REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
08-0138PR Additions and Alterations 0-001-011 UNREVIEWED 08/11/08 08/04/08 09/12/06 03/20/08 02 - 16 0 0 MGL 0 0 0
James Jordan Associates
08-1014 Additions and Alterations 0-001-011 04/09/09 DONE DONE DONE 01/05/09 12/24/08 09/12/06 03/20/08 02 - 16 4,584,000 4,238,942 MGL 0 0 192,998
James Jordan Associates
NEW BUS MAINTENANCE FACILITY:
- XX New Construction 5-007-001 CANCELLED / / / / 09/12/06 / / 02 - 16 0 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Burton Street School:
09-0110 Reconstruction 0-002-005 11/17/09 DONE DONE DONE 08/11/09 08/07/09 10/10/06 12/11/08 2,4,7,8,9,10,13,14,1 0 9,439,476 DDJ 0 0 0
TETRA TECH ARCHITECTS & ENGINEERS
Emory Avenue Complex (MS/HS):
07-0591 Reconstruction 0-005-004 03/18/08 DONE DONE DONE 10/19/07 10/18/07 10/10/06 05/15/07 2,4,7,8,9,10,13,14,1 2,230,000 2,230,000 DDJ 0 0 577,570
Thomas Associates
09-0030 Additions and Alterations 0-005-005 UNREVIEWED 07/10/09 07/09/09 06/01/09 / / 02 - 16 0 0 DDJ 0 0 0
TETRA TECH ARCHITECTS & ENGINEERS
09-0111 Additions and Alterations 0-005-005 11/17/09 DONE DONE DONE 08/11/09 08/07/09 06/01/09 12/11/08 02 - 16 0 0 DDJ 0 0 0
TETRA TECH ARCHITECTS & ENGINEERS
Bus Garage:
09-0112 Reconstruction 5-014-004 11/17/09 DONE DONE DONE 08/11/09 08/07/09 10/10/06 12/11/08 16 0 0 DDJ 0 0 0
TETRA TECH ARCHITECTS & ENGINEERS
Concession Stand-Fenner Rd. Complex:
- Reconstruction 7-012-003 / / / / 10/10/06 / / 2,16 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building K-12:
- PR Additions and Alterations 0-001-010 / / / / 11/04/08 / / 02 - 16 0 0 HCM 0 0 0
Temporary CR Bldg '67:
- Reconstruction 0-004-003 / / / / 11/04/08 / / 2 0 0 HCM 0 0 0
Annex Building:
- Reconstruction 0-007-005 / / / / 11/04/08 / / 2,4,7,8,9,155,15,16 0 0 HCM 0 0 0
Modular 2CR Building:
- Reconstruction 0-009-004 / / / / 11/04/08 / / 2 0 0 HCM 0 0 0
Crandall House:
- Reconstruction 1-003-001 / / / / 11/04/08 / / 2 0 0 HCM 0 0 0
School Bus Garage:
08-1080 Reconstruction 5-002-003 02/06/09 DONE DONE DONE 01/15/09 01/12/09 09/23/08 10/09/08 2,15 16,000 16,000 HCM 0 0 0
March Associates
08-1081 Reconstruction 5-002-004 02/06/09 DONE DONE DONE 01/15/09 01/12/09 09/23/08 10/09/08 2,15 43,000 43,000 HCM 0 0 0
March Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Elementary School:
07-0470 Reconstruction 0-003-008 03/19/08 DONE DONE DONE 10/01/07 10/01/07 09/08/06 12/19/06 2,4,7,8,9,155,15,16 1,496,250 0 MGL 0 0 121,534
Ashley McGraw Architects
06-1055 Reconstruction 0-003-009 03/22/07 DONE DONE DONE 03/06/07 03/02/07 01/12/07 12/19/06 7 836,049 836,049 MGL 0 0 46,819
Ashley McGraw Architects
06-1063 Reconstruction 0-003-010 03/30/07 DONE DONE DONE 03/07/07 03/06/07 03/07/07 12/19/06 155 155,000 155,000 MGL 0 0 155,000
Ashley McGraw Architects
- Reconstruction 0-003-011 / / / / 11/14/07 / / 4,9 0 0 MGL 0 0 0
- Reconstruction 0-003-012 / / / / 11/14/07 / / 16 0 0 MGL 0 0 0
Jr/Sr High School:
07-0471 Reconstruction 0-005-008 03/19/08 DONE DONE DONE 10/01/07 10/01/07 09/08/06 12/19/06 2,4,7,8,9,155,15,16 3,906,729 3,906,729 MGL 0 0 175,803
Ashley McGraw Architects
06-1056 Reconstruction 0-005-009 03/22/07 DONE DONE DONE 03/06/07 03/02/07 01/12/07 12/19/06 7 1,203,095 1,203,095 MGL 0 0 67,373
Ashley McGraw Architects
- Reconstruction 0-005-010 / / / / 01/12/07 / / 155 0 9,901,380 MGL 0 0 0
- Reconstruction 0-005-011 / / / / 11/14/07 / / 4,9 0 0 MGL 0 0 0
High School Bus Garage:
07-0472 Reconstruction 5-001-004 03/19/08 DONE DONE DONE 10/01/07 10/01/07 09/12/06 12/19/06 2,4,7,8,9,155,15,16 455,223 455,223 MGL 0 0 0
Ashley McGraw Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
K-12 Bldg:
06-0763SR Reconstruction 0-003-006 03/20/07 DONE DONE DONE 01/12/07 01/12/07 03/07/06 05/16/06 2,4,8,9,10,13,14,155 0 13,801,810 JOD 0 0 0
King & King, Architects
06-1156 Reconstruction 0-003-006 08/02/07 DONE DONE DONE 03/21/07 01/12/07 03/07/06 05/16/06 2,4,8,9,10,13,14,155 7,487,522 7,407,522 JOD 0 0 0
King & King, Architects
07-0241 Reconstruction 0-003-007 11/28/07 DONE DONE DONE 08/24/07 08/24/07 12/21/06 05/15/07 2,9,16 999,810 999,810 JOD 0 0 181,966
King & King, Architects
08-0260 Reconstruction 0-003-008 09/16/08 DONE DONE DONE 09/08/08 08/29/08 05/01/08 03/10/08 15 75,000 75,000 JOD 0 0 0
King & King, Architects
- Reconstruction 0-003-009 / / / / 05/20/09 / / 13,16 0 0 JOD 0 0 0
Press Box @ Grandstand:
06-1157 New Construction 7-009-001 03/21/07 DONE DONE DONE 03/21/07 03/14/07 02/16/07 05/16/06 02 - 16 37,700 0 JOD 0 0 0
King & King, Architects
Electrical Shed:
06-1158 New Construction 7-010-001 03/21/07 DONE DONE DONE 03/21/07 03/14/07 03/21/07 05/16/06 02 - 16 5,700 0 JOD 0 0 0
King & King, Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Roberts Street School Complex:
07-0161 Reconstruction 0-001-017 12/10/07 DONE DONE DONE 08/15/07 08/14/07 09/18/06 12/15/06 4,7,8,9,155,15,16 2,589,187 2,485,000 MGL 0 0 0
RSA (Robertson Strong Apgar)
06-1035 Reconstruction 0-001-018 03/21/07 DONE DONE DONE 03/05/07 03/02/07 02/12/07 12/15/06 2,7 510,813 510,813 MGL 0 0 510,813
Robertson Strong Apgar Architects
04-0436SC Visual Structural Inspection 0-001-SC1 11/24/04 DONE DONE DONE 10/18/04 10/18/04 / / / / 16 15,360 6,000 JOD 0 0 0
04-0437SC Visual Structural Inspection 0-001-SC2 11/24/04 DONE DONE DONE 10/18/04 10/18/04 / / / / 16 48,240 24,000 JOD 0 0 0
04-0438SC Visual Structural Inspection 0-001-SC3 11/24/04 DONE DONE DONE 10/18/04 10/18/04 / / / / 16 49,920 32,000 JOD 0 0 0
06-0147SC Visual Structural Inspection 0-001-SC4 08/07/06 DONE DONE DONE 07/31/06 07/31/06 / / / / 16 163,760 96,000 JOD 0 0 0
South Side School:
08-1736 Reconstruction 0-004-007 06/30/09 DONE DONE DONE 06/26/09 06/17/09 05/06/09 04/07/09 155 35,000 0 HCM 0 0 0
King & King Architects
- Reconstruction 0-004-008 / / / / 11/18/09 / / 2,4,8,9,155,15,16 0 0 HCM 0 0 0
Greenhouse:
08-1659 New Construction 0-011-001 DONE DONE UNREVIEWED06/08/09 05/28/09 03/26/09 04/20/09 02 - 16 0 0 HCM 0 0 0
King & King Architects
New Prek-K-5:
- PR New Construction 0-012-001 / / / / 11/18/09 / / 02 - 16 0 0 HCM 0 0 0
Land Purchase/Future Trans.Facility:
- New Construction 5-010-001 / / / / 08/03/06 / / 02 - 16 0 0 MGL 0 0 0
:
- Alterations 5-013-001 / / / / / / / / 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
07-0982 Reconstruction 0-001-014 04/04/08 DONE DONE DONE 11/29/07 11/28/07 11/06/06 05/15/07 2,4,7,8,9,10 1,400,000 1,400,000 HCM 0 0 110,600
March Associates
New Bus Garage:
07-1499 Additions and Alterations 5-008-002 02/20/08 DONE DONE DONE 02/01/08 01/24/08 09/13/07 12/19/07 02 - 16 480,000 480,000 HCM 0 0 0
March Associates
Land Purchase (Adj. to Main K-12):
- PR New Construction 7-009-001 / / / / 01/02/07 / / 02 - 16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Senior High School:
07-1450 Reconstruction 0-001-012 10/08/08 DONE DONE DONE 01/26/08 01/17/08 03/26/07 05/15/07 2,4,7,8,9,10,155,15, 7,476,040 7,476,040 JOD 0 0 0
King & King, Architects
- Reconstruction 0-001-013 / / / / 03/22/07 / / 2,4,7,8,9,10,155,15, 0 15,858,990 JOD 0 0 0
Willard F Prior Elementary:
07-1451 Reconstruction 0-004-005 10/08/08 DONE DONE DONE 01/26/08 01/17/08 03/26/07 05/15/07 2,4,7,8,9,10,155,15, 1,459,383 1,698,873 JOD 0 0 0
King & King, Architects
- Reconstruction 0-004-006 / / / / 03/26/07 / / 2,4,7,8,9,155,15,16 0 2,030,049 JOD 0 0 0
North Broad Street:
- Reconstruction 0-005-010 / / / / 03/26/07 / / 2,4,7,8,9,10,155,15, 0 3,480,084 JOD 0 0 0
07-1452 Reconstruction 0-005-011 10/08/08 DONE DONE DONE 01/26/08 01/17/08 03/26/07 05/15/07 2,4,7,8,9,10,155,15, 572,688 1,124,068 JOD 0 0 0
King & King, Architects
Seneca Street School:
07-1453 Reconstruction 0-006-008 10/08/08 DONE DONE DONE 01/26/08 01/17/08 03/26/07 05/15/07 2,4,7,8,9,10,155,15, 1,303,152 1,324,000 JOD 0 0 0
King & King, Architects
- Reconstruction 0-006-009 / / / / 03/26/07 / / 2,4,7,8,9,10,155,15, 0 3,780,832 JOD 0 0 0
Power Shop Annex/Maint. Bldg.:
07-1454 Reconstruction 0-007-004 10/08/08 DONE DONE DONE 01/26/08 01/17/08 03/26/07 05/15/07 2,4,7,8,9,10,155,15, 332,901 220,250 JOD 0 0 0
King & King, Architects
- Reconstruction 0-007-005 / / / / 03/26/07 / / 2,4,7,8,9,10,155,15, 0 503,460 JOD 0 0 0
Durhamville Elementary School:
06-1510 Reconstruction 0-008-006 05/24/07 DONE DONE DONE 05/18/07 05/17/07 03/27/07 04/17/07 2,4,7,8,9,10,155,15, 801,150 875,000 JOD 0 0 801,150
King & King, Architects
07-1455 Reconstruction 0-008-007 10/08/08 DONE DONE DONE 01/26/08 01/17/08 03/27/07 05/15/07 2,4,7,8,9,10,155,15, 989,281 1,275,000 JOD 0 0 0
King & King, Architects
Oneida Castle Elementary:
07-1456 Reconstruction 0-009-009 10/08/08 DONE DONE DONE 01/26/08 01/17/08 03/27/07 05/15/07 2,4,7,8,9,10,155,15, 1,440,006 1,349,000 JOD 0 0 0
King & King, Architects
- Reconstruction 0-009-010 / / / / 03/27/07 / / 2,4,7,8,9,10,155,15, 0 3,113,538 JOD 0 0 0
Middle School:
07-1457 Reconstruction 0-010-006 10/08/08 DONE DONE DONE 01/26/08 01/17/08 03/27/07 05/15/07 2,4,7,8,9,10,155,15, 2,027,046 2,434,600 JOD 0 0 0
King & King, Architects
- Reconstruction 0-010-007 / / / / 03/27/07 / / 2,4,7,8,9,10,155,15, 0 8,113,952 JOD 0 0 0
Sylvan Verona Beach Elem.:
07-1458 Reconstruction 0-022-007 10/08/08 DONE DONE DONE 01/26/08 01/17/08 03/27/07 05/15/07 2,4,7,8,9,10,155,15, 547,447 1,014,000 JOD 0 0 0
King & King, Architects
- Reconstruction 0-022-008 / / / / 03/27/07 / / 2,4,7,8,9,10,155,15, 0 2,610,063 JOD 0 0 0
Admin Building:
07-1459 Reconstruction 1-019-002 10/08/08 DONE DONE DONE 01/26/08 01/17/08 03/27/07 05/15/07 2,4,7,8,9,10,155,15, 663,248 0 JOD 0 0 0
King & King, Architects
Maintenance Warehouse:
07-1460 Reconstruction 3-012-003 10/08/08 DONE DONE DONE 01/26/08 01/17/08 03/27/07 05/15/07 2,4,7,8,9,10,155,15, 10,908 0 JOD 0 0 0
King & King, Architects
New Bus Garage:
07-1461 Reconstruction 5-024-002 10/08/08 DONE DONE DONE 01/26/08 01/17/08 03/27/07 05/15/07 2,4,7,8,9,10,155,15, 40,000 35,000 JOD 0 0 0
King & King, Architects
New Bus Storage Facility:
- Reconstruction 5-025-002 / / / / 03/27/07 / / 2,4,7,8,9,10,155,15, 0 0 JOD 0 0 0
High School PressBox:
07-1462 New Construction 7-026-001 10/08/08 DONE DONE DONE 01/26/08 01/17/08 01/18/08 05/15/07 02 - 16 86,750 0 JOD 0 0 0
King & King, Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
(New) K-12 Building:
06-1159 Reconstruction 0-010-003 04/27/07 DONE DONE DONE 03/21/07 03/11/07 11/02/06 05/16/06 4,7 121,476 121,476 HCM 0 0 0
King & King, Architects
08-1032 Reconstruction 0-010-004 06/10/09 DONE DONE DONE 01/06/09 01/02/09 09/16/08 03/11/08 2,4,7,8,9,10,155,15, 5,679,639 5,679,639 HCM 0 0 113,593
King & King, Architects
Agricultural Storage Facility:
- PR New Construction 1-016-001 / / / / 12/06/06 / / 02 - 16 0 0 HCM 0 0 0
06-0967 New Construction 1-016-001 07/30/07 DONE DONE DONE 02/21/07 02/21/07 12/06/06 05/16/06 02 - 16 43,030 0 HCM 0 0 0
King & King, Architects
New Bus Garage:
08-1033 Reconstruction 5-013-002 06/10/09 DONE DONE DONE 01/06/09 01/02/09 09/16/08 03/11/08 2,16 152,361 152,361 HCM 0 0 0
King & King, Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
High School:
03-1674 Reconstruction 0-001-013 11/23/04 DONE DONE DONE 06/29/04 06/24/04 08/11/03 12/16/03 2,7,8,9,155,15,16 1,125,103 1,125,103 HCM 0 0 0
Thomas Associates
05-1390XX Reconstruction 0-001-016 01/18/07 CANCELLED 06/20/06 06/19/06 04/10/06 12/16/03 2,13 160,500 160,500 HCM 0 0 0
Thomas Associates
08-0531 Reconstruction 0-001-017 04/02/09 DONE DONE DONE 10/15/08 10/14/08 08/12/08 05/20/08 2,10,16 657,951 0 HCM 0 0 158,200
Thomas Associates
05-0327SC Visual Structural Inspection 0-001-SC1 11/07/05 DONE DONE DONE 05/04/05 05/04/05 / / / / 16 5,867 5,867 JOD 0 0 0
05-0475SC Visual Structural Inspection 0-001-SC2 02/14/06 DONE DONE DONE 12/19/05 12/19/05 / / / / 16 6,103 6,103 JOD 0 0 0
Lake Street Elementary:
03-1675 Reconstruction 0-002-007 11/23/04 DONE DONE DONE 06/29/04 06/24/04 08/11/03 12/16/03 2,4,7,8,9,155,15,16 1,080,198 1,080,198 HCM 0 0 0
Thomas Associates
08-0532 Reconstruction 0-002-008 04/02/09 DONE DONE DONE 10/15/08 10/14/08 08/12/08 05/20/08 2,4,7,8,9,10,16 779,685 0 HCM 0 0 158,200
Thomas Associates
07-0876SC Visual Structural Inspection 0-002-SC1 11/21/07 DONE DONE DONE 10/15/07 10/15/07 / / / / 16 5,743 0 JOD 0 0 0
Bolivar Road Elementary:
03-1676 Reconstruction 0-003-007 11/23/04 DONE DONE DONE 06/29/04 06/24/04 08/11/03 12/16/03 2,4,7,8,9,10,155,15, 5,322,278 4,881,183 HCM 0 0 0
Thomas Associates
08-0533 Reconstruction 0-003-009 04/02/09 DONE DONE DONE 10/15/08 10/14/08 08/12/08 05/20/08 2,4,8,9,14,155,15,16 739,822 0 HCM 0 0 158,200
Thomas Associates
07-0875SC Visual Structural Inspection 0-003-SC1 11/21/07 DONE DONE DONE 10/15/07 10/15/07 / / / / 16 5,743 0 JOD 0 0 0
Bridgeport Elementary:
03-1677 Reconstruction 0-004-007 11/23/04 DONE DONE DONE 06/29/04 06/24/04 08/11/03 12/16/03 2,4,7,8,9,155,15,16 458,120 458,120 HCM 0 0 0
Thomas Associates
05-1232 Reconstruction 0-004-008 06/20/06 DONE DONE DONE 05/08/06 05/01/06 / / 12/16/03 2,7 272,371 272,371 HCM 0 0 0
Thomas Associates
08-0534 Reconstruction 0-004-009 04/02/09 DONE DONE DONE 10/15/08 10/14/08 08/12/08 05/20/08 2,8,9,14,155,15,16 718,806 0 HCM 0 0 158,200
Thomas Associates
07-0872SC Visual Structural Inspection 0-004-SC1 11/21/07 DONE DONE DONE 10/15/07 10/15/07 / / / / 16 1,872 0 JOD 0 0 0
07-0874SC Visual Structural Inspection 0-004-SC2 11/21/07 DONE DONE DONE 10/15/07 10/15/07 / / / / 16 4,386 0 JOD 0 0 0
Chittenango Middle School:
03-1678 Reconstruction 0-005-008 11/23/04 DONE DONE DONE 06/29/04 06/24/04 08/11/03 12/16/03 2,4,7,8,9,155,15,16 674,145 674,145 HCM 0 0 0
Thomas Associates
06-0024 Reconstruction 0-005-009 11/17/06 DONE DONE DONE 07/10/06 07/05/06 03/31/06 12/16/03 2,8,9,10,16 125,673 125,673 HCM 0 0 0
Thomas Associates
08-0535 Reconstruction 0-005-010 04/02/09 DONE DONE DONE 10/15/08 10/14/08 08/12/08 05/20/08 2,4,7,8,9,14,155,15, 526,554 0 HCM 0 0 158,200
Thomas Associates
07-0873SC Visual Structural Inspection 0-005-SC1 11/21/07 DONE DONE DONE 10/15/07 10/15/07 / / / / 16 640 0 JOD 0 0 0
07-0877SC Visual Structural Inspection 0-005-SC2 11/21/07 DONE DONE DONE 10/15/07 10/15/07 / / / / 16 5,743 0 JOD 0 0 0
New Press Box:
08-1443 New Construction 7-013-001 04/02/09 DONE DONE DONE 03/30/09 03/12/09 01/26/09 05/20/08 02 - 16 77,180 0 HCM 0 0 0
TETRA TECH ARCHITECTS & ENGINEERS
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Districtwide:
05-0993 Reconstruction 7-999-001 11/06/06 DONE DONE DONE 03/17/06 03/17/06 01/09/06 12/08/05 16 2,879,876 2,879,876 JOD 0 0 0
Building Engergy Solutions
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED