REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
03-1636 Reconstruction 0-001-010 07/23/04 DONE DONE DONE 06/17/04 06/16/04 10/14/03 07/09/03 2,15,16 146,179 146,179 RDR 0 0 0
- PR Additions and Alterations 0-001-011 / / / / 09/12/06 / / 02 - 16 0 0 MGL 0 0 0
NEW BUS MAINTENANCE FACILITY:
- XX New Construction 5-007-001 CANCELLED / / / / 09/12/06 / / 02 - 16 0 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Burton Street School:
02-0986 Additions and Alterations 0-002-003 12/10/03 DONE DONE DONE 12/30/02 12/19/02 02/18/00 03/25/02 02 - 16 714,070 714,070 MGL 84,478 26,396 0
Beardsley Design Associates Arch.
- Reconstruction 0-002-005 / / / / 10/10/06 / / 2,4,7,8,9,10,13,14,1 0 9,102,990 DDJ 0 0 0
Emory Avenue Complex (MS/HS):
02-0987 Additions and Alterations 0-005-002 12/10/03 DONE DONE DONE 12/30/02 12/19/02 03/26/02 03/25/02 02 - 16 3,058,533 2,270,664 MGL 0 0 0
Beardsley Design Associates Arch.
07-0591 Reconstruction 0-005-004 03/18/08 DONE DONE DONE 10/19/07 10/18/07 10/10/06 05/15/07 2,4,7,8,9,10,13,14,1 2,230,000 0 DDJ 0 0 579,712
Thomas Associates
Bus Garage:
04-0070 Reconstruction 5-014-003 07/27/04 DONE DONE DONE 07/21/04 07/19/04 04/22/04 05/18/04 10 50,000 50,000 DDJ 0 0 0
Bowne Associates
- Reconstruction 5-014-004 / / / / 10/10/06 / / 16 0 0 DDJ 0 0 0
Concession Stand-Fenner Rd. Complex:
02-0988 Additions and Alterations 7-012-002 12/10/03 DONE DONE DONE 12/30/02 12/19/02 03/26/02 03/25/02 02 - 16 52,000 0 MGL 0 0 0
Beardsley Design Associates Arch.
- Reconstruction 7-012-003 / / / / 10/10/06 / / 2,16 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building K-12:
02-2423 Reconstruction 0-001-008 08/31/04 DONE DONE DONE 06/17/03 06/16/03 09/19/02 04/10/03 2,155,16 678,855 678,855 HCM 0 0 0
King & King Architects
04-0327 Reconstruction 0-001-009 10/29/04 DONE DONE DONE 10/26/04 10/25/04 09/29/04 04/10/03 2,7 115,000 115,000 HCM 0 0 0
Temporary CR Bldg '67:
02-2424 Reconstruction 0-004-002 08/31/04 DONE DONE DONE 06/17/03 06/16/03 09/19/02 04/10/03 16 4,530 0 HCM 0 0 0
King & King Architects
Annex Building:
02-2425 Reconstruction 0-007-004 08/31/04 DONE DONE DONE 06/17/03 06/16/03 09/19/02 04/10/03 16 4,472 0 HCM 0 0 0
King & King Architects
Modular 2CR Building:
02-2426 Reconstruction 0-009-003 08/31/04 DONE DONE DONE 06/17/03 06/16/03 09/19/02 04/10/03 16 4,775 0 HCM 0 0 0
King & King Architects
School Bus Garage:
02-2427 Reconstruction 5-002-002 08/31/04 DONE DONE DONE 06/17/03 06/16/03 09/19/02 04/10/03 155,16 15,098 15,098 HCM 0 0 0
King & King Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Elementary School:
07-0470 Reconstruction 0-003-008 03/19/08 DONE DONE DONE 10/01/07 10/01/07 09/08/06 12/19/06 2,4,7,8,9,155,15,16 1,496,250 0 MGL 0 0 121,534
Ashley McGraw Architects
06-1055 Reconstruction 0-003-009 03/22/07 DONE DONE DONE 03/06/07 03/02/07 01/12/07 12/19/06 7 836,049 836,049 MGL 0 0 46,819
Ashley McGraw Architects
06-1063 Reconstruction 0-003-010 03/30/07 DONE DONE DONE 03/07/07 03/06/07 03/07/07 12/19/06 155 155,000 155,000 MGL 0 0 155,000
Ashley McGraw Architects
- Reconstruction 0-003-011 / / / / 11/14/07 / / 4,9 0 0 MGL 0 0 0
- Reconstruction 0-003-012 / / / / 11/14/07 / / 16 0 0 MGL 0 0 0
Jr/Sr High School:
07-0471 Reconstruction 0-005-008 03/19/08 DONE DONE DONE 10/01/07 10/01/07 09/08/06 12/19/06 2,4,7,8,9,155,15,16 3,229,200 0 MGL 0 0 180,835
Ashley McGraw Architects
06-1056 Reconstruction 0-005-009 03/22/07 DONE DONE DONE 03/06/07 03/02/07 01/12/07 12/19/06 7 1,203,095 1,203,095 MGL 0 0 67,373
Ashley McGraw Architects
- Reconstruction 0-005-010 / / / / 01/12/07 / / 155 0 9,901,380 MGL 0 0 0
- Reconstruction 0-005-011 / / / / 11/14/07 / / 4,9 0 0 MGL 0 0 0
High School Bus Garage:
07-0472 Reconstruction 5-001-004 03/19/08 DONE DONE DONE 10/01/07 10/01/07 09/12/06 12/19/06 2,4,7,8,9,155,15,16 297,500 0 MGL 0 0 0
Ashley McGraw Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
K-12 Bldg:
- Reconstruction 0-003-006 UNREVIEWED 01/12/07 01/12/07 03/07/06 05/16/06 2,4,8,9,10,13,14,155 0 14,627,200 JOD 0 0 0
King & King, Architects
06-0763SR Reconstruction 0-003-006 03/20/07 DONE DONE DONE 01/12/07 01/12/07 03/07/06 05/16/06 2,4,8,9,10,13,14,155 0 13,801,810 JOD 0 0 0
King & King, Architects
06-1156 Reconstruction 0-003-006 08/02/07 DONE DONE DONE 03/21/07 01/12/07 03/07/06 05/16/06 2,4,8,9,10,13,14,155 7,487,522 7,407,522 JOD 0 0 0
King & King, Architects
07-0241 Reconstruction 0-003-007 11/28/07 DONE DONE DONE 08/24/07 08/24/07 12/21/06 05/15/07 2,4,8,9,155,15,16 999,810 0 JOD 0 0 195,962
King & King, Architects
- Reconstruction 0-003-008 / / / / 05/01/08 / / 15 0 0 JOD 0 0 0
press box:
06-1157 New Construction 7-009-001 03/21/07 DONE DONE DONE 03/21/07 03/14/07 02/16/07 05/16/06 02 - 16 37,700 0 JOD 0 0 0
King & King, Architects
Electrical Shed:
06-1158 New Construction 7-010-001 03/21/07 DONE DONE DONE 03/21/07 03/14/07 03/21/07 05/16/06 02 - 16 5,700 0 JOD 0 0 0
King & King, Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Roberts Street School Complex:
04-0108 Reconstruction 0-001-015 09/10/04 DONE DONE DONE 08/09/04 08/03/04 01/28/03 07/13/04 9 94,000 94,000 RDR 0 0 0
Robertson Strong Apgar Architects
07-0161 Reconstruction 0-001-017 12/10/07 DONE DONE DONE 08/15/07 08/14/07 09/18/06 12/15/06 4,7,8,9,155,15,16 2,589,187 2,485,000 MGL 0 0 0
RSA (Robertson Strong Apgar)
06-1035 Reconstruction 0-001-018 03/21/07 DONE DONE DONE 03/05/07 03/02/07 02/12/07 12/15/06 2,7 510,813 510,813 MGL 0 0 510,813
Robertson Strong Apgar Architects
04-0436SC Visual Structural Inspection 0-001-SC1 11/24/04 DONE DONE DONE 10/18/04 10/18/04 / / / / 16 15,360 6,000 JOD 0 0 0
04-0437SC Visual Structural Inspection 0-001-SC2 11/24/04 DONE DONE DONE 10/18/04 10/18/04 / / / / 16 48,240 24,000 JOD 0 0 0
04-0438SC Visual Structural Inspection 0-001-SC3 11/24/04 DONE DONE DONE 10/18/04 10/18/04 / / / / 16 49,920 32,000 JOD 0 0 0
06-0147SC Visual Structural Inspection 0-001-SC4 08/07/06 DONE DONE DONE 07/31/06 07/31/06 / / / / 16 163,760 96,000 JOD 0 0 0
Land Purchase/Future Trans.Facility:
- New Construction 5-010-001 / / / / 08/03/06 / / 02 - 16 0 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
07-0982 Reconstruction 0-001-014 04/04/08 DONE DONE DONE 11/29/07 11/28/07 11/06/06 05/15/07 2,4,7,8,9,10 1,400,000 0 HCM 0 0 110,600
March Associates
New Bus Garage:
07-1499 Additions and Alterations 5-008-002 02/20/08 DONE DONE DONE 02/01/08 01/24/08 09/13/07 12/19/07 02 - 16 480,000 480,000 HCM 0 0 0
March Associates
Land Purchase (Adj. to Main K-12):
- PR New Construction 7-009-001 / / / / 01/02/07 / / 02 - 16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Senior High School:
02-0329 Reconstruction 0-001-009 08/01/03 DONE DONE DONE 10/07/02 10/04/02 11/23/01 05/21/02 8,155,16 2,379,016 2,379,016 MGL 0 0 0
King & King Architects
02-1019 Additions and Alterations 0-001-010 08/01/03 DONE DONE DONE 01/02/03 12/27/02 01/23/02 05/21/02 02 - 16 2,060,548 2,060,548 JOD 0 0 0
King & King Architects
03-0157 Reconstruction 0-001-011 01/30/04 DONE DONE DONE 08/07/03 07/01/03 03/12/03 06/03/03 2,4,7,8,9,10,155,15, 234,134 234,134 JOD 0 0 0
King & King Architects
07-1450 Reconstruction 0-001-012 ADDENDUM REQ'D 01/26/08 01/17/08 03/26/07 05/15/07 2,4,7,8,9,10,155,15, 0 15,858,990 JOD 0 0 0
King & King, Architects
- Reconstruction 0-001-013 / / / / 03/22/07 / / 2,4,7,8,9,10,155,15, 0 15,858,990 JOD 0 0 0
Willard F Prior Elementary:
02-1020 Additions and Alterations 0-004-002 08/01/03 DONE DONE DONE 01/02/03 12/27/02 07/17/96 05/21/02 02 - 16 642,496 642,496 JOD 0 0 0
King & King Architects
02-0330 Reconstruction 0-004-003 08/01/03 DONE DONE DONE 10/07/02 10/04/02 11/23/01 05/21/02 8,155,16 241,776 241,776 MGL 0 0 0
King & King Architects
03-0158 Reconstruction 0-004-004 01/30/04 DONE DONE DONE 08/07/03 07/01/03 03/12/03 06/03/03 2,4,7,8,9,155,15,16 25,065 25,065 JOD 0 0 0
King & King Architects
07-1451 Reconstruction 0-004-005 ADDENDUM REQ'D 01/26/08 01/17/08 03/26/07 05/15/07 2,4,7,8,9,10,155,15, 0 2,030,049 JOD 0 0 0
King & King, Architects
- Reconstruction 0-004-006 / / / / 03/26/07 / / 2,4,7,8,9,155,15,16 0 2,030,049 JOD 0 0 0
North Broad Street:
02-0890 Additions and Alterations 0-005-007 08/01/03 DONE DONE DONE 12/09/02 12/02/02 08/07/01 05/21/02 02 - 16 3,823,819 3,656,613 MGL 0 0 0
King & King Architects
02-0331 Reconstruction 0-005-008 08/01/03 DONE DONE DONE 10/07/02 10/04/02 11/23/01 05/21/02 8,155,16 134,312 134,312 MGL 0 0 0
King & King Architects
03-0159XX Reconstruction 0-005-009 01/30/04 CANCELLED 08/07/03 07/01/03 03/12/03 06/03/03 2,4,7,9,155,15,16 0 3,222,504 JOD 0 0 0
King & King Architects
- Reconstruction 0-005-010 / / / / 03/26/07 / / 2,4,7,8,9,10,155,15, 0 3,480,084 JOD 0 0 0
07-1452 Reconstruction 0-005-011 ADDENDUM REQ'D 01/26/08 01/17/08 03/26/07 05/15/07 2,4,7,8,9,10,155,15, 0 3,480,084 JOD 0 0 0
King & King, Architects
Seneca Street School:
02-1021 Reconstruction 0-006-005 08/01/03 DONE DONE DONE 01/02/03 12/27/02 / / 05/21/02 122,011 122,011 JOD 0 0 0
King & King Architects
02-0332 Reconstruction 0-006-006 08/01/03 DONE DONE DONE 10/07/02 10/04/02 11/23/01 05/21/02 8,155,16 223,479 223,479 MGL 0 0 0
King & King Architects
03-0160 Reconstruction 0-006-007 01/30/04 DONE DONE DONE 08/07/03 07/01/03 01/28/03 06/03/03 2,9,155,15,16 378,438 378,438 JOD 0 0 0
King & King Architects
07-1453 Reconstruction 0-006-008 ADDENDUM REQ'D 01/26/08 01/17/08 03/26/07 05/15/07 2,4,7,8,9,10,155,15, 0 3,780,832 JOD 0 0 0
King & King, Architects
- Reconstruction 0-006-009 / / / / 03/26/07 / / 2,4,7,8,9,10,155,15, 0 3,780,832 JOD 0 0 0
Power Shop Annex/Maint. Bldg.:
02-0333 Reconstruction 0-007-002 08/01/03 DONE DONE DONE 10/07/02 10/04/02 11/23/01 05/21/02 8,155,16 4,096 0 MGL 0 0 0
King & King Architects
02-1022 Reconstruction 0-007-003 08/01/03 DONE DONE DONE 01/02/03 12/27/02 01/23/02 05/21/02 8,9,15,16 320,063 320,063 JOD 0 0 0
King & King Architects
07-1454 Reconstruction 0-007-004 ADDENDUM REQ'D 01/26/08 01/17/08 03/26/07 05/15/07 2,4,7,8,9,10,155,15, 0 503,460 JOD 0 0 0
King & King, Architects
- Reconstruction 0-007-005 / / / / 03/26/07 / / 2,4,7,8,9,10,155,15, 0 503,460 JOD 0 0 0
Durhamville Elementary School:
02-0334 Reconstruction 0-008-003 08/01/03 DONE DONE DONE 10/07/02 10/04/02 11/23/01 05/21/02 8,155,16 145,709 145,709 MGL 0 0 0
King & King Architects
02-1023 Reconstruction 0-008-004 08/01/03 DONE DONE DONE 01/02/03 12/27/02 01/23/02 05/21/02 2,7,9,155,15,16 579,243 579,243 JOD 0 0 0
King & King Architects
03-0161 Reconstruction 0-008-005 01/30/04 DONE DONE DONE 08/07/03 07/01/03 01/28/03 06/03/03 2,9,155,15,16 375,083 375,083 JOD 0 0 0
King & King Architects
06-1510 Reconstruction 0-008-006 05/24/07 DONE DONE DONE 05/18/07 05/17/07 03/27/07 04/17/07 2,4,7,8,9,10,155,15, 875,000 0 JOD 0 0 0
King & King, Architects
07-1455 Reconstruction 0-008-007 ADDENDUM REQ'D 01/26/08 01/17/08 03/27/07 05/15/07 2,4,7,8,9,10,155,15, 0 2,320,056 JOD 0 0 0
King & King, Architects
Oneida Castle Elementary:
02-0335 Reconstruction 0-009-006 08/01/03 DONE DONE DONE 10/07/02 10/04/02 11/23/01 05/21/02 8,155,16 111,916 111,916 MGL 0 0 0
King & King Architects
02-1024XX Reconstruction 0-009-007 08/01/03 CANCELLED 01/02/03 12/27/02 03/22/02 05/21/02 2,4,7,155,15,16 113,809 113,809 JOD 0 0 0
King & King Architects
03-0162 Reconstruction 0-009-008 01/30/04 DONE DONE DONE 08/07/03 07/01/03 03/12/03 06/03/03 2,4,7,9,155,15,16 304,119 304,119 JOD 0 0 0
King & King Architects
07-1456 Reconstruction 0-009-009 ADDENDUM REQ'D 01/26/08 01/17/08 03/27/07 05/15/07 2,4,7,8,9,10,155,15, 0 3,113,538 JOD 0 0 0
King & King, Architects
- Reconstruction 0-009-010 / / / / 03/27/07 / / 2,4,7,8,9,10,155,15, 0 3,113,538 JOD 0 0 0
Middle School:
02-0336 Reconstruction 0-010-005 08/01/03 DONE DONE DONE 10/07/02 10/04/02 11/23/01 05/21/02 8,155,16 275,984 275,984 MGL 0 0 0
07-1457 Reconstruction 0-010-006 ADDENDUM REQ'D 01/26/08 01/17/08 03/27/07 05/15/07 2,4,7,8,9,10,155,15, 0 8,113,952 JOD 0 0 0
King & King, Architects
- Reconstruction 0-010-007 / / / / 03/27/07 / / 2,4,7,8,9,10,155,15, 0 8,113,952 JOD 0 0 0
Sylvan Verona Beach Elem.:
02-0337 Reconstruction 0-022-005 08/01/03 DONE DONE DONE 10/07/02 10/04/02 11/23/01 05/21/02 8,155,16 75,593 75,593 MGL 0 0 0
King & King Architects
03-0163 Reconstruction 0-022-006 01/30/04 DONE DONE DONE 08/07/03 07/01/03 03/12/03 06/03/03 2,4,7,9,155,15,16 34,255 34,255 JOD 0 0 0
King & King Architects
07-1458 Reconstruction 0-022-007 ADDENDUM REQ'D 01/26/08 01/17/08 03/27/07 05/15/07 2,4,7,8,9,10,155,15, 0 2,610,063 JOD 0 0 0
King & King, Architects
- Reconstruction 0-022-008 / / / / 03/27/07 / / 2,4,7,8,9,10,155,15, 0 2,610,063 JOD 0 0 0
Admin Building:
02-0338 Reconstruction 1-019-001 08/01/03 DONE DONE DONE 10/07/02 10/04/02 11/23/01 05/21/02 8,155,16 29,173 0 MGL 0 0 0
King & King Architects
07-1459 Reconstruction 1-019-002 ADDENDUM REQ'D 01/26/08 01/17/08 03/27/07 05/15/07 2,4,7,8,9,10,155,15, 0 0 JOD 0 0 0
King & King, Architects
Maintenance Warehouse:
02-0339 Reconstruction 3-012-001 08/01/03 DONE DONE DONE 10/07/02 10/04/02 11/23/01 05/21/02 8,155,16 5,218 0 MGL 0 0 0
King & King Architects
02-1025 Reconstruction 3-012-002 08/01/03 DONE DONE DONE 01/02/03 12/27/02 09/06/02 05/21/02 2,8,9,155,15,16 50,505 0 JOD 0 0 0
King & King Architects
07-1460 Reconstruction 3-012-003 ADDENDUM REQ'D 01/26/08 01/17/08 03/27/07 05/15/07 2,4,7,8,9,10,155,15, 0 0 JOD 0 0 0
King & King, Architects
New Bus Garage:
07-1461 Reconstruction 5-024-002 ADDENDUM REQ'D 01/26/08 01/17/08 03/27/07 05/15/07 2,4,7,8,9,10,155,15, 0 0 JOD 0 0 0
King & King, Architects
New Bus Storage Facility:
- Reconstruction 5-025-002 / / / / 03/27/07 / / 2,4,7,8,9,10,155,15, 0 0 JOD 0 0 0
High School PressBox:
07-1462 New Construction 7-026-001 ADDENDUM REQ'D 01/26/08 01/17/08 01/18/08 05/15/07 02 - 16 0 0 JOD 0 0 0
King & King, Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
(New) K-12 Building:
06-1159 Reconstruction 0-010-003 04/27/07 DONE DONE DONE 03/21/07 03/11/07 11/02/06 05/16/06 4,7 124,042 95,000 HCM 0 0 0
King & King, Architects
03-0948SC Visual Structural Inspection 0-010-SC1 01/14/04 DONE DONE DONE 11/26/03 11/26/03 / / / / 16 25,479 25,479 JOD 0 0 0
Agricultural Storage Facility:
- PR New Construction 1-016-001 / / / / 12/06/06 / / 02 - 16 0 0 HCM 0 0 0
06-0967 New Construction 1-016-001 07/30/07 DONE DONE DONE 02/21/07 02/21/07 12/06/06 05/16/06 02 - 16 43,030 0 HCM 0 0 0
King & King, Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
High School:
03-1674 Reconstruction 0-001-013 11/23/04 DONE DONE DONE 06/29/04 06/24/04 08/11/03 12/16/03 2,7,8,9,155,15,16 1,134,978 1,134,978 HCM 0 0 0
Thomas Associates
03-1149 Reconstruction 0-001-014 06/01/04 DONE DONE DONE 02/19/04 02/18/04 / / 12/16/03 2,16 1,426,855 1,426,855 HCM 0 0 0
Thomas Associates
- XX Reconstruction 0-001-015 CANCELLED / / / / 02/04/04 / / 2,16 0 19,383,210 HCM 0 0 0
05-1390 Reconstruction 0-001-016 01/18/07 DONE DONE DONE 06/20/06 06/19/06 04/10/06 12/16/03 2,13 160,500 160,500 HCM 0 0 0
Thomas Associates
05-0327SC Visual Structural Inspection 0-001-SC1 11/07/05 DONE DONE DONE 05/04/05 05/04/05 / / / / 16 5,867 5,867 JOD 0 0 0
05-0475SC Visual Structural Inspection 0-001-SC2 02/14/06 DONE DONE DONE 12/19/05 12/19/05 / / / / 16 6,103 6,103 JOD 0 0 0
Lake Street Elementary:
03-1675 Reconstruction 0-002-007 11/23/04 DONE DONE DONE 06/29/04 06/24/04 08/11/03 12/16/03 2,4,7,8,9,155,15,16 1,129,905 1,129,905 HCM 0 0 0
Thomas Associates
07-0876SC Visual Structural Inspection 0-002-SC1 11/21/07 DONE DONE DONE 10/15/07 10/15/07 / / / / 16 5,743 0 JOD 0 0 0
Bolivar Road Elementary:
03-1676 Reconstruction 0-003-007 11/23/04 DONE DONE DONE 06/29/04 06/24/04 08/11/03 12/16/03 2,4,7,8,9,10,155,15, 5,493,434 5,144,993 HCM 0 0 0
Thomas Associates
- XX Additions and Alterations 0-003-008 CANCELLED / / / / 08/11/03 / / 02 - 16 0 0 HCM 0 0 0
07-0875SC Visual Structural Inspection 0-003-SC1 11/21/07 DONE DONE DONE 10/15/07 10/15/07 / / / / 16 5,743 0 JOD 0 0 0
Bridgeport Elementary:
03-1677 Reconstruction 0-004-007 11/23/04 DONE DONE DONE 06/29/04 06/24/04 08/11/03 12/16/03 2,4,7,8,9,155,15,16 458,120 458,120 HCM 0 0 0
Thomas Associates
05-1232 Reconstruction 0-004-008 06/20/06 DONE DONE DONE 05/08/06 05/01/06 / / 12/16/03 2,7 272,026 272,026 HCM 0 0 0
Thomas Associates
07-0872SC Visual Structural Inspection 0-004-SC1 11/21/07 DONE DONE DONE 10/15/07 10/15/07 / / / / 16 1,872 0 JOD 0 0 0
07-0874SC Visual Structural Inspection 0-004-SC2 11/21/07 DONE DONE DONE 10/15/07 10/15/07 / / / / 16 4,386 0 JOD 0 0 0
Chittenango Middle School:
03-1678 Reconstruction 0-005-008 11/23/04 DONE DONE DONE 06/29/04 06/24/04 08/11/03 12/16/03 2,4,7,8,9,155,15,16 674,279 674,279 HCM 0 0 0
Thomas Associates
06-0024 Reconstruction 0-005-009 11/17/06 DONE DONE DONE 07/10/06 07/05/06 03/31/06 12/16/03 2,8,9,10,16 210,403 210,403 HCM 0 0 0
Thomas Associates
07-0873SC Visual Structural Inspection 0-005-SC1 11/21/07 DONE DONE DONE 10/15/07 10/15/07 / / / / 16 640 0 JOD 0 0 0
07-0877SC Visual Structural Inspection 0-005-SC2 11/21/07 DONE DONE DONE 10/15/07 10/15/07 / / / / 16 5,743 0 JOD 0 0 0
Maintenance Bldg.:
- XX Reconstruction 3-008-004 CANCELLED / / / / 08/11/03 / / 2,4,7,8,9,155,15,16 0 0 HCM 0 0 0
Bus Maintenance:
- XX Reconstruction 5-007-004 CANCELLED / / / / 08/11/03 / / 2,4,7,8,9,155,15,16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Alternative Ed Ctr:
- XX Reconstruction 0-006-003 CANCELLED / / / / 01/23/04 / / 0 9,733,560 MAC 0 0 0
Support Services:
03-1332 Reconstruction 1-006-001 04/09/04 DONE DONE DONE 03/29/04 03/26/04 / / 12/22/03 7 353,197 0 MAC 0 0 0
King & King Architects
Districtwide:
05-0993 Reconstruction 7-999-001 11/06/06 DONE DONE DONE 03/17/06 03/17/06 01/09/06 12/08/05 16 2,879,876 2,879,876 JOD 0 0 0
Building Engergy Solutions
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED