REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Cairo Elementary:
07-0057 Reconstruction 0-001-008 12/11/07 DONE DONE DONE 07/16/07 07/16/07 02/27/07 02/15/07 2,9,155,15,16 589,540 589,540 HCM 0 0 29,477
Dodge Chamberlin Luzine Weber, Arch.
08-1714 Reconstruction 0-001-009 11/16/09 DONE DONE DONE 06/19/09 06/10/09 10/10/08 05/13/08 2,8,9,13,155,15,16 0 0 HCM 0 0 0
Mosaic Associates
06-0287SC Visual Structural Inspection 0-001-SC1 10/04/06 DONE DONE DONE 09/29/06 09/29/06 / / / / 16 1,270 1,270 JOD 0 0 0
Durham Elementary:
07-0058 Reconstruction 0-010-007 12/11/07 DONE DONE DONE 07/16/07 07/16/07 02/27/07 02/15/07 4,9,15,16 290,530 288,000 HCM 0 0 14,527
Dodge Chamberlin Luzine Weber, Arch.
08-1715 Reconstruction 0-010-008 11/16/09 DONE DONE DONE 06/19/09 06/10/09 10/10/08 05/13/09 8,9,10,13,155,15,16 0 0 HCM 0 0 0
Mosaic Associates
06-0286SC Visual Structural Inspection 0-010-SC1 10/04/06 DONE DONE DONE 09/29/06 09/29/06 / / / / 16 1,270 1,270 JOD 0 0 0
Jr/Sr High:
07-0059 Additions and Alterations 0-011-008 12/11/07 DONE DONE DONE 07/16/07 07/16/07 02/27/07 02/15/07 02 - 16 4,229,773 4,192,130 HCM 0 0 211,489
Dodge Chamberlin Luzine Weber, Arch.
08-0565 Reconstruction 0-011-009 12/09/08 DONE DONE DONE 10/21/08 10/17/08 07/15/08 05/13/08 7 825,000 1,000,000 HCM 0 0 41,250
Dodge Chamberlin Luzine Weber, Arch.
08-1716 Reconstruction 0-011-010 11/16/09 DONE DONE DONE 06/19/09 06/10/09 10/10/08 05/13/08 2,9,10,13,155,15,16 0 0 HCM 0 0 0
Mosaic Associates
06-0288SC Visual Structural Inspection 0-011-SC1 10/04/06 DONE DONE DONE 09/29/06 09/29/06 / / / / 16 2,540 2,540 JOD 0 0 0
Storage Container:
04-1091DB Discovered Building 2-013-001 08/01/05 DONE DONE DONE 04/06/05 04/06/05 08/05/04 / / 0 0 HCM 0 0 0
Storage Container #2 @ MS/HS:
04-1092DB Discovered Building 2-014-001 08/01/05 DONE DONE DONE 04/06/05 04/06/05 08/06/04 / / 0 0 HCM 0 0 0
Storage Container #3 @ MS/HS:
04-1093DB Discovered Building 2-015-001 08/01/05 DONE DONE DONE 04/06/05 04/06/05 08/06/04 / / 0 0 HCM 0 0 0
Storage Container #4 @ MS/HS:
04-1094DB Discovered Building 2-016-001 08/01/05 DONE DONE DONE 04/06/05 04/06/05 08/06/04 / / 0 0 HCM 0 0 0
Storage Container @ ES:
04-1095DB Discovered Building 2-017-001 08/01/05 DONE DONE DONE 04/06/05 04/06/05 08/06/04 / / 0 0 HCM 0 0 0
Durham Pavilion:
04-1458 New Construction 7-012-001 08/10/05 DONE DONE DONE 06/23/05 06/22/05 04/13/04 / / 02 - 16 0 0 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Senior/Junior High School:
05-0515 Reconstruction 0-005-011 05/19/06 DONE DONE DONE 12/28/05 12/27/05 12/03/04 01/11/05 2,4,8,9,10,155,15,16 13,465,000 13,465,000 HCM 0 0 0
Sammel Architecture
05-0516 Reconstruction 0-005-012 04/21/06 DONE DONE DONE 12/28/05 12/27/05 12/21/04 01/11/05 2,4,8,9,10,155,15,16 3,250,000 3,250,000 HCM 0 0 0
Sammel Architecture
04-0888 Reconstruction 0-005-013 08/25/05 DONE DONE DONE 03/04/05 03/03/05 01/14/05 01/12/05 2,155,15,16 776,634 776,634 HCM 0 0 0
C.LewisTomaselli Architects
- Reconstruction 0-005-014 / / / / 03/17/05 / / 8,9,15,16 0 17,436,498 HCM 0 0 0
07-0295 Additions and Alterations 0-005-015 02/12/08 DONE DONE DONE 09/04/07 08/31/07 11/20/06 03/13/07 02 - 16 3,152,517 3,100,951 HCM 0 0 0
Sammel Architecture
06-1436 Reconstruction 0-005-016 05/30/07 DONE DONE DONE 05/07/07 05/07/07 03/06/07 03/13/07 4,7,9 1,074,350 725,000 HCM 0 0 21,487
Sammel Architecture
07-1155 Reconstruction 0-005-017 06/18/08 DONE DONE DONE 12/18/07 12/18/07 11/21/07 03/13/07 2,4,7,8,9,155,15,16 8,507,862 8,310,332 HCM 0 0 0
Sammel Architecture
New Elementary School/Broome Street:
08-1260 Reconstruction 0-028-002 05/07/09 DONE DONE DONE 02/23/09 02/18/09 04/26/07 03/13/07 2,9,16 750,000 0 HCM 0 0 41,250
Sammel Architecture
Superintendent Office:
08-0909 Additions and Alterations 1-003-001 04/22/09 DONE DONE DONE 12/15/08 12/10/08 10/06/08 05/20/08 02 - 16 500,000 0 HCM 0 0 0
Sammel Architecture
Business Office:
08-0910 Reconstruction 1-007-001 04/22/09 DONE DONE DONE 12/15/08 12/10/08 10/06/08 05/20/08 2,4,7,8,9,155,15,16 400,000 0 HCM 0 0 0
Sammel Architecture
Maintenance Building @ CHS:
08-0934 New Construction 3-032-001 04/29/09 DONE DONE DONE 12/16/08 12/11/08 08/14/08 05/20/08 02 - 16 250,000 0 HCM 0 0 0
Sammel Architecture
Gazebo #2:
- DB Discovered Building 7-031-001 / / / / 05/26/05 / / 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Junior Senior High School:
- PR Additions and Alterations 0-001-013 / / / / 09/24/08 / / 02 - 16 0 0 JOD 0 0 0
Elementary School:
- PR Additions and Alterations 0-006-011 / / / / 09/24/08 / / 02 - 16 0 0 JOD 0 0 0
Athens Elementary School:
06-1423 Reconstruction 0-007-010 05/08/07 DONE DONE DONE 05/07/07 05/04/07 03/05/07 05/15/07 7 99,600 99,600 JOD 0 0 0
Collins & Scoville Architects
- PR Additions and Alterations 0-007-011 / / / / 09/24/08 / / 02 - 16 0 0 JOD 0 0 0
One-car Garage @ Jr./Sr. High (Stora:
06-1154DB Discovered Building 2-014-001 05/04/07 DONE DONE DONE 03/21/07 03/08/07 08/01/02 / / 02 - 16 0 0 JOD 0 0 0
Storage Trailer @ Athens E.S.:
06-1155DB Discovered Building 2-015-001 05/04/07 DONE DONE DONE 03/21/07 03/08/07 08/01/02 / / 02 - 16 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Scott M Ellis Elementary:
04-1157XX Reconstruction 0-001-022 05/10/05 CANCELLED 04/13/05 04/11/05 12/14/04 05/18/04 2,8 30,000 30,000 DDJ 0 0 0
Rhinebeck Architecture
05-1276 Reconstruction 0-001-023 07/13/06 DONE DONE DONE 05/22/06 05/19/06 03/30/06 01/18/05 4,7 214,564 214,564 DDJ 0 0 0
Rhinebeck Architecture
07-1277 Additions and Alterations 0-001-024 08/27/08 DONE DONE DONE 12/31/07 12/27/07 07/27/07 05/15/07 02 - 16 1,700,000 1,700,000 DDJ 0 0 438,600
Rhinebeck Architecture
Jr/Sr High School:
04-1158 Additions and Alterations 0-008-015 05/10/05 DONE DONE DONE 04/13/05 04/11/05 12/14/04 05/18/04 02 - 16 480,684 480,684 DDJ 0 0 0
Rhinebeck Architecture
06-0192 Reconstruction 0-008-016 09/07/06 DONE DONE DONE 08/24/06 08/23/06 07/14/06 05/16/06 155 80,000 80,000 DDJ 0 0 0
Rhinebeck Architecture
Admin Bldg (now Alt Ed Bldg):
- PR Alterations 1-002-001 / / / / 03/30/06 / / 0 0 DDJ 0 0 0
05-1308 Alterations 1-002-001 09/15/06 DONE DONE DONE 05/31/06 05/31/06 03/30/06 01/18/05 02 - 16 80,000 0 DDJ 0 0 0
Rhinebeck Architecture
District Office:
- New Construction 1-017-001 / / / / 02/23/05 / / 02 - 16 0 0 DDJ 0 0 0
05-1309 Alterations 1-017-002 09/15/06 DONE DONE DONE 05/31/06 05/31/06 03/30/06 01/18/05 02 - 16 76,494 0 DDJ 0 0 0
Rhinebeck Architecture
Storage Building:
- New Construction 2-018-001 / / / / 02/23/05 / / 02 - 16 0 0 DDJ 0 0 0
District-wide Telephone System:
- Reconstruction 7-999-002 / / / / 09/10/08 / / 13,16 0 0 DDJ 0 0 0
- Reconstruction 7-999-003 / / / / 05/29/09 / / 13,16 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Junior Senior High:
04-0716 Reconstruction 0-001-010 01/28/05 DONE DONE DONE 01/28/05 01/27/05 12/22/04 12/02/04 155 89,000 89,000 DDJ 0 0 0
Ashley McGraw Architects
07-0806 Reconstruction 0-001-011 05/27/08 DONE DONE DONE 11/14/07 11/13/07 11/20/06 03/06/07 2,4,7,8,9,155,15,16 8,294,714 5,643,416 DDJ 0 0 0
Ashley McGraw Architects
Elementary School:
06-1551 Reconstruction 0-002-010 05/27/08 DONE DONE DONE 05/25/07 05/25/07 11/20/06 03/06/07 2,4,7,155,15,16 1,657,326 1,657,326 DDJ 0 0 174,971
Ashley McGraw Architects
- Reconstruction 0-002-011 / / / / 04/24/07 / / 2 0 0 DDJ 0 0 0
New Storage Shed:
- PR New Construction 2-010-001 / / / / 05/27/08 / / 02 - 16 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
- PR Additions and Alterations 0-001-012 / / / / 10/07/05 / / 02 - 16 0 0 HCM 0 0 0
06-0706 Additions and Alterations 0-001-012 05/01/07 DONE DONE DONE 01/02/07 12/29/06 10/07/05 12/20/05 02 - 16 18,870,000 11,338,791 HCM 0 0 142,604
Bearsch Compeau Knudson
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
:
- PR New Construction 0-011-001 / / / / 01/02/07 / / 02 - 16 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Otsego Occupational Center:
05-0177 Reconstruction 0-016-009 09/22/05 DONE DONE DONE 09/07/05 09/07/05 05/02/05 05/24/05 7 561,622 561,622 JOD 0 0 0
Bernier Carr Associates
07-0540 Reconstruction 0-016-010 04/04/08 DONE DONE DONE 10/12/07 10/11/07 04/18/07 05/21/07 16 60,320 60,320 JOD 0 0 0
Bernier Carr Associates
- Reconstruction 0-016-011 / / / / 03/31/08 / / 155,16 0 0 JOD 0 0 0
No. Catskills Occ. Ctr.:
- Reconstruction 0-018-006 / / / / 07/27/06 / / 2 0 4,027,680 JOD 0 0 0
07-0575 Reconstruction 0-018-007 03/25/08 DONE DONE DONE 10/17/07 10/15/07 04/18/07 05/21/07 16 122,200 122,200 JOD 0 0 0
Bernier Carr Associates
09-0029 Reconstruction 0-018-008 07/20/09 DONE DONE DONE 07/10/09 07/08/09 03/31/08 06/22/08 155,15,16 670,331 0 JOD 0 0 0
Bernier Carr Associates
Storage Shed #1-Records Storage:
07-1985DB Discovered Building 2-062-001 06/10/08 DONE DONE DONE 04/16/08 04/16/08 05/25/07 / / 0 0 JOD 0 0 0
Storage Shed #2:
- XX Reconstruction 2-063-001 CANCELLED / / / / 05/25/07 / / 0 0 JOD 0 0 0
New Pavillion @ Grand George:
- PR New Construction 7-061-001 / / / / 04/04/06 / / 02 - 16 0 0 JOD 0 0 0
06-0026 New Construction 7-061-001 07/25/06 DONE DONE DONE 07/10/06 07/07/06 04/04/06 05/17/05 02 - 16 45,500 0 JOD 0 0 0
Bernier Carr Associates
YES Program - Saint Marys:
00-0576XX Reconstruction 8-052-001 01/08/09 CANCELLED 12/08/00 / / 10/02/00 / / 0 0 MAC 0 0 0
Scarzafava and Smith BLDG:
04-0167TQ Temporary Quarters 8-059-001 05/23/05 DONE DONE DONE 08/30/04 08/30/04 08/04/04 / / 0 0 MAC 0 0 0
AO FOX HOSPITAL-THERAPEUTIC LRNG. CN:
06-0215XX New Construction 8-060-L01 10/06/06 CANCELLED 09/13/06 09/13/06 03/20/06 / / 02 - 16 0 0 JOD 0 0 0
Classroom-Distance Learing@Worcester:
08-1491TQ Temporary Quarters 8-064-001 05/27/09 DONE DONE DONE 04/13/09 04/09/09 03/11/09 / / 0 0 JOD 0 0 0
Keystone Trozze,LLC Architects & Eng
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED