Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 11/19/09 at 17:00:02




AUSABLE VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 09-02-01-04
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Keeseville Elementary:
04-1294   Reconstruction               0-003-011  07/05/05     DONE    DONE       DONE      05/19/05   05/11/05   10/28/04   03/08/05   2,7,8,9,15,16          1,515,216     1,515,216  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
05-0641   Reconstruction               0-003-012  04/28/06     DONE    DONE       DONE      01/24/06   01/24/06   12/01/05   03/08/05   2,4,8,9,155,15,16      2,714,784     2,714,784  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
08-1057   Additions and Alterations    0-003-013               DONE    DONE       ADD. REQ'D01/08/09   01/05/09   04/30/07   11/14/07   02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    

          Middle High School:
05-0642   Reconstruction               0-011-014  04/28/06     DONE    DONE       DONE      01/24/06   01/24/06   12/01/05   03/08/05   2,8,9,155,15,16        5,829,507     5,829,507  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
05-0639   Reconstruction               0-011-015  03/27/06     DONE    DONE       DONE      01/24/06   01/24/06   12/01/05   03/08/05   7                      1,667,500     1,667,500  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
08-1058   Additions and Alterations    0-011-016               DONE    DONE       ADD. REQ'D01/08/09   01/05/09   04/30/07   11/14/07   02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    

          AuSable Forks Primary:
04-1295   Reconstruction               0-012-006  07/05/05     DONE    DONE       DONE      05/19/05   05/11/05   10/28/04   03/08/05   2,7,8,9,15,16            177,937       177,937  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
05-0643   Reconstruction               0-012-007  04/28/06     DONE    DONE       DONE      01/24/06   01/24/06   12/01/05   03/08/05   2,4,8,9,155,15,16        452,063       452,063  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
05-0640   Reconstruction               0-012-008  03/27/06     DONE    DONE       DONE      01/24/06   01/24/06   12/01/05   03/08/05   7                        432,500       432,500  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
08-1059   Additions and Alterations    0-012-009               DONE    DONE       ADD. REQ'D01/08/09   01/05/09   04/30/07   11/14/07   02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    

          District Office:
04-1296   Reconstruction               1-006-003  07/05/05     DONE    DONE       DONE      05/19/05   05/11/05   11/05/04   03/08/05   2,7,155,15,16            150,493             0  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Bus Garage:
08-1060   Additions and Alterations    5-004-006               DONE    DONE       ADD. REQ'D01/08/09   01/05/09   09/27/07   11/14/07   02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    

          AuSable Forks Bus Garage:
08-1061   Reconstruction               5-019-002               DONE    DONE       ADD. REQ'D01/08/09   01/05/09   09/25/07   11/14/07   2,155,16                       0             0  HCM             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    

          Concession Building:
05-0644   New Construction             7-020-001  04/28/06     DONE    DONE       DONE      01/24/06   01/24/06   11/05/04   03/08/05   02 - 16                   35,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Press Box (New Bldg.):
05-0645   New Construction             7-022-001  04/28/06     DONE    DONE       DONE      01/24/06   01/24/06   12/21/05   03/08/05   02 - 16                   25,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Biomass Boiler Bldg. @ Keeseville:
08-1062   New Construction             7-023-001               DONE    DONE       ADD. REQ'D01/08/09   01/05/09   06/20/08   11/14/07   02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    

          Biomass Boiler Bldg. @ High School:
08-1063   New Construction             7-024-001               DONE    DONE       ADD. REQ'D01/08/09   01/05/09   06/20/08   11/14/07   02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                 SEI Design Group                    


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BEEKMANTOWN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 09-03-01-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
  -       Reconstruction               0-003-008                                              /  /       /  /     04/15/05     /  /     2                              0    36,722,874  MGL             0           0            0
                                                                                                                                                                                                                                                                     
05-0198   Reconstruction               0-003-009  10/11/05     DONE    DONE       DONE      09/19/05   09/15/05   08/11/05   05/18/04   155,16                   221,000       221,000  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-0115   Reconstruction               0-003-010  11/15/07     DONE    DONE       DONE      08/01/07   07/31/07   08/11/05   05/18/04   13,16                    480,000       480,000  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
08-0554   Reconstruction               0-003-011  03/20/09     DONE    DONE       DONE      10/17/08   10/15/08   06/10/08   05/20/08   2,7,8,9,155,15,16      2,348,920     5,050,519  HCM             0           0            0
                                                                                                                                                                                                                                 TEtra Tech Engineers,Architects,& La
05-0533SC Visual Structural Inspection 0-003-SC1  01/03/06     DONE    DONE       DONE      01/03/06   01/03/06     /  /       /  /     16                        39,457        39,457  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Cumberland Head Elementary:
07-0116   Reconstruction               0-004-010  11/15/07     DONE    DONE       DONE      08/01/07   07/31/07   08/11/05   05/18/04   2,8,16                   265,000       265,000  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
08-0555   Reconstruction               0-004-011  03/20/09     DONE    DONE       DONE      10/17/08   10/15/08   06/10/08   05/20/08   2,4,7,8,9,155,15,16    1,256,080     1,604,936  HCM             0           0            0
                                                                                                                                                                                                                                 TEtra Tech Engineers,Architects,& La
05-0534SC Visual Structural Inspection 0-004-SC1  01/03/06     DONE    DONE       DONE      01/03/06   01/03/06     /  /       /  /     16                         7,891         7,891  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Middle School Annex:
05-0535SC Visual Structural Inspection 0-009-SC1  01/03/06     DONE    DONE       DONE      01/03/06   01/03/06     /  /       /  /     16                        13,152        13,152  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Press Box / Bleachers:
09-0186   New Construction             7-011-001                       ADDENDUM REQ'D       09/02/09   08/31/09   06/10/09   05/19/09   02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                 TEtra Tech Engineers,Architects,& La


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NORTHEASTERN CLINTON CENTRAL SCHOOL STATUS REPORT ON CAPITAL PROJECTS
District No.: 09-05-01-04
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Middle High School:
04-1013   Reconstruction               0-001-005  03/29/05     DONE    DONE       DONE      03/22/05   03/21/05   03/03/05   06/15/04   155                       63,425        63,425  RDR             0           0            0
                                                                                                                                                                                                                                 WPS Consulting Engs.                
05-1016   Reconstruction               0-001-006  04/10/06     DONE    DONE       DONE      03/24/06   03/17/06   01/12/06   01/10/06   15                        89,600        89,600  RDR             0           0            0
                                                                                                                                                                                                                                 WPS Consulting Engs.                
07-1127   Reconstruction               0-001-007  06/27/08     DONE    DONE       DONE      12/14/07   12/13/07   12/11/06   01/23/07   2,4,7,8,9,155,15,16    3,307,165     3,307,165  MGL             0           0      165,358
                                                                                                                                                                                                                                 Collins & Scoville Architects       
06-0855   Reconstruction               0-001-008  01/26/07     DONE    DONE       DONE      01/31/07   01/25/07   01/10/07   05/16/06   155                       65,696        65,696  MGL             0           0            0
                                                                                                                                                                                                                                 WPS Consulting Engs.                
06-1297   Reconstruction               0-001-009  02/28/07     DONE    DONE       DONE      04/10/07   04/09/07   02/27/07   02/27/07   155                      178,745       178,745  MGL             0           0            0
                                                                                                                                                                                                                                 WPS Consulting Engs.                
09-0339   Reconstruction               0-001-010               STARTED STARTED    UNREVIEWED10/26/09   10/21/09   08/28/09   01/23/07   2,4,8,9,155,16                 0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Rouses Point Elem.:
  -       Reconstruction               0-002-005                                              /  /       /  /     11/21/05     /  /     7                              0     3,039,703  MGL             0           0            0
                                                                                                                                                                                                                                                                     
06-1298   Reconstruction               0-002-006  05/31/07     DONE    DONE       DONE      04/10/07   04/09/07   08/18/06   08/21/06   2,9                      292,521       292,521  MGL             0           0            0
                                                                                                                                                                                                                                 WPS Consulting Engs.                
07-1128   Additions and Alterations    0-002-007  06/27/08     DONE    DONE       DONE      12/14/07   12/13/07   12/11/06   01/23/07   02 - 16                3,738,609     3,624,418  MGL             0           0      186,980
                                                                                                                                                                                                                                 Collins & Scoville Architects       
07-0583   Reconstruction               0-002-008  03/28/08     DONE    DONE       DONE      10/18/07   10/17/07   09/13/07   01/23/07   2,4,7,9,14             1,349,860     1,304,967  MGL             0           0       67,493
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Mooers Elementary School:
07-1129   Reconstruction               0-005-012  06/27/08     DONE    DONE       DONE      12/14/07   12/13/07   12/11/06   01/23/07   2,4,7,8,9,155,15,16    1,785,865     1,785,865  MGL             0           0       89,293
                                                                                                                                                                                                                                 Collins & Scoville Architects       
07-0584   Reconstruction               0-005-013  03/28/08     DONE    DONE       DONE      10/18/07   10/17/07   09/11/07   01/23/07   2,4,7,8,9,15,16        2,085,173     2,085,173  MGL             0           0      104,258
                                                                                                                                                                                                                                 Collins & Scoville Architects       
07-1369   Reconstruction               0-005-014  02/08/08     DONE    DONE       DONE      01/15/08   01/14/08   12/06/07   05/15/07   8                        100,000       100,000  MGL             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
08-0397   Reconstruction               0-005-015  09/25/08     DONE    DONE       DONE      09/26/08   09/24/08   12/20/07   09/19/08   2,9                       50,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       
09-0340   Reconstruction               0-005-016               DONE    STARTED    UNREVIEWED10/26/09   10/21/09   08/28/09   01/23/07   2,8                            0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Senior High School:
04-0764   Reconstruction               0-009-001  03/03/05     DONE    DONE       DONE      02/02/05   02/02/05   11/19/86     /  /     2,15                     803,391       803,391  RDR             0           0            0
                                                                                                                                                                                                                                 WPS Consulting Engs.                
06-0856   Reconstruction               0-009-007  01/26/07     DONE    DONE       DONE      01/31/07   01/26/07   01/24/07   01/23/07   155                       87,958        87,958  MGL             0           0            0
                                                                                                                                                                                                                                 WPS Consulting Engs.                
07-1130   Reconstruction               0-009-008  06/27/08     DONE    DONE       DONE      12/14/07   12/13/07   02/05/07   01/23/07   2,4,7,8,9,155,15,16    2,609,431     2,609,431  MGL             0           0       67,229
                                                                                                                                                                                                                                 Collins & Scoville Architects       
07-1708   Reconstruction               0-009-009  03/25/08     DONE    DONE       DONE      02/25/08   02/21/08   01/07/08   02/08/08   155                      600,000       600,000  MGL             0           0       30,000
                                                                                                                                                                                                                                 Collins & Scoville Architects       
08-1465   Alterations                  0-009-010  05/08/09     DONE    DONE       DONE      04/09/09   04/06/09   02/23/09   01/06/09   02 - 16                  100,000       100,000  DDJ             0           0            0
                                                                                                                                                                                                                                 McKenna Associates                  
09-0341   Reconstruction               0-009-011               DONE    STARTED    UNREVIEWED10/26/09   10/21/09   08/28/09   01/23/07   8,155,16                       0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Storage Building - Rouses Point:
  -    DB Discovered Building          2-009-001                                              /  /       /  /     01/31/08     /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Track Equipment Storage Building:
  -    DB Discovered Building          2-012-001                                              /  /       /  /     01/31/08     /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          :
04-0113DB Discovered Building          2-023-001  11/01/05     DONE    DONE       DONE      08/10/04   08/09/04   06/18/04     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
07-1131   Additions and Alterations    5-004-004  06/27/08     DONE    DONE       DONE      12/14/07   12/13/07   12/11/06   01/23/07   02 - 16                  218,041             0  MGL             0           0            0
                                                                                                                                                                                                                                 Collins & Scoville Architects       

          Sand Filtration Building-Mooers:
  -    DB Discovered Building          7-010-001                                              /  /       /  /     01/31/08     /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Utility Building - Mooers:
  -    DB Discovered Building          7-011-001                                              /  /       /  /     01/31/08     /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Booster Club Concession Stand:
  -    DB Discovered Building          7-013-001                                              /  /       /  /     01/31/08     /  /                                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     

          Gas Meter Building:
  -       New Construction             7-014-001                                              /  /       /  /     05/27/08     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CHAZY UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 09-06-01-02
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Chazy Rural Sch/Indust.Arts Bldg.:
04-1306   Reconstruction               0-001-010  08/26/05     DONE    DONE       DONE      05/20/05   05/18/05   12/28/04   06/29/00   2,4,8,9,10,155,15,16     151,717       151,717  HCM             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
08-0578   Reconstruction               0-001-011  03/24/09     DONE    DONE       DONE      10/23/08   10/21/08   08/30/07   11/20/07   2,4,7,8,9,155,15,16    6,300,000     6,800,000  HCM             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
07-1711   Reconstruction               0-001-012  04/22/08     DONE    DONE       DONE      02/28/08   02/26/08   12/19/07   11/20/07   2,8,9,155,16             532,620       642,675  HCM             0           0       79,360
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Concession Building:
04-1307XX New Construction             7-010-001  08/26/05               CANCELLED          05/20/05   05/18/05   05/12/04   06/29/00   02 - 16                  447,095             0  HCM             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Press Box:
06-1378DB Discovered Building          7-011-001  09/29/08     DONE    DONE       DONE      05/01/07   05/01/07   05/01/07     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




NORTHERN ADIRONDACK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 09-09-01-04
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Ellenburgh Elementary:
05-0782   Reconstruction               0-001-008  09/29/06     DONE    DONE       DONE      02/16/06   02/09/06   09/30/05   06/30/98   155,15                    75,933        75,933  DDJ             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
06-0421   Reconstruction               0-001-009  12/01/06     DONE    DONE       DONE      11/02/06   11/01/06   03/17/06   05/16/06   4,7,9,155                100,000       100,000  DDJ             0           0            0
                                                                                                                                                                                                                                 AES Northeast                       
08-1077   Reconstruction               0-001-010  03/09/09     DONE    DONE       DONE      01/09/09   01/09/09   12/02/08   05/20/08   7                        100,000       100,000  DDJ             0           0            0
                                                                                                                                                                                                                                 AES Northeast                       
08-1668   Reconstruction               0-001-011  09/22/09     DONE    DONE       DONE      06/09/09   06/02/09   04/06/09   05/19/08   8,9                       45,000        45,000  DDJ             0           0            0
                                                                                                                                                                                                                                 AES Northeast                       

          Jr/Sr High School:
05-0783   Reconstruction               0-007-007  09/29/06     DONE    DONE       DONE      02/16/06   02/09/06   09/30/05   06/30/98   155,15                 1,575,653     1,575,653  DDJ             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
  -       Reconstruction               0-007-008                                              /  /       /  /     03/17/06     /  /     4,7,9,155,15,16                0    20,977,500  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
07-0809   Reconstruction               0-007-009  12/26/07     DONE    DONE       DONE      11/15/07   11/14/07   08/13/07   05/15/07   2,4,7,9                  100,000       100,000  DDJ             0           0            0
                                                                                                                                                                                                                                 AES Northeast                       

          Bus Garage & Maint.:
05-0784   Reconstruction               5-002-005  09/29/06     DONE    DONE       DONE      02/16/06   02/09/06   06/11/02   06/30/98   155,15,16                  5,576             0  MGL             0           0            0
                                                                                                                                                                                                                                 Dodge Chamberlin Luzine Weber, Arch.
  -       Reconstruction               5-002-006                                              /  /       /  /     03/17/06     /  /     4,7,155                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PERU CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 09-11-01-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Primary School:
04-1463   Reconstruction               0-004-008  06/28/05     DONE    DONE       DONE      06/24/05   05/17/05   05/04/05   04/03/02   9,16                      43,534        43,534  RDR             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
  -       Reconstruction               0-004-009                                              /  /       /  /     03/24/06     /  /     4                              0     9,017,047  MGL             0           0            0
                                                                                                                                                                                                                                                                     
  -       Reconstruction               0-004-010                                              /  /       /  /     02/05/07     /  /     16                             0     9,017,047  MGL             0           0            0
                                                                                                                                                                                                                                                                     
09-0056   Additions and Alterations    0-004-011               DONE    DONE       ADD. REQ'D07/21/09   07/15/09   07/27/07   03/12/08   02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Intermediate School:
04-1464   Reconstruction               0-005-011  06/28/05     DONE    DONE       DONE      06/24/05   05/17/05   05/11/05   04/03/02   10,16                     53,299        53,299  RDR             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
05-1294   Reconstruction               0-005-012  08/29/06     DONE    DONE       DONE      05/26/06   05/16/06   03/24/06   03/21/06   4                        350,000       350,000  MGL             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
  -       Reconstruction               0-005-013                                              /  /       /  /     02/05/07     /  /     16                             0     5,800,140  MGL             0           0            0
                                                                                                                                                                                                                                                                     
09-0057   Additions and Alterations    0-005-014               DONE    DONE       ADD. REQ'D07/21/09   07/15/09   07/27/07   03/12/08   02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Junior Senior High School:
  -       Reconstruction               0-007-014                                              /  /       /  /     02/05/07     /  /     16                             0    19,030,788  MGL             0           0            0
                                                                                                                                                                                                                                                                     
08-1410   Additions and Alterations    0-007-015  09/14/09     DONE    DONE       DONE      03/23/09   03/23/09   07/27/07   03/12/08   02 - 16                5,674,414             0  MGL             0           0      339,790
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Maintenance Bldg.:
09-0058   Reconstruction               3-013-001               DONE    DONE       ADD. REQ'D07/21/09   07/15/09   07/27/07   03/12/08   4,8,9,15,16                    0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Bus Garage:
09-0059   Reconstruction               5-012-009               DONE    DONE       ADD. REQ'D07/21/09   07/15/09   07/27/07   03/12/08   2,8,155                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Athletic Field House:
04-1465   New Construction             7-018-001  06/28/05     DONE    DONE       DONE      06/24/05   05/17/05   05/11/05   04/03/02   02 - 16                   68,933             0  RDR             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             

          District Wide:
07-0686   Reconstruction               7-999-001  11/27/07     DONE    DONE       DONE      11/01/07   10/31/07   11/20/06   04/03/02   16                       556,303             0  MGL             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PLATTSBURGH CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 09-12-00-01
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Bailey Avenue School:
04-0494   Reconstruction               0-001-004  12/30/04     DONE    DONE       DONE      12/09/04   12/07/04   04/23/04   12/11/03   2,4,7,8,9,155,15       1,163,314     1,163,314  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1760   Reconstruction               0-001-005  07/29/09     DONE    DONE       DONE      03/06/08   03/04/08   10/17/07   05/15/07   4,7,9,155,16             562,540             0  MGL             0           0       92,257
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Broad Street School:
04-0499   Reconstruction               0-002-005  12/30/04     DONE    DONE       DONE      12/09/04   12/07/04     /  /     12/11/03   2,8,9,155,15,16          614,815       614,815  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Momot E.S.(formerly Monty Street):
04-0495   Reconstruction               0-004-003  12/30/04     DONE    DONE       DONE      12/09/04   12/07/04   04/23/04   12/11/03   2,8,9,155,15,16          658,334       658,334  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1761   Reconstruction               0-004-004  07/29/09     DONE    DONE       DONE      03/06/08   03/04/08   10/17/07   05/15/07   2,4,8,9,10,155,15,16     625,000             0  MGL             0           0      102,500
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Oak Street School:
04-0496   Reconstruction               0-005-004  12/30/04     DONE    DONE       DONE      12/09/04   12/07/04   04/23/04   12/11/03   2,8,9,155,15,16        1,179,935     1,179,935  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1762   Additions and Alterations    0-005-005  07/29/09     DONE    DONE       DONE      03/06/08   03/04/08   10/17/07   05/15/07   02 - 16                1,563,648             0  MGL             0           0      256,438
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Senior High School:
04-0497   Reconstruction               0-007-007  12/30/04     DONE    DONE       DONE      12/09/04   12/07/04   04/23/04   12/11/03   2,4,8,9,10,155,15,16   1,126,043     1,126,043  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1763   Additions and Alterations    0-007-008  07/29/09     DONE    DONE       DONE      03/06/08   03/04/08   10/17/07   05/15/07   02 - 16                2,846,200             0  MGL             0           0      466,777
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Stafford Middle School:
04-0498   Reconstruction               0-013-006  12/30/04     DONE    DONE       DONE      12/09/04   12/07/04   09/30/03   12/11/03   2,8,155,15,16          2,075,863     2,075,863  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   
07-1764   Reconstruction               0-013-007  07/29/09     DONE    DONE       DONE      03/06/08   03/04/08   10/17/07   05/15/07   2,7,9,10,155,15,16     1,467,000             0  MGL             0           0      240,588
                                                                                                                                                                                                                                 Bernier Carr Associates             

          Broad St. Admin. Bldg.(chng. of use):
  -       Reconstruction               1-002-002  12/30/04     DONE    DONE       DONE      12/09/04   12/07/04   04/23/04   12/11/03   2,8,9,155,15,16          516,400             0  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Bus Garage:
04-0500   Reconstruction               4-014-003  12/30/04     DONE    DONE       DONE      12/09/04   12/07/04   04/23/04   12/11/03   2,8                      303,791       303,791  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Concession Stand:
05-0104   New Construction             7-016-001  11/28/05     DONE    DONE       DONE      08/04/05   08/04/05   02/18/05     /  /     02 - 16                   75,000             0  RDR             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   

          Press Box:
05-0293   New Construction             7-017-001  NEED AUTH    DONE    DONE       DONE      10/24/05   10/19/05   08/11/05     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Thomas Associates                   


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SARANAC CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 09-14-02-06
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Saranac Elem School K-6:
  -    PR Additions and Alterations    0-001-007                                              /  /       /  /     09/30/09     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Saranac Jr/Sr HS 7-12:
04-1222   Reconstruction               0-002-010  06/29/05     DONE    DONE       DONE      05/02/05   05/01/05   04/06/05   06/04/02   4,8,9,10,155,15,16       400,399       400,399  HCM             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
  -    PR Additions and Alterations    0-002-011                                              /  /       /  /     09/30/09     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Cadyville Elementary:
04-1223   Reconstruction               0-003-009  06/29/05     DONE    DONE       DONE      05/02/05   05/01/05     /  /     06/04/02   2,9                      111,231       111,231  HCM             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
  -       Reconstruction               0-003-010                                              /  /       /  /     09/30/09     /  /     2,155,15,16                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Morrisonville Elementary:
  -    PR Additions and Alterations    0-004-009                                              /  /       /  /     09/30/09     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Dannemora Elementary:
  -       Reconstruction               0-006-009                                              /  /       /  /     09/30/09     /  /     2,155,15,16                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Saranac head start:
  -    PR New Construction             0-009-001                                              /  /       /  /     09/30/09     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Administrative Office:
  -       Reconstruction               1-016-003                                              /  /       /  /     09/30/09     /  /     2,155,15,16                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage Annex:
07-0424   Additions and Alterations    4-013-004  11/21/07     DONE    DONE       DONE      09/27/07   09/26/07   07/25/07     /  /     02 - 16                   34,400        34,400  HCM             0           0            0
                                                                                                                                                                                                                                 348 Lake Street                     
  -       Reconstruction               4-013-005                                              /  /       /  /     09/30/09     /  /     7,155,15,16                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
07-2040   Reconstruction               5-012-004  11/03/08     DONE    DONE       DONE      04/30/08   04/22/08     /  /     10/01/07   155                       74,157        58,000  MGL             0           0            0
                                                                                                                                                                                                                                 Bernier Carr Associates             
  -       Reconstruction               5-012-005                                              /  /       /  /     09/30/09     /  /     2,8,155,15,16                  0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BOCES CLINTON-ESSEX-WARR-WASH STATUS REPORT ON CAPITAL PROJECTS
District No.: 09-90-00-00
last updated on 11/19/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Yandon Dillon Education Ctr.:
05-1142   Reconstruction               0-001-006  05/12/06     DONE    DONE       DONE      04/17/06   04/14/06   12/28/04   03/16/06   2,13                     157,969       157,969  JOD             0           0            0
                                                                                                                                                                                                                                 McKenna Associates                  

          Harrold Education Center:
08-1195   Reconstruction               0-007-006  03/09/09     DONE    DONE       DONE      02/10/09   02/04/09   05/07/07   02/13/08   2,8,9,10,155,15,16       856,200             0  JOD             0           0            0
                                                                                                                                                                                                                                 McKenna Associates                  

          Instructional Services Center:
  -    XX Reconstruction               1-021-001                         CANCELLED            /  /       /  /     05/02/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Platts Sat Camp-Admin Off Bldg:
  -    TQ Temporary Quarters           1-026-001                                              /  /       /  /     08/27/09     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Building 194, U.S. Oval:
08-0501TQ Temporary Quarters           2-023-001  10/28/08     DONE    DONE       DONE      10/14/08   10/02/08   06/11/07     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Beardsley Design Associates         

          Platts Sat Camp-Storage Bldg. East:
  -    TQ Temporary Quarters           2-027-001                                              /  /       /  /     08/27/09     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Platts Sat Camp-Storage Bldg. West:
  -    TQ Temporary Quarters           2-028-001                                              /  /       /  /     08/27/09     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
  -    TQ Temporary Quarters           2-028-002                                              /  /       /  /       /  /       /  /                                    0             0                  0           0            0
                                                                                                                                                                                                                                                                     

          Platts Sat Camp-Maintenance Bldg:
  -    TQ Temporary Quarters           3-029-001                                              /  /       /  /     08/27/09     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Platts Sat Camp-Generator Bldg.:
  -    TQ Temporary Quarters           7-030-001                                              /  /       /  /     08/27/09     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Districtwide:
04-0426   Reconstruction               7-999-001  12/08/04     DONE    DONE       DONE      11/23/04   11/19/04   05/02/03   08/19/04   16                       164,925       164,925  MAC             0           0            0
                                                                                                                                                                                                                                 McKenna Associates                  

          Platts SatCamp-S. Hangar:
09-0173TQ Temporary Quarters           8-024-001  09/03/09     DONE    DONE       DONE      08/31/09   08/26/09   09/23/08     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Platts Sat Camp-North Hanger:
09-0174TQ Temporary Quarters           8-025-001  09/03/09     DONE    DONE       DONE      08/31/09   08/26/09   08/27/09     /  /                                    0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED