Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 11/05/09 at 16:03:18




WASHINGTONVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-01-02-06
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Washingtonville 5/6 School:
04-0953XX Reconstruction               0-001-009  05/25/05               CANCELLED          03/10/05   03/08/05   05/25/99   11/13/03   2,8,9,155,15,16        3,800,000     3,800,000  JOD             0           0            0
                                                                                                                                                                                                                                 Silverman & Cosentino, Assoc.       
04-0346   Reconstruction               0-001-011  09/19/05     DONE    DONE       DONE      11/03/04   10/28/04   12/04/02   04/19/04   8,9,10,155,15,16         732,617       732,617  JOD             0           0            0
                                                                                                                                                                                                                                 Silverman & Cosentino, Assoc.       
05-1179   Reconstruction               0-001-012  11/06/06     DONE    DONE       DONE      04/21/06   04/19/06   06/17/05   05/17/05   2,9,10,13                540,177       396,822  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
06-0439XX Reconstruction               0-001-013  02/07/07               CANCELLED          11/08/06   11/08/06   03/02/06   05/17/05   16                        37,350        37,350  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
06-1025   Reconstruction               0-001-014  06/19/07     DONE    DONE       DONE      03/05/07   02/27/07   04/06/06   05/16/06   2,4,8,9,10,155,15,16   2,611,873     2,761,873  JOD             0           0      626,978
                                                                                                                                                                                                                                 Sammel Architecture                 
08-1740   Reconstruction               0-001-015  10/28/09     DONE    DONE       DONE      06/26/09   06/18/09   01/31/08   05/20/09   2,4,7,8,9,16             758,192             0  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
08-1766   Reconstruction               0-001-016  07/20/09     DONE    DONE       DONE      06/30/09   06/24/09   04/06/09   05/20/08   10                       313,261             0  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
06-0420SC Visual Structural Inspection 0-001-SC1  11/06/06     DONE    DONE       DONE      10/04/06   10/04/06     /  /       /  /     16                        28,873        26,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Taft Elementary School:
04-0347   Reconstruction               0-002-008  09/19/05     DONE    DONE       DONE      11/03/04   10/28/04   12/04/02   04/19/04   8,9,10,155,15,16         490,239       490,239  JOD             0           0            0
                                                                                                                                                                                                                                 Silverman & Cosentino, Assoc.       
  -       Reconstruction               0-002-010                                              /  /       /  /     07/11/05     /  /     2,10                           0     8,990,217  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0440   Reconstruction               0-002-011  02/07/07     DONE    DONE       DONE      11/08/06   11/08/06   03/02/06   05/17/05   16                       208,072       208,072  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
06-1026   Reconstruction               0-002-012  06/19/07     DONE    DONE       DONE      03/05/07   02/27/07   04/06/06   05/16/06   2,9,155,15             1,669,445     1,669,445  JOD             0           0      431,473
                                                                                                                                                                                                                                 Sammel Architecture                 
08-1741   Reconstruction               0-002-013  10/28/09     DONE    DONE       DONE      06/26/09   06/18/09   01/31/08   05/20/09   2,4,8,9,155,16           804,987             0  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 

          Little Britain Elementary:
04-0348   Reconstruction               0-004-010  09/19/05     DONE    DONE       DONE      11/03/04   10/28/04   12/04/02   04/19/04   8,9,10,155,15,16         663,104       663,104  JOD             0           0            0
                                                                                                                                                                                                                                 Silverman & Cosentino, Assoc.       
  -       Reconstruction               0-004-011                         UNREVIEWED         06/30/09   06/24/09   07/11/05   05/20/08   2,10                           0     7,172,872  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
06-0441   Reconstruction               0-004-012  02/07/07     DONE    DONE       DONE      11/08/06   11/08/06   03/02/06   05/17/05   16                       351,846       351,846  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
06-1027   Reconstruction               0-004-013  06/19/07     DONE    DONE       DONE      03/05/07   02/27/07   04/06/06   05/16/06   2,9,15                   345,797       345,797  JOD             0           0      110,275
                                                                                                                                                                                                                                 Sammel Architecture                 
08-1742   Reconstruction               0-004-014  10/28/09     DONE    DONE       DONE      06/26/09   06/18/09   01/31/08   05/20/09   2,4,8,9,10,155,15,16     613,542             0  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
08-1767   Reconstruction               0-004-015  07/20/09     DONE    DONE       DONE      06/30/09   06/24/09   04/06/09   05/20/08   10                       242,124             0  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 

          Senior High School:
04-0954   Additions and Alterations    0-007-011  05/25/05     DONE    DONE       DONE      03/10/05   03/08/05   05/25/99   11/13/03   02 - 16                8,672,213     8,672,213  JOD             0           0            0
                                                                                                                                                                                                                                 Silverman & Cosentino, Assoc.       
04-0349   Reconstruction               0-007-012  09/19/05     DONE    DONE       DONE      11/03/04   10/28/04   12/04/02   04/19/04   8,9,10,155,15,16       1,642,506     1,642,506  JOD             0           0            0
                                                                                                                                                                                                                                 Silverman & Cosentino, Assoc.       
05-0872   Reconstruction               0-007-013  04/20/06     DONE    DONE       DONE      03/07/06   03/07/06   07/11/05   05/17/05   2,7,10                 2,453,595     2,453,595  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
06-0442   Reconstruction               0-007-014  02/07/07     DONE    DONE       DONE      11/08/06   11/08/06   03/02/06   05/17/05   16                       248,446       248,446  DDJ             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
06-1028   Reconstruction               0-007-015  06/19/07     DONE    DONE       DONE      03/05/07   02/27/07   04/06/06   05/16/06   2,9,15,16                989,876       989,876  JOD             0           0      251,984
                                                                                                                                                                                                                                 Sammel Architecture                 
07-1631   Reconstruction               0-007-016  03/07/08     DONE    DONE       DONE      02/19/08   02/13/08   01/18/08   05/15/07   4,8,9                     46,666        46,666  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
08-1743   Reconstruction               0-007-017  10/28/09     DONE    DONE       DONE      06/26/09   06/18/09   01/31/08   05/20/08   2,4,8,9,10,155,15,16   1,383,617             0  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
  -       Reconstruction               0-007-018                                              /  /       /  /     04/06/09     /  /     10                             0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0419   Visual Structural Inspection 0-007-SC1  11/06/06     DONE    DONE       DONE      10/04/06   10/04/06     /  /       /  /     16                        37,757        34,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-0452SC Visual Structural Inspection 0-007-SC2  10/03/08     DONE    DONE       DONE      06/26/08   06/26/08     /  /       /  /     16                        13,628             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Round Hill Elementary:
04-0350   Reconstruction               0-008-009  09/19/05     DONE    DONE       DONE      11/03/04   10/28/04   12/04/02   04/19/04   8,9,10,155,15,16         832,918       832,918  JOD             0           0            0
                                                                                                                                                                                                                                 Silverman & Cosentino, Assoc.       
05-0873   Reconstruction               0-008-010  04/20/06     DONE    DONE       DONE      03/07/06   03/07/06   07/11/05   05/17/05   2,7,10,16              1,116,880     1,116,880  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
06-0443XX Reconstruction               0-008-011  02/07/07               CANCELLED          11/08/06   11/08/06   03/02/06   05/17/05   16                        17,100        17,100  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
06-1029   Reconstruction               0-008-012  06/19/07     DONE    DONE       DONE      03/05/07   02/27/07     /  /     05/16/06   2,9,15,16                738,407       738,407  JOD             0           0      161,401
                                                                                                                                                                                                                                 Sammel Architecture                 
08-1744   Reconstruction               0-008-013  10/28/09     DONE    DONE       DONE      06/26/09   06/18/09   01/31/08   05/20/08   2,4,8,9,10,155,15,16     642,745             0  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
07-2126   Reconstruction               0-008-014  09/29/08     DONE    DONE       DONE      05/19/08   05/14/08   05/02/08   05/17/05   16                       183,980             0  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 

          New 7/8 School:
04-0955   New Construction             0-024-001  05/25/05     DONE    DONE       DONE      03/10/05   03/08/05   11/09/98   11/13/03   02 - 16               27,000,000    18,587,150  JOD             0           0            0
                                                                                                                                                                                                                                 Silverman & Cosentino, Assoc.       
08-0451SC Visual Structural Inspection 0-024-SC1  10/03/08     DONE    DONE       DONE      06/26/08   06/26/08     /  /       /  /     16                         2,807             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Administration:
04-0351   Reconstruction               1-016-004  09/19/05     DONE    DONE       DONE      11/03/04   10/28/04   12/04/02   04/19/04   8,9,10,155,15,16          64,380             0  JOD             0           0            0
                                                                                                                                                                                                                                 Silverman & Cosentino, Assoc.       
08-1745   Reconstruction               1-016-005  10/28/09     DONE    DONE       DONE      06/26/09   06/18/09   01/31/08   05/20/08   2,7,8,9                  128,700             0  JOD             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 

          22 Sarah Wells Trail:
02-2315   Reconstruction               1-021-001  02/27/06     DONE    DONE       DONE      05/27/03     /  /     02/11/03     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               1-021-002                                              /  /       /  /       /  /       /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
04-0352   Reconstruction               5-013-008  09/19/05     DONE    DONE       DONE      11/03/04   10/28/04   05/25/99   04/19/04   8,9,16                   140,890       140,890  JOD             0           0            0
                                                                                                                                                                                                                                 Silverman & Cosentino, Assoc.       
06-1030   Reconstruction               5-013-009  06/19/07     DONE    DONE       DONE      03/05/07   02/27/07   12/04/02   05/16/06   2,4,8,9,155,15,16        253,843       229,240  MAC             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CHESTER UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-02-01-02
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Elementary School:
08-1520   Reconstruction               0-001-006                       ADDENDUM REQ'D       04/20/09   04/17/09   09/10/08   05/20/08   4,8,10,155,16                  0     8,877,654  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  
03-0812FP Reconstruction               0-001-FP1  01/06/09     DONE    DONE       DONE      12/10/03     /  /       /  /       /  /     16                         4,898             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          NEW CONSTRUCTION-NEW MIDDLE/HS:
08-1521   Additions and Alterations    0-009-002               STARTED STARTED    UNREVIEWED04/20/09   04/17/09   09/10/08   05/20/08   02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  
03-0810FP Reconstruction               0-009-FP1  01/06/09     DONE    DONE       DONE      12/10/03     /  /       /  /       /  /     16                         4,160             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0876SC Visual Structural Inspection 0-009-SC1  02/05/07     DONE    DONE       DONE      01/25/07   01/25/07     /  /       /  /     16                        62,466        62,466  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CORNWALL CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-03-01-06
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Cornwall M.S.(fmly HS):
  -       Reconstruction               0-001-019                                              /  /       /  /     09/27/07     /  /     13                             0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
07-2118   Reconstruction               0-001-020  11/12/08     DONE    DONE       DONE      05/16/08   05/09/08   10/01/07   05/15/07   13,16                    237,350       240,000  HCM             0           0       87,345
                                                                                                                                                                                                                                 McGoey, Hauser and Edsall           
08-0053   Additions and Alterations    0-001-021  06/23/09     DONE    DONE       DONE      07/21/08   07/08/08   10/01/07   05/15/07   02 - 16                  200,000       200,000  HCM             0           0            0
                                                                                                                                                                                                                                 McGoey, Hauser and Edsall           

          Elementary School:
05-1218   Reconstruction               0-002-010  05/03/06     DONE    DONE       DONE      04/28/06   04/27/06   02/15/06   06/14/06   2,4,7                    397,390       397,390  HCM             0           0            0
                                                                                                                                                                                                                                 McGoey, Hauser and Edsall           
06-0028   Reconstruction               0-002-011  07/26/06     DONE    DONE       DONE      07/10/06   07/10/06   06/08/06   06/21/06   13                       387,905       387,905  HCM             0           0            0
                                                                                                                                                                                                                                 McGoey, Hauser and Edsall           
07-1593   Additions and Alterations    0-002-012  01/09/08     DONE    DONE       DONE      02/11/08   02/07/08   09/27/07   05/15/07   02 - 16                  498,557       498,557  HCM             0           0      183,469
                                                                                                                                                                                                                                 McGoey, Hauser and Edsall           

          Willow Ave Elementary School:
07-0582   Reconstruction               0-004-010  01/21/08     DONE    DONE       DONE      10/18/07   10/17/07   01/30/07   05/15/07   7                        198,800       198,800  HCM             0           0            0
                                                                                                                                                                                                                                 McGoey, Hauser and Edsall           
07-1598   Additions and Alterations    0-004-011  01/09/09     DONE    DONE       DONE      02/11/08   02/07/08   09/27/07   05/15/07   02 - 16                  622,439       622,439  HCM             0           0      229,058
                                                                                                                                                                                                                                 McGoey, Hauser and Edsall           
07-1600   Additions and Alterations    0-004-012  05/28/08     DONE    DONE       DONE      02/12/08   02/07/08   12/26/07   05/15/07   02 - 16                   96,800        96,800  HCM             0           0            0
                                                                                                                                                                                                                                 McGoey, Hauser and Edsall           

          Cornwall Elementary:
07-1470   Reconstruction               0-006-011  03/03/08     DONE    DONE       DONE      01/26/08   01/24/08   01/30/07   05/15/07   7                        651,620       651,620  HCM             0           0            0
                                                                                                                                                                                                                                 McGoey, Hauser and Edsall           
07-1599   Additions and Alterations    0-006-012  01/09/09     DONE    DONE       DONE      02/12/08   02/07/08   09/27/07   05/15/07   02 - 16                  396,304       396,304  HCM             0           0      145,840
                                                                                                                                                                                                                                 McGoey, Hauser and Edsall           

          New High School:
09-0023   Alterations                  0-012-002  08/31/09     DONE    DONE       DONE      07/03/09   07/03/09   01/30/07   05/15/07   02 - 16                  267,475       275,000  HCM             0           0      101,640
                                                                                                                                                                                                                                 McGoey, Hauser and Edsall           
  -       Reconstruction               0-012-003                                              /  /       /  /     10/01/07     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Shipping Container Storage:
  -       New Construction             2-017-001                                              /  /       /  /     01/17/08     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Press Box:
02-0244   New Construction             7-014-001  02/01/08     DONE    DONE       DONE      09/16/02   07/19/02   10/19/01   05/22/02   02 - 16                   56,000             0  MAC             0           0            0
                                                                                                                                                                                                                                 Pendergast & Terach, PC             

          Baseball Field Dugouts:
  -       New Construction             7-016-001                                              /  /       /  /     12/22/04     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PINE BUSH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-04-01-06
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Crispell Middle School:
07-0565   Reconstruction               0-001-005  03/31/09     DONE    DONE       DONE      10/17/07   10/15/07   06/25/07   06/12/07   16                         5,695             0  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          E.J. Russell School:
07-0566   Reconstruction               0-002-008  03/31/09     DONE    DONE       DONE      10/17/07   10/15/07   06/25/07   06/12/07   16                       215,518       215,518  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
  -       Reconstruction               0-002-009                                              /  /       /  /     08/22/08     /  /     2,7,8,9,10,155,15,16           0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Music Room-crispell:
07-0165   Reconstruction               0-003-003  08/24/07     DONE    DONE       DONE      08/16/07   08/15/07   08/01/07   05/15/07   2                         50,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Senior High School:
04-0555   Additions and Alterations    0-007-014  01/31/05     DONE    DONE       DONE      12/15/04   12/03/04   10/14/04   03/28/02   02 - 16                3,096,998     3,096,998  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
05-1386   Reconstruction               0-007-015  07/13/06     DONE    DONE       DONE      06/20/06   06/19/06   03/22/06   03/28/02   7                        207,000       207,000  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
07-0567   Reconstruction               0-007-016  03/31/09     DONE    DONE       DONE      10/17/07   10/15/07   06/25/07   06/12/07   15,16                  2,085,645             0  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
  -       Reconstruction               0-007-017                                              /  /       /  /     08/22/08     /  /     2,7,8,9,10,155,15,16           0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Circleville Primary:
05-1387   Reconstruction               0-009-009  07/13/06     DONE    DONE       DONE      06/20/06   06/19/06   03/22/06   03/28/02   7                         96,700        96,700  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
07-0568   Reconstruction               0-009-010  03/31/09     DONE    DONE       DONE      10/17/07   10/15/07   06/25/07   06/12/07   16                       223,285             0  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
  -       Reconstruction               0-009-011                                              /  /       /  /     08/22/08     /  /     2,7,8,9,10,155,15,16           0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Pakanasink Elementary:
07-0569   Reconstruction               0-012-009  03/31/09     DONE    DONE       DONE      10/17/07   10/15/07   06/25/07   06/12/07   15,16                    655,464             0  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
08-0984   Reconstruction               0-012-010  05/19/09     DONE    DONE       DONE      12/31/08   12/19/08   08/22/08   05/20/08   2,7,8,9,10,155,15,16   2,092,000             0  HCM             0           0      376,560
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Crispell Middle School:
05-1388   Reconstruction               0-013-003  07/13/06     DONE    DONE       DONE      06/20/06   06/19/06   03/22/06   03/28/02   7                        261,800       261,800  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
07-0570   Reconstruction               0-013-004  03/31/09     DONE    DONE       DONE      10/17/07   10/15/07   06/25/07   06/12/07   16                       298,755             0  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
  -       Reconstruction               0-013-005                                              /  /       /  /     11/09/07     /  /     10,155                         0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
08-0985   Reconstruction               0-013-006  05/19/09     DONE    DONE       DONE      12/31/08   12/19/08   08/22/08   05/20/08   2,7,8,9,10,14,155,15   1,215,640             0  HCM             0           0      218,815
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Circleville Middle School:
07-0571   Reconstruction               0-014-007  03/31/09     DONE    DONE       DONE      10/17/07   10/15/07   06/25/07   06/12/07   16                       635,646             0  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
08-0986   Reconstruction               0-014-008  05/19/09     DONE    DONE       DONE      12/31/08   12/19/08   11/05/08   05/20/08   2,7,8,9,10,155,15,16   1,296,000             0  HCM             0           0      233,280
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Pine Bush Elementary School:
05-1389   Reconstruction               0-015-008  07/13/06     DONE    DONE       DONE      06/20/06   06/19/06   03/22/06   03/28/02   7                        690,000       690,000  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
  -       Reconstruction               0-015-009                                              /  /       /  /     11/01/06     /  /     2,4,7,10                       0    13,871,889  HCM             0           0            0
                                                                                                                                                                                                                                                                     
07-0572   Reconstruction               0-015-010  03/31/09     DONE    DONE       DONE      10/17/07   10/15/07   06/26/07   06/12/07   16                       293,486             0  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 
  -       Reconstruction               0-015-011                                              /  /       /  /     08/22/08     /  /     2,7,8,9,10,155,15,16           0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          New Crispell Annex (Modular):
07-0164   New Construction             0-017-001  08/24/07     DONE    DONE       DONE      08/16/07   08/15/07   08/01/07   05/15/07   02 - 16                  990,200       990,200  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          District Offices:
07-0573   Reconstruction               1-004-002  03/31/09     DONE    DONE       DONE      10/17/07   10/15/07   07/27/07   06/12/07   15,16                    225,809             0  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          Special Programs Building:
07-1790TQ Temporary Quarters           1-018-001  03/25/08     DONE    DONE       DONE      03/15/08   03/14/08   03/14/08     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          New Special Programs Building:
08-0411   New Construction             1-019-001  12/04/08     DONE    DONE       DONE      09/26/08   09/25/08   08/21/08     /  /     02 - 16                  690,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          District Storage:
07-0574   Reconstruction               2-008-001  03/31/09     DONE    DONE       DONE      10/17/07   10/15/07   06/25/07   06/12/07   16                        10,155             0  HCM             0           0            0
                                                                                                                                                                                                                                 ECG ENGINEERING,LLC                 

          Districtwide-NYPA:
09-0335   Reconstruction               7-999-002                         UNREVIEWED         10/23/09   10/20/09   02/23/09   05/20/08   2,10,13,16                     0             0  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GOSHEN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-06-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Charles J.Hooker Middle:
05-1007   Reconstruction               0-001-007  04/14/06     DONE    DONE       DONE      03/23/06   03/20/06   01/09/06   12/13/05   4,7,10,16                698,251       698,251  RDR             0           0      291,200
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -    PR Additions and Alterations    0-001-008                                              /  /       /  /     07/16/07     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
08-1106   Reconstruction               0-001-009  03/13/09     DONE    DONE       DONE      01/21/09   01/15/09   04/22/08   05/20/08   2,8,9,13                 659,994             0  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-001-010                                              /  /       /  /     04/23/08     /  /     2,8,9,13                       0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
08-0453   Reconstruction               0-001-011  10/01/08     DONE    DONE       DONE      10/06/08   10/01/08   05/01/08   06/17/08   4,7,13                    46,971        46,971  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          Main Street School:
08-0839   Reconstruction               0-002-006  01/15/09     DONE    DONE       DONE      12/03/08   12/01/08   04/22/08   05/20/08   2,7                      290,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-002-007                                              /  /       /  /     04/23/08     /  /     2,7                            0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Scotchtown Ave. School:
  -    PR Additions and Alterations    0-003-006                                              /  /       /  /     07/16/07     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Intermediate School:
  -       Reconstruction               0-006-005                                              /  /       /  /     07/16/07     /  /     4,7,8,9,13,155,15,16           0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
08-1232   Reconstruction               0-006-006  05/13/09     DONE    DONE       DONE      02/19/09   02/17/09   04/22/08   05/20/08   2,14,16                  283,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-006-007                                              /  /       /  /     04/23/08     /  /     2,14,16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          High School:
  -    PR Additions and Alterations    0-008-007                                              /  /       /  /     07/16/07     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
08-1233   Reconstruction               0-008-008  05/13/09     DONE    DONE       DONE      02/19/09   02/17/09   04/22/08   05/20/08   2,14,155,15,16           708,000       708,000  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               0-008-009                                              /  /       /  /     04/23/08     /  /     2,155,15,16                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
08-0840   Reconstruction               5-007-003  01/15/09     DONE    DONE       DONE      12/03/08   12/01/08   04/22/08   05/20/08   2,7                      154,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
  -       Reconstruction               5-007-004                                              /  /       /  /     04/23/08     /  /     2,7                            0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Main St. Panelfab:
05-1018   Reconstruction               7-009-001  04/14/06     DONE    DONE       DONE      03/24/06   03/10/06   10/19/05   12/13/05   2,10,15,16                69,772             0  RDR             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          

          District Wide:
06-0214   Reconstruction               7-999-002  11/09/06     DONE    DONE       DONE      09/12/06   08/17/06   01/09/06   07/10/06   16                       455,269       455,269  MGL             0           0      215,014
                                                                                                                                                                                                                                 Bridging The Gap                    


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HIGHLAND FALLS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-09-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Middle School:
07-2204SC Visual Structural Inspection 0-004-SC2  09/30/08     DONE    DONE       DONE      06/02/08   06/02/08     /  /       /  /     16                        10,448             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Ft. Montgomery Elementary:
04-1334   Reconstruction               0-005-005  06/21/05     DONE    DONE       DONE      05/25/05   05/24/05   01/18/05   05/18/04   2,15                     327,644       327,644  JOD             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-1417   Reconstruction               0-005-006  04/21/09     DONE    DONE       DONE      03/24/09   03/18/09   10/10/08   01/20/09   2,4,8,9,155,16           980,059       609,610  JOD             0           0      223,453
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
07-2203SC Visual Structural Inspection 0-005-SC1  09/30/08     DONE    DONE       DONE      06/02/08   06/02/08     /  /       /  /     16                         5,221             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Elementary School:
  -       Reconstruction               0-007-005                                              /  /       /  /     10/23/07     /  /     16                             0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-007-006                                              /  /       /  /     10/26/07     /  /     16                             0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
07-2205SC Visual Structural Inspection 0-007-SC1  09/30/08     DONE    DONE       DONE      06/02/08   06/02/08     /  /       /  /     16                         4,419             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          James O'Neill High School:
04-1305   Reconstruction               0-008-010  06/07/05     DONE    DONE       DONE      05/20/05   05/17/05   03/02/05   05/18/04   10                       131,129       131,129  JOD             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
05-0203   Reconstruction               0-008-011  11/23/05     DONE    DONE       DONE      09/21/05   09/20/05   06/07/05   05/18/04   2,10,16                  253,605       253,605  JOD             0           0            0
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
08-1423   Reconstruction               0-008-012  05/27/09     DONE    DONE       DONE      03/24/09   03/18/09   04/17/07   01/20/09   10,16                    231,660       849,378  JOD             0           0       52,818
                                                                                                                                                                                                                                 Kaeyer, Garment & Davidson          
06-1574SC Visual Structural Inspection 0-008-SC2  06/13/07     DONE    DONE       DONE      02/09/07   02/09/07     /  /       /  /     16                         8,589             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          District Wide:
  -       Reconstruction               7-999-001                                              /  /       /  /     04/17/07     /  /     10,16                          0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MIDDLETOWN CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-10-00-01
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Twin Towers Middle School (JHS):
04-1124   Reconstruction               0-001-021  03/16/06     DONE    DONE       DONE      04/11/05   04/08/05   10/01/04   10/06/04   2,155,15,16              550,781       550,781  HCM             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
05-0771   Reconstruction               0-001-022  02/15/06     DONE    DONE       DONE      02/15/06   02/15/06   04/19/05   05/17/05   4                        200,000       200,000  HCM             0           0            0
                                                                                                                                                                                                                                 Robertson Strong Apgar Architects   
07-2237   Reconstruction               0-001-023  12/31/08     DONE    DONE       DONE      06/09/08   06/02/08   12/19/06   12/05/06   2,4,7,8,9,10,15        2,091,532     3,094,500  HCM             0           0      443,405
                                                                                                                                                                                                                                 Robertson Strong Apgar Architects   
07-2238   Reconstruction               0-001-024  12/31/08     DONE    DONE       DONE      06/09/08   06/02/08   05/01/08   12/05/06   2                        313,050       303,050  HCM             0           0            0
                                                                                                                                                                                                                                 Robertson Strong Apgar Architects   
  -       Reconstruction               0-001-025                                              /  /       /  /     09/04/09     /  /     4                              0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-0783SC Visual Structural Inspection 0-001-SC1  04/11/07     DONE    DONE       DONE      03/22/07   03/22/07     /  /       /  /     16                        39,236             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Senior High School:
04-0740   Additions and Alterations    0-002-018  04/13/05     DONE    DONE       DONE      02/01/05   01/28/05   07/08/03   12/16/03   02 - 16               35,100,000    35,000,996  HCM             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
04-1125   Reconstruction               0-002-019  03/16/06     DONE    DONE       DONE      04/11/05   04/08/05   10/01/04   10/06/04   155,15,16              1,421,212     1,421,212  HCM             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
06-1149   Additions and Alterations    0-002-020  07/11/07     DONE    DONE       DONE      03/21/07   03/13/07   12/19/06   12/05/06   02 - 16               17,354,054    17,132,718  HCM             0           0    3,848,911
                                                                                                                                                                                                                                 Robertson Strong Apgar Architects   
06-1150   Additions and Alterations    0-002-021  07/11/07     DONE    DONE       DONE      03/21/07   03/13/07   01/05/07   12/05/06   02 - 16                3,349,631     3,349,631  HCM             0           0            0
                                                                                                                                                                                                                                 Robertson Strong Apgar Architects   
07-1819   Reconstruction               0-002-022  06/03/08     DONE    DONE       DONE      03/17/08   03/11/08   11/21/07   05/15/07   2,8,9                    100,000       100,000  HCM             0           0            0
                                                                                                                                                                                                                                 RSA  (Robertson Strong Apgar)       
06-1316SC Visual Structural Inspection 0-002-SC2  06/12/07     DONE    DONE       DONE      03/22/07   03/22/07     /  /       /  /     16                        75,590             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Chorley Elementary School:
04-1126   Reconstruction               0-009-017  03/16/06     DONE    DONE       DONE      04/11/05   04/08/05   10/01/04   10/06/04   2,8,155,15,16          1,047,976     1,047,976  HCM             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-2239   Reconstruction               0-009-018  12/31/08     DONE    DONE       DONE      06/09/08   06/02/08   12/19/06   12/05/06   2,4,7,10,15            1,097,950     1,097,950  HCM             0           0      144,345
                                                                                                                                                                                                                                 Robertson Strong Apgar Architects   
07-2228   Reconstruction               0-009-019  12/29/08     DONE    DONE       DONE      06/06/08   06/02/08   04/23/08   12/05/07                             75,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Robertson Strong Apgar Architects   
06-1314SC Visual Structural Inspection 0-009-SC1  06/12/07     DONE    DONE       DONE      03/22/07   03/22/07     /  /       /  /     16                        24,463             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Moon Elementary School:
04-1127   Reconstruction               0-010-021  03/16/06     DONE    DONE       DONE      04/11/05   04/08/05   10/01/04   10/06/04   2,155,15,16              286,329       286,329  HCM             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-2240   Reconstruction               0-010-022  12/31/08     DONE    DONE       DONE      06/09/08   06/02/08   12/19/06   12/05/06   2,4,7,10,15              404,875       227,500  HCM             0           0       82,500
                                                                                                                                                                                                                                 Robertson Strong Apgar Architects   
07-2229   Reconstruction               0-010-023  12/29/08     DONE    DONE       DONE      06/06/08   06/02/08   04/23/08   12/05/07   2,8,9                     75,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Robertson Strong Apgar Architects   
06-1315SC Visual Structural Inspection 0-010-SC1  06/12/07     DONE    DONE       DONE      03/22/07   03/22/07     /  /       /  /     16                        19,481             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Mechanicstown Elementary:
04-1128   Reconstruction               0-012-011  03/16/06     DONE    DONE       DONE      04/11/05   04/08/05   10/01/04   10/06/04   2,155,15,16              325,960       325,960  HCM             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-2241   Reconstruction               0-012-012  12/31/08     DONE    DONE       DONE      06/09/08   06/02/08   12/19/06   12/05/06   2,4,7,10,15            2,000,000     2,000,000  HCM             0           0      395,882
                                                                                                                                                                                                                                 Robertson Strong Apgar Architects   
  -       Reconstruction               0-012-013                                              /  /       /  /     04/23/08     /  /     2,7,8                          0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-012-014                                              /  /       /  /     05/01/08     /  /     2,8,9                          0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-1311SC Visual Structural Inspection 0-012-SC1  06/12/07     DONE    DONE       DONE      03/22/07   03/22/07     /  /       /  /     16                        28,966             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Monhagen Middle School:
04-1129   Reconstruction               0-030-004  03/16/06     DONE    DONE       DONE      04/11/05   04/08/05   10/01/04   10/06/04   155,15,16                381,570       381,570  HCM             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-2242   Reconstruction               0-030-005  12/31/08     DONE    DONE       DONE      06/09/08   06/02/08   12/19/06   12/05/06   2,4,7,9,10,155,15,16   2,500,000     2,003,100  HCM             0           0      349,482
                                                                                                                                                                                                                                 Robertson Strong Apgar Architects   
  -       Reconstruction               0-030-006                                              /  /       /  /     09/04/09     /  /     7                              0    22,576,995  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-1313SC Visual Structural Inspection 0-030-SC1  06/12/07     DONE    DONE       DONE      03/22/07   03/22/07     /  /       /  /     16                        28,802             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Maple Hill Elementary School:
04-1130   Reconstruction               0-032-004  03/16/06     DONE    DONE       DONE      04/11/05   04/08/05   10/01/04   10/06/04   155,15,16                384,814       384,814  HCM             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-2243   Reconstruction               0-032-005  12/31/08     DONE    DONE       DONE      06/09/08   06/02/08   12/19/06   12/05/06   2,4,7,9,10               180,500             0  HCM             0           0       38,266
                                                                                                                                                                                                                                 Robertson Strong Apgar Architects   
07-2230   Reconstruction               0-032-006  12/29/08     DONE    DONE       DONE      06/06/08   06/02/08   04/23/08   12/05/07   2,8,9                     90,000        90,000  HCM             0           0            0
                                                                                                                                                                                                                                 Robertson Strong Apgar Architects   
08-1382   Reconstruction               0-032-007  04/10/09     DONE    DONE       DONE      03/16/09   03/10/09   07/16/08   07/16/08   2,9                      100,000       100,000  HCM             0           0            0
                                                                                                                                                                                                                                 RSA  (Robertson Strong Apgar)       
09-0346   Reconstruction               0-032-008                         UNREVIEWED         10/27/09   10/22/09   07/16/08   02/07/08   155                            0             0  HCM             0           0            0
                                                                                                                                                                                                                                 Fellenzer Engineering               
06-1312SC Visual Structural Inspection 0-032-SC1  06/12/07     DONE    DONE       DONE      03/22/07   03/22/07     /  /       /  /     16                        26,813             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          New Elementary School:
09-0373   New Construction             0-041-001                         UNREVIEWED         ***MULTIPLE PROBLEMS***                                                                  0  HCM             0           0            0
                                                                                                                                                                                                                                 RSA  (Robertson Strong Apgar)       

          Administration Building:
04-1131   Reconstruction               1-016-006  03/16/06     DONE    DONE       DONE      04/11/05   04/08/05   10/01/04   10/06/04   2,155,15,16               69,167             0  HCM             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-2244   Reconstruction               1-016-007  12/31/08     DONE    DONE       DONE      06/09/08   06/02/08   12/19/06   12/05/06   2,7,13                    96,765             0  HCM             0           0            0
                                                                                                                                                                                                                                 Robertson Strong Apgar Architects   

          TEACHERS CENTER:
06-0071TQ Temporary Quarters           1-037-001  02/22/07     DONE    DONE       DONE      07/12/06   07/12/06   05/22/06     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Athletic Storage/Rest Rooms:
  -    PR Additions and Alterations    2-019-003                                              /  /       /  /     12/19/06     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Food Storage Building:
  -    PR Additions and Alterations    2-021-004                                              /  /       /  /     12/19/06     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          New Maintenance Building:
  -    PR New Construction             3-039-001                                              /  /       /  /     12/21/06     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Concession Stand:
06-1151   New Construction             7-038-001  07/11/07     DONE    DONE       DONE      03/21/07   03/13/07   12/19/06   12/05/06   02 - 16                  471,771             0  HCM             0           0            0
                                                                                                                                                                                                                                 Robertson Strong Apgar Architects   

          Field House:
06-1152   New Construction             7-040-001  07/11/07     DONE    DONE       DONE      03/21/07   03/13/07   03/09/07   12/05/06   02 - 16                1,347,351             0  HCM             0           0            0
                                                                                                                                                                                                                                 Robertson Strong Apgar Architects   

          Districtwide:
  -       Reconstruction               7-999-001                                              /  /       /  /     04/19/05     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MINISINK VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-11-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Slate Hill ES/MS:
05-1067   Reconstruction               0-001-005  07/25/06     DONE    DONE       DONE      03/31/06   03/07/06   07/05/05   06/14/05   2,4,8,14,155,15,16     1,802,017     1,802,017  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
08-0523   Reconstruction               0-001-006  03/11/09     DONE    DONE       DONE      10/14/08   10/10/08   05/15/08   02/05/08   2,4,7,8,9,10,13,155,   9,672,442    11,340,946  HCM             0           0      483,622
                                                                                                                                                                                                                                 Thomas Associates                   
08-0900   Reconstruction               0-001-007  05/12/09     DONE    DONE       DONE      12/15/08   12/10/08   08/22/08   02/05/08   2,4,7,8,13,155,15,16   1,298,970             0  HCM             0           0            0
                                                                                                                                                                                                                                 TETRA TECH ARCHITECTS & ENGINEERS   

          High School:
05-1216   Reconstruction               0-005-005  09/20/06     DONE    DONE       DONE      04/28/06   04/26/06   03/22/06   12/09/03   2,7                      255,850       255,850  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
08-0524   Reconstruction               0-005-006  03/11/09     DONE    DONE       DONE      10/14/08   10/10/08   05/15/08   02/05/08   2,4,7,8,9,10,13,14,1   4,600,452     6,135,521  HCM             0           0      230,023
                                                                                                                                                                                                                                 Thomas Associates                   
08-1139   Reconstruction               0-005-007  04/09/09     DONE    DONE       DONE      01/28/09   01/26/09   08/14/08   12/09/03   2,16                     450,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
08-0901   Reconstruction               0-005-008  05/12/09     DONE    DONE       DONE      12/15/08   12/10/08   08/22/08   02/05/08   2,4,7,8,155,15,16      1,608,463             0  HCM             0           0            0
                                                                                                                                                                                                                                 TETRA TECH ARCHITECTS & ENGINEERS   

          Jr/High School:
05-1217   Reconstruction               0-012-006  09/20/06     DONE    DONE       DONE      04/28/06   04/26/06   03/22/06   12/09/03   2,155,16               1,525,000     1,525,000  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
08-0525   Reconstruction               0-012-007  03/11/09     DONE    DONE       DONE      10/14/08   10/10/08   05/15/08   02/05/08   2,4,7,8,9,10,13,15,1   2,064,369     3,866,970  HCM             0           0      103,218
                                                                                                                                                                                                                                 Thomas Associates                   
08-0902   Reconstruction               0-012-008  05/12/09     DONE    DONE       DONE      12/15/08   12/10/08   08/22/08   02/05/08   2,4,7,8,155,15,16        931,744             0  HCM             0           0            0
                                                                                                                                                                                                                                 TETRA TECH ARCHITECTS & ENGINEERS   

          Otisville Elementary School:
  -    PR New Construction             0-021-001                                              /  /       /  /     08/26/05     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
05-1068   New Construction             0-021-001  07/25/06     DONE    DONE       DONE      03/31/06   03/07/06   08/26/05   06/14/05   02 - 16               37,772,983             0  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -       Reconstruction               0-021-002                                              /  /       /  /     05/27/08     /  /     10,13,16                       0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          New Pole Barn #2:
05-0584   New Construction             2-022-001  05/19/06     DONE    DONE       DONE      01/18/06   01/12/06   09/28/05     /  /     02 - 16                  183,926             0  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Bus Garage:
08-0526   Additions and Alterations    5-002-003  03/11/09     DONE    DONE       DONE      10/14/08   10/10/08   05/27/08   02/05/08   02 - 16                1,613,750     1,613,750  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
08-0903   Reconstruction               5-002-004  05/12/09     DONE    DONE       DONE      12/15/08   12/10/08   08/22/08   02/05/08   2,4,7,8,155,15,16         21,649             0  HCM             0           0            0
                                                                                                                                                                                                                                 TETRA TECH ARCHITECTS & ENGINEERS   

          Bus Maintenance Building:
08-1660TQ Temporary Quarters           5-023-001  06/29/09     DONE    DONE       DONE      06/08/09   06/01/09   05/14/09     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                 TETRA TECH ARCHITECTS & ENGINEERS   

          Bus Maintenance Facility:
  -    TQ Temporary Quarters           5-024-001                                              /  /       /  /       /  /       /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MONROE - WOODBURY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-12-01-06
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          North Main St. School:
07-0318   Reconstruction               0-002-007  01/03/08     DONE    DONE       DONE      09/07/07   09/07/07   01/22/07   05/15/07   7,8,9,155                322,170       322,170  JOD             0           0       86,987
                                                                                                                                                                                                                                 Fellenzer Engineering               
  -       Reconstruction               0-002-008                                              /  /       /  /     10/16/09     /  /     2,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Central Valley Elem.(fmly Middle):
04-1178   Reconstruction               0-004-006  05/23/05     DONE    DONE       DONE      04/19/05   04/18/05   05/03/04   07/14/04   7                        340,164       340,164  JOD             0           0            0
                                                                                                                                                                                                                                 Fellenzer Engineering               
  -       Reconstruction               0-004-007                                              /  /       /  /     03/08/07     /  /     8,155                          0    16,306,224  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-004-008                                              /  /       /  /     01/31/08     /  /     16                             0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-004-009                                              /  /       /  /     10/16/09     /  /     2,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-004-010                                              /  /       /  /     10/21/09     /  /     2,8,155,15,16                  0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Harriman Kindergarten Center:
04-0819   Reconstruction               0-005-003  04/05/05     DONE    DONE       DONE      02/14/05   01/03/05   05/03/04   07/14/04   7                        233,216       233,216  JOD             0           0            0
                                                                                                                                                                                                                                 Fellenzer Engineering               
  -       Reconstruction               0-005-004                                              /  /       /  /     10/21/09     /  /     155,16                         0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Pine Tree Elementary:
  -       Reconstruction               0-006-004                                              /  /       /  /     03/18/05     /  /     2                              0       290,007  JOD             0           0            0
                                                                                                                                                                                                                                                                     
07-0319   Reconstruction               0-006-005  02/27/08     DONE    DONE       DONE      09/07/07   09/07/07   01/22/07   05/15/07   7,155                    319,345       319,345  JOD             0           0            0
                                                                                                                                                                                                                                 Fellenzer Engineering               
  -       Reconstruction               0-006-006                                              /  /       /  /     01/31/08     /  /     16                             0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Middle School (fmly Sr. High):
07-0298   Reconstruction               0-009-011  01/18/08     DONE    DONE       DONE      09/05/07   09/04/07   01/22/07   05/15/07   7,8,9                  1,518,744     1,518,744  JOD             0           0      402,939
                                                                                                                                                                                                                                 Fellenzer Engineering               
06-1552   Reconstruction               0-009-012  06/13/07     DONE    DONE       DONE      05/30/07   05/29/07   05/21/07   05/15/07   7                      1,019,057     1,019,057  JOD             0           0      565,916
                                                                                                                                                                                                                                 Fellenzer Engineering               
  -       Reconstruction               0-009-013                                              /  /       /  /     01/09/09     /  /     155,16                         0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-009-014                                              /  /       /  /     10/16/09     /  /     2,8,155,15,16                  0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Smith Clove Elem.(fmly Cent.Valley):
05-0485   Reconstruction               0-012-005  05/03/06     DONE    DONE       DONE      12/21/05   12/20/05   07/11/05   07/06/05   16                       321,275       321,275  JOD             0           0            0
                                                                                                                                                                                                                                 Fellenzer Engineering               
  -       Reconstruction               0-012-006                                              /  /       /  /     03/08/07     /  /     8,155                          0     7,250,175  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-012-007                                              /  /       /  /     10/21/09     /  /     2,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Sapphire Lake Elementary School:
05-0390   Reconstruction               0-015-004  06/23/06     DONE    DONE       DONE      11/29/05   11/28/05   02/17/05   08/24/05   2,15                     706,313       706,313  JOD             0           0            0
                                                                                                                                                                                                                                 Fellenzer Engineering               
07-0122   Reconstruction               0-015-005  01/24/08     DONE    DONE       DONE      08/03/07   08/02/07   01/22/07   05/15/07   7,9,15                 2,557,538     2,557,538  JOD             0           0      690,536
                                                                                                                                                                                                                                 Fellenzer Engineering               
06-1553   Reconstruction               0-015-006  06/18/07     DONE    DONE       DONE      05/30/07   05/29/07   05/21/07   05/15/07   7                        175,070       175,070  JOD             0           0       69,373
                                                                                                                                                                                                                                 Fellenzer Engineering               
  -       Reconstruction               0-015-007                                              /  /       /  /     10/21/09     /  /     2,155,16                       0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          New High School:
  -       Reconstruction               0-021-006                                              /  /       /  /     10/16/09     /  /     2,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0694FP Alterations                  0-021-FP1  01/29/07     DONE    DONE       DONE        /  /       /  /       /  /       /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Education Center:
04-0820   Reconstruction               1-001-002  04/05/05     DONE    DONE       DONE      02/14/05   01/03/05   05/03/04   07/14/04   7                        112,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fellenzer Engineering               
  -       Reconstruction               1-001-003                                              /  /       /  /     10/21/09     /  /     2,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Dormitory/Admin. Bldg:
04-0075   Reconstruction               1-018-002  07/21/05     DONE    DONE       DONE      07/22/04   07/21/04   04/30/04     /  /     155,15,16                110,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fellenzer Engineering               
06-1233   Reconstruction               1-018-003  05/10/07     DONE    DONE       DONE      03/27/07   03/26/07   01/22/07   01/10/07   155                      260,725             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fellenzer Engineering               
  -       Reconstruction               1-018-004                                              /  /       /  /     10/21/09     /  /     2,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Garage/ Utility Bldg.:
  -       Reconstruction               2-019-002                                              /  /       /  /     10/21/09     /  /     2,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Pole Barn @ Bus Garage:
08-0766DB Discovered Building          2-022-001  08/04/09     DONE    DONE       DONE      11/19/08   10/31/08   11/05/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Fellenzer Engineering               

          Revised Bus Garage Storage:
  -       Reconstruction               4-010-002                                              /  /       /  /     10/21/09     /  /     2,155,16                       0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage Maint. Bldg.:
  -       Reconstruction               5-003-003                                              /  /       /  /     10/21/09     /  /     2,155,16                       0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Micro Computer Center (former lease0:
  -       Reconstruction               8-017-002                                              /  /       /  /     10/21/09     /  /     155,16                         0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




KIRYAS JOEL VILLAGE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-12-02-02
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Kiryas Joel Public School-see #8012:
05-0510XX New Construction             0-013-001  03/20/06               CANCELLED          12/27/05   12/27/05   02/18/05   05/17/05   02 - 16               10,987,643     4,443,696  DDJ             0           0            0
                                                                                                                                                                                                                                 Pendergrast & Terach, P.C           

          Greenhouse Project (12x15):
  -    DB Discovered Building          0-014-001                                              /  /       /  /     02/28/08     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Kiryas Joel Remedial Education Cntr.:
06-0527TQ Temporary Quarters           8-011-001  02/01/07     DONE    DONE       DONE      11/20/06   11/17/06   07/12/02     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          New Kiryas Joel Public School:
  -       Reconstruction               8-012-001                                              /  /       /  /     07/13/09     /  /     2,15,16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
07-2142   Reconstruction               8-012-L02  05/01/08     DONE    DONE       DONE      05/22/08   05/15/07   06/25/07   08/24/06                            924,000       924,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Pendergrast & Terach, P.C           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-13-01-06
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Maybrook Elementary School:
05-1000   Reconstruction               0-002-010  05/01/06     DONE    DONE       DONE      03/23/06   03/15/06   04/06/05   05/17/05   7                      2,021,518     2,021,518  JOD             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
08-1011   Reconstruction               0-002-011  06/04/09     DONE    DONE       DONE      01/05/09   12/23/08   11/21/07   01/15/08   2,155                    636,777             0  JOD             0           0      150,000
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Montgomery Elementary:
05-1001   Reconstruction               0-004-012  05/01/06     DONE    DONE       DONE      03/23/06   03/15/06   04/25/05   05/17/05   7                        739,113       739,113  JOD             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Walden Elementary School:
05-1002   Reconstruction               0-009-014  05/01/06     DONE    DONE       DONE      03/23/06   03/15/06   04/06/05   05/17/05   7                        332,863       332,863  JOD             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             

          East Coldenham Elementary:
04-1392   Reconstruction               0-013-013  07/11/05     DONE    DONE       DONE      06/09/05   06/07/05   04/25/05   05/17/05   7,16                     856,213       856,213  JOD             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
05-1003   Reconstruction               0-013-014  05/01/06     DONE    DONE       DONE      03/23/06   03/15/06   03/10/06   05/17/05   16                        64,350        64,350  JOD             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
08-1662   Reconstruction               0-013-015  07/02/09     DONE    DONE       DONE      06/08/09   06/01/09   05/15/08   05/15/07   2,155                    156,200             0  JOD             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Valley Central High School:
05-1004   Reconstruction               0-015-017  05/01/06     DONE    DONE       DONE      03/23/06   03/15/06   04/06/05   05/17/05   7                      1,532,520     1,532,520  JOD             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
08-1012   Reconstruction               0-015-018  06/04/09     DONE    DONE       DONE      01/05/09   12/23/08   11/21/07   01/15/08   2,16                     685,480             0  JOD             0           0      160,000
                                                                                                                                                                                                                                 Bernier Carr Associates             
  -       Reconstruction               0-015-019                                              /  /       /  /     03/17/08     /  /     10,155,15,16                   0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Valley Middle School:
05-1005   Reconstruction               0-016-016  05/01/06     DONE    DONE       DONE      03/23/06   03/15/06   04/06/05   05/17/05   7                      1,037,541     1,037,541  JOD             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
08-1013   Reconstruction               0-016-017  06/04/09     DONE    DONE       DONE      01/05/09   12/23/08   11/21/07   01/15/08   2,8,155,15,16          5,827,743             0  JOD             0           0    1,348,700
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Berea Elementary:
05-1006   Reconstruction               0-017-009  05/01/06     DONE    DONE       DONE      03/23/06   03/15/06   04/06/05   05/17/05   16                        83,875        83,875  JOD             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
08-1664   Reconstruction               0-017-010  06/17/09     DONE    DONE       DONE      06/08/09   06/01/09   03/17/08   07/14/03   13                        79,069             0  JOD             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Main Admin. Bldg.:
07-0118   Reconstruction               1-005-003  08/08/07     DONE    DONE       DONE      08/01/07   07/31/07   03/08/07   05/15/07   7                        291,475             0  JOD             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
  -       Reconstruction               1-005-004                                              /  /       /  /     03/17/08     /  /     2,155                          0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Trinity Lutheran Church Lease:
04-1343   Reconstruction               8-018-L02  08/30/00     DONE    DONE       DONE      04/12/05   04/12/05     /  /       /  /                               14,000        14,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     
04-1344   Reconstruction               8-018-L03  08/30/01     DONE    DONE       DONE      04/12/05   04/12/05     /  /       /  /                               16,000        16,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     
04-1345   Reconstruction               8-018-L04  08/30/02     DONE    DONE       DONE      04/12/05   04/12/05     /  /       /  /                               16,000        16,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     
04-1346   Reconstruction               8-018-L05  08/30/03     DONE    DONE       DONE      04/12/05   04/12/05     /  /       /  /                               16,000        16,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     
05-0110   Reconstruction               8-018-L06  03/25/05     DONE    DONE       DONE      03/25/05   03/25/05     /  /     05/17/04                             16,000        16,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0387TQ Temporary Quarters           8-018-L07  10/30/06     DONE    DONE       DONE      10/19/06   10/19/06   10/23/06     /  /                               16,000        16,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0388TQ Temporary Quarters           8-018-L08  10/30/06     DONE    DONE       DONE      10/19/06   10/19/06   10/23/06     /  /                               16,800        16,800  JOD             0           0            0
                                                                                                                                                                                                                                                                     
07-0043TQ Temporary Quarters           8-018-L09  08/02/07     DONE    DONE       DONE      07/30/07   07/30/07   08/02/07     /  /                               17,600             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-0162   Reconstruction               8-018-L10  08/19/08     DONE    DONE       DONE      08/13/08   08/04/08   08/13/08     /  /                               19,000             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NEWBURGH CITY SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-16-00-01
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Newburgh Free Academy:
05-1125   Reconstruction               0-001-013  05/23/06     DONE    DONE       DONE      04/13/06   04/07/06   03/23/04   02/15/05   2,4,7,8,9,10,155,15,   2,203,617     2,203,617  RDR             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
05-0670   Reconstruction               0-001-014  04/10/06     DONE    DONE       DONE      01/30/06   01/30/06   01/19/05   02/15/05   2,4,7,8,9,10,155,15,   5,468,565     5,468,565  RDR             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
07-0674   Reconstruction               0-001-015  12/28/07     DONE    DONE       DONE      10/30/07   10/29/07   08/24/07   03/27/07   2,8                    2,294,500             0  MGL             0           0      221,648
                                                                                                                                                                                                                                 Collins & Scoville Architects       
07-0676   Reconstruction               0-001-016  03/31/08     DONE    DONE       DONE      10/30/07   10/29/07   08/24/07   03/27/07   2,4,8,9,155,15,16      3,000,000             0  MGL             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
08-1602   Reconstruction               0-001-017  08/10/09     DONE    DONE       DONE      05/11/09   05/05/09   08/24/07   03/27/07   2,4,8,9,10,155,15,16   2,447,500             0  MGL             0           0      337,750
                                                                                                                                                                                                                                 Collins & Scoville Architects       
07-1184   Reconstruction               0-001-018  01/04/08     DONE    DONE       DONE      12/21/07   12/19/07   11/21/07   05/15/07   2,155,16                 260,000             0  MGL             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
08-1641   Reconstruction               0-001-019  06/24/09     DONE    DONE       DONE      05/19/09   05/15/09   03/04/09   02/15/05   2,4                      445,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  
  -       Reconstruction               0-001-020                                              /  /       /  /     09/24/09     /  /     2,4,8,9,10,155,15,16           0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-1562SC Visual Structural Inspection 0-001-SC1  06/04/07     DONE    DONE       DONE      05/31/07   05/31/07     /  /       /  /     16                       214,686             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-1563SC Visual Structural Inspection 0-001-SC2  06/04/07     DONE    DONE       DONE      05/31/07   05/31/07     /  /       /  /     16                        21,274             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          North Junior High School:
04-0731   Reconstruction               0-002-009  02/23/05     DONE    DONE       DONE      01/28/05   01/27/05   03/23/04   02/15/05   2,4,7,8,9,155,15,16    1,426,268     1,426,268  RDR             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 
05-0696   Reconstruction               0-002-010  05/25/06     DONE    DONE       DONE      02/10/06   01/31/06   01/19/05   02/15/05   2,4,7,8,9,10,155,15,   2,204,160     1,497,500  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
07-2225   Additions and Alterations    0-002-011  10/09/08     DONE    DONE       DONE      06/09/08   05/30/08   08/24/07   03/27/07   02 - 16                9,360,000     9,360,000  MGL             0           0    1,291,680
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  
07-0675   Reconstruction               0-002-012  12/28/07     DONE    DONE       DONE      10/30/07   10/29/07   08/24/07   03/27/07   2,8                    1,173,900             0  MGL             0           0      161,998
                                                                                                                                                                                                                                 Collins & Scoville Architects       
07-0677   Reconstruction               0-002-013  03/31/08     DONE    DONE       DONE      10/30/07   10/29/07   08/24/07   03/27/07   2                      2,000,000             0  MGL             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          South Junior High School:
05-0282   Reconstruction               0-003-011  10/21/05     DONE    DONE       DONE      10/21/05   10/19/05   03/23/04   09/27/05   2,4,7,8,9,10,155,15,     101,870       101,870  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture PLLC            
05-0697   Reconstruction               0-003-012  05/25/06     DONE    DONE       DONE      02/10/06   01/31/06   01/19/05   02/15/05   2,4,7,9,10,155,15,16     959,539       959,539  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
05-0693   Reconstruction               0-003-013  03/03/06     DONE    DONE       DONE      02/10/06   01/31/06   10/05/05   02/15/05   7                      1,819,447     1,819,447  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
08-1484   Additions and Alterations    0-003-014  06/04/09     DONE    DONE       DONE      04/13/09   04/08/09   08/24/07   03/13/07   02 - 16                1,404,783             0  MGL             0           0      193,860
                                                                                                                                                                                                                                 Sammel Architecture                 
  -       Reconstruction               0-003-015                                              /  /       /  /     03/04/09     /  /     2,4,8,9,10,155,15,16           0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          NFA Auto Body Shop:
  -       Reconstruction               0-004-003                                              /  /       /  /     08/24/07     /  /     16                             0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Chestnut Street:
  -    PR Additions and Alterations    0-005-004                                              /  /       /  /     01/19/05     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
05-1328   Reconstruction               0-005-005  09/06/06     DONE    DONE       DONE      06/06/06   06/06/06   03/23/04   02/15/05   2,4,7,8,9,10,14,155,     450,000             0  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 

          Gidney Ave Memorial School:
04-1370   Reconstruction               0-006-007  07/01/05     DONE    DONE       DONE      06/06/05   05/31/05   03/23/04   03/25/03   2,8,9,10,155,15,16        96,456       132,500  RDR             0           0            0
                                                                                                                                                                                                                                 Joseph J. Minuta Architecture, desig
08-0973   Reconstruction               0-006-008  06/15/09     DONE    DONE       DONE      12/26/08   12/18/08   01/19/05   03/27/07   2,8,9,10,155,15,16       670,000             0  MGL             0           0       92,460
                                                                                                                                                                                                                                 Minuta Architecture                 
  -       Reconstruction               0-006-009                                              /  /       /  /     08/24/07     /  /     2,4,8,9,10,155,15,16           0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          The Primary School:
05-0691   Reconstruction               0-009-005  07/12/06     DONE    DONE       DONE      02/10/06   01/31/06   03/23/04   02/15/05   2,7,8,9,10,14,155,15     639,946       639,946  RDR             0           0            0
                                                                                                                                                                                                                                 Joseph J. Minuta Architecture, desig
  -       Reconstruction               0-009-006                                              /  /       /  /     01/19/05     /  /     2,7,8,9,10,14,155,15           0     2,685,120  MGL             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-009-007                                              /  /       /  /     08/24/07     /  /     2,8,9,10,14,155,15,1           0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          West Street School:
05-1378   Reconstruction               0-010-005  09/05/06     DONE    DONE       DONE      06/19/06   06/15/06   03/23/04   02/15/05   2,4,7,8,9,10,14,155,     150,000       150,000  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
  -       Reconstruction               0-010-006                                              /  /       /  /     01/19/05     /  /     2,4,7,8,9,10,14,155,           0     1,901,157  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Horizons on the Hudson:
05-0694   Reconstruction               0-017-009  03/03/06     DONE    DONE       DONE      02/10/06   01/31/06   03/23/04   02/15/05   2,4,7,8,9,10,155,15,     503,208       503,208  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
05-0698   Reconstruction               0-017-010  05/25/06     DONE    DONE       DONE      02/10/06   01/31/06   01/19/05   02/15/05   2,4,7,8,9,10,155,15,   1,305,920     1,305,920  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
07-2105   Reconstruction               0-017-011  02/03/09     DONE    DONE       DONE      05/08/08   05/06/08   08/24/07   03/27/07   2,4,8,9,10,155,15,16     316,000             0  MGL             0           0       43,700
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  
  -       Reconstruction               0-017-012                                              /  /       /  /     09/24/09     /  /     2,4,9,155,15,16                0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Vails Gate Elementary:
08-0972   Reconstruction               0-018-005               DONE    DONE       ADD. REQ'D12/26/08   12/18/08   03/23/04   03/27/07   2,4,8,9,10,155,15,16           0     8,227,606  MGL             0           0            0
                                                                                                                                                                                                                                 Minuta Architecture                 
  -       Reconstruction               0-018-006                                              /  /       /  /     01/19/05     /  /     2,7,8,9,10,14,155,15           0     8,227,606  MGL             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-018-007                                              /  /       /  /     08/24/07     /  /     2,8,9,10,155,15,16             0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Gardnertown Elementary:
08-0971   Reconstruction               0-019-008  05/19/09     DONE    DONE       DONE      12/26/08   12/18/08   03/23/04   03/27/07   2,8,10,14,155,15,16    1,090,000       740,000  MGL             0           0            0
                                                                                                                                                                                                                                 Minuta Architecture                 
  -       Reconstruction               0-019-009                                              /  /       /  /     08/24/07     /  /     2,8,155,15,16                  0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          New Windsor School:
04-1254   Reconstruction               0-022-004  06/03/05     DONE    DONE       DONE      05/11/05   05/06/05   03/23/04   05/20/03   2,4,7,8,9,10,14,155,     227,611       227,611  RDR             0           0            0
                                                                                                                                                                                                                                 Jack Eisenbach - Engineer           
05-0076   Reconstruction               0-022-005  11/02/05     DONE    DONE       DONE      08/01/05   08/01/05   01/19/05   02/15/05   2,4,7,8,9,10,14,155,   8,195,982     7,575,100  RDR             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
08-1165   Reconstruction               0-022-006  03/25/09     DONE    DONE       DONE      02/03/09   01/29/09   08/24/07   03/27/07   2,8,16                 1,235,000             0  MGL             0           0      170,430
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  

          New Balmville School:
05-0077   Reconstruction               0-023-009  11/02/05     DONE    DONE       DONE      08/01/05   08/01/05   01/19/05   02/15/05   2,7,8,9,10,155,15,16   7,570,226     6,743,534  RDR             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
08-1166   Reconstruction               0-023-010  03/25/09     DONE    DONE       DONE      02/03/09   01/29/09   08/24/07   03/27/07   2,8                      260,000             0  MGL             0           0       35,880
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  

          Old Balhville School:
07-0622   Reconstruction               0-024-001  12/13/07     DONE    DONE       DONE      10/25/07   10/25/07   10/25/07   05/15/07   2                        375,000             0  MGL             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Fostertown School:
05-0695   Reconstruction               0-026-006  03/03/06     DONE    DONE       DONE      02/10/06   01/31/06   03/23/04   02/15/05   2,8,9,10,155,15,16       675,740       675,740  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
05-0699   Reconstruction               0-026-007  05/25/06     DONE    DONE       DONE      02/10/06   01/31/06     /  /     02/15/05   2,8,9,10,13,155,16       701,208       701,208  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
  -       Reconstruction               0-026-008                                              /  /       /  /     08/24/07     /  /     2,4,9,155,15,16                0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Meadow Hill School:
04-0732   Reconstruction               0-035-008  02/23/05     DONE    DONE       DONE      01/28/05   01/27/05   03/23/04   05/20/03   2,4,7,8,9,10,14,155,   2,623,189     1,692,246  RDR             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 
05-0700   Reconstruction               0-035-009  05/25/06     DONE    DONE       DONE      02/10/06   01/31/06   01/19/05   02/15/05   2,4,7,8,9,10,155,15,   2,501,881     2,501,881  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
08-1261   Reconstruction               0-035-010  08/07/09     DONE    DONE       DONE      02/23/09   02/18/09   08/24/07   03/13/07   2,4,8,9,10,155,15,16   6,750,000             0  MGL             0           0      931,500
                                                                                                                                                                                                                                 Sammel Architecture                 
07-1125   Reconstruction               0-035-011  01/10/08     DONE    DONE       DONE      12/14/07   12/13/07   08/24/07   03/13/07   2,8                    1,000,000             0  MGL             0           0      138,000
                                                                                                                                                                                                                                 Sammel Architecture                 
  -       Reconstruction               0-035-012                                              /  /       /  /     03/14/08     /  /     2,10                           0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Temple Hill School:
04-0733   Reconstruction               0-036-008  02/23/05     DONE    DONE       DONE      01/28/05   01/27/05   03/23/04   05/20/03   2,4,7,8,9,10,155,15,   1,711,273     1,711,273  RDR             0           0            0
                                                                                                                                                                                                                                 Envision Architects                 
05-0701   Reconstruction               0-036-009  05/25/06     DONE    DONE       DONE      02/10/06   01/31/06   01/19/05   02/15/05   2,4,7,8,9,10,155,15,   2,194,933     2,194,933  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 
08-1262   Reconstruction               0-036-010  08/07/09     DONE    DONE       DONE      02/23/09   02/18/09   08/24/07   03/13/07   2,4,8,9,10,155,15,16   2,900,000             0  MGL             0           0      400,200
                                                                                                                                                                                                                                 Sammel Architecture                 
07-1126   Reconstruction               0-036-011  01/10/08     DONE    DONE       DONE      12/14/07   12/13/07   08/24/07   03/13/07   2,8                    1,000,000             0  MGL             0           0      138,000
                                                                                                                                                                                                                                 Sammel Architecture                 
08-1263   Reconstruction               0-036-012  08/07/09     DONE    DONE       DONE      02/23/09   02/18/09   03/14/08   03/13/07   2,10                   1,750,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 

          Heritage Junior High School:
05-0692   Reconstruction               0-039-005  07/10/06     DONE    DONE       DONE      02/10/06   01/31/06   03/23/04   02/15/05   2,8,9,10,155,15,16       102,089       102,089  RDR             0           0            0
                                                                                                                                                                                                                                 Joseph J. Minuta Architecture, desig
  -       Reconstruction               0-039-006                                              /  /       /  /     01/19/05     /  /     2,9,16                         0    11,755,114  MGL             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-039-007                                              /  /       /  /     08/24/07     /  /     4,8,9,16                       0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
07-1083   Reconstruction               0-039-008  12/12/07     DONE    DONE       DONE      12/11/07   12/10/07   08/24/07   03/13/07   7,10                   1,700,000     1,700,000  MGL             0           0      234,600
                                                                                                                                                                                                                                 Sammel Architecture                 

          Construction Career Academy:
05-1293   Additions and Alterations    0-044-002  06/08/06     DONE    DONE       DONE      05/25/06   05/19/06   05/18/06   02/15/05   02 - 16                  768,000       696,048  RDR             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Bd of Ed/Public Library:
05-1379   Reconstruction               1-007-005  06/20/06     DONE    DONE       DONE      06/19/06   06/15/06   01/04/06   05/16/06   2,7                      250,000             0  RDR             0           0            0
                                                                                                                                                                                                                                 Sammel Architecture                 

          Special Education Offices:
  -    TQ Temporary Quarters           1-052-001                                              /  /       /  /     09/12/06     /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Grounds Shop:
  -       Reconstruction               2-008-001                                              /  /       /  /     03/31/06     /  /     2,8,9,155,15,16                0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Toilet Building (see 0044):
  -    PR Additions and Alterations    7-044-002                                              /  /       /  /     05/18/06     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Concession Stand/Cafeteria:
  -    PR Additions and Alterations    7-045-002                                              /  /       /  /     03/31/06     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Stewart Airport Bldg. 105:
  -       Reconstruction               8-042-002                                              /  /       /  /     01/19/05     /  /     2,4,7,8,9,10,155,15,           0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
06-1654   Reconstruction               8-042-L02  07/11/07     DONE    DONE       DONE      06/26/07   06/26/07   05/22/07     /  /                              623,408       579,600  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          St. Francis of Assisi School:
06-1534   Reconstruction               8-050-L02  07/11/07     DONE    DONE       DONE      05/22/07   05/18/07   05/22/07     /  /                              440,611             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PORT JERVIS CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-18-00-05
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Middle School 7-8:
07-0511   Reconstruction               0-005-009  03/18/08     DONE    DONE       DONE      10/09/07   10/05/07   01/02/07   12/12/06   2,4,7,8,9,10,155,15,   1,683,806     1,683,806  DDJ             0           0      227,314
                                                                                                                                                                                                                                 McGoey, Hauser and Edsall           
06-0918   Reconstruction               0-005-010  07/27/07     DONE    DONE       DONE      02/09/07   02/08/07   01/02/07   12/12/06   2,10,155,15,16           267,395       267,395  DDJ             0           0       36,098
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  
08-1763   Additions and Alterations    0-005-011                       ADDENDUM REQ'D       06/29/09   06/29/09   04/23/09   05/16/09   02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Hamilton Bicentennial ES K-6:
06-1110   Reconstruction               0-011-005  06/06/07     DONE    DONE       DONE      03/15/07   03/12/07   01/02/07   12/12/06   2,4,7,8,9,10,155,15,   1,852,405     1,852,405  DDJ             0           0      250,075
                                                                                                                                                                                                                                 McGoey, Hauser and Edsall           
06-0919   Reconstruction               0-011-006  07/27/07     DONE    DONE       DONE      02/09/07   02/08/07   01/02/07   12/12/06   2,10,155,15,16           539,571       539,571  DDJ             0           0       72,842
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  
08-1482   Reconstruction               0-011-007  08/20/09     DONE    DONE       DONE      04/13/09   04/08/09   11/04/08   12/12/06   2,15,16                  197,500             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Kuhl ES K-6/PJHS 9-12:
06-0920   Reconstruction               0-012-019  07/27/07     DONE    DONE       DONE      02/09/07   02/08/07   12/29/06   12/12/06   2,4,7,8,9,10,155,15,   9,171,423     9,171,423  DDJ             0           0    1,236,117
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  
07-1281   Reconstruction               0-012-020  06/11/08     DONE    DONE       DONE      01/02/08   12/28/07   11/27/07   05/15/07   2,4,7,15,16              645,000       645,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  
08-1739   Additions and Alterations    0-012-021                       ADDENDUM REQ'D       06/26/09   06/18/09   04/23/09   05/16/09   02 - 16                        0    29,765,744  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Portable #1:
06-1639   New Construction             0-033-001  07/27/07     DONE    DONE       DONE      06/22/07   06/14/07   02/21/07   05/15/07   02 - 16                  265,200             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  

          Portable #2:
06-1640   New Construction             0-034-001  07/27/07     DONE    DONE       DONE      06/22/07   06/14/07   02/21/07   05/15/07   02 - 16                  265,200             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  

          Transportation Admin Bldg:
08-1774DB Discovered Building          1-036-001  09/16/09     DONE    DONE       DONE      07/01/09   06/29/09   08/22/08     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  

          Maintenance Building:
09-0372   New Construction             3-037-001               STARTED DONE       STARTED   10/29/09   10/27/09   08/28/09   05/19/09   02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  

          Bus Garage (demolition):
  -       Reconstruction               5-002-004                                              /  /       /  /     10/20/05     /  /     2,10,15,16                     0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-1747   Additions and Alterations    5-002-005  06/30/09     DONE    DONE       DONE      06/29/09   06/26/09     /  /     05/19/09   02 - 16                  345,392       345,392  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Bus Garage Bays @ Deepark Oil:
06-1630   Reconstruction               5-035-L01  06/28/07     DONE    DONE       DONE      06/19/07   06/18/07   04/26/07     /  /                              450,000       450,000  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




TUXEDO UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-19-03-02
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Mason Elementary School:
07-2278   Reconstruction               0-001-006  12/09/08     DONE    DONE       DONE      06/27/08   06/12/08   04/10/08   04/10/08   10,13,155,16             493,938       493,938  HCM             0           0      120,659
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan

          George F. Baker High School:
07-2279   Reconstruction               0-002-006  12/09/08     DONE    DONE       DONE      06/27/08   06/12/08   04/10/08   04/10/08   10,13,155,16             362,732       362,732  HCM             0           0       88,601
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
  -       Reconstruction               0-002-007                                              /  /       /  /     07/31/09     /  /     2,4                            0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Gymnasium:
  -       Reconstruction               0-003-005                                              /  /       /  /     04/10/08     /  /     10,13,155,16                   0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WARWICK VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-21-01-06
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          High School:
08-1223   Reconstruction               0-001-018  04/03/09     DONE    DONE       DONE      02/19/09   02/11/09   04/25/08   06/26/08   4                         67,655        67,655  DDJ             0           0       24,492
                                                                                                                                                                                                                                 Bernier Carr Associates             
  -       Reconstruction               0-001-019                                              /  /       /  /     10/27/08     /  /     4,8,9,155,15,16                0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Park Avenue Elementary:
08-1224   Reconstruction               0-002-013  04/03/09     DONE    DONE       DONE      02/19/09   02/11/09   04/25/08   06/26/08   4,7                      473,858       473,858  DDJ             0           0      171,537
                                                                                                                                                                                                                                 Bernier Carr Associates             
  -       Reconstruction               0-002-014                                              /  /       /  /     10/27/08     /  /     9,16                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Pine Island Elementary:
  -       Reconstruction               0-004-010                                              /  /       /  /     10/27/08     /  /     16                             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Kings Elementary:
08-1225XX Reconstruction               0-005-007  03/23/09               CANCELLED          02/19/09   02/11/09   04/25/08   06/26/08   2,7                            0     7,915,752  DDJ             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
  -       Reconstruction               0-005-008                                              /  /       /  /     10/27/08     /  /     8,155,15,16                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Warwick Middle School:
08-1226   Reconstruction               0-006-010  04/03/09     DONE    DONE       DONE      02/19/09   02/11/09   04/25/08   06/26/08   7                      2,015,373     2,015,373  DDJ             0           0      729,566
                                                                                                                                                                                                                                 Bernier Carr Associates             
  -       Reconstruction               0-006-011                                              /  /       /  /     10/27/08     /  /     9,10,16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Pine Island Sweet Pea Garden Shed:
04-1419DB Discovered Building          2-023-001  07/15/08     DONE    DONE       DONE      06/17/05   06/15/05   11/09/04     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Storage Shed #1 @ Kings ES:
05-1176DB Discovered Building          2-025-001  07/25/06     DONE    DONE       DONE      04/18/06   04/01/06   03/10/06     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Warwick Valley Public Library:
05-0145   Reconstruction               6-021-002  08/24/05     DONE    DONE       DONE      08/22/05   08/18/05   08/22/05   04/05/05   9,16                      66,833             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Butler Rowland Mays Architects,LLP  

          Albert Wisner Public Libray:
  -    PR New Construction             6-024-001                                              /  /       /  /     02/04/05     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0511   New Construction             6-024-001  11/16/06     DONE    DONE       DONE      11/15/06   11/15/06   02/04/05   04/04/06   02 - 16                  232,100             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Butler Rowland Mays Architects,LLP  
07-0106   Reconstruction               6-024-002  07/27/07     DONE    DONE       DONE      07/27/07   07/26/07   07/25/07   03/08/07   2                        200,125             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Butler Rowland Mays Architects,LLP  
07-0747   Reconstruction               6-024-003  04/10/08     DONE    DONE       DONE      11/07/07   11/05/07   11/06/07   03/08/07   2,7,8,9,10,155,15,16   8,267,900             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Butler Rowland Mays Architects,LLP  

          T. Jahn Memorian X-Country Pavilion:
08-1388   New Construction             7-026-001  04/13/09     DONE    DONE       DONE      03/16/09   03/11/09   08/20/07   07/30/07   02 - 16                    6,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Cosentino Architecture,PLLC         


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GREENWOOD LAKE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-21-11-02
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Middle School:
07-1352   Reconstruction               0-001-008  03/04/08     DONE    DONE       DONE      01/09/08   01/08/08   05/30/07   05/15/07   15                        70,000        70,000  HCM             0           0            0
                                                                                                                                                                                                                                 Fellenzer Engineering               
08-1543   Reconstruction               0-001-009  09/21/09     DONE    DONE       DONE      04/24/09   04/21/09   02/02/09     /  /     15                        94,285             0  HCM             0           0       43,937
                                                                                                                                                                                                                                 Fellenzer Engineering               
08-1544   Reconstruction               0-001-010  05/06/09     DONE    DONE       DONE      04/24/09   04/21/09   03/11/09     /  /     15                        71,000        71,000  HCM             0           0            0
                                                                                                                                                                                                                                 Fellenzer Engineering               
08-1545   Reconstruction               0-001-011  09/21/09     DONE    DONE       DONE      04/27/09   04/21/09   04/06/09     /  /     15                        89,428             0  HCM             0           0       41,673
                                                                                                                                                                                                                                 Fellenzer Engineering               
  -       Reconstruction               0-001-012                                              /  /       /  /     06/04/09     /  /     2,4,7                          0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Greenwood Lake School:
  -       Reconstruction               0-002-008                                              /  /       /  /     08/23/05     /  /     15                             0     3,684,163  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          :
  -       Reconstruction               7-999-001                                              /  /       /  /     08/25/05     /  /     16                             0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




FLORIDA UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-21-15-02
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          SS Seward Institute:
  -       Reconstruction               0-001-007                                              /  /       /  /     09/25/08     /  /     2,4,8,9,10,14,155,15           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-0668   Reconstruction               0-001-008  01/28/09     DONE    DONE       DONE      11/04/08   10/30/08   10/07/08   03/31/08   8                        170,101       312,523  JOD             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
08-0987   Reconstruction               0-001-009  06/04/09     DONE    DONE       DONE      12/31/08   12/18/08   12/31/08   03/31/08                          1,183,862     1,017,357  JOD             0           0      100,000
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
  -       Reconstruction               0-001-010                                              /  /       /  /     11/05/09     /  /     2,9,10,13,14,155,16            0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Samuel S Seward Memorial Building:
08-0988   Reconstruction               0-003-004  06/04/09     DONE    DONE       DONE      12/31/08   12/18/08   09/25/08   03/31/08   2,4,7,8,9,14,155,15,     835,562     1,008,440  JOD             0           0       75,916
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
  -       Reconstruction               0-003-005                                              /  /       /  /     10/07/08     /  /     8                              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Florida Golden Hill Elementary:
  -       Reconstruction               0-004-005                                              /  /       /  /     09/25/08     /  /     2,4,8,9,10,14,155,15           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-0669   Reconstruction               0-004-006  01/28/09     DONE    DONE       DONE      11/04/08   10/30/08   10/07/08   03/31/08   8                        278,938       373,398  JOD             0           0            0
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
08-0989   Reconstruction               0-004-007  06/04/09     DONE    DONE       DONE      12/31/08   12/18/08     /  /     03/31/08                          1,387,115     1,455,800  JOD             0           0      100,000
                                                                                                                                                                                                                                 BurtonBehrendt Smith and O'Callaghan
  -       Reconstruction               0-004-008                                              /  /       /  /     11/05/09     /  /     8,9,10,15                      0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES ORANGE - ULSTER STATUS REPORT ON CAPITAL PROJECTS
District No.: 44-90-00-00
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Special Ed Building:
04-0061   Reconstruction               0-009-016  11/08/04     DONE    DONE       DONE      07/19/04   07/16/04     /  /     03/15/04   7,10,13,155,16           247,125       247,125  MAC             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      
05-1008   Reconstruction               0-009-018  05/22/06     DONE    DONE       DONE      03/23/06   03/20/06   01/09/06     /  /     8,16                      66,000        66,000  JOD             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      
06-1138   Reconstruction               0-009-019  09/05/07     DONE    DONE       DONE      03/19/07   03/12/07   11/20/06   02/08/07   4,8,16                   213,000       213,000  JOD             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      
06-1139   Reconstruction               0-009-020  09/05/07     DONE    DONE       DONE      03/19/07   03/12/07   01/30/07   02/08/07   155,16                   168,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      
06-1549   Reconstruction               0-009-021  07/05/07     DONE    DONE       DONE      05/25/07   05/25/07   03/26/07   05/10/07   8,16                     172,025       172,025  JOD             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      
08-0694   Reconstruction               0-009-022  06/17/09     DONE    DONE       DONE      11/05/08   11/04/08   02/26/08   02/08/07   155,16                   242,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Innovative Engineering Pllc         
  -       Reconstruction               0-009-023                                              /  /       /  /     12/15/08     /  /     13,155,16                      0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Occ.Ed.Bldg(Career&Tech Cntr):
03-1113   Reconstruction               0-010-009  11/10/04     DONE    DONE       DONE      02/13/04   02/12/04     /  /     06/03/03   155,16                   179,951       179,951  MAC             0           0            0
                                                                                                                                                                                                                                 LAN Assoc.                          
06-1140   Reconstruction               0-010-012  09/05/07     DONE    DONE       DONE      03/19/07   03/12/07     /  /     02/08/07   4,8,16                   105,300       171,500  JOD             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      
06-1141   Reconstruction               0-010-013  09/05/07     DONE    DONE       DONE      03/19/07   03/12/07   01/30/07   02/08/07   155,16                    67,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      
06-1550   Reconstruction               0-010-014  07/05/07     DONE    DONE       DONE      05/25/07   05/25/07   03/26/07   05/10/07   8,16                     132,975       132,975  JOD             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      
08-0695   Reconstruction               0-010-015  06/17/09     DONE    DONE       DONE      11/05/08   11/04/08   02/26/08   02/08/07   155,16                    35,500             0  JOD             0           0            0
                                                                                                                                                                                                                                 Innovative Engineering Pllc         

          Educational Comm. Ctr.:
07-2216   Additions and Alterations    7-002-001  08/13/08     DONE    DONE       DONE      06/05/08   05/28/08   11/30/06     /  /     02 - 16                  212,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      

          Chester HS @ Chester UFSD:
04-0409   Reconstruction               8-033-001  01/19/05     DONE    DONE       DONE      11/16/04   11/16/04   11/16/04   09/09/04   10,155,15,16           1,667,884     1,667,884  MAC             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      
04-0957   Reconstruction               8-033-002  05/11/05     DONE    DONE       DONE      03/10/05   03/07/05   02/23/05   09/09/04   7                        470,779       470,779  JOD             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      
05-0717   Reconstruction               8-033-003  07/11/06     DONE    DONE       DONE      02/10/06   02/07/06   11/02/05   09/09/04   155,16                 1,861,500     1,861,500  JOD             0           0            0
                                                                                                                                                                                                                                 LAN Associates                      

          Adult Education / Nursing @ Playtogs:
07-1276TQ Temporary Quarters           8-034-001  04/09/08     DONE    DONE       DONE      12/31/07   12/26/07   12/04/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED