Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 11/05/09 at 16:03:14




ANDES CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-01-02-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
05-0437XX Reconstruction               0-001-005  03/02/06               CANCELLED          12/12/05   12/08/05   10/27/05   11/17/05   2,7                       42,000        42,000  HCM             0           0            0
                                                                                                                                                                                                                                 Glynn Spillane Griffing Architests,P
06-1332   Additions and Alterations    0-001-006  04/16/08     DONE    DONE       DONE      04/17/07   04/17/07   08/14/06   09/14/06   02 - 16                1,296,435       255,873  HCM             0           0            0
                                                                                                                                                                                                                                 Glynn Spillane Griffing Architests,P
07-2222   Additions and Alterations    0-001-007  06/22/09     DONE    DONE       DONE      06/06/08   05/30/08   10/16/07   02/12/08   02 - 16                   98,000             0  HCM             0           0       44,543
                                                                                                                                                                                                                                 Glynn Spillane Griffing Architests,P

          Bus Garage/AG Building:
06-0868   Reconstruction               0-003-004  06/18/07     DONE    DONE       DONE      02/02/07   02/01/07   08/14/06   10/12/06   2,7,155,15,16            100,000       100,000  HCM             0           0            0
                                                                                                                                                                                                                                 Glynn Spillane Griffing Architests,P
07-2223   Additions and Alterations    0-003-005  06/22/09     DONE    DONE       DONE      06/06/08   05/30/08   01/18/08   02/12/08   02 - 16                   23,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Glynn Spillane Griffing Architests,P

          Red Schoolhouse:
07-2224   Additions and Alterations    0-004-002  06/22/09     DONE    DONE       DONE      06/06/08   06/06/08   01/18/08   02/12/08   02 - 16                    9,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Glynn Spillane Griffing Architests,P


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




DOWNSVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-03-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Central School:
08-1667PR Additions and Alterations    0-001-013                         UNREVIEWED         06/09/09   06/01/09   05/01/08     /  /     02 - 16                        0     9,315,250  DDJ             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
09-0130   Additions and Alterations    0-001-013               DONE    DONE       ADD. REQ'D08/18/09   08/17/09   05/01/08   06/11/08   02 - 16                        0     9,315,250  DDJ             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
08-0964   Reconstruction               0-001-014  04/08/09     DONE    DONE       DONE      12/24/08   12/17/08   05/01/08   06/11/08   2,9,10,16              2,559,610             0  DDJ             0           0      112,481
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             

          New Bus Garage:
08-1456   New Construction             5-004-001  09/17/09     DONE    DONE       DONE      04/02/09   04/01/09   05/01/08   06/11/08   02 - 16                3,210,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CHARLOTTE VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-04-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
07-1774PR Additions and Alterations    0-001-012                         UNREVIEWED         03/09/08   03/05/08   07/27/07     /  /     02 - 16                7,597,250     7,514,170  DDJ             0           0      331,521
                                                                                                                                                                                                                                 William Taylor Architects, PLLC.    
07-2147   Additions and Alterations    0-001-012  01/13/09     DONE    DONE       DONE      05/23/08   05/16/08   07/27/07   06/12/07   02 - 16                7,937,400     7,937,400  DDJ             0           0      331,521
                                                                                                                                                                                                                                 William Taylor Architects, PLLC.    

          New Atheletic Storage Shed:
  -       New Construction             2-008-001                                              /  /       /  /     10/23/08     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
07-2148   Reconstruction               5-002-002  01/13/09     DONE    DONE       DONE      05/23/08   05/16/08   07/27/07   06/12/07   155,16                    18,600        18,600  DDJ             0           0            0
                                                                                                                                                                                                                                 William Taylor Architects, PLLC.    

          Town of Davenport Water System Bldg.:
  -       Alterations                  7-007-001                                              /  /       /  /       /  /       /  /                                    0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




DELHI CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-05-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Delaware Academy:
05-0824   Reconstruction               0-001-007  12/14/06     DONE    DONE       DONE      02/27/06   02/21/06   07/20/05   06/13/05   4,7,8,155,15,16        6,444,340     6,444,340  DDJ             0           0      307,962
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Delhi Elementary School:
05-0825   Reconstruction               0-004-004  12/14/06     DONE    DONE       DONE      02/27/06   02/21/06   07/20/05   06/13/05   4,7,8,9,155,15,16      3,947,020     3,725,027  DDJ             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Abraham L Kellogg:
  -    XX Reconstruction               0-006-003                         CANCELLED            /  /       /  /     07/20/05     /  /     4,7,8,9,155,15,16              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          A.L. Kellogg Elementary School:
05-0826   Reconstruction               0-009-002  12/14/06     DONE    DONE       DONE      02/27/06   02/21/06   09/29/05   06/13/05   4,7,8,9,155,15,16        501,900       501,900  DDJ             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Storage Shed:
05-0827   New Construction             2-012-001  12/14/06     DONE    DONE       DONE      02/27/06   02/21/06   08/11/05   06/13/05   02 - 16                   78,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Bus/Maintenance Garage:
05-0828   Reconstruction               5-010-002  12/14/06     DONE    DONE       DONE      02/27/06   02/21/06   07/20/05   06/13/05   4,7,8,9,155,15,16        498,740       498,740  DDJ             0           0            0
                                                                                                                                                                                                                                 Ashley McGraw Architects            

          Sugar Maple House:
  -    PR New Construction             7-013-001                                              /  /       /  /     07/25/07     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




FRANKLIN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-07-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
05-0360   Reconstruction               0-001-014  03/09/06     DONE    DONE       DONE      11/22/05   11/21/05   12/21/04   03/15/05   2,4,7,9,155,15,16      2,468,000     2,468,000  JOD             0           0      211,675
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
06-1556   Reconstruction               0-001-015  08/28/07     DONE    DONE       DONE      05/31/07   05/30/07   11/15/06   03/15/05   2,4,8,9,10,13,155,15     274,033       274,033  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
06-1557   Reconstruction               0-001-016  08/28/07     DONE    DONE       DONE      05/31/07   05/30/07   04/18/07   03/15/05   16                        81,000        81,000  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




HANCOCK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-09-06-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Jr/Sr High School:
07-0928   Reconstruction               0-001-010  04/01/08     DONE    DONE       DONE      11/23/07   11/21/07   09/20/05   03/22/07   2,4,7,8,9,155,15,16    2,626,576     2,626,576  JOD             0           0            0
                                                                                                                                                                                                                                 RSA  (Robertson Strong Apgar)       

          Elementary School:
07-0929   Additions and Alterations    0-004-009  04/01/08     DONE    DONE       DONE      11/23/07   11/21/07   09/20/05   03/22/07   02 - 16                5,193,424     2,953,437  JOD             0           0      356,424
                                                                                                                                                                                                                                 RSA  (Robertson Strong Apgar)       

          Storage Bldg. #1 @ High School:
08-0666DB Discovered Building          2-010-001  10/19/09     DONE    DONE       DONE      11/04/08   10/30/08   03/19/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                 RSA  (Robertson Strong Apgar)       

          Storage Bldg. #2 @ High School:
08-0667DB Discovered Building          2-011-001  10/19/09     DONE    DONE       DONE      11/04/08   10/30/08   03/19/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                 RSA  (Robertson Strong Apgar)       

          Public Library:
08-1086   Reconstruction               6-002-002  03/17/09     DONE    DONE       DONE      01/20/09   01/12/09   03/14/08   05/20/08   2,7                       77,100             0  JOD             0           0            0
                                                                                                                                                                                                                                 Robertson Strong Apgar Architects   

          New Press Box:
07-0930   New Construction             7-012-001  04/01/08     DONE    DONE       DONE      11/23/07   11/21/07   11/16/07   03/22/07   02 - 16                   30,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 RSA  (Robertson Strong Apgar)       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




MARGARETVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-14-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Margaretville School:
06-1512   Reconstruction               0-001-009  09/19/07     DONE    DONE       DONE      05/18/07   05/17/07   06/08/06   11/14/06   2,8,9,10,155,16          693,103       693,103  DDJ             0           0      327,145
                                                                                                                                                                                                                                 Sacco & Mckinney Architects         
  -    PR Additions and Alterations    0-001-010                                              /  /       /  /     05/06/09     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
07-1500   Reconstruction               5-002-003  04/10/08     DONE    DONE       DONE      02/01/08   01/30/08   06/08/06   05/15/07   2,8,9,155                 50,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Sacco & McKinney Architects, PC     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




ROXBURY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-15-02-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Central School:
07-1365   Reconstruction               0-001-010  06/11/08     DONE    DONE       DONE      01/15/08   01/11/08   03/15/07   05/15/07   2,8,9,16                 114,000       114,000  MGL             0           0      114,000
                                                                                                                                                                                                                                 March Associates                    
  -       Reconstruction               0-001-011                                              /  /       /  /     03/23/07     /  /     2,8,9,16                       0    11,902,065  MGL             0           0            0
                                                                                                                                                                                                                                                                     
05-0329SC Visual Structural Inspection 0-001-SC1  11/07/05     DONE    DONE       DONE      05/06/05   05/06/05     /  /       /  /     16                         1,210         1,210  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          STORAGE GARAGE:
06-1399DB Discovered Building          2-010-001  01/14/08     DONE    DONE       DONE      05/03/07   04/26/07   03/23/06     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                 March Associates                    


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SIDNEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-16-01-06
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Sidney Senior High:
  -       Reconstruction               0-001-009                                              /  /       /  /     06/20/05     /  /     16                             0    10,522,314  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-001-010                                              /  /       /  /     07/25/07     /  /     2                              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-001-011                                              /  /       /  /     11/12/08     /  /     2,4,7,8,9,10,155,15,           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Pearl Street Elementary:
  -       Reconstruction               0-003-009                                              /  /       /  /     11/04/08     /  /     2,4,7,8,9,10,155,15,           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Masonville Elementary:
08-1617   Reconstruction               0-006-007  05/15/09     DONE    DONE       DONE      05/11/09   05/04/09   02/08/00   05/13/08   155,15,16                 52,000             0  MGL             0           0            0
                                                                                                                                                                                                                                 Mosaic Associates                   
  -       Reconstruction               0-006-008                                              /  /       /  /     04/10/09     /  /     13,15                          0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Middle School:
06-1501   Reconstruction               0-007-009  06/07/07     DONE    DONE       DONE      05/16/07   05/15/07   11/01/06   05/16/06   7                         85,085        85,085  JOD             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
  -       Reconstruction               0-007-010                                              /  /       /  /     07/24/07     /  /     2,10                           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-007-011                                              /  /       /  /     11/12/08     /  /     2,4,7,8,9,10,155,15,           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




STAMFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-17-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Bldg.:
07-1221   Reconstruction               0-001-004  06/04/08     DONE    DONE       DONE      12/26/07   12/24/07   11/28/06   05/15/07   2,4,8,9,155,15,16      2,997,769     2,997,769  MGL             0           0      367,344
                                                                                                                                                                                                                                 March Associates                    
  -       Reconstruction               0-001-005                                              /  /       /  /     03/30/07     /  /     2,7                            0    10,555,625  MGL             0           0            0
                                                                                                                                                                                                                                                                     
07-1222   Reconstruction               0-001-005  06/04/08     DONE    DONE       DONE      12/26/07   12/24/07   11/28/06   05/15/07   2,4,7,8,9,155,15,16      451,228       500,000  MGL             0           0            0
                                                                                                                                                                                                                                 March Associates                    
08-0119   Reconstruction               0-001-006               DONE    DONE       ADD. REQ'D08/04/08   07/23/08   10/23/07   07/10/08   8,10,155,16                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Einhorn, Yaffee, Prescott Architects
08-1392SC Visual Structural Inspection 0-001-SC1  03/18/09     DONE    DONE       DONE      03/05/09   03/05/09     /  /       /  /     16                        27,498             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Churchill Bldg. 3:
08-0120   Reconstruction               0-002-002               DONE    DONE       ADD. REQ'D08/04/08   07/23/08   10/23/07   07/10/08   10,155                         0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Einhorn, Yaffee, Prescott Architects

          Bus Garage Clrm. #2:
07-1223   Reconstruction               0-003-001  06/04/08     DONE    DONE       DONE      12/26/07   12/24/07   11/28/06   05/15/07   7,8                      153,003       139,100  MGL             0           0       19,431
                                                                                                                                                                                                                                 March Associates                    
08-0121   Reconstruction               0-003-002               DONE    DONE       ADD. REQ'D08/04/08   07/23/08   10/23/07   07/10/08   10,155,16                      0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Einhorn, Yaffee, Prescott Architects


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SOUTH KORTRIGHT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-17-02-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Central School:
05-0323   Reconstruction               0-003-009  01/24/06     DONE    DONE       DONE      11/04/05   11/03/05   09/12/05   10/17/05   10                        66,221        66,221  DDJ             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
08-0131   Reconstruction               0-003-010  03/24/09     DONE    DONE       DONE      08/05/08   07/31/08   11/09/07   06/19/07   2,7,8,9,10,155,15,16   2,561,384     2,561,384  DDJ             0           0      276,268
                                                                                                                                                                                                                                 SWBR Architects P.C.                

          Bus Garage:
05-0324   Reconstruction               5-001-007  01/24/06     DONE    DONE       DONE      11/04/05   11/03/05   09/12/05   10/17/05   10                        63,354        63,354  DDJ             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                
08-0132   Additions and Alterations    5-001-008  03/24/09     DONE    DONE       DONE      08/05/08   07/31/08   11/09/07   06/19/07   02 - 16                1,438,616     1,438,616  DDJ             0           0            0
                                                                                                                                                                                                                                 SWBR Architects P.C.                


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WALTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-19-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Townsend Elementary School:
04-0282   Reconstruction               0-006-014  12/03/04     DONE    DONE       DONE      10/08/04   10/07/04   03/25/04   05/18/04   9,155,16                  75,105        75,105  HCM             0           0            0
                                                                                                                                                                                                                                 Bell&Spina, P.C                     
05-0610   Reconstruction               0-006-015  01/31/06     DONE    DONE       DONE      01/18/06   01/17/06   12/05/05   12/20/05   9,155,16                  40,000        40,000  HCM             0           0            0
                                                                                                                                                                                                                                 Stantec Consulting Services Inc,.   
06-0772   Reconstruction               0-006-016  01/19/07     DONE    DONE       DONE      01/17/07   01/16/07   07/07/06   07/25/06   2,8,9,155,15,16        2,380,000     2,380,000  HCM             0           0            0
                                                                                                                                                                                                                                 Bell&Spina, P.C                     
08-1449   Reconstruction               0-006-017  07/31/09     DONE    DONE       DONE      04/01/09   03/30/09   06/04/07   05/15/07   2,4,8,9,10,155,15,16     500,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Bell&Spina, P.C                     
07-1994   Reconstruction               0-006-018  06/11/08     DONE    DONE       DONE      04/18/08   04/10/08     /  /     12/18/07   16                       178,500             0  HCM             0           0            0
                                                                                                                                                                                                                                 Bell&Spina, P.C                     
  -       Reconstruction               0-006-019                                              /  /       /  /     04/24/08     /  /     2,4,9,13,155,16                0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          O'Neill Jr/Sr High School:
04-0283   Reconstruction               0-007-014  12/03/04     DONE    DONE       DONE      10/08/04   10/07/04   03/25/04   05/18/04   2,4,7,8,9,10,155,15,     277,081       277,081  HCM             0           0            0
                                                                                                                                                                                                                                 Bell&Spina, P.C                     
07-1241   Reconstruction               0-007-015  05/20/08     DONE    DONE       DONE      12/27/07   12/24/07   06/04/07   05/15/07   2,4,7,8,9,10,155,15,   3,100,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Bell&Spina, P.C                     
08-1450   Reconstruction               0-007-016  08/27/09     DONE    DONE       DONE      04/01/09   03/30/09   04/24/08   05/15/07   2,4,8,9,155,15,16      1,500,000             0  HCM             0           0      880,166
                                                                                                                                                                                                                                 Bell&Spina, P.C                     

          New Storage Building:
07-0545DB Discovered Building          2-016-002  10/20/09     DONE    DONE       DONE      10/12/07   10/12/07   11/22/06     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                 Bell&Spina, P.C                     

          Wood Athletic Storage Bldg.:
07-0546DB Discovered Building          2-017-001  10/20/09     DONE    DONE       DONE      10/12/07   10/12/07   11/22/06     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                 Bell&Spina, P.C                     

          Bus Garage:
06-1034   Reconstruction               5-003-006  06/26/07     DONE    DONE       DONE      03/05/07   03/01/07   05/12/05   05/16/06   13                       134,400       134,400  HCM             0           0            0
                                                                                                                                                                                                                                 Bell&Spina, P.C                     
06-1351   Reconstruction               5-003-007  05/15/07     DONE    DONE       DONE      04/24/07   04/03/07   10/31/06   07/25/06   8,9,16                   196,000       196,000  HCM             0           0            0
                                                                                                                                                                                                                                 Bell&Spina, P.C                     
07-1995   Reconstruction               5-003-008  06/11/08     DONE    DONE       DONE      04/18/08   04/10/08   01/18/08   12/18/07   8,9,16                    57,200             0  HCM             0           0            0
                                                                                                                                                                                                                                 Bell&Spina, P.C                     
  -       Reconstruction               5-003-009                                              /  /       /  /     04/25/08     /  /     8,9,16                         0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES DEL-CHEN-MADISON-OTSEGO STATUS REPORT ON CAPITAL PROJECTS
District No.: 12-90-00-00
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          W.Delaware Occ.Bldg. A:
06-0801   Additions and Alterations    0-001-013  03/21/07     DONE    DONE       DONE      01/23/07   01/23/07   11/09/04   12/13/05   02 - 16                   29,950        36,000  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
04-1014   Reconstruction               0-001-014  05/03/05     DONE    DONE       DONE      03/22/05   03/21/05   11/22/04     /  /     2,8,9,10,155,15,16        75,242        75,242  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
05-0917   Reconstruction               0-001-015  04/26/06     DONE    DONE       DONE      03/10/06   03/06/06   03/10/06     /  /     2,7                      265,000       265,000  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
06-1334   Reconstruction               0-001-016  06/06/07     DONE    DONE       DONE      04/17/07   04/16/07   01/18/07     /  /     2,15,16                        0     7,367,020  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
06-1459   Alterations                  0-001-017  06/05/07     DONE    DONE       DONE      05/09/07   05/07/07   01/18/07   12/13/05   02 - 16               10,693,928     9,682,889  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
08-1598   Reconstruction               0-001-018  05/29/09     DONE    DONE       DONE      05/06/09   05/01/09   02/02/09   01/28/09   2,4,7,8,9,16             235,950             0  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             

          Chenango Campus (Occ Ctr 011):
06-0802   Additions and Alterations    0-002-017  03/21/07     DONE    DONE       DONE      01/23/07   01/23/07   11/09/04   12/13/05   02 - 16               19,135,342    19,135,342  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
04-1015   Reconstruction               0-002-018  05/03/05     DONE    DONE       DONE      03/22/05   03/21/05   11/22/04     /  /     2,4,8,9,10,13,155,15     205,497       205,497  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
05-0147   Reconstruction               0-002-019  08/26/05     DONE    DONE       DONE      08/23/05   08/22/05   07/13/05   08/15/05   2,15                      21,000        21,000  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
05-0918   Reconstruction               0-002-020  04/26/06     DONE    DONE       DONE      03/10/06   03/06/06   03/10/06     /  /     2,4                       30,000        30,000  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
06-1460   Reconstruction               0-002-021  06/05/07     DONE    DONE       DONE      05/09/07   05/07/07   01/18/07   12/13/05   2,4,8,9,10,13,14,155   4,341,859     2,926,625  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
08-1599   Reconstruction               0-002-022  05/29/09     DONE    DONE       DONE      05/06/09   05/01/09   02/02/09   01/28/09   2,4,8,15,16              164,050             0  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             

          W. Delaware Ed. Campus Bldg. B:
06-0803   Additions and Alterations    0-003-010  03/20/07     DONE    DONE       DONE      01/23/07   01/23/07   11/09/04   12/13/05   02 - 16                2,590,224     2,212,417  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
04-1016   Reconstruction               0-003-011  05/03/05     DONE    DONE       DONE      03/22/05   03/21/05   11/22/04     /  /     2,4,8,9,10,13,155,15      80,344        80,344  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
  -       Reconstruction               0-003-012                                              /  /       /  /     08/29/05     /  /     4,9,155,16                     0     8,223,205  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-1461   Reconstruction               0-003-013  06/05/07     DONE    DONE       DONE      05/09/07   05/07/07   01/18/07   12/13/05   2,4,7,8,9,10,13,14,1   9,480,014     6,749,883  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             

          White House 023:
04-1017   Reconstruction               1-021-002  05/03/05     DONE    DONE       DONE      03/22/05   03/21/05   11/22/04     /  /     2,9,16                    16,039             0  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             

          Support Service Building:
05-0919   Reconstruction               1-032-001  04/26/06     DONE    DONE       DONE      03/10/06   03/06/06   10/26/05     /  /     4,155,16                 105,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             

          Pole Barn #4 016:
06-1335XX Reconstruction               2-014-001                         CANCELLED          04/17/07   04/16/07   11/09/04     /  /     2,4,7,8,9,155,15,16            0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             

          Oc. Ed. Clsrm. Bldg. W. Delwr.:
06-1336   Reconstruction               8-026-002  06/06/07     DONE    DONE       DONE      04/17/07   04/16/07   11/09/04     /  /     2,15,16                  393,944       393,944  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
05-1274   Reconstruction               8-026-003  09/14/05     DONE    DONE       DONE      05/19/06   05/17/06   09/01/05   03/30/06   9,13                      48,800        48,800  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             
  -       Reconstruction               8-026-004                                              /  /       /  /     02/02/09     /  /     2,16                           0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Administrative Offices (IYP):
06-1337   Reconstruction               8-028-002  06/06/07     DONE    DONE       DONE      04/17/07   04/16/07   11/09/04     /  /     2,15,16                    6,056             0  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             

          United Church of Christ First Congre:
04-1195TQ Temporary Quarters           8-039-001  05/26/05     DONE    DONE       DONE      04/25/05   04/25/05   01/14/05     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Sidney Civic Center:
04-1177TQ Temporary Quarters           8-040-001  04/19/05     DONE    DONE       DONE      04/19/05   04/19/05   01/14/05     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Eaton Center:
05-1177   Reconstruction               8-041-001  09/06/06     DONE    DONE       DONE      04/18/06   04/10/06   10/14/05     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
09-0100TQ Temporary Quarters           8-041-002  08/18/09     DONE    DONE       DONE      08/04/09   08/03/09   08/04/09     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Bearsch Compeau Knudson             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED