/27/07   05/22/06   10/24/06   2,4,7,8,10,155,16      5,837,582             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
06-0798   Reconstruction               0-001-013  02/21/07     DONE    DONE       DONE      01/23/07   01/22/07   11/21/06   10/24/06   4,7                    1,622,450     1,622,450  JOD             0           0      282,307
                                                                                                                                                                                                                                 Clark Patterson Associates          

          :
  -    XX Additions and Alterations    0-010-012  02/25/05               CANCELLED          12/17/04   12/15/04   06/04/03   11/18/03   02 - 16                9,989,000     9,696,445  RDR             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.

          Storage/Concession Building:
06-1679   New Construction             7-005-001  12/07/07     DONE    DONE       DONE      06/28/07   06/27/07   01/23/07   10/24/06   02 - 16                  181,600             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LANSINGBUGH CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-06-01-06
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Lansingburgh Elementary:
05-1267   Reconstruction               0-003-003  08/26/06     DONE    DONE       DONE      05/19/06   05/17/06   07/01/05   12/06/05   9,155,15,16            1,162,300             0  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0366   Reconstruction               0-003-004  02/15/08     DONE    DONE       DONE      09/17/07   09/14/07   10/04/06   12/15/06   4,8,16                   152,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    

          Knickerbacker Middle School:
05-1268   Reconstruction               0-006-006  08/26/06     DONE    DONE       DONE      05/19/06   05/17/06   06/30/05   12/06/05   8,9,155,15,16            346,916       915,871  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0367   Reconstruction               0-006-007  02/15/08     DONE    DONE       DONE      09/17/07   09/14/07   10/03/06   12/15/06   4,7,16                 3,897,495     3,897,495  HCM             0           0      474,600
                                                                                                                                                                                                                                 SEI Design Group                    
  -       Reconstruction               0-006-008                                              /  /       /  /     12/11/07     /  /     4,10,155,15,16                 0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-006-009                                              /  /       /  /     01/17/08     /  /     2,155,16                       0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Lansingburgh High School:
03-1001   Reconstruction               0-010-008  02/17/04     DONE    DONE       DONE      01/21/04   12/30/03     /  /     12/16/03   7                         19,800        19,800  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -    XX Reconstruction               0-010-009                         CANCELLED            /  /       /  /     01/29/04     /  /     4                              0    10,908,345  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -    XX Reconstruction               0-010-010                         CANCELLED            /  /       /  /     12/19/03     /  /     4                              0    10,908,345  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -    XX Reconstruction               0-010-011                         CANCELLED            /  /       /  /     12/19/03     /  /     7                              0    10,908,345  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -    PR Additions and Alterations    0-010-012                                              /  /       /  /     06/30/05     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
05-1269   Additions and Alterations    0-010-012  08/28/06     DONE    DONE       DONE      05/19/06   05/17/06   06/30/05   12/06/05   02 - 16                9,899,046     9,899,046  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0368   Reconstruction               0-010-013  02/15/08     DONE    DONE       DONE      09/17/07   09/14/07   10/03/06   12/15/06   2,4,7,8,16             2,411,961     2,411,961  HCM             0           0      305,100
                                                                                                                                                                                                                                 SEI Design Group                    
  -       Reconstruction               0-010-014                                              /  /       /  /     12/06/07     /  /     2,4,8,10,155,15,16             0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-010-015                                              /  /       /  /     01/17/08     /  /     2,9,155,15,16                  0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Rensselaer Park Elementary:
05-1270   Reconstruction               0-014-006  08/26/06     DONE    DONE       DONE      05/19/06   05/17/06   07/01/05   12/06/05   2,8,9,155,15,16          365,738     1,024,260  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0369   Reconstruction               0-014-007  02/15/08     DONE    DONE       DONE      09/17/07   09/14/07   10/04/06   12/15/06   4,7,8,155,16           1,525,534     1,525,534  HCM             0           0      169,500
                                                                                                                                                                                                                                 SEI Design Group                    
  -       Reconstruction               0-014-008                                              /  /       /  /     03/12/08     /  /     2,4,10,155,15,16               0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Turnpike Elem School:
05-1271   Reconstruction               0-015-006  08/26/06     DONE    DONE       DONE      05/19/06   05/17/06   07/01/05   12/06/05   2,8,9,155,15,16          363,300     1,012,394  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -       Reconstruction               0-015-007                                              /  /       /  /     10/04/06     /  /     4,8,16                         0     6,090,147  HCM             0           0            0
                                                                                                                                                                                                                                                                     
07-0370   Reconstruction               0-015-008  02/15/08     DONE    DONE       DONE      09/17/07   09/14/07   10/04/06   12/15/06   4,7,8,155,16           1,626,234     1,626,234  HCM             0           0      180,800
                                                                                                                                                                                                                                 SEI Design Group                    
  -       Reconstruction               0-015-009                                              /  /       /  /     12/11/07     /  /     2,8,10,15,16                   0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Strg.Bldg. @ Rensselaer Park ES:
07-0371   New Construction             2-018-001  02/15/08     DONE    DONE       DONE      09/17/07   09/14/07   07/25/07   12/15/06   02 - 16                   18,388             0  HCM             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    

          Storage Building at Turnpike Element:
07-0372   New Construction             2-019-001  02/15/08     DONE    DONE       DONE      09/17/07   09/14/07   08/01/07   12/15/06   02 - 16                   18,388             0  DDJ             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    

          Press Box/Bleachers:
02-1700   New Construction             7-017-001  07/08/03     DONE    DONE       DONE      03/14/03   02/14/03   03/07/02   12/12/01   02 - 16                   30,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NORTH GREENBUSH COMMON SCHOOL STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-08-01-08
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Garnder Dickinson School:
05-0340TQ Temporary Quarters           8-006-001  05/10/06     DONE    DONE       DONE      11/14/05   11/08/05   11/08/05     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WYNANTSKILL UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-08-04-02
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Avenue School:
  -       Reconstruction               0-001-003                                              /  /       /  /     03/06/07     /  /     2,4,7,8,9,10,155,15,           0     2,148,200  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Gardner Dickinson:
05-0718   Reconstruction               0-004-006  01/17/06     DONE    DONE       DONE      02/13/06   01/17/06   01/12/06   01/04/06   15,16                     31,500        31,500  RDR             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
07-0564   Reconstruction               0-004-007  03/17/08     DONE    DONE       DONE      10/16/07   10/16/07   07/17/07   05/15/07   2,4,7,8,9,10,155,15,   6,300,000     6,300,000  MGL             0           0      127,543
                                                                                                                                                                                                                                 Collins & Scoville Architects       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




RENSSELAER CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-12-00-01
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Van Rensselaer Elementary:
03-0369SC Visual Structural Inspection 0-003-SC1  10/02/03     DONE    DONE       DONE      08/28/03     /  /       /  /       /  /     16                         3,930         3,930  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          New Pre-K-12 Building:
  -    PR New Construction             0-013-001                                              /  /       /  /     08/26/04     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
05-0964   New Construction             0-013-001  03/31/06     DONE    DONE       DONE      03/14/06   03/13/06   08/26/04   11/01/05   02 - 16               66,643,778    37,250,739  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -       Reconstruction               0-013-002                                              /  /       /  /     10/17/07     /  /     8                              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          MAINTENANCE/GROUNDS:
07-1143   New Construction             3-015-001  03/31/06     DONE    DONE       DONE      12/17/07   12/05/07   02/22/06   10/31/07   02 - 16                  212,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          PRESS BOX (NEW):
07-1144   New Construction             7-014-001  03/31/00     DONE    DONE       DONE      12/17/07   12/05/07   02/22/06   10/31/07   02 - 16                   21,200             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




AVERILL PARK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-13-02-06
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          High School:
04-1494   Reconstruction               0-001-006  07/15/05     DONE    DONE       DONE      06/30/05   06/30/05   05/20/05   10/30/01   2,9,10,155,16            274,618       275,500  HCM             0           0            0
                                                                                                                                                                                                                                                                     
07-0416   Additions and Alterations    0-001-007  02/27/08     DONE    DONE       DONE      09/25/07   09/24/07   03/01/07   02/27/07   02 - 16                6,439,838     6,302,376  HCM             0           0      321,992
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Sand Lake Elementary:
07-0417   Reconstruction               0-002-004  02/27/08     DONE    DONE       DONE      09/25/07   09/24/07   03/01/07   02/27/07   2,4,8,14,15              163,481             0  HCM             0           0        8,174
                                                                                                                                                                                                                                 Collins & Scoville Architects       
07-1629SC Visual Structural Inspection 0-002-SC1  02/19/08     DONE    DONE       DONE      02/01/08   02/01/08     /  /       /  /     16                           417             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Poestenkill Elementary:
07-0418   Reconstruction               0-004-004  02/27/08     DONE    DONE       DONE      09/25/07   09/24/07   03/01/07   02/27/07   8,9,155,16               791,384             0  HCM             0           0       39,569
                                                                                                                                                                                                                                 Collins & Scoville Architects       
07-1630SC Visual Structural Inspection 0-004-SC1  02/19/08     DONE    DONE       DONE      02/01/08   02/01/08     /  /       /  /     16                        18,781             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          West Sand Lake Elementary:
07-0419   Reconstruction               0-006-007  02/27/08     DONE    DONE       DONE      09/25/07   09/24/07   03/01/07   02/27/07   8,9,155,15,16          1,338,233             0  HCM             0           0       66,912
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Algonquin Middle:
06-1281   Reconstruction               0-009-006  05/15/07     DONE    DONE       DONE      04/05/07   04/04/07   05/20/05   02/27/07   2,7                    1,719,300             0  HCM             0           0       85,965
                                                                                                                                                                                                                                 Collins & Scoville Architects       
07-0420   Reconstruction               0-009-007  02/27/08     DONE    DONE       DONE      09/25/07   09/24/07   03/01/07   02/27/07   2,9,155,15,16          2,189,963             0  HCM             0           0      109,498
                                                                                                                                                                                                                                 Collins & Scoville Architects       
  -       Reconstruction               0-009-008                                              /  /       /  /     03/01/07     /  /     7,155,15,16                    0    17,470,637  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Miller Hill Elementary:
07-0421   Reconstruction               0-010-004  02/27/08     DONE    DONE       DONE      09/25/07   09/24/07   03/01/07   02/27/07   2,9,15                   156,346             0  HCM             0           0        7,817
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          George Washington School:
07-0422   Reconstruction               0-017-005  02/27/08     DONE    DONE       DONE      09/25/07   09/24/07   03/01/07   02/27/07   2,9,155,16               301,455             0  HCM             0           0       15,073
                                                                                                                                                                                                                                 Collins & Scoville Architects       
07-1628SC Visual Structural Inspection 0-017-SC1  02/19/08     DONE    DONE       DONE      02/01/08   02/01/08     /  /       /  /     16                           775             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          New Bus Garage:
07-1631SC Visual Structural Inspection 5-016-SC1  02/19/08     DONE    DONE       DONE      02/01/08   02/01/08     /  /       /  /     16                         5,950             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HOOSIC VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-14-01-04
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Elementary School:
07-0473   Additions and Alterations    0-001-007  02/21/08     DONE    DONE       DONE      10/01/07   10/01/07   08/23/05   12/14/06   02 - 16                2,131,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
06-0559   Reconstruction               0-001-008  12/18/06     DONE    DONE       DONE      11/29/06   11/28/06   11/16/06   11/06/06   8,16                      19,500        19,500  JOD             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
06-0927   Reconstruction               0-001-009  06/21/07     DONE    DONE       DONE      02/09/07   02/08/07   11/22/06   11/06/06   2,4,8,10,16               93,876        93,876  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          High School:
04-1211   Reconstruction               0-002-010  05/16/05     DONE    DONE       DONE      04/28/05   04/27/05   03/24/05   03/07/05   2,4,7                    215,401       215,401  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-002-011                                              /  /       /  /     05/20/05     /  /     9,10,16                        0    12,620,076  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-002-012                                              /  /       /  /     06/08/05     /  /     16                             0    12,620,076  HCM             0           0            0
                                                                                                                                                                                                                                                                     
07-0474   Additions and Alterations    0-002-013  02/21/08     DONE    DONE       DONE      10/01/07   10/01/07   08/23/05   12/14/06   02 - 16               14,163,000             0  HCM             0           0      404,100
                                                                                                                                                                                                                                 Collins & Scoville Architects       
05-0703   Reconstruction               0-002-014  03/30/06     DONE    DONE       DONE      02/10/06   02/01/06   09/20/05   12/19/05   2,7,155,15,16            140,654       140,654  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
06-0928   Reconstruction               0-002-015  06/21/07     DONE    DONE       DONE      02/09/07   02/08/07   11/22/06   11/06/06   9                         56,124        56,124  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
06-1348SC Visual Structural Inspection 0-002-SC2  05/22/07     DONE    DONE       DONE      04/19/07   04/19/07     /  /       /  /     16                         9,874             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Equipment Storage Trailer:
  -    DB Discovered Building          2-011-001                                              /  /       /  /     09/24/03     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          New Transportation Facility:
05-0704   Reconstruction               5-009-002  03/30/06     DONE    DONE       DONE      02/10/06   02/01/06   01/09/06   12/19/05   16                        10,204        10,204  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Press Box:
  -       New Construction             7-012-001                                              /  /       /  /     11/16/07     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SCHODACK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-15-01-04
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Castleton Elementary:
04-1287XX Reconstruction               0-001-013  07/26/05               CANCELLED          05/19/05   05/18/05   11/07/01   05/18/04   10,16                     79,060        79,060  DDJ             0           0            0
                                                                                                                                                                                                                                 Stieglitz Snyder Architecture       
06-1535   New Construction             0-001-014  06/26/07     DONE    DONE       DONE      05/24/07   05/21/07   06/30/05   10/26/06   02 - 16               11,623,318    10,720,827  DDJ             0           0      385,513
                                                                                                                                                                                                                                 Stieglitz Snyder Architecture       

          Maple Hill High School:
05-0231   Reconstruction               0-002-016  12/12/05     DONE    DONE       DONE      10/05/05   09/30/05   09/30/04   06/16/05   2                         56,093        56,093  DDJ             0           0            0
                                                                                                                                                                                                                                 Stieglitz Snyder Architecture       
07-0661   Reconstruction               0-002-017  12/20/07     DONE    DONE       DONE      10/29/07   10/25/07   06/22/05   10/26/06   2,4,7,8,9,155,15,16    1,602,330     1,602,330  DDJ             0           0            0
                                                                                                                                                                                                                                 Stieglitz Snyder Architecture       

          Middle School:
06-0874SR Reconstruction               0-004-010  04/18/07     DONE    DONE       DONE      02/05/07   02/01/07   06/30/05   10/26/06   2,4,7,8,9,155,15,16      106,057       106,057  DDJ             0           0            0
                                                                                                                                                                                                                                 Stieglitz Snyder Architecture       
07-0662   Reconstruction               0-004-010  12/20/07     DONE    DONE       DONE      10/29/07   10/25/07   06/30/05   10/26/06   2,4,7,8,9,155,15,16    2,357,737     2,357,737  DDJ             0           0            0
                                                                                                                                                                                                                                 Stieglitz Snyder Architecture       

          CES Modular Village-Bldg. #1:
06-0875   New Construction             0-011-001  04/18/07     DONE    DONE       DONE      02/05/07   02/01/07   01/02/07   10/26/06   02 - 16                1,232,660             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Stieglitz Snyder Architecture       

          CES Modular Village:
  -    PR New Construction             0-012-001                                              /  /       /  /     01/02/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          CES Modular-Bldg. #3:
  -    PR New Construction             0-013-001                                              /  /       /  /     01/02/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
07-0663   Reconstruction               5-005-007  12/20/07     DONE    DONE       DONE      10/29/07   10/25/07   06/30/05   10/26/06   2,13,15                  762,161       762,161  DDJ             0           0            0
                                                                                                                                                                                                                                 Stieglitz Snyder Architecture       

          District Wide:
05-0232   Reconstruction               7-999-002  05/15/06     DONE    DONE       DONE      10/05/05   09/30/05   06/30/05   06/16/05   16                        62,845        62,845  DDJ             0           0            0
                                                                                                                                                                                                                                 Stieglitz Snyder Architecture       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




TROY CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-17-00-01
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          School #1:
07-2107   Reconstruction               0-001-005                         UNREVIEWED         05/16/08   05/08/08   11/09/07   05/16/00   2,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Public School #2:
07-2108   Reconstruction               0-002-007                         UNREVIEWED         05/16/08   05/08/08   11/09/07   05/16/00   2,7,8,9,15,16                  0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Public School #12:
05-1009   Reconstruction               0-005-009  05/12/06     DONE    DONE       DONE      03/23/06   03/21/06   02/09/06   05/16/00   7                        836,898       836,898  JOD             0           0            0
                                                                                                                                                                                                                                 Einhorn Yaffee Prescott P.C.        
07-2109   Reconstruction               0-005-010                         UNREVIEWED         05/16/08   05/08/08   11/09/07   05/16/00   16                             0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          School-14:
04-0860   Reconstruction               0-006-005  03/10/05     DONE    DONE       DONE      03/01/05   02/28/05   12/29/04   05/16/00   7,8,9                    697,748       697,748  JOD             0           0            0
                                                                                                                                                                                                                                 Einhorn Yaffee Prescott P.C.        
07-1691   Reconstruction               0-006-006  05/16/08     DONE    DONE       DONE      02/23/08   02/18/08   11/09/07   05/16/00   2,7,155,15,16            484,575             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-2110   Reconstruction               0-006-007                         UNREVIEWED         05/16/08   05/08/08   04/24/08   05/16/00   9,15,16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Public School #16:
07-2111   Reconstruction               0-008-009                         UNREVIEWED         05/16/08   05/08/08   11/09/07   05/16/00   2,7,9,155,15,16                0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          School #18:
05-1010   Reconstruction               0-010-009  05/12/06     DONE    DONE       DONE      03/23/06   03/21/06   08/17/04   05/16/00   13                       590,000       590,000  MAC             0           0            0
                                                                                                                                                                                                                                 Einhorn Yaffee Prescott P.C.        
07-2112   Reconstruction               0-010-010                         UNREVIEWED         05/16/08   05/08/08   11/09/07   05/16/00   2,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Troy High School:
04-0861   Reconstruction               0-011-017  03/10/05     DONE    DONE       DONE      03/01/05   02/28/05   12/22/04   05/16/00   7,155,15,16              527,797       527,797  JOD             0           0            0
                                                                                                                                                                                                                                 Einhorn Yaffee Prescott P.C.        
05-0557   Reconstruction               0-011-018  04/28/06     DONE    DONE       DONE      01/17/06   01/06/06   12/22/04   05/16/00   14                     4,497,165     4,127,500  JOD             0           0            0
                                                                                                                                                                                                                                 Einhorn Yaffee Prescott P.C.        
05-1011   Reconstruction               0-011-019  05/12/06     DONE    DONE       DONE      03/23/06   03/21/06   08/09/05   05/16/00   2,4,7,8,9                742,475       742,475  JOD             0           0            0
                                                                                                                                                                                                                                 Einhorn Yaffee Prescott P.C.        
  -    PR Additions and Alterations    0-011-020                                              /  /       /  /     11/15/06     /  /     02 - 16                        0    57,159,492  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0658   Additions and Alterations    0-011-020  03/19/07     DONE    DONE       DONE      12/22/06   12/21/06   11/15/06   05/16/00   02 - 16                9,284,114     9,284,114  JOD             0           0            0
                                                                                                                                                                                                                                 Einhorn Yaffee Prescott P.C.        
07-0601   Reconstruction               0-011-021  04/04/08     DONE    DONE       DONE      10/22/07   10/19/07   08/24/07     /  /     2,4,7,9,13,155,15,16     100,000       100,000  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-2113   Reconstruction               0-011-022                         UNREVIEWED         05/16/08   05/08/08   11/09/07   05/16/00   2,4,155,15,16                  0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          W. K. Doyle Middle School:
05-0348   Reconstruction               0-012-009  01/26/06     DONE    DONE       DONE      11/17/05   11/14/05   02/09/01   05/16/00   155                      672,550       633,000  BJB             0           0            0
                                                                                                                                                                                                                                 Einhorn Yaffee Prescott P.C.        
05-0780   Reconstruction               0-012-011  04/05/06     DONE    DONE       DONE      02/15/06   02/13/06   08/09/05   05/16/00   2,8,9,155,15,16        1,249,803     1,182,000  JOD             0           0            0
                                                                                                                                                                                                                                 Einhorn Yaffee Prescott P.C.        
07-1754   Reconstruction               0-012-012  06/03/08     DONE    DONE       DONE      03/06/08   02/29/08   11/09/07     /  /     2,15,16                  100,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-2114   Reconstruction               0-012-013                         UNREVIEWED         05/16/08   05/08/08   04/24/08   05/16/00   9,16                           0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
03-0188FP Reconstruction               0-012-FP1  10/14/03     DONE    DONE       DONE      08/15/03     /  /       /  /       /  /     16                         3,800         3,800  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Carroll Hill School:
07-2115   Reconstruction               0-016-007                         UNREVIEWED         05/16/08   05/08/08   11/09/07   05/16/00   2,4,8,9,16                     0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Maintenance Trailer/Office @ HS:
04-0109DB Discovered Building          1-019-001  11/01/05     DONE    DONE       DONE      08/10/04   08/09/04   06/18/04     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     

          Boiler Room Trailer/Office @ HS:
04-0110DB Discovered Building          1-020-001  11/01/05     DONE    DONE       DONE      08/10/04   08/09/04   06/18/04     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     

          Storage Shed @ Carroll Hill:
04-0111DB Discovered Building          2-021-001  11/01/05     DONE    DONE       DONE      08/10/04   08/09/04   06/18/04     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     

          Maintenance Storage Container @ HS:
04-0112DB Discovered Building          2-022-001  11/01/05     DONE    DONE       DONE      08/10/04   08/09/04   06/18/04     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     

          Athletic Storage Container @ HS:
04-0114DB Discovered Building          2-024-001  11/01/05     DONE    DONE       DONE      08/10/04   08/09/04   06/18/04     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     

          Athletic Container #2 @ HS:
04-0115DB Discovered Building          2-025-001  11/01/05     DONE    DONE       DONE      08/10/04   08/09/04   06/18/04     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     

          Food Service Storage Container @ HS:
04-0116DB Discovered Building          2-026-001  11/01/05     DONE    DONE       DONE      08/10/04   08/09/04   06/18/04     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     

          Maintenance Storage Container@ HS:
04-0369XX Reconstruction               2-027-001                         CANCELLED          11/05/04   11/05/04   11/05/04     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     

          Guard Shack:
04-0370DB Discovered Building          7-018-001  11/01/05     DONE    DONE       DONE      11/05/04   11/05/04   02/18/00     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES QUESTAR III STATUS REPORT ON CAPITAL PROJECTS
District No.: 49-90-00-00
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Columbia-Green VoTec Center:
05-1423   Reconstruction               0-021-002  07/13/06     DONE    DONE       DONE      06/29/06   06/28/06   06/30/06   05/11/06   7                        215,000       215,000  JOD             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
  -       Reconstruction               0-021-003                                              /  /       /  /     04/03/08     /  /     2,4,8                          0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Admin. Office - Empire State Blvd.:
03-0794TQ Temporary Quarters           1-063-001  08/09/05     DONE    DONE       DONE      12/09/03   11/26/03     /  /       /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     

          Storage Shed @ Sackets School:
  -    DB Discovered Building          2-073-001                                              /  /       /  /     03/30/05     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Columbia-Greene VO-TEC Ctr*see 0-021:
  -       Reconstruction               8-021-005                                              /  /       /  /     06/05/06     /  /     7                              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Tamarac ES 2 Rooms:
  -    TQ Temporary Quarters           8-069-001                                              /  /       /  /     11/13/03     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     

          Tamarac MS/HS 4 Rooms:
  -    TQ Temporary Quarters           8-070-001                                              /  /       /  /     11/13/03     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     

          Coxsackie-Athens MS/HS Classrooms:
  -    TQ Temporary Quarters           8-071-001                                              /  /       /  /     11/13/03     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     

          lease @ Gardiner in Wynantskill UFSD:
  -    TQ Temporary Quarters           8-072-001                                              /  /       /  /     09/16/04     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     

          Tech Valley Rgn 1 Tech Institute:
06-1565TQ Temporary Quarters           8-074-001  06/25/07     DONE    DONE       DONE      06/04/07   06/04/07   03/07/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED