Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 11/19/09 at 17:00:04




BRIGHTON CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-01-01-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Twelve Corners Middle School:
04-0490   Reconstruction               0-002-016  02/11/05     DONE    DONE       DONE      12/09/04   12/07/04   11/02/04   05/18/04   4                         77,837        77,837  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
06-0536   Reconstruction               0-002-017  01/31/07     DONE    DONE       DONE      11/21/06   11/20/06   05/19/06   05/16/06   2,4                       73,200        73,200  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
08-0272   Additions and Alterations    0-002-018  02/13/09     DONE    DONE       DONE      09/08/08   09/03/08   07/09/08   05/20/08   02 - 16                  441,490             0  DDJ             0           0      134,213
                                                                                                                                                                                                                                 Thomas Associates                   
09-0166   Reconstruction               0-002-019                       ADDENDUM REQ'D       08/27/09   08/25/09   07/17/09   05/19/09   7,155,15,16                    0    18,569,234  DDJ             0           0            0
                                                                                                                                                                                                                                 Tetra Tech Architects & Engineers   

          Brighton Senior High:
04-0491   Reconstruction               0-003-017  02/11/05     DONE    DONE       DONE      12/09/04   12/07/04   11/02/04   05/18/04   9,10,15                1,034,075     1,034,075  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
05-0367   Reconstruction               0-003-018  03/03/06     DONE    DONE       DONE      11/28/05   11/23/05   08/26/05   05/17/05   10                     1,202,296     1,202,296  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
06-0537   Reconstruction               0-003-019  01/31/07     DONE    DONE       DONE      11/21/06   11/20/06   05/19/06   05/16/06   2,4,7                  1,464,000     1,464,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1081   Reconstruction               0-003-020  05/22/08     DONE    DONE       DONE      12/10/07   12/10/07   06/25/07   05/15/07   2,4,9,10                 507,860             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
09-0167   Reconstruction               0-003-021                       ADDENDUM REQ'D       08/27/09   08/25/09   07/14/09   05/19/09   2,9,155,15,16                  0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Tetra Tech Architects & Engineers   

          Council Rock Elementary:
04-0146   Additions and Alterations    0-004-015  12/14/04     DONE    DONE       DONE      08/20/04   08/17/04   09/22/03   03/16/04   02 - 16                3,203,481     2,384,407  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
06-0538   Reconstruction               0-004-016  01/31/07     DONE    DONE       DONE      11/21/06   11/20/06   05/19/06   05/16/06   2,7,9                    902,800       902,800  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
08-0273   Reconstruction               0-004-017  02/13/09     DONE    DONE       DONE      09/08/08   09/03/08   07/09/08   05/20/08   8                        962,830       962,830  DDJ             0           0      292,701
                                                                                                                                                                                                                                 Thomas Associates                   

          French Road School:
04-0147   Additions and Alterations    0-006-017  12/14/04     DONE    DONE       DONE      08/20/04   08/17/04   09/22/03   03/16/04   02 - 16                6,790,029     3,436,278  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
04-0147PR Additions and Alterations    0-006-017  12/14/04     DONE    DONE       DONE        /  /       /  /     09/22/03     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
08-0274   Reconstruction               0-006-018  02/13/09     DONE    DONE       DONE      09/08/08   09/03/08   07/09/08   05/20/08   8                         71,680             0  DDJ             0           0       21,791
                                                                                                                                                                                                                                 Thomas Associates                   

          Admin Bldg (Old Twelve Crn ES-0005):
07-1082   Reconstruction               1-005-001  05/22/08     DONE    DONE       DONE      12/10/07   12/10/07   06/26/07   05/15/07   2,8                      779,740             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
09-0168   Reconstruction               1-005-002                       ADDENDUM REQ'D       08/27/09   08/25/09   07/17/09   05/19/09   2,7,9,155,15,16                0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Tetra Tech Architects & Engineers   

          Athletic Storage Building:
09-0169   New Construction             2-016-001                       ADDENDUM REQ'D       08/27/09   08/25/09   07/17/09   05/19/09   02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Tetra Tech Architects & Engineers   

          District-Wide:
09-0170   Reconstruction               7-999-002                       ADDENDUM REQ'D       08/27/09   08/25/09   07/17/09   05/19/09   13                             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Tetra Tech Architects & Engineers   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GATES CHILI CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-04-01-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Gates Chili High:
05-0897   Reconstruction               0-001-010  05/24/07     DONE    DONE       DONE      03/08/06   03/06/06   05/14/04   03/29/05   8,9,16                 1,252,366     1,252,366  DDJ             0           0            0
                                                                                                                                                                                                                                 Saren Engineering, INC.             
05-0536   Additions and Alterations    0-001-011  05/11/06     DONE    DONE       DONE      01/03/06   12/20/05   12/22/04   03/29/05   02 - 16               47,562,580    31,788,465  DDJ             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 
  -    PR Additions and Alterations    0-001-012                                              /  /       /  /       /  /       /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
05-0813   Additions and Alterations    0-001-012  03/09/06     DONE    DONE       DONE      02/24/06   02/23/06     /  /     03/29/05   02 - 16                  843,032       770,976  DDJ             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 
  -       Reconstruction               0-001-013                                              /  /       /  /     05/24/07     /  /     13,16                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-1246   Reconstruction               0-001-015                       ADDENDUM REQ'D       02/23/09   02/17/09   12/29/08   05/01/05   8,155,15,16                    0    43,079,538  DDJ             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          Florence Brasser:
04-1068   Reconstruction               0-002-008  08/08/05     DONE    DONE       DONE      04/01/05   03/31/05   05/14/04   03/29/05   155,15,16                334,399       334,399  DDJ             0           0            0
                                                                                                                                                                                                                                 Saren Engineering, INC.             
06-0886   Reconstruction               0-002-009  12/26/07     DONE    DONE       DONE      02/07/07   02/05/07   12/22/04   03/29/05   2,4,7,8,9,14,155,15,   1,053,348     1,053,348  DDJ             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 
  -       Reconstruction               0-002-010                                              /  /       /  /     11/21/05     /  /     13,155,15,16                   0     5,026,758  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-002-011                                              /  /       /  /     05/24/07     /  /     13,16                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-1247   Reconstruction               0-002-012                       ADDENDUM REQ'D       02/23/09   02/17/09   12/29/08   05/01/05   8                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          Washington Irving School:
04-1069   Reconstruction               0-005-008  08/08/05     DONE    DONE       DONE      04/01/05   03/31/05   05/14/04   03/29/05   155,15,16                202,623       202,623  DDJ             0           0            0
                                                                                                                                                                                                                                 Saren Engineering, INC.             
  -    PR Additions and Alterations    0-005-009                                              /  /       /  /     12/22/04     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0887   Additions and Alterations    0-005-009  12/26/07     DONE    DONE       DONE      02/07/07   02/05/07   12/22/04   03/29/05   02 - 16                  129,140       129,140  DDJ             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 
05-0898   Reconstruction               0-005-010  05/24/07     DONE    DONE       DONE      03/08/06   03/06/06   11/21/05   03/29/05   10,155,15,16              13,243        13,243  DDJ             0           0            0
                                                                                                                                                                                                                                 Saren Engineering, INC.             
  -       Reconstruction               0-005-011                                              /  /       /  /     05/24/07     /  /     13,16                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Middle School:
04-1070   Reconstruction               0-006-006  08/08/05     DONE    DONE       DONE      04/01/05   03/31/05   05/14/04   03/29/05   155,15,16                854,657       854,657  DDJ             0           0            0
                                                                                                                                                                                                                                 Saren Engineering, INC.             
  -    PR Additions and Alterations    0-006-007                                              /  /       /  /     12/22/04     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0888   Additions and Alterations    0-006-007  12/26/07     DONE    DONE       DONE      02/07/07   02/05/07   12/22/04   03/29/05   02 - 16                3,733,929     3,040,018  DDJ             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 
05-0899   Reconstruction               0-006-008  05/24/07     DONE    DONE       DONE      03/08/06   03/06/06   11/21/05   03/29/05   10,155,15,16             307,573       307,573  DDJ             0           0            0
                                                                                                                                                                                                                                 Saren Engineering, INC.             
  -       Reconstruction               0-006-009                                              /  /       /  /     05/24/07     /  /     13,16                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-1248   Reconstruction               0-006-010                       ADDENDUM REQ'D       02/23/09   02/17/09   12/29/08   05/01/05   13,15,16                       0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          Paul Rd Elementary:
04-1071   Reconstruction               0-007-009  08/08/05     DONE    DONE       DONE      04/01/05   03/31/05   05/14/04   03/29/05   155,15,16                363,297       363,297  DDJ             0           0            0
                                                                                                                                                                                                                                 Saren Engineering, INC.             
06-0889   Reconstruction               0-007-010  12/26/07     DONE    DONE       DONE      02/07/07   02/05/07   12/22/04   03/29/05   2,10,155,15,16           381,128       381,128  DDJ             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 
05-0900   Reconstruction               0-007-011  05/24/07     DONE    DONE       DONE      03/08/06   03/06/06   11/21/05   03/29/05   10,155,15,16             148,892       148,892  DDJ             0           0            0
                                                                                                                                                                                                                                 Saren Engineering, INC.             
  -       Reconstruction               0-007-012                                              /  /       /  /     05/24/07     /  /     13,16                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Walt Disney School:
04-1072   Reconstruction               0-008-008  08/08/05     DONE    DONE       DONE      04/01/05   03/31/05   05/14/04   03/29/05   155,15,16                234,393       234,393  DDJ             0           0            0
                                                                                                                                                                                                                                 Saren Engineering, INC.             
  -    PR Additions and Alterations    0-008-009                                              /  /       /  /     12/22/04     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0890   Additions and Alterations    0-008-009  12/26/07     DONE    DONE       DONE      02/07/07   02/05/07   12/22/04   03/29/05   02 - 16                  455,425       455,425  DDJ             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 
05-0901   Reconstruction               0-008-010  05/24/07     DONE    DONE       DONE      03/08/06   03/06/06   11/21/05   03/29/05   10,155,15,16               7,677             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Saren Engineering, INC.             
  -       Reconstruction               0-008-011                                              /  /       /  /     05/24/07     /  /     13,16                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-1249   Reconstruction               0-008-012                       ADDENDUM REQ'D       02/23/09   02/17/09   12/29/08   05/01/05   155,15,16                      0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          Neil Armstrong Elementary:
04-1073   Reconstruction               0-009-008  08/08/05     DONE    DONE       DONE      04/01/05   03/31/05   05/14/04   03/29/05   155,15,16                260,747       260,747  DDJ             0           0            0
                                                                                                                                                                                                                                 Saren Engineering, INC.             
  -    PR Additions and Alterations    0-009-009                                              /  /       /  /     12/22/04     /  /     02 - 16                        0     9,280,224  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0891   Additions and Alterations    0-009-009  12/26/07     DONE    DONE       DONE      02/07/07   02/05/07   12/22/04   03/29/05   02 - 16                1,025,250     1,025,250  DDJ             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 
05-0902   Reconstruction               0-009-010  05/24/07     DONE    DONE       DONE      03/08/06   03/06/06   11/21/05   03/29/05   10,155,15,16               7,677             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Saren Engineering, INC.             
  -       Reconstruction               0-009-011                                              /  /       /  /     05/24/07     /  /     13,16                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-1250   Reconstruction               0-009-012                       ADDENDUM REQ'D       02/23/09   02/17/09   12/29/08   05/01/05   155,15,16                      0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          Administration Building:
05-0903   Reconstruction               1-003-005  05/24/07     DONE    DONE       DONE      03/08/06   03/06/06   05/14/04   03/29/05   155,15,16                161,750             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Saren Engineering, INC.             
  -       Reconstruction               1-003-006                                              /  /       /  /     12/22/04     /  /     2,4,9,155,15,16                0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               1-003-007                                              /  /       /  /     05/25/07     /  /     13,16                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-1251   Reconstruction               1-003-008                       ADDENDUM REQ'D       02/23/09   02/17/09   12/29/08   05/01/05   155,15,16                      0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          Trans.& Facilities Complex:
05-0904   Reconstruction               5-004-006  05/24/07     DONE    DONE       DONE      03/08/06   03/06/06   05/14/04   03/29/05   155,15,16                 65,784        65,784  DDJ             0           0            0
                                                                                                                                                                                                                                 Saren Engineering, INC.             
  -       Reconstruction               5-004-007                                              /  /       /  /     12/22/04     /  /     2,4,7,8,9,13,155,15,           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               5-004-008                                              /  /       /  /     05/24/07     /  /     13,16                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               5-004-009                                              /  /       /  /     12/29/08     /  /     155,16                         0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          New Transp Bldg-project canceled:
05-0052XX New Construction             5-016-001  09/07/05               CANCELLED          07/15/05   07/14/05   12/22/04   03/29/05   02 - 16                4,647,830     4,647,830  DDJ             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          Press Box:
05-1166   New Construction             7-018-001  05/11/06     DONE    DONE       DONE      04/18/06   04/17/06   03/31/06   03/29/05   02 - 16                   44,500             0  DDJ             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GREECE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-05-01-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Barnard Elementary:
06-0582   Reconstruction               0-001-013  05/08/07     DONE    DONE       DONE      12/04/06   12/01/06   09/08/06   05/16/06   15                        10,467        10,467  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey
06-0657   Reconstruction               0-001-014  05/15/07     DONE    DONE       DONE      12/22/06   12/22/06   09/13/06   05/16/06   2,4,7,8,9,10,155,15,     252,795       252,795  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -       Reconstruction               0-001-015                                              /  /       /  /     04/20/07     /  /     2,7,8,155,15,16                0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Craig Hill Elementary:
08-0644   Reconstruction               0-003-008  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/10/06   12/13/07   2,4,7,8,9,10,155,15,   1,114,251             0  JOD             0           0      398,337
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Greece Olympia High School:
04-1239   Reconstruction               0-004-024  08/10/05     DONE    DONE       DONE      05/10/05   05/05/05   10/13/04   05/17/05   2                         73,195        73,195  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
06-0165   Reconstruction               0-004-025  11/13/06     DONE    DONE       DONE      08/09/06   08/03/06   12/20/05   05/16/06   10                        22,544        22,544  HCM             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
08-0645   Reconstruction               0-004-026  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/10/06   12/13/07   2,4,7,8,9,10,155,15,   3,415,192             0  JOD             0           0    1,062,847
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1034   Reconstruction               0-004-027  07/23/09     DONE    DONE       DONE      01/06/09   01/02/09   08/01/08   05/20/08   155,16                   255,100             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1749   Reconstruction               0-004-028  07/08/09     DONE    DONE       DONE      06/29/09   06/22/09   05/14/09   05/20/09   2,13                     112,331        84,500  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
09-0226   Reconstruction               0-004-029               STARTED ADD. REQ'D STARTED   09/16/09   09/15/09   07/09/09   05/19/09   2,4,8,9,155,15,16              0    26,500,821  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Odyssey Mid/High (fmly Hoover):
05-1128   Reconstruction               0-005-016  11/10/06     DONE    DONE       DONE      04/13/06   04/03/06   12/20/05   05/17/05   2,10,155,15,16            92,492        92,492  HCM             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
08-0646   Reconstruction               0-005-017  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/10/06   12/13/07   2,4,7,8,9,10,155,15,     423,197             0  JOD             0           0       75,329
                                                                                                                                                                                                                                 Clark Patterson Associates          
09-0227   Reconstruction               0-005-018               STARTED ADD. REQ'D STARTED   09/16/09   09/15/09   07/08/09   05/19/09   2,8,15                         0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Longridge School:
08-0647   Reconstruction               0-006-010  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/10/06   12/13/07   2,4,7,8,9,10,14,155,      15,538             0  JOD             0           0        2,766
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1035   Reconstruction               0-006-011  07/23/09     DONE    DONE       DONE      01/06/09   01/02/09   08/01/08   05/20/08   16                        36,650             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
09-0228   Reconstruction               0-006-012               DONE    ADD. REQ'D STARTED   09/16/09   09/15/09   07/08/09   05/19/09   7,10,16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Paddy Hill School:
05-1129   Reconstruction               0-007-012  11/10/06     DONE    DONE       DONE      04/13/06   04/03/06   12/20/05   05/17/05   8,9,10,155,15,16         138,461       138,461  HCM             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
08-0648   Reconstruction               0-007-013  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/10/06   12/13/07   2,4,7,8,9,10,155,15,     452,476             0  JOD             0           0       80,541
                                                                                                                                                                                                                                 Clark Patterson Associates          

          West Ridge School:
06-0166   Reconstruction               0-008-011  11/13/06     DONE    DONE       DONE      08/09/06   08/03/06   12/20/05   05/16/06   10,16                     23,209        23,209  HCM             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
08-0643   Reconstruction               0-008-012  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/10/06   12/13/07   2,4,7,8,9,10,14,155,     225,976             0  JOD             0           0       40,224
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Autumn Lane Elementary:
08-0649   Reconstruction               0-009-012  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/10/06   12/13/07   2,4,7,8,9,10,155,15,     254,933       254,933  JOD             0           0       45,378
                                                                                                                                                                                                                                 Clark Patterson Associates          
09-0229   Reconstruction               0-009-013               DONE    ADD. REQ'D STARTED   09/16/09   09/15/09   07/08/09   05/19/09   10,16                          0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          English Village Elementary:
08-0650   Reconstruction               0-010-016  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/10/06   12/13/07   2,4,7,8,9,10,14,155,     538,130             0  JOD             0           0       95,787
                                                                                                                                                                                                                                 Clark Patterson Associates          
09-0230   Reconstruction               0-010-017               DONE    ADD. REQ'D STARTED   09/16/09   09/15/09   07/08/09   05/19/09   10,16                          0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Lake Shore Elementary:
04-1240   Reconstruction               0-011-011  08/10/05     DONE    DONE       DONE      05/10/05   05/05/05   10/13/04   05/17/05   2                        220,390       220,390  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
08-0651   Reconstruction               0-011-012  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/10/06   12/13/07   2,4,7,8,9,10,155,15,     541,540             0  JOD             0           0       96,394
                                                                                                                                                                                                                                 Clark Patterson Associates          
09-0231   Reconstruction               0-011-013               DONE    ADD. REQ'D STARTED   09/16/09   09/15/09   07/08/09   05/19/09   10,16                          0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Arcadia Middle/High School:
05-1130   Reconstruction               0-012-029  11/10/06     DONE    DONE       DONE      04/13/06   04/03/06   12/20/05   05/17/05   2,7,8,9,10,155,15,16     318,733       318,733  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
06-0167   Reconstruction               0-012-030  12/05/06     DONE    DONE       DONE      08/09/06   08/03/06   08/04/06   05/16/06   10                        22,544        22,544  HCM             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
08-0652   Reconstruction               0-012-031  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/10/06   12/13/07   2,4,7,8,9,10,14,155,   1,082,372             0  JOD             0           0      192,662
                                                                                                                                                                                                                                 Clark Patterson Associates          
06-0583   Reconstruction               0-012-032  05/08/07     DONE    DONE       DONE      12/04/06   12/01/06   09/08/06   05/16/06   16                       108,445       108,445  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey
06-1103   Reconstruction               0-012-033  04/10/07     DONE    DONE       DONE      03/14/07   03/12/07   01/22/07   05/16/06   13                       107,595       107,595  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey
07-0795   Reconstruction               0-012-034  11/27/07     DONE    DONE       DONE      11/13/07   11/09/07   10/02/07   05/15/07   7                      2,000,000     2,000,000  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey
09-0232   Reconstruction               0-012-035               STARTED ADD. REQ'D STARTED   09/16/09   09/15/09   07/08/09   05/19/09   2,4,8,9,155,15,16              0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Buckman Heights Elementary:
08-0653   Reconstruction               0-013-009  09/08/09     DONE    DONE       DONE      11/03/08   08/22/08   08/10/06   12/13/07   2,4,7,8,9,10,155,15,     742,148             0  JOD             0           0      132,102
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Brookside Elementary:
04-1241   Reconstruction               0-014-010  08/10/05     DONE    DONE       DONE      05/10/05   05/05/05   10/13/04   05/17/05   2,16                      29,891        29,891  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
08-0654   Reconstruction               0-014-011  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/11/06   12/13/07   2,4,7,8,9,10,155,15,     425,762             0  JOD             0           0       75,786
                                                                                                                                                                                                                                 Clark Patterson Associates          
06-0584   Reconstruction               0-014-012  05/08/07     DONE    DONE       DONE      12/04/06   12/01/06     /  /     05/16/06   2                        153,937       153,937  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey
08-1036   Reconstruction               0-014-013  07/23/09     DONE    DONE       DONE      01/06/09   01/02/09   08/01/08   05/20/08   155,15,16                275,300             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
09-0233   Reconstruction               0-014-014               STARTED ADD. REQ'D STARTED   09/16/09   09/15/09   07/08/09   05/19/09   10,16                          0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Parkland Elementary:
04-1242   Reconstruction               0-015-009  08/10/05     DONE    DONE       DONE      05/10/05   05/05/05   10/13/04   05/17/05   2,16                       6,562        40,640  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
08-0655   Reconstruction               0-015-010  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/11/06   12/13/07   2,4,7,8,9,10,155,15,   1,900,445             0  JOD             0           0      338,279
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1037   Reconstruction               0-015-011  07/23/09     DONE    DONE       DONE      01/06/09   01/02/09   08/01/08   05/20/08   155,16                   227,750             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
09-0234   Reconstruction               0-015-012               DONE    ADD. REQ'D STARTED   09/16/09   09/15/09   07/08/09   05/19/09   10,16                          0     5,112,342  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Holmes Road Elementary:
05-1131   Reconstruction               0-016-006  11/11/06     DONE    DONE       DONE      04/13/06   04/03/06   12/20/05   05/17/05   2,7,10,15                975,718       975,718  HCM             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
08-0656   Reconstruction               0-016-007  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/11/06   12/13/07   2,4,7,8,9,10,14,155,     202,961             0  JOD             0           0       36,127
                                                                                                                                                                                                                                 Clark Patterson Associates          
06-0585   Reconstruction               0-016-008  05/08/07     DONE    DONE       DONE      12/04/06   12/01/06   09/08/06   05/16/06   2,155,15,16              221,934       221,934  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey
08-1038   Reconstruction               0-016-009  07/23/09     DONE    DONE       DONE      01/06/09   01/02/09   08/11/08   05/20/08   155,16                   228,950             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Athena Middle/High School:
05-1132   Reconstruction               0-017-029  11/10/06     DONE    DONE       DONE      04/13/06   04/03/06   12/20/05   05/17/05   2,7,8,9,10,155,15,16     786,748       786,748  HCM             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
08-0657   Reconstruction               0-017-030  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/11/06   12/13/07   2,4,7,8,9,10,155,15,   1,722,006             0  JOD             0           0      606,517
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -       Reconstruction               0-017-031                                              /  /       /  /     09/08/06     /  /     2                              0    46,905,690  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-017-032                                              /  /       /  /       /  /       /  /     155,16                         0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
09-0235   Reconstruction               0-017-033               DONE    ADD. REQ'D STARTED   09/16/09   09/15/09   07/08/09   05/19/09   9,15                           0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Kirk Road Elementary:
06-0168   Reconstruction               0-018-014  12/05/06     DONE    DONE       DONE      08/09/06   08/03/06   12/20/05   05/16/06   10                        17,903        17,903  HCM             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
08-0658   Reconstruction               0-018-015  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/11/06   12/13/07   2,4,7,8,9,10,155,15,      44,588             0  JOD             0           0        7,937
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Apollo Middle School:
05-1133   Reconstruction               0-031-016  11/10/06     DONE    DONE       DONE      04/13/06   04/03/06   12/20/05   05/17/05   2,8,10                   622,347       622,347  HCM             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
08-0659   Reconstruction               0-031-017  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/11/06   12/13/07   2,4,7,8,9,10,155,15,   3,220,932             0  JOD             0           0      973,326
                                                                                                                                                                                                                                 Clark Patterson Associates          
06-0586   Reconstruction               0-031-018  05/08/07     DONE    DONE       DONE      12/04/06   12/01/06   09/08/06   05/16/06   4,7,8,9,155,15,16        261,979       261,979  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey
08-1039   Reconstruction               0-031-019  07/23/09     DONE    DONE       DONE      01/06/09   01/02/09   08/01/08   05/20/08   9,155,16                 538,500             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
09-0236   Reconstruction               0-031-020               STARTED ADD. REQ'D STARTED   09/16/09   09/15/09   07/08/09   05/19/09   2,8,155,15,16                  0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Pine Brook Elementary:
06-0169   Reconstruction               0-036-004  12/05/06     DONE    DONE       DONE      08/09/06   08/03/06   12/20/05   05/16/06   10                        17,903        17,903  HCM             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
08-0660   Reconstruction               0-036-005  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/11/06   12/13/07   2,4,7,8,9,10,155,15,     196,455             0  JOD             0           0       34,969
                                                                                                                                                                                                                                 Clark Patterson Associates          
06-0587   Reconstruction               0-036-006  05/08/07     DONE    DONE       DONE      12/04/06   12/01/06   09/08/06   05/16/06   16                       101,417       101,417  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey

          Greece Ridge Mall-Continuing Ed.:
  -       Reconstruction               0-042-003                                              /  /       /  /     08/11/06     /  /     2,4,7,8,9,10,155,15,           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Dugout/Storage @ Athena High School:
07-0692DB Discovered Building          2-046-001  11/20/07     DONE    DONE       DONE      11/01/07   10/29/07   04/25/01     /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey

          Dugout/Storage @ Arcadia High School:
07-0693DB Discovered Building          2-047-001  11/20/07     DONE    DONE       DONE      11/01/07   10/29/07   04/25/01     /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey

          Dugout/Storage @ Olympia High School:
07-0711DB Discovered Building          2-048-001  11/20/07     DONE    DONE       DONE      11/05/07   10/29/07   04/25/01     /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey

          Longridge Storage Building:
04-1235   New Construction             2-050-001  09/20/05     DONE    DONE       DONE      05/10/05   05/05/05   02/23/04     /  /     02 - 16                   90,791             0  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
  -       Reconstruction               2-050-002                                              /  /       /  /       /  /       /  /     2,4,7,8,9,10,14,155,           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Storage Trlr @ Athena Highschool:
07-0712DB Discovered Building          2-054-001  11/20/07     DONE    DONE       DONE      11/05/07   10/29/07   12/15/06     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey

          Storage Trailer @ Olympic Highschool:
07-0713DB Discovered Building          2-055-001  11/20/07     DONE    DONE       DONE      11/05/07   10/29/07   12/18/06     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey

          Storage Trailer #1 @ Arcadia HS:
07-0714DB Discovered Building          2-056-001  11/20/07     DONE    DONE       DONE      11/05/07   10/29/07   12/18/06     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey

          Gas Equipment Storage @ Longridge ES:
07-0715DB Discovered Building          2-057-001  11/20/07     DONE    DONE       DONE      11/05/07   10/29/07     /  /       /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey

          Storage Trailier #2 @ Arcadia High:
08-0953DB Discovered Building          2-058-001  01/06/09     DONE    DONE       DONE      12/19/08   12/16/08   11/18/08     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey

          Storage Trailer #3 @ Arcadia High:
08-0954DB Discovered Building          2-059-001  01/06/09     DONE    DONE       DONE      12/19/08   12/16/08   11/18/08     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey

          Storage Trailer @ Apollo MS:
08-0955DB Discovered Building          2-060-001  01/06/09     DONE    DONE       DONE      12/19/08   12/16/08   11/18/08     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey

          Storage Trailer @ Transportation Bld:
08-0956DB Discovered Building          2-061-001  01/06/09     DONE    DONE       DONE      12/19/08   12/16/08   11/18/08     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey

          Maintenance Garage:
  -       Reconstruction               3-002-002                                              /  /       /  /     04/20/07     /  /     2,8,155,15,16                  0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Transportation Annex:
08-0661   Reconstruction               5-023-010  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/14/06   12/13/07   2,4,7,8,9,10,155,15,     749,358             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-0774   Reconstruction               5-023-011  02/02/09     DONE    DONE       DONE      11/20/08   11/19/08   08/01/08   05/20/08   2,155                    200,000       200,000  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Bldg Grounds/Bus Storage:
  -       Reconstruction               5-024-008                                              /  /       /  /     12/20/05     /  /     8,9,155,15,16                  0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-0662   Reconstruction               5-024-009  09/08/09     DONE    DONE       DONE      11/03/08   10/22/08   08/14/06   12/13/07   2,4,7,8,9,10,155,15,   1,036,976             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1040   Reconstruction               5-024-010  07/23/09     DONE    DONE       DONE      01/06/09   01/02/09   08/01/08   05/20/08   13                        59,830             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1429   Reconstruction               5-024-011  05/28/09     DONE    DONE       DONE      03/26/09   03/24/09   12/02/08   06/10/08   14                        42,074             0  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey

          Apollo Concession/Storage:
04-1236   Reconstruction               7-035-002  09/20/05     DONE    DONE       DONE      05/10/05   05/05/05   10/13/04     /  /     8,10,155,15,16            13,259             0  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
  -       Reconstruction               7-035-003                                              /  /       /  /     08/14/06     /  /     2,4,7,8,9,10,155,15,           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Toilet Rm. Bldg. @ Apollo MS:
04-1237   New Construction             7-051-001  09/20/05     DONE    DONE       DONE      05/10/05   05/05/05   10/08/04     /  /     02 - 16                  241,040             0  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
  -       Reconstruction               7-051-002                                              /  /       /  /     08/14/06     /  /     2,4,7,8,9,10,14,155,           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Pressbox/Storage @ Athena Middle/HS:
04-1238   Reconstruction               7-053-001  09/20/05     DONE    DONE       DONE      05/10/05   05/05/05   10/21/04     /  /                               60,460             0  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
  -       Reconstruction               7-053-002                                              /  /       /  /     08/14/06     /  /     2,4,7,8,9,10,155,15,           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Districtwide:
08-1735   Reconstruction               7-999-003  10/23/09     DONE    DONE       DONE      06/24/09   06/15/09   08/22/08   12/18/07   10,16                    979,305             0  JOD             0           0      174,319
                                                                                                                                                                                                                                 Clark Patterson Associates          
09-0237   Reconstruction               7-999-004               UNREVIEWED
                                                                       ADD. REQ'D STARTED   09/16/09   09/15/09   07/08/09   05/19/09   16                             0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




EAST IRONDEQUOIT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-08-01-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Helendale Rd Primary School:
05-0632   Reconstruction               0-001-011  03/27/06     DONE    DONE       DONE      01/19/06   01/19/06   10/12/04   03/22/05   2,4,7,8,9,10,155,15,           0     5,965,628  RDR             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
06-1503   Reconstruction               0-001-012  10/02/07     DONE    DONE       DONE      05/16/07   05/16/07   12/04/06   02/28/07   2,4,7,8,9,10,13,14,1     221,208       221,208  MGL             0           0       46,675
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1043PR Additions and Alterations    0-001-013                         UNREVIEWED         01/06/09   12/30/08   11/15/07     /  /     02 - 16                        0     7,756,404  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
09-0280   Additions and Alterations    0-001-013               STARTED STARTED    UNREVIEWED10/02/09   10/02/09   11/15/07   12/09/08   02 - 16                        0     7,756,404  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Eastridge Sr High:
05-0633   Reconstruction               0-002-016  03/27/06     DONE    DONE       DONE      01/19/06   01/19/06   10/12/04   03/22/05   2,4,7,8,9,155,15,16      948,731       948,731  RDR             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
06-1504   Reconstruction               0-002-017  10/02/07     DONE    DONE       DONE      05/16/07   05/16/07   12/04/06   02/28/07   2,4,7,8,9,10,13,14,1   2,246,501     2,246,501  MGL             0           0      474,012
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1044PR Additions and Alterations    0-002-018                         UNREVIEWED         01/06/09   12/30/08   11/15/07     /  /     02 - 16                        0    29,382,498  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1082SR Additions and Alterations    0-002-018  05/07/09     DONE    DONE       DONE      01/20/09   01/09/09   11/15/07   12/09/08   02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
09-0281   Additions and Alterations    0-002-018               STARTED STARTED    UNREVIEWED10/02/09   10/02/09   11/15/07   12/09/08   02 - 16                        0    29,442,330  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Ivan L. Green  School:
05-0634   Reconstruction               0-004-013  03/27/06     DONE    DONE       DONE      01/19/06   01/19/06   10/12/04   03/22/05   2,4,7,9,155,15,16        767,969     1,208,059  RDR             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
06-1505   Reconstruction               0-004-014  10/02/07     DONE    DONE       DONE      05/16/07   05/16/07   12/04/06   02/28/07   2,4,7,8,9,10,13,14,1     610,326       610,326  MGL             0           0      128,779
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1045PR Additions and Alterations    0-004-015                         UNREVIEWED         01/06/09   12/30/08   11/15/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1535   Additions and Alterations    0-004-015  10/23/09     DONE    DONE       DONE      04/24/09   04/20/09   11/15/07   12/09/08   02 - 16                2,956,421             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Laurelton Pardee School:
05-0635   Reconstruction               0-005-014  03/27/06     DONE    DONE       DONE      01/19/06   01/19/06   10/12/04   03/22/05   2,4,7,8,9,155,15,16    1,786,284     1,786,284  RDR             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
06-1506   Reconstruction               0-005-015  10/02/07     DONE    DONE       DONE      05/16/07   05/16/07   12/04/06   02/28/07   2,4,7,8,9,10,13,14,1   1,336,647     1,336,647  MGL             0           0      282,032
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1046PR Reconstruction               0-005-016                         UNREVIEWED         01/06/09   12/30/08   11/15/07     /  /     2,4,7,8,9,155,15,16    2,594,650     2,551,647  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
09-0282   Reconstruction               0-005-016               STARTED STARTED    UNREVIEWED10/02/09   10/02/09   11/15/07   12/09/08   2,4,7,8,9,155,15,16    2,594,650     2,551,647  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Durand Eastman:
04-1090PR Additions and Alterations    0-007-013  09/26/05     DONE    DONE       DONE      04/06/05   04/04/05   10/12/04     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
05-0636   Additions and Alterations    0-007-013  03/27/06     DONE    DONE       DONE      01/19/06   01/19/06   10/12/04   03/22/05   02 - 16                8,715,279     8,150,672  RDR             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
06-1507   Reconstruction               0-007-015  10/02/07     DONE    DONE       DONE      05/16/07   05/16/07   12/04/06   02/28/07   2,4,7,8,9,10,13,14,1     675,318       675,318  MGL             0           0      142,492
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1047PR Additions and Alterations    0-007-016                         UNREVIEWED         01/06/09   12/30/08   11/15/07     /  /     02 - 16                        0     8,860,512  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1536   Additions and Alterations    0-007-016  10/23/09     DONE    DONE       DONE      04/24/09   04/20/09   11/15/07   12/09/08   02 - 16                2,159,961             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          New Middle School:
05-0637   Reconstruction               0-013-003  03/27/06     DONE    DONE       DONE      01/19/06   01/19/06   10/12/04   03/22/05   2,8,9,10,13,16            44,625        44,625  RDR             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -       Reconstruction               0-013-004                                              /  /       /  /     12/04/06     /  /     2,4,7,8,9,10,13,14,1           0    25,183,608  MGL             0           0            0
                                                                                                                                                                                                                                                                     
08-1048PR Additions and Alterations    0-013-005                         UNREVIEWED         01/06/09   12/30/08   11/15/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1083SR Additions and Alterations    0-013-005  05/07/09     DONE    DONE       DONE      01/20/09   01/09/09   11/15/07   12/09/08   02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1537   Additions and Alterations    0-013-005  10/23/09     DONE    DONE       DONE      04/24/09   04/20/09   11/15/07   12/09/08   02 - 16                1,130,416             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Ath. Storage (demolished '09):
  -    XX Reconstruction               2-014-004                         CANCELLED            /  /       /  /     11/15/07     /  /     2,4,7,8,9,155,15,16            0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Maintenance Bldg:
  -       Reconstruction               3-009-006                                              /  /       /  /     11/15/07     /  /     2,4,7,8,9,155,15,16            0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
  -       Reconstruction               5-003-005                                              /  /       /  /     11/15/07     /  /     2,4,7,8,9,155,15,16            0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Transporation Building:
08-1049PR New Construction             5-016-001                         UNREVIEWED         01/06/09   12/30/08   11/15/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1084SR New Construction             5-016-001  05/07/09     DONE    DONE       DONE      01/20/09   01/09/09   11/15/07   12/09/08   02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1538   New Construction             5-016-001  10/23/09     DONE    DONE       DONE      04/24/09   04/20/09   11/15/07   12/09/08   02 - 16               16,651,745             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Storage/Restrooms:
08-1050PR New Construction             7-017-001                         UNREVIEWED         01/06/09   12/30/08   05/27/08     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
09-0283   New Construction             7-017-001               STARTED STARTED    UNREVIEWED10/02/09   10/02/09   05/27/08   12/09/08   02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Pressbox:
08-1051PR New Construction             7-018-001                         UNREVIEWED         01/06/09   12/30/08   05/27/08   12/09/08   02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-1085   New Construction             7-018-001  10/23/09     DONE    DONE       DONE      01/20/09   01/09/09   05/27/08   12/09/08   02 - 16                  113,027             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          District Wide:
  -       Reconstruction               7-999-003                                              /  /       /  /     01/17/08     /  /     16                             0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Bishop Kearney High School:
05-1413TQ Temporary Quarters           8-015-L01  08/07/06     DONE    DONE       DONE      06/22/06   06/19/06   02/17/05     /  /                               85,400        85,400  RDR             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WEST IRONDEQUOIT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-08-03-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Irondequoit High School:
04-1156   Reconstruction               0-001-020  06/02/05     DONE    DONE       DONE      04/13/05   04/11/05   03/14/05   05/17/05   8                        364,022       364,022  RDR             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
05-0427   Reconstruction               0-001-021  03/31/06     DONE    DONE       DONE      12/08/05   12/07/05   04/19/05   05/17/05   16                        78,566        78,566  RDR             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
06-0297   Reconstruction               0-001-022  01/24/07     DONE    DONE       DONE      10/04/06   10/04/06   06/05/06   05/16/06   9,16                     249,035       249,035  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0528   Additions and Alterations    0-001-023  03/19/08     DONE    DONE       DONE      10/11/07   10/09/07   06/20/06   05/15/07   02 - 16                5,849,990     4,656,210  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0529   Reconstruction               0-001-024  03/19/08     DONE    DONE       DONE      10/11/07   10/09/07   03/06/07   05/15/07   2,8,155,15,16            418,852       418,852  MGL             0           0       52,357
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0512   Reconstruction               0-001-025  03/12/08     DONE    DONE       DONE      10/09/07   10/05/07   03/26/07   05/15/07   8,9,13,16                 80,700        80,700  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -       Reconstruction               0-001-026                                              /  /       /  /     09/16/09     /  /     155,16                         0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
06-0065SC Visual Structural Inspection 0-001-SC5  08/07/06     DONE    DONE       DONE      06/12/06   06/12/06     /  /       /  /     16                        12,663        12,663  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Ruben Dake JH School 7-8:
04-1155   Reconstruction               0-002-008  06/02/05     DONE    DONE       DONE      04/13/05   04/11/05   03/14/05   05/17/05   8                        234,222       234,222  RDR             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
05-0428   Reconstruction               0-002-009  03/31/06     DONE    DONE       DONE      12/08/05   12/07/05   04/19/05   05/17/05   9,16                      28,571        28,571  RDR             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
06-0298   Reconstruction               0-002-010  01/24/07     DONE    DONE       DONE      10/04/06   10/04/06   06/05/06   05/16/06   9,10,16                  129,292       129,292  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0530   Reconstruction               0-002-011  03/19/08     DONE    DONE       DONE      10/11/07   10/09/07   03/06/07   05/15/07   2,8,9,155,15,16          331,832       331,832  MGL             0           0       48,779
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0513   Reconstruction               0-002-012  03/12/08     DONE    DONE       DONE      10/09/07   10/05/07   03/26/07   05/15/07   7,9,13,16                103,000       103,000  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -       Reconstruction               0-002-013                                              /  /       /  /     03/04/09     /  /     2,8,9,155,15,16                0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -    XX Reconstruction               0-002-014                         CANCELLED            /  /       /  /     05/29/09     /  /     155,15                         0    12,575,108  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
04-0580SC Visual Structural Inspection 0-002-SC2  12/01/04     DONE    DONE       DONE      10/28/04   10/28/04     /  /       /  /     16                         1,392         1,392  JOD             0           0            0
                                                                                                                                                                                                                                                                     
05-0130SC Visual Structural Inspection 0-002-SC3  08/17/05     DONE    DONE       DONE      08/02/05   08/02/05     /  /       /  /     16                         7,992         7,992  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0066SC Visual Structural Inspection 0-002-SC5  08/07/06     DONE    DONE       DONE      06/12/06   06/12/06     /  /       /  /     16                         2,412         2,412  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Rogers/Southlawn School:
05-0429   Reconstruction               0-003-010  03/31/06     DONE    DONE       DONE      12/08/05   12/07/05   04/19/05   05/17/05   16                         2,259             0  RDR             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -    PR Additions and Alterations    0-003-011                                              /  /       /  /     11/15/06     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
06-0787   Additions and Alterations    0-003-011  01/24/07     DONE    DONE       DONE      01/18/07   01/18/07   11/15/06   05/16/06   02 - 16                   14,431        14,431  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0531   Reconstruction               0-003-012  03/19/08     DONE    DONE       DONE      10/11/07   10/09/07   03/06/07   05/15/07   2,7,8,155,15,16          947,484       947,484  MGL             0           0      139,280
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0514   Reconstruction               0-003-013  03/12/08     DONE    DONE       DONE      10/09/07   10/05/07   03/26/07   05/15/07   9                         21,750        21,750  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -    PR Additions and Alterations    0-003-014                                              /  /       /  /     03/04/09     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Iroquois/Colebrook School:
05-0430   Reconstruction               0-004-008  03/31/06     DONE    DONE       DONE      12/08/05   12/07/05   04/19/05   05/17/05   10,16                     72,903        72,903  RDR             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
06-0788   Reconstruction               0-004-009  01/24/07     DONE    DONE       DONE      01/18/07   01/18/07   07/26/06   05/16/06   2,8,9                     12,569        12,569  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -    PR Additions and Alterations    0-004-010                                              /  /       /  /     11/15/06     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
07-0532   Reconstruction               0-004-011  03/19/08     DONE    DONE       DONE      10/11/07   10/09/07   03/06/07   05/15/07   7,8,9,13,155,16          851,434       851,434  MGL             0           0      125,161
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0515   Reconstruction               0-004-012  03/12/08     DONE    DONE       DONE      10/09/07   10/05/07   03/26/07   05/15/07   2,9                       80,800             0  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -       Reconstruction               0-004-013                                              /  /       /  /     03/04/09     /  /     2,9,155,16                     0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-004-014                                              /  /       /  /     05/29/09     /  /     155,15                         0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Seneca Elem School K-3:
05-0431   Reconstruction               0-006-005  03/31/06     DONE    DONE       DONE      12/08/05   12/07/05   04/19/05   05/17/05   9,10,16                   16,486        16,486  RDR             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0533   Reconstruction               0-006-006  03/19/08     DONE    DONE       DONE      10/11/07   10/09/07   03/06/07   05/15/07   2,8,155,16               315,911       315,911  MGL             0           0       46,439
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -       Reconstruction               0-006-007                                              /  /       /  /     03/04/09     /  /     155,16                         0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Listwood Elem Sch K-3:
03-1307XX Reconstruction               0-008-004  04/21/04               CANCELLED          03/23/04   03/22/04   01/26/04   12/07/99   2                        120,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Brookview E.S.(11/2003 demolished):
  -    XX Reconstruction               0-011-004                         CANCELLED            /  /       /  /     03/04/09     /  /     8,9,155,16                     0     2,559,231  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Gym Building:
07-0534   Reconstruction               0-021-003  03/19/08     DONE    DONE       DONE      10/11/07   10/09/07   03/06/07   05/15/07   13,155,16                125,000       125,000  MGL             0           0       22,000
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0516   Reconstruction               0-021-004  03/12/08     DONE    DONE       DONE      10/09/07   10/05/07   03/26/07   05/15/07   2                         43,800        43,800  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -       Reconstruction               0-021-005                                              /  /       /  /     03/04/09     /  /     2,8,9,16                       0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Pinegrove Site #2/WOW Building:
00-1772DB Discovered Building          0-024-001  08/27/09     DONE    DONE       DONE      05/10/01     /  /     09/22/98     /  /                                    0             0  BJB             0           0            0
                                                                                                                                                                                                                                                                     

          New Listwood School:
05-0432   Reconstruction               0-027-002  03/31/06     DONE    DONE       DONE      12/08/05   12/07/05   04/19/05   05/17/05   16                         1,086             0  RDR             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0535   Additions and Alterations    0-027-003  03/19/08     DONE    DONE       DONE      10/11/07   10/09/07   03/06/07   05/15/07   02 - 16                    4,000             0  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0517   Reconstruction               0-027-004  03/12/08     DONE    DONE       DONE      10/09/07   10/05/07   03/26/07   05/15/07   13                        20,200        20,200  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -       Reconstruction               0-027-005                                              /  /       /  /     03/04/09     /  /     8,9,155,16                     0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          New Brookview Elementary:
05-0433   Reconstruction               0-028-002  03/31/06     DONE    DONE       DONE      12/08/05   12/07/05   04/19/05   05/17/05   16                         1,086             0  RDR             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0536   Reconstruction               0-028-003  03/19/08     DONE    DONE       DONE      10/11/07   10/09/07   03/06/07   05/15/07   2,13,16                    5,000             0  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0518   Reconstruction               0-028-004  03/12/08     DONE    DONE       DONE      10/09/07   10/05/07   03/26/07   05/15/07   2,9,16                    67,200        67,200  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -       Reconstruction               0-028-005                                              /  /       /  /     03/04/09     /  /     2,8,9,155,16                   0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          New Briarwood Elementary:
05-0434   Reconstruction               0-029-002  03/31/06     DONE    DONE       DONE      12/08/05   12/07/05   04/19/05   05/17/05   16                         1,086             0  RDR             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0537   Reconstruction               0-029-003  03/19/08     DONE    DONE       DONE      10/11/07   10/09/07   03/06/07   05/15/07   16                         4,500             0  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0519   Reconstruction               0-029-004  03/12/08     DONE    DONE       DONE      10/09/07   10/05/07   03/26/07   05/15/07   2,9,13                    20,200        20,200  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -    PR Additions and Alterations    0-029-005                                              /  /       /  /     03/04/09     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Colebrook:
05-0435   Reconstruction               0-032-002  03/31/06     DONE    DONE       DONE      12/08/05   12/07/05   04/19/05   05/17/05   16                         1,086             0  RDR             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0538   Reconstruction               0-032-003  03/19/08     DONE    DONE       DONE      10/11/07   10/09/07   03/06/07   05/15/07   2,16                       5,500             0  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0520   Reconstruction               0-032-004  03/12/08     DONE    DONE       DONE      10/09/07   10/05/07   03/26/07   05/15/07   2,13,16                   36,350        36,350  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -    PR Additions and Alterations    0-032-005                                              /  /       /  /     03/04/09     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          New Administration Building:
  -    PR Additions and Alterations    1-033-002                                              /  /       /  /     11/15/06     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
06-0789   Additions and Alterations    1-033-002  01/24/07     DONE    DONE       DONE      01/18/07   01/18/07   11/15/06   05/16/06   02 - 16                    8,700             0  MGL             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HONEOYE FALLS - LIMA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-09-01-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Manor Elementary:
07-0842   Reconstruction               0-001-009  05/13/08     DONE    DONE       DONE      11/19/07   11/16/07   01/19/07   05/15/07   4,7,8,9,155,15,16      1,438,707     1,159,300  MGL             0           0       71,935
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       
  -       Reconstruction               0-001-010                                              /  /       /  /     08/26/09     /  /     2,4,7,8,9,155,15,16            0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Middle School-Joined to H.S.-003 '89:
  -    XX Reconstruction               0-002-008                         CANCELLED            /  /       /  /     01/19/07     /  /     4,7,8,9,155,15,16              0     6,037,349  MGL             0           0            0
                                                                                                                                                                                                                                                                     
  -    XX Reconstruction               0-002-009                         CANCELLED          04/09/07   04/06/07   02/23/07     /  /     7                              0     6,037,349  MGL             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    

          High School:
07-0843   Reconstruction               0-003-010  05/13/08     DONE    DONE       DONE      11/19/07   11/16/07   01/19/07   05/15/07   2,4,7,8,9,155,15,16    4,241,011     4,795,345  MGL             0           0      212,051
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       
07-0672   Reconstruction               0-003-011  11/28/07     DONE    DONE       DONE      10/30/07   10/29/07   10/11/07   05/15/07   2                        108,500       108,500  MGL             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    
  -       Reconstruction               0-003-012                                              /  /       /  /     08/26/09     /  /     2,7,155,15,16                  0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-0528SC Visual Structural Inspection 0-003-SC1  11/21/06     DONE    DONE       DONE      11/14/06   11/14/06     /  /       /  /     16                         9,498         9,498  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Lima Elementary:
07-0844   Reconstruction               0-004-008  05/13/08     DONE    DONE       DONE      11/19/07   11/16/07   01/19/07   05/15/07   2,4,7,8,9,155,15,16    2,018,516     2,147,400  MGL             0           0      100,926
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       
07-0673   Reconstruction               0-004-009  11/28/07     DONE    DONE       DONE      10/30/07   10/29/07   10/11/07   05/15/07   2                        117,672       233,900  MGL             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    
  -       Reconstruction               0-004-010                                              /  /       /  /     08/26/09     /  /     2,4,7,8,9,10,14,155,           0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          New Middle School:
06-1290   Reconstruction               0-013-004  05/16/07     DONE    DONE       DONE      04/09/07   04/06/07   04/10/07   05/15/07   7                      1,424,805     1,441,400  MGL             0           0       71,240
                                                                                                                                                                                                                                 SEI Design Group                    
07-0845   Reconstruction               0-013-005  05/13/08     DONE    DONE       DONE      11/19/07   11/16/07   04/10/07   05/15/07   2,7,155,16             1,525,145     1,668,800  MGL             0           0       76,257
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       
  -    PR Additions and Alterations    0-013-006                                              /  /       /  /     08/26/09     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-013-007                                              /  /       /  /     08/26/09     /  /     2,7,9,10,155,15,16             0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Storage garage:
07-0846   Reconstruction               2-006-003  05/13/08     DONE    DONE       DONE      11/19/07   11/16/07   01/19/07   05/15/07   7,155,16                  74,325             0  MGL             0           0            0
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       
  -       Reconstruction               2-006-004                                              /  /       /  /     08/26/09     /  /     2,7,155,15,16                  0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Support Service Bus Garage:
07-0847   Reconstruction               5-011-005  05/13/08     DONE    DONE       DONE      11/19/07   11/16/07   01/19/07   05/15/07   7,155,16                 128,855             0  MGL             0           0            0
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       

          Toilet/Storage Building:
  -       New Construction             7-016-001                                              /  /       /  /     09/01/09     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          District Wide:
08-0261   Reconstruction               7-999-002  01/05/09     DONE    DONE       DONE      09/08/08   09/02/08   03/07/08   05/15/07   10,13,16               1,265,000             0  MGL             0           0       63,250
                                                                                                                                                                                                                                 SEI Design Group                    


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SPENCERPORT CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-10-01-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Admin/BOCES Bldg:
07-0615   Reconstruction               0-001-005  04/07/08     DONE    DONE       DONE      10/23/07   10/22/07     /  /     03/27/07   7                      1,002,440     1,002,440  MGL             0           0      142,347
                                                                                                                                                                                                                                 Thomas Associates                   

          Leo Bernabi Elem (fmly IS):
06-0539   Reconstruction               0-002-007  04/20/07     DONE    DONE       DONE      11/21/06   11/15/06   12/18/00   05/16/06   2,7,9                    354,736       890,000  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
06-0346   Reconstruction               0-002-008  02/02/07     DONE    DONE       DONE      10/23/06   10/20/06   02/17/06   05/16/06   4,7,8,9,10,155,16      1,407,742     1,048,600  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0608   Reconstruction               0-002-009  04/07/08     DONE    DONE       DONE      10/23/07   10/22/07   02/13/07   03/27/07   2,8,9,10,155,15,16     1,697,572     1,697,572  MGL             0           0      241,055
                                                                                                                                                                                                                                 Thomas Associates                   
04-0606FP Reconstruction               0-002-FP1  01/13/05     DONE    DONE       DONE      01/03/05     /  /       /  /       /  /     16                         3,700         3,700  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Cosgrove MS 7-8(fmly Wilson HS):
06-0540   Additions and Alterations    0-005-010  04/20/07     DONE    DONE       DONE      11/21/06   11/15/06   08/12/02   05/16/06   02 - 16                   34,858       218,000  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
06-0347   Reconstruction               0-005-011  02/02/07     DONE    DONE       DONE      10/23/06   10/20/06   02/17/06   05/16/06   2,4,10,155,15,16       1,439,357     1,498,000  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0609   Reconstruction               0-005-012  04/07/08     DONE    DONE       DONE      10/23/07   10/22/07   02/13/07   03/27/07   2,155                  3,440,778     3,440,778  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0610   Reconstruction               0-005-013  04/07/08     DONE    DONE       DONE      10/23/07   10/22/07   02/13/07   03/27/07   2,9,10,155,16            187,464       187,464  MGL             0           0       26,620
                                                                                                                                                                                                                                 Thomas Associates                   
  -       Reconstruction               0-005-014                                              /  /       /  /     11/10/09     /  /     2,8,9,10,155,15,16             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
04-0605FP Reconstruction               0-005-FP1  01/13/05     DONE    DONE       DONE      01/03/05     /  /       /  /       /  /     16                         7,400         7,400  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-0447SC Visual Structural Inspection 0-005-SC1  10/02/08     DONE    DONE       DONE      06/18/08   06/18/08     /  /       /  /     16                         5,374             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
09-0019SC Visual Structural Inspection 0-005-SC2  07/20/09     DONE    DONE       DONE      06/24/09   06/24/09     /  /       /  /     16                         5,263             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Wm Munn Elementary:
06-0541   Reconstruction               0-006-007  04/20/07     DONE    DONE       DONE      11/21/06   11/15/06   12/18/00   05/16/06   2,7,9                    376,469       574,000  MAC             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
06-0348   Reconstruction               0-006-008  02/02/07     DONE    DONE       DONE      10/23/06   10/20/06   02/17/06   05/16/06   2,7,8,9,155,16         1,141,602       898,800  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
06-0433   Reconstruction               0-006-009  11/07/06     DONE    DONE       DONE      11/06/06   11/03/06   09/12/06   05/16/06   16                       374,000       374,000  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0611   Reconstruction               0-006-010  04/07/08     DONE    DONE       DONE      10/23/07   10/22/07   02/13/07   03/27/07   2,8,9,155,16             425,695       425,695  MGL             0           0       60,449
                                                                                                                                                                                                                                 Thomas Associates                   
04-0603FP Reconstruction               0-006-FP1  01/13/05     DONE    DONE       DONE      01/03/05     /  /       /  /       /  /     16                         3,700         3,700  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Terry A. Taylor ES (fmly Town Line):
06-0542   Reconstruction               0-007-007  04/20/07     DONE    DONE       DONE      11/21/06   11/15/06   12/19/00   05/16/06   2,7,9                     61,445        72,000  MAC             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
06-0349   Reconstruction               0-007-008  02/02/07     DONE    DONE       DONE      10/23/06   10/20/06   02/17/06   05/16/06   7,9,155,16             1,289,544       869,000  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0612   Reconstruction               0-007-009  04/07/08     DONE    DONE       DONE      10/23/07   10/22/07   02/13/07   03/27/07   9,10                     217,970       217,970  MGL             0           0       30,952
                                                                                                                                                                                                                                 Thomas Associates                   
04-0604FP Reconstruction               0-007-FP1  01/13/05     DONE    DONE       DONE      01/03/05     /  /       /  /       /  /     16                        11,100        11,100  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          S'port HS 9-12(fmly CosgroveJHS):
06-0513   Reconstruction               0-008-009  04/20/07     DONE    DONE       DONE      11/16/06   11/15/06   02/17/06   05/16/06   2,4,7,8,9,10,13,155,   8,347,471     6,999,000  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0613   Reconstruction               0-008-010  04/07/08     DONE    DONE       DONE      10/23/07   10/22/07   02/13/07   03/27/07   2,4,7,9,10,155,15,16   4,972,461     4,972,461  MGL             0           0      706,089
                                                                                                                                                                                                                                 Thomas Associates                   
  -       Reconstruction               0-008-011                                              /  /       /  /     11/10/09     /  /     2,8,9,10,155,15,16             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
04-0607FP Reconstruction               0-008-FP1  01/13/05     DONE    DONE       DONE      01/03/05     /  /       /  /       /  /     16                         3,700         3,700  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-0448SC Visual Structural Inspection 0-008-SC1  10/03/08     DONE    DONE       DONE      06/19/08   06/19/08     /  /       /  /     16                        15,840             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
09-0018SC Visual Structural Inspection 0-008-SC2  07/20/09     DONE    DONE       DONE      06/24/09   06/24/09     /  /       /  /     16                        12,026             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          CANAL VEIW ELEMENTARY (FRM. NEW ELM):
  -       Reconstruction               0-015-002                                              /  /       /  /     02/17/06     /  /     9                              0    10,222,713  MGL             0           0            0
                                                                                                                                                                                                                                                                     
07-0614   Reconstruction               0-015-003  04/07/08     DONE    DONE       DONE      10/23/07   10/22/07   02/13/07   03/27/07   9,155                     82,771        82,771  MGL             0           0       11,753
                                                                                                                                                                                                                                 Thomas Associates                   

          Administration Bldg:
06-0514   Reconstruction               1-001-004  04/20/07     DONE    DONE       DONE      11/16/06   11/15/06   02/17/06   05/16/06   15,16                    172,220             0  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -    XX Reconstruction               1-001-005                         CANCELLED          10/23/07   10/22/07   02/13/07   03/27/07   7                              0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Athletic Storage:
07-1907   Reconstruction               2-010-001  04/07/08     DONE    DONE       DONE      04/03/08   04/02/08   03/27/08   03/27/07   16                         5,993             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Football Storage:
04-0399   New Construction             2-019-001  04/29/05     DONE    DONE       DONE      11/16/04   11/12/04   05/11/04     /  /     02 - 16                   24,000             0  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Track Storage:
04-0400   New Construction             2-020-001  04/29/05     DONE    DONE       DONE      11/16/04   11/12/04   05/11/04     /  /     02 - 16                   12,800             0  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          New Bus Facility:
06-0515   Reconstruction               5-014-003  04/20/07     DONE    DONE       DONE      11/16/06   11/15/06   02/17/06   05/16/06   2,16                     149,825        80,000  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Concession/Ticket:
04-0401   New Construction             7-017-001  04/29/05     DONE    DONE       DONE      11/16/04   11/12/04   05/11/04     /  /     02 - 16                   28,000             0  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Soccer Toilets:
04-0402   New Construction             7-018-001  04/29/05     DONE    DONE       DONE      11/16/04   11/12/04   05/11/04     /  /     02 - 16                   11,200             0  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1908   Reconstruction               7-018-002  04/07/08     DONE    DONE       DONE      04/03/08   04/02/08   03/27/08   03/27/07   2,10,155,15,16            30,968             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Press Box w/ Bleachers:
07-1909   New Construction             7-021-001  04/07/08     DONE    DONE       DONE      04/03/08   03/19/08   02/28/08   03/27/07   02 - 16                   99,205             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Soccer Field Storage Building:
07-1910   New Construction             7-022-001  04/07/08     DONE    DONE       DONE      04/03/08   03/19/08   02/28/08   03/27/07   02 - 16                   28,218             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Soccer Field Toilets:
07-1911   New Construction             7-023-001  04/02/08     DONE    DONE       DONE      04/03/08   03/19/08   03/05/08   03/27/07   02 - 16                  250,465             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HILTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-11-01-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          West Avenue Elementary:
06-0088   Reconstruction               0-001-009  04/16/07     DONE    DONE       DONE      07/20/06   07/19/06   11/23/05   12/04/01   2,8,9,155,15,16           74,240        74,240  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0066   Reconstruction               0-001-010  11/19/07     DONE    DONE       DONE      07/16/07   07/16/07   12/05/06   01/30/07   2,4,7,8,9,155,15,16      640,127       640,127  MGL             0           0       81,296
                                                                                                                                                                                                                                 Thomas Associates                   
08-1753   Reconstruction               0-001-011  10/07/09     DONE    DONE       DONE      06/29/09   06/24/09   10/22/08   01/13/09   2,4,8,9                  281,976             0  DDJ             0           0       37,511
                                                                                                                                                                                                                                 Tetra Tech Architects & Engineers   

          Northwood Elementary School:
06-0089   Reconstruction               0-003-010  04/16/07     DONE    DONE       DONE      07/20/06   07/19/06   11/23/05   12/04/01   2,8,9,16                  49,063        49,063  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0067   Reconstruction               0-003-011  11/19/07     DONE    DONE       DONE      07/16/07   07/16/07   12/05/06   01/30/07   2,4,7,8,9,155,15,16    4,913,931     4,913,931  MGL             0           0      624,069
                                                                                                                                                                                                                                 Thomas Associates                   
08-1754   Reconstruction               0-003-012  10/07/09     DONE    DONE       DONE      06/29/09   06/24/09   10/22/08   01/13/09   2,4,8,9,10,155,15        443,604       443,604  DDJ             0           0       59,011
                                                                                                                                                                                                                                 Tetra Tech Architects & Engineers   

          Village Elementary:
06-0090   Reconstruction               0-004-008  04/16/07     DONE    DONE       DONE      07/20/06   07/19/06   11/23/05   12/04/01   2,8,15,16                 46,371        46,371  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0068   Reconstruction               0-004-009  11/19/07     DONE    DONE       DONE      07/16/07   07/16/07   12/05/06   01/30/07   2,4,7,8,9,155,15,16    1,423,677     1,423,677  MGL             0           0      180,807
                                                                                                                                                                                                                                 Thomas Associates                   
08-1755   Reconstruction               0-004-010  10/07/09     DONE    DONE       DONE      06/29/09   06/24/09   10/22/08   01/13/09   2,4,8,9,10,155,15,16     296,002             0  DDJ             0           0       39,376
                                                                                                                                                                                                                                 Tetra Tech Architects & Engineers   

          Merton Williams Middle School:
06-0091   Reconstruction               0-005-009  04/16/07     DONE    DONE       DONE      07/20/06   07/19/06   11/23/05   12/04/01   2,4,8,10,15,16            96,192        96,192  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0069   Reconstruction               0-005-010  11/19/07     DONE    DONE       DONE      07/16/07   07/16/07   12/05/06   01/30/07   2,4,7,8,9,155,15,16      266,529       266,529  MGL             0           0       33,849
                                                                                                                                                                                                                                 Thomas Associates                   
08-1756   Reconstruction               0-005-011  10/07/09     DONE    DONE       DONE      06/29/09   06/24/09   10/22/08   01/13/09   4,8,9,155,16             495,670             0  DDJ             0           0       65,938
                                                                                                                                                                                                                                 Tetra Tech Architects & Engineers   

          High School:
06-0092   Reconstruction               0-007-010  04/16/07     DONE    DONE       DONE      07/20/06   07/19/06   11/23/05   12/04/01   2,4,8,10,155,15,16       247,810       247,810  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0070   Reconstruction               0-007-011  11/19/07     DONE    DONE       DONE      07/16/07   07/16/07   12/05/06   01/30/07   2,4,7,8,9,155,15,16    2,120,275     2,120,275  MGL             0           0      269,275
                                                                                                                                                                                                                                 Thomas Associates                   
08-1757   Reconstruction               0-007-012  10/07/09     DONE    DONE       DONE      06/29/09   06/24/09   10/22/08   01/13/09   2,8,9,10,155,16          375,682             0  DDJ             0           0       49,976
                                                                                                                                                                                                                                 Tetra Tech Architects & Engineers   

          Transportation Maint. Facility:
06-0093   Reconstruction               5-010-010  04/16/07     DONE    DONE       DONE      07/20/06   07/19/06   11/23/05   12/04/01   2,8,16                    40,439        40,439  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0071   Reconstruction               5-010-011  11/19/07     DONE    DONE       DONE      07/16/07   07/16/07   12/05/06   01/30/07   4,7,8,16                 135,461       135,461  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
08-1758   Reconstruction               5-010-012  10/07/09     DONE    DONE       DONE      06/29/09   06/24/09   10/22/08   01/13/09   155                       64,423             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Tetra Tech Architects & Engineers   

          Concession Stand/Press Box:
08-1759   Reconstruction               7-012-002  10/07/09     DONE    DONE       DONE      06/29/09   06/24/09   06/01/09   01/13/09   155                       27,642             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Tetra Tech Architects & Engineers   

          District Wide:
  -       Reconstruction               7-999-003                                              /  /       /  /     12/05/06     /  /     13,16                          0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PENFIELD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-12-01-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Indian Landing Elementary:
04-0677   Reconstruction               0-002-007  03/22/05     DONE    DONE       DONE      01/13/05   01/12/05   12/18/03   05/18/04   10                        11,772        11,772  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
09-0325   Reconstruction               0-002-008               STARTED STARTED    UNREVIEWED10/21/09   10/19/09   08/25/05   05/15/07   2,4,7,8,9                      0     8,158,115  DDJ             0           0            0
                                                                                                                                                                                                                                 Tetra Tech Architects & Engineers   
  -    XX Reconstruction               0-002-009                         CANCELLED            /  /       /  /     03/21/06     /  /     13,16                          0     7,744,261  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Penfield Senior High:
04-1421   Reconstruction               0-005-011  07/15/05     DONE    DONE       DONE      06/17/05   06/14/05   03/24/05   05/17/04   2                         90,727        90,727  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0358PR Additions and Alterations    0-005-012  11/05/07     DONE    DONE       DONE      09/13/07     /  /     08/25/05     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1093   Additions and Alterations    0-005-012  04/09/08     DONE    DONE       DONE      12/12/07   12/10/07   08/25/05   05/15/07   02 - 16               44,897,931    42,095,058  MGL             0           0    1,555,192
                                                                                                                                                                                                                                 Thomas Associates                   
  -       Reconstruction               0-005-013                                              /  /       /  /     03/21/06     /  /     13,16                          0    19,551,030  MGL             0           0            0
                                                                                                                                                                                                                                                                     
  -    XX Reconstruction               0-005-014                         CANCELLED            /  /       /  /     09/11/06     /  /     2,15                           0    19,551,030  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Cobbles Elementary:
04-0678   Reconstruction               0-006-009  03/22/05     DONE    DONE       DONE      01/13/05   01/12/05   12/18/03   05/18/04   10,155,15,16           1,316,800     1,316,800  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
09-0326   Reconstruction               0-006-010               STARTED STARTED    UNREVIEWED10/21/09   10/19/09   08/25/05   05/15/07   2,8,9,10,15,16                 0    11,978,235  DDJ             0           0            0
                                                                                                                                                                                                                                 Tetra Tech Architects & Engineers   
  -    XX Reconstruction               0-006-011                         CANCELLED            /  /       /  /     03/21/06     /  /     13,16                          0    11,370,663  MGL             0           0            0
                                                                                                                                                                                                                                                                     
06-1268   Reconstruction               0-006-012  05/01/07     DONE    DONE       DONE      04/04/07   04/03/07   06/16/06     /  /     2                         92,048        92,048  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Scribner Rd Elem:
07-1091   Reconstruction               0-007-008  04/30/08     DONE    DONE       DONE      12/12/07   12/10/07   08/25/05   05/15/07   2,4,7,8,9,10,13,155,     605,079       605,079  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -    XX Reconstruction               0-007-009                         CANCELLED            /  /       /  /     03/21/06     /  /     13,16                          0     7,890,579  MGL             0           0            0
                                                                                                                                                                                                                                                                     
09-0327   Reconstruction               0-007-010               STARTED STARTED    UNREVIEWED10/21/09   10/19/09   06/19/09   05/15/07   2,9,10,155,15,16               0     8,312,175  DDJ             0           0            0
                                                                                                                                                                                                                                 Tetra Tech Architects & Engineers   

          Bay Trail Junior High School:
04-0679   Reconstruction               0-008-007  03/22/05     DONE    DONE       DONE      01/13/05   01/12/05   11/09/04   05/18/04   10                        14,923        14,923  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0359PR Additions and Alterations    0-008-008  10/23/07     DONE    DONE       DONE      09/13/07     /  /     08/12/05     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1092   Additions and Alterations    0-008-008  04/30/08     DONE    DONE       DONE      12/12/07   12/10/07   08/12/05   05/15/07   02 - 16               22,665,701    22,469,304  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -       Reconstruction               0-008-009                                              /  /       /  /     03/21/06     /  /     13,16                          0    23,151,368  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Harris Hill Elementary:
04-0680   Reconstruction               0-009-009  03/22/05     DONE    DONE       DONE      01/13/05   01/12/05   12/18/03   05/18/04   10                        12,623        12,623  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
09-0328   Reconstruction               0-009-011               STARTED STARTED    UNREVIEWED10/21/09   10/19/09   08/12/05   05/15/07   2,4,7,8,9,10,13,155,           0     6,110,100  DDJ             0           0            0
                                                                                                                                                                                                                                 Tetra Tech Architects & Engineers   
  -    XX Reconstruction               0-009-012                         CANCELLED            /  /       /  /     03/21/06     /  /     13,16                          0     5,800,140  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          District Office:
  -       Additions and Alterations    1-001-005                                              /  /       /  /     08/25/05     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
  -    XX Reconstruction               1-001-006                         CANCELLED            /  /       /  /     03/21/06     /  /     13,16                          0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Maintenance Bldg:
  -    XX Additions and Alterations    3-004-002                         CANCELLED            /  /       /  /     08/25/05     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          New Maintenance Facility:
  -    XX New Construction             3-026-001                         CANCELLED            /  /       /  /     09/28/05     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
04-0681   Reconstruction               5-010-003  03/22/05     DONE    DONE       DONE      01/13/05   01/12/05   12/18/03   05/18/04   13                       437,475       437,475  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -       Additions and Alterations    5-010-004                                              /  /       /  /     08/25/05     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
  -    XX Reconstruction               5-010-005                         CANCELLED            /  /       /  /     03/21/06     /  /     13,16                          0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
09-0329   Reconstruction               5-010-006               STARTED STARTED    UNREVIEWED10/21/09   10/19/09   08/09/07   05/15/07   14,15,16                       0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Tetra Tech Architects & Engineers   

          Transportation Facility:
  -    XX New Construction             5-027-001                         CANCELLED            /  /       /  /     09/28/05     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Concession Building:
  -    XX New Construction             7-025-001                         CANCELLED            /  /       /  /     08/22/05     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Press Box & Public Restroom Facility:
07-1094   New Construction             7-028-001  04/09/08     DONE    DONE       DONE      12/12/07   12/10/07   08/17/07   05/15/07   02 - 16                  504,725             0  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Districtwide:
06-0239   Reconstruction               7-999-002  12/06/06     DONE    DONE       DONE      09/26/06   09/22/06   07/06/06   05/16/06   16                     1,100,000     1,100,000  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




FAIRPORT CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-13-01-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          J. Perrin Middle School:
07-0229PR Additions and Alterations    0-001-009                         UNREVIEWED         08/23/07   08/17/07   02/04/00   05/16/00   02 - 16               10,122,000     8,998,840  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0744   Additions and Alterations    0-001-009  04/18/08     DONE    DONE       DONE      11/06/07   11/01/07   02/04/00   05/15/07   02 - 16               10,122,000     9,083,058  DDJ             0           0    1,004,776
                                                                                                                                                                                                                                 Clark Patterson Associates          
05-1084   Reconstruction               0-001-011  05/19/06     DONE    DONE       DONE      03/31/06   03/31/06   07/06/05   05/16/06   7                      1,484,070     1,484,070  DDJ             0           0      375,936
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Minerva Deland HS (9-12):
07-2235PR Additions and Alterations    0-002-012                         UNREVIEWED         06/09/08   05/12/08   02/04/00     /  /     02 - 16                5,696,692     4,979,999  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-0610   Additions and Alterations    0-002-012  03/30/09     DONE    DONE       DONE      10/29/08   10/28/08   02/04/00   12/06/07   02 - 16                5,247,373     4,634,468  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
04-0690   Reconstruction               0-002-014  01/28/05     DONE    DONE       DONE      01/19/05   01/18/05   09/29/04   11/17/04   4,13                     519,312       519,312  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
05-1085   Reconstruction               0-002-015  05/19/06     DONE    DONE       DONE      03/31/06   03/31/06   07/06/05   05/16/06   7                        355,999       355,999  DDJ             0           0       89,356
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Martha Brown Middle School:
07-2236PR Additions and Alterations    0-003-010                         UNREVIEWED         06/09/08   05/12/08   02/04/00     /  /     02 - 16                7,753,664     6,711,789  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-0611   Additions and Alterations    0-003-010  03/30/09     DONE    DONE       DONE      10/29/08   10/28/08   02/04/00   12/06/07   02 - 16                8,797,833     5,507,615  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
05-1086   Reconstruction               0-003-011  05/19/06     DONE    DONE       DONE      03/31/06   03/31/06   06/24/05   05/16/06   7                      1,318,662     1,318,662  DDJ             0           0      276,243
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Brooks Hill Elem (K-5):
05-1069   Reconstruction               0-004-009  04/26/06     DONE    DONE       DONE      03/31/06   03/30/06   11/29/00   03/15/06   7                         85,902        85,902  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
05-1087   Reconstruction               0-004-010  05/19/06     DONE    DONE       DONE      03/31/06   03/31/06   07/06/05   05/16/06   7                        722,784       722,784  DDJ             0           0      181,419
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-2231PR Additions and Alterations    0-004-011                         UNREVIEWED         06/09/08   05/12/08   07/06/05     /  /     02 - 16                8,671,978     6,196,323  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-0612   Additions and Alterations    0-004-011  03/30/09     DONE    DONE       DONE      10/29/08   10/28/08   07/06/05   12/06/07   02 - 16                8,338,873     6,699,882  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
06-1489   Additions and Alterations    0-004-012  09/05/07     DONE    DONE       DONE      05/14/07   05/14/07   04/30/07   04/25/07   02 - 16                  412,809             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Jefferson Ave Elem (K-5):
05-1088   Reconstruction               0-006-012  05/19/06     DONE    DONE       DONE      03/31/06   03/31/06   07/06/05   05/16/06   7                      1,216,590     1,216,590  DDJ             0           0      262,353
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-2232PR Additions and Alterations    0-006-013                         UNREVIEWED         06/09/08   05/12/08   07/06/05     /  /     02 - 16                3,533,156     2,570,077  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-0613   Additions and Alterations    0-006-013  03/30/09     DONE    DONE       DONE      10/29/08   10/28/08   07/06/05   12/06/07   02 - 16                2,817,066     2,499,583  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Fairport High School (9-12):
05-1301   Reconstruction               0-007-012  07/18/06     DONE    DONE       DONE      05/31/06   05/31/06   02/04/00   04/26/06   15                        93,911        93,911  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
07-0587   Alterations                  0-007-013  02/22/08     DONE    DONE       DONE      10/19/07   10/18/07   07/06/05   05/15/07   02 - 16                1,666,000     1,666,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-0614   Reconstruction               0-007-014  03/30/09     DONE    DONE       DONE      12/15/08   12/15/08   12/11/07   12/06/07   9,16                     676,382       676,400  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Northside Elem (3-5):
07-2233PR Additions and Alterations    0-008-006                         UNREVIEWED         06/09/08   05/12/08   07/06/05     /  /     02 - 16                2,579,915     2,201,007  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-0615   Additions and Alterations    0-008-006  03/30/09     DONE    DONE       DONE      10/29/08   10/28/08   07/06/05   12/06/07   02 - 16                1,936,664     1,708,751  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
05-1089   Reconstruction               0-008-007  05/19/06     DONE    DONE       DONE      03/31/06   03/31/06   06/24/05   05/16/06   7                        188,834       188,834  DDJ             0           0       47,398
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Dudley Elem (K-2):
07-2234PR Reconstruction               0-009-010                         UNREVIEWED         06/09/08   05/12/08   06/24/05     /  /     2,4,8,9,155,15,16      2,007,002     1,637,828  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
08-0616   Reconstruction               0-009-010  03/30/09     DONE    DONE       DONE      10/29/08   10/28/08   06/24/05   12/06/07   2,4,8,9,155,15,16      2,085,809     1,811,558  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
05-1090   Reconstruction               0-009-011  05/19/06     DONE    DONE       DONE      03/31/06   03/31/06   07/06/05   05/16/06   7                        188,834       188,834  DDJ             0           0       47,398
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Streppa Building:
  -    PR Additions and Alterations    1-005-003                                              /  /       /  /     06/30/05     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          New Administration Office Bldg.:
  -       Reconstruction               1-023-003                                              /  /       /  /     07/06/05     /  /     2,7,8,9,155,15,16              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Storage Container BUS 4679:
07-1056DB Discovered Building          2-029-001  01/17/08     DONE    DONE       DONE      12/06/07   11/30/07   09/05/07     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Design Professionals                

          Storage Container MD 10193:
07-1057DB Discovered Building          2-030-001  01/17/08     DONE    DONE       DONE      12/06/07   11/30/07   09/05/07     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Design Professionals                

          Storage Container MD 1309:
07-1058DB Discovered Building          2-031-001  01/17/08     DONE    DONE       DONE      12/06/07   11/30/07   09/05/07     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Design Professionals                

          Storage Container MD 420:
07-1059DB Discovered Building          2-032-001  01/17/08     DONE    DONE       DONE      12/06/07   11/30/07   09/05/07     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Design Professionals                

          Storage Container JP9027:
07-1060DB Discovered Building          2-033-001  01/17/08     DONE    DONE       DONE      12/06/07   11/30/07   09/05/07     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Design Professionals                

          Storage Container:
07-1061DB Discovered Building          2-034-001  01/17/08     DONE    DONE       DONE      12/06/07   11/30/07   09/05/07     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Design Professionals                

          Storage Container BH382:
07-1062DB Discovered Building          2-035-001  01/17/08     DONE    DONE       DONE      12/06/07   11/30/07   09/05/07     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Design Professionals                

          Storage Contanier BH99020:
07-1063DB Discovered Building          2-036-001  01/17/08     DONE    DONE       DONE      12/06/07   11/30/07   09/05/07     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Design Professionals                

          Storage Container MB 55073:
07-1064DB Discovered Building          2-037-001  01/17/08     DONE    DONE       DONE      12/06/07   11/30/07   09/05/07     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Design Professionals                

          Storage Container MB 60136:
07-1065DB Discovered Building          2-038-001  01/17/08     DONE    DONE       DONE      12/06/07   11/30/07   09/05/07     /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Design Professionals                

          Maintenance Bldg.:
  -       Reconstruction               3-011-003                                              /  /       /  /     07/06/05     /  /     2,8,9,155,15,16                0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Center:
04-1425   Reconstruction               5-010-009  08/19/05     DONE    DONE       DONE      06/17/05   06/15/05   04/12/05   05/17/05   2,155,16                  99,643        99,643  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -    PR Additions and Alterations    5-010-010                                              /  /       /  /     07/06/05     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Transportation Substation @ Dudley:
  -       New Construction             5-024-001                                              /  /       /  /     06/27/05     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Concession\Bathrooms:
07-0588   New Construction             7-025-001  02/22/08     DONE    DONE       DONE      10/19/07   10/18/07   06/27/05   05/15/07   02 - 16                  388,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Bleachers/Coaches Booth/Press Box:
07-0589   New Construction             7-026-001  02/22/08     DONE    DONE       DONE      10/19/07   10/18/07   06/27/05   05/15/07   02 - 16                  460,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Clark Patterson Associates          

          Track Storage Bldg:
07-1837DB Discovered Building          7-027-001  12/10/08     DONE    DONE       DONE      03/19/08   03/14/08   02/15/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                

          Football Storage Bldg:
07-1838DB Discovered Building          7-028-001  12/10/08     DONE    DONE       DONE      03/19/08   03/14/08   02/15/06     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




EAST ROCHESTER UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-13-13-03
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          E. Rochester Educ. Cmplx.(O'Bourn):
05-0247   Additions and Alterations    0-001-013  05/19/06     DONE    DONE       DONE      10/07/05   10/06/05   02/13/03   05/17/05   02 - 16                2,233,000     2,233,000  RDR             0           0            0
                                                                                                                                                                                                                                 EDGE Architecture                   
03-1556   Reconstruction               0-001-014  04/13/05     DONE    DONE       DONE      05/17/04   05/17/04   02/02/04   12/18/03   9,155,15,16            1,025,000     1,025,000  RDR             0           0            0
                                                                                                                                                                                                                                 EDGE Architecture                   
05-1245   Additions and Alterations    0-001-015  07/10/06     DONE    DONE       DONE      05/08/06   05/04/06   04/06/05   05/17/05   02 - 16                   42,884        42,884  RDR             0           0            0
                                                                                                                                                                                                                                 EDGE Architecture                   
07-1782   Reconstruction               0-001-016  09/30/08     DONE    DONE       DONE      03/09/08   03/05/08   07/16/07   10/16/07   2,4,7,8,9,10,155,15,   7,150,000     7,150,000  JOD             0           0      376,860
                                                                                                                                                                                                                                 EDGE Architecture                   

          LE BIRD/TLRMorgan Middle School:
05-1323   Reconstruction               0-002-009  07/10/06     DONE    DONE       DONE      06/06/06   06/05/06   12/05/05   01/17/06   2,4,7,9                   19,717        19,717  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
06-0807   Reconstruction               0-002-010  04/27/07     DONE    DONE       DONE      01/24/07   01/24/07   01/19/07   12/19/06   2,9,155,15,16             99,221        99,221  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                

          Lois E. Bird Elementary:
05-1324   Reconstruction               0-003-008  07/10/06     DONE    DONE       DONE      06/06/06   06/05/06   11/02/05   01/17/06   2,4,7,9                   78,867        78,867  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PITTSFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-14-01-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Jefferson Rd. Elementary:
05-0016   Reconstruction               0-002-020  03/30/06     DONE    DONE       DONE      07/06/05   07/01/05   08/09/04   12/03/02   2,16                           0     8,351,880  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
04-1488   Reconstruction               0-002-021  04/17/06     DONE    DONE       DONE      06/30/05   06/29/05   05/26/05   12/03/02   155,15,16                278,696       278,696  JOD             0           0      106,741
                                                                                                                                                                                                                                 Thomas Associates                   

          Sutherland High School:
06-0414SC Visual Structural Inspection 0-003-SC1  11/03/06     DONE    DONE       DONE      10/16/06   10/16/06     /  /       /  /     16                        24,065        24,065  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-1690SC Visual Structural Inspection 0-003-SC2  06/18/09     DONE    DONE       DONE      03/17/09   03/17/09     /  /       /  /     16                         3,616             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Pittsford(Barker Rd.)MS:
04-1487   Reconstruction               0-007-016  01/26/06     DONE    DONE       DONE      06/30/05   06/29/05   12/18/03   12/03/02   15                       409,346       409,346  JOD             0           0      149,140
                                                                                                                                                                                                                                 Thomas Associates                   
04-1225   Reconstruction               0-007-017  04/12/05     DONE    DONE       DONE      05/06/05   05/02/05   08/09/04   12/03/02   13,155,15,16             451,000       451,000  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
06-0412SC Visual Structural Inspection 0-007-SC1  11/03/06     DONE    DONE       DONE      10/16/06   10/16/06     /  /       /  /     16                        23,019        23,019  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Pittsford High Sch. (Mendon):
04-1227   Reconstruction               0-009-018  04/25/06     DONE    DONE       DONE      05/06/05   05/02/05   08/09/04   12/03/02   155,16                   310,000       310,000  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
  -       Reconstruction               0-009-019                                              /  /       /  /     05/26/05     /  /     15                             0    18,007,110  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -    PR Additions and Alterations    0-009-020                                              /  /       /  /     02/13/06     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
07-1943   Reconstruction               0-009-021  04/17/08     DONE    DONE       DONE      04/14/08   04/03/08   03/17/08   05/16/06   2,7                    1,744,040     1,744,040  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
08-0885   Reconstruction               0-009-022  12/09/08     DONE    DONE       DONE      12/08/08   12/05/08   10/06/08   10/24/08   16                        60,000        60,000  JOD             0           0       43,337
                                                                                                                                                                                                                                 TETRA TECH ARCHITECTS & ENGINEERS   
  -       Reconstruction               0-009-023                                              /  /       /  /     05/07/09     /  /     16                             0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0413SC Visual Structural Inspection 0-009-SC1  11/03/06     DONE    DONE       DONE      10/16/06   10/16/06     /  /       /  /     16                        24,065        24,065  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          New Middle School:
06-0411SC Visual Structural Inspection 0-025-SC1  11/03/06     DONE    DONE       DONE      10/16/06   10/16/06     /  /       /  /     16                        22,050        22,050  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
09-0269   Reconstruction               5-011-068  10/01/09     DONE    DONE       DONE      09/28/09   09/28/09   08/17/09   08/10/09   4,9,14,15,16             797,069             0  JOD             0           0            0
                                                                                                                                                                                                                                 TETRA TECH ARCHITECTS & ENGINEERS   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CHURCHVILLE CHILI CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-15-01-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Chestnut Ridge Elementary:
06-1447   Reconstruction               0-001-007  09/21/07     DONE    DONE       DONE      05/08/07   05/07/07   11/21/06   01/30/07   2,4,7,155,15,16        1,074,631     1,074,631  MGL             0           0      114,985
                                                                                                                                                                                                                                 SEI Design Group                    
  -       Reconstruction               0-001-008                                              /  /       /  /     09/28/09     /  /     2,4,9,16                       0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Churchville Elementary:
06-1448   Reconstruction               0-002-007  09/21/07     DONE    DONE       DONE      05/08/07   05/07/07   11/21/06   01/30/07   2,4,7,155,15,16        2,459,525     2,459,525  MGL             0           0      263,169
                                                                                                                                                                                                                                 SEI Design Group                    
06-0054SC Visual Structural Inspection 0-002-SC1  08/08/06     DONE    DONE       DONE      07/05/06   07/05/06     /  /       /  /     16                         3,694         3,694  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0055SC Visual Structural Inspection 0-002-SC2  08/08/06     DONE    DONE       DONE      07/05/06   07/05/06     /  /       /  /     16                         3,106         3,106  JOD             0           0            0
                                                                                                                                                                                                                                                                     
07-2183SC Visual Structural Inspection 0-002-SC3  09/26/08     DONE    DONE       DONE      03/03/08   03/03/08     /  /       /  /     16                         9,204             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Fairbank Rd Elem:
06-1449   Reconstruction               0-004-007  09/21/07     DONE    DONE       DONE      05/08/07   05/07/07   11/21/06   01/30/07   2,4,7,155,15,16        3,092,311     3,092,311  MGL             0           0      330,877
                                                                                                                                                                                                                                 SEI Design Group                    
08-1175   Reconstruction               0-004-008  03/11/09     DONE    DONE       DONE      02/09/09   02/02/09   07/24/07   05/20/08   2,9                      100,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    
  -       Reconstruction               0-004-009                                              /  /       /  /       /  /       /  /     2,4,8,9,155,15,16              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-1176   Reconstruction               0-004-010  03/11/09     DONE    DONE       DONE      02/09/09   02/02/09   01/29/09   05/20/08   2,9                      422,074       422,074  DDJ             0           0       35,191
                                                                                                                                                                                                                                 SEI Design Group                    

          Senior High School:
06-1450   Reconstruction               0-005-007  09/21/07     DONE    DONE       DONE      05/08/07   05/07/07   11/21/06   01/30/07   2,4,7,155,15,16          731,885       731,885  MGL             0           0       78,312
                                                                                                                                                                                                                                 SEI Design Group                    
07-0723   Reconstruction               0-005-008  11/13/07     DONE    DONE       DONE      11/06/07   11/02/07   08/09/07   05/15/07   2,9                      100,000       100,000  MGL             0           0            0
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       
08-0196PR Additions and Alterations    0-005-009                         UNREVIEWED         08/22/08   07/24/08   08/12/08     /  /     02 - 16               38,226,194    33,616,819  DDJ             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    

          Middle School:
06-1451   Reconstruction               0-006-007  09/21/07     DONE    DONE       DONE      05/08/07   05/07/07   11/21/06   01/30/07   2,4,7,15,16            1,471,648     1,471,648  MGL             0           0      157,466
                                                                                                                                                                                                                                 SEI Design Group                    
  -       Reconstruction               0-006-008                                              /  /       /  /     08/09/07     /  /     2                              0    60,602,438  MGL             0           0            0
                                                                                                                                                                                                                                                                     
08-0198PR Additions and Alterations    0-006-009                         UNREVIEWED         08/22/08   07/24/08   08/12/08     /  /     02 - 16                        3     9,915,950  DDJ             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    

          eus Storage Building:
03-1684   New Construction             4-012-001  04/26/05     DONE    DONE       DONE      06/29/04   06/22/04   01/27/04   01/18/00   02 - 16                   29,000        29,000  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          New Transportation Facility:
  -       Reconstruction               5-009-003                                              /  /       /  /     08/12/08     /  /     2,8,9,15                       0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Transportation Facility:
08-1390SC Visual Structural Inspection 7-010-SC1  03/17/09     DONE    DONE       DONE      02/02/09   02/02/09     /  /       /  /     16                         6,358         4,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Concession (metal bldg.):
03-1685   New Construction             7-011-001  04/26/05     DONE    DONE       DONE      06/29/04   06/22/04   09/02/03   01/18/00   02 - 16                   29,000             0  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Ticket Booth (Metal Bldg.):
03-1686   New Construction             7-013-001  04/26/05     DONE    DONE       DONE      06/29/04   06/22/04   09/02/03   01/18/00   02 - 16                    6,250             0  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Pressbox:
03-1687   New Construction             7-014-001  04/26/05     DONE    DONE       DONE      06/29/04   06/22/04   11/05/03   01/18/00   02 - 16                   13,750             0  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Operations/Security Bldg (House):
05-1410PR New Construction             7-015-001  06/21/06     DONE    DONE       DONE      06/22/06   06/21/06   06/14/06     /  /     02 - 16                  147,000             0  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1572DB Discovered Building          7-015-002  04/30/08     DONE    DONE       DONE      02/08/08   02/06/08   06/26/06     /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    

          District-Wide:
08-1308   Reconstruction               7-999-002  05/07/09     DONE    DONE       DONE      03/02/09   02/26/09   01/21/09   12/09/08   10,13,15,16            1,741,600     1,741,600  DDJ             0           0      182,392
                                                                                                                                                                                                                                 SEI Design Group                    


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ROCHESTER CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-16-00-01
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          #1 M B Anderson K-6:
  -       Reconstruction               0-001-019                                              /  /       /  /     07/15/09     /  /     8,155,15,16                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          #2 Clara Barton K-6:
05-0490   Reconstruction               0-002-014  03/16/06     DONE    DONE       DONE      12/23/05   12/23/05   07/27/05   07/01/05   2,4,9,16                 541,770       541,770  RDR             0           0       10,835
                                                                                                                                                                                                                                 Harison Bridges & Associates        
08-0791   Reconstruction               0-002-015  01/30/09     DONE    DONE       DONE      11/25/08   11/24/08   05/01/08   07/01/08   2,8,155,16               453,552       453,552  DDJ             0           0        9,071
                                                                                                                                                                                                                                 HBT Architects                      

          #3 Nathaniel Rochester Cmmty K-8:
05-0603   Reconstruction               0-003-015  04/12/06     DONE    DONE       DONE      01/18/06   01/09/06   07/27/05   07/10/05   8,9,155,16               939,004       939,004  RDR             0           0       17,132
                                                                                                                                                                                                                                 CMA Architecture,P.C                
07-1045   Reconstruction               0-003-016  02/29/08     DONE    DONE       DONE      12/05/07   12/03/07   07/20/07   07/01/07   155,16                   934,679       934,679  MGL             0           0       18,694
                                                                                                                                                                                                                                 CMA Architecture,P.C                
08-0832   Reconstruction               0-003-017  02/13/09     DONE    DONE       DONE      12/02/08   12/01/08   05/01/08   07/01/08   2,10,155,16              977,401       977,401  DDJ             0           0       19,548
                                                                                                                                                                                                                                 CMA Architecture,P.C                
  -       Reconstruction               0-003-018                                              /  /       /  /     09/25/08     /  /     2,16                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          #4 G.M.Forbes K-6:
04-0898   Reconstruction               0-004-017  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/09/04   07/01/04   16                        47,938        47,938  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
05-0489   Reconstruction               0-004-018  03/16/06     DONE    DONE       DONE      12/23/05   12/23/05   07/27/05   07/01/05   4,8,9,155,15,16          814,193       814,193  RDR             0           0       16,526
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey
08-0787   Reconstruction               0-004-019  02/13/09     DONE    DONE       DONE      11/24/08   11/24/08   05/01/08   07/01/08   155,15,16                513,216       513,216  DDJ             0           0       10,264
                                                                                                                                                                                                                                 Clark Patterson Associates          

          #5 J.Williams K-5:
04-0899   Reconstruction               0-005-019  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                             0    12,331,165  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
05-0549   Reconstruction               0-005-020  04/03/06     DONE    DONE       DONE      01/11/06     /  /     07/28/05   07/01/05   2,4,7,8,9,155,15,16    1,232,171     1,232,171  RDR             0           0       24,177
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       
07-1423   Reconstruction               0-005-021  04/11/08     DONE    DONE       DONE      01/18/08   01/17/08   07/20/07   07/01/07   4,7,13                   836,649       836,649  MGL             0           0       16,733
                                                                                                                                                                                                                                 Stantec Consulting Services Inc,.   
08-0741   Reconstruction               0-005-022  12/17/08     DONE    DONE       DONE      11/10/08   11/07/08   05/01/08   07/01/08   2,9,155,15,16          1,851,123     1,851,123  DDJ             0           0       37,022
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey
09-0378   Reconstruction               0-005-023  11/10/09     DONE    DONE       DONE      11/03/09   10/30/09   07/15/09   07/01/09   8                        800,000             0  DDJ             0           0       16,000
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       

          #6 Dag Hammarskjold K-6:
05-0561   Reconstruction               0-006-016  04/05/06     DONE    DONE       DONE      01/17/06   01/09/06   07/28/05   07/01/05   4,8,9                    360,027       360,027  RDR             0           0            0
                                                                                                                                                                                                                                 M/E Engineering                     
  -       Reconstruction               0-006-017                                              /  /       /  /     07/20/07     /  /     2                              0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
08-0768   Reconstruction               0-006-018  12/31/08     DONE    DONE       DONE      11/19/08   11/18/08   05/01/08   07/01/08   2,7,8,155,16             734,976       734,976  DDJ             0           0       14,700
                                                                                                                                                                                                                                 Miller- Anderson Architects         
09-0379   Reconstruction               0-006-019  11/16/09     DONE    DONE       DONE      11/03/09   11/02/09   07/15/09   07/01/09   8                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       

          #7 Virgil Grissom K-6:
05-0441   Reconstruction               0-007-015  03/13/06     DONE    DONE       DONE      12/13/05   12/12/05   07/28/05   07/01/05   2,8,9,155,15,16          632,705       632,705  RDR             0           0       12,654
                                                                                                                                                                                                                                 HBMA Architecture Engineering & Land
08-0888   Reconstruction               0-007-016  02/04/09     DONE    DONE       DONE      12/09/08   12/08/08   05/01/08   07/01/08   2,8,9,10,16              827,376       827,376  DDJ             0           0       16,548
                                                                                                                                                                                                                                 SEI Design Group                    

          #9 M.L.King    K-6:
06-0662   Reconstruction               0-009-017  02/09/07     DONE    DONE       DONE      12/27/06   12/22/06   03/30/06   07/01/06   8,10,13,155,16           986,175       986,175  MGL             0           0       19,723
                                                                                                                                                                                                                                 CMA Architecture,P.C                
07-0852   Reconstruction               0-009-018  02/07/08     DONE    DONE       DONE      11/20/07   11/16/07   07/20/07   07/01/07   2,155                  1,095,389     1,095,389  MGL             0           0       21,908
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       
  -    PR Additions and Alterations    0-009-019                                              /  /       /  /     07/15/09     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Roberto Clemente New ES8:
06-0553   Reconstruction               0-010-007  03/30/07     DONE    DONE       DONE      11/28/06   11/27/06   03/30/06   07/01/06   2,4,8,9,10,13,155,15     739,616       739,616  MGL             0           0       14,792
                                                                                                                                                                                                                                 HBMA Architecture Engineering & Land
  -       Reconstruction               0-010-008                                              /  /       /  /     07/15/09     /  /     2,13,16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          M McLeod Bethune #45(fmlyNE.Elem):
06-1099   Reconstruction               0-011-008  04/11/07     DONE    DONE       DONE      03/14/07   03/08/07   03/30/06   07/01/06   2,10,13,155,15,16        400,000       400,000  MGL             0           0            0
                                                                                                                                                                                                                                 IBC Engineering,P.C.                
  -       Reconstruction               0-011-009                                              /  /       /  /     09/21/09     /  /     10,16                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          #12 J.P.B.Duffy K-5:
04-0700   Reconstruction               0-012-016  03/28/05     DONE    DONE       DONE      01/21/05   01/20/05   05/05/04   07/01/04   16                       305,879       305,879  RDR             0           0            0
                                                                                                                                                                                                                                 Terrence J. Costich                 
07-0824   Reconstruction               0-012-017  02/11/08     DONE    DONE       DONE      11/16/07   11/15/07   07/19/07   07/01/07   2,4,9,10,15,16           731,350             0  MGL             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey

          #14 C.Dewey/W of Inquiry K-5:
06-0710   Reconstruction               0-014-021  02/09/07     DONE    DONE       DONE      01/04/07   01/03/07   03/30/06   07/01/06   2,4,7,8,9,14,155,15,     540,705       540,705  MGL             0           0       10,814
                                                                                                                                                                                                                                 CMA Architecture,P.C                
  -       Reconstruction               0-014-022                                              /  /       /  /     07/15/09     /  /     7                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-014-023                                              /  /       /  /     07/15/09     /  /     2,4,7,8,9,13,16                0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          #15 Freeman Clarke School:
04-0900   Reconstruction               0-015-007  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                        39,191        39,191  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
04-0549   Reconstruction               0-015-008  03/16/05     DONE    DONE       DONE      12/15/04   12/13/04   05/05/04   07/01/04   8,9,155,15,16            641,592       641,592  RDR             0           0            0
                                                                                                                                                                                                                                 Plan Architectural Studio, P.C.     
07-1335   Reconstruction               0-015-009  03/17/08     DONE    DONE       DONE      01/07/08   01/04/08   07/19/07   07/01/07   4,8,13,15,16             244,015       244,015  MGL             0           0        4,880
                                                                                                                                                                                                                                 CMA Architecture,P.C                

          #16 J.W.Spencer K-6:
06-0638   Reconstruction               0-016-016  01/29/07     DONE    DONE       DONE      12/21/06   12/18/06   03/30/06   07/01/06   9,16                      39,270        39,270  MGL             0           0          785
                                                                                                                                                                                                                                 Terrence J. Costich                 
09-0450   Reconstruction               0-016-017                         UNREVIEWED         11/19/09   11/16/09   07/15/09   07/01/09   2,4,8,9,13,155,15,16           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       

          #17 Enrico Fermi K-5:
04-0901   Reconstruction               0-017-018  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                        44,734        44,734  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
04-0420   Reconstruction               0-017-019  01/19/05     DONE    DONE       DONE      11/22/04   11/18/04   05/05/04   07/01/04   2,7,9,155,15,16        1,930,914     1,930,914  RDR             0           0            0
                                                                                                                                                                                                                                 RFL Architects,P>C.                 
07-0671   Reconstruction               0-017-020  02/13/08     DONE    DONE       DONE      10/30/07   10/29/07   07/19/07   07/01/07   2,8,9,16               1,023,207     1,023,207  MGL             0           0       20,464
                                                                                                                                                                                                                                 IBC Engineering,P.C.                

          School of the Arts:
04-0902   Reconstruction               0-018-009  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                        56,554        56,554  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
04-0660   Reconstruction               0-018-010  02/24/05     DONE    DONE       DONE      01/11/05   01/10/05   05/06/04   07/01/04   2,4,9,16                 633,533       633,533  RDR             0           0            0
                                                                                                                                                                                                                                 FJF Architects, LLP                 
07-1421   Reconstruction               0-018-011  03/18/08     DONE    DONE       DONE      01/18/08   01/17/08   07/20/07   07/01/07   8,9,10,13,155,15,16      195,641       195,641  MGL             0           0        3,913
                                                                                                                                                                                                                                 Miller- Anderson Architects         
  -       Reconstruction               0-018-012                                              /  /       /  /     09/25/08     /  /     2,16                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          #19 Dr.C.T.Lunsford K-6:
04-0903   Reconstruction               0-019-016  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                             0     8,815,748  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
04-0581   Reconstruction               0-019-017  02/28/05     DONE    DONE       DONE      12/27/04   12/24/04   05/05/04   07/01/04   2,9,15,16                536,826       536,826  RDR             0           0            0
                                                                                                                                                                                                                                 FJF Architects, LLP                 
07-0825   Reconstruction               0-019-018  02/11/08     DONE    DONE       DONE      11/16/07   11/15/07   07/19/07   07/01/07   8,9,155,16               350,764       350,764  MGL             0           0        7,015
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey

          #20 Early Childhood School:
04-0904   Reconstruction               0-020-010  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                        51,082        51,082  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
04-1132   Reconstruction               0-020-011  05/19/05     DONE    DONE       DONE      04/11/05   04/11/05   05/05/04   07/01/04   4,10,16                  275,350       275,350  RDR             0           0            0
                                                                                                                                                                                                                                 Terrence J. Costich                 
07-1881   Reconstruction               0-020-012  05/27/08     DONE    DONE       DONE      03/31/08   03/24/08   07/19/07   07/01/07   2,4,155,16               142,428       142,428  MGL             0           0          948
                                                                                                                                                                                                                                 IBC Engineering,P.C.                

          #22 Abe Lincoln K-6:
06-0711   Reconstruction               0-022-019  02/09/07     DONE    DONE       DONE      01/04/07   01/03/07   03/30/06   07/01/06   2,4,7,155,16             200,000       200,000  MGL             0           0            0
                                                                                                                                                                                                                                 CMA Architecture,P.C                
09-0451   Reconstruction               0-022-020                         UNREVIEWED         11/19/09   11/16/09   07/15/09   07/01/09   2,8,9,155,15,16                0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       

          Francis Parker School No.23:
04-0905   Reconstruction               0-023-014  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                        45,757        45,757  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
04-0567   Reconstruction               0-023-015  02/18/05     DONE    DONE       DONE      12/17/04   12/16/04   05/05/04   07/01/04   2,9,16                   703,269       703,269  RDR             0           0            0
                                                                                                                                                                                                                                 Terrence J. Costich                 
07-1882   Reconstruction               0-023-016  05/27/08     DONE    DONE       DONE      03/31/08   03/24/08   07/19/07   07/01/07   9,10,155,15,16            73,656        73,656  MGL             0           0        1,473
                                                                                                                                                                                                                                 IBC Engineering,P.C.                

          #25 N.Hawthorne K-6:
04-0570   Reconstruction               0-025-015  01/07/05     DONE    DONE       DONE      12/22/04   12/17/04   05/05/04   07/01/04   2,4,8,16                       0     5,777,965  RDR             0           0            0
                                                                                                                                                                                                                                 Terrence J. Costich                 
07-1883   Reconstruction               0-025-016  05/27/08     DONE    DONE       DONE      03/31/08   03/24/08   07/19/07   07/01/07   9,15,16                   18,480        18,480  MGL             0           0          370
                                                                                                                                                                                                                                 IBC Engineering,P.C.                

          #28 Henry Hudson K-6:
04-0906   Reconstruction               0-028-019  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                             0     7,868,872  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
05-0538   Reconstruction               0-028-020  03/16/06     DONE    DONE       DONE      01/04/06   01/03/06   07/28/05   07/01/05   4,9,155,15,16            540,079       540,079  RDR             0           0       10,802
                                                                                                                                                                                                                                 Miller- Anderson Architects         
08-0734   Reconstruction               0-028-021  12/26/08     DONE    DONE       DONE      11/10/08   11/07/08   05/01/08   07/01/08   2,155,15,16              329,919       329,919  DDJ             0           0            0
                                                                                                                                                                                                                                 Architectura                        

          #29 Adlai Stevenson K-6:
04-0907   Reconstruction               0-029-018  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                        44,541        44,541  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
05-0550   Reconstruction               0-029-019  04/13/06     DONE    DONE       DONE      01/11/06     /  /     07/28/05   07/01/05   2,8,9                    478,500       478,500  RDR             0           0            0
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       
08-0997   Reconstruction               0-029-020  02/27/09     DONE    DONE       DONE      01/02/09   12/22/08   05/01/08   07/01/08   2,8,9,10,155,16          454,901       454,901  DDJ             0           0        9,098
                                                                                                                                                                                                                                 Stantec Consulting Services Inc,.   
  -       Reconstruction               0-029-021                                              /  /       /  /     09/25/08     /  /     2,4,7,8,9,155,15,16            0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          #30 Gen E.S.Otis K-6:
04-0908   Reconstruction               0-030-018  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                             0     7,052,599  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
05-0491   Reconstruction               0-030-019  03/16/06     DONE    DONE       DONE      12/23/05   12/23/05   07/28/05   07/01/05   2,8,9,16                 495,000       495,000  RDR             0           0            0
                                                                                                                                                                                                                                 Harison Bridges & Associates        
08-0895   Reconstruction               0-030-020  01/12/09     DONE    DONE       DONE      12/09/08   12/08/08   05/01/08   07/01/08   2,8,9                    217,470       217,470  DDJ             0           0        4,349
                                                                                                                                                                                                                                 Razak Associates,LLC,Architects     

          Dr. Freddie Thomas Lrng. Ctr.:
04-0909   Reconstruction               0-031-007  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                        11,956        11,956  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
05-0562   Reconstruction               0-031-008  04/05/06     DONE    DONE       DONE      01/17/06   01/09/06   07/28/05   07/01/05   2,4,7,8,9,155,16         400,000       400,000  RDR             0           0            0
                                                                                                                                                                                                                                 M/E Engineering                     
08-0835   Reconstruction               0-031-009  03/04/09     DONE    DONE       DONE      12/02/08   12/01/08   05/01/08   07/01/08   10,13,16                 688,182       688,182  DDJ             0           0       13,764
                                                                                                                                                                                                                                 FRA engineering & Architecture      
  -       Reconstruction               0-031-010                                              /  /       /  /     09/25/08     /  /     2,16                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Wilson Foundation Academy:
06-0683   Reconstruction               0-032-005  03/19/07     DONE    DONE       DONE      12/28/06   12/27/06   03/30/06   07/01/06   9,10,13,155              100,000       100,000  MGL             0           0            0
                                                                                                                                                                                                                                 CMA Architecture,P.C                
  -       Reconstruction               0-032-006                                              /  /       /  /     09/25/08     /  /     2,16                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Audubon K-6:
04-0910   Reconstruction               0-033-017  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                        64,535        64,535  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
07-0117   Reconstruction               0-033-019  01/25/08     DONE    DONE       DONE      08/01/07   07/31/07   07/28/05   11/16/06   2,4,7,8,9,155,15,16   36,500,000    21,904,023  MGL             0           0    9,333,051
                                                                                                                                                                                                                                 Stantec Architecture                

          #34 Dr. L.A.Cerulli K-6:
06-0604   Reconstruction               0-034-018  02/07/07     DONE    DONE       DONE      12/11/06   12/11/06   03/30/06   07/01/06   8,9,10,13,155,15,16      383,980       383,980  MGL             0           0        7,680
                                                                                                                                                                                                                                 Miller- Anderson Architects         
  -       Reconstruction               0-034-019                                              /  /       /  /     07/15/09     /  /     2,8,9,10,13,155,15,1           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          #35 Pinnacle K-6:
04-0911   Reconstruction               0-035-014  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                        57,237        57,237  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
04-0583   Reconstruction               0-035-015  02/09/05     DONE    DONE       DONE      12/27/04   12/24/04   05/05/04   07/01/04   2,9,155                  669,011       669,011  RDR             0           0            0
                                                                                                                                                                                                                                 Heininger Bataille Marquest Alatmura
07-1474   Reconstruction               0-035-016  04/14/08     DONE    DONE       DONE      01/29/08   01/28/08   07/19/07   07/01/07   8,155,16                  59,136        59,136  MGL             0           0        1,183
                                                                                                                                                                                                                                 FRA engineering & Architecture      

          #36 H.W.Longfellow K-5:
04-0912   Reconstruction               0-036-013  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                        29,429        29,429  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
04-1066   Reconstruction               0-036-014  04/12/05     DONE    DONE       DONE      04/01/05   03/31/05   05/05/04   07/01/04   2,8,9,16                 115,360       115,360  RDR             0           0            0
                                                                                                                                                                                                                                 FJF Architects, LLP                 
07-1475   Reconstruction               0-036-015  04/14/08     DONE    DONE       DONE      01/29/08   01/28/08   07/19/07   07/01/07   9,14                      27,720        27,720  MGL             0           0          554
                                                                                                                                                                                                                                 FRA engineering & Architecture      

          #37 L.E.Morgan K-6:
  -       Reconstruction               0-037-016                                              /  /       /  /     11/01/06     /  /     2,4,7,8,9,10,13,155,           0     4,629,371  MGL             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-037-017                                              /  /       /  /     07/20/07     /  /     2,7,8,9,155,16                 0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          #39 A.J.Townson K-6:
04-0913   Reconstruction               0-039-014  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                        47,933        47,933  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
05-0505   Reconstruction               0-039-015  03/13/06     DONE    DONE       DONE      12/27/05   12/23/05   07/28/05   07/01/05   2,8,155,16             1,071,917     1,071,917  RDR             0           0            0
                                                                                                                                                                                                                                 CMA Architecture,P.C                
08-0836   Reconstruction               0-039-016  03/04/09     DONE    DONE       DONE      12/02/08   12/01/08   05/01/08   07/01/08   2,4                      397,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 FRA engineering & Architecture      

          #41 Kodak Park K-6:
04-0914   Reconstruction               0-041-018  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                        32,786        32,786  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
04-1133   Reconstruction               0-041-019  06/10/05     DONE    DONE       DONE      04/11/05   04/11/05   05/05/04   07/01/04   2,9,15,16                343,098       343,098  RDR             0           0            0
                                                                                                                                                                                                                                 Terrence J. Costich                 
07-1884   Reconstruction               0-041-020  05/27/08     DONE    DONE       DONE      03/31/08   03/24/08   07/19/07   07/01/07   8,9,13,155,16             42,240        42,240  MGL             0           0          845
                                                                                                                                                                                                                                 IBC Engineering,P.C.                
  -       Reconstruction               0-041-021                                              /  /       /  /     07/19/07     /  /     9,15,16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          #42 Abelard Reynolds K-6:
  -    XX Reconstruction               0-042-013                         CANCELLED            /  /       /  /     01/14/05     /  /     155,15,16                      0     7,207,211  MGL             0           0            0
                                                                                                                                                                                                                                                                     
06-1047   Reconstruction               0-042-014  04/30/07     DONE    DONE       DONE      03/06/07   03/01/07   03/30/06   07/01/06   9,13,155,15,16           385,167       385,167  MGL             0           0        7,703
                                                                                                                                                                                                                                 Terrence J. Costich                 
09-0385   Additions and Alterations    0-042-015               STARTED STARTED    UNREVIEWED11/03/09   11/02/09   07/15/09   07/01/09   02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       

          #43 T.Roosevelt K-6:
04-0915   Reconstruction               0-043-013  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                        65,802        65,802  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
04-0421   Reconstruction               0-043-014  01/03/05     DONE    DONE       DONE      11/22/04   11/18/04   05/05/04   07/01/04   8,9,155,15,16            365,462       365,462  RDR             0           0            0
                                                                                                                                                                                                                                 Fraser-Willey&Associaes,P.C         
07-1476   Additions and Alterations    0-043-015  04/14/08     DONE    DONE       DONE      01/29/08   01/28/08   07/19/07   07/01/07   02 - 16                  148,896       148,896  MGL             0           0        2,978
                                                                                                                                                                                                                                 FRA engineering & Architecture      

          #44 Lincoln Park K-6:
06-0712   Reconstruction               0-044-021  02/09/07     DONE    DONE       DONE      01/04/07   01/03/07   03/30/06   07/01/06   8,9,10,15                454,356       454,356  MGL             0           0        9,087
                                                                                                                                                                                                                                 CMA Architecture,P.C                
07-1885   Reconstruction               0-044-022  05/27/08     DONE    DONE       DONE      03/31/08   03/24/08   07/20/07   07/01/07   155,15                   240,636       240,636  MGL             0           0        4,813
                                                                                                                                                                                                                                 IBC Engineering,P.C.                
09-0418   Reconstruction               0-044-023               STARTED STARTED    UNREVIEWED11/18/09   11/09/09   07/15/09   07/01/09   4                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       

          Sch W/out Walls 9-12:
04-0550   Reconstruction               0-045-011  03/16/05     DONE    DONE       DONE      12/15/04   12/13/04   05/07/04   07/01/04   2,8,9,155,15,16          495,704       495,704  RDR             0           0            0
                                                                                                                                                                                                                                 Plan Architectural Studio, P.C.     
07-1336   Reconstruction               0-045-012  03/17/08     DONE    DONE       DONE      01/07/08   01/04/08   07/24/07   07/01/07   8,16                     532,963       532,963  MGL             0           0       10,659
                                                                                                                                                                                                                                 CMA Architecture,P.C                
  -       Reconstruction               0-045-013                                              /  /       /  /     09/25/08     /  /     2,16                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-045-014                                              /  /       /  /     07/15/09     /  /     16                             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-045-015                                              /  /       /  /     07/15/09     /  /     13,16                          0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-045-016                                              /  /       /  /       /  /       /  /     16                             0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          #46 C.Carroll K-6:
05-0537   Reconstruction               0-046-018  03/15/06     DONE    DONE       DONE      01/04/06   01/03/06   07/28/05   07/01/05   7,10                      76,263        76,263  RDR             0           0        1,525
                                                                                                                                                                                                                                 Miller- Anderson Architects         
08-0837   Reconstruction               0-046-019  03/04/09     DONE    DONE       DONE      12/02/08   12/01/08   05/01/08   07/01/08   2,9                      229,271       229,271  DDJ             0           0            0
                                                                                                                                                                                                                                 FRA engineering & Architecture      

          #50 H.B.Montgomery K-5:
04-0649   Reconstruction               0-050-013  02/09/05     DONE    DONE       DONE      01/10/05   01/07/05   05/25/01   07/01/04   8                        889,861       889,861  RDR             0           0            0
                                                                                                                                                                                                                                 Harrison Bridges & Associates       
06-0666   Reconstruction               0-050-018  04/02/07     DONE    DONE       DONE      12/27/06   12/22/06   03/30/06   07/01/06   8,10,13,15,16            227,761       227,761  MGL             0           0        4,555
                                                                                                                                                                                                                                 HBMA Architecture Engineering & Land
  -       Reconstruction               0-050-019                                              /  /       /  /     07/15/09     /  /     7                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          #52 F.F.Dow K-5:
04-0916   Reconstruction               0-052-015  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                        75,010        75,010  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
04-0453   Reconstruction               0-052-016  12/24/04     DONE    DONE       DONE      11/24/04   11/24/04   05/05/04   07/01/04   2,8,9,15,16              625,078       625,078  RDR             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 
07-1477   Reconstruction               0-052-017  04/14/08     DONE    DONE       DONE      01/29/08   01/28/08   01/29/08   07/01/07                             65,472        65,472  MGL             0           0        1,309
                                                                                                                                                                                                                                 FRA engineering & Architecture      

          #57 Early Childhood Ctr.:
06-0639   Reconstruction               0-087-010  01/29/07     DONE    DONE       DONE      12/21/06   12/18/06   03/30/06   07/01/06   2,8,9,13,155,16          150,000       150,000  MGL             0           0            0
                                                                                                                                                                                                                                 Terrence J. Costich                 
  -       Reconstruction               0-087-011                                              /  /       /  /     09/21/09     /  /     2,8                            0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Franklin HS 9-12:
04-0917   Reconstruction               0-101-024  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                        95,599        95,599  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
04-0838   Reconstruction               0-101-025  04/13/05     DONE    DONE       DONE      02/23/05   02/11/05   05/05/04   07/01/04   7,8,9,155,15,16        3,463,485     3,463,485  RDR             0           0            0
                                                                                                                                                                                                                                 Miller- Anderson Architects         
  -       Reconstruction               0-101-026                                              /  /       /  /     08/01/05     /  /     4,8,9,155,15,16                0    30,073,344  MGL             0           0            0
                                                                                                                                                                                                                                                                     
07-1525   Reconstruction               0-101-027  05/08/08     DONE    DONE       DONE      02/01/08   01/31/08   07/19/07   07/01/07   2,8,9,13,16            1,533,416     1,533,416  MGL             0           0       30,668
                                                                                                                                                                                                                                 Miller- Anderson Architects         
  -       Reconstruction               0-101-028                                              /  /       /  /     09/25/08     /  /     2,16                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Charlotte M.S. 6-8:
04-0918   Reconstruction               0-102-024  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                             0    21,266,705  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
05-0421   Reconstruction               0-102-025  04/06/06     DONE    DONE       DONE      12/07/05   12/05/05   07/28/05   07/01/05   9,10,155,15,16           707,256       707,256  RDR             0           0       14,145
                                                                                                                                                                                                                                 Plan Architectural Studio, P.C.     
07-1933   Reconstruction               0-102-026  05/13/08     DONE    DONE       DONE      04/08/08   03/31/08   07/20/07   07/01/07   7                        300,000             0  DDJ             0           0        6,000
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       
08-0833   Reconstruction               0-102-027  02/02/09     DONE    DONE       DONE      12/02/08   12/01/08   05/01/08   07/01/08   8,9,10,13,155,16         583,608       583,608  DDJ             0           0       11,672
                                                                                                                                                                                                                                 Smith+Associates Architects         
  -       Reconstruction               0-102-028                                              /  /       /  /     09/25/08     /  /     2,16                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-102-029                                              /  /       /  /     07/15/09     /  /     7                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          East High School  9-12:
04-1261   Reconstruction               0-103-024  05/19/05     DONE    DONE       DONE      05/11/05   05/04/05   04/08/05   07/01/04   2,9                      280,983       280,983  RDR             0           0            0
                                                                                                                                                                                                                                 Terrence J. Costich                 
05-0528   Reconstruction               0-103-025  03/31/06     DONE    DONE       DONE      01/03/06   12/30/05   07/28/05   07/01/05   2,4,9,155,15,16        1,561,758     1,561,758  RDR             0           0       29,836
                                                                                                                                                                                                                                 CMA Architecture,P.C                
07-1105   Reconstruction               0-103-026  02/14/08     DONE    DONE       DONE      12/12/07   12/11/07   07/20/07   07/01/07   155                      550,633       550,633  MGL             0           0       11,013
                                                                                                                                                                                                                                 Miller- Anderson Architects         
08-0788   Reconstruction               0-103-027  01/07/09     DONE    DONE       DONE      11/24/08   11/24/08   05/01/08   07/01/08   2,9,10,155,16          1,708,476     1,708,476  DDJ             0           0       34,170
                                                                                                                                                                                                                                 Clark Patterson Associates          
  -       Reconstruction               0-103-028                                              /  /       /  /     09/25/08     /  /     2,16                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Jefferson M.S. 6-8:
05-0560   Reconstruction               0-105-022  04/07/06     DONE    DONE       DONE      01/17/06   01/09/06   08/01/05   07/01/05   2,4,8,9,155,15,16      1,664,257     1,664,257  RDR             0           0       33,285
                                                                                                                                                                                                                                 M/E Engineering                     
07-1043   Reconstruction               0-105-023  01/08/08     DONE    DONE       DONE      12/05/07   12/03/07   10/23/07   07/01/07   16                        98,683        98,683  MGL             0           0        1,974
                                                                                                                                                                                                                                 IBC Engineering,P.C.                
08-1000   Reconstruction               0-105-024  03/17/09     DONE    DONE       DONE      01/02/09   12/22/08   05/01/08   07/01/08   8,9,10,13,155,16       1,019,238     1,019,238  DDJ             0           0       20,385
                                                                                                                                                                                                                                 Miller- Anderson Architects         
  -       Reconstruction               0-105-025                                              /  /       /  /     09/25/08     /  /     2,16                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Monroe M.S. 6-8:
04-0919   Reconstruction               0-107-020  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                             0    34,129,111  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
04-0551   Reconstruction               0-107-021  03/16/05     DONE    DONE       DONE      12/15/04   12/13/04   05/05/04   07/01/04   2,4,9,15,16            3,766,304     3,766,304  RDR             0           0            0
                                                                                                                                                                                                                                 Plan Architectural Studio, P.C.     
06-1567   Reconstruction               0-107-022  06/25/07     DONE    DONE       DONE      06/04/07   06/04/07   04/04/07   07/01/06   9                        125,374       125,374  MGL             0           0            0
                                                                                                                                                                                                                                 Terrence J. Costich                 
07-1337   Reconstruction               0-107-023  03/17/08     DONE    DONE       DONE      01/07/08   01/04/08   07/20/07   07/01/07   2,4,8,9,10,13,16         169,240       169,240  MGL             0           0        3,385
                                                                                                                                                                                                                                 CMA Architecture,P.C                
  -       Reconstruction               0-107-024                                              /  /       /  /     08/10/07     /  /     13,16                          0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Wilson HS 9-12:
06-0684   Reconstruction               0-108-019  03/19/07     DONE    DONE       DONE      12/28/06   12/27/06   03/30/06   07/01/06   2,9,13,155,15,16         744,504       744,504  MGL             0           0       14,890
                                                                                                                                                                                                                                 CMA Architecture,P.C                
  -       Reconstruction               0-108-020                                              /  /       /  /     09/25/08     /  /     2,16                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-108-021                                              /  /       /  /     07/15/09     /  /     2,8,9,10,13,155,15,1           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          F. Douglass M.S. 6-8:
06-0797   Reconstruction               0-109-021  03/22/07     DONE    DONE       DONE      01/23/07   01/22/07   03/30/06   07/01/06   4,8,9,10,13,15,16      1,175,139     1,175,139  MGL             0           0       23,503
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey
07-0920   Reconstruction               0-109-022  02/13/08     DONE    DONE       DONE      11/23/07   11/21/07   07/20/07   07/01/07   2,8,9,155,15,16        2,436,126     2,436,126  MGL             0           0       48,723
                                                                                                                                                                                                                                 EDGE Architecture                   
  -       Reconstruction               0-109-023                                              /  /       /  /     09/25/08     /  /     2,16                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-109-024                                              /  /       /  /     07/15/09     /  /     8,9,13,155,16                  0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Marshall HS 9-12:
04-0920   Reconstruction               0-110-027  03/28/05     DONE    DONE       DONE      03/09/05   03/07/05   04/22/04   07/01/04   16                        63,247        63,247  RDR             0           0            0
                                                                                                                                                                                                                                 TLC Engineering,P.C.                
04-0547   Reconstruction               0-110-028  02/01/05     DONE    DONE       DONE      12/14/04   12/13/04   05/05/04   07/01/04   4,7,8,9,155,15,16      2,379,510     2,379,510  RDR             0           0            0
                                                                                                                                                                                                                                 Plan Architectural Studio, P.C.     
07-0944   Reconstruction               0-110-029  03/24/08     DONE    DONE       DONE      11/23/07   11/23/07     /  /     07/01/07   4,7,8,9,155,15,16        468,304       468,304  MGL             0           0        9,366
                                                                                                                                                                                                                                 Miller- Anderson Architects         
  -       Reconstruction               0-110-030                                              /  /       /  /     09/25/08     /  /     2,16                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Edison Tech/Occ H.S. 9-12:
04-0821   Reconstruction               0-111-021  04/12/05     DONE    DONE       DONE      02/14/05   02/11/05   05/05/04   07/01/04   4,8,9,155,15,16        3,685,423     3,685,423  RDR             0           0            0
                                                                                                                                                                                                                                 Miller- Anderson Architects         
05-0785   Reconstruction               0-111-022  04/12/06     DONE    DONE       DONE      02/16/06   02/13/06   07/28/05   07/01/05   9,155,15,16            2,492,747     2,492,747  RDR             0           0       49,855
                                                                                                                                                                                                                                 Miller- Anderson Architects         
06-0655   Reconstruction               0-111-023  01/31/07     DONE    DONE       DONE      12/21/06   12/20/06   03/30/06   07/01/06   2,13,155,16            1,418,868     1,418,868  MGL             0           0            0
                                                                                                                                                                                                                                 Miller- Anderson Architects         
07-1044   Reconstruction               0-111-024  02/14/08     DONE    DONE       DONE      12/05/07   12/03/07   07/20/07   07/01/07   2,13,155,16              525,587       525,587  MGL             0           0       10,512
                                                                                                                                                                                                                                 Miller- Anderson Architects         
  -       Reconstruction               0-111-025                                              /  /       /  /     09/25/08     /  /     2,16                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-111-026                                              /  /       /  /     07/15/09     /  /     8,9,13,155,15,16               0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          1ofton SHS 9-12:
  -       Reconstruction               0-112-015                                              /  /       /  /     07/20/07     /  /     8,9,10,155,15,16               0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Service Station:
  -    XX Reconstruction               0-117-002                         CANCELLED            /  /       /  /     12/29/04     /  /     4,8,9,16                       0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Modular Classroom:
  -    PR New Construction             0-178-001                                              /  /       /  /     04/11/07     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Central Office:
  -       Reconstruction               1-053-010                                              /  /       /  /     08/01/05     /  /     4,7                            0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               1-053-011                                              /  /       /  /     03/30/06     /  /     7,8                            0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               1-053-012                                              /  /       /  /     05/10/07     /  /     15,16                          0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Guard Station @ Transp.Dept.(Demolis:
  -    XX Reconstruction               1-171-002                         CANCELLED            /  /       /  /     06/30/06     /  /     2,10,155,16                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Grounds Bldg-Quonset Hut:
06-0726   Reconstruction               2-080-002  04/19/07     DONE    DONE       DONE      01/10/07   01/08/07   09/21/06   07/01/05   2,10                      44,608             0  MGL             0           0            0
                                                                                                                                                                                                                                 Wendel Duchscherer                  

          Maintenance Shed @ Carrol School:
08-1132   New Construction             3-180-001  03/04/09     DONE    DONE       DONE      01/27/09   01/16/09   12/02/08   07/01/08   02 - 16                   70,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 FRA engineering & Architecture      

          Adlai E. Stevenson-Maintenance Shed:
08-1301   New Construction             3-181-001  02/27/09     DONE    DONE       DONE      02/27/09   02/27/09   01/09/09   07/01/08   02 - 16                   54,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Stantec Consulting Services Inc,.   

          Trans. Bldg. @ Service Center:
04-0648   Reconstruction               5-078-104  04/18/05     DONE    DONE       DONE      01/10/05   01/07/05   05/07/04   07/01/04   7                      1,039,490     1,039,490  RDR             0           0            0
                                                                                                                                                                                                                                 Terrence J. Costich                 
  -    XX Reconstruction               5-078-105                         CANCELLED            /  /       /  /     08/01/05     /  /     2                              0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
  -    XX Additions and Alterations    5-078-106                         CANCELLED            /  /       /  /     03/30/06     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
06-0727   Reconstruction               5-078-107  04/19/07     DONE    DONE       DONE      01/10/07   01/08/07   06/30/06   07/01/05   2,10,16                2,006,287     2,006,287  MGL             0           0            0
                                                                                                                                                                                                                                 Wendel Duchscherer                  

          Recreation Bldg:
05-0604   Reconstruction               7-058-001  04/10/06     DONE    DONE       DONE      01/18/06   01/09/06   07/27/05   07/10/05   2,4,8,9,15,16            504,438       504,438  RDR             0           0            0
                                                                                                                                                                                                                                 CMA Architecture,P.C                
06-0663   Reconstruction               7-059-001  02/09/07     DONE    DONE       DONE      12/27/06   12/22/06   09/22/06   07/01/06   2,8,10,13,155,15,16      359,600             0  MGL             0           0            0
                                                                                                                                                                                                                                 CMA Architecture,P.C                
  -       Reconstruction               7-059-002                                              /  /       /  /     10/02/09     /  /     4,7,8,9,155,15,16              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
04-0701   Reconstruction               7-060-001  03/28/05     DONE    DONE       DONE      01/21/05   01/20/05   08/10/04   07/01/04   2,8,9,155,15,16          176,725             0  RDR             0           0            0
                                                                                                                                                                                                                                 Terrence J. Costich                 
04-0582   Reconstruction               7-062-001  02/28/05     DONE    DONE       DONE      12/27/04   12/24/04   08/10/04   07/01/04   2,9,155,15,16            215,292             0  RDR             0           0            0
                                                                                                                                                                                                                                 FJF Architects, LLP                 

          R.I.S.E. Bldg.-Service Center:
06-0728XX Additions and Alterations    7-079-002  04/19/07               CANCELLED          01/10/07   01/08/07   06/30/06   07/01/05   02 - 16                1,151,000             0  MGL             0           0            0
                                                                                                                                                                                                                                 Wendel Duchscherer                  

          Svce. Ctr. Storehouse, Kitchen, Offi:
06-0729   Additions and Alterations    7-081-002  04/19/07     DONE    DONE       DONE      01/10/07   01/08/07   06/30/06   07/01/05   02 - 16                  705,626             0  MGL             0           0            0
                                                                                                                                                                                                                                 Wendel Duchscherer                  

          Press Box@Marshall Ctr for Learning:
04-0548   Reconstruction               7-134-002  02/01/05     DONE    DONE       DONE      12/14/04   12/13/04   11/23/04   07/01/04   2,4,8,15,16              250,000             0  RDR             0           0            0
                                                                                                                                                                                                                                 Plan Architectural Studio, P.C.     

          Baseball Press Box @ East HS:
  -       New Construction             7-172-001                                              /  /       /  /     01/09/06     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Grounds Department Building:
06-0730   New Construction             7-174-001  04/19/07     DONE    DONE       DONE      01/10/07   01/08/07   07/10/06   07/01/05   02 - 16                3,182,932             0  MGL             0           0            0
                                                                                                                                                                                                                                 Wendel Duchscherer                  

          Field House @ Charlotte High School:
08-0834   New Construction             7-179-001  02/02/09     DONE    DONE       DONE      12/02/08   12/01/08   09/26/08   07/01/08   02 - 16                  681,309             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Smith+Associates Architects         

          St. Simon's Terr. (Marritta):
  -       Reconstruction               8-057-002                                              /  /       /  /     07/15/09     /  /     2,8                            0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Rochester Bus. Institute-RBI Tutoria:
07-1544   Reconstruction               8-121-004  04/18/08     DONE    DONE       DONE      02/06/08   01/30/08   10/14/05   07/01/07   2,8,9,155,15,16        1,267,180     1,267,180  MGL             0           0       25,344
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       
  -       Reconstruction               8-121-005                                              /  /       /  /     09/25/08     /  /     2,16                           0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Sacred Heart School:
  -    TQ Temporary Quarters           8-173-001                                              /  /       /  /     06/29/06     /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Lease @ 690 St. Paul Street:
07-1440   Reconstruction               8-176-L01  01/29/08     DONE    DONE       DONE      01/25/08   01/25/08   02/27/07   03/27/08                         13,875,000    12,129,779  MGL             0           0            0
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       

          Purchase Former Rochester Charter Sc:
07-0916   New Construction             8-177-001  03/17/08     DONE    DONE       DONE      11/23/07   11/20/07   02/27/07   07/19/07   02 - 16                5,000,000     1,699,494  MGL             0           0    3,176,670
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       

          I'm ready community learning center:
09-0375   Reconstruction               8-182-L01  11/13/09     DONE    DONE       DONE      10/30/09   10/29/09   05/27/09   06/24/09                            657,587       657,587  DDJ             0           0            0
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




RUSH HENRIETTA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-17-01-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Winslow Elementary School:
07-0757   Reconstruction               0-002-013  03/31/08     DONE    DONE       DONE      11/07/07   11/06/07   06/19/07   05/07/07   2,4,7,8,9,155,15,16    2,084,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 
  -       Reconstruction               0-002-014                                              /  /       /  /     08/14/09     /  /     2,9,155,15,16                  0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Roth Middle School:
06-0790   Reconstruction               0-003-021  04/20/07     DONE    DONE       DONE      01/19/07   01/10/07   09/02/05   12/13/05   2,4,7,8,9,155,15,16    4,200,000     2,256,267  HCM             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 
  -       Reconstruction               0-003-022                                              /  /       /  /     08/14/09     /  /     2,4,8,9,10,155,15,16           0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
07-2175SC Visual Structural Inspection 0-003-SC1  06/04/08     DONE    DONE       DONE      01/25/08   01/25/08     /  /       /  /     16                         3,931             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Leary Elementary School:
08-0857   Additions and Alterations    0-005-016  05/14/09     DONE    DONE       DONE      12/04/08   12/02/08   06/11/08   05/07/08   02 - 16                3,000,000       610,000  HCM             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          Carlton Webster-Ninth Grade Academy:
07-0758   Reconstruction               0-006-013  03/31/08     DONE    DONE       DONE      11/07/07   11/06/07   06/19/07   05/07/07   2,4,8,9,155,15,16        464,000       464,000  HCM             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 
  -       Reconstruction               0-006-014                                              /  /       /  /     08/14/09     /  /     2,7,8,155,15,16                0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
07-2173SC Visual Structural Inspection 0-006-SC1  06/04/08     DONE    DONE       DONE      01/25/08   01/25/08     /  /       /  /     16                         2,500             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Ethel K Fyle Elementary:
08-0858   Reconstruction               0-007-017  05/14/09     DONE    DONE       DONE      12/04/08   12/02/08   06/11/08   05/07/08   2,4,7,8,9,155,15,16      890,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          Emma Sherman Elementary:
07-0759   Reconstruction               0-008-014  03/31/08     DONE    DONE       DONE      11/07/07   11/06/07   11/20/06   05/07/07   2,4,7,8,9,155,15,16    1,174,000     1,174,000  HCM             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          David Crane Elementary:
04-1194   Reconstruction               0-009-016  04/26/05     DONE    DONE       DONE      04/25/05   04/19/05   03/03/05   05/31/02   7                        855,012       855,012  HCM             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 
07-0760   Reconstruction               0-009-017  03/31/08     DONE    DONE       DONE      11/07/07   11/06/07   11/20/06   05/07/07   2,4,7,8,9,155,15,16      324,000       324,000  HCM             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          Burger Middle School:
  -    PR Additions and Alterations    0-010-012                                              /  /       /  /     09/02/05     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-0791   Additions and Alterations    0-010-012  04/20/07     DONE    DONE       DONE      01/19/07   01/10/07   09/02/05   12/13/05   02 - 16               16,039,542     5,368,846  HCM             0           0    1,828,544
                                                                                                                                                                                                                                 La Bella Associates                 
  -       Reconstruction               0-010-013                                              /  /       /  /     10/05/09     /  /     10                             0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Rush Henrietta Sperry School:
  -    PR Additions and Alterations    0-011-024                                              /  /       /  /     09/02/05     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
05-1385   Reconstruction               0-011-025  05/10/06     DONE    DONE       DONE      06/19/06   06/19/06   04/06/06   05/17/05   155,15                   121,454       121,454  HCM             0           0            0
                                                                                                                                                                                                                                 M/E Engineering                     
06-1272   Reconstruction               0-011-026  02/22/08     DONE    DONE       DONE      04/04/07   04/04/07   11/20/06   12/13/05   2,4,8,9,155,15,16      2,997,000     2,997,000  HCM             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 
06-1392SC Visual Structural Inspection 0-011-SC1  05/02/07     DONE    DONE       DONE      03/01/07   03/01/07     /  /       /  /     16                         4,000             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
07-2174SC Visual Structural Inspection 0-011-SC2  06/04/08     DONE    DONE       DONE      01/25/08   01/25/08     /  /       /  /     16                        13,666             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          New Administration Building:
07-0856   New Construction             1-023-001  05/05/08     DONE    DONE       DONE      11/20/07   11/19/07   04/10/07     /  /     02 - 16                2,906,895             0  HCM             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          Erie Station Storage:
  -       New Construction             2-025-001                                              /  /       /  /     08/25/09     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Guard House East @ Sperry HS:
06-1273   New Construction             7-021-001  02/22/08     DONE    DONE       DONE      04/04/07   04/04/07   01/24/07   12/13/05   02 - 16                   30,500             0  HCM             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          Guard House West @ Sperry HS:
06-1274   New Construction             7-022-001  02/22/08     DONE    DONE       DONE      04/04/07   04/04/07   01/24/07   12/13/05   02 - 16                   30,500             0  HCM             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          Church of the Good Shepard Elem.:
07-2264TQ Temporary Quarters           8-024-001  07/07/08     DONE    DONE       DONE      06/16/08   06/03/08   06/13/08     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BROCKPORT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-18-01-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Middle School:
05-0267   Reconstruction               0-001-012  03/06/06     DONE    DONE       DONE      10/19/05   10/18/05   04/06/05   05/17/05   2,4,7,8,9,15,16        1,238,591     1,238,591  JOD             0           0            0
                                                                                                                                                                                                                                 Konopka Architecture                
06-0529   Reconstruction               0-001-013  02/13/07     DONE    DONE       DONE      11/21/06   11/20/06   09/13/06   05/16/06   2,7,8,9,155,16           408,003       127,300  JOD             0           0       51,000
                                                                                                                                                                                                                                 Konopka Architecture                
07-0264   Reconstruction               0-001-014  01/16/08     DONE    DONE       DONE      09/04/07   08/30/07   01/04/07   02/13/07   2,4,7,16                 853,762       747,888  JOD             0           0       79,400
                                                                                                                                                                                                                                 Konopka Architecture                

          E. Barclay Elementary School:
05-0268   Reconstruction               0-002-011  03/06/06     DONE    DONE       DONE      10/19/05   10/18/05   04/06/05   05/17/05   2,4,7,8,9,10,13,14,1   1,918,568     1,918,568  JOD             0           0            0
                                                                                                                                                                                                                                 Konopka Architecture                
06-0530   Reconstruction               0-002-012  02/13/07     DONE    DONE       DONE      11/21/06   11/20/06   09/13/06   05/16/06   2,8,9,16                 134,749       172,455  JOD             0           0       16,844
                                                                                                                                                                                                                                 Konopka Architecture                
07-0265   Reconstruction               0-002-013  01/16/08     DONE    DONE       DONE      09/04/07   08/30/07   01/04/07   02/13/07   2,9,155,15,16            905,296     1,077,206  JOD             0           0       84,193
                                                                                                                                                                                                                                 Konopka Architecture                

          J. Ginther Elementary:
05-0269   Reconstruction               0-004-010  03/06/06     DONE    DONE       DONE      10/19/05   10/18/05   04/06/05   05/17/05   2,8,155,15,16            448,443       448,443  JOD             0           0            0
                                                                                                                                                                                                                                 Konopka Architecture                
06-0531   Reconstruction               0-004-011  02/13/07     DONE    DONE       DONE      11/21/06   11/20/06   09/13/06   05/16/06   2,8,9,16                 156,301       233,000  JOD             0           0       19,538
                                                                                                                                                                                                                                 Konopka Architecture                
07-0266   Reconstruction               0-004-012  01/16/08     DONE    DONE       DONE      09/04/07   08/30/07   01/04/07   02/13/07   2,4,8,9,10,155,15,16     397,644       367,154  JOD             0           0       36,981
                                                                                                                                                                                                                                 Konopka Architecture                

          Senior High School:
05-0270   Reconstruction               0-007-019  03/06/06     DONE    DONE       DONE      10/19/05   10/18/05   04/06/05   05/17/05   2,4,9,10,155,15,16     2,596,362     2,596,362  JOD             0           0            0
                                                                                                                                                                                                                                 Konopka Architecture                
06-0532   Reconstruction               0-007-020  02/13/07     DONE    DONE       DONE      11/21/06   11/20/06   09/13/06   05/16/06   2,8,9,16               1,173,827     1,348,230  JOD             0           0      146,728
                                                                                                                                                                                                                                 Konopka Architecture                
07-0267   Reconstruction               0-007-021  01/16/08     DONE    DONE       DONE      09/04/07   08/30/07   01/04/07   02/13/07   2,4,7,8,9,10,155,15,   2,208,916     2,508,165  JOD             0           0      205,429
                                                                                                                                                                                                                                 Konopka Architecture                

          Fred Hill Intermediate School:
05-0271   Reconstruction               0-010-012  03/06/06     DONE    DONE       DONE      10/19/05   10/18/05   04/06/05   05/17/05   2,7,8,9,155,15,16        969,320       969,320  JOD             0           0            0
                                                                                                                                                                                                                                 Konopka Architecture                
06-0533   Reconstruction               0-010-013  02/13/07     DONE    DONE       DONE      11/21/06   11/20/06   09/13/06   05/16/06   2,7,8,9,155,16           153,188       153,188  JOD             0           0       19,149
                                                                                                                                                                                                                                 Konopka Architecture                
07-0268   Reconstruction               0-010-014  01/16/08     DONE    DONE       DONE      09/04/07   08/30/07   01/04/07   02/13/07   7,8,9,16                 499,479       742,987  JOD             0           0       46,451
                                                                                                                                                                                                                                 Konopka Architecture                

          District Office Facility:
06-0534   Reconstruction               1-014-002  02/13/07     DONE    DONE       DONE      11/21/06   11/20/06   09/13/06   05/16/06   2,9,16                    23,932             0  JOD             0           0            0
                                                                                                                                                                                                                                 Konopka Architecture                

          New Storage Bldg.:
05-0272   Reconstruction               2-012-002  03/06/06     DONE    DONE       DONE      10/19/05   10/18/05   04/06/05   05/17/05   2                         79,641             0  JOD             0           0            0
                                                                                                                                                                                                                                 Konopka Architecture                

          Buildings & Grounds Facility:
05-0273   Reconstruction               3-011-003  03/06/06     DONE    DONE       DONE      10/19/05   10/18/05   04/06/05   05/17/05   2                         79,641             0  JOD             0           0            0
                                                                                                                                                                                                                                 Konopka Architecture                

          Bus Garage(see 1-003):
05-0274   Reconstruction               5-003-009  03/06/06     DONE    DONE       DONE      10/19/05   10/18/05   04/06/05   05/17/05   2,16                      48,173        48,173  JOD             0           0            0
                                                                                                                                                                                                                                 Konopka Architecture                
09-0347   Reconstruction               5-003-010               DONE    STARTED    UNREVIEWED10/27/09   10/22/09   09/17/08   03/05/09                                  0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Konopka Architecture                

          Transporation Facility:
08-1674   New Construction             5-016-001  09/17/09     DONE    DONE       DONE      06/09/09   06/04/09   06/20/08   03/05/09   02 - 16                9,623,249             0  JOD             0           0            0
                                                                                                                                                                                                                                 Konopka Architecture                

          Stadium Concession:
05-0829   New Construction             7-015-001  02/02/07     DONE    DONE       DONE      02/28/06   02/27/06   02/28/06   05/16/06   02 - 16                  390,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Konopka Architecture                

          New Press Box @ High School:
  -    PR New Construction             7-017-001                                              /  /       /  /     05/14/09     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Districtwide:
09-0253   Reconstruction               7-999-001  10/01/09     DONE    DONE       DONE      09/22/09   09/21/09   05/14/09   05/19/09   16                       140,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Konopka Architecture                


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WEBSTER CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-19-01-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Spry MS 7-9:
  -    PR Additions and Alterations    0-001-009                                              /  /       /  /     07/26/05     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0757   Additions and Alterations    0-001-009  05/23/07     DONE    DONE       DONE      01/12/07   01/11/07   07/26/05   05/16/06   02 - 16                3,263,861     3,263,861  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0235   Reconstruction               0-001-010  04/17/08     DONE    DONE       DONE      08/23/07   08/23/07   06/20/07   05/16/06   2,4,8,9,10,155,15,16   1,952,399             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Klem Road North Elementary:
  -    PR Additions and Alterations    0-003-007                                              /  /       /  /     07/26/05     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0758   Additions and Alterations    0-003-007  05/23/07     DONE    DONE       DONE      01/12/07   01/11/07   07/26/05   05/16/06   02 - 16                  515,053       515,053  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0230   Reconstruction               0-003-008  02/29/08     DONE    DONE       DONE      08/23/07   08/23/07   06/20/07   05/16/06   2,4,8,9,10,155,15,16   2,704,030             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
04-0234   Reconstruction               0-003-FP1  12/23/04     DONE    DONE       DONE      09/16/04     /  /       /  /       /  /     16                         3,600         3,600  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Plank Road North Elementary:
  -    PR Additions and Alterations    0-009-009                                              /  /       /  /     07/26/05     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0752   Additions and Alterations    0-009-009  05/17/07     DONE    DONE       DONE      01/12/07   01/11/07   07/26/05   05/16/06   02 - 16                  802,800       802,800  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0236   Reconstruction               0-009-010  04/17/08     DONE    DONE       DONE      08/23/07   08/23/07   06/20/07   05/16/06   2,4,8,9,10,155,15,16   4,931,488             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
04-0237   Reconstruction               0-009-FP1  12/23/04     DONE    DONE       DONE      09/16/04     /  /       /  /       /  /     16                         3,600         3,600  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Dewitt Road Elementary:
  -    PR Additions and Alterations    0-010-006                                              /  /       /  /     07/26/05     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0753   Additions and Alterations    0-010-006  05/17/07     DONE    DONE       DONE      01/12/07   01/11/07   07/26/05   05/16/06   02 - 16                  635,653       635,653  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0237   Reconstruction               0-010-007  04/17/08     DONE    DONE       DONE      08/23/07   08/23/07   06/20/07   05/16/06   2,7,8,9,155,15,16        608,690             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
04-0238   Reconstruction               0-010-FP1  12/23/04     DONE    DONE       DONE      09/16/04     /  /       /  /       /  /     16                         3,600         3,600  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Thomas MS 7-9:
  -    PR Additions and Alterations    0-011-019                                              /  /       /  /     07/26/05     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0754   Additions and Alterations    0-011-019  05/17/07     DONE    DONE       DONE      01/12/07   01/11/07   07/26/05   05/16/06   02 - 16                3,367,510     3,367,510  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0238   Reconstruction               0-011-020  04/17/08     DONE    DONE       DONE      08/23/07   08/23/07   06/20/07   05/16/06   2,4,8,9,10,155,15,16   4,445,864     4,445,864  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
04-0611   Visual Structural Inspection 0-011-SC1  12/31/04     DONE    DONE       DONE      12/30/04   12/30/04     /  /       /  /     16                        23,932        23,932  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          State Road Elementary:
  -    PR Additions and Alterations    0-012-008                                              /  /       /  /     07/26/05     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0759   Additions and Alterations    0-012-008  05/23/07     DONE    DONE       DONE      01/12/07   01/11/07   07/26/05   05/16/06   02 - 16                  466,578       466,578  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0231   Reconstruction               0-012-009  02/29/08     DONE    DONE       DONE      08/23/07   08/23/07   06/20/07   05/16/06   2,4,8,10,155,15,16     2,643,945             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
04-0236   Reconstruction               0-012-FP1  12/23/04     DONE    DONE       DONE      09/16/04     /  /       /  /       /  /     16                         3,600         3,600  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Schroeder HS 10-12:
06-0755   Reconstruction               0-013-018  05/17/07     DONE    DONE       DONE      01/12/07   01/11/07   07/26/05   05/16/06   2,8,9,10,155,15,16     1,845,036     1,845,036  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0219   Reconstruction               0-013-019  03/31/08     DONE    DONE       DONE      08/22/07   08/22/07   06/20/07   05/16/06   2,4,7,8,9,10,155,15,  13,530,261    13,530,261  JOD             0           0    2,802,422
                                                                                                                                                                                                                                 Thomas Associates                   
04-0612SC Visual Structural Inspection 0-013-SC1  12/31/04     DONE    DONE       DONE      12/30/04   12/30/04     /  /       /  /     16                        23,932        23,932  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Plank Road South Elementary:
  -    PR Additions and Alterations    0-016-005                                              /  /       /  /     07/26/05     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0756   Additions and Alterations    0-016-005  05/17/07     DONE    DONE       DONE      01/12/07   01/11/07   07/26/05   05/16/06   02 - 16                  641,550       641,550  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0232   Reconstruction               0-016-006  02/29/08     DONE    DONE       DONE      08/23/07   08/23/07   06/20/07   05/16/06   2,8,9,10,155,15,16     1,245,362             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
04-0233FP Reconstruction               0-016-FP2  12/23/04     DONE    DONE       DONE      09/16/04     /  /       /  /       /  /     16                         3,600         3,600  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Klem Road South Elementary:
  -    PR Additions and Alterations    0-017-005                                              /  /       /  /     07/26/05     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0760   Additions and Alterations    0-017-005  05/23/07     DONE    DONE       DONE      01/12/07   01/11/07   07/26/05   05/16/06   02 - 16                  727,792       727,792  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0233   Reconstruction               0-017-006  02/29/08     DONE    DONE       DONE      08/23/07   08/23/07   06/20/07   05/16/06   2,4,8,9,10,155,15,16     889,520             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
04-0232   Reconstruction               0-017-FP1  12/23/04     DONE    DONE       DONE      09/16/04     /  /       /  /       /  /     16                         7,932         7,932  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Schlegel Road Elementary:
  -    PR Additions and Alterations    0-018-005                                              /  /       /  /     07/26/05     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0761   Additions and Alterations    0-018-005  05/23/07     DONE    DONE       DONE      01/12/07   01/11/07   07/26/05   05/16/06   02 - 16                  715,175       715,175  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0234   Reconstruction               0-018-006  02/29/08     DONE    DONE       DONE      08/23/07   08/23/07   06/20/07   05/16/06   2,4,8,10,155,15,16     1,271,421             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
04-0235   Reconstruction               0-018-FP1  12/23/04     DONE    DONE       DONE      09/16/04     /  /       /  /       /  /     16                         7,932         7,932  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Maintenance Storage Building:
  -       Additions and Alterations    2-015-002                                              /  /       /  /     09/28/05     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Storage Building #3 @ Schroeder High:
  -    PR New Construction             2-034-001                                              /  /       /  /     01/21/09     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Thomas High School Storage Building:
  -       New Construction             2-035-001                                              /  /       /  /     01/21/09     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          New Maintenance Facility:
07-0239   New Construction             3-032-001  04/17/08     DONE    DONE       DONE      08/23/07   08/23/07   06/20/07   05/16/06   02 - 16                  651,290             0  JOD             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Bus Garage Annex:
  -       Reconstruction               5-007-004                                              /  /       /  /     09/28/05     /  /     2,7,8,9,155,15,16              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          New Bus Garage:
  -       Reconstruction               5-028-002                                              /  /       /  /     09/28/05     /  /     2,9                            0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Fueling Station:
  -       New Construction             7-033-001                                              /  /       /  /     11/14/07     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WHEATLAND CHILI CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-20-01-04
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Thomas J. Connor Elementary:
05-0445   Reconstruction               0-002-010  04/27/06     DONE    DONE       DONE      12/14/05   12/14/05   03/22/05   06/16/05   2,7,8,9,15,16          1,773,957     1,773,957  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0562   Reconstruction               0-002-011  03/06/08     DONE    DONE       DONE      10/17/07   10/15/07   11/30/06   03/27/07   2,4,8,9,155,16           773,790       773,790  MGL             0           0      112,589
                                                                                                                                                                                                                                 La Bella Associates                 
07-2191SC Visual Structural Inspection 0-002-SC1  09/26/08     DONE    DONE       DONE      03/04/08   03/04/08     /  /       /  /     16                         7,246             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Junior Senior High School:
05-0446   Reconstruction               0-003-010  04/27/06     DONE    DONE       DONE      12/14/05   12/14/05   03/22/05   06/16/05   2,7,8,9,10,155,15,16   5,132,416     5,132,416  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0563   Reconstruction               0-003-011  03/06/08     DONE    DONE       DONE      10/18/07   10/15/07   11/30/06   03/27/07   4,8,9,155,15,16        1,226,210     1,226,210  MGL             0           0      151,790
                                                                                                                                                                                                                                 La Bella Associates                 

          Bus Garage:
05-0447   Reconstruction               5-004-005  04/27/06     DONE    DONE       DONE      12/14/05   12/14/05   03/22/05   06/16/05   2,4,7,8,9,155,15,16    2,090,627     2,090,627  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES MONROE #1 STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-91-00-00
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Forman Center (fmlyPhase1,2,3):
04-1152   Reconstruction               0-002-007  06/24/05     DONE    DONE       DONE      04/13/05   04/11/05   08/31/04     /  /     155                      149,149       149,149  MAC             0           0            0
                                                                                                                                                                                                                                 Turner Engineering                  
  -       Reconstruction               0-002-008                                              /  /       /  /     03/07/06     /  /     2,9,155,16                     0    23,763,780  JOD             0           0            0
                                                                                                                                                                                                                                                                     
05-1334   Reconstruction               0-002-009  07/11/06     DONE    DONE       DONE      06/07/06   06/06/06   04/06/06     /  /     7                        796,786       796,786  JOD             0           0            0
                                                                                                                                                                                                                                 HBMA Architecture Engineering & Land
05-1335   Reconstruction               0-002-010  07/11/06     DONE    DONE       DONE      06/07/06   06/06/06   06/05/06     /  /     7                         45,463        45,463  JOD             0           0            0
                                                                                                                                                                                                                                 HBMA Architecture Engineering & Land
07-1189   Reconstruction               0-002-011  10/08/08     DONE    DONE       DONE      12/24/07   12/19/07   09/06/07     /  /     4,8,9,155,15,16          750,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 habza architecture                  
07-1471   Reconstruction               0-002-012  05/06/08     DONE    DONE       DONE      01/26/08   01/24/08   11/23/07   12/13/07   2,7,15                 1,200,000     1,200,000  JOD             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
  -    PR Additions and Alterations    0-002-013                                              /  /       /  /     03/04/09     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Vocational Bldg-Foreman Center:
05-1336   Reconstruction               0-003-005  07/11/06     DONE    DONE       DONE      06/07/06   06/06/06   04/27/06     /  /     7                         25,000        25,000  JOD             0           0            0
                                                                                                                                                                                                                                 HBMA Architecture Engineering & Land
  -    PR Additions and Alterations    0-003-006                                              /  /       /  /     03/04/09     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-1666   Reconstruction               0-003-007  07/17/09     DONE    DONE       DONE      06/09/09   06/01/09   05/20/09   06/25/09   7                        465,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey

          Theraputic Swimming Pool Forman:
  -       Reconstruction               0-004-001                                              /  /       /  /     03/07/06     /  /     7                              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
05-1337   Reconstruction               0-004-002  07/11/06     DONE    DONE       DONE      06/07/06   06/06/06   04/27/06     /  /     7                          6,334             0  JOD             0           0            0
                                                                                                                                                                                                                                 HBMA Architecture Engineering & Land
  -    PR Additions and Alterations    0-004-003                                              /  /       /  /     03/04/09     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          World Of Work Cottage:
04-1153   Reconstruction               0-008-002  06/24/05     DONE    DONE       DONE      04/13/05   04/11/05   08/31/04     /  /     2,155                     69,850        69,850  MAC             0           0            0
                                                                                                                                                                                                                                 Turner Engineering                  

          Main Cottage Rush:
04-1154   Reconstruction               0-009-002  06/24/05     DONE    DONE       DONE      04/13/05   04/11/05   08/31/04     /  /     2,155                     70,390        70,390  MAC             0           0            0
                                                                                                                                                                                                                                 Turner Engineering                  

          Staff Development Services:
03-0062TQ Temporary Quarters           7-038-001  01/20/06     DONE    DONE       DONE      07/16/03     /  /     08/23/00     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                                                     

          Alternative HS/OConnor Rd.:
  -    PR Additions and Alterations    8-033-002                                              /  /       /  /     03/04/09     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Technology Services:
06-0652TQ Temporary Quarters           8-040-001  01/02/07     DONE    DONE       DONE      12/21/06   12/21/06     /  /       /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-1129   Reconstruction               8-040-002  05/20/09     DONE    DONE       DONE      01/27/09   01/23/09     /  /     12/11/08   9,155,16                 328,800             0  JOD             0           0            0
                                                                                                                                                                                                                                 Hunt Engineers & Architects & Survey


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES MONROE II-ORLEANS STATUS REPORT ON CAPITAL PROJECTS
District No.: 26-92-00-00
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          We-mo-co Bldg North:
04-0293   Reconstruction               0-001-014  02/22/05     DONE    DONE       DONE      10/20/04   10/13/04   12/18/03   09/15/04   2,4,7,8,9,10,13,14,1   2,789,567     2,789,567  MAC             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 
07-2331   Reconstruction               0-001-015  02/17/09     DONE    DONE       DONE      07/08/08   06/23/08   12/26/07   06/18/08   2,4,7,8,9,10,155,15,   1,206,037             0  JOD             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          We-mo-co Bldg South:
04-0294   Reconstruction               0-002-018  02/22/05     DONE    DONE       DONE      10/20/04   10/13/04   12/18/03   09/15/04   2,7,8,9,155,15,16        271,754       271,754  MAC             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 
07-2332   Reconstruction               0-002-019  02/17/09     DONE    DONE       DONE      07/08/08   06/23/08   12/26/07   06/18/08   2,7,9,155,15,16          316,963             0  JOD             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          ADL House:
07-2333   Reconstruction               0-013-003  02/17/09     DONE    DONE       DONE      07/08/08   06/23/08   12/26/07   06/18/08   16                        23,276             0  JOD             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          Admin. Bldg.(Educ. Service Cntr.):
04-0295   Reconstruction               1-005-012  02/22/05     DONE    DONE       DONE      10/20/04   10/13/04   12/18/03   09/15/04   2,8,155,15,16            167,601             0  MAC             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 
07-2334   Reconstruction               1-005-013  02/17/09     DONE    DONE       DONE      07/08/08   06/23/08   12/26/07   06/18/08   2,7,8,155,15,16          214,211             0  JOD             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          Spencerport Plaza #3:
07-1998TQ Temporary Quarters           1-043-001  05/13/08     DONE    DONE       DONE      04/18/08   04/18/08   01/28/02     /  /                                    0             0  MAC             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 

          Paul Road Transition Program:
  -    XX Reconstruction               8-047-001  10/30/06               CANCELLED            /  /       /  /     07/19/05     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Monroe2 Orleans Boces:
05-0283TQ Temporary Quarters           8-048-001  08/29/06     DONE    DONE       DONE      10/24/05   10/18/05   10/21/05     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Paul Rd. Transition Center:
06-0373TQ Temporary Quarters           8-049-001  10/30/06     DONE    DONE       DONE      10/27/06   10/27/06   08/15/06     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Generations Child Care Incorporated:
  -    TQ Temporary Quarters           8-050-001                                              /  /       /  /     12/19/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Greenhouse:
07-2335   Reconstruction               9-006-001  02/17/09     DONE    DONE       DONE      07/08/08   06/23/08   12/26/07   06/18/08   2,16                      19,619             0  JOD             0           0            0
                                                                                                                                                                                                                                 La Bella Associates                 


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED