REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
James Forrestal School:
05-0495 Alterations 0-002-012 05/08/06 DONE DONE DONE 12/23/05 12/23/05 03/09/04 05/18/04 02 - 16 175,000 175,000 JOD 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-0761 Reconstruction 0-002-013 04/28/08 DONE DONE DONE 11/07/07 11/06/07 03/08/07 03/21/07 2,4,7,9,10,14,155,16 1,194,613 1,194,613 JOD 0 0 151,716
Fellenzer Engineering
09-0075 Reconstruction 0-002-014 DONE DONE ADD. REQ'D07/23/09 07/20/09 12/15/08 12/16/08 2,7,9,14,155,15,16 0 0 JOD 0 0 0
Rhinebeck Architecture
South Ave. School:
05-0496 Alterations 0-003-008 05/08/06 DONE DONE DONE 12/23/05 12/23/05 03/09/04 05/18/04 02 - 16 250,000 250,000 JOD 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-0762 Reconstruction 0-003-009 04/28/08 DONE DONE DONE 11/07/07 11/06/07 03/08/07 03/21/07 2,4,7,8,9,10,14,155, 2,875,172 2,875,172 JOD 0 0 365,147
Fellenzer Engineering
09-0076 Reconstruction 0-003-010 DONE DONE ADD. REQ'D07/23/09 07/20/09 12/15/08 12/16/08 2,7,9,155,15,16 0 0 JOD 0 0 0
Rhinebeck Architecture
Rombout Junior High School:
04-1035 Additions and Alterations 0-004-010 05/17/05 DONE DONE DONE 03/25/05 03/22/05 03/09/04 05/18/04 02 - 16 8,400,000 8,400,000 JOD 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-0763 Reconstruction 0-004-011 04/28/08 DONE DONE DONE 11/07/07 11/06/07 03/08/07 03/21/07 7,9,10,155,15,16 949,600 949,600 JOD 0 0 120,599
Fellenzer Engineering
09-0077 Reconstruction 0-004-012 DONE DONE ADD. REQ'D07/23/09 07/20/09 12/15/08 12/16/08 2,4,7,8,9,14,155,15, 0 0 JOD 0 0 0
Rhinebeck Architecture
09-0097 Reconstruction 0-004-013 09/30/09 DONE DONE DONE 07/31/09 07/27/09 06/29/09 12/16/08 16 95,000 0 JOD 0 0 14,440
Rhinebeck Architecture
Glenham Elementary School:
05-0497 Alterations 0-006-013 05/08/06 DONE DONE DONE 12/23/05 12/23/05 03/09/04 05/18/04 02 - 16 130,000 130,000 JOD 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-0764 Reconstruction 0-006-014 04/28/08 DONE DONE DONE 11/07/07 11/06/07 03/08/07 03/21/07 2,7,9,10,16 1,108,962 1,108,962 JOD 0 0 140,838
Fellenzer Engineering
09-0078 Reconstruction 0-006-015 DONE DONE ADD. REQ'D07/23/09 07/20/09 12/15/08 12/16/08 2,9,15,16 0 0 JOD 0 0 0
Rhinebeck Architecture
Sargent Elementary School:
05-0498 Additions and Alterations 0-008-011 05/08/06 DONE DONE DONE 12/23/05 12/23/05 03/09/04 05/18/04 02 - 16 320,000 320,000 JOD 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-0765 Reconstruction 0-008-012 04/28/08 DONE DONE DONE 11/07/07 11/06/07 03/08/07 03/21/07 2,4,9,14,16 583,896 583,896 JOD 0 0 74,155
Fellenzer Engineering
09-0079 Reconstruction 0-008-013 DONE DONE ADD. REQ'D07/23/09 07/20/09 12/15/08 12/16/08 2,7,9,14,155,15,16 0 0 JOD 0 0 0
Rhinebeck Architecture
New High School:
05-0499 Alterations 0-020-002 05/08/06 DONE DONE DONE 12/23/05 12/23/05 03/09/04 05/18/04 02 - 16 50,000 50,000 JOD 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-0766 Reconstruction 0-020-003 04/28/08 DONE DONE DONE 11/07/07 11/06/07 03/08/07 03/21/07 10,155,16 1,087,757 1,087,757 JOD 0 0 138,145
Fellenzer Engineering
09-0080 Reconstruction 0-020-004 STARTED DONE ADD. REQ'D07/23/09 07/20/09 12/15/08 12/16/08 2,4,9,15,16 0 36,148,108 JOD 0 0 0
Rhinebeck Architecture
09-0113 Reconstruction 0-020-005 ADDENDUM REQ'D 08/11/09 08/11/09 07/31/09 12/16/08 2,8 0 36,148,108 JOD 0 0 0
Rhinebeck Architecture
Maintenance Garage:
- Reconstruction 3-011-004 / / / / 03/08/07 / / 4,7,8 0 0 JOD 0 0 0
New Bus Maintenance/Storage:
09-0081 Reconstruction 5-018-003 DONE DONE ADD. REQ'D07/23/09 07/20/09 12/15/08 12/16/08 2,155,16 0 0 JOD 0 0 0
Rhinebeck Architecture
Howland Public Library:
- PR New Construction 6-022-001 / / / / 02/04/05 / / 02 - 16 0 0 JOD 0 0 0
Fieldhouse:
- Reconstruction 7-016-002 / / / / 03/08/07 / / 7,15 0 0 JOD 0 0 0
New Press Box:
04-1459 New Construction 7-023-001 09/02/05 DONE DONE DONE 06/23/05 06/22/05 04/25/05 05/18/04 02 - 16 35,629 0 JOD 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Dover Middle/High School:
05-0181 Reconstruction 0-001-009 01/30/06 DONE DONE DONE 09/13/05 09/12/05 04/11/05 05/17/05 2,8,9,15 99,691 99,691 RDR 0 0 0
Morris Associates
05-1277 Reconstruction 0-001-010 02/15/07 DONE DONE DONE 05/22/06 05/19/06 10/27/05 12/15/05 2,10,155,15,16 2,070,450 2,070,450 JOD 0 0 0
Morris Associates
06-1084 Reconstruction 0-001-011 03/09/07 DONE DONE DONE 03/09/07 03/02/07 02/16/07 05/16/06 10,13,15,16 91,500 91,500 JOD 0 0 0
Morris Associates
07-1529 Reconstruction 0-001-012 04/18/08 DONE DONE DONE 02/01/08 01/31/08 10/11/07 05/15/07 15 56,100 56,100 JOD 0 0 0
Morris Associates
- Reconstruction 0-001-013 / / / / 09/23/08 / / 4,7 0 0 JOD 0 0 0
Wingdale Elementary:
07-1530 Reconstruction 0-003-004 04/18/08 DONE DONE DONE 02/01/08 01/31/08 10/11/07 05/15/07 16 43,400 43,400 JOD 0 0 0
Morris Associates
08-0601 Reconstruction 0-003-005 02/10/09 DONE DONE DONE 10/27/08 10/24/08 05/14/08 05/13/08 15 200,000 99,900 JOD 0 0 0
Morris Associates
08-1764 Reconstruction 0-003-006 07/22/09 DONE DONE DONE 06/30/09 06/24/09 03/02/09 05/19/09 15,16 100,000 6,249,175 JOD 0 0 0
Rennia Engineering
Dover Elem. School:
06-0543 Reconstruction 0-004-008 06/15/09 DONE DONE DONE 11/22/06 11/21/06 10/27/05 12/15/05 2,7,9,15,16 618,800 203,300 JOD 0 0 203,585
Morris Associates
Athletic Storage Building:
08-1419 New Construction 2-011-001 06/10/09 DONE DONE DONE 03/24/09 03/20/09 09/23/08 05/20/08 02 - 16 136,000 0 JOD 0 0 0
Morris Associates
Press Box / Bleachers:
05-1278 New Construction 7-009-001 02/15/07 DONE DONE DONE 05/22/06 05/19/06 11/10/05 12/15/05 02 - 16 351,702 0 JOD 0 0 0
Morris Associates
Concession Stand @ MS/HS:
05-1279 New Construction 7-010-001 02/15/07 DONE DONE DONE 05/22/06 05/19/06 11/10/05 12/15/05 02 - 16 69,481 0 JOD 0 0 0
Morris Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Haviland Middle School(JrHigh):
04-0446XX Reconstruction 0-001-015 03/10/05 CANCELLED 11/24/04 11/19/04 / / 05/21/02 7,9,10,15,16 625,000 625,000 MAC 0 0 0
Liscum-McCormack-Vanvoorhis
- Reconstruction 0-001-016 / / / / 01/14/05 / / 2,4,7,8,9,14,155,15, 0 15,961,616 HCM 0 0 0
04-1244 Reconstruction 0-001-016 06/24/05 DONE DONE DONE 05/10/05 05/09/05 / / 03/15/05 443,892 443,892 0 0 0
Thomas Associates
05-0017 Reconstruction 0-001-017 08/23/05 DONE DONE DONE 07/06/05 07/01/05 05/31/05 03/15/05 7 233,417 233,417 HCM 0 0 0
Thomas Associates
05-0468 Reconstruction 0-001-018 04/06/06 DONE DONE DONE 12/20/05 12/20/05 05/31/05 03/15/05 2,4,8,9,14,155,15,16 2,449,646 2,110,261 HCM 0 0 335,816
Thomas Associates
07-2297 Reconstruction 0-001-019 11/26/08 DONE DONE DONE 07/03/08 06/12/08 10/23/07 12/13/07 2,7,8 304,023 403,500 HCM 0 0 0
ThomasAssociates, PC
08-0735 Reconstruction 0-001-020 03/12/09 DONE DONE DONE 11/10/08 11/07/08 09/10/08 12/13/07 2,7,8 2,736,979 4,450,251 HCM 0 0 0
Tetra Tech Architects & Engineers
Roosevelt High School:
04-1245 Reconstruction 0-002-015 06/24/05 DONE DONE DONE 05/10/05 05/09/05 01/14/05 03/15/05 2,4,8,9,14,155,15,16 400,121 400,121 HCM 0 0 0
Thomas Associates
05-0469 Reconstruction 0-002-016 04/06/06 DONE DONE DONE 12/20/05 12/20/05 05/31/05 03/15/05 2,4,8,9,155,15,16 1,548,970 1,783,284 HCM 0 0 276,137
Thomas Associates
05-0254 Reconstruction 0-002-017 10/11/05 DONE DONE DONE 10/11/05 10/11/05 09/28/05 03/15/05 16 434,630 434,630 HCM 0 0 0
Thomas Associates
07-2298 Reconstruction 0-002-018 11/26/08 DONE DONE DONE 07/03/08 06/12/08 10/23/07 12/13/07 7,8 494,281 458,640 HCM 0 0 0
ThomasAssociates, PC
07-2316 Reconstruction 0-002-019 08/26/08 DONE DONE DONE 07/18/08 07/18/08 07/16/08 / / 2,8,13 836,307 1,085,835 HCM 0 0 0
ThomasAssociates, PC
09-0172 Reconstruction 0-002-020 08/31/09 DONE DONE DONE 08/27/09 08/25/09 07/17/09 06/25/09 16 70,000 0 HCM 0 0 0
Tetra Tech Architects & Engineers
Ralph R. Smith Elementary:
04-0443XX Reconstruction 0-003-013 03/10/05 CANCELLED 11/24/04 11/19/04 09/12/02 05/21/02 8 25,000 25,000 MAC 0 0 0
Liscum-McCormack-Vanvoorhis
04-1246 Reconstruction 0-003-014 06/24/05 DONE DONE DONE 05/10/05 05/09/05 01/14/05 03/15/05 2,4,7,8,9,14,155,15, 345,662 345,662 HCM 0 0 0
Thomas Associates
05-0470 Reconstruction 0-003-015 04/06/06 DONE DONE DONE 12/20/05 12/20/05 05/31/05 03/15/05 2,4,7,8,9,14,155,15, 2,348,837 2,131,437 HCM 0 0 499,415
Thomas Associates
07-2299 Reconstruction 0-003-016 11/26/08 DONE DONE DONE 07/03/08 06/12/08 10/23/07 12/13/07 2,7,8 355,172 516,140 HCM 0 0 0
ThomasAssociates, PC
08-0736 Reconstruction 0-003-017 03/12/09 DONE DONE DONE 11/10/08 11/07/08 09/10/08 12/13/07 7,8 854,072 1,440,128 HCM 0 0 0
Tetra Tech Architects & Engineers
Violet Avenue Elementary:
04-0444 Reconstruction 0-004-012 03/10/05 DONE DONE DONE 11/24/04 11/19/04 09/12/02 05/21/02 7,9,15 530,927 530,927 MAC 0 0 0
Liscum-McCormack-Vanvoorhis
04-1247 Reconstruction 0-004-013 06/24/05 DONE DONE DONE 05/10/05 05/09/05 01/14/05 03/15/05 2,4,7,8,9,14,155,15, 252,572 252,572 HCM 0 0 0
Thomas Associates
05-0471 Reconstruction 0-004-014 04/06/06 DONE DONE DONE 12/20/05 12/20/05 05/31/05 03/15/05 2,4,7,8,9,14,155,15, 1,289,034 1,443,027 HCM 0 0 132,002
Thomas Associates
07-2300 Reconstruction 0-004-015 11/26/08 DONE DONE DONE 07/03/08 06/12/08 10/23/07 12/13/07 2,7,8 110,237 72,115 HCM 0 0 0
ThomasAssociates, PC
08-0737 Reconstruction 0-004-016 03/12/09 DONE DONE DONE 11/10/08 11/07/08 09/10/08 12/13/07 2,4,7,8 1,417,588 2,357,230 HCM 0 0 0
Tetra Tech Architects & Engineers
Hyde Park Elementary:
04-0445 Reconstruction 0-005-016 03/10/05 DONE DONE DONE 11/24/04 11/19/04 09/12/02 05/21/02 7,8,9,13,15 253,301 253,301 MAC 0 0 0
Liscum-McCormack-Vanvoorhis
04-0737 Reconstruction 0-005-017 02/03/05 DONE DONE DONE 01/28/05 01/27/05 12/13/04 05/15/01 14,16 52,800 52,800 HCM 0 0 0
Thomas Associates
04-1248 Reconstruction 0-005-018 06/24/05 DONE DONE DONE 05/10/05 05/09/05 01/14/05 03/15/05 2,4,7,8,9,14,155,15, 55,304 55,304 HCM 0 0 0
Thomas Associates
05-0472 Reconstruction 0-005-019 04/06/06 DONE DONE DONE 12/20/05 12/20/05 05/31/05 03/15/05 2,4,7,8,9,14,155,15, 731,044 862,607 HCM 0 0 68,108
Thomas Associates
07-2301 Reconstruction 0-005-020 11/26/08 DONE DONE DONE 07/03/08 06/12/08 10/23/07 12/13/07 2,7,8 177,416 222,645 HCM 0 0 0
ThomasAssociates, PC
08-0738 Reconstruction 0-005-021 03/12/09 DONE DONE DONE 11/10/08 11/07/08 09/10/08 12/13/07 2,4,7,8 755,839 869,212 HCM 0 0 0
Tetra Tech Architects & Engineers
Netherwood Elementary School:
04-1249 Reconstruction 0-007-014 06/24/05 DONE DONE DONE 05/10/05 05/09/05 01/14/05 03/15/05 2,4,7,8,9,14,155,15, 33,755 33,755 HCM 0 0 0
Thomas Associates
05-0473 Reconstruction 0-007-015 04/06/06 DONE DONE DONE 12/20/05 12/20/05 05/31/05 03/15/05 2,4,7,8,9,14,155,15, 2,098,122 2,098,122 HCM 0 0 92,823
Thomas Associates
07-2302 Reconstruction 0-007-016 11/26/08 DONE DONE DONE 07/03/08 06/12/08 10/23/07 12/13/07 2,7,8 126,667 138,590 HCM 0 0 0
ThomasAssociates, PC
08-0739 Reconstruction 0-007-017 03/12/09 DONE DONE DONE 11/10/08 11/07/08 09/10/08 12/13/07 7,8 128,927 216,184 HCM 0 0 0
Tetra Tech Architects & Engineers
North Park Elementary School:
04-0479XX Reconstruction 0-013-014 02/24/05 CANCELLED 11/24/04 11/18/04 09/12/02 05/21/02 2,155 60,000 60,000 MAC 0 0 0
Liscum-McCormack-Vanvoorhis
04-1250 Reconstruction 0-013-015 06/24/05 DONE DONE DONE 05/10/05 05/09/05 01/14/05 03/15/05 2,4,7,8,9,14,155,15, 82,647 82,647 HCM 0 0 0
Thomas Associates
05-0474 Reconstruction 0-013-016 04/06/06 DONE DONE DONE 12/20/05 12/20/05 05/31/05 03/15/05 2,4,7,8,9,155,15,16 572,346 572,346 HCM 0 0 74,942
Thomas Associates
07-2303 Reconstruction 0-013-017 11/26/08 DONE DONE DONE 07/03/08 06/12/08 10/23/07 12/13/07 2,7,8 311,104 475,920 HCM 0 0 0
ThomasAssociates, PC
08-0740 Reconstruction 0-013-018 03/13/09 DONE DONE DONE 11/10/08 11/07/08 09/10/08 12/13/07 7,8 971,585 1,309,056 HCM 0 0 0
Tetra Tech Architects & Engineers
Leased Administration:
07-2317 Reconstruction 1-016-002 08/26/08 DONE DONE DONE 07/07/08 06/18/08 01/31/08 12/13/07 432,121 0 HCM 0 0 0
Thomas Associates
Bus Garage:
07-2318 Reconstruction 4-006-008 08/26/08 DONE DONE DONE 07/07/08 06/18/08 10/23/07 12/13/07 7 99,421 384,210 HCM 0 0 0
Thomas Associates
District Wide:
- Reconstruction 7-999-001 / / / / 10/23/07 / / 10,13,16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Millerton Elementary School:
05-0131 Reconstruction 0-001-007 08/30/05 DONE DONE DONE 08/16/05 08/09/05 04/06/05 04/18/05 13 320,000 320,000 JOD 0 0 0
08-0892 Reconstruction 0-001-008 03/09/09 DONE DONE DONE 12/09/08 12/08/08 05/01/08 11/13/07 2,7,15 271,800 0 JOD 0 0 104,072
Rhinebeck Architecture
Webutuck Jr/Sr High School:
08-0893 Reconstruction 0-002-013 03/09/09 DONE DONE DONE 12/09/08 12/08/08 05/01/08 11/13/07 8,9,15,16 251,800 0 JOD 0 0 114,745
Rhinebeck Architecture
- Reconstruction 0-002-014 / / / / 02/04/09 / / 10 0 0 JOD 0 0 0
Webutuck Elementary School:
08-0894 Reconstruction 0-004-012 03/09/09 DONE DONE DONE 12/09/08 12/08/08 10/07/08 11/13/07 8,9,15,16 181,400 0 JOD 0 0 66,712
Rhinebeck Architecture
Concession Stand:
- New Construction 7-009-001 / / / / 11/16/07 / / 02 - 16 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Pawling Elementary School:
04-0689 Reconstruction 0-001-014 02/04/05 DONE DONE DONE 01/19/05 01/18/05 08/12/04 11/22/04 7 115,000 115,000 JOD 0 0 0
Kaeyer, Garment & Davidson
05-0063 Reconstruction 0-001-015 03/29/06 DONE DONE DONE 07/22/05 07/20/05 08/12/04 05/18/04 16 150,000 150,000 JOD 0 0 0
Kaeyer, Garment & Davidson
06-0778 Reconstruction 0-001-017 03/09/07 DONE DONE DONE 01/17/07 01/17/07 11/20/06 05/16/06 7 2,600,000 2,600,000 JOD 0 0 0
Kaeyer, Garment & Davidson
09-0108 Reconstruction 0-001-018 08/11/09 DONE DONE DONE 08/10/09 08/07/09 07/17/09 05/19/09 2 9,500 0 JOD 0 0 0
Kaeyer, Garment & Davidson
Junior Senior High School:
07-1616 Reconstruction 0-002-013 04/23/08 DONE DONE DONE 02/14/08 02/12/08 12/17/07 05/15/07 2,4,7,16 1,910,000 1,910,000 JOD 0 0 465,307
Kaeyer, Garment & Davidson
New Middle School:
07-0550 Reconstruction 0-006-003 10/19/07 DONE DONE DONE 10/16/07 10/12/07 10/15/07 10/02/07 15 35,000 35,000 JOD 0 0 0
Damiano Barile Engineers, P.C.
- Reconstruction 0-006-004 / / / / 10/11/07 / / 15 0 0 JOD 0 0 0
Admin @ Donaldson Center:
05-0039TQ Temporary Quarters 1-010-001 ADDENDUM REQ'D 07/13/05 07/12/05 06/13/05 / / 0 0 JOD 0 0 0
Administration Building:
05-0196TQ Temporary Quarters 1-011-001 ADDENDUM REQ'D 09/16/05 09/16/05 07/19/05 / / 0 0 JOD 0 0 0
Bus Garage:
07-1617 Reconstruction 3-003-003 04/23/08 DONE DONE DONE 02/14/08 02/12/08 12/17/07 05/15/07 7 30,000 0 JOD 0 0 0
Kaeyer, Garment & Davidson
Leased Bus Garage:
05-0040 Reconstruction 5-009-L01 01/26/06 DONE DONE DONE 07/13/05 07/12/05 06/08/05 / / 848,500 848,500 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Seymour Smith School:
- Reconstruction 0-001-011 / / / / 08/11/05 / / 155 0 8,055,750 HCM 0 0 0
07-0346 Reconstruction 0-001-012 09/12/07 DONE DONE DONE 09/10/07 09/10/07 08/10/07 06/20/07 2,4,155,15,16 175,000 175,000 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
- Reconstruction 0-001-013 / / / / 08/22/08 / / 2,4,7,8,10,16 0 0 HCM 0 0 0
Cold Springs Elementary:
04-1007 Reconstruction 0-002-005 06/03/05 DONE DONE DONE 03/17/05 03/16/05 01/20/05 05/17/05 7 740,187 740,187 HCM 0 0 0
Quality Environmental Solutions & Te
Stissing Mt Jr/Sr High School:
06-1355 Reconstruction 0-009-009 09/05/07 DONE DONE DONE 04/24/07 04/19/07 06/05/06 05/15/07 2,4,8,9,155,15,16 824,000 824,000 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
08-0097 Reconstruction 0-009-010 10/08/08 DONE DONE DONE 07/25/08 07/23/08 03/17/08 03/05/08 16 235,000 0 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Storage Shed:
06-1356 New Construction 2-011-001 09/05/07 DONE DONE DONE 04/24/07 04/19/07 04/10/07 / / 02 - 16 95,000 0 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Press Box:
06-1357 New Construction 7-010-001 09/05/07 DONE DONE DONE 04/24/07 04/19/07 04/10/07 / / 02 - 16 56,000 0 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Columbus School #3:
- Reconstruction 0-001-010 / / / / 07/22/09 / / 2,4,8,9,155,15,16 0 0 JOD 0 0 0
SFB Morse School #5:
- Reconstruction 0-002-010 / / / / 07/22/09 / / 2,4,7,8,9,155,15,16 0 0 JOD 0 0 0
Gov. Clinton School #8:
- Reconstruction 0-004-010 / / / / 07/22/09 / / 2,4,7,8,9,155,15,16 0 0 JOD 0 0 0
Krieger School No. 11:
- Reconstruction 0-006-010 / / / / 07/22/09 / / 2,4,8,155,15,16 0 0 JOD 0 0 0
- Reconstruction 0-006-011 / / / / 07/22/09 / / 2,7,8,155,15,16 0 0 JOD 0 0 0
Junior/Senior High School:
- Reconstruction 0-007-013 / / / / 07/22/09 / / 2,7,8,9,10,155,15,16 0 0 JOD 0 0 0
04-1394SC Visual Structural Inspection 0-007-SC1 06/10/05 DONE DONE DONE 04/13/05 04/13/05 / / / / 16 32,208 32,208 JOD 0 0 0
W.W. Smith Elementary:
- Reconstruction 0-008-015 / / / / 07/22/09 / / 2,4,7,8,9,155,15,16 0 0 JOD 0 0 0
Middle School:
- Reconstruction 0-015-015 / / / / 07/22/09 / / 2,7,8,9,10,155,15,16 0 0 JOD 0 0 0
04-1395SC Visual Structural Inspection 0-015-SC1 06/10/05 DONE DONE DONE 04/13/05 04/13/05 / / / / 16 27,122 27,122 JOD 0 0 0
BOATHOUSE STORAGE BUILDING:
- TQ Temporary Quarters 7-020-001 / / / / 06/14/06 / / 0 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Arlington Middle School:
06-0390 Reconstruction 0-002-012 02/27/07 DONE DONE DONE 10/31/06 10/30/06 02/13/06 12/13/05 2,4,7,8,9,10,155,15, 1,562,099 1,407,392 HCM 0 0 0
Clark Patterson Associates
Raymond Ave. Grade School:
06-0391 Reconstruction 0-003-011 02/27/07 DONE DONE DONE 10/31/06 10/30/06 02/13/06 12/13/05 2,8,9,155,16 479,357 224,869 HCM 0 0 0
Clark Patterson Associates
Overlook Elementary School:
06-0392 Reconstruction 0-004-010 02/27/07 DONE DONE DONE 10/31/06 10/30/06 02/13/06 12/13/05 2,7,155,15,16 1,437,093 1,703,242 HCM 0 0 0
Clark Patterson Associates
LaGrange Elementary School:
06-0393 Reconstruction 0-005-013 02/27/07 DONE DONE DONE 10/31/06 10/30/06 02/13/06 12/13/05 2,7,13,15,16 1,360,874 1,261,608 HCM 0 0 0
Clark Patterson Associates
Beekman Elementary School:
06-0394 Reconstruction 0-006-009 02/27/07 DONE DONE DONE 10/31/06 10/30/06 02/13/06 12/13/05 2,8,155,15,16 1,029,305 1,042,099 HCM 0 0 0
Clark Patterson Associates
Traver Road Primary:
06-0395 Reconstruction 0-007-010 02/27/07 DONE DONE DONE 10/31/06 10/30/06 02/13/06 12/13/05 2,7,8,155,15,16 1,337,411 1,075,599 HCM 0 0 0
Clark Patterson Associates
North Campus HS:
04-1349 Reconstruction 0-008-008 07/27/05 DONE DONE DONE 06/01/05 05/27/05 03/24/05 05/11/05 16 365,000 365,000 HCM 0 0 0
Clark Patterson Associates
- PR Additions and Alterations 0-008-009 / / / / 08/10/05 / / 02 - 16 0 0 HCM 0 0 0
06-0839 Additions and Alterations 0-008-009 06/21/07 DONE DONE DONE 01/30/07 01/25/07 08/10/05 12/13/05 02 - 16 2,164,280 2,164,280 HCM 0 0 0
Clark Patterson Associates
07-0426 Reconstruction 0-008-010 12/26/07 DONE DONE DONE 09/27/07 09/14/07 / / 12/13/05 2,4,7,8,9,14,155,15, 44,678,959 44,678,959 HCM 0 0 3,307,788
Clark Patterson Associates
- PR Additions and Alterations 0-008-011 / / / / 07/27/07 / / 02 - 16 0 0 HCM 0 0 0
- PR Additions and Alterations 0-008-012 / / / / 09/03/08 / / 02 - 16 0 0 HCM 0 0 0
LaGrange MS(fmlySouth Campus):
06-0396 Reconstruction 0-009-006 02/27/07 DONE DONE DONE 10/31/06 10/30/06 02/13/06 12/13/05 2,9,155,15,16 1,888,325 1,326,677 HCM 0 0 0
Clark Patterson Associates
Titusville Elementary School:
06-0397 Reconstruction 0-010-008 02/27/07 DONE DONE DONE 10/31/06 10/30/06 02/13/06 12/13/05 2,4,7,8,9,14,155,15, 2,239,675 1,977,608 HCM 0 0 0
Clark Patterson Associates
West Road Elem. School:
06-0398 Reconstruction 0-012-006 02/27/07 DONE DONE DONE 10/31/06 10/30/06 02/13/06 12/13/05 2,7,14,155,15,16 946,507 946,507 HCM 0 0 0
Clark Patterson Associates
Noxon Road Elem. School:
06-0399 Reconstruction 0-013-003 02/27/07 DONE DONE DONE 10/31/06 10/30/06 02/13/06 12/13/05 2,4,7,9,14,155,15,16 1,057,115 925,378 HCM 0 0 0
Clark Patterson Associates
Grounds Garage:
06-0840 Reconstruction 2-023-001 12/26/07 DONE DONE DONE 01/30/07 01/25/07 12/05/06 12/13/05 15,16 0 0 HCM 0 0 0
Clark Patterson Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Martha W. Lawrence Elementary:
04-0322 Reconstruction 0-001-003 01/03/05 DONE DONE DONE 10/25/04 10/22/04 09/17/04 05/18/04 7,9 204,800 204,800 JOD 0 0 0
Clark Patterson Associates
06-1002 Reconstruction 0-001-004 03/02/07 DONE DONE DONE 02/26/07 02/22/07 11/20/06 10/10/06 155 135,000 135,000 JOD 0 0 0
Clark Patterson Associates
06-1643 Reconstruction 0-001-005 07/06/07 DONE DONE DONE 06/26/07 06/22/07 05/22/07 05/07/07 2,155 105,000 105,000 JOD 0 0 0
Clark Patterson Associates
Todd Junior High School:
04-0323 Reconstruction 0-002-011 01/03/05 DONE DONE DONE 10/25/04 10/22/04 03/25/04 05/18/04 7,16 860,500 860,500 JOD 0 0 0
Clark Patterson Associates
Nassau Road Elementary:
04-0324 Reconstruction 0-003-009 01/03/05 DONE DONE DONE 10/25/04 10/22/04 03/25/04 05/18/04 2,7,16 702,300 702,300 JOD 0 0 0
Clark Patterson Associates
Hagan Elementary School:
04-0325 Reconstruction 0-004-010 01/03/05 DONE DONE DONE 10/25/04 10/22/04 03/25/04 05/18/04 7,15,16 1,182,400 1,182,400 JOD 0 0 0
Clark Patterson Associates
08-1657 Reconstruction 0-004-011 06/25/09 DONE DONE DONE 06/01/09 05/26/09 09/24/08 05/20/09 2,4,9,155 100,000 0 JOD 0 0 0
Clark Patterson Associates
Spackenkill High School:
05-0647 Reconstruction 0-005-015 10/19/06 DONE DONE DONE 01/24/06 01/24/06 03/16/05 03/16/05 2,7,8,9,155,15,16 2,150,000 2,150,000 JOD 0 0 0
Clark Patterson Associates
09-0376 Additions and Alterations 0-005-016 STARTED STARTED UNREVIEWED10/30/09 10/29/09 09/24/08 02/17/09 02 - 16 0 0 JOD 0 0 0
Clark Patterson Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Linden Ave Middle School:
07-1053 Reconstruction 0-003-005 04/24/08 DONE DONE DONE 12/06/07 12/05/07 06/28/06 01/23/07 2,7 1,770,320 1,770,320 DDJ 0 0 89,708
Gerard Associates
07-1382SC Visual Structural Inspection 0-003-SC1 01/17/08 DONE DONE DONE 01/07/08 01/07/08 / / / / 16 10,000 0 JOD 0 0 0
Senior High School:
05-0343 Reconstruction 0-005-006 03/03/06 DONE DONE DONE 11/14/05 11/03/05 02/17/05 03/10/05 16 178,887 178,887 DDJ 0 0 0
J.Paul Vosburgh, Architct
07-1054 Reconstruction 0-005-007 04/24/08 DONE DONE DONE 12/06/07 12/05/07 06/28/06 01/23/07 2,7 3,648,227 3,648,227 DDJ 0 0 184,868
Gerard Associates
09-0294PR Additions and Alterations 0-005-008 UNREVIEWED 10/09/09 10/05/09 10/05/09 / / 02 - 16 0 0 DDJ 0 0 0
TEtra Tech Engineers,Architects,& La
06-0746SC Visual Structural Inspection 0-005-SC1 06/07/07 DONE DONE DONE 01/05/07 01/05/07 / / / / 16 12,667 0 JOD 0 0 0
Mill Rd. Elementary:
05-0049 Reconstruction 0-006-005 07/15/05 DONE DONE DONE 07/15/05 07/14/05 04/19/05 05/18/05 2,15 99,761 99,761 DDJ 0 0 0
J.Paul Vosburgh, Architct
06-0616 Reconstruction 0-006-006 12/28/06 DONE DONE DONE 12/12/06 12/11/06 06/20/06 08/17/06 15 85,991 85,991 DDJ 0 0 0
J.Paul Vosburgh, Architct
07-1055 Reconstruction 0-006-007 04/24/08 DONE DONE DONE 12/06/07 12/05/07 06/28/06 01/23/07 2,7 9,531,453 9,531,453 DDJ 0 0 482,991
Gerard Associates
07-1380SC Visual Structural Inspection 0-006-SC1 01/17/08 DONE DONE DONE 01/07/08 01/07/08 / / / / 16 11,852 0 JOD 0 0 0
High School Track Storage Barn:
07-1029DB Discovered Building 2-019-001 07/18/08 DONE DONE DONE 12/04/07 11/30/07 09/23/03 / / 02 - 16 0 0 MAC 0 0 0
Field Hockey Storage Shed:
08-1603DB Discovered Building 2-023-001 05/29/09 DONE DONE DONE 05/11/09 04/17/09 05/07/09 / / 0 0 DDJ 0 0 0
D.F. Wheeler Engineers
PE Equipment Storage Shed:
08-1604DB Discovered Building 2-024-001 05/29/09 DONE DONE DONE 05/11/09 04/17/09 05/07/09 / / 0 0 DDJ 0 0 0
D.F. Wheeler Engineers
Linden Ave Bus Garage:
07-0273 Reconstruction 5-007-005 10/05/07 DONE DONE DONE 09/04/07 08/31/07 05/21/07 06/14/07 10 150,000 150,000 DDJ 0 0 0
Gerard Associates
07-1381SC Visual Structural Inspection 5-007-SC1 01/17/08 DONE DONE DONE 01/07/08 01/07/08 / / / / 16 5,960 0 JOD 0 0 0
:
05-0226 Reconstruction 7-020-001 10/03/05 DONE DONE DONE 09/27/05 09/20/05 08/22/05 / / 0 0 HCM 0 0 0
Red Hook VFW:
- XX Reconstruction 8-021-001 CANCELLED / / / / 05/25/05 / / 0 0 DDJ 0 0 0
RED HOOK FIRE HOUSE:
06-0212TQ Temporary Quarters 8-022-001 04/26/07 DONE DONE DONE 09/07/06 09/01/06 03/31/06 / / 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
High School:
04-0886 Additions and Alterations 0-002-014 04/22/05 DONE DONE DONE 03/04/05 03/03/05 10/25/00 01/27/04 02 - 16 17,454,364 15,418,085 DDJ 0 0 0
Einhorn Yaffee Prescott P.C.
05-1123 Reconstruction 0-002-015 10/12/06 DONE DONE DONE 04/13/06 04/10/06 07/22/05 08/16/05 8,155,16 755,412 755,412 DDJ 0 0 0
Einhorn Yaffee Prescott P.C.
07-1367 Reconstruction 0-002-016 01/28/08 DONE DONE DONE 01/15/08 01/14/08 03/07/07 03/13/07 2,8,16 459,805 459,805 DDJ 0 0 290,597
Clark Patterson Associates
Livingston Elem. School:
04-0887 Additions and Alterations 0-004-011 04/22/05 DONE DONE DONE 03/04/05 03/03/05 11/17/00 01/27/04 02 - 16 6,205,636 5,195,447 DDJ 0 0 0
Einhorn Yaffee Prescott P.C.
05-1124 Reconstruction 0-004-012 10/12/06 DONE DONE DONE 04/13/06 04/10/06 07/22/05 08/16/05 8,155,16 58,030 58,030 DDJ 0 0 0
Einhorn Yaffee Prescott P.C.
07-1368 Reconstruction 0-004-013 01/28/08 DONE DONE DONE 01/15/08 01/14/08 03/07/07 03/13/07 2,8,16 165,902 165,902 DDJ 0 0 104,850
Clark Patterson Associates
Administrative Building:
04-1351TQ Temporary Quarters 1-009-001 08/02/05 DONE DONE DONE 06/01/05 06/01/05 05/02/05 / / 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Kinry Road Elementary:
07-0817 Reconstruction 0-002-013 02/04/08 DONE DONE DONE 11/16/07 11/15/07 04/18/07 05/15/07 155 108,970 0 HCM 0 0 45,730
Dodge Chamberlin Luzine Weber, Arch.
Evans Elementary School:
04-1480 Reconstruction 0-003-016 08/09/05 DONE DONE DONE 06/29/05 06/27/05 04/15/05 05/17/05 155,15,16 215,680 215,680 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-0130 Reconstruction 0-003-017 09/12/07 DONE DONE DONE 08/06/07 08/03/07 04/18/07 05/15/07 8,155 52,445 50,820 HCM 0 0 21,870
Dodge Chamberlin Luzine Weber, Arch.
Junior High School:
- Reconstruction 0-004-025 / / / / 07/31/06 / / 2,4,7,8,9,10,13,14,1 0 15,540,132 HCM 0 0 0
Vassar Road Elementary:
06-0300 Reconstruction 0-008-017 10/25/06 DONE DONE DONE 10/05/06 10/04/06 07/31/06 05/16/06 7 1,059,796 1,059,796 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-0818 Reconstruction 0-008-018 02/04/08 DONE DONE DONE 11/16/07 11/15/07 04/18/07 05/15/07 2,155,15,16 23,229 0 HCM 0 0 9,756
Dodge Chamberlin Luzine Weber, Arch.
Ketcham Senior High School:
07-0129 Reconstruction 0-012-021 11/13/07 DONE DONE DONE 08/06/07 08/03/07 04/18/07 05/15/07 4,8,9,10,155,15,16 447,056 447,056 HCM 0 0 186,422
Dodge Chamberlin Luzine Weber, Arch.
07-0145 Reconstruction 0-012-022 10/25/07 DONE DONE DONE 08/08/07 08/03/07 08/08/07 05/15/07 71,842 75,217 HCM 0 0 29,961
Dodge Chamberlin Luzine Weber, Arch.
07-1771 Reconstruction 0-012-023 09/22/08 DONE DONE DONE 03/08/08 03/05/08 08/08/07 05/15/07 10 1,408,290 1,408,290 HCM 0 0 301,551
Dodge Chamberlin Luzine Weber, Arch.
04-0335SC Visual Structural Inspection 0-012-SC2 12/01/04 DONE DONE DONE 10/27/04 10/27/04 / / / / 16 47,360 47,360 JOD 0 0 0
Brinckerhoff Elementary:
06-0301 Reconstruction 0-013-016 10/25/06 DONE DONE DONE 10/05/06 10/04/06 07/31/06 05/16/06 7,15 1,401,063 1,401,063 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-0819 Reconstruction 0-013-017 02/04/08 DONE DONE DONE 11/16/07 11/15/07 04/18/07 05/15/07 2,155,15,16 513,201 577,858 HCM 0 0 214,005
Dodge Chamberlin Luzine Weber, Arch.
Oak Grove Elementary:
07-0820 Reconstruction 0-014-015 02/04/08 DONE DONE DONE 11/16/07 11/15/07 04/18/07 05/15/07 2,7,155,15,16 945,658 403,322 HCM 0 0 421,906
Dodge Chamberlin Luzine Weber, Arch.
07-0808 Reconstruction 0-014-016 11/21/07 DONE DONE DONE 11/15/07 11/14/07 08/30/07 05/15/07 7 847,600 945,658 HCM 0 0 353,450
Dodge Chamberlin Luzine Weber, Arch.
Gayhead Elementary:
04-0575 Reconstruction 0-016-014 01/10/05 DONE DONE DONE 12/22/04 12/17/04 09/08/04 05/18/04 7 816,551 816,551 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
06-0150 Reconstruction 0-016-015 08/09/06 DONE DONE DONE 08/07/06 08/04/06 07/31/06 06/26/06 15,16 265,000 265,000 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-0821 Reconstruction 0-016-016 02/04/08 DONE DONE DONE 11/16/07 11/15/07 04/18/07 05/15/07 2,155,15,16 591,711 624,475 HCM 0 0 246,744
Dodge Chamberlin Luzine Weber, Arch.
Van Wyck Junior High School:
04-1338 Reconstruction 0-017-016 08/10/05 DONE DONE DONE 05/27/05 05/26/05 04/12/05 05/18/04 2,15 39,000 39,000 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
06-0525 Reconstruction 0-017-017 12/01/06 DONE DONE DONE 11/20/06 11/17/06 07/31/06 05/16/06 15 365,347 365,347 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
- Additions and Alterations 0-017-018 / / / / 07/31/06 / / 02 - 16 0 26,049,232 HCM 0 0 0
Sheafe Road Elementary:
07-0822 Reconstruction 0-018-012 02/04/08 DONE DONE DONE 11/16/07 11/15/07 04/18/07 05/15/07 2,155,15,16 239,876 0 HCM 0 0 100,748
Dodge Chamberlin Luzine Weber, Arch.
Myers Corners Elementary:
07-0823 Reconstruction 0-019-016 02/04/08 DONE DONE DONE 11/16/07 11/15/07 04/18/07 05/15/07 2,155,15,16 806,664 0 HCM 0 0 338,799
Dodge Chamberlin Luzine Weber, Arch.
John Jay High School:
04-1339 Reconstruction 0-020-024 08/10/05 DONE DONE DONE 05/27/05 05/26/05 04/12/05 05/18/04 2,15 75,000 75,000 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
05-1416 Reconstruction 0-020-025 07/15/02 DONE DONE DONE 06/27/06 06/23/06 / / 04/26/06 2 774,255 774,255 HCM 0 0 0
Jack Eisenbach - Engineer
07-1772 Additions and Alterations 0-020-026 09/22/08 DONE DONE DONE 03/08/08 03/05/08 04/18/07 05/15/07 02 - 16 4,602,396 4,602,396 HCM 0 0 1,933,000
Dodge Chamberlin Luzine Weber, Arch.
07-1747 Reconstruction 0-020-027 05/14/08 DONE DONE DONE 03/04/08 02/29/08 02/01/08 12/18/07 15 250,000 0 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
06-0046SC Visual Structural Inspection 0-020-SC1 08/09/06 DONE DONE DONE 05/17/06 05/17/06 / / / / 16 73,036 64,000 JOD 0 0 0
:
- PR New Construction 0-045-001 / / / / 12/01/05 / / 02 - 16 0 0 HCM 0 0 0
Portable #1 @ Fishkill ES:
07-1624 New Construction 0-046-001 04/02/08 DONE DONE DONE 02/14/08 02/12/08 12/26/07 12/18/07 02 - 16 625,000 0 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Athletic Storage @ Ketcham HS:
04-1102 New Construction 2-043-001 06/15/05 DONE DONE DONE 04/06/05 04/05/05 11/05/04 11/08/04 02 - 16 0 0 HCM 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Bus Garage (lease):
04-0483 Reconstruction 5-038-L02 11/23/04 DONE DONE DONE 12/08/04 11/15/04 12/08/04 01/27/04 435,000 435,000 HCM 0 0 0
Fishkill Plains Bus Garage:
- New Construction 5-047-001 / / / / 10/22/08 / / 02 - 16 0 0 HCM 0 0 0
Orchard View School & Administration:
05-0225TQ Temporary Quarters 8-044-001 ADDENDUM REQ'D 09/28/05 09/21/05 05/26/05 / / 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Junior/Senior High School:
- Reconstruction 0-008-007 / / / / 09/13/07 / / 2,10,15 0 0 HCM 0 0 0
07-1996 Reconstruction 0-008-008 05/22/08 DONE DONE DONE 04/18/08 04/10/08 02/21/08 10/29/07 2,155 504,827 0 HCM 0 0 388,717
Clark Patterson Associates
08-1066 Reconstruction 0-008-009 DONE DONE ADD. REQ'D01/08/09 01/06/08 08/11/08 07/01/08 2,8,155,15,16 0 0 HCM 0 0 0
ECG ENGINEERING,LLC
06-0609SC Visual Structural Inspection 0-008-SC1 06/25/07 DONE DONE DONE 08/17/06 08/17/06 / / / / 16 9,744 0 JOD 0 0 0
Elm Drive Elementary School:
08-1067 Reconstruction 0-010-011 DONE DONE ADD. REQ'D01/08/09 01/06/09 08/11/08 07/01/08 2,8,155,15,16 0 0 HCM 0 0 0
ECG ENGINEERING,LLC
06-0611SC Visual Structural Inspection 0-010-SC1 06/25/07 DONE DONE DONE 08/17/06 08/17/06 / / / / 16 4,331 0 JOD 0 0 0
Alden Place Elementary:
07-1725 Reconstruction 0-011-009 05/13/08 DONE DONE DONE 03/03/08 02/26/08 01/31/08 / / 2,13,15 58,145 58,145 HCM 0 0 0
Clark Patterson Associates
08-1068 Reconstruction 0-011-010 DONE DONE ADD. REQ'D01/08/09 01/06/09 08/11/08 07/01/08 2,8,155,15,16 0 0 HCM 0 0 0
ECG ENGINEERING,LLC
06-0610SC Visual Structural Inspection 0-011-SC1 06/25/07 DONE DONE DONE 08/17/06 08/17/06 / / / / 16 4,331 0 JOD 0 0 0
New High School:
04-0602 New Construction 0-031-001 03/07/05 DONE DONE DONE 12/28/04 12/20/04 01/09/02 03/09/04 02 - 16 20,795,000 11,895,781 HCM 0 0 0
Clark Patterson Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Salt Point Center(frmly Spec ed ctr):
05-0781 Reconstruction 0-001-020 04/20/06 DONE DONE DONE 02/16/06 02/15/06 04/06/05 04/30/05 2,9,10,155,15,16 371,056 371,056 JOD 0 0 0
Rhinebeck Architecture
- Reconstruction 0-001-021 / / / / 08/09/05 / / 2,155,15,16 0 335,640 JOD 0 0 0
06-0078 Reconstruction 0-001-022 11/07/06 DONE DONE DONE 07/19/06 07/05/06 03/24/06 04/30/06 4,9,155,16 325,000 325,000 JOD 0 0 0
Rhinebeck Architecture
06-0076 Reconstruction 0-001-023 10/26/06 DONE DONE DONE 07/19/06 07/05/06 07/17/06 04/30/06 15,16 260,000 260,000 JOD 0 0 0
Rhinebeck Architecture
08-1605 Reconstruction 0-001-024 05/14/09 DONE DONE DONE 05/11/09 05/06/09 03/27/09 04/01/09 7 1,413,775 0 JOD 0 0 0
Kaeyer, Garment & Davidson
Area Occupational Center:
06-0079XX Reconstruction 0-003-021 11/07/06 CANCELLED 07/19/06 07/05/06 11/15/00 04/30/06 155,16 0 17,383,742 JOD 0 0 0
Rhinebeck Architecture
06-0077 Reconstruction 0-003-022 10/26/06 DONE DONE DONE 07/19/06 07/05/06 07/17/06 04/30/06 15,16 750,000 750,000 JOD 0 0 0
Rhinebeck Architecture
Alt. Ed. Bldg. @ Salt Point Campus:
- PR New Construction 0-042-001 / / / / 11/26/07 / / 02 - 16 0 0 JOD 0 0 0
Administration Bldg.:
- PR Alterations 1-002-011 / / / / 04/21/06 / / 0 0 JOD 0 0 0
06-0080XX Alterations 1-002-011 11/07/06 CANCELLED 07/19/06 07/05/06 04/21/06 04/30/06 02 - 16 0 0 JOD 0 0 0
Rhinebeck Architecture
:
- Reconstruction 8-039-L01 / / / / 08/01/05 / / 0 0 JOD 0 0 0
OBSERVATORY @ VASSAR COLLEGE:
- TQ Temporary Quarters 8-040-001 / / / / 05/18/06 / / 0 0 JOD 0 0 0
Karate for Kids:
07-0121TQ Temporary Quarters 8-041-001 08/07/07 DONE DONE DONE 08/01/07 08/01/07 06/05/07 / / 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED