Construction Project Status

Construction Project Status

THE STATE EDUCATION DEPARTMENT

FACILITIES PLANNING


UPDATED: 11/05/09 at 16:03:13




SOUTHWESTERN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-02-01-06
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          High School:
06-0322   Reconstruction               0-005-015  01/18/07     DONE    DONE       DONE      10/16/06   10/10/06   03/20/06   05/16/06   2,4,7,8,9,10,155,15,   3,314,666     3,314,666  JOD             0           0            0
                                                                                                                                                                                                                                 Gordon W. Jones Associates          
07-0555   Reconstruction               0-005-016  02/22/08     DONE    DONE       DONE      10/16/07   10/15/07   10/10/06   10/24/06   2,4,7,8,9,155,15,16    2,856,250     2,072,336  JOD             0           0            0
                                                                                                                                                                                                                                 Gordon W. Jones Associates          
07-0551   Reconstruction               0-005-017  02/25/08     DONE    DONE       DONE      10/16/07   10/15/07   03/26/07   03/27/07   2,8,9,155,15,16          770,524       770,524  JOD             0           0      134,072
                                                                                                                                                                                                                                 Gordon W. Jones Associates          
08-0262   Reconstruction               0-005-018  01/27/09     DONE    DONE       DONE      09/08/08   09/02/08   03/11/08   03/25/08   2,4,9,10,15,16         2,804,643     2,804,643  JOD             0           0       21,773
                                                                                                                                                                                                                                 Gordon W. Jones Associates          

          Middle School:
06-0323   Reconstruction               0-006-010  01/18/07     DONE    DONE       DONE      10/16/06   10/10/06   03/20/06   05/16/06   2,4,7,8,9,10,155,15,   2,221,657     2,221,657  JOD             0           0            0
                                                                                                                                                                                                                                 Gordon W. Jones Associates          
07-0552   Reconstruction               0-006-011  02/25/08     DONE    DONE       DONE      10/16/07   10/15/07   03/26/07   03/27/07   2,4,7,8,9,10,155,15,   2,038,037     2,038,037  JOD             0           0      354,619
                                                                                                                                                                                                                                 Gordon W. Jones Associates          
08-0263   Reconstruction               0-006-012  01/27/09     DONE    DONE       DONE      09/08/08   09/02/08   02/12/08   03/25/08   2,4,7,9,15,16          1,821,483     1,821,483  JOD             0           0            0
                                                                                                                                                                                                                                 Gordon W. Jones Associates          

          New Elementary School:
06-0324   Reconstruction               0-011-003  01/18/07     DONE    DONE       DONE      10/16/06   10/10/06   03/20/06   05/16/06   4,7,8,9,155,15,16        192,667       192,667  JOD             0           0            0
                                                                                                                                                                                                                                 Gordon W. Jones Associates          
07-0553   Reconstruction               0-011-004  02/25/08     DONE    DONE       DONE      10/16/07   10/15/07   03/26/07   03/27/07   4                         33,390             0  JOD             0           0        5,156
                                                                                                                                                                                                                                 Gordon W. Jones Associates          
08-0264   Reconstruction               0-011-005  01/27/09     DONE    DONE       DONE      09/08/08   09/02/08   02/12/08   03/25/08   10,16                    184,431             0  JOD             0           0            0
                                                                                                                                                                                                                                 Gordon W. Jones Associates          

          Bus Storage Garage:
06-0325   Reconstruction               4-002-002  01/18/07     DONE    DONE       DONE      10/16/06   10/10/06   03/20/06   05/16/06   2,7,8,9,155,15,16        581,431       581,431  JOD             0           0            0
                                                                                                                                                                                                                                 Gordon W. Jones Associates          
  -       Reconstruction               4-002-003                                              /  /       /  /     10/10/06     /  /     2                              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
07-0554   Reconstruction               4-002-004  02/25/08     DONE    DONE       DONE      10/16/07   10/15/07   03/26/07   03/27/07   2,4                      319,767       319,767  JOD             0           0            0
                                                                                                                                                                                                                                 Gordon W. Jones Associates          
  -       Reconstruction               4-002-005                                              /  /       /  /     03/11/08     /  /     2                              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Concession Stand:
06-0326   Reconstruction               7-007-002  01/18/07     DONE    DONE       DONE      10/16/06   10/10/06   03/20/06   05/16/06   15,16                     12,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Gordon W. Jones Associates          
07-0556   Reconstruction               7-007-003  02/22/08     DONE    DONE       DONE      10/16/07   10/15/07   09/27/07   10/27/06   2,10                      15,750             0  JOD             0           0            0
                                                                                                                                                                                                                                 Gordon W. Jones Associates          

          New Press Box:
  -       Reconstruction               7-010-002                                              /  /       /  /     03/20/06     /  /     2,13,15,16                     0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Utility Building:
08-0099   New Construction             7-014-001  07/28/08     DONE    DONE       DONE      07/25/08   07/10/08   06/13/08   10/24/06   02 - 16                   15,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Gordon W. Jones Associates          


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




FREWSBURG CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-03-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          High School:
05-0648   Reconstruction               0-001-010  06/06/06     DONE    DONE       DONE      01/23/06   01/23/06   12/21/04   04/27/05   2,4,7,8,9,10,155,15,     611,788       611,788  JOD             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           
07-0726   Reconstruction               0-001-011  04/23/08     DONE    DONE       DONE      11/06/07   11/02/07   08/22/06   12/13/06   2,4,7,8,9,10,155,15,   1,061,778     1,061,778  JOD             0           0       52,220
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           
06-1204   Reconstruction               0-001-012  04/20/07     DONE    DONE       DONE      03/22/07   03/21/07   01/24/07   12/13/06   7                      1,426,831     1,426,831  JOD             0           0       97,025
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          Robert H Jackson Elementary:
05-0649   Reconstruction               0-002-006  06/06/06     DONE    DONE       DONE      01/23/06   01/23/06   12/28/04   04/27/05   2,4,7,8,9,155,15,16      321,626       321,626  JOD             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           
07-0727   Reconstruction               0-002-007  04/23/08     DONE    DONE       DONE      11/06/07   11/02/07   08/22/06   12/13/06   2,7,8,9,155,15,16      1,015,099       997,356  JOD             0           0       57,639
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           
06-1205   Reconstruction               0-002-008  04/20/07     DONE    DONE       DONE      03/22/07   03/21/07   01/24/07   12/13/06   7                        769,788       769,788  JOD             0           0       52,346
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          STEEL POLE MAINT BLDG:
06-1608DB Discovered Building          2-012-001  07/17/08     DONE    DONE       DONE      06/13/07   06/07/07   02/03/00     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          Bus Garage:
  -       Reconstruction               5-003-006                                              /  /       /  /     08/22/06     /  /     2,4,7,8,155,15,16              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-1206   Reconstruction               5-003-007  04/20/07     DONE    DONE       DONE      03/22/07   03/21/07   01/24/07   12/13/06   7                        138,081       138,081  JOD             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          Concession Stand/elementary:
05-1071   New Construction             7-013-001  08/01/06     DONE    DONE       DONE      03/31/06   03/14/06   09/02/05   12/06/05   02 - 16                   27,000             0  JOD             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CASSADAGA VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-04-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Cassadaga Elementary School:
06-1326   Reconstruction               0-001-005  08/03/07     DONE    DONE       DONE      04/17/07   04/13/07   07/14/06   09/19/06   2,4,7,8,9,155,15,16      765,537       765,537  MGL             0           0       18,373
                                                                                                                                                                                                                                 Habiterra Associates                

          Jr/Sr High School:
06-1327   Additions and Alterations    0-005-006  08/03/07     DONE    DONE       DONE      04/17/07   04/13/07   07/13/06   09/19/06   02 - 16                6,563,190     6,220,434  MGL             0           0      507,600
                                                                                                                                                                                                                                 Habiterra Associates                
06-0898   Reconstruction               0-005-007  02/23/07     DONE    DONE       DONE      02/07/07   02/07/07   12/05/06   09/19/06   7                      1,392,393     1,392,393  MGL             0           0       33,418
                                                                                                                                                                                                                                 Habiterra Associates                

          Sinclairville Elementary:
06-1328   Reconstruction               0-008-005  08/03/07     DONE    DONE       DONE      04/17/07   04/13/07   07/14/06   09/19/06   2,4,7,9,155,15,16        815,970       815,970  MGL             0           0       19,584
                                                                                                                                                                                                                                 Habiterra Associates                

          Cassadaga Bus Garage:
06-1329   Reconstruction               4-006-002  08/03/07     DONE    DONE       DONE      04/17/07   04/13/07   07/14/06   09/19/06   2,7                       75,282        75,282  MGL             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          Bus Garage:
06-1330   Reconstruction               5-004-009  08/03/07     DONE    DONE       DONE      04/17/07   04/13/07   07/14/06   09/19/06   2,4,7,8                  187,628       187,628  MGL             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          New Pressbox/Storage Facility:
04-0092   New Construction             7-013-001  01/20/05     DONE    DONE       DONE      07/27/04   07/26/04   06/08/04   05/27/04   02 - 16                   40,000             0  RDR             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          Districtwide:
04-0848   Reconstruction               7-999-002  04/08/05     DONE    DONE       DONE      02/24/05   02/24/05   12/21/04   06/30/99   16                        59,821        59,821  RDR             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CHAUTAUQUA LAKE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-05-03-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          New PK-12:
04-1275   Additions and Alterations    0-012-004  07/14/05     DONE    DONE       DONE      05/18/05   05/13/05   01/17/03   01/19/05   02 - 16                4,925,471     4,629,860  HCM             0           0            0
                                                                                                                                                                                                                                 Mach Architecture & Engineering,P.C.
  -       Reconstruction               0-012-005                                              /  /       /  /     07/31/09     /  /     2,4,7,8,9,155,15,16            0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Storage Bldg. #3:
04-1276   New Construction             2-018-001  07/07/05     DONE    DONE       DONE      05/18/05   05/13/05   10/08/04   01/19/05   02 - 16                  176,613             0  HCM             0           0            0
                                                                                                                                                                                                                                 Mach Architecture & Engineering,P.C.

          New Bus Garage:
04-1277   Reconstruction               5-013-002  07/07/05     DONE    DONE       DONE      05/18/05   05/13/05   01/17/03   01/19/05   2,4,7,8,9,15,16          199,762       199,762  HCM             0           0            0
                                                                                                                                                                                                                                 Mach Architecture & Engineering,P.C.
  -       Reconstruction               5-013-003                                              /  /       /  /     07/31/09     /  /     2,9,155,15,16                  0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Alternative Energy Plant:
  -    PR New Construction             7-020-001                                              /  /       /  /     08/07/09     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PINE VALLEY CSD - SO DAYTON STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-06-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Junior/Senior High School:
07-1248   Reconstruction               0-001-009  04/22/08     DONE    DONE       DONE      12/31/07   12/24/07   01/17/06   12/05/06   2,4,7,8,9,10,155,15,   6,987,000     6,987,000  DDJ             0           0      195,636
                                                                                                                                                                                                                                 Habiterra Associates                
03-0915FP Reconstruction               0-001-FP1  08/09/05     DONE    DONE       DONE      12/30/03     /  /       /  /       /  /     16                        11,000        11,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-1309SC Visual Structural Inspection 0-001-SC1  04/16/07     DONE    DONE       DONE      03/28/07   03/28/07     /  /       /  /     16                         3,550             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Pine Valley Elementary:
07-1249   Reconstruction               0-005-009  04/22/08     DONE    DONE       DONE      12/31/07   12/24/07   01/17/06   12/05/06   2,4,7,8,9,10,155,15,   2,844,294             0  DDJ             0           0       79,640
                                                                                                                                                                                                                                 Habiterra Associates                
03-0914FP Reconstruction               0-005-FP1  08/09/05     DONE    DONE       DONE      12/30/03     /  /       /  /       /  /     16                         5,500         5,500  JOD             0           0            0
                                                                                                                                                                                                                                                                     
06-1310SC Visual Structural Inspection 0-005-SC1  04/16/07     DONE    DONE       DONE      03/28/07   03/28/07     /  /       /  /     16                         3,550             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
07-1250   Reconstruction               5-002-006  04/22/08     DONE    DONE       DONE      12/31/07   12/24/07   01/17/06   12/05/06   2,4,7,8,9,10,155,15,     685,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          Press Box:
07-1251   New Construction             7-007-001  04/22/08     DONE    DONE       DONE      12/31/07   12/24/07   10/16/07   12/05/06   02 - 16                   27,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




CLYMER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-07-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Clymer Central School:
07-0428   Reconstruction               0-002-011  01/16/08     DONE    DONE       DONE      09/27/07   09/26/07     /  /     02/28/07   2,4,7,8,9,10,14,155,   2,100,000     2,023,463  HCM             0           0      340,200
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          Clymer Bus Garage:
07-0429   Reconstruction               5-005-005  01/16/08     DONE    DONE       DONE      09/27/07   09/26/07   02/23/06   02/28/07   2,4,7,8,9,10,155,15,     326,537       250,000  HCM             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




DUNKIRK CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-08-00-01
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          School #3:
03-0817   Reconstruction               0-002-005  05/12/05     DONE    DONE       DONE      12/12/03   12/09/03   08/28/03   06/26/03   8,16                       4,505             0  MAC             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       
  -    PR Additions and Alterations    0-002-007                                              /  /       /  /     08/10/07     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          School #4:
03-0818   Reconstruction               0-003-004  05/12/05     DONE    DONE       DONE      12/12/03   12/09/03   08/29/03   06/26/03   8,16                     138,262       138,262  MAC             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       
05-1241   Additions and Alterations    0-003-005  07/14/06     DONE    DONE       DONE      05/08/06   05/03/06   04/29/04   06/29/06   02 - 16                   67,427        67,427  MAC             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       
  -       Reconstruction               0-003-006                                              /  /       /  /     03/31/06     /  /     4,155                          0     3,480,084  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -    PR Additions and Alterations    0-003-007                                              /  /       /  /     08/13/07     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          School #5:
03-0819   Reconstruction               0-004-005  05/12/05     DONE    DONE       DONE      12/12/03   12/09/03   08/29/03   06/26/03   8,16                     146,187       146,187  MAC             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       
05-1242   Reconstruction               0-004-007  07/14/06     DONE    DONE       DONE      05/08/06   05/03/06   03/31/06   06/29/06   4,155                     67,427        67,427  HCM             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       
  -    PR Additions and Alterations    0-004-008                                              /  /       /  /     08/13/07     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          School #6:
  -    PR Additions and Alterations    0-005-003                                              /  /       /  /     08/13/07     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          School #7:
03-0820   Reconstruction               0-006-006  05/12/05     DONE    DONE       DONE      12/12/03   12/09/03   09/02/03   06/26/03   8,155                     16,112        16,112  MAC             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       
  -    PR Additions and Alterations    0-006-008                                              /  /       /  /     08/13/07     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Middle School:
03-0821   Reconstruction               0-008-007  05/12/05     DONE    DONE       DONE      12/12/03   12/09/03   08/28/03   06/26/03   8,155,15,16              516,475       516,475  MAC             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       
  -    PR Additions and Alterations    0-008-008                                              /  /       /  /     08/13/07     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
08-0763   Reconstruction               0-008-009  04/13/09     DONE    DONE       DONE      11/17/08   11/14/08   09/27/07   03/11/08   155,16                 1,848,398     1,347,400  HCM             0           0       36,968
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           
08-0058   Reconstruction               0-008-010  08/06/08     DONE    DONE       DONE      07/21/08   07/09/08   06/05/08   06/17/08   15                       106,868       106,868  HCM             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          Senior High School:
03-0822   Reconstruction               0-009-015  05/12/05     DONE    DONE       DONE      12/12/03   12/09/03   08/28/03   06/26/03   8,155,15,16              392,291       392,291  MAC             0           0            0
                                                                                                                                                                                                                                 Cannon Design                       
  -    PR Additions and Alterations    0-009-016                                              /  /       /  /     08/13/07     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
08-0764   Reconstruction               0-009-017  04/13/09     DONE    DONE       DONE      11/17/08   11/14/08   09/27/07   03/11/08   155,16                 5,671,602     6,120,500  HCM             0           0      113,432
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          Modular Concession/Storage @ HS:
  -       Reconstruction               2-018-002                                              /  /       /  /     08/13/07     /  /     2,4,7,8,9,155,15,16            0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Maintenance/Storage Building:
  -       New Construction             2-019-001                                              /  /       /  /     12/29/08     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Athletic Field Ticket Booth:
  -    DB Discovered Building          7-021-001                                              /  /       /  /     10/27/09     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Rosings Store Adult Learning Center:
  -       Reconstruction               8-012-003                                              /  /       /  /     08/10/07     /  /     2,4,7,8,9,155,15,16            0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          St. Hyacinth's Parochial School:
  -    TQ Temporary Quarters           8-020-001                                              /  /       /  /     10/27/09     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BEMUS POINT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-10-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Bemus Point Elem.K-6:
06-0750SC Visual Structural Inspection 0-002-SC2  06/07/07     DONE    DONE       DONE      12/19/06   12/19/06     /  /       /  /     16                             0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Maple Grove High School:
07-0151   Reconstruction               0-005-007  12/19/07     DONE    DONE       DONE      08/09/07   08/08/07   08/03/06   02/06/07   8,13,16                1,307,300     1,307,300  HCM             0           0      270,468
                                                                                                                                                                                                                                 Thomas Associates                   
06-0749SC Visual Structural Inspection 0-005-SC2  06/07/07     DONE    DONE       DONE      12/19/06   12/19/06     /  /       /  /     16                         3,774             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




FALCONER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-11-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Jr/Sr High School:
04-0986   Reconstruction               0-001-006  04/15/05     DONE    DONE       DONE      03/16/05   03/15/05   06/28/04   12/14/04   2,7,9                    275,196       275,196  JOD             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           
05-0650   Reconstruction               0-001-007  05/24/06     DONE    DONE       DONE      01/19/06   01/19/06     /  /     12/14/04   2,4,8,9,10,155,16        478,659       478,659  JOD             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           
06-0923   Reconstruction               0-001-008  06/19/07     DONE    DONE       DONE      02/09/07   02/08/07   09/06/06   11/21/06   2,4,7,8,9,155,15,16    2,217,000     2,217,000  JOD             0           0      222,680
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          HARVEY C FENNER ELEMENTARY SCHOOL:
04-0987   Reconstruction               0-002-004  04/15/05     DONE    DONE       DONE      03/16/05   03/15/05   06/28/04   12/14/04   7                        635,895       635,895  JOD             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           
06-0924   Reconstruction               0-002-005  06/19/07     DONE    DONE       DONE      02/09/07   02/08/07   09/06/06   11/21/06   2,4,8,155,15,16          283,000       261,675  JOD             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          Temple Elementary School:
04-0988   Reconstruction               0-007-005  04/15/05     DONE    DONE       DONE      03/16/05   03/15/05   06/28/04   12/14/04   7                        523,957       523,957  JOD             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          Track & Field Storage Building:
05-0113DB Discovered Building          2-010-001  NEED AUTH    DONE    DONE       DONE      08/09/05   08/09/05   05/05/05     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SILVER CREEK CENTRAL SCHOOL DISTRCT STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-15-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          K-12 Building(frmrly 6-12):
07-1349   Reconstruction               0-002-012  09/30/08     DONE    DONE       DONE      01/09/08   01/08/08   10/04/06   03/13/07   2,4,7,8,9,10,155,15,   9,799,314             0  DDJ             0           0      523,283
                                                                                                                                                                                                                                 Habiterra Associates                
06-1295   Reconstruction               0-002-013  04/27/07     DONE    DONE       DONE      04/09/07   04/09/07   03/26/07   03/13/07   7                        800,000       800,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                
09-0131   Reconstruction               0-002-014                       ADDENDUM REQ'D       08/18/09   08/17/09   12/29/08   03/13/07   4,7,9,155,15,16                0    24,873,360  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                
05-1023SC Visual Structural Inspection 0-002-SC1  03/29/06     DONE    DONE       DONE      03/16/06   03/16/06     /  /       /  /     16                        10,000        10,000  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage:
07-1350   Reconstruction               5-003-003  09/30/08     DONE    DONE       DONE      01/09/08   01/08/08   10/04/06   03/13/07   2,8,15,16                 57,600             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                
06-0885   Reconstruction               5-003-004  02/07/07     DONE    DONE       DONE      02/07/07   02/05/07   11/16/06   12/13/06   14                        25,000        25,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                
09-0132   Reconstruction               5-003-005                       ADDENDUM REQ'D       08/18/09   08/17/09   05/07/09   03/13/07   8                              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          New Press Box:
07-1351   New Construction             7-007-001  09/30/08     DONE    DONE       DONE      01/09/08   01/08/08     /  /     03/13/07   02 - 16                   51,900             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




FORESTVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-15-03-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Elementary Building:
05-0154PR Additions and Alterations    0-001-006                         UNREVIEWED         08/25/05   08/23/05   08/19/04     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Trautman King Markwart Assoc.       
07-1717   Additions and Alterations    0-001-006  10/15/08     DONE    DONE       DONE      02/28/08   02/26/08   08/19/04   04/24/07   02 - 16                  564,864       564,864  JOD             0           0            0
                                                                                                                                                                                                                                 Trautman King Markwart Assoc.       
  -       Reconstruction               0-001-007                                              /  /       /  /     10/22/09     /  /     9                              0             0  JOD             0           0            0
                                                                                                                                                                                                                                                                     

          Forestville High School:
05-0155PR Additions and Alterations    0-002-006                         UNREVIEWED         08/25/05   08/23/05   08/20/04     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Trautman King Markwart Assoc.       
07-1718   Additions and Alterations    0-002-006  10/15/08     DONE    DONE       DONE      02/28/08   02/26/08   08/20/04   04/24/07   02 - 16                9,751,796     9,751,796  JOD             0           0      484,831
                                                                                                                                                                                                                                 Trautman King Markwart Assoc.       

          New Bus Garage:
05-0156PR New Construction             5-004-002                         UNREVIEWED         08/25/05   08/23/05   01/05/05     /  /     02 - 16                        0             0  JOD             0           0            0
                                                                                                                                                                                                                                 Trautman King Markwart Assoc.       
07-1719   New Construction             5-004-002  10/15/08     DONE    DONE       DONE      02/28/08   02/26/08   01/05/05   04/24/07   02 - 16                1,450,590     1,450,590  JOD             0           0            0
                                                                                                                                                                                                                                 Trautman King Markwart Assoc.       


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




PANAMA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-16-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Panama Central School:
04-0799   Reconstruction               0-002-008  03/03/05     DONE    DONE       DONE      02/10/05   02/07/05   07/12/04   08/24/04   2,4,8,9,155,15,16      2,514,689     2,514,689  RDR             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                
  -       Reconstruction               0-002-009                                              /  /       /  /     07/27/07     /  /     2,4,7,8,9,10,14,155,           0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     
07-0907PR Additions and Alterations    0-002-010               STARTED                      11/23/07     /  /     08/20/07     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                
08-0886   Additions and Alterations    0-002-010  04/30/09     DONE    DONE       DONE      12/09/08   12/08/08   08/20/07   06/24/08   02 - 16                6,680,000     6,680,000  MGL             0           0      221,758
                                                                                                                                                                                                                                 Habiterra Associates                

          New Bus Garage:
04-0800   Additions and Alterations    5-010-002  03/03/05     DONE    DONE       DONE      02/10/05   02/07/05   07/12/04   08/24/04   02 - 16                  210,311       210,311  RDR             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          Concession Stand:
  -       Reconstruction               7-011-001                                              /  /       /  /     08/20/07     /  /     2,7,8,10,155,15,16             0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




JAMESTOWN CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-17-00-01
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          New Technical Academy (Admin):
08-0576   Reconstruction               0-004-002               DONE    DONE       ADD. REQ'D10/23/08   10/21/08   11/14/07   10/25/05   2,8,9,155,15,16                0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          High School:
08-0513PR Reconstruction               0-005-010                         UNREVIEWED         10/14/08   10/08/08   11/14/07     /  /     2,4,8,9,155,15,16              0    38,447,448  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                
08-0577   Reconstruction               0-005-010               DONE    DONE       ADD. REQ'D10/23/08   10/21/08   11/14/07   10/25/05   2,4,8,9,155,15,16              0    38,447,448  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          Lincoln School:
  -       Reconstruction               0-007-005                                              /  /       /  /     03/27/09     /  /     8,9,155,15,16                  0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Carlyle Ring Elementary:
05-0759   Reconstruction               0-009-006  03/03/06     DONE    DONE       DONE      02/15/06   02/02/06   11/21/05   10/25/05   2,7,13                   920,000       920,000  DDJ             0           0       18,039
                                                                                                                                                                                                                                 Habiterra Associates                
  -       Reconstruction               0-009-007                                              /  /       /  /     03/27/09     /  /     8,9,155,15,16                  0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Clinton V Bush Elementary:
05-0760   Reconstruction               0-010-006  03/03/06     DONE    DONE       DONE      02/15/06   02/02/06   11/21/05   10/25/05   2,7,13                   850,000       850,000  DDJ             0           0       16,667
                                                                                                                                                                                                                                 Habiterra Associates                
  -       Reconstruction               0-010-007                                              /  /       /  /     03/27/09     /  /     8,9,155,15,16                  0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Milton J. Fletcher School:
  -    PR Additions and Alterations    0-012-007                                              /  /       /  /     03/27/09     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Samuel G. Love School:
  -       Reconstruction               0-013-006                                              /  /       /  /     03/27/09     /  /     8,9,155,15,16                  0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Persell School:
08-0575   Reconstruction               0-014-005               STARTED DONE       ADD. REQ'D10/23/08   10/21/08   11/14/07   10/25/05   2,4,7,8,9,155,15,16            0             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          Jefferson Middle School:
  -    PR Additions and Alterations    0-015-013                                              /  /       /  /     12/01/05     /  /     02 - 16                        0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     
05-1404   Additions and Alterations    0-015-013  11/29/06     DONE    DONE       DONE      06/21/06   06/20/06   12/01/05   10/25/05   02 - 16               12,700,000    12,233,466  DDJ             0           0      249,020
                                                                                                                                                                                                                                 Habiterra Associates                
05-0762   Reconstruction               0-015-014  07/12/06     DONE    DONE       DONE      02/15/06   02/02/06   12/09/05   10/25/05   2,10,16                1,845,000     1,845,000  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                
06-0921   Reconstruction               0-015-015  06/06/07     DONE    DONE       DONE      02/09/07   02/08/07   10/02/06   10/25/05   2,4,7,8,155,15,16      7,500,000     7,500,000  DDJ             0           0      147,059
                                                                                                                                                                                                                                 Habiterra Associates                

          Washington School:
06-0137   Reconstruction               0-017-010  09/25/06     DONE    DONE       DONE      08/03/06   07/31/06   06/01/06   10/25/05   155                       65,000        65,000  DDJ             0           0        1,275
                                                                                                                                                                                                                                 Habiterra Associates                
07-0137   Additions and Alterations    0-017-011  01/03/08     DONE    DONE       DONE      08/07/07   08/06/07   03/06/07   10/25/05   02 - 16               12,700,000    12,083,922  DDJ             0           0      249,020
                                                                                                                                                                                                                                 Habiterra Associates                
06-1492   Reconstruction               0-017-012  10/11/07     DONE    DONE       DONE      05/15/07   05/14/07   03/06/07   10/25/05   10,155                 1,150,000     1,150,000  DDJ             0           0       22,549
                                                                                                                                                                                                                                 Habiterra Associates                

          Roger Elementary:
04-0441   Reconstruction               0-018-003  01/06/05     DONE    DONE       DONE      11/24/04   11/22/04   11/12/97   08/11/98   2,7,8,9,155,15,16      1,277,739     1,277,739  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                
05-0761   Reconstruction               0-018-005  03/03/06     DONE    DONE       DONE      02/15/06   02/02/06   11/21/05   10/25/05   7                         60,000        60,000  DDJ             0           0        1,176
                                                                                                                                                                                                                                 Habiterra Associates                
06-0138   Reconstruction               0-018-006  09/25/06     DONE    DONE       DONE      08/03/06   07/31/06   06/01/06   10/25/05   155                       38,000        38,000  DDJ             0           0          745
                                                                                                                                                                                                                                 Habiterra Associates                
06-1493   Reconstruction               0-018-007  10/11/07     DONE    DONE       DONE      05/15/07   05/14/07   03/06/07   10/25/05   10,155                   950,000       950,000  DDJ             0           0       18,627
                                                                                                                                                                                                                                 Habiterra Associates                
  -       Reconstruction               0-018-008                                              /  /       /  /     03/27/09     /  /     8,9,155,15,16                  0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Crescent Warehouse:
  -       Reconstruction               2-008-001                                              /  /       /  /     11/14/07     /  /     4,7,8,9,155,15,16              0             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Concession Stand @ Jefferson MS:
06-0922   Reconstruction               7-022-002  06/06/07     DONE    DONE       DONE        /  /       /  /       /  /       /  /     2,4,7,8,155,15,16        250,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                                                     

          Press Box:
05-0763   New Construction             7-026-001  07/12/06     DONE    DONE       DONE      02/15/06   02/02/06   02/09/06   10/25/05   02 - 16                   40,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          Track & Field Timers Booth:
05-0764   New Construction             7-027-001  07/12/06     DONE    DONE       DONE      02/15/06   02/02/06   02/09/06   10/25/05   02 - 16                   18,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          District Wide:
06-0785   Reconstruction               7-999-003  02/09/07     DONE    DONE       DONE      01/18/07   01/17/07   07/10/06   10/25/05   8,16                   1,750,000     1,750,000  DDJ             0           0       34,314
                                                                                                                                                                                                                                 Habiterra Associates                
07-0586   Reconstruction               7-999-004  10/30/07     DONE    DONE       DONE      10/19/07   10/18/07   01/18/07   10/25/05   10,16                    900,000       900,000  DDJ             0           0       22,549
                                                                                                                                                                                                                                 Habiterra Associates                


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




FREDONIA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-22-01-06
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Wheelock School K-3:
05-0773   Reconstruction               0-001-008  06/28/06     DONE    DONE       DONE      02/15/06   02/13/06   10/07/05   06/24/99   16                        43,267        43,267  HCM             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          Main Street Campus 3-12:
05-0774   Reconstruction               0-009-010  06/28/06     DONE    DONE       DONE      02/15/06   02/13/06   10/07/05   06/24/99   2,16                     122,549       122,549  HCM             0           0            0
                                                                                                                                                                                                                                 Harrington/Sandberg Arch.           

          Press Box / Dugout - High School:
  -    DB Discovered Building          7-014-001                                              /  /       /  /     06/20/07     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Dug-Out Storage:
  -    DB Discovered Building          7-015-001                                              /  /       /  /     06/20/07     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




BROCTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-23-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Brocton Central:
  -       Reconstruction               0-001-008                                              /  /       /  /     11/06/06     /  /     2,4,7,8,9,10,13,14,1           0    19,985,110  MGL             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




RIPLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-24-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
07-0924   Reconstruction               0-001-012  05/20/08     DONE    DONE       DONE      11/23/07   11/21/07   09/12/06   01/24/07   2,4,7,8,9,10,155,15,   1,590,175             0  DDJ             0           0       62,971
                                                                                                                                                                                                                                 Habiterra Associates                

          Storage Area #2-Softball:
07-0925   Reconstruction               2-008-002  05/20/08     DONE    DONE       DONE      11/23/07   11/21/07   10/24/07   01/24/07   13                         1,500             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          New Bus Garage:
07-0926   Reconstruction               5-009-002  05/20/08     DONE    DONE       DONE      11/23/07   11/21/07   11/21/06   01/24/07   2,4,7,8,9,10,155,15,     283,500             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          Dugout / Concession Building:
07-0927   Alterations                  7-010-001  05/20/08     DONE    DONE       DONE      11/23/07   11/21/07   08/30/07   01/24/07   02 - 16                    3,000             0  DDJ             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




SHERMAN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-26-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Main Building:
  -       Additions and Alterations    0-001-007                                              /  /       /  /     07/27/07     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
07-1652PR Additions and Alterations    0-001-007                         UNREVIEWED         02/21/08   02/15/08   07/27/07     /  /     02 - 16                        0             0  HCM             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                
07-2116   Additions and Alterations    0-001-007  12/22/08     DONE    DONE       DONE      05/16/08   05/09/08   07/27/07   08/28/07   02 - 16                3,858,293     3,858,293  HCM             0           0      217,000
                                                                                                                                                                                                                                 Habiterra Associates                

          Metal Storage Building:
  -    DB Discovered Building          2-005-001                                              /  /       /  /       /  /       /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     
  -    DB Discovered Building          2-005-001                                              /  /       /  /     12/29/08     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Athletic/Phys Ed Storage:
  -    DB Discovered Building          2-007-001                                              /  /       /  /     12/29/08     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     

          Bus Garage/ag shop:
07-1820   Reconstruction               5-002-001  12/22/08     DONE    DONE       DONE      03/17/08   03/10/08   07/27/07   08/28/07   4,7,8,9,155,15,16      2,022,000             0  HCM             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          New Bus Garage:
08-1734   New Construction             5-004-001  12/22/08     DONE    DONE       DONE      06/24/09   06/24/09   12/02/08   08/05/08   02 - 16                1,963,707     1,963,707  HCM             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          Press Box:
08-0591   New Construction             7-003-001  12/22/08     DONE    DONE       DONE      10/23/08   10/14/08   02/28/08   08/28/07   02 - 16                   16,500             0  HCM             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          Concession Stand:
  -    DB Discovered Building          7-006-001                                              /  /       /  /     12/29/08     /  /                                    0             0  HCM             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED




WESTFIELD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 06-29-01-04
last updated on 11/05/09
REVIEW    BUILDING NAME/               BLDG./       SED        FINAL PROJECT REVIEW         PLAN/SPEC  PLAN/SPEC  LETTER OF   VOTER                           PROJECT      ESTIMATED    PRJ.     RESCUE 1    RESCUE 2  EXCEL     ARCHITECT/ENGINEER
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Prj. Mgr.  Const.     Mech.     COMPLETE   RECEIVED   INTENT      AUTHOR.   CSI CODES             COST         COST ALLOW.  MGR.     AID         AID       AID       FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________

          Westfield Academy:
07-1252   Reconstruction               0-001-009  06/20/08     DONE    DONE       DONE      12/31/07   12/24/07   12/11/06   03/06/07   8,9,10,155,15          4,768,223     4,768,223  MGL             0           0      538,810
                                                                                                                                                                                                                                 Habiterra Associates                

          Wayside Building:
07-1253   Reconstruction               0-002-002  06/20/08     DONE    DONE       DONE      12/31/07   12/24/07   01/19/07   03/06/07   2,4,7,8,9,10,155,15,      13,000             0  MGL             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          Bus Garage:
07-1254   Reconstruction               5-003-004  06/20/08     DONE    DONE       DONE      12/31/07   12/24/07   12/11/06   03/06/07   2,7,8,9,155,15,16        496,000       496,000  MGL             0           0            0
                                                                                                                                                                                                                                 Habiterra Associates                

          New Press Box:
  -    PR New Construction             7-005-001                                              /  /       /  /     01/19/07     /  /     02 - 16                        0             0  MGL             0           0            0
                                                                                                                                                                                                                                                                     


CSI Codes: 02-Site  02-Asbestos  04-Masonry  07-Roof  08-Doors/Windows  09-Finishes  10-Specialties  13-Special Const  14-Elevator
           155-HVAC  15-Plumbing  16-Electric  02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED            UNREVIEWED = FINAL REVIEW NOT STARTED