REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
New Scotland Elem (was School 19):
06-0195 Additions and Alterations 0-019-006 01/08/07 DONE DONE DONE 08/30/06 08/28/06 07/14/00 12/11/03 02 - 16 15,033,000 9,912,907 MGL 0 0 0
Collins & Scoville Architects
Public School #23, S of Humanities:
08-0239 Reconstruction 0-023-009 ADDENDUM REQ'D 09/03/08 08/26/08 01/04/08 08/05/08 10,155,16 0 0 HCM 0 0 0
PB Power
- Reconstruction 0-023-010 / / / / 01/04/08 / / 10,155,16 0 0 HCM 0 0 0
Thomas O'Brien #24:
04-0571 Reconstruction 0-024-004 02/09/05 DONE DONE DONE 12/22/04 12/21/04 07/14/00 12/11/03 2,4,7,8,9,10,14,155, 1,585,000 1,585,000 MGL 0 0 0
Collins & Scoville Architects
05-1235 Reconstruction 0-024-005 06/09/06 DONE DONE DONE 05/08/06 05/02/06 09/16/04 12/11/03 2,7,155,15,16 385,000 385,000 HCM 0 0 0
Collins & Scoville Architects
07-0148 Reconstruction 0-024-006 02/04/08 DONE DONE DONE 08/09/07 08/06/07 04/05/07 12/11/01 2,4,7,8,9,10,14,155, 7,165,000 0 HCM 0 0 3,305,099
Collins & Scoville Architects
07-0141 Reconstruction 0-024-007 10/18/07 DONE DONE DONE 08/07/07 08/06/07 07/05/07 02/06/07 2,8 835,000 835,000 HCM 0 0 220,440
Collins & Scoville Architects
Philip Livingston Middle School:
06-0053SC Visual Structural Inspection 0-043-SC1 08/09/06 DONE DONE DONE 06/30/06 06/30/06 / / / / 16 17,198 4,000 JOD 0 0 0
Hackett Middle School:
04-0452 Alterations 0-044-010 02/09/05 DONE DONE DONE 11/24/04 11/18/04 07/17/00 06/03/03 02 - 16 3,800,000 3,800,000 MGL 0 0 0
Envision Architects
05-0048 Additions and Alterations 0-044-011 01/27/06 DONE DONE DONE 07/15/05 07/14/05 07/11/05 12/11/01 02 - 16 29,700,000 17,727,417 HCM 0 0 0
Envision Architects
Giffen Memorial Elementary:
05-1228 Additions and Alterations 0-046-005 05/25/06 DONE DONE DONE 05/08/06 05/01/06 07/17/00 12/11/03 02 - 16 1,845,752 1,845,752 MGL 0 0 0
Collins & Scoville Architects
07-0149 Reconstruction 0-046-006 02/04/08 DONE DONE DONE 08/09/07 08/06/07 04/05/07 12/11/01 2,4,7,8,9,10,14,155, 10,960,000 0 HCM 0 0 4,000,000
Collins & Scoville Architects
07-0142 Reconstruction 0-046-007 10/18/07 DONE DONE DONE 08/07/07 08/06/07 07/05/07 02/06/07 2,8 1,040,000 0 HCM 0 0 274,560
Collins & Scoville Architects
Arbor Hill Elementary:
07-2123 Reconstruction 0-047-006 10/29/08 DONE DONE DONE 05/19/08 05/12/08 07/17/00 06/03/03 2,8,9,10,155,15,16 12,000,000 11,308,580 MGL 0 0 3,150,000
Collins & Scoville Architects
Albany High School:
06-0294 Reconstruction 0-048-011 02/26/07 DONE DONE DONE 10/04/06 09/25/06 06/08/05 06/06/06 155 2,036,136 2,036,136 HCM 0 0 0
PB Power INC.
08-1259 Reconstruction 0-048-012 02/24/09 DONE DONE DONE 02/23/09 02/18/09 02/02/09 02/03/09 8 185,000 0 HCM 0 0 0
Collins & Scoville Architects
School 18 Replacement:
04-0296 New Construction 0-059-001 02/03/05 DONE DONE DONE 10/20/04 10/15/04 07/14/00 12/11/01 02 - 16 10,837,752 6,090,555 MGL 0 0 0
Envision Architects
School 16 Replacement:
04-0326 New Construction 0-060-001 03/01/05 DONE DONE DONE 10/25/04 10/22/04 07/14/00 12/11/01 02 - 16 12,700,000 7,401,065 MGL 0 0 0
Cannon Design
Administration Bldg.:
05-0345 Reconstruction 1-001-002 11/04/05 DONE DONE DONE 11/15/05 11/03/05 08/26/05 06/07/05 155 268,469 0 HCM 0 0 0
New York Power Authority
Shed #1 @ Hackett MS:
07-1501DB Discovered Building 2-066-001 11/09/09 DONE DONE DONE 02/01/08 01/23/08 02/01/08 / / 0 0 HCM 0 0 0
Hamlin Design Group
Shed #1 @ Philip Schuyler Ach. Acad.:
07-1502DB Discovered Building 2-067-001 11/09/09 DONE DONE DONE 02/01/08 01/23/08 02/01/08 / / 0 0 HCM 0 0 0
Hamlin Design Group
Shed #1 @ Pine Hills:
07-1503DB Discovered Building 2-068-001 ADDENDUM REQ'D 02/01/08 01/23/08 02/01/08 / / 0 0 HCM 0 0 0
Hamlin Design Group
Shed #1 @ Sheridan:
07-1504DB Discovered Building 2-069-001 11/09/09 DONE DONE DONE 02/01/08 01/23/08 02/01/08 / / 0 0 HCM 0 0 0
Hamlin Design Group
Shed #1 @ Montessori Magnet School:
07-1505DB Discovered Building 2-070-001 11/09/09 DONE DONE DONE 02/01/08 01/23/08 02/01/08 / / 0 0 HCM 0 0 0
Hamlin Design Group
Shed #1 @ Harriet Gibbons:
07-1506DB Discovered Building 2-071-001 ADDENDUM REQ'D 02/01/08 01/23/08 02/01/08 / / 0 0 HCM 0 0 0
Hamlin Design Group
Shed #2 @ Harriet Gibbons:
07-1507DB Discovered Building 2-072-001 ADDENDUM REQ'D 02/01/08 01/23/08 02/01/08 / / 0 0 HCM 0 0 0
Hamlin Design Group
Shed #1 @ Myers MS:
07-1508DB Discovered Building 2-073-001 ADDENDUM REQ'D 02/01/08 01/23/08 02/01/08 / / 0 0 HCM 0 0 0
Hamlin Design Group
Shed #2 @ Myers:
07-1509DB Discovered Building 2-074-001 ADDENDUM REQ'D 02/01/08 01/23/08 02/01/08 / / 0 0 HCM 0 0 0
Hamlin Design Group
Shed #1 School 19:
07-1510XX Alterations 2-075-001 10/16/08 CANCELLED 02/01/08 01/23/08 02/01/08 / / 0 0 HCM 0 0 0
Hamlin Design Group
YMCA:
04-0722 Reconstruction 8-063-L01 02/11/05 DONE DONE DONE 02/11/05 / / 12/27/01 12/11/01 2,000,000 795,723 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Berne Elementary:
08-1479 Reconstruction 0-001-014 DONE ADD. REQ'D DONE 04/10/09 02/25/09 11/30/06 12/18/07 2,4,7,8,9,10,155,15, 0 8,457,000 DDJ 0 0 0
Griffith Dardanelli,Architects,PC
07-1792 Reconstruction 0-001-015 03/19/08 DONE DONE DONE 03/15/08 03/12/08 01/17/08 12/10/07 9,15 170,000 170,000 DDJ 0 0 170,000
Griffith Dardanelli,Architects,PC
08-1098 Reconstruction 0-001-016 05/01/09 DONE DONE DONE 01/21/09 01/12/09 11/14/08 12/18/07 9,16 146,000 146,000 DDJ 0 0 0
Griffith Dardanelli,Architects,PC
Jr/Sr High School:
04-0480 Reconstruction 0-004-013 03/18/05 DONE DONE DONE 12/06/04 12/03/04 12/09/03 12/10/02 13,15 463,841 463,841 RDR 0 0 0
Cataldo, Waters and Griffith Arch.
05-1302 Reconstruction 0-004-014 09/01/06 DONE DONE DONE 05/31/06 05/31/06 03/24/06 05/16/06 10,16 100,000 100,000 MGL 0 0 0
CWG Architects.P.C.
08-0599PR Additions and Alterations 0-004-015 UNREVIEWED 10/27/08 10/24/08 11/30/06 / / 02 - 16 0 16,116,651 DDJ 0 0 0
Griffith Dardanelli,Architects,PC
08-1307 Additions and Alterations 0-004-015 DONE ADD. REQ'D DONE 03/02/09 02/25/09 11/30/06 12/18/07 02 - 16 0 16,116,651 DDJ 0 0 0
Griffith Dardanelli,Architects,PC
Bus Garage:
08-1222 Reconstruction 5-003-008 05/27/09 DONE DONE DONE 02/19/09 02/10/09 11/30/06 12/18/07 2,8,9,155,15,16 100,390 100,390 MGL 0 0 0
Griffith Dardanelli,Architects,PC
WATER TREATMENT BLDG.:
06-0141DB Discovered Building 7-010-001 08/30/06 DONE DONE DONE 08/04/06 07/31/06 07/10/06 / / 0 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Glenmont Elementary:
05-0906 Reconstruction 0-002-012 09/22/06 DONE DONE DONE 03/08/06 03/08/06 04/22/03 12/02/03 2,9,155,15,16 1,729,315 1,198,016 RDR 0 0 0
Collins & Scoville Architects
Hamagrael Elementary (Playground):
05-0907 Reconstruction 0-003-014 09/22/06 DONE DONE DONE 03/08/06 03/08/06 04/22/03 12/02/03 2,7,9,155,15,16 2,632,684 2,413,653 RDR 0 0 0
Collins & Scoville Architects
- Reconstruction 0-003-015 / / / / 11/21/07 / / 2,7 0 0 MGL 0 0 0
Clarksville Elementary:
05-0905 Additions and Alterations 0-004-014 07/21/06 DONE DONE DONE 03/08/06 03/08/06 04/21/03 12/02/03 02 - 16 4,065,682 3,576,965 RDR 0 0 0
Collins & Scoville Architects
- Reconstruction 0-004-015 / / / / 11/21/07 / / 2,7,9 0 0 MGL 0 0 0
Middle School:
04-0608 Additions and Alterations 0-005-016 04/22/05 DONE DONE DONE 12/29/04 12/17/04 04/21/03 12/02/03 02 - 16 23,066,086 22,511,960 RDR 0 0 0
Collins & Scoville Architects
- Reconstruction 0-005-017 / / / / 11/21/07 / / 2,8 0 0 MGL 0 0 0
- Reconstruction 0-005-018 / / / / 11/21/07 / / 2,4,9,155,15,16 0 0 MGL 0 0 0
Senior High School:
03-1368PR Additions and Alterations 0-006-024 11/22/04 DONE DONE DONE 04/07/04 04/06/04 04/21/03 / / 02 - 16 0 0 MGL 0 0 0
04-0168 Additions and Alterations 0-006-024 11/22/04 DONE DONE DONE 08/30/04 04/06/04 04/21/03 12/02/03 02 - 16 39,830,187 37,806,561 RDR 0 0 0
Collins & Scoville Architects
05-1017 Reconstruction 0-006-025 04/10/07 DONE DONE DONE 03/24/06 03/16/06 02/17/06 12/02/03 2,8 1,460,680 1,654,100 MGL 0 0 0
Collins & Scoville Architects
- Reconstruction 0-006-026 / / / / 11/21/07 / / 2,7,9 0 0 MGL 0 0 0
Elsmere Elementary:
06-0428 Reconstruction 0-008-015 09/24/07 DONE DONE DONE 11/02/06 11/02/06 05/08/02 12/02/03 2,9 2,762,540 1,760,000 MGL 0 0 0
Collins & Scoville Architects
04-1232 Additions and Alterations 0-008-016 07/05/05 DONE DONE DONE 05/09/05 05/01/05 04/21/03 12/02/03 02 - 16 704,660 527,527 RDR 0 0 0
Slingerlands Elementary:
06-0429 Additions and Alterations 0-009-011 09/24/07 DONE DONE DONE 11/02/06 11/02/06 04/21/03 12/02/03 02 - 16 2,893,755 2,285,000 MGL 0 0 0
Collins & Scoville Architects
Eagle Elementary School:
06-0402 New Construction 0-026-001 02/07/07 DONE DONE DONE 10/31/06 10/30/06 06/27/03 12/02/03 02 - 16 9,108,670 5,444,390 MGL 0 0 0
Collins & Scoville Architects
07-1275 Additions and Alterations 0-026-002 07/03/08 DONE DONE DONE 12/31/07 12/27/07 11/21/07 10/30/07 02 - 16 2,780,178 2,771,688 MGL 0 0 0
Collins & Scoville Architects
Educ. Services Center:
05-1103 Reconstruction 1-007-006 08/31/06 DONE DONE DONE 04/11/06 04/07/06 04/21/03 12/02/03 2,4,7,155,15,16 524,002 0 MGL 0 0 0
Collins & Scoville Architects
Softball Shed @ High School:
- PR New Construction 2-030-001 / / / / 07/15/08 / / 02 - 16 0 0 HCM 0 0 0
Bus Garage:
05-0788 Additions and Alterations 5-010-008 09/01/06 DONE DONE DONE 02/17/06 02/17/06 04/22/03 12/02/03 02 - 16 3,139,568 2,956,517 RDR 0 0 0
Collins & Scoville Architects
Transportation Dept./Bus Wash:
05-0789 New Construction 5-027-001 09/01/06 DONE DONE DONE 02/17/06 02/17/06 04/23/04 12/02/03 02 - 16 1,043,815 699,369 RDR 0 0 0
Collins & Scoville Architects
Public Library:
07-0083 Reconstruction 6-021-005 07/24/07 DONE DONE DONE 07/23/07 07/23/07 09/07/00 07/16/07 7,8,9 333,760 0 MGL 0 0 0
Sacco & McKinney Architects, PC
08-0199 Reconstruction 6-021-007 09/03/08 DONE DONE DONE 08/22/08 08/18/08 08/22/08 07/14/08 2,4,10,16 521,980 0 HCM 0 0 0
CLA Site Landscape Architecture,Engi
Concession Stand@High School:
04-0169 New Construction 7-028-001 11/22/04 DONE DONE DONE 08/30/04 08/25/04 04/23/04 12/02/03 02 - 16 145,848 0 RDR 0 0 0
Collins & Scoville Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Pieter B. Coeymans:
07-0810 Reconstruction 0-005-006 05/30/08 DONE DONE DONE 11/15/07 11/14/07 07/30/07 10/09/07 2,4,7,8,9,15,16 247,000 247,000 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
A.W. Becker Elementary:
07-0811 Reconstruction 0-009-007 05/30/08 DONE DONE DONE 11/15/07 11/14/07 07/30/07 10/09/07 2,4,7,8,9,155,15,16 247,000 247,000 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Senior High School:
07-0812 Reconstruction 0-013-014 05/30/08 DONE DONE DONE 11/15/07 11/14/07 07/30/07 10/09/07 2,4,7,8,9,155,15,16 1,135,243 1,135,243 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Junior High School:
07-0813 Reconstruction 0-014-004 05/30/08 DONE DONE DONE 11/15/07 11/14/07 07/30/07 10/09/07 2,4,7,8,9,155,15,16 724,000 724,000 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Green House @ High School:
06-1586 New Construction 0-018-001 11/26/07 DONE DONE DONE 06/07/07 06/06/07 02/01/07 05/15/07 02 - 16 85,000 0 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Bus Garage:
04-0610 Additions and Alterations 5-001-009 06/07/05 DONE DONE DONE 12/30/04 12/29/04 09/17/04 05/18/04 02 - 16 2,900,000 2,900,000 RDR 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
- Reconstruction 5-001-010 / / / / 07/06/06 / / 10 0 0 MGL 0 0 0
- Reconstruction 5-001-011 / / / / 07/30/07 / / 2,4,8,9,155,15,16 0 0 MGL 0 0 0
09-0098 Reconstruction 5-001-012 08/27/09 DONE DONE DONE 07/31/09 07/27/09 06/04/09 06/01/09 2,15,16 15,000 0 JOD 0 0 0
Mosaic Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Cohoes Middle School:
05-1024 Reconstruction 0-001-013 04/27/06 DONE DONE DONE 03/29/06 03/22/06 02/22/06 03/08/06 14,16 60,000 60,000 JOD 0 0 0
Collins & Scoville Architects
06-0544 Reconstruction 0-001-014 03/08/07 DONE DONE DONE 11/22/06 11/21/06 04/11/06 05/16/06 2,4,7,8,9,14,155,15, 886,076 319,715 JOD 0 0 45,190
Collins & Scoville Architects
07-0997 Reconstruction 0-001-015 04/16/08 DONE DONE DONE 12/03/07 11/29/07 / / 03/13/07 2,4,8,9,14,15,16 979,975 979,975 JOD 0 0 49,979
Collins & Scoville Architects
08-1267 Additions and Alterations 0-001-016 07/30/09 DONE DONE DONE 02/23/09 02/18/09 05/29/08 06/24/08 02 - 16 1,890,000 0 JOD 0 0 41,345
Collins & Scoville Architects
Abram Lansing School:
06-0545 Reconstruction 0-002-012 03/08/07 DONE DONE DONE 11/22/06 11/21/06 04/11/06 05/16/06 2,4,7,8,9,14,155,15, 728,352 1,134,239 JOD 0 0 37,146
Collins & Scoville Architects
07-0998 Reconstruction 0-002-013 04/16/08 DONE DONE DONE 12/03/07 11/29/07 02/06/07 03/13/07 2,4,155,15,16 796,369 0 JOD 0 0 40,615
Collins & Scoville Architects
08-1268 Additions and Alterations 0-002-014 07/30/09 DONE DONE DONE 02/23/09 02/18/09 05/29/08 06/24/08 02 - 16 4,220,000 0 JOD 0 0 92,316
Collins & Scoville Architects
Van Schaick Elementary:
06-0546 Reconstruction 0-005-013 03/08/07 DONE DONE DONE 11/22/06 11/21/06 04/11/06 05/16/06 2,4,7,8,9,14,155,15, 2,644,800 2,265,271 JOD 0 0 134,885
Collins & Scoville Architects
07-0999 Additions and Alterations 0-005-014 04/16/08 DONE DONE DONE 12/03/07 11/29/07 02/05/07 03/13/07 02 - 16 4,354,102 3,753,731 JOD 0 0 222,059
Collins & Scoville Architects
08-1269 Additions and Alterations 0-005-015 07/30/09 DONE DONE DONE 02/23/09 02/18/09 05/29/08 06/24/08 02 - 16 1,100,000 0 JOD 0 0 24,063
Collins & Scoville Architects
- PR Additions and Alterations 0-005-016 / / / / 06/20/08 / / 02 - 16 0 0 JOD 0 0 0
High School:
06-0547 Reconstruction 0-006-016 03/08/07 DONE DONE DONE 11/22/06 11/21/06 / / 05/16/06 2,4,7,8,9,10,13,14,1 3,298,408 3,312,170 JOD 0 0 168,219
Collins & Scoville Architects
07-1000 Additions and Alterations 0-006-017 04/16/08 DONE DONE DONE 02/03/08 02/03/08 02/05/07 03/13/07 02 - 16 4,238,179 0 JOD 0 0 216,147
Collins & Scoville Architects
08-1270 Additions and Alterations 0-006-018 07/30/09 DONE DONE DONE 02/23/09 02/18/09 05/29/08 06/24/08 02 - 16 13,489,000 0 JOD 0 0 295,085
Collins & Scoville Architects
08-1648SC Visual Structural Inspection 0-006-SC2 05/28/09 DONE DONE DONE 08/05/08 08/05/08 / / / / 16 24,750 0 JOD 0 0 0
Harmony Hill School:
06-0548 Reconstruction 0-010-006 03/08/07 DONE DONE DONE 11/22/06 11/21/06 04/11/06 05/16/06 2,4,7,8,9,14,155,15, 814,800 1,099,568 JOD 0 0 41,555
Collins & Scoville Architects
07-1001 Additions and Alterations 0-010-007 04/16/08 DONE DONE DONE 12/03/07 11/29/07 02/05/07 03/13/07 02 - 16 3,131,375 0 JOD 0 0 159,700
Collins & Scoville Architects
08-1271 Reconstruction 0-010-008 07/30/09 DONE DONE DONE 02/23/09 02/18/09 / / 06/24/08 2,4,7,8,9,155,15,16 2,494,000 0 JOD 0 0 39,400
Collins & Scoville Architects
Page Avenue School formerly St.Micha:
06-0549 Reconstruction 0-015-002 03/08/07 DONE DONE DONE 11/22/06 11/21/06 04/11/06 05/16/06 2,4,7,8,9,14,155,15, 627,564 764,612 JOD 0 0 32,005
Collins & Scoville Architects
- Reconstruction 0-015-003 / / / / 02/06/07 / / 2,155,16 0 2,013,840 JOD 0 0 0
STORAGE BLDG @ ABRAM LANSING:
- XX New Construction 2-017-001 CANCELLED / / / / 04/11/06 / / 02 - 16 0 0 JOD 0 0 0
District Wide:
05-0830 Reconstruction 7-999-003 05/23/06 DONE DONE DONE 02/28/06 02/27/06 08/10/05 05/04/05 16 500,000 500,000 JOD 0 0 0
Collins & Scoville Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Colonie High School:
04-0850 Reconstruction 0-001-021 05/25/05 DONE DONE DONE 02/28/05 02/24/05 09/05/01 12/01/03 2,4,7,8,9,10,13,155, 5,292,788 5,292,788 RDR 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
06-0822 Reconstruction 0-001-023 04/05/07 DONE DONE DONE 01/29/07 01/24/07 09/08/06 10/19/06 2,4,7,8,9,10,14,155, 1,360,000 1,360,000 MGL 0 0 540,000
Dodge Chamberlin Luzine Weber, Arch.
07-0898 Reconstruction 0-001-024 05/15/08 DONE DONE DONE 11/23/07 11/21/07 07/30/07 12/10/03 9 545,000 545,000 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Lisha Kill Jr High School:
04-0851 Additions and Alterations 0-002-013 05/25/05 DONE DONE DONE 02/28/05 02/24/05 09/05/01 12/01/03 02 - 16 4,837,996 4,837,996 RDR 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
06-0823 Reconstruction 0-002-014 04/05/07 DONE DONE DONE 01/29/07 01/24/07 09/08/06 10/19/06 2,4,7,8,9,10,14,155, 1,750,000 1,750,000 MGL 0 0 700,000
Dodge Chamberlin Luzine Weber, Arch.
Veeder Elementary School:
04-0852 Reconstruction 0-003-011 05/25/05 DONE DONE DONE 02/28/05 02/24/05 03/12/04 12/01/03 2,7 4,124,348 4,124,348 RDR 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
06-1226 Additions and Alterations 0-003-012 09/19/07 DONE DONE DONE 03/27/07 03/22/07 09/08/06 10/19/06 02 - 16 1,775,000 1,643,089 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-0899XX Reconstruction 0-003-013 05/15/08 CANCELLED 11/23/07 11/21/07 / / 12/10/03 4,155 65,000 65,000 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Saddlewood Elementary:
04-0853 Additions and Alterations 0-008-011 05/25/05 DONE DONE DONE 02/28/05 02/24/05 09/10/01 12/01/03 02 - 16 2,439,780 2,329,726 RDR 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
06-1227 Reconstruction 0-008-012 09/19/07 DONE DONE DONE 03/27/07 03/22/07 09/08/06 10/19/06 2,4,7,8,9,10,14,155, 1,065,000 1,065,000 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Shaker Rd. Elementary:
04-0854 Additions and Alterations 0-009-012 05/25/05 DONE DONE DONE 02/28/05 02/24/05 09/10/01 12/01/03 02 - 16 2,245,690 2,147,984 RDR 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
06-1228 Reconstruction 0-009-013 09/19/07 DONE DONE DONE 03/27/07 03/22/07 09/08/06 10/19/06 2,4,7,8,9,10,14,155, 1,065,000 1,065,000 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Forest Park Elementary School:
04-0855 Reconstruction 0-014-009 05/25/05 DONE DONE DONE 02/28/05 02/24/05 09/05/01 12/01/03 2,4,7,8,9,10,155,15, 1,300,534 1,300,534 RDR 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
06-1229 Reconstruction 0-014-010 09/19/07 DONE DONE DONE 03/27/07 03/22/07 09/08/06 10/19/06 2,4,7,8,9,10,14,155, 625,000 625,000 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
07-0900XX Reconstruction 0-014-011 05/15/08 CANCELLED 11/23/07 11/21/07 07/30/07 12/10/03 155,15,16 85,000 85,000 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Sand Creek School:
04-0856 Reconstruction 0-015-012 05/25/05 DONE DONE DONE 02/28/05 02/24/05 09/05/01 12/01/03 2,4,7,8,9,10,13,155, 1,185,421 1,185,421 RDR 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
06-1230 Reconstruction 0-015-013 09/19/07 DONE DONE DONE 03/27/07 03/22/07 09/08/06 10/19/06 2,4,7,8,9,10,14,155, 1,520,000 1,520,000 MGL 0 0 585,000
Dodge Chamberlin Luzine Weber, Arch.
Roessleville Elementary:
04-0857 Reconstruction 0-017-008 05/25/05 DONE DONE DONE 02/28/05 02/24/05 09/10/01 12/01/03 2,4,7,8,9,155,15,16 277,590 277,590 RDR 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
06-1231 Reconstruction 0-017-009 09/19/07 DONE DONE DONE 03/27/07 03/22/07 09/08/06 10/19/06 2,15 15,000 15,000 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Greenhouse @ Sand Creek MS:
08-0490DB Discovered Building 0-030-001 10/02/08 DONE DONE DONE 10/08/08 10/02/08 08/27/08 / / 0 0 JOD 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Greenhouse @ Veeder K-4:
- DB Discovered Building 0-032-001 / / / / 08/29/08 / / 0 0 JOD 0 0 0
Storage Garage @ Sand Creek Middle:
- PR New Construction 2-021-001 / / / / 05/25/07 / / 02 - 16 0 0 MGL 0 0 0
Track Shed:
08-1282DB Discovered Building 2-022-001 09/17/09 DONE DONE DONE 02/25/09 02/25/09 02/28/08 / / 0 0 MGL 0 0 0
Mosaic Associates
Field Storage Building:
08-1283DB Discovered Building 2-023-001 09/17/09 DONE DONE DONE 02/25/09 02/25/09 02/28/08 / / 0 0 MGL 0 0 0
Mosaic Associates
Ppo Warner Shed:
08-1288DB Discovered Building 2-027-001 09/17/09 DONE DONE DONE 02/25/09 02/25/09 08/27/08 / / 0 0 JOD 0 0 0
Mosaic Associates
Storage Trailer @ Sand Creek MS:
08-1287DB Discovered Building 2-028-001 10/02/09 DONE DONE DONE 02/25/09 02/25/09 08/27/08 / / 0 0 JOD 0 0 0
Mosaic Associates
Archery Storage Shed:
08-1285DB Discovered Building 2-029-001 10/02/09 DONE DONE DONE 02/25/09 02/25/09 08/27/08 / / 0 0 JOD 0 0 0
Mosaic Associates
Baseball Storage Building:
08-1286DB Discovered Building 2-031-001 09/17/09 DONE DONE DONE 02/25/09 02/25/09 08/29/08 / / 0 0 JOD 0 0 0
Mosaic Associates
Storage Trailer @ Roessleville K-4:
08-1289DB Discovered Building 2-033-001 09/17/09 DONE DONE DONE 02/25/09 02/25/09 08/29/08 / / 0 0 JOD 0 0 0
Mosaic Associates
SC Bike Shed:
09-0265DB Discovered Building 2-034-001 10/02/09 DONE DONE DONE 09/28/09 09/25/09 04/23/09 / / 0 0 JOD 0 0 0
Bus Storage Building:
06-1232 Reconstruction 4-007-004 09/19/07 DONE DONE DONE 03/27/07 03/22/07 09/08/06 10/19/06 2,15 225,000 225,000 MGL 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Press Box:
08-1393 Reconstruction 7-012-001 05/28/09 DONE DONE DONE 03/19/09 03/16/09 02/12/09 05/20/08 2,4,7,8,9,13,16 90,000 0 JOD 0 0 0
Mosaic Associates
Soccer Score Building:
08-1284DB Discovered Building 7-024-001 09/17/09 DONE DONE DONE 02/25/09 02/25/09 02/28/08 / / 0 0 MGL 0 0 0
Mosaic Associates
New Press Box @ HS:
- New Construction 7-026-001 / / / / 07/17/08 / / 02 - 16 0 0 JOD 0 0 0
Colonie Community Center:
05-1357TQ Temporary Quarters 8-020-001 06/22/06 DONE DONE DONE 06/08/06 04/19/06 05/11/05 / / 0 0 MGL 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Blue Creek Elementary:
06-0521 Reconstruction 0-003-012 02/23/07 DONE DONE DONE 11/20/06 11/17/06 03/06/06 05/16/06 9 85,000 85,000 MGL 0 0 0
Collins & Scoville Architects
Loudonville School:
- XX Reconstruction 0-004-007 05/20/08 CANCELLED 04/21/08 04/11/08 04/10/08 03/03/08 2,9 50,000 50,000 DDJ 0 0 13,350
Collins & Scoville Architects
Shaker High School:
06-0522 Reconstruction 0-005-030 02/23/07 DONE DONE DONE 11/20/06 11/17/06 03/10/06 05/16/06 8,9,10,13,14,155,15, 353,000 353,000 MGL 0 0 0
Collins & Scoville Architects
Southgate School:
- XX Reconstruction 0-006-012 05/20/08 CANCELLED 04/21/08 04/11/08 04/10/08 03/03/08 2,7,15,16 760,000 760,000 DDJ 0 0 202,920
Collins & Scoville Architects
Fort Ferry School:
06-0523 Reconstruction 0-008-011 02/23/07 DONE DONE DONE 11/20/06 11/17/06 03/09/06 05/16/06 2,9 105,000 105,000 MGL 0 0 0
Collins & Scoville Architects
- Reconstruction 0-008-012 / / / / 06/19/07 / / 2,7,9,16 0 0 MGL 0 0 0
Goodrich School:
05-1070 Reconstruction 1-002-004 03/31/06 DONE DONE DONE 03/31/06 03/31/06 03/29/01 05/15/01 7,8,10 801,300 0 RDR 0 0 0
Collins & Scoville Architects
- Reconstruction 1-002-006 / / / / 03/10/06 / / 7 0 0 MGL 0 0 0
Loudonville Storage Shed:
05-1408DB Discovered Building 2-021-001 07/05/06 DONE DONE DONE 06/22/06 06/16/06 02/22/01 / / 02 - 16 0 0 MGL 0 0 0
Storage Shed @ Forts Ferry:
05-1409DB Discovered Building 2-024-001 07/05/06 DONE DONE DONE 06/22/06 06/16/06 06/05/01 / / 02 - 16 0 0 MGL 0 0 0
Storage Shed @ Blue Creek:
07-0356DB Discovered Building 2-029-001 07/14/08 DONE DONE DONE 09/13/07 09/12/07 08/01/07 / / 0 0 MGL 0 0 0
Collins & Scoville Architects
Bus Garage:
05-0058 Reconstruction 5-015-010 08/12/05 DONE DONE DONE 07/15/05 07/08/05 06/21/05 05/17/05 13 85,000 85,000 RDR 0 0 0
06-0524 Reconstruction 5-015-011 02/23/07 DONE DONE DONE 12/29/06 12/29/06 10/06/06 05/16/06 16 100,000 30,000 MGL 0 0 0
Collins & Scoville Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Blue Creek Elementary:
08-0633 Reconstruction 0-003-001 05/06/09 DONE DONE DONE 10/30/08 10/29/08 08/11/08 03/03/08 2,4,15,16 591,000 591,000 DDJ 0 0 157,800
Collins & Scoville Architects
Loudonville School:
07-2001 Reconstruction 0-004-001 05/20/08 DONE DONE DONE 04/21/08 04/11/08 08/11/08 03/03/08 2,15,16 50,000 50,000 DDJ 0 0 13,350
Collins & Scoville Architects
08-0634 Reconstruction 0-004-002 05/06/09 DONE DONE DONE 02/11/09 10/29/08 / / 03/03/08 241,000 0 0 0 64,300
Collins & Scoville Architects
- Reconstruction 0-004-003 / / / / 11/09/09 / / 2,9,155,16 0 0 DDJ 0 0 0
Shaker High School:
08-0635 Reconstruction 0-005-001 05/06/09 DONE DONE DONE 02/11/09 10/29/08 08/11/08 03/03/08 2,4,7,8,9,15,16 2,897,000 0 DDJ 0 0 742,300
Collins & Scoville Architects
09-0217 Reconstruction 0-005-002 10/26/09 DONE DONE DONE 09/15/09 09/14/09 06/23/09 05/19/09 16 135,000 0 DDJ 0 0 0
Collins & Scoville Architects
- Reconstruction 0-005-003 / / / / 11/09/09 / / 9,155,16 0 0 DDJ 0 0 0
Southgate School:
07-2002 Reconstruction 0-006-001 05/20/08 DONE DONE DONE 04/21/08 04/11/08 08/11/08 03/03/08 2,4,7,8,9,15,16 760,000 760,000 DDJ 0 0 202,920
Collins & Scoville Architects
08-0636 Reconstruction 0-006-002 05/06/09 DONE DONE DONE 02/11/09 10/29/08 / / 03/03/08 1,043,000 0 0 0 241,100
Collins & Scoville Architects
- Reconstruction 0-006-003 / / / / 11/09/09 / / 2,9 0 0 DDJ 0 0 0
Boght Hills:
08-0637 Reconstruction 0-007-001 05/06/09 DONE DONE DONE 02/11/09 10/29/08 08/11/08 03/03/08 2,8,9,15,16 265,000 0 DDJ 0 0 60,600
Collins & Scoville Architects
Fort Ferry School:
08-0638 Reconstruction 0-008-001 05/06/09 DONE DONE DONE 02/11/09 10/29/08 08/11/08 03/03/08 2,15,16 123,000 0 DDJ 0 0 32,800
Collins & Scoville Architects
- Reconstruction 0-008-002 / / / / 11/09/09 / / 2,9,16 0 0 DDJ 0 0 0
Shaker Junior High:
08-0639 Reconstruction 0-009-001 05/06/09 DONE DONE DONE 02/11/09 10/29/08 08/11/08 03/03/08 2,8,9,15,16 502,000 0 DDJ 0 0 127,400
Collins & Scoville Architects
Latham Ridge Elementary:
08-0640 Reconstruction 0-011-001 05/06/09 DONE DONE DONE 02/11/09 10/29/08 08/11/08 03/03/08 2,15,16 248,000 0 DDJ 0 0 66,200
Collins & Scoville Architects
Maplewood Elementary:
08-0641 Reconstruction 0-030-001 05/06/09 DONE DONE DONE 02/11/09 10/29/08 08/11/08 03/03/08 4,7,8,9,14,15,16 650,000 647,027 DDJ 0 0 160,200
Collins & Scoville Architects
Maintenance Garage:
08-0642 Reconstruction 3-014-001 05/06/09 DONE DONE DONE 02/11/09 10/29/08 08/11/08 03/03/08 15,16 15,000 0 DDJ 0 0 0
Collins & Scoville Architects
Districwide:
- Reconstruction 7-999-001 / / / / 08/11/08 / / 16 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Heatly School:
05-0263 Additions and Alterations 0-001-006 12/20/05 DONE DONE DONE 10/14/05 10/12/05 07/08/04 10/20/04 02 - 16 11,560,000 8,322,674 DDJ 0 0 104,469
Collins & Scoville Architects
07-0218 Reconstruction 0-001-007 11/13/07 DONE DONE DONE 08/22/07 08/22/07 01/18/07 04/24/07 2,4,8,9,10,16 475,000 475,000 DDJ 0 0 0
Collins & Scoville Architects
07-0882SC Visual Structural Inspection 0-001-SC2 11/21/07 DONE DONE DONE 09/19/07 09/19/07 / / / / 16 19,903 0 JOD 0 0 0
Modular D @ Tibbits Ave & Paine St.:
05-1051TQ Temporary Quarters 8-002-001 03/30/06 DONE DONE DONE 03/30/06 03/30/06 03/15/06 / / 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Altamont Elementary School:
08-0286 Reconstruction 0-001-017 02/06/09 DONE DONE DONE 09/09/08 09/04/08 10/02/07 11/13/07 2,7,8,9,155,15,16 3,482,245 3,482,245 DDJ 0 0 0
Collins & Scoville Architects
Westmere Elementary:
08-0287 Reconstruction 0-003-008 02/06/09 DONE DONE DONE 09/09/08 09/04/08 10/02/07 11/13/07 2,7,8,9,155,15,16 6,155,990 6,155,598 DDJ 0 0 1,778,873
Collins & Scoville Architects
Guilderland High School:
07-1789 Reconstruction 0-005-018 03/24/09 DONE DONE DONE 03/15/08 03/06/08 05/31/07 / / 4,16 0 40,640,321 DDJ 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
08-0288 Additions and Alterations 0-005-019 02/06/09 DONE DONE DONE 09/09/08 09/04/08 10/02/07 11/13/07 02 - 16 8,865,770 8,865,770 DDJ 0 0 0
Collins & Scoville Architects
- Reconstruction 0-005-020 / / / / 06/10/08 / / 13 0 0 DDJ 0 0 0
09-0179 Reconstruction 0-005-021 09/17/09 DONE DONE DONE 08/31/09 08/28/09 04/09/09 05/19/09 4,155 100,000 0 DDJ 0 0 0
Collins & Scoville Architects
04-1274FP Reconstruction 0-005-FP2 05/20/05 DONE DONE DONE 05/12/05 / / / / / / 16 0 12,996,000 JOD 0 0 0
Lynwood Elementary:
08-0289 Reconstruction 0-007-006 02/06/09 DONE DONE DONE 09/09/08 09/04/08 10/02/07 11/13/07 7,8,155,15,16 1,814,165 1,814,165 DDJ 0 0 0
Collins & Scoville Architects
Farnsworth Middle School:
08-0290 Reconstruction 0-009-015 02/06/09 DONE DONE DONE 09/09/08 09/04/08 10/02/07 11/13/07 10,16 1,176,930 1,176,930 DDJ 0 0 0
Collins & Scoville Architects
- Reconstruction 0-009-016 / / / / / / / / 7,9,155,16 0 0 DDJ 0 0 0
Guilderland Elementary School:
08-0291 Reconstruction 0-012-013 02/06/09 DONE DONE DONE 09/09/08 09/04/08 10/02/07 11/13/07 2,7,8,9,155,15,16 5,203,310 5,203,310 DDJ 0 0 0
Collins & Scoville Architects
Pine Bush Elementary School:
08-0292 Reconstruction 0-015-002 02/06/09 DONE DONE DONE 09/09/08 09/04/08 10/02/07 11/13/07 2,16 888,325 888,325 DDJ 0 0 0
Collins & Scoville Architects
Lumber Storage Shed:
- New Construction 2-020-001 / / / / 02/10/05 / / 02 - 16 0 0 DDJ 0 0 0
Wood Storage Shed @ High School:
07-1570 Reconstruction 2-021-001 03/04/08 DONE DONE DONE 02/08/08 02/04/08 12/27/07 / / 0 0 DDJ 0 0 0
Collins & Scoville Architects
Guilderland Public Library:
06-0497 Alterations 6-014-003 11/14/06 DONE DONE DONE 11/14/06 11/14/06 11/14/06 11/09/06 02 - 16 178,000 0 DDJ 0 0 0
Schafer Engineering Associates
- PR Additions and Alterations 6-014-004 / / / / 11/15/06 / / 02 - 16 0 0 DDJ 0 0 0
07-0143 Reconstruction 6-014-005 08/13/07 DONE DONE DONE 08/07/07 08/07/07 08/01/07 07/12/07 2 140,665 0 DDJ 0 0 0
Schafer Engineering Associates
08-0155 Reconstruction 6-014-006 08/15/08 DONE DONE DONE 08/13/08 08/13/08 07/16/08 08/05/08 7,8 105,955 0 DDJ 0 0 0
Peter Gisolfi Associates
08-1779 Additions and Alterations 6-014-007 07/16/09 DONE DONE DONE 07/01/09 06/30/09 06/10/09 03/12/09 02 - 16 46,685 0 DDJ 0 0 0
Peter Gisolfi Associates
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Junior Senior High School:
06-0340 Reconstruction 0-001-012 03/02/07 DONE DONE DONE 10/18/06 10/17/06 02/15/06 09/19/06 2,4,7,8,9,10,14,155, 537,727 537,727 DDJ 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
05-1374 Reconstruction 0-001-013 07/11/06 DONE DONE DONE 06/14/06 06/13/06 04/11/06 05/16/06 7 147,751 147,751 DDJ 0 0 0
Dodge Chamberlin Luzine Weber, Arch.
Elementary School/Bus Garage:
06-0341 Additions and Alterations 0-002-012 03/02/07 DONE DONE DONE 10/18/06 10/17/06 02/15/06 09/19/06 02 - 16 4,326,273 4,326,273 DDJ 0 0 409,000
Dodge Chamberlin Luzine Weber, Arch.
- Reconstruction 0-002-013 / / / / 10/02/09 / / 2,15,16 0 0 DDJ 0 0 0
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Jr/Sr High School:
06-1300 Reconstruction 0-001-010 05/30/07 DONE DONE DONE 04/10/07 04/09/07 03/05/07 02/06/07 2,7,8,9,155,15,16 2,240,803 2,240,803 MGL 0 0 107,559
Collins & Scoville Architects
08-1171 Reconstruction 0-001-011 06/22/09 DONE DONE DONE 02/09/09 02/02/09 / / 03/04/08 14,237,906 14,237,906 JOD 0 0 352,391
Collins & Scoville Architects
08-1656 Reconstruction 0-001-012 06/10/09 DONE DONE DONE 06/01/09 05/27/09 05/29/09 06/02/09 2,4,7,8,9,155,16 600,000 0 JOD 0 0 0
Collins & Scoville Architects
Watervliet Elementary:
07-0549 Reconstruction 0-006-008 03/07/08 DONE DONE DONE 10/12/07 10/12/07 09/25/06 02/06/07 2,4,7,8,9 6,879,885 6,795,816 MGL 0 0 343,994
Collins & Scoville Architects
06-1301 Additions and Alterations 0-006-009 05/30/07 DONE DONE DONE 04/10/07 04/09/07 03/05/07 02/06/07 02 - 16 5,673,629 5,673,629 MGL 0 0 272,334
Collins & Scoville Architects
08-1172 Reconstruction 0-006-010 06/22/09 DONE DONE DONE 02/09/09 02/02/09 / / 03/04/08 127,209 349,000 JOD 0 0 0
Collins & Scoville Architects
Press Box/ Grandstand:
06-1302 New Construction 7-010-001 05/30/07 DONE DONE DONE 04/10/07 04/09/07 03/07/07 02/06/07 02 - 16 34,811 0 MGL 0 0 0
Collins & Scoville Architects
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED
REVIEW BUILDING NAME/ BLDG./ SED FINAL PROJECT REVIEW PLAN/SPEC PLAN/SPEC LETTER OF VOTER PROJECT ESTIMATED PRJ. RESCUE 1 RESCUE 2 EXCEL ARCHITECT/ENGINEER
No. PROJECT SCOPE PROJ. NO. APPROVAL Prj. Mgr. Const. Mech. COMPLETE RECEIVED INTENT AUTHOR. CSI CODES COST COST ALLOW. MGR. AID AID AID FIRM
_________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
Albany Center Bldg. B:
04-1214 Reconstruction 0-008-003 07/27/05 DONE DONE DONE 04/29/05 04/28/05 08/18/04 09/20/04 7,9,10,155,15,16 182,400 182,400 MAC 0 0 0
CWG Architects.P.C.
06-1318 Reconstruction 0-008-005 05/09/07 DONE DONE DONE 04/13/07 04/12/07 02/12/07 03/19/07 155 311,602 311,602 JOD 0 0 0
Griffith Dardanelli,Architects,PC
- Reconstruction 0-008-006 / / / / 02/13/07 / / 2,7,9,155,15,16 0 671,280 JOD 0 0 0
Maywood School:
04-1340 Reconstruction 0-018-007 07/13/05 DONE DONE DONE 05/27/05 04/25/05 01/20/05 10/20/03 2,7 191,797 191,797 JOD 0 0 0
Cataldo, Waters and Griffith Arch.
06-1511 Reconstruction 0-018-009 10/03/07 DONE DONE DONE 05/18/07 05/17/07 01/19/07 03/19/07 2,4,8,9,10,155,15,16 313,000 313,000 JOD 0 0 0
Griffith Dardanelli,Architects,PC
06-1024 Reconstruction 0-018-010 03/12/07 DONE DONE DONE 02/27/07 02/26/07 01/19/07 02/15/07 2,4,9 53,000 53,000 JOD 0 0 0
CWG Architects.P.C.
08-1276 Reconstruction 0-018-011 03/18/09 DONE DONE DONE 02/24/09 02/19/09 05/14/08 03/17/08 2,4,8,9 469,000 469,000 JOD 0 0 0
Griffith Dardanelli,Architects,PC
- Reconstruction 0-018-012 / / / / 11/02/09 / / 2,4,8,9 0 0 JOD 0 0 0
Non-public Textbook office:
04-0273TQ Temporary Quarters 1-037-001 03/10/05 DONE DONE DONE 10/06/04 10/01/04 03/24/04 / / 0 0 MAC 0 0 0
NERIC North Country:
08-0482TQ Temporary Quarters 1-057-001 11/04/08 DONE DONE DONE 10/07/08 10/06/08 02/28/08 / / 0 0 JOD 0 0 0
Science Kit Program:
- TQ Temporary Quarters 7-059-001 / / / / 04/27/09 / / 0 0 JOD 0 0 0
Special Ed @ Former Progressive Bldg:
04-0274TQ Temporary Quarters 8-040-001 03/10/05 DONE DONE DONE 10/06/04 10/06/04 05/11/04 / / 0 0 MAC 0 0 0
Temple Israel:
04-0653TQ Temporary Quarters 8-042-001 09/10/08 DONE DONE DONE 01/10/05 01/06/05 08/12/04 / / 0 0 MAC 0 0 0
Special Ed @ College of St. Rose:
04-0654XX Reconstruction 8-043-001 CANCELLED 01/10/05 01/06/05 08/26/04 / / 0 0 MAC 0 0 0
Technology Valley High School:
09-0136TQ Temporary Quarters 8-044-001 08/24/09 DONE DONE DONE 08/19/09 08/19/09 11/14/08 / / 0 0 JOD 0 0 0
Entek Environmental and Tech. Servic
Center City Plaza:
06-0786XX Reconstruction 8-053-001 04/27/07 CANCELLED 01/18/07 01/16/07 12/29/06 / / 0 0 JOD 0 0 0
Times Union Building:
07-0329TQ Temporary Quarters 8-054-001 UNREVIEWED 09/07/07 09/07/07 06/05/07 / / 0 0 JOD 0 0 0
Adult Nursing Home:
- XX Alterations 8-055-001 CANCELLED / / / / 01/17/08 / / 0 0 JOD 0 0 0
Rosewood Plaza:
08-0938TQ Temporary Quarters 8-056-001 02/13/09 DONE DONE DONE 12/16/08 12/10/08 02/05/08 / / 0 0 JOD 0 0 0
PETER P. SEIDNER ARCHITECT
Proctors Classroom:
08-0152TQ Temporary Quarters 8-058-001 04/07/09 DONE DONE DONE 08/13/08 08/06/08 03/19/08 / / 0 0 JOD 0 0 0
Stracher-Roth
CSI Codes: 02-Site 02-Asbestos 04-Masonry 07-Roof 08-Doors/Windows 09-Finishes 10-Specialties 13-Special Const 14-Elevator
155-HVAC 15-Plumbing 16-Electric 02-16 New/Addition
Note: ADD. REQ'D = ADDENDUM REQUIRED UNREVIEWED = FINAL REVIEW NOT STARTED