REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Wilson Elementary:
- Reconstruction 0-001-008 / / / / 05/30/07 / / 2,4,7,8,9,10,155,15, 0 0 HCM 0 0 0
Gen. B.C.Clarke Jr/Sr High:
- Reconstruction 0-005-005 / / / / 05/30/07 / / 2,4,7,8,9,10,155,15, 0 0 HCM 0 0 0
Mannsville Elementary:
- Reconstruction 0-006-005 / / / / 05/30/07 / / 2,4,7,8,9,10,155,15, 0 0 HCM 0 0 0
Clarke Maint Stor Bl:
- Reconstruction 2-007-001 / / / / 05/31/07 / / 8,9,15,16 0 0 HCM 0 0 0
Adams Center Bus Garage:
- Additions and Alterations 5-002-005 / / / / 05/30/07 / / 02 - 16 0 0 HCM 0 0 0
Press Box / Concession Building:
- DB Discovered Building 7-009-001 / / / / 06/12/07 / / 0 0 HCM 0 0 0
Clarke Storage and Concesstion Stand:
- New Construction 7-010-001 / / / / 07/17/08 / / 02 - 16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Alexandria Central:
05-0341 Reconstruction 0-001-010 06/16/06 DONE DONE DONE 11/14/05 11/07/05 07/20/05 07/14/05 2,155,15,16 830,621 830,621 JOD 0 0 0
Bernier Carr Associates
07-0973 Reconstruction 0-001-011 06/26/08 DONE DONE DONE 11/28/07 11/27/07 05/01/07 04/03/07 2,4,7,8,9,10,13,14,1 2,175,000 0 JOD 0 0 213,746
King & King, Architects
Bus Garage:
05-0342 Reconstruction 0-004-002 06/16/06 DONE DONE DONE 11/14/05 11/07/05 07/21/05 07/14/05 16 10,969 10,969 JOD 0 0 0
Bernier Carr Associates
07-0974 Additions and Alterations 0-004-003 06/26/08 DONE DONE DONE 11/28/07 11/27/07 05/01/07 04/03/07 02 - 16 285,000 0 JOD 0 0 0
King & King, Architects
New Greenhouse:
07-0975 New Construction 0-005-001 06/26/08 DONE DONE DONE 11/28/07 11/27/07 10/16/07 04/03/07 02 - 16 40,000 0 JOD 0 0 0
King & King, Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Antwerp Primary School:
04-0804 Reconstruction 0-001-010 03/08/05 DONE DONE DONE 02/10/05 02/09/05 02/26/04 05/18/04 2,4 46,200 46,200 HCM 0 0 0
March Associates
07-2047 Reconstruction 0-001-011 UNREVIEWED 05/01/08 04/24/08 06/22/07 10/17/07 2,4,7,8,9,155,15,16 0 0 HCM 0 0 0
March Associates
Evans Mills Primary School:
04-0805 Reconstruction 0-004-013 03/08/05 DONE DONE DONE 02/10/05 02/09/05 02/26/04 05/18/04 2,4 49,800 49,800 HCM 0 0 0
March Associates
07-2048 Reconstruction 0-004-014 UNREVIEWED 05/01/08 04/24/08 06/22/07 10/17/07 2,4,7,8,9,155,15,16 0 0 HCM 0 0 0
March Associates
Philadelphia Primary School:
04-0806 Reconstruction 0-005-010 03/08/05 DONE DONE DONE 02/10/05 02/09/05 02/26/04 05/18/04 2,4 43,166 43,166 HCM 0 0 0
March Associates
07-2049 Reconstruction 0-005-011 UNREVIEWED 05/01/08 04/24/08 06/22/07 10/17/07 2,4,8,9,155,15,16 0 0 HCM 0 0 0
March Associates
Indian River High School:
04-0807 Reconstruction 0-007-014 03/08/05 DONE DONE DONE 02/10/05 02/09/05 02/26/04 05/18/04 2,4,7 48,000 48,000 HCM 0 0 0
March Associates
08-0072 Additions and Alterations 0-007-015 UNREVIEWED 07/22/08 07/16/08 06/22/07 10/17/07 02 - 16 0 0 HCM 0 0 0
March Associates
Theresa Primary School:
04-0808 Reconstruction 0-008-009 03/08/05 DONE DONE DONE 02/10/05 02/09/05 02/26/04 05/18/04 2,4 78,600 78,600 HCM 0 0 0
March Associates
07-2050 Reconstruction 0-008-010 UNREVIEWED 05/01/08 04/24/08 06/22/07 10/17/07 2,7,8,9,155,16 0 0 HCM 0 0 0
March Associates
Indian River Middle 5-8):
04-0809 Reconstruction 0-010-009 03/08/05 DONE DONE DONE 02/10/05 02/09/05 02/26/04 05/18/04 4 117,500 117,500 HCM 0 0 0
March Associates
07-2280 Reconstruction 0-010-010 UNREVIEWED 07/01/08 06/13/08 06/22/07 10/17/07 4,7,8,9,10,155,15,16 0 0 HCM 0 0 0
March Associates
Calcium Primary School:
04-0810 Reconstruction 0-027-006 03/08/05 DONE DONE DONE 02/10/05 02/09/05 02/26/04 05/18/04 4 41,400 41,400 HCM 0 0 0
March Associates
07-2281 Additions and Alterations 0-027-008 UNREVIEWED 07/01/08 06/13/08 06/22/07 10/17/07 02 - 16 0 0 HCM 0 0 0
March Associates
New Grade 4-5 Building:
07-2103 Additions and Alterations 0-032-002 UNREVIEWED 05/08/08 05/06/08 06/22/07 10/17/07 02 - 16 0 0 HCM 0 0 0
March Associates
Flammable Storage Bldg. @ Antwerp:
05-1172DB Discovered Building 2-039-001 03/26/07 DONE DONE DONE 04/18/06 03/30/06 05/24/04 / / 0 0 HCM 0 0 0
District & Athletic Storage Bldg.:
05-1173DB Discovered Building 2-042-001 03/26/07 DONE DONE DONE 04/18/06 03/30/06 05/24/04 / / 0 0 HCM 0 0 0
Maintenance Storage Building:
05-1174DB Discovered Building 3-041-001 03/26/07 DONE DONE DONE 04/18/06 03/30/06 05/24/04 / / 0 0 HCM 0 0 0
- Reconstruction 3-041-002 / / / / / / / / 0 0 HCM 0 0 0
Calcium Bus Garage:
07-2282 Reconstruction 4-009-005 UNREVIEWED 07/01/08 06/13/08 06/22/07 10/17/07 2,14,155,16 0 0 HCM 0 0 0
March Associates
Bus Garage:
07-2051 Additions and Alterations 5-002-005 UNREVIEWED 05/01/08 04/24/08 06/22/07 10/17/07 02 - 16 0 0 HCM 0 0 0
March Associates
New Transportation Facility:
07-2104 Reconstruction 5-031-002 UNREVIEWED 05/08/08 05/06/08 06/22/07 10/17/07 2,4,9,155,16 0 0 HCM 0 0 0
March Associates
07-1899 Reconstruction 5-031-003 04/03/08 DONE DONE DONE 03/31/08 03/24/08 02/21/08 10/17/07 14,16 125,000 0 HCM 0 0 0
March Associates
Well Pump House:
05-1175DB Discovered Building 7-040-001 03/26/07 DONE DONE DONE 04/18/06 03/30/06 05/24/04 / / 0 0 HCM 0 0 0
New Concession Stand:
08-0073 New Construction 7-043-001 UNREVIEWED 07/22/08 07/16/08 04/10/08 10/17/07 02 - 16 0 0 HCM 0 0 0
March Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Brownville Glen Elementary:
- Reconstruction 0-001-003 / / / / 01/22/07 / / 2,4,7,8,9,155,15,16 0 4,296,400 HCM 0 0 0
Dexter Elementary:
- Reconstruction 0-002-003 / / / / 03/01/07 / / 2,4,7,8,9,155,15,16 0 4,296,400 HCM 0 0 0
General Brown High:
- Reconstruction 0-003-003 / / / / 01/22/07 / / 2,4,7,8,9,155,15,16 0 15,355,530 HCM 0 0 0
Elementary School:
- Reconstruction 0-010-003 / / / / 01/22/07 / / 2,4,7,8,9,155,15,16 0 8,990,217 HCM 0 0 0
Bus Garage:
- Reconstruction 5-004-003 / / / / 01/22/07 / / 2,4,7,8,9,155,15,16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Guardino Elem. (fmly Clayton):
07-0108 Reconstruction 0-003-002 11/21/07 DONE DONE DONE 07/30/07 07/27/07 03/17/06 12/19/06 2,4,7,8,9,10,13,14,1 1,477,818 0 MGL 0 0 0
Ashley McGraw Architects
07-0044 Reconstruction 0-003-003 04/09/08 DONE DONE DONE 07/12/07 07/11/07 01/10/07 / / 7,155,16 1,271,228 1,271,228 MGL 0 0 0
Ashley McGraw Architects
Cape Vincent Elem:
07-0109 Reconstruction 0-005-002 11/21/07 DONE DONE DONE 07/30/07 07/27/07 03/17/06 12/19/06 2,4,8,9,155,15,16 372,391 0 MGL 0 0 0
Ashley McGraw Architects
07-0045 Reconstruction 0-005-003 04/09/08 DONE DONE DONE 07/12/07 07/11/07 01/10/07 / / 7,8,155,16 39,556 0 MGL 0 0 0
Ashley McGraw Architects
Junior Senior High:
03-1647 Reconstruction 0-011-005 07/06/04 DONE DONE DONE 06/24/04 06/22/04 03/17/04 03/16/04 2,15 137,454 137,454 RDR 0 0 0
Ashley McGraw Architects
04-1378 Reconstruction 0-011-006 07/27/05 DONE DONE DONE 06/08/05 05/31/05 04/19/05 05/19/05 9,16 53,308 53,308 RDR 0 0 0
Ashley McGraw Architects
07-0110 Additions and Alterations 0-011-007 11/21/07 DONE DONE DONE 07/30/07 07/27/07 03/17/06 12/19/06 02 - 16 5,595,042 0 MGL 0 0 105,092
Ashley McGraw Architects
06-0799 Reconstruction 0-011-008 02/01/07 DONE DONE DONE 01/23/07 01/22/07 03/17/06 12/19/06 2,7 1,068,014 1,068,014 MGL 0 0 183,698
Ashley McGraw Architects
07-0046 Reconstruction 0-011-009 04/09/08 DONE DONE DONE 07/12/07 07/11/07 01/10/07 / / 7,155,16 1,271,228 0 MGL 0 0 0
Ashley McGraw Architects
Bus Garage/Clayton:
07-0111 Reconstruction 5-001-005 11/21/07 DONE DONE DONE 07/30/07 07/27/07 03/17/06 12/19/06 2,4,7,8,9 103,988 0 MGL 0 0 0
Ashley McGraw Architects
- Reconstruction 5-001-006 / / / / 01/10/07 / / 7,8,155,16 0 0 MGL 0 0 0
07-0004 Reconstruction 5-001-007 07/24/07 DONE DONE DONE 07/03/07 07/02/07 05/25/07 12/19/06 15,16 85,200 0 MGL 0 0 0
Ashley McGraw Architects
Bus Garage @ Cape Vincent:
07-0112 Reconstruction 5-004-003 11/21/07 DONE DONE DONE 07/30/07 07/27/07 03/17/06 12/19/06 2,4,7,8,9 32,500 0 MGL 0 0 0
Ashley McGraw Architects
06-0800 Reconstruction 5-004-004 02/01/07 DONE DONE DONE 01/23/07 01/22/07 03/17/06 12/19/06 2,4 51,074 51,074 MGL 0 0 0
Ashley McGraw Architects
- Reconstruction 5-004-005 / / / / 01/10/07 / / 7,8,155,16 0 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
K-12 School:
- Reconstruction 0-010-003 / / / / 03/02/04 / / 15 0 11,770,407 DDJ 0 0 0
- PR Additions and Alterations 0-010-004 / / / / 12/01/05 / / 02 - 16 0 0 DDJ 0 0 0
Bus Garage (Union):
- Reconstruction 5-003-002 / / / / 03/02/04 / / 15 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Sackets Harbor Central:
07-0119 Reconstruction 0-001-007 02/29/08 DONE DONE DONE 08/01/07 08/01/07 10/07/05 12/06/06 2,4,7,8,9,10,155,15, 2,439,967 2,439,967 MGL 0 0 153,820
Bernier Carr Associates
07-0326 Reconstruction 0-001-008 01/18/08 DONE DONE DONE 09/07/07 09/07/07 08/14/07 12/06/06 2,8,9,10,155,15,16 1,336,990 0 MGL 0 0 0
Bernier Carr Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
07-0360 Reconstruction 0-002-004 DONE DONE ADD. REQ'D09/14/07 09/13/07 11/30/06 07/26/07 8,155,16 0 9,814,284 MGL 0 0 0
Bernier Carr Associates
- PR Additions and Alterations 0-002-005 / / / / 01/16/08 / / 02 - 16 0 0 MGL 0 0 0
- PR Additions and Alterations 0-002-006 / / / / 03/14/08 / / 02 - 16 0 0 JOD 0 0 0
06-0892SC Visual Structural Inspection 0-002-SC1 02/07/07 DONE DONE DONE 01/26/07 01/26/07 / / / / 16 8,160 8,160 JOD 0 0 0
New Bus Garage:
07-0361 Reconstruction 5-006-002 DONE DONE ADD. REQ'D09/14/07 09/13/07 11/30/06 07/26/07 8,155,16 0 0 MGL 0 0 0
Bernier Carr Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
04-0023 Reconstruction 0-001-007 08/25/04 DONE DONE DONE 07/02/04 06/29/04 06/18/04 05/18/04 8,10 112,979 112,979 JOD 0 0 0
Bernier Carr Associates
- Additions and Alterations 0-001-008 / / / / 01/22/07 / / 02 - 16 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
North Elementary:
03-1692 Reconstruction 0-010-004 07/26/04 DONE DONE DONE 07/01/04 06/30/04 06/18/04 05/18/04 9,14 23,332 23,332 HCM 0 0 0
Bernier Carr Associates
05-0863 Reconstruction 0-010-005 03/16/06 DONE DONE DONE 03/06/06 03/03/06 05/13/05 06/21/05 4,8,9,10,14,155,15,1 1,586,503 1,586,503 HCM 0 0 79,325
Bernier Carr Associates
- Reconstruction 0-010-006 / / / / 03/07/08 / / 2,4,155,16 0 0 HCM 0 0 0
Knickerbocker Elementary:
- PR Additions and Alterations 0-011-003 / / / / 05/13/05 / / 02 - 16 0 0 HCM 0 0 0
05-0864 Additions and Alterations 0-011-003 03/16/06 DONE DONE DONE 03/06/06 03/03/06 05/13/05 06/21/05 02 - 16 1,244,592 1,239,490 HCM 0 0 62,230
Bernier Carr Associates
- PR Additions and Alterations 0-011-004 / / / / 03/07/08 / / 02 - 16 0 0 HCM 0 0 0
Sherman Elementary School:
- PR Additions and Alterations 0-012-003 / / / / 05/13/05 / / 02 - 16 0 0 HCM 0 0 0
05-0865 Additions and Alterations 0-012-003 03/16/06 DONE DONE DONE 03/06/06 03/03/06 05/13/05 06/21/05 02 - 16 3,173,506 3,173,506 HCM 0 0 158,675
Bernier Carr Associates
- Reconstruction 0-012-004 / / / / 03/07/08 / / 2,8,9,155,15,16 0 0 HCM 0 0 0
Watertown High School:
- PR Additions and Alterations 0-015-005 / / / / 05/13/05 / / 02 - 16 0 0 HCM 0 0 0
05-0866 Additions and Alterations 0-015-005 03/16/06 DONE DONE DONE 03/06/06 03/03/06 05/13/05 06/21/05 02 - 16 1,990,909 1,990,909 HCM 0 0 0
Bernier Carr Associates
- Reconstruction 0-015-006 / / / / 02/05/07 / / 16 0 26,045,664 HCM 0 0 0
- Reconstruction 0-015-007 / / / / 03/07/08 / / 2,4,7,8,9,155,15,16 0 0 HCM 0 0 0
07-0881SC Visual Structural Inspection 0-015-SC1 11/21/07 DONE DONE DONE 09/13/07 09/13/07 / / / / 16 48,025 7,121 JOD 0 0 0
Ohio Street Elementary:
- Reconstruction 0-016-003 / / / / 05/13/05 / / 9,155,15,16 0 5,800,140 HCM 0 0 0
06-1250 Reconstruction 0-016-004 06/29/07 DONE DONE DONE 04/02/07 04/02/07 02/05/07 06/21/05 2,9,155,15,16 376,187 376,187 HCM 0 0 18,809
Bernier Carr Associates
07-2125PR Additions and Alterations 0-016-005 UNREVIEWED 05/19/08 05/14/08 03/07/08 / / 02 - 16 0 0 HCM 0 0 0
Bernier Carr Associates
Starbuck School:
07-0970 Reconstruction 0-017-003 05/20/08 DONE DONE DONE 11/28/07 11/27/07 11/21/07 11/19/07 2,4,7,8,9,10,155,15, 4,119,550 0 HCM 0 0 205,977
Bernier Carr Associates
H.T.Wiley Elementary:
05-0867 Reconstruction 0-021-008 03/16/06 DONE DONE DONE 03/06/06 03/03/06 05/13/05 06/21/05 2,4,7,8,9,10,14,155, 7,962,692 7,962,692 HCM 0 0 398,135
Bernier Carr Associates
06-1462 Reconstruction 0-021-009 09/12/07 DONE DONE DONE 05/09/07 05/09/07 02/05/07 06/21/05 2,7,8,9,155,15,16 188,870 0 HCM 0 0 0
Bernier Carr Associates
- Reconstruction 0-021-010 / / / / 03/07/08 / / 2,9,16 0 0 HCM 0 0 0
New Middle School:
- Reconstruction 0-023-002 / / / / 02/05/07 / / 2 0 22,139,888 HCM 0 0 0
Field House:
03-0512 Reconstruction 7-004-001 06/02/04 DONE DONE DONE 10/28/03 10/14/03 09/24/03 10/27/98 4,7,9 78,000 0 HCM 0 0 0
Bernier Carr Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
High School:
03-1375 Reconstruction 0-001-009 05/02/04 DONE DONE DONE 04/09/04 04/08/04 02/04/04 03/16/04 2,7 1,013,000 1,013,000 JOD 0 0 0
March Associates
04-0378 Reconstruction 0-001-010 01/14/05 DONE DONE DONE 11/09/04 11/08/04 02/04/04 03/16/04 2,4,8,9,10,155,15,16 1,979,704 1,979,704 JOD 0 0 0
March Associates
- PR Additions and Alterations 0-001-011 / / / / 02/17/06 / / 02 - 16 0 0 JOD 0 0 0
06-0571 Additions and Alterations 0-001-011 03/09/07 DONE DONE DONE 11/30/06 11/29/06 02/17/06 05/16/06 02 - 16 18,083,000 6,872,000 JOD 0 0 360,000
March Associates
- Reconstruction 0-001-012 / / / / 11/15/06 / / 8,16 0 27,054,706 JOD 0 0 0
Middle School:
04-0379 Reconstruction 0-002-004 01/14/05 DONE DONE DONE 11/09/04 11/08/04 02/04/04 03/16/04 2,8,9,10,155,15,16 1,407,460 1,407,460 JOD 0 0 0
March Associates
- PR Additions and Alterations 0-002-005 / / / / 02/21/06 / / 02 - 16 0 0 JOD 0 0 0
06-0572 Additions and Alterations 0-002-005 03/09/07 DONE DONE DONE 11/30/06 11/29/06 02/21/06 05/16/06 02 - 16 11,211,000 11,211,000 JOD 0 0 180,000
March Associates
Black River Elementary:
03-1376 Reconstruction 0-003-005 05/02/04 DONE DONE DONE 04/09/04 04/08/04 02/04/04 03/16/04 2,7 499,946 499,946 JOD 0 0 0
March Associates
04-0380 Reconstruction 0-003-006 01/14/05 DONE DONE DONE 11/09/04 11/08/04 02/04/04 03/16/04 2,4,8,9,10,155,15,16 355,330 355,330 JOD 0 0 0
March Associates
Great Bend Grade School:
04-0381 Reconstruction 0-008-004 01/14/05 DONE DONE DONE 11/09/04 11/08/04 02/05/04 03/16/04 155,15,16 105,830 105,830 JOD 0 0 0
March Associates
05-0702 Reconstruction 0-008-005 05/23/06 DONE DONE DONE 02/10/06 02/01/06 10/19/05 05/17/05 7 113,500 113,500 JOD 0 0 0
March Associates
07-2338 Reconstruction 0-008-006 UNREVIEWED 07/08/08 06/24/08 05/03/07 03/16/04 2,16 0 0 JOD 0 0 0
March Associates
Carthage Elementary:
03-1377 Reconstruction 0-012-005 05/02/04 DONE DONE DONE 04/09/04 04/08/04 02/04/04 03/16/04 7 140,000 140,000 JOD 0 0 0
March Associates
04-0382 Reconstruction 0-012-006 01/14/05 DONE DONE DONE 11/09/04 11/08/04 02/04/04 03/16/04 2,4,8,9,10,155,15,16 230,840 230,840 JOD 0 0 0
March Associates
Pole Barn:
06-0573 Reconstruction 3-006-002 03/09/07 DONE DONE DONE 11/30/06 11/29/06 11/15/06 05/16/06 2,7,8,9,10,155,15,16 230,000 0 JOD 0 0 0
March Associates
Bus Garage:
04-0383 Reconstruction 5-005-003 01/14/05 DONE DONE DONE 11/09/04 11/08/04 02/05/04 03/16/04 2 392,816 392,816 JOD 0 0 0
March Associates
Districtwide:
04-0384 Reconstruction 7-999-001 12/28/04 DONE DONE DONE 11/09/04 11/08/04 02/05/04 03/16/04 16 179,020 179,020 JOD 0 0 0
March Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED