REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Washingtonville 5/6 School:
04-0953XX Reconstruction 0-001-009 05/25/05 CANCELLED 03/10/05 03/08/05 05/25/99 11/13/03 2,8,9,155,15,16 3,800,000 3,800,000 JOD 0 0 0
Silverman & Cosentino, Assoc.
04-0346 Reconstruction 0-001-011 09/19/05 DONE DONE DONE 11/03/04 10/28/04 12/04/02 04/19/04 8,9,10,155,15,16 732,617 732,617 JOD 0 0 0
Silverman & Cosentino, Assoc.
05-1179 Reconstruction 0-001-012 11/06/06 DONE DONE DONE 04/21/06 04/19/06 06/17/05 05/17/05 2,9,10,13 540,177 396,822 JOD 0 0 0
Sammel Architecture
06-0439XX Reconstruction 0-001-013 02/07/07 CANCELLED 11/08/06 11/08/06 03/02/06 05/17/05 16 37,350 37,350 JOD 0 0 0
Sammel Architecture
06-1025 Reconstruction 0-001-014 06/19/07 DONE DONE DONE 03/05/07 02/27/07 04/06/06 05/16/06 2,4,8,9,10,155,15,16 2,611,873 2,761,873 JOD 0 0 626,978
Sammel Architecture
08-1740 Reconstruction 0-001-015 10/28/09 DONE DONE DONE 06/26/09 06/18/09 01/31/08 05/20/09 2,4,7,8,9,16 758,192 0 JOD 0 0 0
Sammel Architecture
08-1766 Reconstruction 0-001-016 07/20/09 DONE DONE DONE 06/30/09 06/24/09 04/06/09 05/20/08 10 313,261 0 JOD 0 0 0
Sammel Architecture
06-0420SC Visual Structural Inspection 0-001-SC1 11/06/06 DONE DONE DONE 10/04/06 10/04/06 / / / / 16 28,873 26,000 JOD 0 0 0
Taft Elementary School:
04-0347 Reconstruction 0-002-008 09/19/05 DONE DONE DONE 11/03/04 10/28/04 12/04/02 04/19/04 8,9,10,155,15,16 490,239 490,239 JOD 0 0 0
Silverman & Cosentino, Assoc.
- Reconstruction 0-002-010 / / / / 07/11/05 / / 2,10 0 8,990,217 JOD 0 0 0
06-0440 Reconstruction 0-002-011 02/07/07 DONE DONE DONE 11/08/06 11/08/06 03/02/06 05/17/05 16 208,072 208,072 JOD 0 0 0
Sammel Architecture
06-1026 Reconstruction 0-002-012 06/19/07 DONE DONE DONE 03/05/07 02/27/07 04/06/06 05/16/06 2,9,155,15 1,669,445 1,669,445 JOD 0 0 431,473
Sammel Architecture
08-1741 Reconstruction 0-002-013 10/28/09 DONE DONE DONE 06/26/09 06/18/09 01/31/08 05/20/09 2,4,8,9,155,16 804,987 0 JOD 0 0 0
Sammel Architecture
Little Britain Elementary:
04-0348 Reconstruction 0-004-010 09/19/05 DONE DONE DONE 11/03/04 10/28/04 12/04/02 04/19/04 8,9,10,155,15,16 663,104 663,104 JOD 0 0 0
Silverman & Cosentino, Assoc.
- Reconstruction 0-004-011 UNREVIEWED 06/30/09 06/24/09 07/11/05 05/20/08 2,10 0 7,172,872 JOD 0 0 0
Sammel Architecture
06-0441 Reconstruction 0-004-012 02/07/07 DONE DONE DONE 11/08/06 11/08/06 03/02/06 05/17/05 16 351,846 351,846 JOD 0 0 0
Sammel Architecture
06-1027 Reconstruction 0-004-013 06/19/07 DONE DONE DONE 03/05/07 02/27/07 04/06/06 05/16/06 2,9,15 345,797 345,797 JOD 0 0 110,275
Sammel Architecture
08-1742 Reconstruction 0-004-014 10/28/09 DONE DONE DONE 06/26/09 06/18/09 01/31/08 05/20/09 2,4,8,9,10,155,15,16 613,542 0 JOD 0 0 0
Sammel Architecture
08-1767 Reconstruction 0-004-015 07/20/09 DONE DONE DONE 06/30/09 06/24/09 04/06/09 05/20/08 10 242,124 0 JOD 0 0 0
Sammel Architecture
Senior High School:
04-0954 Additions and Alterations 0-007-011 05/25/05 DONE DONE DONE 03/10/05 03/08/05 05/25/99 11/13/03 02 - 16 8,672,213 8,672,213 JOD 0 0 0
Silverman & Cosentino, Assoc.
04-0349 Reconstruction 0-007-012 09/19/05 DONE DONE DONE 11/03/04 10/28/04 12/04/02 04/19/04 8,9,10,155,15,16 1,642,506 1,642,506 JOD 0 0 0
Silverman & Cosentino, Assoc.
05-0872 Reconstruction 0-007-013 04/20/06 DONE DONE DONE 03/07/06 03/07/06 07/11/05 05/17/05 2,7,10 2,453,595 2,453,595 JOD 0 0 0
Sammel Architecture
06-0442 Reconstruction 0-007-014 02/07/07 DONE DONE DONE 11/08/06 11/08/06 03/02/06 05/17/05 16 248,446 248,446 DDJ 0 0 0
Sammel Architecture
06-1028 Reconstruction 0-007-015 06/19/07 DONE DONE DONE 03/05/07 02/27/07 04/06/06 05/16/06 2,9,15,16 989,876 989,876 JOD 0 0 251,984
Sammel Architecture
07-1631 Reconstruction 0-007-016 03/07/08 DONE DONE DONE 02/19/08 02/13/08 01/18/08 05/15/07 4,8,9 46,666 46,666 JOD 0 0 0
Sammel Architecture
08-1743 Reconstruction 0-007-017 10/28/09 DONE DONE DONE 06/26/09 06/18/09 01/31/08 05/20/08 2,4,8,9,10,155,15,16 1,383,617 0 JOD 0 0 0
Sammel Architecture
- Reconstruction 0-007-018 / / / / 04/06/09 / / 10 0 0 JOD 0 0 0
06-0419 Visual Structural Inspection 0-007-SC1 11/06/06 DONE DONE DONE 10/04/06 10/04/06 / / / / 16 37,757 34,000 JOD 0 0 0
08-0452SC Visual Structural Inspection 0-007-SC2 10/03/08 DONE DONE DONE 06/26/08 06/26/08 / / / / 16 13,628 0 JOD 0 0 0
Round Hill Elementary:
04-0350 Reconstruction 0-008-009 09/19/05 DONE DONE DONE 11/03/04 10/28/04 12/04/02 04/19/04 8,9,10,155,15,16 832,918 832,918 JOD 0 0 0
Silverman & Cosentino, Assoc.
05-0873 Reconstruction 0-008-010 04/20/06 DONE DONE DONE 03/07/06 03/07/06 07/11/05 05/17/05 2,7,10,16 1,116,880 1,116,880 JOD 0 0 0
Sammel Architecture
06-0443XX Reconstruction 0-008-011 02/07/07 CANCELLED 11/08/06 11/08/06 03/02/06 05/17/05 16 17,100 17,100 JOD 0 0 0
Sammel Architecture
06-1029 Reconstruction 0-008-012 06/19/07 DONE DONE DONE 03/05/07 02/27/07 / / 05/16/06 2,9,15,16 738,407 738,407 JOD 0 0 161,401
Sammel Architecture
08-1744 Reconstruction 0-008-013 10/28/09 DONE DONE DONE 06/26/09 06/18/09 01/31/08 05/20/08 2,4,8,9,10,155,15,16 642,745 0 JOD 0 0 0
Sammel Architecture
07-2126 Reconstruction 0-008-014 09/29/08 DONE DONE DONE 05/19/08 05/14/08 05/02/08 05/17/05 16 183,980 0 JOD 0 0 0
Sammel Architecture
New 7/8 School:
04-0955 New Construction 0-024-001 05/25/05 DONE DONE DONE 03/10/05 03/08/05 11/09/98 11/13/03 02 - 16 27,000,000 18,587,150 JOD 0 0 0
Silverman & Cosentino, Assoc.
08-0451SC Visual Structural Inspection 0-024-SC1 10/03/08 DONE DONE DONE 06/26/08 06/26/08 / / / / 16 2,807 0 JOD 0 0 0
Administration:
04-0351 Reconstruction 1-016-004 09/19/05 DONE DONE DONE 11/03/04 10/28/04 12/04/02 04/19/04 8,9,10,155,15,16 64,380 0 JOD 0 0 0
Silverman & Cosentino, Assoc.
08-1745 Reconstruction 1-016-005 10/28/09 DONE DONE DONE 06/26/09 06/18/09 01/31/08 05/20/08 2,7,8,9 128,700 0 JOD 0 0 0
Sammel Architecture
22 Sarah Wells Trail:
02-2315 Reconstruction 1-021-001 02/27/06 DONE DONE DONE 05/27/03 / / 02/11/03 / / 0 0 MAC 0 0 0
- Reconstruction 1-021-002 / / / / / / / / 0 0 JOD 0 0 0
Bus Garage:
04-0352 Reconstruction 5-013-008 09/19/05 DONE DONE DONE 11/03/04 10/28/04 05/25/99 04/19/04 8,9,16 140,890 140,890 JOD 0 0 0
Silverman & Cosentino, Assoc.
06-1030 Reconstruction 5-013-009 06/19/07 DONE DONE DONE 03/05/07 02/27/07 12/04/02 05/16/06 2,4,8,9,155,15,16 253,843 229,240 MAC 0 0 0
Sammel Architecture
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Elementary School:
08-1520 Reconstruction 0-001-006 ADDENDUM REQ'D 04/20/09 04/17/09 09/10/08 05/20/08 4,8,10,155,16 0 8,877,654 DDJ 0 0 0
Collins & Scoville Architects,P.C.
03-0812FP Reconstruction 0-001-FP1 01/06/09 DONE DONE DONE 12/10/03 / / / / / / 16 4,898 0 JOD 0 0 0
NEW CONSTRUCTION-NEW MIDDLE/HS:
08-1521 Additions and Alterations 0-009-002 STARTED STARTED UNREVIEWED04/20/09 04/17/09 09/10/08 05/20/08 02 - 16 0 0 DDJ 0 0 0
Collins & Scoville Architects,P.C.
03-0810FP Reconstruction 0-009-FP1 01/06/09 DONE DONE DONE 12/10/03 / / / / / / 16 4,160 0 JOD 0 0 0
06-0876SC Visual Structural Inspection 0-009-SC1 02/05/07 DONE DONE DONE 01/25/07 01/25/07 / / / / 16 62,466 62,466 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Cornwall M.S.(fmly HS):
- Reconstruction 0-001-019 / / / / 09/27/07 / / 13 0 0 HCM 0 0 0
07-2118 Reconstruction 0-001-020 11/12/08 DONE DONE DONE 05/16/08 05/09/08 10/01/07 05/15/07 13,16 237,350 240,000 HCM 0 0 87,345
McGoey, Hauser and Edsall
08-0053 Additions and Alterations 0-001-021 06/23/09 DONE DONE DONE 07/21/08 07/08/08 10/01/07 05/15/07 02 - 16 200,000 200,000 HCM 0 0 0
McGoey, Hauser and Edsall
Elementary School:
05-1218 Reconstruction 0-002-010 05/03/06 DONE DONE DONE 04/28/06 04/27/06 02/15/06 06/14/06 2,4,7 397,390 397,390 HCM 0 0 0
McGoey, Hauser and Edsall
06-0028 Reconstruction 0-002-011 07/26/06 DONE DONE DONE 07/10/06 07/10/06 06/08/06 06/21/06 13 387,905 387,905 HCM 0 0 0
McGoey, Hauser and Edsall
07-1593 Additions and Alterations 0-002-012 01/09/08 DONE DONE DONE 02/11/08 02/07/08 09/27/07 05/15/07 02 - 16 498,557 498,557 HCM 0 0 183,469
McGoey, Hauser and Edsall
Willow Ave Elementary School:
07-0582 Reconstruction 0-004-010 01/21/08 DONE DONE DONE 10/18/07 10/17/07 01/30/07 05/15/07 7 198,800 198,800 HCM 0 0 0
McGoey, Hauser and Edsall
07-1598 Additions and Alterations 0-004-011 01/09/09 DONE DONE DONE 02/11/08 02/07/08 09/27/07 05/15/07 02 - 16 622,439 622,439 HCM 0 0 229,058
McGoey, Hauser and Edsall
07-1600 Additions and Alterations 0-004-012 05/28/08 DONE DONE DONE 02/12/08 02/07/08 12/26/07 05/15/07 02 - 16 96,800 96,800 HCM 0 0 0
McGoey, Hauser and Edsall
Cornwall Elementary:
07-1470 Reconstruction 0-006-011 03/03/08 DONE DONE DONE 01/26/08 01/24/08 01/30/07 05/15/07 7 651,620 651,620 HCM 0 0 0
McGoey, Hauser and Edsall
07-1599 Additions and Alterations 0-006-012 01/09/09 DONE DONE DONE 02/12/08 02/07/08 09/27/07 05/15/07 02 - 16 396,304 396,304 HCM 0 0 145,840
McGoey, Hauser and Edsall
New High School:
09-0023 Alterations 0-012-002 08/31/09 DONE DONE DONE 07/03/09 07/03/09 01/30/07 05/15/07 02 - 16 267,475 275,000 HCM 0 0 101,640
McGoey, Hauser and Edsall
- Reconstruction 0-012-003 / / / / 10/01/07 / / 0 0 HCM 0 0 0
Shipping Container Storage:
- New Construction 2-017-001 / / / / 01/17/08 / / 02 - 16 0 0 HCM 0 0 0
Press Box:
02-0244 New Construction 7-014-001 02/01/08 DONE DONE DONE 09/16/02 07/19/02 10/19/01 05/22/02 02 - 16 56,000 0 MAC 0 0 0
Pendergast & Terach, PC
Baseball Field Dugouts:
- New Construction 7-016-001 / / / / 12/22/04 / / 02 - 16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Crispell Middle School:
07-0565 Reconstruction 0-001-005 03/31/09 DONE DONE DONE 10/17/07 10/15/07 06/25/07 06/12/07 16 5,695 0 HCM 0 0 0
ECG ENGINEERING,LLC
E.J. Russell School:
07-0566 Reconstruction 0-002-008 03/31/09 DONE DONE DONE 10/17/07 10/15/07 06/25/07 06/12/07 16 215,518 215,518 HCM 0 0 0
ECG ENGINEERING,LLC
- Reconstruction 0-002-009 / / / / 08/22/08 / / 2,7,8,9,10,155,15,16 0 0 HCM 0 0 0
Music Room-crispell:
07-0165 Reconstruction 0-003-003 08/24/07 DONE DONE DONE 08/16/07 08/15/07 08/01/07 05/15/07 2 50,000 0 HCM 0 0 0
Collins & Scoville Architects
Senior High School:
04-0555 Additions and Alterations 0-007-014 01/31/05 DONE DONE DONE 12/15/04 12/03/04 10/14/04 03/28/02 02 - 16 3,096,998 3,096,998 HCM 0 0 0
Thomas Associates
05-1386 Reconstruction 0-007-015 07/13/06 DONE DONE DONE 06/20/06 06/19/06 03/22/06 03/28/02 7 207,000 207,000 HCM 0 0 0
Collins & Scoville Architects
07-0567 Reconstruction 0-007-016 03/31/09 DONE DONE DONE 10/17/07 10/15/07 06/25/07 06/12/07 15,16 2,085,645 0 HCM 0 0 0
ECG ENGINEERING,LLC
- Reconstruction 0-007-017 / / / / 08/22/08 / / 2,7,8,9,10,155,15,16 0 0 HCM 0 0 0
Circleville Primary:
05-1387 Reconstruction 0-009-009 07/13/06 DONE DONE DONE 06/20/06 06/19/06 03/22/06 03/28/02 7 96,700 96,700 HCM 0 0 0
Collins & Scoville Architects
07-0568 Reconstruction 0-009-010 03/31/09 DONE DONE DONE 10/17/07 10/15/07 06/25/07 06/12/07 16 223,285 0 HCM 0 0 0
ECG ENGINEERING,LLC
- Reconstruction 0-009-011 / / / / 08/22/08 / / 2,7,8,9,10,155,15,16 0 0 HCM 0 0 0
Pakanasink Elementary:
07-0569 Reconstruction 0-012-009 03/31/09 DONE DONE DONE 10/17/07 10/15/07 06/25/07 06/12/07 15,16 655,464 0 HCM 0 0 0
ECG ENGINEERING,LLC
08-0984 Reconstruction 0-012-010 05/19/09 DONE DONE DONE 12/31/08 12/19/08 08/22/08 05/20/08 2,7,8,9,10,155,15,16 2,092,000 0 HCM 0 0 376,560
Collins & Scoville Architects
Crispell Middle School:
05-1388 Reconstruction 0-013-003 07/13/06 DONE DONE DONE 06/20/06 06/19/06 03/22/06 03/28/02 7 261,800 261,800 HCM 0 0 0
Collins & Scoville Architects
07-0570 Reconstruction 0-013-004 03/31/09 DONE DONE DONE 10/17/07 10/15/07 06/25/07 06/12/07 16 298,755 0 HCM 0 0 0
ECG ENGINEERING,LLC
- Reconstruction 0-013-005 / / / / 11/09/07 / / 10,155 0 0 HCM 0 0 0
08-0985 Reconstruction 0-013-006 05/19/09 DONE DONE DONE 12/31/08 12/19/08 08/22/08 05/20/08 2,7,8,9,10,14,155,15 1,215,640 0 HCM 0 0 218,815
Collins & Scoville Architects
Circleville Middle School:
07-0571 Reconstruction 0-014-007 03/31/09 DONE DONE DONE 10/17/07 10/15/07 06/25/07 06/12/07 16 635,646 0 HCM 0 0 0
ECG ENGINEERING,LLC
08-0986 Reconstruction 0-014-008 05/19/09 DONE DONE DONE 12/31/08 12/19/08 11/05/08 05/20/08 2,7,8,9,10,155,15,16 1,296,000 0 HCM 0 0 233,280
Collins & Scoville Architects
Pine Bush Elementary School:
05-1389 Reconstruction 0-015-008 07/13/06 DONE DONE DONE 06/20/06 06/19/06 03/22/06 03/28/02 7 690,000 690,000 HCM 0 0 0
Collins & Scoville Architects
- Reconstruction 0-015-009 / / / / 11/01/06 / / 2,4,7,10 0 13,871,889 HCM 0 0 0
07-0572 Reconstruction 0-015-010 03/31/09 DONE DONE DONE 10/17/07 10/15/07 06/26/07 06/12/07 16 293,486 0 HCM 0 0 0
ECG ENGINEERING,LLC
- Reconstruction 0-015-011 / / / / 08/22/08 / / 2,7,8,9,10,155,15,16 0 0 HCM 0 0 0
New Crispell Annex (Modular):
07-0164 New Construction 0-017-001 08/24/07 DONE DONE DONE 08/16/07 08/15/07 08/01/07 05/15/07 02 - 16 990,200 990,200 HCM 0 0 0
Collins & Scoville Architects
District Offices:
07-0573 Reconstruction 1-004-002 03/31/09 DONE DONE DONE 10/17/07 10/15/07 07/27/07 06/12/07 15,16 225,809 0 HCM 0 0 0
ECG ENGINEERING,LLC
Special Programs Building:
07-1790TQ Temporary Quarters 1-018-001 03/25/08 DONE DONE DONE 03/15/08 03/14/08 03/14/08 / / 0 0 HCM 0 0 0
Collins & Scoville Architects
New Special Programs Building:
08-0411 New Construction 1-019-001 12/04/08 DONE DONE DONE 09/26/08 09/25/08 08/21/08 / / 02 - 16 690,000 0 HCM 0 0 0
Collins & Scoville Architects
District Storage:
07-0574 Reconstruction 2-008-001 03/31/09 DONE DONE DONE 10/17/07 10/15/07 06/25/07 06/12/07 16 10,155 0 HCM 0 0 0
ECG ENGINEERING,LLC
Districtwide-NYPA:
09-0335 Reconstruction 7-999-002 UNREVIEWED 10/23/09 10/20/09 02/23/09 05/20/08 2,10,13,16 0 0 HCM 0 0 0
Collins & Scoville Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Charles J.Hooker Middle:
05-1007 Reconstruction 0-001-007 04/14/06 DONE DONE DONE 03/23/06 03/20/06 01/09/06 12/13/05 4,7,10,16 698,251 698,251 RDR 0 0 291,200
Kaeyer, Garment & Davidson
- PR Additions and Alterations 0-001-008 / / / / 07/16/07 / / 02 - 16 0 0 MGL 0 0 0
08-1106 Reconstruction 0-001-009 03/13/09 DONE DONE DONE 01/21/09 01/15/09 04/22/08 05/20/08 2,8,9,13 659,994 0 HCM 0 0 0
Kaeyer, Garment & Davidson
- Reconstruction 0-001-010 / / / / 04/23/08 / / 2,8,9,13 0 0 HCM 0 0 0
08-0453 Reconstruction 0-001-011 10/01/08 DONE DONE DONE 10/06/08 10/01/08 05/01/08 06/17/08 4,7,13 46,971 46,971 HCM 0 0 0
Kaeyer, Garment & Davidson
Main Street School:
08-0839 Reconstruction 0-002-006 01/15/09 DONE DONE DONE 12/03/08 12/01/08 04/22/08 05/20/08 2,7 290,000 0 HCM 0 0 0
Kaeyer, Garment & Davidson
- Reconstruction 0-002-007 / / / / 04/23/08 / / 2,7 0 0 HCM 0 0 0
Scotchtown Ave. School:
- PR Additions and Alterations 0-003-006 / / / / 07/16/07 / / 02 - 16 0 0 MGL 0 0 0
Intermediate School:
- Reconstruction 0-006-005 / / / / 07/16/07 / / 4,7,8,9,13,155,15,16 0 0 MGL 0 0 0
08-1232 Reconstruction 0-006-006 05/13/09 DONE DONE DONE 02/19/09 02/17/09 04/22/08 05/20/08 2,14,16 283,000 0 HCM 0 0 0
Kaeyer, Garment & Davidson
- Reconstruction 0-006-007 / / / / 04/23/08 / / 2,14,16 0 0 HCM 0 0 0
High School:
- PR Additions and Alterations 0-008-007 / / / / 07/16/07 / / 02 - 16 0 0 MGL 0 0 0
08-1233 Reconstruction 0-008-008 05/13/09 DONE DONE DONE 02/19/09 02/17/09 04/22/08 05/20/08 2,14,155,15,16 708,000 708,000 HCM 0 0 0
Kaeyer, Garment & Davidson
- Reconstruction 0-008-009 / / / / 04/23/08 / / 2,155,15,16 0 0 HCM 0 0 0
Bus Garage:
08-0840 Reconstruction 5-007-003 01/15/09 DONE DONE DONE 12/03/08 12/01/08 04/22/08 05/20/08 2,7 154,000 0 HCM 0 0 0
Kaeyer, Garment & Davidson
- Reconstruction 5-007-004 / / / / 04/23/08 / / 2,7 0 0 HCM 0 0 0
Main St. Panelfab:
05-1018 Reconstruction 7-009-001 04/14/06 DONE DONE DONE 03/24/06 03/10/06 10/19/05 12/13/05 2,10,15,16 69,772 0 RDR 0 0 0
Kaeyer, Garment & Davidson
District Wide:
06-0214 Reconstruction 7-999-002 11/09/06 DONE DONE DONE 09/12/06 08/17/06 01/09/06 07/10/06 16 455,269 455,269 MGL 0 0 215,014
Bridging The Gap
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School:
07-2204SC Visual Structural Inspection 0-004-SC2 09/30/08 DONE DONE DONE 06/02/08 06/02/08 / / / / 16 10,448 0 JOD 0 0 0
Ft. Montgomery Elementary:
04-1334 Reconstruction 0-005-005 06/21/05 DONE DONE DONE 05/25/05 05/24/05 01/18/05 05/18/04 2,15 327,644 327,644 JOD 0 0 0
Kaeyer, Garment & Davidson
08-1417 Reconstruction 0-005-006 04/21/09 DONE DONE DONE 03/24/09 03/18/09 10/10/08 01/20/09 2,4,8,9,155,16 980,059 609,610 JOD 0 0 223,453
Kaeyer, Garment & Davidson
07-2203SC Visual Structural Inspection 0-005-SC1 09/30/08 DONE DONE DONE 06/02/08 06/02/08 / / / / 16 5,221 0 JOD 0 0 0
Elementary School:
- Reconstruction 0-007-005 / / / / 10/23/07 / / 16 0 0 JOD 0 0 0
- Reconstruction 0-007-006 / / / / 10/26/07 / / 16 0 0 JOD 0 0 0
07-2205SC Visual Structural Inspection 0-007-SC1 09/30/08 DONE DONE DONE 06/02/08 06/02/08 / / / / 16 4,419 0 JOD 0 0 0
James O'Neill High School:
04-1305 Reconstruction 0-008-010 06/07/05 DONE DONE DONE 05/20/05 05/17/05 03/02/05 05/18/04 10 131,129 131,129 JOD 0 0 0
Kaeyer, Garment & Davidson
05-0203 Reconstruction 0-008-011 11/23/05 DONE DONE DONE 09/21/05 09/20/05 06/07/05 05/18/04 2,10,16 253,605 253,605 JOD 0 0 0
Kaeyer, Garment & Davidson
08-1423 Reconstruction 0-008-012 05/27/09 DONE DONE DONE 03/24/09 03/18/09 04/17/07 01/20/09 10,16 231,660 849,378 JOD 0 0 52,818
Kaeyer, Garment & Davidson
06-1574SC Visual Structural Inspection 0-008-SC2 06/13/07 DONE DONE DONE 02/09/07 02/09/07 / / / / 16 8,589 0 JOD 0 0 0
District Wide:
- Reconstruction 7-999-001 / / / / 04/17/07 / / 10,16 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Twin Towers Middle School (JHS):
04-1124 Reconstruction 0-001-021 03/16/06 DONE DONE DONE 04/11/05 04/08/05 10/01/04 10/06/04 2,155,15,16 550,781 550,781 HCM 0 0 0
Clark Patterson Associates
05-0771 Reconstruction 0-001-022 02/15/06 DONE DONE DONE 02/15/06 02/15/06 04/19/05 05/17/05 4 200,000 200,000 HCM 0 0 0
Robertson Strong Apgar Architects
07-2237 Reconstruction 0-001-023 12/31/08 DONE DONE DONE 06/09/08 06/02/08 12/19/06 12/05/06 2,4,7,8,9,10,15 2,091,532 3,094,500 HCM 0 0 443,405
Robertson Strong Apgar Architects
07-2238 Reconstruction 0-001-024 12/31/08 DONE DONE DONE 06/09/08 06/02/08 05/01/08 12/05/06 2 313,050 303,050 HCM 0 0 0
Robertson Strong Apgar Architects
- Reconstruction 0-001-025 / / / / 09/04/09 / / 4 0 0 HCM 0 0 0
06-0783SC Visual Structural Inspection 0-001-SC1 04/11/07 DONE DONE DONE 03/22/07 03/22/07 / / / / 16 39,236 0 JOD 0 0 0
Senior High School:
04-0740 Additions and Alterations 0-002-018 04/13/05 DONE DONE DONE 02/01/05 01/28/05 07/08/03 12/16/03 02 - 16 35,100,000 35,000,996 HCM 0 0 0
Clark Patterson Associates
04-1125 Reconstruction 0-002-019 03/16/06 DONE DONE DONE 04/11/05 04/08/05 10/01/04 10/06/04 155,15,16 1,421,212 1,421,212 HCM 0 0 0
Clark Patterson Associates
06-1149 Additions and Alterations 0-002-020 07/11/07 DONE DONE DONE 03/21/07 03/13/07 12/19/06 12/05/06 02 - 16 17,354,054 17,132,718 HCM 0 0 3,848,911
Robertson Strong Apgar Architects
06-1150 Additions and Alterations 0-002-021 07/11/07 DONE DONE DONE 03/21/07 03/13/07 01/05/07 12/05/06 02 - 16 3,349,631 3,349,631 HCM 0 0 0
Robertson Strong Apgar Architects
07-1819 Reconstruction 0-002-022 06/03/08 DONE DONE DONE 03/17/08 03/11/08 11/21/07 05/15/07 2,8,9 100,000 100,000 HCM 0 0 0
RSA (Robertson Strong Apgar)
06-1316SC Visual Structural Inspection 0-002-SC2 06/12/07 DONE DONE DONE 03/22/07 03/22/07 / / / / 16 75,590 0 JOD 0 0 0
Chorley Elementary School:
04-1126 Reconstruction 0-009-017 03/16/06 DONE DONE DONE 04/11/05 04/08/05 10/01/04 10/06/04 2,8,155,15,16 1,047,976 1,047,976 HCM 0 0 0
Clark Patterson Associates
07-2239 Reconstruction 0-009-018 12/31/08 DONE DONE DONE 06/09/08 06/02/08 12/19/06 12/05/06 2,4,7,10,15 1,097,950 1,097,950 HCM 0 0 144,345
Robertson Strong Apgar Architects
07-2228 Reconstruction 0-009-019 12/29/08 DONE DONE DONE 06/06/08 06/02/08 04/23/08 12/05/07 75,000 0 HCM 0 0 0
Robertson Strong Apgar Architects
06-1314SC Visual Structural Inspection 0-009-SC1 06/12/07 DONE DONE DONE 03/22/07 03/22/07 / / / / 16 24,463 0 JOD 0 0 0
Moon Elementary School:
04-1127 Reconstruction 0-010-021 03/16/06 DONE DONE DONE 04/11/05 04/08/05 10/01/04 10/06/04 2,155,15,16 286,329 286,329 HCM 0 0 0
Clark Patterson Associates
07-2240 Reconstruction 0-010-022 12/31/08 DONE DONE DONE 06/09/08 06/02/08 12/19/06 12/05/06 2,4,7,10,15 404,875 227,500 HCM 0 0 82,500
Robertson Strong Apgar Architects
07-2229 Reconstruction 0-010-023 12/29/08 DONE DONE DONE 06/06/08 06/02/08 04/23/08 12/05/07 2,8,9 75,000 0 HCM 0 0 0
Robertson Strong Apgar Architects
06-1315SC Visual Structural Inspection 0-010-SC1 06/12/07 DONE DONE DONE 03/22/07 03/22/07 / / / / 16 19,481 0 JOD 0 0 0
Mechanicstown Elementary:
04-1128 Reconstruction 0-012-011 03/16/06 DONE DONE DONE 04/11/05 04/08/05 10/01/04 10/06/04 2,155,15,16 325,960 325,960 HCM 0 0 0
Clark Patterson Associates
07-2241 Reconstruction 0-012-012 12/31/08 DONE DONE DONE 06/09/08 06/02/08 12/19/06 12/05/06 2,4,7,10,15 2,000,000 2,000,000 HCM 0 0 395,882
Robertson Strong Apgar Architects
- Reconstruction 0-012-013 / / / / 04/23/08 / / 2,7,8 0 0 HCM 0 0 0
- Reconstruction 0-012-014 / / / / 05/01/08 / / 2,8,9 0 0 HCM 0 0 0
06-1311SC Visual Structural Inspection 0-012-SC1 06/12/07 DONE DONE DONE 03/22/07 03/22/07 / / / / 16 28,966 0 JOD 0 0 0
Monhagen Middle School:
04-1129 Reconstruction 0-030-004 03/16/06 DONE DONE DONE 04/11/05 04/08/05 10/01/04 10/06/04 155,15,16 381,570 381,570 HCM 0 0 0
Clark Patterson Associates
07-2242 Reconstruction 0-030-005 12/31/08 DONE DONE DONE 06/09/08 06/02/08 12/19/06 12/05/06 2,4,7,9,10,155,15,16 2,500,000 2,003,100 HCM 0 0 349,482
Robertson Strong Apgar Architects
- Reconstruction 0-030-006 / / / / 09/04/09 / / 7 0 22,576,995 HCM 0 0 0
06-1313SC Visual Structural Inspection 0-030-SC1 06/12/07 DONE DONE DONE 03/22/07 03/22/07 / / / / 16 28,802 0 JOD 0 0 0
Maple Hill Elementary School:
04-1130 Reconstruction 0-032-004 03/16/06 DONE DONE DONE 04/11/05 04/08/05 10/01/04 10/06/04 155,15,16 384,814 384,814 HCM 0 0 0
Clark Patterson Associates
07-2243 Reconstruction 0-032-005 12/31/08 DONE DONE DONE 06/09/08 06/02/08 12/19/06 12/05/06 2,4,7,9,10 180,500 0 HCM 0 0 38,266
Robertson Strong Apgar Architects
07-2230 Reconstruction 0-032-006 12/29/08 DONE DONE DONE 06/06/08 06/02/08 04/23/08 12/05/07 2,8,9 90,000 90,000 HCM 0 0 0
Robertson Strong Apgar Architects
08-1382 Reconstruction 0-032-007 04/10/09 DONE DONE DONE 03/16/09 03/10/09 07/16/08 07/16/08 2,9 100,000 100,000 HCM 0 0 0
RSA (Robertson Strong Apgar)
09-0346 Reconstruction 0-032-008 UNREVIEWED 10/27/09 10/22/09 07/16/08 02/07/08 155 0 0 HCM 0 0 0
Fellenzer Engineering
06-1312SC Visual Structural Inspection 0-032-SC1 06/12/07 DONE DONE DONE 03/22/07 03/22/07 / / / / 16 26,813 0 JOD 0 0 0
New Elementary School:
09-0373 New Construction 0-041-001 UNREVIEWED ***MULTIPLE PROBLEMS*** 0 HCM 0 0 0
RSA (Robertson Strong Apgar)
Administration Building:
04-1131 Reconstruction 1-016-006 03/16/06 DONE DONE DONE 04/11/05 04/08/05 10/01/04 10/06/04 2,155,15,16 69,167 0 HCM 0 0 0
Clark Patterson Associates
07-2244 Reconstruction 1-016-007 12/31/08 DONE DONE DONE 06/09/08 06/02/08 12/19/06 12/05/06 2,7,13 96,765 0 HCM 0 0 0
Robertson Strong Apgar Architects
TEACHERS CENTER:
06-0071TQ Temporary Quarters 1-037-001 02/22/07 DONE DONE DONE 07/12/06 07/12/06 05/22/06 / / 0 0 HCM 0 0 0
Athletic Storage/Rest Rooms:
- PR Additions and Alterations 2-019-003 / / / / 12/19/06 / / 02 - 16 0 0 HCM 0 0 0
Food Storage Building:
- PR Additions and Alterations 2-021-004 / / / / 12/19/06 / / 02 - 16 0 0 HCM 0 0 0
New Maintenance Building:
- PR New Construction 3-039-001 / / / / 12/21/06 / / 02 - 16 0 0 HCM 0 0 0
Concession Stand:
06-1151 New Construction 7-038-001 07/11/07 DONE DONE DONE 03/21/07 03/13/07 12/19/06 12/05/06 02 - 16 471,771 0 HCM 0 0 0
Robertson Strong Apgar Architects
Field House:
06-1152 New Construction 7-040-001 07/11/07 DONE DONE DONE 03/21/07 03/13/07 03/09/07 12/05/06 02 - 16 1,347,351 0 HCM 0 0 0
Robertson Strong Apgar Architects
Districtwide:
- Reconstruction 7-999-001 / / / / 04/19/05 / / 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Slate Hill ES/MS:
05-1067 Reconstruction 0-001-005 07/25/06 DONE DONE DONE 03/31/06 03/07/06 07/05/05 06/14/05 2,4,8,14,155,15,16 1,802,017 1,802,017 HCM 0 0 0
Thomas Associates
08-0523 Reconstruction 0-001-006 03/11/09 DONE DONE DONE 10/14/08 10/10/08 05/15/08 02/05/08 2,4,7,8,9,10,13,155, 9,672,442 11,340,946 HCM 0 0 483,622
Thomas Associates
08-0900 Reconstruction 0-001-007 05/12/09 DONE DONE DONE 12/15/08 12/10/08 08/22/08 02/05/08 2,4,7,8,13,155,15,16 1,298,970 0 HCM 0 0 0
TETRA TECH ARCHITECTS & ENGINEERS
High School:
05-1216 Reconstruction 0-005-005 09/20/06 DONE DONE DONE 04/28/06 04/26/06 03/22/06 12/09/03 2,7 255,850 255,850 HCM 0 0 0
Thomas Associates
08-0524 Reconstruction 0-005-006 03/11/09 DONE DONE DONE 10/14/08 10/10/08 05/15/08 02/05/08 2,4,7,8,9,10,13,14,1 4,600,452 6,135,521 HCM 0 0 230,023
Thomas Associates
08-1139 Reconstruction 0-005-007 04/09/09 DONE DONE DONE 01/28/09 01/26/09 08/14/08 12/09/03 2,16 450,000 0 HCM 0 0 0
Thomas Associates
08-0901 Reconstruction 0-005-008 05/12/09 DONE DONE DONE 12/15/08 12/10/08 08/22/08 02/05/08 2,4,7,8,155,15,16 1,608,463 0 HCM 0 0 0
TETRA TECH ARCHITECTS & ENGINEERS
Jr/High School:
05-1217 Reconstruction 0-012-006 09/20/06 DONE DONE DONE 04/28/06 04/26/06 03/22/06 12/09/03 2,155,16 1,525,000 1,525,000 HCM 0 0 0
Thomas Associates
08-0525 Reconstruction 0-012-007 03/11/09 DONE DONE DONE 10/14/08 10/10/08 05/15/08 02/05/08 2,4,7,8,9,10,13,15,1 2,064,369 3,866,970 HCM 0 0 103,218
Thomas Associates
08-0902 Reconstruction 0-012-008 05/12/09 DONE DONE DONE 12/15/08 12/10/08 08/22/08 02/05/08 2,4,7,8,155,15,16 931,744 0 HCM 0 0 0
TETRA TECH ARCHITECTS & ENGINEERS
Otisville Elementary School:
- PR New Construction 0-021-001 / / / / 08/26/05 / / 02 - 16 0 0 HCM 0 0 0
05-1068 New Construction 0-021-001 07/25/06 DONE DONE DONE 03/31/06 03/07/06 08/26/05 06/14/05 02 - 16 37,772,983 0 HCM 0 0 0
Thomas Associates
- Reconstruction 0-021-002 / / / / 05/27/08 / / 10,13,16 0 0 HCM 0 0 0
New Pole Barn #2:
05-0584 New Construction 2-022-001 05/19/06 DONE DONE DONE 01/18/06 01/12/06 09/28/05 / / 02 - 16 183,926 0 HCM 0 0 0
Thomas Associates
Bus Garage:
08-0526 Additions and Alterations 5-002-003 03/11/09 DONE DONE DONE 10/14/08 10/10/08 05/27/08 02/05/08 02 - 16 1,613,750 1,613,750 HCM 0 0 0
Thomas Associates
08-0903 Reconstruction 5-002-004 05/12/09 DONE DONE DONE 12/15/08 12/10/08 08/22/08 02/05/08 2,4,7,8,155,15,16 21,649 0 HCM 0 0 0
TETRA TECH ARCHITECTS & ENGINEERS
Bus Maintenance Building:
08-1660TQ Temporary Quarters 5-023-001 06/29/09 DONE DONE DONE 06/08/09 06/01/09 05/14/09 / / 0 0 HCM 0 0 0
TETRA TECH ARCHITECTS & ENGINEERS
Bus Maintenance Facility:
- TQ Temporary Quarters 5-024-001 / / / / / / / / 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
North Main St. School:
07-0318 Reconstruction 0-002-007 01/03/08 DONE DONE DONE 09/07/07 09/07/07 01/22/07 05/15/07 7,8,9,155 322,170 322,170 JOD 0 0 86,987
Fellenzer Engineering
- Reconstruction 0-002-008 / / / / 10/16/09 / / 2,155,15,16 0 0 JOD 0 0 0
Central Valley Elem.(fmly Middle):
04-1178 Reconstruction 0-004-006 05/23/05 DONE DONE DONE 04/19/05 04/18/05 05/03/04 07/14/04 7 340,164 340,164 JOD 0 0 0
Fellenzer Engineering
- Reconstruction 0-004-007 / / / / 03/08/07 / / 8,155 0 16,306,224 JOD 0 0 0
- Reconstruction 0-004-008 / / / / 01/31/08 / / 16 0 0 JOD 0 0 0
- Reconstruction 0-004-009 / / / / 10/16/09 / / 2,155,15,16 0 0 JOD 0 0 0
- Reconstruction 0-004-010 / / / / 10/21/09 / / 2,8,155,15,16 0 0 JOD 0 0 0
Harriman Kindergarten Center:
04-0819 Reconstruction 0-005-003 04/05/05 DONE DONE DONE 02/14/05 01/03/05 05/03/04 07/14/04 7 233,216 233,216 JOD 0 0 0
Fellenzer Engineering
- Reconstruction 0-005-004 / / / / 10/21/09 / / 155,16 0 0 JOD 0 0 0
Pine Tree Elementary:
- Reconstruction 0-006-004 / / / / 03/18/05 / / 2 0 290,007 JOD 0 0 0
07-0319 Reconstruction 0-006-005 02/27/08 DONE DONE DONE 09/07/07 09/07/07 01/22/07 05/15/07 7,155 319,345 319,345 JOD 0 0 0
Fellenzer Engineering
- Reconstruction 0-006-006 / / / / 01/31/08 / / 16 0 0 JOD 0 0 0
Middle School (fmly Sr. High):
07-0298 Reconstruction 0-009-011 01/18/08 DONE DONE DONE 09/05/07 09/04/07 01/22/07 05/15/07 7,8,9 1,518,744 1,518,744 JOD 0 0 402,939
Fellenzer Engineering
06-1552 Reconstruction 0-009-012 06/13/07 DONE DONE DONE 05/30/07 05/29/07 05/21/07 05/15/07 7 1,019,057 1,019,057 JOD 0 0 565,916
Fellenzer Engineering
- Reconstruction 0-009-013 / / / / 01/09/09 / / 155,16 0 0 JOD 0 0 0
- Reconstruction 0-009-014 / / / / 10/16/09 / / 2,8,155,15,16 0 0 JOD 0 0 0
Smith Clove Elem.(fmly Cent.Valley):
05-0485 Reconstruction 0-012-005 05/03/06 DONE DONE DONE 12/21/05 12/20/05 07/11/05 07/06/05 16 321,275 321,275 JOD 0 0 0
Fellenzer Engineering
- Reconstruction 0-012-006 / / / / 03/08/07 / / 8,155 0 7,250,175 JOD 0 0 0
- Reconstruction 0-012-007 / / / / 10/21/09 / / 2,155,15,16 0 0 JOD 0 0 0
Sapphire Lake Elementary School:
05-0390 Reconstruction 0-015-004 06/23/06 DONE DONE DONE 11/29/05 11/28/05 02/17/05 08/24/05 2,15 706,313 706,313 JOD 0 0 0
Fellenzer Engineering
07-0122 Reconstruction 0-015-005 01/24/08 DONE DONE DONE 08/03/07 08/02/07 01/22/07 05/15/07 7,9,15 2,557,538 2,557,538 JOD 0 0 690,536
Fellenzer Engineering
06-1553 Reconstruction 0-015-006 06/18/07 DONE DONE DONE 05/30/07 05/29/07 05/21/07 05/15/07 7 175,070 175,070 JOD 0 0 69,373
Fellenzer Engineering
- Reconstruction 0-015-007 / / / / 10/21/09 / / 2,155,16 0 0 JOD 0 0 0
New High School:
- Reconstruction 0-021-006 / / / / 10/16/09 / / 2,155,15,16 0 0 JOD 0 0 0
06-0694FP Alterations 0-021-FP1 01/29/07 DONE DONE DONE / / / / / / / / 0 0 JOD 0 0 0
Education Center:
04-0820 Reconstruction 1-001-002 04/05/05 DONE DONE DONE 02/14/05 01/03/05 05/03/04 07/14/04 7 112,000 0 JOD 0 0 0
Fellenzer Engineering
- Reconstruction 1-001-003 / / / / 10/21/09 / / 2,155,15,16 0 0 JOD 0 0 0
Dormitory/Admin. Bldg:
04-0075 Reconstruction 1-018-002 07/21/05 DONE DONE DONE 07/22/04 07/21/04 04/30/04 / / 155,15,16 110,000 0 JOD 0 0 0
Fellenzer Engineering
06-1233 Reconstruction 1-018-003 05/10/07 DONE DONE DONE 03/27/07 03/26/07 01/22/07 01/10/07 155 260,725 0 JOD 0 0 0
Fellenzer Engineering
- Reconstruction 1-018-004 / / / / 10/21/09 / / 2,155,15,16 0 0 JOD 0 0 0
Garage/ Utility Bldg.:
- Reconstruction 2-019-002 / / / / 10/21/09 / / 2,155,15,16 0 0 JOD 0 0 0
Pole Barn @ Bus Garage:
08-0766DB Discovered Building 2-022-001 08/04/09 DONE DONE DONE 11/19/08 10/31/08 11/05/07 / / 0 0 JOD 0 0 0
Fellenzer Engineering
Revised Bus Garage Storage:
- Reconstruction 4-010-002 / / / / 10/21/09 / / 2,155,16 0 0 JOD 0 0 0
Bus Garage Maint. Bldg.:
- Reconstruction 5-003-003 / / / / 10/21/09 / / 2,155,16 0 0 JOD 0 0 0
Micro Computer Center (former lease0:
- Reconstruction 8-017-002 / / / / 10/21/09 / / 155,16 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Kiryas Joel Public School-see #8012:
05-0510XX New Construction 0-013-001 03/20/06 CANCELLED 12/27/05 12/27/05 02/18/05 05/17/05 02 - 16 10,987,643 4,443,696 DDJ 0 0 0
Pendergrast & Terach, P.C
Greenhouse Project (12x15):
- DB Discovered Building 0-014-001 / / / / 02/28/08 / / 0 0 DDJ 0 0 0
Kiryas Joel Remedial Education Cntr.:
06-0527TQ Temporary Quarters 8-011-001 02/01/07 DONE DONE DONE 11/20/06 11/17/06 07/12/02 / / 0 0 DDJ 0 0 0
New Kiryas Joel Public School:
- Reconstruction 8-012-001 / / / / 07/13/09 / / 2,15,16 0 0 DDJ 0 0 0
07-2142 Reconstruction 8-012-L02 05/01/08 DONE DONE DONE 05/22/08 05/15/07 06/25/07 08/24/06 924,000 924,000 DDJ 0 0 0
Pendergrast & Terach, P.C
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Maybrook Elementary School:
05-1000 Reconstruction 0-002-010 05/01/06 DONE DONE DONE 03/23/06 03/15/06 04/06/05 05/17/05 7 2,021,518 2,021,518 JOD 0 0 0
Bernier Carr Associates
08-1011 Reconstruction 0-002-011 06/04/09 DONE DONE DONE 01/05/09 12/23/08 11/21/07 01/15/08 2,155 636,777 0 JOD 0 0 150,000
Bernier Carr Associates
Montgomery Elementary:
05-1001 Reconstruction 0-004-012 05/01/06 DONE DONE DONE 03/23/06 03/15/06 04/25/05 05/17/05 7 739,113 739,113 JOD 0 0 0
Bernier Carr Associates
Walden Elementary School:
05-1002 Reconstruction 0-009-014 05/01/06 DONE DONE DONE 03/23/06 03/15/06 04/06/05 05/17/05 7 332,863 332,863 JOD 0 0 0
Bernier Carr Associates
East Coldenham Elementary:
04-1392 Reconstruction 0-013-013 07/11/05 DONE DONE DONE 06/09/05 06/07/05 04/25/05 05/17/05 7,16 856,213 856,213 JOD 0 0 0
Bernier Carr Associates
05-1003 Reconstruction 0-013-014 05/01/06 DONE DONE DONE 03/23/06 03/15/06 03/10/06 05/17/05 16 64,350 64,350 JOD 0 0 0
Bernier Carr Associates
08-1662 Reconstruction 0-013-015 07/02/09 DONE DONE DONE 06/08/09 06/01/09 05/15/08 05/15/07 2,155 156,200 0 JOD 0 0 0
Bernier Carr Associates
Valley Central High School:
05-1004 Reconstruction 0-015-017 05/01/06 DONE DONE DONE 03/23/06 03/15/06 04/06/05 05/17/05 7 1,532,520 1,532,520 JOD 0 0 0
Bernier Carr Associates
08-1012 Reconstruction 0-015-018 06/04/09 DONE DONE DONE 01/05/09 12/23/08 11/21/07 01/15/08 2,16 685,480 0 JOD 0 0 160,000
Bernier Carr Associates
- Reconstruction 0-015-019 / / / / 03/17/08 / / 10,155,15,16 0 0 JOD 0 0 0
Valley Middle School:
05-1005 Reconstruction 0-016-016 05/01/06 DONE DONE DONE 03/23/06 03/15/06 04/06/05 05/17/05 7 1,037,541 1,037,541 JOD 0 0 0
Bernier Carr Associates
08-1013 Reconstruction 0-016-017 06/04/09 DONE DONE DONE 01/05/09 12/23/08 11/21/07 01/15/08 2,8,155,15,16 5,827,743 0 JOD 0 0 1,348,700
Bernier Carr Associates
Berea Elementary:
05-1006 Reconstruction 0-017-009 05/01/06 DONE DONE DONE 03/23/06 03/15/06 04/06/05 05/17/05 16 83,875 83,875 JOD 0 0 0
Bernier Carr Associates
08-1664 Reconstruction 0-017-010 06/17/09 DONE DONE DONE 06/08/09 06/01/09 03/17/08 07/14/03 13 79,069 0 JOD 0 0 0
Bernier Carr Associates
Main Admin. Bldg.:
07-0118 Reconstruction 1-005-003 08/08/07 DONE DONE DONE 08/01/07 07/31/07 03/08/07 05/15/07 7 291,475 0 JOD 0 0 0
Bernier Carr Associates
- Reconstruction 1-005-004 / / / / 03/17/08 / / 2,155 0 0 JOD 0 0 0
Trinity Lutheran Church Lease:
04-1343 Reconstruction 8-018-L02 08/30/00 DONE DONE DONE 04/12/05 04/12/05 / / / / 14,000 14,000 JOD 0 0 0
04-1344 Reconstruction 8-018-L03 08/30/01 DONE DONE DONE 04/12/05 04/12/05 / / / / 16,000 16,000 JOD 0 0 0
04-1345 Reconstruction 8-018-L04 08/30/02 DONE DONE DONE 04/12/05 04/12/05 / / / / 16,000 16,000 JOD 0 0 0
04-1346 Reconstruction 8-018-L05 08/30/03 DONE DONE DONE 04/12/05 04/12/05 / / / / 16,000 16,000 JOD 0 0 0
05-0110 Reconstruction 8-018-L06 03/25/05 DONE DONE DONE 03/25/05 03/25/05 / / 05/17/04 16,000 16,000 JOD 0 0 0
06-0387TQ Temporary Quarters 8-018-L07 10/30/06 DONE DONE DONE 10/19/06 10/19/06 10/23/06 / / 16,000 16,000 JOD 0 0 0
06-0388TQ Temporary Quarters 8-018-L08 10/30/06 DONE DONE DONE 10/19/06 10/19/06 10/23/06 / / 16,800 16,800 JOD 0 0 0
07-0043TQ Temporary Quarters 8-018-L09 08/02/07 DONE DONE DONE 07/30/07 07/30/07 08/02/07 / / 17,600 0 JOD 0 0 0
08-0162 Reconstruction 8-018-L10 08/19/08 DONE DONE DONE 08/13/08 08/04/08 08/13/08 / / 19,000 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Newburgh Free Academy:
05-1125 Reconstruction 0-001-013 05/23/06 DONE DONE DONE 04/13/06 04/07/06 03/23/04 02/15/05 2,4,7,8,9,10,155,15, 2,203,617 2,203,617 RDR 0 0 0
Collins & Scoville Architects
05-0670 Reconstruction 0-001-014 04/10/06 DONE DONE DONE 01/30/06 01/30/06 01/19/05 02/15/05 2,4,7,8,9,10,155,15, 5,468,565 5,468,565 RDR 0 0 0
Collins & Scoville Architects
07-0674 Reconstruction 0-001-015 12/28/07 DONE DONE DONE 10/30/07 10/29/07 08/24/07 03/27/07 2,8 2,294,500 0 MGL 0 0 221,648
Collins & Scoville Architects
07-0676 Reconstruction 0-001-016 03/31/08 DONE DONE DONE 10/30/07 10/29/07 08/24/07 03/27/07 2,4,8,9,155,15,16 3,000,000 0 MGL 0 0 0
Collins & Scoville Architects
08-1602 Reconstruction 0-001-017 08/10/09 DONE DONE DONE 05/11/09 05/05/09 08/24/07 03/27/07 2,4,8,9,10,155,15,16 2,447,500 0 MGL 0 0 337,750
Collins & Scoville Architects
07-1184 Reconstruction 0-001-018 01/04/08 DONE DONE DONE 12/21/07 12/19/07 11/21/07 05/15/07 2,155,16 260,000 0 MGL 0 0 0
Collins & Scoville Architects
08-1641 Reconstruction 0-001-019 06/24/09 DONE DONE DONE 05/19/09 05/15/09 03/04/09 02/15/05 2,4 445,000 0 HCM 0 0 0
Collins & Scoville Architects,P.C.
- Reconstruction 0-001-020 / / / / 09/24/09 / / 2,4,8,9,10,155,15,16 0 0 HCM 0 0 0
06-1562SC Visual Structural Inspection 0-001-SC1 06/04/07 DONE DONE DONE 05/31/07 05/31/07 / / / / 16 214,686 0 JOD 0 0 0
06-1563SC Visual Structural Inspection 0-001-SC2 06/04/07 DONE DONE DONE 05/31/07 05/31/07 / / / / 16 21,274 0 JOD 0 0 0
North Junior High School:
04-0731 Reconstruction 0-002-009 02/23/05 DONE DONE DONE 01/28/05 01/27/05 03/23/04 02/15/05 2,4,7,8,9,155,15,16 1,426,268 1,426,268 RDR 0 0 0
Envision Architects
05-0696 Reconstruction 0-002-010 05/25/06 DONE DONE DONE 02/10/06 01/31/06 01/19/05 02/15/05 2,4,7,8,9,10,155,15, 2,204,160 1,497,500 RDR 0 0 0
Sammel Architecture
07-2225 Additions and Alterations 0-002-011 10/09/08 DONE DONE DONE 06/09/08 05/30/08 08/24/07 03/27/07 02 - 16 9,360,000 9,360,000 MGL 0 0 1,291,680
Collins & Scoville Architects,P.C.
07-0675 Reconstruction 0-002-012 12/28/07 DONE DONE DONE 10/30/07 10/29/07 08/24/07 03/27/07 2,8 1,173,900 0 MGL 0 0 161,998
Collins & Scoville Architects
07-0677 Reconstruction 0-002-013 03/31/08 DONE DONE DONE 10/30/07 10/29/07 08/24/07 03/27/07 2 2,000,000 0 MGL 0 0 0
Collins & Scoville Architects
South Junior High School:
05-0282 Reconstruction 0-003-011 10/21/05 DONE DONE DONE 10/21/05 10/19/05 03/23/04 09/27/05 2,4,7,8,9,10,155,15, 101,870 101,870 RDR 0 0 0
Sammel Architecture PLLC
05-0697 Reconstruction 0-003-012 05/25/06 DONE DONE DONE 02/10/06 01/31/06 01/19/05 02/15/05 2,4,7,9,10,155,15,16 959,539 959,539 RDR 0 0 0
Sammel Architecture
05-0693 Reconstruction 0-003-013 03/03/06 DONE DONE DONE 02/10/06 01/31/06 10/05/05 02/15/05 7 1,819,447 1,819,447 RDR 0 0 0
Sammel Architecture
08-1484 Additions and Alterations 0-003-014 06/04/09 DONE DONE DONE 04/13/09 04/08/09 08/24/07 03/13/07 02 - 16 1,404,783 0 MGL 0 0 193,860
Sammel Architecture
- Reconstruction 0-003-015 / / / / 03/04/09 / / 2,4,8,9,10,155,15,16 0 0 HCM 0 0 0
NFA Auto Body Shop:
- Reconstruction 0-004-003 / / / / 08/24/07 / / 16 0 0 MGL 0 0 0
Chestnut Street:
- PR Additions and Alterations 0-005-004 / / / / 01/19/05 / / 02 - 16 0 0 MGL 0 0 0
05-1328 Reconstruction 0-005-005 09/06/06 DONE DONE DONE 06/06/06 06/06/06 03/23/04 02/15/05 2,4,7,8,9,10,14,155, 450,000 0 RDR 0 0 0
Sammel Architecture
Gidney Ave Memorial School:
04-1370 Reconstruction 0-006-007 07/01/05 DONE DONE DONE 06/06/05 05/31/05 03/23/04 03/25/03 2,8,9,10,155,15,16 96,456 132,500 RDR 0 0 0
Joseph J. Minuta Architecture, desig
08-0973 Reconstruction 0-006-008 06/15/09 DONE DONE DONE 12/26/08 12/18/08 01/19/05 03/27/07 2,8,9,10,155,15,16 670,000 0 MGL 0 0 92,460
Minuta Architecture
- Reconstruction 0-006-009 / / / / 08/24/07 / / 2,4,8,9,10,155,15,16 0 0 MGL 0 0 0
The Primary School:
05-0691 Reconstruction 0-009-005 07/12/06 DONE DONE DONE 02/10/06 01/31/06 03/23/04 02/15/05 2,7,8,9,10,14,155,15 639,946 639,946 RDR 0 0 0
Joseph J. Minuta Architecture, desig
- Reconstruction 0-009-006 / / / / 01/19/05 / / 2,7,8,9,10,14,155,15 0 2,685,120 MGL 0 0 0
- Reconstruction 0-009-007 / / / / 08/24/07 / / 2,8,9,10,14,155,15,1 0 0 MGL 0 0 0
West Street School:
05-1378 Reconstruction 0-010-005 09/05/06 DONE DONE DONE 06/19/06 06/15/06 03/23/04 02/15/05 2,4,7,8,9,10,14,155, 150,000 150,000 RDR 0 0 0
Sammel Architecture
- Reconstruction 0-010-006 / / / / 01/19/05 / / 2,4,7,8,9,10,14,155, 0 1,901,157 MGL 0 0 0
Horizons on the Hudson:
05-0694 Reconstruction 0-017-009 03/03/06 DONE DONE DONE 02/10/06 01/31/06 03/23/04 02/15/05 2,4,7,8,9,10,155,15, 503,208 503,208 RDR 0 0 0
Sammel Architecture
05-0698 Reconstruction 0-017-010 05/25/06 DONE DONE DONE 02/10/06 01/31/06 01/19/05 02/15/05 2,4,7,8,9,10,155,15, 1,305,920 1,305,920 RDR 0 0 0
Sammel Architecture
07-2105 Reconstruction 0-017-011 02/03/09 DONE DONE DONE 05/08/08 05/06/08 08/24/07 03/27/07 2,4,8,9,10,155,15,16 316,000 0 MGL 0 0 43,700
Collins & Scoville Architects,P.C.
- Reconstruction 0-017-012 / / / / 09/24/09 / / 2,4,9,155,15,16 0 0 HCM 0 0 0
Vails Gate Elementary:
08-0972 Reconstruction 0-018-005 DONE DONE ADD. REQ'D12/26/08 12/18/08 03/23/04 03/27/07 2,4,8,9,10,155,15,16 0 8,227,606 MGL 0 0 0
Minuta Architecture
- Reconstruction 0-018-006 / / / / 01/19/05 / / 2,7,8,9,10,14,155,15 0 8,227,606 MGL 0 0 0
- Reconstruction 0-018-007 / / / / 08/24/07 / / 2,8,9,10,155,15,16 0 0 MGL 0 0 0
Gardnertown Elementary:
08-0971 Reconstruction 0-019-008 05/19/09 DONE DONE DONE 12/26/08 12/18/08 03/23/04 03/27/07 2,8,10,14,155,15,16 1,090,000 740,000 MGL 0 0 0
Minuta Architecture
- Reconstruction 0-019-009 / / / / 08/24/07 / / 2,8,155,15,16 0 0 MGL 0 0 0
New Windsor School:
04-1254 Reconstruction 0-022-004 06/03/05 DONE DONE DONE 05/11/05 05/06/05 03/23/04 05/20/03 2,4,7,8,9,10,14,155, 227,611 227,611 RDR 0 0 0
Jack Eisenbach - Engineer
05-0076 Reconstruction 0-022-005 11/02/05 DONE DONE DONE 08/01/05 08/01/05 01/19/05 02/15/05 2,4,7,8,9,10,14,155, 8,195,982 7,575,100 RDR 0 0 0
Collins & Scoville Architects
08-1165 Reconstruction 0-022-006 03/25/09 DONE DONE DONE 02/03/09 01/29/09 08/24/07 03/27/07 2,8,16 1,235,000 0 MGL 0 0 170,430
Collins & Scoville Architects,P.C.
New Balmville School:
05-0077 Reconstruction 0-023-009 11/02/05 DONE DONE DONE 08/01/05 08/01/05 01/19/05 02/15/05 2,7,8,9,10,155,15,16 7,570,226 6,743,534 RDR 0 0 0
Collins & Scoville Architects
08-1166 Reconstruction 0-023-010 03/25/09 DONE DONE DONE 02/03/09 01/29/09 08/24/07 03/27/07 2,8 260,000 0 MGL 0 0 35,880
Collins & Scoville Architects,P.C.
Old Balhville School:
07-0622 Reconstruction 0-024-001 12/13/07 DONE DONE DONE 10/25/07 10/25/07 10/25/07 05/15/07 2 375,000 0 MGL 0 0 0
Collins & Scoville Architects
Fostertown School:
05-0695 Reconstruction 0-026-006 03/03/06 DONE DONE DONE 02/10/06 01/31/06 03/23/04 02/15/05 2,8,9,10,155,15,16 675,740 675,740 RDR 0 0 0
Sammel Architecture
05-0699 Reconstruction 0-026-007 05/25/06 DONE DONE DONE 02/10/06 01/31/06 / / 02/15/05 2,8,9,10,13,155,16 701,208 701,208 RDR 0 0 0
Sammel Architecture
- Reconstruction 0-026-008 / / / / 08/24/07 / / 2,4,9,155,15,16 0 0 MGL 0 0 0
Meadow Hill School:
04-0732 Reconstruction 0-035-008 02/23/05 DONE DONE DONE 01/28/05 01/27/05 03/23/04 05/20/03 2,4,7,8,9,10,14,155, 2,623,189 1,692,246 RDR 0 0 0
Envision Architects
05-0700 Reconstruction 0-035-009 05/25/06 DONE DONE DONE 02/10/06 01/31/06 01/19/05 02/15/05 2,4,7,8,9,10,155,15, 2,501,881 2,501,881 RDR 0 0 0
Sammel Architecture
08-1261 Reconstruction 0-035-010 08/07/09 DONE DONE DONE 02/23/09 02/18/09 08/24/07 03/13/07 2,4,8,9,10,155,15,16 6,750,000 0 MGL 0 0 931,500
Sammel Architecture
07-1125 Reconstruction 0-035-011 01/10/08 DONE DONE DONE 12/14/07 12/13/07 08/24/07 03/13/07 2,8 1,000,000 0 MGL 0 0 138,000
Sammel Architecture
- Reconstruction 0-035-012 / / / / 03/14/08 / / 2,10 0 0 HCM 0 0 0
Temple Hill School:
04-0733 Reconstruction 0-036-008 02/23/05 DONE DONE DONE 01/28/05 01/27/05 03/23/04 05/20/03 2,4,7,8,9,10,155,15, 1,711,273 1,711,273 RDR 0 0 0
Envision Architects
05-0701 Reconstruction 0-036-009 05/25/06 DONE DONE DONE 02/10/06 01/31/06 01/19/05 02/15/05 2,4,7,8,9,10,155,15, 2,194,933 2,194,933 RDR 0 0 0
Sammel Architecture
08-1262 Reconstruction 0-036-010 08/07/09 DONE DONE DONE 02/23/09 02/18/09 08/24/07 03/13/07 2,4,8,9,10,155,15,16 2,900,000 0 MGL 0 0 400,200
Sammel Architecture
07-1126 Reconstruction 0-036-011 01/10/08 DONE DONE DONE 12/14/07 12/13/07 08/24/07 03/13/07 2,8 1,000,000 0 MGL 0 0 138,000
Sammel Architecture
08-1263 Reconstruction 0-036-012 08/07/09 DONE DONE DONE 02/23/09 02/18/09 03/14/08 03/13/07 2,10 1,750,000 0 HCM 0 0 0
Sammel Architecture
Heritage Junior High School:
05-0692 Reconstruction 0-039-005 07/10/06 DONE DONE DONE 02/10/06 01/31/06 03/23/04 02/15/05 2,8,9,10,155,15,16 102,089 102,089 RDR 0 0 0
Joseph J. Minuta Architecture, desig
- Reconstruction 0-039-006 / / / / 01/19/05 / / 2,9,16 0 11,755,114 MGL 0 0 0
- Reconstruction 0-039-007 / / / / 08/24/07 / / 4,8,9,16 0 0 MGL 0 0 0
07-1083 Reconstruction 0-039-008 12/12/07 DONE DONE DONE 12/11/07 12/10/07 08/24/07 03/13/07 7,10 1,700,000 1,700,000 MGL 0 0 234,600
Sammel Architecture
Construction Career Academy:
05-1293 Additions and Alterations 0-044-002 06/08/06 DONE DONE DONE 05/25/06 05/19/06 05/18/06 02/15/05 02 - 16 768,000 696,048 RDR 0 0 0
Collins & Scoville Architects
Bd of Ed/Public Library:
05-1379 Reconstruction 1-007-005 06/20/06 DONE DONE DONE 06/19/06 06/15/06 01/04/06 05/16/06 2,7 250,000 0 RDR 0 0 0
Sammel Architecture
Special Education Offices:
- TQ Temporary Quarters 1-052-001 / / / / 09/12/06 / / 0 0 MGL 0 0 0
Grounds Shop:
- Reconstruction 2-008-001 / / / / 03/31/06 / / 2,8,9,155,15,16 0 0 MGL 0 0 0
Toilet Building (see 0044):
- PR Additions and Alterations 7-044-002 / / / / 05/18/06 / / 02 - 16 0 0 MGL 0 0 0
Concession Stand/Cafeteria:
- PR Additions and Alterations 7-045-002 / / / / 03/31/06 / / 02 - 16 0 0 MGL 0 0 0
Stewart Airport Bldg. 105:
- Reconstruction 8-042-002 / / / / 01/19/05 / / 2,4,7,8,9,10,155,15, 0 0 MGL 0 0 0
06-1654 Reconstruction 8-042-L02 07/11/07 DONE DONE DONE 06/26/07 06/26/07 05/22/07 / / 623,408 579,600 MGL 0 0 0
St. Francis of Assisi School:
06-1534 Reconstruction 8-050-L02 07/11/07 DONE DONE DONE 05/22/07 05/18/07 05/22/07 / / 440,611 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School 7-8:
07-0511 Reconstruction 0-005-009 03/18/08 DONE DONE DONE 10/09/07 10/05/07 01/02/07 12/12/06 2,4,7,8,9,10,155,15, 1,683,806 1,683,806 DDJ 0 0 227,314
McGoey, Hauser and Edsall
06-0918 Reconstruction 0-005-010 07/27/07 DONE DONE DONE 02/09/07 02/08/07 01/02/07 12/12/06 2,10,155,15,16 267,395 267,395 DDJ 0 0 36,098
Collins & Scoville Architects,P.C.
08-1763 Additions and Alterations 0-005-011 ADDENDUM REQ'D 06/29/09 06/29/09 04/23/09 05/16/09 02 - 16 0 0 DDJ 0 0 0
Collins & Scoville Architects
Hamilton Bicentennial ES K-6:
06-1110 Reconstruction 0-011-005 06/06/07 DONE DONE DONE 03/15/07 03/12/07 01/02/07 12/12/06 2,4,7,8,9,10,155,15, 1,852,405 1,852,405 DDJ 0 0 250,075
McGoey, Hauser and Edsall
06-0919 Reconstruction 0-011-006 07/27/07 DONE DONE DONE 02/09/07 02/08/07 01/02/07 12/12/06 2,10,155,15,16 539,571 539,571 DDJ 0 0 72,842
Collins & Scoville Architects,P.C.
08-1482 Reconstruction 0-011-007 08/20/09 DONE DONE DONE 04/13/09 04/08/09 11/04/08 12/12/06 2,15,16 197,500 0 DDJ 0 0 0
Collins & Scoville Architects
Kuhl ES K-6/PJHS 9-12:
06-0920 Reconstruction 0-012-019 07/27/07 DONE DONE DONE 02/09/07 02/08/07 12/29/06 12/12/06 2,4,7,8,9,10,155,15, 9,171,423 9,171,423 DDJ 0 0 1,236,117
Collins & Scoville Architects,P.C.
07-1281 Reconstruction 0-012-020 06/11/08 DONE DONE DONE 01/02/08 12/28/07 11/27/07 05/15/07 2,4,7,15,16 645,000 645,000 DDJ 0 0 0
Collins & Scoville Architects,P.C.
08-1739 Additions and Alterations 0-012-021 ADDENDUM REQ'D 06/26/09 06/18/09 04/23/09 05/16/09 02 - 16 0 29,765,744 DDJ 0 0 0
Collins & Scoville Architects
Portable #1:
06-1639 New Construction 0-033-001 07/27/07 DONE DONE DONE 06/22/07 06/14/07 02/21/07 05/15/07 02 - 16 265,200 0 DDJ 0 0 0
Collins & Scoville Architects,P.C.
Portable #2:
06-1640 New Construction 0-034-001 07/27/07 DONE DONE DONE 06/22/07 06/14/07 02/21/07 05/15/07 02 - 16 265,200 0 DDJ 0 0 0
Collins & Scoville Architects,P.C.
Transportation Admin Bldg:
08-1774DB Discovered Building 1-036-001 09/16/09 DONE DONE DONE 07/01/09 06/29/09 08/22/08 / / 0 0 DDJ 0 0 0
Collins & Scoville Architects,P.C.
Maintenance Building:
09-0372 New Construction 3-037-001 STARTED DONE STARTED 10/29/09 10/27/09 08/28/09 05/19/09 02 - 16 0 0 DDJ 0 0 0
Collins & Scoville Architects,P.C.
Bus Garage (demolition):
- Reconstruction 5-002-004 / / / / 10/20/05 / / 2,10,15,16 0 0 DDJ 0 0 0
08-1747 Additions and Alterations 5-002-005 06/30/09 DONE DONE DONE 06/29/09 06/26/09 / / 05/19/09 02 - 16 345,392 345,392 DDJ 0 0 0
Collins & Scoville Architects
Bus Garage Bays @ Deepark Oil:
06-1630 Reconstruction 5-035-L01 06/28/07 DONE DONE DONE 06/19/07 06/18/07 04/26/07 / / 450,000 450,000 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Mason Elementary School:
07-2278 Reconstruction 0-001-006 12/09/08 DONE DONE DONE 06/27/08 06/12/08 04/10/08 04/10/08 10,13,155,16 493,938 493,938 HCM 0 0 120,659
BurtonBehrendt Smith and O'Callaghan
George F. Baker High School:
07-2279 Reconstruction 0-002-006 12/09/08 DONE DONE DONE 06/27/08 06/12/08 04/10/08 04/10/08 10,13,155,16 362,732 362,732 HCM 0 0 88,601
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-002-007 / / / / 07/31/09 / / 2,4 0 0 HCM 0 0 0
Gymnasium:
- Reconstruction 0-003-005 / / / / 04/10/08 / / 10,13,155,16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
High School:
08-1223 Reconstruction 0-001-018 04/03/09 DONE DONE DONE 02/19/09 02/11/09 04/25/08 06/26/08 4 67,655 67,655 DDJ 0 0 24,492
Bernier Carr Associates
- Reconstruction 0-001-019 / / / / 10/27/08 / / 4,8,9,155,15,16 0 0 DDJ 0 0 0
Park Avenue Elementary:
08-1224 Reconstruction 0-002-013 04/03/09 DONE DONE DONE 02/19/09 02/11/09 04/25/08 06/26/08 4,7 473,858 473,858 DDJ 0 0 171,537
Bernier Carr Associates
- Reconstruction 0-002-014 / / / / 10/27/08 / / 9,16 0 0 DDJ 0 0 0
Pine Island Elementary:
- Reconstruction 0-004-010 / / / / 10/27/08 / / 16 0 0 DDJ 0 0 0
Kings Elementary:
08-1225XX Reconstruction 0-005-007 03/23/09 CANCELLED 02/19/09 02/11/09 04/25/08 06/26/08 2,7 0 7,915,752 DDJ 0 0 0
Bernier Carr Associates
- Reconstruction 0-005-008 / / / / 10/27/08 / / 8,155,15,16 0 0 DDJ 0 0 0
Warwick Middle School:
08-1226 Reconstruction 0-006-010 04/03/09 DONE DONE DONE 02/19/09 02/11/09 04/25/08 06/26/08 7 2,015,373 2,015,373 DDJ 0 0 729,566
Bernier Carr Associates
- Reconstruction 0-006-011 / / / / 10/27/08 / / 9,10,16 0 0 DDJ 0 0 0
Pine Island Sweet Pea Garden Shed:
04-1419DB Discovered Building 2-023-001 07/15/08 DONE DONE DONE 06/17/05 06/15/05 11/09/04 / / 02 - 16 0 0 DDJ 0 0 0
Storage Shed #1 @ Kings ES:
05-1176DB Discovered Building 2-025-001 07/25/06 DONE DONE DONE 04/18/06 04/01/06 03/10/06 / / 0 0 DDJ 0 0 0
Warwick Valley Public Library:
05-0145 Reconstruction 6-021-002 08/24/05 DONE DONE DONE 08/22/05 08/18/05 08/22/05 04/05/05 9,16 66,833 0 DDJ 0 0 0
Butler Rowland Mays Architects,LLP
Albert Wisner Public Libray:
- PR New Construction 6-024-001 / / / / 02/04/05 / / 02 - 16 0 0 DDJ 0 0 0
06-0511 New Construction 6-024-001 11/16/06 DONE DONE DONE 11/15/06 11/15/06 02/04/05 04/04/06 02 - 16 232,100 0 DDJ 0 0 0
Butler Rowland Mays Architects,LLP
07-0106 Reconstruction 6-024-002 07/27/07 DONE DONE DONE 07/27/07 07/26/07 07/25/07 03/08/07 2 200,125 0 DDJ 0 0 0
Butler Rowland Mays Architects,LLP
07-0747 Reconstruction 6-024-003 04/10/08 DONE DONE DONE 11/07/07 11/05/07 11/06/07 03/08/07 2,7,8,9,10,155,15,16 8,267,900 0 DDJ 0 0 0
Butler Rowland Mays Architects,LLP
T. Jahn Memorian X-Country Pavilion:
08-1388 New Construction 7-026-001 04/13/09 DONE DONE DONE 03/16/09 03/11/09 08/20/07 07/30/07 02 - 16 6,000 0 DDJ 0 0 0
Cosentino Architecture,PLLC
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle School:
07-1352 Reconstruction 0-001-008 03/04/08 DONE DONE DONE 01/09/08 01/08/08 05/30/07 05/15/07 15 70,000 70,000 HCM 0 0 0
Fellenzer Engineering
08-1543 Reconstruction 0-001-009 09/21/09 DONE DONE DONE 04/24/09 04/21/09 02/02/09 / / 15 94,285 0 HCM 0 0 43,937
Fellenzer Engineering
08-1544 Reconstruction 0-001-010 05/06/09 DONE DONE DONE 04/24/09 04/21/09 03/11/09 / / 15 71,000 71,000 HCM 0 0 0
Fellenzer Engineering
08-1545 Reconstruction 0-001-011 09/21/09 DONE DONE DONE 04/27/09 04/21/09 04/06/09 / / 15 89,428 0 HCM 0 0 41,673
Fellenzer Engineering
- Reconstruction 0-001-012 / / / / 06/04/09 / / 2,4,7 0 0 HCM 0 0 0
Greenwood Lake School:
- Reconstruction 0-002-008 / / / / 08/23/05 / / 15 0 3,684,163 HCM 0 0 0
:
- Reconstruction 7-999-001 / / / / 08/25/05 / / 16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
SS Seward Institute:
- Reconstruction 0-001-007 / / / / 09/25/08 / / 2,4,8,9,10,14,155,15 0 0 JOD 0 0 0
08-0668 Reconstruction 0-001-008 01/28/09 DONE DONE DONE 11/04/08 10/30/08 10/07/08 03/31/08 8 170,101 312,523 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
08-0987 Reconstruction 0-001-009 06/04/09 DONE DONE DONE 12/31/08 12/18/08 12/31/08 03/31/08 1,183,862 1,017,357 JOD 0 0 100,000
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-001-010 / / / / 11/05/09 / / 2,9,10,13,14,155,16 0 0 JOD 0 0 0
Samuel S Seward Memorial Building:
08-0988 Reconstruction 0-003-004 06/04/09 DONE DONE DONE 12/31/08 12/18/08 09/25/08 03/31/08 2,4,7,8,9,14,155,15, 835,562 1,008,440 JOD 0 0 75,916
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-003-005 / / / / 10/07/08 / / 8 0 0 JOD 0 0 0
Florida Golden Hill Elementary:
- Reconstruction 0-004-005 / / / / 09/25/08 / / 2,4,8,9,10,14,155,15 0 0 JOD 0 0 0
08-0669 Reconstruction 0-004-006 01/28/09 DONE DONE DONE 11/04/08 10/30/08 10/07/08 03/31/08 8 278,938 373,398 JOD 0 0 0
BurtonBehrendt Smith and O'Callaghan
08-0989 Reconstruction 0-004-007 06/04/09 DONE DONE DONE 12/31/08 12/18/08 / / 03/31/08 1,387,115 1,455,800 JOD 0 0 100,000
BurtonBehrendt Smith and O'Callaghan
- Reconstruction 0-004-008 / / / / 11/05/09 / / 8,9,10,15 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Special Ed Building:
04-0061 Reconstruction 0-009-016 11/08/04 DONE DONE DONE 07/19/04 07/16/04 / / 03/15/04 7,10,13,155,16 247,125 247,125 MAC 0 0 0
LAN Associates
05-1008 Reconstruction 0-009-018 05/22/06 DONE DONE DONE 03/23/06 03/20/06 01/09/06 / / 8,16 66,000 66,000 JOD 0 0 0
LAN Associates
06-1138 Reconstruction 0-009-019 09/05/07 DONE DONE DONE 03/19/07 03/12/07 11/20/06 02/08/07 4,8,16 213,000 213,000 JOD 0 0 0
LAN Associates
06-1139 Reconstruction 0-009-020 09/05/07 DONE DONE DONE 03/19/07 03/12/07 01/30/07 02/08/07 155,16 168,000 0 JOD 0 0 0
LAN Associates
06-1549 Reconstruction 0-009-021 07/05/07 DONE DONE DONE 05/25/07 05/25/07 03/26/07 05/10/07 8,16 172,025 172,025 JOD 0 0 0
LAN Associates
08-0694 Reconstruction 0-009-022 06/17/09 DONE DONE DONE 11/05/08 11/04/08 02/26/08 02/08/07 155,16 242,000 0 JOD 0 0 0
Innovative Engineering Pllc
- Reconstruction 0-009-023 / / / / 12/15/08 / / 13,155,16 0 0 JOD 0 0 0
Occ.Ed.Bldg(Career&Tech Cntr):
03-1113 Reconstruction 0-010-009 11/10/04 DONE DONE DONE 02/13/04 02/12/04 / / 06/03/03 155,16 179,951 179,951 MAC 0 0 0
LAN Assoc.
06-1140 Reconstruction 0-010-012 09/05/07 DONE DONE DONE 03/19/07 03/12/07 / / 02/08/07 4,8,16 105,300 171,500 JOD 0 0 0
LAN Associates
06-1141 Reconstruction 0-010-013 09/05/07 DONE DONE DONE 03/19/07 03/12/07 01/30/07 02/08/07 155,16 67,000 0 JOD 0 0 0
LAN Associates
06-1550 Reconstruction 0-010-014 07/05/07 DONE DONE DONE 05/25/07 05/25/07 03/26/07 05/10/07 8,16 132,975 132,975 JOD 0 0 0
LAN Associates
08-0695 Reconstruction 0-010-015 06/17/09 DONE DONE DONE 11/05/08 11/04/08 02/26/08 02/08/07 155,16 35,500 0 JOD 0 0 0
Innovative Engineering Pllc
Educational Comm. Ctr.:
07-2216 Additions and Alterations 7-002-001 08/13/08 DONE DONE DONE 06/05/08 05/28/08 11/30/06 / / 02 - 16 212,000 0 JOD 0 0 0
LAN Associates
Chester HS @ Chester UFSD:
04-0409 Reconstruction 8-033-001 01/19/05 DONE DONE DONE 11/16/04 11/16/04 11/16/04 09/09/04 10,155,15,16 1,667,884 1,667,884 MAC 0 0 0
LAN Associates
04-0957 Reconstruction 8-033-002 05/11/05 DONE DONE DONE 03/10/05 03/07/05 02/23/05 09/09/04 7 470,779 470,779 JOD 0 0 0
LAN Associates
05-0717 Reconstruction 8-033-003 07/11/06 DONE DONE DONE 02/10/06 02/07/06 11/02/05 09/09/04 155,16 1,861,500 1,861,500 JOD 0 0 0
LAN Associates
Adult Education / Nursing @ Playtogs:
07-1276TQ Temporary Quarters 8-034-001 04/09/08 DONE DONE DONE 12/31/07 12/26/07 12/04/07 / / 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED