AUSABLE VALLEY 090201
BEEKMANTOWN 090301
CHAZY 090601
CLINTON BOCES 099000
NORTHEASTERN 090501
NORTHRN ADIRON 090901
PERU 091101
PLATTSBURGH 091200
SARANAC 091402
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Keeseville Elementary:
04-1294 Reconstruction 0-003-011 07/05/05 DONE DONE DONE 05/19/05 05/11/05 10/28/04 03/08/05 2,7,8,9,15,16 1,515,216 1,515,216 HCM 0 0 0
Thomas Associates
05-0641 Reconstruction 0-003-012 04/28/06 DONE DONE DONE 01/24/06 01/24/06 12/01/05 03/08/05 2,4,8,9,155,15,16 2,714,784 2,714,784 HCM 0 0 0
Thomas Associates
- PR Additions and Alterations 0-003-013 / / / / 04/30/07 / / 02 - 16 0 0 HCM 0 0 0
Middle High School:
- XX Reconstruction 0-011-013 CANCELLED / / / / 10/28/04 / / 2,4,7,8,9,15,16 0 21,861,087 HCM 0 0 0
05-0642 Reconstruction 0-011-014 04/28/06 DONE DONE DONE 01/24/06 01/24/06 12/01/05 03/08/05 2,8,9,155,15,16 5,829,507 5,829,507 HCM 0 0 0
Thomas Associates
05-0639 Reconstruction 0-011-015 03/27/06 DONE DONE DONE 01/24/06 01/24/06 12/01/05 03/08/05 7 1,667,500 1,667,500 HCM 0 0 0
Thomas Associates
- PR Additions and Alterations 0-011-016 / / / / 04/30/07 / / 02 - 16 0 0 HCM 0 0 0
AuSable Forks Primary:
04-1295 Reconstruction 0-012-006 07/05/05 DONE DONE DONE 05/19/05 05/11/05 10/28/04 03/08/05 2,7,8,9,15,16 177,937 177,937 HCM 0 0 0
Thomas Associates
05-0643 Reconstruction 0-012-007 04/28/06 DONE DONE DONE 01/24/06 01/24/06 12/01/05 03/08/05 2,4,8,9,155,15,16 452,063 452,063 HCM 0 0 0
Thomas Associates
05-0640 Reconstruction 0-012-008 03/27/06 DONE DONE DONE 01/24/06 01/24/06 12/01/05 03/08/05 7 432,500 432,500 HCM 0 0 0
Thomas Associates
- PR Additions and Alterations 0-012-009 / / / / 04/30/07 / / 02 - 16 0 0 HCM 0 0 0
District Office:
04-1296 Reconstruction 1-006-003 07/05/05 DONE DONE DONE 05/19/05 05/11/05 11/05/04 03/08/05 2,7,155,15,16 150,493 0 HCM 0 0 0
Thomas Associates
Storage Bldg. @ Middle/HS:
- XX New Construction 2-021-001 CANCELLED / / / / 11/17/04 / / 02 - 16 0 0 HCM 0 0 0
Bus Garage:
- PR Additions and Alterations 5-004-006 / / / / 09/27/07 / / 02 - 16 0 0 HCM 0 0 0
AuSable Forks Bus Garage:
- Reconstruction 5-019-002 / / / / 09/25/07 / / 2,155,16 0 0 HCM 0 0 0
Concession Building:
05-0644 New Construction 7-020-001 04/28/06 DONE DONE DONE 01/24/06 01/24/06 11/05/04 03/08/05 02 - 16 35,000 0 HCM 0 0 0
Thomas Associates
Press Box (New Bldg.):
05-0645 New Construction 7-022-001 04/28/06 DONE DONE DONE 01/24/06 01/24/06 12/21/05 03/08/05 02 - 16 25,000 0 HCM 0 0 0
Thomas Associates
Biomass Boiler Bldg. @ Keeseville:
- PR New Construction 7-023-001 / / / / 06/20/08 / / 02 - 16 0 0 HCM 0 0 0
Biomass Boiler Bldg. @ High School:
- PR New Construction 7-024-001 / / / / 06/20/08 / / 02 - 16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
West Chazy Elementary:
03-1689 Reconstruction 0-001-006 07/21/04 DONE DONE DONE 07/01/04 06/30/04 04/23/04 05/18/04 2,4,8,9,10,155,15,16 180,000 180,000 RDR 0 0 0
Bernier Carr Associates
Main Building:
03-1691 Reconstruction 0-003-007 07/07/04 DONE DONE DONE 07/01/04 06/30/04 04/23/04 05/18/04 2,4,8,9,10,155,15,16 130,000 130,000 RDR 0 0 0
Bernier Carr Associates
- Reconstruction 0-003-008 / / / / 04/15/05 / / 2 0 36,722,874 MGL 0 0 0
05-0198 Reconstruction 0-003-009 10/11/05 DONE DONE DONE 09/19/05 09/15/05 08/11/05 05/18/04 155,16 221,000 221,000 RDR 0 0 0
Thomas Associates
07-0115 Reconstruction 0-003-010 11/15/07 DONE DONE DONE 08/01/07 07/31/07 08/11/05 05/18/04 13,16 265,000 0 MGL 0 0 0
Thomas Associates
- Reconstruction 0-003-011 / / / / 06/10/08 / / 2,7,8,9,155,15,16 0 0 HCM 0 0 0
05-0533SC Visual Structural Inspection 0-003-SC1 01/03/06 DONE DONE DONE 01/03/06 01/03/06 / / / / 16 39,457 39,457 JOD 0 0 0
Cumberland Head Elementary:
03-1690 Reconstruction 0-004-009 09/23/04 DONE DONE DONE 07/01/04 06/30/04 04/23/04 05/18/04 2,4,8,9,10,155,15,16 131,400 131,400 RDR 0 0 0
Bernier Carr Associates
07-0116 Reconstruction 0-004-010 11/15/07 DONE DONE DONE 08/01/07 07/31/07 08/11/05 05/18/04 2,8,16 480,000 0 MGL 0 0 0
Thomas Associates
- Reconstruction 0-004-011 / / / / 06/10/08 / / 2,4,7,8,9,155,15,16 0 0 HCM 0 0 0
05-0534SC Visual Structural Inspection 0-004-SC1 01/03/06 DONE DONE DONE 01/03/06 01/03/06 / / / / 16 7,891 7,891 JOD 0 0 0
Middle School Annex:
05-0535SC Visual Structural Inspection 0-009-SC1 01/03/06 DONE DONE DONE 01/03/06 01/03/06 / / / / 16 13,152 13,152 JOD 0 0 0
Land Acquisition:
04-0151SR New Construction 7-010-001 08/13/04 DONE DONE DONE 08/24/04 08/20/04 04/05/02 / / 02 - 16 0 0 RDR 0 0 0
Bernier Carr Associates
District Wide Project:
03-0100 Reconstruction 7-999-001 04/19/04 DONE DONE DONE 07/22/03 07/12/02 12/07/01 06/22/99 16 2,644,394 2,644,394 RDR 0 0 0
Bernier Carr Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Middle High School:
04-1013 Reconstruction 0-001-005 03/29/05 DONE DONE DONE 03/22/05 03/21/05 03/03/05 06/15/04 155 63,425 63,425 RDR 0 0 0
WPS Consulting Engs.
05-1016 Reconstruction 0-001-006 04/10/06 DONE DONE DONE 03/24/06 03/17/06 01/12/06 01/10/06 15 89,600 89,600 RDR 0 0 0
WPS Consulting Engs.
07-1127 Reconstruction 0-001-007 06/27/08 DONE DONE DONE 12/14/07 12/13/07 12/11/06 01/23/07 2,4,7,8,9,155,15,16 5,382,990 0 MGL 0 0 174,544
Collins & Scoville Architects
06-0855 Reconstruction 0-001-008 01/26/07 DONE DONE DONE 01/31/07 01/25/07 01/10/07 05/16/06 155 70,000 70,000 MGL 0 0 0
WPS Consulting Engs.
06-1297 Reconstruction 0-001-009 02/28/07 DONE DONE DONE 04/10/07 04/09/07 02/27/07 02/27/07 155 178,745 203,000 MGL 0 0 0
WPS Consulting Engs.
Rouses Point Elem.:
- Reconstruction 0-002-005 / / / / 11/21/05 / / 7 0 3,039,703 MGL 0 0 0
06-1298 Reconstruction 0-002-006 05/31/07 DONE DONE DONE 04/10/07 04/09/07 08/18/06 08/21/06 2,9 278,799 278,799 MGL 0 0 0
WPS Consulting Engs.
07-1128 Additions and Alterations 0-002-007 06/27/08 DONE DONE DONE 12/14/07 12/13/07 12/11/06 01/23/07 02 - 16 4,809,107 0 MGL 0 0 0
Collins & Scoville Architects
07-0583 Reconstruction 0-002-008 03/28/08 DONE DONE DONE 10/18/07 10/17/07 09/13/07 01/23/07 2,4,7,9,14 1,313,130 0 MGL 0 0 0
Collins & Scoville Architects
Mooers Elementary School:
03-0809 Reconstruction 0-005-011 03/02/04 DONE DONE DONE 12/10/03 12/05/03 09/15/03 09/15/03 15 90,776 90,776 RDR 0 0 0
WPS Consulting Engs.
07-1129 Reconstruction 0-005-012 06/27/08 DONE DONE DONE 12/14/07 12/13/07 12/11/06 01/23/07 2,4,7,8,9,155,15,16 3,574,835 0 MGL 0 0 174,543
Collins & Scoville Architects
07-0584 Reconstruction 0-005-013 03/28/08 DONE DONE DONE 10/18/07 10/17/07 09/11/07 01/23/07 2,4,7,8,9,15,16 2,063,789 0 MGL 0 0 0
Collins & Scoville Architects
07-1369 Reconstruction 0-005-014 02/08/08 DONE DONE DONE 01/15/08 01/14/08 12/06/07 05/15/07 8 100,000 100,000 MGL 0 0 0
Collins & Scoville Architects
08-0397 Reconstruction 0-005-015 09/25/08 DONE DONE DONE 09/26/08 09/24/08 12/20/07 09/19/08 2,9 50,000 0 MGL 0 0 0
Collins & Scoville Architects
Senior High School:
04-0764 Reconstruction 0-009-001 03/03/05 DONE DONE DONE 02/02/05 02/02/05 11/19/86 / / 2,15 803,391 803,391 RDR 0 0 0
WPS Consulting Engs.
06-0856 Reconstruction 0-009-007 01/26/07 DONE DONE DONE 01/31/07 01/26/07 01/24/07 01/23/07 155 87,958 75,000 MGL 0 0 0
WPS Consulting Engs.
07-1130 Reconstruction 0-009-008 06/27/08 DONE DONE DONE 12/14/07 12/13/07 02/05/07 01/23/07 2,4,7,8,9,155,15,16 5,082,490 0 MGL 0 0 174,544
Collins & Scoville Architects
07-1708 Reconstruction 0-009-009 03/25/08 DONE DONE DONE 02/25/08 02/21/08 01/07/08 02/08/08 155 600,000 600,000 MGL 0 0 30,000
Collins & Scoville Architects
Storage Building - Rouses Point:
- DB Discovered Building 2-009-001 / / / / 01/31/08 / / 0 0 MGL 0 0 0
Track Equipment Storage Building:
- DB Discovered Building 2-012-001 / / / / 01/31/08 / / 0 0 MGL 0 0 0
:
04-0113DB Discovered Building 2-023-001 11/01/05 DONE DONE DONE 08/10/04 08/09/04 06/18/04 / / 0 0 JOD 0 0 0
Bus Garage:
07-1131 Additions and Alterations 5-004-004 06/27/08 DONE DONE DONE 12/14/07 12/13/07 12/11/06 01/23/07 02 - 16 218,041 0 MGL 0 0 0
Collins & Scoville Architects
Sand Filtration Building-Mooers:
- DB Discovered Building 7-010-001 / / / / 01/31/08 / / 0 0 MGL 0 0 0
Utility Building - Mooers:
- DB Discovered Building 7-011-001 / / / / 01/31/08 / / 0 0 MGL 0 0 0
Booster Club Concession Stand:
- DB Discovered Building 7-013-001 / / / / 01/31/08 / / 0 0 MGL 0 0 0
Gas Meter Building:
- New Construction 7-014-001 / / / / 05/27/08 / / 02 - 16 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Chazy Rural Sch/Indust.Arts Bldg.:
04-1306 Reconstruction 0-001-010 08/26/05 DONE DONE DONE 05/20/05 05/18/05 12/28/04 06/29/00 2,4,8,9,10,155,15,16 151,717 151,717 HCM 0 0 0
Bernier Carr Associates
- Reconstruction 0-001-011 / / / / 08/30/07 / / 2,4,7,8,9,155,15,16 0 0 HCM 0 0 0
07-1711 Reconstruction 0-001-012 04/22/08 DONE DONE DONE 02/28/08 02/26/08 12/19/07 11/20/07 2,8,9,155,16 532,620 642,675 HCM 0 0 79,360
Bernier Carr Associates
03-1643FP Reconstruction 0-001-FP1 09/17/04 DONE DONE DONE 06/23/04 / / / / / / 16 5,887 5,887 JOD 0 0 0
Concession Building:
04-1307XX New Construction 7-010-001 08/26/05 CANCELLED 05/20/05 05/18/05 05/12/04 06/29/00 02 - 16 447,095 0 HCM 0 0 0
Bernier Carr Associates
Press Box:
06-1378DB Discovered Building 7-011-001 09/29/08 DONE DONE DONE 05/01/07 05/01/07 05/01/07 / / 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Ellenburgh Elementary:
05-0782 Reconstruction 0-001-008 09/29/06 DONE DONE DONE 02/16/06 02/09/06 09/30/05 06/30/98 155,15 75,933 75,933 DDJ 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
06-0421 Reconstruction 0-001-009 12/01/06 DONE DONE DONE 11/02/06 11/01/06 03/17/06 05/16/06 4,7,9,155 100,000 100,000 DDJ 0 0 0
AES Northeast
Jr/Sr High School:
05-0783 Reconstruction 0-007-007 09/29/06 DONE DONE DONE 02/16/06 02/09/06 09/30/05 06/30/98 155,15 1,575,653 1,575,653 DDJ 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
- Reconstruction 0-007-008 / / / / 03/17/06 / / 4,7,9,155,15,16 0 20,977,500 DDJ 0 0 0
07-0809 Reconstruction 0-007-009 12/26/07 DONE DONE DONE 11/15/07 11/14/07 08/13/07 05/15/07 2,4,7,9 100,000 100,000 DDJ 0 0 0
AES Northeast
Bus Garage & Maint.:
05-0784 Reconstruction 5-002-005 09/29/06 DONE DONE DONE 02/16/06 02/09/06 06/11/02 06/30/98 155,15,16 5,576 0 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
- Reconstruction 5-002-006 / / / / 03/17/06 / / 4,7,155 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Primary School:
03-0196 Reconstruction 0-004-007 01/30/04 DONE DONE DONE 08/19/03 08/08/03 05/09/03 04/03/02 2,8,9,10,155,15,16 425,740 425,740 RDR 0 0 0
Bernier Carr Associates
04-1463 Reconstruction 0-004-008 06/28/05 DONE DONE DONE 06/24/05 05/17/05 05/04/05 04/03/02 9,16 43,534 43,534 RDR 0 0 0
Bernier Carr Associates
- Reconstruction 0-004-009 / / / / 03/24/06 / / 4 0 9,017,047 MGL 0 0 0
- Reconstruction 0-004-010 / / / / 02/05/07 / / 16 0 9,017,047 MGL 0 0 0
- PR Additions and Alterations 0-004-011 / / / / 07/27/07 / / 02 - 16 0 0 MGL 0 0 0
Intermediate School:
03-0197 Reconstruction 0-005-009 01/30/04 DONE DONE DONE 08/19/03 08/08/03 07/01/02 04/03/02 9 1,159,922 1,159,922 RDR 0 0 0
Bernier Carr Associates
04-1464 Reconstruction 0-005-011 06/28/05 DONE DONE DONE 06/24/05 05/17/05 05/11/05 04/03/02 10,16 53,299 53,299 RDR 0 0 0
Bernier Carr Associates
05-1294 Reconstruction 0-005-012 08/29/06 DONE DONE DONE 05/26/06 05/16/06 03/24/06 03/21/06 4 350,000 350,000 MGL 0 0 0
Bernier Carr Associates
- Reconstruction 0-005-013 / / / / 02/05/07 / / 16 0 5,800,140 MGL 0 0 0
- PR Additions and Alterations 0-005-014 / / / / 07/27/07 / / 02 - 16 0 0 MGL 0 0 0
03-0831FP Reconstruction 0-005-FP1 02/24/04 DONE DONE DONE 12/23/03 / / / / / / 16 6,168 6,000 JOD 0 0 0
Junior Senior High School:
03-0198 Additions and Alterations 0-007-013 01/30/04 DONE DONE DONE 08/19/03 08/08/03 05/09/03 04/03/02 02 - 16 5,390,067 5,108,612 RDR 0 0 0
Bernier Carr Associates
- Reconstruction 0-007-014 / / / / 02/05/07 / / 16 0 19,030,788 MGL 0 0 0
- PR Additions and Alterations 0-007-015 / / / / 07/27/07 / / 02 - 16 0 0 MGL 0 0 0
03-0867FP Reconstruction 0-007-FP1 02/24/04 DONE DONE DONE 12/23/03 / / / / / / 16 6,168 6,000 JOD 0 0 0
Maintenance Bldg.:
- Reconstruction 3-013-001 / / / / 07/27/07 / / 4,8,9,15,16 0 0 MGL 0 0 0
Bus Garage:
03-0199 Reconstruction 5-012-008 01/30/04 DONE DONE DONE 08/19/03 08/08/03 05/09/03 04/03/02 2,4,7,8,9,155,15 222,255 222,255 RDR 0 0 0
Bernier Carr Associates
- Reconstruction 5-012-009 / / / / 07/27/07 / / 2,8,155 0 0 MGL 0 0 0
Press Box:
04-0154 New Construction 7-017-001 09/10/04 DONE DONE DONE 08/24/04 08/19/04 08/11/04 04/03/02 02 - 16 75,000 0 RDR 0 0 0
Bernier Carr Associates
Athletic Field House:
04-1465 New Construction 7-018-001 06/28/05 DONE DONE DONE 06/24/05 05/17/05 05/11/05 04/03/02 02 - 16 45,000 0 RDR 0 0 0
Bernier Carr Associates
District Wide:
07-0686 Reconstruction 7-999-001 11/27/07 DONE DONE DONE 11/01/07 10/31/07 11/20/06 04/03/02 16 520,000 0 MGL 0 0 0
Bernier Carr Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Bailey Avenue School:
03-1312 Reconstruction 0-001-003 05/12/04 DONE DONE DONE 03/24/04 03/23/04 09/30/03 12/11/03 2,4,7,8,9,155,15,16 230,818 307,560 RDR 0 0 0
Thomas Associates
04-0494 Reconstruction 0-001-004 12/30/04 DONE DONE DONE 12/09/04 12/07/04 04/23/04 12/11/03 2,4,7,8,9,155,15 1,163,314 893,000 RDR 0 0 0
Thomas Associates
07-1760 Reconstruction 0-001-005 ADDENDUM REQ'D 03/06/08 03/04/08 10/17/07 05/15/07 4,7,9,155,16 0 0 MGL 0 0 0
Bernier Carr Associates
Broad Street School:
03-1310 Reconstruction 0-002-004 05/12/04 DONE DONE DONE 03/24/04 03/23/04 / / 12/11/03 2,7,8,9,155,15,16 216,024 257,400 RDR 0 0 0
Thomas Associates
04-0499 Reconstruction 0-002-005 12/30/04 DONE DONE DONE 12/09/04 12/07/04 / / 12/11/03 2,8,9,155,15,16 615,425 516,400 RDR 0 0 0
Thomas Associates
Momot E.S.(formerly Monty Street):
03-1313 Reconstruction 0-004-002 05/12/04 DONE DONE DONE 03/24/04 03/23/04 09/30/03 12/11/03 2,7,8,9,155,15,16 438,890 363,660 RDR 0 0 0
Thomas Associates
04-0495 Reconstruction 0-004-003 12/30/04 DONE DONE DONE 12/09/04 12/07/04 04/23/04 12/11/03 2,8,9,155,15,16 658,334 897,600 RDR 0 0 0
Thomas Associates
07-1761 Reconstruction 0-004-004 ADDENDUM REQ'D 03/06/08 03/04/08 10/17/07 05/15/07 2,4,8,9,10,155,15,16 0 0 MGL 0 0 0
Bernier Carr Associates
Oak Street School:
03-1311 Reconstruction 0-005-003 05/12/04 DONE DONE DONE 03/24/04 03/23/04 09/30/03 12/11/03 2,7,8,9,155,15,16 298,224 373,230 RDR 0 0 0
Thomas Associates
04-0496 Reconstruction 0-005-004 12/30/04 DONE DONE DONE 12/09/04 12/07/04 04/23/04 12/11/03 2,8,9,155,15,16 1,179,935 1,364,725 RDR 0 0 0
Thomas Associates
07-1762 Additions and Alterations 0-005-005 ADDENDUM REQ'D 03/06/08 03/04/08 10/17/07 05/15/07 02 - 16 0 0 MGL 0 0 0
Bernier Carr Associates
Senior High School:
03-1309 Reconstruction 0-007-006 08/13/04 DONE DONE DONE 03/24/04 03/23/04 09/30/03 12/11/03 2,8,9,155,15,16 2,257,571 2,324,784 RDR 0 0 0
Thomas Associates
04-0497 Reconstruction 0-007-007 12/30/04 DONE DONE DONE 12/09/04 12/07/04 04/23/04 12/11/03 2,4,8,9,10,155,15,16 1,129,826 1,351,774 RDR 0 0 0
Thomas Associates
07-1763 Additions and Alterations 0-007-008 ADDENDUM REQ'D 03/06/08 03/04/08 10/17/07 05/15/07 02 - 16 0 0 MGL 0 0 0
Bernier Carr Associates
Stafford Middle School:
04-0498 Reconstruction 0-013-006 12/30/04 DONE DONE DONE 12/09/04 12/07/04 09/30/03 12/11/03 2,8,155,15,16 2,079,920 1,606,917 RDR 0 0 0
Thomas Associates
07-1764 Reconstruction 0-013-007 ADDENDUM REQ'D 03/06/08 03/04/08 10/17/07 05/15/07 2,7,9,10,155,15,16 0 0 MGL 0 0 0
Bernier Carr Associates
Broad St. Admin. Bldg.(chng. of use):
- Reconstruction 1-002-001 05/12/04 DONE DONE DONE 03/24/04 03/23/04 09/30/03 12/11/03 2,7,8,9,155,15,16 257,400 0 RDR 0 0 0
Thomas Associates
- Reconstruction 1-002-002 12/30/04 DONE DONE DONE 12/09/04 12/07/04 04/23/04 12/11/03 2,8,9,155,15,16 516,400 0 RDR 0 0 0
Thomas Associates
- XX Reconstruction 1-002-003 CANCELLED / / / / 04/27/04 / / 2,8,9,155,15,16 0 0 MGL 0 0 0
Athletic Storage Building:
- XX New Construction 2-015-001 CANCELLED / / / / 11/05/03 / / 02 - 16 0 0 MGL 0 0 0
Bus Garage:
03-1314 Reconstruction 4-014-002 05/12/04 DONE DONE DONE 03/24/04 03/23/04 09/30/03 12/11/03 7,8,155,15,16 24,394 33,660 RDR 0 0 0
Thomas Associates
04-0500 Reconstruction 4-014-003 12/30/04 DONE DONE DONE 12/09/04 12/07/04 04/23/04 12/11/03 2,8 303,791 209,290 RDR 0 0 0
Thomas Associates
Concession Stand:
05-0104 New Construction 7-016-001 11/28/05 DONE DONE DONE 08/04/05 08/04/05 02/18/05 / / 02 - 16 75,000 0 RDR 0 0 0
Thomas Associates
Press Box:
05-0293 New Construction 7-017-001 NEED AUTH DONE DONE DONE 10/24/05 10/19/05 08/11/05 / / 02 - 16 0 0 MGL 0 0 0
Thomas Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Saranac Jr/Sr HS 7-12:
04-0002 Additions and Alterations 0-002-009 UNREVIEWED 07/01/04 06/30/04 07/01/04 06/04/02 02 - 16 0 0 HCM 0 0 0
Bernier Carr Associates
04-1222 Reconstruction 0-002-010 06/29/05 DONE DONE DONE 05/02/05 05/01/05 04/06/05 06/04/02 4,8,9,10,155,15,16 400,399 400,399 HCM 0 0 0
Bernier Carr Associates
Cadyville Elementary:
04-0001 Reconstruction 0-003-008 08/20/04 DONE DONE DONE 07/01/04 06/30/04 03/09/04 12/16/03 2,155,16 163,660 163,660 HCM 0 0 0
Bernier Carr Associates
04-1223 Reconstruction 0-003-009 06/29/05 DONE DONE DONE 05/02/05 05/01/05 / / 06/04/02 2,9 111,231 111,231 HCM 0 0 0
Bernier Carr Associates
Bus Garage Annex:
07-0424 Additions and Alterations 4-013-004 11/21/07 DONE DONE DONE 09/27/07 09/26/07 07/25/07 / / 02 - 16 33,750 0 HCM 0 0 0
348 Lake Street
Bus Garage:
07-2040 Reconstruction 5-012-004 DONE STARTED STARTED 04/30/08 04/22/08 / / 10/01/07 155 0 0 MGL 0 0 0
Bernier Carr Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Yandon Dillon Education Ctr.:
05-1142 Reconstruction 0-001-006 05/12/06 DONE DONE DONE 04/17/06 04/14/06 12/28/04 03/16/06 2,13 157,969 157,969 JOD 0 0 0
McKenna Associates
Harrold Education Center:
04-0077 Reconstruction 0-007-005 07/22/04 DONE DONE DONE 07/22/04 07/21/04 07/08/04 07/15/04 2 112,438 112,438 MAC 0 0 0
McKenna Associates
- Reconstruction 0-007-006 / / / / 05/07/07 / / 2,8,9,10,155,15,16 0 0 JOD 0 0 0
Instructional Services Center:
- XX Reconstruction 1-021-001 CANCELLED / / / / 05/02/07 / / 0 0 JOD 0 0 0
Building 194, U.S. Oval:
- TQ Temporary Quarters 2-023-001 / / / / 06/11/07 / / 0 0 JOD 0 0 0
Districtwide:
04-0426 Reconstruction 7-999-001 12/08/04 DONE DONE DONE 11/23/04 11/19/04 05/02/03 08/19/04 16 164,925 164,925 MAC 0 0 0
McKenna Associates
Plattsburgh Satellite Campus:
- TQ Temporary Quarters 8-024-001 / / / / 09/23/08 / / 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED