REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Junior-Senior High School:
94-0995 Reconstruction 0-001-004 03/06/95 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0069 Reconstruction 0-001-006 07/24/92 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1059 Reconstruction 0-001-007 06/19/96 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0175 Additions and Alterations 0-001-009 04/19/02 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
EC-01 50,028 06/22/06 06/26/06 HMJ Electrical
GC-01 42,996 06/22/06 06/26/06 Stalco Construction
GC-02 89,842 06/22/06 06/26/06 Stalco Construction
GC-03 18,834 06/22/06 06/26/06 Stalco Construction
GC-3 18,834 09/28/04 10/04/04 Stalco Construction
MC-1 36,192 12/22/03 12/31/03 Heating Piping Specialties
MC-2 2,400 12/22/03 12/31/03 Heating Piping Specialties
PC-01 33,478 06/22/06 06/26/06 ARA Plumbing
04-0202 Reconstruction 0-001-010 09/16/04 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0653 Reconstruction 0-001-012 05/17/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2342 Reconstruction 0-001-013 07/16/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1879FP Reconstruction 0-001-FP1 10/23/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0880SC Visual Structural Inspection 0-001-SC1 01/09/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Memorial Grade School:
94-0996 Reconstruction 0-002-004 03/06/95 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1556 Reconstruction 0-002-005 07/30/93 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1060 Reconstruction 0-002-007 06/19/96 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0176 Reconstruction 0-002-008 04/19/02 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
EC-1 10,261 12/22/03 01/14/04 Bana Electric
MC-01 7,450 06/22/06 06/26/06 ARA Plumbing
03-0357FP Reconstruction 0-002-FP1 10/23/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Elementary School:
94-0997 Reconstruction 0-003-005 03/06/95 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1557 Reconstruction 0-003-006 07/30/93 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1061 Reconstruction 0-003-008 06/19/96 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0177 Additions and Alterations 0-003-009 04/19/02 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
EC-02 33,000 06/22/06 06/26/06 HMJ Electrical
GC-2 88,226 06/22/06 06/26/06 Irwin Contracting
MC-02 73,578 06/22/06 06/26/06 HVAC INC
06-0654 Reconstruction 0-003-010 05/17/07 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0881SC Visual Structural Inspection 0-003-SC1 01/09/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Babylon Public Library:
90-1728 Reconstruction 6-008-002 07/01/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0311 Reconstruction 6-008-003 10/28/92 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2429 Additions and Alterations 6-008-004 03/13/04 *CO No.* Amount Disallowed Received Approved Contractor
EC-001 8,053 10/20/05 / / Sj electric inc
EC-002 1,938 10/20/05 10/27/05 Sj Electric Inc
EC-003 2,237 10/20/05 10/27/05 Sj Electric Inc
EC-004 4,184 10/20/05 10/27/05 SJ Electric Inc
GC-001 -25,000 10/20/05 11/08/05 LD Wenger Construction
GC-002 3,000 10/20/05 11/08/05 LD Wenger Construction
GC-003 19,949 10/20/05 11/08/05 LD Wenger Construction
GC-004 2,904 10/20/05 / / LD Wenger Construction
GC-005 3,450 10/20/05 11/08/05 Ld Wenger Construction
GC-006 -3,000 10/20/05 11/08/05 LD Wenger Construction
GC-007 6,384 10/20/05 11/08/05 LD Wenger Construction
GC-008 6,761 10/20/05 11/08/05 LD Wenger Construction
GC-009 4,396 10/20/05 11/08/05 LD wenger Construction
GC-010 -1,794 10/20/05 11/08/05 LD Wenger Construction
GC-011 443 10/20/05 11/08/05 LD Wenger Construction
GC-012 6,440 10/20/05 11/08/05 Ld wenger Construction
GC-013 4,294 10/20/05 11/08/05 Ld Wenger Construction
GC-015 1,720 02/01/06 06/30/06 Ld Wenger Construction
GC-016 8,287 02/01/06 06/30/06 Ld Wenger Construction
GC-017 4,042 02/01/06 06/30/06 Ld Wenger Construction
GC-020 3,344 02/01/06 06/30/06 Ld Wenger Construction
GC-021 2,085 02/01/06 06/30/06 LD Wenger Construction
GC014 678 02/01/06 06/30/06 LD Wenger Construction
GC018 520 02/01/06 06/30/06 Ld Wenger Construction
GC019 872 02/01/06 06/30/06 Ld Wenger Construction
HC-001 -1,000 10/20/05 / / All Weather Temp Control
MW-001 7,200 10/20/05 11/08/05 AR kropp Co and Sons
MW-002 3,375 10/20/05 11/08/05 AR kropp Co and Sons
MW-003 13,050 10/20/05 11/08/05 AR kropp Co and Sons
MW-004 14,900 10/20/05 11/08/05 AR Kropp Co and Sons
Mw-005 7,125 10/20/05 / / AR Kropp co and sons
PC-001 1,173 10/20/05 10/27/05 Maccarone Plumbing
PC-002 2,023 02/01/06 06/30/06 Maccarone Plumbing
PC-003 -1,358 02/01/06 06/30/06 Maccarone Plumbing
PC-005 3,279 02/01/06 06/30/06 Maccarone Plumbing
Pc-004 9,835 02/01/06 06/30/06 Maccarone Plumbing
WEST BABYLON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-02-03
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Senior High School:
91-1556 Reconstruction 0-001-006 07/14/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0837 Reconstruction 0-001-007 04/05/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1134 Reconstruction 0-001-010 03/24/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0121 Reconstruction 0-001-011 08/31/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0126 Reconstruction 0-001-012 08/07/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1664 Reconstruction 0-001-013 07/01/98 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1107 Reconstruction 0-001-014 04/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1337 Reconstruction 0-001-015 05/10/99 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0726 Reconstruction 0-001-016 02/06/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0218 Reconstruction 0-001-017 11/02/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0932 Reconstruction 0-001-019 04/17/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0308 Reconstruction 0-001-020 05/13/03 *CO No.* Amount Disallowed Received Approved Contractor
1 10,908 03/24/04 03/30/04 Pella Gen. Const.
1 5,109 05/03/04 05/07/04 JS McHugh
1 -2,497 09/13/04 10/27/04 Reel Mech.
1 -13,216 09/13/04 10/27/04 Majestic Plumbing
1 16,366 11/17/04 11/24/04 Corporate Elec.
2 -2,743 09/13/04 10/27/04 Pella Gen. Const.
3 6,447 02/07/05 03/14/05 Pella general Construction
00-0620 Reconstruction 0-001-021 03/19/01 *CO No.* Amount Disallowed Received Approved Contractor
1 1,650 12/18/01 04/19/02 WGP Contracting
1 2,250 04/01/02 05/07/02 Total A.C.
2 500 12/18/01 02/28/02 West Babylon Elec.
3 4,900 12/18/01 02/28/02 West Babylon Elec.
3 3,665 3,665 04/28/04 04/30/04 WGP Contracting
4 2,200 03/13/02 04/19/02 West Babylon Elec.
4 -3,000 12/12/03 12/12/03 WGP Contracting
5 990 03/13/02 04/19/02 West Babylon Elec.
6 600 03/13/02 04/19/02 West Babylon Elec.
7 1,325 06/06/02 06/14/02 West Babylon Elec.
8 2,162 06/06/02 06/14/02 West Babylon Elec.
03-0900 Reconstruction 0-001-022 06/14/04 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
1 4,491 03/01/05 / / Major Systems Inc
1 10,600 03/01/05 / / Manning Plumbing Heating
1 19,531 03/01/05 03/31/05 Lipsky Enteprises
1 15,760 03/01/05 10/03/05 RMT Electric Corp
1 16,476 06/29/06 / / Maccarone Plumbing
1 -40,000 02/05/07 03/12/07 Barbizon Electric
2 10,074 03/01/05 05/02/05 RMT Electric Corp
2 28,795 05/02/05 06/10/05 Lipsky Enterprises
2 3,240 03/05/07 08/15/07 Maccarone Plumbing
2 -3,000 04/11/07 10/26/07 Major Systems
3 15,338 03/01/05 10/03/05 RMT Electric Corp
3 26,637 04/30/07 05/08/07 Lipsky Enterprises
4 29,048 10/11/05 / / RMT Electric Corp
4 20,000 69,000 04/30/07 05/08/07 Lipsky Enterprises
5 13,283 03/14/06 05/26/06 RMT Electric Corp
5 16,273 04/30/07 05/08/07 Lipsky Enterprises
6 15,583 03/14/06 / / RMT Electric Corp
7 13,717 03/14/06 05/25/06 RMT Electric Corp
Junior High School:
91-1557 Reconstruction 0-002-004 07/14/92 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0188 Reconstruction 0-002-005 08/31/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0838 Reconstruction 0-002-006 04/05/94 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0387 Additions and Alterations 0-002-007 12/09/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1135 Reconstruction 0-002-010 03/24/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0122 Reconstruction 0-002-011 08/31/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0127 Reconstruction 0-002-012 08/07/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1106 Reconstruction 0-002-014 04/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0929 Additions and Alterations 0-002-015 08/07/01 *CO No.* Amount Disallowed Received Approved Contractor
1 17,995 10/10/02 10/28/02 West Babylon Elec.
1 21,157 06/24/03 07/11/03 West Babylon Elec.
1 3,745 10/07/03 10/14/03 KEM Const.
1 -9,978 03/02/04 03/03/04 Excel Builders Group
1 -10,000 03/24/04 04/23/04 Air Design
1 7,854 06/23/06 06/26/06 Asplundh Const.
2 43,936 10/10/02 10/28/02 Asplundh Const.
2 -8,000 12/04/02 03/13/03 West Babylon Elec.
2 19,980 09/03/03 10/14/03 West Babylon Elec.
2 1,765 10/07/03 10/14/03 KEM Const.
3 10,980 12/04/02 02/14/03 Asplundh Const.
3 -22,146 03/24/04 04/23/04 West Babylon Elec.
3 1,661 05/03/04 05/07/04 KEM Const.
4 -1,854 02/03/03 02/05/03 Asplundh Const.
99-0385 Reconstruction 0-002-016 01/12/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0465 Reconstruction 0-002-017 01/06/03 *CO No.* Amount Disallowed Received Approved Contractor
1 -6,032 12/08/04 02/11/05 Walsh mechanical Contractors
1 -5,000 07/31/06 08/10/06 suburban Resotoration
06-1407 Reconstruction 0-002-018 06/18/07 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1424 Reconstruction 0-002-020 05/31/07 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 -2,248 02/19/08 02/23/08 Hygrade Insulators
ML-JHS -14,219 04/28/08 / / ASTRO AV CORP.
Forest Avenue School:
92-0190 Reconstruction 0-003-004 03/04/93 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1432 Reconstruction 0-003-005 06/29/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0839 Reconstruction 0-003-006 04/05/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1131 Reconstruction 0-003-009 03/24/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0123 Reconstruction 0-003-010 08/31/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1272 Reconstruction 0-003-011 05/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1101 Reconstruction 0-003-012 04/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1147 Alterations 0-003-013 08/17/01 *CO No.* Amount Disallowed Received Approved Contractor
1 7,900 10/10/02 11/06/02 West Babylon Elec.
1 1,693 10/10/02 11/06/02 EBC Co
2 6,222 06/24/03 07/11/03 West Babylon Elec.
3 9,990 09/03/03 09/05/03 West Babylon Elec.
4 -7,900 03/24/04 04/28/04 West Babylon Elec.
99-0386 Reconstruction 0-003-014 01/12/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0466 Reconstruction 0-003-015 01/06/03 *CO No.* Amount Disallowed Received Approved Contractor
1 2,294 05/27/04 06/07/04 Long Island Mech.
06-1408 Reconstruction 0-003-016 06/18/07 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1425 Reconstruction 0-003-017 05/31/07 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 -93,679 02/19/08 02/23/08 Hygrade Insulators
Santapogue Elementary School:
92-0191 Reconstruction 0-005-004 03/04/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0257 Reconstruction 0-005-005 10/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0991 Reconstruction 0-005-007 04/27/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1129 Reconstruction 0-005-008 03/24/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0124 Reconstruction 0-005-009 08/31/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1273 Reconstruction 0-005-010 05/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1104 Reconstruction 0-005-011 04/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0934 Reconstruction 0-005-013 04/17/00 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1409 Reconstruction 0-005-015 06/18/07 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1426 Reconstruction 0-005-017 05/31/07 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 -5,310 02/19/08 02/23/08 Hygrade Insulators
South Bay School:
92-0192 Reconstruction 0-006-004 03/04/93 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1433 Reconstruction 0-006-005 06/29/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0840 Reconstruction 0-006-006 04/05/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1132 Reconstruction 0-006-009 03/24/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0125 Reconstruction 0-006-010 08/31/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1274 Reconstruction 0-006-011 05/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1102 Reconstruction 0-006-013 04/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0387 Reconstruction 0-006-016 01/12/00 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0933 Reconstruction 0-006-017 04/17/00 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1410 Reconstruction 0-006-019 06/18/07 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1427 Reconstruction 0-006-021 05/31/07 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 -7,116 02/19/08 02/23/08 Hygrade Insulators
Tooker Avenue Elementary:
92-0193 Reconstruction 0-007-004 03/04/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0841 Reconstruction 0-007-005 04/05/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1130 Reconstruction 0-007-008 03/24/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0126 Reconstruction 0-007-009 08/31/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1103 Reconstruction 0-007-011 04/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0172 Additions and Alterations 0-007-012 12/27/01 *CO No.* Amount Disallowed Received Approved Contractor
1 7,500 10/10/02 10/28/02 Excel Builders Group
1 7,551 06/24/03 07/11/03 Bana Elec.
1 -10,000 03/02/04 03/04/04 Air Design
2 10,578 06/24/03 07/02/03 Bana Elec.
2 2,932 09/03/03 09/05/03 Excel Builders Group
3 10,876 06/24/03 07/11/03 Bana Elec.
3 17,345 05/10/04 05/17/04 Excel Building Group
4 -1,763 03/24/04 04/13/04 Bana Elec.
4 -741 05/27/04 06/07/04 Excel Builders Group
99-0388 Reconstruction 0-007-013 01/12/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0467 Reconstruction 0-007-014 01/06/03 *CO No.* Amount Disallowed Received Approved Contractor
1 -1,164 05/27/04 06/07/04 Long Island Mech.
06-1411 Reconstruction 0-007-015 06/18/07 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1428 Reconstruction 0-007-016 05/31/07 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 -4,431 02/19/08 02/23/08 Hygrade Insulators
M1-t -1,783 05/13/08 / / Astro Air Corp
John F Kennedy Elementary School:
92-0194 Reconstruction 0-008-005 03/04/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0842 Reconstruction 0-008-006 04/05/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1133 Reconstruction 0-008-009 03/24/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0127 Reconstruction 0-008-010 08/31/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1105 Reconstruction 0-008-012 04/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1072 Reconstruction 0-008-013 03/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0151 Additions and Alterations 0-008-014 12/12/01 *CO No.* Amount Disallowed Received Approved Contractor
1 24,263 06/24/03 07/02/03 Bana Elec.
1 796 09/03/03 09/16/03 Excel Builders
1 18,035 12/24/03 01/08/04 Hirsch & Co.
1 2,168 01/26/04 02/04/04 Air Design
2 10,876 06/24/03 07/02/03 Bana Elec.
2 -573 12/24/03 01/08/04 Hirsch & Co.
2 -10,867 03/02/04 03/03/04 Excel Builders
2 7,295 02/07/05 / / Air Design Inc
3 952 03/02/04 03/04/04 Bana Elec.
99-0389 Reconstruction 0-008-015 01/12/00 *CO No.* Amount Disallowed Received Approved Contractor
1 11,800 09/07/01 01/14/03 ANS Tank & Environ.
99-0935 Reconstruction 0-008-016 04/17/00 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1412 Reconstruction 0-008-018 06/18/07 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1429 Reconstruction 0-008-020 05/31/07 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 -11,166 02/19/08 02/23/08 Hygrade Insulators
District Wide(all clsrm bldgs):
93-0651 Reconstruction 0-999-001 03/17/94 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
92-0195 Reconstruction 5-004-005 03/04/93 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1430 Reconstruction 5-004-009 05/31/07 NO CHANGE ORDERS ON ELECTRONIC FILE
West Babylon Public Library:
91-0428 Reconstruction 6-010-001 12/02/91 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0261 Additions and Alterations 6-010-002 12/12/00 NO CHANGE ORDERS ON ELECTRONIC FILE
05-1019 Reconstruction 6-010-003 06/23/06 *CO No.* Amount Disallowed Received Approved Contractor
PC-0001 -1,847 07/17/07 08/01/07 E and A Restoration
PC-0002 -10,000 01/25/08 03/19/08 E&A REATORATION
RC-0001 -13,000 07/17/07 08/01/07 More Contracting
RC-0002 -3,073 01/25/08 03/19/08 MORE CONTRACTING
RC-003 -11,130 01/25/08 03/19/08 MORE CONTRACTING
RC-004 2,058 01/25/08 03/19/08 MORE CONRACTING
NORTH BABYLON UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-03-02
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Senior High School:
90-0708 Reconstruction 0-002-008 04/30/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1143 Reconstruction 0-002-011 03/07/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1004 Reconstruction 0-002-012 04/15/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1345 Reconstruction 0-002-013 06/02/92 NO CHANGE ORDERS ON ELECTRONIC FILE
Woods Road Elementary School:
91-0007 Reconstruction 0-007-006 08/07/91 NO CHANGE ORDERS ON ELECTRONIC FILE
Belmont Lake Jr. High School:
91-0008 Reconstruction 0-009-002 08/07/91 NO CHANGE ORDERS ON ELECTRONIC FILE
North Babylon Public Library:
91-0393 Reconstruction 6-005-001 11/13/91 NO CHANGE ORDERS ON ELECTRONIC FILE
Senior High School:
95-1206 Reconstruction 0-002-021 04/17/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0856 Reconstruction 0-002-023 03/28/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0440 Reconstruction 0-002-024 12/04/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1463 Reconstruction 0-002-025 06/18/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1491 Reconstruction 0-002-026 06/19/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1134 Reconstruction 0-002-027 06/03/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1144 Reconstruction 0-002-028 03/31/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0232 Reconstruction 0-002-030 09/21/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0300 Reconstruction 0-002-031 12/23/99 *CO No.* Amount Disallowed Received Approved Contractor
00001 192,000 02/06/01 01/13/03 JP Daly & Sons
00009 19,404 02/19/03 03/24/03 Acoustic Technology
00010 5,024 02/06/02 03/25/02 Acoustic Technology
00010 3,974 06/04/02 / / Ultimate Power
00015 1,157 02/06/02 03/25/02 ARA Plumbing
00016 41,225 06/04/02 08/15/02 JP Daley
00017 117,000 02/06/02 03/22/02 JP Daly
00018 42,344 02/06/02 03/22/02 JP Daly
00019 85,000 02/06/02 03/22/02 JP Daly
10 -500 02/06/02 03/22/02 Lita Const.
11 55,057 02/06/02 03/22/02 Lita Const.
12 59,850 02/06/02 03/22/02 Lita Const.
13 61,775 06/04/02 08/15/02 Lita Const.
14 8,542 02/19/03 03/24/03 Lita Const.
15 70,569 02/19/03 03/24/03 Lita Const.
16 6,008 02/19/03 03/24/03 Lita Const.
3 7,424 02/06/02 03/22/02 Arch. Window Mfg.
3 10,000 02/19/03 03/24/03 Pella Gen. Const.
4 10,257 02/06/02 03/22/02 Arch. Window
5 6,013 02/19/03 03/24/03 Arch. Window
6 -1,392 02/19/03 03/24/03 Arch. Window
9 37,062 02/06/02 03/22/02 Lita Const.
04-0365 Reconstruction 0-002-032 12/23/04 *CO No.* Amount Disallowed Received Approved Contractor
1 37,761 07/13/06 07/24/06 Fenley Nicol Environmental
2 5,906 12/28/07 01/07/08 Fenley & Nichol Environmental
03-1274 Reconstruction 0-002-034 04/26/04 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2302FP Reconstruction 0-002-FP1 08/04/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1404SC Visual Structural Inspection 0-002-SC1 02/19/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Belmont Elementary:
92-1406 Reconstruction 0-003-011 07/19/93 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1492 Reconstruction 0-003-013 06/19/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0626 Additions and Alterations 0-003-015 02/20/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0301 Reconstruction 0-003-016 12/23/99 *CO No.* Amount Disallowed Received Approved Contractor
00001 26,427 02/06/01 01/13/03 Bain Heating
00001 61,000 02/06/01 01/14/03 JP Daly
00001 26,427 02/19/03 / / Bain Heating
00002 18,353 02/06/01 01/13/03 Bain Heating
00003 60,000 02/06/01 01/14/03 JP Daly
00003 13,000 02/19/03 / / Bain Heating
00004 44,182 06/04/02 08/15/02 Bain Heating
00004 105,000 105,000 02/19/03 12/01/03 JP Daly
00004 44,182 02/19/03 / / Bain Heating
00005 13,000 02/06/01 01/14/03 JP Daly
00007 19,971 06/04/02 08/15/02 Lita Const.
00008 11,048 06/04/02 08/15/02 JP Daly
1 -12,353 02/19/03 / / Empire Restoration
3 4,295 02/06/02 03/22/02 Arch. Window
4 4,160 02/06/02 03/22/02 Arch. Window
5 3,436 02/19/03 / / Arch. Window
6 -48,000 02/06/02 03/22/02 AM Const.
6 -1,950 02/19/03 / / Arch. Window
8 -500 02/06/02 03/22/02 Lita Const.
9 5,775 02/06/02 03/22/02 Lita Const.
03-1092 Reconstruction 0-003-018 04/29/05 *CO No.* Amount Disallowed Received Approved Contractor
1 -2,000 11/21/05 11/23/05 darr Construction
02-2301FP Reconstruction 0-003-FP1 08/04/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1444FP Reconstruction 0-003-FP2 06/09/04 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1405SC Visual Structural Inspection 0-003-SC1 02/19/03 NO CHANGE ORDERS ON ELECTRONIC FILE
M. G. Vedder Elementary:
92-0443 Reconstruction 0-004-011 12/15/92 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1493 Reconstruction 0-004-016 06/19/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0627 Alterations 0-004-018 02/20/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1750 Reconstruction 0-004-021 02/05/01 *CO No.* Amount Disallowed Received Approved Contractor
1 16,270 06/04/02 08/15/02 Architectural Window Manufacturing
2 17,572 06/04/02 08/15/02 Bana Elec.
Asb-1 5,647 02/06/02 03/22/02 DSA Services
Asb-2 2,431 02/06/02 03/22/02 DSA Services
Asb-3 19,721 02/06/02 03/22/02 DSA Services
Asb-5 7,335 02/06/02 03/22/02 DSA Services
Asb-6 8,654 02/06/02 03/22/02 DSA Services
Asb-7 602 02/06/02 03/22/02 DSA Services
Asb-8 7,349 02/06/02 03/22/02 DSA Services
Elec-1 18,617 02/06/02 03/22/02 Bana Elec.
Elec-3 37,000 02/06/02 03/22/02 Bana Elec.
Elec.-4 3,820 02/06/02 03/22/02 Bana Elec.
Inter-1 190,938 02/06/02 03/22/02 Marangos Const.
Inter-2 23,856 02/06/02 03/22/02 Marangos Const.
Mech-1 18,134 02/06/02 03/22/02 Bain Heating
Mech-2 1,459 02/06/02 03/22/02 Bain Heating
Mech-3 13,818 02/06/02 03/22/02 Bain Heating
Mech-4 7,093 02/06/02 03/22/02 Bain Heating
Mech-5 15,727 02/06/02 03/22/02 Bain Heating
Plumb-1 17,412 02/06/02 03/22/02 ARA Plumbing
Plumb-2 67,407 02/06/02 03/22/02 ARA Plumbing
Plumb-3 803 02/06/02 03/22/02 ARA Plumbing
Rf-mas-1 4,064 02/06/02 03/22/02 JNG Const.
Rf-mas-2 9,860 02/06/02 03/22/02 JNG Const.
99-0352 Reconstruction 0-004-022 05/31/00 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0353 Reconstruction 0-004-024 03/31/04 *CO No.* Amount Disallowed Received Approved Contractor
1 4,753 02/08/07 02/22/07 LM Specialty Co
02-1406SC Visual Structural Inspection 0-004-SC1 02/19/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Woods Road Elementary School:
95-1494 Reconstruction 0-007-013 06/19/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1135 Reconstruction 0-007-014 06/03/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0628 Additions and Alterations 0-007-015 02/20/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0302 Reconstruction 0-007-017 12/23/99 *CO No.* Amount Disallowed Received Approved Contractor
00001 42,000 02/06/01 01/13/03 JP Daly
00002 -15,254 02/06/02 03/22/02 L&C Europa Contracting
00002 13,000 02/19/03 / / Bain Heating
00002 60,000 60,000 02/19/03 12/01/03 JP Daly
00003 34,797 02/19/03 / / Bain Heating
00004 29,300 02/06/01 01/14/03 JP Daly
00004 19,941 02/19/03 / / Bain Heating
00004 4,737 02/19/03 / / Lita Const.
00008 9,061 06/04/02 08/15/02 JP Daly
10 -2,802 06/04/02 08/15/02 AM Const. Ent.
11 -2,203 04/03/03 04/17/03 AM Const. Ent.
3 3,436 02/06/02 03/22/02 Arch. Window
4 3,386 02/06/02 03/22/02 Arch. Window
5 -500 02/06/02 03/22/02 Lita Const.
5 2,577 02/19/03 / / Arch. Window
6 -1,950 02/19/03 / / Arch. Window
7 4,961 02/06/02 03/22/02 AM Const. Ent.
8 4,800 02/06/02 03/22/02 AM Const. Ent.
9 -36,600 02/06/02 03/22/02 AM Const. Ent.
03-1093 Additions and Alterations 0-007-018 04/29/05 *CO No.* Amount Disallowed Received Approved Contractor
1 22,604 05/03/07 05/15/07 Adjo Contracting
2 -18,200 11/16/07 02/23/08 Adjo Contracting Corp
2 -18,200 12/28/07 01/07/08 Adjo Contracting Corp.
02-1407SC Visual Structural Inspection 0-007-SC1 02/19/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Parliament Place Elementary:
92-0328 Reconstruction 0-008-011 10/29/92 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1495 Reconstruction 0-008-014 06/19/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0629 Additions and Alterations 0-008-016 02/20/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1751 Reconstruction 0-008-017 02/05/01 *CO No.* Amount Disallowed Received Approved Contractor
1 24,405 06/04/02 08/15/02 Architectural Window Manufacturing
2 3,200 06/04/02 08/15/02 Architectural Window Manufacturing
3 4,318 02/19/03 03/24/03 Architectural Window Manufacturing
4 4,799 04/03/03 04/17/03 Architectural Window Manufacturing
Asb-1 1,267 02/06/02 03/22/02 DSA Services
Asb-2 1,267 02/06/02 03/22/02 DSA Services
Asb-3 4,839 02/06/02 03/22/02 Spector Group
Elec-1 88,000 02/06/02 03/22/02 JP Daly & Sons
Elec-2 13,200 02/06/02 03/22/02 JP Daly & Sons
Elec-3 40,000 02/06/02 03/22/02 JP Daly & Sons
Elec-4 24,705 02/06/02 03/22/02 JP Daly & Sons
Inter-1 6,400 02/06/02 03/22/02 Spector Group
Inter-2 15,500 02/06/02 03/22/02 Spector Group
Mech-1 8,576 02/06/02 03/22/02 Bain Heating
Mech-2 3,063 02/06/02 03/22/02 Bain Heating
Plumb-1 4,119 02/06/02 03/22/02 ARA Plumbing
03-1094 Reconstruction 0-008-018 04/29/05 *CO No.* Amount Disallowed Received Approved Contractor
1 -2,000 11/21/05 11/23/05 Darr Construction equipment
02-1408SC Visual Structural Inspection 0-008-SC1 02/19/03 NO CHANGE ORDERS ON ELECTRONIC FILE
P.J. Brennan - Boces:
94-0976 Reconstruction 0-009-001 02/25/95 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0366 Reconstruction 0-009-002 12/23/04 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1496 Reconstruction 0-009-003 06/19/96 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0252 Reconstruction 0-009-004 10/08/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1156 Reconstruction 0-009-005 06/27/01 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1651 Reconstruction 0-009-006 07/27/00 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0959 Reconstruction 0-009-007 05/21/02 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0473 Reconstruction 0-009-008 12/09/04 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1034 Reconstruction 0-009-009 04/22/05 *CO No.* Amount Disallowed Received Approved Contractor
1 -170,499 07/30/07 08/07/07 Frendolph Construction
William DeLuca Elementary:
92-1474 Reconstruction 0-010-013 07/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1497 Reconstruction 0-010-014 06/19/96 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0367 Reconstruction 0-010-015 12/23/04 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0630 Additions and Alterations 0-010-016 02/20/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1752 Reconstruction 0-010-017 02/05/01 *CO No.* Amount Disallowed Received Approved Contractor
1 -1,725 06/04/02 08/15/02 Architectural Window Manufacturing
1 1,895 02/19/03 04/03/03 Schindler Elevator
1 18,220 02/19/03 04/03/03 Stalco Const.
1 -1,200 02/19/03 04/03/03 Advanced Environ. Services
1 6,185 02/19/03 04/03/03 Advanced Conservation Systems
1 2,527 02/19/03 04/03/03 Astro Air
1 73,687 04/03/03 04/17/03 Bana Elec.
2 45,344 06/04/02 08/15/02 Architectural Window Manufacturing
2 3,063 02/19/03 04/03/03 Schindler Elevator
2 9,494 02/19/03 04/03/03 Stalco Const.
2 9,514 02/19/03 04/03/03 Astro Air
3 16,697 02/19/03 04/03/03 Stalco Const.
04-0413 Reconstruction 0-010-021 01/19/05 *CO No.* Amount Disallowed Received Approved Contractor
1 221,550 41,268 02/08/07 03/09/07 Bancker Construction
1 -11,025 05/03/07 05/09/07 Watral Brothers
02-2300FP Reconstruction 0-010-FP1 08/04/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1409SC Visual Structural Inspection 0-010-SC1 02/19/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Robert Moses Jr. High:
92-1475 Reconstruction 0-011-011 07/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0248 Reconstruction 0-011-014 09/10/92 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1012 Additions and Alterations 0-011-015 03/13/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1498 Reconstruction 0-011-016 06/19/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1136 Reconstruction 0-011-017 06/03/96 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0368 Reconstruction 0-011-020 12/23/04 *CO No.* Amount Disallowed Received Approved Contractor
1 20,851 07/13/06 07/24/06 Fenley Nicol Environmental
1 -2,169 02/05/08 04/04/08 FENLEY & nICOL ENVIRONMENTAL
2 2,953 12/28/07 01/07/08 Fenley & Nicol Environmental
99-1753 Reconstruction 0-011-021 02/05/01 *CO No.* Amount Disallowed Received Approved Contractor
1 20,400 02/06/02 03/22/02 WB Contracting
1 40,112 06/04/02 08/15/02 Archiectural Window Manufacturing
1 15,553 02/19/03 04/03/03 Stalco Construction
1 -4,362 02/19/03 04/03/03 DSA Services
1 8,442 02/19/03 04/03/03 Astro Air Corporation
1 6,268 02/19/03 04/03/03 Advanced Conservation Systems
1 58,640 04/03/03 04/17/03 Bana Electric
2 5,064 02/19/03 04/03/03 Stalco Construction
2 7,275 02/19/03 04/03/03 Astro Air Corporation
2 2,924 02/19/03 04/03/03 Advanced Conservation Systems
3 16,167 02/19/03 04/03/03 Stalco Construction
04-0482 Additions and Alterations 0-011-022 03/29/05 *CO No.* Amount Disallowed Received Approved Contractor
1 18,031 04/10/06 07/24/06 JNS heating service
1 85,667 09/07/06 01/09/07 Cooper Power Lighting
1 -8,253 01/09/06 02/22/07 Preferred Plumbing Heating
1 212,318 02/06/07 02/22/07 Bancker Construction
1 44,950 11/30/07 12/27/07 Capobianco, Inc.
2 19,338 06/12/07 10/23/07 JNS Heating Service
02-2303FP Reconstruction 0-011-FP1 08/04/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1410SC Visual Structural Inspection 0-011-SC1 02/19/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Administration Bldg.:
95-1499 Reconstruction 1-001-001 06/19/96 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
00-0692 Reconstruction 5-012-002 04/11/01 NO CHANGE ORDERS ON ELECTRONIC FILE
North Babylon Public Library:
94-0036 Reconstruction 6-005-011 08/11/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1543 Reconstruction 6-005-013 06/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0574 Reconstruction 6-005-014 12/01/06 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2160 Reconstruction 6-005-016 06/18/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Press Box:
95-1198 New Construction 7-014-001 05/28/96 NO CHANGE ORDERS ON ELECTRONIC FILE
LINDENHURST UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-04-03
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Kellum School:
04-0510 Reconstruction 0-001-004 01/26/05 *CO No.* Amount Disallowed Received Approved Contractor
1 26,877 12/12/06 01/30/07 J Anthony Enterprise
04-0922 Reconstruction 0-001-005 06/24/05 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0841 Reconstruction 0-001-006 06/01/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1580SC Visual Structural Inspection 0-001-SC1 02/19/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Junior High School:
90-1092 Reconstruction 0-002-004 04/10/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1245 Reconstruction 0-002-006 05/12/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0228 Reconstruction 0-002-007 09/23/93 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1464 Reconstruction 0-002-009 06/06/96 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0371 Additions and Alterations 0-002-010 01/14/99 *CO No.* Amount Disallowed Received Approved Contractor
8 14,676 03/07/00 12/01/03 Quad Const.
98-0941 Reconstruction 0-002-012 05/21/99 *CO No.* Amount Disallowed Received Approved Contractor
1 -98 12/17/03 12/29/03 Manning Plumbing
2 -3,457 05/19/04 05/27/04 Wes Design & Supply
4 6,175 10/18/00 12/01/03 Manning Plumbing
99-0958 Additions and Alterations 0-002-014 05/12/00 *CO No.* Amount Disallowed Received Approved Contractor
1 2,000 03/11/02 04/19/02 JS McHugh
3 12,017 08/09/05 08/10/05 Landtek Group
7 7,690 12/10/01 02/28/02 Landtec Group
8 2,242 12/10/01 02/28/02 Landtec Group
00-0472 Reconstruction 0-002-015 03/26/01 *CO No.* Amount Disallowed Received Approved Contractor
1 22,180 05/13/04 05/14/04 Milcon Const.
10 1,767 03/11/02 05/06/02 Marangos Const.
11 2,666 03/11/02 05/06/02 Marangos Const.
12 3,261 03/11/02 05/06/02 Marangos Const.
13 1,723 03/11/02 05/06/02 Marangos Const.
14 3,534 03/11/02 05/06/02 Marangos Const.
15 14,385 07/08/02 10/30/02 Marangos Const.
16 6,480 07/08/02 10/30/02 Marangos Const.
19-GC 14,773 05/19/04 05/19/04 Marangos Const.
2 636 11/14/01 02/08/02 Marangos Const.
3 1,762 11/14/01 05/22/02 Marangos Const.
3 8,999 05/13/04 05/14/04 Milcon Const.
3-EL -102,872 03/20/03 03/24/03 Roland's Elec.
4 9,453 05/13/04 05/14/04 Milcon Const.
4 919 05/19/04 05/19/04 Marangos Const.
5 2,595 05/13/04 05/14/04 Milcon Const.
5 1,879 05/19/04 05/19/04 Marangos Const.
6 3,711 01/29/02 03/21/02 Marangos Const.
6 2,118 05/13/04 05/14/04 Milcon Const.
7 2,945 03/11/02 05/06/02 Marangos Const.
7 16,800 05/13/04 05/14/04 Milcon Const.
8 2,592 03/11/02 05/06/02 Marangos Const.
9 98,285 03/11/02 05/06/02 Marangos Const.
EL-4 92,060 02/12/04 03/03/04 Rolands Elec.
GC-17 18,547 12/17/03 12/26/03 Marangos Const.
GC-18 2,208 12/17/03 12/26/03 Marangos Const.
M-1 -2,407 12/17/03 12/29/03 Smith Haven Mech.
P-1 -4,289 12/17/03 12/29/03 Snow Industries
02-0045 Reconstruction 0-002-016 11/08/02 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0905 Reconstruction 0-002-018 01/15/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1041 Reconstruction 0-002-019 06/21/04 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0511 Reconstruction 0-002-020 01/26/05 *CO No.* Amount Disallowed Received Approved Contractor
3 3,000 05/15/07 06/22/07 County Carpet
ONE 12,300 11/23/05 02/13/06 The Landtek Group
TWO 8,809 11/23/05 02/13/06 The Landtek group
04-0923 Reconstruction 0-002-021 06/24/05 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0842 Reconstruction 0-002-022 06/01/07 *CO No.* Amount Disallowed Received Approved Contractor
SEVEN 812 03/21/08 08/12/08 ROLAND'S ELECTRIC
07-0220 Reconstruction 0-002-023 12/18/07 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0406 Visual Structural Inspection 0-002-SC1 11/16/04 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1582SC Visual Structural Inspection 0-002-SC2 02/19/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Alleghany Ave. Elementary:
90-1093 Reconstruction 0-004-003 04/10/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1604 Reconstruction 0-004-004 06/24/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1455 Reconstruction 0-004-006 06/30/93 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0685 Additions and Alterations 0-004-007 03/19/99 *CO No.* Amount Disallowed Received Approved Contractor
1-PL -4,600 04/17/03 05/05/03 Manning Plumbing
98-0958 Reconstruction 0-004-009 05/25/99 *CO No.* Amount Disallowed Received Approved Contractor
6 13,335 05/07/02 05/23/02 JP Daly and Sons
00-1393 Reconstruction 0-004-010 10/03/01 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0018 Reconstruction 0-004-011 07/19/02 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0328 Reconstruction 0-004-012 11/02/04 *CO No.* Amount Disallowed Received Approved Contractor
1 -2,000 11/23/05 11/25/05 EBC Co
1 -2,671 06/29/06 10/02/06 KEM Construction
04-0512 Reconstruction 0-004-013 01/26/05 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0924 Reconstruction 0-004-014 06/24/05 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0843 Reconstruction 0-004-015 06/01/07 *CO No.* Amount Disallowed Received Approved Contractor
TWO 1,812 03/21/08 08/12/08 ROLAND'S ELECTRIC
07-0221 Reconstruction 0-004-016 12/18/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Edward Bower Elementary:
90-1296 Reconstruction 0-005-004 05/02/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1246 Reconstruction 0-005-006 05/12/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0972 Reconstruction 0-005-007 04/22/94 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0959 Reconstruction 0-005-009 05/25/99 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1394 Reconstruction 0-005-010 10/03/01 *CO No.* Amount Disallowed Received Approved Contractor
1 -25,415 12/26/03 03/15/04 Whitestone Construction
1-BR-BWR 19,020 02/24/03 03/06/03 Rockmore Contracting
03-1190 Reconstruction 0-005-012 06/25/04 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0513 Additions and Alterations 0-005-013 01/26/05 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0925 Reconstruction 0-005-014 06/24/05 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0844 Reconstruction 0-005-015 06/01/07 *CO No.* Amount Disallowed Received Approved Contractor
FOUR 1,812 03/21/08 08/12/08 ROLDAND'S ELECTRIC
07-0222 Reconstruction 0-005-016 12/18/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1584SC Visual Structural Inspection 0-005-SC1 02/19/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Daniel Street Elementary:
91-0125 Reconstruction 0-006-004 09/17/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1456 Reconstruction 0-006-007 06/30/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0973 Reconstruction 0-006-008 04/22/94 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1179 Reconstruction 0-006-010 04/01/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0425 Reconstruction 0-006-011 12/17/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0960 Reconstruction 0-006-012 05/25/99 *CO No.* Amount Disallowed Received Approved Contractor
1-DS 2,000 02/24/03 03/04/03 SJ Hoerning Const.
00-1395 Reconstruction 0-006-013 10/03/01 *CO No.* Amount Disallowed Received Approved Contractor
1-DS 14,180 02/24/03 03/06/03 Marangos Construction
01-1477 Reconstruction 0-006-014 07/23/02 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0107 Reconstruction 0-006-015 09/04/03 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0514 Reconstruction 0-006-016 01/26/05 *CO No.* Amount Disallowed Received Approved Contractor
1 46,200 05/15/07 06/22/07 County Carpet
04-0926 Reconstruction 0-006-017 06/24/05 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0845 Reconstruction 0-006-018 06/01/07 *CO No.* Amount Disallowed Received Approved Contractor
THREE 1,812 03/21/08 08/12/08 ROLAND'S ELECTRIC
07-0223 Reconstruction 0-006-019 12/18/07 NO CHANGE ORDERS ON ELECTRONIC FILE
William Rall Elementary:
90-1297 Reconstruction 0-007-003 05/02/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0126 Reconstruction 0-007-005 09/17/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0974 Reconstruction 0-007-007 04/22/94 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0559 Additions and Alterations 0-007-008 04/03/00 *CO No.* Amount Disallowed Received Approved Contractor
1 7,500 08/21/01 02/06/02 Air Design
1 18,078 07/25/06 08/01/06 AM Construction Enterprises
2 3,920 08/21/01 02/06/02 Air Design
3 2,790 08/21/01 02/06/02 Air Design
3 8,000 10/22/01 04/15/02 Manning Plumbing
98-0961 Reconstruction 0-007-010 05/25/99 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1396 Reconstruction 0-007-011 10/03/01 *CO No.* Amount Disallowed Received Approved Contractor
!-WR 11,982 02/24/03 03/06/03 Marangos Construction
02-0122 Reconstruction 0-007-012 10/21/02 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0515 Reconstruction 0-007-013 01/26/05 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0927 Reconstruction 0-007-014 06/24/05 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0846 Reconstruction 0-007-015 06/01/07 *CO No.* Amount Disallowed Received Approved Contractor
EIGHT 5,150 03/21/08 08/12/08 ROLAND'S ELECTRIC
07-0224 Reconstruction 0-007-016 12/18/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Senior High School:
90-1094 Reconstruction 0-009-003 04/10/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1605 Reconstruction 0-009-005 06/24/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1457 Reconstruction 0-009-006 06/30/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0975 Reconstruction 0-009-007 04/22/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1465 Reconstruction 0-009-009 06/06/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0558 Additions and Alterations 0-009-011 04/03/00 *CO No.* Amount Disallowed Received Approved Contractor
1 -256 03/15/02 04/19/02 Roland's Electric
1 -51,189 04/30/03 02/21/06 Suburban Restoration Co., Inc.
10 34,035 07/10/01 01/15/02 Rockmore Contracting
10 1,500 10/23/01 01/08/02 Roland's Electric
11 9,916 07/10/01 01/15/02 Rockmore Contracting
12 39,138 07/10/01 01/15/02 Rockmore Contracting
13 898 07/10/01 01/15/02 Rockmore Contracting
14 4,267 07/10/01 01/15/02 Rockmore Contracting
15 13,166 07/10/01 01/15/02 Rockmore Contracting
16 74,961 07/10/01 01/15/02 Rockmore Contracting
17 6,801 08/21/01 01/09/02 Rockmore Contracting
18 45,982 08/21/01 01/09/02 Rockmore Contracting
2 -1,667 07/10/01 01/28/02 Air Design
2 2,414 05/25/01 05/27/03 Rockmore Contracting
21 -3,250 08/26/02 09/03/02 Roland's Electric
22-EL 2,404 02/12/04 03/04/04 Roland's Electric
23-EL 935 03/20/03 03/28/03 Roland's Electric
24-EL 3,509 03/20/03 03/28/03 Roland's Electric
3 12,017 07/10/01 01/28/02 Landtek Group
3 -2,710 01/10/01 01/14/03 Air Design
4 534 07/10/01 01/15/02 Rockmore Contracting
4 -4,420 07/08/02 07/12/02 Air Design
5 2,488 07/10/01 01/15/02 Rockmore Contracting
5 4,500 01/10/01 / / Roland's Electric
6 6,677 07/10/01 01/15/02 Rockmore Contracting
6 9,989 07/10/01 01/28/02 Roland's Electric
6 -891 09/04/01 04/12/02 Manning Plumbing
7 73,000 07/10/01 01/15/02 Rockmore Contracting
7 1,027 07/10/01 01/28/02 Roland's Electric
8 15,500 07/10/01 01/15/02 Rockmore Contracting
8-EL -6,329 03/20/03 03/28/03 Roland's Electric
8-PL -3,995 04/17/03 05/01/03 Manning Plumbing
9 9,715 07/10/01 01/15/02 Rockmore Contracting
9-Pl -8,510 04/17/03 02/21/06 Manning Plumbing
MECH 5 -450 05/19/04 05/27/04 Air Design
99-1230 Reconstruction 0-009-012 06/29/00 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1559 Reconstruction 0-009-013 10/03/01 *CO No.* Amount Disallowed Received Approved Contractor
1-Ir 5,378 02/24/03 03/06/03 Rockmore Contracting
1-SW 26,340 02/24/03 03/06/03 The Landtek Group
2-SW 10,625 02/12/04 03/03/04 The Landtek Group
3-SW 4,200 02/12/04 03/03/04 The Landtek Group
02-0016 Reconstruction 0-009-014 07/19/02 *CO No.* Amount Disallowed Received Approved Contractor
1 -9,425 06/17/03 06/26/03 Ultimate Power
02-1248 Reconstruction 0-009-015 08/29/03 *CO No.* Amount Disallowed Received Approved Contractor
EL-001 4,035 01/28/05 09/22/06 Palace Electrical
EL-002 3,184 01/28/05 02/11/05 Palace Electrical Contractors
EL-003 -500 03/12/06 09/22/06 Palace Electrical
02-0904 Reconstruction 0-009-016 01/15/03 *CO No.* Amount Disallowed Received Approved Contractor
00016 14,317 04/27/05 08/03/05 Christa Construction
03-0270 Reconstruction 0-009-017 11/03/03 *CO No.* Amount Disallowed Received Approved Contractor
1 181,500 03/21/05 04/15/05 Annex General Contracting
1 5,500 03/09/06 03/13/06 Annex General Contracting, Inc.
04-0208 Reconstruction 0-009-018 10/04/04 *CO No.* Amount Disallowed Received Approved Contractor
1 -3,500 06/21/05 06/27/05 Hawkeye
2 1,900 05/15/07 06/22/07 County Carpet
04-0928 Reconstruction 0-009-019 06/24/05 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0516 Reconstruction 0-009-020 01/26/05 *CO No.* Amount Disallowed Received Approved Contractor
1 255,913 11/24/06 01/12/07 Stasi Brothers
2 -10,000 06/25/07 07/17/07 Stasi Brothers
06-0847 Reconstruction 0-009-021 06/01/07 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
SIX 1,687 03/21/08 08/12/08 ROLAND'S ELECTRIC
Three 10,000 08/18/08 / / thermo Tech Combustion
07-0225 Reconstruction 0-009-022 12/18/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0745 Reconstruction 0-009-023 11/20/07 *CO No.* Amount Disallowed Received Approved Contractor
ONE -4,000 08/19/08 / / VEZANDIO CONTRACTIONG CORP.
07-1204 Reconstruction 0-009-024 01/03/08 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2218 Reconstruction 0-009-025 08/21/08 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1511SC Visual Structural Inspection 0-009-SC1 05/04/04 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1586SC Visual Structural Inspection 0-009-SC2 02/19/08 NO CHANGE ORDERS ON ELECTRONIC FILE
West Gates Elementary:
90-1095 Reconstruction 0-010-003 04/10/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0976 Reconstruction 0-010-004 04/22/94 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0962 Reconstruction 0-010-006 05/25/99 *CO No.* Amount Disallowed Received Approved Contractor
1-WG 2,000 02/24/03 03/06/03 SJ Hoerning Const.
00-1397 Reconstruction 0-010-007 10/03/01 *CO No.* Amount Disallowed Received Approved Contractor
1-IR-WG 21,790 02/24/03 03/06/03 Rockmore Contracting
04-0517 Reconstruction 0-010-008 01/26/05 *CO No.* Amount Disallowed Received Approved Contractor
ONE 9,483 01/23/08 04/04/08 STASI BROTHERS ASPHALT
04-0929 Reconstruction 0-010-009 06/24/05 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0848 Reconstruction 0-010-010 06/01/07 *CO No.* Amount Disallowed Received Approved Contractor
NINE 1,812 03/21/08 08/12/08 ROLAND'S ELECTRIC
ONE 4,025 07/14/08 / / THERMO TECH COMBUSTION
07-0226 Reconstruction 0-010-011 12/18/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1581SC Visual Structural Inspection 0-010-SC1 02/19/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Earding Elementary School:
93-0977 Reconstruction 0-011-005 04/22/94 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0963 Reconstruction 0-011-007 05/25/99 *CO No.* Amount Disallowed Received Approved Contractor
1-HAR 2,000 02/24/03 03/04/03 SJ Hoerning Const.
00-1398 Reconstruction 0-011-008 10/03/01 *CO No.* Amount Disallowed Received Approved Contractor
1-IR-HAR 12,151 02/24/03 03/06/03 Rockmore Contracting
02-0072 Reconstruction 0-011-009 01/08/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0405 Reconstruction 0-011-010 10/21/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1191 Reconstruction 0-011-011 06/26/04 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0518 Reconstruction 0-011-012 01/26/05 *CO No.* Amount Disallowed Received Approved Contractor
1 45,492 01/02/07 01/30/07 J Anthony Enterprises
2 19,100 02/23/07 03/14/07 J Anthony Enterprises
04-0930 Reconstruction 0-011-013 06/24/05 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0849 Reconstruction 0-011-014 06/01/07 *CO No.* Amount Disallowed Received Approved Contractor
FIVE 1,812 03/21/08 08/12/08 ROLAND'S ELECTRIC
TWO -5,250 07/14/08 / / THERMO TECH COMBUSTION
07-0227 Reconstruction 0-011-015 12/18/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1579SC Visual Structural Inspection 0-011-SC1 02/19/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Albany Avenue Elementary School:
90-1298 Reconstruction 0-012-003 05/02/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0127 Reconstruction 0-012-004 09/17/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0978 Reconstruction 0-012-005 04/22/94 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0964 Reconstruction 0-012-007 05/25/99 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1399 Reconstruction 0-012-008 10/03/01 *CO No.* Amount Disallowed Received Approved Contractor
1-ALB 13,131 02/24/03 03/06/03 Marangos Construction
02-0017 Reconstruction 0-012-009 07/19/02 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0519 Additions and Alterations 0-012-011 01/26/05 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0931 Reconstruction 0-012-012 06/24/05 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0850 Reconstruction 0-012-013 06/01/07 *CO No.* Amount Disallowed Received Approved Contractor
ONE 2,142 03/21/08 08/12/08 ROLAND'S ELECTRIC
07-0228 Reconstruction 0-012-014 12/18/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1583SC Visual Structural Inspection 0-012-SC1 02/19/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Niagara Ave. School & Admin.:
90-1299 Reconstruction 0-013-003 05/02/91 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0520 Reconstruction 0-013-005 01/26/05 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0932 Reconstruction 0-013-006 06/24/05 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0851 Reconstruction 0-013-007 06/01/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Lindenhurst Memorial Library:
94-1367 Reconstruction 6-003-002 03/23/95 NO CHANGE ORDERS ON ELECTRONIC FILE
Toilet Facility:
99-0959 New Construction 7-018-001 05/12/00 *CO No.* Amount Disallowed Received Approved Contractor
1-MS 114,169 02/24/03 03/13/03 Rockmore Contracting
Press Box @ Middle School:
99-1531 New Construction 7-020-001 06/02/00 NO CHANGE ORDERS ON ELECTRONIC FILE
COPIAGUE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-05-03
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Deauville Gardens Elementary:
90-1157 Reconstruction 0-001-010 04/09/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1216 Reconstruction 0-001-011 03/15/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1605 Reconstruction 0-001-012 06/20/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1054 Additions and Alterations 0-001-013 05/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0159 Reconstruction 0-001-014 12/11/00 *CO No.* Amount Disallowed Received Approved Contractor
1 36,800 10/05/01 02/08/02 Thomas Novelli Contracting
01-0584 Reconstruction 0-001-015 04/08/02 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1107 Reconstruction 0-001-016 06/05/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1470 Reconstruction 0-001-017 07/03/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0259 Reconstruction 0-001-018 03/29/04 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1542 Reconstruction 0-001-019 11/19/07 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1221FP Reconstruction 0-001-FP1 03/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1631SC Visual Structural Inspection 0-001-SC1 06/17/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Great Neck Rd. Elementary:
90-1158 Reconstruction 0-002-007 04/09/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1508 Reconstruction 0-002-008 08/05/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1055 Reconstruction 0-002-009 05/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0160 Reconstruction 0-002-010 12/11/00 *CO No.* Amount Disallowed Received Approved Contractor
1 38,081 10/05/01 02/08/02 Stasi Bros. Asphalt
01-0585 Reconstruction 0-002-011 04/08/02 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1108 Reconstruction 0-002-012 06/05/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1471 Reconstruction 0-002-013 07/03/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0260 Reconstruction 0-002-014 03/29/04 *CO No.* Amount Disallowed Received Approved Contractor
1 49,700 49,700 09/13/04 10/28/04 Stasi Brothers Asphalt
1 2,857 09/13/04 10/25/04 Stalco Const.
06-0619 Reconstruction 0-002-016 02/13/07 *CO No.* Amount Disallowed Received Approved Contractor
ONE 16,015 10/01/07 10/23/07 PAZA CONSTRUCTION
ONE -6,125 04/11/08 04/18/08 TROPIC ROOFING CORP.
06-1543 Reconstruction 0-002-017 11/19/07 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1219FP Reconstruction 0-002-FP1 03/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1630SC Visual Structural Inspection 0-002-SC1 06/17/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Copiague Jr High School:
90-1382 Reconstruction 0-004-009 06/07/91 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1056 Reconstruction 0-004-011 05/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1288 Reconstruction 0-004-012 05/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0162 Reconstruction 0-004-013 12/11/00 *CO No.* Amount Disallowed Received Approved Contractor
2 5,693 09/07/01 01/08/02 Stalco Const.
3 4,235 03/22/02 04/18/02 Stalco Const.
01-0586 Reconstruction 0-004-014 04/08/02 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1109 Reconstruction 0-004-015 06/05/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1472 Reconstruction 0-004-016 07/03/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0261 Additions and Alterations 0-004-017 03/29/04 *CO No.* Amount Disallowed Received Approved Contractor
1 -5,000 03/27/06 06/23/06 KEM Construction
06-1544 Reconstruction 0-004-018 11/19/07 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1218GP Reconstruction 0-004-FP1 03/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1628SC Visual Structural Inspection 0-004-SC1 06/17/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Susan E. Wiley Elementary:
90-1159 Reconstruction 0-005-008 04/09/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1383 Reconstruction 0-005-010 06/07/91 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0582 Additions and Alterations 0-005-012 02/17/95 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1057 Reconstruction 0-005-013 05/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0387 Reconstruction 0-005-014 11/21/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0161 Reconstruction 0-005-015 12/11/00 *CO No.* Amount Disallowed Received Approved Contractor
1 41,200 10/04/01 02/08/02 Arch. Window Mfg.
01-0587 Reconstruction 0-005-016 04/08/02 *CO No.* Amount Disallowed Received Approved Contractor
1 7,913 04/08/03 04/17/03 AT Inc
02-1110 Reconstruction 0-005-017 06/05/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1473 Reconstruction 0-005-018 07/03/03 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1545 Reconstruction 0-005-019 11/19/07 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1220FP Reconstruction 0-005-FP1 03/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1629SC Visual Structural Inspection 0-005-SC1 06/17/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Senior High School:
90-1160 Reconstruction 0-006-006 04/09/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0993 Reconstruction 0-006-008 06/15/92 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1417 Reconstruction 0-006-009 05/30/96 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0946 Reconstruction 0-006-010 04/22/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1058 Reconstruction 0-006-011 05/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0588 Reconstruction 0-006-012 04/08/02 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1111 Reconstruction 0-006-013 06/05/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1474 Reconstruction 0-006-014 07/03/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0262 Reconstruction 0-006-015 03/29/04 *CO No.* Amount Disallowed Received Approved Contractor
1 22,489 22,489 09/13/04 10/25/04 Rolands Elec.
1 6,407 11/26/04 12/17/04 Gordon Seaman
1 7,416 01/31/05 02/11/05 Hirsch Co
1 9,210 03/29/05 04/15/05 Irwin Contracting Inc
1 -3,850 07/26/05 08/05/05 Major Systems
1 -5,000 07/26/05 08/05/05 Kem Construction
1 -7,273 11/15/07 01/28/08 KEM Construction
2 6,718 12/16/04 12/28/04 Roland's Elec.
2 9,744 01/31/05 02/11/05 E and M Hardwood Flooring
2 4,248 04/04/05 04/15/05 Hirsch Co
06-0620 Reconstruction 0-006-018 02/13/07 *CO No.* Amount Disallowed Received Approved Contractor
ONE 298,000 10/01/07 10/23/07 STALCO CONSTRUCTION
07-0729 Reconstruction 0-006-019 12/11/07 NO CHANGE ORDERS ON ELECTRONIC FILE
08-0068 Reconstruction 0-006-020 09/11/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1217FP Reconstruction 0-006-FP1 04/14/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1627SC Visual Structural Inspection 0-006-SC1 06/17/04 NO CHANGE ORDERS ON ELECTRONIC FILE
District Garage:
03-0263 Additions and Alterations 2-003-001 03/29/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Public Library:
06-0601 Reconstruction 6-007-003 12/14/06 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0255 Reconstruction 6-007-004 08/30/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Press Box @ High School:
01-1210 New Construction 7-009-001 05/01/02 NO CHANGE ORDERS ON ELECTRONIC FILE
District Wide:
92-1269 Reconstruction 7-999-002 06/15/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1509EP Energy Project 7-999-E01 05/24/94 NO CHANGE ORDERS ON ELECTRONIC FILE
AMITYVILLE UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 58-01-06-03
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Memorial High School:
91-1380 Reconstruction 0-001-003 06/29/92 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0992 Reconstruction 0-001-004 05/11/93 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0091 Reconstruction 0-001-005 07/31/92 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1317 Reconstruction 0-001-007 04/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0636 Reconstruction 0-001-009 05/17/07 *CO No.* Amount Disallowed Received Approved Contractor
001 17,800 01/18/08 01/22/08 J. Anthony Enterprises
001 8,262 02/03/08 03/31/08 BEST ROOFING OF NEW JERSEY
001 -19,993 05/29/08 / / WALSH MECHANICAL CONTRACTORS, INC.
002 26,622 01/18/08 01/22/08 J. Anthony Enterprises
003 -18,470 01/18/08 01/22/08 J. Anthony Enterprises
004 15,000 01/18/08 01/22/08 J. Anthony Enterprises
005 30,000 01/18/08 01/22/08 J. Anthony Enterprises
006 58,000 01/18/08 01/22/08 J. Anthony Enterprises
007 -10,000 01/18/08 01/22/08 J. Anthony Enterprises
008 23,053 01/18/08 01/22/08 J. Anthony Enterprises
009 45,500 01/18/08 01/22/08 J. Anthony Enterprises
010 -15,460 05/29/08 09/29/08 J.Anthony Enterprises Inc
07-0099 Reconstruction 0-001-010 09/11/07 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1627SC Visual Structural Inspection 0-001-SC1 06/19/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Northeast Elementary School:
92-0424 Reconstruction 0-003-001 12/08/92 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0729 Reconstruction 0-003-002 04/01/93 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0631 Reconstruction 0-003-003 03/10/93 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1722 Reconstruction 0-003-006 07/15/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1318 Reconstruction 0-003-007 04/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0194 Reconstruction 0-003-009 03/14/07 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1388 Reconstruction 0-003-010 09/12/07 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0767FP Reconstruction 0-003-FP1 05/21/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Northwest Elementary School:
92-0730 Reconstruction 0-004-001 04/01/93 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0632 Reconstruction 0-004-002 03/10/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0950 Reconstruction 0-004-003 02/25/95 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0274 Reconstruction 0-004-004 03/08/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1723 Reconstruction 0-004-005 07/15/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1319 Reconstruction 0-004-006 04/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1151 Additions and Alterations 0-004-007 04/15/99 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0193 Reconstruction 0-004-008 03/14/07 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1389 Reconstruction 0-004-009 09/12/07 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0768FP Reconstruction 0-004-FP1 05/02/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Park Avenue Elementary:
92-0731 Reconstruction 0-005-002 04/01/93 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0264 Reconstruction 0-005-004 10/30/03 *CO No.* Amount Disallowed Received Approved Contractor
1 13,237 03/14/06 08/17/07 Statewide Roofing
2 -4,000 03/14/06 08/17/07 Statewide Roofing
97-1320 Reconstruction 0-005-005 04/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1707 Additions and Alterations 0-005-006 11/22/99 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
1 -10,560 12/30/04 08/16/07 Empire Interior Systems
1 12,000 12/30/04 / / Feran Develop.
1 -13,500 12/30/04 / / Inter-County Roofing
1 11,108 12/30/04 08/16/07 Maryland Fabricators
1 -3,760 12/30/04 08/17/07 R&D Carpet
1 55,000 12/30/04 / / Sumrart Restoration
1 -10,560 12/30/04 / / Empire Interior Systems
1 -8,579 12/30/04 08/16/07 RMT Electric Corp
1 6,200 03/14/07 06/13/07 HVAC Incorp
1 7,900 12/30/04 08/16/07 Roebell Painting
10 2,016 12/30/04 08/16/07 Empire Interior Systems
10 118,634 118,634 03/14/06 08/17/07 Maryland Fabricators
10 12,271 03/14/06 08/17/07 Tradwinds Plumbing
11 52,658 12/30/04 / / Empire Interior Systems
11 21,259 03/14/06 08/17/07 Maryland Fabricators
11 1,066 03/14/06 08/17/07 Tradewinds Plumbing
12 50,988 12/30/04 / / Empire Interior Systems
12 26,251 03/14/06 08/17/07 Maryland Fabricators
12 1,415 03/14/06 08/17/07 Tradewinds Plumbing
13 24,280 03/14/06 08/17/07 Maryland Fabricators
13 15,517 03/14/06 08/17/07 Tradewinds Plumbing
14 -1,590 03/14/06 08/16/07 RMT Electric
14 78,802 03/14/06 06/13/07 Empire Interior
14 4,832 03/14/06 06/13/07 HVAC Inc
14 27,162 03/14/06 08/17/07 Maryland Fabricators
14 -15,141 03/14/06 08/17/07 Tradewinds Plumbing
15 -6,231 03/14/06 06/13/07 Empire Interior Systems
15 8,155 03/14/06 06/13/07 HVAC Inc
15 -394 06/14/06 08/17/07 Maryland Fabricators
15 2,003 03/14/06 08/17/07 RMT Electric
15 296 03/14/06 08/17/07 Tradewinds Plumbing
16 19,373 03/14/06 / / Empire Interior Systems
16 10,292 03/14/06 06/13/06 HVAC Inc
16 13,006 03/14/06 08/17/07 Maryland Fabricators
16 9,024 03/14/06 08/17/07 RMT Electric
16 -2,250 03/14/06 08/17/07 Tradewinds Plumbing
17 10,040 03/14/06 06/13/07 Empire Interior
17 9,990 2,170 03/14/06 08/17/07 Maryland Fabricators
17 8,936 03/14/06 08/17/07 RMT Electric
18 16,769 03/14/06 06/13/07 Empire Interior
18 3,535 03/14/06 06/13/07 HVAC Inc
18 48,743 48,743 03/14/06 08/17/07 RMT Electric
19 16,256 03/14/06 / / Empire Interior
19 20,257 03/14/06 08/17/07 RMT Electric
2 142,570 12/30/04 / / Empire Interior Systems
2 -163,823 12/30/04 08/16/07 Feran Develop.
2 3,210 12/30/04 08/16/07 Maryland Fabricators
2 4,530 12/30/04 08/16/07 RMT Elec.
2 19,363 12/30/04 08/16/07 Sumrart Restoration
2 531 12/30/04 08/16/07 Tradewinds Plumbing
2 142,570 12/30/04 / / Empire Interior Systems
2 16,993 03/14/06 06/13/07 HVAC Incorp
2 16,948 16,948 03/14/06 08/17/07 Shervan Equipment
20 30,301 03/14/06 / / Empire Interior Systems
20 -2,000