Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 11/06/09 at 17:05:33




LEWISTON PORTER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 40-03-01-06
last updated on 11/06/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Middle School:
06-0716   Reconstruction               0-004-012  05/14/07     DONE    DONE       DONE      01/10/07   01/08/07   06/29/06   05/16/06   2,7,8,9,155,15,16      5,344,468     5,344,468  JOD             0           0      755,644
                                                                                                                                                                                                                                 SWBR Architects P.C.                
  -       Reconstruction               0-004-013                                              /  /       /  /     01/03/07     /  /     155,16                         0    19,673,984  JOD             0           0            0
                                                                                                                                                                                                                                                                     
07-1224   Reconstruction               0-004-014  11/13/08     DONE    DONE       DONE      12/26/07   12/24/07   06/06/07   05/16/06   2,4,8,9,10,14,155,15     891,080       960,650  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                

          Lewiston-Porter Inter.Edu.Ctr.:
06-0717   Reconstruction               0-005-014  05/14/07     DONE    DONE       DONE      01/10/07   01/08/07   06/29/06   05/16/06   2,8,9,155,15,16        1,926,212     1,926,212  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
08-1527   Reconstruction               0-005-015  04/30/09     DONE    DONE       DONE      04/20/09   04/17/09   01/03/07   05/16/06   2,7                    1,259,475     1,455,825  JOD             0           0            0
                                                                                                                                                                                                                                 Gordon W. Jones Associates          
07-1225   Reconstruction               0-005-016  11/13/08     DONE    DONE       DONE      12/26/07   12/24/07   06/06/07   05/16/07   2,4,8,9,10,155,15,16   2,239,471     1,756,094  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                

          Primary Education Center:
06-0718   Reconstruction               0-006-011  05/14/07     DONE    DONE       DONE      01/10/07   01/08/07   06/29/06   05/16/06   2,8,9,155,15,16        2,018,814     2,018,814  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
08-1528   Reconstruction               0-006-012  04/30/09     DONE    DONE       DONE      04/20/09   04/17/09   01/03/07   05/16/06   2,7                    2,004,555     2,174,445  JOD             0           0            0
                                                                                                                                                                                                                                 Gordon W. Jones Associates          
07-1226   Reconstruction               0-006-013  11/13/08     DONE    DONE       DONE      12/26/07   12/24/07   06/06/07   05/16/06   2,4,8,9,10,14,155,15   2,039,563     1,562,467  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                

          Community Resource Center:
06-0719   Reconstruction               0-014-007  05/14/07     DONE    DONE       DONE      01/10/07   01/08/07   06/29/06   05/16/06   2,4,7,8,9,10,155,15,   2,408,831             0  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                

          Senior High School:
06-0720   Reconstruction               0-015-012  05/14/07     DONE    DONE       DONE      01/10/07   01/08/07   06/29/06   05/16/06   2,7,8,9,155,15,16      3,013,460     3,013,460  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
  -       Reconstruction               0-015-013                                              /  /       /  /     01/03/07     /  /     8,155,16                       0    19,450,338  JOD             0           0            0
                                                                                                                                                                                                                                                                     
07-1227   Additions and Alterations    0-015-014  11/13/08     DONE    DONE       DONE      12/26/07   12/24/07   06/06/07   05/16/06   02 - 16                1,857,697     7,520,988  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                

          Administration:
  -       Reconstruction               1-001-004                                              /  /       /  /     11/01/06     /  /     2,4,7,8,9,10,155,15,           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Community Resource Center Admin:
  -       Alterations                  1-014-001                                              /  /       /  /       /  /       /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-1529   Reconstruction               1-014-002  04/30/09     DONE    DONE       DONE      04/20/09   04/17/09   07/06/07   05/16/06   2,7                      782,880             0  JOD             0           0            0
                                                                                                                                                                                                                                 Gordon W. Jones Associates          

          Tin Shed Storage:
  -       Reconstruction               2-007-001                                              /  /       /  /     07/06/07     /  /     2                              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Maintnance Port 1:
  -       Reconstruction               3-002-001                                              /  /       /  /     07/06/07     /  /     2                              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Maintenace Port 2:
  -       Reconstruction               3-003-001                                              /  /       /  /     07/06/07     /  /     2                              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Maintenance Building:
06-0721   New Construction             3-018-001  05/14/07     DONE    DONE       DONE      01/10/07   01/08/07   06/28/06   05/16/06   02 - 16                1,692,749             0  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                

          Lavatory Stadium:
06-0722   Reconstruction               7-009-001  05/14/07     DONE    DONE       DONE      01/10/07   01/08/07   11/01/06   05/16/06   2,4,7,8,9,15,16          173,695             0  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                

          Concession Stand:
  -    PR New Construction             7-019-001                                              /  /       /  /     08/07/06     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0723   New Construction             7-019-001  05/14/07     DONE    DONE       DONE      01/10/07   01/08/07   08/07/06   05/16/06   02 - 16                  592,517             0  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                

          Team Room Building:
06-0724   Reconstruction               7-020-001  05/14/07     DONE    DONE       DONE      01/10/07   01/08/07   11/01/06   05/16/06                            904,183             0  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
  -    PR New Construction             7-021-001                                              /  /       /  /     11/02/06     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LOCKPORT CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 40-04-00-01
last updated on 11/06/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Lockport Senior High School:
06-0640   Reconstruction               0-001-014  05/01/07     DONE    DONE       DONE      12/21/06   12/15/06   02/16/06   05/16/06   2,4,10,155,15,16       1,850,000     1,850,000  JOD             0           0      201,650
                                                                                                                                                                                                                                 Habiterra Associates                
  -       Reconstruction               0-001-015                                              /  /       /  /     01/19/07     /  /     16                             0    37,373,514  JOD             0           0            0
                                                                                                                                                                                                                                                                     
09-0261   Additions and Alterations    0-001-016                         UNREVIEWED         09/22/09   09/22/09   11/21/07   12/16/08   02 - 16                        0    32,334,820  JOD             0           0            0
                                                                                                                                                                                                                                 Young Wright Architectural          
07-2270   Reconstruction               0-001-017  06/20/08     DONE    DONE       DONE      06/20/08   06/10/08   06/20/08   05/21/08   7                        935,000       450,000  JOD             0           0       49,050
                                                                                                                                                                                                                                 Habiterra Associates                
  -       Reconstruction               0-001-018                                              /  /       /  /     05/19/08     /  /     7,13                           0    38,360,075  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Emmet Belknap Middle School:
06-0641   Reconstruction               0-002-010  05/01/07     DONE    DONE       DONE      12/21/06   12/15/06   02/16/06   05/16/06   2,4,9,155,15,16          682,500       682,500  JOD             0           0       74,393
                                                                                                                                                                                                                                 Habiterra Associates                
  -       Reconstruction               0-002-011                                              /  /       /  /     01/19/07     /  /     16                             0    17,639,819  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          North Park Junior High:
06-0642   Reconstruction               0-003-008  05/01/07     DONE    DONE       DONE      12/21/06   12/15/06   02/16/06   05/16/06   2,4,7,8,155,15,16      1,482,000     1,482,000  JOD             0           0      161,538
                                                                                                                                                                                                                                 Habiterra Associates                
  -       Reconstruction               0-003-009                                              /  /       /  /     01/19/07     /  /     16                             0    13,122,792  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Dewitt Clinton Elementary:
06-0643   Reconstruction               0-004-009  05/01/07     DONE    DONE       DONE      12/21/06   12/15/06   02/17/06   05/16/06   2,4,8,9,13,155,15,16     536,500       536,500  JOD             0           0       58,479
                                                                                                                                                                                                                                 Habiterra Associates                
  -       Reconstruction               0-004-010                                              /  /       /  /     01/19/07     /  /     13,16                          0     3,512,307  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Washington Hunt Elementary:
06-0644   Reconstruction               0-005-009  05/01/07     DONE    DONE       DONE      12/21/06   12/15/06   02/17/06   05/16/06   2,8,10,155,16            786,000       786,000  JOD             0           0       85,674
                                                                                                                                                                                                                                 Habiterra Associates                
  -       Reconstruction               0-005-010                                              /  /       /  /     01/19/07     /  /     13,16                          0     4,640,112  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          John Pound Elementary:
06-0645   Reconstruction               0-006-006  05/01/07     DONE    DONE       DONE      12/21/06   12/15/06   02/17/06   05/16/06   2,7,10,155,15,16         573,000       573,000  JOD             0           0       62,457
                                                                                                                                                                                                                                 Habiterra Associates                
  -       Reconstruction               0-006-007                                              /  /       /  /     01/19/07     /  /     13,16                          0     4,264,177  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Charlotte Cross Elementary:
06-0646   Reconstruction               0-007-008  05/01/07     DONE    DONE       DONE      12/21/06   12/15/06   02/16/06   05/16/06   2,4,7,9,10,155,15,16     640,500       640,500  JOD             0           0       69,815
                                                                                                                                                                                                                                 Habiterra Associates                
  -       Reconstruction               0-007-009                                              /  /       /  /     01/19/07     /  /     13,16                          0     4,350,105  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Charles Upson Elementary:
06-0647   Reconstruction               0-008-010  05/01/07     DONE    DONE       DONE      12/21/06   12/15/06   02/17/06   05/16/06   2,4,10,155,16             97,000        97,000  JOD             0           0       10,573
                                                                                                                                                                                                                                 Habiterra Associates                
  -       Reconstruction               0-008-011                                              /  /       /  /       /  /       /  /     13,16                          0    10,774,500  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Roy B. Kelly Elementary:
06-0648   Reconstruction               0-009-009  05/01/07     DONE    DONE       DONE      12/21/06   12/15/06   02/17/06   05/16/06   2,8,155,15,16          1,260,000     1,260,000  JOD             0           0      137,340
                                                                                                                                                                                                                                 Habiterra Associates                
  -       Reconstruction               0-009-010                                              /  /       /  /     01/19/07     /  /     13,16                          0     5,327,536  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Anna Merritt Elementary:
06-0649   Reconstruction               0-010-005  05/01/07     DONE    DONE       DONE      12/21/06   12/15/06   02/17/06   05/16/06   2,4,7,10,16              214,000       214,000  JOD             0           0       23,326
                                                                                                                                                                                                                                 Habiterra Associates                
  -       Reconstruction               0-010-006                                              /  /       /  /     01/19/07     /  /     13,16                          0     6,315,693  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          George Southard Elementary:
06-0650   Reconstruction               0-011-008  05/01/07     DONE    DONE       DONE      12/21/06   12/15/06   02/17/06   05/16/06   2,8,10,16                324,000       324,000  JOD             0           0       35,316
                                                                                                                                                                                                                                 Habiterra Associates                
  -       Reconstruction               0-011-009                                              /  /       /  /     01/19/07     /  /     13,16                          0     8,281,281  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Administration Bldg:
06-0651   Reconstruction               1-014-002  05/01/07     DONE    DONE       DONE      12/21/06   12/15/06   02/16/06   05/16/06   7                        229,500             0  JOD             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          Public Library:
07-0279   Reconstruction               6-017-002  09/06/07     DONE    DONE       DONE      09/04/07   08/31/07   07/16/07   08/22/07   7                        122,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          Districtwide:
07-0576   Reconstruction               7-999-004  10/31/07     DONE    DONE       DONE      10/17/07   10/16/07   08/20/07   05/15/07   10,13,16               1,426,250     1,426,250  JOD             0           0      183,986
                                                                                                                                                                                                                                 Habiterra Associates                


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NEWFANE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 40-06-01-06
last updated on 11/06/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Newfane Elementary:
07-0703   Reconstruction               0-001-009  03/17/08     DONE    DONE       DONE      11/05/07   11/02/07   03/20/07   02/06/07   2,4,7,9,155,15,16        354,515       354,515  MGL             0           0       29,424
                                                                                                                                                                                                                                 Cannon Design                       
07-0305   Reconstruction               0-001-010  09/06/07     DONE    DONE       DONE      09/05/07   09/04/07   09/05/07   08/07/07   4,7,9                    353,407       353,407  MGL             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       

          Middle School:
07-0704   Reconstruction               0-003-010  03/17/08     DONE    DONE       DONE      11/05/07   11/02/07   03/20/07   02/06/07   2,4,7,8,10,14,155,15   5,325,422     5,325,422  MGL             0           0      442,010
                                                                                                                                                                                                                                 Cannon Design                       

          Newfane Early Childhood Ctr.:
07-0705   Reconstruction               0-004-007  03/17/08     DONE    DONE       DONE      11/05/07   11/02/07   03/20/07   02/06/00   2,8,9,155,15,16          399,019       399,019  MGL             0           0       33,118
                                                                                                                                                                                                                                 Cannon Design                       
  -       Reconstruction               0-004-008                                              /  /       /  /     01/08/09     /  /     9,155,16                       0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Senior High:
07-0706   Reconstruction               0-005-010  03/17/08     DONE    DONE       DONE      11/05/07   11/02/07   03/20/07   02/06/07   2,8,9,10,155,15,16       569,447       569,447  MGL             0           0       47,264
                                                                                                                                                                                                                                 Cannon Design                       

          Central Serv. Bldg.:
07-0707   Reconstruction               3-006-003  03/17/08     DONE    DONE       DONE      11/05/07   11/02/07   03/20/07   02/06/07   2,9,155,15,16            236,621             0  MGL             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NIAGARA WHEATFIELD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 40-07-01-06
last updated on 11/06/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Errick Road Elementary:
05-0206   Reconstruction               0-005-012  12/23/05     DONE    DONE       DONE      09/21/05   09/19/05   06/18/04   11/17/04   2,9,155,15,16            922,306       922,306  DDJ             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       
07-1353   Reconstruction               0-005-013  01/24/08     DONE    DONE       DONE      01/09/08   01/09/08   02/16/07   05/15/07   2,7,15                 1,258,410             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       
08-1702SC Visual Structural Inspection 0-005-SC1  06/19/09     DONE    DONE       DONE      04/20/09   04/20/09     /  /       /  /     16                         1,975             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Colonial Village Elementary:
05-0207   Reconstruction               0-011-016  12/23/05     DONE    DONE       DONE      09/21/05   09/19/05   06/18/04   11/17/04   2,155,15,16              544,190       544,190  DDJ             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       
07-1354   Reconstruction               0-011-017  01/24/08     DONE    DONE       DONE      01/09/08   01/09/08   02/16/07   05/15/07   2,7,15                 1,400,912             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       

          Senior High School:
05-0208   Additions and Alterations    0-013-021  12/23/05     DONE    DONE       DONE      09/21/05   09/19/05   06/18/04   11/17/04   02 - 16               18,990,130    18,131,203  DDJ             0           0    1,314,526
                                                                                                                                                                                                                                 Cannon Design                       
06-0406   Reconstruction               0-013-022  01/19/07     DONE    DONE       DONE      11/01/06   10/31/06   06/09/06   11/17/04   2,14,15,16               636,444       636,444  DDJ             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       

          Edward Town Middle School:
05-0209   Additions and Alterations    0-014-010  12/23/05     DONE    DONE       DONE      09/21/05   09/19/05   06/18/04   11/17/04   02 - 16               12,609,946    11,623,494  DDJ             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       
06-0407   Reconstruction               0-014-011  01/19/07     DONE    DONE       DONE      11/01/06   10/31/06   06/08/06   11/17/04   155,16                    98,000        98,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       

          West Street Elementary(New Elem):
05-0210   Additions and Alterations    0-029-003  12/23/05     DONE    DONE       DONE      09/21/05   09/19/05   06/18/04   11/17/04   02 - 16                3,944,983     3,944,983  DDJ             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       

          Bergholz Admin. Bldg./fmly. 2-016:
  -       Alterations                  1-016-001                                              /  /       /  /       /  /       /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          CONCESSION/COMFORT:
  -    PR New Construction             7-033-001                                              /  /       /  /     06/14/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0408   New Construction             7-033-001  01/19/07     DONE    DONE       DONE      11/01/06   10/31/06   06/14/06   11/17/04   02 - 16                  386,325             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NIAGARA FALLS CITY SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 40-08-00-01
last updated on 11/06/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Gaskill Middle School:
05-1144   Reconstruction               0-001-012  12/01/06     DONE    DONE       DONE      04/17/06   04/09/06   04/23/04   12/14/04   2,4,8,9,10,155,15,16     415,876       415,876  HCM             0           0            0
                                                                                                                                                                                                                                 EI Team, Inc.                       
04-1110   Reconstruction               0-001-013  05/09/06     DONE    DONE       DONE      04/08/05   04/06/05   12/13/04   08/26/04   13,155,15,16             484,528       484,528  HCM             0           0            0
                                                                                                                                                                                                                                 IBC Engineering,P.C.                
08-0004   Reconstruction               0-001-014  01/13/09     DONE    DONE       DONE      07/11/08   07/01/08   12/14/07   10/28/04   2,4,7,13,155,15,16     2,678,068             0  HCM             0           0    1,101,188
                                                                                                                                                                                                                                 Cannon Design                       

          79th Street Elementary School:
05-1145   Reconstruction               0-005-009  12/01/06     DONE    DONE       DONE      04/17/06   04/09/06   04/23/04   12/14/04   2,4,7,8,9,10,14,155,           2       441,033  HCM             0           0            0
                                                                                                                                                                                                                                 EI Team, Inc.                       
04-1111   Reconstruction               0-005-010  05/09/06     DONE    DONE       DONE      04/08/05   04/06/05   12/13/04   08/26/04   13,155,15,16             326,655       326,655  HCM             0           0            0
                                                                                                                                                                                                                                 IBC Engineering,P.C.                
08-0005   Reconstruction               0-005-011  01/13/09     DONE    DONE       DONE      07/11/08   07/01/08   12/14/07   10/28/04   2,7                      875,178             0  HCM             0           0      315,954
                                                                                                                                                                                                                                 Cannon Design                       

          Geraldine J. Mann Elementary School:
05-1146   Reconstruction               0-011-008  12/01/06     DONE    DONE       DONE      04/17/06   04/09/06   04/23/04   12/14/04   2,8,9,10,155,15,16       171,664       171,664  HCM             0           0            0
                                                                                                                                                                                                                                 EI Team, Inc.                       
04-1112   Reconstruction               0-011-009  05/09/06     DONE    DONE       DONE      04/08/05   04/06/05   12/13/04   08/26/04   155,16                    62,673        62,673  HCM             0           0            0
                                                                                                                                                                                                                                 IBC Engineering,P.C.                
08-0006   Reconstruction               0-011-010  01/13/09     DONE    DONE       DONE      07/11/08   07/01/08   12/14/07   10/28/04   2,7,15                 1,446,442             0  HCM             0           0      563,554
                                                                                                                                                                                                                                 Cannon Design                       

          Kalfas Early Childhood Magnet School:
05-1147   Additions and Alterations    0-014-013  12/01/06     DONE    DONE       DONE      04/17/06   04/09/06   04/23/04   12/14/04   02 - 16                  213,599       213,599  HCM             0           0            0
                                                                                                                                                                                                                                 EI Team, Inc.                       
04-1113   Reconstruction               0-014-014  05/09/06     DONE    DONE       DONE      04/08/05   04/06/05   12/13/04   08/26/04   13,155,15,16             429,380       429,380  HCM             0           0            0
                                                                                                                                                                                                                                 IBC Engineering,P.C.                
08-0007   Reconstruction               0-014-015  01/13/09     DONE    DONE       DONE      07/11/08   07/01/08   12/14/07   10/28/04   13                       565,976             0  HCM             0           0      204,327
                                                                                                                                                                                                                                 Cannon Design                       

          Maple Avenue Elementary School:
05-1148   Reconstruction               0-015-009  12/01/06     DONE    DONE       DONE      04/17/06   04/09/06   04/23/04   12/14/04   4,8,9,10,155,15,16       356,197       356,197  HCM             0           0            0
                                                                                                                                                                                                                                 EI Team, Inc.                       
04-1114   Reconstruction               0-015-010  05/09/06     DONE    DONE       DONE      04/08/05   04/06/05   12/13/04   08/26/04   8,13,155,15,16           927,755       927,755  HCM             0           0            0
                                                                                                                                                                                                                                 IBC Engineering,P.C.                
08-0008   Reconstruction               0-015-011  01/13/09     DONE    DONE       DONE      07/11/08   07/01/08   12/14/07   10/28/04   9                        460,945             0  HCM             0           0      166,409
                                                                                                                                                                                                                                 Cannon Design                       

          LaSalle Middle School:
05-1149   Reconstruction               0-020-010  12/01/06     DONE    DONE       DONE      04/17/06   04/09/06   04/23/04   12/14/04   2,4,9,10,155,15,16       625,321       625,321  HCM             0           0            0
                                                                                                                                                                                                                                 EI Team, Inc.                       
04-1115   Reconstruction               0-020-011  05/09/06     DONE    DONE       DONE      04/08/05   04/06/05   12/13/04   08/26/04   13,155,15,16             765,893       765,893  HCM             0           0            0
                                                                                                                                                                                                                                 IBC Engineering,P.C.                
08-0009   Reconstruction               0-020-012  01/13/09     DONE    DONE       DONE      07/11/08   07/01/08   12/14/07   10/28/04   4,13,15                1,624,133             0  HCM             0           0      632,299
                                                                                                                                                                                                                                 Cannon Design                       

          24th Street School:
05-1150   Reconstruction               0-021-008  12/01/06     DONE    DONE       DONE      04/17/06   04/09/06   04/23/04   12/14/04   2,8,9,10,155,15,16       458,814       458,814  HCM             0           0            0
                                                                                                                                                                                                                                 EI Team, Inc.                       
04-1116   Reconstruction               0-021-009  05/09/06     DONE    DONE       DONE      04/08/05   04/06/05   12/13/04   08/26/04   155,15                   372,493       372,493  HCM             0           0            0
                                                                                                                                                                                                                                 IBC Engineering,P.C.                

          Admin Bldg (was 66th St School):
05-1151   Reconstruction               0-024-009  12/01/06     DONE    DONE       DONE      04/17/06   04/09/06   04/23/04   12/14/04   2,4,7,8,9,10,14,155,     172,032       172,032  HCM             0           0            0
                                                                                                                                                                                                                                 EI Team, Inc.                       
04-1117   Reconstruction               0-024-010  05/09/06     DONE    DONE       DONE      04/08/05   04/06/05   12/13/04   08/26/04   155,16                   290,086       290,086  HCM             0           0            0
                                                                                                                                                                                                                                 IBC Engineering,P.C.                
08-0010   Additions and Alterations    0-024-011  01/13/09     DONE    DONE       DONE      07/11/08   07/01/08   06/10/08   10/28/04   02 - 16                1,482,118     1,482,118  HCM             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       

          Hyde Park School:
05-1152   Reconstruction               0-026-008  12/01/04     DONE    DONE       DONE      04/17/06   04/09/06   04/23/04   12/14/04   2,8,9,10,14,155,15,1     687,943       687,943  HCM             0           0            0
                                                                                                                                                                                                                                 EI Team, Inc.                       
04-1118   Reconstruction               0-026-009  05/09/06     DONE    DONE       DONE      04/08/05   04/06/05   12/13/04   08/26/04   155,15,16                259,096       259,096  HCM             0           0            0
                                                                                                                                                                                                                                 IBC Engineering,P.C.                
08-0011   Reconstruction               0-026-010  01/13/09     DONE    DONE       DONE      07/11/08   07/01/08   12/14/07   10/28/04   2,4                      567,299       567,299  HCM             0           0      204,805
                                                                                                                                                                                                                                 Cannon Design                       

          Community Ed Ctr (was 60th St Sch):
05-1153   Reconstruction               0-033-009  12/01/06     DONE    DONE       DONE      04/17/06   04/09/06   04/23/04   12/14/04   2,4,7,8,9,10,14,155,     410,527       410,527  HCM             0           0            0
                                                                                                                                                                                                                                 EI Team, Inc.                       
04-1119   Reconstruction               0-033-010  05/09/06     DONE    DONE       DONE      04/08/05   04/06/05   12/13/04   08/26/04   13,155,15,16             259,321       259,321  HCM             0           0            0
                                                                                                                                                                                                                                 IBC Engineering,P.C.                
08-0012   Reconstruction               0-033-011  01/13/09     DONE    DONE       DONE      07/11/08   07/01/08   12/14/07   10/28/04   2,155,15,16              660,991       660,991  HCM             0           0      238,629
                                                                                                                                                                                                                                 Cannon Design                       

          Abate Elementary School:
05-1264   Reconstruction               0-038-013  12/01/06     DONE    DONE       DONE      05/19/06   05/08/06   04/23/04   12/14/04   2,9,10,155,15,16          11,968        11,968  HCM             0           0            0
                                                                                                                                                                                                                                 EI Team, Inc.                       
04-1120   Reconstruction               0-038-014  05/09/06     DONE    DONE       DONE      04/08/05   04/06/05   12/13/04   08/26/04   13,155,15,16             640,123       640,123  HCM             0           0            0
                                                                                                                                                                                                                                 IBC Engineering,P.C.                
08-0013   Reconstruction               0-038-015  01/13/09     DONE    DONE       DONE      07/11/08   07/01/08   12/14/07   10/28/04   2,15                   1,874,073             0  HCM             0           0      771,415
                                                                                                                                                                                                                                 Cannon Design                       

          Niagara Middle School:
05-1154   Additions and Alterations    0-039-005  12/01/06     DONE    DONE       DONE      04/17/06   04/09/06   04/23/04   12/14/04   02 - 16                   42,743        42,743  HCM             0           0            0
                                                                                                                                                                                                                                 EI Team, Inc.                       
04-1121   Reconstruction               0-039-006  05/09/06     DONE    DONE       DONE      04/08/05   04/06/05   12/13/04   08/26/04   13,155,15,16             365,773       365,773  HCM             0           0            0
                                                                                                                                                                                                                                 IBC Engineering,P.C.                
08-0014   Reconstruction               0-039-007  01/13/09     DONE    DONE       DONE      07/11/08   07/01/08   12/13/07   10/28/04   2                      1,388,080     1,388,080  HCM             0           0      537,888
                                                                                                                                                                                                                                 Cannon Design                       

          Hyde Park High School:
05-1155   Additions and Alterations    0-043-002  12/01/06     DONE    DONE       DONE      04/17/06   04/09/06   04/23/04   12/14/04   02 - 16                  200,611       200,611  HCM             0           0            0
                                                                                                                                                                                                                                 EI Team, Inc.                       
04-1122   Reconstruction               0-043-003  05/09/06     DONE    DONE       DONE      04/08/05   04/06/05   12/13/04   08/26/04   155,15,16              2,169,044     2,169,044  HCM             0           0            0
                                                                                                                                                                                                                                 IBC Engineering,P.C.                
08-0015   Additions and Alterations    0-043-004  01/13/09     DONE    DONE       DONE      07/11/08   07/01/08   12/14/07   10/28/04   02 - 16                3,591,561     2,481,561  HCM             0           0    1,478,396
                                                                                                                                                                                                                                 Cannon Design                       

          New Elementary School:
04-0460PR New Construction             0-045-001  11/30/04     DONE    DONE       DONE      11/30/04   11/30/04   04/14/04     /  /     02 - 16                        0    12,587,217  HCM             0           0            0
                                                                                                                                                                                                                                                                     
04-0461   New Construction             0-045-001  08/12/05     DONE    DONE       DONE      06/08/05   06/01/05   04/14/04   12/14/04   02 - 16               24,197,400    12,570,274  HCM             0           0            0
                                                                                                                                                                                                                                 EI Team, Inc.                       

          DeVeauz Campus Administration Comple:
  -    TQ Temporary Quarters           1-048-001                                              /  /       /  /     04/06/05     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Storage Building(Found Building):
  -    DB Discovered Building          2-049-001                                              /  /       /  /     02/19/09     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          District Wide:
  -       Reconstruction               7-999-005                                              /  /       /  /     12/13/07     /  /     10,13,16                       0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          St. Joseph's:
04-0963TQ Temporary Quarters           8-046-001  05/27/05     DONE    DONE       DONE      03/28/05   03/28/05   03/11/05     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          St. Stanislaus School:
04-0962TQ Temporary Quarters           8-047-001  05/27/05     DONE    DONE       DONE      03/28/05   03/28/05   03/11/05     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NORTH TONAWANDA SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 40-09-00-01
last updated on 11/06/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Grant School 9:
08-1721   Reconstruction               0-002-008                       ADDENDUM REQ'D       06/22/09   06/12/09   01/16/08   04/22/08   2,4,7,8,9,10,155,15,           0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Kideney Architects, P.C.            
06-0859SC Visual Structural Inspection 0-002-SC1  02/06/07     DONE    DONE       DONE      01/19/07   01/19/07     /  /       /  /     16                         2,137         2,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Drake School 10:
08-0701   Reconstruction               0-003-009  03/04/09     DONE    DONE       DONE      11/05/08   11/04/08   01/16/08   04/22/08   2,4,7,8,9,10,155,15,   3,811,754     3,811,754  JOD             0           0            0
                                                                                                                                                                                                                                 Kideney Architects, P.C.            
05-0857SC Visual Structural Inspection 0-003-SC1  02/06/07     DONE    DONE       DONE      01/19/07   01/19/07     /  /       /  /     16                         2,062         2,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Gilmore School:
08-1722   Reconstruction               0-010-010                       ADDENDUM REQ'D       06/22/09   06/12/09   01/16/08   04/22/08   2,4,7,8,9,10,14,155,           0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Kideney Architects, P.C.            
06-0858SC Visual Structural Inspection 0-010-SC1  02/06/07     DONE    DONE       DONE      01/19/07   01/19/07     /  /       /  /     16                         2,984         2,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Spruce School:
08-1723   Reconstruction               0-011-009                       ADDENDUM REQ'D       06/22/09   06/12/09   01/16/08   04/22/09   2,4,7,8,9,10,155,15,           0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Kideney Architects, P.C.            

          Ohio St Elementary:
08-1724   Reconstruction               0-014-010                       ADDENDUM REQ'D       06/22/09   06/12/09   01/16/08   04/22/09   2,4,7,8,9,10,155,15,           0     6,014,520  JOD             0           0            0
                                                                                                                                                                                                                                 Kideney Architects, P.C.            
06-0861SC Visual Structural Inspection 0-014-SC1  02/06/07     DONE    DONE       DONE      01/19/07   01/19/07     /  /       /  /     16                         2,137         2,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Meadow Dr ES K-5/NT HS 9-12:
04-1162   Reconstruction               0-015-010  04/27/05     DONE    DONE       DONE      04/14/05   04/13/05   10/25/04   02/01/05   2,8                    1,079,800     1,079,800  JOD             0           0            0
                                                                                                                                                                                                                                 Trautman King Markwart Assoc.       
05-0244   Reconstruction               0-015-011  11/10/05     DONE    DONE       DONE      10/07/05   10/06/05   06/29/05   12/10/02   2,155,15,16              214,758       214,758  JOD             0           0            0
                                                                                                                                                                                                                                 Trautman King Markwart Assoc.       
08-1147   Reconstruction               0-015-012  02/24/09     DONE    DONE       DONE      01/29/09   01/27/09   07/06/05   04/22/08   2,8                      360,000       360,000  JOD             0           0            0
                                                                                                                                                                                                                                 Kideney Architects, P.C.            
08-1725   Reconstruction               0-015-013                       ADDENDUM REQ'D       06/22/09   06/12/09   01/16/08   04/22/09   2,4,7,8,9,10,155,15,           0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Kideney Architects, P.C.            
08-1726   Reconstruction               0-015-014  07/14/09     DONE    DONE       DONE      06/22/09   06/12/09   01/06/09   04/22/09   7                        249,654             0  JOD             0           0            0
                                                                                                                                                                                                                                 Kideney Architects, P.C.            
08-1589   Reconstruction               0-015-015  07/30/09     DONE    DONE       DONE      05/05/09   04/28/09   01/29/09   04/27/08   155,16                         0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Kideney Architects, P.C.            
06-0860SC Visual Structural Inspection 0-015-SC1  02/06/07     DONE    DONE       DONE      01/19/07   01/19/07     /  /       /  /     16                         2,342         2,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Reszel Middle School:
08-0702   Additions and Alterations    0-016-012  03/04/09     DONE    DONE       DONE      11/05/08   11/04/08   01/16/08   04/22/08   02 - 16               13,881,073    13,881,073  JOD             0           0    1,376,696
                                                                                                                                                                                                                                 Kideney Architects, P.C.            

          LEASED STORAGE @ TCCO:
06-0762TQ Temporary Quarters           2-021-001  05/01/07     DONE    DONE       DONE      01/12/07   01/12/07   05/22/06     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Maintenance Building @ Spruce:
09-0398   Alterations                  3-023-001                         UNREVIEWED         11/06/09   11/04/09   07/22/09   04/22/08                                  0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Kideney Architects, P.C.            

          New Transportation Maitenance Bldg.:
  -       Reconstruction               5-018-003                                              /  /       /  /     12/09/08     /  /     2,9,16                         0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Tom Murphy Softball Stadium:
  -    DB Discovered Building          7-022-001                                              /  /       /  /     05/07/09     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Districtwide:
  -       Reconstruction               7-999-005                                              /  /       /  /     05/19/06     /  /     16                             0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




STARPOINT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 40-10-01-06
last updated on 11/06/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building(JR/SR):
05-0019   Reconstruction               0-001-017  09/08/05     DONE    DONE       DONE      07/06/05   07/01/05   03/24/05   05/17/05   2,7,155,15,16            760,500       760,500  DDJ             0           0            0
                                                                                                                                                                                                                                 Gordon W. Jones Associates          
07-0683   Additions and Alterations    0-001-018  04/22/08     DONE    DONE       DONE      11/01/07   10/31/07   03/01/07   05/15/07   02 - 16                6,424,912     6,424,912  DDJ             0           0      365,257
                                                                                                                                                                                                                                 Gordon W. Jones Associates          
07-0125   Reconstruction               0-001-019  09/05/07     DONE    DONE       DONE      08/03/07   08/02/07   07/25/07   05/15/07   2,7                    2,961,266     2,961,266  DDJ             0           0      286,655
                                                                                                                                                                                                                                 Gordon W. Jones Associates          
06-1612SC Visual Structural Inspection 0-001-SC1  06/19/07     DONE    DONE       DONE      06/05/07   06/05/07     /  /       /  /     16                         7,615             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
07-2184SC Visual Structural Inspection 0-001-SC2  09/26/08     DONE    DONE       DONE      03/13/08   03/13/08     /  /       /  /     16                        17,193             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Fricano Elementary School:
05-0020   Reconstruction               0-002-006  09/08/05     DONE    DONE       DONE      07/06/05   07/01/05   03/24/05   05/17/05   2,7                      117,000       117,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Gordon W. Jones Associates          
07-0684   Additions and Alterations    0-002-007  04/22/08     DONE    DONE       DONE      11/01/07   10/31/07   03/01/07   05/15/07   02 - 16                2,695,561     2,695,561  DDJ             0           0      145,829
                                                                                                                                                                                                                                 Gordon W. Jones Associates          
07-0126   Reconstruction               0-002-008  09/05/07     DONE    DONE       DONE      08/03/07   08/02/07   07/25/07   05/15/07   2,7                    1,578,253     1,578,253  DDJ             0           0      126,465
                                                                                                                                                                                                                                 Gordon W. Jones Associates          

          Storage Building:
07-0685   New Construction             2-009-001  04/22/08     DONE    DONE       DONE      11/01/07   10/31/07   08/01/07   05/15/07   02 - 16                  151,200             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Gordon W. Jones Associates          

          Press Box:
06-0285DB Discovered Building          7-008-001  10/02/06     DONE    DONE       DONE      10/02/06   10/02/06   11/19/02     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ROYALTON-HARTLAND CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 40-12-01-06
last updated on 11/06/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Jr/Sr High School:
  -    PR Additions and Alterations    0-001-006                                              /  /       /  /     02/13/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Middleport Elem School:
  -    PR Additions and Alterations    0-002-003                                              /  /       /  /     02/13/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Gasport Elementary:
08-0816   Additions and Alterations    0-003-004  10/13/09     DONE    DONE       DONE      11/26/08   11/25/08   02/13/07   01/17/08   02 - 16                4,392,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 McKenna Associates                  


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BARKER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 40-13-01-04
last updated on 11/06/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Central Building:
06-0247   Reconstruction               0-001-012  01/05/07     DONE    DONE       DONE      09/28/06   09/25/06   12/28/05   05/16/06   2,4,8,9,10,155,15,16   3,580,000     3,580,000  MGL             0           0      324,625
                                                                                                                                                                                                                                 Trautman King Markwart Assoc.       
05-1300   Reconstruction               0-001-013  10/19/06     DONE    DONE       DONE      05/31/06   05/15/06   03/31/06   02/27/06   7                        220,440       220,440  MGL             0           0            0
                                                                                                                                                                                                                                 Trautman King Markwart Assoc.       
08-0733   Reconstruction               0-001-014  03/23/09     DONE    DONE       DONE      11/10/08   11/06/08   01/31/08   05/20/08   2,4,7,8,9,155,15,16    1,500,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Trautman King Markwart Assoc.       

          1911 Building:
07-0313   Reconstruction               0-003-004  02/13/08     DONE    DONE       DONE      09/06/07   09/06/07   12/28/05   05/16/06   8,9,155,15,16            400,000       400,000  MGL             0           0            0
                                                                                                                                                                                                                                 Trautman King Markwart Assoc.       
  -       Reconstruction               0-003-005                                              /  /       /  /     01/31/08     /  /     4,8,155,15,16                  0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WILSON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 40-15-01-06
last updated on 11/06/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Industrial Arts Bldg:
07-0475   Reconstruction               0-001-004  03/06/08     DONE    DONE       DONE      10/01/07   10/01/07   10/20/06   12/13/06   2,4,7,8,9,155,15,16      247,501       247,501  JOD             0           0       16,290
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          Wilson Middle/High School:
07-0476   Additions and Alterations    0-002-015  03/06/08     DONE    DONE       DONE      10/01/07   10/01/07   10/20/06   12/13/06   02 - 16                3,897,167     3,765,797  JOD             0           0      256,508
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          Thomas Marks Elementary:
07-0477   Reconstruction               0-003-007  03/06/08     DONE    DONE       DONE      10/01/07   10/01/07   10/20/06   12/13/06   2,4,8,9,10,155,15,16   1,375,845     1,375,845  JOD             0           0       90,557
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          Stevenson Elementary:
07-0478   Additions and Alterations    0-004-006  03/06/08     DONE    DONE       DONE      10/01/07   10/01/07   10/20/06   12/13/06   02 - 16                1,768,068     1,768,068  JOD             0           0      116,373
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          District Office II:
07-0479   Reconstruction               1-005-001  03/06/08     DONE    DONE       DONE      10/01/07   10/01/07   10/20/06   12/13/06                             12,400             0  JOD             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          District Office:
07-0480   Reconstruction               1-007-001  03/06/08     DONE    DONE       DONE      10/01/07   10/01/07   10/20/06   12/13/06   2,7,8,9,155,15,16        191,239             0  JOD             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          Dugout I @ Middle / High School:
07-0481   New Construction             7-016-001  03/06/08     DONE    DONE       DONE      10/01/07   10/01/07   04/23/07   12/13/06   02 - 16                   49,824             0  JOD             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          Dugout @ Middle / High School:
07-0482   New Construction             7-017-001  03/06/08     DONE    DONE       DONE      10/01/07   10/01/07   04/23/07   12/13/06   02 - 16                   45,217             0  JOD             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          Concession Stand @ Thomas Marks:
07-0483   New Construction             7-018-001  03/06/08     DONE    DONE       DONE      10/01/07   10/01/07   05/31/07   12/13/06   02 - 16                  417,347             0  JOD             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED