REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Washingtonville 5/6 School:
04-0953XX Reconstruction 0-001-009 05/25/05 CANCELLED 03/10/05 03/08/05 05/25/99 11/13/03 2,8,9,155,15,16 3,800,000 3,800,000 JOD 0 0 0
Silverman & Cosentino, Assoc.
04-0346 Reconstruction 0-001-011 09/19/05 DONE DONE DONE 11/03/04 10/28/04 12/04/02 04/19/04 8,9,10,155,15,16 732,617 732,617 JOD 0 0 0
Silverman & Cosentino, Assoc.
05-1179 Reconstruction 0-001-012 11/06/06 DONE DONE DONE 04/21/06 04/19/06 06/17/05 05/17/05 2,9,10,13 565,520 565,520 JOD 0 0 0
Sammel Architecture
06-0439XX Reconstruction 0-001-013 02/07/07 CANCELLED 11/08/06 11/08/06 03/02/06 05/17/05 16 37,350 37,350 JOD 0 0 0
Sammel Architecture
06-1025 Reconstruction 0-001-014 06/19/07 DONE DONE DONE 03/05/07 02/27/07 04/06/06 05/16/06 2,4,8,9,10,155,15,16 2,611,873 2,761,873 JOD 0 0 626,978
Sammel Architecture
- Reconstruction 0-001-015 / / / / 01/31/08 / / 2,4,7,8,9,16 0 0 JOD 0 0 0
06-0420SC Visual Structural Inspection 0-001-SC1 11/06/06 DONE DONE DONE 10/04/06 10/04/06 / / / / 16 28,873 26,000 JOD 0 0 0
Taft Elementary School:
03-1042 Reconstruction 0-002-007 04/06/04 DONE DONE DONE 01/27/04 01/26/04 05/25/99 06/03/03 7 1,242,753 1,242,753 MAC 0 0 0
Silverman & Cosentino, Assoc.
04-0347 Reconstruction 0-002-008 09/19/05 DONE DONE DONE 11/03/04 10/28/04 12/04/02 04/19/04 8,9,10,155,15,16 490,239 490,239 JOD 0 0 0
Silverman & Cosentino, Assoc.
04-0204 Reconstruction 0-002-009 09/13/04 DONE DONE DONE 09/13/04 09/13/04 / / 08/19/04 7 415,809 415,809 MAC 0 0 0
Silverman & Cosentino, Assoc.
- Reconstruction 0-002-010 / / / / 07/11/05 / / 2,10 0 8,990,217 JOD 0 0 0
06-0440 Reconstruction 0-002-011 02/07/07 DONE DONE DONE 11/08/06 11/08/06 03/02/06 05/17/05 16 209,953 209,953 JOD 0 0 0
Sammel Architecture
06-1026 Reconstruction 0-002-012 06/19/07 DONE DONE DONE 03/05/07 02/27/07 04/06/06 05/16/06 2,9,155,15 1,669,445 1,669,445 JOD 0 0 431,473
Sammel Architecture
- Reconstruction 0-002-013 / / / / 01/31/08 / / 2,4,8,9,155,16 0 0 JOD 0 0 0
Little Britain Elementary:
03-1043 Reconstruction 0-004-009 04/06/04 DONE DONE DONE 01/27/04 01/26/04 05/25/99 06/03/03 7 909,985 909,985 MAC 0 0 0
Silverman & Cosentino, Assoc.
04-0348 Reconstruction 0-004-010 09/19/05 DONE DONE DONE 11/03/04 10/28/04 12/04/02 04/19/04 8,9,10,155,15,16 663,104 663,104 JOD 0 0 0
Silverman & Cosentino, Assoc.
- Reconstruction 0-004-011 / / / / 07/11/05 / / 2,10 0 6,917,204 JOD 0 0 0
06-0441 Reconstruction 0-004-012 02/07/07 DONE DONE DONE 11/08/06 11/08/06 03/02/06 05/17/05 16 353,348 336,248 JOD 0 0 0
Sammel Architecture
06-1027 Reconstruction 0-004-013 06/19/07 DONE DONE DONE 03/05/07 02/27/07 04/06/06 05/16/06 2,9,15 345,797 345,797 JOD 0 0 110,275
Sammel Architecture
- Reconstruction 0-004-014 / / / / 01/31/08 / / 2,4,8,9,10,155,15,16 0 0 JOD 0 0 0
Senior High School:
03-1069 Reconstruction 0-007-008 04/07/04 DONE DONE DONE 02/03/04 02/03/04 12/27/96 06/03/03 9,10,13 172,964 172,964 MAC 0 0 0
Silverman & Cosentino, Assoc.
04-0954 Additions and Alterations 0-007-011 05/25/05 DONE DONE DONE 03/10/05 03/08/05 05/25/99 11/13/03 02 - 16 9,000,000 9,000,000 JOD 0 0 0
Silverman & Cosentino, Assoc.
04-0349 Reconstruction 0-007-012 09/19/05 DONE DONE DONE 11/03/04 10/28/04 12/04/02 04/19/04 8,9,10,155,15,16 1,642,506 1,642,506 JOD 0 0 0
Silverman & Cosentino, Assoc.
05-0872 Reconstruction 0-007-013 04/20/06 DONE DONE DONE 03/07/06 03/07/06 07/11/05 05/17/05 2,7,10 2,592,520 2,592,520 JOD 0 0 0
Sammel Architecture
06-0442 Reconstruction 0-007-014 02/07/07 DONE DONE DONE 11/08/06 11/08/06 03/02/06 05/17/05 16 299,466 262,116 DDJ 0 0 0
Sammel Architecture
06-1028 Reconstruction 0-007-015 06/19/07 DONE DONE DONE 03/05/07 02/27/07 04/06/06 05/16/06 2,9,15,16 989,876 989,876 JOD 0 0 251,984
Sammel Architecture
07-1631 Reconstruction 0-007-016 03/07/08 DONE DONE DONE 02/19/08 02/13/08 01/18/08 05/15/07 4,8,9 100,000 0 JOD 0 0 0
Sammel Architecture
- Reconstruction 0-007-017 / / / / 01/31/08 / / 2,4,8,9,10,155,15,16 0 0 JOD 0 0 0
06-0419 Visual Structural Inspection 0-007-SC1 11/06/06 DONE DONE DONE 10/04/06 10/04/06 / / / / 16 37,757 34,000 JOD 0 0 0
Round Hill Elementary:
04-0350 Reconstruction 0-008-009 09/19/05 DONE DONE DONE 11/03/04 10/28/04 12/04/02 04/19/04 8,9,10,155,15,16 832,918 832,918 JOD 0 0 0
Silverman & Cosentino, Assoc.
05-0873 Reconstruction 0-008-010 04/20/06 DONE DONE DONE 03/07/06 03/07/06 07/11/05 05/17/05 2,7,10,16 1,227,872 1,411,852 JOD 0 0 0
Sammel Architecture
06-0443XX Reconstruction 0-008-011 02/07/07 CANCELLED 11/08/06 11/08/06 03/02/06 05/17/05 16 17,100 17,100 JOD 0 0 0
Sammel Architecture
06-1029 Reconstruction 0-008-012 06/19/07 DONE DONE DONE 03/05/07 02/27/07 / / 05/16/06 2,9,15,16 738,407 738,407 JOD 0 0 161,401
Sammel Architecture
- Reconstruction 0-008-013 / / / / 01/31/08 / / 2,4,8,9,10,155,15,16 0 0 JOD 0 0 0
07-2126 Reconstruction 0-008-014 ADDENDUM REQ'D 05/19/08 05/14/08 05/02/08 05/17/05 16 0 0 JOD 0 0 0
Sammel Architecture
New 7/8 School:
04-0955 New Construction 0-024-001 05/25/05 DONE DONE DONE 03/10/05 03/08/05 11/09/98 11/13/03 02 - 16 27,000,000 18,587,150 JOD 0 0 0
Silverman & Cosentino, Assoc.
Administration:
04-0351 Reconstruction 1-016-004 09/19/05 DONE DONE DONE 11/03/04 10/28/04 12/04/02 04/19/04 8,9,10,155,15,16 64,380 0 JOD 0 0 0
Silverman & Cosentino, Assoc.
- Reconstruction 1-016-005 / / / / 01/31/08 / / 2,7,8,9 0 0 JOD 0 0 0
22 Sarah Wells Trail:
02-2315 Reconstruction 1-021-001 02/27/06 DONE DONE DONE 05/27/03 / / 02/11/03 / / 0 0 MAC 0 0 0
- Reconstruction 1-021-002 / / / / / / / / 0 0 JOD 0 0 0
Bus Garage:
04-0352 Reconstruction 5-013-008 09/19/05 DONE DONE DONE 11/03/04 10/28/04 05/25/99 04/19/04 8,9,16 140,890 140,890 JOD 0 0 0
Silverman & Cosentino, Assoc.
06-1030 Reconstruction 5-013-009 06/19/07 DONE DONE DONE 03/05/07 02/27/07 12/04/02 05/16/06 2,4,8,9,155,15,16 253,843 229,240 MAC 0 0 0
Sammel Architecture
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Elementary School:
03-0812FP Reconstruction 0-001-FP1 12/10/03 / / / / / / 16 0 4,698,000 JOD 0 0 0
NEW CONSTRUCTION-NEW MIDDLE/HS:
03-0810FP Reconstruction 0-009-FP1 12/10/03 / / / / / / 16 0 0 JOD 0 0 0
06-0876SC Visual Structural Inspection 0-009-SC1 02/05/07 DONE DONE DONE 01/25/07 01/25/07 / / / / 16 62,466 62,466 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Cornwall M.S.(fmly HS):
- XX Additions and Alterations 0-001-018 CANCELLED / / / / 05/13/04 / / 02 - 16 0 0 MAC 0 0 0
- Reconstruction 0-001-019 / / / / 09/27/07 / / 13 0 0 HCM 0 0 0
07-2118 Reconstruction 0-001-020 UNREVIEWED 05/16/08 05/09/08 10/01/07 05/15/07 13,16 0 0 HCM 0 0 0
McGoey, Hauser and Edsall
08-0053 Additions and Alterations 0-001-021 UNREVIEWED 07/21/08 07/08/08 10/01/07 05/15/07 02 - 16 0 0 HCM 0 0 0
McGoey, Hauser and Edsall
Elementary School:
- Reconstruction 0-002-009 / / / / 10/13/04 / / 4,7,155 0 3,018,206 HCM 0 0 0
05-1218 Reconstruction 0-002-010 05/03/06 DONE DONE DONE 04/28/06 04/27/06 02/15/06 06/14/06 2,4,7 397,390 397,390 HCM 0 0 0
McGoey, Hauser and Edsall
06-0028 Reconstruction 0-002-011 07/26/06 DONE DONE DONE 07/10/06 07/10/06 06/08/06 06/21/06 13 395,500 395,500 HCM 0 0 0
McGoey, Hauser and Edsall
07-1593 Additions and Alterations 0-002-012 STARTED STARTED UNREVIEWED***SHPO RESPONSE*** 0 HCM 0 0 0
McGoey, Hauser and Edsall
Willow Ave. School:
07-0582 Reconstruction 0-004-010 01/21/08 DONE DONE DONE 10/18/07 10/17/07 01/30/07 05/15/07 7 171,600 0 HCM 0 0 0
McGoey, Hauser and Edsall
07-1598 Additions and Alterations 0-004-011 STARTED STARTED UNREVIEWED***SHPO RESPONSE*** 0 HCM 0 0 0
McGoey, Hauser and Edsall
07-1600 Additions and Alterations 0-004-012 05/28/08 DONE DONE DONE 02/12/08 02/07/08 12/26/07 05/15/07 02 - 16 50,000 0 HCM 0 0 0
McGoey, Hauser and Edsall
Cornwall Elementary:
07-1470 Reconstruction 0-006-011 03/03/08 DONE DONE DONE 01/26/08 01/24/08 01/30/07 05/15/07 7 750,000 0 HCM 0 0 0
McGoey, Hauser and Edsall
07-1599 Additions and Alterations 0-006-012 DONE STARTED UNREVIEWED02/12/08 02/07/08 09/27/07 05/15/07 02 - 16 0 0 HCM 0 0 0
McGoey, Hauser and Edsall
New High School:
- PR Additions and Alterations 0-012-002 / / / / 01/30/07 / / 02 - 16 0 0 HCM 0 0 0
- Reconstruction 0-012-003 / / / / 10/01/07 / / 0 0 HCM 0 0 0
Shipping Container Storage:
- New Construction 2-017-001 / / / / 01/17/08 / / 02 - 16 0 0 HCM 0 0 0
Press Box @ HS football field:
02-0244 New Construction 7-014-001 02/01/08 DONE DONE DONE 09/16/02 07/19/02 10/19/01 05/22/02 02 - 16 56,000 0 MAC 0 0 0
Pendergast & Terach, PC
Baseball Field Dugouts:
- New Construction 7-016-001 / / / / 12/22/04 / / 02 - 16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Crispell Middle Shop:
07-0565 Reconstruction 0-001-005 ADDENDUM REQ'D 10/17/07 10/15/07 06/25/07 06/12/07 16 0 0 HCM 0 0 0
ECG ENGINEERING,LLC
E.J. Russell School:
02-2260 Additions and Alterations 0-002-007 02/27/04 DONE DONE DONE 05/22/03 / / 09/08/00 03/28/02 02 - 16 8,463,934 7,909,849 RDR 0 0 0
07-0566 Reconstruction 0-002-008 DONE UNREVIEWED STARTED 10/17/07 10/15/07 06/25/07 06/12/07 16 0 0 HCM 0 0 0
ECG ENGINEERING,LLC
Music Room-crispell:
07-0165 Reconstruction 0-003-003 08/24/07 DONE DONE DONE 08/16/07 08/15/07 08/01/07 05/15/07 2 50,000 0 HCM 0 0 0
Collins & Scoville Architects
District Administration/Annex School:
- Reconstruction 0-004-002 / / / / 06/25/07 / / 15,16 0 0 HCM 0 0 0
Senior High School:
02-2262 Additions and Alterations 0-007-013 02/27/04 DONE DONE DONE 05/22/03 / / 09/08/00 03/28/02 02 - 16 3,125,802 3,125,802 RDR 0 0 0
Thomas Associates
04-0555 Additions and Alterations 0-007-014 01/31/05 DONE DONE DONE 12/15/04 12/03/04 10/14/04 03/28/02 02 - 16 3,096,998 0 HCM 0 0 0
Thomas Associates
05-1386 Reconstruction 0-007-015 07/13/06 DONE DONE DONE 06/20/06 06/19/06 03/22/06 03/28/02 7 207,000 207,000 HCM 0 0 0
Collins & Scoville Architects
07-0567 Reconstruction 0-007-016 DONE UNREVIEWED STARTED 10/17/07 10/15/07 06/25/07 06/12/07 15,16 0 0 HCM 0 0 0
ECG ENGINEERING,LLC
Circleville Primary:
02-2263 Reconstruction 0-009-006 02/27/04 DONE DONE DONE 05/22/03 / / 01/21/99 03/28/02 2,9 612,327 612,327 RDR 0 0 0
Thomas Associates
05-1387 Reconstruction 0-009-009 07/13/06 DONE DONE DONE 06/20/06 06/19/06 03/22/06 03/28/02 7 96,700 96,700 HCM 0 0 0
Collins & Scoville Architects
07-0568 Reconstruction 0-009-010 DONE UNREVIEWED STARTED 10/17/07 10/15/07 06/25/07 06/12/07 16 0 0 HCM 0 0 0
ECG ENGINEERING,LLC
Pakanasink Elementary:
02-2264 Additions and Alterations 0-012-008 02/27/04 DONE DONE DONE 05/22/03 / / 09/08/00 03/28/02 02 - 16 5,734,468 4,916,450 RDR 0 0 0
Thomas Associates
07-0569 Reconstruction 0-012-009 DONE UNREVIEWED STARTED 10/17/07 10/15/07 06/25/07 06/12/07 15,16 0 0 HCM 0 0 0
ECG ENGINEERING,LLC
- Reconstruction 0-012-010 / / / / 06/25/07 / / 16 0 0 HCM 0 0 0
Crispell Middle School:
02-2265 Additions and Alterations 0-013-002 02/27/04 DONE DONE DONE 05/22/03 / / 09/08/00 03/28/02 02 - 16 5,118,848 5,118,848 RDR 0 0 0
Thomas Associates
05-1388 Reconstruction 0-013-003 07/13/06 DONE DONE DONE 06/20/06 06/19/06 03/22/06 03/28/02 7 261,800 261,800 HCM 0 0 0
Collins & Scoville Architects
07-0570 Reconstruction 0-013-004 DONE UNREVIEWED STARTED 10/17/07 10/15/07 06/25/07 06/12/07 16 0 0 HCM 0 0 0
ECG ENGINEERING,LLC
- Reconstruction 0-013-005 / / / / 11/09/07 / / 10,155 0 0 HCM 0 0 0
Circleville Middle School:
02-2266 Additions and Alterations 0-014-006 02/27/04 DONE DONE DONE 05/22/03 12/10/02 09/08/00 03/28/02 02 - 16 2,250,846 1,798,084 RDR 0 0 0
Thomas Associates
07-0571 Reconstruction 0-014-007 DONE UNREVIEWED STARTED 10/17/07 10/15/07 06/25/07 06/12/07 16 0 0 HCM 0 0 0
ECG ENGINEERING,LLC
Pine Bush Elementary School:
05-1389 Reconstruction 0-015-008 07/13/06 DONE DONE DONE 06/20/06 06/19/06 03/22/06 03/28/02 7 690,000 690,000 HCM 0 0 0
Collins & Scoville Architects
- Reconstruction 0-015-009 / / / / 11/01/06 / / 2,4,7,10 0 13,871,889 HCM 0 0 0
07-0572 Reconstruction 0-015-010 DONE UNREVIEWED STARTED 10/17/07 10/15/07 06/26/07 06/12/07 16 0 0 HCM 0 0 0
ECG ENGINEERING,LLC
New Crispell Annex:
07-0164 New Construction 0-017-001 08/24/07 DONE DONE DONE 08/16/07 08/15/07 08/01/07 05/15/07 02 - 16 520,000 520,000 HCM 0 0 0
Collins & Scoville Architects
District Offices:
02-2261 Additions and Alterations 1-004-001 02/27/04 DONE DONE DONE 05/22/03 / / 01/23/01 03/28/02 02 - 16 0 0 RDR 0 0 0
Thomas Associates
07-0573 Reconstruction 1-004-002 DONE UNREVIEWED STARTED 10/17/07 10/15/07 07/27/07 06/12/07 15,16 0 0 HCM 0 0 0
ECG ENGINEERING,LLC
Special Programs Building:
07-1790TQ Temporary Quarters 1-018-001 03/25/08 DONE DONE DONE 03/15/08 03/14/08 03/14/08 / / 0 0 HCM 0 0 0
Collins & Scoville Architects
District Storage:
07-0574 Reconstruction 2-008-001 DONE UNREVIEWED STARTED 10/17/07 10/15/07 06/25/07 06/12/07 16 0 0 HCM 0 0 0
ECG ENGINEERING,LLC
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Charles J.Hooker Middle:
05-1007 Reconstruction 0-001-007 04/14/06 DONE DONE DONE 03/23/06 03/20/06 01/09/06 12/13/05 4,7,10,16 700,000 700,000 RDR 0 0 291,200
Kaeyer, Garment & Davidson
- PR Additions and Alterations 0-001-008 / / / / 07/16/07 / / 02 - 16 0 0 MGL 0 0 0
- Reconstruction 0-001-009 / / / / 04/22/08 / / 2,8,9,13 0 0 HCM 0 0 0
- Reconstruction 0-001-010 / / / / 04/23/08 / / 2,8,9,13 0 0 HCM 0 0 0
- Reconstruction 0-001-011 / / / / 05/01/08 / / 4,7,13 0 0 HCM 0 0 0
Main Street School:
- Reconstruction 0-002-006 / / / / 04/22/08 / / 2,7 0 0 HCM 0 0 0
- Reconstruction 0-002-007 / / / / 04/23/08 / / 2,7 0 0 HCM 0 0 0
Scotchtown Ave. School:
- PR Additions and Alterations 0-003-006 / / / / 07/16/07 / / 02 - 16 0 0 MGL 0 0 0
Intermediate School:
- Reconstruction 0-006-005 / / / / 07/16/07 / / 4,7,8,9,13,155,15,16 0 0 MGL 0 0 0
- Reconstruction 0-006-006 / / / / 04/22/08 / / 2,14,16 0 0 HCM 0 0 0
- Reconstruction 0-006-007 / / / / 04/23/08 / / 2,14,16 0 0 HCM 0 0 0
High School:
- PR Additions and Alterations 0-008-007 / / / / 07/16/07 / / 02 - 16 0 0 MGL 0 0 0
- Reconstruction 0-008-008 / / / / 04/22/08 / / 2,14,155,15,16 0 0 HCM 0 0 0
- Reconstruction 0-008-009 / / / / 04/23/08 / / 2,155,15,16 0 0 HCM 0 0 0
Bus Garage:
- Reconstruction 5-007-003 / / / / 04/22/08 / / 2,7 0 0 HCM 0 0 0
- Reconstruction 5-007-004 / / / / 04/23/08 / / 2,7 0 0 HCM 0 0 0
Main St. Panelfab:
05-1018 Reconstruction 7-009-001 04/14/06 DONE DONE DONE 03/24/06 03/10/06 10/19/05 12/13/05 2,10,15,16 69,772 0 RDR 0 0 0
Kaeyer, Garment & Davidson
District Wide:
06-0214 Reconstruction 7-999-002 11/09/06 DONE DONE DONE 09/12/06 08/17/06 01/09/06 07/10/06 16 491,100 491,100 MGL 0 0 215,014
Bridging The Gap
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School:
03-1546 Reconstruction 0-004-012 05/27/04 DONE DONE DONE 05/13/04 05/12/04 03/24/04 06/30/03 7,15 406,301 406,301 RDR 0 0 0
Ft. Montgomery Elementary:
04-1334 Reconstruction 0-005-005 06/21/05 DONE DONE DONE 05/25/05 05/24/05 01/18/05 05/18/04 2,15 556,000 556,000 JOD 0 0 0
Kaeyer, Garment & Davidson
Elementary School:
04-0059 Reconstruction 0-007-004 07/19/04 DONE DONE DONE 07/19/04 07/19/04 04/02/04 05/18/04 2 24,302 24,302 RDR 0 0 0
Kaeyer, Garment & Davidson
- Reconstruction 0-007-005 / / / / 10/23/07 / / 16 0 0 JOD 0 0 0
- Reconstruction 0-007-006 / / / / 10/26/07 / / 16 0 0 JOD 0 0 0
James O'Neill High School:
03-0265 Reconstruction 0-008-009 09/26/03 DONE DONE DONE 09/11/03 08/29/03 07/01/03 07/17/03 10 105,368 105,368 MGL 0 0 0
Kaeyer, Garment & Davidson
04-1305 Reconstruction 0-008-010 06/07/05 DONE DONE DONE 05/20/05 05/17/05 03/02/05 05/18/04 10 131,129 131,129 JOD 0 0 0
Kaeyer, Garment & Davidson
05-0203 Reconstruction 0-008-011 11/23/05 DONE DONE DONE 09/21/05 09/20/05 06/07/05 05/18/04 2,10,16 253,605 253,605 JOD 0 0 0
Kaeyer, Garment & Davidson
- Reconstruction 0-008-012 / / / / 04/17/07 / / 10,16 0 0 JOD 0 0 0
06-1574SC Visual Structural Inspection 0-008-SC2 06/13/07 DONE DONE DONE 02/09/07 02/09/07 / / / / 16 8,589 0 JOD 0 0 0
District Wide:
- Reconstruction 7-999-001 / / / / 04/17/07 / / 10,16 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Twin Towers Middle School (JHS):
04-1124 Reconstruction 0-001-021 03/16/06 DONE DONE DONE 04/11/05 04/08/05 10/01/04 10/06/04 2,155,15,16 550,781 550,781 HCM 0 0 0
Clark Patterson Associates
05-0771 Reconstruction 0-001-022 02/15/06 DONE DONE DONE 02/15/06 02/15/06 04/19/05 05/17/05 4 100,000 100,000 HCM 0 0 0
Robertson Strong Apgar Architects
07-2237 Reconstruction 0-001-023 UNREVIEWED 06/09/08 06/02/08 12/19/06 12/05/06 2,4,7,8,9,10,15 0 15,523,024 HCM 0 0 0
Robertson Strong Apgar Architects
07-2238 Reconstruction 0-001-024 UNREVIEWED 06/09/08 06/02/08 05/01/08 12/05/06 2 0 0 HCM 0 0 0
Robertson Strong Apgar Architects
02-2332FP Reconstruction 0-001-FP1 08/26/03 DONE DONE DONE 06/02/03 / / / / / / 16 4,800 4,800 MGL 0 0 0
06-0783SC Visual Structural Inspection 0-001-SC1 04/11/07 DONE DONE DONE 03/22/07 03/22/07 / / / / 16 39,236 0 JOD 0 0 0
Senior High School:
03-0639 Additions and Alterations 0-002-017 02/20/04 DONE DONE DONE 11/07/03 09/24/03 03/04/02 05/21/03 02 - 16 246,127 246,127 HCM 0 0 0
Fellenzer Engineering
04-0740 Additions and Alterations 0-002-018 04/13/05 DONE DONE DONE 02/01/05 01/28/05 07/08/03 12/16/03 02 - 16 35,100,000 34,944,569 HCM 0 0 0
Clark Patterson Associates
04-1125 Reconstruction 0-002-019 03/16/06 DONE DONE DONE 04/11/05 04/08/05 10/01/04 10/06/04 155,15,16 1,421,212 1,421,212 HCM 0 0 0
Clark Patterson Associates
06-1149 Additions and Alterations 0-002-020 07/11/07 DONE DONE DONE 03/21/07 03/13/07 12/19/06 12/05/06 02 - 16 15,341,321 15,119,985 HCM 0 0 2,976,216
Robertson Strong Apgar Architects
06-1150 Additions and Alterations 0-002-021 07/11/07 DONE DONE DONE 03/21/07 03/13/07 01/05/07 12/05/06 02 - 16 2,844,842 0 HCM 0 0 0
Robertson Strong Apgar Architects
07-1819 Reconstruction 0-002-022 06/03/08 DONE DONE DONE 03/17/08 03/11/08 11/21/07 05/15/07 2,8,9 100,000 0 HCM 0 0 0
RSA (Robertson Strong Apgar)
02-2309FP Reconstruction 0-002-FP1 08/26/03 DONE DONE DONE 06/02/03 / / / / / / 16 14,400 14,400 MGL 0 0 0
03-1544SC Visual Structural Inspection 0-002-SC1 08/24/04 DONE DONE DONE 05/10/04 05/10/04 / / / / 16 51,045 30,000 JOD 0 0 0
06-1316SC Visual Structural Inspection 0-002-SC2 06/12/07 DONE DONE DONE 03/22/07 03/22/07 / / / / 16 75,590 0 JOD 0 0 0
Memorial Elementary:
- XX Reconstruction 0-004-006 CANCELLED / / / / 10/01/04 / / 2,155,15,16 0 4,661,594 HCM 0 0 0
Reloc #1 St Joseph's:
- Reconstruction 0-007-002 / / / / 05/01/08 / / 2,8,9,10,16 0 0 DDJ 0 0 0
Chorley Elementary School:
04-1126 Reconstruction 0-009-017 03/16/06 DONE DONE DONE 04/11/05 04/08/05 10/01/04 10/06/04 2,8,155,15,16 1,047,976 1,047,976 HCM 0 0 0
Clark Patterson Associates
07-2239 Reconstruction 0-009-018 UNREVIEWED 06/09/08 06/02/08 12/19/06 12/05/06 2,4,7,10,15 0 4,779,745 HCM 0 0 0
Robertson Strong Apgar Architects
07-2228 Reconstruction 0-009-019 UNREVIEWED 06/06/08 06/02/08 04/23/08 12/05/07 0 0 HCM 0 0 0
Robertson Strong Apgar Architects
06-1314SC Visual Structural Inspection 0-009-SC1 06/12/07 DONE DONE DONE 03/22/07 03/22/07 / / / / 16 24,463 0 JOD 0 0 0
Moon Elementary School:
04-1127 Reconstruction 0-010-021 03/16/06 DONE DONE DONE 04/11/05 04/08/05 10/01/04 10/06/04 2,155,15,16 286,329 286,329 HCM 0 0 0
Clark Patterson Associates
07-2240 Reconstruction 0-010-022 UNREVIEWED 06/09/08 06/02/08 12/19/06 12/05/06 2,4,7,10,15 0 6,906,463 HCM 0 0 0
Robertson Strong Apgar Architects
07-2229 Reconstruction 0-010-023 UNREVIEWED 06/06/08 06/02/08 04/23/08 12/05/07 2,8,9 0 0 HCM 0 0 0
Robertson Strong Apgar Architects
02-2308FP Reconstruction 0-010-FP1 08/26/03 DONE DONE DONE 06/02/03 / / / / / / 16 4,800 4,800 MGL 0 0 0
06-1315SC Visual Structural Inspection 0-010-SC1 06/12/07 DONE DONE DONE 03/22/07 03/22/07 / / / / 16 19,481 0 JOD 0 0 0
Mechanicstown Elementary:
04-1128 Reconstruction 0-012-011 03/16/06 DONE DONE DONE 04/11/05 04/08/05 10/01/04 10/06/04 2,155,15,16 325,960 325,960 HCM 0 0 0
Clark Patterson Associates
07-2241 Reconstruction 0-012-012 UNREVIEWED 06/09/08 06/02/08 12/19/06 12/05/06 2,4,7,10,15 0 12,556,229 HCM 0 0 0
Robertson Strong Apgar Architects
- Reconstruction 0-012-013 / / / / 04/23/08 / / 2,7,8 0 0 HCM 0 0 0
- Reconstruction 0-012-014 / / / / 05/01/08 / / 2,8,9 0 0 HCM 0 0 0
02-2310FP Reconstruction 0-012-FP1 08/26/03 DONE DONE DONE 06/02/03 / / / / / / 16 4,800 4,800 MGL 0 0 0
06-1311SC Visual Structural Inspection 0-012-SC1 06/12/07 DONE DONE DONE 03/22/07 03/22/07 / / / / 16 28,966 0 JOD 0 0 0
Monhagen Middle School:
04-1129 Reconstruction 0-030-004 03/16/06 DONE DONE DONE 04/11/05 04/08/05 10/01/04 10/06/04 155,15,16 381,570 381,570 HCM 0 0 0
Clark Patterson Associates
07-2242 Reconstruction 0-030-005 UNREVIEWED 06/09/08 06/02/08 12/19/06 12/05/06 2,4,7,9,10,155,15,16 0 21,346,323 HCM 0 0 0
Robertson Strong Apgar Architects
02-2331FP Reconstruction 0-030-FP1 08/26/03 DONE DONE DONE 06/02/03 / / / / / / 16 9,600 9,600 MGL 0 0 0
06-1313SC Visual Structural Inspection 0-030-SC1 06/12/07 DONE DONE DONE 03/22/07 03/22/07 / / / / 16 28,802 0 JOD 0 0 0
Maple Hill Elementary School:
04-1130 Reconstruction 0-032-004 03/16/06 DONE DONE DONE 04/11/05 04/08/05 10/01/04 10/06/04 155,15,16 384,814 384,814 HCM 0 0 0
Clark Patterson Associates
07-2243 Reconstruction 0-032-005 UNREVIEWED 06/09/08 06/02/08 12/19/06 12/05/06 2,4,7,9,10 0 20,691,057 HCM 0 0 0
Robertson Strong Apgar Architects
07-2230 Reconstruction 0-032-006 UNREVIEWED 06/06/08 06/02/08 04/23/08 12/05/07 2,8,9 0 0 HCM 0 0 0
Robertson Strong Apgar Architects
- Reconstruction 0-032-007 / / / / 07/16/08 / / 2,9 0 0 HCM 0 0 0
- Reconstruction 0-032-008 / / / / 07/16/08 / / 155 0 0 HCM 0 0 0
02-2311FP Reconstruction 0-032-FP1 08/26/03 DONE DONE DONE 06/02/03 / / / / / / 16 9,600 9,600 MGL 0 0 0
06-1312SC Visual Structural Inspection 0-032-SC1 06/12/07 DONE DONE DONE 03/22/07 03/22/07 / / / / 16 26,813 0 JOD 0 0 0
Administration Building:
04-1131 Reconstruction 1-016-006 03/16/06 DONE DONE DONE 04/11/05 04/08/05 10/01/04 10/06/04 2,155,15,16 69,167 0 HCM 0 0 0
Clark Patterson Associates
07-2244 Reconstruction 1-016-007 UNREVIEWED 06/09/08 06/02/08 12/19/06 12/05/06 2,7,13 0 0 HCM 0 0 0
Robertson Strong Apgar Architects
TEACHERS CENTER:
06-0071TQ Temporary Quarters 1-037-001 02/22/07 DONE DONE DONE 07/12/06 07/12/06 05/22/06 / / 0 0 HCM 0 0 0
Athletic Storage/Rest Rooms:
- PR Additions and Alterations 2-019-003 / / / / 12/19/06 / / 02 - 16 0 0 HCM 0 0 0
Food Storage Building:
- PR Additions and Alterations 2-021-004 / / / / 12/19/06 / / 02 - 16 0 0 HCM 0 0 0
New Maintenance Building:
- PR New Construction 3-039-001 / / / / 12/21/06 / / 02 - 16 0 0 HCM 0 0 0
Concession Stand:
06-1151 New Construction 7-038-001 07/11/07 DONE DONE DONE 03/21/07 03/13/07 12/19/06 12/05/06 02 - 16 471,771 0 HCM 0 0 0
Robertson Strong Apgar Architects
Fld Hse/Bleach/Lkrs/Restroom:
06-1152 New Construction 7-040-001 07/11/07 DONE DONE DONE 03/21/07 03/13/07 03/09/07 12/05/06 02 - 16 1,347,351 0 HCM 0 0 0
Robertson Strong Apgar Architects
Districtwide:
- Reconstruction 7-999-001 / / / / 04/19/05 / / 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Slate Hill ES/MS:
05-1067 Reconstruction 0-001-005 07/25/06 DONE DONE DONE 03/31/06 03/07/06 07/05/05 06/14/05 2,4,8,14,155,15,16 1,802,017 1,802,017 HCM 0 0 0
Thomas Associates
- Reconstruction 0-001-006 / / / / 05/15/08 / / 2,4,7,8,9,10,13,155, 0 0 HCM 0 0 0
02-2078FP Reconstruction 0-001-FP1 10/26/04 DONE DONE DONE 05/02/03 / / / / / / 16 14,400 14,400 MGL 0 0 0
High School:
04-0033 Reconstruction 0-005-004 10/06/04 DONE DONE DONE 07/02/04 06/29/04 09/24/03 12/09/03 2,7 676,000 676,000 HCM 0 0 0
Thomas Associates
05-1216 Reconstruction 0-005-005 09/20/06 DONE DONE DONE 04/28/06 04/26/06 03/22/06 12/09/03 2,7 255,850 255,850 HCM 0 0 0
Thomas Associates
- Reconstruction 0-005-006 / / / / 05/15/08 / / 2,4,7,8,9,10,13,14,1 0 0 HCM 0 0 0
02-2079FP Reconstruction 0-005-FP1 12/11/03 DONE DONE DONE 05/02/03 / / / / / / 16 14,400 14,400 MGL 0 0 0
Jr/High School:
04-0034 Additions and Alterations 0-012-005 10/06/04 DONE DONE DONE 07/02/04 06/29/04 06/25/03 12/09/03 02 - 16 19,024,000 19,024,000 HCM 0 0 0
Thomas Associates
05-1217 Reconstruction 0-012-006 09/20/06 DONE DONE DONE 04/28/06 04/26/06 03/22/06 12/09/03 2,155,16 1,525,000 1,525,000 HCM 0 0 0
Thomas Associates
- Reconstruction 0-012-007 / / / / 05/15/08 / / 2,4,7,8,9,10,13,15,1 0 0 HCM 0 0 0
02-2080 Reconstruction 0-012-FP1 12/11/03 DONE DONE DONE 05/02/03 / / / / / / 16 4,800 4,800 MGL 0 0 0
Otisville Elementary School:
- PR New Construction 0-021-001 / / / / 08/26/05 / / 02 - 16 0 0 HCM 0 0 0
05-1068 New Construction 0-021-001 07/25/06 DONE DONE DONE 03/31/06 03/07/06 08/26/05 06/14/05 02 - 16 37,772,983 0 HCM 0 0 0
Thomas Associates
- Reconstruction 0-021-002 / / / / 05/27/08 / / 10,13,16 0 0 HCM 0 0 0
New Pole Barn #2:
05-0584 New Construction 2-022-001 05/19/06 DONE DONE DONE 01/18/06 01/12/06 09/28/05 / / 02 - 16 136,700 0 HCM 0 0 0
Thomas Associates
Bus Garage:
- PR Additions and Alterations 5-002-003 / / / / 05/27/08 / / 02 - 16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
North Main St. School:
07-0318 Reconstruction 0-002-007 01/03/08 DONE DONE DONE 09/07/07 09/07/07 01/22/07 05/15/07 7,8,9,155 1,004,000 0 JOD 0 0 426,700
Fellenzer Engineering
Central Valley Elem.(fmly Middle):
04-1178 Reconstruction 0-004-006 05/23/05 DONE DONE DONE 04/19/05 04/18/05 05/03/04 07/14/04 7 340,164 340,164 JOD 0 0 0
Fellenzer Engineering
- Reconstruction 0-004-007 / / / / 03/08/07 / / 8,155 0 16,306,224 JOD 0 0 0
- Reconstruction 0-004-008 / / / / 01/31/08 / / 16 0 0 JOD 0 0 0
Harriman Kindergarten Center:
04-0819 Reconstruction 0-005-003 04/05/05 DONE DONE DONE 02/14/05 01/03/05 05/03/04 07/14/04 7 233,216 233,216 JOD 0 0 0
Fellenzer Engineering
Pine Tree Elementary:
- Reconstruction 0-006-004 / / / / 03/18/05 / / 2 0 290,007 JOD 0 0 0
07-0319 Reconstruction 0-006-005 02/27/08 DONE DONE DONE 09/07/07 09/07/07 01/22/07 05/15/07 7,155 536,920 0 JOD 0 0 228,195
Fellenzer Engineering
- Reconstruction 0-006-006 / / / / 01/31/08 / / 16 0 0 JOD 0 0 0
Middle School (fmly Sr. High):
03-1529 Reconstruction 0-009-009 05/07/04 DONE DONE DONE 05/07/04 05/07/04 05/03/04 06/03/03 2,7,13 140,782 140,782 JOD 0 0 0
Fellenzer Engineering
- XX Reconstruction 0-009-010 CANCELLED / / / / 06/29/04 / / 2,7 0 27,505,698 JOD 0 0 0
07-0298 Reconstruction 0-009-011 01/18/08 DONE DONE DONE 09/05/07 09/04/07 01/22/07 05/15/07 7,8,9 1,492,365 481,400 JOD 0 0 626,793
Fellenzer Engineering
06-1552 Reconstruction 0-009-012 06/13/07 DONE DONE DONE 05/30/07 05/29/07 05/21/07 05/15/07 7 1,019,057 1,019,057 JOD 0 0 565,916
Fellenzer Engineering
02-2293FP Reconstruction 0-009-FP1 08/01/03 DONE DONE DONE 06/02/03 / / / / / / 16 0 9,834,000 MGL 0 0 0
Smith Clove Elem.(fmly Cent.Valley):
05-0485 Reconstruction 0-012-005 05/03/06 DONE DONE DONE 12/21/05 12/20/05 07/11/05 07/06/05 16 321,275 321,275 JOD 0 0 0
Fellenzer Engineering
- Reconstruction 0-012-006 / / / / 03/08/07 / / 8,155 0 7,250,175 JOD 0 0 0
Sapphire Lake Elementary School:
05-0390 Reconstruction 0-015-004 06/23/06 DONE DONE DONE 11/29/05 11/28/05 02/17/05 08/24/05 2,15 706,313 706,313 JOD 0 0 0
Fellenzer Engineering
07-0122 Reconstruction 0-015-005 01/24/08 DONE DONE DONE 08/03/07 08/02/07 01/22/07 05/15/07 7,9,15 2,895,683 2,895,683 JOD 0 0 1,216,187
Fellenzer Engineering
06-1553 Reconstruction 0-015-006 06/18/07 DONE DONE DONE 05/30/07 05/29/07 05/21/07 05/15/07 7 175,078 175,078 JOD 0 0 69,373
Fellenzer Engineering
New High School:
- XX Additions and Alterations 0-021-005 CANCELLED / / / / 10/25/04 / / 02 - 16 0 0 JOD 0 0 0
06-0694FP Alterations 0-021-FP1 01/29/07 DONE DONE DONE / / / / / / / / 0 0 JOD 0 0 0
Education Center:
04-0820 Reconstruction 1-001-002 04/05/05 DONE DONE DONE 02/14/05 01/03/05 05/03/04 07/14/04 7 112,000 0 JOD 0 0 0
Fellenzer Engineering
Dormitory/Admin. Bldg:
04-0075 Reconstruction 1-018-002 07/21/05 DONE DONE DONE 07/22/04 07/21/04 04/30/04 / / 155,15,16 110,000 0 JOD 0 0 0
Fellenzer Engineering
06-1233 Reconstruction 1-018-003 05/10/07 DONE DONE DONE 03/27/07 03/26/07 01/22/07 01/10/07 155 260,725 0 JOD 0 0 0
Fellenzer Engineering
Pole Barn @ Bus Garage:
- DB Discovered Building 2-022-001 / / / / 11/05/07 / / 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Kiryas Joel Public School-see #8012:
05-0510XX New Construction 0-013-001 03/20/06 CANCELLED 12/27/05 12/27/05 02/18/05 05/17/05 02 - 16 10,987,643 3,747,664 DDJ 0 0 0
Pendergrast & Terach, P.C
Greenhouse Project (12x15):
- DB Discovered Building 0-014-001 / / / / 02/28/08 / / 0 0 DDJ 0 0 0
Kiryas Joel Remedial Education Cntr.:
06-0527TQ Temporary Quarters 8-011-001 02/01/07 DONE DONE DONE 11/20/06 11/17/06 07/12/02 / / 0 0 DDJ 0 0 0
New Kiryas Joel Public School:
03-0568XX Reconstruction 8-012-L01 CANCELLED 10/28/03 / / 09/19/02 / / 0 0 DDJ 0 0 0
07-2142 Reconstruction 8-012-L02 05/01/08 DONE DONE DONE 05/22/08 05/15/07 06/25/07 08/24/06 792,000 792,000 DDJ 0 0 181,325
Pendergrast & Terach, P.C
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Maybrook Elementary School:
05-1000 Reconstruction 0-002-010 05/01/06 DONE DONE DONE 03/23/06 03/15/06 04/06/05 05/17/05 7 2,021,518 2,021,518 JOD 0 0 0
Bernier Carr Associates
- Reconstruction 0-002-011 / / / / 11/21/07 / / 2,155 0 0 JOD 0 0 0
Montgomery Elementary:
05-1001 Reconstruction 0-004-012 05/01/06 DONE DONE DONE 03/23/06 03/15/06 04/25/05 05/17/05 7 739,113 739,113 JOD 0 0 0
Bernier Carr Associates
Walden Elementary School:
02-2212 Reconstruction 0-009-013 08/13/03 DONE DONE DONE 05/13/03 03/24/03 02/11/03 11/18/98 2,8,9 226,497 226,497 MGL 0 0 0
Bernier Carr Associates
05-1002 Reconstruction 0-009-014 05/01/06 DONE DONE DONE 03/23/06 03/15/06 04/06/05 05/17/05 7 332,863 332,863 JOD 0 0 0
Bernier Carr Associates
East Coldenham Elementary:
03-1653 Reconstruction 0-013-011 07/01/04 DONE DONE DONE 06/28/04 06/24/04 09/24/03 06/14/04 4,10 2,023,914 2,023,914 JOD 0 0 0
Bernier Carr Associates
- XX Reconstruction 0-013-012 CANCELLED / / / / 09/25/03 / / 4,10 0 6,380,154 JOD 0 0 0
04-1392 Reconstruction 0-013-013 07/11/05 DONE DONE DONE 06/09/05 06/07/05 04/25/05 05/17/05 7,16 856,213 856,213 JOD 0 0 0
Bernier Carr Associates
05-1003 Reconstruction 0-013-014 05/01/06 DONE DONE DONE 03/23/06 03/15/06 03/10/06 05/17/05 16 64,350 64,350 JOD 0 0 0
Bernier Carr Associates
- Reconstruction 0-013-015 / / / / 05/15/08 / / 2,155 0 0 JOD 0 0 0
Valley Central High School:
05-1004 Reconstruction 0-015-017 05/01/06 DONE DONE DONE 03/23/06 03/15/06 04/06/05 05/17/05 7 1,532,520 1,532,520 JOD 0 0 0
Bernier Carr Associates
- Reconstruction 0-015-018 / / / / 11/21/07 / / 2,16 0 0 JOD 0 0 0
- Reconstruction 0-015-019 / / / / 03/17/08 / / 10,155,15,16 0 0 JOD 0 0 0
Valley Middle School:
05-1005 Reconstruction 0-016-016 05/01/06 DONE DONE DONE 03/23/06 03/15/06 04/06/05 05/17/05 7 1,037,541 1,037,541 JOD 0 0 0
Bernier Carr Associates
- Reconstruction 0-016-017 / / / / 11/21/07 / / 2,8,155,15,16 0 0 JOD 0 0 0