REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Cairo Elementary:
03-0087 Reconstruction 0-001-007 08/14/03 DONE DONE DONE 07/28/03 / / 05/19/03 05/02/03 4,7,10,15,16 900,374 900,374 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-0057 Reconstruction 0-001-008 12/11/07 DONE DONE DONE 07/16/07 07/16/07 02/27/07 02/15/07 2,9,155,15,16 576,000 0 HCM 0 0 28,800
Dodge Chamberlin Luzine Weber, Arch.
06-0287SC Visual Structural Inspection 0-001-SC1 10/04/06 DONE DONE DONE 09/29/06 09/29/06 / / / / 16 1,270 1,270 JOD 0 0 0
Durham Elementary:
03-0088 Reconstruction 0-010-006 08/14/03 DONE DONE DONE 07/28/03 / / 05/19/03 05/02/03 2,9,10,15,16 734,837 734,837 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-0058 Reconstruction 0-010-007 12/11/07 DONE DONE DONE 07/16/07 07/16/07 02/27/07 02/15/07 4,9,15,16 288,000 0 HCM 0 0 14,400
Dodge Chamberlin Luzine Weber, Arch.
06-0286SC Visual Structural Inspection 0-010-SC1 10/04/06 DONE DONE DONE 09/29/06 09/29/06 / / / / 16 1,270 1,270 JOD 0 0 0
Jr/Sr High:
03-0089 Reconstruction 0-011-007 08/14/03 DONE DONE DONE 07/28/03 / / 05/19/03 05/02/03 2,9,10,155,15,16 1,582,210 1,582,210 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-0059 Additions and Alterations 0-011-008 12/11/07 DONE DONE DONE 07/16/07 07/16/07 02/27/07 02/15/07 02 - 16 2,837,000 0 HCM 0 0 141,850
Dodge Chamberlin Luzine Weber, Arch.
- Reconstruction 0-011-009 / / / / 07/15/08 / / 7 0 0 HCM 0 0 0
06-0288SC Visual Structural Inspection 0-011-SC1 10/04/06 DONE DONE DONE 09/29/06 09/29/06 / / / / 16 2,540 2,540 JOD 0 0 0
Storage Container:
04-1091DB Discovered Building 2-013-001 08/01/05 DONE DONE DONE 04/06/05 04/06/05 08/05/04 / / 0 0 HCM 0 0 0
Storage Container #2 @ MS/HS:
04-1092DB Discovered Building 2-014-001 08/01/05 DONE DONE DONE 04/06/05 04/06/05 08/06/04 / / 0 0 HCM 0 0 0
Storage Container #3 @ MS/HS:
04-1093DB Discovered Building 2-015-001 08/01/05 DONE DONE DONE 04/06/05 04/06/05 08/06/04 / / 0 0 HCM 0 0 0
Storage Container #4 @ MS/HS:
04-1094DB Discovered Building 2-016-001 08/01/05 DONE DONE DONE 04/06/05 04/06/05 08/06/04 / / 0 0 HCM 0 0 0
Storage Container @ ES:
04-1095DB Discovered Building 2-017-001 08/01/05 DONE DONE DONE 04/06/05 04/06/05 08/06/04 / / 0 0 HCM 0 0 0
Durham Pavilion:
04-1458 New Construction 7-012-001 08/10/05 DONE DONE DONE 06/23/05 06/22/05 04/13/04 / / 02 - 16 0 0 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Senior/Junior High School:
03-0333XX Reconstruction 0-005-010 CANCELLED 09/19/03 06/03/03 04/16/03 02/26/03 155,16 0 17,436,498 HCM 0 0 0
05-0515 Reconstruction 0-005-011 05/19/06 DONE DONE DONE 12/28/05 12/27/05 12/03/04 01/11/05 2,4,8,9,10,155,15,16 13,465,000 13,465,000 HCM 0 0 0
Sammel Architecture
05-0516 Reconstruction 0-005-012 04/21/06 DONE DONE DONE 12/28/05 12/27/05 12/21/04 01/11/05 2,4,8,9,10,155,15,16 3,250,000 3,250,000 HCM 0 0 0
Sammel Architecture
04-0888 Reconstruction 0-005-013 08/25/05 DONE DONE DONE 03/04/05 03/03/05 01/14/05 01/12/05 2,155,15,16 776,634 776,634 HCM 0 0 0
C.LewisTomaselli Architects
- Reconstruction 0-005-014 / / / / 03/17/05 / / 8,9,15,16 0 17,436,498 HCM 0 0 0
07-0295 Additions and Alterations 0-005-015 02/12/08 DONE DONE DONE 09/04/07 08/31/07 11/20/06 03/13/07 02 - 16 4,422,982 0 HCM 0 0 243,264
Sammel Architecture
06-1436 Reconstruction 0-005-016 05/30/07 DONE DONE DONE 05/07/07 05/07/07 03/06/07 03/13/07 4,7,9 1,074,350 725,000 HCM 0 0 21,487
Sammel Architecture
07-1155 Reconstruction 0-005-017 06/18/08 DONE DONE DONE 12/18/07 12/18/07 11/21/07 03/13/07 2,4,7,8,9,155,15,16 9,536,000 0 HCM 0 0 524,480
Sammel Architecture
New Elementary School/Broome Street:
- Reconstruction 0-028-002 / / / / 04/26/07 / / 2,9,16 0 0 HCM 0 0 0
- Reconstruction 0-028-003 / / / / 04/26/07 / / 2,9,16 0 0 HCM 0 0 0
Gazebo:
- DB Discovered Building 7-030-001 / / / / 06/08/04 / / 0 0 HCM 0 0 0
Gazebo #2:
- DB Discovered Building 7-031-001 / / / / 05/26/05 / / 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Junior Senior High School:
02-0137FP Reconstruction 0-001-FP1 10/15/03 DONE DONE DONE 08/21/02 08/19/02 / / / / 16 10,456 10,456 MGL 0 0 0
Athens Elementary School:
06-1423 Reconstruction 0-007-010 05/08/07 DONE DONE DONE 05/07/07 05/04/07 03/05/07 05/15/07 7 99,600 99,600 JOD 0 0 0
Collins & Scoville Architects
One-car Garage @ Jr./Sr. High (Stora:
06-1154DB Discovered Building 2-014-001 05/04/07 DONE DONE DONE 03/21/07 03/08/07 08/01/02 / / 02 - 16 0 0 JOD 0 0 0
Storage Trailer @ Athens E.S.:
06-1155DB Discovered Building 2-015-001 05/04/07 DONE DONE DONE 03/21/07 03/08/07 08/01/02 / / 02 - 16 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Scott M Ellis Elementary:
03-1121 Reconstruction 0-001-021 04/25/04 DONE DONE DONE 02/17/04 02/13/04 11/28/03 06/25/02 2,7,8,155,15,16 224,999 224,999 MAC 0 0 0
Rhinebeck Architecture
04-1157XX Reconstruction 0-001-022 05/10/05 CANCELLED 04/13/05 04/11/05 12/14/04 05/18/04 2,8 30,000 30,000 DDJ 0 0 0
Rhinebeck Architecture
05-1276 Reconstruction 0-001-023 07/13/06 DONE DONE DONE 05/22/06 05/19/06 03/30/06 01/18/05 4,7 214,564 214,564 DDJ 0 0 0
Rhinebeck Architecture
07-1277 Additions and Alterations 0-001-024 UNREVIEWED 12/31/07 12/27/07 07/27/07 05/15/07 02 - 16 0 9,097,000 DDJ 0 0 0
Rhinebeck Architecture
Jr/Sr High School:
04-1158 Additions and Alterations 0-008-015 05/10/05 DONE DONE DONE 04/13/05 04/11/05 12/14/04 05/18/04 02 - 16 495,000 495,000 DDJ 0 0 0
Rhinebeck Architecture
06-0192 Reconstruction 0-008-016 09/07/06 DONE DONE DONE 08/24/06 08/23/06 07/14/06 05/16/06 155 80,000 80,000 DDJ 0 0 0
Rhinebeck Architecture
03-0080FP Reconstruction 0-008-FP1 09/27/04 DONE DONE DONE 08/11/03 / / / / / / 16 19,711 19,711 JOD 0 0 0
NEW BLDG FOR AGRICULTURE CLASS/LIVES:
04-0058XX New Construction 0-015-001 CANCELLED 07/15/04 07/02/04 04/03/00 / / 02 - 16 0 0 MAC 0 0 0
MKM Architects
Administration Bldg:
- PR Alterations 1-002-001 / / / / 03/30/06 / / 0 0 DDJ 0 0 0
05-1308 Alterations 1-002-001 09/15/06 DONE DONE DONE 05/31/06 05/31/06 03/30/06 01/18/05 02 - 16 80,000 0 DDJ 0 0 0
Rhinebeck Architecture
District Office:
- New Construction 1-017-001 / / / / 02/23/05 / / 02 - 16 0 0 DDJ 0 0 0
- PR Alterations 1-017-002 / / / / 03/30/06 / / 0 0 DDJ 0 0 0
05-1309 Alterations 1-017-002 09/15/06 DONE DONE DONE 05/31/06 05/31/06 03/30/06 01/18/05 02 - 16 78,636 0 DDJ 0 0 0
Rhinebeck Architecture
Storage Building:
- New Construction 2-018-001 / / / / 02/23/05 / / 02 - 16 0 0 DDJ 0 0 0
New Bus Garage:
03-0497 New Construction 5-016-001 06/18/04 DONE DONE DONE 10/28/03 / / 08/12/03 06/20/00 02 - 16 1,173,882 1,173,882 MAC 0 0 0
MKM Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Junior Senior High:
04-0716 Reconstruction 0-001-010 01/28/05 DONE DONE DONE 01/28/05 01/27/05 12/22/04 12/02/04 155 89,000 89,000 DDJ 0 0 0
Ashley McGraw Architects
07-0806 Reconstruction 0-001-011 05/27/08 DONE DONE DONE 11/14/07 11/13/07 11/20/06 03/06/07 2,4,7,8,9,155,15,16 6,900,000 0 DDJ 0 0 0
Ashley McGraw Architects
Elementary School:
06-1551 Reconstruction 0-002-010 05/27/08 DONE DONE DONE 05/25/07 05/25/07 11/20/06 03/06/07 2,4,7,155,15,16 3,227,011 0 DDJ 0 0 174,971
Ashley McGraw Architects
- Reconstruction 0-002-011 / / / / 04/24/07 / / 2 0 0 DDJ 0 0 0
New Storage Shed:
- PR New Construction 2-010-001 / / / / 05/27/08 / / 02 - 16 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
- PR Additions and Alterations 0-001-012 / / / / 10/07/05 / / 02 - 16 0 0 HCM 0 0 0
06-0706 Additions and Alterations 0-001-012 05/01/07 DONE DONE DONE 01/02/07 12/29/06 10/07/05 12/20/05 02 - 16 18,870,000 11,338,791 HCM 0 0 142,604
Bearsch Compeau Knudson
03-1387FP Reconstruction 0-001-FP1 06/02/04 DONE DONE DONE 04/14/04 / / / / / / 16 5,913 5,913 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
:
- PR New Construction 0-011-001 / / / / 01/02/07 / / 02 - 16 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Occupation Center:
- XX Reconstruction 0-006-002 CANCELLED / / / / 04/27/04 / / 155 0 335,640 MAC 0 0 0
Otsego Occupational Center:
04-0276 Reconstruction 0-016-008 10/07/03 DONE DONE DONE 10/06/04 10/06/04 02/19/03 06/27/03 155 227,835 227,835 MAC 0 0 0
William Taylor Architects, PLLC.
05-0177 Reconstruction 0-016-009 09/22/05 DONE DONE DONE 09/07/05 09/07/05 05/02/05 05/24/05 7 561,622 561,622 JOD 0 0 0
Bernier Carr Associates
07-0540 Reconstruction 0-016-010 04/04/08 DONE DONE DONE 10/12/07 10/11/07 04/18/07 05/21/07 16 60,320 0 JOD 0 0 0
Bernier Carr Associates
- Reconstruction 0-016-011 / / / / 03/31/08 / / 155,16 0 0 JOD 0 0 0
No. Catskills Occ. Ctr.:
- Reconstruction 0-018-006 / / / / 07/27/06 / / 2 0 4,027,680 JOD 0 0 0
07-0575 Reconstruction 0-018-007 03/25/08 DONE DONE DONE 10/17/07 10/15/07 04/18/07 05/21/07 16 122,200 0 JOD 0 0 0
Bernier Carr Associates
- Reconstruction 0-018-008 / / / / 03/31/08 / / 155,15,16 0 0 JOD 0 0 0
Storage Shed #1:
07-1985DB Discovered Building 2-062-001 06/10/08 DONE DONE DONE 04/16/08 04/16/08 05/25/07 / / 0 0 JOD 0 0 0
Storage Shed #2:
- DB Discovered Building 2-063-001 / / / / 05/25/07 / / 0 0 JOD 0 0 0
NEW PAVILLION @ GRAND GEORGE:
- PR New Construction 7-061-001 / / / / 04/04/06 / / 02 - 16 0 0 JOD 0 0 0
06-0026 New Construction 7-061-001 07/25/06 DONE DONE DONE 07/10/06 07/07/06 04/04/06 05/17/05 02 - 16 45,500 0 JOD 0 0 0
Bernier Carr Associates
Leased space @ Cooperstown CSD:
02-1305TQ Temporary Quarters 8-057-001 02/05/04 DONE DONE DONE 02/04/03 / / 09/17/02 / / 0 0 MAC 0 0 0
Margaretville CS Learning Lab:
- TQ Temporary Quarters 8-058-001 / / / / 08/04/04 / / 0 0 MAC 0 0 0
Scarzafava and Smith BLDG:
04-0167TQ Temporary Quarters 8-059-001 05/23/05 DONE DONE DONE 08/30/04 08/30/04 08/04/04 / / 0 0 MAC 0 0 0
AO FOX HOSPITAL-THERAPEUTIC LRNG. CN:
06-0215 New Construction 8-060-L01 10/06/06 DONE DONE DONE 09/13/06 09/13/06 03/20/06 / / 02 - 16 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED