NYC Construction Project Status
THE STATE EDUCATION DEPARTMENT
OFFICE OF FACILITIES PLANNING
UPDATED: 02/14/06 at 02:04:15
**CITY-WIDE PROJECTS**
NYC SCHOOLS-CHANCELLOR'S OFFICE STATUS REPORT ON CAPITAL PROJECTS
District No.: 30-00-00-00
last updated on 02/14/06
PROJECT BUILDING PROJECT APPLICAT NYSED CONTRACT ESTIMATED COST PROJECT RATED COST/
No. NO. NAME DESCRIPTION TO NYSED APPROVAL AWARD REC NEW ADD COST ALLOWANCE SIZE CAPACIT. SQ. FT.
_____________________________________________________________________________________________________________________________________________________________________________________________________
1 30-00-00-00-0-000-3NJ 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 04/26/96 09/19/90 * 58,627 3,550,874 120,000 1,134 0
2 30-00-00-00-0-000-3NL 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 07/26/90 * 212,795 146,000 112,000 1,466 2
3 30-00-00-00-0-000-3NM 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/16/90 * 11,404 11,404 2,187,000 8,714 0
4 30-00-00-00-0-000-3NO 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 10/17/90 * 3,180,265 2,181,999 147,000 1,529 22
5 30-00-00-00-0-000-3NP 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 11/30/90 * 86,430 59,300 44,000 522 2
6 30-00-00-00-0-000-3NR 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 11/30/90 * 65,005 44,600 36,000 508 2
7 30-00-00-00-0-000-3NS 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 04/02/91 * 6,023,316 5,373,028 8,618,000 94,413 1
8 30-00-00-00-0-000-3NU 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 04/18/91 * 1,134,585 778,008 22,663,000 98,122 0
9 30-00-00-00-0-000-3NW 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 06/14/91 * 2,252,227 1,679,407 6,030,000 72,133 0
10 30-00-00-00-0-000-3NX 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 06/14/91 * 10,056,692 7,845,558 58,614,000 4,692 0
11 30-00-00-00-0-000-3O5 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 12/06/90 * 727,991 499,479 6,849,000 21,673 0
12 30-00-00-00-0-000-3O9 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 03/19/91 * 4,044,251 8,016,838 221,000 2,279 18
13 30-00-00-00-0-000-3OA 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 02/21/91 * 3,493,810 3,079,108 1,269,000 13,144 3
14 30-00-00-00-0-000-3OB 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 02/21/91 * 6,751,641 4,915,003 576,000 4,989 12
15 30-00-00-00-0-000-3OG 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 07/25/91 * 265,766 6,168,783 2,393,000 28,954 0
16 30-00-00-00-0-000-3OI 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 06/28/91 * 7,694,234 9,095,244 2,864,000 31,433 3
17 30-00-00-00-0-000-3OO 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 10/31/91 * 1,121,550 766,907 3,399,000 40,420 0
18 30-00-00-00-0-000-3OQ 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 12/16/91 * 2,262,627 1,715,763 9,482,000 109,589 0
19 30-00-00-00-0-000-3OR 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 01/15/92 * 692,440 914,465 1,752,000 19,189 0
20 30-00-00-00-0-000-3OY 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 11/12/91 * 85,920 410,447 140,000 1,433 1
21 30-00-00-00-0-000-3Op 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 11/12/91 * 1,457,500 924,859 1,811,000 21,849 1
22 30-00-00-00-0-000-3P4 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 03/23/93 * 1,340,945 1,031,328 30,922,000 2,978 0
23 30-00-00-00-0-000-3P5 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 01/22/93 * 999,705 628,480 18,419,000 91,960 0
24 30-00-00-00-0-000-3P6 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 03/23/93 * 728,750 449,660 9,468,000 106,943 0
25 30-00-00-00-0-000-3P7 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 05/04/93 * 2,113,375 1,332,434 10,355,000 119,793 0
26 30-00-00-00-0-000-3P8 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 05/04/93 * 2,024,451 1,345,117 501,000 6,070 4
27 30-00-00-00-0-000-3P9 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 05/24/93 * 1,498,272 1,012,371 6,974,000 75,438 0
28 30-00-00-00-0-000-3PA 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 05/25/93 * 3,222,501 2,060,978 1,935,000 18,150 2
29 30-00-00-00-0-000-3PB 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 06/03/93 * 184,665 126,700 99,000 1,119 2
30 30-00-00-00-0-000-3PD 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 06/10/93 * 655,875 450,000 955,000 9,392 1
31 30-00-00-00-0-000-3PE 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 06/09/93 * 2,448,873 1,668,817 7,220,000 83,543 0
32 30-00-00-00-0-000-3PF 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 06/14/93 * 10,332,407 7,086,673 1,312,000 13,883 8
33 30-00-00-00-0-000-3PG 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 06/14/93 * 6,266,302 4,805,337 17,944,000 80,540 0
34 30-00-00-00-0-000-3PH 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 06/21/93 * 298,979 145,975 120,000 1,268 2
35 30-00-00-00-0-000-3PI 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 06/16/93 * 7,480,400 4,010,439 5,626,000 16,835 1
36 30-00-00-00-0-000-3PJ 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 06/28/93 * 2,326,881 3,404,972 35,034,000 1,988 0
37 30-00-00-00-0-000-3PM 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/20/93 * 437,724 403,487 16,304,000 165,016 0
38 30-00-00-00-0-000-3PO 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/10/93 * 2,915,000 1,766,933 3,023,000 26,236 1
39 30-00-00-00-0-000-3PP 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 07/07/93 * 225,653 154,134 319,000 2,581 1
40 30-00-00-00-0-000-3PQ 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/13/93 * 2,919,453 1,619,079 11,802,000 127,490 0
41 30-00-00-00-0-000-3PR 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/17/93 * 1,243,404 853,107 9,140,000 28,856 0
42 30-00-00-00-0-000-3PT 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/18/93 * 51,492 35,329 1,039,000 3,734 0
43 30-00-00-00-0-000-3PW 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/20/93 * 309,420 212,295 178,000 1,801 2
44 30-00-00-00-0-000-3PX 116-25 Guy R. Brewer Blvd "Sampling, testing 06/28/95 04/26/96 08/20/93 * 4,999,225 3,417,937 26,389,000 91,727 0
45 30-00-00-00-0-000-3PZ 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/20/93 * 1,439,538 987,675 8,415,000 40,440 0
46 30-00-00-00-0-000-3Q0 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/20/93 * 255,063 68,945 2,978,000 22,885 0
47 30-00-00-00-0-000-3Q1 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/20/93 * 1,275,313 875,000 11,274,000 136,756 0
48 30-00-00-00-0-000-3Q2 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/23/93 * 1,166,000 800,000 548,000 7,432 2
49 30-00-00-00-0-000-3Q3 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/23/93 * 2,186,250 1,437,390 17,194,000 78,192 0
50 30-00-00-00-0-000-3Q4 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 04/26/96 08/23/93 * 416,934 286,060 3,113,000 13,783 0
51 30-00-00-00-0-000-3Q5 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/23/93 * 1,100,461 755,033 3,218,000 9,441 0
52 30-00-00-00-0-000-3Q6 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/25/93 * 245,936 168,737 5,193,000 40,337 0
53 30-00-00-00-0-000-3Q7 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/25/93 * 215,787 159,146 3,770,000 42,441 0
54 30-00-00-00-0-000-3Q8 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/25/93 * 65,230 44,754 1,774,000 10,949 0
55 30-00-00-00-0-000-3Q9 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/26/93 * 120,944 82,980 805,000 1,795 0
56 30-00-00-00-0-000-3QA 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/26/93 * 378,950 239,015 388,000 6,963 1
57 30-00-00-00-0-000-3QB 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/30/93 * 600,624 412,092 866,000 10,636 1
58 30-00-00-00-0-000-3QC 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/30/93 * 364,375 79,363 1,351,000 12,457 0
59 30-00-00-00-0-000-3QD 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/31/93 * 636,277 436,553 2,778,000 11,109 0
60 30-00-00-00-0-000-3QE 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/30/93 * 498,461 341,997 4,578,000 24,273 0
61 30-00-00-00-0-000-3QF 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/30/93 * 2,915,000 1,547,757 6,923,000 60,249 0
62 30-00-00-00-0-000-3QG 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/30/93 * 10,202,500 6,317,215 3,610,000 21,526 3
63 30-00-00-00-0-000-3QH 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/30/93 * 23,983,056 16,454,926 11,572,000 31,355 2
64 30-00-00-00-0-000-3QI 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/30/93 * 95,195 65,313 239,000 1,758 0
65 30-00-00-00-0-000-3QJ 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/30/93 * 8,745,000 4,449,798 151,000 1,791 58
66 30-00-00-00-0-000-3QK 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/14/93 * 1,114,696 764,800 878,000 2,622 1
67 30-00-00-00-0-000-3QL 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/01/93 * 360,038 247,024 594,000 1,951 1
68 30-00-00-00-0-000-3QM 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/01/93 * 163,996 112,519 1,222,000 8,604 0
69 30-00-00-00-0-000-3QN 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/01/93 * 698,531 475,266 4,713,000 16,660 0
70 30-00-00-00-0-000-3QO 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/01/93 * 641,895 440,408 5,492,000 33,174 0
71 30-00-00-00-0-000-3QP 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/03/93 * 437,250 263,099 1,551,000 17,518 0
72 30-00-00-00-0-000-3QQ 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/03/93 * 1,082,941 743,013 204,000 2,647 5
73 30-00-00-00-0-000-3QR 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/09/93 * 1,767,009 1,212,355 48,827,000 11,273 0
74 30-00-00-00-0-000-3QS 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/14/93 * 5,757,125 3,950,000 879,000 10,291 7
75 30-00-00-00-0-000-3QU 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/14/93 * 1,457,500 972,302 4,492,000 46,693 0
76 30-00-00-00-0-000-3QV 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/10/93 * 178,715 122,617 240,000 1,129 1
77 30-00-00-00-0-000-3QX 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/13/93 * 327,669 224,816 1,594,000 16,994 0
78 30-00-00-00-0-000-3QY 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/14/93 * 563,697 386,756 360,000 4,325 2
79 30-00-00-00-0-000-3QZ 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/13/93 * 366,895 251,729 2,811,000 10,986 0
80 30-00-00-00-0-000-3R0 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/14/93 * 161,905 111,084 1,196,000 4,427 0
81 30-00-00-00-0-000-3R1 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/14/93 * 109,036 74,810 135,000 1,857 1
82 30-00-00-00-0-000-3R3 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/21/93 * 6,190,734 4,247,502 701,000 7,927 9
83 30-00-00-00-0-000-3R4 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/21/93 * 1,321,792 839,015 603,000 4,760 2
84 30-00-00-00-0-000-3R5 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/22/93 * 541,129 371,266 522,000 5,726 1
85 30-00-00-00-0-000-3R6 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/23/93 * 236,251 162,093 445,000 2,998 1
86 30-00-00-00-0-000-3R7 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/24/93 * 1,024,077 552,141 1,360,000 18,516 1
87 30-00-00-00-0-000-3RA 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/24/93 * 206,506 134,601 359,000 4,308 1
88 30-00-00-00-0-000-3RB 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/27/93 * 1,500,545 1,029,533 1,988,000 16,475 1
89 30-00-00-00-0-000-3RC 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/28/93 * 846,079 580,493 185,000 2,285 5
90 30-00-00-00-0-000-3RD 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 09/27/93 * 1,566,813 1,071,598 3,740,000 15,811 0
91 30-00-00-00-0-000-3RF 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 03/08/94 * 55,935 1,881,241 277,000 3,257 0
92 30-00-00-00-0-000-3RH 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 03/23/94 * 14,185 14,185 3,289,000 37,864 0
93 30-00-00-00-0-000-3RI 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 03/23/94 * 44,995 140,861 6,082,000 65,083 0
94 30-00-00-00-0-000-3SG 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 07/13/94 * 583,000 1,006,634 8,961,000 106,533 0
95 30-00-00-00-0-000-3SH 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 07/13/94 * 874,500 3,166,274 15,765,000 51,372 0
96 30-00-00-00-0-000-3SI 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 07/18/94 * 3,060,750 3,688,558 10,851,000 119,305 0
97 30-00-00-00-0-000-3SJ 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 07/18/94 * 1,530,375 1,930,181 5,841,000 69,054 0
98 30-00-00-00-0-000-3SK 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 07/19/94 * 3,511,110 3,070,822 7,492,000 90,927 0
99 30-00-00-00-0-000-3SL 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 07/27/94 * 1,007,140 691,005 316,000 2,391 3
100 30-00-00-00-0-000-3SM 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/03/94 * 340,618 769,989 3,852,000 42,921 0
101 30-00-00-00-0-000-3SN 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/03/94 * 583,000 1,751,029 8,871,000 104,262 0
102 30-00-00-00-0-000-3SO 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/03/94 * 72,875 13,014 266,000 3,486 0
103 30-00-00-00-0-000-3SP 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/03/94 * 510,125 240,256 3,040,000 36,676 0
104 30-00-00-00-0-000-3SQ 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/04/94 * 145,750 174,015 48,873,000 15,836 0
105 30-00-00-00-0-000-3SR 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/04/94 * 437,250 771,841 8,139,000 94,338 0
106 30-00-00-00-0-000-3SS 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/04/94 * 1,165,999 1,819,718 19,570,000 1,769 0
107 30-00-00-00-0-000-3ST 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/04/94 * 145,750 56,642 4,463,000 33,630 0
108 30-00-00-00-0-000-3SV 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 03/16/95 * 229,119 170,049 80,000 1,066 3
109 30-00-00-00-0-000-3SX 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 03/21/90 * 109,313 75,000 97,000 931 1
110 30-00-00-00-0-000-3SY 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 04/10/91 * 193,509 544,135 66,000 795 3
111 30-00-00-00-0-000-3SZ 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 05/18/90 * 215,885 148,120 144,000 1,507 1
112 30-00-00-00-0-000-3T0 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 05/14/90 * 50,284 34,155 84,000 1,320 1
113 30-00-00-00-0-000-3T1 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 05/15/90 * 256,520 176,000 109,000 1,278 2
114 30-00-00-00-0-000-3T2 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 11/02/90 * 661,081 453,572 78,000 972 8
115 30-00-00-00-0-000-3T3 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 06/26/90 * 408,598 280,341 113,000 1,394 4
116 30-00-00-00-0-000-3T4 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 11/09/90 * 169,733 116,454 140,000 1,340 1
117 30-00-00-00-0-000-3T5 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 10/16/90 * 362,759 248,891 66,000 866 5
118 30-00-00-00-0-000-3T6 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 10/30/90 * 208,154 142,816 110,000 1,544 2
119 30-00-00-00-0-000-3T7 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/13/90 * 74,801 51,321 60,000 669 1
120 30-00-00-00-0-000-3T8 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/13/90 * 124,147 85,178 121,000 1,117 1
121 30-00-00-00-0-000-3TC 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 06/20/90 * 31,620 21,695 116,000 1,233 0
122 30-00-00-00-0-000-3TD 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 06/14/90 * 107,418 67,500 71,000 998 2
123 30-00-00-00-0-000-3TE 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 06/01/90 * 88,154 57,488 144,000 1,507 1
124 30-00-00-00-0-000-3TF 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 06/21/90 * 41,539 28,500 246,000 2,136 0
125 30-00-00-00-0-000-3TG 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 08/16/90 * 2,802,885 1,923,077 158,000 2,237 18
126 30-00-00-00-0-000-3TH 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 02/16/90 * 199,591 136,941 316,000 2,391 1
127 30-00-00-00-0-000-3TM 116-25 Guy R. Brewer Blvd Sampling, testing, 06/28/95 11/16/95 02/13/90 * 35,709 251,030 32,000 465 1
128 30-00-00-00-0-000-16Y 116-25 Guy R. Brewer Blvd Intrusion alarm systems 04/22/93 05/18/93 04/14/92 * 1,159,200 740,684 0 47,854 0
129 30-00-00-00-0-000-16Z 116-25 Guy R. Brewer Blvd New fire alarm and door 04/22/93 05/26/93 05/08/92 * 4,041,800 3,758,021 0 12,493 0
130 30-00-00-00-0-000-171 116-25 Guy R. Brewer Blvd Furnish and install metal 04/22/93 08/30/95 08/02/90 * 63,710 72,210 0 22,604 0
131 30-00-00-00-0-000-172 116-25 Guy R. Brewer Blvd Exterior doors renovation 04/22/93 05/18/93 07/30/90 * 400,958 286,346 0 7,129 0
132 30-00-00-00-0-000-3W8 116-25 Guy R. Brewer Blvd INDOOR BUILDING 03/17/96 06/17/99 12/27/91 * 167,261 144,069 0 158 0
133 30-00-00-00-0-000-3YU 116-25 Guy R. Brewer Blvd BUILDING ENVELOPE 03/17/96 06/11/99 03/15/93 * 3,753,632 3,168,174 0 2,958 0
134 30-00-00-00-0-000-40J 116-25 Guy R. Brewer Blvd Installation of Computer 03/17/96 04/22/99 06/16/93 * 48,864 0 0 0 0
135 30-00-00-00-0-000-41F 116-25 Guy R. Brewer Blvd Installation of Computer 03/17/96 04/26/96 06/26/95 * 40,810 220,831 0 816 0
136 30-00-00-00-0-000-429 116-25 Guy R. Brewer Blvd INDOOR BUILDING 03/18/96 06/11/99 06/29/95 * 82,607 67,434 0 1,604 0
137 30-00-00-00-0-000-42A 116-25 Guy R. Brewer Blvd PARTITIONING OF 03/18/96 04/26/96 06/29/95 * 76,387 59,595 0 2,015 0
138 30-00-00-00-0-000-42B 116-25 Guy R. Brewer Blvd PARTITIONING OF 03/18/96 04/26/96 06/29/95 * 102,290 76,089 0 1,288 0
139 30-00-00-00-0-000-42K 116-25 Guy R. Brewer Blvd PARTITIONING OF 03/18/96 04/26/96 06/29/95 * 38,618 30,967 0 1,146 0
140 30-00-00-00-0-000-42M 116-25 Guy R. Brewer Blvd PARTITIONING OF 03/18/96 04/26/96 06/29/95 * 35,648 28,987 0 4,635 0
141 30-00-00-00-0-000-42U 116-25 Guy R. Brewer Blvd INDOOR BUILDING 03/18/96 06/11/99 06/27/95 * 1,361,302 0 0 0 0
142 30-00-00-00-0-000-T9W 116-25 Guy R. Brewer Blvd New Schools 03/27/01 04/18/01 03/13/01 * 116,645,785 25,446,857 0 969 0
143 30-00-00-00-0-000-TAD 116-25 Guy R. Brewer Blvd New Schools 03/27/01 04/18/01 03/02/01 * 60,331,841 20,609,076 0 1,116 0
144 30-00-00-00-0-037-3ZP BUILDING ENVELOPE 03/17/96 06/11/99 10/15/93 * 28,374 37,815 0 300 0
145 30-00-00-00-0-098-PYT Building envelope 04/07/99 06/14/99 10/27/98 * 173,910 120,156 0 1,650 0
146 30-00-00-00-0-138-402 ASBESTOS ABATEMENT 03/17/96 06/21/99 08/03/94 * 10,472 10,472 0 824 0
147 30-00-00-00-0-154-3YK Computer Room Wiring to 03/17/96 06/11/99 03/15/93 * 34,282 25,996 0 1,038 0
148 30-00-00-00-0-250-O7F Computer Room Wiring to 10/14/98 10/23/98 06/22/98 * 76,839 81,137 0 487 0
149 30-00-00-00-0-340-3XZ BUILDING SYSTEMS 03/17/96 04/26/96 09/24/92 * 809,083 638,013 0 936 0
150 30-00-00-01-0-999-QQI District-Wide Projects Rescue Project - General 10/27/02 03/07/00 08/09/99 * * 213,555,603 213,555,603 14,859,000 206,657 14
151 30-00-00-01-0-999-QQH District-Wide Projects Installation of Air 02/28/00 03/07/00 02/15/00 * 95,504,818 0 0 37,432 0
152 30-00-93-00-0-148-PWX Building Envelope 04/07/99 05/26/99 10/22/96 * 140,462 0 0 1,726 0
153 30-00-93-00-0-275-PXU Building envelope 04/07/99 05/26/99 12/01/98 * 133,824 0 0 1,007 0
154 30-00-93-00-0-838-559 Conversion of leased space 04/06/99 06/14/99 09/20/96 * 266,951 199,141 0 631 0
155 30-00-93-00-0-838-7AM Building System 04/06/99 06/14/99 01/31/96 * 5,475,761 4,393,022 50,000 631 110
156 30-00-93-00-0-877-PYU Building envelope 04/07/99 05/26/99 09/12/94 * 210,128 0 0 219 0
157 30-00-93-00-0-913-PTJ BUILDING ENVELOPE 04/06/99 05/26/99 06/07/96 * 143,131 0 0 150 0
158 30-00-93-00-0-913-PTW CONSTRUCTION AND 04/06/99 05/26/99 08/22/95 * 382,280 375,688 0 150 0
159 30-00-93-00-0-917-N8O Construction and 10/24/97 04/21/98 05/21/97 * 640,245 404,049 0 150 0
160 30-00-93-00-0-920-PSK Construction and 04/06/99 06/11/99 09/04/97 * 987,538 767,539 0 116 0
161 30-00-93-00-0-922-PTX CONSTRUCTION AND 04/06/99 05/26/99 08/22/95 * 384,129 331,850 0 150 0
162 30-00-93-00-0-923-N4K Construction and 10/24/97 10/30/97 09/29/97 * 360,286 387,043 0 330 0
163 30-00-93-00-0-923-N1C Construction and 03/15/97 03/31/97 05/10/96 * 1,240,486 928,789 0 330 0
164 30-00-93-00-0-923-PS0 BUILDING ENVELOPE 04/06/99 05/26/99 02/17/98 * 617,711 492,970 0 330 0
165 30-00-93-00-0-925-PRO BUILDING ENVELOPE 04/06/99 05/26/99 01/14/98 * 686,727 0 0 232 0
166 30-00-93-00-0-929-N3Q Construction and 10/24/97 04/19/99 07/10/97 * 1,398,824 718,211 0 3,447 0
167 30-00-93-00-0-939-N1B Construction and 03/15/97 03/31/97 05/16/96 * 694,386 587,490 0 224 0
168 30-00-93-00-0-941-N45 Construction and 10/24/97 10/30/97 08/20/97 * 592,872 570,692 0 85 0
169 30-00-93-00-0-942-N4J Construction and 10/24/97 10/30/97 08/05/97 * 757,415 651,648 0 100 0
170 30-00-93-00-0-942-N3O Construction and 10/24/97 04/19/99 04/17/97 * 478,901 462,696 0 162 0
171 30-00-93-00-0-943-72Y Construction and 01/02/98 04/19/99 09/29/97 * 406,316 332,721 0 1,021 0
172 30-00-93-00-0-944-N4P Construction and 10/24/97 10/30/97 08/11/97 * 657,578 683,385 0 116 0
173 30-00-93-00-0-945-PRI Construction and 04/06/99 06/11/99 03/12/98 * 1,348,629 1,077,252 0 232 0
174 30-00-93-00-0-946-N44 Construction and 10/24/97 10/30/97 06/07/97 * 889,801 829,412 0 232 0
175 30-00-93-00-0-946-PRH CONSTRUCTION AND 04/06/99 05/26/99 03/12/98 * 1,544,634 1,203,804 0 176 0
176 30-00-93-00-0-947-N42 Construction and 10/24/97 10/30/97 05/28/97 * 1,155,196 1,154,026 0 232 0
177 30-00-93-00-0-947-N8R Construction and 10/24/97 04/21/98 04/03/97 * 728,405 665,532 0 112 0
178 30-00-93-00-0-948-N8P Construction and 10/24/97 04/21/98 06/09/97 * 388,105 341,427 0 100 0
179 30-00-93-00-0-948-PRG Construction and 04/06/99 06/11/99 02/18/98 * 487,416 378,491 0 100 0
180 30-00-93-00-0-951-N8S Construction and 10/24/97 04/21/98 04/03/97 * 1,095,551 944,454 0 116 0
181 30-00-93-00-0-952-N8Q Construction and 10/24/97 04/21/98 05/07/97 * 495,879 431,100 0 50 0
182 30-00-93-00-0-957-N4C Construction and 10/24/97 04/19/99 06/20/97 * 769,720 652,209 0 124 0
183 30-00-93-00-0-963-PRM Construction and 04/06/99 06/11/99 03/26/98 * 531,893 399,898 0 58 0
184 30-00-93-00-0-964-PRL CONSTRUCTION AND 04/06/99 05/26/99 03/24/98 * 527,761 376,404 0 48 0
185 30-00-93-00-0-965-N8T Construction and 10/24/97 04/21/98 06/23/97 * 4,982,320 4,686,225 0 870 0
186 30-00-93-00-0-966-N4D Construction and 10/24/97 04/19/99 06/20/97 * 907,200 737,384 0 116 0
187 30-00-93-00-0-967-PS7 CONSTRUCTION AND 04/06/99 05/26/99 01/08/98 * 490,545 300,248 0 36 0
188 30-00-93-00-0-968-PRK Construction and 04/06/99 06/11/99 04/10/98 * 1,028,556 480,436 0 58 0
189 30-00-93-00-0-976-PSL CONSTRUCTION AND 04/06/99 05/26/99 02/17/98 * 675,323 458,127 0 56 0
190 30-00-93-00-0-977-PSF Construction and 04/06/99 06/11/99 11/13/97 * 976,658 756,184 0 116 0
191 30-00-93-00-0-N30-T9R New Design/Build school to 03/27/01 04/18/01 02/12/01 * 27,325,136 7,201,396 0 414 0
** COUNTY**
STATUS REPORT ON CAPITAL PROJECTS
District No.: 31-00-00-01
last updated on 02/14/06
PROJECT BUILDING PROJECT APPLICAT NYSED CONTRACT ESTIMATED COST PROJECT RATED COST/
No. NO. NAME DESCRIPTION TO NYSED APPROVAL AWARD REC NEW ADD COST ALLOWANCE SIZE CAPACIT. SQ. FT.
_____________________________________________________________________________________________________________________________________________________________________________________________________
192 31-00-00-01-0-093-VMU Emergency Stabilization - 01/08/04 01/20/04 06/20/03 * 580,731 580,731 0 559 0
193 31-00-00-01-0-178-TQD Emergency, Unspecified - 12/18/01 02/11/02 05/05/98 * 37,992 243,677 0 441 0
194 31-00-00-01-0-650-TPZ New Schools - Feasibility 12/18/01 12/31/01 12/06/99 * 50,147 0 0 650 0
195 31-00-00-01-0-970-UFO Conversion of leased space 08/19/04 09/15/04 02/05/02 * 49,400,926 18,480,816 0 665 0
MANHATTAN DISTRICT 1 STATUS REPORT ON CAPITAL PROJECTS
District No.: 31-01-00-01
last updated on 02/14/06
PROJECT BUILDING PROJECT APPLICAT NYSED CONTRACT ESTIMATED COST PROJECT RATED COST/
No. NO. NAME DESCRIPTION TO NYSED APPROVAL AWARD REC NEW ADD COST ALLOWANCE SIZE CAPACIT. SQ. FT.
_____________________________________________________________________________________________________________________________________________________________________________________________________
196 31-01-00-01-0-015-12X P.S. 15 Roberto Clemente School Installation of a new 10/01/92 04/30/93 05/22/90 * 71,418 62,315 60,000 520 1
197 31-01-00-01-0-015-3XT P.S. 15 Roberto Clemente School Installation of Computer 03/17/96 04/26/96 08/06/91 * 56,282 43,149 60,000 520 1
198 31-01-00-01-0-015-66G P.S. 15 Roberto Clemente School Building Envelope 03/17/97 01/27/99 10/22/98 * 1,746,750 1,324,842 60,000 520 29
199 31-01-00-01-0-015-NJ7 P.S. 15 Roberto Clemente School Asbestos Abatement 09/03/98 09/29/98 09/14/93 * 88,574 88,574 60,000 520 1
200 31-01-00-01-0-015-OM7 P.S. 15 Roberto Clemente School Lead Paint Abatement 01/13/99 01/27/99 03/01/96 * 24,250 25,560 60,000 520 0
201 31-01-00-01-0-015-OTO P.S. 15 Roberto Clemente School Building Envelope 01/13/99 01/27/99 10/22/98 * 470,409 606,204 60,000 520 8
202 31-01-00-01-0-015-OTP P.S. 15 Roberto Clemente School Building Envelope 01/13/99 01/27/99 10/22/98 * 96,267 388,405 60,000 520 2
203 31-01-00-01-0-015-OTQ P.S. 15 Roberto Clemente School Building Envelope 01/13/99 01/27/99 10/22/98 * 892,953 500,070 60,000 520 15
204 31-01-00-01-0-015-P75 P.S. 15 Roberto Clemente School ASBESTOS ABATEMENT 01/14/99 01/27/99 12/08/97 * 46,034 57,940 60,000 520 1
205 31-01-00-01-0-015-PVC P.S. 15 Roberto Clemente School BUILDING ENVELOPE 04/07/99 06/11/99 07/12/95 * 73,685 0 60,000 520 1
206 31-01-00-01-0-015-R8H P.S. 15 Roberto Clemente School Architectural and Barrier 08/14/00 08/31/00 08/10/00 * 433,485 323,391 60,000 648 7
207 31-01-00-01-0-015-TPA P.S. 15 Roberto Clemente School Asbestos abatement 12/18/01 12/31/01 06/21/99 * 141,463 97,327 60,000 696 2
208 31-01-00-01-0-015-UIQ P.S. 15 Roberto Clemente School Asbestos abatement 04/02/02 04/18/02 03/18/99 * 15,870 0 60,000 696 0
209 31-01-00-01-0-015-WPF P.S. 15 Roberto Clemente School Asbestos abatement 05/17/05 06/10/05 04/28/05 * 98,313 98,313 60,000 716 2
210 31-01-00-01-0-015-XG9 P.S. 15 Roberto Clemente School Asbestos abatement 11/07/05 12/12/05 09/01/05 * 34,652 34,652 60,000 712 1
211 31-01-00-01-0-015-RU9 P.S. 15 Roberto Clemente School Building System 01/23/01 02/21/01 10/30/00 * 386,257 346,802 60,000 30 6
212 31-01-00-01-0-019-1CT P.S. 19 Asher Levy School Lighting improvements 10/16/92 11/19/93 05/15/90 * 135,303 97,845 84,000 964 2
213 31-01-00-01-0-019-220 P.S. 19 Asher Levy School BUILDING SYSTEMS 03/14/95 05/17/95 06/16/93 * 173,990 102,399 84,000 964 2
214 31-01-00-01-0-019-29V P.S. 19 Asher Levy School INDOOR BUILDING 03/14/95 05/17/95 05/13/93 * 16,687 14,074 84,000 964 0
215 31-01-00-01-0-019-2GQ P.S. 19 Asher Levy School BUILDING ENVELOPE 04/17/95 05/15/95 07/26/91 * 76,527 72,087 84,000 964 1
216 31-01-00-01-0-019-76O P.S. 19 Asher Levy School Building Envelope 01/08/98 01/21/98 06/05/97 * 945,000 897,530 84,000 964 11
217 31-01-00-01-0-019-NJ4 P.S. 19 Asher Levy School Asbestos Abatement 09/03/98 09/29/98 06/28/91 * 28,842 28,842 84,000 964 0
218 31-01-00-01-0-019-PM8 P.S. 19 Asher Levy School SIDEWALK BRIDGING, 04/02/99 06/14/99 04/06/98 * 225,169 237,328 84,000 964 3
219 31-01-00-01-0-019-PWR P.S. 19 Asher Levy School BUILDING ENVELOPE 04/07/99 06/11/99 04/13/95 * 46,513 0 84,000 964 1
220 31-01-00-01-0-019-PY6 P.S. 19 Asher Levy School Building envelope 04/07/99 05/26/99 01/04/99 * 44,199 0 84,000 964 1
221 31-01-00-01-0-019-S51 P.S. 19 Asher Levy School BUILDING SYSTEM 04/02/99 06/17/99 06/16/93 * 117,431 123,772 84,000 964 1
222 31-01-00-01-0-019-UUW P.S. 19 Asher Levy School Building Envelope 10/22/02 10/31/02 12/10/01 * 13,837 10,354 84,000 989 0
223 31-01-00-01-0-019-VQZ P.S. 19 Asher Levy School Asbestos abatement 03/16/04 03/30/04 02/12/04 * 56,004 56,004 84,000 989 1
224 31-01-00-01-0-019-W5X P.S. 19 Asher Levy School Asbestos abatement 11/12/04 12/01/04 09/30/04 * 76,312 76,312 84,000 922 1
225 31-01-00-01-0-019-W6U P.S. 19 Asher Levy School Asbestos abatement 11/12/04 12/01/04 09/30/04 * 25,262 25,262 84,000 922 0
226 31-01-00-01-0-019-WIE P.S. 19 Asher Levy School Building System 02/18/05 03/28/05 10/15/04 * 35,700 35,700 84,000 922 0
227 31-01-00-01-0-019-WOX P.S. 19 Asher Levy School Asbestos abatement 05/17/05 06/10/05 03/09/05 * 129,814 129,814 84,000 922 2
228 31-01-00-01-0-020-221 P.s. 20 Anna Silver School BUILDING SYSTEMS 03/14/95 05/17/95 08/09/93 * 13,130 10,044 92,000 1,127 0
229 31-01-00-01-0-020-3TP P.s. 20 Anna Silver School BUILDING SYSTEMS 03/17/96 04/26/96 05/05/92 * 24,729 18,834 92,000 1,127 0
230 31-01-00-01-0-020-40R P.s. 20 Anna Silver School Installation of Computer 03/17/96 04/26/96 06/26/95 * 190,986 0 92,000 1,127 2
231 31-01-00-01-0-020-6EC P.s. 20 Anna Silver School Computer Room Wiring to 10/24/97 10/30/97 07/18/97 * 29,309 32,938 92,000 1,127 0
232 31-01-00-01-0-020-76P P.s. 20 Anna Silver School Building Envelope 01/08/98 01/21/98 06/05/97 * 450,980 427,636 92,000 1,127 5
233 31-01-00-01-0-020-NBI P.s. 20 Anna Silver School Building Envelope 04/13/98 04/21/98 10/15/97 * 1,760,324 1,737,883 92,000 1,127 19
234 31-01-00-01-0-020-P74 P.s. 20 Anna Silver School ASBESTOS ABATEMENT 01/14/99 01/27/99 11/08/96 * 21,079 22,316 92,000 1,127 0
235 31-01-00-01-0-020-PVB P.s. 20 Anna Silver School Building System 04/07/99 05/26/99 07/12/95 * 24,916 0 92,000 1,127 0
236 31-01-00-01-0-020-TID P.s. 20 Anna Silver School Architectural and Barrier 07/25/01 10/15/01 06/15/01 * 432,601 575,277 92,000 1,162 5
237 31-01-00-01-0-020-VFO P.s. 20 Anna Silver School Building System 08/28/03 10/06/03 06/23/03 * 56,619 56,619 92,000 1,162 1
238 31-01-00-01-0-022-223 J.h.s. 22 G. Straubenmuller J. BUILDING SYSTEMS 03/14/95 05/17/95 08/09/93 * 13,130 13,130 151,000 1,371 0
239 31-01-00-01-0-022-2RY J.h.s. 22 G. Straubenmuller J. BUILDING SYSTEMS 04/17/95 05/15/95 07/21/92 * 126,349 80,343 151,000 1,371 1
240 31-01-00-01-0-022-33T J.h.s. 22 G. Straubenmuller J. INDOOR BUILDING 04/17/95 05/15/95 12/03/90 * 6,930 0 151,000 1,371 0
241 31-01-00-01-0-022-6CC J.h.s. 22 G. Straubenmuller J. Building Envelope 04/09/99 04/22/99 06/29/97 * 861,394 949,269 151,000 1,371 6
242 31-01-00-01-0-022-6CD J.h.s. 22 G. Straubenmuller J. Building System 03/18/97 06/10/99 06/29/97 * 226,299 213,846 151,000 1,371 1
243 31-01-00-01-0-022-P73 J.h.s. 22 G. Straubenmuller J. ASBESTOS ABATEMENT 01/14/99 01/27/99 08/30/93 * 906,466 821,114 151,000 1,371 6
244 31-01-00-01-0-022-R6K J.h.s. 22 G. Straubenmuller J. Asbestos abatement 08/14/00 08/31/00 03/31/00 * 18,217 12,421 151,000 984 0
245 31-01-00-01-0-022-R8F J.h.s. 22 G. Straubenmuller J. Architectural and Barrier 08/14/00 08/31/00 08/10/00 * 193,623 232,319 151,000 984 1
246 31-01-00-01-0-022-V1D J.h.s. 22 G. Straubenmuller J. Asbestos abatement 10/23/02 10/31/02 09/25/02 * 15,576 17,229 151,000 938 0
247 31-01-00-01-0-025-24D J.h.s. 25 Marta Valle J.h.s. BUILDING SYSTEMS 03/14/95 05/17/95 06/16/93 * 259,389 164,021 159,000 1,050 2
248 31-01-00-01-0-025-2GO J.h.s. 25 Marta Valle J.h.s. BUILDING ENVELOPE 04/17/95 05/15/95 11/07/91 * 105,605 78,038 159,000 1,050 1
249 31-01-00-01-0-025-NJ3 J.h.s. 25 Marta Valle J.h.s. Asbestos Abatement 09/03/98 09/29/98 08/20/93 * 13,146 13,146 159,000 1,050 0
250 31-01-00-01-0-025-O8J J.h.s. 25 Marta Valle J.h.s. Computer Room Wiring to 10/14/98 10/23/98 05/05/98 * 192,601 150,871 159,000 1,050 1
251 31-01-00-01-0-025-PR4 J.h.s. 25 Marta Valle J.h.s. Reconstruction to replace 04/06/99 06/14/99 10/05/98 * 238,866 276,596 159,000 1,050 2
252 31-01-00-01-0-025-RWR J.h.s. 25 Marta Valle J.h.s. Rehabilitation and 01/23/01 02/21/01 06/06/00 * 756,832 830,341 159,000 1,050 5
253 31-01-00-01-0-025-RXM J.h.s. 25 Marta Valle J.h.s. Rehabilitation and 01/23/01 02/21/01 06/06/00 * 296,600 284,415 159,000 1,050 2
254 31-01-00-01-0-025-TOU J.h.s. 25 Marta Valle J.h.s. Rehabilitation and 08/14/01 10/15/01 06/06/00 * 1,541,398 0 159,000 626 10
255 31-01-00-01-0-025-UV9 J.h.s. 25 Marta Valle J.h.s. Building Envelope 10/22/02 10/31/02 01/30/02 * 95,495 31,370 159,000 790 1
256 31-01-00-01-0-025-WHD J.h.s. 25 Marta Valle J.h.s. Building System 02/18/05 03/28/05 10/15/04 * 38,708 38,708 159,000 956 0
257 31-01-00-01-0-025-WKF J.h.s. 25 Marta Valle J.h.s. FY'05 Lead Paint Abatement 03/22/05 / / 04/12/04 * 10,816 10,816 0 956 0
258 31-01-00-01-0-025-WQP J.h.s. 25 Marta Valle J.h.s. Indoor Building 05/17/05 06/10/05 09/27/04 * 35,160 35,160 159,000 956 0
259 31-01-00-01-0-025-XA4 J.h.s. 25 Marta Valle J.h.s. Building System 08/03/05 10/11/05 05/20/05 * 1,240,483 1,240,483 159,000 820 8
260 31-01-00-01-0-025-XA5 J.h.s. 25 Marta Valle J.h.s. Building System 08/03/05 10/11/05 05/20/05 * 691,945 691,945 159,000 820 4
261 31-01-00-01-0-025-XA7 J.h.s. 25 Marta Valle J.h.s. Building System 08/03/05 10/11/05 05/20/05 * 1,513,317 1,513,317 159,000 820 10
262 31-01-00-01-0-025-XBI J.h.s. 25 Marta Valle J.h.s. Building Envelope 08/03/05 10/11/05 05/20/05 * 1,630,789 1,630,789 159,000 820 10
263 31-01-00-01-0-025-XBJ J.h.s. 25 Marta Valle J.h.s. Building Envelope 08/03/05 10/11/05 05/20/05 * 4,242,369 4,242,369 159,000 820 27
264 31-01-00-01-0-034-178 P.s. 34 F. D. Roosevelt School Lighting upgrade. 05/03/93 06/11/93 05/14/90 * 24,034 18,560 55,000 724 0
265 31-01-00-01-0-034-19S P.s. 34 F. D. Roosevelt School Roof replacement of main 05/12/93 06/08/93 09/26/90 * 673,365 517,827 55,000 724 12
266 31-01-00-01-0-034-29W P.s. 34 F. D. Roosevelt School INDOOR BUILDING 03/14/95 05/17/95 05/13/93 * 4,934 0 55,000 724 0
267 31-01-00-01-0-034-3X4 P.s. 34 F. D. Roosevelt School BUILDING SYSTEMS 03/17/96 04/26/96 07/10/92 * 12,316 12,316 55,000 724 0
268 31-01-00-01-0-034-NJ0 P.s. 34 F. D. Roosevelt School Asbestos Abatement 09/03/98 09/29/98 07/25/91 * 13,530 13,530 55,000 724 0
269 31-01-00-01-0-034-OD8 P.s. 34 F. D. Roosevelt School Building Envelope 01/13/99 01/27/99 08/13/98 * 1,521,365 1,930,776 55,000 724 28
270 31-01-00-01-0-034-ODR P.s. 34 F. D. Roosevelt School Building Envelope 01/13/99 01/27/99 08/13/98 * 1,482,921 993,977 55,000 724 27
271 31-01-00-01-0-034-OM5 P.s. 34 F. D. Roosevelt School Lead Paint Abatement 01/13/99 01/27/99 05/10/96 * 10,092 10,637 55,000 724 0
272 31-01-00-01-0-034-PY4 P.s. 34 F. D. Roosevelt School Building envelope 04/07/99 05/26/99 11/19/98 * 59,014 0 55,000 724 1
273 31-01-00-01-0-034-R0C P.s. 34 F. D. Roosevelt School Asbestos abatement 04/05/00 04/19/00 03/02/00 * 72,942 55,131 55,000 664 1
274 31-01-00-01-0-034-R24 P.s. 34 F. D. Roosevelt School Asbestos abatement 04/05/00 04/19/00 11/10/99 * 51,495 39,011 55,000 664 1
275 31-01-00-01-0-034-RTD P.s. 34 F. D. Roosevelt School Asbestos abatement 01/23/01 02/21/01 03/15/00 * 112,494 97,076 55,000 664 2
276 31-01-00-01-0-034-UI6 P.s. 34 F. D. Roosevelt School Asbestos abatement 04/02/02 04/18/02 04/30/99 * 42,937 0 55,000 664 1
277 31-01-00-01-0-034-UJE P.s. 34 F. D. Roosevelt School Asbestos abatement 04/02/02 04/18/02 03/18/99 * 38,363 0 55,000 664 1
278 31-01-00-01-0-034-UZY P.s. 34 F. D. Roosevelt School Building System 10/22/02 10/31/02 06/26/02 * 381,150 441,804 55,000 664 7
279 31-01-00-01-0-034-VFN P.s. 34 F. D. Roosevelt School Building System 08/28/03 10/06/03 06/23/03 * 42,966 42,966 55,000 664 1
280 31-01-00-01-0-034-W31 P.s. 34 F. D. Roosevelt School Building Envelope 08/19/04 09/13/04 06/15/04 * 1,450,266 1,450,266 55,000 692 26
281 31-01-00-01-0-034-W5C P.s. 34 F. D. Roosevelt School Building Envelope 08/19/04 09/13/04 06/15/04 * 306,107 306,107 55,000 692 6
282 31-01-00-01-0-034-X5A P.s. 34 F. D. Roosevelt School Building System 08/03/05 10/11/05 05/27/05 * 172,322 172,322 55,000 684 3
283 31-01-00-01-0-056-18E J.h.s. 56 Corlears J.h.s. Furnish and install window 05/03/93 06/11/93 05/14/90 * 119,329 94,850 153,000 1,897 1
284 31-01-00-01-0-056-1C0 J.h.s. 56 Corlears J.h.s. Upgrade of elevators 08/23/93 09/30/93 07/30/90 * 400,813 96,799 153,000 1,897 3
285 31-01-00-01-0-056-24E J.h.s. 56 Corlears J.h.s. BUILDING SYSTEMS 03/14/95 05/17/95 06/16/93 * 181,176 105,683 153,000 1,897 1
286 31-01-00-01-0-056-2GP J.h.s. 56 Corlears J.h.s. BUILDING SYSTEMS 04/17/95 05/15/95 06/26/90 * 26,235 20,260 153,000 1,897 0
287 31-01-00-01-0-056-2VN J.h.s. 56 Corlears J.h.s. INDOOR BUILDING 04/17/95 05/15/95 03/26/92 * 62,673 58,814 153,000 1,897 0
288 31-01-00-01-0-056-O8G J.h.s. 56 Corlears J.h.s. Computer Room Wiring to 10/14/98 10/23/98 05/05/98 * 252,211 207,255 153,000 1,897 2
289 31-01-00-01-0-056-QXC J.h.s. 56 Corlears J.h.s. Asbestos abatement 04/05/00 04/19/00 03/15/00 * 14,181 27,189 153,000 2,025 0
290 31-01-00-01-0-056-R8E J.h.s. 56 Corlears J.h.s. Architectural and Barrier 08/14/00 08/31/00 07/14/00 * 162,302 183,610 153,000 2,025 1
291 31-01-00-01-0-056-VZ2 J.h.s. 56 Corlears J.h.s. Asbestos abatement 08/19/04 09/15/04 06/07/04 * 15,602 15,602 153,000 1,725 0
292 31-01-00-01-0-056-WHC J.h.s. 56 Corlears J.h.s. Building System 02/18/05 03/28/05 10/15/04 * 48,932 48,932 153,000 1,725 0
293 31-01-00-01-0-060-1X2 J.h.s. 60 O.m. Beha J.h.s. RECONSTRUCTION OF SEVERELY 03/14/95 05/02/96 01/10/91 * 1,508,876 2,125,431 120,000 1,057 13
294 31-01-00-01-0-060-24F J.h.s. 60 O.m. Beha J.h.s. BUILDING SYSTEMS 03/14/95 05/17/95 06/16/93 * 279,028 176,584 120,000 1,057 2
295 31-01-00-01-0-060-2WE J.h.s. 60 O.m. Beha J.h.s. INDOOR BUILDING 04/17/95 05/15/95 07/15/92 * 68,701 61,055 120,000 1,057 1
296 31-01-00-01-0-060-3ZO J.h.s. 60 O.m. Beha J.h.s. BUILDING SYSTEMS 03/17/96 04/26/96 08/03/94 * 409,245 0 120,000 1,057 3
297 31-01-00-01-0-060-NIQ J.h.s. 60 O.m. Beha J.h.s. Asbestos Abatement 09/03/98 09/29/98 02/16/90 * 13,153 13,153 120,000 1,057 0
298 31-01-00-01-0-060-NIR J.h.s. 60 O.m. Beha J.h.s. Asbestos Abatement 09/03/98 09/29/98 01/24/91 * 11,706 11,706 120,000 1,057 0
299 31-01-00-01-0-060-NIS J.h.s. 60 O.m. Beha J.h.s. Asbestos Abatement 09/03/98 09/29/98 01/24/91 * 45,197 45,197 120,000 1,057 0
300 31-01-00-01-0-060-O0L J.h.s. 60 O.m. Beha J.h.s. Lead Abatement 10/13/98 10/23/98 07/21/97 * 57,544 15,160 120,000 1,057 0
301 31-01-00-01-0-060-O8F J.h.s. 60 O.m. Beha J.h.s. Computer Room Wiring to 10/14/98 10/23/98 05/05/98 * 140,869 84,019 120,000 1,057 1
302 31-01-00-01-0-060-PN1 J.h.s. 60 O.m. Beha J.h.s. SIDEWALK BRIDGING, 04/02/99 06/14/99 06/21/96 * 36,200 38,155 120,000 542 0
303 31-01-00-01-0-060-QGT J.h.s. 60 O.m. Beha J.h.s. LEAD PAINT ABATEMENT 09/30/99 10/04/99 09/17/99 * 90,346 90,346 120,000 1,535 1
304 31-01-00-01-0-060-S66 J.h.s. 60 O.m. Beha J.h.s. BUILDING ENVELOPE 04/02/99 06/17/99 06/16/93 * 155,091 163,466 120,000 542 1
305 31-01-00-01-0-060-UO1 J.h.s. 60 O.m. Beha J.h.s. FY01 Phase I - Parapet, 04/11/02 04/18/02 04/05/01 * 7,195,622 5,527,507 0 168 0
306 31-01-00-01-0-060-UP5 J.h.s. 60 O.m. Beha J.h.s. FY01 Phase II - Windows 04/11/02 04/18/02 12/11/01 * 3,792,418 3,481,933 0 168 0
307 31-01-00-01-0-060-RCW J.h.s. 60 O.m. Beha J.h.s. Building System 08/14/00 08/31/00 07/14/00 * 612,344 327,941 120,000 812 5
308 31-01-00-01-0-060-RDV J.h.s. 60 O.m. Beha J.h.s. Building System 08/14/00 08/31/00 07/14/00 * 3,008,607 2,889,844 120,000 812 25
309 31-01-00-01-0-060-TK9 J.h.s. 60 O.m. Beha J.h.s. Architectural and Barrier 07/25/01 10/15/01 06/15/01 * 2,183,771 2,183,771 120,000 812 18
310 31-01-00-01-0-060-TNB J.h.s. 60 O.m. Beha J.h.s. Emergency, Unspecified - 07/25/01 10/24/01 10/25/00 * 258,832 179,439 120,000 812 2
311 31-01-00-01-0-060-UIF J.h.s. 60 O.m. Beha J.h.s. Asbestos abatement 04/02/02 04/18/02 06/09/99 * 20,319 0 120,000 812 0
312 31-01-00-01-0-060-V70 J.h.s. 60 O.m. Beha J.h.s. FY 2001 Phase 1b - 01/24/03 07/11/03 03/27/02 * 1,525,324 1,525,324 0 812 0
313 31-01-00-01-0-060-VZ1 J.h.s. 60 O.m. Beha J.h.s. Asbestos abatement 08/19/04 09/15/04 06/01/04 * 16,173 16,173 120,000 987 0
314 31-01-00-01-0-060-WHB J.h.s. 60 O.m. Beha J.h.s. Building System 02/18/05 03/28/05 10/15/04 * 38,793 38,793 120,000 1,070 0
315 31-01-00-01-0-060-WPG J.h.s. 60 O.m. Beha J.h.s. Asbestos abatement 05/17/05 06/10/05 04/28/05 * 292,771 292,771 120,000 1,070 2
316 31-01-00-01-0-060-QPQ J.h.s. 60 O.m. Beha J.h.s. SCA - Emergency 01/18/00 03/09/00 04/09/98 * 165,008 144,247 120,000 1,535 1
317 31-01-00-01-0-060-VUK J.h.s. 60 O.m. Beha J.h.s. Room Partition, Conversion 03/16/04 03/30/04 12/30/03 * 136,118 136,118 120,000 1,535 1
318 31-01-00-01-0-061-1YJ P.s. 61 Anna Howard Shaw Schoo BUILDING ENVELOPE 03/14/95 06/11/99 03/31/93 * 485,180 448,931 75,000 790 6
319 31-01-00-01-0-061-2BQ P.s. 61 Anna Howard Shaw Schoo PS 061 M EXT. MASONRY & 03/14/95 05/17/95 01/10/91 * 28,669 0 75,000 790 0
320 31-01-00-01-0-061-2C1 P.s. 61 Anna Howard Shaw Schoo PS 061 M Reso.A Comput. 03/14/95 05/17/95 07/23/93 * 57,076 44,019 75,000 790 1
321 31-01-00-01-0-061-2RV P.s. 61 Anna Howard Shaw Schoo BUILDING SYSTEMS 04/17/95 05/15/95 07/21/92 * 78,444 59,622 75,000 790 1
322 31-01-00-01-0-061-30Y P.s. 61 Anna Howard Shaw Schoo INDOOR BUILDING 04/17/95 05/15/95 12/03/90 * 57,124 43,795 75,000 790 1
323 31-01-00-01-0-061-6GS P.s. 61 Anna Howard Shaw Schoo Building Envelope 10/24/97 10/30/97 09/30/96 * 610,356 647,285 75,000 790 8
324 31-01-00-01-0-061-NIP P.s. 61 Anna Howard Shaw Schoo Asbestos Abatement 09/03/98 09/29/98 02/16/90 * 35,960 35,960 75,000 790 0
325 31-01-00-01-0-061-O0K P.s. 61 Anna Howard Shaw Schoo Lead Abatement 10/13/98 10/23/98 04/16/98 * 248,737 87,389 75,000 790 3
326 31-01-00-01-0-061-O6F P.s. 61 Anna Howard Shaw Schoo Building Envelope 10/14/98 04/19/99 09/30/96 * 353,684 0 75,000 790 5
327 31-01-00-01-0-061-P6Q P.s. 61 Anna Howard Shaw Schoo ASBESTOS ABATEMENT 01/14/99 01/27/99 11/08/96 * 35,935 44,637 75,000 790 0
328 31-01-00-01-0-061-PET P.s. 61 Anna Howard Shaw Schoo LEAD PAINT ABATEMENT 04/01/99 06/14/99 07/13/98 * 144,160 151,944 75,000 790 2
329 31-01-00-01-0-061-QOK P.s. 61 Anna Howard Shaw Schoo Building System 01/04/00 03/08/00 08/31/99 * 390,198 422,655 75,000 247 5
330 31-01-00-01-0-061-QRM P.s. 61 Anna Howard Shaw Schoo Asbestos abatement 03/03/00 04/19/00 12/28/99 * 54,827 22,693 75,000 247 1
331 31-01-00-01-0-061-RCX P.s. 61 Anna Howard Shaw Schoo Building System 08/14/00 08/31/00 07/10/00 * 3,919,236 3,663,519 75,000 247 52
332 31-01-00-01-0-061-T60 P.s. 61 Anna Howard Shaw Schoo Asbestos abatement 03/27/01 04/18/01 12/13/00 * 46,680 64,764 75,000 247 1
333 31-01-00-01-0-061-UPX P.s. 61 Anna Howard Shaw Schoo FY02 Lead Paint Abatement 04/11/02 04/18/02 09/23/01 * 24,311 24,311 0 384 0
334 31-01-00-01-0-061-WDD P.s. 61 Anna Howard Shaw Schoo Asbestos abatement 02/18/05 03/28/05 12/30/04 * 34,043 34,043 75,000 844 0
335 31-01-00-01-0-063-2GR P.S. 63 William Mckinley Schoo BUILDING SYSTEMS 04/17/95 05/15/95 12/27/91 * 6,698 0 85,000 957 0
336 31-01-00-01-0-063-2RW P.S. 63 William Mckinley Schoo BUILDING SYSTEMS 04/17/95 05/15/95 07/21/92 * 71,323 53,961 85,000 957 1
337 31-01-00-01-0-063-3XR P.S. 63 William Mckinley Schoo Installation of Computer 03/17/96 04/26/96 08/06/91 * 56,282 43,149 85,000 957 1
338 31-01-00-01-0-063-45A P.S. 63 William Mckinley Schoo Rehabilitation and 07/19/96 07/31/96 06/24/96 * 4,321,488 3,713,706 85,000 957 51
339 31-01-00-01-0-063-6HK P.S. 63 William Mckinley Schoo Asbestos abatement 10/24/97 10/30/97 12/31/96 * 101,920 83,080 85,000 957 1
340 31-01-00-01-0-063-O1B P.S. 63 William Mckinley Schoo Asbestos abatement 10/14/98 10/23/98 06/23/98 * 385,517 318,195 85,000 957 5
341 31-01-00-01-0-063-P6P P.S. 63 William Mckinley Schoo ASBESTOS ABATEMENT 01/14/99 01/27/99 06/11/97 * 134,861 154,300 85,000 957 2
342 31-01-00-01-0-063-PC9 P.S. 63 William Mckinley Schoo Building System 02/22/99 06/14/99 03/30/98 * 1,206,440 1,157,611 85,000 957 14
343 31-01-00-01-0-063-PRW P.S. 63 William Mckinley Schoo BUILDING ENVELOPE 04/06/99 05/26/99 10/06/98 * 402,436 0 85,000 957 5
344 31-01-00-01-0-063-QMM P.S. 63 William Mckinley Schoo Asbestos abatement 01/04/00 03/08/00 06/17/99 * 392,225 311,889 85,000 526 5
345 31-01-00-01-0-063-TCN P.S. 63 William Mckinley Schoo Building Envelope 07/25/01 10/15/01 05/10/01 * 99,608 0 85,000 526 1
346 31-01-00-01-0-063-UN3 P.S. 63 William Mckinley Schoo High Efficiency Lighting 04/11/02 04/18/02 05/03/01 * 141,060 141,060 0 526 0
347 31-01-00-01-0-063-VT3 P.S. 63 William Mckinley Schoo Asbestos abatement 03/16/04 03/30/04 12/05/03 * 172,266 172,266 85,000 556 2
348 31-01-00-01-0-063-W07 P.S. 63 William Mckinley Schoo Asbestos abatement 08/19/04 09/15/04 04/05/04 * 19,479 15,082 85,000 507 0
349 31-01-00-01-0-063-WFV P.S. 63 William Mckinley Schoo Asbestos abatement 02/18/05 03/28/05 12/23/04 * 24,129 24,129 85,000 507 0
350 31-01-00-01-0-063-WWE P.S. 63 William Mckinley Schoo Climate Controls Upgrade 06/03/05 06/13/05 09/01/01 * 461,433 461,433 0 507 0
351 31-01-00-01-0-063-XAT P.S. 63 William Mckinley Schoo Indoor Building 08/03/05 10/11/05 06/01/05 * 244,036 244,036 85,000 453 3
352 31-01-00-01-0-063-XB1 P.S. 63 William Mckinley Schoo Indoor Building 08/03/05 10/11/05 06/01/05 * 6,579,186 6,579,186 85,000 453 77
353 31-01-00-01-0-064-1HA P.S. 64 Robert Simon School Roof replacement and 12/09/93 12/31/93 11/29/91 * 672,726 453,429 134,000 790 5
354 31-01-00-01-0-064-1Y9 P.S. 64 Robert Simon School BUILDING SYSTEMS 03/14/95 05/17/95 08/23/94 * 2,392,607 2,123,851 134,000 790 18
355 31-01-00-01-0-064-35T P.S. 64 Robert Simon School INDOOR BUILDING 06/28/95 06/11/99 11/23/93 * 107,712 91,093 134,000 790 1
356 31-01-00-01-0-064-63Q P.S. 64 Robert Simon School Building Envelope 03/17/97 04/01/97 06/19/97 * 2,880,880 2,078,143 134,000 790 21
357 31-01-00-01-0-064-NIO P.S. 64 Robert Simon School Asbestos Abatement 09/03/98 09/29/98 01/31/92 * 52,222 52,222 134,000 790 0
358 31-01-00-01-0-064-P6O P.S. 64 Robert Simon School ASBESTOS ABATEMENT 01/14/99 01/27/99 06/12/96 * 19,746 22,672 134,000 790 0
359 31-01-00-01-0-064-RU8 P.S. 64 Robert Simon School Building System 01/23/01 02/21/01 10/30/00 * 372,781 458,844 134,000 511 3
360 31-01-00-01-0-064-TCE P.S. 64 Robert Simon School Building Envelope 07/25/01 10/15/01 04/24/01 * 169,458 140,326 134,000 511 1
361 31-01-00-01-0-064-WDE P.S. 64 Robert Simon School Asbestos abatement 02/18/05 03/28/05 12/27/04 * 26,375 26,375 134,000 661 0
362 31-01-00-01-0-097-1UF P.s. 97 Mangin School PS 097 K Asbestos 03/14/95 05/17/95 06/14/91 * 18,869 15,226 71,000 968 0
363 31-01-00-01-0-097-2U9 P.s. 97 Mangin School BUILDING SYSTEMS 04/17/95 05/15/95 05/05/92 * 54,316 41,805 71,000 968 1
364 31-01-00-01-0-097-3XQ P.s. 97 Mangin School Installation of Computer 03/17/96 04/26/96 08/06/91 * 56,282 43,149 71,000 968 1
365 31-01-00-01-0-097-N2W P.s. 97 Mangin School School Safety - 03/15/97 03/31/97 05/07/96 * 87,854 73,261 71,000 968 1
366 31-01-00-01-0-097-NIH P.s. 97 Mangin School Asbestos Abatement 09/03/98 09/29/98 01/24/91 * 67,327 67,327 71,000 968 1
367 31-01-00-01-0-097-O0J P.s. 97 Mangin School Lead Abatement 10/13/98 10/23/98 07/24/97 * 9,090 0 71,000 968 0
368 31-01-00-01-0-097-O1W P.s. 97 Mangin School Building System 10/14/98 10/23/98 06/23/98 * 2,143,489 1,898,779 71,000 968 30
369 31-01-00-01-0-097-P6C P.s. 97 Mangin School ASBESTOS ABATEMENT 01/14/99 01/27/99 07/18/94 * 251,480 291,940 71,000 968 4
370 31-01-00-01-0-097-Q5T P.s. 97 Mangin School Building Envelope 09/10/99 09/28/99 04/23/99 * 101,741 89,957 71,000 964 1
371 31-01-00-01-0-097-Q5U P.s. 97 Mangin School Building Envelope 09/10/99 09/28/99 04/23/99 * 528,169 468,505 71,000 964 7
372 31-01-00-01-0-097-Q9H P.s. 97 Mangin School Building Envelope 09/10/99 09/28/99 04/23/99 * 1,383,709 1,193,845 71,000 964 19
373 31-01-00-01-0-097-RXR P.s. 97 Mangin School Asbestos abatement 01/23/01 02/21/01 12/15/00 * 14,915 11,354 71,000 964 0
374 31-01-00-01-0-097-U00 P.s. 97 Mangin School Building System 12/18/01 12/31/01 04/18/00 * 327,329 0 71,000 1,022 5
375 31-01-00-01-0-097-VFW P.s. 97 Mangin School Building System 08/28/03 10/06/03 06/23/03 * 81,844 81,844 71,000 1,022 1
376 31-01-00-01-0-110-1CX P.s. 110 Florence Nightingale S Lighting upgrade 10/16/92 11/19/93 05/14/90 * 678,219 139,737 52,000 729 13
377 31-01-00-01-0-110-2UA P.s. 110 Florence Nightingale S BUILDING SYSTEMS 04/17/95 05/15/95 05/05/92 * 56,357 42,929 52,000 729 1
378 31-01-00-01-0-110-3YB P.s. 110 Florence Nightingale S CONVERSION AND 03/17/96 04/26/96 09/24/92 * 27,897 16,708 52,000 729 1
379 31-01-00-01-0-110-NIB P.s. 110 Florence Nightingale S Asbestos Abatement 09/03/98 09/29/98 11/12/91 * 20,702 20,702 52,000 729 0
380 31-01-00-01-0-110-O9C P.s. 110 Florence Nightingale S EXTERIOR STABILIZATION TO 10/15/98 10/23/98 08/07/98 * 103,952 70,225 52,000 729 2
381 31-01-00-01-0-110-OUZ P.s. 110 Florence Nightingale S Exterior Stabilization to 01/13/99 01/27/99 08/07/98 * 582,755 426,556 0 691 0
382 31-01-00-01-0-110-P68 P.s. 110 Florence Nightingale S ASBESTOS ABATEMENT 01/14/99 01/27/99 06/28/93 * 70,225 75,144 52,000 729 1
383 31-01-00-01-0-110-T02 P.s. 110 Florence Nightingale S FY01 LEAD PAINT ABATEMENT 03/13/01 04/18/01 10/27/00 * 58,356 58,356 52,000 691 1
384 31-01-00-01-0-110-T23 P.s. 110 Florence Nightingale S Building System 03/16/01 04/18/01 04/13/00 * 1,629,792 1,530,778 52,000 691 31
385 31-01-00-01-0-110-T7G P.s. 110 Florence Nightingale S Asbestos abatement 03/27/01 04/18/01 04/05/00 * 70,333 382,248 52,000 691 1
386 31-01-00-01-0-110-TOH P.s. 110 Florence Nightingale S Building Envelope 08/14/01 10/15/01 10/18/99 * 99,055 0 52,000 691 2
387 31-01-00-01-0-110-U1H P.s. 110 Florence Nightingale S Asbestos abatement 04/02/02 04/18/02 03/19/02 * 97,409 82,959 52,000 686 2
388 31-01-00-01-0-110-V85 P.s. 110 Florence Nightingale S High Efficiency Lighting 03/27/03 04/14/03 09/12/02 * 624,916 559,672 0 691 0
389 31-01-00-01-0-110-VFU P.s. 110 Florence Nightingale S Building System 08/28/03 10/06/03 06/23/03 * 129,799 129,799 52,000 686 2
390 31-01-00-01-0-110-VIP P.s. 110 Florence Nightingale S Rehabilitation and 08/28/03 10/06/03 04/21/03 * 5,154,008 5,154,008 52,000 686 99
391 31-01-00-01-0-110-VME P.s. 110 Florence Nightingale S Asbestos abatement 01/08/04 01/20/04 08/20/03 * 103,479 77,959 52,000 691 2
392 31-01-00-01-0-110-VRX P.s. 110 Florence Nightingale S Asbestos abatement 03/16/04 03/30/04 11/13/03 * 70,652 70,652 52,000 686 1
393 31-01-00-01-0-110-WD7 P.s. 110 Florence Nightingale S Asbestos abatement 02/18/05 03/28/05 12/27/04 * 36,308 36,308 52,000 691 1
394 31-01-00-01-0-110-WWA P.s. 110 Florence Nightingale S High Efficiency Lighting 06/03/05 06/13/05 04/26/04 * 100,268 100,268 0 691 0
395 31-01-00-01-0-134-19C P.s. 134 Henrietta Szold School ROOF RENOVATION INCLUDING 05/12/93 06/08/93 11/30/90 * 454,740 351,537 87,000 873 5
396 31-01-00-01-0-134-222 P.s. 134 Henrietta Szold School BUILDING SYSTEMS 03/14/95 05/17/95 06/16/93 * 165,197 95,777 87,000 873 2
397 31-01-00-01-0-134-2E9 P.s. 134 Henrietta Szold School Installation of Computer 03/14/95 05/17/95 06/16/93 * 103,013 84,269 87,000 873 1
398 31-01-00-01-0-134-6HJ P.s. 134 Henrietta Szold School Asbestos abatement 10/24/97 10/30/97 12/31/96 * 595,572 442,994 87,000 873 7
399 31-01-00-01-0-134-NPR P.s. 134 Henrietta Szold School Building Envelope 10/13/98 10/23/98 03/25/97 * 1,122,000 1,175,153 87,000 873 13
400 31-01-00-01-0-134-NQC P.s. 134 Henrietta Szold School Building Envelope 10/13/98 10/23/98 08/19/98 * 1,537,991 1,465,788 87,000 873 18
401 31-01-00-01-0-134-P5U P.s. 134 Henrietta Szold School ASBESTOS ABATEMENT 01/14/99 01/27/99 02/19/97 * 111,533 127,223 87,000 873 1
402 31-01-00-01-0-134-R8G P.s. 134 Henrietta Szold School Architectural and Barrier 08/14/00 08/31/00 07/14/00 * 250,252 203,817 87,000 807 3
403 31-01-00-01-0-134-VOB P.s. 134 Henrietta Szold School Building System 01/08/04 01/20/04 02/15/00 * 169,783 154,826 87,000 807 2
404 31-01-00-01-0-134-WIB P.s. 134 Henrietta Szold School Building System 02/18/05 03/28/05 10/15/04 * 43,802 43,802 87,000 796 1
405 31-01-00-01-0-134-WMU P.s. 134 Henrietta Szold School Asbestos abatement 05/17/05 06/10/05 03/29/05 * 74,419 74,419 87,000 796 1
406 31-01-00-01-0-137-2GS P.s. 137 John L. Bernstein Scho BUILDING ENVELOPE 04/17/95 05/15/95 11/07/91 * 71,769 53,369 83,000 900 1
407 31-01-00-01-0-137-4VU P.s. 137 John L. Bernstein Scho Building Systems 03/12/97 03/31/97 09/25/96 * 59,080 51,943 83,000 900 1
408 31-01-00-01-0-137-59B P.s. 137 John L. Bernstein Scho Building envelope 03/15/97 03/31/97 09/24/96 * 806,767 728,752 83,000 900 10
409 31-01-00-01-0-137-QHF P.s. 137 John L. Bernstein Scho Indoor Building 10/08/99 12/31/99 05/07/99 * 141,621 114,686 83,000 870 2
410 31-01-00-01-0-140-2GT P.s. 140 Nathan Straus School BUILDING ENVELOPE 04/17/95 05/15/95 11/07/91 * 121,793 86,727 78,000 978 2
411 31-01-00-01-0-140-31R P.s. 140 Nathan Straus School INDOOR BUILDING 04/17/95 05/15/95 07/22/92 * 80,546 71,134 78,000 978 1
412 31-01-00-01-0-140-N2B P.s. 140 Nathan Straus School School Safety - 03/15/97 04/15/99 10/22/96 * 30,128 33,000 78,000 978 0
413 31-01-00-01-0-140-P5S P.s. 140 Nathan Straus School ASBESTOS ABATEMENT 01/14/99 01/27/99 08/03/94 * 74,306 85,781 78,000 978 1
414 31-01-00-01-0-140-PZY P.s. 140 Nathan Straus School Building Envelope 04/09/99 04/22/99 03/03/99 * 486,986 580,526 78,000 978 6
415 31-01-00-01-0-140-Q1O P.s. 140 Nathan Straus School Building Envelope 04/09/99 04/22/99 03/03/99 * 1,835,667 1,627,553 78,000 978 24
416 31-01-00-01-0-140-Q1Q P.s. 140 Nathan Straus School Building Envelope 04/09/99 04/22/99 03/03/99 * 347,622 829,323 78,000 978 4
417 31-01-00-01-0-140-RFK P.s. 140 Nathan Straus School Indoor Building 08/14/00 08/31/00 03/15/00 * 548,859 620,507 78,000 880 7
418 31-01-00-01-0-140-TYB P.s. 140 Nathan Straus School Emergency Stabilization 12/18/01 12/31/01 05/05/98 * 51,536 54,328 78,000 913 1
419 31-01-00-01-0-140-UY6 P.s. 140 Nathan Straus School Building System 10/22/02 10/31/02 06/17/02 * 129,094 140,281 78,000 913 2
420 31-01-00-01-0-142-2GU P.s. 142 Amalia Castro School BUILDING SYSTEMS 04/17/95 05/15/95 11/12/91 * 13,798 10,825 87,000 975 0
421 31-01-00-01-0-142-332 P.s. 142 Amalia Castro School Installation of Computer 04/17/95 05/15/95 08/02/91 * 165,184 122,913 87,000 975 2
422 31-01-00-01-0-142-4UY P.s. 142 Amalia Castro School Building Systems 03/12/97 03/31/97 09/25/96 * 28,300 43,652 87,000 975 0
423 31-01-00-01-0-142-65Y P.s. 142 Amalia Castro School Indoor Building 03/17/97 04/01/97 07/21/97 * 57,353 48,560 87,000 975 1
424 31-01-00-01-0-142-P5R P.s. 142 Amalia Castro School ASBESTOS ABATEMENT 01/14/99 01/27/99 12/08/97 * 86,100 86,610 87,000 975 1
425 31-01-00-01-0-142-QL6 P.s. 142 Amalia Castro School Building System 12/01/99 12/31/99 10/07/99 * 104,346 137,760 87,000 975 1
426 31-01-00-01-0-142-U2C P.s. 142 Amalia Castro School Emergency, Unspecified - 04/02/02 04/18/02 01/07/02 * 203,923 178,128 87,000 909 2
427 31-01-00-01-0-142-U8Q P.s. 142 Amalia Castro School Building Envelope 04/02/02 04/18/02 10/29/01 * 133,790 133,790 87,000 909 2
428 31-01-00-01-0-142-W8Y P.s. 142 Amalia Castro School Building System 11/12/04 12/01/04 07/26/04 * 173,448 173,448 87,000 985 2
429 31-01-00-01-0-142-W8Z P.s. 142 Amalia Castro School Building Envelope 11/12/04 12/01/04 07/26/04 * 486,864 486,864 87,000 985 6
430 31-01-00-01-0-142-W9G P.s. 142 Amalia Castro School Building Envelope 11/12/04 12/01/04 07/26/04 * 1,834,503 1,834,503 87,000 985 21
431 31-01-00-01-0-142-WGE P.s. 142 Amalia Castro School Building System 02/18/05 03/28/05 10/15/04 * 51,335 51,335 87,000 985 1
432 31-01-00-01-0-188-1YF P.s. 188 John Burroughs School BUILDING SYSTEMS 03/14/95 05/19/95 03/15/93 * 1,114,639 891,045 135,000 1,063 8
433 31-01-00-01-0-188-29U P.s. 188 John Burroughs School INDOOR BUILDING 03/14/95 05/19/95 05/13/93 * 89,000 68,782 135,000 1,063 1
434 31-01-00-01-0-188-2GV P.s. 188 John Burroughs School BUILDING SYSTEMS 04/17/95 05/15/95 12/27/91 * 35,481 30,932 135,000 1,063 0
435 31-01-00-01-0-188-2Q1 P.s. 188 John Burroughs School BUILDING SYSTEMS 04/17/95 05/15/95 11/12/91 * 11,169 11,169 135,000 1,063 0
436 31-01-00-01-0-188-2RX P.s. 188 John Burroughs School BUILDING SYSTEMS 04/17/95 05/15/95 07/21/92 * 152,810 116,645 135,000 1,063 1
437 31-01-00-01-0-188-6GP P.s. 188 John Burroughs School Building Envelope 10/24/97 10/30/97 05/27/97 * 1,153,786 1,098,800 135,000 1,063 9
438 31-01-00-01-0-188-N8Y P.s. 188 John Burroughs School Gymnasium 04/13/98 04/21/98 03/23/98 * 791,914 507,487 135,000 1,063 6
439 31-01-00-01-0-188-N9E P.s. 188 John Burroughs School Building Envelope 04/13/98 04/21/98 03/23/98 * 1,172,116 399,762 135,000 1,063 9
440 31-01-00-01-0-188-NAM P.s. 188 John Burroughs School Indoor Building 04/13/98 04/21/98 03/23/98 * 567,111 358,367 135,000 1,063 4
441 31-01-00-01-0-188-NAN P.s. 188 John Burroughs School Building System 04/13/98 04/21/98 03/23/98 * 955,871 307,558 135,000 1,063 7
442 31-01-00-01-0-188-NAO P.s. 188 John Burroughs School Building System 04/13/98 04/21/98 03/23/98 * 885,189 728,088 135,000 1,063 7
443 31-01-00-01-0-188-NH9 P.s. 188 John Burroughs School Asbestos Abatement 09/03/98 09/29/98 01/31/92 * 157,236 157,236 135,000 1,063 1
444 31-01-00-01-0-188-NHA P.s. 188 John Burroughs School Asbestos Abatement 09/03/98 09/29/98 06/28/91 * 24,228 24,228 135,000 1,063 0
445 31-01-00-01-0-188-OM3 P.s. 188 John Burroughs School Lead Paint Abatement 01/13/99 01/27/99 02/16/96 * 32,750 34,519 135,000 1,063 0
446 31-01-00-01-0-188-P59 P.s. 188 John Burroughs School ASBESTOS ABATEMENT 01/14/99 01/27/99 04/13/98 * 87,135 203,673 135,000 1,063 1
447 31-01-00-01-0-188-POY P.s. 188 John Burroughs School SIDEWALK BRIDGING, 04/02/99 06/14/99 06/21/96 * 36,225 38,181 135,000 1,063 0
448 31-01-00-01-0-188-RN9 P.s. 188 John Burroughs School Emergency, Unspecified - 01/23/01 02/21/01 09/13/00 * 44,938 72,753 135,000 1,063 0
449 31-01-00-01-0-188-SA5 P.s. 188 John Burroughs School INDOOR BUILDING 04/02/99 06/17/99 06/16/93 * 682,807 719,679 135,000 1,063 5
450 31-01-00-01-0-188-TIQ P.s. 188 John Burroughs School Emergency Stabilization - 04/02/02 04/18/02 05/11/00 * 940,360 924,768 135,000 1,063 7
451 31-01-00-01-0-188-WKG P.s. 188 John Burroughs School FY'05 Lead Paint Abatement 03/22/05 / / 06/21/04 * 22,129 22,129 0 845 0
452 31-01-00-01-0-188-XF2 P.s. 188 John Burroughs School Indoor Building 09/02/05 10/07/05 08/16/05 * 1,257,171 1,257,171 135,000 1,175 9
453 31-01-00-01-0-188-XF4 P.s. 188 John Burroughs School Building System 09/02/05 10/07/05 08/16/05 * 413,689 413,689 135,000 1,175 3
454 31-01-00-01-0-188-UC6 P.s. 188 John Burroughs School Building System 04/02/02 04/18/02 10/11/01 * 688,703 607,172 135,000 580 5
455 31-01-00-01-0-188-UFZ P.s. 188 John Burroughs School Building System 04/02/02 04/18/02 06/19/00 * 180,886 0 135,000 580 1
456 31-01-00-01-0-188-UMR P.s. 188 John Burroughs School High Efficiency Lighting 04/11/02 04/18/02 04/26/01 * 159,749 159,748 0 580 0
457 31-01-00-01-0-188-URJ P.s. 188 John Burroughs School Asbestos abatement 10/22/02 10/31/02 07/08/02 * 14,831 12,013 135,000 852 0
MANHATTAN DISTRICT 2 STATUS REPORT ON CAPITAL PROJECTS
District No.: 31-02-00-01
last updated on 02/14/06
PROJECT BUILDING PROJECT APPLICAT NYSED CONTRACT ESTIMATED COST PROJECT RATED COST/
No. NO. NAME DESCRIPTION TO NYSED APPROVAL AWARD REC NEW ADD COST ALLOWANCE SIZE CAPACIT. SQ. FT.
_____________________________________________________________________________________________________________________________________________________________________________________________________
458 31-02-00-01-0-001-12V P.s. 1 Smith C. School WINDOW REPLACEMENT 10/01/92 04/30/93 05/15/90 * 1,147,668 860,121 73,000 969 16
459 31-02-00-01-0-001-17G P.s. 1 Smith C. School Intrusion Alarm System 05/03/93 06/10/93 05/14/90 * 16,907 14,680 73,000 969 0
460 31-02-00-01-0-001-1N4 P.s. 1 Smith C. School Roof and masonry repair 02/01/94 02/22/94 10/08/92 * 558,113 377,188 73,000 969 8
461 31-02-00-01-0-001-1NM P.s. 1 Smith C. School PLAYGROUND 03/14/95 / / 06/26/90 * 451,574 0 73,000 969 6
462 31-02-00-01-0-001-224 P.s. 1 Smith C. School BUILDING SYSTEMS 03/14/95 05/17/95 06/16/93 * 176,970 150,669 73,000 969 2
463 31-02-00-01-0-001-32I P.s. 1 Smith C. School BUILDING SYSTEMS 04/17/95 05/15/95 09/24/92 * 977,611 766,467 73,000 969 13
464 31-02-00-01-0-001-6EB P.s. 1 Smith C. School Building Envelope 10/24/97 10/30/97 08/25/97 * 1,456,183 1,238,688 73,000 969 20
465 31-02-00-01-0-001-OT5 P.s. 1 Smith C. School Lead Paint Abatement 01/13/99 01/27/99 04/18/97 * 59,728 62,953 73,000 969 1
466 31-02-00-01-0-001-P7B P.s. 1 Smith C. School ASBESTOS ABATEMENT 01/14/99 01/27/99 06/14/93 * 663,968 766,475 73,000 969 9
467 31-02-00-01-0-001-TFJ P.s. 1 Smith C. School Asbestos abatement 07/25/01 10/15/01 01/08/01 * 22,802 33,403 73,000 960 0
468 31-02-00-01-0-001-U1D P.s. 1 Smith C. School Asbestos abatement 04/02/02 04/18/02 01/25/02 * 24,948 69,379 73,000 939 0
469 31-02-00-01-0-001-U27 P.s. 1 Smith C. School Asbestos abatement 04/02/02 04/18/02 01/04/02 * 174,191 66,132 73,000 939 2
470 31-02-00-01-0-001-U79 P.s. 1 Smith C. School Building Envelope 04/02/02 04/18/02 01/29/02 * 212,835 158,670 73,000 939 3
471 31-02-00-01-0-001-VZB P.s. 1 Smith C. School Asbestos abatement 08/19/04 09/13/04 07/30/04 * 16,017 16,017 73,000 1,014 0
472 31-02-00-01-0-001-W7W P.s. 1 Smith C. School Asbestos abatement 11/12/04 12/01/04 09/30/04 * 29,746 29,746 73,000 1,014 0
473 31-02-00-01-0-001-WIA P.s. 1 Smith C. School Building System 02/18/05 03/28/05 10/15/04 * 39,291 39,291 73,000 1,014 1
474 31-02-00-01-0-001-WPW P.s. 1 Smith C. School Asbestos abatement 05/17/05 06/10/05 10/29/04 * 16,160 16,160 73,000 1,014 0
475 31-02-00-01-0-001-XGE P.s. 1 Smith C. School Asbestos abatement 11/07/05 12/12/05 10/14/05 * 42,007 42,007 73,000 1,003 1
476 31-02-00-01-0-002-2UB P.s. 2 Meyer London School BUILDING SYSTEMS 04/17/95 05/15/95 05/05/92 * 56,139 52,508 91,000 1,188 1
477 31-02-00-01-0-002-2WF P.s. 2 Meyer London School INDOOR BUILDING 04/17/95 05/15/95 07/15/92 * 32,211 34,974 91,000 1,188 0
478 31-02-00-01-0-002-340 P.s. 2 Meyer London School Installation of Computer 04/17/95 05/15/95 01/14/92 * 36,072 27,457 91,000 1,188 0
479 31-02-00-01-0-002-6EA P.s. 2 Meyer London School Building Envelope 10/24/97 10/30/97 05/06/97 * 757,179 536,082 91,000 1,188 8
480 31-02-00-01-0-002-6HG P.s. 2 Meyer London School Building Envelope 10/24/97 10/30/97 05/06/97 * 847,186 742,321 91,000 1,188 9
481 31-02-00-01-0-002-NJ8 P.s. 2 Meyer London School Asbestos Abatement 09/03/98 09/29/98 11/12/91 * 18,215 18,215 91,000 1,188 0
482 31-02-00-01-0-002-P7A P.s. 2 Meyer London School ASBESTOS ABATEMENT 01/14/99 01/27/99 06/19/96 * 195,891 199,848 91,000 1,188 2
483 31-02-00-01-0-002-TDI P.s. 2 Meyer London School Asbestos abatement 07/25/01 10/15/01 04/03/01 * 27,617 104,230 91,000 1,021 0
484 31-02-00-01-0-002-UC8 P.s. 2 Meyer London School Building System 04/02/02 04/18/02 06/19/01 * 612,612 521,053 91,000 992 7
485 31-02-00-01-0-002-UK1 P.s. 2 Meyer London School Emergency, Unspecified - 04/02/02 04/18/02 08/31/99 * 441,773 0 91,000 992 5
486 31-02-00-01-0-002-VFQ P.s. 2 Meyer London School Building System 08/28/03 10/06/03 06/23/03 * 110,727 110,727 91,000 992 1
487 31-02-00-01-0-002-VNO P.s. 2 Meyer London School Building System 01/08/04 01/20/04 08/27/03 * 133,295 146,534 91,000 1,021 1
488 31-02-00-01-0-003-19J P.s. 3 Renovation of windows 05/12/93 06/08/93 11/30/90 * 852,491 658,084 101,000 791 8
489 31-02-00-01-0-003-1CR P.s. 3 FURNISH AND INSTALL NEW 08/23/93 09/30/93 05/15/90 * 139,920 111,992 101,000 791 1
490 31-02-00-01-0-003-1NC P.s. 3 Cornice restoration 02/01/94 02/22/94 03/13/92 * 2,225,292 1,641,558 101,000 791 22
491 31-02-00-01-0-003-1S7 P.s. 3 BUILDING SYSTEMS 03/14/95 05/17/95 07/10/92 * 26,104 21,333 101,000 791 0
492 31-02-00-01-0-003-1UO P.s. 3 PS 003 M Asbestos 03/14/95 05/17/95 06/14/91 * 1,768,222 1,204,282 101,000 791 18
493 31-02-00-01-0-003-2GX P.s. 3 BUILDING SYSTEMS 04/17/95 05/15/95 06/26/90 * 20,988 16,959 101,000 791 0
494 31-02-00-01-0-003-40Q P.s. 3 Installation of Computer 03/17/96 04/26/96 06/26/95 * 45,433 0 101,000 791 0
495 31-02-00-01-0-003-66C P.s. 3 Building Envelope 03/17/97 04/01/97 10/13/97 * 928,428 762,336 101,000 791 9
496 31-02-00-01-0-003-6HH P.s. 3 Building Envelope 10/24/97 10/30/97 05/01/97 * 574,631 629,524 101,000 791 6
497 31-02-00-01-0-003-O0I P.s. 3 Lead Abatement 10/13/98 10/23/98 08/15/97 * 12,028 12,028 101,000 791 0
498 31-02-00-01-0-003-OM2 P.s. 3 Lead Paint Abatement 01/13/99 06/15/99 08/05/95 * 7,471 0 101,000 791 0
499 31-02-00-01-0-003-OT4 P.s. 3 Lead Paint Abatement 01/13/99 04/19/99 08/20/96 * 12,180 12,838 101,000 791 0
500 31-02-00-01-0-003-P79 P.s. 3 ASBESTOS ABATEMENT 01/14/99 01/27/99 06/28/91 * 831,366 62,663 101,000 791 8
501 31-02-00-01-0-003-T21 P.s. 3 Building System 03/16/01 04/18/01 04/13/00 * 1,426,539 1,344,395 101,000 816 14
502 31-02-00-01-0-003-U2M P.s. 3 Emergency, Unspecified - 04/02/02 04/18/02 12/04/01 * 641,940 566,454 101,000 739 6
503 31-02-00-01-0-003-UXT P.s. 3 Emergency Stabilization - 10/22/02 10/31/02 07/09/02 * 392,316 498,721 101,000 739 4
504 31-02-00-01-0-003-VEC P.s. 3 Building System 08/28/03 10/06/03 06/23/03 * 170,201 170,201 101,000 739 2
505 31-02-00-01-0-003-WKH P.s. 3 FY'05 Lead Paint Abatement 03/22/05 / / 08/24/04 * 17,702 17,702 0 808 0
506 31-02-00-01-0-003-WPH P.s. 3 Asbestos abatement 05/17/05 06/10/05 05/06/05 * 364,752 364,752 101,000 808 4
507 31-02-00-01-0-003-WW9 P.s. 3 High Efficiency Lighting 06/03/05 06/13/05 04/26/04 * 92,617 92,617 0 808 0
508 31-02-00-01-0-006-225 P.s. 6 BUILDING SYSTEMS 03/14/95 05/17/95 06/16/93 * 188,425 112,613 76,000 999 2
509 31-02-00-01-0-006-445 P.s. 6 INSTALLATION OF COMPUTER 07/19/96 07/31/96 08/31/94 * 16,684 0 76,000 999 0
510 31-02-00-01-0-006-OM1 P.s. 6 Lead Paint Abatement 01/13/99 01/27/99 07/05/95 * 11,822 12,460 76,000 999 0
511 31-02-00-01-0-006-QE8 P.s. 6 Building Envelope 09/10/99 09/28/99 06/11/99 * 4,678,426 3,356,133 76,000 973 62
512 31-02-00-01-0-006-QE9 P.s. 6 Building Envelope 09/10/99 09/28/99 06/11/99 * 250,532 496,451 76,000 973 3
513 31-02-00-01-0-006-V3V P.s. 6 Asbestos abatement 01/17/03 01/24/03 01/15/03 * 14,198 12,711 76,000 957 0
514 31-02-00-01-0-006-VD3 P.s. 6 Asbestos abatement 08/28/03 10/06/03 06/19/03 * 42,160 42,160 76,000 957 1
515 31-02-00-01-0-006-VUJ P.s. 6 Construction of Computer 03/16/04 03/30/04 10/23/03 * 596,218 484,952 76,000 957 8
516 31-02-00-01-0-006-W7G P.s. 6 Building System 11/12/04 12/01/04 07/28/04 * 282,231 755,698 76,000 1,030 4
517 31-02-00-01-0-006-WI8 P.s. 6 Building System 02/18/05 03/28/05 10/15/04 * 38,834 38,834 76,000 1,030 1
518 31-02-00-01-0-006-X5C P.s. 6 Building System 08/03/05 10/11/05 06/29/05 * 580,357 580,357 76,000 1,022 8
519 31-02-00-01-0-006-X5D P.s. 6 Gymnasium Upgrade 08/03/05 10/11/05 06/29/05 * 769,113 769,113 76,000 1,022 10
520 31-02-00-01-0-006-X5E P.s. 6 Indoor Building 08/03/05 10/11/05 06/28/05 * 1,450,666 1,450,666 76,000 1,022 19
521 31-02-00-01-0-006-X5F P.s. 6 Building System 08/03/05 10/11/05 06/29/05 * 1,992,709 1,992,709 76,000 1,022 26
522 31-02-00-01-0-006-X5G P.s. 6 Indoor Building 08/03/05 10/11/05 06/29/05 * 257,743 257,743 76,000 1,022 3
523 31-02-00-01-0-006-X5H P.s. 6 Building System 08/03/05 10/11/05 06/29/05 * 1,921,971 1,921,971 76,000 1,022 25
524 31-02-00-01-0-006-X5I P.s. 6 Building System 08/03/05 10/11/05 06/29/05 * 1,261,459 1,261,459 76,000 1,022 17
525 31-02-00-01-0-011-16U P.s. 11 William T. Harris Scho New Washer-extractor, 04/22/93 05/26/93 05/14/90 * 393,656 33,429 96,000 852 4
526 31-02-00-01-0-011-226 P.s. 11 William T. Harris Scho BUILDING SYSTEMS 03/14/95 05/17/95 06/16/93 * 213,539 130,968 96,000 852 2
527 31-02-00-01-0-011-33Z P.s. 11 William T. Harris Scho Installation of Computer 04/17/95 05/15/95 01/14/92 * 46,988 35,765 96,000 852 0
528 31-02-00-01-0-011-6IA P.s. 11 William T. Harris Scho Building Envelope 10/24/97 10/30/97 09/04/97 * 1,272,145 780,969 96,000 852 13
529 31-02-00-01-0-011-6IB P.s. 11 William T. Harris Scho Building Envelope 10/24/97 10/30/97 09/04/97 * 103,899 164,854 96,000 852 1
530 31-02-00-01-0-011-6IG P.s. 11 William T. Harris Scho Indoor Building 10/24/97 10/30/97 09/04/97 * 43,212 39,452 96,000 852 0
531 31-02-00-01-0-011-6IJ P.s. 11 William T. Harris Scho Building Envelope 10/24/97 10/30/97 09/04/97 * 170,147 168,211 96,000 852 2
532 31-02-00-01-0-011-N9K P.s. 11 William T. Harris Scho Building Envelope 04/13/98 04/21/98 03/31/98 * 2,357,093 2,004,971 96,000 852 25
533 31-02-00-01-0-011-NAL P.s. 11 William T. Harris Scho Window Guards, Emergency 04/13/98 04/21/98 03/31/98 * 275,849 234,181 96,000 852 3
534 31-02-00-01-0-011-NOZ P.s. 11 William T. Harris Scho Asbestos Abatement 09/17/98 09/28/98 01/31/92 * 36,369 36,369 96,000 852 0
535 31-02-00-01-0-011-O0H P.s. 11 William T. Harris Scho lead Abatement 10/13/98 10/23/98 07/30/97 * 28,416 28,416 96,000 852 0
536 31-02-00-01-0-011-OM0 P.s. 11 William T. Harris Scho Lead Paint Abatement 01/13/99 01/27/99 04/10/96 * 10,927 11,517 96,000 852 0
537 31-02-00-01-0-011-P76 P.s. 11 William T. Harris Scho ASBESTOS ABATEMENT 01/14/99 01/27/99 06/12/96 * 89,177 91,941 96,000 852 1
538 31-02-00-01-0-011-QRV P.s. 11 William T. Harris Scho Asbestos abatement 03/03/00 04/19/00 01/31/00 * 71,165 30,324 96,000 842 1
539 31-02-00-01-0-011-R9J P.s. 11 William T. Harris Scho Rehabilitation and 08/14/00 08/31/00 10/08/99 * 761,992 859,696 96,000 842 8
540 31-02-00-01-0-011-T22 P.s. 11 William T. Harris Scho Building System 03/16/01 04/18/01 04/13/00 * 1,519,985 1,404,380 96,000 842 16
541 31-02-00-01-0-011-TUT P.s. 11 William T. Harris Scho Emergency, Unspecified - 12/18/01 02/11/02 05/05/98 * 43,897 37,048 96,000 756 0
542 31-02-00-01-0-011-UH0 P.s. 11 William T. Harris Scho Emergency, Unspecified - 04/02/02 04/18/02 10/18/99 * 62,079 0 96,000 756 1
543 31-02-00-01-0-011-WI6 P.s. 11 William T. Harris Scho Building System 02/18/05 03/28/05 10/15/04 * 43,559 43,559 96,000 805 0
544 31-02-00-01-0-011-WKI P.s. 11 William T. Harris Scho FY'05 Lead Paint Abatement 03/22/05 / / 08/25/04 * 10,681 10,681 0 805 0
545 31-02-00-01-0-011-3FD P.s. 11 William T. Harris Scho IS 017 M Mod rehab 06/28/95 04/26/96 03/15/93 * 312,884 206,583 96,000 295 3
546 31-02-00-01-0-017-11W J.h.s. 17 Modify and convert 10/31/91 03/23/93 03/19/91 * 1,875,380 1,698,178 104,000 620 18
547 31-02-00-01-0-017-1HR J.h.s. 17 Furnish and install "EXIT" 12/09/93 12/31/93 11/30/90 * 54,059 41,630 104,000 620 1
548 31-02-00-01-0-017-227 J.h.s. 17 BUILDING SYSTEMS 03/14/95 05/17/95 08/09/93 * 13,130 10,143 104,000 620 0
549 31-02-00-01-0-017-2GW J.h.s. 17 Exterior door replacement 04/17/95 05/15/95 05/23/90 * 366,686 55,785 104,000 620 4
550 31-02-00-01-0-017-NJ5 J.h.s. 17 Asbestos Abatement 09/03/98 09/29/98 01/24/91 * 30,032 30,032 104,000 620 0
551 31-02-00-01-0-017-NJ6 J.h.s. 17 Asbestos Abatement 09/03/98 09/29/98 12/06/90 * 12,447 12,447 104,000 620 0
552 31-02-00-01-0-017-OLZ J.h.s. 17 Lead Paint Abatement 01/13/99 01/27/99 04/10/96 * 20,449 21,553 104,000 620 0
553 31-02-00-01-0-017-Q0F J.h.s. 17 Building System 04/09/99 04/22/99 10/06/98 * 1,662,700 1,996,335 104,000 620 16
554 31-02-00-01-0-017-RPG J.h.s. 17 Emergency Stabilization - 01/23/01 02/22/01 11/13/00 * 97,680 51,714 104,000 620 1
555 31-02-00-01-0-017-RQ9 J.h.s. 17 Emergency, Unspecified - 01/23/01 02/21/01 06/09/00 * 28,985 16,037 104,000 620 0
556 31-02-00-01-0-017-T3U J.h.s. 17 EMERGENCY STABILIZATION 03/21/01 04/18/01 01/05/00 * 220,387 220,387 104,000 620 2
557 31-02-00-01-0-017-THQ J.h.s. 17 Indoor Building 07/25/01 10/15/01 12/08/00 * 136,058 236,105 104,000 1,114 1
558 31-02-00-01-0-017-TOT J.h.s. 17 Building System 08/14/01 10/15/01 06/19/99 * 202,217 220,365 104,000 1,114 2
559 31-02-00-01-0-017-TUK J.h.s. 17 Emergency, Unspecified - 12/18/01 02/11/02 05/05/98 * 210,654 173,384 104,000 1,114 2
560 31-02-00-01-0-017-TXB J.h.s. 17 Asbestos abatement 12/18/01 12/31/01 11/21/00 * 20,018 0 104,000 1,114 0
561 31-02-00-01-0-017-UCP J.h.s. 17 Asbestos abatement 04/02/02 04/18/02 09/19/01 * 20,539 15,349 104,000 1,114 0
562 31-02-00-01-0-017-ULG J.h.s. 17 Building System 04/02/02 04/18/02 10/06/98 * 295,717 321,121 104,000 1,114 3
563 31-02-00-01-0-017-UXN J.h.s. 17 Building Envelope 10/22/02 10/31/02 06/25/02 * 55,973 57,317 104,000 1,114 1
564 31-02-00-01-0-017-UY0 J.h.s. 17 Building System 10/22/02 10/31/02 06/17/02 * 245,008 269,825 104,000 1,114 2
565 31-02-00-01-0-017-UZ0 J.h.s. 17 Building Envelope 10/22/02 10/31/02 06/25/02 * 1,321,182 1,368,226 104,000 1,114 13
566 31-02-00-01-0-017-UZ1 J.h.s. 17 Building Envelope 10/22/02 10/31/02 06/25/02 * 948,767 852,860 104,000 1,114 9
567 31-02-00-01-0-017-UZ2 J.h.s. 17 Building System 10/22/02 10/31/02 06/25/02 * 449,169 442,962 104,000 1,114 4
568 31-02-00-01-0-017-V3W J.h.s. 17 Emergency Stabilization - 01/17/03 01/24/03 12/16/02 * 31,185 93,300 104,000 1,155 0
569 31-02-00-01-0-017-UPY J.h.s. 17 FY02 Lead Paint Abatement 04/11/02 04/18/02 09/06/01 * 17,026 17,026 0 661 0
570 31-02-00-01-0-017-W1U J.h.s. 17 Asbestos abatement 08/19/04 09/13/04 02/06/04 * 63,238 63,238 104,000 661 1
571 31-02-00-01-0-017-W7P J.h.s. 17 Building Envelope 11/12/04 12/01/04 06/25/04 * 83,160 83,160 104,000 661 1
572 31-02-00-01-0-017-WP6 J.h.s. 17 Asbestos abatement 05/17/05 06/10/05 01/19/05 * 30,571 30,571 104,000 661 0
573 31-02-00-01-0-017-WR1 J.h.s. 17 Science Lab Upgrade 05/17/05 06/10/05 05/11/05 * 2,238,662 2,238,662 104,000 661 22
574 31-02-00-01-0-033-24G P.s. 33 Chelsea School BUILDING SYSTEMS 03/14/95 05/17/95 06/16/93 * 178,210 0 83,000 758 2
575 31-02-00-01-0-033-76Q P.s. 33 Chelsea School Building Envelope 01/08/98 01/21/98 06/05/97 * 446,924 421,841 83,000 758 5
576 31-02-00-01-0-033-NBH P.s. 33 Chelsea School Building Envelope 04/13/98 04/21/98 10/15/97 * 2,184,613 1,875,347 83,000 758 26
577 31-02-00-01-0-033-NJ1 P.s. 33 Chelsea School Asbestos Abatement 09/03/98 09/29/98 12/06/90 * 28,966 28,966 83,000 758 0
578 31-02-00-01-0-033-O0G P.s. 33 Chelsea School Lead Abatement 10/13/98 10/23/98 08/02/97 * 8,124 0 83,000 758 0
579 31-02-00-01-0-033-P6Z P.s. 33 Chelsea School ASBESTOS ABATEMENT 01/14/99 01/27/99 08/30/93 * 13,760 16,510 83,000 758 0
580 31-02-00-01-0-033-R8D P.s. 33 Chelsea School Architectural and Barrier 08/14/00 08/31/00 07/14/00 * 94,741 96,365 83,000 826 1
581 31-02-00-01-0-033-V8G P.s. 33 Chelsea School Building Envelope 04/02/03 04/14/03 03/11/03 * 174,718 174,718 83,000 799 2
582 31-02-00-01-0-033-W4P P.s. 33 Chelsea School Rehabilitation and 08/19/04 09/13/04 06/11/04 * 3,151,764 3,151,764 83,000 911 38
583 31-02-00-01-0-033-WHA P.s. 33 Chelsea School Building System 02/18/05 03/28/05 10/15/04 * 45,974 45,974 83,000 911 1
584 31-02-00-01-0-033-XD7 P.s. 33 Chelsea School Asbestos abatement 09/02/05 10/07/05 07/26/05 * 86,270 86,270 83,000 915 1
585 31-02-00-01-0-033-XG5 P.s. 33 Chelsea School Asbestos abatement 11/07/05 12/12/05 09/26/05 * 144,089 144,089 83,000 915 2
586 31-02-00-01-0-040-1B0 P.s. 40 Remove existing windows 07/12/93 07/30/93 09/26/91 * 1,402,724 0 95,000 1,030 15
587 31-02-00-01-0-040-1TX P.s. 40 INDOOR BUILDING 03/14/95 05/17/95 02/05/91 * 17,531 624,503 95,000 1,030 0
588 31-02-00-01-0-040-24H P.s. 40 BUILDING SYSTEMS 03/14/95 05/17/95 06/16/93 * 191,568 126,030 95,000 1,030 2
589 31-02-00-01-0-040-40S P.s. 40 Installation of Computer 03/17/96 04/26/96 06/26/95 * 40,810 0 95,000 1,030 0
590 31-02-00-01-0-040-66K P.s. 40 Building Envelope 03/17/97 04/01/97 05/27/98 * 617,909 899,280 95,000 1,030 7
591 31-02-00-01-0-040-NIY P.s. 40 Asbestos Abatement 09/03/98 09/29/98 01/31/92 * 15,622 15,622 95,000 1,030 0
592 31-02-00-01-0-040-NIZ P.s. 40 Asbestos Abatement 09/03/98 09/29/98 01/24/91 * 87,093 87,093 95,000 1,030 1
593 31-02-00-01-0-040-O0F P.s. 40 Lead Abatement 10/13/98 10/23/98 02/27/98 * 21,306 21,306 95,000 1,030 0
594 31-02-00-01-0-040-P6X P.s. 40 ASBESTOS ABATEMENT 01/14/99 01/27/99 06/28/95 * 411,667 474,934 95,000 1,030 4
595 31-02-00-01-0-040-QMV P.s. 40 Asbestos abatement 01/04/00 03/08/00 06/17/99 * 242,409 290,512 95,000 704 3
596 31-02-00-01-0-040-QOT P.s. 40 Building Envelope 01/04/00 03/08/00 06/18/96 * 5,097,021 5,009,396 95,000 704 54
597 31-02-00-01-0-040-R4G P.s. 40 Asbestos abatement 08/14/00 08/31/00 06/23/00 * 27,872 115,494 95,000 704 0
598 31-02-00-01-0-040-TR6 P.s. 40 Asbestos abatement 12/18/01 12/31/01 04/07/00 * 42,768 0 95,000 748 0
599 31-02-00-01-0-040-TRY P.s. 40 Asbestos abatement 12/18/01 12/31/01 04/07/00 * 16,788 0 95,000 748 0
600 31-02-00-01-0-040-U5A P.s. 40 Asbestos abatement 04/02/02 04/18/02 11/08/01 * 106,446 72,089 95,000 748 1
601 31-02-00-01-0-040-U8F P.s. 40 Building Envelope 04/02/02 04/18/02 10/29/01 * 232,487 202,451 95,000 748 2
602 31-02-00-01-0-040-WH9 P.s. 40 Building System 02/18/05 03/28/05 10/15/04 * 44,102 44,102 95,000 819 0
603 31-02-00-01-0-040-WKJ P.s. 40 FY'05 Lead Paint Abatement 03/22/05 / / 02/10/05 * 103,528 103,528 0 819 0
604 31-02-00-01-0-040-WNR P.s. 40 Asbestos abatement 05/17/05 06/10/05 03/03/05 * 30,455 30,455 95,000 819 0
605 31-02-00-01-0-040-WXP P.s. 40 Asbestos abatement 08/03/05 10/11/05 05/09/05 * 16,765 16,765 95,000 802 0
606 31-02-00-01-0-040-XCL P.s. 40 Asbestos abatement 09/02/05 10/07/05 08/24/05 * 27,388 27,388 95,000 802 0
607 31-02-00-01-0-040-XG3 P.s. 40 Asbestos abatement 11/07/05 12/12/05 09/21/05 * 202,540 202,540 95,000 802 2
608 31-02-00-01-0-041-1NN P.s. 41 Greenwich Village Scho PLAYGROUND 03/14/95 05/17/95 08/22/90 * 191,941 148,228 81,000 972 2
609 31-02-00-01-0-041-24I P.s. 41 Greenwich Village Scho BUILDING SYSTEMS 03/14/95 05/17/95 06/16/93 * 171,325 99,827 81,000 972 2
610 31-02-00-01-0-041-2GY P.s. 41 Greenwich Village Scho BUILDING SYSTEMS 04/17/95 05/15/95 12/27/91 * 6,698 10,592 81,000 972 0
611 31-02-00-01-0-041-32P P.s. 41 Greenwich Village Scho Installation of Computer 04/17/95 05/15/95 01/14/92 * 68,865 57,702 81,000 972 1
612 31-02-00-01-0-041-P6W P.s. 41 Greenwich Village Scho ASBESTOS ABATEMENT 01/14/99 01/27/99 05/15/90 * 19,617 20,711 81,000 972 0
613 31-02-00-01-0-041-QL5 P.s. 41 Greenwich Village Scho Building System 12/01/99 12/31/99 10/25/99 * 428,514 802,163 81,000 1,018 5
614 31-02-00-01-0-041-RZL P.s. 41 Greenwich Village Scho Rehabilitation and 01/23/01 02/21/01 12/04/00 * 4,682,605 4,282,007 81,000 1,018 58
615 31-02-00-01-0-041-UT7 P.s. 41 Greenwich Village Scho Asbestos abatement 10/22/02 10/31/02 07/15/02 * 66,968 65,442 81,000 1,005 1
616 31-02-00-01-0-041-VKD P.s. 41 Greenwich Village Scho Asbestos abatement 01/08/04 01/20/04 11/13/03 * 238,432 238,432 81,000 1,018 3
617 31-02-00-01-0-041-WH8 P.s. 41 Greenwich Village Scho Building System 02/18/05 03/28/05 10/15/04 * 38,708 38,708 81,000 977 0
618 31-02-00-01-0-041-XF3 P.s. 41 Greenwich Village Scho Auditorium Upgrade - 09/02/05 10/07/05 07/26/05 * 1,296,336 1,296,336 81,000 968 16
619 31-02-00-01-0-042-1NO P.s. 42 Benjamin Altman School BUILDING SYSTEMS 03/14/95 05/17/95 07/08/92 * 1,389,855 1,160,489 74,000 1,009 19
620 31-02-00-01-0-042-2Q4 P.s. 42 Benjamin Altman School BUILDING SYSTEMS 04/17/95 05/15/95 12/27/91 * 30,061 22,552 74,000 1,009 0
621 31-02-00-01-0-042-2U8 P.s. 42 Benjamin Altman School BUILDING SYSTEMS 04/17/95 05/15/95 05/05/92 * 83,759 61,861 74,000 1,009 1
622 31-02-00-01-0-042-444 P.s. 42 Benjamin Altman School Climate Control 07/19/96 07/31/96 05/21/96 * 1,272,398 1,283,260 74,000 1,009 17
623 31-02-00-01-0-042-O0E P.s. 42 Benjamin Altman School Lead Abatement 10/13/98 10/23/98 10/24/97 * 28,433 29,968 74,000 1,009 0
624 31-02-00-01-0-042-P6V P.s. 42 Benjamin Altman School ASBESTOS ABATEMENT 01/14/99 01/27/99 06/14/91 * 192,332 223,046 74,000 1,009 3
625 31-02-00-01-0-042-QI8 P.s. 42 Benjamin Altman School Building System 10/08/99 10/26/99 09/30/99 * 372,258 479,293 74,000 985 5
626 31-02-00-01-0-042-RQ5 P.s. 42 Benjamin Altman School Indoor Building 01/23/01 02/22/01 09/05/00 * 54,515 0 74,000 985 1
627 31-02-00-01-0-042-RQO P.s. 42 Benjamin Altman School Asbestos abatement 01/23/01 02/21/01 03/21/00 * 20,090 28,073 74,000 985 0
628 31-02-00-01-0-042-RVK P.s. 42 Benjamin Altman School Rehabilitation and 01/23/01 02/21/01 09/05/00 * 6,814,852 5,763,629 74,000 985 92
629 31-02-00-01-0-042-TMC P.s. 42 Benjamin Altman School Emergency, Unspecified - 07/25/01 10/24/01 12/13/99 * 196,415 168,488 74,000 985 3
630 31-02-00-01-0-042-URE P.s. 42 Benjamin Altman School Asbestos abatement 10/22/02 10/31/02 06/26/02 * 117,810 94,874 74,000 967 2
631 31-02-00-01-0-042-V42 P.s. 42 Benjamin Altman School Asbestos abatement 01/17/03 01/24/03 11/26/02 * 14,641 11,386 74,000 967 0
632 31-02-00-01-0-042-V89 P.s. 42 Benjamin Altman School Asbestos abatement 04/02/03 04/14/03 03/21/03 * 24,411 25,239 74,000 967 0
633 31-02-00-01-0-042-VFR P.s. 42 Benjamin Altman School Building System 08/28/03 10/06/03 06/23/03 * 100,555 100,555 74,000 967 1
634 31-02-00-01-0-042-VRM P.s. 42 Benjamin Altman School Asbestos abatement 03/16/04 03/30/04 11/12/03 * 16,601 20,436 74,000 967 0
635 31-02-00-01-0-042-WKK P.s. 42 Benjamin Altman School FY'05 Lead Paint Abatement 03/22/05 / / 08/27/04 * 33,342 33,342 0 937 0
636 31-02-00-01-0-047-W87 Indoor Building 11/12/04 12/01/04 08/19/04 * 195,219 195,219 118,000 850 2
637 31-02-00-01-0-047-XCN Asbestos abatement 09/02/05 10/07/05 08/24/05 * 27,388 27,388 118,000 923 0
638 31-02-00-01-0-051-130 P.s. 51 Elias Howe School Replace and upgrade the 10/01/92 04/30/93 05/15/90 * 97,708 72,066 31,000 516 3
639 31-02-00-01-0-051-1S8 P.s. 51 Elias Howe School BUILDING SYSTEMS 03/14/95 05/17/95 07/10/92 * 30,535 23,311 31,000 516 1
640 31-02-00-01-0-051-NIT P.s. 51 Elias Howe School Asbestos Abatement 09/03/98 09/29/98 07/25/91 * 14,830 14,830 31,000 516 0
641 31-02-00-01-0-051-O0D P.s. 51 Elias Howe School Lead Abatement 10/13/98 10/23/98 08/11/97 * 7,956 0 31,000 516 0
642 31-02-00-01-0-051-O1V P.s. 51 Elias Howe School Building System 10/14/98 10/23/98 06/23/98 * 1,654,232 1,511,550 31,000 516 53
643 31-02-00-01-0-051-QUQ P.s. 51 Elias Howe School Indoor Building 03/21/00 04/19/00 12/08/99 * 68,552 69,360 31,000 408 2
644 31-02-00-01-0-051-QYK P.s. 51 Elias Howe School Asbestos abatement 04/05/00 04/19/00 03/02/00 * 15,958 31,636 31,000 408 1
645 31-02-00-01-0-051-R6X P.s. 51 Elias Howe School Emergency, Unspecified - 12/18/01 02/11/02 05/11/00 * 306,114 277,101 31,000 408 10
646 31-02-00-01-0-051-RNZ P.s. 51 Elias Howe School Emergency, Unspecified - 01/23/01 02/21/01 09/14/00 * 61,305 88,439 31,000 408 2
647 31-02-00-01-0-051-RT8 P.s. 51 Elias Howe School Asbestos abatement 01/23/01 02/21/01 03/30/00 * 136,860 109,791 31,000 408 4
648 31-02-00-01-0-051-U45 P.s. 51 Elias Howe School Asbestos abatement 04/02/02 04/18/02 02/04/02 * 76,924 175,179 31,000 423 2
649 31-02-00-01-0-051-UBC P.s. 51 Elias Howe School Building Envelope 04/02/02 04/18/02 01/29/02 * 65,088 41,137 31,000 423 2
650 31-02-00-01-0-051-V2M P.s. 51 Elias Howe School Indoor Building 10/23/02 10/31/02 08/21/02 * 332,766 109,122