REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
West Park School:
98-0790 Additions and Alterations 0-006-001 06/11/99 NO CHANGE ORDERS ON ELECTRONIC FILE
West Park School-Bus Garage:
98-0789 New Construction 5-009-001 06/11/99 NO CHANGE ORDERS ON ELECTRONIC FILE
KINGSTON CITY SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 62-06-00-01
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Frank T. Meagher Elementary:
95-0439 Additions and Alterations 0-001-005 01/29/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0637 Reconstruction 0-001-006 02/08/96 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1256 Reconstruction 0-001-007 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
05-05 2,209 02/21/07 03/14/07 Key Interiors
07-06 644 08/31/06 10/13/06 Pantel Contracting
05-1095 Reconstruction 0-001-008 06/12/06 *CO No.* Amount Disallowed Received Approved Contractor
00001 -1,308 03/16/07 04/03/07 S and O Construction
08-0845 Reconstruction 0-001-009 05/19/09 NO CHANGE ORDERS ON ELECTRONIC FILE
Sophie Finn Elementary School:
90-1569 Reconstruction 0-002-002 08/02/91 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0529 Reconstruction 0-002-005 02/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1261 Reconstruction 0-002-008 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
05-08 970 02/21/07 03/14/07 Key Interiors
07-0931 Reconstruction 0-002-010 07/03/08 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1801 Reconstruction 0-002-011 05/01/08 *CO No.* Amount Disallowed Received Approved Contractor
EWC-01 0 05/05/09 08/31/09 RAY S. PANTEL INC
GWC08 1,687 05/05/09 08/31/09 WILLIAM MANFREDI CONSTRUCTION CORP
RWC3-002 2,406 05/05/09 08/31/09
John F. Kennedy Elem School:
95-0530 Reconstruction 0-003-003 02/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0691 Reconstruction 0-003-004 02/08/96 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1259 Reconstruction 0-003-005 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
07-03 308 08/31/06 10/13/06 Pantel Contracting
07-0932 Reconstruction 0-003-006 07/03/08 NO CHANGE ORDERS ON ELECTRONIC FILE
08-0846 Reconstruction 0-003-007 05/19/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1665FP Reconstruction 0-003-FP1 06/06/03 *CO No.* Amount Disallowed Received Approved Contractor
1 200 01/28/04 02/04/04 Ziske Kraftwerks
George Washington School:
92-0046 Reconstruction 0-004-001 07/23/92 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0382 Reconstruction 0-004-004 11/21/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0531 Reconstruction 0-004-005 02/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1257 Reconstruction 0-004-007 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
05-01 10,089 04/04/05 05/02/05 Key Interiors Inc
05-06 5,036 02/21/07 03/14/07 Key Interiors
07-02 308 08/31/06 10/13/06 Pantel Contracting
07-0933 Reconstruction 0-004-008 07/03/08 *CO No.* Amount Disallowed Received Approved Contractor
GWC04 0 05/05/09 08/14/09 WILLIAM MANFREDI CONSTRUCTION CORP
GWC04 0 05/05/09 08/14/09 WILLIAM MANFREDI CONSTRUCTION CORP
GWC05 0 05/05/09 08/14/09 WILLIAM MANFREDI CONSTRUCTION CORP
GWC06 1,782 05/05/09 08/14/09 WILLIAM MANFREDI CONSTRUCTION CORP
GWC07 2,020 05/05/09 08/14/09 WILLIAM MANFREDI CONSTRUCTION CORP
GWC08 422 05/05/09 08/12/09 WILLIAM MANFREDI CONSTRUCTION CORP
PWC1-001 -11,371 05/05/09 08/11/09 JAC MECHANICAL SERVICES INC
PWC1-002 -14,861 05/05/09 08/11/09 JAC MECHANICAL SERVICES INC
RWC2-001 0 05/05/09 08/14/09 BEST ROOFING OF NJ INC
RWC2-002 10,736 05/05/09 08/14/09 BEST ROOFING OF NJ INC
RWC2-003 -6,000 05/05/09 08/14/09 BEST ROOFING OF NJ INC
07-1802 Reconstruction 0-004-009 05/01/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1661FP Reconstruction 0-004-FP1 06/06/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Myron J. Michael Building:
90-0995 Reconstruction 0-005-003 03/08/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0403 Reconstruction 0-005-005 12/24/92 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0383 Reconstruction 0-005-006 11/21/94 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1269 Reconstruction 0-005-009 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
07-08 1,928 08/31/06 10/13/06 Pantel Contracting
05-1096 Reconstruction 0-005-010 06/12/06 *CO No.* Amount Disallowed Received Approved Contractor
00003 5,103 03/16/07 04/03/07 S and O Construction
07-0934 Reconstruction 0-005-011 07/24/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Kingston High School:
91-0309 Reconstruction 0-006-005 10/04/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0404 Reconstruction 0-006-006 12/24/92 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0384 Reconstruction 0-006-007 11/21/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0172 Reconstruction 0-006-008 10/02/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1035 Reconstruction 0-006-009 04/03/97 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0768 Reconstruction 0-006-012 03/25/04 *CO No.* Amount Disallowed Received Approved Contractor
001 5,300 03/09/05 03/24/05 AMB Construction Inc
03-1265 Reconstruction 0-006-013 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
01-01 19,995 09/29/05 10/14/05 Specialty Service Contracting
01-02 1,450 09/29/05 10/14/05 specialty Service contracting
04-01 5,162 04/04/05 05/02/05 Glasssolutions Unlimited Group
07-056 3,020 08/31/06 10/13/06 Pantel Contracting
07-0935 Reconstruction 0-006-014 07/03/08 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1803 Reconstruction 0-006-015 05/01/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Vocational Bldg(Whiston Bldg.):
92-0405 Reconstruction 0-007-001 12/24/92 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0385 Reconstruction 0-007-003 11/21/94 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0769 Reconstruction 0-007-004 03/25/04 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1266 Reconstruction 0-007-005 07/01/04 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0936 Reconstruction 0-007-006 07/03/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Kate Walton Field House:
92-0406 Reconstruction 0-008-003 12/24/92 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0173 Reconstruction 0-008-005 10/02/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0692 Reconstruction 0-008-006 02/08/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1036 Reconstruction 0-008-007 04/03/97 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1260 Reconstruction 0-008-008 04/14/97 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1267 Reconstruction 0-008-009 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
02-01 13,500 02/02/06 06/30/06 Patterson Stevens
02-02 4,762 07/21/06 07/24/06 Patterson stevens
06-01 3,730 11/10/06 03/15/07 Ashley mechanical
07-09 1,288 08/31/06 10/13/06 Pantel Contracting
07-0937 Reconstruction 0-008-010 07/03/08 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1244 Reconstruction 0-008-011 06/20/07 *CO No.* Amount Disallowed Received Approved Contractor
01-01 -3,307 01/28/08 03/19/08 Hudson Valley Roofing & Sheetmetal
02-1658FP Reconstruction 0-008-FP1 06/06/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Chambers Elementary:
90-1722 Reconstruction 0-009-003 07/02/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1745 Reconstruction 0-009-005 08/05/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0532 Reconstruction 0-009-006 02/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1763 Reconstruction 0-009-008 07/20/99 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1253 Reconstruction 0-009-009 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
05-02 2,074 02/21/07 03/14/07 Key Interiors
07-01083 308 08/31/06 10/13/06 Pantel Construction
08-0847 Reconstruction 0-009-010 05/19/09 NO CHANGE ORDERS ON ELECTRONIC FILE
eeea Devine School:
92-0407 Reconstruction 0-010-001 12/24/92 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0533 Reconstruction 0-010-002 02/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1252 Reconstruction 0-010-004 07/01/04 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0938 Reconstruction 0-010-005 07/03/08 *CO No.* Amount Disallowed Received Approved Contractor
GWC04 0 05/05/09 08/14/09 WILLIAM MANFREDI CONSTRUCTION CORP
GWC08 1,687 05/05/09 08/14/09 WILLIAM MANFREDI CONSTRUCTION CORP
07-1804 Reconstruction 0-010-006 05/01/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1667FP Reconstruction 0-010-FP1 06/06/03 *CO No.* Amount Disallowed Received Approved Contractor
1 200 01/28/04 02/04/04 Ziske Kraftwerks
Louis A Salzmann Bldg.:
92-0408 Reconstruction 0-011-002 12/24/92 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1037 Reconstruction 0-011-003 04/03/97 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1261 Reconstruction 0-011-004 04/14/97 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1268 Reconstruction 0-011-005 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
04-01 5,162 03/02/07 03/06/07 Glassolutions Unlimited
07-0939 Reconstruction 0-011-006 07/03/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Robert Graves Ptbldg:
95-0534 Reconstruction 0-012-001 02/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
Ernest C. Myer Elementary:
90-0757 Reconstruction 0-013-001 02/12/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0409 Reconstruction 0-013-002 12/24/92 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0329 Reconstruction 0-013-003 11/17/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0535 Reconstruction 0-013-004 02/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0693 Reconstruction 0-013-005 02/08/96 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1255 Reconstruction 0-013-006 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
05-04 1,572 02/21/07 03/14/07 Key Interiors
08-01 16,000 10/12/05 12/28/06 Sun Up Enterprises
08-02 4,205 10/12/05 11/08/05 Sun Up Enteprises
08-0848 Reconstruction 0-013-007 05/19/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1668FP Reconstruction 0-013-FP1 06/06/03 *CO No.* Amount Disallowed Received Approved Contractor
1 200 01/28/04 02/04/04 Ziske Kraftwerks
Edward R.Crosby Elementary:
93-1560 Reconstruction 0-014-002 07/07/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0536 Reconstruction 0-014-003 02/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1254 Reconstruction 0-014-005 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
05-03 4,135 02/21/07 03/14/07 Key Interiors
05-1097 Reconstruction 0-014-006 06/12/06 *CO No.* Amount Disallowed Received Approved Contractor
00002 522 03/16/07 04/03/07 S and o Construction
08-0849 Reconstruction 0-014-007 05/19/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1664FP Reconstruction 0-014-FP1 06/06/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Robert Graves Elem. School:
03-1260 Reconstruction 0-016-004 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
05-07 2,776 02/21/07 04/04/07 Key Interiors
09-01 22,445 02/02/06 06/30/06 S and M Management
07-0940 Reconstruction 0-016-005 07/03/08 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1805 Reconstruction 0-016-006 05/01/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1666FP Reconstruction 0-016-FP1 06/06/03 *CO No.* Amount Disallowed Received Approved Contractor
1 200 01/28/04 02/04/04 Ziske Kraftwerks
Tobin Learning Center:
03-1270 Reconstruction 0-017-003 07/01/04 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0941 Reconstruction 0-017-004 07/03/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Pool Building K H S:
92-0410 Reconstruction 0-020-003 12/24/92 NO CHANGE ORDERS ON ELECTRONIC FILE
J. Watson Bailey Jr High proj.advent:
92-0411 Additions and Alterations 0-026-003 12/24/92 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1024 Reconstruction 0-026-004 05/12/93 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1263 Reconstruction 0-026-006 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
0704 2,240 08/31/06 10/13/06 Pantel Construction
06-0235 Alterations 0-026-007 09/21/06 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0942 Reconstruction 0-026-008 07/03/08 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1806 Reconstruction 0-026-009 05/01/08 *CO No.* Amount Disallowed Received Approved Contractor
EWC-02 0 05/05/09 08/11/09 RAY S. PANTEL INC
EWC-03 -1,893 05/05/09 08/31/09 RAY S. PANTEL INC
HWC1-001 -4,500 05/05/09 08/31/09 T.M. BRENNAN CONTRACTORS INC
HWC1-002 -8,000 05/05/09 08/31/09 T.M. BRENNAN CONTRACTORS INC
RWC-001 0 05/05/09 08/31/09 PRECISION ROOFING INC
RWC1-002 0 05/05/09 08/14/09 PRECISION ROOFING INC
RWC1-003 0 05/05/09 08/31/09 PRECISION ROOFING INC
RWC1-005 -2,051 05/05/09 08/31/09 PRECISION ROOFING INC
RWC1-006 -15,000 05/05/09 08/31/09 PRECISION ROOFING INC
RWC3-002 2,406 05/05/09 08/31/09 HUDSON VALLEY ROOFING & SHEET METAL
08-0850 Reconstruction 0-026-010 05/19/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1660FP Reconstruction 0-026-FP1 06/06/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Harry L. Edson Elem. School:
95-0537 Reconstruction 0-027-002 02/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0694 Reconstruction 0-027-003 02/08/96 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1258 Reconstruction 0-027-004 07/01/04 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0943 Reconstruction 0-027-005 07/03/08 *CO No.* Amount Disallowed Received Approved Contractor
GWC-05 0 05/05/09 08/14/09 WILLIAM MANFREDI CONSTRUCTION CORP
GWC01 0 05/05/09 08/14/09 WILLIAM MANFREDI CONSTRUCTION CORP
GWC02 0 05/05/09 08/14/09 WILLIAM MANFREDI CONSTRUCTION CORP
GWC03 0 05/05/09 08/14/09 WILLIAM MANFREDI CONSTRUCTION CORP
GWC07 2,020 05/05/09 / / WILLIAM MANFREDI CONSTRUCTION CORP
GWC08 1,687 05/05/09 08/14/09 WILLIAM MANFREDI CONSTRUCTION CORP
TR2-001 -3,753 05/05/09 08/14/09 S&O CONSTRUCTION SERVICES INC
02-1662FP Reconstruction 0-027-FP1 06/06/03 *CO No.* Amount Disallowed Received Approved Contractor
1 200 01/28/04 02/04/04 Ziske Kraftworks
M. Clifford Miller Middle:
03-1264 Reconstruction 0-028-007 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
07-07 77 08/31/06 10/13/06 Pantel Contracting
08-0851 Reconstruction 0-028-008 05/19/09 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0236 Alterations 0-028-009 09/21/06 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1659FP Reconstruction 0-028-FP1 06/06/03 *CO No.* Amount Disallowed Received Approved Contractor
1 200 01/28/04 02/04/04 Ziske Kraftwerks
Zena Elementary:
92-0413 Reconstruction 0-031-001 12/24/92 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0538 Reconstruction 0-031-002 02/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0820 Reconstruction 0-031-003 02/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1262 Reconstruction 0-031-004 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
05-09 970 02/21/07 03/14/07 Kay Interiors
08-0852 Reconstruction 0-031-005 05/19/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1663FP Reconstruction 0-031-FP1 06/06/03 *CO No.* Amount Disallowed Received Approved Contractor
1 200 01/28/04 02/04/04 Ziske Kraftwerks
Deitz Stadium:
99-1274 Reconstruction 0-032-004 05/16/00 NO CHANGE ORDERS ON ELECTRONIC FILE
Mfd. Classroom--Bailey:
90-1615 New Construction 0-045-001 07/15/91 NO CHANGE ORDERS ON ELECTRONIC FILE
MANUF.CR BLDG.-MILLER:
90-1616 New Construction 0-046-001 07/15/91 NO CHANGE ORDERS ON ELECTRONIC FILE
Central Administration:
92-1062 Reconstruction 1-029-001 04/27/93 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0083 Reconstruction 1-029-002 08/23/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0192 Reconstruction 1-029-004 08/29/97 NO CHANGE ORDERS ON ELECTRONIC FILE
Administration Office-Deitz:
96-1161 Reconstruction 1-042-002 04/08/97 NO CHANGE ORDERS ON ELECTRONIC FILE
Carnegie Library Annex:
03-1161 Reconstruction 6-041-001 05/02/04 *CO No.* Amount Disallowed Received Approved Contractor
1 -1,522 01/13/05 / / P&D Elec.
1 -63,424 01/13/05 02/01/05 Debrino Caulking Assoc
1 -1,522 12/06/05 12/09/05 P and D Electric of Hudson Valley
2 4,884 01/13/05 01/24/05 Debrino Caulking Assoc
3 -3,020 01/13/05 01/24/05 Debrino Caulking Assoc
4 3,697 01/13/05 01/24/05 Debrino Caulking Assoc
5 4,600 01/13/05 01/24/05 Debrino Caulking Assoc
6 -3,941 08/08/06 08/10/06 Debrino Caulking Associates
District Wide:
92-0460 Reconstruction 7-999-001 12/01/92 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1570 Reconstruction 7-999-002 08/19/93 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1374 Reconstruction 7-999-003 06/21/99 *CO No.* Amount Disallowed Received Approved Contractor
1 12,510 12/07/00 12/01/03 NYPA
2 75,005 12/07/00 12/01/03 NYPA
3 130,172 12/07/00 12/01/03 NYPA
4 34,475 12/14/00 01/14/03 HEC Energy
5 101,757 06/15/04 09/08/04 NYPA
6 77,396 6,744 06/15/04 09/08/04 NYPA
7 23,399 04/08/02 09/08/04 NYPA
8 -448,879 06/15/04 09/08/04 NYPA
03-1271 Reconstruction 7-999-005 07/01/04 NO CHANGE ORDERS ON ELECTRONIC FILE
HIGHLAND CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 62-08-03-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Middle School:
96-1415 Reconstruction 0-001-001 05/23/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0013 Additions and Alterations 0-001-002 11/13/00 *CO No.* Amount Disallowed Received Approved Contractor
007 3,209 11/27/00 12/01/03 Roehrs Const.
1003 3,655 03/06/03 03/11/03 Gross Elec.
1004 31,829 10/01/02 11/01/02 Gross Elec.
1005 25,000 12/23/02 01/08/03 Gross Elec.
116 1,477 06/12/02 07/10/02 Eugene DiLorenzo
117 4,816 06/24/02 07/12/02 Eugene DiLorenzo
122 607 06/24/02 07/12/02 Eugene DiLorenzo
139 1,426 06/12/02 07/10/02 Eugene DiLorenzo
140 18,799 01/11/02 03/26/02 Eugene DiLorenzo
141 24,889 06/24/02 08/07/02 Eugene DiLorenzo
142 4,481 03/18/02 06/04/02 Eugene DiLorenzo
2-03 -10,000 09/13/04 10/25/04 Ashley Mech.
201 4,791 12/20/02 01/09/03 Ashley Mech.
202 24,109 03/18/02 06/04/02 Ashley Mech.
3-06 -15,000 09/13/04 10/25/04 Ashley Mech.
301 -17,500 03/06/03 03/11/03 Ashley Mech.
302 8,338 03/06/03 03/11/03 Ashley Mech.
304 22,375 06/24/02 07/12/02 Ashley Mech.
305 9,945 12/20/02 01/09/03 Ashley Mech.
501 26,400 06/01/01 06/08/01 A. Colarusso & Son
502 6,400 06/01/01 06/08/01 A. Colarusso & Son
503 2,500 06/01/01 06/08/01 A. Colarusso & Son
515 15,540 01/11/02 03/26/02 A. Colarusso & Son
8-001 -15,000 05/09/03 05/21/03 Gross Elec.
807 15,655 05/20/02 06/04/02 Clean Air Tech.
808 20,878 03/06/03 03/11/03 Clean Air Tech.
809 17,600 06/12/02 07/10/02 Clean Air Tech.
07-1102 Reconstruction 0-001-003 01/11/08 *CO No.* Amount Disallowed Received Approved Contractor
RC-02 -4,728 04/29/09 07/16/09 HENDERSON-JOHNSON CO INC
07-2019 Reconstruction 0-001-004 11/24/08 *CO No.* Amount Disallowed Received Approved Contractor
AA-01 -16,750 07/24/09 08/07/09 PAR ENVIRONMENTAL CORP
AA-02 -5,000 10/19/09 11/18/09 PAR ENVIRONMENTAL CORP
Junior/Senior High School:
91-1519 Reconstruction 0-009-001 08/06/92 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1546 Reconstruction 0-009-002 06/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1414 Reconstruction 0-009-003 05/23/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0591 Additions and Alterations 0-009-004 05/15/01 *CO No.* Amount Disallowed Received Approved Contractor
1-010 10,000 05/03/04 05/12/05 Arris Contracting
103 15,513 01/11/02 03/26/02 Arris Contracting
104 74,969 06/24/02 09/25/02 Arris Contracting
105 10,561 03/18/02 04/19/02 Arris Contracting
106 69,680 05/22/02 06/04/02 Arris Contracting
107 2,017 06/12/02 07/10/02 Arris Contracting
108 22,500 05/20/02 06/04/02 Arris Contracting
109 4,356 12/20/02 01/09/03 Arris Contracting
201 7,667 12/20/02 01/09/03 Ashley Mech.
202 4,910 06/24/02 07/12/02 Ashley Mech.
203 10,027 03/18/02 06/04/02 Ashley Mech.
204 1,002 05/22/02 06/04/02 Ashley Mech.
218 680 06/12/02 07/10/02 Ashley Mech.
219 24,415 02/07/03 02/13/03 Ashley Mech.
220 31,681 02/07/03 02/13/03 Ashley Mech.
301 6,740 06/24/02 07/12/02 Ashley Mech.
302 -1,898 03/18/02 06/04/02 Ashley Mech.
312 350 06/12/02 07/10/02 Ashley Mech.
313 3,212 03/06/03 03/11/03 Ashley Mech.
314 -23,265 02/07/03 02/12/03 Ashley Mech.
316 -15,000 06/09/03 06/10/03 Ashley Mech.
317 -1,900 06/09/03 06/10/03 Ashley Mech.
501 19,257 03/06/03 03/11/03 Everfoam Insulation
601 -11,236 05/22/02 06/04/02 Gross Elec.
602 12,324 06/12/02 07/10/02 Gross Elec.
603 -19,761 10/01/02 11/01/02 Gross Elec.
604 26,011 10/01/02 11/01/02 Gross Elec.
605 9,173 10/01/02 11/01/02 Gross Elec.
606 9,222 12/23/02 01/08/03 Gross Elec.
607 -15,000 05/09/03 05/21/03 Gross Elec.
701 54,205 12/20/02 01/09/03 Jupiter Environ.
801 35,519 01/11/02 05/10/02 Westbank Contracting
802 -10,728 11/17/03 11/21/03 Westbank Contracting
803 25,259 05/22/02 06/04/02 Westbank Contracting
804 14,473 02/07/03 02/12/03 Westbank Contracting
805 4,003 02/07/03 02/12/03 Westbank Contracting
806 23,000 12/23/02 01/08/03 Westbank Contracting
99-0679 Reconstruction 0-009-005 05/09/00 *CO No.* Amount Disallowed Received Approved Contractor
001 2,656 02/07/03 02/13/03 Richers Elec.
003 5,648 05/20/02 06/04/02 Ashley Mech.
2014 1,126 03/06/03 03/11/03 Canale Elec.
310 5,629 12/20/02 01/09/03 Ashley Mech.
5-03 -10,000 09/13/04 10/25/04 Partel Contracting
502 66,061 03/06/03 03/11/03 Pantel Contracting
T301 -4,459 12/20/02 01/09/03 Ashley Tech.
05-0158 Reconstruction 0-009-006 09/30/05 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1103 Reconstruction 0-009-007 01/11/08 *CO No.* Amount Disallowed Received Approved Contractor
RC-01 -41,727 04/29/09 07/16/09 HENDERSON-JOHNSON CO INC
07-2020 Reconstruction 0-009-008 11/24/08 *CO No.* Amount Disallowed Received Approved Contractor
AA-03 -700 10/19/09 11/18/09 PAR ENVIRONMENTAL CORP
GC-01 -2,978 09/21/09 11/17/09 FOURMEN CONSTRUCTION INC
MC-01 58,800 06/22/09 08/10/09 TECHNICAL BUILDING SERVICES
SC-02 -8,750 09/15/09 10/09/09 AVELLO BROS CONTRACTORS INC
03-0215FP Reconstruction 0-009-FP1 10/15/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Elementary School:
93-0206 Reconstruction 0-010-003 10/19/93 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1412 Reconstruction 0-010-005 05/23/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0678 Additions and Alterations 0-010-006 05/09/00 *CO No.* Amount Disallowed Received Approved Contractor
001 2,500 11/27/00 12/01/03 Jupiter Environ.
002 -270 06/01/01 07/20/01 Jupiter Environmental Services
008 960 11/27/00 12/01/03 Roehrs Const.
010 8,478 05/17/02 06/04/02 Arris Contracting
012 2,500 06/24/02 07/12/02 Roehrs Const.
012 5,919 12/23/02 01/08/03 Arris Contracting
013 17,467 05/22/02 06/04/02 Roehrs Const.
016 656 06/01/01 06/08/01 Arris Contracting
1003 8,804 01/11/02 06/04/02 Jupiter Environ. Services
102 -704 04/01/01 05/10/02 Mechanical Const.
1182 3,520 04/02/01 05/10/02 Arris Contracting
1185 767 08/01/01 05/10/02 Arris Contracting
1189 2,892 01/11/02 03/26/02 Arris Contracting
1190 5,048 06/24/02 07/12/02 Arris Contracting
2009 1,024 08/01/01 01/30/02 Canale Elec.
2010 60,492 01/11/02 05/10/02 Canale Elec.
2012 9,392 06/24/02 07/12/02 Canale Elec.
301 -704 04/01/01 05/10/02 Ashley Mech.
302 2,751 08/01/01 01/30/02 Ashley Mech.
303 298 06/28/01 02/06/02 Ashley Mech.
304 -256 08/01/01 05/10/02 Ashley Mech.
305 2,096 12/20/02 01/09/03 Ashley Mech.
306 14,960 06/24/02 07/12/02 Ashley Mech.
307 2,073 12/20/02 01/09/03 Ashley Mech.
4-15 -16,738 06/10/04 07/09/04 Mechanical Const.
411 6,073 08/01/01 01/30/02 Mech. Const.
412 -256 08/01/01 05/10/02 Mech. Const.
413 13,900 12/20/02 01/09/03 Mech. Const.
414 8,328 03/18/02 06/04/02 Mech. Const.
500 -704 04/01/01 05/10/02 Pantel Contracting
501 -256 08/01/01 05/10/02 Pantel Contracting
T100 -704 04/01/01 05/10/02 Adirondack Cabling
T200 -704 04/01/01 05/10/02 Canale Elec.
07-1104 Reconstruction 0-010-007 01/11/08 *CO No.* Amount Disallowed Received Approved Contractor
RC-03 -15,545 08/11/09 09/02/09 HENDERSON-JOHNSON CO INC
07-2021 Reconstruction 0-010-008 11/24/08 *CO No.* Amount Disallowed Received Approved Contractor
SC-03 3,499 10/19/09 11/18/09 AVELLO BROS CONTRACTORS INC
03-0216FP Reconstruction 0-010-FP1 10/15/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
96-1413 Reconstruction 5-002-001 05/23/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1723 Additions and Alterations 5-002-002 04/12/02 *CO No.* Amount Disallowed Received Approved Contractor
01-001 -16,900 05/03/04 05/07/04 Discover General Contracting
02-001 -2,400 10/03/03 10/06/03 Pittsfield Pipers
03-001 -2,400 10/03/03 10/06/03 S&O Const.
04-002 2,500 05/09/03 05/21/03 Richer's Elec.
04-003 -2,400 10/03/03 10/06/03 Richer's Elec.
10-001 -15,000 11/17/03 11/21/03 Jupiter Environ.
6-001 -2,721 10/03/03 10/06/03 Dutchess Restaurant Equip.
8-007 -37,615 10/03/03 10/06/03 Westbank Contracting
99-1377 Reconstruction 5-002-003 05/25/00 *CO No.* Amount Disallowed Received Approved Contractor
PH-002 -15,404 06/10/04 07/09/04 Mechanical Construction
PH001 -10,000 03/18/02 04/19/02 Mechanical Construction
07-2022 Reconstruction 5-002-004 11/24/08 *CO No.* Amount Disallowed Received Approved Contractor
SC-01 -60,900 07/24/09 08/07/09 AVELLO BROS. CONTRACTORS INC
07-2106 Reconstruction 5-002-005 05/12/08 NO CHANGE ORDERS ON ELECTRONIC FILE
District-wide:
99-1178 Reconstruction 7-999-001 04/27/00 *CO No.* Amount Disallowed Received Approved Contractor
2011 35,000 01/11/02 05/10/02 Canale Elec.
2013 845 06/12/02 11/04/02 Canale Elec.
T-1 8,372 12/20/02 01/02/03 NEC Business Network Solutions
RONDOUT VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 62-09-01-06
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Rondout Valley High:
90-0730 Additions and Alterations 0-002-002 02/26/91 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1190 Reconstruction 0-002-003 04/29/97 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0886 Reconstruction 0-002-005 02/27/04 *CO No.* Amount Disallowed Received Approved Contractor
005 10,728 06/22/06 07/13/06 Glass Solutions
007 42,195 06/22/06 07/13/06 Glass Solutions
009 13,750 06/22/06 07/13/06 Glass solutions
01 -15,550 06/22/06 07/13/06 Glass Solutions
010 13,225 06/22/06 07/13/06 Glass Solutions
011 5,750 06/22/06 07/13/06 Glass solutions
012 5,500 06/22/06 07/13/06 Glass solutions
01C 46,568 06/30/06 02/01/07 Chandler Security Systems
03 13,585 06/22/06 07/13/06 Glass Solutions
04 47,767 06/22/06 07/13/06 Glass Solutions
08-0593 Additions and Alterations 0-002-007 05/14/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1976FP Reconstruction 0-002-FP1 06/03/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Marbletown Elementary:
90-0731 Additions and Alterations 0-004-002 02/26/91 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1194 Reconstruction 0-004-004 04/29/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1681 Reconstruction 0-004-005 07/07/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1333 Reconstruction 0-004-007 04/14/00 *CO No.* Amount Disallowed Received Approved Contractor
02 0 12/13/01 02/28/02 John Herbert
1 19,630 12/11/01 02/28/02 Ashley Mech.
1 23,833 12/11/01 02/28/02 JJ Sass Elec.
1 71,390 12/11/01 02/28/02 Ashley Mech.
1 3,367 12/11/01 02/28/02 John Herbert
1 79,000 12/11/01 02/28/02 Westbank Contracting
10 1,300 12/11/01 02/28/02 J&J Sass
10 28,625 12/11/01 02/28/02 Ashley Mech.
10 -2,875 12/11/01 02/28/02 Westbank
11 1,700 12/11/01 02/28/02 J&J Sass
11 39,779 12/11/01 02/28/02 Ashley Mech.
11 0 12/11/01 02/28/02 Westbank
12 1,100 12/11/01 02/28/02 J&J Sass
12 6,735 12/11/01 02/28/02 Ashley Mech.
12 1,505 12/11/01 02/28/02 Westbank
13 3,985 12/11/01 02/28/02 J&J Sass
13 2,345 12/11/01 02/28/02 Ashley Mech.
13 -71,667 12/11/01 02/28/02 Westbank
14 43,938 01/07/02 02/28/02 Ashley Mech.
14 3,820 12/11/01 02/28/02 J&J Sass
14 0 12/11/01 02/28/02 Westbank
15 0 12/11/01 02/28/02 J&J Sass
15 78,685 12/11/01 02/28/02 Westbank
16 5,790 12/11/01 02/28/02 J&J Sass
16 19,492 12/11/01 02/28/02 Westbank
16 4,132 01/24/03 02/20/03 Ashley Mech.
17 0 12/11/01 02/28/02 Westbank
18 0 12/11/01 02/28/02 Westbank
19 4,500 12/11/01 02/28/02 Westbank
2 0 12/11/01 02/28/02 Ashley Mech.
2 12,800 12/11/01 02/28/02 JJ Sass Elec.
2 11,462 12/11/01 02/28/02 Ashley Mech.
2 -3,150 12/11/01 02/28/02 Westbank
2 -7,184 06/17/04 06/21/04 John Herbert Company
20 750 12/11/01 02/28/02 Westbank
21 425 12/11/01 02/28/02 Westbank
22 16,412 12/11/01 02/28/02 Westbank
23 10,254 12/11/01 02/28/02 Westbank
24 900 12/11/01 02/28/02 Westbank
25 0 12/11/01 02/28/02 Westbank
26 439 12/11/01 02/28/02 Westbank
27 18,450 12/11/01 02/28/02 Westbank
28 7,395 12/11/01 02/28/02 Westbank
29 904 12/11/01 02/28/02 Westbank
3 0 12/11/01 02/28/02 Ashley Mech.
3 8,670 12/11/01 02/28/02 JJ Sass Elec.
3 35,222 12/11/01 02/28/02 Ashley Mech.
3 0 12/11/01 02/28/02 Westbank
30 3,451 12/11/01 02/28/02 Westbank
31 2,000 12/11/01 02/28/02 Westbank
32 0 12/11/01 02/28/02 Westbank
33 25,000 12/11/01 02/28/02 Westbank
34 5,290 12/11/01 02/28/02 Westbank
35 342 12/11/01 02/28/02 Westbank
36 20,350 12/11/01 02/28/02 Westbank
38 -13,790 12/11/01 02/28/02 Westbank
39 0 12/11/01 02/28/02 Westbank
4 10,800 12/11/01 02/28/02 JJ Sass Elec.
4 10,362 12/11/01 02/28/02 Ashley Mech.
4 17,700 12/11/01 02/28/02 Westbank
40 -17,349 12/11/01 02/28/02 Westbank
41 -1,248 06/17/04 06/21/04 Westbank
42 -17,000 06/17/04 06/21/04 Westbank
5 0 12/11/01 02/28/02 Ashley Mech.
5 6,500 12/11/01 02/28/02 Westbank
5 2,780 12/06/01 02/28/02 JJ Sass Elec.
6 650 12/11/01 02/28/02 JJ Sass Elec.
6 0 12/11/01 02/28/02 Ashley Mech.
6 0 12/11/01 02/28/02 Westbank
7 325 12/11/01 02/28/02 J&J Sass Elec.
7 99,880 12/11/01 02/28/02 Ashley Mech.
7 122,650 12/11/01 02/28/02 Westbank
8 -6,800 12/11/01 02/28/02 Ashley Mech.
8 0 12/11/01 02/28/02 Westbank
8 400 06/17/04 06/21/04 J&J Sass Elec.
9 450 12/11/01 02/28/02 J&J Sass Elec.
9 87,330 12/11/01 02/28/02 Ashley Mech.
9 5,500 12/11/01 02/28/02 Westbank
Kerhonkson Elementary:
90-0732 Additions and Alterations 0-006-002 02/26/91 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1192 Reconstruction 0-006-003 04/29/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1682 Reconstruction 0-006-004 07/07/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1141 Additions and Alterations 0-006-005 06/25/00 *CO No.* Amount Disallowed Received Approved Contractor
1 0 11/27/01 05/29/02 Westbank Contracting
1 0 11/27/01 05/29/02 Weisburgh Mech.
1 0 11/27/01 05/28/02 Forno Ent.
100 37,069 07/21/03 01/09/06 Westbank
11 0 11/27/01 05/29/02 Hudson Valley Elec. Const.
12 0 11/27/01 05/29/02 CB Strain & Son
18 0 11/27/01 05/29/02 Hudson Valley Elec.
19 0 11/27/01 05/29/02 Westbank
2 0 11/27/01 05/29/02 Westbank
2 0 11/27/01 05/29/02 Weisburgh Mech.
21 0 11/27/01 05/29/02 Westbank
23 0 11/27/01 05/29/02 Westbank
25 0 11/27/01 05/29/02 Westbank
27 242 11/27/01 05/29/02 Hudson Valley Elec.
28 0 11/27/01 05/29/02 Westbank
3 0 11/27/01 05/29/02 Westbank
3 0 06/17/02 08/15/02 Forno Ent.
30 0 11/27/01 05/29/02 Westbank
31 0 11/27/01 05/29/02 Westbank
37 0 11/27/01 05/29/02 Westbank
37 15,000 05/06/04 05/06/04 Westbank
4 0 11/27/01 05/29/02 CB Strain & Son
4 0 11/27/01 05/29/02 Westbank
4 0 12/13/01 03/26/02 CB Strain & Son
40 0 11/27/01 05/29/02 Westbank
41 0 11/27/01 05/29/02 Westbank
42 0 11/27/01 05/29/02 Westbank
43 3,302 06/17/02 08/15/02 Hudson Valley Elec.
49 0 11/27/01 05/29/02 Westbank
5 0 11/27/01 05/29/02 Westbank
50 0 11/27/01 05/29/02 Westbank
6 0 11/27/01 05/29/02 CB Strain & Son
6 0 11/27/01 05/29/02 Westbank
61 7,315 11/27/01 05/29/02 Westbank
9 0 11/27/01 05/29/02 Hudson Valley Elec.
92 -4,600 06/17/02 08/15/02 Westbank
94 6,139 06/17/02 08/15/02 Westbank
96 1,930 06/17/02 08/15/02 Westbank
97 4,200 06/17/02 08/15/02 Westbank
98 3,567 06/17/02 08/15/02 Westbank
99 1,200 06/17/02 08/15/02 Westbank
GT-1 0 03/01/02 / / Westbank
GT-19 0 03/01/02 05/31/02 Westbank
GT-2 0 03/01/02 / / Westbank
GT-21 0 03/01/02 / / Westbank
GT-23 0 03/01/02 / / Westbank
GT-25 0 03/01/02 / / Westbank
GT-28 0 03/01/02 / / Westbank
GT-3 0 03/01/02 / / Westbank
GT-31 0 03/01/02 / / Westbank
GT-35 0 03/01/02 05/31/02 Westbank
GT-37 0 03/01/02 / / Westbank
GT-4 0 03/01/02 / / Westbank
GT-40 0 03/01/02 / / Westbank
GT-41 0 03/01/02 / / Westbank
GT-42 0 03/01/02 / / Westbank
GT-49 0 03/01/02 / / Westbank
GT-5 0 03/01/02 / / Westbank
GT-50 0 03/01/02 / / Westbank
GT-6 0 03/01/02 / / Westbank
GT-61 7,315 03/01/02 / / Westbank
GT-62 3,272 03/01/02 05/31/02 Westbank
GT-63 9,900 03/01/02 05/31/02 Westbank
GT-67 6,734 03/01/02 05/31/02 Westbank
Middle School:
90-0733 Reconstruction 0-007-003 02/26/91 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0493 Reconstruction 0-007-004 02/13/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1193 Reconstruction 0-007-005 04/29/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1451 Reconstruction 0-007-006 05/18/99 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1295 Reconstruction 0-007-007 07/15/99 *CO No.* Amount Disallowed Received Approved Contractor
1 6,800 05/20/03 05/20/03 CFI Const.
2 15,000 05/20/03 05/21/03 CFI Const.
3 35,000 05/20/03 05/21/03 CFI Const.
4 12,000 05/20/03 05/21/03 CFI Const.
5 7,800 05/20/03 05/21/03 CFI Const.
6 4,368 05/20/03 05/20/03 CFI Const.
7 10,000 05/20/03 05/21/03 CFI Const.
99-1143 Additions and Alterations 0-007-008 06/25/00 *CO No.* Amount Disallowed Received Approved Contractor
1 17,800 11/27/01 03/27/02 Bako Const.
1 0 11/27/01 05/29/02 Hudson Valley Elec.
1 0 12/13/01 03/27/02 CB Strain
1-elec 0 12/13/01 03/26/02 Hudson Valley Elec.
1-window 0 12/13/01 03/27/02 Forno Ent.
10-Plumb 0 12/13/01 03/26/02 Weisburgh Mech.
10-hvac 0 12/13/01 03/27/02 CB Strain
101 99,344 07/21/03 / / Westbank Contracting
11 0 11/27/01 05/29/02 Weisburgh Mech.
11 0 12/13/01 03/27/02 CB Strain
11-Elec 0 12/13/01 03/26/02 Hudson Valley Elec.
11-Plumb 0 12/13/01 03/26/02 Weisburgh Mech.
12 0 12/11/01 03/29/02 Westbank
12 0 11/27/01 05/29/02 Hudson Valley Elec.
12 0 11/27/01 05/29/02 Weisburgh Mech.
12 0 11/27/01 05/28/02 Westbank
12 0 12/11/01 05/22/02 Westbank
12-elec 0 12/13/01 03/26/02 Hudson Valley Elec.
12-hvac 0 12/13/01 03/27/02 CB Strain
12-plumb 0 12/13/01 03/26/02 Weisburgh Mech.
13 0 11/27/01 05/29/02 CB Strain
13 0 11/27/01 05/29/02 Westbank
13 0 11/27/01 05/29/02 Hudson Valley Elec.
13 0 11/27/01 05/29/02 Weisburgh Mech.
13-GT 0 12/11/01 03/29/02 Westbank
13-elec 0 12/13/01 03/26/02 Hudson Valley Elec.
13-elec 0 12/13/01 03/27/02 Hudson Valley Elec.
13-plumb 0 12/13/01 03/26/02 Weisburgh Mech.
14 0 01/07/02 05/22/02 CB Strain
14 0 11/27/01 05/29/02 Hudson Valley Elec.
14 0 11/27/01 05/29/02 Hudson Valley Elec.
14-GT 0 12/11/01 03/29/02 Westbank
14-elec 0 12/13/01 03/27/02 Hudson Valley Elec.
14-elec 0 12/13/01 03/26/02 Hudson Valley Elec.
14-plumb 0 12/13/01 03/26/02 Weisburgh Mech.
15 0 11/27/01 05/29/02 Hudson Valley Elec.
15-GT 0 12/11/01 03/29/02 Westbank
15-elec 0 12/13/01 03/27/02 Hudson Valley Elec.
15-elec 0 12/13/01 03/26/02 Hudson Valley Elec.
15-plumb 0 12/13/01 03/26/02 Weisburgh Mech.
16 0 01/07/02 05/22/02 Weisburgh Mech.
16 0 01/07/02 05/22/02 CB Strain
16 0 12/11/01 05/22/02 Westbank
16 0 11/27/01 05/29/02 Hudson Valley Elec.
16-elec 0 12/13/01 03/26/02 Hudson Valley Elec.
17 0 01/07/02 05/22/02 Weisburgh Mech.
17 0 01/07/02 05/22/02 CB Strain
17 0 11/27/01 05/29/02 Hudson Valley Elec.
17-GT 0 12/11/01 03/29/02 Westbank
17-elec 0 12/13/01 03/26/02 Hudson Valley Elec.
18 0 01/07/02 05/22/02 Weisburgh Mech.
18 0 03/11/02 05/06/02 CB Strain
18-Elec 0 12/13/01 03/26/02 Hudson Valley Elec.
19 0 01/07/02 05/22/02 Weisburgh Mech.
19 0 11/27/01 05/29/02 Hudson Valley Elec.
19 0 06/26/03 10/04/05 CB Strain
19-elec 0 12/13/01 03/26/02 Hudson Valley Elec.
2 -1,000 01/09/02 / / William J. Murray
2 0 12/13/01 03/26/02 Hudson Valley Elec.
2 0 12/13/01 03/27/02 CB Strain
2-elec 0 12/13/01 03/26/02 Hudson Valley Elec.
2-plumb 0 12/13/01 03/26/02 Weisburgh Mech.
2-window 0 12/13/01 03/27/02 Forno Ent.
20 0 11/27/01 05/29/02 Westbank
20 0 11/27/01 05/29/02 Hudson Valley Elec.
20 0 03/12/02 05/06/02 Weisburgh Mech.
20 0 03/11/02 05/06/02 CB Strain
20-Elec 0 12/13/01 03/26/02 Hudson Valley Elec.
21 0 11/27/01 05/29/02 Hudson Valley Elec.
21 -1,299 03/27/03 04/17/03 Weisburgh Mech.
21 HVAC 0 06/06/02 08/15/02 CB Strain
21-elec 0 12/13/01 03/26/02 Hudson Valley Elec.
22 0 12/13/01 / / Hudson Valley Elec.
22 HVAC 0 06/06/02 08/15/02 CB Strain
22-elec 1,211 11/27/01 03/26/02 Hudson Valley Elec.
23 2,496 11/27/01 05/29/02 Hudson Valley Elec.
23 0 06/26/03 10/03/05 CB Strain
24 2,397 11/27/01 05/29/02 Hudson Valley Elec.
24 0 06/26/03 10/04/05 CB Strain
24-GT 0 12/11/01 03/29/02 Westbank
25 0 06/26/03 10/04/05 CB Strain
25-elec 601 12/13/01 03/26/02 Hudson Valley Elec.
26 HVAC 0 06/06/02 08/15/02 CB Strain
26-GT 0 12/11/01 03/29/02 Westbank
26-elec 1,596 12/13/01 03/26/02 Hudson Valley Elec.
27 HVAC 0 06/06/02 08/15/02 CB Strain
27-Elec 242 12/13/01 / / Hudson Valley Elec.
27-GT 0 12/11/01 03/29/02 Westbank
28 1,004 01/07/02 05/22/02 Hudson Valley Elec.
28 HVAC 0 06/06/02 08/15/02 CB Strain
29 2,069 01/07/02 05/22/02 Hudson Valley Elec.
29 HVAC 0 06/06/02 08/15/02 CB Strain
3 0 11/27/01 05/29/02 CB Strain
3 0 11/27/01 05/29/02 Weisburgh Mech.
3 0 11/27/01 05/29/02 Hudson Valley Elec.
3 0 12/13/01 03/27/02 CB Strain
3-elec 0 12/13/01 03/26/02 Hudson Valley Elec.
3-hvac 0 12/13/01 03/27/02 CB Strain
3-plumb 0 12/13/01 03/26/02 Weisburgh Mech.
30 HVAC 0 06/06/02 08/15/02 CB Strain
30-GT 0 12/11/01 03/29/02 Westbank
31 889 01/07/02 05/22/02 Hudson Valley Elec.
31 0 06/26/03 09/30/05 CB Strain
31-GT 0 12/11/01 03/29/02 Westbank
32 958 01/07/02 05/22/02 Hudson Valley Elec.
32 HVAC 0 06/06/02 08/15/02 CB Strain
33 1,060 01/07/02 05/22/02 Hudson Valley Elec.
33 HVAC 0 06/06/02 08/15/02 CB Strain
33-GT 0 12/11/01 03/29/02 Westbank
34 1,399 01/07/02 05/22/02 Hudson Valley Elec.
35 0 01/07/02 05/22/02 Hudson Valley Elec.
35 0 11/27/01 05/29/02 Westbank
35-GT 0 12/11/01 03/29/02 Westbank
36 0 11/27/01 05/29/02 Westbank
36 684 03/11/02 05/06/02 Hudson Valley Elec.
36-GT 0 12/11/01 03/29/02 Westbank
37 7,012 03/11/02 05/06/02 Hudson Valley Elec.
38 0 11/27/01 05/29/02 Westbank
38 1,497 03/11/02 05/06/02 Hudson Valley Elec.
38-GT 0 12/11/01 03/29/02 Westbank
39 242 03/11/02 05/06/02 Hudson Valley Elec.
4 0 11/27/01 05/29/02 Weisburgh Mech.
4 0 11/27/01 05/29/02 Hudson Valley Elec.
4 0 12/13/01 05/29/02 Weisburgh Mech.
4 0 03/12/02 05/06/02 Forno Ent.
4-Elec 0 12/13/01 03/26/02 Hudson Valley Elec.
4-elec 0 12/13/01 03/26/02 Hudson Valley Elec.
40 221 03/11/02 05/06/02 Hudson Valley Elec.
41 756 03/11/02 05/06/02 Hudson Valley Elec.
42 1,132 03/11/02 05/06/02 Hudson Valley Elec.
43-GT 0 12/11/01 03/29/02 Westbank
44 0 11/27/01 05/29/02 Westbank
44-GT 0 12/11/01 03/29/02 Westbank
45 0 11/27/01 05/29/02 Westbank
45-GT 0 12/11/01 03/29/02 Westbank
46 0 11/27/01 05/29/02 Westbank
46-GT 0 12/11/01 03/29/02 Westbank
47 0 11/27/01 05/29/02 Westbank
47-GT 0 12/11/01 03/29/02 Westbank
48 0 11/27/01 05/29/02 Westbank
48-GT 0 12/11/01 03/29/02 Westbank
5 0 11/27/01 05/29/02 CB Strain
5 0 11/27/01 05/29/02 Weisburgh Mech.
5 0 12/13/01 03/27/02 CB Strain
5-elec 0 12/13/01 03/26/02 Hudson Valley Elec.
5-plumb 0 12/13/01 03/26/02 Weisburgh Mech.
51 0 11/27/01 / / Westbank
51-GT 0 12/11/01 03/29/02 Westbank
53 0 11/27/01 05/29/02 Westbank
53-GT 0 12/11/01 03/29/02 Westbank
54-GT 0 12/11/01 03/29/02 Westbank
55 0 11/27/01 05/29/02 Westbank
55-GT 0 12/11/01 03/29/02 Westbank
56 0 11/27/01 05/29/02 Westbank
56-GT 0 12/11/01 03/29/02 Westbank
58-GT 0 12/11/01 03/29/02 Westbank
59 0 11/27/01 05/29/02 Westbank
59-GT 0 12/11/01 03/29/02 Westbank
6 0 11/27/01 05/29/02 Weisburgh Mech.
6 0 11/27/01 05/29/02 Hudson Valley Elec.
6-elec 0 12/13/01 03/26/02 Hudson Valley Elec.
6-plumb 0 12/13/01 03/26/02 Weisburgh Mech.
60-GT 91,528 12/11/01 03/29/02 Westbank
62-GT 3,272 12/11/01 03/29/02 Westbank
63-GT 9,900 12/11/01 03/29/02 Westbank
64 175 11/27/01 05/29/02 Westbank
65-GT 380 12/11/01 03/29/02 Westbank
66-GT 984 12/11/01 03/29/02 Westbank
67 6,734 12/11/01 05/22/02 Westbank
68 -33,440 01/07/02 04/01/02 Westbank
69 1,612 01/07/02 04/01/02 Westbank
7 0 11/27/01 05/29/02 Weisburgh Mech.
7-elec 0 12/13/01 03/26/02 Hudson Valley Elec.
7-plumb 0 12/13/01 03/26/02 Weisburgh Mech.
70 5,850 01/07/02 04/01/02 Westbank
71 3,672 01/07/02 04/01/02 Westbank
72 12,584 01/07/02 04/01/02 Westbank
73 2,567 01/07/02 04/01/02 Westbank
74 13,016 01/07/02 04/01/02 Westbank
75 4,022 01/07/02 04/01/02 Westbank
76 3,446 01/07/02 04/01/02 Westbank
78 1,653 03/12/02 05/06/02 Westbank
79 600 03/12/02 05/06/02 Westbank
8 0 11/27/01 05/29/02 CB Strain
8 0 11/27/01 05/29/02 Hudson Valley Elec.
8 0 11/27/01 05/29/02 Weisburgh Mech.
8 0 12/13/01 03/27/02 CB Strain
8-Plumb 0 12/13/01 03/26/02 Weisburgh Mech.
8-elec 0 12/13/01 03/26/02 Hudson Valley Elec.
80 2,546 03/12/02 05/06/02 Westbank
81 523 03/12/02 05/06/02 Westbank
82 1,200 03/12/02 05/06/02 Westbank
83 1,957 03/12/02 05/06/02 Westbank
84 3,003 03/12/02 05/06/02 Westbank
85 2,233 03/12/02 05/06/02 Westbank
86 1,844 03/12/02 05/06/02 Westbank
87 15,000 03/12/02 05/06/02 Westbank
88 4,326 03/12/02 05/06/02 Westbank
89 3,515 03/12/02 05/06/02 Westbank
9 0 11/27/01 05/29/02 Weisburgh Mech.
9 0 12/13/01 03/27/02 CB Strain
9-Elec 0 12/13/01 03/26/02 Hudson Valley Elec.
9-Plumb 0 12/13/01 03/26/02 Weisburgh Mech.
90 1,500 03/12/02 05/06/02 Westbank
93 2,958 03/12/02 05/06/02 Westbank
01-0758 Reconstruction 0-007-009 03/05/02 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
002C 39,716 06/22/06 / / Chandler Security Systems
006 690 06/22/06 07/13/06 Glass Solutions
008 5,200 06/22/06 07/13/06 Glass Solutions
012 11,000 06/22/06 07/13/06 Glass Solutions
02 10,800 06/22/06 07/13/06 Glass Solutions
3C 3,565 06/22/06 10/02/06 Chandler Security Systems
08-0594 Reconstruction 0-007-010 05/14/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1977FP Reconstruction 0-007-FP1 06/03/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Rosendale Elementary:
90-0734 Additions and Alterations 0-012-002 02/26/91 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1191 Reconstruction 0-012-004 04/29/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0259 Reconstruction 0-012-005 10/30/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1142 Additions and Alterations 0-012-006 06/25/00 *CO No.* Amount Disallowed Received Approved Contractor
10 0 11/27/01 05/29/02 Westbank
10 0 11/27/01 05/29/02 Hudson Valley Elec.
102 11,862 07/21/03 / / Westbank
11 0 11/27/01 05/29/02 Westbank
18 0 11/27/01 05/29/02 Westbank
2 0 11/27/01 05/29/02 Forno Ent.
22 0 11/27/01 05/29/02 Westbank
29 0 11/27/01 05/29/02 Westbank
32 0 11/27/01 05/29/02 Westbank
34 0 11/27/01 05/29/02 Westbank
39 0 11/27/01 05/29/02 Westbank
52 0 11/27/01 05/29/02 Westbank
57 0 11/27/01 05/29/02 Westbank
7 0 11/27/01 05/29/02 Westbank
7 0 12/13/01 03/26/02 CB Strain
7-HVAC 0 11/27/01 05/29/02 CB Strain
8 0 11/27/01 05/29/02 Westbank
9 0 11/27/01 05/29/02 Westbank
02-1975FP Reconstruction 0-012-FP1 06/03/03 NO CHANGE ORDERS ON ELECTRONIC FILE
NEW ADMINISTRATION BLDG.:
95-0774 New Construction 1-017-001 05/07/96 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
98-0260 Reconstruction 5-008-002 10/30/98 NO CHANGE ORDERS ON ELECTRONIC FILE
District Wide:
96-0428 Reconstruction 7-999-001 11/06/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1108 Reconstruction 7-999-003 07/08/98 NO CHANGE ORDERS ON ELECTRONIC FILE
MARLBORO CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 62-10-01-06
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Middle School:
97-1765 Additions and Alterations 0-001-003 10/13/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1588 Reconstruction 0-001-004 06/14/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0763 Reconstruction 0-001-005 08/18/02 *CO No.* Amount Disallowed Received Approved Contractor
001 5,007 07/14/03 08/28/03 Hudson Valley Elec.
001 -38,100 07/14/03 08/28/03 Ashley Mech.
001 2,500 09/18/03 11/04/03 Mike Korn and Sons
001 17,970 11/25/03 01/14/04 Eastern Heating
001 -6,160 11/25/03 12/04/03 Specialty Service Contracting
002 17,586 07/14/03 08/28/03 Meyer Contracting
002 -101,200 09/18/03 11/04/03 Ashley Mech.
002 1,980 09/18/03 11/04/03 Mike Korn and Sons
003 21,051 09/18/03 11/04/03 Meyer Contracting
003 3,430 11/25/03 03/17/04 Ashley Mech.
004 11,093 09/30/03 11/04/03 Meyer Contracting
004-002 -2,975 09/18/03 11/04/03 Hudson Valley Elec.
004-003 4,631 11/25/03 01/14/04 Hudson Valley Elec.
006 2,794 11/25/03 12/01/03 Meyer Contracting
99-1179 Reconstruction 0-001-006 04/22/00 NO CHANGE ORDERS ON ELECTRONIC FILE
08-1730 Reconstruction 0-001-007 07/15/09 NO CHANGE ORDERS ON ELECTRONIC FILE
00-2006SC Visual Structural Inspection 0-001-SC1 06/29/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Elementary School:
96-1400 Additions and Alterations 0-002-003 06/19/97 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0749 Additions and Alterations 0-002-004 06/30/04 *CO No.* Amount Disallowed Received Approved Contractor
00001 27,780 05/13/05 06/07/05 Vamco Sheet Metal
00001 17,382 05/13/05 06/07/05 Profax Inc
00001 19,990 05/13/05 06/07/05 Specialty Service
00001 135,000 05/13/05 / / Piazza brothers
00002 8,431 12/16/05 04/21/06 Profex Inc
00002 38,051 12/23/05 / / Piazza brothers
00003 50,000 12/23/05 / / Profex inc
00003 63,217 06/06/06 07/26/06 Piazza Brothers
0004 98,415 12/23/05 / / Profex Inc
03-0101 Additions and Alterations 0-002-005 01/27/04 *CO No.* Amount Disallowed Received Approved Contractor
00001 4,734 12/15/05 01/01/29 William Manfredi Construction
03-1199FP Reconstruction 0-002-FP1 03/16/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Middle Hope ES:
04-0704 Additions and Alterations 0-003-003 02/11/05 NO CHANGE ORDERS ON ELECTRONIC FILE
Milton Elementary:
98-1357 Reconstruction 0-006-003 06/18/99 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0705 Additions and Alterations 0-006-004 02/11/05 NO CHANGE ORDERS ON ELECTRONIC FILE
Marlboro High School:
02-0589 Reconstruction 0-007-003 11/22/02 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0541 Reconstruction 0-007-004 01/21/08 *CO No.* Amount Disallowed Received Approved Contractor
GCR-1 13,834 04/01/09 07/29/09 HUDSON VALLEY ROOFING AND SHEETMETAL
GCR-2 19,008 05/04/09 / / HUDSON VALLEY ROOFING & SHEET METAL
GCR-3 16,042 05/04/09 / / HUDSON VALLEY ROOFING & SHEET METAL
GCR-4 21,730 05/04/09 / / HUDSON VALLEY ROOFING & SHEET METAL
GCR-5 7,005 05/04/09 / / HUDSON VALLEY ROOFING & SHEET METAL
GCW-1 -48,600 04/01/09 07/29/09 R.D. ARCHITECTURAL PRODUCTS
07-1263 Additions and Alterations 0-007-005 09/26/08 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 -2,541 07/21/09 09/25/09 ALLSTAR ELECTRIC CORP
EC-2 858 07/21/09 09/25/09 ALLSTAR ELECTRIC CORP
EC-3 817 07/21/09 09/25/09 ALLSTAR ELECTRIC CORP
EC-4 6,487 07/21/09 09/25/09 ALLSTAR ELECTRIC CORP
GC-1 -46,385 07/21/09 08/10/09 EUGENE DILORENZO INC
GC-2 6,085 07/21/09 08/10/09 EUGENE DILORENZO INC
GC-3 5,350 07/21/09 08/10/09 EUGENE DILORENZO INC
GC-4 3,070 08/10/09 09/04/09 EUGENE DILORENZO INC
GC-5 16,327 08/10/09 09/04/09 EUGENE DILORENZO INC
GC-6 39,400 08/10/09 09/04/09 EUGENE DILORENZO INC
GC-7 19,973 08/10/09 09/04/09 EUGENE DILORENZO INC
GC-8 8,707 08/10/09 09/04/09 EUGENE DILORENZO INC
GC-9 1,258 08/10/09 09/04/09 EUGENE DILORENZO INC
SC-1 17,534 07/21/09 08/10/09 SHAWN'S LAWNS INC
SC-2 13,507 07/21/09 08/10/09 SHAWN'S LAWNS INC
SC-3 14,841 07/21/09 08/10/09 SHAWN'S LAWNS INC
SC-4 6,250 07/21/09 08/10/09 SHAWN'S LAWNS INC
SC-5 12,100 07/21/09 08/10/09 SHAWN'S LAWNS INC
SC-6 10,140 07/21/09 08/10/09 SHAWN'S LAWNS INC
SC-7 8,750 07/21/09 08/10/09 SHAWN'S LAWNS INC
SC-8 3,850 07/27/09 08/10/09 SHAWN'S LAWNS INC
SC-9 1,570 07/21/09 08/10/09 SHAWN'S LAWNS INC
03-1200FP Reconstruction 0-007-FP1 03/16/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Lattintown School:
07-2292 Reconstruction 2-005-001 07/07/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Marlboro Library:
99-1096 Reconstruction 6-008-002 04/17/00 NO CHANGE ORDERS ON ELECTRONIC FILE
Milton Elem.Modular Classroom:
93-0044 New Construction 8-013-001 07/29/93 NO CHANGE ORDERS ON ELECTRONIC FILE
Reloc. CR Middle Hope Lease:
93-0045 New Construction 8-014-001 07/29/93 NO CHANGE ORDERS ON ELECTRONIC FILE
Reloc. CR Marlboro Elem. Lease:
93-0046 New Construction 8-015-001 07/29/93 NO CHANGE ORDERS ON ELECTRONIC FILE
NEW PALTZ CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 62-11-01-06
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Middle School:
94-1539 Reconstruction 0-001-005 06/09/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1396 Reconstruction 0-001-006 05/30/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1578 Reconstruction 0-001-007 06/05/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0516 Reconstruction 0-001-009 12/23/97 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0004 Reconstruction 0-001-010 05/11/07 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1776FP Reconstruction 0-001-FP1 05/29/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Duzine Elementary School:
94-1564 Reconstruction 0-004-004 07/14/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1580 Reconstruction 0-004-005 06/05/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0517 Reconstruction 0-004-007 12/23/97 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0005 Reconstruction 0-004-008 05/11/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0579 Reconstruction 0-004-009 10/17/07 *CO No.* Amount Disallowed Received Approved Contractor
RC-01 4,419 06/19/08 08/27/08 Precision Roofing
07-1282 Reconstruction 0-004-010 04/15/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1774FP Reconstruction 0-004-FP1 05/29/03 NO CHANGE ORDERS ON ELECTRONIC FILE
High School:
94-1565 Reconstruction 0-005-006 07/14/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1487 Reconstruction 0-005-007 06/17/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1579 Reconstruction 0-005-009 06/05/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0518 Reconstruction 0-005-011 12/23/97 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0711 Additions and Alterations 0-005-012 06/24/03 *CO No.* Amount Disallowed Received Approved Contractor
01-01 -4,425 09/09/04 09/24/04 Arris Contracting Co
01-02 -1,913 10/12/04 10/18/04 Arris Contracting Co
01-03 -3,010 09/09/04 09/24/04 Arris Contracting Co
01-04 -412 05/26/05 07/20/05 Arris Contracting
01-05 -5,658 10/12/04 10/18/04 Arris Contracting Co
01-06 19,350 04/22/05 04/26/05 Arris Contracting
01-07 -801 04/22/05 04/26/05 Arris Contracting Co
02-002 6,107 12/13/04 12/23/04 Ashley Mech.
02-003 3,880 12/13/04 12/23/04 Ashley Mech.
02-004 7,266 10/12/04 10/18/04 Ashley Mech.
02-005 1,511 10/12/04 10/18/04 Ashley Mech.
02-006 5,322 05/26/05 07/20/05 Ashley Mechanical
02-007 801 05/26/05 07/20/05 Ashley Mechanical
02-01 -10,500 02/04/04 07/17/07 Ashley Mech.
03-01 -42,300 02/04/04 04/23/07 Ashley Mech.
03-02 48,237 04/22/05 12/19/06 Ashley mechanical
03-03 8,806 02/17/05 03/02/05 Ashley Mech
03-04 799 02/17/05 03/02/05 Ashley Mech
03-05 8,704 02/17/05 03/02/05 Ashley Mechanical
03-06 1,925 05/26/05 07/20/05 Ashley Mechanical
03-07 2,699 05/26/05 07/20/05 Ashley Mechanical
03-08 2,297 05/26/05 07/20/05 Ashley Mechanical
04-002 -4,741 05/26/05 07/20/05 Hudson Valley
04-01 -95,000 02/04/04 07/17/07 Hudson Valley EC&M
06-01 8,490 05/26/05 07/20/05 Consorti Brothers Paving
06-02 2,800 05/26/05 07/20/05 Consorti Brothers Paving
06-03 2,500 05/26/05 07/20/05 Consorti Brothers Paving
06-04 1,500 05/26/05 07/20/05 Consorti Brothers Paving
06-05 15,700 05/26/05 07/20/05 Consorti Brothers Paving
06-06 7,500 05/26/05 07/20/05 Consorti Brothers Paving
07-1283 Reconstruction 0-005-014 04/15/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1777FP Reconstruction 0-005-FP1 05/29/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Lenape Elementary School:
01-1369 Reconstruction 0-008-005 05/31/02 *CO No.* Amount Disallowed Received Approved Contractor
01-01 -10,081 08/26/03 10/22/03 Arris Contracting
02-01 -3,086 08/26/03 10/22/03 Weather Guard Roofing
02-0832 Reconstruction 0-008-006 01/30/03 *CO No.* Amount Disallowed Received Approved Contractor
00001 2,500 12/03/03 12/09/03 D'Onofrio
00002 -15,000 09/13/04 09/17/04 D'Onofrio
07-1284 Reconstruction 0-008-008 04/15/09 NO CHANGE ORDERS ON ELECTRONIC FILE
08-1610 Reconstruction 0-008-009 05/12/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1775FP Reconstruction 0-008-FP1 05/29/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Modular Classrooms - High School:
95-1622 New Construction 0-010-001 06/28/96 NO CHANGE ORDERS ON ELECTRONIC FILE
561 Bus Garage:
94-1566 Reconstruction 5-006-002 07/14/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1570 Reconstruction 5-006-003 06/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0514 Additions and Alterations 5-006-004 12/30/97 NO CHANGE ORDERS ON ELECTRONIC FILE
Districtwide:
97-0597 Reconstruction 7-999-001 12/22/97 NO CHANGE ORDERS ON ELECTRONIC FILE
ONTEORA CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 62-12-01-06
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Jr/Sr High School:
90-0396 Reconstruction 0-001-002 01/02/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1114 Reconstruction 0-001-010 04/03/91 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1444 Reconstruction 0-001-012 07/08/98 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1095 Reconstruction 0-001-013 05/17/02 *CO No.* Amount Disallowed Received Approved Contractor
3-004 -18,750 10/27/03 11/04/03 Arris Contracting Company
4-004 -6,066 12/08/03 12/31/03 Associated Const.
00-0348 Reconstruction 0-001-014 11/27/00 *CO No.* Amount Disallowed Received Approved Contractor
E-1 6,143 05/19/04 / / Hudson Valley Elec.
GC-1 3,121 05/19/04 / / AN Contracting
HVAC-1 3,089 3,089 09/18/03 05/27/04 Ashley Mech.
P-1 1,752 05/19/04 / / Pittsfield Pipers
04-0277 Reconstruction 0-001-015 10/08/04 *CO No.* Amount Disallowed Received Approved Contractor
1 3,436 09/21/05 10/04/05 BMI Supply
2 1,552 09/21/05 10/03/05 BMI Supply
07-1199 Reconstruction 0-001-016 08/04/08 *CO No.* Amount Disallowed Received Approved Contractor
001 25,238 10/23/09 11/19/09 SAUSTO CONTRACTING INC
GC-001 157,599 09/11/09 09/25/09 TRANSITIONAL BUILDERS INC
GC-002 24,379 09/11/09 09/25/09 TRANSITIONAL BUILDERS INC
GC-003 23,083 09/11/09 09/25/09 TRANSITIONAL BUILDERS INC
GC-004 7,463 09/11/09 09/25/09 TRANSITIONAL BUILDERS INC
GC-005 1,119 09/11/09 09/25/09 TRANSITIONAL BUILDERS INC
GC-006 34,405 09/11/09 09/25/09 TRANSITIONAL BUILDERS INC
08-1391 Reconstruction 0-001-017 03/18/09 NO CHANGE ORDERS ON ELECTRONIC FILE
08-1546 Reconstruction 0-001-018 07/06/09 NO CHANGE ORDERS ON ELECTRONIC FILE
08-1707 Reconstruction 0-001-019 09/03/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1278FP Reconstruction 0-001-FP1 08/13/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Reginald R Bennett School:
93-0139 Additions and Alterations 0-002-006 09/29/93 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1445 Reconstruction 0-002-007 07/08/98 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0721 Additions and Alterations 0-002-008 05/17/02 *CO No.* Amount Disallowed Received Approved Contractor
1-001 -378 05/27/03 06/02/03 Avala Contracting Company
1-002 -14,433 05/27/03 06/02/03 Avala Contracting Company
2-001 -2,000 05/27/03 06/02/03 Arold Paving Company
2-002 -500 05/27/03 06/02/03 Arold Paving Company
2-003 850 07/31/03 08/12/03 Arold Paving Company
2-004 23,130 11/21/03 11/24/03 Arold Paving Company
3-001 -37,118 05/27/03 06/02/03 Arris Contracting
3-002 -2,250 07/31/03 08/12/03 Arris Contracting
3-003 -44,496 10/27/03 11/04/03 Arris Contracting
4-001 15,185 05/27/03 06/02/03 Assoc. Const.
4-005 -4,099 10/27/03 11/04/03 Assoc. Const.
5-001 -779 05/27/03 06/02/03 Ashley Mech.
5-002 4,482 05/27/03 06/02/03 Ashley Mech.
5-003 -329 10/03/03 10/06/03 Ashley Mech.
6-001 -2,246 11/21/03 01/08/04 Ashley Mech.
7-001 13,324 07/31/03 / / Hudson Valley Elec.
7-002 1,499 08/28/03 09/16/03 Hudson Valley Elec.
02-1279FP Reconstruction 0-002-FP1 08/13/03 NO CHANGE ORDERS ON ELECTRONIC FILE
West Hurley #1:
97-1446 Reconstruction 0-007-008 07/08/98 NO CHANGE ORDERS ON ELECTRONIC FILE
Woodstock Elementary:
94-1470 Reconstruction 0-009-006 05/31/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1447 Reconstruction 0-009-007 07/08/98 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1634 Reconstruction 0-009-008 04/03/03 *CO No.* Amount Disallowed Received Approved Contractor
1 -30,017 09/18/03 09/22/03 Monahan & Loughlin
05-1230 Reconstruction 0-009-009 06/13/06 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1391 Reconstruction 0-009-010 05/10/07 *CO No.* Amount Disallowed Received Approved Contractor
E-001 5,045 08/06/08 / / STONERIDGE ELECTRIC
West Hurley #2:
97-1448 Reconstruction 0-010-007 07/08/98 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1096 Reconstruction 0-010-008 05/17/02 *CO No.* Amount Disallowed Received Approved Contractor
4-002 -1,669 09/15/03 09/19/03 Associated Const.
4-003 -474 12/08/03 12/31/03 Associated Const.
Phoenicia Elementary:
93-0140 Additions and Alterations 0-011-008 09/29/93 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1449 Reconstruction 0-011-009 07/08/98 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1635 Reconstruction 0-011-010 04/03/03 *CO No.* Amount Disallowed Received Approved Contractor
2 -20,105 09/18/03 09/22/03 Monahan & Loughlin
3 10,409 03/03/04 04/08/04 Monahan Loughlin
Portable #1 @ Bennett:
01-0298 New Construction 0-016-001 11/02/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Portable #2 @ Bennett:
01-0299 New Construction 0-017-001 11/02/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Portable #3 @ Bennett:
01-0300 New Construction 0-018-001 11/02/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
90-0397 Additions and Alterations 5-004-003 01/02/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1115 Reconstruction 5-004-004 04/03/91 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1773 Reconstruction 5-004-006 07/28/98 NO CHANGE ORDERS ON ELECTRONIC FILE
Sewer Treatment Building:
94-1342 New Construction 7-014-001 06/02/95 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0303 Reconstruction 7-014-002 11/01/02 NO CHANGE ORDERS ON ELECTRONIC FILE
SAUGERTIES CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 62-16-01-06
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Riccardi School (F'mlyGlasco):
98-1193 Reconstruction 0-004-002 05/11/99 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0925 Reconstruction 0-004-003 07/03/01 *CO No.* Amount Disallowed Received Approved Contractor
G-2 655 11/12/02 11/21/02 Glomar Const.
05-0651 Alterations 0-004-005 04/13/06 *CO No.* Amount Disallowed Received Approved Contractor
2R -4,460 05/21/07 06/21/07 WB Roofing Sheetmetal
2R -11,000 05/23/07 / / General Mechanical Systems
2R -29,739 05/23/07 06/22/07 Arris Contracting
34R 2,369 01/14/09 07/03/09 GENERAL MECHANICAL SYSTEMS, INC.
7R -15,002 05/23/07 06/22/07 Jupiter Environmental
8R -18,242 05/23/07 / / General Mechanical
8R -20,117 05/23/07 06/22/07 Arris Contracting
EL-14R -6,414 04/28/08 06/12/08 HUDSON VALLEY ELECTRICAL CONSTRUCTIO
EL-18R 2,033 06/02/08 / / HUDSON VALLEY EC&M, INC.
EL-19GM 1,511 06/02/08 / / HUDSON VALLEY EC&M, INC.
ENV 2R -49,858 05/23/07 06/22/07 Jupiter Environmental
ENV-11R 1,900 09/18/09 11/10/09 JUPITER ENVIRONMENTAL SERVICES
ENV-16R -572 05/20/08 08/05/08 JUPITER ENVIRONMENTAL SERVICES
ENV-19R 75,875 06/25/08 10/27/08 Jupiter Environmental Services
FP30R -19,056 12/19/08 / / GENERAL MECHANICAL SYSTEMS, INC.
GC-26R -3,170 11/26/07 12/27/07 Arris constrution
GC-29R -15,925 01/16/08 01/23/08 Arris Contracting
GC-34R 5,454 04/08/08 04/21/08 ARRIS CONTRACTING CO., INC.
GC-40R -48,200 05/07/08 08/04/08 ARRIS CONTRACTING CO., INC.
GC-41R -47,500 05/07/08 08/04/08 ARRIS CONTRACTING CO., INC.
GC-45R -6,845 05/07/08 11/06/08 ARRIS CONTRACTING CO., INC.
GC-48R -23,804 06/17/08 02/05/09 Arris Contracting
GC-51R -75,875 06/25/08 10/27/08 Arris Contracting
GC-64R 4,133 12/19/08 06/18/09 ARRIS CONTRACTING CO. INC.
GC-67R 2,168 09/16/09 10/13/09 ARRIS CONTRACTING CO INC
GC18 -11,100 07/19/07 08/20/07 Arris Contracting
HVAC-20R -4,609 04/28/08 06/12/08 GENERAL MECHANICAL SYSTEMS, INC.
HVAC-27R 2,973 02/10/09 03/05/09 GENERAL MECHANICAL SYSTEMS, INC.
HVAC-29R 27,992 03/03/09 / / GENERAL MECHANICAL SYSTEMS, INC.
PL & FP2 -2,250 08/31/07 / / U. W. MARX, INC.
PL & FP6 -3,517 08/31/07 / / GENERAL MECHANICAL SYSTEMS, INC.
PL &FP11 -263 08/31/07 11/07/07 GENERAL MECHANICAL SYSTEMS INC.
PL&FP27R 1,737 10/06/08 / / GENERAL MECHANCIAL SYSTEMS, INC.
PLFP18R 17,731 03/17/08 04/29/08 GENERAL MECHANICAL SYSTEMS, INC.
PLFP21R -2,009 04/28/08 06/12/08 GENERAL MECHANICAL SYSTEMS, INC.
ROOF22R -96,735 10/08/08 03/17/09 WB ROOFING & SHEETMETAL, INC.
Roof18R -1,566 06/02/08 08/28/08 WB Roofing & Sheetmetal
SITE-16R -98 09/30/08 05/12/09 KINGSLEY ARMS, INC.
03-0683FP Reconstruction 0-004-FP1 12/02/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Cahill Elementary School:
91-0959 Reconstruction 0-005-004 04/07/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1572 Additions and Alterations 0-005-005 08/03/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1267 Reconstruction 0-005-006 05/28/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1581 Reconstruction 0-005-007 08/04/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1582 Reconstruction 0-005-008 08/04/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1583 Reconstruction 0-005-009 08/04/92 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1194 Reconstruction 0-005-010 05/11/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1485 Reconstruction 0-005-012 02/12/03 *CO No.* Amount Disallowed Received Approved Contractor
G-1 -1,051 10/02/03 10/06/03 Arris Contracting Company
S-1 -47,420 07/28/03 07/15/04 Roehrs Const.
02-0275 Reconstruction 0-005-013 04/18/03 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0652 Reconstruction 0-005-015 04/13/06 *CO No.* Amount Disallowed Received Approved Contractor
10LC -1,658 05/23/07 / / General Mechanical
11LC -1,180 05/23/07 06/22/07 Arris Contracting
5LC -446 05/21/07 06/21/07 WB Roofing and Sheetmetal
5LC -1,000 05/23/07 08/07/07 General Mechanical Systems
5LC -4,956 05/23/07 06/22/07 Arris Contracting
EL-13LC -390 04/28/08 06/12/08 HUDSON VALLEY ELECTRICAL CONSTRUCTIO
FP-29LC -1,508 12/19/08 06/17/09 GENERAL MECHANICAL SYSTEMS, INC.
GC-28LC -20,157 01/16/08 01/23/08 Arris Contracting
GC-47LC -5,267 06/17/08 02/05/09 Arris Contracting
GC-58LC -42,980 09/09/08 09/29/08 Arris Contracting
HVAC19LC -113 04/28/08 06/12/08 GENERAL MECHANICAL SYSTEMS, INC.
PL & FP9 -2,147 08/31/07 11/07/07 U. W. MARX, INC.
PLFP20LC -199 04/28/08 06/12/08 GENERAL MECHANICAL SYSTEMS, INC.
Roof17LC -94 06/02/08 08/28/08 WB Roofing & Sheetmetal
Mt Marion Elementary:
98-1195 Reconstruction 0-008-005 05/11/99 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0926 Reconstruction 0-008-007 07/03/01 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1486 Reconstruction 0-008-008 02/12/03 *CO No.* Amount Disallowed Received Approved Contractor
S-2 -500 07/28/03 07/15/04 Roehrs Const.
S-3 31,482 10/21/03 10/24/03 Roehrs Const.
SF-2 -2,171 07/28/03 07/13/04 Edward Knight Wood Flooring
02-0276 Reconstruction 0-008-009 04/18/03 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0653 Alterations 0-008-011 04/13/06 *CO No.* Amount Disallowed Received Approved Contractor
3M -10,035 05/21/07 06/21/07 WB Roofing Sheetmetal
3MM -9,000 05/23/07 / / General Mechanical
8M -15,002 05/23/07 06/22/07 Jupiter Environmental
9MM -14,926 05/23/07 / / General Mechanical Systems
9MM -31,818 05/23/07 06/21/07 Arris Contracting
EL-15MM -8,538 04/28/08 06/12/08 HUDSON VALLEY ELECTRICAL CONSTRUCTIO
ENV 3M -52,098 05/23/07 06/22/07 Jupiter Environmental
ENV-13MM 49,125 06/19/08 08/27/08 Jupiter Environmental Services
ENV-14MM 7,000 05/20/08 08/05/08 JUPITER ENVIRONMENTAL SERVICES
ENV-17MM -576 05/20/08 08/05/08 JUPITER ENVIRONMENTAL SERVICES
F-7MM 15,960 10/23/07 11/08/07 WB ROOFING & SHEETMETAL INC
FL & FP8 -7,436 08/31/07 / / U. W. MARX, INC.
FP-31MM -8,263 12/19/08 / / GENERAL MECHANICAL SYSTEMS, INC.
GC 20 -7,400 07/19/07 08/20/07 Arris Contracting
GC-30MM -12,636 01/16/08 01/23/08 Arris Contracting
GC-35MM -49,125 05/07/08 08/04/08 ARRIS CONTRACTING CO. INC.
GC-36MM -7,000 05/07/08 08/04/08 ARRIS CONTRACTING CO., INC.
GC-38MM -23,061 05/07/08 08/04/08 ARRIS CONTRACTING CO., INC.
GC-3MM -17,348 05/23/07 06/22/07 Arris Contracting
GC-42MM -23,980 05/07/08 08/04/08 ARRIS CONTRACTING CO., INC.
GC-49MM -20,215 06/17/08 02/05/09 Arris Contracting
GC-68MM 8,189 04/17/09 07/29/09 ARRIS CONTRACTING CO,INC
HVAC-24 4,089 09/09/08 09/29/08 General Mechanical Systems
HVAC-25M 4,389 09/29/08 01/22/09 GENERAL MECHANICAL SYSTEMS, INC.
HVAC21MM -9,482 04/28/08 06/12/08 GENERAL MECHANCIAL SYSTEMS, INC.
HVAC28MM 1,745 02/10/09 03/05/09 GENERAL MECHANICAL SYSTEMS, INC.
PL & FP4 -2,813 08/31/07 / / U. W. MARZ, INC.
PL &FP13 -559 08/31/07 11/07/07 GENERAL MECHANICAL SYSTEMS, INC.
PLFP16MM 3,650 10/11/07 01/23/08 General Mechanical Systems
PLFP22MM -2,550 04/28/08 06/12/08 GENERAL MECHANICAL SYSTEMS, INC.
ROOF11MM 14,343 10/23/07 11/08/07 WB ROOFING & SHEETMETAL INC
ROOF14MM 34,215 12/14/07 02/23/08 WB ROOFING & SHEETMETAL
ROOF15MM 21,099 12/14/07 02/23/08 WB ROOFING & SHEETMETAL INC
ROOF19MM -5,036 06/02/08 10/27/08 WB ROOFING & SHEETMETAL, INC.
03-0682FP Reconstruction 0-008-FP1 12/02/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Jr/Sr High School:
94-0127 Reconstruction 0-009-007 08/15/94 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0276 Reconstruction 0-009-008 10/08/96 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1196 Reconstruction 0-009-009 05/11/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0905 Reconstruction 0-009-010 04/19/00 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0927 Reconstruction 0-009-011 07/03/01 *CO No.* Amount Disallowed Received Approved Contractor
R-1 -8,800 10/21/02 10/28/02 Superior Roofing
01-1487 Reconstruction 0-009-012 02/12/03 *CO No.* Amount Disallowed Received Approved Contractor
R-1 -2,000 10/15/03 10/20/03 Best Roofing of NJ
SF-1 -14,239 07/28/03 07/13/04 Edward Knight Wood Flooring
SF-3 26,000 11/18/03 11/21/03 Edward Knight Wood Flooring
SF-4 3,000 11/18/03 11/21/03 Edward Knight Wood Flooring
SF-5 -8,270 01/23/04 01/29/04 Edward Knight Wood Flooring Contract
SF-6 0 03/05/04 03/15/04 Edward Knight Wood Floor Contractors
02-0277 Reconstruction 0-009-013 04/18/03 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0772 Additions and Alterations 0-009-016 06/08/06 *CO No.* Amount Disallowed Received Approved Contractor
13S -67,000 05/23/07 / / General Mehcanical Systems
1JS -19,624 05/21/07 06/21/07 WB Roofing Sheetmetal
5JS 12,780 05/23/07 06/22/07 Jupiter Environmental
6JS -14,982 05/23/07 06/22/07 Jupiter Environmental
6JS -111,113 05/23/07 / / General Mechanical
EL - 2JS -4,367 09/19/07 / / W. W. MARX, INC.
EL-10JS 2,405 03/17/08 04/29/08 HUDSON VALLEY ELECTRICAL CONSTRUCTIO
EL-11JS 1,256 03/17/08 04/29/08 HUDSON VALLEY ELECTRICAL CONSTRUCTIO
EL-12JS -38,574 04/28/08 06/12/08 HUDSON VALLEY ELECTRICAL CONSTRUCTIO
EL-20JS 13,321 06/02/08 08/05/08 HUDSON VALLEY EC&M, INC.
EL-21JS 4,131 07/16/08 10/21/08 HUDSON VALLEY ELECTRICAL CONSTRUCTIO
EL-22JS 5,770 10/06/08 / / HUDSON VALLEY EC&M INC
EL-23JS 16,598 01/16/09 04/07/09 HUDSON VALLEY EC&M, INC.
EL-24JS 27,084 02/10/09 03/05/09 HUDSON VALLEY EC&M, INC.
EL-25JS 3,236 06/09/09 / / HUDSON VALLEY EC&M INC
EL-3JS 29,390 01/16/08 / / Hudson Valley EC&M Inc
EL-3JS -13,600 01/16/08 01/26/08 Hudson Valley EC & M
EL-6JS 2,484 02/15/08 04/04/08 HUDSON VALLEY EC&M, INC.
EL-7JS 14,350 03/17/08 04/29/08 HUDSON VALLEY ELECTRICAL CONSTRUCTIO
EL-8JS 5,793 03/17/08 04/29/08 HUDSON VALLEY ELECTRICAL CONSTRUCTIO
ENV-12JS 14,750 09/19/07 11/08/07 JUIPER ENVIRONMENTAL SERVICES
ENV-15JS -1,958 05/20/08 08/05/08 JUPITER ENVIRONMENTAL SERVICES
ENV-1JS -39,712 05/23/07 06/22/07 Jupiter Environmental
ENV-21JS 91,875 06/25/08 10/27/08 Jupiter Environmental Services
ENV-22JS 45,777 45,777 10/06/08 11/06/08 JUPITER ENVIRONMENTAL SERVICES
ENV23JS 29,950 10/06/08 11/06/08 JUPITER ENVIRONMENTAL SERVICES
ENV24JS -18,100 10/06/08 11/06/08 JUPITER ENVIONMENTAL SERVICES
El1JS -8,500 07/09/07 07/17/07 Hudson Valley
FP28JS -2,108 12/19/08 / / GENERAL MECHANICAL SYSTEMS, INC.
GC-01JS -170,999 05/23/07 06/22/07 Arris Contracting
GC-06JS -45,033 05/23/07 06/22/07 Arris Contracting
GC-07JS -16,000 05/23/07 06/22/07 Arris Contracting
GC-12JS -31,300 07/19/07 08/20/07 Arris Contracting
GC-14JS -21,735 07/19/07 08/20/07 Arris Contracting
GC-15JS -40,365 07/19/07 08/20/07 Arris Contracting
GC-16JS -25,100 07/19/07 08/20/07 Arris Contracting
GC-17JS -12,950 07/19/07 08/20/07 Arris Contracting
GC-21JS 3,382 08/22/07 08/23/07 Arris Contracting Co
GC-22JS -2,940 08/22/07 08/23/07 Arris Contracting
GC-23JS 12,269 08/31/07 11/08/07 U. W. MARX, INC.
GC-24JS 9,238 11/21/07 12/27/07 Arris contracting
GC-25JS -20,454 11/26/07 12/27/07 Arris construction
GC-27JS -23,027 01/16/08 01/23/08 Arris Contracting Co
GC-32JS 2,185 01/16/08 01/23/08 Arris Contracting
GC-33JS 14,525 03/17/08 04/02/08 ARRIS CONTRACTING CO., INC.
GC-37JS 20,252 05/07/08 08/04/08 ARRIS CONTRACTING CO., INC.
GC-43JS -17,600 05/07/08 08/04/08 ARRIS CONTRACTING CO., INC.
GC-46JS -185,292 07/22/08 12/08/08 ARRIS CONTRACTING CO INC.
GC-53JS -91,875 06/25/08 10/27/08 Arris Contracting
GC-54JS 3,929 06/17/08 02/05/09 Arris Contracting
GC-55JS 4,535 06/17/08 02/05/09 Arris Contracting
GC-56JS 30,560 06/17/08 02/05/09 Arris Contracting
GC-57JS -28,646 08/08/08 10/27/08 Arris Contracting Co,Inc
GC-59JS 5,158 09/09/08 09/29/08 Arris Contracting
GC-60JS -158,569 10/08/08 03/17/09 ARRIS CONTRACTING CO., INC.
GC-61JS 25,536 10/06/08 11/06/08 ARRIS CONTRACTING CO., INC.
GC-63JS 41,242 12/19/08 06/17/09 ARRIS CONTRACTING CO. INC.
GC-65JS 28,912 01/26/09 05/04/09 ARRIS CONTRACTING CO. INC.
GC-66JS 1,084 09/16/09 10/13/09 ARRIS CONTRACTING INC
HVAC 11 -50,284 06/07/07 10/22/07 General Mechanical Systems
HVAC 12 -10,261 06/07/07 / / General Mechanical Systems
HVAC 13 -7,200 06/07/07 10/22/07 General Mechanical Systems
HVAC-14 32,907 03/13/09 06/11/09 GENERAL MECHANICAL SYSTEMS, INC.
HVAC-17J 17,155 04/11/08 08/05/08 GENERAL MECHANICAL SYSTEMS, INC.
HVAC-23 4,599 09/09/08 11/06/08 General Mechanical Systems
HVAC-26J -49,614 12/19/08 / / GENERAL MECHANICAL SYSTEMS, INC.
HVAC-30 11,314 03/13/09 06/11/09 GENERAL MEHCANICAL SYSTEMS, INC.
HVAC15JS 45,257 02/15/08 04/04/08 GENERAL MECHANICAL SYSTEMS, INC.
HVAC16JS 9,306 02/15/08 04/04/08 GENERAL MECHANICAL SYSTEMS, INC
HVAC18JS -60,379 05/06/08 06/12/08 GENERAL MEHANICAL SYSTEMS, INC.
HVAC31JS 34,656 09/16/09 10/13/09 GENERAL MECHANICAL SYSTEMS INC
PL & FP1 -47,813 08/31/07 / / U. W. MARX, INC.
PL & FP5 -45,999 08/31/07 11/07/07 GENERAL MECHANICAL SYSTEMS, INC.
PL &FP14 -5,889 08/31/07 / / U. W. MARX, INC.
PL& FP10 -2,005 08/31/07 11/07/07 GENERAL MECHANCIAL SYSTEMS, INC.
PL&FP-33 39,848 01/14/09 07/08/09 GENERAL MECHANICAL SYSTEMS, INC.
PL&FP35 2,669 02/10/09 / / GENERAL MECHANCIAL SYSTEMS, INC.
PLFP15JS 19,070 10/11/07 01/23/08 General Mechanical Systems
PLFP17JS 11,992 02/15/08 / / GENRAL MECHANICAL SYSTEMS, INC.
PLFP19JS -43,794 04/28/08 06/12/08 GENERAL MECHANICAL SYSTEMS, INC.
PLFP24JS -13,626 10/06/08 / / GENERAL MECHANICAL SYSTEMS, INC.
PLFP25JS -33,552 10/06/08 / / GENERAL MECHANICAL SYSTEMS,INC
PLFP35JS 26,669 02/10/09 03/05/09 GENERAL MECHANICAL SYSTEMS, INC.
ROOF-10J 21,724 10/23/07 11/08/07 WB ROOFING & SHEETMETAL INC
ROOF-9JS -17,600 10/23/07 11/08/07 WB ROOFING & SHEETMETAL INC
ROOF21JS 214,598 10/08/08 03/17/09 WB ROOFING & SHEETMETAL, INC.
ROOF23JS 33,021 04/13/09 07/29/09 WB ROOFING & SHEETMETAL INC
ROOF24JS 20,666 04/13/09 07/29/09 WB ROOFING & SHEETMETAL INC
ROOF25JS 57,900 07/02/09 / / WB ROOFING & SHEETMETAL INC
ROOF26JS 5,400 09/16/09 10/13/09 WB ROOFING & SHEETMETAL INC
Roof-6JS 80,700 06/25/08 10/27/08 WB Roofing & Sheetmetal, Inc.
Roof16js -10,288 06/02/08 08/28/08 WB Roofing & SheetMetal
SITE-10J 2,472 09/19/07 11/08/07 W.W. MARX, INC.
SITE-15J -81,730 09/30/08 05/12/09 KINGSLEY ARMS, INC.
SITE11JS 25,410 10/11/07 11/09/07 Kingsley Arms, Inc
SITE12js 28,298 10/11/07 11/09/07 Kingsley Arms
SITE13JS 221,620 02/08/08 03/06/08 KINGSLEY ARMS, INC.
SITE14JS 36,575 02/08/08 03/06/08 KINGSLEY ARMS, INC.
SITE18JS 23,100 06/18/08 02/05/09 Kingsley Arms
Site 6JS -7,934 07/19/07 08/20/07 Kingsley Arms
Site 7JS -25,000 07/19/07 08/20/07 Kingsley Arms
Site 8Js -30,750 07/19/07 08/20/07 Kingsley Arms
Site 9Js 24,684 07/19/07 08/20/07 Kingsley Arms Inc
site 1JS -9,830 07/19/07 08/20/07 Kingsley Arms
site 2JS -34,500 07/19/07 08/20/07 Kingsley Arms
site 3JS -21,475 07/19/07 08/20/07 Kingsley Arms
site 4JS -41,854 07/19/07 08/20/07 Kinglsey Arms
site 5Js -35,000 07/19/07 08/20/07 Kingsley Arms
03-0684FP Reconstruction 0-009-FP1 12/02/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Grant D Morse Elem. School:
98-1197 Reconstruction 0-010-002 05/11/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0906 Reconstruction 0-010-003 04/19/00 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0928 Reconstruction 0-010-004 07/03/01 *CO No.* Amount Disallowed Received Approved Contractor
E-1 4,630 08/20/02 10/28/02 Elektro-Max
G-1 11,709 08/20/02 10/28/02 Glomar Const.
L-1 1,750 12/04/01 01/08/02 Arold Paving
02-0278 Reconstruction 0-010-005 04/18/03 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0654 Alterations 0-010-008 04/13/06 *CO No.* Amount Disallowed Received Approved Contractor
10-GM 2,100 09/17/07 11/14/07 JUPITER ENVIRONMENTAL SERVICES
10GM -28,714 05/23/07 06/22/07 Arris Contracting
4GM -10,035 05/21/07 06/21/07 WB roofing Sheetmetal
4GM -49,018 05/23/07 06/22/07 Jupiter Environmental
4GM -12,000 05/23/07 / / General Mechanical Systems
4GM -24,783 05/23/07 06/22/07 Arris Contracting
7GM -19,901 05/23/07 / / General mechanical
9GM -15,016 05/23/07 06/22/07 Jupiter Environmental
EL-16GM -6,084 04/28/08 06/12/08 HUDSON VALLEY ELECTRICAL CONSTRUCTIO
EL-5GM -6,093 01/16/08 / / Hudson Valley EC & M
ENV-18GM -519 05/20/08 10/21/08 JUPITER ENVIRONMENTAL SERVICES
ENV-20GM 75,125 06/25/08 10/27/08 Jupiter Environmental Services
FP-32GM -3,800 12/19/08 / / GENERAL MECHANICAL SYSTEMS, INC.
GC-19 -5,550 07/19/07 08/20/07 Arris Contracting
GC-31GM -11,896 01/16/08 01/23/08 Arris Contracting
GC-39GM -49,900 05/07/08 08/04/08 ARRIS CONTRACTING CO., INC.
GC-44GM -3,835 05/07/08 08/04/08 ARRIS CONTRACTING CO., INC.
GC-50GM -23,597 06/17/08 02/05/09 Arris Contracting
GC-52GM -75,125 06/25/08 10/27/08 Arris Contracting Co.
GC-62GM 2,218 10/06/08 11/06/08 ARRIS CONTRACTING CO., INC.
GC13 -3,925 07/19/07 08/20/07 Arris Construction
H-4 8,848 06/18/08 10/21/08 SIRACUSA MECHANICAL INC.
H-5 -1,015 06/18/08 10/21/08 SIRACUSA MECHANCIAL INC.
HVAC22GM -5,417 04/28/08 06/12/08 GENERAL MECHANICAL SYSTEMS, INC.
P-6 6,264 06/18/08 10/21/08 THURSTON BROTHERS INC.
PL & FP3 -3,375 08/31/07 / / GENERAL MECHANICAL SYSTEMS, INC.
PL & FP7 -11,116 08/31/07 / / U. W. MARX, INC.
PL FP 12 -122 08/31/07 11/07/07 U. W. MARX, INC.
PL&FP26G 1,737 10/06/08 11/06/08 GENERAL MECHANCIAL SYSTEMS, INC.
PLFP23GM -2,448 04/28/08 / / GERNERAL MECHANCIAL SYSTEMS, INC.
ROOF12GM 12,046 10/23/07 11/08/07 WB ROOFING & SHEETMETAL INC
ROOF20GM -3,016 06/02/08 08/27/08 WB ROOFING & SHEETMETAL, INC.
SITE-17G -172 09/30/08 05/12/09 KINGSLEY ARMS, INC.
03-0681FP Reconstruction 0-010-FP1 12/02/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Riccardi Elementary:
96-0277 Reconstruction 0-011-001 10/08/96 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0279 Reconstruction 0-011-004 04/18/03 NO CHANGE ORDERS ON ELECTRONIC FILE
WALLKILL CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 62-18-01-06
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Leptondale Elementary:
90-1343 Additions and Alterations 0-001-004 05/02/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1647 Reconstruction 0-001-006 07/27/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1496 Reconstruction 0-001-007 06/02/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1138 Reconstruction 0-001-008 05/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0672 Reconstruction 0-001-009 01/22/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0361 Additions and Alterations 0-001-011 02/15/01 *CO No.* Amount Disallowed Received Approved Contractor
C-01 1,760 07/23/03 07/24/03 Johnson Controls
EC-13 -5,000 03/28/03 04/17/03 Harry Rotolo & Son
EC-1L 2,009 07/18/02 08/15/02 Harry Rotolo & Son
EC-2 18,793 08/29/02 10/29/02 Harry Rotolo & Son
EC-5 900 08/29/02 10/29/02 Harry Rotolo & Son
EC-6 11,877 04/10/03 04/21/03 Harry Rotolo & Son
EC-9 6,450 01/24/00 02/05/03 Harry Rotolo & Son
GC-3 19,791 12/10/01 05/22/02 Glomar Const.
GC-4 -4,126 05/19/03 05/23/03 Glomar Const.
HV-01 -24,362 01/02/02 03/29/02 S&O Const.
HV-05 35,258 01/29/03 02/05/03 S&O Const.
HV-08 -5,000 01/29/03 02/05/03 S&O Const.
P-01 8,508 12/18/01 05/28/02 Joe Lombardo Plumbing
P-04 -3,333 12/27/02 01/10/03 Joe Lombardo Plumbing
RC-2 -3,300 05/29/02 05/30/02 Everfoam Insulations Systems
04-1187 Reconstruction 0-001-012 06/21/05 *CO No.* Amount Disallowed Received Approved Contractor
C-01 4,827 01/25/06 06/23/06 Profex,INc
C-02 11,751 10/23/06 12/14/06 Profex
C-03 18,936 10/23/06 12/18/06 Profex
C-04 9,848 10/23/06 12/18/06 Profex inc
C-05 -10,000 10/23/06 12/18/06 Profex
05-1213 Reconstruction 0-001-013 06/22/06 *CO No.* Amount Disallowed Received Approved Contractor
LE-01 -5,801 09/25/06 10/13/06 Everfoam Insulation
07-0775 Reconstruction 0-001-014 04/16/08 *CO No.* Amount Disallowed Received Approved Contractor
EC-02 7,380 05/27/09 07/28/09 HARRY F ROTOLO & SON INC
GC-02 30,596 10/31/08 04/03/09 WILLIAM MANFREDI CONSTRUCTION CORPOR
GC-05 7,327 05/07/09 07/30/09 WILLIAM MANFRED CONSTRUCTION CORP
GC-07 26,807 08/11/09 09/18/09 WILLIAM MANFREDI CONSTRUCTION CORP
GC-12 4,173 09/30/09 11/16/09 WILLIAM MANFREDI CONSTRUCTION CORP
SC-01 -17,000 08/18/08 01/22/09 WHISPERING PINES DEVELOPMENT CORP.
SC-02 -2,232 11/13/08 06/12/09 WHISPERING PINES DEVELOPMENT CORPORA
02-1170FP Reconstruction 0-001-FP1 05/01/03 NO CHANGE ORDERS ON ELECTRONIC FILE
John G. Borden Middle(fmly Wallkill):
94-1497 Reconstruction 0-002-003 06/02/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0523 Reconstruction 0-002-004 01/23/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1139 Reconstruction 0-002-005 05/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1418 Reconstruction 0-002-006 05/21/98 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0321 Reconstruction 0-002-007 04/06/02 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
AC-2 96,580 02/13/04 02/23/04 S&S Environ.
AC-4 60,533 02/13/04 02/23/04 S&S Environ.
EC-17 5,821 02/12/04 03/12/04 Canale Elec.
EC-18 -23,795 02/08/05 03/28/06 Canale electric
EC-7 8,625 11/07/03 12/22/03 Canale Elec.
GC-2 11,390 02/13/04 02/23/04 Discover General Contracting
M-03 675 02/12/04 03/12/04 Ashley Mech.
P-03 6,430 07/23/03 07/25/03 S&O Const.
P-04 16,854 08/26/03 09/16/03 S&O Const.
P-05 3,450 02/12/04 02/23/04 S&O Const.
P-06 1,681 02/12/04 03/12/04 S&O Const.
Site 2 12,210 03/28/03 04/07/03 Waltech Const.
07-0776 Reconstruction 0-002-008 04/16/08 *CO No.* Amount Disallowed Received Approved Contractor
GC-01 14,100 08/06/08 02/05/09 WILLIAM MANFREDI CONSTRUCTION CORP.
GC-15 4,627 09/30/09 11/16/09 WILLIAM MANFREDI CONSTRUCTION CORP
PC-01 -1,439 11/25/08 04/07/09 THOMAS J. KEMPTON JR. INC.
SC-05 14,580 09/30/09 11/16/09 WHISPERING PINES DEVELOPMENT CORP
06-0679SC Visual Structural Inspection 0-002-SC1 12/28/06 NO CHANGE ORDERS ON ELECTRONIC FILE
Ostrander Elementary:
90-1344 Additions and Alterations 0-003-003 05/02/91 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1498 Reconstruction 0-003-004 06/02/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1140 Reconstruction 0-003-005 05/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0673 Reconstruction 0-003-006 01/22/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1419 Reconstruction 0-003-007 05/21/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0362 Additions and Alterations 0-003-008 02/15/01 *CO No.* Amount Disallowed Received Approved Contractor
C-03 1,271 07/23/03 07/25/03 Johnson Controls
EC-10 3,704 01/24/03 02/05/03 Harry Rotolo & Sons
EC-14 -5,000 03/28/03 04/17/03 Harry Rotolo & Sons
EC-3 5,258 08/29/02 10/29/02 Harry Rotolo & Sons
EC-7 15,496 04/07/03 04/21/03 Harry Rotolo & Sons
GC-1 15,684 12/10/01 05/22/02 Glomar Const.
GC-2 21,730 12/10/01 05/22/02 Glomar Const.
GC-6 -7,444 05/19/03 05/23/03 Glomar Const.
HV-02 -10,800 01/02/02 03/29/02 S&O Const.
HV-06 58,576 01/29/03 02/05/03 S&O Const.
HV-09 -5,000 01/29/03 02/05/03 S&O Const.
P-02 8,211 12/18/01 05/28/02 Joe Lombardo Plumbing
P-05 -3,333 12/27/02 01/10/03 Joe Lombardo Plumbing
RC-3 -3,300 05/29/02 05/30/02 Everfoam Insulations Systems
WC-1 1,450 12/10/01 05/22/02 Arch. Window Mfg.
07-0777 Reconstruction 0-003-009 04/16/08 *CO No.* Amount Disallowed Received Approved Contractor
SC-04 30,362 08/11/09 09/18/09 WHISPERING PINES DEVELOPMENT CORP
02-1172FP Reconstruction 0-003-FP1 05/01/03 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0680SC Visual Structural Inspection 0-003-SC1 12/28/06 NO CHANGE ORDERS ON ELECTRONIC FILE
Plattekill Elementary:
90-1345 Additions and Alterations 0-005-002 05/02/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0048 Reconstruction 0-005-004 07/15/93 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1141 Reconstruction 0-005-005 05/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0674 Reconstruction 0-005-006 01/22/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1420 Reconstruction 0-005-007 05/21/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0363 Additions and Alterations 0-005-008 02/15/01 *CO No.* Amount Disallowed Received Approved Contractor
C-02 558 07/23/03 07/25/03 Johnson Controls
EC-11 2,653 01/24/03 02/05/03 Harry Rotolo & Sons
EC-12 665 03/28/03 04/17/03 Harry Rotolo & Sons
EC-15 -5,000 03/28/03 04/17/03 Harry Rotolo & Sons
EC-4 1,618 08/29/02 10/29/02 Harry Rotolo & Sons
EC-8 10,049 04/07/03 04/21/03 Harry Rotolo & Sons
GC-5 -9,120 05/19/03 05/23/03 Glomar Const.
HV-03 -10,800 01/02/02 03/29/02 S&O Const.
HV-04 1,757 01/29/03 02/04/03 S&O Const.
HV-07 31,564 01/29/03 02/04/03 S&O Const.
HV-10 -5,000 01/29/03 02/04/03 S&O Const.
P-03 11,775 12/18/01 05/28/02 Joe Lombardo Plumbing
P-06 -3,334 12/27/02 01/10/03 Joe Lombardo Plumbing
RC-1 -3,400 05/29/02 05/30/02 Everfoam Insulations Systems
02-0002 Reconstruction 0-005-009 07/03/02 *CO No.* Amount Disallowed Received Approved Contractor
FT-01 3,265 10/03/02 10/21/02 Ira Conklin & Sons
07-0778 Reconstruction 0-005-010 04/16/08 *CO No.* Amount Disallowed Received Approved Contractor
GC-03 18,743 11/25/08 04/03/09 WILLIAM MANFREDI CONSTRUCTION CORPOR
GC-14 5,472 09/30/09 11/16/09 WILLIAM MANFREDI CONSTRUCTION CORP
GC-4 5,284 01/02/09 05/05/09 WILLIAM MANFREDI CONSTRUCTION CORPOR
SC-03 39,577 08/11/09 09/18/09 WHISPERING PINES DEVELOPMENT CORP
02-1171FP Reconstruction 0-005-FP1 05/01/03 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0681SC Visual Structural Inspection 0-005-SC1 12/28/06 NO CHANGE ORDERS ON ELECTRONIC FILE
Wallkill High School:
92-1315 Reconstruction 0-007-005 06/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1499 Reconstruction 0-007-006 06/02/95 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0826 Reconstruction 0-007-007 02/21/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0181 Reconstruction 0-007-008 09/25/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1142 Reconstruction 0-007-009 05/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1421 Reconstruction 0-007-010 05/21/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1347 Reconstruction 0-007-011 06/09/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0322 Additions and Alterations 0-007-012 04/06/02 *CO No.* Amount Disallowed Received Approved Contractor
3 18,892 09/22/03 09/25/03 Waltech Const.
5 25,652 06/01/04 07/06/04 Waltech Const.
6 39,415 10/28/04 11/23/04 Waltech Const.
AC-1 56,169 02/13/04 02/23/04 S&S Environ.
AC-3 -16,641 02/13/04 02/23/04 S&S Environ.
C-01 3,480 07/23/03 08/27/03 Johnson Controls
C-02 2,558 07/23/03 07/25/03 Johnson Controls
C-03 2,950 02/24/05 06/30/05 Johnson Controls
EC-1 5,250 07/23/03 07/25/03 Canale Elec.
EC-10 4,580 11/07/03 12/22/03 Canale Elec.
EC-11 3,783 11/28/03 01/14/04 Canale Elec.
EC-12 3,110 11/28/03 01/14/04 Canale Elec.
EC-13 1,925 11/28/03 01/14/04 Canale Elec.
EC-14 15,545 11/28/03 01/14/04 Canale Elec.
EC-15 1,346 02/12/04 03/12/04 Canale Elec.
EC-16 4,075 02/12/04 03/12/04 Canale Elec.
EC-2 6,145 07/23/03 07/25/03 Canale Elec.
EC-3 16,490 07/23/03 07/25/03 Canale Elec.
EC-4 22,500 09/18/03 09/23/03 Canale Elec.
EC-5 5,810 09/18/03 09/23/03 Canale Elec.
EC-6 8,665 11/07/03 12/22/03 Canale Elec.
EC-8 9,381 11/07/03 12/22/03 Canale Elec.
EC-9 3,092 11/07/03 12/22/03 Canale Elec.
GC-03 -13,000 02/18/05 03/02/05 Discover General Contracting
GC-1 8,188 02/13/04 02/23/04 Discover General Contracting
GC-4 -46,000 02/18/05 03/02/05 Discover General Contracting
M-01 15,651 02/12/04 04/13/04 Ashley Mech.
M-02 8,998 02/12/04 04/08/04 Ashley Mech.
M-04 -20,000 02/12/04 03/12/04 Ashley Mech.
P-01 10,520 03/28/03 04/01/03 S&O Const.
P-02 5,850 07/23/03 07/25/03 S&O Const.
P-07 -15,000 02/12/04 03/12/04 S&O Const.
R-01 -10,000 02/18/05 03/02/05 Everform Insulation Systems
Site 1 32,404 03/28/03 04/07/03 Waltech Const.
Site 4 38,178 02/12/04 04/14/04 Waltech Const.
05-1214 Reconstruction 0-007-013 06/22/06 *CO No.* Amount Disallowed Received Approved Contractor
HS-01 -8,676 09/25/06 12/27/06 Everfoam Insulation
07-0779 Reconstruction 0-007-014 04/16/08 *CO No.* Amount Disallowed Received Approved Contractor
EC-01 2,486 05/07/09 07/28/09 HARRY F ROTOLO & SON INC
GC-06 37,388 08/11/09 09/18/09 WILLIAM MANFREDI CONSTRUCTION CORP
GC-13 5,540 09/30/09 11/16/09 WILLIAM MANFREDI CONSTRUCTION CORP
02-1169FP Reconstruction 0-007-FP1 05/01/03 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0249SC Visual Structural Inspection 0-007-SC1 10/03/06 NO CHANGE ORDERS ON ELECTRONIC FILE
Greenhouse:
02-2380 New Construction 0-019-001 03/15/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Districtwide:
00-0364 Reconstruction 7-999-001 02/15/01 *CO No.* Amount Disallowed Received Approved Contractor
T-01 4,620 11/14/02 01/08/03 LeClair Communications
T-02 1,602 11/14/02 01/08/03 LeClair Communications
T-03 2,132 12/02/02 12/09/02 LeClair Communications
T-04 1,094 12/02/02 12/09/02 LeClair Communications
T-05 -15,000 12/02/02 12/09/02 LeClair Communications
TEL-01 9,051 12/12/02 01/08/03 NEC Business Network Systems
TEL-02 -10,690 09/12/02 10/22/02 NEC Business Network
01-0323 Reconstruction 7-999-002 04/06/02 *CO No.* Amount Disallowed Received Approved Contractor
T-01 -3,480 09/30/03 10/06/03 Interworks Systems
T-02 1,598 09/30/03 10/06/03 Interworks Systems
T-03 3,199 03/02/05 06/21/05 Interworks Systems Inc
T-04 -15,000 03/02/05 06/21/05 Interworks Systems Inc
ELLENVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 62-20-02-06
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
MS/HS 5-12:
91-0073 Reconstruction 0-001-010 08/01/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0441 Reconstruction 0-001-011 11/22/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0899 Additions and Alterations 0-001-012 03/16/95 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0447 Reconstruction 0-001-013 12/08/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0900 Additions and Alterations 0-001-014 05/24/96 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0846 Reconstruction 0-001-015 02/16/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0156 Reconstruction 0-001-016 08/25/97 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1266 Reconstruction 0-001-017 10/17/02 *CO No.* Amount Disallowed Received Approved Contractor
1-001 5,200 09/22/03 10/03/03 CFI Const.
2-001 -8,979 10/07/03 11/06/03 Darlind Const.
2-002 -1,525 10/07/03 11/06/03 Darlind Const.
2-003 -1,668 10/07/03 11/06/03 Darlind Const.
2-004 -168 10/07/03 11/06/03 Darlind Const.
2-005 20,085 10/07/03 12/17/03 Darlind Const.
2-006 5,346 10/07/03 11/06/03 Darlind Const.
2-007 -205 10/20/03 11/06/03 Darlind Const.
2-008 1,173 10/20/03 11/06/03 Darlind Const.
2-010 -406 11/06/03 11/13/03 Darlind Const.
2-011 -1,338 11/06/03 11/13/03 Darlind Const.
2-013 -552 11/06/03 11/13/03 Darlind Const.
2-014 -234 12/04/03 12/30/03 Darlind Const.
2-015 -128 12/04/03 12/30/03 Darlind Const.
2-017 1,125 12/03/03 12/30/03 Darlind Const.
2-022 1,218 12/04/03 12/30/03 Darlind Const.
2-028 -554 12/04/03 12/31/03 Darlind Const.
2-031 -589 12/04/03 03/04/04 Darlind Const.
2-032 -226 12/04/03 12/30/03 Darlind Const.
2-033 -58 12/04/03 12/30/03 Darlind Const.
2-034 -300 12/04/03 12/30/03 Darlind Const.
2-036 -1,801 12/04/03 12/30/03 Darlind Const.
2-037 165 12/04/03 12/31/03 Darlind Const.
2-038 4,199 12/04/03 12/31/03 Darlind Const.
2-039 2,050 12/04/03 12/31/03 Darlind Const.
2-040 2,331 12/04/03 12/31/03 Darlind Const.
2-043 664 12/04/03 12/30/03 Darlind Const.
2-044 924 12/04/03 12/30/03 Darlind Const.
2-046 3,811 12/05/03 12/30/03 Darlind Const.
2-047 730 12/04/03 12/30/03 Darlind Const.
2-048 2,181 12/04/03 12/30/03 Darlind Const.
2-050 -245 12/04/03 12/30/03 Darlind Const.
5-001 -3,997 12/04/03 12/30/03 Best Roofing of NJ
5-002 3,500 07/15/04 07/21/04 Best Roofing of NJ
6-002 9,993 9,993 10/23/03 11/06/03 Mid Orange Mech.
6-003 1,573 10/23/03 11/06/03 Mid Orange Mech.
6-005 -8,133 10/29/03 11/12/03 Mid-Orange Mech.
7-001 3,301 12/04/03 03/04/04 General Mech. Systems
7-002 3,621 12/04/03 03/04/04 General Mech. Systems
7-003 290 12/04/03 12/30/03 General Mech. Systems
7-004 213 12/04/03 12/30/03 General Mech. Systems
7-005 8,360 12/04/03 12/30/03 General Mech. Systems
7-006 -1,250 12/04/03 12/30/03 General Mech. Systems
7-008 20,214 03/22/04 04/13/04 General Mech. Systems
7-012 -300 08/03/04 09/17/04 General Mech. Systems
7-013 8,950 09/03/04 09/17/04 General Mech. Systems
8-001 337 10/23/03 11/06/03 Canale Elec.
8-002 -1,643 10/23/03 11/06/03 Canale Elec.
8-003 15,720 10/23/03 / / Canale Elec.
8-005 1,805 10/29/03 11/12/03 Canale Elec.
9-001 -25,000 10/20/03 11/06/03 Jupiter Environ.
9-002 21,000 10/20/03 11/06/03 Jupiter Environ.
9-004 279 10/20/03 11/06/03 Jupiter Environ.
9-006 20,380 10/23/03 11/06/03 Jupiter Environ.
9-008 17,125 10/23/03 11/06/03 Jupiter Environ.
9-009 19,800 10/29/03 11/12/03 Jupiter Environ.
9-010 17,120 10/29/03 11/12/03 Jupiter Environ.
9-013 1,000 12/04/03 12/31/03 Jupiter Environ.
02-0050 Reconstruction 0-001-018 08/06/02 *CO No.* Amount Disallowed Received Approved Contractor
1 -7,500 03/11/03 04/18/03 NorEaster Heating
2 8,633 03/11/03 04/18/03 NorEaster Heating
05-0172 Reconstruction 0-001-019 06/02/06 *CO No.* Amount Disallowed Received Approved Contractor
EC-01 -4,005 03/15/07 08/15/07 Shock Electrical
GC-01 19,680 01/24/07 03/14/07 Mid State Industries
PC-01 -4,700 12/18/06 01/24/07 Arold Paving Co
08-0002 Reconstruction 0-001-020 07/14/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2118FP Reconstruction 0-001-FP1 02/02/04 NO CHANGE ORDERS ON ELECTRONIC FILE
ES K-4:
95-0901 Additions and Alterations 0-008-001 05/24/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0157 Reconstruction 0-008-002 08/25/97 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1267 Reconstruction 0-008-003 10/17/02 *CO No.* Amount Disallowed Received Approved Contractor
2-009 1,506 10/20/03 11/06/03 Darlind Construction
2-012 -1,156 11/06/03 11/13/03 Darlind Construction
2-016 -232 12/04/03 12/30/03 Darlind Construction
2-018 1,051 12/04/03 12/30/03 Darlind Construction
2-019 233 12/03/03 12/30/03 Darlind Construction
2-020 703 12/04/03 12/30/03 Darlind Construction
2-021 653 12/04/03 12/30/03 Darlind Construction
2-023 337 12/04/03 12/30/03 Darlind Construction
2-024 -276 12/04/03 12/30/03 Darlind Construction
2-025 -340 12/04/03 12/30/03 Darlind Construction
2-026 -276 12/04/03 12/30/03 Darlind Construction
2-027 -340 12/04/03 12/30/03 Darlind Construction
2-029 -727 12/04/03 12/31/03 Darlind Construction
2-030 -194 12/04/03 12/30/03 Darlind Construction
2-035 2,415 12/04/03 12/30/03 Darlind Construction
2-041 3,159 12/04/03 12/30/03 Darlind Construction
2-042 2,364 12/04/03 12/30/03 Darlind Construction
2-045 4,139 12/04/03 12/30/03 Darlind Construction
2-049 6,337 12/15/03 12/30/03 Darlind Construction
6-001 -6,239 10/23/03 11/06/03 Mid-Orange Mech.
6-004 3,385 10/29/03 11/12/03 Mid-Orange Mech.
6-006 5,252 10/29/03 11/12/03 Mid-Orange Mech.
7-007 796 03/22/04 04/13/04 General Mech. Systems
7-009 19,649 03/22/04 04/13/04 General Mech. Systems
7-010 18,867 03/22/04 04/13/04 General Mech. Systems
7-011 610 03/22/04 04/13/04 General Mech. Systems
8-004 -271 10/29/03 11/12/03 Canale Elec.
8-006 372 10/29/03 11/12/03 Canale Elec.
8-007 1,604 12/04/03 12/31/03 Canale Elec.
9-003 21,000 10/20/03 11/06/03 Jupiter Environ.
9-005 20,380 10/23/03 11/06/03 Jupiter Environ.
9-007 17,125 10/23/03 11/06/03 Jupiter Environ.
9-011 20,040 10/29/03 11/12/03 Jupiter Environ.
9-012 19,600 01/20/04 01/20/04 Jupiter Environ.
08-1654 Reconstruction 0-008-005 06/26/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2119FP Reconstruction 0-008-FP1 12/09/03 NO CHANGE ORDERS ON ELECTRONIC FILE
SBC Office Space no longer used:
93-1676 Reconstruction 1-011-001 08/28/94 NO CHANGE ORDERS ON ELECTRONIC FILE
Ellenville Public Library:
06-0563 Reconstruction 6-007-003 12/04/06 NO CHANGE ORDERS ON ELECTRONIC FILE
BOCES ULSTER STATUS REPORT ON CAPITAL PROJECTS
District No.: 62-90-00-00
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Instructional Center:
94-0104 Reconstruction 0-002-001 09/22/94 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1643 Reconstruction 0-002-003 07/14/97 NO CHANGE ORDERS ON ELECTRONIC FILE
Port Ewen Ed Center (Votec):
91-0110 Reconstruction 0-014-003 08/12/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0916 Reconstruction 0-014-005 04/07/92 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0374 Reconstruction 0-014-006 11/17/94 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0092 Reconstruction 0-014-007 07/25/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1861 Reconstruction 0-014-008 09/01/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1479 Reconstruction 0-014-010 08/23/99 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1558 Reconstruction 0-014-011 06/30/03 *CO No.* Amount Disallowed Received Approved Contractor
1 14,384 03/22/04 04/01/04 One Way Construction Services
1 253 04/21/05 04/26/05 Tech Electric Electrical Contractors
1 -210 04/21/05 04/26/05 Ashley Mechanical
1 -40 04/21/05 04/26/05 S and I Construction Service
2 -240 04/21/05 04/26/05 S and I Construction Services
2 727 04/21/05 04/26/05 Ashley Mechanical Inc
2 5,250 04/21/05 04/26/05 One way Construction Services
05-0638 Reconstruction 0-014-012 05/19/06 *CO No.* Amount Disallowed Received Approved Contractor
EC-01 -10,000 03/12/08 03/15/08 Pantel Contracting Corporation
EC-02 -8,599 03/12/08 03/15/08 Pantel Contracting Corporation
GC-01 49,625 07/19/07 08/07/07 One Way Construction
GC-02 -9,670 05/29/08 08/08/08 ONE WAY CONTRUCTION, INC.
HC-01 1,113 10/01/07 10/23/07 S & O CONSTRUCTION SERVICES
HC-02 2,413 05/29/08 08/08/08 S & O CONSTRUCTION SERVICES
05-0909 Reconstruction 0-014-013 07/21/06 *CO No.* Amount Disallowed Received Approved Contractor
EC-01 -2,356 12/16/08 05/19/09 RICHERS ELECTRIC, INC.
GC-01 -2,000 12/16/08 02/27/09 TRANSITIONAL BUILDERS, INC.
HC-01 -5,000 12/16/08 05/19/09 ASHELEY MECHANCIAL, INC.
PC-01 -5,000 12/16/08 05/19/09 ASHLEY MECHANCIAL, INC.
PC-02 -1,950 05/22/09 07/15/09 ASHLEY MECHANICAL INC
08-1422 Reconstruction 0-014-014 04/13/09 NO CHANGE ORDERS ON ELECTRONIC FILE
08-1421 Reconstruction 0-014-015 04/21/09 *CO No.* Amount Disallowed Received Approved Contractor
GC-01 10,413 09/18/09 11/03/09 TRANSITIONAL BUILDERS INC
Learning Center #1:
99-1741 Reconstruction 0-016-001 08/04/00 NO CHANGE ORDERS ON ELECTRONIC FILE
Instructional Center:
99-1768 Reconstruction 1-002-001 08/03/00 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0139 Reconstruction 1-002-002 09/06/05 *CO No.* Amount Disallowed Received Approved Contractor
1 3,245 01/19/06 08/08/06 Barrett Inc
Administration Building:
90-1467 Additions and Alterations 1-003-001 06/21/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0475 Reconstruction 1-003-004 01/12/93 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1642 Reconstruction 1-003-006 07/14/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1769 Reconstruction 1-003-008 08/03/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0535 Reconstruction 1-003-009 01/02/03 *CO No.* Amount Disallowed Received Approved Contractor
1 7,800 08/28/03 09/05/03 Infinity Environ.
2 10,400 03/22/04 / / Infinity Environ.
05-0186 Reconstruction 1-003-010 11/10/05 *CO No.* Amount Disallowed Received Approved Contractor
GC-01 1,485 10/10/06 11/29/06 One way Construction
06-0550 Reconstruction 1-003-011 11/30/06 NO CHANGE ORDERS ON ELECTRONIC FILE
New Paltz Computer Lab:
00-1213 New Construction 1-027-001 04/23/01 *CO No.* Amount Disallowed Received Approved Contractor
1 8,563 04/17/02 05/10/02 Sun Up Enterprises
District-Wide Project:
08-1131 Reconstruction 7-999-002 03/16/09 *CO No.* Amount Disallowed Received Approved Contractor
EC-01 27,140 08/19/09 / / HUDSON VALLEY EC&M INC
Leased Portable at Ellenville:
94-0373 New Construction 8-022-001 12/22/94 NO CHANGE ORDERS ON ELECTRONIC FILE
Sanger Bldg.-- leased port.:
99-1740 Reconstruction 8-023-002 08/04/00 NO CHANGE ORDERS ON ELECTRONIC FILE