Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 11/05/09 at 16:03:15




SOUTH JEFFERSON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 22-01-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          lilson Elementary:
08-0507   Reconstruction               0-001-008  03/25/09     DONE    DONE       DONE      10/14/08   10/07/08   05/30/07   12/04/07   2,4,7,8,9,10,155,15,   3,687,000     3,687,000  HCM             0           0      140,000
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Gen. B.C.Clarke Jr/Sr High:
08-0508   Reconstruction               0-005-005  03/25/09     DONE    DONE       DONE      10/14/08   10/07/08   05/30/07   12/04/07   2,4,7,8,9,10,155,15,  12,701,940    12,701,940  HCM             0           0      398,000
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Mannsville Elementary:
08-0509   Reconstruction               0-006-005  03/25/09     DONE    DONE       DONE      10/14/08   10/07/08   05/30/07   12/04/07   2,4,7,8,9,10,155,15,   2,200,707             0  HCM             0           0      110,000
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Clarke Maint Stor Bl:
  -       Reconstruction               2-007-001                                              /  /       /  /     05/31/07     /  /     8,9,15,16                      0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Adams Center Bus Garage:
08-0510   Additions and Alterations    5-002-005  03/25/09     DONE    DONE       DONE      10/14/08   10/07/08   05/30/07   12/04/07   02 - 16                3,620,500     3,620,500  HCM             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Press Box / Concession Building:
08-0390DB Discovered Building          7-009-001  10/01/08     DONE    DONE       DONE      09/24/08   09/23/08   06/12/07     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            
08-0511   Reconstruction               7-009-002  03/25/09     DONE    DONE       DONE      10/14/08   10/07/08     /  /     12/04/07                            148,478             0  HCM             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            
  -       Additions and Alterations    7-009-003                                              /  /       /  /     10/20/08     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Clarke Storage and Concession Stand:
08-0512   New Construction             7-010-001  03/25/09     DONE    DONE       DONE      10/14/08   10/07/08   07/17/08   12/04/07   02 - 16                  241,375             0  HCM             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ALEXANDRIA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 22-02-02-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Alexandria Central:
05-0341   Reconstruction               0-001-010  06/16/06     DONE    DONE       DONE      11/14/05   11/07/05   07/20/05   07/14/05   2,155,15,16              802,562       802,562  JOD             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
07-0973   Reconstruction               0-001-011  06/26/08     DONE    DONE       DONE      11/28/07   11/27/07   05/01/07   04/03/07   2,4,7,8,9,10,13,14,1   2,175,000             0  JOD             0           0      213,746
                                                                                                                                                                                                                                 King & King, Architects             

          Bus Garage:
05-0342   Reconstruction               0-004-002  06/16/06     DONE    DONE       DONE      11/14/05   11/07/05   07/21/05   07/14/05   16                        10,969        10,969  JOD             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
07-0974   Additions and Alterations    0-004-003  06/26/08     DONE    DONE       DONE      11/28/07   11/27/07   05/01/07   04/03/07   02 - 16                  285,000       285,000  JOD             0           0            0
                                                                                                                                                                                                                                 King & King, Architects             

          New Greenhouse:
07-0975   New Construction             0-005-001  06/26/08     DONE    DONE       DONE      11/28/07   11/27/07   10/16/07   04/03/07   02 - 16                   40,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 King & King, Architects             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




INDIAN RIVER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 22-03-01-06
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Antwerp Primary School:
04-0804   Reconstruction               0-001-010  03/08/05     DONE    DONE       DONE      02/10/05   02/09/05   02/26/04   05/18/04   2,4                       46,200        46,200  HCM             0           0            0
                                                                                                                                                                                                                                 March Associates                    
07-2047   Reconstruction               0-001-011  11/13/08     DONE    DONE       DONE      05/01/08   04/24/08   06/22/07   10/17/07   2,4,7,8,9,155,15,16    1,565,000             0  HCM             0           0       31,300
                                                                                                                                                                                                                                 March Associates                    

          Evans Mills Primary School:
04-0805   Reconstruction               0-004-013  03/08/05     DONE    DONE       DONE      02/10/05   02/09/05   02/26/04   05/18/04   2,4                       49,800        49,800  HCM             0           0            0
                                                                                                                                                                                                                                 March Associates                    
07-2048   Reconstruction               0-004-014  11/13/08     DONE    DONE       DONE      05/01/08   04/24/08   06/22/07   10/17/07   2,4,7,8,9,155,15,16    2,289,700             0  HCM             0           0       45,700
                                                                                                                                                                                                                                 March Associates                    

          Philadelphia Primary School:
04-0806   Reconstruction               0-005-010  03/08/05     DONE    DONE       DONE      02/10/05   02/09/05   02/26/04   05/18/04   2,4                       43,166        43,166  HCM             0           0            0
                                                                                                                                                                                                                                 March Associates                    
07-2049   Reconstruction               0-005-011  11/13/08     DONE    DONE       DONE      05/01/08   04/24/08   06/22/07   10/17/07   2,4,8,9,155,15,16        625,000             0  HCM             0           0       12,500
                                                                                                                                                                                                                                 March Associates                    

          Indian River High School:
04-0807   Reconstruction               0-007-014  03/08/05     DONE    DONE       DONE      02/10/05   02/09/05   02/26/04   05/18/04   2,4,7                     48,000        48,000  HCM             0           0            0
                                                                                                                                                                                                                                 March Associates                    
08-0072   Additions and Alterations    0-007-015  02/27/09     DONE    DONE       DONE      07/22/08   07/16/08   06/22/07   10/17/07   02 - 16               15,112,000             0  HCM             0           0    1,046,000
                                                                                                                                                                                                                                 March Associates                    

          Theresa Primary School:
04-0808   Reconstruction               0-008-009  03/08/05     DONE    DONE       DONE      02/10/05   02/09/05   02/26/04   05/18/04   2,4                       78,600        78,600  HCM             0           0            0
                                                                                                                                                                                                                                 March Associates                    
07-2050   Reconstruction               0-008-010  11/13/08     DONE    DONE       DONE      05/01/08   04/24/08   06/22/07   10/17/07   2,7,8,9,155,16           548,500       548,500  HCM             0           0       10,900
                                                                                                                                                                                                                                 March Associates                    

          Indian River Middle 5-8):
04-0809   Reconstruction               0-010-009  03/08/05     DONE    DONE       DONE      02/10/05   02/09/05   02/26/04   05/18/04   4                        117,500       117,500  HCM             0           0            0
                                                                                                                                                                                                                                 March Associates                    
07-2280   Reconstruction               0-010-010  12/16/08     DONE    DONE       DONE      07/01/08   06/13/08   06/22/07   10/17/07   4,7,8,9,10,155,15,16   2,882,500             0  HCM             0           0       57,500
                                                                                                                                                                                                                                 March Associates                    

          Calcium Primary School:
04-0810   Reconstruction               0-027-006  03/08/05     DONE    DONE       DONE      02/10/05   02/09/05   02/26/04   05/18/04   4                         41,400        41,400  HCM             0           0            0
                                                                                                                                                                                                                                 March Associates                    
07-2281   Additions and Alterations    0-027-008  12/16/08     DONE    DONE       DONE      07/01/08   06/13/08   06/22/07   10/17/07   02 - 16                9,849,000             0  HCM             0           0      680,000
                                                                                                                                                                                                                                 March Associates                    

          New Grade 4-5 Building:
07-2103   Additions and Alterations    0-032-002  01/16/09     DONE    DONE       DONE      05/08/08   05/06/08   06/22/07   10/17/07   02 - 16                7,190,000             0  HCM             0           0      910,500
                                                                                                                                                                                                                                 March Associates                    

          Flammable Storage Bldg. @ Antwerp:
05-1172DB Discovered Building          2-039-001  03/26/07     DONE    DONE       DONE      04/18/06   03/30/06   05/24/04     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          District & Athletic Storage Bldg.:
05-1173DB Discovered Building          2-042-001  03/26/07     DONE    DONE       DONE      04/18/06   03/30/06   05/24/04     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Maintenance Storage Building:
05-1174DB Discovered Building          3-041-001  03/26/07     DONE    DONE       DONE      04/18/06   03/30/06   05/24/04     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Calcium Bus Garage:
07-2282   Reconstruction               4-009-005  12/16/08     DONE    DONE       DONE      07/01/08   06/13/08   06/22/07   10/17/07   2,14,155,16              130,500             0  HCM             0           0            0
                                                                                                                                                                                                                                 March Associates                    

          Maintenance Center (old bus garage):
07-2051   Additions and Alterations    5-002-005  11/13/08     DONE    DONE       DONE      05/01/08   04/24/08   06/22/07   10/17/07   02 - 16                   48,800        48,800  HCM             0           0            0
                                                                                                                                                                                                                                 March Associates                    

          New Transportation Facility:
07-2104   Reconstruction               5-031-002  01/16/09     DONE    DONE       DONE      05/08/08   05/06/08   06/22/07   10/17/07   2,4,9,155,16             368,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 March Associates                    
07-1899   Reconstruction               5-031-003  04/03/08     DONE    DONE       DONE      03/31/08   03/24/08   02/21/08   10/17/07   14,16                    125,000       125,000  HCM             0           0            0
                                                                                                                                                                                                                                 March Associates                    

          Well Pump House:
05-1175DB Discovered Building          7-040-001  03/26/07     DONE    DONE       DONE      04/18/06   03/30/06   05/24/04     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          New Concession Stand:
08-0073   New Construction             7-043-001  02/27/09     DONE    DONE       DONE      07/22/08   07/16/08   04/10/08   10/17/07   02 - 16                   50,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 March Associates                    


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




GENERAL BROWN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 22-04-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Brownville Glen Elementary:
08-0772   Reconstruction               0-001-003  04/22/09     DONE    DONE       DONE      11/20/08   11/19/08   01/22/07   03/17/08   2,4,7,8,9,155,15,16      609,083     1,024,452  HCM             0           0       46,332
                                                                                                                                                                                                                                 Bernier Carr Associates             
08-1595   Reconstruction               0-001-004  08/20/09     DONE    DONE       DONE      05/06/09   05/01/09   03/24/09   03/17/08   10,15,16               1,842,447     1,842,447  HCM             0           0      144,152
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Dexter Elementary:
08-0773   Reconstruction               0-002-003  04/22/09     DONE    DONE       DONE      11/20/08   11/18/08   03/01/07   03/17/08   2,4,7,8,9,155,15,16    3,591,633     3,502,218  HCM             0           0      273,210
                                                                                                                                                                                                                                 Bernier Carr Associates             

          General Brown High:
08-1596   Reconstruction               0-003-003  10/21/09     DONE    DONE       DONE      05/06/09   05/01/09   01/22/07   03/17/08   2,4,7,8,9,155,15,16    6,958,883     6,958,883  HCM             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Elementary School:
  -       Reconstruction               0-010-003                                              /  /       /  /     01/22/07     /  /     2,4,7,8,9,155,15,16            0     8,990,217  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
  -       Reconstruction               5-004-003                                              /  /       /  /     01/22/07     /  /     2,4,7,8,9,155,15,16            0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Concession stand @ High School:
  -       Reconstruction               7-013-002                                              /  /       /  /       /  /       /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Press Box:
08-1597   New Construction             7-014-001  08/20/09     DONE    DONE       DONE      05/06/09   05/01/09   04/06/09   03/17/08   02 - 16                   63,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




THOUSAND ISLANDS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 22-07-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Guardino Elem. (fmly Clayton):
07-0108   Reconstruction               0-003-002  11/21/07     DONE    DONE       DONE      07/30/07   07/27/07   03/17/06   12/19/06   2,4,7,8,9,10,13,14,1     709,424       709,424  MGL             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            
07-0044   Reconstruction               0-003-003  04/09/08     DONE    DONE       DONE      07/12/07   07/11/07   01/10/07     /  /     7,155,16               1,271,228     1,271,228  MGL             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Cape Vincent Elem:
07-0109   Reconstruction               0-005-002  11/21/07     DONE    DONE       DONE      07/30/07   07/27/07   03/17/06   12/19/06   2,4,8,9,155,15,16        615,878       615,323  MGL             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            
07-0045   Reconstruction               0-005-003  04/09/08     DONE    DONE       DONE      07/12/07   07/11/07   01/10/07     /  /     7,8,155,16                39,556             0  MGL             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Junior Senior High:
04-1378   Reconstruction               0-011-006  07/27/05     DONE    DONE       DONE      06/08/05   05/31/05   04/19/05   05/19/05   9,16                      53,308        53,308  RDR             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            
07-0110   Additions and Alterations    0-011-007  11/21/07     DONE    DONE       DONE      07/30/07   07/27/07   03/17/06   12/19/06   02 - 16                6,951,060     6,864,581  MGL             0           0      194,124
                                                                                                                                                                                                                                 Ashley McGraw Architects            
06-0799   Reconstruction               0-011-008  02/01/07     DONE    DONE       DONE      01/23/07   01/22/07   03/17/06   12/19/06   2,7                    1,068,014     1,068,014  MGL             0           0      183,698
                                                                                                                                                                                                                                 Ashley McGraw Architects            
07-0046   Reconstruction               0-011-009  04/09/08     DONE    DONE       DONE      07/12/07   07/11/07   01/10/07     /  /     7,155,16               1,271,228             0  MGL             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Bus Garage/Clayton:
07-0111   Reconstruction               5-001-005  11/21/07     DONE    DONE       DONE      07/30/07   07/27/07   03/17/06   12/19/06   2,4,7,8,9                 76,201        76,201  MGL             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            
  -       Reconstruction               5-001-006                                              /  /       /  /     01/10/07     /  /     7,8,155,16                     0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
07-0004   Reconstruction               5-001-007  07/24/07     DONE    DONE       DONE      07/03/07   07/02/07   05/25/07   12/19/06   15,16                    125,950       125,950  MGL             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Bus Garage @ Cape Vincent:
07-0112   Reconstruction               5-004-003  11/21/07     DONE    DONE       DONE      07/30/07   07/27/07   03/17/06   12/19/06   2,4,7,8,9                 94,621        94,621  MGL             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            
06-0800   Reconstruction               5-004-004  02/01/07     DONE    DONE       DONE      01/23/07   01/22/07   03/17/06   12/19/06   2,4                       51,074        51,074  MGL             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            
  -       Reconstruction               5-004-005                                              /  /       /  /     01/10/07     /  /     7,8,155,16                     0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BELLEVILLE HENDERSON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 22-09-09-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          K-12 School:
  -    XX Additions and Alterations    0-010-004                         CANCELLED            /  /       /  /     12/01/05     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
08-0891PR Additions and Alterations    0-010-005                         UNREVIEWED         12/09/08   12/09/08   08/12/08     /  /     02 - 16                8,164,650     8,164,650  DDJ             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
08-1608   Reconstruction               0-010-006  05/12/09     DONE    DONE       DONE      05/11/09   05/06/09     /  /     02/27/09                          1,296,536     1,296,536  DDJ             0           0       75,000
                                                                                                                                                                                                                                 Bernier Carr Associates             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SACKETS HARBOR CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 22-10-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building K-12:
07-0119   Reconstruction               0-001-007  02/29/08     DONE    DONE       DONE      08/01/07   08/01/07   10/07/05   12/06/06   2,4,7,8,9,10,155,15,   2,129,098     2,129,098  MGL             0           0      153,820
                                                                                                                                                                                                                                 Bernier Carr Associates             
07-0326   Reconstruction               0-001-008  01/18/08     DONE    DONE       DONE      09/07/07   09/07/07   08/14/07   12/06/06   2,8,9,10,155,15,16     1,648,159     1,648,159  MGL             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LYME CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 22-13-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
07-0360XX Reconstruction               0-002-004                         CANCELLED          09/14/07   09/13/07   11/30/06   07/26/07   8,155,16                       0    10,205,772  MGL             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
  -    PR Additions and Alterations    0-002-005                                              /  /       /  /     01/16/08     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
  -    PR Additions and Alterations    0-002-006                                              /  /       /  /     03/14/08     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0892SC Visual Structural Inspection 0-002-SC1  02/07/07     DONE    DONE       DONE      01/26/07   01/26/07     /  /       /  /     16                         8,160         8,160  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          New Bus Garage:
07-0361XX Reconstruction               5-006-002                         CANCELLED          09/14/07   09/13/07   11/30/06   07/26/07   8,155,16                       0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




LAFARGEVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 22-14-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
08-0761   Additions and Alterations    0-001-008  05/07/09     DONE    DONE       DONE      11/14/08   11/14/08   01/22/07   03/10/08   02 - 16               12,838,835             0  JOD             0           0      459,811
                                                                                                                                                                                                                                 Bernier Carr Associates             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WATERTOWN CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 22-20-00-01
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          North Elementary:
05-0863   Reconstruction               0-010-005  03/16/06     DONE    DONE       DONE      03/06/06   03/03/06   05/13/05   06/21/05   4,8,9,10,14,155,15,1   1,229,418     1,229,418  HCM             0           0       79,325
                                                                                                                                                                                                                                 Bernier Carr Associates             
08-1324   Reconstruction               0-010-006  09/04/09     DONE    DONE       DONE      03/10/09   03/05/09   03/07/08   11/19/07   2,4,155,16               455,689             0  HCM             0           0        9,115
                                                                                                                                                                                                                                 Bernier Carr Associates             
08-1369SC Visual Structural Inspection 0-010-SC1  03/17/09     DONE    DONE       DONE      01/14/09   01/14/09     /  /       /  /     16                         1,875             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Knickerbocker Elementary:
  -    PR Additions and Alterations    0-011-003                                              /  /       /  /     05/13/05     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
05-0864   Additions and Alterations    0-011-003  03/16/06     DONE    DONE       DONE      03/06/06   03/03/06   05/13/05   06/21/05   02 - 16                1,244,592     1,239,490  HCM             0           0       62,230
                                                                                                                                                                                                                                 Bernier Carr Associates             
08-1325   Additions and Alterations    0-011-004  09/04/09     DONE    DONE       DONE      03/10/09   03/05/09   03/07/08   11/19/07   02 - 16                  285,226             0  HCM             0           0        5,705
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Sherman Elementary School:
  -    PR Additions and Alterations    0-012-003                                              /  /       /  /     05/13/05     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
05-0865   Additions and Alterations    0-012-003  03/16/06     DONE    DONE       DONE      03/06/06   03/03/06   05/13/05   06/21/05   02 - 16                3,315,843     3,315,843  HCM             0           0      158,675
                                                                                                                                                                                                                                 Bernier Carr Associates             
08-1326   Reconstruction               0-012-004  09/04/09     DONE    DONE       DONE      03/10/09   03/05/09   03/07/08   11/19/07   2,8,9,155,15,16        1,622,472             0  HCM             0           0       32,449
                                                                                                                                                                                                                                 Bernier Carr Associates             
08-1430   Reconstruction               0-012-005  04/30/09     DONE    DONE       DONE      03/26/09   03/24/09   02/23/09   11/19/07   7                        229,310       229,310  HCM             0           0        4,586
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Watertown High School:
  -    PR Additions and Alterations    0-015-005                                              /  /       /  /     05/13/05     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
05-0866   Additions and Alterations    0-015-005  03/16/06     DONE    DONE       DONE      03/06/06   03/03/06   05/13/05   06/21/05   02 - 16                1,089,218     1,051,195  HCM             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
  -       Reconstruction               0-015-006                                              /  /       /  /     02/05/07     /  /     16                             0    26,045,664  HCM             0           0            0
                                                                                                                                                                                                                                                                     
08-1327   Reconstruction               0-015-007  09/04/09     DONE    DONE       DONE      03/10/09   03/05/09   03/07/08   11/19/07   2,4,7,8,9,155,15,16    2,800,477             0  HCM             0           0       76,027
                                                                                                                                                                                                                                 Bernier Carr Associates             
08-1431   Reconstruction               0-015-008  04/30/09     DONE    DONE       DONE      03/26/09   03/24/09   02/23/09   11/19/07   7                      1,414,270     1,414,270  HCM             0           0       28,285
                                                                                                                                                                                                                                 Bernier Carr Associates             
07-0881SC Visual Structural Inspection 0-015-SC1  11/21/07     DONE    DONE       DONE      09/13/07   09/13/07     /  /       /  /     16                        48,025         7,121  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-1368SC Visual Structural Inspection 0-015-SC2  03/17/09     DONE    DONE       DONE      01/14/09   01/14/09     /  /       /  /     16                        27,620             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
08-1701SC Visual Structural Inspection 0-015-SC3  06/18/09     DONE    DONE       DONE      05/14/09   05/14/09     /  /       /  /     16                         3,370             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Ohio Street Elementary:
  -       Reconstruction               0-016-003                                              /  /       /  /     05/13/05     /  /     9,155,15,16                    0     5,800,140  HCM             0           0            0
                                                                                                                                                                                                                                                                     
06-1250   Reconstruction               0-016-004  06/29/07     DONE    DONE       DONE      04/02/07   04/02/07   02/05/07   06/21/05   2,9,155,15,16            392,850       392,850  HCM             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
07-2125PR Additions and Alterations    0-016-005                         UNREVIEWED         05/19/08   05/14/08   03/07/08     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
08-1328   Additions and Alterations    0-016-005  09/04/09     DONE    DONE       DONE      03/10/09   03/05/09   03/07/08   11/19/07   02 - 16                5,712,921             0  HCM             0           0      114,258
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Starbuck Elementary School:
07-0970   Reconstruction               0-017-003  05/20/08     DONE    DONE       DONE      11/28/07   11/27/07   11/21/07   11/19/07   2,4,7,8,9,10,155,15,   3,003,061     3,003,061  HCM             0           0       60,061
                                                                                                                                                                                                                                 Bernier Carr Associates             

          H.T.Wiley Elementary:
05-0867   Reconstruction               0-021-008  03/16/06     DONE    DONE       DONE      03/06/06   03/03/06   05/13/05   06/21/05   2,4,7,8,9,10,14,155,   9,028,520     8,969,673  HCM             0           0      398,135
                                                                                                                                                                                                                                 Bernier Carr Associates             
06-1462   Reconstruction               0-021-009  09/12/07     DONE    DONE       DONE      05/09/07   05/09/07   02/05/07   06/21/05   2,7,8,9,155,15,16        216,120       216,120  HCM             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
08-1329   Reconstruction               0-021-010  09/04/09     DONE    DONE       DONE      03/10/09   03/05/09   03/07/08   11/19/07   2,9,16                   358,378       358,378  HCM             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             

          New Middle School:
  -       Reconstruction               0-023-002                                              /  /       /  /     02/05/07     /  /     2                              0    22,139,888  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Administration Building:
  -       Reconstruction               1-001-002                                              /  /       /  /       /  /       /  /     2                              0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CARTHAGE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 22-22-01-06
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          High School:
04-0378   Reconstruction               0-001-010  01/14/05     DONE    DONE       DONE      11/09/04   11/08/04   02/04/04   03/16/04   2,4,8,9,10,155,15,16   1,925,164     1,925,164  JOD             0           0            0
                                                                                                                                                                                                                                 March Associates                    
  -    PR Additions and Alterations    0-001-011                                              /  /       /  /     02/17/06     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0571   Additions and Alterations    0-001-011  03/09/07     DONE    DONE       DONE      11/30/06   11/29/06   02/17/06   05/16/06   02 - 16               20,906,967    17,355,867  JOD             0           0      360,000
                                                                                                                                                                                                                                 March Associates                    
  -       Reconstruction               0-001-012                                              /  /       /  /     11/15/06     /  /     8,16                           0    27,054,706  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Middle School:
04-0379   Reconstruction               0-002-004  01/14/05     DONE    DONE       DONE      11/09/04   11/08/04   02/04/04   03/16/04   2,8,9,10,155,15,16     1,360,061     1,360,061  JOD             0           0            0
                                                                                                                                                                                                                                 March Associates                    
  -    PR Additions and Alterations    0-002-005                                              /  /       /  /     02/21/06     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0572   Additions and Alterations    0-002-005  03/09/07     DONE    DONE       DONE      11/30/06   11/29/06   02/21/06   05/16/06   02 - 16               11,211,000    11,211,000  JOD             0           0      180,000
                                                                                                                                                                                                                                 March Associates                    

          Black River Elementary:
04-0380   Reconstruction               0-003-006  01/14/05     DONE    DONE       DONE      11/09/04   11/08/04   02/04/04   03/16/04   2,4,8,9,10,155,15,16     392,945       392,945  JOD             0           0            0
                                                                                                                                                                                                                                 March Associates                    

          Great Bend Grade School:
04-0381   Reconstruction               0-008-004  01/14/05     DONE    DONE       DONE      11/09/04   11/08/04   02/05/04   03/16/04   155,15,16                107,732       105,830  JOD             0           0            0
                                                                                                                                                                                                                                 March Associates                    
05-0702   Reconstruction               0-008-005  05/23/06     DONE    DONE       DONE      02/10/06   02/01/06   10/19/05   05/17/05   7                        102,500       102,500  JOD             0           0            0
                                                                                                                                                                                                                                 March Associates                    
07-2338   Reconstruction               0-008-006  09/18/08     DONE    DONE       DONE      07/08/08   06/24/08   05/03/07   03/16/04   2,16                      80,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 March Associates                    

          Carthage Elementary:
04-0382   Reconstruction               0-012-006  01/14/05     DONE    DONE       DONE      11/09/04   11/08/04   02/04/04   03/16/04   2,4,8,9,10,155,15,16     243,698       243,698  JOD             0           0            0
                                                                                                                                                                                                                                 March Associates                    

          Pole Barn:
06-0573   Reconstruction               3-006-002  03/09/07     DONE    DONE       DONE      11/30/06   11/29/06   11/15/06   05/16/06   2,7,8,9,10,155,15,16     306,033             0  JOD             0           0            0
                                                                                                                                                                                                                                 March Associates                    

          Bus Garage:
04-0383   Reconstruction               5-005-003  01/14/05     DONE    DONE       DONE      11/09/04   11/08/04   02/05/04   03/16/04   2                        396,223       396,223  JOD             0           0            0
                                                                                                                                                                                                                                 March Associates                    

          Districtwide:
04-0384   Reconstruction               7-999-001  12/28/04     DONE    DONE       DONE      11/09/04   11/08/04   02/05/04   03/16/04   16                       298,475       298,475  JOD             0           0            0
                                                                                                                                                                                                                                 March Associates                    


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED