Construction Project Status

Change Order Status

THE STATE EDUCATION DEPARTMENT

OFFICE OF FACILITIES PLANNING


UPDATED: 11/24/09 at 17:30:57




ADDISON CENTRAL SCHOOL STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-01-01-04
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Valley Elementary School:
90-1900   Reconstruction               0-004-004  08/16/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0390   Reconstruction               0-004-005  02/13/92  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1212   Reconstruction               0-004-006  05/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0872   Additions and Alterations    0-004-007  04/29/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          High School:
90-1901   Reconstruction               0-005-005  08/16/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0391   Reconstruction               0-005-006  02/13/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0873   Reconstruction               0-005-007  04/29/94  NO CHANGE ORDERS ON ELECTRONIC FILE
07-0945   Additions and Alterations    0-005-010  03/20/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            101-001        19,431                  10/06/08   01/30/09    EDGER ENTERPRISES OF ELMIRA         
                                                            101-002        39,736                  12/11/08   02/18/09    EDGER ENTERPRISES OF ELMIRA INC.    
                                                            101-003         4,450                  02/05/09   04/03/09    EDGER ENTERPRISES OF ELMIRA INC.    
                                                            101-004        10,399                  06/10/09     /  /      EDGER ENTERPRISES OF ELMIRA INC     
                                                            101-005        12,840                  06/10/09   07/14/09    EDGER ENTERPRISES OF ELMIRA INC     
                                                            101-006        -1,174                  10/15/09   11/17/09    EDGER ENTERPRISES OF ELMIRA INC     
                                                            102-001        10,018                  10/06/08   01/30/09    ENVIRONMENTAL REMEDIATION           
                                                            102-003       125,000                  02/05/09   04/03/09    ENVIRONMENTAL REMEDIATION SERVICES, 
                                                            102-004         4,191                  02/19/09   04/23/09    ENVIRONMENTAL REMEDIATION SERVICES, 
                                                            102-005         7,559                  04/03/09   07/28/09    ENVIRONMENTAL REMEDIATION SERVICES  
                                                            102-006           900                  06/10/09   07/14/09    ENVIRONMENTAL REMEDIATION SERVICES  
                                                            102-007        11,943                  08/28/09   09/17/09    ENVIRONMENTAL REMEDIATION SERVICES  
                                                            103-001        27,652                  06/10/09   07/14/09    HOLDSWORTH KLIMOWSKI CONSTRUCTION   
                                                            103-002         9,593                  06/10/09   07/14/09    HOLDSWORTH KLIMOWSKI CONSTRUCTION   
                                                            103-003         1,215                  06/10/09   07/14/09    HOLDSWORTH KLIMOWSKI CONSTRUCTION   
                                                            103-004        42,840                  08/06/09   09/03/09    HOLDSWORTH KLIMOWSKI CONSTRUCTION   
                                                            103-005       222,411                  08/28/09   09/17/09    HOLDSWORTH KLIMOWSKI CONSTRUCTION   
                                                            103-006        31,712                  08/28/09   09/17/09    HOLDSWORTH KLIMOWSKI CONSTRUCTION   
                                                            103-007        13,927                  08/28/09   09/17/09    HOLDSWORTH KLIMOWSKI CONSTRUCTION   
                                                            105-001       -14,000                  06/10/09   07/14/09    TOWER ROOFING CO. INC.              
                                                            105-004         1,467                  08/28/09   09/17/09    TOWER ROOFING CO INC                
                                                            106-001        -9,850                  08/06/09   09/03/09    JOSEPH FLIHAN COMPANY               
                                                            107-001         7,946                  06/10/09   07/16/09    SCHOONOVER PLUMBING AND HEATING     
                                                            107-002        11,715                  08/28/09   09/17/09    SCHOONOVER PLUMBING AND HEATING     
                                                            108-001        12,798                  08/28/09   09/17/09    FREY & CAMPBELL INC                 
                                                            109-001         8,556                  05/12/09   07/29/09    G.O. WICK, INC.                     
                                                            109-002         2,326                  09/24/09   10/13/09    G.O. WICK INC                       
                                                            110-001        -6,600                  08/06/09   09/03/09    POLYVISION CORPORATION              
 
02-2453FP Reconstruction               0-005-FP1  09/08/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Tuscarora Elementary:
90-1902   Reconstruction               0-006-004  08/16/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0392   Reconstruction               0-006-005  02/13/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0874   Additions and Alterations    0-006-006  04/29/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0062   Reconstruction               0-006-007  01/10/96  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0166   Reconstruction               0-006-008  05/05/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-001          6,759                  05/22/06     /  /      John Mills Electric                 
 
07-0946   Reconstruction               0-006-010  03/20/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            105-002       -14,000                  06/10/09   07/14/09    TOWER ROOFING CO. INC               
                                                            105-003         1,569                  08/06/09   09/03/09    TOWER ROOFING CO INC                
 
02-2454FP Reconstruction               0-006-FP1  09/08/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Elem. Storage (New):
94-0198   New Construction             2-014-001  10/27/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Storage:
90-1903   Reconstruction               4-002-001  08/16/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0875   Reconstruction               4-002-003  04/29/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
90-1904   Reconstruction               5-001-003  08/16/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0876   Reconstruction               5-001-004  04/29/94  NO CHANGE ORDERS ON ELECTRONIC FILE





AVOCA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-02-01-04
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Bldg:
91-0424   Reconstruction               0-002-004  12/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1380   Additions and Alterations    0-002-005  10/15/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-2           16,849                  12/04/02   01/03/03    Lambert's Asbestos Removal          
                                                            EC-1           30,361                  11/15/01   02/08/02    Burns Elec.                         
                                                            EC-10           3,858                  11/27/02   01/03/03    Burns Elec.                         
                                                            EC-11           3,408                  12/24/02   01/08/03    Burns Elec.                         
                                                            EC-12           1,486                  01/29/03   02/11/03    Burns Elec.                         
                                                            EC-2(rev        6,166                  04/24/02   05/07/02    Burns Elec.                         
                                                            EC-3(rev       13,292                  04/24/02   05/07/02    Burns Elec.                         
                                                            EC-4            8,502                  05/09/02   06/04/02    Burns Elec.                         
                                                            EC-5            1,827                  07/30/02   08/28/02    Burns Elec.                         
                                                            EC-6            2,121                  07/30/02   08/28/02    Burns Elec.                         
                                                            EC-7            2,536                  06/22/09     /  /      R.G. BURNS ELECTRIC INC             
                                                            EC-8           10,092                  06/22/09     /  /      R.G. BURNS ELECTRIC INC             
                                                            EC-9 rev       -2,663                  11/01/02     /  /      Burns Elec.                         
                                                            GC-1          -19,096                  11/28/01   03/01/02    Saucke Bros. Const.                 
                                                            GC-2            6,890                  11/28/01     /  /      Saucke Bros. Const.                 
                                                            GC-3           10,855                  11/28/01   02/28/02    Saucke Bros. Const.                 
                                                            GC-4           11,776                  01/28/02   03/08/02    Saucke Bros. Const.                 
                                                            HC-1            4,843                  12/07/01   04/23/02    Faulks Plumbing                     
                                                            HC-2            9,957                  12/03/01   01/10/02    Faulks Plumbing                     
                                                            HC-3           22,640                  01/18/02   03/25/02    Faulks Plumbing                     
                                                            HC-4            8,083                  01/18/02   03/25/02    Faulks Plumbing                     
                                                            HC-5            6,007                  05/30/02   08/28/02    Faulks Plumbing                     
                                                            HC-6            1,454                  04/12/02   04/25/02    Faulks Plumbing                     
                                                            HC-7              566                  08/29/02   09/05/02    Faulks Plumbing                     
                                                            HC-8            6,917                  06/26/03   07/01/03    Faulks Plumbing                     
                                                            PC-1            4,284                  08/24/01   03/27/02    Frey & Campbell                     
                                                            PC-2              247                  06/22/09   09/25/09    FREY & CAMPBELL INC                 
                                                            PC-3            1,939                  01/28/02   03/08/02    Frey & Campbell                     
                                                            PC-4            3,063                  03/20/02   04/18/02    Frey & Campbell                     
                                                            PC-5            1,279                  04/18/02   04/18/02    Frey & Campbell                     
                                                            PC-6            3,530                  07/30/02   08/28/02    Frey & Campbell                     
                                                            PC-7            2,021                  07/30/02   08/28/02    Frey & Campbell                     
                                                            PC-8            5,112                  07/30/02   08/28/02    Frey & Campbell                     
                                                            PC-9          -27,365                  06/22/09   09/25/09    FREY & CAMPBELL INC                 
                                                            SC-1            4,100                  04/18/01   01/08/02    AL Blades & Sons                    
                                                            SC-10           6,700                  01/02/03   01/10/03    AL Blades & Sons                    
                                                            SC-11          25,924                  09/22/03   10/03/03    AL Blades & Sons                    
                                                            SC-12          10,221                  12/12/03   12/24/03    AL Blades & Sons                    
                                                            SC-2            3,200                  06/22/09   08/13/09    A.L. BLADES & SONS INC              
                                                            SC-3            3,700                  02/19/02   04/01/02    AL Blades & Sons                    
                                                            SC-4            4,767                  06/22/09   08/13/09    A.L. BLADES & SONS INC              
                                                            SC-5           14,793                  01/18/02   03/25/02    AL Blades & Sons                    
                                                            SC-6            2,536                  03/28/02   04/26/02    AL Blades & Sons                    
                                                            SC-7           12,586                  07/30/02   08/28/02    AL Blades & Sons                    
                                                            SC-7                0                  06/22/09     /  /      A.L. BLADES & SONS                  
                                                            SC-8           12,030                  08/13/02   09/05/02    AL Blades & Sons                    
                                                            SC-9           -5,509                  11/08/02   12/11/02    AL Blades & Sons                    
 
06-0158   Additions and Alterations    0-002-008  01/22/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            301-001         3,102                  10/22/07   10/26/07    HORNING CONSTRUCTION LLC            
                                                            301-002        12,420                  10/22/07   10/26/07    HORNING CONSTRUCTIONLLC             
                                                            301-004         2,774                  10/29/07   11/14/07    Horning Construction                
                                                            301-005         4,914                  10/29/07   11/14/07    Horning Construction                
                                                            301-007        12,353                  11/26/07   12/12/07    HORNING CONSTRUCTION INC.           
                                                            301-008         7,434                  11/26/07   02/23/08    HORNING CONSTRUCTION INC.           
                                                            301-009         2,697                  01/03/08   01/23/08    HORNING CONSTRUCTIOL LLC            
                                                            301-010        16,198                  01/03/08   04/08/08    HORNING CONSTRUCTION                
                                                            301-011        16,198                  01/03/08   04/08/08    HORNING CONSTRUCTION                
                                                            301-012         4,853                  01/03/08   01/23/08    HORNING CONSTRUCTION                
                                                            301-013         4,647                  01/03/08   01/23/08    HORNING CONSTRUCTION                
                                                            301-014        10,422                  01/03/08   01/23/08    HORNING CONSTRUCTION                
                                                            301-015        11,508                  03/10/08   03/19/08    Horning Construction, LLC.          
                                                            301-016        10,059                  01/03/08   09/29/08    HORNING CONSTRUCTION LLC            
                                                            301-017         8,789                  01/03/08   01/24/08    HORNING CONSTRUCTION LLC            
                                                            301-018        12,334                  01/29/08   03/08/08    HORNING CONSTRUCTION LLC            
                                                            301-019         8,159                  01/29/08   08/05/08    HORNING CONSTRUCTION INC.           
                                                            301-020         4,240                  03/10/08   03/19/08    Horning Construction, LLC.          
                                                            301-021        11,163                  03/10/08   03/19/08    Horning Construction LLC.           
                                                            301-022         5,234                  03/10/08   03/19/08    Horning Construction, LLC           
                                                            301-023        12,127                  03/10/08   03/19/08    Horning Construction, LLC           
                                                            301-024        14,397                  03/10/08   03/19/08    Horning Construction, LLC           
                                                            301-025        10,833                  03/10/08   04/11/08    Horning Construction, LLC           
                                                            301-026        15,504                  03/28/08   04/02/08    HORNING CONSTRUCTION LLC.           
                                                            301-027         6,880                  05/21/08   09/29/08    Horning Construction LLC            
                                                            301-028        18,817                  05/21/08   09/29/08    Horning Construction LLC            
                                                            301-029         4,548                  05/21/08   09/29/08    Horning Construction LLC            
                                                            301-030        14,066                  09/23/08   11/06/08    HORNING CONSTRUCTION LLC            
                                                            301-031        10,226                  06/18/08   08/26/08    HORNING CONSTRUCTION INC.           
                                                            301-032          -458                  06/18/08   08/26/08    HORNING CONSTRUCTION                
                                                            301-034        75,238                  02/24/09   04/03/09    HORNING CONSTRUCTION LLC            
                                                            301-036        14,896                  09/22/08   10/24/08    HORNING CONSTRUCTIN LLC             
                                                            301-037        15,352                  09/22/08   10/24/08    HORNING CONSTRUCTION, LLC.          
                                                            301-039       -26,039                  11/05/08   12/02/08    HORNING CONSTRUCTION LLC            
                                                            301-040         2,760                  01/12/09   03/30/09    HORNING CONSTRUCTION LLC            
                                                            301-041        14,367                  01/12/09   06/16/09    HORNING CONSTRUCTION LLC            
                                                            301-042        13,142                  01/12/09   06/16/09    HORNING CONSTRUCTION LLC            
                                                            301-045        12,709                  01/16/09   04/03/09    HORNING CONSTRUCTION LLC            
                                                            301-046         1,489                  01/16/09   06/08/09    HORNING CONSTRUCTION LLC            
                                                            301-049        -1,282                  05/04/09   07/28/09    HORNING CONSTRUCTION LLC            
                                                            304 -004        2,236                  11/06/07   01/16/08    FREY & CAMPBELL INC                 
                                                            304-005         5,224                  05/21/08   05/11/09    Frey & Campbell                     
                                                            304-006         2,513                  05/21/08   09/29/08    Frey & Campbell Inc.                
                                                            304-007         2,654                  05/21/08   05/11/09    Frey & Campbell Inc.                
                                                            304-008         8,515                  06/18/08   06/18/09    FREY & CAMPBELL INC                 
                                                            304-009         5,166                  11/05/08   03/02/09    FREY & CAMPBELL INC.                
                                                            304-01          1,716                  10/22/07   10/26/07    FREY & CAMPBELL INC                 
                                                            304-02         12,340                  10/22/07   10/26/07    FREY & CAMPBELL INC                 
                                                            305 -004       18,127                  01/03/08   08/05/08    FREY & CAMPBELL INCORPORATED        
                                                            305 -005        2,588                  01/03/08   08/05/08    FREY & CAMPBELL INCORPORATED        
                                                            305-001        11,832                  10/22/07   10/26/07    FREY & CAMPBELL INC                 
                                                            305-002         1,296                  10/22/07   01/28/08    FREY & CAMPBELL INC                 
                                                            305-003         5,509                  01/03/08   04/09/08    FREY & CAMPBELL INC                 
                                                            305-006         3,186                  04/18/08   01/27/09    FREY & CAMPBELL INC.                
                                                            305-007         1,912                  05/21/08   05/11/09    Frey & Campbell Inc.                
                                                            305-008        13,102                  05/21/08   03/02/09    Frey & Campbell Inc.                
                                                            305-009         1,694                  01/28/09   04/23/09    FREY CAMPBELL INC.                  
                                                            306 -006        1,403                  01/03/07   08/05/08    BILLITIER ELECTRIC, INCORPORATED    
                                                            306 -007        3,131                  01/03/08   08/05/08    BILLITIER ELECTRIC, INCORPORATED    
                                                            306-001         4,047                  10/22/07   01/28/08    BILLITIER ELECTRIC INC              
                                                            306-003         6,094                  10/22/07   01/28/08    BILLITIER ELECTRIC, INC             
                                                            306-004         1,465                  10/22/07   01/17/08    BILLITER ELECTRIC .INC              
                                                            306-005         6,207                  10/29/07   03/06/09    Billitier Electric                  
                                                            306-005         6,207                  11/25/08   05/15/09    BILLITIER ELECTRIC, INC.            
                                                            306-009         4,291                  03/10/08   03/15/08    Billitier Electric, Inc.            
                                                            306-010         4,643                  05/21/08   07/09/09    Billitier Electric, Inc.            
                                                            306-011         1,607                  05/21/08   03/02/09    Billitier Electric, Inc.            
                                                            306-012         2,398                  08/14/08   05/11/09    BILLITIER ELECTRIC, INC.            
                                                            306-013         4,485                  08/14/08   08/04/09    BILLITIER ELECTRIC, INC.            
                                                            306-014         7,058                  01/12/09   03/11/09    BILLITIER ELECTRIC, INC.            
                                                            306-015         1,191                  01/28/09   05/11/09    BILLITIER ELECTRIC, INC.            
                                                            306-019           490                  02/24/09   06/09/09    BILLITIER ELECTRIC, INC.            
                                                            306-021         2,014                  05/04/09   07/31/09    BILLITIER ELECTRIC INC              
                                                            307-001         4,600                  10/22/07   10/26/07    JUPITER ENVIRONMENTAL SERVICES INC  
                                                            308-001        16,100                  01/03/08   01/23/08    NICKERSON CORPORATION               
                                                            308-002        10,132                  01/03/08   03/19/08    NICKERSON CORP                      
                                                            308-003         2,814                  10/22/07   10/26/07    NICKERSON CORPORATION               
                                                            308-004         4,722                  08/14/08   08/26/08    NICKERSON CORPORATION               
                                                            308-005        15,533                  09/22/08   10/27/08    NICKERSON CORPORATION               
                                                            308-006        15,210                  08/14/08   08/26/08    NICKERSON CORPORATION               
 
07-1010   Additions and Alterations    0-002-009  04/17/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            401-001        12,161                  01/12/09   03/30/09    STREETER ASSOCIATES                 
                                                            401-002         4,563                  01/12/09   04/17/09    STREETER ASSOCIATES                 
                                                            401-003         3,466                  02/24/09   04/13/09    STREETER ASSOCIATES                 
                                                            401-004         3,727                  02/24/09   04/13/09    STREETER ASSOCIATES                 
                                                            401-005         2,899                  03/31/09   07/03/09    STREETER ASSOICATES                 
                                                            401-006        11,083                  05/04/09   07/28/09    STREETER ASSOCIATES                 
                                                            401-007        14,659                  05/19/09   07/30/09    STREETER ASSOCIATES                 
                                                            401-008       -46,266                  05/26/09   07/15/09    STREETER ASSOCIATES                 
                                                            401-009         9,545                  07/22/09   08/24/09    STREETER ASSOCIATES INC             
                                                            404-001        -2,983                  11/05/08   12/12/08    FREY & CAMPBELL INC.                
                                                            404-002         1,113                  02/24/09   04/13/09    FREY & CAMPBELL INC.                
                                                            405-001        10,495                  11/05/08   12/02/08    FREY & CAMPBELL INC.                
                                                            405-002         2,490                  01/28/09   04/03/09    FREY & CAMPBELL INC.                
                                                            405-003         5,288                  03/31/09   07/03/09    FREY & CAMPBELL INC.                
                                                            405-004         7,448                  05/04/09   08/05/09    FREY & CAMPBELL INC                 
                                                            406-001         1,220                  12/02/08   06/16/09    BILLITIER ELECTRIC INC.             
                                                            406-002         1,576                  01/16/09   02/26/09    BILLITIER ELECTRIC INC.             
                                                            406-003        -2,453                  03/31/09   07/03/09    BILLITIER ELECTRIC, INC.            
                                                            406-004         1,659                  04/20/09   08/04/09    BILLITIER ELECTRIC INC.             
                                                            406-005       -29,689                  04/20/09   08/04/09    BILLITIER ELECTRIC INC.             
                                                            406-006       -52,551                  05/19/09   08/07/09    BILLITIER ELECTRIC INC              
                                                            406-007        10,844                  05/19/09   08/07/09    BILLITIER ELECTRIC INC              
                                                            406-008        -5,492                  05/26/09   11/12/09    BILLITIER ELECTRIC INC              
                                                            406-009        15,322                  07/22/09   11/12/09    BILLITIER ELECTRIC                  
                                                            406-010         2,753                  07/22/09   11/12/09    BILLITIER ELECTRIC                  
                                                            407-001        -1,040                  01/28/09   04/03/09    ENVIRONMENTAL REMEDIATION SERVICES, 
                                                            407-002         8,921                  05/19/09   07/22/09    ENVIRONMENTAL REMEDIATION SERVICES  
 

          South Annex:
91-1563   Reconstruction               0-004-001  07/14/92  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Maintenance:
90-0943   Reconstruction               5-011-003  02/14/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0301   Reconstruction               5-011-004  10/22/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1381   Reconstruction               5-011-005  10/15/00  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0159   Additions and Alterations    5-011-006  01/22/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            301-003        12,420                  10/22/07   10/26/07    HORNING CONSTRUCTION LLC            
                                                            301-006        18,114                  11/26/07   12/12/07    Horning construction                
                                                            301-033        14,219                  08/14/08   08/26/08    HORNING CONSTRUCTION LLC            
                                                            301-035         8,688                  09/22/08   10/24/08    HORNING CONSTRUCTIN LLC             
                                                            301-038         4,251                  11/05/08   12/12/08    HORNING CONSTRUCTION LLC            
                                                            301-043        12,693                  01/12/09   06/16/09    HORNING CONSTRUCTION LLC            
                                                            301-044         8,125                  01/12/09   06/16/09    HORNING CONSTRUCTION LLC            
                                                            304-003         3,453                  10/22/07     /  /      FREY & CAMPBELL INC                 
                                                            304-003         3,453                  06/06/08   12/16/08    Frey & Campbell                     
                                                            304-010         1,532                  01/28/09   07/07/09    FREY & CAMPBELL INC.                
                                                            304-011         4,602                  05/26/09   07/15/09    FREY & CAMPBELL INC                 
                                                            304-047         6,261                  02/24/09   04/03/09    HORNING CONSTRUCTION LLC            
                                                            305-010           350                  05/04/09   07/31/09    FREY & CAMPBELL INC                 
                                                            306 -008        2,623                  01/03/08   08/05/08    BILLITIER ELECTRIC, INCORPORATED    
                                                            306-002         2,105                  10/22/07   01/28/08    BILLITIER ELECTRIC, INC             
                                                            306-016         1,024                  01/28/09   07/07/09    BILLITIER ELECTRIC, INC.            
                                                            306-017         9,222                  02/24/09   06/09/09    BILLITIER ELECTRIC, INC.            
                                                            306-018         2,558                  02/24/09   06/09/09    BILLITIER ELECTRIC, INC.            
                                                            306-020        -2,087                  02/24/09   06/09/09    BILLITIER ELECTRIC, INC.            
 





BATH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-03-02-06
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Dana L Lyon Elementary:
90-0636   Reconstruction               0-004-003  01/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0558   Reconstruction               0-004-004  03/23/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0393   Reconstruction               0-004-005  11/24/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          Haverling Jr/Sr High:
90-0637   Reconstruction               0-006-006  01/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1014   Reconstruction               0-006-007  04/16/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0594   Additions and Alterations    0-006-009  05/10/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-19            2,574                  01/24/02   03/04/02    LeChase Construction                
                                                            1-22            7,990                  03/15/02   04/19/02    LeChase Construction                
                                                            1-24           17,526                  03/15/02   04/19/02    LeChase Construction                
                                                            1-25           17,334                  03/15/02   04/19/02    LeChase Construction                
                                                            1-26            7,794                  04/12/02   04/25/02    LeChase Construction                
                                                            1-27           15,611                  04/26/02   05/17/02    LeChase Construction                
                                                            1-28           11,187                  04/26/02   05/17/02    LeChase Construction                
                                                            1-29            4,088                  04/19/02   05/17/02    LeChase Construction                
                                                            1-30           17,580                  05/23/02   07/15/02    LeChase Construction                
                                                            1-32           17,446                  05/23/02   06/05/02    LeChase Construction                
                                                            1-33           12,419                  05/23/02   06/04/02    LeChase Construction                
                                                            1-34           12,893                  05/23/02   06/05/02    LeChase Construction                
                                                            1-35           12,937                  06/19/02   07/12/02    LeChase Construction                
                                                            1-36           10,709                  06/19/02   07/12/02    LeChase Construction                
                                                            1-37            4,457                  07/03/02   07/15/02    LeChase Construction                
                                                            1-38            1,519                  08/02/02   08/16/02    LeChase Construction                
                                                            1-39           15,826                  08/27/02   09/06/02    LeChase Construction                
                                                            1-40           16,887                  10/17/02   12/02/02    LeChase Construction                
                                                            1-41           19,888                  11/20/02   01/02/03    LeChase Construction                
                                                            1-42           18,289                  10/17/02   12/02/02    LeChase Construction                
                                                            1-43           17,497                  10/17/02   12/02/02    LeChase Construction                
                                                            1-44            6,426                  11/20/02   01/02/03    LeChase Construction                
                                                            1-45           17,142                  11/20/02   01/02/03    LeChase Construction                
                                                            1-46            2,527                  11/20/02   01/02/03    LeChase Construction                
                                                            1-47            5,413                  11/20/02   01/02/03    LeChase Construction                
                                                            1-48           18,666                  02/10/03   02/14/03    LeChase Construction                
                                                            1-49            3,066                  09/09/03   09/19/03    LeChase Construction                
                                                            1-5            -3,116                  08/06/01   01/08/02    LeChase Construction                
                                                            1-50            8,181                  09/09/03   09/19/03    LeChase Construction                
                                                            1-51           14,050                  09/09/03   09/19/03    LeChase Construction                
                                                            1-52            7,263                  09/09/03   09/19/03    LeChase Construction                
                                                            1-53           16,598                  09/09/03   09/19/03    LeChase Construction                
                                                            1-54           15,899                  09/09/03   09/19/03    LeChase Construction                
                                                            1-55           19,084                  09/09/03   09/19/03    LeChase Construction                
                                                            1-56           10,313                  09/09/03   09/19/03    LeChase Construction                
                                                            1-56           16,779                  03/05/04   03/17/04    LeChase Construction                
                                                            10-11          14,880                  03/15/02   04/19/02    Cashette Electric                   
                                                            10-12           4,008                  04/12/02   04/25/02    Cashette Electric                   
                                                            10-13          10,167                  04/12/02   04/26/02    Cashette Electric                   
                                                            10-14          -2,266                  04/26/02   05/07/02    Cashette Electric                   
                                                            10-15          19,894                  06/19/02   07/12/02    Cashette Electric                   
                                                            10-17           8,122                  07/03/02   07/15/02    Cashette Electric                   
                                                            10-18           9,571                  08/02/02   08/16/02    Cashette Electric                   
                                                            10-19           3,392                  08/27/02   09/05/02    Cashette Electric                   
                                                            10-20           6,871                  09/26/02   11/01/02    Cashette Electric                   
                                                            10-21          10,018                  10/15/02   12/02/02    Cashette Electric                   
                                                            10-22           7,556                  11/20/02   01/03/03    Cashette Electric                   
                                                            10-23          11,829                  11/20/02   01/03/03    Cashette Electric                   
                                                            10-24          19,513                  11/20/02   01/03/03    Cashette Electric                   
                                                            10-25          16,246                  11/20/02   01/03/03    Cashette Electric                   
                                                            10-26          13,280                  11/20/02   01/03/03    Cashette Electric                   
                                                            10-27REV        1,824                  03/10/03   03/18/03    Cashette Electric                   
                                                            10-28          18,376                  03/10/03   03/18/03    Cashette Electric                   
                                                            10-29           4,540                  03/10/03   03/18/03    Cashette Electric                   
                                                            10-30           6,869                  03/10/03   03/18/03    Cashette Electric                   
                                                            10-31           7,542                  04/29/03   05/05/03    Cashette Electric                   
                                                            10-32          11,387                  06/24/03   06/30/03    Cashette Electric                   
                                                            10-33          14,138                  06/24/03   06/30/03    Cashette Electric                   
                                                            10-34          10,933                  06/24/03   06/30/03    Cashette Electric                   
                                                            10-35           9,999                  06/24/03   06/30/03    Cashette Electric                   
                                                            10-36          14,448                  06/24/03   06/30/03    Cashette Electric                   
                                                            10-37           3,800                  04/23/04   04/28/04    Cashette Electric                   
                                                            10-38           3,716                  04/23/04   04/28/04    Cashette electric                   
                                                            10-4              496                  08/29/01   01/29/02    Cashette Electric                   
                                                            10-9            2,972                  01/24/02   03/04/02    Cashette Electric                   
                                                            11-1          -61,050                  02/10/03   02/14/03    Sound & Communications Div.         
                                                            11-2          -23,175                  06/24/03   06/30/03    Sound & Communications Div.         
                                                            12-10           2,902                  04/12/02   04/25/02    Frey & Campbell                     
                                                            12-11           8,886                  04/12/02   04/25/02    Frey & Campbell                     
                                                            12-12          19,312                  04/12/02   04/25/02    Frey & Campbell                     
                                                            12-13          18,798                  04/19/02   05/07/02    Frey & Campbell                     
                                                            12-14          12,455                  07/03/02   07/15/02    Frey & Campbell                     
                                                            12-15           3,575                  08/27/02   09/05/02    Frey & Campbell                     
                                                            12-16          12,115                  09/26/02   11/01/02    Frey & Campbell                     
                                                            12-17          10,872                  10/17/02   12/02/02    Frey & Campbell                     
                                                            12-18           3,391                  10/17/02   12/02/02    Frey & Campbell                     
                                                            12-19          17,139                  03/10/03   03/19/03    Frey & Campbell                     
                                                            12-20          15,286                  03/10/03   03/19/03    Frey & Campbell                     
                                                            12-21           1,911                  03/10/03   03/19/03    Frey & Campbell                     
                                                            12-22           1,200                  03/10/03   03/18/03    Frey & Campbell                     
                                                            12-23          10,960                  04/29/03   05/05/03    Frey & Campbell                     
                                                            12-24           5,349                  06/24/03   06/30/03    Frey & Campbell                     
                                                            12-25           4,316                  06/24/03   06/30/03    Frey & Campbell                     
                                                            12-5           17,247                  10/02/01   01/08/02    Frey & Campbell                     
                                                            12-9            2,816                  03/15/02   04/19/02    Frey & Campbell                     
                                                            13-1            3,290                  06/19/02   07/12/02    Patterson Stevens                   
                                                            13-2            9,950                  07/03/02   07/15/02    Patterson Stevens                   
                                                            13-3            3,167                  02/10/03   02/14/03    Patterson-Stevens                   
                                                            13-5            4,129                  07/01/03   07/07/03    Patterson Stevens                   
                                                            13-6            2,444                  04/23/04   04/30/04    Patterson Stevens                   
                                                            14-2           14,507                  09/26/02   11/01/02    Kleen All of America                
                                                            14-3           19,167                  02/18/03   02/26/03    Kleen All of America                
                                                            14-4           18,747                  02/18/03   02/26/03    Kleen All of America                
                                                            14-5           15,832                  02/18/03   02/26/03    Kleen All of America                
                                                            14-6           19,851                  02/18/03   02/26/03    Kleen All of America                
                                                            14-7           19,413                  02/18/03   02/25/03    Kleen All of America                
                                                            14-8            9,570                  04/29/03   05/05/03    Kleen All of America                
                                                            16-1            5,754                  02/10/03   02/14/03    Burns Elec.                         
                                                            2-1             5,000                  03/15/02   04/19/02    Amthor Steel                        
                                                            2-14           -5,780                  04/29/03   05/05/03    Suite Kote Contracting              
                                                            2-2             5,606                  05/09/02   06/04/02    Amthor Steel                        
                                                            2-3             9,929                  08/02/02   08/16/02    Amthor Steel                        
                                                            2-5            18,813                  11/06/03   11/13/03    Amthor Steel                        
                                                            2-6            -1,500                  03/26/04   04/12/04    Amother Steel                       
                                                            3-10           11,228                  06/19/02   07/12/02    Hakes Const.                        
                                                            3-11           19,900                  06/19/02   07/12/02    Hakes Const.                        
                                                            3-12            7,521                  08/02/02   08/16/02    Hakes Const.                        
                                                            3-13           13,193                  08/27/02   09/05/02    Hakes Const.                        
                                                            3-14           19,505                  09/26/02   11/01/02    Hakes Const.                        
                                                            3-15           19,893                  09/26/02   11/01/02    Hakes Const.                        
                                                            3-16           19,961                  09/26/02   11/01/02    Hakes Const.                        
                                                            3-18           16,146                  10/15/02   12/02/02    Hakes Const.                        
                                                            3-19          -13,589                  11/05/02   12/02/02    Hakes Const.                        
                                                            3-2            21,231                  10/02/01   01/08/02    Hakes Const.                        
                                                            3-20            4,042                  02/10/03   02/14/03    Hakes Const.                        
                                                            3-21            3,798                  09/09/03   09/19/03    Hakes Const.                        
                                                            3-22           -3,520                  04/23/04   04/28/04    Hakes Const.                        
                                                            3-3            24,439                  10/02/01   01/08/02    Hakes Const.                        
                                                            3-7             1,533                  03/15/02   04/19/02    Hakes Const.                        
                                                            3-8            15,929                  03/28/02   04/26/02    Hakes Const.                        
                                                            3-9             5,527                  04/12/02   04/25/02    Hakes Const.                        
                                                            4-10            5,930                  04/29/03   05/05/03    McLaughlin Roofing                  
                                                            4-11            3,097                  04/29/03   05/05/03    McLaughlin Roofing                  
                                                            4-12            1,199                  08/11/03   09/05/03    McLaughlin Roofing                  
                                                            4-13            2,357                  06/24/03   06/30/03    McLaughlin Roofing                  
                                                            4-2              -529                  11/06/01   02/08/02    McLaughlin Roofing                  
                                                            4-4            -4,254                  04/12/02   04/25/02    McLaughlin Roofing                  
                                                            4-5             3,774                  06/19/02   07/12/02    McLaughlin Roofing                  
                                                            4-6             4,510                  08/27/02   09/05/02    McLaughlin Roofing                  
                                                            4-7            10,393                  10/15/02   12/02/02    McLaughlin Roofing                  
                                                            4-8             7,981                  11/20/02   01/03/03    McLaughlin Roofing                  
                                                            4-9            16,189                  02/18/03   02/26/03    McLaughlin Roofing                  
                                                            4693              959                  10/24/02     /  /      McLaughlin Roofing                  
                                                            5-3             3,240                  04/26/02   05/17/02    Cortland Glass                      
                                                            5-4             3,922                  07/03/02   07/15/02    Cortland Glass                      
                                                            5-5             3,439                  10/17/02   12/02/02    Cortland Glass                      
                                                            5-6             3,602                  10/24/02   12/02/02    Cortland Glass                      
                                                            5-7               850                  03/27/03   04/03/03    Cortland Glass                      
                                                            5-8               925                  04/29/03   05/05/03    Cortland Glass                      
                                                            5-9            -3,000                  06/24/03   06/30/03    Cortland Glass                      
                                                            6-1             9,062                  10/02/01   01/08/02    John C. Lowery                      
                                                            6-10            4,099                  11/20/02   01/03/03    John C. Lowery                      
                                                            6-11           19,135                  11/20/02   01/02/03    John C. Lowery                      
                                                            6-12           19,947                  11/20/02   01/02/03    John C. Lowery                      
                                                            6-13           10,187                  03/10/03   03/18/03    John C. Lowery                      
                                                            6-14           13,391                  03/10/03   03/18/03    John C. Lowery                      
                                                            6-15            1,106                  04/29/03   05/05/03    John C. Lowery                      
                                                            6-16            2,962                  04/29/03   05/05/03    John C. Lowery                      
                                                            6-17            8,072                  06/24/03   06/30/03    John C. Lowery                      
                                                            6-18           13,288                  06/24/03   06/30/03    John C. Lowery                      
                                                            6-19            9,083                  07/17/03   07/24/03    John C. Lowery                      
                                                            6-20            8,413                  09/09/03   11/04/03    John C. Lowery                      
                                                            6-5             3,986                  04/12/02   04/25/02    John C. Lowery                      
                                                            6-6            10,600                  05/09/02   06/04/02    John C. Lowery                      
                                                            6-7             7,703                  08/02/02   08/16/02    John C. Lowery                      
                                                            6-8             8,101                  10/17/02   12/02/02    John C. Lowery                      
                                                            6-9             8,945                  10/24/02   12/02/02    John C. Lowery                      
                                                            7-2             6,400                  12/21/01   03/25/02    KSP Painting                        
                                                            7-4            13,620                  08/27/02   09/05/02    KSP Painting                        
                                                            7-5             4,000                  10/17/02   12/02/02    KSP Painting                        
                                                            7-6             6,312                  07/17/03   07/24/03    KSP Painting                        
                                                            7-7             5,276                  09/09/03   09/19/03    KSP Painting                        
                                                            7-8             2,700                  12/20/04   12/28/04    KSP Painting                        
                                                            8-1            18,600                  08/06/01   01/08/02    Jason Mfg.                          
                                                            8-2            -6,743                  05/09/02   06/04/02    Jason Mfg.                          
                                                            8-3             5,290                  11/20/02   01/03/03    Jason Mfg.                          
                                                            8-4             4,655                  03/27/03   04/03/03    Jason Mfg.                          
                                                            8-5                 0                  06/24/03   06/30/03    Jason Mfg.                          
                                                            9-10            3,153                  03/28/02   04/26/02    Ferrauilo Plumbing                  
                                                            9-11            2,737                  04/12/02   04/25/02    Ferrauilo Plumbing                  
                                                            9-12            7,526                  04/26/02   05/07/02    Ferrauilo Plumbing                  
                                                            9-14            3,687                  07/03/02   07/15/02    Ferrauilo Plumbing                  
                                                            9-15            9,962                  08/02/02   01/07/03    Ferrauilo Plumbing                  
                                                            9-16           11,734                  08/27/02   09/05/02    Ferrauilo Plumbing                  
                                                            9-17            9,046                  09/26/02   11/01/02    Ferrauilo Plumbing                  
                                                            9-20            5,078                  03/27/03   04/03/03    Ferrauilo Plumbing                  
                                                            9-21             -575                  03/10/03   03/18/03    Ferrauilo Plumbing                  
                                                            9-22           10,218                  03/10/03   03/18/03    Ferrauilo Plumbing                  
                                                            9-23            7,955                  04/29/03   05/05/03    Ferrauilo Plumbing                  
                                                            9-24            7,511                  06/24/03   06/30/03    Ferrauilo Plumbing                  
                                                            9-25           17,892                  06/24/03   06/30/03    Ferrauilo Plumbing                  
                                                            9-26           10,259                  06/24/03   06/30/03    Ferrauilo Plumbing                  
                                                            9-27            7,428                  09/09/03   09/19/03    Ferrauilo Plumbing                  
                                                            9-29            2,887                  11/06/03   11/13/03    Ferrauilo Plumbing                  
                                                            9-8             4,314                  01/24/02   03/04/02    Ferrauilo Plumbing                  
                                                            9-9             4,075                  03/15/02   04/19/02    Ferrauilo Plumbing                  
 
03-0757FP Reconstruction               0-006-FP1  12/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Wightman Primary:
99-0595   Additions and Alterations    0-007-004  05/10/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               7,497                  04/30/01   02/06/02    LeChase Const.                      
                                                            1-10            1,044                  10/02/01   01/08/02    LeChase Const.                      
                                                            1-11            2,374                  10/02/01   01/08/02    LeChase Const.                      
                                                            1-12            3,847                  10/02/01   01/08/02    LeChase Const.                      
                                                            1-13              802                  10/10/01   02/11/02    LeChase Const.                      
                                                            1-14              468                  11/15/01   02/08/02    LeChase Const.                      
                                                            1-15           10,942                  11/06/01   02/08/02    LeChase Const.                      
                                                            1-16            4,695                  12/04/01   01/13/03    LeChase Const.                      
                                                            1-17           16,296                  02/24/02   03/04/02    LeChase Const.                      
                                                            1-18            6,235                  02/24/02   03/04/02    LeChase Const.                      
                                                            1-20            5,014                  02/24/02   03/04/02    LeChase Const.                      
                                                            1-21            8,796                  02/19/02   04/01/02    LeChase Const.                      
                                                            1-23            6,723                  03/15/02   04/19/02    LeChase Const.                      
                                                            1-31           12,182                  05/23/02   06/04/02    LeChase Const.                      
                                                            1-40           16,887                  11/05/02   12/02/02    LeChase Const.                      
                                                            1-6            -6,600                  08/29/01   01/15/02    LeChase Const.                      
                                                            1-7               863                  10/02/01   01/08/02    LeChase Const.                      
                                                            1-8             5,623                  10/02/01   01/08/02    LeChase Const.                      
                                                            1-9             2,208                  10/02/01   01/08/02    LeChase Const.                      
                                                            10-10           9,894                  02/19/02   04/01/02    Cashette Elec.                      
                                                            10-16           9,539                  06/19/02   07/12/02    Cashette Elec.                      
                                                            10-5              570                  10/02/01   01/08/02    Cashette Elec.                      
                                                            10-6            2,578                  10/10/01   02/11/02    Cashette Elec.                      
                                                            10-7            1,051                  10/10/01   02/11/02    Cashette Elec.                      
                                                            12-4            3,948                  08/29/01   01/29/02    Frey & Campbell                     
                                                            12-7           18,087                  11/06/01   02/08/02    Frey & Campbell                     
                                                            12-8            1,580                  12/21/01   03/08/02    Frey & Campbell                     
                                                            3-5            12,009                  11/15/01   02/08/02    Hakes Const.                        
                                                            3-6            10,470                  11/19/01   02/11/02    Hakes Const.                        
                                                            4-1           -22,852                  11/06/01   02/08/02    McLaughlin Roofing                  
                                                            4-14            7,543                  09/25/03   10/03/03    McLaughlin Roofing                  
                                                            4-3             3,297                  02/19/02   04/01/02    McLaughlin Roofing                  
                                                            5-1             1,506                  08/29/01   01/15/02    Cortland Glass                      
                                                            5-10           -1,500                  06/24/03   06/30/03    Cortland Glass                      
                                                            6-2             1,765                  10/10/01   02/11/02    John Lowery                         
                                                            6-4             2,705                  01/24/02   03/04/02    John Lowery                         
                                                            7-1             3,400                  12/04/01   01/13/03    KSP Painting                        
                                                            7-3             8,800                  04/19/02   05/07/02    KSP Painting                        
                                                            9-13            2,743                  06/19/02   07/12/02    Ferrauilo Plumbing                  
                                                            9-18           13,833                  09/26/02   11/01/02    Ferrauilo Plumbing                  
                                                            9-19            2,457                  11/20/02   01/02/03    Ferrauilo Plumbing                  
                                                            9-2             1,445                  10/02/01   01/08/02    Ferrauilo Plumbing                  
                                                            9-28              808                  09/09/03   09/19/03    Ferrauilo Plumbing                  
                                                            9-3               891                  10/10/01   02/11/02    Ferrauilo Plumbing                  
                                                            9-5             9,213                  11/06/01   01/29/02    Ferrauilo Plumbing                  
                                                            9-6             2,668                  11/19/01   02/11/02    Ferrauilo Plumbing                  
                                                            9-7             2,381                  02/24/02   03/25/02    Ferrauilo Plumbing                  
 
09-0031   Reconstruction               0-007-008  09/24/09  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2202FP Reconstruction               0-007-FP1  08/06/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Athletic Storage Building:
94-0217   New Construction             2-015-001  10/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage Maintenance:
00-0282   Reconstruction               5-009-001  01/30/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-1             1,734                  10/10/01   02/26/02    R Hyland & Son                      
                                                            1-10            8,282                  04/26/02   05/30/02    R Hyland & Son                      
                                                            1-11           10,063                  05/15/02   05/24/02    R Hyland & Son                      
                                                            1-12            1,432                  06/19/02   08/15/02    R Hyland & Son                      
                                                            1-13            1,236                  06/19/02   08/15/02    R Hyland & Son                      
                                                            1-16           13,887                  12/06/02   01/02/03    R Hyland & Son                      
                                                            1-17            5,161                  10/17/02   11/07/02    R Hyland & Son                      
                                                            1-18           10,401                  02/10/03   02/27/03    R Hyland & Son                      
                                                            1-19           11,144                  02/10/03   02/27/03    R Hyland & Son                      
                                                            2-10           -2,757                  04/12/02   05/24/02    Suite Kote Contracting              
                                                            2-12           12,771                  12/06/02   01/02/03    Suite Kote Contracting              
                                                            2-13            5,406                  10/17/02   11/07/02    Suite Kote Contracting              
                                                            2-9             3,675                  03/28/02   05/24/02    Suite Kote Contracting              
                                                            4-10           11,007                  06/19/02   08/15/02    Burns Elec.                         
                                                            4-12           -3,079                  01/29/03   02/04/03    Burns Elec.                         
                                                            4-4             3,627                  10/10/01   01/10/03    Burns Elec.                         
                                                            4-7            16,946                  03/28/02   05/24/02    Burns Elec.                         
                                                            4-8             1,568                  05/15/02   05/24/02    Burns Elec.                         
                                                            4-9             4,424                  06/19/02   08/15/02    Burns Elec.                         
                                                            5-7             7,710                  06/19/02   08/15/02    Frey & Campbell                     
                                                            5-8            16,652                  04/28/03   05/05/03    Frey & Campbell                     
 

          New Bus Garage & Maintenance Facilit:
00-0283   New Construction             5-017-001  01/30/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-14           17,602                  08/02/02   08/16/02    R Hyland & Son                      
                                                            1-15           13,971                  08/02/02   08/16/02    R Hyland & Son                      
                                                            1-2             6,900                  10/10/01   02/26/02    R Hyland & Son                      
                                                            1-3            12,120                  10/30/01   01/09/03    R Hyland & Son                      
                                                            1-4             7,924                  11/19/01   05/22/02    R Hyland & Son                      
                                                            1-5            12,244                  01/24/02   05/13/02    R Hyland & Son                      
                                                            1-6            12,190                  01/24/02   05/13/02    R Hyland & Son                      
                                                            1-7             1,781                  01/24/02   05/13/02    R Hyland & Son                      
                                                            1-8            10,550                  03/07/02   04/04/02    R Hyland & Son                      
                                                            1-9             1,833                  04/12/02   05/28/02    R Hyland & Son                      
                                                            2-11            8,635                  05/23/02   05/29/02    Suit Kote Contracting               
                                                            2-4                 0                  10/02/01   01/14/03    Suit-Kote Contracting               
                                                            2-6            10,215                  11/19/01   05/22/02    Suit-Kote Contracting               
                                                            2-7               813                  01/24/02   05/13/02    Suit-Kote Contracting               
                                                            2-8            -4,002                  01/24/02   05/13/02    Suit-Kote                           
                                                            4-11            7,308                  08/02/02   08/16/02    Burns Elec.                         
                                                            4-3             5,422                  01/24/02   05/13/02    Burns Elec.                         
                                                            4-5             2,321                  10/30/01   01/09/03    Burns Elec.                         
                                                            4-6            15,133                  03/07/02   04/04/02    Burns Elec.                         
                                                            5-2             1,298                  12/21/01   03/29/02    Frey & Campbell                     
                                                            5-3             2,335                  01/24/02   05/13/02    Frey & Campbell                     
                                                            5-4             8,561                  01/24/02   05/13/02    Frey & Campbell                     
                                                            5-5             2,004                  01/24/02   05/13/02    Frey & Campbell                     
                                                            5-6            12,983                  04/12/02   05/24/02    Frey & Campbell                     
 

          Soccer Field Press Box:
90-0688   New Construction             7-013-001  01/17/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          House/site purchase 41 Robie Street:
99-0196   New Construction             7-018-001  11/09/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession Stand:
02-0051   New Construction             7-019-001  11/07/02  NO CHANGE ORDERS ON ELECTRONIC FILE





BRADFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-04-01-04
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          K-12:
92-1340   Reconstruction               0-001-002  07/13/93  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0128   Additions and Alterations    0-001-003  11/16/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            5               2,268                  05/24/02   05/28/02    RC Daniel                           
                                                            AV-1            9,250                  09/20/01   02/07/02    Delaware AV Dist.                   
                                                            AV-2            6,036                  09/20/01   02/07/02    Delaware AV Dist.                   
                                                            C-1               359                  05/24/02   05/28/02    O'Connell Elec.                     
                                                            C-2             2,646                  05/24/02   05/28/02    O'Connell Elec.                     
                                                            C-3             3,282                  05/24/02   05/28/02    O'Connell Elec.                     
                                                            E-18              849                  08/03/01   01/30/02    RC Daniel                           
                                                            E-20           15,890                  05/24/02   05/28/02    RC Daniel                           
                                                            E-20           15,890                  08/15/01   01/14/03    RC Daniel                           
                                                            E-21            4,000                  02/22/02   04/01/02    RC Daniel                           
                                                            E-22            4,563                  05/24/02   05/28/02    RC Daniel                           
                                                            E-7               639                  05/24/02   05/28/02    RC Daniel                           
                                                            G-1             2,599                  05/24/02   05/28/02    Keuka Const.                        
                                                            G-2               693                  05/24/02   05/28/02    Keuka Const.                        
                                                            G-3             2,181                  05/24/02   05/28/02    Keuka Const.                        
                                                            G-4               842                  05/24/02   05/28/02    Keuka Const.                        
                                                            G-8             2,523                  05/24/02   05/28/02    Keuka Const.                        
                                                            G-9               742                  05/24/02   05/28/02    Keuka Const.                        
                                                            H-1             6,610                  08/03/01   01/30/02    Faulks Plumbing                     
                                                            P-1             1,168                  05/24/02   05/28/02    Faulks Plumbing                     
                                                            P-2               750                  08/03/01   01/30/02    Faulks Plumbing                     
                                                            S-1             6,000                  05/24/02   05/28/02    RC Billings                         
 
00-0878   Additions and Alterations    0-001-005  07/17/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1             3,120                  03/04/02   05/23/02    Matco Elec.                         
                                                            E-2             3,737                  03/04/02   05/23/02    Matco Elec.                         
                                                            E-3            13,585                  05/30/02   08/15/02    Matco Elec.                         
                                                            E-4             2,861                  06/13/02   11/04/02    Matco Elec.                         
                                                            E-5             6,895                  09/27/02   11/06/02    Matco Elec.                         
                                                            E-6             9,767                  07/17/03   07/24/03    Matco Elec.                         
                                                            E-7               754                  07/17/03   07/24/03    Matco Elec.                         
                                                            GC-1          -61,100                  06/22/04   06/22/04    Iversen Const.                      
                                                            GC-2            1,403                  02/22/02   03/29/02    Iversen Const.                      
                                                            GC-4            3,873                  06/22/04   06/22/04    Iversen Const.                      
                                                            GC-5           -4,426                  05/31/02   02/13/03    Iversen Const.                      
                                                            GC-6           15,191                  06/13/02   11/04/02    Iversen Const.                      
                                                            GC-7              564                  06/22/04   06/22/04    Iversen Const.                      
                                                            GC-8            7,389                  06/27/02   07/03/02    Iversen Const.                      
                                                            GC-9           18,867                  09/16/02   01/08/03    Iversen Const.                      
                                                            H-1             1,002                  04/09/02   05/23/02    Faulks Plumbing                     
                                                            H-2             7,856                  10/24/02   11/07/02    Faulks Plumbing                     
                                                            P-1             5,782                  02/22/02   03/29/02    Postler and Jaeckle                 
                                                            P-2             1,157                  02/22/02   03/29/02    Postler and Jaeckle                 
                                                            P-3             1,054                  03/04/02   05/23/02    Postler and Jaeckle                 
                                                            P-4             6,213                  06/07/02   11/04/02    Postler and Jaeckle                 
                                                            S-1           -13,800                  12/11/01   03/21/02    Scott's Const.                      
 
07-0542   Reconstruction               0-001-006  03/10/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001         -10,959                  08/25/08   03/09/09    G. O. WICK, INC.                    
                                                            E-002          12,457                  10/27/08   04/14/09    G.O. WICK,INC                       
                                                            E-003           9,846                  11/05/08   02/05/09    G.O. WICK, INC.                     
                                                            E-004           1,995                  04/24/09   07/22/09    G.O. WICK INC                       
                                                            G-001         -50,938                  08/25/08   11/18/08    CONMAS, INC.                        
                                                            G-002            -584                  08/20/08   11/18/08    CONMAS, INC.                        
                                                            G-003          -1,432                  09/08/08   05/12/09    CONMAS, INC.                        
                                                            G-004            -950                  10/27/08   12/02/08    CONMAS,INC                          
                                                            G-006           5,187                  11/07/08   12/02/08    CONMAS, INC.                        
                                                            G-007          -7,942                  10/24/08   11/12/08    CONMAS INC                          
                                                            G-008          -1,620                  02/10/09   05/18/09    CONMAS, INC.                        
                                                            G-009           2,585                  02/10/09   05/18/09    CONMAS, INC.                        
                                                            G-010             754                  03/27/09   07/20/09    CONMAS INC.                         
                                                            G-011           2,806                  03/27/09   07/20/09    CON MAS INC.                        
                                                            G-012          15,608                  03/27/09   07/20/09    CONMAS INC.                         
                                                            G-013             359                  05/04/09   07/30/09    CONMAS INC                          
                                                            G-014           1,160                  06/22/09   08/13/09    CONMAS INC                          
                                                            M-001           4,750                  11/19/08   01/27/09    FREY & CAMPBELL, INC.               
                                                            P-001         -24,389                  07/28/08   01/30/09    FREU & CAMPBELL, INC.               
                                                            P-002          -3,561                  07/28/08   01/30/09    FREY & CAMPBELL, INC.               
                                                            P-003           1,819                  11/07/08   05/19/09    FREY & CAMPBELL, INC.               
                                                            P-003           1,819                  11/14/08   05/18/09    FREY & CAMPBELL, INC.               
 
03-0085FP Reconstruction               0-001-FP1  10/14/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
92-1446   Reconstruction               5-002-003  07/13/93  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0879   Additions and Alterations    5-002-004  07/17/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-3           15,928                  05/30/02   08/15/02    Iverson Const.                      
 

          Bus Garage / Maintenance Facility:
02-0302   New Construction             5-006-001  05/08/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001           8,925                  09/16/03   09/23/03    Kaplan Schmidt                      
                                                            E-002           2,311                  10/15/04   10/25/04    Kaplan Schmidt                      
                                                            E-003          -2,000                  10/15/04   10/25/04    Kaplan Schmidt                      
                                                            E-004           2,538                  10/15/04   10/25/04    Kaplan Schmidt                      
                                                            E-005           1,508                  07/01/05   07/20/05    Kaplan Schmidt Electric             
                                                            G-001          -2,600                  11/17/03   11/21/03    Streeter Associates                 
                                                            G-002           4,599                  11/17/03   11/21/03    Streeter Associates                 
                                                            G-003           2,576                  11/17/03   11/21/03    Streeter Associates                 
                                                            G-004           6,923                  12/20/04   12/28/04    Streeter Associates                 
                                                            G-005           2,250                  12/20/04   12/28/04    Streeter Associates                 
                                                            G-007           2,018                  01/18/05   02/11/05    Streeter Associates                 
                                                            H-001          23,986                  09/16/03   09/23/03    Kimble, Inc.                        
                                                            P-001           4,734                  04/15/04   04/28/04    Finger Lakes Piping                 
 





CAMPBELL-SAVONA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-06-03-04
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Campbell 6-12:
92-1559   Reconstruction               0-001-001  08/12/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1396   Additions and Alterations    0-001-002  09/13/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1387   Reconstruction               0-001-004  06/25/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0951   Additions and Alterations    0-001-005  04/30/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0207   Reconstruction               0-001-007  01/11/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0317   Alterations                  0-001-008  03/02/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-2             3,427                  08/13/02   09/05/02    RG Burns, Inc                       
                                                            L-2            -2,522                  12/17/01   03/05/02    RC Billings                         
 
00-1518   Additions and Alterations    0-001-009  11/07/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1           10,610                  03/18/02   04/29/02    John Mills Elec.                    
                                                            EC-2            5,916                  12/24/02   02/14/03    John Mills Elec.                    
                                                            EC-7          -17,625                  09/30/03   10/06/03    John Mills Elec.                    
                                                            GC-1          200,200                  03/13/02   04/29/02    Streeter Assoc.                     
                                                            GC-2            8,999                  05/05/03   05/07/03    Streeter Assoc.                     
                                                            GC-3          -32,181                  12/22/03   12/31/03    Streeter Assoc.                     
                                                            HC-1          124,300                  03/13/02   04/29/02    Frey and Campbell                   
                                                            HC-2           16,767                  05/31/02   06/17/02    Frey and Campbell                   
                                                            HC-3          -96,006                  11/01/02   02/05/03    Frey and Campbell                   
                                                            HC-4          -25,635                  12/22/03   12/30/03    Frey and Campbell                   
                                                            PC-1           16,000                  03/13/02   04/29/02    Frey and Campbell                   
                                                            PC-2            8,513                  05/06/02   05/13/02    Frey and Campbell                   
                                                            PC-3            3,787                  05/31/02   06/17/02    Frey and Campbell                   
                                                            PC-4            5,252                  11/01/02   02/05/03    Frey and Campbell                   
                                                            PC-6           -3,000                  12/22/03   12/30/03    Frey and Campbell                   
                                                            SC-1           10,046                  08/13/02   10/28/02    Suite-Kote Contracting              
                                                            SC-2            4,556                  03/18/03   04/18/03    Suite-Kote Contracting              
                                                            SFC-1          14,000                  03/13/02   04/29/02    Suite-Kote Contracting              
                                                            SFC-2           5,506                  06/30/03   07/02/03    Suite-Kote Contracting              
                                                            SFC-3         -11,356                  08/06/03   08/26/03    Suite-Kote Contracting              
                                                            SFC-4           2,299                  11/06/03   11/20/03    Suit Kote Contracting               
                                                            TC-1                0                  03/20/02   04/29/02    Meson Network Services              
                                                            TC-2          -12,682                  06/30/03   07/02/03    Scientel Americal                   
 
02-1066   Reconstruction               0-001-010  05/20/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1           21,958                  02/02/04     /  /      John Mills Electric                 
                                                            EC-2            3,528                  02/02/04   03/05/04    John Mills Electric                 
 
06-0966   Reconstruction               0-001-011  03/02/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-001           6,750                  06/06/07   07/17/07    Archie Donougher Sanding            
 
08-0081   Reconstruction               0-001-012  01/29/09  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2271   Reconstruction               0-001-013  06/23/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            S-001          11,850                  11/28/08   06/17/09    MORSCH PIPELINE INC.                
 
02-0792FP Reconstruction               0-001-FP1  12/24/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          K-5 Savona:
93-0089   Additions and Alterations    0-003-001  09/27/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1560   Reconstruction               0-003-002  08/12/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0555   Reconstruction               0-003-003  02/10/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1034   Reconstruction               0-003-004  04/25/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1593   Reconstruction               0-003-006  06/25/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0952   Reconstruction               0-003-008  04/30/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0208   Reconstruction               0-003-009  01/11/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0318   Reconstruction               0-003-010  03/02/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1               963                  02/04/02   03/25/02    RG Burns Elec.                      
 
00-1517   Additions and Alterations    0-003-011  11/07/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-3            7,845                  04/01/03   04/18/03    John Mills Elec.                    
                                                            EC-4            4,046                  05/05/03   05/07/03    John Mills Elec.                    
                                                            EC-5           14,774                  05/05/03   05/07/03    John Mills Elec.                    
                                                            EC-6            4,281                  05/29/03   06/04/03    John Mills Elec.                    
                                                            PC-5            6,436                  04/01/03   04/18/03    Frey & Campbell                     
                                                            SC-3            2,436                  06/30/03   07/02/03    Suite-Kote Contracting              
 
02-1067   Reconstruction               0-003-012  05/20/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-3            1,888                  03/03/04     /  /      John Mills Electric                 
                                                            EC-4           -1,606                  03/15/05   03/31/05    John Mills Electric                 
 
08-0082   Reconstruction               0-003-013  01/29/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-001          1,725                  07/17/09   08/14/09    AAC CONTRACTING INC                 
                                                            GC-001         20,292                  10/14/09   11/06/09    EDGER ENTERPRISES INC               
                                                            GC-002          1,473                  09/30/09   11/03/09    EDGER ENTERPRISES INC               
                                                            GC-003         24,282                  09/22/09   10/26/09    EDGER ENTERPRISES INC               
                                                            GC-004          2,996                  10/14/09   11/06/09    EDGER ENTERPRISES INC               
                                                            GC-005            893                  10/26/09   11/20/09    EDGER ENTERPRISES INC               
                                                            GC-006          1,745                  10/14/09   11/06/09    EDGER ENTERPRISES INC               
                                                            GC-007          1,094                  10/14/09   11/06/09    EDGER ENTERPRISES INC               
                                                            GC-008          9,595                  10/15/09   11/12/09    EDGER ENTERPRISES INC               
                                                            GC-009         13,961                  10/15/09   11/12/09    EDGER ENTERPRISES INC               
                                                            T-001           2,475                  09/30/09   11/03/09    STRUCTURED CABLING SYSTEMS LLC      
                                                            T-002           4,114                  09/30/09   11/03/09    STRUCTURED CABLING SYSTEMS LLC      
                                                            T-003          14,232                  09/25/09   10/09/09    STRUCTURED CABLING SYSTEMS LLC      
                                                            T-004          10,098                  09/30/09   11/03/09    STRUCTURED CABLING SYSTEMS LLC      
 
02-0791FP Reconstruction               0-003-FP1  12/24/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Storage Garage:
00-1519   Reconstruction               2-004-001  11/07/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
92-0963   Reconstruction               5-002-001  04/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Bus Garage:
97-0007   New Construction             5-006-002  08/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          Campbell Press Box:
00-1520   New Construction             7-007-001  11/07/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Concession Stand:
03-1051   New Construction             7-009-001  09/17/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            1,340                  08/08/05   08/15/05    John Mills Electric                 
                                                            PC-01          -1,000                  01/05/06   03/14/06    GVE Inc                             
 

          District Wide:
07-0983   Reconstruction               7-999-001  12/17/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            T-001           8,400                  09/12/08   02/23/09    STRUCTORED CABLING SYSTEMS, LLC     
                                                            T-003          11,000                  03/10/09   06/08/09    Structured Cabling System           
 





CANISTEO CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-07-01-04
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Junior Senior High School:
91-1148   Reconstruction               0-001-004  04/30/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0359   Reconstruction               0-001-005  12/09/96  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0936   Reconstruction               0-001-006  03/29/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1147   Reconstruction               0-001-007  06/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1179   Reconstruction               0-001-008  11/21/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         -32,800                  09/26/02   02/26/03    Environ. Protection Roofing         
                                                            00001          -2,600                  09/26/02   11/01/02    RE Krug                             
                                                            00001         -62,800                  09/26/02   02/26/03    DeSprit Mosaic and Tile             
                                                            00001         -26,641                  09/26/02   02/26/03    Frey and Campbell                   
                                                            00001          -1,722                  09/26/02   02/26/03    Blackmon-Farrell Elec.              
                                                            00001         -50,712                  09/26/02   02/26/03    Hey's Enterprises                   
                                                            00001         -14,825                  09/26/02   02/26/03    Javen Const.                        
                                                            00002           1,068                  10/10/02   12/02/02    Environ. Protection Roofing         
                                                            00002          -5,000                  02/18/03   02/26/03    Lamberts Asbestos Removal Service   
                                                            00003             714                  10/10/02   12/02/02    Javen Const.                        
                                                            00003             529                  01/21/03   02/06/03    Frey & Campbell                     
                                                            00003          19,612                  04/23/04   04/28/04    Lamberts Asbestos Removal           
                                                            00004             282                  10/10/02   12/02/02    Javen Const.                        
                                                            00004             957                  10/10/02   12/02/02    Blackmon-Farrell Elec.              
                                                            00004           2,007                  01/21/03   02/06/03    Frey & Campbell                     
                                                            00004         -22,577                  04/23/04   04/28/04    Hey's Enterprises                   
                                                            00005           1,042                  10/10/02   12/02/02    Javen Const.                        
                                                            00005             907                  01/21/03   02/06/03    Frey & Campbell                     
                                                            00006           3,776                  12/23/02   01/08/03    Javen Const.                        
                                                            00007           6,214                  12/23/02   01/10/03    Javen Const.                        
                                                            00008             930                  12/23/02   01/10/03    Javen Const.                        
                                                            00009             219                  12/23/02   01/10/03    Javen Const.                        
                                                            00010             546                  12/23/02   01/10/03    Javen Const.                        
                                                            00012            -500                  02/18/03   02/26/03    Javen Const.                        
                                                            00014          -2,450                  02/26/03   03/11/03    Javen Const.                        
 

          Elementary:
96-0358   Additions and Alterations    0-002-001  12/09/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1148   Reconstruction               0-002-002  06/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1180   Reconstruction               0-002-003  11/21/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         -20,223                  11/29/02   01/03/03    Hey's Enterprises                   
                                                            00001         -14,200                  11/29/02   03/18/03    Javen Const.                        
                                                            00001          -9,900                  11/29/02   01/03/03    DeSprit Mosaic & Tile               
                                                            00001         -44,386                  11/29/02   02/26/03    Frey & Campbell                     
                                                            00001          -3,998                  11/29/02   02/26/03    Blackmon-Farrell Elec.              
                                                            00002           4,270                  10/10/02   12/02/02    Hey's Enterprises                   
                                                            00002          -3,602                  10/10/02   12/02/02    Javen Const.                        
                                                            00002          19,782                  10/10/02   12/02/02    Blackmon-Farrell Elec.              
                                                            00002          10,262                  01/21/03   02/06/03    Frey & Campbell                     
                                                            00003             480                  10/10/02   12/02/02    Hey's Enterprises                   
                                                            00003             805                  10/10/02   12/02/02    Blackmon-Farrell Elec.              
                                                            00003           6,012                  05/21/03   06/03/03    Environ. Prot. Roofing              
                                                            00005         104,460                  01/21/03   02/06/03    Blackmon-Farrell Elec.              
                                                            00011             230                  12/23/02   01/08/03    Javen Const.                        
                                                            00013           2,177                  02/18/03   02/26/03    Javen Const.                        
                                                            00015          -2,095                  02/26/03   03/11/03    Javen Const.                        
 
03-1384FP Reconstruction               0-002-FP1  06/07/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Preston House:
00-1181   Reconstruction               0-003-001  11/21/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -3,007                  11/29/02   05/22/03    Hey's Enterprises                   
 

          Maint. Bldg / High School:
00-1182   New Construction             3-018-001  11/21/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
95-1149   Reconstruction               5-004-003  06/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1185   Reconstruction               5-004-004  11/21/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           5,308                  09/26/02   11/01/02    Onsyr Inc                           
                                                            00001         -32,180                  11/29/02   05/22/03    Javen Const.                        
                                                            00001         -15,899                  11/29/02   01/03/03    Frey & Campbell                     
                                                            00001          -2,711                  02/18/03   02/26/03    Blackmon-Farrell Elec.              
                                                            BG-01          -5,250                  02/18/03   02/26/03    Environmental Protection Roofing    
                                                            BG-01         -20,214                  02/18/03   02/26/03    Javen Const.                        
 

          Concession Stand:
99-1347   New Construction             7-015-001  06/29/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box @ Elementary School:
00-1183   New Construction             7-016-001  11/21/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession/Restroom @ Elem.:
00-1184   New Construction             7-017-001  11/21/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -3,166                  02/18/03   02/26/03    Blackmon-Farrell Elec.              
                                                            00001         -12,262                  02/18/03   02/26/03    Frey & Campbell                     
                                                            CS-01          -6,300                  02/18/03   02/26/03    Environ. Protection Roofing         
                                                            CS-01         -62,000                  02/18/03   02/26/03    Javen Const.                        
 





COHOCTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-09-05-04
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Bus Garage See Reorg#57.30.02.04:
91-0471   Reconstruction               5-002-001  12/16/91  NO CHANGE ORDERS ON ELECTRONIC FILE





CORNING-PAINTED POST SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-10-00-01
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Fred Carder Elementary:
90-1173   Reconstruction               0-005-004  05/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0889   Reconstruction               0-005-006  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0617   Reconstruction               0-005-007  02/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0432   Reconstruction               0-005-008  11/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1866   Reconstruction               0-005-009  08/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0956   Reconstruction               0-005-010  04/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0596   Reconstruction               0-005-011  04/20/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1 rev       19,802                  05/14/02   06/04/02    John Mills Elec.                    
                                                            EC-2           15,221                  05/14/02   06/04/02    John Mills Elec.                    
                                                            EC-4            3,542                  02/20/03   03/18/03    John Mills Elec.                    
                                                            GC-05           8,760                  05/14/02   06/04/02    Keuka Const.                        
                                                            GC-3            6,207                  01/10/02   03/26/02    Keuka Const.                        
                                                            GC-4           49,401                  01/10/02   03/26/02    Keuka Const.                        
                                                            GC-6             -454                  01/14/03   02/06/03    Keuka Const.                        
                                                            HC-1            5,223                  11/18/02   11/19/02    Kimble, Inc.                        
                                                            PC-1            5,443                  05/14/02   06/04/02    Postler and Jaeckle                 
 
99-0226   Reconstruction               0-005-013  12/21/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2             -46,894                  06/24/02     /  /      Custom Energy                       
 
01-0814   Additions and Alterations    0-005-014  07/08/02  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1466   Reconstruction               0-005-015  06/04/04  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0840   Reconstruction               0-005-016  05/12/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-4            1,991                  05/19/06   06/23/06    Keuka Construction                  
 
05-0565   Reconstruction               0-005-017  06/13/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-1            3,821                  01/22/08   04/02/08    KIMBLE INC                          
                                                            MC-2            3,206                  01/22/08   04/02/08    KIMBLE INC.                         
 
06-0444   Additions and Alterations    0-005-018  04/24/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2129   Reconstruction               0-005-019  03/25/08  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1869FP Reconstruction               0-005-FP1  05/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Corning Academy Middle School:
90-1174   Reconstruction               0-007-007  05/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0890   Reconstruction               0-007-008  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0618   Reconstruction               0-007-009  02/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0433   Reconstruction               0-007-010  11/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1674   Reconstruction               0-007-011  06/20/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0957   Reconstruction               0-007-012  04/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0227   Reconstruction               0-007-015  12/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1467   Reconstruction               0-007-018  06/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-01           2,199                  02/14/05   03/17/05    Massa construction Inc              
                                                            RC-2           13,608                  10/30/06   12/18/06    J and B Installations               
 
05-0566   Reconstruction               0-007-019  06/13/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1            7,507                  01/22/08   04/04/08    STREETER ASSOCIATES                 
 
06-0445   Reconstruction               0-007-020  04/24/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2130   Reconstruction               0-007-021  03/25/08  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1873FP Reconstruction               0-007-FP1  05/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Erwin Valley Elementary:
92-1179   Reconstruction               0-009-005  06/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0891   Reconstruction               0-009-006  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0619   Additions and Alterations    0-009-008  02/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1874   Reconstruction               0-009-010  08/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0228   Reconstruction               0-009-013  12/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0815   Additions and Alterations    0-009-014  07/08/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-02            1,584                  07/23/03   07/25/03    John Mills Elec.                    
                                                            E-05            4,984                  10/31/03   01/08/04    John Mills Elec.                    
                                                            E-07            2,844                  12/26/03   01/08/04    John Mills Elec.                    
                                                            E-08              -81                  02/23/04   03/05/04    John Mills Elec.                    
                                                            E-09            1,918                  02/23/04   03/05/04    John Mills Elec.                    
                                                            E-10              -74                  04/20/04   04/23/04    John Mills Elec.                    
                                                            G-11            1,855                  06/30/03   07/02/03    Keuka Const.                        
                                                            G-13            7,942                  06/30/03   07/02/03    Keuka Const.                        
                                                            G-23            1,516                  12/26/03   12/31/03    Keuka Const.                        
                                                            G-24            2,339                  02/06/04   02/20/04    Keuka Const.                        
                                                            G-25            4,565                  02/06/04   02/20/04    Keuka Const.                        
                                                            G-28           14,665                  02/23/04   03/02/04    Keuka Const.                        
                                                            G-30            2,053                  09/07/04   09/24/04    Keuka Const.                        
                                                            G-31            2,813                  10/15/04   10/26/04    Keuka Const.                        
                                                            H-03            1,420                  06/04/03   06/25/03    Postler and Jaeckle                 
 
03-1468   Reconstruction               0-009-015  06/04/04  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0446   Reconstruction               0-009-016  04/24/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2131   Reconstruction               0-009-017  03/25/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Hugh W. Gregg Elementary:
90-1175   Reconstruction               0-010-006  05/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0888   Reconstruction               0-010-007  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0620   Reconstruction               0-010-008  02/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1867   Reconstruction               0-010-009  08/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1876   Reconstruction               0-010-010  09/08/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E2-2           38,993                  02/26/01   01/14/03    Bouille Elec.                       
                                                            E2-4           -3,828                  04/12/02   05/24/02    Bouille Elec.                       
                                                            EC-4           48,118                  01/09/01   01/14/03    J. Mills Elec.                      
 
00-0598   Reconstruction               0-010-011  04/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0229   Reconstruction               0-010-013  12/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0816   Additions and Alterations    0-010-014  07/08/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-03           -5,635                  08/19/03   09/09/03    John Mills Elec.                    
                                                            G-17           -3,102                  09/09/03   09/16/03    Keuka Const.                        
 
04-0841   Reconstruction               0-010-015  05/12/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            Gc-1           -4,591                  05/15/06   06/23/06    Keuka Construction                  
 
05-0567   Reconstruction               0-010-016  06/13/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0447   Reconstruction               0-010-017  04/24/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2132   Reconstruction               0-010-018  03/25/08  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1867FP Reconstruction               0-010-FP1  05/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Lindley-Presho Elementary School:
90-1176   Reconstruction               0-011-006  05/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1180   Reconstruction               0-011-007  06/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0892   Reconstruction               0-011-008  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0621   Reconstruction               0-011-009  02/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1870   Reconstruction               0-011-011  08/18/98  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-3           44,753                  01/09/01   01/14/03    John Mills Elec.                    
 
00-0597   Reconstruction               0-011-012  04/20/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-1              420                  11/18/02     /  /      Kimble, Inc.                        
 
99-0230   Reconstruction               0-011-014  12/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0817   Additions and Alterations    0-011-015  07/08/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-01            3,309                  06/04/03   06/25/03    Keuka Const.                        
                                                            G-16            1,215                  08/19/03   09/02/03    Keuka Const.                        
                                                            G-21            1,857                  10/20/03   10/24/03    Keuka Const.                        
                                                            G-26            1,335                  02/06/04   02/20/04    Keuka Const.                        
                                                            G-29            1,418                  03/18/04   04/06/04    Keuka Const.                        
                                                            H-01           -2,214                  06/04/03   06/25/03    Postler & Jaeckle                   
 
05-0568   Reconstruction               0-011-017  06/13/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0448   Reconstruction               0-011-018  04/24/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2133   Reconstruction               0-011-019  03/25/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Northside Blodgett Middle School:
93-0893   Reconstruction               0-013-007  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0622   Reconstruction               0-013-008  02/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0434   Reconstruction               0-013-009  11/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1677   Reconstruction               0-013-010  06/20/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1261   Reconstruction               0-013-011  08/09/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0231   Reconstruction               0-013-014  12/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0569   Reconstruction               0-013-017  06/13/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-1            3,936                  01/22/08   04/02/08    FREY & COMBPELL                     
 
06-0449   Reconstruction               0-013-018  04/24/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-1            2,547                  04/21/09     /  /      FREY & CAMPBELL,INC                 
 
07-2134   Reconstruction               0-013-019  03/23/08  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1871FP Reconstruction               0-013-FP1  05/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Phillips Elementary:
93-0894   Reconstruction               0-016-006  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0623   Reconstruction               0-016-007  02/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1868   Reconstruction               0-016-008  08/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1875   Reconstruction               0-016-009  09/08/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0595   Reconstruction               0-016-010  04/20/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-3              598                  02/20/03   02/26/03    John Mills Electric                 
 
99-0232   Reconstruction               0-016-012  12/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0818   Additions and Alterations    0-016-013  07/08/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-01             -570                  07/23/03   07/25/03    John Mills Elec.                    
                                                            G-02           15,202                  06/04/03   06/25/03    Keuka Const.                        
                                                            G-07           -2,553                  06/04/03   06/25/03    Keuka Const.                        
                                                            G-12            1,060                  06/30/03   07/02/03    Keuka Const.                        
                                                            G-22            2,364                  12/26/03   12/31/03    Keuka Const.                        
                                                            H-02              -65                  06/04/03   06/25/03    Postler and Jaeckle                 
 
05-0570   Reconstruction               0-016-014  06/13/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0450   Reconstruction               0-016-015  04/27/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-2           30,000                  04/21/09   06/05/09    LECHASE CONSTRUCTION SERVICES       
 
07-2135   Reconstruction               0-016-016  03/25/08  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1832FP Reconstruction               0-016-FP1  05/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Frank F Pierce Elementary:
92-1181   Reconstruction               0-017-003  06/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0624   Reconstruction               0-017-004  02/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1869   Reconstruction               0-017-005  08/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0543   Reconstruction               0-017-006  03/02/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02           2,085                  08/10/04   09/23/04    Matco Elec.                         
 
99-0233   Reconstruction               0-017-008  12/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0571   Reconstruction               0-017-009  06/13/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0451   Reconstruction               0-017-010  04/24/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            PC-2            2,994                  04/21/09     /  /      FREY & CAMPBELL INC                 
 
07-2136   Reconstruction               0-017-011  03/25/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          E. Severn Elementary:
93-0895   Reconstruction               0-018-004  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0625   Additions and Alterations    0-018-005  02/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1871   Reconstruction               0-018-006  08/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0544   Reconstruction               0-018-007  03/02/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-03           2,398                  08/10/04   09/23/04    Matco Elec.                         
                                                            EC-05          10,708                  06/13/05   07/08/05    matco Electric Corp                 
                                                            EC-08             252                  10/18/06   12/18/06    Matco Electric                      
                                                            GC-02          12,166                  12/08/04   12/24/04    Keuka Construction                  
                                                            GC-03          12,732                  12/08/04   12/24/04    Keuka Construction                  
                                                            GC-04          13,159                  01/11/05   01/24/05    Keuka Construction                  
                                                            GC-05          44,883                  01/11/05   01/24/05    Keuka Construction                  
                                                            GC-06           9,267                  01/11/05   01/24/05    Keuka Construction                  
                                                            GC-07          18,211                  01/11/05   01/24/05    Keuka Construction                  
                                                            GC-08          15,983                  01/11/05   01/24/05    Keuka Construction                  
                                                            GC-09           1,245                  01/11/05   01/24/05    Keuka Construction                  
                                                            GC-10           3,986                  01/11/05   01/24/05    Keuka Construction                  
                                                            GC-11           1,005                  01/11/05   01/24/05    Keuka Construction                  
                                                            GC-12           6,389                  05/05/05   06/02/05    Keuka Construction Corp             
                                                            GC-13          37,100          37,100  06/30/05   10/05/06    Keuka Construction                  
                                                            HC-01           1,837                  01/28/05   05/02/05    Kimble Mechanical Contractors       
 
99-0234   Reconstruction               0-018-009  12/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0843   Reconstruction               0-018-012  05/12/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01            -377                  08/14/08   05/11/09    BOUILLE ELETRIC INC.                
                                                            GC-3           -2,804                  05/19/06   06/23/06    Keuka Construction                  
                                                            MC-1           -2,774                  08/14/08   10/21/08    POSTLER AND JAECKLE CORP            
 
05-0572   Reconstruction               0-018-013  06/13/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-3            2,495                  01/22/08   04/02/08    KIMBLE                              
 
06-0452   Reconstruction               0-018-014  04/24/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2137   Reconstruction               0-018-015  03/25/08  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1870FP Reconstruction               0-018-FP1  05/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Calvin U Smith Elementary:
93-0896   Reconstruction               0-019-007  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0626   Reconstruction               0-019-008  02/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1872   Reconstruction               0-019-009  08/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1260   Reconstruction               0-019-011  08/09/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C-4               630                  06/20/02     /  /      Hakes Const.                        
                                                            EC-1 rev        9,863                  11/10/00   01/14/03    RG Burns Elec.                      
                                                            EC-2           39,924                  11/10/00   01/14/03    RG Burns Elec.                      
                                                            EC-3           22,141                  11/10/00   01/14/03    RG Burns Elec.                      
                                                            EC-4           23,687                  06/20/02     /  /      RG Burns Elec.                      
                                                            EC-5            2,711                  06/20/02     /  /      RG Burns Elec.                      
                                                            G-3(rev)       31,742                  06/20/02   10/23/03    Keuka Const.                        
                                                            G-5             5,262                  01/15/02   03/26/02    Keuka Const.                        
                                                            HC-1           30,469                  06/20/02   12/01/03    Kimble, Inc                         
                                                            HC-2           27,191                  11/10/00   01/14/03    Kimble, Inc.                        
                                                            HC-3            7,805                  06/14/01   01/10/02    Kimble, Inc.                        
                                                            JC-2           27,191                  06/20/02     /  /      Kimble, Inc                         
                                                            PC-1           -2,942                  06/14/01   01/10/02    Frey & Campbell                     
                                                            SC-3           41,281                  06/20/02     /  /      Hakes Const.                        
                                                            SC-4              630                  12/07/01   04/05/02    Hakes Const.                        
 
99-0235   Reconstruction               0-019-013  12/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0819   Additions and Alterations    0-019-014  07/08/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-04            1,161                  08/19/03   09/02/03    John Mills Elec.                    
                                                            E-11              318                  08/11/04   09/08/04    John Mills Elec.                    
                                                            G-04            9,881                  06/04/03   06/25/03    Keuka Const.                        
                                                            G-05            1,580                  06/04/03   06/25/03    Keuka Const.                        
                                                            G-06              681                  06/04/03   06/25/03    Keuka Const.                        
                                                            G-09            8,049                  06/04/03   06/25/03    Keuka Const.                        
                                                            G-10           -2,485                  06/04/03   06/25/03    Keuka Const.                        
                                                            G-14              920                  06/30/03   07/02/03    Keuka Const.                        
                                                            G-15            3,426                  07/23/03   07/25/03    Keuka Const.                        
                                                            G-18            8,055                  10/07/03   10/14/03    Keuka Const.                        
                                                            G-19            3,308                  10/20/03   10/24/03    Keuka Const.                        
                                                            G-20            2,594                  10/20/03   10/24/03    Keuka Const.                        
                                                            G-27            3,191                  02/06/04   02/20/04    Keuka Const.                        
                                                            H-04              753                  08/19/03   09/02/03    Postler & Jaeckle                   
 
06-0453   Reconstruction               0-019-015  04/23/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2138   Reconstruction               0-019-016  03/25/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Winfield Elementary School:
90-1177   Reconstruction               0-021-003  05/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0897   Reconstruction               0-021-004  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0627   Reconstruction               0-021-005  02/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0431   Reconstruction               0-021-006  11/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1873   Reconstruction               0-021-007  08/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0599   Reconstruction               0-021-008  04/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0236   Reconstruction               0-021-010  12/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0820   Additions and Alterations    0-021-011  07/08/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-06            2,165                  12/26/03   01/08/04    John Mills Elec.                    
                                                            G-03            5,114                  06/04/03   06/25/03    Keuka Const.                        
                                                            G-08            3,346                  06/04/03   06/25/03    Keuka Const.                        
 
05-0573   Reconstruction               0-021-013  06/13/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0454   Reconstruction               0-021-014  04/24/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2139   Reconstruction               0-021-015  03/25/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          East High School:
91-0773   Reconstruction               0-023-007  03/27/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0831   Reconstruction               0-023-008  04/08/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0162   Reconstruction               0-023-009  08/25/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1233   Reconstruction               0-023-010  05/14/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0898   Reconstruction               0-023-012  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1020   Additions and Alterations    0-023-013  04/17/95  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0769   Reconstruction               0-023-014  02/17/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0628   Reconstruction               0-023-015  02/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1676   Reconstruction               0-023-017  06/20/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0954   Reconstruction               0-023-018  04/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1259   Reconstruction               0-023-019  08/09/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1521   Reconstruction               0-023-020  08/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1           -8,930                  05/14/02   06/04/02    GVE, Inc                            
                                                            SC-3           -3,139                  05/14/02   06/04/02    AL Blades and Sons                  
                                                            SC-4           -3,337                  05/14/02   06/04/02    AL Blades and Sons                  
 
00-0594   Reconstruction               0-023-021  04/20/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-1            3,805                  11/18/02     /  /      Kimble, Inc.                        
 
99-0237   Reconstruction               0-023-022  12/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1469   Reconstruction               0-023-025  06/04/04  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0574   Reconstruction               0-023-026  06/13/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1            5,330                  01/22/08   04/02/08    JOHN MILLS ELECTRIC                 
                                                            PC-2            3,597                  01/22/08   04/02/08    FREY & COMBELL                      
 
06-0455   Reconstruction               0-023-027  04/24/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC2-1            -994                  04/21/09     /  /      BOUILLE ELECTRIC INC                
                                                            GC-1           51,146                  04/21/09   06/05/09    LECHASE CONSTRUCTION SERVICES       
                                                            MC2-1          -9,174                  04/21/09     /  /      KIMBLE INC                          
 
07-2140   Reconstruction               0-023-028  03/25/08  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1868FP Reconstruction               0-023-FP1  05/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          West High School:
90-1023   Reconstruction               0-024-006  03/12/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1521   Reconstruction               0-024-007  06/19/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1259   Reconstruction               0-024-008  04/25/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0330   Reconstruction               0-024-009  10/11/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0601   Additions and Alterations    0-024-010  03/19/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0899   Reconstruction               0-024-011  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0629   Reconstruction               0-024-012  02/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0435   Reconstruction               0-024-013  11/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1675   Reconstruction               0-024-014  06/20/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0955   Reconstruction               0-024-015  04/01/97  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0545   Reconstruction               0-024-016  03/02/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          44,158                  08/10/04   09/23/04    Matco Elec.                         
                                                            EC-04          60,443                  08/19/04   07/17/07    Matco Elec.                         
                                                            EC-06          -2,318                  06/30/05   07/21/05    Matco Electric Corp                 
                                                            EC-07           5,802                  10/18/06   03/23/07    Matco electric                      
                                                            HC-02             108                  02/14/05   03/17/05    Kimble Mechanical Contractors       
 
98-1258   Reconstruction               0-024-017  08/09/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            Ec-4           23,688                  03/09/01   01/14/03    RG Burns Elec.                      
 
99-0238   Reconstruction               0-024-019  12/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0171   Reconstruction               0-024-021  10/02/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-1           19,268                  03/18/03   03/20/03    J&B Installation                    
 
03-1470   Reconstruction               0-024-022  06/04/04  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0575   Reconstruction               0-024-023  06/13/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0456   Reconstruction               0-024-024  04/24/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-1           21,463                  04/21/09     /  /      KIMBLE INC                          
 
07-2141   Reconstruction               0-024-025  03/25/08  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1872FP Reconstruction               0-024-FP1  05/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          New High School:
02-0267SR New Construction             0-052-001  09/24/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            16,373                  01/29/03   02/04/03    Glen Hawbaker                       
 

          Adm Bldg Warehouse:
99-0239   Reconstruction               1-001-004  12/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1465   Reconstruction               1-001-005  06/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-1           20,051                  02/17/05   04/28/05    J and B Installations               
                                                            RC-3           -1,000                  10/30/06   12/18/06    J and B Installation                
 

          Bus Garage:
92-1188   Reconstruction               5-015-001  06/09/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0900   Reconstruction               5-015-002  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1877   Reconstruction               5-015-003  09/08/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0240   Reconstruction               5-015-004  12/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0845   Reconstruction               5-015-005  05/12/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-2            5,404                  05/19/06   06/23/06    Keuka Construction                  
 

          E.H.S. Stadium:
90-1178   Reconstruction               7-026-003  05/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0241   Reconstruction               7-026-004  12/21/99  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1471   Reconstruction               7-026-005  06/04/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          District Wide Tech/Network:
03-1472   Reconstruction               7-999-002  06/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -19,969                  02/11/08   04/08/08    Ronco Communications & electronics  
 





GREENWOOD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-15-01-04
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
94-0293   Reconstruction               0-001-004  11/14/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1482   Reconstruction               0-001-005  06/26/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1672   Additions and Alterations    0-001-006  07/22/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0284   Additions and Alterations    0-001-007  06/24/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003             2,852                  03/22/05   03/31/05    Lobar Inc                           
                                                            004             2,769                  03/22/05   03/31/05    Lobar Inc                           
                                                            005             4,638                  03/22/05   03/31/05    Lobar Inc                           
                                                            E-001          -2,196                  02/14/05   03/02/05    Blackmon Farrell Electric           
                                                            E-002             321                  03/10/05   03/23/05    Blackmon Farrell electric           
                                                            E-003          -2,500                  03/30/06   07/21/06    Blackmon Farrell Electric           
                                                            G-001             787                  06/18/04   06/22/04    Lobar Inc                           
                                                            G-002             630                  10/18/04   10/26/04    Lobar Inc                           
                                                            G-006          13,790                  03/22/05   03/31/05    Lobar Inc                           
                                                            G-007         -10,000                  03/10/05   03/23/05    Lobar Inc                           
                                                            G-008          -2,217                  04/10/06   06/26/06    Lobar Inc                           
                                                            H-001           3,919                  10/18/04   10/26/04    Kimble Inc                          
                                                            H-002           4,169                  10/18/04   10/26/04    Kimble Inc                          
                                                            H-003          -4,355                  06/06/05   07/19/05    Kimble Inc                          
                                                            P-001           3,386                  10/06/04   10/18/04    Nairy Mech.                         
                                                            P-002          -2,500                  03/10/05   03/23/05    Nairy Mechanical                    
 
04-0508   Additions and Alterations    0-001-008  02/15/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001           1,461                  06/23/05   07/21/05    GVE Inc                             
                                                            E-002          -1,939                  03/10/06   06/30/06    GVE Inc                             
                                                            E-003          -3,000                  04/10/06   05/26/06    GVE Inc                             
                                                            GC-001         -1,014                  10/24/05   11/08/05    Lobar inc                           
                                                            P-001          -1,000                  10/13/05   10/25/05    Frey Campbell inc                   
 
03-0027FP Reconstruction               0-001-FP1  09/18/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
94-0294   Reconstruction               5-002-002  11/14/94  NO CHANGE ORDERS ON ELECTRONIC FILE





CANISTEO-GREENWOOD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-15-02-06
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Junior Senior High School:
07-0953   Reconstruction               0-001-002  06/27/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001           4,921                  09/03/09   09/18/09    BLACKMON-FARRELL ELECTRIC INC       
                                                            G-001          23,944                  09/03/09   09/18/09    HOLDSWORTH-KLIMOWSKI CONSTRUCTION   
                                                            G-007           5,049                  10/01/09   11/16/09    HOLDSWORTH-KLIMOWSKI CONSTRUCTION   
                                                            M-002          -4,173                  09/03/09   09/18/09    PICCIRILLI-SLAVIK & VINCENT P&H INC 
                                                            T-001           7,715                  09/03/09   09/18/09    O'CONNELL ELECTRIC                  
 

          Elementary:
07-0954   Reconstruction               0-002-001  06/27/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-002           1,630                  09/03/09   09/18/09    BLACKMON-FARRELL ELECTRIC INC       
                                                            G-002         -17,090                  09/03/09   09/18/09    HOLDSWORTH-KLIMOWSKI CONSTRUCTION   
                                                            G-006          46,682                  10/01/09   11/16/09    HOLDSWORTH-KLIMOWSKI CONSTRUCTION   
                                                            M-003           1,473                  10/01/09   11/16/09    PICCIRILLI-SLAVIK & VINCENT P/H INC 
                                                            T-003           9,276                  09/03/09   09/18/09    O'CONNELL ELECTRIC                  
 

          Greenwood Middle Sch.(frmrly Main):
07-0955   Reconstruction               0-020-002  06/27/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-005           4,944                  09/03/09   09/18/09    HOLDSWORTH-KLIMOWSKI CONSTRUCTION   
                                                            G-008          52,339                  10/01/09   11/16/09    HOLDSWORTH-KLIMOWSKI CONSTRUCTION   
                                                            M-001           5,355                  09/03/09     /  /      PICCIRILLI-SLAVIK & VINCENT P/H     
                                                            M-004           2,941                  10/01/09   11/16/09    PICCIRILLI-SLAVIK & VINCENT P/H INC 
                                                            T-002           2,766                  09/03/09   09/18/09    O'CONNELL ELECTRIC                  
 

          New Storage Building:
05-1243   New Construction             2-025-001  09/25/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
07-0956   Reconstruction               5-004-001  06/27/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-003           3,629                  09/03/09   09/18/09    BLACKMON-FARRELL ELECTRIC INC       
                                                            G-003          16,050                  09/03/09   10/02/09    HOLDSWORTH-KLIMOWSKI CONSTRUCTION   
                                                            T-004             273                  09/03/09   09/18/09    O'CONNELL ELECTRIC                  
 
07-0957   Reconstruction               5-021-001  06/27/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-004             482                  09/03/09   09/18/09    BLACKMON-FARRELL ELECTRIC INC       
                                                            G-004          15,562                  09/03/09   09/18/09    HOLDSWORTH-KLIMOWSKI CONSTRUCTION   
 





HORNELL CITY SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-18-00-01
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Intermediate School:
91-1382   Reconstruction               0-003-005  07/02/92  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1047   Reconstruction               0-003-008  03/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1200   Reconstruction               0-003-009  04/24/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1254   Reconstruction               0-003-010  10/18/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            16,067                  08/20/02   11/01/02    Pettit and Pettit                   
                                                            002             8,646                  04/24/03   05/05/03    Javen Construction                  
                                                            006             4,221                  04/24/03   05/05/03    Postler & Jaeckle                   
                                                            006             3,342                  04/24/03   05/05/03    Postler & Jaeckle                   
                                                            007             8,582                  01/07/05   03/11/05    Javen Construction                  
                                                            009             1,268                  06/16/03   07/11/03    Postler & Jaeckle                   
                                                            009             2,647                  08/26/03   10/23/03    Postler & Jaeckle                   
                                                            009               231                  12/20/04   12/30/04    Finger Lake Roofing                 
                                                            010             1,390                  06/16/03   07/11/03    Postler & Jaeckle                   
                                                            010             5,542                  03/10/05   03/23/05    Javen Construction                  
                                                            012            10,537                  06/16/03   07/11/03    Postler & Jaeckle                   
                                                            012             2,462                  03/10/05   03/23/05    Javen Construction                  
                                                            014             2,834                  06/16/03   07/11/03    Postler & Jaeckle                   
                                                            016            20,825                  09/24/03   12/09/03    Postler & Jaeckle                   
                                                            019             2,435                  12/20/04   12/30/04    Postler & Jaeckle                   
                                                            021             4,755                  12/20/04   12/30/04    Postler & Jaeckle                   
                                                            18            -20,718                  06/26/08   08/27/08    Javen Construction                  
                                                            20             85,867                  06/26/08   08/27/08    Javen Construction                  
                                                            3               1,705                  12/31/02   01/16/03    Javen Construction                  
                                                            ACM-001           437                  02/03/03   02/27/03    S&S Environmental                   
                                                            ACM-002           231                  02/03/03   02/27/03    S&S Environmental                   
                                                            E-21            7,339                  07/02/03   07/09/03    Matco Electric                      
                                                            E21-006         2,720                  02/03/03   02/27/03    Matco Electric                      
                                                            H21-005         2,808                  02/03/03   02/27/03    Postler & Jaeckle                   
                                                            W21-003        -1,470                  06/23/05   07/20/05    John Cadwallder inc                 
 
06-1641   Reconstruction               0-003-011  07/03/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            P-001          -9,900                  09/10/07   10/18/07    WILLIAM L. WATSON CO., INC.         
 
02-1417FP Reconstruction               0-003-FP1  03/14/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bryant Elementary:
92-0666   Reconstruction               0-007-005  04/27/93  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1255   Reconstruction               0-007-007  10/18/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003             6,235                  04/11/03   04/21/03    S&S Environ.                        
                                                            006            13,088                  07/02/03   07/09/03    S&S Environ.                        
                                                            007             2,905                  12/31/02   01/16/03    Pettit & Pettit                     
                                                            007            12,973                  05/20/04   05/27/04    S&S Environ.                        
                                                            007               870                  05/20/04   05/27/04    Finger Lakes Roofing                
                                                            008            18,202                  05/20/04   05/27/04    S&S Environ.                        
                                                            010             2,647                  08/26/03   10/23/03    Postler & Jaeckle                   
                                                            010B           21,339                  03/10/05   03/23/05    Javen Construction                  
                                                            012A           16,892                  10/15/03   10/23/03    Matco Elec.                         
                                                            012B            4,074                  10/15/03   10/23/03    Matco Elec.                         
                                                            013            19,454                  10/15/03   10/23/03    Matco Elec.                         
                                                            014            12,617                  09/24/03   12/09/03    Matco Elec.                         
                                                            014             2,192                  03/30/04   04/26/04    Postler & Jaeckle                   
                                                            015             2,637                  09/24/03   12/09/03    Matco Elec.                         
                                                            017            18,706                  09/24/03   12/09/03    Matco Elec.                         
                                                            ACM-21         -4,840                  11/21/05   02/13/06    S and S Environmental               
                                                            H-21            1,134                  12/20/04   12/30/04    Postler & Jaeckle                   
                                                            H-21            5,730                  12/07/05   08/09/06    Postler Jaeckle                     
                                                            H21-008           574                  04/24/03   05/05/03    Postler & Jaeckle                   
                                                            H21-024           565                  03/04/05   03/24/05    Postler Jaeckle Corp                
                                                            bcif-017       -4,756                  06/26/08   12/03/08    JAVEN CONSTRUCTION                  
 
08-0463   Reconstruction               0-007-008  04/01/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001           4,612                  10/26/09     /  /      BILLITIER ELECTRIC INC              
                                                            E-002           5,245                  10/26/09     /  /      BILLITIER ELECTRIC INC              
                                                            GC-001         10,054                  10/26/09     /  /      LECHASE CONSTRUCTION SERVICES LLC   
                                                            GC-002         52,829                  10/26/09     /  /      LECHASE CONSTRUCTION SERVICES LLC   
                                                            GC-003         33,706                  10/26/09     /  /      LECHASE CONSTRUCTION SERVICES LLC   
                                                            GC-004          2,920                  10/26/09     /  /      LECHASE CONSTRUCTION SERVICES LLC   
                                                            GC-005          2,325                  10/26/09     /  /      LECHASE CONSTRUCTION SERVICES LLC   
                                                            GC-006          1,418                  10/26/09     /  /      LECHASE CONSTRUCTION SERVICES LLC   
                                                            GC-007          2,163                  10/26/09     /  /      LECHASE CONSTRUCTION SERVICES LLC   
                                                            GC-008          9,009                  10/26/09     /  /      LECHASE CONSTRUCTION SERVICES LLC   
                                                            GC-009          5,313                  10/26/09     /  /      LECHASE CONSTRUCTION SERVICES LLC   
                                                            GC-010          6,234                  10/26/09     /  /      LECHASE CONSTRUCTION SERVICES LLC   
 

          North Hornell Elementary:
00-1256   Additions and Alterations    0-012-004  10/18/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             5,000                  09/20/02   10/24/02    Javen Const.                        
                                                            001               900                  09/20/02   10/24/02    Postler & Jaeckle                   
                                                            001             2,333                  09/20/02   10/24/02    Matco Elec.                         
                                                            001             4,300                  09/20/02   10/24/02    Postler & Jaeckle                   
                                                            002           -86,800                  09/20/02   10/24/02    Postler & Jaeckle                   
                                                            002            -4,210                  12/31/02   08/01/06    Finger Lakes Roofing                
                                                            003            35,000                  09/20/02   10/24/02    Pettit & Pettit                     
                                                            003           140,000                  09/20/02   10/24/02    Postler & Jaeckle                   
                                                            003            -8,937                  09/20/02   10/24/02    Matco Elec.                         
                                                            004            14,928                  09/20/02   10/24/02    Pettit & Pettit                     
                                                            004             4,930                  09/20/02   10/24/02    Matco Elec.                         
                                                            004             1,252                  04/28/03   05/05/03    Postler & Jaeckle                   
                                                            005             2,069                  09/20/02   10/24/02    Pettit & Pettit                     
                                                            005               810                  03/18/04   04/07/04    Finger Lakes Piping                 
                                                            006             7,204                  01/07/05   03/11/05    Javen Construction                  
                                                            009            13,623                  05/20/04   05/27/04    S&S Environ.                        
                                                            011             4,308                  06/16/03   07/11/03    Postler & Jaeckle                   
                                                            011             2,224                  03/10/05   03/23/05    Javen Construction                  
                                                            012             3,749                  03/18/04   04/28/04    Postler & Jaeckle                   
                                                            015            13,408                  08/26/03   10/23/03    Postler & Jaeckle                   
                                                            017             7,612                  09/24/03   12/09/03    Postler & Jaeckle                   
                                                            19             -9,053                  06/26/08   10/07/08    Javen Construction                  
                                                            H-21 026          430                  04/26/05   06/10/05    Postler Jaeckle                     
                                                            H21-004         2,220                  02/03/03   02/27/03    Postler & Jaeckle                   
                                                            P21-003         1,411                  02/03/03   02/27/03    Postler & Jaeckle                   
                                                            R-21            1,580                  03/30/04   04/07/04    Finger Lakes Roofing                
 
02-1415FP Reconstruction               0-012-FP1  03/14/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Senior High School:
92-0667   Reconstruction               0-013-004  04/27/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1048   Reconstruction               0-013-005  03/11/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1201   Reconstruction               0-013-006  04/24/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1257   Additions and Alterations    0-013-007  10/18/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             8,475                  10/17/02   11/07/02    Finger Lakes Roofing                
                                                            001            -8,015                  12/20/04   12/30/04    John Cadwallder                     
                                                            003            10,980                  12/04/03   03/15/04    Finger Lakes Roofing                
                                                            004             7,180                  04/11/03   04/21/03    S&S Environ.                        
                                                            004            10,820                  07/30/03   08/01/03    Javen Const.                        
                                                            004             1,136                  03/18/04   04/07/04    Finger Lakes Roofing                
                                                            005             9,350                  07/30/03   08/01/03    Javen Const.                        
                                                            007             8,256                  04/24/03   05/05/03    Postler & Jaeckle                   
                                                            007            16,145                  06/16/03   07/11/03    Postler & Jaeckle                   
                                                            008            12,600                  06/16/03   07/11/03    Matco Elec.                         
                                                            008             6,521                  06/16/03   07/11/03    Postler & Jaeckle                   
                                                            008              -222                  12/20/04   12/30/04    Finger Lakes Roofing                
                                                            008            19,180                  02/04/05   03/14/05    Javen Construction                  
                                                            009             6,182                  06/16/03   07/11/03    Matco Elec.                         
                                                            009             8,346                  07/02/03   07/09/03    Pettit & Pettit                     
                                                            009            15,029                  02/04/05   03/14/05    Javen Construction                  
                                                            010            12,617                  05/20/04   05/27/04    S&S Environ.                        
                                                            010           -29,235                  12/07/05   05/25/06    Pettit and Pettit                   
                                                            010a            2,737                  03/10/05   03/23/05    Javen Construction                  
                                                            011             7,088                  07/02/03   07/09/03    Matco Elec.                         
                                                            011             1,135                  03/18/04   04/28/04    Postler & Jaeckle                   
                                                            011            28,962                  05/20/04   05/27/04    S&S Environ.                        
                                                            011             3,199                  12/07/05   05/25/06    Pettit and Pettit                   
                                                            012            12,602                  05/20/04   05/27/04    S&S Environ.                        
                                                            013             8,198                  06/16/03   07/11/03    Postler & Jaeckle                   
                                                            013             3,710                  03/30/04   04/26/04    Postler & Jaeckle                   
                                                            013             5,909                  12/20/04   12/30/04    S&S Environ.                        
                                                            014             1,952                  08/31/04   09/23/04    S&S Environ.                        
                                                            015               839                  07/12/04   07/19/04    Postler & Jaeckle                   
                                                            015             6,087                  12/20/04   12/30/04    S&S Environ.                        
                                                            016            19,427                  12/20/04   12/30/04    S&S Environ.                        
                                                            016A            9,775                  10/15/03   10/23/03    Matco Elec.                         
                                                            016B           11,207                  10/15/03   10/23/03    Matco Elec.                         
                                                            018            10,539                  08/31/04   09/23/04    Postler & Jaeckle                   
                                                            018           -14,301                  04/26/06   05/24/06    MATCO ELECTRIC CORPORATION          
                                                            019            -2,992                  01/05/06   05/01/06    S&S ENVIROMENTAL                    
                                                            020            54,621                  08/31/04   09/23/04    Postler & Jaeckle                   
                                                            023             3,973                  12/20/04   12/30/04    Postler & Jaeckle                   
                                                            16             -7,077                  06/26/08   08/27/08    Javen Construction                  
                                                            2               1,100                  12/31/02   01/16/03    Matco Elec.                         
                                                            511-006         3,250                  12/31/02   01/16/03    Pettit & Pettit                     
                                                            511-008        10,700                  12/31/02   01/16/03    Pettit & Pettit                     
                                                            ACM-21         -2,992                  11/21/05   02/13/06    S and S Ennvironmental              
                                                            ACM-21         -1,438                  11/21/05   11/23/05    S and S Enviornmental               
                                                            E21-005         5,165                  12/31/02   01/16/03    Matco Elec.                         
                                                            E21-007         8,447                  04/24/03   05/05/03    Matco Elec.                         
                                                            H-21              887                  04/26/05   06/10/05    Postler Jaeckle                     
                                                            P21-002        15,394                  02/03/03   02/27/03    Postler & Jaeckle                   
                                                            P21-005         1,415                  04/24/03   05/05/03    Postler & Jaeckle                   
                                                            S-11-002        3,225                  08/28/02   10/29/02    Pettit & Pettit                     
                                                            W-21 002         -384                  06/23/05   07/20/05    John Cadwallder Inc                 
 
08-0255   Reconstruction               0-013-009  09/08/08  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1416FP Reconstruction               0-013-FP1  03/14/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Columbian Elementary:
00-1253   Reconstruction               0-015-004  10/18/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            005             1,094                  04/11/03   04/21/03    S&S Environmental                   
                                                            016             2,210                  07/12/04   07/19/04    Postler & Jaeckle                   
 

          Bldgs And Grounds Building:
91-0118   Reconstruction               3-004-002  08/27/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
91-1383   Reconstruction               5-002-003  06/23/92  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1252   Additions and Alterations    5-002-004  10/18/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            011             3,001                  06/16/03   07/11/03    Postler&Jaeckle                     
 

          District Wide:
08-0762   Reconstruction               7-999-001  12/19/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001           1,046                  10/26/09     /  /      BILLITIER ELECTRIC INC              
                                                            GC-001          9,754                  10/26/09     /  /      KUITEMS CONSTRUCTION INC            
                                                            H-001             762                  10/26/09     /  /      JOHN W. DANFORTH COMPANY            
                                                            H-002           2,789                  10/26/09     /  /      JOHN W. DANFORTH COMPANY            
                                                            T-001             162                  10/26/09     /  /      BILLITIER ELECTRIC INC              
                                                            T-002           1,007                  10/26/09     /  /      BILLITIER ELECTRIC INC              
                                                            T-003           2,421                  10/26/09     /  /      BILLITIER ELECTRIC INC              
 





ARKPORT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-19-01-04
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Central School:
91-0812   Reconstruction               0-001-004  03/26/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0258   Additions and Alterations    0-001-005  11/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0257   Reconstruction               0-001-006  12/03/96  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1161   Additions and Alterations    0-001-007  06/25/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-03              912                  06/03/03   06/03/03    Connors Haas                        
                                                            E-04            3,303                  06/03/03   06/03/03    Connors Haas                        
                                                            E-24            1,042                  05/06/01   02/06/02    Connors-Haas                        
                                                            E-25            6,282                  05/15/01   01/29/02    Connors-Haas                        
                                                            GC-06           8,926                  06/03/03   06/03/03    Welliver McGuire                    
                                                            GC-30           1,480                  04/27/01   01/10/02    Welliver McGuire                    
                                                            GC-31           8,715                  04/27/01   01/10/02    Welliver McGuire                    
                                                            GC-32             761                  04/27/01   01/10/02    Welliver McGuire                    
                                                            GC-33             790                  04/27/01   01/10/02    Welliver McGuire                    
                                                            GC-34               0                  04/27/01   01/10/02    Welliver McGuire                    
                                                            GC-35           1,216                  04/27/01   01/10/02    Welliver McGuire                    
                                                            GC-36           1,266                  04/27/01   01/10/02    Welliver McGuire                    
                                                            GC-37           4,242                  04/27/01   01/10/02    Welliver McGuire                    
                                                            GC-38         -12,340                  05/15/01   01/29/02    Welliver McGuire                    
                                                            GC-40          -9,593                  05/29/01   01/14/02    Welliver McGuire                    
                                                            M-08            4,577                  06/03/03   06/03/03    Amering & Johnston                  
                                                            P-04            6,484                  06/03/03   06/03/03    Frey & Campbell                     
                                                            P-11              345                  05/12/01   02/06/02    Frey & Campbell                     
                                                            P-12           -5,305                  03/18/02   05/24/02    Frey & Campbell                     
 
03-0249   Reconstruction               0-001-008  09/05/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-005           2,263                  03/12/05   04/27/05    Amering Johnston Inc                
                                                            H-005           2,263                  04/29/05   06/10/05    Amering and Johnston                
                                                            H-006          15,878                  03/22/05   03/31/05    Amering Johnston                    
                                                            H-007             798                  04/29/05   06/10/05    Amering and Johnston                
                                                            H-008           7,309                  09/07/05   09/15/05    Amering Johnston Inc                
                                                            H-1            17,284                  03/12/04   04/30/04    Amering & Johnston                  
                                                            H-2            17,328                  04/16/04   04/26/04    Amering & Johnston                  
                                                            H-3            35,414                  04/16/04   04/26/04    Amering & Johnston                  
                                                            H-4             5,033                  08/31/04   09/23/04    Amering & Johnston                  
 
08-0432   Reconstruction               0-001-010  01/27/09  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1414FP Reconstruction               0-001-FP1  03/10/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Athletic Field Stor. Bldg.:
98-1615   New Construction             7-006-001  06/25/99  NO CHANGE ORDERS ON ELECTRONIC FILE





PRATTSBURGH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-23-01-04
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
90-0519   Additions and Alterations    0-001-002  01/10/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1182   Reconstruction               0-001-003  05/11/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1648   Reconstruction               0-001-004  08/04/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0367   Reconstruction               0-001-005  12/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0283   Additions and Alterations    0-001-006  03/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-1            4,100                  09/12/03   09/16/03    Lambert's Asbestos Removal          
                                                            AA-2            9,688                  12/04/01   02/20/02    Lambert's Asbestos Removal          
                                                            E-10           12,494                  10/03/01   04/16/02    RG Burns                            
                                                            E-11            4,827                  12/04/01   02/20/02    RG Burns                            
                                                            E-12           10,582                  01/29/02   03/25/02    RG Burns                            
                                                            E-13              395                  03/19/02   04/19/02    RG Burns                            
                                                            E-14           10,447                  04/08/02   04/26/02    RG Burns                            
                                                            E-15            7,250                  06/27/02   07/15/02    RG Burns                            
                                                            E-16              799                  05/07/03   05/21/03    RG Burns                            
                                                            E-17            1,013                  09/10/03   09/16/03    RG Burns                            
                                                            E-2            23,945                  11/10/00   01/17/03    RG Burns                            
                                                            E-6            45,453                  05/02/01   01/14/03    RG Burns                            
                                                            E-7            21,210                  06/28/01   01/08/02    RG Burns                            
                                                            E-8            32,969                  09/12/03   09/16/03    RG Burns                            
                                                            E-9            18,319                  08/17/01   01/14/02    RG Burns                            
                                                            GC-10          45,543                  01/29/02   03/25/02    Streeter Assoc.                     
                                                            GC-11           6,911                  03/19/02   02/14/03    Streeter Assoc,                     
                                                            GC-12           3,060                  08/16/02   09/05/02    Streeter Assoc.                     
                                                            GC-13          11,404                  10/15/02   12/02/02    Streeter Assoc.                     
                                                            GC-14           1,152                  10/06/03   11/05/03    Streeter Assoc.                     
                                                            GC-9            1,040                  11/30/01   01/28/02    Streeter Assoc.                     
                                                            GC2 rev.       53,251                  03/19/02   04/19/02    Streeter Assoc.                     
                                                            H-2             6,046                  03/23/01   01/14/03    Finger Lakes Piping                 
                                                            H-4             1,944                  06/19/01   01/08/02    Finger Lakes Piping                 
                                                            H-5            12,365                  08/17/01   01/14/02    Finger Lakes Piping                 
                                                            H-6            45,923                  12/04/01   01/13/03    Finger Lakes Piping                 
                                                            H-7            10,253                  04/08/02   04/26/02    Finger Lakes Piping                 
                                                            P-5            10,652                  02/13/02   03/25/02    Faulks Plumbing                     
                                                            WT-1              262                  09/17/02   10/30/02    Home Comfort                        
                                                            WT-2            1,486                  11/08/02   12/12/02    Home Comfort                        
                                                            WT-3            1,456                  03/06/03   03/19/03    Home Comfort                        
 
04-0390   Additions and Alterations    0-001-007  02/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A-1             1,950                  08/24/05   09/01/05    Lamberts Asbestos Removal Services  
                                                            A-2             8,688                  11/23/05   02/13/06    Lamberts Asbestos Removal           
                                                            E-01            9,035                  11/15/05     /  /      John Mills Electric                 
                                                            E-01            9,035                  02/29/08   04/15/08    JOHN MILLS ELECTRIC, INC            
                                                            E-01            9,035                  03/03/08   04/15/08    JOHN MILLS ELECTRC, INC.            
                                                            E-02           12,775                  08/04/06   06/04/09    John Mills Electric                 
                                                            GC-2            9,321                  08/24/05   09/01/05    Edger Enterprises of Elmira         
                                                            GC-3           33,800                  11/15/05   12/02/05    Edger Enterprises of Elmira Co      
                                                            GC-5           12,316                  02/09/06   04/15/08    Edger Enterprises of Elmira         
                                                            GC-5           12,316                  02/29/08     /  /      EDGER ENTERPRISES OF ELMIRA, INC    
                                                            GC-5           12,317                  03/03/08   04/15/08    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            GC-6            2,664                  02/09/06   03/15/08    Edger Enterprises                   
                                                            GC-6            2,665                  02/29/08     /  /      EDGER ENTERPRISES OF ELMIRA, INC    
                                                            GC-6            2,665                  03/03/08   03/15/08    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            GC-7           -1,500                  03/22/06   06/23/06    Edger Enterprises of Elmira         
                                                            HVAC-1          2,613                  11/15/05     /  /      Frey Campbell                       
                                                            HVAC-1          2,613                  02/29/08   04/15/08    FREY & CAMPBELL, INC                
                                                            HVAC-1          2,613                  03/03/08   04/15/08    FREY & CAMPBELL, INC.               
                                                            HVAC2           2,482                  09/11/06   01/09/07    Frey Campbell                       
                                                            LR-1           -1,558                  08/24/05   09/01/05    E and B Equipement                  
                                                            P-1              -920                  12/21/05   12/29/05    Frey Campbell                       
                                                            P-2             8,400                  10/03/06   06/04/09    Frey Campbell                       
 
05-0337   Reconstruction               0-001-008  03/01/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0836   Reconstruction               0-001-009  05/23/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-10            7,156                  02/09/09   04/10/09    JOHN MILLS ELECTRIC, INC.           
                                                            E-10            7,156                  02/09/09     /  /      JOHN MILLS ELECTRIC, INC.           
                                                            E-11              523                  05/06/09   07/28/09    HOHN MILLS ELECTRIC, INC.           
                                                            E-2             6,332                  10/30/07   01/16/08    John Mills Electric                 
                                                            E-3             4,371                  04/10/08   01/30/09    JOHN MILLS ELECTRIC, INC.           
                                                            E-4               625                  04/10/08     /  /      JOHN MILLS ELECTRIC, INC.           
                                                            E-7            10,419                  11/03/08   02/27/09    JOHN MILLS ELECTRIC, INC            
                                                            E-8            12,030                  11/24/08   05/19/09    JOHN MILLS ELECTRIC, INC.           
                                                            GC-10             276                  10/30/08   01/22/09    KEUKA CONSTRUCTION CORPORATION      
                                                            GC-12           3,583                  10/30/08   01/22/09    KEUKA CONSTRUCTION CORPORATION      
                                                            GC-2            6,618                  10/30/07   11/14/07    Keuka Construction Corp             
                                                            GC-5           23,248                  01/09/08   01/23/08    KEUKA CONSTRUCTION CORP             
                                                            GC-6            9,154                  02/06/08     /  /      KEUKA CONSTRUCTION CORP             
                                                            GC-6            9,154                  02/06/08     /  /      KEUKA CONSTRUCTION CORPORATION      
                                                            GC-7           25,315                  04/10/08   08/07/08    KEUKA CONSTRUCTION CORPORATION      
                                                            GC-8           16,711                  06/20/08   10/07/08    KEUKA CONSTRUCTION CORPORATION      
                                                            HVAC-1          3,484                  10/30/07   01/16/08    Frey & Campbell                     
                                                            HVAC-3          1,327                  01/09/08   04/09/08    FREY&CAMPBELL,INC                   
                                                            HVAC-4            565                  06/20/08   05/11/09    Frey & Campbell                     
                                                            P-1             9,275                  10/30/07     /  /      Frey & Campbell                     
                                                            P-3            10,408                  01/09/08   03/19/08    FREY & CAMPBELL                     
                                                            P-5             4,312                  06/20/08   05/11/09    Frey & Campbell                     
 
08-1024   Reconstruction               0-001-010  06/01/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1           -2,700                  09/03/09   10/30/09    IVERSON CONSTRUCTION CORPORATION    
                                                            GC-4            3,646                  10/13/09   11/17/09    IVERSEN CONSTRUCTION CORPORATION    
                                                            HVAC-1          2,926                  10/13/09   11/17/09    FREY & CAMPBELL INC                 
                                                            P-2             2,083                  10/19/09   11/18/09    FREY & CAMPBELL INC                 
 
02-1609FP Reconstruction               0-001-FP1  05/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Agriculture Shop-Auxiliary CR:
93-1649   Reconstruction               0-002-002  08/04/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0429   Reconstruction               0-002-003  12/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1119   Additions and Alterations    0-002-004  03/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-3            -9,921                  11/10/00   06/09/03    RG Burns                            
                                                            E-4               421                  11/10/00   06/09/03    RG Burns                            
 
06-0837   Reconstruction               0-002-006  05/23/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1               150                  10/30/07   01/16/08    John Mills Electric                 
                                                            E-4               625                  04/10/09   02/10/09    JOHN MILLS ELECTRIC INC.            
                                                            E-9             2,018                  11/24/08   05/19/09    JOHN MILLS ELECTRIC, INC.           
                                                            GC-11           7,901                  10/30/08   01/22/09    KEUKA CONSTRUCTION CORPORATION      
                                                            GC-3            3,673                  10/30/07   11/14/07    Keuka Construction Corp             
                                                            GC-9              888                  09/26/08   02/10/09    KEUKA CONSTRUCTION CORPORATION      
                                                            HVAC-2            316                  10/30/07   01/16/08    Frey & Campbell                     
                                                            P-2               607                  10/30/07   01/16/08    Frey & Campbell                     
                                                            P-4             1,166                  01/09/08   04/09/08    FREY & CAMPBELL                     
 
93-1650EP Energy Project               0-002-E01  08/04/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Agricultural Classroom:
91-1183   New Construction             0-008-001  05/11/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1651   Additions and Alterations    0-008-002  08/04/94  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0392   Additions and Alterations    0-008-003  02/07/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1            3,383                  08/24/05   09/01/05    Edger Enterprises of elmira         
                                                            GC-4           -2,555                  11/15/05     /  /      Edger Enterprises of elmira         
                                                            R-1            -1,288                  03/22/06   06/23/06    J and B Installations               
 
06-0838   Reconstruction               0-008-004  05/23/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-5               330                  04/10/08   02/10/09    JOHN MILLS ELECTRIC, INC.           
                                                            E-6             2,791                  10/31/08     /  /      JOHN MILLS ELECTRIC, INC.           
                                                            GC-4            3,960                  01/09/08   01/23/08    KEUKA CONSTRUCTION CORP.            
 
08-1025   Reconstruction               0-008-005  06/01/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-2            1,860                  09/03/09   10/30/09    IVERSON CONSTRUCTION CORPORATION    
                                                            P-1               714                  10/13/09   11/17/09    FREY & CAMPBELL INC                 
 

          Maintenance Storage Shed:
99-1120   Reconstruction               2-006-002  03/22/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1             4,674                  11/10/00   06/09/03    RG Burns                            
 





JASPER-TROUPSBURG CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-27-02-04
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Jasper-Troupsburg Elem.:
91-1143   Additions and Alterations    0-001-001  06/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0585   Reconstruction               0-001-003  01/27/92  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1877   Reconstruction               0-001-004  08/14/91  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0599   Reconstruction               0-001-006  01/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0056   Reconstruction               0-001-007  07/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1403   Reconstruction               0-001-008  06/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0760   Additions and Alterations    0-001-009  05/22/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            C-1               565                  03/29/02   05/10/02    E&B Equip.                          
                                                            C-3               564                  07/12/02   07/24/02    E&B Equip.                          
                                                            C-4               450                  07/12/02   07/24/02    E&B Equip.                          
                                                            C-6               328                  08/20/02   09/04/02    E&B Equip.                          
                                                            C-7            -3,259                  12/24/02   01/08/03    E&B Equip.                          
                                                            C-8             1,598                  12/10/02   01/06/03    E&B Equip.                          
                                                            E-2            11,742                  12/12/01   09/04/02    John Mills Electric                 
                                                            E-7             2,350                  06/17/02   07/10/02    John Mills Electric                 
                                                            G-10            5,338                  01/24/02   03/04/02    Streeter Assoc.                     
                                                            G-15            4,762                  05/22/02   06/05/02    Streeter Assoc.                     
                                                            G-17             -725                  06/17/02   07/10/02    Streeter Assoc.                     
                                                            G-21            9,713                  07/12/02   07/24/02    Streeter Assoc.                     
                                                            G-22            4,644                  08/20/02   09/04/02    Streeter Assoc.                     
                                                            G-23            4,938                  08/20/02   09/04/02    Streeter Assoc.                     
                                                            G-25             -575                  08/30/02   09/05/02    Streeter Assoc.                     
                                                            G-27            2,835                  10/24/02   12/02/02    Streeter Assoc.                     
                                                            G-28            4,343                  10/24/02     /  /      Streeter Assoc.                     
                                                            G-28            1,056                  03/20/03   03/28/03    Streeter Assoc.                     
                                                            G-29              743                  10/24/02   12/02/02    Streeter Assoc.                     
                                                            G-30            6,307                  01/17/03   02/05/03    Streeter Assoc.                     
                                                            G-31           20,160                  01/17/03   01/23/03    Streeter Assoc.                     
                                                            G-32              494                  01/17/03   01/23/03    Streeter Assoc.                     
                                                            G-33              728                  01/17/03   02/05/03    Streeter Assoc.                     
                                                            G-34A             968                  01/17/03   02/03/03    Streeter Assoc.                     
                                                            G-35            7,512                  12/24/02   01/08/03    Streeter Assoc.                     
                                                            G-37              599                  01/30/03   02/11/03    Streeter Assoc.                     
                                                            G-38             -489                  03/05/03   03/19/03    Streeter Assoc.                     
                                                            G-6             5,636                  01/24/02   03/04/02    Streeter Assoc.                     
                                                            G-6               328                  08/20/02   09/04/02    E&B Equip.                          
                                                            G-7             2,720                  01/24/02   03/04/02    Streeter Assoc.                     
                                                            G-8             6,851                  01/24/02   03/04/02    Streeter Assoc.                     
                                                            G-9            -1,118                  01/24/02   03/04/02    Streeter Assoc.                     
                                                            GC-7              564                  06/17/02   07/10/02    Iverson Const.                      
                                                            H-1            -1,157                  06/27/02   07/15/02    Faulks Plumbing                     
                                                            H-2             1,994                  06/27/02   07/15/02    Faulks Plumbing                     
                                                            H-3           -27,293                  08/20/02     /  /      Faulks Plumbing                     
                                                            H-5               547                  04/11/03   04/21/03    Faulks Plumbing                     
                                                            P-3            -1,266                  04/11/03   04/21/03    Faulks Plumbing                     
                                                            T-5             6,105                  06/17/02   07/10/02    VDV Communications                  
                                                            T-8             8,287                  12/24/02   01/08/03    VDV Communications                  
 
02-1532   Reconstruction               0-001-010  04/26/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001         -18,529                  08/14/03   08/19/03    John Mills Elec.                    
                                                            E-003           2,456                  01/15/04   02/04/04    John Mills Elec.                    
 

          Main Building Jasper:
91-1144   Additions and Alterations    0-002-001  06/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0586   Reconstruction               0-002-002  01/27/92  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1878   Reconstruction               0-002-003  08/14/91  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0600   Reconstruction               0-002-005  01/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0057   Reconstruction               0-002-006  07/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1402   Reconstruction               0-002-007  06/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1666   Reconstruction               0-002-008  07/06/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0759   Additions and Alterations    0-002-009  05/22/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            BL-1            4,074                  01/10/02   03/26/02    Beavers Petroleum Equip.            
                                                            C-2               984                  04/16/02   05/10/02    E&B Equip.                          
                                                            C-5             3,070                  07/12/02   07/24/02    E&B Equip.                          
                                                            E-10             -791                  03/05/03   03/19/03    John Mills Elec.                    
                                                            E-11            6,203                  12/24/02   01/08/03    John Mills Elec.                    
                                                            E-12            8,681                  12/24/02   01/08/03    John Mills Elec.                    
                                                            E-13           -3,174                  01/30/03   02/11/03    John Mills Elec.                    
                                                            E-15          -11,965                  01/30/03   02/11/03    John Mills Elec.                    
                                                            E-16           10,498                  04/03/03   04/17/03    John Mills Elec.                    
                                                            E-17            2,304                  06/25/03   07/01/03    John Mills Elec.                    
                                                            E-18            2,615                  06/25/03   07/01/03    John Mills Elec.                    
                                                            E-3             4,538                  12/12/01   09/04/02    John Mills Elec.                    
                                                            E-4           -20,150                  03/05/02   04/18/02    John Mills Elec.                    
                                                            E-6               534                  08/20/02   09/04/02    John Mills Elec.                    
                                                            E-8            25,136                  08/20/02   09/04/02    John Mills Elec.                    
                                                            E-9            26,313                  08/20/02   09/04/02    John Mills Elec.                    
                                                            G-11            3,655                  03/05/02   04/18/02    Streeter Assoc.                     
                                                            G-12           31,580                  03/20/02   04/18/02    Streeter Assoc.                     
                                                            G-13            1,154                  04/30/02   05/07/02    Streeter Assoc.                     
                                                            G-14              450                  05/09/02   06/04/02    Streeter Assoc.                     
                                                            G-18            4,613                  06/27/02   07/15/02    Streeter Assoc.                     
                                                            G-19              591                  06/27/02   07/15/02    Streeter Assoc.                     
                                                            G-20            1,507                  06/27/02   07/15/02    Streeter Assoc.                     
                                                            G-26           14,328                  10/07/02   12/02/02    Streeter Assoc.                     
                                                            G-28a           3,287                  03/20/03   03/28/03    Streeter Assoc.                     
                                                            G-3             2,969                  12/11/01   03/26/02    Streeter Assoc.                     
                                                            G-34            3,246                  01/17/03   02/03/03    Streeter Assoc.                     
                                                            G-36           -2,883                  12/24/02   01/08/03    Streeter Assoc.                     
                                                            G-5             2,140                  01/10/02   03/26/02    Streeter Assoc.                     
                                                            G31-A           4,467                  01/17/03   01/23/03    Streeter Assoc.                     
                                                            G33-A             322                  01/17/03   02/05/03    Streeter Assoc.                     
                                                            H-6            -2,557                  04/11/03   04/21/03    Faulks Plumbing                     
                                                            P-2             3,406                  01/27/03   02/11/03    Faulks Plumbing                     
                                                            P-5               138                  04/11/03   05/08/03    Faulks Plumbing                     
                                                            T-1              -748                  11/13/01   04/19/02    VDV Communications                  
                                                            T-2               715                  12/11/01   03/26/02    VDV Communications                  
                                                            T-3            -7,166                  01/10/02   03/26/02    VDV Communications                  
                                                            T-4             1,039                  05/09/02   06/04/02    VDV Communications                  
                                                            T-6             1,003                  08/20/02   09/04/02    VDV Communications                  
                                                            T-7             2,061                  08/20/02   09/04/02    VDV Communications                  
 
02-1533   Reconstruction               0-002-010  04/26/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-002         -46,012                  08/14/03   08/19/03    John Mills Elec.                    
                                                            E-004           3,164                  01/15/04   02/04/04    John Mills Elec.                    
 
08-0541   Reconstruction               0-002-013  10/21/08  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            M-001           1,997                  06/08/09   09/23/09    FREY & CAMPBELL INC                 
 
08-1030   Reconstruction               0-002-014  01/09/09  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1166FP Reconstruction               0-002-FP1  02/26/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Bus Garage Storage:
96-0597   New Construction             4-009-001  01/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1401   Reconstruction               4-009-002  06/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage Service:
93-0342   Reconstruction               5-004-002  12/06/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0598   Additions and Alterations    5-004-003  01/23/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0516   Reconstruction               5-004-004  12/09/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0762   Reconstruction               5-004-005  05/22/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-14           -3,246                  01/30/03   02/11/03    John Mills Elec.                    
                                                            G-16            1,800                  05/22/02   06/05/02    Streeter Assoc.                     
                                                            G-24            2,147                  08/20/02   09/04/02    Streeter Assoc.                     
                                                            G31-B           6,659                  01/17/03   01/23/03    Streeter Assoc.                     
                                                            H-7             2,629                  05/19/03   06/03/03    Faulks Plumbing                     
 

          Bus Garage Main:
96-0515   Reconstruction               5-005-001  12/09/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0058   Reconstruction               5-005-002  07/19/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1400   Reconstruction               5-005-003  06/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          Concession Stand:
00-0761   New Construction             7-012-001  05/22/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-34B           1,481                  01/17/03   01/23/03    Streeter Assoc.                     
                                                            G-4             5,367                  12/12/01   01/28/02    Streeter Assoc.                     
                                                            G31C            3,135                  01/17/03   01/23/03    Streeter Assoc.                     
                                                            P-1             3,936                  05/09/02   06/04/02    Faulks Plumbing                     
                                                            P-4               507                  04/11/03   04/21/03    Faulks Plumbing                     
 





HAMMONDSPORT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-29-01-04
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Curtiss School:
95-0146   Reconstruction               0-001-004  09/12/95  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0978   Additions and Alterations    0-001-005  06/21/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003            14,293                  01/24/03   01/24/03    Suite Kote                          
 
06-0999   Reconstruction               0-001-006  05/14/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-004         -14,395                  05/19/08   03/02/09    Blackmon-Farrell Electric,Inc       
                                                            GC-01          11,000                  12/31/07   01/09/08    Edger Enterpirses of Elmira         
                                                            GC-01          11,000                  03/19/08   04/21/08    Edger Enterprises of Elmira, Incorp.
                                                            GC-03          31,198                  03/19/08   04/21/08    Edger Enterprises of Elmira, Incorp.
 
08-0105   Reconstruction               0-001-007  01/15/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            005            -1,943                  10/22/09     /  /      STREETER ASSOCIATES INC             
 

          High School:
91-0095   Reconstruction               0-002-003  08/19/91  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1109   Reconstruction               0-002-007  04/11/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0979   Additions and Alterations    0-002-008  06/21/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            36,286                  01/24/03   01/24/03    SuiteKote                           
                                                            002            24,032                  01/24/03   01/24/03    SuiteKote                           
                                                            004            32,100                  01/24/03   01/24/03    SuiteKote                           
                                                            005             4,000                  01/24/03   01/24/03    E&B Equip.                          
                                                            006               110                  01/24/03   01/24/03    GVE                                 
                                                            007             1,834                  01/24/03   01/24/03    Frey & Campbell                     
                                                            008             1,194                  01/24/03   01/24/03    Frey & Campbell                     
                                                            009             2,066                  01/24/03   01/24/03    Frey & Campbell                     
                                                            010               394                  01/24/03   01/24/03    GVE                                 
                                                            011             2,712                  01/24/03   01/24/03    SuiteKote                           
                                                            012               864                  01/24/03   01/24/03    Frey & Campbell                     
                                                            013             1,462                  01/24/03   01/24/03    Frey & Campbell                     
                                                            014               960                  01/24/03   01/24/03    Frey & Campbell                     
 
06-1000   Additions and Alterations    0-002-010  05/14/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-006          15,371                  11/14/08   05/18/09    BLACKMON-FARRELL ELECTRIC, INC.     
                                                            E-02           26,500                  12/31/07   08/05/08    Blackmon-Farrell Electric           
                                                            E-7             1,119                  11/24/08   05/15/09    BLACKMON-FARRELL ELECTRIC, INC.     
                                                            EC-005          1,431                  05/19/08   03/02/09    Blackmon-Farrell Electric, Inc.     
                                                            GC-009          1,634                  08/28/08   02/05/09    Edgar Enterprises Of Elmira, Inc.   
                                                            GC-02           3,250                  12/31/07   01/09/08    Edger Enterprises of Elmira         
                                                            GC-02           3,250                  03/19/08   04/25/08    Edger Enterprises of Elmira, Incorp.
 
08-0106   Reconstruction               0-002-011  01/15/09  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             4,520                  08/24/09   11/10/09    STREETER ASSOCIATES                 
                                                            002            51,985                  08/24/09   11/10/09    STREETER ASSOCIATES                 
                                                            003             2,886                  08/24/09   11/10/09    STREETER ASSOCIATES                 
                                                            004            -5,529                  10/22/09     /  /      STREETER ASSOCIATES INC             
 
03-0164FP Reconstruction               0-002-FP1  10/14/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
91-0096   Reconstruction               5-003-002  08/19/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Bus Garage:
06-1001   New Construction             5-006-001  05/14/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-008          12,846                  12/02/08   05/15/09    BLACKMON-FARRELL ELECTRIC, INC.     
                                                            E-01           17,105                  12/31/07   04/03/08    Blackmon-Farrell Electric           
                                                            EC-003         12,483                  05/19/08     /  /      Blackmon-Farrrell Electric,Inc      
                                                            GC-004          5,163                  03/03/08   04/14/08    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            GC-005          7,601                  03/03/08   04/14/08    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            GC-007        209,082                  07/14/08   11/18/08    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            GC-008          2,612                  08/28/08   10/27/08    Edger Enterprises of Elmira, Inc.   
                                                            GC-010         18,800                  09/26/08   05/12/09    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            GC-011          5,694                  09/26/08   05/12/09    EDGER ENTERPRISES OF ELMIRA, INC.   
                                                            GC-03          31,198                  12/31/07   01/09/08    Edger Enterprises of Elmira         
                                                            GC0-006        16,199                  06/09/08   04/14/09    Edger Enterprises of Elmira         
                                                            HVAC-001        2,031                  03/03/08   08/05/08    FREY & CAMPBELL, INC.               
                                                            P-002          10,233                  06/09/08   10/07/08    B&B MECHANICAL CONTRACTORS, INC     
                                                            P-01           11,786                  12/31/07   04/03/08    B & B Mechanical Contractors        
 





WAYLAND CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-30-01-04
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building See Reorg#57.30.02.04:
91-1046   Reconstruction               0-001-006  04/17/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1413   Reconstruction               0-001-007  07/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage-See Reorg#57.30.02.04:
92-1454   Reconstruction               5-002-003  07/30/93  NO CHANGE ORDERS ON ELECTRONIC FILE





WAYLAND-COHOCTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-30-02-04
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Cohocton Elementary:
94-0168   Reconstruction               0-001-001  10/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1361   Additions and Alterations    0-001-002  07/08/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0918   Reconstruction               0-001-004  03/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0145   Reconstruction               0-001-005  12/06/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-12          -10,000                  07/18/02   08/28/02    Babcock Ent.                        
                                                            2-18           -4,594                  08/17/01   03/04/02    Babcock Ent.                        
                                                            3-25            1,080                  01/17/02   03/25/02    Sear-Brown Product Delivery         
                                                            3-37           12,300                  04/19/02   05/07/02    Sear Brown Product Delivery         
                                                            3-41            5,562                  06/19/02   07/12/02    Sear Brown Product Delivery         
                                                            3-44              275                  06/19/02   07/12/02    Sear Brown Product Delivery         
                                                            3-48            1,166                  10/24/02   12/02/02    Sear Brown Product Delivery         
                                                            3-50            2,740                  10/24/02   12/02/02    Sear Brown Product Delivery         
                                                            6-26            2,224                  01/07/02   03/06/02    GVE                                 
 
99-0966   Reconstruction               0-001-006  04/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2441   Reconstruction               0-001-007  01/23/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-003          -1,050                  10/18/04   11/03/04    Massa Construction                  
 
07-0207   Reconstruction               0-001-008  11/28/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            301-006          -808                  03/10/09   06/08/09    Streeter Associates                 
                                                            305-007        12,138                  06/12/09   09/23/09    HMI MECHANICAL SYSTEMS INC          
                                                            306-013         1,471                  07/20/09   11/12/09    BILLITIER ELECTRIC INC              
 

          Main Building - Wayland:
94-0169   Additions and Alterations    0-005-001  10/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1608   Reconstruction               0-005-002  07/20/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1360   Additions and Alterations    0-005-003  07/08/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0919   Reconstruction               0-005-004  03/18/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0141   Additions and Alterations    0-005-005  12/06/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-14            5,566                  07/18/02   08/28/02    Babcock Ent.                        
                                                            2-16            2,749                  07/18/02   08/28/02    Babcock Ent.                        
                                                            2-19            2,950                  07/18/02   08/28/02    Babcock Ent.                        
                                                            2-22           18,550                  04/15/02   04/26/02    Babcock Ent.                        
                                                            2-23            9,000                  04/15/02   04/26/02    Babcock Ent.                        
                                                            2-24            2,450                  04/15/02   04/25/02    Babcock Ent.                        
                                                            2-26            2,100                  10/16/02   10/30/02    Babcock Ent.                        
                                                            3-17           19,249                  11/28/01   05/10/02    Sear-Brown Prod. Delivery           
                                                            3-18            5,400                  11/28/01   03/04/02    Sear-Brown Prod. Delivery           
                                                            3-19              877                  12/18/01   03/06/02    Sear-Brown Prod. Delivery           
                                                            3-20           13,500                  12/18/01   05/10/02    Sear-Brown Prod. Delivery           
                                                            3-21            4,197                  12/18/01   03/06/02    Sear-Brown Prod. Delivery           
                                                            3-23           -3,100                  01/17/02   03/25/02    Sear-Brown Prod. Delivery           
                                                            3-24            9,990                  01/17/02   03/25/02    Sear-Brown Prod. Delivery           
                                                            3-26          -60,000                  03/05/02   04/18/02    Sear Brown Prod. Delivery           
                                                            3-28            1,992                  03/05/02   04/18/02    Sear Brown Prod. Delivery           
                                                            3-30              992                  03/05/02   04/18/02    Sear Brown Prod. Delivery           
                                                            3-31          -16,711                  03/05/02   04/18/02    Sear Brown Prod. Delivery           
                                                            3-35            1,296                  04/01/02   05/09/02    Sear Brown Prod. Delivery           
                                                            3-38            1,995                  04/19/02   05/07/02    Sear Brown Prod. Delivery           
                                                            3-39            1,200                  04/19/02   05/07/02    Sear Brown Prod. Delivery           
                                                            3-40              986                  05/30/02   06/04/02    Sear Brown Prod. Delivery           
                                                            3-42            1,237                  06/19/02   07/12/02    Sear Brown Prod. Delivery           
                                                            3-45            3,721                  07/12/02   07/24/02    Sear Brown Prod. Delivery           
                                                            3-46              644                  08/12/02   09/05/02    Sear Brown Prod. Delivery           
                                                            3-51           -2,500                  10/24/02   12/02/02    Sear Brown Prod. Delivery           
                                                            3-52          -15,584                  10/24/02   12/02/02    Sear Brown Prod. Delivery           
                                                            3-53            1,630                  10/24/02   12/02/02    Sear Brown Prod. Delivery           
                                                            3-54             -629                  10/24/02   12/02/02    Sear Brown Prod. Delivery           
                                                            3-55           15,370                  10/24/02   12/02/02    Sear Brown Prod. Delivery           
                                                            3-56           19,610                  10/24/02   12/02/02    Sear Brown Prod. Delivery           
                                                            4-10            1,587                  01/17/02   03/25/02    Ferrauilo Plumbing                  
                                                            4-12            2,209                  01/17/02   03/25/02    Ferrauilo Plumbing                  
                                                            4-13              706                  03/01/02   04/17/02    Ferrauilo Plumbing                  
                                                            4-17            3,957                  05/13/02   06/04/02    Ferrauilo Plumbing                  
                                                            4-18            1,995                  06/19/02   07/12/02    Ferrauilo Plumbing                  
                                                            4-19            1,661                  06/19/02   07/12/02    Ferrauilo Plumbing                  
                                                            4-2               272                  07/18/02   08/28/02    Ferrauilo Plumbing                  
                                                            4-21              345                  08/07/02   08/16/02    Ferrauilo Plumbing                  
                                                            4-22          -15,000                  08/21/02   09/04/02    Ferrauilo Plumbing                  
                                                            4-23            6,093                  01/28/03   02/11/03    Ferrauilo Plumbing                  
                                                            4-7             1,774                  11/28/01   01/30/04    Ferrauilo Plumbing                  
                                                            4-8             4,686                  12/18/01   03/06/02    Ferrauilo Plumbing                  
                                                            4-9             1,004                  12/18/01   03/26/02    Ferrauilo Plumbing                  
                                                            4A-1            1,977                  10/24/02   12/04/03    Crosby Brownlie                     
                                                            5-1               791                  03/01/02   04/17/02    Invensys-Pritchett                  
                                                            5-3            14,200                  05/13/02   06/04/02    Invensys-Pritchett                  
                                                            6-22              908                  11/28/01   03/04/02    GVE                                 
                                                            6-23            9,512                  11/28/01   01/30/04    GVE                                 
                                                            6-24           14,931                  11/28/01   03/06/02    GVE                                 
                                                            6-25            6,829                  01/07/02   03/06/02    GVE                                 
                                                            6-27           11,042                  01/07/02   03/06/02    GVE                                 
                                                            6-28            1,322                  03/01/02   04/17/02    GVE                                 
                                                            6-29            5,819                  03/01/02   04/17/02    GVE                                 
                                                            6-30            1,896                  03/01/02   04/17/02    GVE                                 
                                                            6-31            1,073                  03/01/02   04/17/02    GVE                                 
                                                            6-32            6,656                  03/01/02   04/17/02    GVE                                 
                                                            6-33            2,609                  03/01/02   04/17/02    GVE                                 
                                                            6-35              333                  03/01/02   04/17/02    GVE                                 
                                                            6-36              708                  03/01/02   04/17/02    GVE                                 
                                                            6-38            1,457                  03/01/02   04/17/02    GVE                                 
                                                            6-39            1,006                  03/01/02   04/23/02    GVE                                 
                                                            6-40            5,871                  04/15/02   04/25/02    GVE                                 
                                                            6-41            3,589                  04/19/02   05/07/02    GVE                                 
                                                            6-42            5,112                  06/19/02   07/12/02    GVE                                 
                                                            6-45            1,565                  06/19/02   07/12/02    GVE                                 
                                                            6-46            6,249                  07/12/02   07/24/02    GVE                                 
                                                            6-47           19,589                  08/07/02   08/16/02    GVE                                 
                                                            6-48            7,189                  08/07/02   08/16/02    GVE                                 
                                                            6-49            6,953                  08/07/02   08/27/02    GVE                                 
                                                            6-51              917                  10/24/02   12/02/02    GVE                                 
                                                            6-52          -12,452                  01/13/03   02/05/03    GVE                                 
                                                            6-53           12,299                  01/13/03   02/05/03    GVE                                 
                                                            7-10            3,230                  05/24/02   06/04/02    Frey & Campbell                     
                                                            7-13            3,261                  05/30/02   06/04/02    Frey & Campbell                     
                                                            7-14            4,675                  08/21/02   09/06/02    Frey & Campbell                     
                                                            7-15            1,053                  02/20/03   02/26/03    Frey & Campbell                     
                                                            7-4            13,011                  03/21/02   04/18/02    Frey & Campbell                     
                                                            7-5             4,605                  03/21/02   04/18/02    Frey & Campbell                     
                                                            7-7               273                  03/28/02   05/07/02    Frey & Campbell                     
                                                            7-8             3,127                  05/24/02   06/04/02    Frey & Campbell                     
                                                            8-01            3,131                  07/18/02   08/28/02    Vanderlinde Elec.                   
                                                            8-2             2,140                  07/18/02   08/28/02    Vanderlinde Elec.                   
                                                            8-3             1,181                  04/15/02   04/25/02    Vanderlinde Elec.                   
                                                            8-4             1,595                  04/15/02   04/25/02    Vanderlinde Elec.                   
                                                            8-5             4,290                  05/13/02   06/04/02    Vanderlinde Elec.                   
                                                            8-6            -2,487                  12/17/02   01/09/03    Vanderlinde Elec.                   
 
99-0967   Reconstruction               0-005-006  04/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2442   Reconstruction               0-005-007  01/23/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-001           1,110                  09/27/04   10/04/04    Suit-Kote Contracting               
                                                            1-002           3,591                  10/07/04   10/12/04    Suit Kote Contracting               
                                                            1-003         -27,391                  10/07/04   10/12/04    Suit Kote Contracting               
                                                            1-004          -7,039                  10/07/04   10/12/04    Suit Kote Contracting               
                                                            1-005           3,500                  12/20/04   02/11/05    Suit Kote Contracting               
                                                            2-001           6,409                  09/13/04   10/04/04    Massa Construction                  
                                                            2-002             340                  09/13/04   10/04/04    Massa Construction                  
                                                            2-004          -4,000                  11/05/04   11/08/04    Massa Construction                  
                                                            2-005            -488                  11/05/04   11/08/04    Massa Construction                  
                                                            2-006          -5,000                  11/05/04   11/08/04    Massa Construction                  
                                                            2-007           1,510                  01/04/05   02/07/05    Massa Construction                  
                                                            2-008           5,398                  03/08/05   03/17/05    Massa Construction Inc              
                                                            3-001           4,076                  10/18/04   11/03/04    Lawman Heating                      
                                                            3-002          11,937                  10/07/04     /  /      Lawman Heating                      
                                                            3-002          11,937                  03/06/06   10/12/06    Lawman Heating Cooling              
                                                            3-003          16,035                  10/18/04     /  /      Lawman Heating                      
                                                            3-003          16,035                  03/06/06   10/12/06    Lawman heating Cooling              
                                                            4-002           2,421                  09/23/04   09/27/04    Blackmon Farrell Elec.              
                                                            4-003             -92                  10/18/04   11/03/04    Blackmon Farrell Elec.              
                                                            4-004           1,140                  01/04/05   02/07/05    Blackmon Farrell Electric           
                                                            4-005           1,603                  01/04/05   02/07/05    Blackmon Farrell Electric           
                                                            4-01            3,996                  08/30/04   09/24/04    Blackmon Farrell Elec.              
                                                            5-001           2,150                  08/30/04   09/24/04    Thurston Brothers                   
                                                            5-002             488                  10/18/04   11/03/04    Thurston Brothers                   
 
06-1416   Reconstruction               0-005-008  05/17/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-001         3,133                  10/30/07   01/28/08    Crosby-Brownlie,Inc.                
                                                            001-002        -7,500                  10/30/07   01/28/08    Crosby-Brownlie, Inc.               
 
07-0208   Reconstruction               0-005-009  11/28/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            301-001           771                  07/11/08   08/26/08    STREETER ASSOCIATES                 
                                                            301-002          -120                  10/01/08   11/06/08    STREETER ASSOCIATES                 
                                                            301-003         1,260                  01/23/09   03/05/09    STREETER ASSOCIATES                 
                                                            301-004         3,979                  02/04/09   07/02/09    STREETER ASSOCIATES                 
                                                            301-005        13,466                  03/05/09   05/26/09    STREETER ASSOCIATES                 
                                                            301-007        17,598                  04/27/09   07/22/09    STREETER ASSOCIATES                 
                                                            301-008        22,360                  03/10/09   06/08/09    Streeter Associates                 
                                                            301-009         2,536                  07/16/09   08/28/09    STREETER ASSOCIATES                 
                                                            301-013         8,523                  09/08/09   09/21/09    STREETER ASSOCIATES                 
                                                            301-014         9,549                  07/20/09   11/12/09    STREETER ASSOCIATES                 
                                                            301-015           324                  08/06/09   09/03/09    STREETER ASSOCIATES                 
                                                            301-016         5,224                  09/18/09   10/19/09    STREETER ASSOCIATES                 
                                                            304-002         1,305                  12/22/08   06/24/09    UNIFIED MECHANICAL                  
                                                            304-003         3,940                  09/08/09   09/21/09    UNIFIED MECHANICAL                  
                                                            304-004         9,427                  10/07/09   10/30/09    UNIFIED MECHANICAL                  
                                                            304-005         2,779                  10/21/09     /  /      UNIFIED MECHANICAL                  
                                                            305-001         3,812                  07/01/08   11/06/08    HMI MECHANICAL SYSTEMS, INC         
                                                            305-002        -7,890                  08/06/08   09/29/08    HMI MECHANICAL SYSTEMS, INC.        
                                                            305-003         1,027                  12/17/08   04/14/09    HMI MECHANICAL SYSTEMS, INC.        
                                                            305-004           744                  05/18/09   09/22/09    HMI MECHANICAL SYSTEMS INC          
                                                            305-005           907                  05/18/09   09/22/09    HMI MECHANICAL SYSTEMS              
                                                            305-006         3,885                  07/14/09   11/12/09    HMI MECHANICAL SYSTEMS INC          
                                                            306-001        20,091                  07/11/08   08/26/08    BILLITITIER ELECTRIC, INC.          
                                                            306-002         2,940                  10/01/08     /  /      BILLITIER ELECTRIC                  
                                                            306-003         8,884                  04/27/09   09/23/09    BILLITIER ELECTRIC INC              
                                                            306-004        19,387                  01/08/09   06/24/09    BILLITIER ELECTRIC, INC.            
                                                            306-005        15,159                  12/19/08   06/17/09    BILLITIER ELECTRIC INC.             
                                                            306-006         6,260                  12/19/08   06/17/09    BILLITIER ELECTRIC INC.             
                                                            306-007         8,192                  01/08/09   06/24/09    BILLITIER ELECTRIC INC.             
                                                            306-008        13,032                  01/29/09   03/06/09    BILLITIER ELECTRIC INC.             
                                                            306-009         8,649                  02/04/09   03/06/09    BILLITIER ELECTRIC INC.             
                                                            306-010         2,368                  07/14/09   11/12/09    BILLITIER ELECTRIC INC              
                                                            306-012         1,115                  07/14/09   11/12/09    BILLITIER ELECTRIC INC              
                                                            306-014           930                  07/20/09     /  /      BILLITIER ELECTRIC INC              
                                                            401-001        11,247                  10/21/09     /  /      MASSA CONSTRUCTION INC              
 
07-0209   Reconstruction               0-005-010  11/28/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            301-010           879                  07/01/09   08/28/09    STREETER ASSOCIATES                 
                                                            301-011         6,395                  06/30/09   08/14/09    STREETER ASSOCIATES                 
                                                            301-012        15,021                  07/16/09   08/28/09    STREETER ASSOCIATES                 
                                                            304-001         6,220                  10/14/08   01/26/09    UNIFIED MECHANCIAL                  
                                                            306-011         5,898                  06/10/09   08/18/09    BILLITIER ELECTRIC INC              
 
02-0313FP Reconstruction               0-005-FP1  11/13/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Bus Storage:
00-0143   New Construction             4-010-001  12/06/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4-16              400                  03/28/02   05/07/02    Ferrauilo Plumbing                  
                                                            6-34            1,149                  03/01/02   04/17/02    GVE                                 
                                                            6-43            1,240                  06/19/02   07/12/02    GVE                                 
 

          Bus Garage - Cohocton:
94-0170   Reconstruction               5-002-001  10/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0144   Reconstruction               5-002-003  12/06/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-15            3,200                  07/18/02   08/28/02    Babcock Ent.                        
 

          Bus Garage - Wayland:
94-0171   Reconstruction               5-006-001  10/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0146   Additions and Alterations    5-006-004  12/06/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-3            -6,966                  07/19/01   07/20/01    Babcock Ent.                        
                                                            2-4            29,537                  08/02/01   08/03/01    Babcock Ent.                        
                                                            2-7            24,822                  08/02/01   08/03/01    Babcock Ent.                        
                                                            3-36           17,950                  04/19/02   05/07/02    Sear Brown Product Delivery         
                                                            3-43              617                  06/19/02   07/12/02    Sear Brown Product Delivery         
                                                            3-47            1,475                  08/12/02   09/05/02    Sear Brown Product Delivery         
                                                            3-57            2,000                  10/24/02   12/02/02    Sear Brown Product Delivery         
                                                            6-006             800                  07/12/01   07/13/01    GVE                                 
                                                            7-12              459                  05/30/02   06/04/02    Frey & Campbell                     
 
99-0968   Reconstruction               5-006-005  04/06/00  NO CHANGE ORDERS ON ELECTRONIC FILE

          New W-C Bus Garage:
00-0142   New Construction             5-009-001  12/06/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2-25            5,630                  07/12/02   07/24/02    Babcock Ent.                        
                                                            3-22            2,700                  12/18/01   03/06/02    Sear-Brown Product Delivery         
                                                            3-27              885                  03/05/02   04/18/02    Sear Brown Product Delivery         
                                                            3-29            3,940                  03/05/02   04/18/02    Sear Brown Product Delivery         
                                                            3-32            2,372                  03/21/02   04/18/02    Sear Brown Product Delivery         
                                                            3-34            1,393                  04/01/02   05/09/02    Sear Brown Product Delivery         
                                                            3-49            1,482                  10/24/02   12/02/02    Sear Brown Product Delivery         
                                                            3=33            5,750                  04/01/02   05/09/02    Sear Brown Product Delivery         
                                                            4-11            2,604                  01/17/02   03/25/02    Ferrauilo Plumbing                  
                                                            4-14            1,920                  03/01/02   04/17/02    Ferrauilo Plumbing                  
                                                            4-15            5,398                  03/01/02   04/17/02    Ferrauilo Plumbing                  
                                                            4-20            6,901                  08/07/02   08/16/02    Ferrauilo Plumbing                  
                                                            4-24             -867                  01/28/03   02/11/03    Ferrauilo Plumbing                  
                                                            5-2               630                  05/13/02   06/04/02    Invensys-Pritchett                  
                                                            5-4            -1,482                  10/24/02   12/02/02    Invensys-Pritchett                  
                                                            6-37            1,802                  03/01/02   04/17/02    GVE                                 
                                                            6-44            2,164                  06/19/02   07/12/02    GVE                                 
                                                            6-50            1,723                  10/24/02   12/02/02    GVE                                 
                                                            7-11           20,680                  05/24/02   06/04/02    Frey & Campbell                     
                                                            7-6               869                  03/22/02   04/18/02    Frey & Campbell                     
                                                            7-9             1,798                  05/24/02   06/04/02    Frey & Campbell                     
 





BOCES STEUBEN-ALLEGANY STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-90-00-00
last updated on 11/24/09
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Wildwood Bldg.#7-Culinary Arts:
95-1337   Reconstruction               0-010-003  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0630   Reconstruction               0-010-004  03/14/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Coopers Automotive Bldg 1:
91-1277   Reconstruction               0-019-001  06/10/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1269   Reconstruction               0-019-002  06/02/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1338   Reconstruction               0-019-003  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0631   Reconstruction               0-019-004  03/14/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-002           3,232                  06/23/06     /  /      Kimble Inc                          
 

          \ildwood Bldg #1/Admin/Dist.Learning:
90-1635   Reconstruction               0-020-001  05/23/91  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1339   Reconstruction               0-020-002  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1041   Reconstruction               0-020-003  04/11/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0040   Reconstruction               0-020-004  02/20/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1               700                  04/21/03   05/07/03    Reed&Culbert                        
                                                            E-2             1,415                  04/21/03   05/07/03    Reed&Culbert                        
                                                            E-3             6,508                  04/21/03   05/07/03    Reed&Culbert                        
 
04-0632   Reconstruction               0-020-006  03/16/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G - 001        25,211                  09/21/07   01/14/08    ACE UNLIMITED                       
                                                            G - 002           564                  09/10/07   01/14/08    ACE UNLIMITED                       
 

          Wildwood Bldg#2 Auto Body/Auto Tech.:
91-0343   Reconstruction               0-021-001  10/25/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1308   Reconstruction               0-021-003  06/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1236   Reconstruction               0-021-004  05/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1340   Reconstruction               0-021-005  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1042   Reconstruction               0-021-006  04/11/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0041   Reconstruction               0-021-007  02/20/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0633   Reconstruction               0-021-008  03/16/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          1,208                  10/05/06   11/29/06    streeter Associates                 
                                                            GC-002         10,903                  11/30/06   12/28/06    Streeter Associates                 
 

          Wildwood Bldg#3 Cosmetology/Nursing/:
90-1636   Reconstruction               0-023-001  05/23/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1396   Reconstruction               0-023-002  06/11/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1689   Reconstruction               0-023-004  06/20/00  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0042   Reconstruction               0-023-005  02/20/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0021   Reconstruction               0-023-006  01/13/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GT-2              717                  02/18/04   03/23/04    John H. Cook Painting               
                                                            GT-3           13,406          13,406  06/04/04   07/22/04    John H. Cook Painting               
                                                            GT-4            1,173                  06/04/04   07/22/04    John H. Cook Painting               
                                                            S-1             2,000           2,000  02/09/04   03/23/04    Hakes Const.                        
 
02-1186   Reconstruction               0-023-007  06/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0634   Reconstruction               0-023-008  03/14/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Wildwood Bldg.#4/Career Majors/Compu:
91-0344   Reconstruction               0-025-001  10/25/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1150   Reconstruction               0-025-002  06/08/93  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1341   Reconstruction               0-025-003  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1043   Reconstruction               0-025-004  04/11/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1187   Reconstruction               0-025-006  06/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0635   Reconstruction               0-025-007  03/14/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-003          -8,727                  01/14/08   01/28/08    Ace Unlimited                       
 

          Wildwood Bldg. #5/Bldg. Trades/Weldi:
95-1342   Reconstruction               0-026-002  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1044   Reconstruction               0-026-003  04/11/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1188   Reconstruction               0-026-004  06/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0636   Reconstruction               0-026-005  03/14/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            M-001            -600                  05/22/07   08/28/07    Kimble Inc                          
 

          Coopers Bldg#2/Heavy Equipt/Conserva:
95-1343   Reconstruction               0-028-001  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1045   Reconstruction               0-028-002  04/11/97  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0637   Reconstruction               0-028-003  03/14/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            H-001           1,613                  06/23/06     /  /      Kimble Inc                          
                                                            S-002           9,407                  10/28/05   12/05/05    Streeter associates                 
 

          Coopers Bldg.#3 Intro. to Career Maj:
02-1189   Reconstruction               0-029-004  06/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0638   Reconstruction               0-029-005  03/14/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-004          8,161                  10/28/05   12/05/05    Streeter associates                 
 

          Coopers Bldg# 4 Machine Shop:
93-1270   Reconstruction               0-030-001  06/02/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1344   Reconstruction               0-030-002  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1046   Reconstruction               0-030-003  04/11/97  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0043   Reconstruction               0-030-004  02/20/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HV-1           30,210                  11/13/02   11/18/02    Mazza Sheet Metal                   
 
02-1190   Reconstruction               0-030-006  06/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0639   Reconstruction               0-030-008  03/14/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Coopers Bldg#5/Computer Graphics/Edu:
95-1345   Reconstruction               0-031-001  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1047   Reconstruction               0-031-002  04/11/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1191   Reconstruction               0-031-003  06/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0640   Reconstruction               0-031-004  03/14/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Coopers Bldg# 6 Cosmetolgy:
91-1278   Reconstruction               0-032-001  06/10/92  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1048   Reconstruction               0-032-003  04/11/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1192   Reconstruction               0-032-004  06/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0641   Reconstruction               0-032-005  03/14/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Coopers Bldg#7/Culinary Arts/Nursing:
92-1202   Reconstruction               0-033-001  06/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1276   Reconstruction               0-033-003  06/10/92  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0044   Reconstruction               0-033-004  02/20/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1193   Reconstruction               0-033-005  06/30/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0642   Reconstruction               0-033-006  03/14/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-001          1,391                  10/07/05   10/28/05    Streeter Associates                 
                                                            GC-002          1,453                  10/28/05   12/05/05    Streeter Associates                 
                                                            S-001           2,502                  10/28/05   12/05/05    Streeter Associates                 
 

          Coopers Campus Building #8:
95-1347   Reconstruction               0-034-004  06/20/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0045   Reconstruction               0-034-005  02/20/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0643   Reconstruction               0-034-006  03/14/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-003            589                  10/28/05   12/05/05    Streeter associates                 
 

          Wildwood #6 Heavy Equipt/Conservator:
92-1309   Reconstruction               0-035-002  06/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1237   Reconstruction               0-035-003  05/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1049   Reconstruction               0-035-005  04/11/97  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1194   Reconstruction               0-035-006  06/30/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GT-1            6,112                  02/09/04   03/03/04    Streeter Assoc.                     
                                                            GT-10             600                  05/03/04   05/11/04    Streeter Assoc.                     
                                                            GT-2            8,500                  02/09/04   03/03/04    Streeter Assoc.                     
                                                            GT-4           -2,242                  02/09/04   03/03/04    Streeter Assoc.                     
                                                            GT-5            4,478                  02/09/04   03/03/04    Streeter Assoc.                     
                                                            GT-6           11,533                  02/09/04   03/03/04    Streeter Assoc.                     
                                                            GT-7             -975                  03/02/04   03/08/04    Streeter Assoc.                     
                                                            GT-8             -851                  05/03/04   05/11/04    Streeter Assoc.                     
                                                            GT-9             -519                  05/03/04   05/11/04    Streeter Assoc.                     
                                                            HVAC-1         52,803          52,803  02/20/07   03/15/07    Kimble, Inc.                        
                                                            HVAC-2            485                  03/25/04   03/15/07    Kimble Inc                          
                                                            HVAC-3          3,608                  05/06/04   03/15/07    Kimble Inc                          
                                                            P-2              -406                  04/19/04   04/26/04    Mazza Sheetmetal                    
 
04-0644   Reconstruction               0-035-007  03/14/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Wildwood/Portable Classrooms:
96-1050   Reconstruction               0-044-002  04/11/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          Criminal Justice Building #18:
01-0308   New Construction             0-053-001  03/28/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Modular classroom Bldg.16 @ Coopers:
05-0794   New Construction             0-055-001  10/23/06  NO CHANGE ORDERS ON ELECTRONIC FILE

          Criminal Justice Storage Bldg:
97-0343   New Construction             2-050-001  10/10/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          Wildwood/Equip. Room:
97-1010   Additions and Alterations    2-051-001  04/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          Coopers Campus/Equip. Room:
97-1011   Additions and Alterations    2-052-001  04/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Bldg. 11:
04-0645   Reconstruction               3-018-002  03/14/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Coopers Bldg.#9 Print Shop:
04-0646   Reconstruction               3-022-001  03/14/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          WB19 Maintenance Pole Base:
98-0653   New Construction             3-049-001  03/18/99  NO CHANGE ORDERS ON ELECTRONIC FILE

          District Wide:
97-1012   Reconstruction               7-999-001  04/23/98  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1640   Reconstruction               7-999-002  05/15/91  NO CHANGE ORDERS ON ELECTRONIC FILE
01-1482   Reconstruction               7-999-003  06/27/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-002          7,028                  04/11/05   10/11/05    Oyer Electric                       
                                                            EC-1           25,324                  02/09/04   03/19/04    Over Electric                       
 
02-0410   Reconstruction               7-999-004  01/08/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0281   Reconstruction               7-999-005  11/02/04  NO CHANGE ORDERS ON ELECTRONIC FILE