REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Argyle Central School:
94-0140 Reconstruction 0-001-003 08/09/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1316 Reconstruction 0-001-004 05/15/95 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1122 Additions and Alterations 0-001-005 06/22/99 *CO No.* Amount Disallowed Received Approved Contractor
1-1 2,472 06/21/02 06/24/02 USA Remediation
13-1 1,854 06/21/02 06/24/02 Siemens Bldg. Technologies
14-11 7,566 06/21/02 06/24/02 Bast Hatfield
14-12 25,740 02/13/02 03/21/02 Bast Hatfield
14-6 8,797 06/21/02 06/24/02 Bast Hatfield
14-7 14,501 06/21/02 06/24/02 Bast Hatfield
14-8 24,814 06/21/02 06/24/02 Bast Hatfield
14-9 7,834 06/21/02 06/24/02 Bast Hatfield
6-2 -2,129 02/13/02 03/21/02 DiGesare Mechanical
7-2 14,746 08/29/02 10/29/02 Crisafulli Brothers
7-3 14,742 02/13/02 03/21/02 Crisafulli Brothers
7-3 -14,008 08/29/02 10/29/02 Crisafulli Brothers
7-4 5,000 08/29/02 10/29/02 Crisafulli Brothers
8-1 3,122 02/13/02 03/21/02 St. Paul Fire and Marine Ins.
9-3 -894 02/13/02 03/21/02 Adirondack Cabling
99-0311 Reconstruction 0-001-006 09/13/00 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0449SC Visual Structural Inspection 0-001-SC1 12/30/05 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0751SC Visual Structural Inspection 0-001-SC2 06/07/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
91-0056 Reconstruction 5-002-001 08/05/91 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0283 Reconstruction 5-002-002 11/04/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0310 Reconstruction 5-002-003 09/13/00 NO CHANGE ORDERS ON ELECTRONIC FILE
FORT ANN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-05-02-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
95-0198 Reconstruction 0-001-004 10/02/95 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1906 Additions and Alterations 0-001-005 03/26/02 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
00026 16,170 06/20/06 07/13/06 Christa Constuction
00046 16,677 05/20/06 07/24/06 GDF Management
1 1,121 11/10/06 01/09/07 Christa Construction
1 9,909 11/09/06 12/19/06 RF Gordon mechanical
1 -658 11/10/06 01/09/07 Gross Electric
1 9,407 12/15/06 01/12/07 RF Gordon
1 -4,793 12/29/06 01/30/07 Open Systems Technologies
10 10,390 10/30/06 02/22/07 Jack Hall Plumbing
11 60,941 10/30/06 02/22/07 Jack Hall Plumbing
12 5,546 10/30/06 02/22/07 Jack hall Plumbing
14 7,300 10/25/06 02/22/07 Jack Hall Plumbing
2 1,850 10/25/06 02/22/07 Jack Hall Plumbing
2 37,822 11/10/06 01/09/07 Christa construction
2 7,752 11/10/06 12/19/06 RF Gordon mechanical
3 9,720 10/25/06 02/22/07 Jack Hall Plumbing
3 19,068 11/08/06 01/09/07 R.f Gordon Mechanical,Inc.
3 7,247 01/25/07 01/30/07 Christa Construction
4 13,191 10/25/06 / / Jack Hall Plumbing
4 10,979 11/13/06 12/19/06 RF Gordon mechanical
4 13,191 06/22/07 10/23/07 Jack Hall Plumbing and Heating
5 5,556 10/30/06 12/19/06 Jack Hall Plumbing
5 12,098 11/14/06 / / RF Gordon Mechanical
5 12,098 06/04/07 10/22/07 RF Gordon Mechanical
6 12,680 10/30/06 02/22/07 Jack Hall Plumbing
6 3,718 11/15/06 12/19/06 RF Gordon Mechanical
7 31,847 10/30/06 02/22/07 Jack hall Plumbing
7 9,670 11/14/06 12/19/06 RF Gordon Mechanical
8 12,067 10/30/06 02/22/07 Jack Hall Plumbing
8 4,215 11/14/06 12/28/06 RF Gordon Mechanical
9 4,265 10/30/06 02/22/07 Jack Hall Plumbing
E-1 6,686 11/09/06 12/19/06 Justin Electric
E-3 5,638 / / 01/09/07
E-4 8,666 11/10/06 12/19/06 Justin Electrical
E-5 7,383 11/07/06 01/12/07 Justin Electrical
E-6 10,217 11/22/06 01/09/07 Justin Electrical
E-7 9,801 11/07/06 12/19/06 Justin Electrical
E-8 8,555 11/07/06 12/19/06 Justin Electrical
E-9 11,698 / / 01/09/07
GC-005 2,426 06/15/06 07/14/06 David Christa Construction
GC-06 21,610 06/20/06 07/13/06 Christa construction
GC-10 12,431 12/29/06 01/30/07 Christa Construction
GC-12 13,831 12/29/06 01/30/07 Christa Construction
GC-13 24,468 12/29/06 01/23/07 Christa Construction
GC-14 37,384 12/29/06 / / Christa Construction
GC-14 37,384 06/07/07 06/20/07 Christa Construction
GC-15 19,898 12/29/06 06/11/07 Christa Construction
GC-15 19,898 06/04/07 06/20/07 Christa construction
GC-16 19,554 06/07/07 06/07/07 Christa Construction
GC-17 15,262 06/07/07 06/07/07 Christa Construction
GC-18 9,573 12/29/06 01/30/07 Christa Construction
GC-19 16,557 05/25/07 06/21/07 Christa Construction
GC-2 17,890 06/15/06 07/14/06 Christa Construction
GC-20 4,329 12/29/06 01/30/07 Christa Construction
GC-21 4,158 12/29/06 01/30/07 Christa Construction
GC-22 15,745 12/29/06 01/30/07 Christa Construction
GC-23 4,379 12/29/06 01/30/07 Christa Construction
GC-24 2,381 12/29/06 01/30/07 Christa Construction
GC-24 3,898 01/05/07 01/24/07 Christa Construction
GC-25 6,028 12/29/06 01/23/07 Christa construction
GC-26 10,584 12/29/06 01/23/07 Christa construction
GC-27 4,727 12/29/06 01/23/07 Christa Construction
GC-28 3,070 12/29/06 01/23/07 Christa Construction
GC-29 11,191 12/29/06 / / Christa Construction
GC-29 11,191 06/04/07 06/20/07 Christa Construction
GC-3 19,959 06/15/06 07/14/06 Christa Construction
GC-30 4,539 12/29/06 01/30/07 Christa Construction
GC-31 11,430 12/29/06 01/30/07 Christa Construction
GC-4 13,748 06/15/06 07/14/06 Christa Construction
GC-5 13,698 01/06/07 01/24/07 Christa Construction
GC-8 10,598 12/20/06 01/30/07 Christa Construction
GC-9 12,861 12/29/06 01/23/07 Christa Construction
e-2 5,554 11/09/06 12/19/06 Justin Electrical
02-1246 Additions and Alterations 0-001-006 02/06/04 *CO No.* Amount Disallowed Received Approved Contractor
1 8,585 05/08/06 / / RF Gordon Mechanical
1 7,585 12/29/06 01/19/07 RF Gordon Mechanical
AB-1 13,307 04/13/06 06/26/06 Avala contracting
AB-2 7,494 04/13/06 06/26/06 Avala Contracting
AB-3 17,431 3 04/13/06 06/30/06 Avala Contracting
AB-4 20,156 04/13/06 06/26/06 Avala Contracting Two Brothers
03-1301 Reconstruction 0-001-007 03/19/04 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0728 Reconstruction 0-001-008 03/16/05 *CO No.* Amount Disallowed Received Approved Contractor
FOT-01 -22,250 01/05/06 04/03/07 Ew Tokpkins Company
02-1094FP Reconstruction 0-001-FP1 02/11/03 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0880SC Visual Structural Inspection 0-001-SC1 11/21/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
00-1907 Reconstruction 5-002-002 03/26/02 *CO No.* Amount Disallowed Received Approved Contractor
BG-1 9,537 11/10/06 12/19/06 Justin Electrical
BG-2 14,620 01/04/07 01/24/07 Justin Electrical
FT-02 9,850 12/29/06 01/23/07 EW Tompkins Co
FT-1 78,151 12/29/06 01/30/07 EW Tompkins Co
GC-1 15,036 01/04/06 01/23/07 Christa Construction
P-1 9,298 01/19/07 01/30/07 Jack Hall Plumbing
cab 1 1,621 05/08/06 07/24/06 Adirondack Cabling
95-0197 Reconstruction 5-002-003 10/02/95 NO CHANGE ORDERS ON ELECTRONIC FILE
FORT EDWARD UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-06-01-02
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
High School:
96-0075 Reconstruction 0-001-003 07/24/96 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0111 Reconstruction 0-001-004 02/04/00 *CO No.* Amount Disallowed Received Approved Contractor
01 2,969 04/11/00 12/01/03 Brownell Elec.
01 8,387 04/11/00 12/01/03 Adirondack P&M
02 3,513 04/11/00 12/01/03 Brownell Elec.
02 24,539 04/11/00 12/01/03 Adirondack P&M
03 826 04/11/00 12/01/03 Brownell Elec.
03 10,950 04/11/00 12/01/03 Adirondack P&M
03-0592 Reconstruction 0-001-005 04/02/04 *CO No.* Amount Disallowed Received Approved Contractor
EC-001 31,245 11/02/04 11/19/04 Brownell Elec.
EC-002 214 03/17/05 05/02/05 Brownell electric Corp
EC-003 3,811 02/03/05 03/17/05 Brownell Electric Corp
EC-004 716 04/01/05 04/26/05 Brownell Electric Corp
EC-005 404 06/23/05 10/25/05 Brownell Electric
GC-001 8,750 02/15/05 03/02/05 Zandri Construction Corp
GC-002 2,581 09/22/05 10/03/05 Zandri Construction
HC-002 4,115 04/20/05 10/25/05 J and K Plumbing Heating Company
HC-003 -541 05/02/05 08/18/05 JandK Plumbing Heating Co
HC-01 13,690 03/17/05 05/02/05 J and K Plumbing heating
PC-001 2,500 04/01/05 07/22/05 Mazone Plumbing and Heating
05-0585 Reconstruction 0-001-007 03/30/06 *CO No.* Amount Disallowed Received Approved Contractor
GC-01 -10,000 05/25/07 06/21/07 AJ Catalfamo Construction
GC-02 1,500 08/14/07 08/20/07 A.J. CATALFAMO CONSTRUCTION
02-2422FP Reconstruction 0-001-FP1 09/08/03 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0276SC Visual Structural Inspection 0-001-SC1 09/18/01 NO CHANGE ORDERS ON ELECTRONIC FILE
High School Annex:
02-0809 Reconstruction 0-002-003 02/18/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Elementary School:
91-0293 Additions and Alterations 0-005-003 10/07/91 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0187 Reconstruction 0-005-004 09/15/94 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0021 Reconstruction 0-005-005 07/17/96 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0148 Additions and Alterations 0-005-006 10/14/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0730 Reconstruction 0-005-007 03/16/00 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0593 Reconstruction 0-005-008 04/02/04 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0793 Additions and Alterations 0-005-009 04/01/05 *CO No.* Amount Disallowed Received Approved Contractor
EC-01 4,124 03/07/07 04/25/07 Gross Electric
GC-01 12,550 08/10/06 10/12/06 Zandri Construction Corp
GC-03 15,791 08/21/06 10/12/06 Zandri Construction
GC-04 1,519 08/21/06 10/12/06 Zandri Costruction
GC-05 -1,232 08/31/06 10/12/06 Zandri Construction
GC-06 21,721 08/31/06 10/12/06 Zandri Construction
GC-07 2,700 10/13/06 12/19/06 Zandri Construction
GC-08 1,140 11/06/06 01/09/07 Zandri Construction
GC-09 1,200 11/06/06 01/09/07 Zandri Construction
GC-10 13,491 03/23/07 05/16/07 Zandri Construction
GC-2 11,599 08/21/06 10/05/06 Zandri Construction
HC-01 1,929 04/09/07 05/16/07 Merit Plumbing
HC-02 -14,068 03/23/07 04/25/07 Merit plumbing
PC-01 -5,851 12/27/06 01/19/07 Merit Plumbing
08-0970 Reconstruction 0-005-010 05/07/09 *CO No.* Amount Disallowed Received Approved Contractor
G-001 -4,385 09/21/09 10/26/09 BCI CONSTRUCTION INC
Bus Pole Barn:
93-1041 New Construction 5-006-001 04/29/94 NO CHANGE ORDERS ON ELECTRONIC FILE
GRANVILLE CENTRAL SCHOOL STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-07-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
High School:
94-0055 Reconstruction 0-001-004 09/14/94 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0031 Reconstruction 0-001-006 07/31/00 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
00001 -2,000 05/25/04 06/01/04 Harold R Clune
00001 60,642 12/04/05 05/17/05 Albany Specialties Inc
00002 -10,000 11/30/04 06/21/05 Albany Specialties
95-1710 Reconstruction 0-001-007 07/15/96 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0125 Reconstruction 0-001-009 10/19/01 *CO No.* Amount Disallowed Received Approved Contractor
01-01 -22,000 02/20/03 03/13/03 Bast Hatfield
01-02 -175 02/20/03 03/13/03 Bast Hatfield
01-03 -2,069 02/20/03 03/13/03 Bast Hatfield
01-04 -20,000 02/20/03 03/13/03 Bast Hatfield
01-05 -13,242 02/20/03 03/13/03 Bast Hatfield
01-06 -482 02/20/03 03/13/03 Bast Hatfield
01-07 -2,514 02/20/03 03/13/03 Bast Hatfield
01-08 -49,570 02/20/03 03/13/03 Bast Hatfield
01-09 -4,770 02/20/03 03/13/03 Bast Hatfield
01-10 -5,276 02/20/03 03/13/03 Bast Hatfield
01-12 -7,428 02/20/03 03/13/03 Bast Hatfield
01-13 -6,738 12/03/03 12/09/03 Bast Hatfield
01-14 -26,056 08/26/03 09/02/03 Bast Hatfield
01-15 -9,461 08/26/03 09/02/03 Bast Hatfield
01-16 -17,724 08/26/03 09/02/03 Bast Hatfield
01-17 -310 08/26/03 09/02/03 Bast Hatfield
01-18 -71,574 12/03/03 12/09/03 Bast Hatfield
01-19 43,300 12/03/03 12/09/03 Bast Hatfield
01-20 1,351 09/15/03 09/19/03 Bast Hatfield
01-21 12,348 09/15/03 09/19/03 Bast Hatfield
01-22 72,634 09/15/03 10/21/03 Bast Hatfield
01-23 8,715 09/15/03 10/21/03 Bast Hatfield
01-24 2,375 09/15/03 09/19/03 Bast Hatfield
01-25 131,979 09/15/03 10/21/03 Bast Hatfield
01-26 51,020 09/15/03 09/19/03 Bast Hatfield
01-27 -2,014 12/03/03 12/09/03 Bast Hatfield
01-28 3,297 12/03/03 12/31/03 Bast Hatfield
01-29 644 12/03/03 12/09/03 Bast Hatfield
01-30 -2,945 02/06/04 02/20/04 Bast Hatfield
01-31 1,774 02/06/04 02/20/04 Bast Hatfield
01-32 616 02/08/04 02/20/04 Bast Hatfield
01-33R 1,589 01/28/05 02/08/05 Bast hatfield
01-34 -3,584 01/28/05 02/08/05 Bast Hatfield
01-35 -2,298 01/28/05 02/08/05 Bast hatfield
01-36 -5,533 01/28/05 02/08/05 Bast hatfield
02-01 -255 02/20/03 03/13/03 RF Gordon Mech.
02-02 -48,556 01/28/05 02/08/05 RF Gordon Mechanical Inc
03-01 -200 02/20/03 03/13/03 Weisburgh Mech.
03-02 -289 02/20/03 03/13/03 Weisburgh Mech.
03-03 -2,926 08/26/03 09/02/03 Weisburgh Mech.
03-04 6,337 12/03/03 01/05/04 Weisburgh Mech.
03-05 -374 09/15/03 09/19/03 Weisburgh Mech.
04-01 -9,750 02/20/03 03/13/03 Crisafulli Bros.
04-02 -414 02/20/03 03/13/03 Crisafulli Bros.
04-03 -328 02/06/04 02/25/04 Crisafulli Bros.
04-04 -12,636 03/23/04 04/23/04 Crisafulli Bros.
08-01 -550 02/06/04 02/20/04 Nickerson Corp
02-0974 Reconstruction 0-001-010 01/21/03 *CO No.* Amount Disallowed Received Approved Contractor
1 7,779 01/21/04 02/17/04 TP Monahan
2 8,830 12/29/04 01/10/05 TP Monahan
3 4,140 01/03/05 01/10/05 TP Monahan
4 3,620 05/17/05 06/07/05 TP Monahan Inc
C3-1 9,900 11/19/04 11/24/04 Lupini Construction
04-1422 Reconstruction 0-001-011 06/20/05 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2066 Additions and Alterations 0-001-012 11/05/08 *CO No.* Amount Disallowed Received Approved Contractor
DW1-001 4,852 09/23/09 10/09/09 SCHENECTADY HARDWARE & ELEC CO INC
DW1-003 49,687 09/23/09 10/09/09 SCHENECTADY HARDWARE & ELEC CO INC
HS1-001 4,480 09/23/09 10/09/09 JERSEN CONSTRUCTION GROUP
HS1-002 3,942 09/23/09 10/09/09 JERSEN CONSTRUCTION GROUP
HS1-003 2,037 09/23/09 10/09/09 JERSEN CONSTRUCTION GROUP
HS1-004 4,463 10/13/09 10/28/09 JERSEN CONSTRUCTION GROUP
HS1-005 11,816 10/13/09 10/28/09 JERSEN CONSTRUCTION GROUP
HS2-001 1,527 10/13/09 10/28/09 J.V. WARREN
HS2-002 979 10/13/09 10/28/09 J.V. WARREN
HS3-001 18,290 10/13/09 10/28/09 MERIT PLUMBING & HEATING LLC
Granville Elem (fmrly Quaker):
94-0053 Reconstruction 0-013-001 08/01/94 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1144 Additions and Alterations 0-013-003 10/19/01 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1651 Reconstruction 0-013-004 04/25/01 *CO No.* Amount Disallowed Received Approved Contractor
00003 -6,521 06/15/04 09/27/04 T Lemme Mech.
02-0975 Reconstruction 0-013-006 01/21/03 *CO No.* Amount Disallowed Received Approved Contractor
1 19,371 01/21/04 02/17/04 TP Monahan Inc
07-2067 Additions and Alterations 0-013-007 11/05/08 *CO No.* Amount Disallowed Received Approved Contractor
DW1-002 19,097 09/23/09 10/09/09 SCHENECTADY HARDWARE & ELEC CO INC
GE1-001 10,386 09/23/09 10/09/09 BAST HATFIELD INC
GE1-002 1,329 09/23/09 10/09/09 BAST HATFIELD INC
GE1-003 2,372 10/13/09 11/19/09 BAST HATFIELD INC
GE1-004 984 10/13/09 11/19/09 BAST HATFIELD INC
GE3-001 7,025 10/13/09 11/19/09 GENERAL MECHANICAL SYSTEMS INC
GE3-003 2,748 10/13/09 11/19/09 GENERAL MECHANICAL SYSTEMS INC
GE3-004 5,075 10/13/09 11/19/09 GENERAL MECHANICAL SYSTEMS INC
07-1537 Reconstruction 0-013-008 03/25/08 *CO No.* Amount Disallowed Received Approved Contractor
E-001 -1,099 08/14/08 10/31/08 HAROLD R. CLUNE, INC.
E-002 -4,429 01/08/09 05/27/09 HAROLD R. CLUNE, INC.
G-001 8,695 07/15/08 10/07/08 MID-STATE INDUSTERIES, LTD.
G-002 -6,200 08/14/08 10/31/08 MID - STATE INDUSTERIES, LTD.
G-003 32,922 01/08/09 05/27/09 MID-STATE INDUSTRIES, LTD
Mary J. Tanner Elementary:
94-0051 Reconstruction 0-014-001 08/01/94 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1145 Additions and Alterations 0-014-002 08/07/00 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
00001 27,000 27,000 04/29/04 05/10/04 Harold R Clune
00001 28,657 04/29/04 05/10/04 Standard Northeast
00001 149,219 01/04/05 01/20/05 Albany Specialties
00002 18,417 11/02/04 / / Saratoga Restaurant Equip.
00002 -820 01/10/05 01/10/05 Albany Specialties
00004-02 -750 01/09/03 01/26/04 RF Gordon Mech.
0002 4,390 4,390 08/03/04 08/12/04 Saratoga Restaurant Equip.
01-01 -28,941 11/02/04 01/03/05 Plank Const.
011-01 -3,800 01/09/04 01/26/04 Dona Tech
04-01 14,818 14,818 01/09/04 01/26/04 RF Gordon Mech.
05-01 1,471 01/09/04 01/26/04 JBS, LLC
07-02 12,765 02/06/04 05/17/05 Dupont Flooring Systems
08-01 -550 11/02/04 01/03/05 Nickerson Corp.
13-002 -11,000 05/25/04 06/01/04 Standard Northeast
13-003 9,036 05/25/04 06/01/04 Standard Northeast
13-004 -489 05/25/04 06/01/04 Standard Northeast
2-003 -28,814 11/02/04 01/03/05 Albany Specialties
C12-001 -412 06/09/04 12/28/04 Quaker Bay
C3-002 -8,036 05/25/04 06/01/04 Harold R Clune
C5-002 -1,222 05/25/04 06/01/04 JBS LLC
C6-002 -5,000 05/25/04 06/01/04 Cortland Glass
C7-001 5,324 06/23/04 07/06/04 Dupont Flooring Systems
C7-003 -925 06/23/04 07/06/04 Dupont Flooring Systems
02-0976 Reconstruction 0-014-003 01/21/03 *CO No.* Amount Disallowed Received Approved Contractor
1 10,582 01/21/04 02/17/04 TP Monahan Inc
04-1423 Reconstruction 0-014-004 06/20/05 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2068 Reconstruction 0-014-005 11/05/08 *CO No.* Amount Disallowed Received Approved Contractor
GE3-002 12,580 10/13/09 10/28/09 GENERAL MECHANICAL SYSTEMS INC
Maintenance Storage Garage & Office:
07-2069 New Construction 2-018-001 11/05/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
94-0050 Reconstruction 5-002-001 08/22/94 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2070 Reconstruction 5-002-005 11/05/08 NO CHANGE ORDERS ON ELECTRONIC FILE
GREENWICH CENTRAL SCHOOL STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-08-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Primary Bldg:
96-0213 Reconstruction 0-004-004 09/06/96 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0642 Additions and Alterations 0-004-005 04/05/99 *CO No.* Amount Disallowed Received Approved Contractor
4-5 870 08/08/01 01/24/02 Rozell-4
00-0846 Reconstruction 0-004-006 08/28/01 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0578 Reconstruction 0-004-008 02/20/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2023 Reconstruction 0-004-009 06/09/08 *CO No.* Amount Disallowed Received Approved Contractor
ONE 35,165 09/24/08 05/12/09 E.W TOMPKINS COMPANY,INC
Middle Grade Building:
96-0214 Reconstruction 0-005-007 09/06/96 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0643 Additions and Alterations 0-005-008 04/05/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0410 Reconstruction 0-005-009 01/19/00 *CO No.* Amount Disallowed Received Approved Contractor
12-09 9,975 10/02/01 01/08/02 Niram, Inc.
17-03 -317 05/13/01 02/06/02 JJ Curran & Sons
17-06 -783 09/21/01 01/15/02 JJ Curran & Sons
17-07 -1,566 09/21/01 01/15/02 JJ Curran & Sons
17-08 -783 10/17/01 02/11/02 JJ Curran & Sons
18-04 748 10/02/01 01/08/02 Sigma Painting of NY
18-07 477 04/12/02 04/25/02 Sigma Painting of NY
21-04 22,367 07/02/01 01/29/02 RF Gordon
21-05 15,600 07/02/01 01/29/02 RF Gordon
21-16 3,936 07/02/01 01/29/02 RF Gordon
21-22 642 10/22/01 01/08/02 RF Gordon
22-18 834 10/05/01 04/15/02 Burniche Piping
23-23 -100 06/14/01 01/08/02 Brownell Elec.
23-59 1,189 02/01/02 03/06/02 Brownell Elec.
23-60 315 02/01/02 03/06/02 Brownell Elec.
23-66 2,386 04/12/02 04/25/02 Brownell Elec.
23-69 1,150 04/12/02 04/25/02 Brownell Elec.
24-05 722 11/30/01 01/10/02 Adirondack Cabling
24-06 432 11/30/01 01/10/02 Adirondack Cabling
24-08 336 04/23/02 05/07/02 Adirondack Cabling
24-10 432 04/23/02 05/07/02 Adirondack Cabling
25-02 -79 10/02/01 01/08/02 H. Lapham & Sons
25-06 -100 10/02/01 01/08/02 H. Lapham & Sons
25-07 -2,542 10/02/01 01/08/02 H. Lapham & Sons
25-08 -2,144 10/02/01 01/08/02 H. Lapham & Sons
25-09 -1,783 10/02/01 01/08/02 H. Lapham & Sons
00-0848 Reconstruction 0-005-010 08/28/01 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0145 Reconstruction 0-005-011 08/04/06 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0579 Reconstruction 0-005-012 02/20/07 NO CHANGE ORDERS ON ELECTRONIC FILE
High School:
92-0237 Reconstruction 0-007-005 10/07/92 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0215 Reconstruction 0-007-006 09/06/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0411 Additions and Alterations 0-007-007 01/19/00 *CO No.* Amount Disallowed Received Approved Contractor
13-04 3,895 10/22/01 01/08/02 Schenectady Steel
13-05 1,434 10/22/01 01/08/02 Schenectady Steel
14-05 -1,200 06/08/01 01/08/02 Malone & Tate Builders
14-12 -480 01/18/02 03/08/02 Malone & Tate
14-19 -179 09/21/01 01/15/02 Malone & Tate
14-20 151 09/21/01 01/15/02 Malone & Tate
14-21 160 10/17/01 02/11/02 Malone & Tate
14-22 826 10/17/01 02/11/02 Malone & Tate
14-23 3,744 10/17/01 02/11/02 Malone & Tate
14-24 277 10/17/01 02/11/02 Malone & Tate
14-25 1,313 10/17/01 02/11/02 Malone & Tate
14-26 231 10/05/01 04/15/02 Malone & Tate
14-27 162 10/05/01 04/15/02 Malone & Tate
14-28 1,384 10/17/01 02/11/02 Malone & Tate
14-29 -293 10/17/01 02/11/02 Malone & Tate
14-30 2,042 10/17/01 02/08/02 Malone & Tate
14-31 1,790 01/25/02 03/25/02 Malone & Tate
14-33 1,294 11/30/01 01/10/02 Malone & Tate
14-34 2,467 01/25/02 03/25/02 Malone & Tate
14-36 203 04/12/02 04/25/02 Malone & Tate
16-07 -1,110 06/08/01 01/08/02 A. Mion & Sons
16-08 -6,548 06/08/01 01/08/02 A. Mion & Sons
16-09 2,953 06/08/01 01/08/02 A. Mion & Sons
16-10 5,216 06/08/01 01/08/02 A. Mion & Sons
16-11 2,052 06/08/01 01/08/02 A. Mion & Sons
16-12 1,490 06/08/01 01/08/02 A. Mion & Sons
16-15 310 10/22/01 01/08/02 A. Mion & Sons
17-04 4,274 06/08/01 01/08/02 JJ Curran & Sons
18-03 632 06/08/01 01/08/02 Sigma Painting
18-05 -1,200 10/18/01 02/08/02 Sigma Painting
18-06 791 04/12/02 04/25/02 Sigma Painting
19-01 -464 10/05/01 04/15/02 Northeastern Interior Systems
20-01 -3,000 10/17/01 02/08/02 Bay State Elevator
21-02 9,750 06/08/01 02/06/02 RF Gordon
21-06 5,593 06/14/01 01/08/02 RF Gordon
21-14 5,071 06/14/01 01/08/02 RF Gordon
21-15 -210 01/18/02 03/26/02 RF Gordon
21-17 -264 01/18/02 03/26/02 RF Gordon
21-23 5,961 09/21/01 04/08/02 RF Gordon
21-24 3,893 09/21/01 04/08/02 RF Gordon
21-25 3,271 09/21/01 04/08/02 RF Gordon
21-26 -935 10/22/01 04/15/02 RF Gordon
21-27 959 09/21/01 04/08/02 RF Gordon
21-28 20,738 10/22/01 01/08/02 RF Gordon
21-30 788 01/25/02 03/25/02 RF Gordon
22-17 2,558 10/22/01 04/15/02 Burniche Piping
23-22 -210 12/18/01 02/28/02 Brownell Elec.
23-23A -502 07/01/02 07/15/02 Brownell Elec.
23-24 1,495 06/08/01 02/06/02 Brownell Elec.
23-25 226 06/08/01 02/06/02 Brownell Elec.
23-28 534 06/08/01 02/06/02 Brownell Elec.
23-30 228 06/08/01 02/06/02 Brownell Elec.
23-33 412 06/08/01 02/06/02 Brownell Elec.
23-34 2,000 06/08/01 02/06/02 Brownell Elec.
23-36 3,474 06/14/01 01/08/02 Brownell Elec.
23-50 257 09/21/01 04/08/02 Brownell Elec.
23-51 2,434 11/21/01 01/29/02 Brownell Elec.
23-52 737 09/21/01 04/08/02 Brownell Elec.
23-53 651 11/21/01 02/11/02 Brownell Elec.
23-54 4,047 11/21/01 02/11/02 Brownell Elec.
23-55 4,300 11/21/01 02/11/02 Brownell Elec.
23-56 -1,712 12/18/01 01/08/03 Brownell Elec.
23-57 416 12/07/01 02/21/02 Brownell Elec.
23-58 1,389 12/24/01 03/25/02 Brownell Elec.
23-63 953 04/12/02 04/25/02 Brownell Elec.
23-64 1,047 04/12/02 04/25/02 Brownell Elec.
23-65 4,113 04/12/02 04/25/02 Brownell Elec.
23-67 844 04/12/02 04/25/02 Brownell Elec.
23-68 1,396 04/12/02 04/25/02 Brownell Elec.
24-04 418 06/08/01 01/08/02 Adirondack Cabling
24-07 192 11/30/01 01/10/02 Adirondack Cabling
24-09 332 04/23/02 05/07/02 Adirondack Cabling
98-0641 Reconstruction 0-007-008 04/05/99 *CO No.* Amount Disallowed Received Approved Contractor
08-01 -21,618 05/02/01 01/14/02 RF Gordon Mech.
3-5 -600 05/02/01 01/14/02 L & C Europa
9-4 1,301 05/02/01 01/14/02 RF Gordon Mech.
00-0847 Additions and Alterations 0-007-009 08/28/01 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1415 Reconstruction 0-007-010 08/11/05 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0580 Reconstruction 0-007-011 02/20/07 *CO No.* Amount Disallowed Received Approved Contractor
C1 -CO#1 26,747 10/19/07 10/26/07 SHAKER FLATS LANDSCAPING, INC.
02-2006FP Reconstruction 0-007-FP1 06/04/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Athletic Storage/HS:
91-1218 New Construction 2-011-001 05/20/92 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
94-0123 Reconstruction 5-001-002 09/06/94 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0644 Additions and Alterations 5-001-004 04/05/99 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0581 Reconstruction 5-001-005 02/20/07 NO CHANGE ORDERS ON ELECTRONIC FILE
District Wide:
08-0391 Reconstruction 7-999-002 11/03/08 NO CHANGE ORDERS ON ELECTRONIC FILE
HARTFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-10-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
90-0585 Reconstruction 0-001-005 01/04/91 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0128 Reconstruction 0-001-007 09/08/94 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0135 Reconstruction 0-001-008 09/05/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0953 Reconstruction 0-001-009 04/22/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0931 Additions and Alterations 0-001-010 08/20/01 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0644 Additions and Alterations 0-001-013 02/27/08 *CO No.* Amount Disallowed Received Approved Contractor
01-02 54,251 07/20/09 08/31/09 CFI CONSTRUCTION
01-03 7,907 07/22/09 09/03/09 CFI CONSTRUCTION
01-06 9,018 10/20/09 11/18/09 CFI CONSTRUCTION
02-01 65,615 02/24/09 04/23/09 BAST HATFIELD INC.
02-03 1,664 07/22/09 09/03/09 BAST HATFIELD INC
02-04 24,470 06/22/09 08/10/09 BAST HATFIELD INC
02-06 1,873 06/22/09 08/10/09 BAST HATFIELD INC
02-07 4,389 07/03/09 08/28/09 BAST HATFIELD INC
02-08 7,790 07/03/09 08/28/09 BAST HATFIELD INC
02-09 4,303 07/20/09 08/31/09 BAST HATFIELD INC
02-10 8,167 07/20/09 08/31/09 BAST HATFIELD INC
02-11 8,155 07/20/09 08/31/09 BAST HATFIELD INC
02-12 8,158 07/20/09 08/31/09 BAST HATFIELD INC
02-13 3,773 07/20/09 08/31/09 BAST HATFIELD INC
02-14 7,120 07/20/09 08/31/09 BAST HATFIELD INC
02-15 41,355 08/04/09 09/02/09 BAST HATFIELD INC
02-16 16,170 09/08/09 10/14/09 BAST HATFIELD INC
02-17 4,148 09/08/09 10/14/09 BAST HATFIELD INC
02-18 4,886 09/08/09 10/14/09 BAST HATFIELD INC
02-22 4,370 09/08/09 10/13/09 BAST HATFIELD INC
02-23 3,814 08/21/09 09/11/09 BAST HATFIELD INC
02-24 2,574 08/21/09 09/11/09 BAST HATFIELD INC
02-30 4,249 09/28/09 10/08/09 BAST HATFIELD INC
02-31 13,475 09/28/09 10/08/09 BAST HATFIELD INC
03-02 2,232 06/08/09 09/23/09 JOHN V. WARREN INC
03-03 1,370 08/21/09 09/11/09 JOHN V WARREN INC
04-001 -2,418 12/02/08 05/08/09 SCHENECTADY HARDWARE & ELECTRIC
04-003 -450 01/23/09 07/07/09 SCHENECTADY HARDWARE & ELECTRIC
04-004 8,990 01/23/09 / / SCHENECTADY HARDWARE & ELECTRIC
04-06 6,797 06/08/09 09/23/09 SCHENECTADY HARDWARE & ELECTRIC
04-07 -1,000 05/29/09 07/14/09 SCHENECTADY HARDWARE & ELECTRIC
04-09 1,064 08/26/09 09/18/09 SCHENECTADY HARDWARE & ELECTRIC
05-01 8,969 06/08/09 07/14/09 JOHN V. WARREN INC
05-02 3,533 05/26/09 / / JOHN V. WARREN INC
05-02 3,533 05/26/09 09/23/09 JOHN V WARREN, INC.
05-03 4,625 06/22/09 09/23/09 JOHN V. WARREN INC
06-01 1,698 11/18/08 06/17/09 BUFFALO HOTEL SUPPLY CO., INC.
02-0743FP Reconstruction 0-001-FP1 12/24/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Shop Building:
90-0586 Reconstruction 0-002-002 01/04/91 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0136 Reconstruction 0-002-003 09/05/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0953 Additions and Alterations 0-002-004 08/20/01 *CO No.* Amount Disallowed Received Approved Contractor
E01 -3,000 11/26/02 03/13/03 Werblow Elec.
GC01 2,803 11/26/02 03/13/03 BEKA Const.
HV01 -3,582 11/26/02 03/13/03 Adirondack P&M
P01 -3,000 11/26/02 03/13/03 Jack Hall Plumbing
07-0645 Reconstruction 0-002-005 02/27/08 *CO No.* Amount Disallowed Received Approved Contractor
01-05 14,127 06/22/09 08/10/09 CFI CONSTRUCTION
04-002 9,623 11/18/08 / / SCHENECTADY HARDWARE & ELECTRIC
Elementary Building:
91-0341 Reconstruction 0-003-002 10/28/91 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0954 Additions and Alterations 0-003-004 04/22/98 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0646 Additions and Alterations 0-003-005 02/27/08 *CO No.* Amount Disallowed Received Approved Contractor
01-04 7,521 05/26/09 09/23/09 CFI CONSTRUCTION
02-02 10,965 07/22/09 09/03/09 BAST HATFIELD INC
02-05 3,080 06/22/09 08/10/09 BAST HATFIELD INC
02-25 16,075 08/21/09 09/11/09 BAST HATFIELD INC
02-26 23,195 08/21/09 09/11/09 BAST HATFIELD INC
02-27 43,294 08/21/09 09/11/09 BAST HATFIELD INC
02-32 13,764 09/28/09 10/08/09 BAST HATFIELD INC
05-04 913 07/22/09 08/31/09 JOHN V WARREN INC
Hartford Bus Garage:
97-0137 Reconstruction 5-004-002 09/05/97 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1502 Reconstruction 5-004-L01 06/27/02 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0171 Reconstruction 5-004-L02 09/02/05 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1077 Reconstruction 5-004-L04 03/12/07 NO CHANGE ORDERS ON ELECTRONIC FILE
ALTERNATIVE ENERGY PLANT:
07-0647 New Construction 7-009-001 02/27/08 *CO No.* Amount Disallowed Received Approved Contractor
01-01 -1,790 12/02/08 04/13/09 CFI CONSTRUCTION
02-19 -3,955 09/08/09 10/13/09 BAST HATFIELD INC
02-20 2,695 09/08/09 10/13/09 BAST HATFIELD INC
02-28 7,283 09/28/09 10/08/09 BAST HATFIELD INC
02-29 9,636 09/28/09 10/08/09 BAST HATFIELD INC
03-01 -4,165 12/02/08 05/08/09 JOHN V. WARREN, INC.
03-04 -7,283 10/20/09 11/18/09 JOHN V. WARREN INC
04-05 1,727 06/08/09 07/14/09 SCHENECTADY HARDWARE & ELECTRIC
04-08 3,952 07/22/09 10/07/09 SCHENECTADY HARDWARE & ELECTRIC
04-10 2,165 10/20/09 11/18/09 SCHENECTADY HARDWARE & ELECTRIC
HUDSON FALLS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-13-01-06
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Senior High School:
90-0935 Reconstruction 0-001-005 03/11/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0700 Reconstruction 0-001-007 03/11/92 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0680 Additions and Alterations 0-001-008 06/05/00 *CO No.* Amount Disallowed Received Approved Contractor
1 -5,000 04/30/03 05/02/03 Jim Quinn and Assoc.
1A 2,735 08/11/03 09/05/03 Tougher Industries
2 13,500 07/29/02 08/28/02 ET O'Connor Const.
2 7,000 01/03/03 01/08/03 Tougher Industries
3 2,124 08/15/02 09/05/02 ET O'Connor Const.
3-B-Hs 15,604 04/30/03 05/02/03 Tougher Industries
4 5,195 08/15/02 09/05/02 ET O'Connor Const.
5 16,200 01/03/03 01/08/03 ET O'Connor Const.
5 696 08/19/03 09/19/03 Tech. Bldg. Services
6 700 10/16/03 11/05/03 Tech. Bldg. Services
7 3,000 01/03/03 01/08/03 ET O'Connor Const.
AA-2 3,500 07/29/02 08/28/02 Anderson & McCoy
AA-3 425 03/16/04 03/30/04 Anderson & McCoy
AA-5 3,000 04/30/03 05/02/03 Anderson & McCoy
CC-1 4,327 07/29/02 08/28/02 Adirondack Cabling
CC-2 2,507 08/15/02 09/05/02 Adirondack Cabling
CC-3 617 07/29/02 08/28/02 Adirondack Cabling
CC-7 2,762 08/11/03 09/05/03 Adirondack Cabling
CC-8 2,264 04/30/03 05/02/03 Adirondack Cabling
EC-10rev 8,978 07/29/02 08/28/02 Harold R. Clune
EC-12 6,097 01/03/03 01/08/03 Harold R. Clune
EC-13 5,573 01/03/03 01/08/03 Harold R. Clune
EC-15 9,182 01/03/03 01/08/03 Harold R. Clune
EC-16 3,452 01/03/03 01/08/03 Harold R. Clune
EC-17 575 04/30/03 05/02/03 Harold R. Clune
EC-18 3,003 04/30/03 05/02/03 Harold R. Clune
EC-19 7,784 04/30/03 05/02/03 Harold R. Clune
EC-2 -4,581 07/29/02 01/09/03 Harold R. Clune
EC-20 1,808 04/30/03 05/02/03 Harold R. Clune
EC-3 7,377 07/29/02 08/28/02 Harold R. Clune
EC-4 4,005 07/29/02 08/28/02 Harold R. Clune
EC-5 11,504 07/29/02 08/28/02 Harold R. Clune
EC-6 2,042 07/29/02 09/03/02 Harold R. Clune
EC-7 2,872 07/29/02 08/28/02 Harold R. Clune
EC-8 9,223 07/29/02 08/28/02 Harold R. Clune
EC9 rev 2,956 07/29/02 08/28/02 Harold R. Clune
GC-1 5,160 07/29/02 08/28/02 MLB Industries
GC-2 -17,050 07/29/02 08/28/02 MLB Industries
GC-3 9,000 01/03/03 01/08/03 MLB Industries
GC-5 11,168 04/30/03 05/02/03 MLB Industries
GC-6 -12,277 04/30/03 05/02/03 MLB Industries
GC-7 17,016 12/19/03 04/30/04 MLB Industries
PC-2 10,169 01/03/03 09/05/03 Weisburgh Mech.
PC-3 1,890 04/30/03 05/02/03 Weisburgh Mech.
R-1 -19,523 07/29/02 09/03/02 Monahan and Loughlin
R-2 3,500 07/29/02 08/28/02 Monahan and Loughlin
R-4 4,150 03/16/04 03/30/04 Monahan and Loughlin
97-0677 Reconstruction 0-001-009 12/15/97 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0696 Alterations 0-001-011 03/01/07 *CO No.* Amount Disallowed Received Approved Contractor
E25 4,653 08/10/09 11/12/09 BROWNELL ELECTRIC CORPORATION
E4 0 01/04/08 03/19/08 BROWNELL ELECTRIC
GC1-10 -15,000 02/15/08 03/19/08 MONAHAN & LOUGHLIN, INC.
GC1-15 8,400 05/15/09 08/13/09 Monahan & Loughlin
GC1-4 -27,338 07/02/07 07/17/07 Monahan and Loughlin
GC2-1 0 01/04/08 01/25/08 BAST HATFIELD INC
GC2-13 0 04/17/08 04/24/08 BAST HATFIELD, INC.
GC2-15 -3,055 04/17/08 04/24/08 BAST HATFIELD, INC.
GC2-20 3,344 06/24/08 10/24/08 Bast Hatfield
GC2-23 0 06/24/08 10/24/08 Bast Hatfield
GC2-25 0 03/13/09 06/11/09 BAST HATFIELD, INC.
GC2-33 0 03/13/09 06/11/09 BAST HATFIELD, INC.
GC2-46 501 05/15/09 08/13/09 BAST HATFIELD INC
GC2-49 142,458 06/15/09 08/13/09 BAST HATFIELD INC
GC2-50 3,964 08/10/09 09/16/09 BAST HATFIELD INC
GC2-9 0 05/07/08 08/04/08 BAST HARTFIELD, INC.
M14 12,118 03/13/09 06/11/09 R.F. GORDON MECHANICAL, INC.
M16 5,891 08/10/09 09/16/09 R.F. GORDON MECHANICAL, INC
M17 786 08/10/09 / / RF GORDON MECHANICAL INC
06-0697 Reconstruction 0-001-012 03/01/07 *CO No.* Amount Disallowed Received Approved Contractor
P19 -1,000 05/13/09 09/23/09 CRISAFULLI BROS.
P8 1,580 01/22/09 03/05/09 CRISAFULLI BROS. PLUMBING & HEATING
07-0959 Additions and Alterations 0-001-013 02/26/08 *CO No.* Amount Disallowed Received Approved Contractor
DFH5 560 06/16/09 08/19/09 B.R. JOHNSON, INC.
E12 12,584 05/13/09 / / HAROLD R. CLUNE INC
E14 3,985 06/16/09 08/19/09 HAROLD R. CLUNE, INC.
E17 1,117 06/16/09 08/19/09 HAROLD R. CLUNE, INC.
E2 0 01/22/09 02/26/09 HAROLD R. CLUNE, INC.
E3 0 01/22/09 02/26/09 HAROLD R. CLUNE, INC.
E9 3,087 03/12/09 06/10/09 Harold R. Clune
GC-1 0 03/12/09 06/10/09 Bast Hatfield
GC-5 -4,160 03/12/09 06/10/09 Bast Hatfield
GC17 2,611 06/16/09 08/19/09 BAST HATFIELD, INC.
GC24 2,279 08/19/09 09/15/09 BAST HATFIELD INC
M7 1,293 03/12/09 06/10/09 R.F. Gordon Mechanical
M9 2,997 08/10/09 08/28/09 RF GORDON MECHANICAL INC
P4 -487 03/12/09 06/03/09 CRISAFULLI BROS. PLUMBING & HEATING
P5 6,849 08/19/09 11/10/09 CRISAFULLI BROS PLUMB & HEAT CONT.
R6 1,215 08/10/09 09/23/09 MONAHAN & LOUGHLIN INC
SW1 0 03/12/09 06/10/09 HMA Contracting Corp
SW8 4,864 03/12/09 06/10/09 HMA Contracting Corp
09-0139 Reconstruction 0-001-017 08/20/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1963FP Reconstruction 0-001-FP1 06/03/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Margaret Murphy Kindergarten Ctr.:
90-0936 Reconstruction 0-003-004 03/11/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0701 Reconstruction 0-003-005 03/11/92 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1696 Reconstruction 0-003-006 08/08/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0912 Reconstruction 0-003-007 04/15/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0674 Reconstruction 0-003-008 06/02/00 *CO No.* Amount Disallowed Received Approved Contractor
1 2,150 04/30/03 05/02/03 TBS
CC-5 980 08/11/03 09/05/03 Adirondack Cabling
06-0699 Reconstruction 0-003-009 03/01/07 *CO No.* Amount Disallowed Received Approved Contractor
E1 542 09/14/07 11/08/07 BROWNELL ELECTRIC CORPORATION
E2 0 01/04/08 03/19/08 BROWNELL ELETRIC CORP
E20 670 03/13/09 06/11/09 TVRWNELL ELECTRIC CORPORATION
GC1-1 -18,017 07/02/07 07/17/07 Monahan Loughlin
GC1-5 0 09/14/07 11/14/07 MONAHAN & LOUGHLIN, INC.
M12 152 01/22/09 03/04/09 R.F. GORDON MECHANICAL, INC.
M15 1,000 05/15/09 10/07/09 R.F. GORDON MECHANICAL INC
M16 5,891 08/10/09 / / RF GORDON MECHANICAL INC
M17 786 08/10/09 09/16/09 RF GORDON MECHANICAL INC
M7 -2,173 04/17/08 08/06/08 R.F.GORDON MECHANICAL, INC.
M9 -5,651 06/24/08 / / R.F.GORDON MECHANICAL
05-1061 Reconstruction 0-003-010 03/31/06 *CO No.* Amount Disallowed Received Approved Contractor
GC-2 2,276 10/17/06 12/14/06 Monahan Loughlin
07-0960 Reconstruction 0-003-011 02/26/08 *CO No.* Amount Disallowed Received Approved Contractor
E1 0 04/08/09 08/14/09 HAROLD R CLUNE INC
E8 -770 03/12/09 06/10/09 Harold R. Clune
GC-4 0 03/12/09 06/10/09 Bast Hatfield
GC19 1,210 06/16/09 08/19/09 BAST HATFIELD, INC.
GC7 0 03/12/09 06/10/09 Bast Hatfield
GC9 -365 03/12/09 06/10/09 Bast Hatfield
M5 162 03/12/09 06/10/09 R.F. Gordon Mechanical
Intermediate Sch. (was Maple St):
90-0938 Reconstruction 0-004-005 03/11/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0702 Reconstruction 0-004-006 03/11/92 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1697 Additions and Alterations 0-004-007 08/08/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0913 Reconstruction 0-004-008 04/15/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0682 Additions and Alterations 0-004-010 06/05/00 *CO No.* Amount Disallowed Received Approved Contractor
3-A-15 1,226 04/30/03 05/02/03 Tougher Industries
4 1,830 08/19/03 09/22/03 Technical Building Services
AA-4 10,405 04/30/03 05/02/03 Anderson & McCoy
CC-4 1,582 01/03/03 01/08/03 Adirondack Cabling
PC-1 5,839 07/29/02 08/28/02 Weisburgh Mech.
PC-4 -151 08/19/03 09/22/03 Weisburgh Mech.
06-0700 Alterations 0-004-011 03/01/07 *CO No.* Amount Disallowed Received Approved Contractor
E15 -146 03/13/09 06/11/09 BROWNELL ELECTRIC CORPORATION
E28 270 08/10/09 11/12/09 BROWNELL ELECTRIC CORPORATION
E3 0 01/04/08 03/19/08 BROWNELL ELETRIC CORP
GC1-3 -49,732 07/02/07 07/17/07 Monahan and Loughlin
07-0961 Additions and Alterations 0-004-012 02/26/08 *CO No.* Amount Disallowed Received Approved Contractor
AA1-1 -6,300 03/12/09 06/10/09 Neoplanta Restoration
AA1-2 1,785 03/12/09 06/10/09 Neoplanta Restoration
DFH1 0 03/12/09 06/10/09 BR Johnson
DFH3 -1,568 06/16/09 08/19/09 B.R. JOHNSON, INC.
DFH4 1,090 06/16/09 08/19/09 B.R. JOHNSON, INC.
DGH2 -1,910 03/12/09 06/10/09 B.R. Johnson Inc
E4 0 01/22/09 02/26/09 HAROLD R. CLUNE, INC.
E7 -1,912 03/12/09 06/10/09 Haroled R. Clune Inc.
GC-3 -6,680 03/12/09 06/10/09 Bast Hatfield
GC11 -539 03/12/09 06/10/09 Bast Hatfield
GC15 2,607 05/13/09 07/30/09 BAST HATFIELD INC
GC16 4,745 06/16/09 08/19/09 BAST HATFIELD, INC.
GC20 1,729 06/16/09 08/19/09 BAST HATFIELD, INC.
GC25 0 08/19/09 09/15/09 BAST HATFIELD INC
GC8 8,095 03/12/09 06/10/09 Bast Hatfield
M10 1,197 08/10/09 08/28/09 RF GORDON MECHANICAL INC
M6 4,481 03/12/09 06/10/09 R.F. Gordon Mechanical
P2 0 03/12/09 06/03/09 CRISAFULLI BROS. PLUMBING & HEATING
SW10 2,875 08/19/09 09/15/09 HMA CONTRACTING CORPORATION
SW5 2,970 03/12/09 06/10/09 HMA Contracting Corporation
08-0375 Reconstruction 0-004-014 09/22/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Primary Sch.(Was Dix Avenue):
90-0937 Reconstruction 0-005-004 03/11/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0703 Reconstruction 0-005-005 03/11/92 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1695 Additions and Alterations 0-005-006 08/08/95 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0675 Reconstruction 0-005-007 06/02/00 *CO No.* Amount Disallowed Received Approved Contractor
2 2,150 04/30/03 05/02/03 TBS
3 2,350 08/19/03 09/22/03 Tech. Bldg. Services
AA-1 -1,207 03/16/04 03/30/04 Anderson & McCoy
CC-6 1,307 08/11/03 09/05/03 Adirondack Cabling
EC-14 2,153 01/03/03 01/08/03 Harold Clune
02-1699 Reconstruction 0-005-008 09/19/03 *CO No.* Amount Disallowed Received Approved Contractor
4-1 15,616 06/01/04 07/09/04 Mazone Plumbing
5-1 3,413 06/01/04 07/09/04 Hour Electric
06-0701 Additions and Alterations 0-005-009 03/01/07 *CO No.* Amount Disallowed Received Approved Contractor
E13 18,354 03/13/09 06/11/09 BROWNELL ELECTRIC CORPORATION
E18 8,772 03/13/09 06/11/09 BROWNELL ELECTRIC CORPORATION
E21 2,343 03/13/09 06/11/09 BROWNELL ELECTRIC CORPORATION
E22 1,834 03/13/09 06/11/09 BROWNELL ELECTRIC CORPORATION
E23 1,234 03/13/09 06/11/09 BROWNELL ELECTRIC CORPORATION
E27 3,019 08/10/09 / / BROWNELL ELECTRIC CORPORATION
E8 0 02/15/08 04/04/08 BROWNELL ELECTRIC CORP
GC1-13 2,291 05/13/09 07/30/09 MONAHAN & LOUGHLIN INC
GC1-2 -35,178 07/02/07 07/17/07 Monahan Loughlin
GC1-7 0 09/14/07 11/26/07 MONAHAN & LOUGHLIN, INC.
GC1-8 0 02/15/08 03/19/08 MONAHAN & LOUGHLIN, INC.
GC1-9 0 02/15/08 03/19/08 MONAHAN & LOUGHLIN, INC.
GC2-11 0 04/17/08 04/24/08 BAST HATFIELD, INC.
GC2-12 0 04/17/08 04/24/08 BAST HATFIELD, INC.
GC2-18 0 04/07/08 04/24/08 BAST HASTFIELD, INC.
GC2-19 0 04/17/08 04/24/08 BAST HATFIELD, INC.
GC2-21 -2,886 06/24/08 10/24/08 BAST HATFIELD
GC2-24 0 06/24/08 10/27/08 BAST HATFIELD
GC2-27 0 03/13/09 06/11/09 BAST HATFIELD, INC.
GC2-29 0 03/13/09 06/11/09 BAST HATFIELD, INC.
GC2-30 -4,000 03/13/09 06/11/09 BAST HATFIELD,INC
GC2-34 0 03/13/09 06/11/09 BAST HATFIELD, INC.
GC2-36 0 03/13/09 06/11/09 BAST HATFIELD, INC.
GC2-38 -2,900 03/13/09 06/11/09 BAST HATFIELD, INC.
GC2-39 0 03/13/09 06/11/09 BAST HATFIELD, INC.
GC2-43 5,723 05/13/09 07/30/09 BAST HATFIELD INC
GC2-45 5,938 05/15/09 08/13/09 BAST HATFIELD INC
GC2-5 0 01/04/08 01/25/08 BAST HATFIELD INC
GC2-6 -28,125 04/17/08 04/24/08 BAST HATFIELD, INC.
M18 4,051 08/10/09 09/16/09 RF GORDON MECHANICAL INC
M4 0 01/04/08 03/19/08 R.F GORDON MECHANICAL
M5 0 04/17/08 08/06/08 R.F. GORDON MECHANICAL, INC.
M8 0 04/17/08 08/05/08 R.F. GORDON MECHANICAL, INC.
P13 1,404 03/13/09 06/11/09 CRISAFULLI BROS. PLUMBING & HEATING
P2 0 01/04/08 03/19/08 CRISAFULLI BROS PLUMBING & HEATING
P6 2,709 11/17/08 06/23/09 CRISAFULLI BROS. PLUMBING & HEATING
07-0962 Reconstruction 0-005-010 02/26/08 *CO No.* Amount Disallowed Received Approved Contractor
AA2-2 0 08/10/09 09/23/09 JUPITER ENVIRONMENTAL SERVICES INC
E16 15,672 06/16/09 08/19/09 HAROLD R. CLUNE, INC.
E16 15,672 06/16/09 / / HAROLD R. CLUNE, INC.
E19 1,289 08/10/09 08/28/09 HAROLD R CLUNE INC
E6 5,410 03/12/09 06/10/09 Harold R. Clune
GC10 -554 03/12/09 06/10/09 Bast Hatfield
GC21 1,815 06/16/09 08/19/09 BAST HATFIELD, INC.
GC23 2,515 08/10/09 09/18/09 BAST HATFIELD INC
M11 5,606 08/10/09 08/28/09 RF GORDON MECHANICAL INC
R3 3,675 06/16/09 08/19/09 MONAHAN & LOUGHLIN, INC.
SW2 0 03/12/09 06/10/09 HMA Contracting Corp
SW4 2,000 03/12/09 06/10/09 HMA Contracting Corp
SW7 706 03/12/09 06/10/09 MA Contracting Corp
SW9 106 03/12/09 06/10/09 HMA Contracting Corp
07-2220 Reconstruction 0-005-012 06/18/08 *CO No.* Amount Disallowed Received Approved Contractor
R1 -48,470 03/12/09 06/10/09 Monahan & Loughlin
R2 -20,424 03/12/09 06/10/09 Monahan & Loughlin
R3 -20,000 06/15/09 08/13/09 MONAHAN & LAUGHLIN INC
02-1962FP Reconstruction 0-005-FP1 06/03/03 NO CHANGE ORDERS ON ELECTRONIC FILE
District Offices (Burgoyne Ave.Sch):
94-1699 Reconstruction 0-006-002 08/08/95 NO CHANGE ORDERS ON ELECTRONIC FILE
Middle School (Was Junior High):
90-0939 Reconstruction 0-007-003 03/11/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0704 Reconstruction 0-007-004 03/11/92 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1698 Reconstruction 0-007-005 08/08/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0914 Reconstruction 0-007-006 04/15/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0681 Additions and Alterations 0-007-007 06/05/00 *CO No.* Amount Disallowed Received Approved Contractor
7 700 10/16/03 11/05/03 Tech, Bldg. Services
CC-9 553 04/30/03 05/02/03 Adirondack Cabling
EC-11Rev 2,457 07/30/02 08/28/02 Harold R. Clune
06-0702 Additions and Alterations 0-007-008 03/01/07 *CO No.* Amount Disallowed Received Approved Contractor
E10 0 04/16/08 08/05/08 BROWNELL ELECTRIC COROPORATION
E11 -11,650 06/24/08 02/11/09 BROWNELL ELECTRIC CORP
E12 0 03/13/09 06/11/09 BROWNELL ELECTRIC CORPORATION
E14 944 03/13/09 06/11/09 BROWNELL ELECTRIC CORPORATION
E17 498 03/13/09 06/11/09 BROWNELL
E24 4,886 03/13/09 06/11/09 BROWNELL ELECTRIC CORPORATION
E26 5,918 08/10/09 / / BROWNELL ELECTRIC CORPORATION
E6 0 01/04/08 02/23/08 BROWNELL ELECTRIC CORPORATION
E7 0 02/15/08 04/04/08 BROWNELL ELECTRIC COPRPORATION
E9 23,023 04/17/08 08/05/08 BROWNELL ELECTRIC CORPORATION
GC-11 0 02/15/08 03/19/08 MONAHAN & LOUGHLIN, INC.
GC1-12 0 04/17/08 04/24/08 MONAHAN & LOUGHLIN, INC.
GC1-14 2,996 05/15/09 08/13/09 MONAHAN & LAUGHLIN INC
GC1-6 0 09/14/07 11/26/07 MONAHAN & LOUGHLIN, INC.
GC2-14 0 04/17/08 04/24/08 BAST HATFIELD, INC.
GC2-16 -312 04/17/08 04/24/08 BAST HATFIELD, INC.
GC2-17 0 04/17/08 04/24/08 BAST HATFIELD, INC.
GC2-2 7,427 01/04/08 01/25/08 BAST HATFIELD INC
GC2-22 0 06/24/08 10/27/08 Bast Hatfield
GC2-26 0 03/13/09 06/11/09 BAST HATFIELD, INC.
GC2-28 0 03/13/09 06/11/09 BAST HATFIELD, INC.
GC2-3 0 01/04/08 01/25/08 BAST HATFIELD INC
GC2-31 -4,000 03/13/09 06/11/09 BAST HATFIELD, INC.
GC2-32 0 03/13/09 06/11/09 BAST HATFIELD, INC.
GC2-35 0 03/13/09 06/11/09 BAST HATFIELD, INC.
GC2-37 0 03/13/09 06/11/09 BAST HATFIELD, INC.
GC2-4 0 01/04/08 01/25/08 BAST HATFIELD INC
GC2-40 0 03/13/09 06/11/09 BAST HATFIELD, INC.
GC2-41 -236 03/13/09 06/11/09 BAST HATFIELD, INC.
GC2-42 3,777 05/13/09 07/30/09 BAST HATFIELD INC
GC2-44 1,764 05/13/09 07/30/09 BAST HATFIELD INC
GC2-47 17,926 06/15/09 08/13/09 BAST HATFIELD INC
GC2-48 5,557 06/15/09 08/13/09 BAST HATFIELD INC
GC2-51 3,518 08/10/09 09/16/09 BAST HATFIELD INC
GC2-7 28,125 04/17/08 04/24/08 BAST HATFIELD, INC.
GC2-8 18,750 04/17/08 04/24/08 BAST HATFIELD, INC.
M-1 0 07/17/07 10/23/07 RF Gordon Mechanical
M10 0 06/24/08 02/11/09 R.F.GORDON MECHANICAL
M13 11,834 03/13/09 06/11/09 R.F. GORDON MECHANICAL, INC.
M19 3,797 08/10/09 09/16/09 RF GORDON MECHANICAL INC
M2 7,560 09/14/07 11/08/07 R.F. GORDON MECHANICAL, INC.
M3 0 01/04/08 03/19/08 R.F GORDON MECHANICAL
M6 0 04/17/08 08/05/08 R.F. GORDON MECHANCIAL, INC.
P1 7,319 01/04/08 03/19/08 CRISAFULLI BROS PLUMBING & HEATING
P11 1,404 03/13/09 06/11/09 CRISAFULLI BROS. PLUMBING & HEATING
P12 6,887 03/13/09 06/11/09 CRISAFULLI BROS. PLUMBING & HEATING
P14 3,388 03/13/09 06/11/09 CRISAFULLI BROS. PLUMBING & HEATING
P16 3,808 03/13/09 06/11/09 CRISAFULLI BROS. PLUMBING & HEATING
P17 4,608 03/13/09 06/11/09 CRISAFULLI BROS. PLUMBING & HEATING
P18 1,269 05/13/09 09/23/09 CRISAFULLI BROS
P21 1,114 06/15/09 / / CRISAFULLI BROS. PLUMBING & HEATING
P21 1,114 06/17/09 09/25/09 CRISAFULLI BROS. PLUMBING & HEATING
P3 -17,905 06/24/08 / / CRISAFULLI BROS PLUMBING
P4 0 06/24/08 / / CRISAFULLI BROS PLUMBING
P5 0 11/17/08 07/07/09 CRISAFULLI BROS. PLUMBING & HEATING
P7 7,983 11/17/08 07/07/09 CRISAFULLI BROS. PLUMBING & HEATING
P9 10,567 03/13/09 06/11/09 CRISAFULLI BROS. PLUMBING & HEATING
05-1062 Reconstruction 0-007-009 03/31/06 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 32 10/17/06 12/14/06 Monahan Loughlin
07-0963 Reconstruction 0-007-010 02/26/08 *CO No.* Amount Disallowed Received Approved Contractor
AA2-1 0 03/12/09 06/10/09 Jupiter Environmental
E10 5,604 03/12/09 06/10/09 Harold R. Clune
E11 7,073 05/13/09 08/14/09 HAROLD R. CLUNE INC
E13 4,289 05/15/09 / / HAROLD R. CLUNE INC
E15 9,661 06/16/09 08/19/09 HAROLD R. CLUNE, INC.
E18 -2,068 06/16/09 08/19/09 HAROLD R. CLUNE, INC.
E20 1,495 08/10/09 08/28/09 HAROLD R CLUNE INC
E21 1,495 08/19/09 09/15/09 HAROLD R CLUNE INC
E5 5,916 03/12/09 06/10/09 Harold R. Clune
GC-13 9,842 05/13/09 07/30/09 BAST HATFIELD INC
GC-2 0 03/12/09 06/10/09 Bast Hatfield
GC-22 1,959 08/10/09 09/18/09 BAST HATFIELD INC
GC12 1,425 03/12/09 06/10/09 Bast Hatfield
GC14 2,184 05/13/09 07/30/09 BAST HATFIELD INC
GC18 1,730 06/16/09 08/19/09 BAST HATFIELD, INC.
GC6 0 03/12/09 06/10/09 Bast Hatfield
M1 0 03/12/09 06/03/09 R.F. GORDON MECHANICAL, INC.
M12 3,750 08/19/09 11/10/09 RF GORDON MECHANICAL INC
M2 662 03/12/09 06/03/09 R.F. GORDON MECHANICAL, INC.
M3 26,823 03/12/09 06/03/09 R.F. GORDON MECHANICAL, INC.
M4 15,153 03/12/09 06/10/09 R.F. Gordon Mechanical
M8 2,138 05/13/09 08/14/09 R.F. GORDON MECHANICAL INC
P1 0 03/12/09 06/03/09 CRISAFULLI BROS. PLUMBING & HEATING
P3 0 03/12/09 06/03/09 CRISAFULLI BROS. PLUMBING & HEATING
R1 7,200 03/12/09 06/10/09 Monahan & Loughlin
R2 5,996 03/12/09 06/10/09 Monahan & Loughlin
R4 3,168 06/16/09 08/19/09 MONAHAN & LOUGHLIN, INC.
R5 254 08/10/09 09/23/09 MONAHAN & LOUGHLIN INC
SW3 12,975 03/12/09 06/10/09 HMA Construction
SW6 3,079 03/12/09 06/10/09 HMA Contracting Corp
09-0140 Reconstruction 0-007-012 08/20/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2028FP Reconstruction 0-007-FP1 06/02/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
92-0438 Reconstruction 5-008-002 11/13/92 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1135 Additions and Alterations 5-008-003 03/19/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0683 Additions and Alterations 5-008-004 06/05/00 *CO No.* Amount Disallowed Received Approved Contractor
1 -1,099 07/29/02 08/28/02 Mazone Plumbing
1 19,000 07/29/02 08/28/02 ET O'Connor Const.
1 730 08/11/03 09/05/03 Tougher Industries
1 -1,440 03/16/04 03/30/04 Bast Hatfield
4 3,527 08/31/04 09/17/04 Tougher Industries
6 12,875 01/03/03 07/07/03 ET O'Connor Const.
8 -12,875 07/02/03 07/07/03 ET O'Connor Const.
GC-4 13,800 01/03/03 01/08/03 MLB Industries
R-3 3,519 04/30/03 05/02/03 Monahan & Loughlin
06-0703 Reconstruction 5-008-005 03/01/07 *CO No.* Amount Disallowed Received Approved Contractor
P10 -349 03/13/09 06/11/09 CRISAFULLI BROS. PLUMBING & HEATING
P15 728 03/13/09 06/11/09 CRISFULLI BROS. PLUMBING & HEATING
P20 3,681 05/13/09 09/23/09 CRISAFULLI BROS.
05-1403 Reconstruction 5-008-006 06/20/06 *CO No.* Amount Disallowed Received Approved Contractor
G-1 -5,000 01/29/07 02/22/07 Total Tool
GC-2 -500 04/03/07 05/15/07 Total Tool
Football Field House:
06-0704 Reconstruction 7-013-001 03/01/07 *CO No.* Amount Disallowed Received Approved Contractor
E16 1,363 03/13/09 06/11/09 BROWNELL ELECTRIC CORPORATION
E19 2,057 03/13/09 06/11/09 BROWNELL ELECTRIC CORPORATION
E5 0 01/04/08 03/19/08 BROWNELL ELECTRIC
GC2-10 0 04/17/08 04/24/08 BAST HATFIELD, INC.
M11 0 11/17/08 07/07/09 R.F. GORDON MECHANCIAL, INC
Multi-Purpose Building:
02-1698 New Construction 7-017-001 09/19/03 *CO No.* Amount Disallowed Received Approved Contractor
2A-1 2,116 06/01/04 07/09/04 James Maloy
2A-2 1,750 07/22/04 08/09/04 James Maloy
2A-3 892 08/11/04 08/13/04 James Maloy
3-1 -3,931 07/22/04 08/09/04 Mazone Plumbing
3-2A -506 07/22/04 08/09/04 Mazone Plumbing
3-2B 268 07/22/04 08/09/04 Mazone Plumbing
3-3 2,828 2,828 07/22/04 08/09/04 Mazone Plumbing
PUTNAM CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-14-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
92-0483 Reconstruction 0-001-004 12/28/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1367 Reconstruction 0-001-005 06/02/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0216 Reconstruction 0-001-007 10/12/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0300 Reconstruction 0-001-008 10/31/96 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1545 Reconstruction 0-001-010 05/28/03 NO CHANGE ORDERS ON ELECTRONIC FILE
SALEM CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-15-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Primary School:
90-1066 Reconstruction 0-001-002 02/25/91 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1025 Additions and Alterations 0-001-003 05/07/99 NO CHANGE ORDERS ON ELECTRONIC FILE
Elementary/High School:
92-0106 Reconstruction 0-002-004 08/12/92 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1026 Additions and Alterations 0-002-005 05/07/99 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1809 Reconstruction 0-002-007 03/18/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1876FP Reconstruction 0-002-FP1 05/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0878SC Visual Structural Inspection 0-002-SC1 11/21/07 NO CHANGE ORDERS ON ELECTRONIC FILE
08-1713SC Visual Structural Inspection 0-002-SC2 06/19/09 NO CHANGE ORDERS ON ELECTRONIC FILE
portable classroon:
97-0159 New Construction 0-008-001 08/08/97 NO CHANGE ORDERS ON ELECTRONIC FILE
Maintenance Storage Shed:
92-0307 New Construction 2-006-001 10/28/92 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
90-1067 Reconstruction 5-003-001 02/25/91 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1071 Reconstruction 5-003-003 03/26/97 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1924 Additions and Alterations 5-003-004 09/09/03 NO CHANGE ORDERS ON ELECTRONIC FILE
CAMBRIDGE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-16-10-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Cambridge Central:
92-0428 Reconstruction 0-002-004 12/10/92 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0048 Reconstruction 0-002-005 08/22/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0320 Additions and Alterations 0-002-006 01/11/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1199 Reconstruction 0-002-007 05/06/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0870 Additions and Alterations 0-002-009 05/30/00 *CO No.* Amount Disallowed Received Approved Contractor
1 8,116 01/07/02 03/27/02 Brownell Elec.
1 4,000 11/06/01 05/22/02 Edison Bridge
1 4,043 11/06/01 05/22/02 Shaw Contract Flooring
1 -983 11/06/01 05/22/02 Arch. Glass & Mirror
1 10,560 11/06/01 05/22/02 The Aulson Co.
1 -3,763 11/06/01 05/22/02 Wallace Johnson
1 12,967 07/23/02 08/16/02 Henderson-Johnson
1 -858 07/23/02 08/16/02 Buffalo Hotel Supply
1 11,176 07/23/02 08/16/02 Northeast Interior Systems
1 2,839 07/23/02 08/16/02 Stone Bridge Iron & Steel
2 3,557 11/06/01 05/22/02 Arch. Glass & Mirror
2 15,000 11/06/01 05/22/02 Edison Bridge
2 7,066 07/23/02 08/16/02 Brownell Elec.
2 4,076 07/23/02 08/16/02 Shaw Contract Flooring
2 992 07/23/02 08/16/02 Henderson-Johnson
2 -35,667 07/23/02 08/16/02 Wallace Johnson
3 -5,200 11/06/01 05/22/02 Edison Bridge
3 1,872 07/23/02 08/16/02 Brownell Elec.
3 5,902 07/23/02 08/16/02 Architectural Glass and Mirror
3 2,009 07/23/02 08/16/02 Shaw Contract Flooring
4 72,840 11/06/01 05/22/02 Edison Bridge
5 45,000 11/06/01 05/22/02 Edison Bridge
6 40,000 11/06/01 05/22/02 Edison Bridge
Roof 1 -10,287 01/10/04 03/03/04 William Brown
00-0875 Reconstruction 0-002-010 06/19/01 *CO No.* Amount Disallowed Received Approved Contractor
1 5,101 07/23/02 07/24/02 Hour Electric
2 1,614 08/11/03 08/26/03 Hour Electric
08-1651 Reconstruction 0-002-012 06/12/09 *CO No.* Amount Disallowed Received Approved Contractor
1-01 -9,000 10/16/09 11/09/09 MID STATE INDUSTRIES LTD
08-1370SC Visual Structural Inspection 0-002-SC1 03/17/09 NO CHANGE ORDERS ON ELECTRONIC FILE
New Bus Garage:
05-1219 New Construction 5-012-001 12/13/06 *CO No.* Amount Disallowed Received Approved Contractor
E-001 -14,400 06/21/07 10/17/07 Hour Electric
E-002 6,723 08/19/08 07/09/09 HOUR ELECTRIC CO., INC.
G-001 -253,889 06/21/07 08/15/07 LeChase Construction Services
G-002 -8,879 08/19/08 09/29/08 LECHASE CONSTRUCTION SERVICES, LLC
H-002 3,070 08/19/08 05/11/09 E. W. TOMPKINS COMPANY, INC.
H-003 225 11/19/08 01/27/09 E.W. TOMPLKINS COMPANY, INC.
H-004 4,515 11/19/08 06/16/09 E.W. TOMPKINS COMPANY, INC.
P-001 -32,523 11/19/07 04/03/08 John V. Warren Inc.
R-001 -50,970 07/02/07 07/17/07 Quaker Bay
R-002 1,021 08/19/08 09/29/08 QUACKER BAY, INC.
S-1 -75,795 06/21/07 07/17/07 William Keller and Sons Construction
Press Box:
00-0876 New Construction 7-011-001 06/19/01 NO CHANGE ORDERS ON ELECTRONIC FILE
WHITEHALL CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-17-01-06
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Elementary School:
93-0818 Reconstruction 0-003-002 04/27/94 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1230 Additions and Alterations 0-003-004 04/07/98 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0741 Reconstruction 0-003-005 02/07/07 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1495 Reconstruction 0-003-006 06/25/07 *CO No.* Amount Disallowed Received Approved Contractor
1 48,567 09/06/07 11/08/07 O'CONNOR CONSTRUCTION, INC.
1 10,838 09/21/07 / / BROWNELL ELECTRIC CORP.
13 20,134 08/28/08 02/05/09 Brownell Electric Corp.
14 4,945 08/28/08 10/07/08 BROWNELL ELECTRIC CORPORATION
3 21,800 09/06/07 11/08/07 O'CONNOR CONSTRUCTION, INC.
3 4,500 12/24/07 02/23/08 BROWNELL ELECTRIC CORPORATION
5 8,121 02/27/08 04/15/08 brownell electric
6 12,875 03/21/08 08/07/08 BROWNELL ELCTRIC CORP.
CO-9 26,973 06/02/08 08/05/08 BROWNELL ELECTRIC CORP.
07-1272 Reconstruction 0-003-007 01/16/08 *CO No.* Amount Disallowed Received Approved Contractor
1 3,706 03/21/08 03/31/08 Rozell East, Incorp.
1 3,206 03/21/08 01/08/09 Rozell East, Incorp.
02-0622FP Reconstruction 0-003-FP1 12/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Junior-Senior High School:
91-0378 Reconstruction 0-008-002 12/16/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0394 Reconstruction 0-008-003 10/29/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0926 Reconstruction 0-008-004 04/26/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0712 Reconstruction 0-008-005 04/24/96 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0103 Reconstruction 0-008-007 08/22/01 *CO No.* Amount Disallowed Received Approved Contractor
1 4,500 02/26/02 04/08/02 All Phase Elec.
2 228 07/02/02 07/03/02 All Phase Elec.
3 5,200 07/30/02 08/05/02 All Phase Elec.
02-0962 Reconstruction 0-008-010 01/29/03 *CO No.* Amount Disallowed Received Approved Contractor
1 0 05/16/03 05/21/03 RF Gordon Mech.
2 -4,000 05/16/03 05/21/03 RF Gordon Mech.
3 275 06/10/03 06/11/03 RF Gordon Mech.
03-0713 Reconstruction 0-008-011 02/26/04 *CO No.* Amount Disallowed Received Approved Contractor
1 -5,710 04/30/04 05/07/04 RF Gordon Mech.
04-0205 Reconstruction 0-008-012 09/13/04 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
1 5,300 11/17/04 01/03/05 Galusha and Sons
2 840 12/09/04 01/03/05 Galusha and Sons
04-1176 Reconstruction 0-008-013 04/26/05 *CO No.* Amount Disallowed Received Approved Contractor
1 5,925 07/12/05 07/22/05 Jack Hall Plumbing Heating
1 -2,500 07/12/05 07/22/05 Adirondeck inc
05-0347 Additions and Alterations 0-008-014 01/23/06 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
1 0 06/23/06 11/04/08 Murnane Building Contractors
1 0 06/23/06 08/09/06 WM keller and Sons
1 0 09/06/06 12/18/06 Rozell East
1 0 09/22/06 08/15/07 Clifford Gray Inc
2 0 09/06/06 10/12/06 Murnane Building
2 32,054 09/20/06 11/05/08 Clifford Gray
2 0 09/27/06 11/04/08 Rozell East
2 36,400 10/23/06 12/18/06 WM J Keller and Sons Construction
3 2,996 09/06/06 10/12/06 Murnane Building
3 7,945 10/23/06 12/18/06 Wm J Keller and Sons Construction
3 20,711 11/21/06 11/05/08 Rozell East
3 3,809 12/18/06 01/12/07 Clifford Gray
4 1,667 09/06/06 10/12/06 Murnane Building
4 7,568 12/18/06 01/12/07 Rozell East
4 748 02/07/07 02/12/07 Clifford Gray Inc
5 4,285 10/23/06 12/18/06 Murnane Building
6 8,913 12/18/06 11/04/08 Murnane Building
7 13,662 12/18/06 01/30/07 Murnane Building
06-0299 Reconstruction 0-008-015 11/09/06 *CO No.* Amount Disallowed Received Approved Contractor
1 -5,000 02/01/07 03/09/07 LH La Plante Co
1 -52,960 02/01/07 04/11/07 Rf Gordon Mechanical
1 -3,000 06/22/07 10/18/07 Murnane Building Contractors
1 -1,500 10/19/07 12/13/07 HAROLD R. CLUNE, INC.
1 -2,000 12/02/08 05/08/09 SUNSHINE ENVIRONMENTAL SERVICES, INC
2 -12,600 02/07/07 03/09/07 Laplante Co
2 16,400 05/09/07 08/20/07 RF Gordon Mechanical
3 -2,000 10/19/07 12/13/07 L. H. LAPLANTE CO., INC.
4 -1,635 12/24/08 06/15/09 L.H. LAPLANTE CO., INC.
06-1496 Reconstruction 0-008-016 06/25/07 *CO No.* Amount Disallowed Received Approved Contractor
10 3,859 07/10/08 08/26/08 BROWNELL ELECTRIC CORP.
11 5,934 07/01/08 08/26/08 Brownell Electric Corp.
12 5,900 08/26/08 10/07/08 BROWNELL ELECTRIC CORPORATION
15 17,750 09/19/08 01/26/09 BROWNLIE ELECTRIC CORP.
16 34,222 09/19/08 / / BROWNLIE ELECTRIC CORP.
17 15,370 09/19/08 / / BROWNLIE ELECTRIC CORP.
18 2,919 09/19/08 / / BROWNLIE ELECTRIC CORP.
19 862 10/23/08 04/16/09 BROWNELL ELECTRIC CORP.
2 22,200 09/06/07 11/08/07 O' CONNOR CONSTRUCTION, INC.
2 32,720 09/21/07 11/26/07 Brownell Electric Corp
4 3,165 12/24/07 02/23/08 BROWNELL ELECTRIC CORP
4 9,890 07/03/08 / / O'CONNOR CONSTRUCTION, INC.
7 9,664 04/15/08 08/05/08 BROWNELL ELECTRIC CORP.
CO-8 1,850 06/02/08 08/05/08 BROWNELL ELECTRIC CORP.
02-0623FP Reconstruction 0-008-FP1 12/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0697SC Visual Structural Inspection 0-008-SC1 12/09/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Storage Facility #4:
99-1210 New Construction 2-009-001 05/11/00 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
93-0927 Reconstruction 5-001-001 04/26/94 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage,Adm,Storage:
92-0320 Reconstruction 5-009-002 10/29/92 NO CHANGE ORDERS ON ELECTRONIC FILE
Pump House:
90-1290 Reconstruction 7-002-001 05/06/91 NO CHANGE ORDERS ON ELECTRONIC FILE
BOCES WASH-WARREN-HAMLTON-ESSEX STATUS REPORT ON CAPITAL PROJECTS
District No.: 64-90-00-00
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Campus Building F:
91-0077 Additions and Alterations 0-001-002 08/21/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0235 Additions and Alterations 0-001-004 10/02/92 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0176 Reconstruction 0-001-005 11/05/99 NO CHANGE ORDERS ON ELECTRONIC FILE
Campus Bldg G:
91-0512 Reconstruction 0-002-003 01/07/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0990 Reconstruction 0-002-004 04/30/92 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1004 Reconstruction 0-002-005 04/21/00 NO CHANGE ORDERS ON ELECTRONIC FILE
Campus Building I:
93-0921 Alterations 0-004-002 05/23/94 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1058 Reconstruction 0-004-003 05/24/93 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0408 Reconstruction 0-004-004 01/30/03 *CO No.* Amount Disallowed Received Approved Contractor
EL-1 -1,793 11/25/03 12/05/03 Harold Clune
F. Donald Myers Educ. Ctr.:
96-1210 Reconstruction 0-006-003 04/22/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1836 Reconstruction 0-006-004 07/22/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0553 Reconstruction 0-006-005 02/25/00 *CO No.* Amount Disallowed Received Approved Contractor
TEL-1 4,687 03/15/01 01/14/03 NEC BNS, Inc.
99-1005 Reconstruction 0-006-006 04/21/00 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1375 Reconstruction 0-006-007 10/17/01 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1374 Reconstruction 0-006-008 10/17/01 *CO No.* Amount Disallowed Received Approved Contractor
EL-1 -1,000 11/06/02 01/07/03 Brownell Elec.
EL-2 -200 02/26/03 03/04/03 Brownell Elec.
GC-1 -4,077 11/07/02 01/10/03 AJ Arpey
Mech-1 -468 02/06/03 02/24/03 Monroe Mech.
01-1167 Reconstruction 0-006-009 06/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0705 Reconstruction 0-006-010 06/12/02 *CO No.* Amount Disallowed Received Approved Contractor
EL-1 16,777 09/25/02 09/30/02 Harold Clune
EL-2 2,507 11/06/02 11/12/02 Harold Clune
EL-3 -691 03/25/03 03/28/03 Harold Clune
GC-1 3,982 09/23/02 09/30/02 AJ Arpey
Mech-1 -2,410 02/26/03 02/28/03 T. McElligott
01-0706 Reconstruction 0-006-011 02/28/02 *CO No.* Amount Disallowed Received Approved Contractor
RC-1 -7,502 12/02/02 12/10/02 Puff, Inc.
02-0464 Reconstruction 0-006-012 01/29/03 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0272 Reconstruction 0-006-013 12/15/04 *CO No.* Amount Disallowed Received Approved Contractor
001 2,733 12/30/05 01/11/06 Phonix Electrician Co
Mech 001 -16 12/30/05 / / RF Gordon mechanical
05-0451 Reconstruction 0-006-014 03/03/06 NO CHANGE ORDERS ON ELECTRONIC FILE
05-1208 Reconstruction 0-006-015 05/12/06 *CO No.* Amount Disallowed Received Approved Contractor
EL-001 -1,473 05/09/07 10/23/07 Farina Electric
07-1338 Reconstruction 0-006-017 01/19/08 *CO No.* Amount Disallowed Received Approved Contractor
RC-001 -1,000 09/04/08 01/26/09 SKYWAY ROOFING INC.
08-0995 Reconstruction 0-006-018 02/03/09 NO CHANGE ORDERS ON ELECTRONIC FILE
Education Svcs. Ctr. Complex:
91-0115 Reconstruction 0-014-005 08/12/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-0690 Reconstruction 0-014-006 01/29/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1059 Reconstruction 0-014-007 05/24/93 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1837 Reconstruction 0-014-010 07/22/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0177 Reconstruction 0-014-012 11/05/99 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2376 Reconstruction 0-014-013 06/25/03 *CO No.* Amount Disallowed Received Approved Contractor
001 -9,400 12/08/04 12/23/04 Puff Inc
001 2,493 05/24/05 07/21/05 J and K Plumbing Heating
00-1557 Reconstruction 0-014-014 05/17/01 *CO No.* Amount Disallowed Received Approved Contractor
Mech-1 -1,100 04/04/02 04/26/02 Northeast Petroleum Tech.
00-1496 Reconstruction 0-014-015 04/12/01 *CO No.* Amount Disallowed Received Approved Contractor
MECH-1 -2,500 03/19/03 03/28/03 Polsinello Fuels
05-0588 Reconstruction 0-014-016 05/16/06 *CO No.* Amount Disallowed Received Approved Contractor
001 8,058 10/27/06 11/29/06 AJ Arpey
EL-01 -713 10/27/06 11/29/06 J McBain Electric
mech 01 -2,224 10/27/06 11/29/06 RF Gordon Mechanical
06-0244 Reconstruction 0-014-017 12/18/06 *CO No.* Amount Disallowed Received Approved Contractor
RC - 001 -9,000 10/10/07 10/22/07 S. D. CARRUTHERS SONS, INC.
06-0327 Reconstruction 0-014-018 12/14/06 *CO No.* Amount Disallowed Received Approved Contractor
EL-001 1,252 11/01/07 11/08/07 BROWNELL ELETRIC CORP.
GC-001 -3,636 10/29/07 11/08/07 Rozell East Inc.
MECH-001 -1,740 10/29/07 11/07/07 Rozell East Inc.
08-0880 Reconstruction 0-014-020 04/20/09 *CO No.* Amount Disallowed Received Approved Contractor
EC 001 9,172 09/28/09 10/13/09 BROWNELL ELECTRIC CORP
07-1203 Reconstruction 0-014-021 06/04/08 *CO No.* Amount Disallowed Received Approved Contractor
EL-001 -1,768 11/17/08 05/18/09 DUNHAM ELECTRIC, INC.
GC-001 -697 11/14/08 01/26/09 A.J. ARPEY INC.
MECH-001 -3,040 02/11/09 03/05/09 FAMILY DANZ HEATING AND AIR
08-0994 Reconstruction 0-014-023 02/03/09 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
02-0803FP Reconstruction 0-014-FP1 12/24/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Special Education Modular:
08-0517 Reconstruction 0-020-002 03/31/09 NO CHANGE ORDERS ON ELECTRONIC FILE
Campus Bldg G:
94-1188 Reconstruction 0-048-001 05/15/95 NO CHANGE ORDERS ON ELECTRONIC FILE
Ed. Serv. Ctr. Cplx.(Bldg A,B,C,D,Eq:
95-1642 Reconstruction 0-056-001 07/11/96 NO CHANGE ORDERS ON ELECTRONIC FILE
BOCES-Wide Telecomunication System:
94-0398 Reconstruction 0-999-001 12/02/94 NO CHANGE ORDERS ON ELECTRONIC FILE
Burgoyne Avenue - Building:
08-0732 Reconstruction 1-073-002 03/06/09 NO CHANGE ORDERS ON ELECTRONIC FILE
Dist.Wide Telephone-Phase II:
96-0313 Reconstruction 7-999-002 10/16/96 NO CHANGE ORDERS ON ELECTRONIC FILE