Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 07/03/08 at 10:44:11




TUPPER LAKE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 16-01-01-06
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Junior/Senior High School:
06-1642   Reconstruction               0-001-005  06/25/07     DONE    DONE       DONE      06/22/07   06/21/07   11/01/06     /  /     4,7,155,15,16            265,000       334,146  HCM             0           0       57,240
                                                                                                                                                                                                                                 SEI Design Group                    
  -       Reconstruction               0-001-006                                              /  /       /  /     05/10/07     /  /     2,8,155,15,16                  0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          L.P. Quinn Elementary School:
  -       Reconstruction               0-006-006                                              /  /       /  /     11/01/06     /  /     155,15,16                      0     8,173,901  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
  -       Reconstruction               5-002-004                                              /  /       /  /     11/01/06     /  /     15,16                          0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Goff Nelson Memorial Library:
07-1532   Reconstruction               6-004-002  03/27/08     DONE    DONE       DONE      02/01/08   02/01/08   11/01/06     /  /     155,15,16                 36,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Design Group Educ. Fac. Dept.       

          Gym @ Civic Center:
  -       Reconstruction               8-007-002                                              /  /       /  /     11/01/06     /  /     16                             0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CHATEAUGAY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 16-08-01-04
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
03-1290   Reconstruction               0-001-007  04/23/04     DONE    DONE       DONE      03/18/04   03/17/04   09/05/03   11/24/03   2,9,155,16               747,950       747,950  RDR             0           0            0
                                                                                                                                                                                                                                                                     
03-1012   Reconstruction               0-001-008  02/13/04     DONE    DONE       DONE      01/22/04   01/12/04   12/18/03   11/24/03   2,155,16                 720,861       720,861  RDR             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
03-0913FP Reconstruction               0-001-FP1  02/24/04     DONE    DONE       DONE      12/30/03     /  /       /  /       /  /     16                         5,938         5,938  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SALMON RIVER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 16-12-01-04
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Bldg. Campus:
02-1016   Additions and Alterations    0-001-013  12/22/03     DONE    DONE       DONE      01/02/03   12/24/02   06/28/02   05/21/02   02 - 16                5,737,100             0  MGL             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
03-1637   Reconstruction               0-001-014  06/28/04     DONE    DONE       DONE      06/21/04   06/18/04   06/08/04   05/21/02   2,155,15,16              485,000       485,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
04-1262   Reconstruction               0-001-015  05/13/05     DONE    DONE       DONE      05/12/05     /  /     01/03/05   05/21/02   2,8,9,155,15             700,000       700,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
07-1202PR Additions and Alterations    0-001-016                         UNREVIEWED         12/24/07   12/24/07   12/14/07     /  /     02 - 16                        0    47,994,749  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects,P.C.  
07-1808   Reconstruction               0-001-017  04/01/08     DONE    DONE       DONE      03/15/08   03/07/08   12/14/07   02/28/08   4,10,15,16             1,136,520             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Bus Garage:
02-1017   Reconstruction               5-008-005  12/22/03     DONE    DONE       DONE      01/02/03   12/24/02   06/28/02   05/21/02   2,4,7,155,15,16          806,800       806,800  MGL             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
  -    PR Additions and Alterations    5-008-006                                              /  /       /  /     12/14/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SARANAC LAKE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 16-14-01-06
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Petrova Avenue School:
04-1044   Reconstruction               0-002-013  06/28/05     DONE    DONE       DONE      03/28/05   03/28/05   10/13/04   06/03/03   2,4,8,9                  387,840       387,840  HCM             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
06-0821   Reconstruction               0-002-014  04/12/07     DONE    DONE       DONE      01/29/07   01/26/07   02/23/06   03/15/05   2,4,8,9,155,15,16      1,598,650     1,598,650  JOD             0           0       98,719
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Bloomingdale Elementary:
  -    PR Additions and Alterations    0-013-007                                              /  /       /  /     02/23/06     /  /     02 - 16                        0     2,900,070  JOD             0           0            0
                                                                                                                                                                                                                                                                     
05-1258   Additions and Alterations    0-013-007  05/17/06     DONE    DONE       DONE      05/18/06   05/17/06   02/23/06   03/15/06   02 - 16                1,012,021     1,012,021  JOD             0           0      417,862
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Middle/High School:
03-1021   Reconstruction               0-014-007  04/19/04     DONE    DONE       DONE      01/23/04   01/16/04   08/11/03   06/03/03   7                        415,257       415,257  HCM             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
04-1045   Reconstruction               0-014-008  06/28/05     DONE    DONE       DONE      03/28/05   03/28/05   10/13/04   06/03/03   2,4,8                    181,813       181,813  HCM             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
07-1640   Reconstruction               0-014-009  02/26/08     DONE    DONE       DONE      02/19/08   02/14/08   02/23/06   03/15/05   2,4,8,9,155,15,16      2,025,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             

          MODULAR #1 @ BLOOMINGDALE ES:
05-1141TQ Temporary Quarters           0-017-001  04/17/06     DONE    DONE       DONE      04/17/06   04/11/06   03/24/06     /  /     02 - 16                   14,289             0  JOD             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Modular #2 @ Bloomingdale ES:
  -    TQ Temporary Quarters           0-018-001                                              /  /       /  /     04/07/06     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          MODULAR #1 @ PERTOVA ES:
  -    PR New Construction             0-019-001                                              /  /       /  /     04/14/06     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          MODULAR #2 @ PETROVA ES:
  -    PR New Construction             0-020-001                                              /  /       /  /     04/14/06     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MALONE CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 16-15-01-06
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Malone Junior High School:
03-0236   Reconstruction               0-001-007               UNREVIEWED
                                                                       DONE       ADD. REQ'D08/27/03   07/30/03   07/12/02   04/16/01   155,15,16                680,487       680,487  JOD             0           0            0
                                                                                                                                                                                                                                 Wendel Duchscherer Arch/Eng         
04-1404   Reconstruction               0-001-008  08/19/05     DONE    DONE       DONE      06/09/05   06/09/05   03/17/05   05/17/05   8                         90,167        55,000  JOD             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
07-0710   Reconstruction               0-001-009  11/08/07     DONE    DONE       DONE      11/05/07   11/02/07   10/11/07   10/09/07   13                       125,000       125,000  JOD             0           0            0
                                                                                                                                                                                                                                 King & King, Architects             
  -    PR Additions and Alterations    0-001-010                                              /  /       /  /     02/28/08     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          St.Joseph's Elem. School:
03-0237   Reconstruction               0-011-003               UNREVIEWED
                                                                       DONE       ADD. REQ'D08/27/03   07/30/03   07/12/02   04/16/01   155,15,16                221,200       221,200  JOD             0           0            0
                                                                                                                                                                                                                                 Wendel Duchscherer Arch/Eng         
04-1405   Reconstruction               0-011-004  08/19/05     DONE    DONE       DONE      06/09/05   06/09/05   03/17/05   05/17/05   2,7                      254,225       254,225  JOD             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.

          Flanders Elementary School:
03-0238   Reconstruction               0-017-005               UNREVIEWED
                                                                       DONE       ADD. REQ'D08/27/03   07/30/03   07/12/02   04/16/01   155,15,16                449,287       449,287  JOD             0           0            0
                                                                                                                                                                                                                                 Wendel Duchscherer Arch/Eng         

          Davis Elementary School Pre - K - 2:
03-0239   Reconstruction               0-018-002               UNREVIEWED
                                                                       DONE       ADD. REQ'D08/27/03   07/30/03   07/12/02   04/16/01   155,15,16                 82,351        82,351  JOD             0           0            0
                                                                                                                                                                                                                                 Wendel Duchscherer Arch/Eng         
  -       Reconstruction               0-018-003                                              /  /       /  /     02/28/08     /  /     2,4,7,8,9,10,14,155,           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Franklin Acad:HS 9-12:
03-0240   Reconstruction               0-019-008               UNREVIEWED
                                                                       DONE       ADD. REQ'D08/27/03   07/30/03   08/06/02   04/16/01   155,15,16                 56,958        56,958  JOD             0           0            0
                                                                                                                                                                                                                                 Wendel Duchscherer Arch/Eng         
04-0578   Additions and Alterations    0-019-009  02/22/05     DONE    DONE       DONE      12/27/04   12/24/04   03/16/04   03/14/00   02 - 16                  278,670       278,670  JOD             0           0            0
                                                                                                                                                                                                                                 Beardsley Design Associates         
  -    XX Reconstruction               0-019-010                         CANCELLED            /  /       /  /     05/24/04     /  /     16                             0    36,031,040  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-0085   Reconstruction               0-019-011  07/19/06     DONE    DONE       DONE      07/19/06   07/19/06   06/01/06   05/23/06   155                      578,000       578,000  JOD             0           0            0
                                                                                                                                                                                                                                 King & King, Architects             
  -       Reconstruction               0-019-012                                              /  /       /  /     05/21/07     /  /     4,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-019-013                                              /  /       /  /     02/28/08     /  /     2,155,15,16                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Pre-Kindergarden - 5 Elementary Scho:
  -    PR New Construction             0-029-001                                              /  /       /  /     02/28/08     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
  -       Reconstruction               5-006-005                                              /  /       /  /     05/18/06     /  /     15,16                          0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          New Bus Garage / Maintencance Buildi:
  -    PR New Construction             5-028-001                                              /  /       /  /     02/28/08     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BRUSHTON MOIRA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 16-16-01-04
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Central School Building:
05-1233   Reconstruction               0-001-008  09/01/06     DONE    DONE       DONE      05/08/06   05/01/06   11/21/05   05/01/05   8,155                     83,500        83,500  DDJ             0           0            0
                                                                                                                                                                                                                                 William Taylor Architects, PLLC.    

          Bus Garage:
05-1234   Reconstruction               5-003-008  09/01/06     DONE    DONE       DONE      05/08/06   05/01/06   11/21/05   05/01/05   8,10,15                   47,000        47,000  DDJ             0           0            0
                                                                                                                                                                                                                                 William Taylor Architects, PLLC.    


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ST. REGIS FALLS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 16-18-01-04
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Bus Garage (lease):
04-1038   Reconstruction               5-004-L02  03/28/05     DONE    DONE       DONE        /  /       /  /     02/22/05     /  /                               37,400        37,400  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES FRANKLIN-ESSEX-HAMILTON STATUS REPORT ON CAPITAL PROJECTS
District No.: 16-90-00-00
last updated on 07/03/08
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          North Franklin Educ. Ctr.:
02-0304   Reconstruction               0-002-006  08/15/03     DONE    DONE       DONE      09/24/02   09/24/02   02/21/02   11/15/01   7                        550,000       550,000  MAC             0           0            0
                                                                                                                                                                                                                                 348 Lake Street                     
07-1932   Reconstruction               0-002-007  04/24/08     DONE    DONE       DONE      04/08/08   03/31/08   11/14/07   11/17/05   155,16                   306,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 348 Lake Street                     

          Adirondack Educ. Ctr.:
02-0305   Reconstruction               0-004-007  08/15/03     DONE    DONE       DONE      09/24/02   09/24/02   02/21/02   11/15/01   7                        238,500       238,500  MAC             0           0            0
                                                                                                                                                                                                                                 348 Lake Street                     
04-0098   Reconstruction               0-004-008  11/09/04     DONE    DONE       DONE      08/06/04   08/05/04   05/23/03   02/20/03   155                      325,372       325,372  MAC             0           0            0
                                                                                                                                                                                                                                 Saranac Engineering                 


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED