REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
High School:
06-0322 Reconstruction 0-005-015 01/18/07 DONE DONE DONE 10/16/06 10/10/06 03/20/06 05/16/06 2,4,7,8,9,10,155,15, 3,314,666 3,314,666 JOD 0 0 0
Gordon W. Jones Associates
07-0555 Reconstruction 0-005-016 02/22/08 DONE DONE DONE 10/16/07 10/15/07 10/10/06 10/24/06 2,4,7,8,9,155,15,16 2,856,250 2,072,336 JOD 0 0 0
Gordon W. Jones Associates
07-0551 Reconstruction 0-005-017 02/25/08 DONE DONE DONE 10/16/07 10/15/07 03/26/07 03/27/07 2,8,9,155,15,16 770,524 770,524 JOD 0 0 134,072
Gordon W. Jones Associates
08-0262 Reconstruction 0-005-018 01/27/09 DONE DONE DONE 09/08/08 09/02/08 03/11/08 03/25/08 2,4,9,10,15,16 2,804,643 2,804,643 JOD 0 0 21,773
Gordon W. Jones Associates
Middle School:
06-0323 Reconstruction 0-006-010 01/18/07 DONE DONE DONE 10/16/06 10/10/06 03/20/06 05/16/06 2,4,7,8,9,10,155,15, 2,221,657 2,221,657 JOD 0 0 0
Gordon W. Jones Associates
07-0552 Reconstruction 0-006-011 02/25/08 DONE DONE DONE 10/16/07 10/15/07 03/26/07 03/27/07 2,4,7,8,9,10,155,15, 2,038,037 2,038,037 JOD 0 0 354,619
Gordon W. Jones Associates
08-0263 Reconstruction 0-006-012 01/27/09 DONE DONE DONE 09/08/08 09/02/08 02/12/08 03/25/08 2,4,7,9,15,16 1,821,483 1,821,483 JOD 0 0 0
Gordon W. Jones Associates
New Elementary School:
06-0324 Reconstruction 0-011-003 01/18/07 DONE DONE DONE 10/16/06 10/10/06 03/20/06 05/16/06 4,7,8,9,155,15,16 192,667 192,667 JOD 0 0 0
Gordon W. Jones Associates
07-0553 Reconstruction 0-011-004 02/25/08 DONE DONE DONE 10/16/07 10/15/07 03/26/07 03/27/07 4 33,390 0 JOD 0 0 5,156
Gordon W. Jones Associates
08-0264 Reconstruction 0-011-005 01/27/09 DONE DONE DONE 09/08/08 09/02/08 02/12/08 03/25/08 10,16 184,431 0 JOD 0 0 0
Gordon W. Jones Associates
Bus Storage Garage:
06-0325 Reconstruction 4-002-002 01/18/07 DONE DONE DONE 10/16/06 10/10/06 03/20/06 05/16/06 2,7,8,9,155,15,16 581,431 581,431 JOD 0 0 0
Gordon W. Jones Associates
- Reconstruction 4-002-003 / / / / 10/10/06 / / 2 0 0 JOD 0 0 0
07-0554 Reconstruction 4-002-004 02/25/08 DONE DONE DONE 10/16/07 10/15/07 03/26/07 03/27/07 2,4 319,767 319,767 JOD 0 0 0
Gordon W. Jones Associates
- Reconstruction 4-002-005 / / / / 03/11/08 / / 2 0 0 JOD 0 0 0
Concession Stand:
06-0326 Reconstruction 7-007-002 01/18/07 DONE DONE DONE 10/16/06 10/10/06 03/20/06 05/16/06 15,16 12,000 0 JOD 0 0 0
Gordon W. Jones Associates
07-0556 Reconstruction 7-007-003 02/22/08 DONE DONE DONE 10/16/07 10/15/07 09/27/07 10/27/06 2,10 15,750 0 JOD 0 0 0
Gordon W. Jones Associates
New Press Box:
- Reconstruction 7-010-002 / / / / 03/20/06 / / 2,13,15,16 0 0 JOD 0 0 0
Utility Building:
08-0099 New Construction 7-014-001 07/28/08 DONE DONE DONE 07/25/08 07/10/08 06/13/08 10/24/06 02 - 16 15,000 0 JOD 0 0 0
Gordon W. Jones Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
High School:
05-0648 Reconstruction 0-001-010 06/06/06 DONE DONE DONE 01/23/06 01/23/06 12/21/04 04/27/05 2,4,7,8,9,10,155,15, 611,788 611,788 JOD 0 0 0
Harrington/Sandberg Arch.
07-0726 Reconstruction 0-001-011 04/23/08 DONE DONE DONE 11/06/07 11/02/07 08/22/06 12/13/06 2,4,7,8,9,10,155,15, 1,061,778 1,061,778 JOD 0 0 52,220
Harrington/Sandberg Arch.
06-1204 Reconstruction 0-001-012 04/20/07 DONE DONE DONE 03/22/07 03/21/07 01/24/07 12/13/06 7 1,426,831 1,426,831 JOD 0 0 97,025
Harrington/Sandberg Arch.
Robert H Jackson Elementary:
05-0649 Reconstruction 0-002-006 06/06/06 DONE DONE DONE 01/23/06 01/23/06 12/28/04 04/27/05 2,4,7,8,9,155,15,16 321,626 321,626 JOD 0 0 0
Harrington/Sandberg Arch.
07-0727 Reconstruction 0-002-007 04/23/08 DONE DONE DONE 11/06/07 11/02/07 08/22/06 12/13/06 2,7,8,9,155,15,16 1,015,099 1,015,099 JOD 0 0 57,639
Harrington/Sandberg Arch.
06-1205 Reconstruction 0-002-008 04/20/07 DONE DONE DONE 03/22/07 03/21/07 01/24/07 12/13/06 7 769,788 769,788 JOD 0 0 52,346
Harrington/Sandberg Arch.
STEEL POLE MAINT BLDG:
06-1608DB Discovered Building 2-012-001 07/17/08 DONE DONE DONE 06/13/07 06/07/07 02/03/00 / / 02 - 16 0 0 MGL 0 0 0
Harrington/Sandberg Arch.
Bus Garage:
- Reconstruction 5-003-006 / / / / 08/22/06 / / 2,4,7,8,155,15,16 0 0 JOD 0 0 0
06-1206 Reconstruction 5-003-007 04/20/07 DONE DONE DONE 03/22/07 03/21/07 01/24/07 12/13/06 7 138,081 138,081 JOD 0 0 0
Harrington/Sandberg Arch.
Concession Stand/elementary:
05-1071 New Construction 7-013-001 08/01/06 DONE DONE DONE 03/31/06 03/14/06 09/02/05 12/06/05 02 - 16 27,000 0 JOD 0 0 0
Harrington/Sandberg Arch.
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Cassadaga Elementary School:
06-1326 Reconstruction 0-001-005 08/03/07 DONE DONE DONE 04/17/07 04/13/07 07/14/06 09/19/06 2,4,7,8,9,155,15,16 765,537 765,537 MGL 0 0 18,373
Habiterra Associates
Jr/Sr High School:
06-1327 Additions and Alterations 0-005-006 08/03/07 DONE DONE DONE 04/17/07 04/13/07 07/13/06 09/19/06 02 - 16 6,563,190 6,220,434 MGL 0 0 507,600
Habiterra Associates
06-0898 Reconstruction 0-005-007 02/23/07 DONE DONE DONE 02/07/07 02/07/07 12/05/06 09/19/06 7 1,392,393 1,392,393 MGL 0 0 33,418
Habiterra Associates
Sinclairville Elementary:
06-1328 Reconstruction 0-008-005 08/03/07 DONE DONE DONE 04/17/07 04/13/07 07/14/06 09/19/06 2,4,7,9,155,15,16 815,970 815,970 MGL 0 0 19,584
Habiterra Associates
Cassadaga Bus Garage:
06-1329 Reconstruction 4-006-002 08/03/07 DONE DONE DONE 04/17/07 04/13/07 07/14/06 09/19/06 2,7 75,282 75,282 MGL 0 0 0
Habiterra Associates
Bus Garage:
06-1330 Reconstruction 5-004-009 08/03/07 DONE DONE DONE 04/17/07 04/13/07 07/14/06 09/19/06 2,4,7,8 187,628 187,628 MGL 0 0 0
Habiterra Associates
New Pressbox/Storage Facility:
04-0092 New Construction 7-013-001 01/20/05 DONE DONE DONE 07/27/04 07/26/04 06/08/04 05/27/04 02 - 16 40,000 0 RDR 0 0 0
Habiterra Associates
Districtwide:
04-0848 Reconstruction 7-999-002 04/08/05 DONE DONE DONE 02/24/05 02/24/05 12/21/04 06/30/99 16 59,821 59,821 RDR 0 0 0
Habiterra Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
New PK-12:
04-1275 Additions and Alterations 0-012-004 07/14/05 DONE DONE DONE 05/18/05 05/13/05 01/17/03 01/19/05 02 - 16 4,925,471 4,629,860 HCM 0 0 0
Mach Architecture & Engineering,P.C.
- Reconstruction 0-012-005 / / / / 07/31/09 / / 2,4,7,8,9,155,15,16 0 0 HCM 0 0 0
Storage Bldg. #3:
04-1276 New Construction 2-018-001 07/07/05 DONE DONE DONE 05/18/05 05/13/05 10/08/04 01/19/05 02 - 16 176,613 0 HCM 0 0 0
Mach Architecture & Engineering,P.C.
New Bus Garage:
04-1277 Reconstruction 5-013-002 07/07/05 DONE DONE DONE 05/18/05 05/13/05 01/17/03 01/19/05 2,4,7,8,9,15,16 199,762 199,762 HCM 0 0 0
Mach Architecture & Engineering,P.C.
- Reconstruction 5-013-003 / / / / 07/31/09 / / 2,9,155,15,16 0 0 HCM 0 0 0
Alternative Energy Plant:
- PR New Construction 7-020-001 / / / / 08/07/09 / / 02 - 16 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Junior/Senior High School:
07-1248 Reconstruction 0-001-009 04/22/08 DONE DONE DONE 12/31/07 12/24/07 01/17/06 12/05/06 2,4,7,8,9,10,155,15, 6,987,000 6,987,000 DDJ 0 0 195,636
Habiterra Associates
03-0915FP Reconstruction 0-001-FP1 08/09/05 DONE DONE DONE 12/30/03 / / / / / / 16 11,000 11,000 JOD 0 0 0
06-1309SC Visual Structural Inspection 0-001-SC1 04/16/07 DONE DONE DONE 03/28/07 03/28/07 / / / / 16 3,550 0 JOD 0 0 0
Pine Valley Elementary:
07-1249 Reconstruction 0-005-009 04/22/08 DONE DONE DONE 12/31/07 12/24/07 01/17/06 12/05/06 2,4,7,8,9,10,155,15, 2,844,294 0 DDJ 0 0 79,640
Habiterra Associates
03-0914FP Reconstruction 0-005-FP1 08/09/05 DONE DONE DONE 12/30/03 / / / / / / 16 5,500 5,500 JOD 0 0 0
06-1310SC Visual Structural Inspection 0-005-SC1 04/16/07 DONE DONE DONE 03/28/07 03/28/07 / / / / 16 3,550 0 JOD 0 0 0
Bus Garage:
07-1250 Reconstruction 5-002-006 04/22/08 DONE DONE DONE 12/31/07 12/24/07 01/17/06 12/05/06 2,4,7,8,9,10,155,15, 685,000 0 DDJ 0 0 0
Habiterra Associates
Press Box:
07-1251 New Construction 7-007-001 04/22/08 DONE DONE DONE 12/31/07 12/24/07 10/16/07 12/05/06 02 - 16 27,000 0 DDJ 0 0 0
Habiterra Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Clymer Central School:
07-0428 Reconstruction 0-002-011 01/16/08 DONE DONE DONE 09/27/07 09/26/07 / / 02/28/07 2,4,7,8,9,10,14,155, 2,100,000 2,023,463 HCM 0 0 340,200
Harrington/Sandberg Arch.
Clymer Bus Garage:
07-0429 Reconstruction 5-005-005 01/16/08 DONE DONE DONE 09/27/07 09/26/07 02/23/06 02/28/07 2,4,7,8,9,10,155,15, 326,537 250,000 HCM 0 0 0
Harrington/Sandberg Arch.
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
School #3:
03-0817 Reconstruction 0-002-005 05/12/05 DONE DONE DONE 12/12/03 12/09/03 08/28/03 06/26/03 8,16 4,505 0 MAC 0 0 0
Cannon Design
- PR Additions and Alterations 0-002-007 / / / / 08/10/07 / / 02 - 16 0 0 HCM 0 0 0
School #4:
03-0818 Reconstruction 0-003-004 05/12/05 DONE DONE DONE 12/12/03 12/09/03 08/29/03 06/26/03 8,16 138,262 138,262 MAC 0 0 0
Cannon Design
05-1241 Additions and Alterations 0-003-005 07/14/06 DONE DONE DONE 05/08/06 05/03/06 04/29/04 06/29/06 02 - 16 67,427 67,427 MAC 0 0 0
Cannon Design
- Reconstruction 0-003-006 / / / / 03/31/06 / / 4,155 0 3,480,084 HCM 0 0 0
- PR Additions and Alterations 0-003-007 / / / / 08/13/07 / / 02 - 16 0 0 HCM 0 0 0
School #5:
03-0819 Reconstruction 0-004-005 05/12/05 DONE DONE DONE 12/12/03 12/09/03 08/29/03 06/26/03 8,16 146,187 146,187 MAC 0 0 0
Cannon Design
05-1242 Reconstruction 0-004-007 07/14/06 DONE DONE DONE 05/08/06 05/03/06 03/31/06 06/29/06 4,155 67,427 67,427 HCM 0 0 0
Cannon Design
- PR Additions and Alterations 0-004-008 / / / / 08/13/07 / / 02 - 16 0 0 HCM 0 0 0
School #6:
- PR Additions and Alterations 0-005-003 / / / / 08/13/07 / / 02 - 16 0 0 HCM 0 0 0
School #7:
03-0820 Reconstruction 0-006-006 05/12/05 DONE DONE DONE 12/12/03 12/09/03 09/02/03 06/26/03 8,155 16,112 16,112 MAC 0 0 0
Cannon Design
- PR Additions and Alterations 0-006-008 / / / / 08/13/07 / / 02 - 16 0 0 HCM 0 0 0
Middle School:
03-0821 Reconstruction 0-008-007 05/12/05 DONE DONE DONE 12/12/03 12/09/03 08/28/03 06/26/03 8,155,15,16 516,475 516,475 MAC 0 0 0
Cannon Design
- PR Additions and Alterations 0-008-008 / / / / 08/13/07 / / 02 - 16 0 0 HCM 0 0 0
08-0763 Reconstruction 0-008-009 04/13/09 DONE DONE DONE 11/17/08 11/14/08 09/27/07 03/11/08 155,16 1,848,398 1,347,400 HCM 0 0 36,968
Harrington/Sandberg Arch.
08-0058 Reconstruction 0-008-010 08/06/08 DONE DONE DONE 07/21/08 07/09/08 06/05/08 06/17/08 15 106,868 106,868 HCM 0 0 0
Harrington/Sandberg Arch.
Senior High School:
03-0822 Reconstruction 0-009-015 05/12/05 DONE DONE DONE 12/12/03 12/09/03 08/28/03 06/26/03 8,155,15,16 392,291 392,291 MAC 0 0 0
Cannon Design
- PR Additions and Alterations 0-009-016 / / / / 08/13/07 / / 02 - 16 0 0 HCM 0 0 0
08-0764 Reconstruction 0-009-017 04/13/09 DONE DONE DONE 11/17/08 11/14/08 09/27/07 03/11/08 155,16 5,671,602 6,120,500 HCM 0 0 113,432
Harrington/Sandberg Arch.
Modular Concession/Storage @ HS:
- Reconstruction 2-018-002 / / / / 08/13/07 / / 2,4,7,8,9,155,15,16 0 0 HCM 0 0 0
Maintenance/Storage Building:
- New Construction 2-019-001 / / / / 12/29/08 / / 02 - 16 0 0 HCM 0 0 0
Athletic Field Ticket Booth:
- DB Discovered Building 7-021-001 / / / / 10/27/09 / / 0 0 HCM 0 0 0
Rosings Store Adult Learning Center:
- Reconstruction 8-012-003 / / / / 08/10/07 / / 2,4,7,8,9,155,15,16 0 0 HCM 0 0 0
St. Hyacinth's Parochial School:
- TQ Temporary Quarters 8-020-001 / / / / 10/27/09 / / 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Bemus Point Elem.K-6:
06-0750SC Visual Structural Inspection 0-002-SC2 06/07/07 DONE DONE DONE 12/19/06 12/19/06 / / / / 16 0 0 JOD 0 0 0
Maple Grove High School:
07-0151 Reconstruction 0-005-007 12/19/07 DONE DONE DONE 08/09/07 08/08/07 08/03/06 02/06/07 8,13,16 1,307,300 1,307,300 HCM 0 0 270,468
Thomas Associates
06-0749SC Visual Structural Inspection 0-005-SC2 06/07/07 DONE DONE DONE 12/19/06 12/19/06 / / / / 16 3,774 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Jr/Sr High School:
04-0986 Reconstruction 0-001-006 04/15/05 DONE DONE DONE 03/16/05 03/15/05 06/28/04 12/14/04 2,7,9 275,196 275,196 JOD 0 0 0
Harrington/Sandberg Arch.
05-0650 Reconstruction 0-001-007 05/24/06 DONE DONE DONE 01/19/06 01/19/06 / / 12/14/04 2,4,8,9,10,155,16 478,659 478,659 JOD 0 0 0
Harrington/Sandberg Arch.
06-0923 Reconstruction 0-001-008 06/19/07 DONE DONE DONE 02/09/07 02/08/07 09/06/06 11/21/06 2,4,7,8,9,155,15,16 2,217,000 2,217,000 JOD 0 0 222,680
Harrington/Sandberg Arch.
HARVEY C FENNER ELEMENTARY SCHOOL:
04-0987 Reconstruction 0-002-004 04/15/05 DONE DONE DONE 03/16/05 03/15/05 06/28/04 12/14/04 7 635,895 635,895 JOD 0 0 0
Harrington/Sandberg Arch.
06-0924 Reconstruction 0-002-005 06/19/07 DONE DONE DONE 02/09/07 02/08/07 09/06/06 11/21/06 2,4,8,155,15,16 283,000 261,675 JOD 0 0 0
Harrington/Sandberg Arch.
Temple Elementary School:
04-0988 Reconstruction 0-007-005 04/15/05 DONE DONE DONE 03/16/05 03/15/05 06/28/04 12/14/04 7 523,957 523,957 JOD 0 0 0
Harrington/Sandberg Arch.
Track & Field Storage Building:
05-0113DB Discovered Building 2-010-001 NEED AUTH DONE DONE DONE 08/09/05 08/09/05 05/05/05 / / 02 - 16 0 0 JOD 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
K-12 Building(frmrly 6-12):
07-1349 Reconstruction 0-002-012 09/30/08 DONE DONE DONE 01/09/08 01/08/08 10/04/06 03/13/07 2,4,7,8,9,10,155,15, 9,799,314 9,799,314 DDJ 0 0 523,283
Habiterra Associates
06-1295 Reconstruction 0-002-013 04/27/07 DONE DONE DONE 04/09/07 04/09/07 03/26/07 03/13/07 7 800,000 800,000 DDJ 0 0 0
Habiterra Associates
09-0131 Reconstruction 0-002-014 ADDENDUM REQ'D 08/18/09 08/17/09 12/29/08 03/13/07 4,7,9,155,15,16 0 24,873,360 DDJ 0 0 0
Habiterra Associates
05-1023SC Visual Structural Inspection 0-002-SC1 03/29/06 DONE DONE DONE 03/16/06 03/16/06 / / / / 16 10,000 10,000 JOD 0 0 0
Bus Garage:
07-1350 Reconstruction 5-003-003 09/30/08 DONE DONE DONE 01/09/08 01/08/08 10/04/06 03/13/07 2,8,15,16 57,600 0 DDJ 0 0 0
Habiterra Associates
06-0885 Reconstruction 5-003-004 02/07/07 DONE DONE DONE 02/07/07 02/05/07 11/16/06 12/13/06 14 25,000 25,000 DDJ 0 0 0
Habiterra Associates
09-0132 Reconstruction 5-003-005 ADDENDUM REQ'D 08/18/09 08/17/09 05/07/09 03/13/07 8 0 0 DDJ 0 0 0
Habiterra Associates
New Press Box:
07-1351 New Construction 7-007-001 09/30/08 DONE DONE DONE 01/09/08 01/08/08 / / 03/13/07 02 - 16 51,900 0 DDJ 0 0 0
Habiterra Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Elementary Building:
05-0154PR Additions and Alterations 0-001-006 UNREVIEWED 08/25/05 08/23/05 08/19/04 / / 02 - 16 0 0 JOD 0 0 0
Trautman King Markwart Assoc.
07-1717 Additions and Alterations 0-001-006 10/15/08 DONE DONE DONE 02/28/08 02/26/08 08/19/04 04/24/07 02 - 16 564,864 564,864 JOD 0 0 0
Trautman King Markwart Assoc.
- Reconstruction 0-001-007 / / / / 10/22/09 / / 9 0 0 JOD 0 0 0
Forestville High School:
05-0155PR Additions and Alterations 0-002-006 UNREVIEWED 08/25/05 08/23/05 08/20/04 / / 02 - 16 0 0 JOD 0 0 0
Trautman King Markwart Assoc.
07-1718 Additions and Alterations 0-002-006 10/15/08 DONE DONE DONE 02/28/08 02/26/08 08/20/04 04/24/07 02 - 16 9,751,796 9,751,796 JOD 0 0 484,831
Trautman King Markwart Assoc.
New Bus Garage:
05-0156PR New Construction 5-004-002 UNREVIEWED 08/25/05 08/23/05 01/05/05 / / 02 - 16 0 0 JOD 0 0 0
Trautman King Markwart Assoc.
07-1719 New Construction 5-004-002 10/15/08 DONE DONE DONE 02/28/08 02/26/08 01/05/05 04/24/07 02 - 16 1,450,590 1,450,590 JOD 0 0 0
Trautman King Markwart Assoc.
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Panama Central School:
04-0799 Reconstruction 0-002-008 03/03/05 DONE DONE DONE 02/10/05 02/07/05 07/12/04 08/24/04 2,4,8,9,155,15,16 2,514,689 2,514,689 RDR 0 0 0
Habiterra Associates
- Reconstruction 0-002-009 / / / / 07/27/07 / / 2,4,7,8,9,10,14,155, 0 0 MGL 0 0 0
07-0907PR Additions and Alterations 0-002-010 STARTED 11/23/07 / / 08/20/07 / / 02 - 16 0 0 MGL 0 0 0
Habiterra Associates
08-0886 Additions and Alterations 0-002-010 04/30/09 DONE DONE DONE 12/09/08 12/08/08 08/20/07 06/24/08 02 - 16 6,680,000 6,680,000 MGL 0 0 221,758
Habiterra Associates
New Bus Garage:
04-0800 Additions and Alterations 5-010-002 03/03/05 DONE DONE DONE 02/10/05 02/07/05 07/12/04 08/24/04 02 - 16 210,311 210,311 RDR 0 0 0
Habiterra Associates
Concession Stand:
- Reconstruction 7-011-001 / / / / 08/20/07 / / 2,7,8,10,155,15,16 0 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
New Technical Academy (Admin):
08-0576 Reconstruction 0-004-002 DONE DONE ADD. REQ'D10/23/08 10/21/08 11/14/07 10/25/05 2,8,9,155,15,16 0 0 DDJ 0 0 0
Habiterra Associates
High School:
08-0513PR Reconstruction 0-005-010 UNREVIEWED 10/14/08 10/08/08 11/14/07 / / 2,4,8,9,155,15,16 0 38,447,448 DDJ 0 0 0
Habiterra Associates
08-0577 Reconstruction 0-005-010 DONE DONE ADD. REQ'D10/23/08 10/21/08 11/14/07 10/25/05 2,4,8,9,155,15,16 0 38,447,448 DDJ 0 0 0
Habiterra Associates
Lincoln School:
- Reconstruction 0-007-005 / / / / 03/27/09 / / 8,9,155,15,16 0 0 DDJ 0 0 0
Carlyle Ring Elementary:
05-0759 Reconstruction 0-009-006 03/03/06 DONE DONE DONE 02/15/06 02/02/06 11/21/05 10/25/05 2,7,13 920,000 920,000 DDJ 0 0 18,039
Habiterra Associates
- Reconstruction 0-009-007 / / / / 03/27/09 / / 8,9,155,15,16 0 0 DDJ 0 0 0
Clinton V Bush Elementary:
05-0760 Reconstruction 0-010-006 03/03/06 DONE DONE DONE 02/15/06 02/02/06 11/21/05 10/25/05 2,7,13 850,000 850,000 DDJ 0 0 16,667
Habiterra Associates
- Reconstruction 0-010-007 / / / / 03/27/09 / / 8,9,155,15,16 0 0 DDJ 0 0 0
Milton J. Fletcher School:
- PR Additions and Alterations 0-012-007 / / / / 03/27/09 / / 02 - 16 0 0 DDJ 0 0 0
Samuel G. Love School:
- Reconstruction 0-013-006 / / / / 03/27/09 / / 8,9,155,15,16 0 0 DDJ 0 0 0
Persell School:
08-0575 Reconstruction 0-014-005 STARTED DONE ADD. REQ'D10/23/08 10/21/08 11/14/07 10/25/05 2,4,7,8,9,155,15,16 0 0 DDJ 0 0 0
Habiterra Associates
Jefferson Middle School:
- PR Additions and Alterations 0-015-013 / / / / 12/01/05 / / 02 - 16 0 0 DDJ 0 0 0
05-1404 Additions and Alterations 0-015-013 11/29/06 DONE DONE DONE 06/21/06 06/20/06 12/01/05 10/25/05 02 - 16 12,700,000 12,233,466 DDJ 0 0 249,020
Habiterra Associates
05-0762 Reconstruction 0-015-014 07/12/06 DONE DONE DONE 02/15/06 02/02/06 12/09/05 10/25/05 2,10,16 1,845,000 1,845,000 DDJ 0 0 0
Habiterra Associates
06-0921 Reconstruction 0-015-015 06/06/07 DONE DONE DONE 02/09/07 02/08/07 10/02/06 10/25/05 2,4,7,8,155,15,16 7,500,000 7,500,000 DDJ 0 0 147,059
Habiterra Associates
Washington School:
06-0137 Reconstruction 0-017-010 09/25/06 DONE DONE DONE 08/03/06 07/31/06 06/01/06 10/25/05 155 65,000 65,000 DDJ 0 0 1,275
Habiterra Associates
07-0137 Additions and Alterations 0-017-011 01/03/08 DONE DONE DONE 08/07/07 08/06/07 03/06/07 10/25/05 02 - 16 12,700,000 12,083,922 DDJ 0 0 249,020
Habiterra Associates
06-1492 Reconstruction 0-017-012 10/11/07 DONE DONE DONE 05/15/07 05/14/07 03/06/07 10/25/05 10,155 1,150,000 1,150,000 DDJ 0 0 22,549
Habiterra Associates
Roger Elementary:
04-0441 Reconstruction 0-018-003 01/06/05 DONE DONE DONE 11/24/04 11/22/04 11/12/97 08/11/98 2,7,8,9,155,15,16 1,277,739 1,277,739 DDJ 0 0 0
Habiterra Associates
05-0761 Reconstruction 0-018-005 03/03/06 DONE DONE DONE 02/15/06 02/02/06 11/21/05 10/25/05 7 60,000 60,000 DDJ 0 0 1,176
Habiterra Associates
06-0138 Reconstruction 0-018-006 09/25/06 DONE DONE DONE 08/03/06 07/31/06 06/01/06 10/25/05 155 38,000 38,000 DDJ 0 0 745
Habiterra Associates
06-1493 Reconstruction 0-018-007 10/11/07 DONE DONE DONE 05/15/07 05/14/07 03/06/07 10/25/05 10,155 950,000 950,000 DDJ 0 0 18,627
Habiterra Associates
- Reconstruction 0-018-008 / / / / 03/27/09 / / 8,9,155,15,16 0 0 DDJ 0 0 0
Crescent Warehouse:
- Reconstruction 2-008-001 / / / / 11/14/07 / / 4,7,8,9,155,15,16 0 0 DDJ 0 0 0
Concession Stand @ Jefferson MS:
06-0922 Reconstruction 7-022-002 06/06/07 DONE DONE DONE / / / / / / / / 2,4,7,8,155,15,16 250,000 0 DDJ 0 0 0
Press Box:
05-0763 New Construction 7-026-001 07/12/06 DONE DONE DONE 02/15/06 02/02/06 02/09/06 10/25/05 02 - 16 40,000 0 DDJ 0 0 0
Habiterra Associates
Track & Field Timers Booth:
05-0764 New Construction 7-027-001 07/12/06 DONE DONE DONE 02/15/06 02/02/06 02/09/06 10/25/05 02 - 16 18,000 0 DDJ 0 0 0
Habiterra Associates
District Wide:
06-0785 Reconstruction 7-999-003 02/09/07 DONE DONE DONE 01/18/07 01/17/07 07/10/06 10/25/05 8,16 1,750,000 1,750,000 DDJ 0 0 34,314
Habiterra Associates
07-0586 Reconstruction 7-999-004 10/30/07 DONE DONE DONE 10/19/07 10/18/07 01/18/07 10/25/05 10,16 900,000 900,000 DDJ 0 0 22,549
Habiterra Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Wheelock School K-3:
05-0773 Reconstruction 0-001-008 06/28/06 DONE DONE DONE 02/15/06 02/13/06 10/07/05 06/24/99 16 43,267 43,267 HCM 0 0 0
Harrington/Sandberg Arch.
Main Street Campus 3-12:
05-0774 Reconstruction 0-009-010 06/28/06 DONE DONE DONE 02/15/06 02/13/06 10/07/05 06/24/99 2,16 122,549 122,549 HCM 0 0 0
Harrington/Sandberg Arch.
Press Box / Dugout - High School:
- DB Discovered Building 7-014-001 / / / / 06/20/07 / / 0 0 HCM 0 0 0
Dug-Out Storage:
- DB Discovered Building 7-015-001 / / / / 06/20/07 / / 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Brocton Central:
- Reconstruction 0-001-008 / / / / 11/06/06 / / 2,4,7,8,9,10,13,14,1 0 19,985,110 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
07-0924 Reconstruction 0-001-012 05/20/08 DONE DONE DONE 11/23/07 11/21/07 09/12/06 01/24/07 2,4,7,8,9,10,155,15, 1,590,175 0 DDJ 0 0 62,971
Habiterra Associates
Storage Area #2-Softball:
07-0925 Reconstruction 2-008-002 05/20/08 DONE DONE DONE 11/23/07 11/21/07 10/24/07 01/24/07 13 1,500 0 DDJ 0 0 0
Habiterra Associates
New Bus Garage:
07-0926 Reconstruction 5-009-002 05/20/08 DONE DONE DONE 11/23/07 11/21/07 11/21/06 01/24/07 2,4,7,8,9,10,155,15, 283,500 0 DDJ 0 0 0
Habiterra Associates
Dugout / Concession Building:
07-0927 Alterations 7-010-001 05/20/08 DONE DONE DONE 11/23/07 11/21/07 08/30/07 01/24/07 02 - 16 3,000 0 DDJ 0 0 0
Habiterra Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Main Building:
- Additions and Alterations 0-001-007 / / / / 07/27/07 / / 02 - 16 0 0 HCM 0 0 0
07-1652PR Additions and Alterations 0-001-007 UNREVIEWED 02/21/08 02/15/08 07/27/07 / / 02 - 16 0 0 HCM 0 0 0
Habiterra Associates
07-2116 Additions and Alterations 0-001-007 12/22/08 DONE DONE DONE 05/16/08 05/09/08 07/27/07 08/28/07 02 - 16 3,858,293 3,858,293 HCM 0 0 217,000
Habiterra Associates
Metal Storage Building:
- DB Discovered Building 2-005-001 / / / / / / / / 0 0 HCM 0 0 0
- DB Discovered Building 2-005-001 / / / / 12/29/08 / / 0 0 HCM 0 0 0
Athletic/Phys Ed Storage:
- DB Discovered Building 2-007-001 / / / / 12/29/08 / / 0 0 HCM 0 0 0
Bus Garage/ag shop:
07-1820 Reconstruction 5-002-001 12/22/08 DONE DONE DONE 03/17/08 03/10/08 07/27/07 08/28/07 4,7,8,9,155,15,16 2,022,000 0 HCM 0 0 0
Habiterra Associates
New Bus Garage:
08-1734 New Construction 5-004-001 12/22/08 DONE DONE DONE 06/24/09 06/24/09 12/02/08 08/05/08 02 - 16 1,963,707 1,963,707 HCM 0 0 0
Habiterra Associates
Press Box:
08-0591 New Construction 7-003-001 12/22/08 DONE DONE DONE 10/23/08 10/14/08 02/28/08 08/28/07 02 - 16 16,500 0 HCM 0 0 0
Habiterra Associates
Concession Stand:
- DB Discovered Building 7-006-001 / / / / 12/29/08 / / 0 0 HCM 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Westfield Academy:
07-1252 Reconstruction 0-001-009 06/20/08 DONE DONE DONE 12/31/07 12/24/07 12/11/06 03/06/07 8,9,10,155,15 4,768,223 4,768,223 MGL 0 0 538,810
Habiterra Associates
Wayside Building:
07-1253 Reconstruction 0-002-002 06/20/08 DONE DONE DONE 12/31/07 12/24/07 01/19/07 03/06/07 2,4,7,8,9,10,155,15, 13,000 0 MGL 0 0 0
Habiterra Associates
Bus Garage:
07-1254 Reconstruction 5-003-004 06/20/08 DONE DONE DONE 12/31/07 12/24/07 12/11/06 03/06/07 2,7,8,9,155,15,16 496,000 496,000 MGL 0 0 0
Habiterra Associates
New Press Box:
- PR New Construction 7-005-001 / / / / 01/19/07 / / 02 - 16 0 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED