REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Valley Elementary School:
90-1900 Reconstruction 0-004-004 08/16/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0390 Reconstruction 0-004-005 02/13/92 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1212 Reconstruction 0-004-006 05/10/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0872 Additions and Alterations 0-004-007 04/29/94 NO CHANGE ORDERS ON ELECTRONIC FILE
High School:
90-1901 Reconstruction 0-005-005 08/16/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0391 Reconstruction 0-005-006 02/13/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0873 Reconstruction 0-005-007 04/29/94 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0945 Additions and Alterations 0-005-010 03/20/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2453FP Reconstruction 0-005-FP1 09/08/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Tuscarora Elementary:
90-1902 Reconstruction 0-006-004 08/16/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0392 Reconstruction 0-006-005 02/13/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0874 Additions and Alterations 0-006-006 04/29/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0062 Reconstruction 0-006-007 01/10/96 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0166 Reconstruction 0-006-008 05/05/05 *CO No.* Amount Disallowed Received Approved Contractor
EC-001 6,759 05/22/06 / / John Mills Electric
07-0946 Reconstruction 0-006-010 03/20/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2454FP Reconstruction 0-006-FP1 09/08/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Elem. Storage (New):
94-0198 New Construction 2-014-001 10/27/94 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Storage:
90-1903 Reconstruction 4-002-001 08/16/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0875 Reconstruction 4-002-003 04/29/94 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
90-1904 Reconstruction 5-001-003 08/16/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0876 Reconstruction 5-001-004 04/29/94 NO CHANGE ORDERS ON ELECTRONIC FILE
AVOCA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-02-01-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Bldg:
91-0424 Reconstruction 0-002-004 12/20/91 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1380 Additions and Alterations 0-002-005 10/15/00 *CO No.* Amount Disallowed Received Approved Contractor
AA-2 16,849 12/04/02 01/03/03 Lambert's Asbestos Removal
EC-1 30,361 11/15/01 02/08/02 Burns Elec.
EC-10 3,858 11/27/02 01/03/03 Burns Elec.
EC-11 3,408 12/24/02 01/08/03 Burns Elec.
EC-12 1,486 01/29/03 02/11/03 Burns Elec.
EC-2(rev 6,166 04/24/02 05/07/02 Burns Elec.
EC-3(rev 13,292 04/24/02 05/07/02 Burns Elec.
EC-4 8,502 05/09/02 06/04/02 Burns Elec.
EC-5 1,827 07/30/02 08/28/02 Burns Elec.
EC-6 2,121 07/30/02 08/28/02 Burns Elec.
EC-9 rev -2,663 11/01/02 / / Burns Elec.
GC-1 -19,096 11/28/01 03/01/02 Saucke Bros. Const.
GC-2 6,890 11/28/01 / / Saucke Bros. Const.
GC-3 10,855 11/28/01 02/28/02 Saucke Bros. Const.
GC-4 11,776 01/28/02 03/08/02 Saucke Bros. Const.
HC-1 4,843 12/07/01 04/23/02 Faulks Plumbing
HC-2 9,957 12/03/01 01/10/02 Faulks Plumbing
HC-3 22,640 01/18/02 03/25/02 Faulks Plumbing
HC-4 8,083 01/18/02 03/25/02 Faulks Plumbing
HC-5 6,007 05/30/02 08/28/02 Faulks Plumbing
HC-6 1,454 04/12/02 04/25/02 Faulks Plumbing
HC-7 566 08/29/02 09/05/02 Faulks Plumbing
HC-8 6,917 06/26/03 07/01/03 Faulks Plumbing
PC-1 4,284 08/24/01 03/27/02 Frey & Campbell
PC-3 1,939 01/28/02 03/08/02 Frey & Campbell
PC-4 3,063 03/20/02 04/18/02 Frey & Campbell
PC-5 1,279 04/18/02 04/18/02 Frey & Campbell
PC-6 3,530 07/30/02 08/28/02 Frey & Campbell
PC-7 2,021 07/30/02 08/28/02 Frey & Campbell
PC-8 5,112 07/30/02 08/28/02 Frey & Campbell
SC-1 4,100 04/18/01 01/08/02 AL Blades & Sons
SC-10 6,700 01/02/03 01/10/03 AL Blades & Sons
SC-11 25,924 09/22/03 10/03/03 AL Blades & Sons
SC-12 10,221 12/12/03 12/24/03 AL Blades & Sons
SC-3 3,700 02/19/02 04/01/02 AL Blades & Sons
SC-5 14,793 01/18/02 03/25/02 AL Blades & Sons
SC-6 2,536 03/28/02 04/26/02 AL Blades & Sons
SC-7 12,586 07/30/02 08/28/02 AL Blades & Sons
SC-8 12,030 08/13/02 09/05/02 AL Blades & Sons
SC-9 -5,509 11/08/02 12/11/02 AL Blades & Sons
06-0158 Additions and Alterations 0-002-008 01/22/07 *CO No.* Amount Disallowed Received Approved Contractor
301-001 3,102 10/22/07 10/26/07 HORNING CONSTRUCTION LLC
301-002 12,420 10/22/07 10/26/07 HORNING CONSTRUCTIONLLC
301-004 2,774 10/29/07 11/14/07 Horning Construction
301-005 4,914 10/29/07 11/14/07 Horning Construction
301-007 12,353 11/26/07 12/12/07 HORNING CONSTRUCTION INC.
301-008 7,434 11/26/07 02/23/08 HORNING CONSTRUCTION INC.
301-009 2,697 01/03/08 01/23/08 HORNING CONSTRUCTIOL LLC
301-010 16,198 01/03/08 04/08/08 HORNING CONSTRUCTION
301-011 16,198 01/03/08 04/08/08 HORNING CONSTRUCTION
301-012 4,853 01/03/08 01/23/08 HORNING CONSTRUCTION
301-013 4,647 01/03/08 01/23/08 HORNING CONSTRUCTION
301-014 10,422 01/03/08 01/23/08 HORNING CONSTRUCTION
301-015 11,508 03/10/08 03/19/08 Horning Construction, LLC.
301-016 10,059 01/03/08 09/29/08 HORNING CONSTRUCTION LLC
301-017 8,789 01/03/08 01/24/08 HORNING CONSTRUCTION LLC
301-018 12,334 01/29/08 03/08/08 HORNING CONSTRUCTION LLC
301-019 8,159 01/29/08 08/05/08 HORNING CONSTRUCTION INC.
301-020 4,240 03/10/08 03/19/08 Horning Construction, LLC.
301-021 11,163 03/10/08 03/19/08 Horning Construction LLC.
301-022 5,234 03/10/08 03/19/08 Horning Construction, LLC
301-023 12,127 03/10/08 03/19/08 Horning Construction, LLC
301-024 14,397 03/10/08 03/19/08 Horning Construction, LLC
301-025 10,833 03/10/08 04/11/08 Horning Construction, LLC
301-026 15,504 03/28/08 04/02/08 HORNING CONSTRUCTION LLC.
301-027 6,880 05/21/08 09/29/08 Horning Construction LLC
301-028 18,817 05/21/08 09/29/08 Horning Construction LLC
301-029 4,548 05/21/08 09/29/08 Horning Construction LLC
301-031 10,226 06/18/08 08/26/08 HORNING CONSTRUCTION INC.
301-032 -458 06/18/08 08/26/08 HORNING CONSTRUCTION
304 -004 2,236 11/06/07 01/16/08 FREY & CAMPBELL INC
304-005 5,224 05/21/08 / / Frey & Campbell
304-006 2,513 05/21/08 09/29/08 Frey & Campbell Inc.
304-007 2,654 05/21/08 / / Frey & Campbell Inc.
304-008 8,515 06/18/08 / / FREY & CAMPBELL INC
304-01 1,716 10/22/07 10/26/07 FREY & CAMPBELL INC
304-02 12,340 10/22/07 10/26/07 FREY & CAMPBELL INC
305 -004 18,127 01/03/08 08/05/08 FREY & CAMPBELL INCORPORATED
305 -005 2,588 01/03/08 08/05/08 FREY & CAMPBELL INCORPORATED
305-001 11,832 10/22/07 10/26/07 FREY & CAMPBELL INC
305-002 1,296 10/22/07 01/28/08 FREY & CAMPBELL INC
305-003 5,509 01/03/08 04/09/08 FREY & CAMPBELL INC
305-006 3,186 04/18/08 09/29/08 FREY & CAMPBELL INC.
305-007 1,912 05/21/08 / / Frey & Campbell Inc.
305-008 13,102 05/21/08 / / Frey & Campbell Inc.
306 -006 1,403 01/03/07 08/05/08 BILLITIER ELECTRIC, INCORPORATED
306 -007 3,131 01/03/08 08/05/08 BILLITIER ELECTRIC, INCORPORATED
306-001 4,047 10/22/07 01/28/08 BILLITIER ELECTRIC INC
306-003 6,094 10/22/07 01/28/08 BILLITIER ELECTRIC, INC
306-004 1,465 10/22/07 01/17/08 BILLITER ELECTRIC .INC
306-005 6,207 10/29/07 / / Billitier Electric
306-009 4,291 03/10/08 03/15/08 Billitier Electric, Inc.
306-010 4,643 05/21/08 / / Billitier Electric, Inc.
306-011 1,607 05/21/08 / / Billitier Electric, Inc.
306-012 2,398 08/14/08 / / BILLITIER ELECTRIC, INC.
306-013 639 08/14/08 / / BILLITIER ELECTRIC, INC.
307-001 4,600 10/22/07 10/26/07 JUPITER ENVIRONMENTAL SERVICES INC
308-001 16,100 01/03/08 01/23/08 NICKERSON CORPORATION
308-002 10,132 01/03/08 03/19/08 NICKERSON CORP
308-003 2,814 10/22/07 10/26/07 NICKERSON CORPORATION
308-004 4,722 08/14/08 08/26/08 NICKERSON CORPORATION
308-006 15,210 08/14/08 08/26/08 NICKERSON CORPORATION
07-1010 Additions and Alterations 0-002-009 04/17/08 NO CHANGE ORDERS ON ELECTRONIC FILE
South Annex:
91-1563 Reconstruction 0-004-001 07/14/92 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Maintenance:
90-0943 Reconstruction 5-011-003 02/14/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0301 Reconstruction 5-011-004 10/22/92 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1381 Reconstruction 5-011-005 10/15/00 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0159 Additions and Alterations 5-011-006 01/22/07 *CO No.* Amount Disallowed Received Approved Contractor
301-003 12,420 10/22/07 10/26/07 HORNING CONSTRUCTION LLC
301-006 18,114 11/26/07 12/12/07 Horning construction
301-033 14,219 08/14/08 08/26/08 HORNING CONSTRUCTION LLC
304-003 3,453 10/22/07 / / FREY & CAMPBELL INC
304-003 3,453 06/06/08 / / Frey & Campbell
306 -008 2,623 01/03/08 08/05/08 BILLITIER ELECTRIC, INCORPORATED
306-002 2,105 10/22/07 01/28/08 BILLITIER ELECTRIC, INC
BATH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-03-02-06
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Dana L Lyon Elementary:
90-0636 Reconstruction 0-004-003 01/07/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0558 Reconstruction 0-004-004 03/23/94 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0393 Reconstruction 0-004-005 11/24/97 NO CHANGE ORDERS ON ELECTRONIC FILE
Haverling Jr/Sr High:
90-0637 Reconstruction 0-006-006 01/07/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1014 Reconstruction 0-006-007 04/16/92 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0594 Additions and Alterations 0-006-009 05/10/00 *CO No.* Amount Disallowed Received Approved Contractor
1-19 2,574 01/24/02 03/04/02 LeChase Construction
1-22 7,990 03/15/02 04/19/02 LeChase Construction
1-24 17,526 03/15/02 04/19/02 LeChase Construction
1-25 17,334 03/15/02 04/19/02 LeChase Construction
1-26 7,794 04/12/02 04/25/02 LeChase Construction
1-27 15,611 04/26/02 05/17/02 LeChase Construction
1-28 11,187 04/26/02 05/17/02 LeChase Construction
1-29 4,088 04/19/02 05/17/02 LeChase Construction
1-30 17,580 05/23/02 07/15/02 LeChase Construction
1-32 17,446 05/23/02 06/05/02 LeChase Construction
1-33 12,419 05/23/02 06/04/02 LeChase Construction
1-34 12,893 05/23/02 06/05/02 LeChase Construction
1-35 12,937 06/19/02 07/12/02 LeChase Construction
1-36 10,709 06/19/02 07/12/02 LeChase Construction
1-37 4,457 07/03/02 07/15/02 LeChase Construction
1-38 1,519 08/02/02 08/16/02 LeChase Construction
1-39 15,826 08/27/02 09/06/02 LeChase Construction
1-40 16,887 10/17/02 12/02/02 LeChase Construction
1-41 19,888 11/20/02 01/02/03 LeChase Construction
1-42 18,289 10/17/02 12/02/02 LeChase Construction
1-43 17,497 10/17/02 12/02/02 LeChase Construction
1-44 6,426 11/20/02 01/02/03 LeChase Construction
1-45 17,142 11/20/02 01/02/03 LeChase Construction
1-46 2,527 11/20/02 01/02/03 LeChase Construction
1-47 5,413 11/20/02 01/02/03 LeChase Construction
1-48 18,666 02/10/03 02/14/03 LeChase Construction
1-49 3,066 09/09/03 09/19/03 LeChase Construction
1-5 -3,116 08/06/01 01/08/02 LeChase Construction
1-50 8,181 09/09/03 09/19/03 LeChase Construction
1-51 14,050 09/09/03 09/19/03 LeChase Construction
1-52 7,263 09/09/03 09/19/03 LeChase Construction
1-53 16,598 09/09/03 09/19/03 LeChase Construction
1-54 15,899 09/09/03 09/19/03 LeChase Construction
1-55 19,084 09/09/03 09/19/03 LeChase Construction
1-56 10,313 09/09/03 09/19/03 LeChase Construction
1-56 16,779 03/05/04 03/17/04 LeChase Construction
10-11 14,880 03/15/02 04/19/02 Cashette Electric
10-12 4,008 04/12/02 04/25/02 Cashette Electric
10-13 10,167 04/12/02 04/26/02 Cashette Electric
10-14 -2,266 04/26/02 05/07/02 Cashette Electric
10-15 19,894 06/19/02 07/12/02 Cashette Electric
10-17 8,122 07/03/02 07/15/02 Cashette Electric
10-18 9,571 08/02/02 08/16/02 Cashette Electric
10-19 3,392 08/27/02 09/05/02 Cashette Electric
10-20 6,871 09/26/02 11/01/02 Cashette Electric
10-21 10,018 10/15/02 12/02/02 Cashette Electric
10-22 7,556 11/20/02 01/03/03 Cashette Electric
10-23 11,829 11/20/02 01/03/03 Cashette Electric
10-24 19,513 11/20/02 01/03/03 Cashette Electric
10-25 16,246 11/20/02 01/03/03 Cashette Electric
10-26 13,280 11/20/02 01/03/03 Cashette Electric
10-27REV 1,824 03/10/03 03/18/03 Cashette Electric
10-28 18,376 03/10/03 03/18/03 Cashette Electric
10-29 4,540 03/10/03 03/18/03 Cashette Electric
10-30 6,869 03/10/03 03/18/03 Cashette Electric
10-31 7,542 04/29/03 05/05/03 Cashette Electric
10-32 11,387 06/24/03 06/30/03 Cashette Electric
10-33 14,138 06/24/03 06/30/03 Cashette Electric
10-34 10,933 06/24/03 06/30/03 Cashette Electric
10-35 9,999 06/24/03 06/30/03 Cashette Electric
10-36 14,448 06/24/03 06/30/03 Cashette Electric
10-37 3,800 04/23/04 04/28/04 Cashette Electric
10-38 3,716 04/23/04 04/28/04 Cashette electric
10-4 496 08/29/01 01/29/02 Cashette Electric
10-9 2,972 01/24/02 03/04/02 Cashette Electric
11-1 -61,050 02/10/03 02/14/03 Sound & Communications Div.
11-2 -23,175 06/24/03 06/30/03 Sound & Communications Div.
12-10 2,902 04/12/02 04/25/02 Frey & Campbell
12-11 8,886 04/12/02 04/25/02 Frey & Campbell
12-12 19,312 04/12/02 04/25/02 Frey & Campbell
12-13 18,798 04/19/02 05/07/02 Frey & Campbell
12-14 12,455 07/03/02 07/15/02 Frey & Campbell
12-15 3,575 08/27/02 09/05/02 Frey & Campbell
12-16 12,115 09/26/02 11/01/02 Frey & Campbell
12-17 10,872 10/17/02 12/02/02 Frey & Campbell
12-18 3,391 10/17/02 12/02/02 Frey & Campbell
12-19 17,139 03/10/03 03/19/03 Frey & Campbell
12-20 15,286 03/10/03 03/19/03 Frey & Campbell
12-21 1,911 03/10/03 03/19/03 Frey & Campbell
12-22 1,200 03/10/03 03/18/03 Frey & Campbell
12-23 10,960 04/29/03 05/05/03 Frey & Campbell
12-24 5,349 06/24/03 06/30/03 Frey & Campbell
12-25 4,316 06/24/03 06/30/03 Frey & Campbell
12-5 17,247 10/02/01 01/08/02 Frey & Campbell
12-9 2,816 03/15/02 04/19/02 Frey & Campbell
13-1 3,290 06/19/02 07/12/02 Patterson Stevens
13-2 9,950 07/03/02 07/15/02 Patterson Stevens
13-3 3,167 02/10/03 02/14/03 Patterson-Stevens
13-5 4,129 07/01/03 07/07/03 Patterson Stevens
13-6 2,444 04/23/04 04/30/04 Patterson Stevens
14-2 14,507 09/26/02 11/01/02 Kleen All of America
14-3 19,167 02/18/03 02/26/03 Kleen All of America
14-4 18,747 02/18/03 02/26/03 Kleen All of America
14-5 15,832 02/18/03 02/26/03 Kleen All of America
14-6 19,851 02/18/03 02/26/03 Kleen All of America
14-7 19,413 02/18/03 02/25/03 Kleen All of America
14-8 9,570 04/29/03 05/05/03 Kleen All of America
16-1 5,754 02/10/03 02/14/03 Burns Elec.
2-1 5,000 03/15/02 04/19/02 Amthor Steel
2-14 -5,780 04/29/03 05/05/03 Suite Kote Contracting
2-2 5,606 05/09/02 06/04/02 Amthor Steel
2-3 9,929 08/02/02 08/16/02 Amthor Steel
2-5 18,813 11/06/03 11/13/03 Amthor Steel
2-6 -1,500 03/26/04 04/12/04 Amother Steel
3-10 11,228 06/19/02 07/12/02 Hakes Const.
3-11 19,900 06/19/02 07/12/02 Hakes Const.
3-12 7,521 08/02/02 08/16/02 Hakes Const.
3-13 13,193 08/27/02 09/05/02 Hakes Const.
3-14 19,505 09/26/02 11/01/02 Hakes Const.
3-15 19,893 09/26/02 11/01/02 Hakes Const.
3-16 19,961 09/26/02 11/01/02 Hakes Const.
3-18 16,146 10/15/02 12/02/02 Hakes Const.
3-19 -13,589 11/05/02 12/02/02 Hakes Const.
3-2 21,231 10/02/01 01/08/02 Hakes Const.
3-20 4,042 02/10/03 02/14/03 Hakes Const.
3-21 3,798 09/09/03 09/19/03 Hakes Const.
3-22 -3,520 04/23/04 04/28/04 Hakes Const.
3-3 24,439 10/02/01 01/08/02 Hakes Const.
3-7 1,533 03/15/02 04/19/02 Hakes Const.
3-8 15,929 03/28/02 04/26/02 Hakes Const.
3-9 5,527 04/12/02 04/25/02 Hakes Const.
4-10 5,930 04/29/03 05/05/03 McLaughlin Roofing
4-11 3,097 04/29/03 05/05/03 McLaughlin Roofing
4-12 1,199 08/11/03 09/05/03 McLaughlin Roofing
4-13 2,357 06/24/03 06/30/03 McLaughlin Roofing
4-2 -529 11/06/01 02/08/02 McLaughlin Roofing
4-4 -4,254 04/12/02 04/25/02 McLaughlin Roofing
4-5 3,774 06/19/02 07/12/02 McLaughlin Roofing
4-6 4,510 08/27/02 09/05/02 McLaughlin Roofing
4-7 10,393 10/15/02 12/02/02 McLaughlin Roofing
4-8 7,981 11/20/02 01/03/03 McLaughlin Roofing
4-9 16,189 02/18/03 02/26/03 McLaughlin Roofing
4693 959 10/24/02 / / McLaughlin Roofing
5-3 3,240 04/26/02 05/17/02 Cortland Glass
5-4 3,922 07/03/02 07/15/02 Cortland Glass
5-5 3,439 10/17/02 12/02/02 Cortland Glass
5-6 3,602 10/24/02 12/02/02 Cortland Glass
5-7 850 03/27/03 04/03/03 Cortland Glass
5-8 925 04/29/03 05/05/03 Cortland Glass
5-9 -3,000 06/24/03 06/30/03 Cortland Glass
6-1 9,062 10/02/01 01/08/02 John C. Lowery
6-10 4,099 11/20/02 01/03/03 John C. Lowery
6-11 19,135 11/20/02 01/02/03 John C. Lowery
6-12 19,947 11/20/02 01/02/03 John C. Lowery
6-13 10,187 03/10/03 03/18/03 John C. Lowery
6-14 13,391 03/10/03 03/18/03 John C. Lowery
6-15 1,106 04/29/03 05/05/03 John C. Lowery
6-16 2,962 04/29/03 05/05/03 John C. Lowery
6-17 8,072 06/24/03 06/30/03 John C. Lowery
6-18 13,288 06/24/03 06/30/03 John C. Lowery
6-19 9,083 07/17/03 07/24/03 John C. Lowery
6-20 8,413 09/09/03 11/04/03 John C. Lowery
6-5 3,986 04/12/02 04/25/02 John C. Lowery
6-6 10,600 05/09/02 06/04/02 John C. Lowery
6-7 7,703 08/02/02 08/16/02 John C. Lowery
6-8 8,101 10/17/02 12/02/02 John C. Lowery
6-9 8,945 10/24/02 12/02/02 John C. Lowery
7-2 6,400 12/21/01 03/25/02 KSP Painting
7-4 13,620 08/27/02 09/05/02 KSP Painting
7-5 4,000 10/17/02 12/02/02 KSP Painting
7-6 6,312 07/17/03 07/24/03 KSP Painting
7-7 5,276 09/09/03 09/19/03 KSP Painting
7-8 2,700 12/20/04 12/28/04 KSP Painting
8-1 18,600 08/06/01 01/08/02 Jason Mfg.
8-2 -6,743 05/09/02 06/04/02 Jason Mfg.
8-3 5,290 11/20/02 01/03/03 Jason Mfg.
8-4 4,655 03/27/03 04/03/03 Jason Mfg.
8-5 0 06/24/03 06/30/03 Jason Mfg.
9-10 3,153 03/28/02 04/26/02 Ferrauilo Plumbing
9-11 2,737 04/12/02 04/25/02 Ferrauilo Plumbing
9-12 7,526 04/26/02 05/07/02 Ferrauilo Plumbing
9-14 3,687 07/03/02 07/15/02 Ferrauilo Plumbing
9-15 9,962 08/02/02 01/07/03 Ferrauilo Plumbing
9-16 11,734 08/27/02 09/05/02 Ferrauilo Plumbing
9-17 9,046 09/26/02 11/01/02 Ferrauilo Plumbing
9-20 5,078 03/27/03 04/03/03 Ferrauilo Plumbing
9-21 -575 03/10/03 03/18/03 Ferrauilo Plumbing
9-22 10,218 03/10/03 03/18/03 Ferrauilo Plumbing
9-23 7,955 04/29/03 05/05/03 Ferrauilo Plumbing
9-24 7,511 06/24/03 06/30/03 Ferrauilo Plumbing
9-25 17,892 06/24/03 06/30/03 Ferrauilo Plumbing
9-26 10,259 06/24/03 06/30/03 Ferrauilo Plumbing
9-27 7,428 09/09/03 09/19/03 Ferrauilo Plumbing
9-29 2,887 11/06/03 11/13/03 Ferrauilo Plumbing
9-8 4,314 01/24/02 03/04/02 Ferrauilo Plumbing
9-9 4,075 03/15/02 04/19/02 Ferrauilo Plumbing
03-0757FP Reconstruction 0-006-FP1 12/02/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Wightman Primary:
99-0595 Additions and Alterations 0-007-004 05/10/00 *CO No.* Amount Disallowed Received Approved Contractor
1 7,497 04/30/01 02/06/02 LeChase Const.
1-10 1,044 10/02/01 01/08/02 LeChase Const.
1-11 2,374 10/02/01 01/08/02 LeChase Const.
1-12 3,847 10/02/01 01/08/02 LeChase Const.
1-13 802 10/10/01 02/11/02 LeChase Const.
1-14 468 11/15/01 02/08/02 LeChase Const.
1-15 10,942 11/06/01 02/08/02 LeChase Const.
1-16 4,695 12/04/01 01/13/03 LeChase Const.
1-17 16,296 02/24/02 03/04/02 LeChase Const.
1-18 6,235 02/24/02 03/04/02 LeChase Const.
1-20 5,014 02/24/02 03/04/02 LeChase Const.
1-21 8,796 02/19/02 04/01/02 LeChase Const.
1-23 6,723 03/15/02 04/19/02 LeChase Const.
1-31 12,182 05/23/02 06/04/02 LeChase Const.
1-40 16,887 11/05/02 12/02/02 LeChase Const.
1-6 -6,600 08/29/01 01/15/02 LeChase Const.
1-7 863 10/02/01 01/08/02 LeChase Const.
1-8 5,623 10/02/01 01/08/02 LeChase Const.
1-9 2,208 10/02/01 01/08/02 LeChase Const.
10-10 9,894 02/19/02 04/01/02 Cashette Elec.
10-16 9,539 06/19/02 07/12/02 Cashette Elec.
10-5 570 10/02/01 01/08/02 Cashette Elec.
10-6 2,578 10/10/01 02/11/02 Cashette Elec.
10-7 1,051 10/10/01 02/11/02 Cashette Elec.
12-4 3,948 08/29/01 01/29/02 Frey & Campbell
12-7 18,087 11/06/01 02/08/02 Frey & Campbell
12-8 1,580 12/21/01 03/08/02 Frey & Campbell
3-5 12,009 11/15/01 02/08/02 Hakes Const.
3-6 10,470 11/19/01 02/11/02 Hakes Const.
4-1 -22,852 11/06/01 02/08/02 McLaughlin Roofing
4-14 7,543 09/25/03 10/03/03 McLaughlin Roofing
4-3 3,297 02/19/02 04/01/02 McLaughlin Roofing
5-1 1,506 08/29/01 01/15/02 Cortland Glass
5-10 -1,500 06/24/03 06/30/03 Cortland Glass
6-2 1,765 10/10/01 02/11/02 John Lowery
6-4 2,705 01/24/02 03/04/02 John Lowery
7-1 3,400 12/04/01 01/13/03 KSP Painting
7-3 8,800 04/19/02 05/07/02 KSP Painting
9-13 2,743 06/19/02 07/12/02 Ferrauilo Plumbing
9-18 13,833 09/26/02 11/01/02 Ferrauilo Plumbing
9-19 2,457 11/20/02 01/02/03 Ferrauilo Plumbing
9-2 1,445 10/02/01 01/08/02 Ferrauilo Plumbing
9-28 808 09/09/03 09/19/03 Ferrauilo Plumbing
9-3 891 10/10/01 02/11/02 Ferrauilo Plumbing
9-5 9,213 11/06/01 01/29/02 Ferrauilo Plumbing
9-6 2,668 11/19/01 02/11/02 Ferrauilo Plumbing
9-7 2,381 02/24/02 03/25/02 Ferrauilo Plumbing
02-2202FP Reconstruction 0-007-FP1 08/06/03 NO CHANGE ORDERS ON ELECTRONIC FILE
New Athletic Storage Building:
94-0217 New Construction 2-015-001 10/03/94 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage Maintenance:
00-0282 Reconstruction 5-009-001 01/30/01 *CO No.* Amount Disallowed Received Approved Contractor
1-1 1,734 10/10/01 02/26/02 R Hyland & Son
1-10 8,282 04/26/02 05/30/02 R Hyland & Son
1-11 10,063 05/15/02 05/24/02 R Hyland & Son
1-12 1,432 06/19/02 08/15/02 R Hyland & Son
1-13 1,236 06/19/02 08/15/02 R Hyland & Son
1-16 13,887 12/06/02 01/02/03 R Hyland & Son
1-17 5,161 10/17/02 11/07/02 R Hyland & Son
1-18 10,401 02/10/03 02/27/03 R Hyland & Son
1-19 11,144 02/10/03 02/27/03 R Hyland & Son
2-10 -2,757 04/12/02 05/24/02 Suite Kote Contracting
2-12 12,771 12/06/02 01/02/03 Suite Kote Contracting
2-13 5,406 10/17/02 11/07/02 Suite Kote Contracting
2-9 3,675 03/28/02 05/24/02 Suite Kote Contracting
4-10 11,007 06/19/02 08/15/02 Burns Elec.
4-12 -3,079 01/29/03 02/04/03 Burns Elec.
4-4 3,627 10/10/01 01/10/03 Burns Elec.
4-7 16,946 03/28/02 05/24/02 Burns Elec.
4-8 1,568 05/15/02 05/24/02 Burns Elec.
4-9 4,424 06/19/02 08/15/02 Burns Elec.
5-7 7,710 06/19/02 08/15/02 Frey & Campbell
5-8 16,652 04/28/03 05/05/03 Frey & Campbell
New Bus Garage & Maintenance Facilit:
00-0283 New Construction 5-017-001 01/30/01 *CO No.* Amount Disallowed Received Approved Contractor
1-14 17,602 08/02/02 08/16/02 R Hyland & Son
1-15 13,971 08/02/02 08/16/02 R Hyland & Son
1-2 6,900 10/10/01 02/26/02 R Hyland & Son
1-3 12,120 10/30/01 01/09/03 R Hyland & Son
1-4 7,924 11/19/01 05/22/02 R Hyland & Son
1-5 12,244 01/24/02 05/13/02 R Hyland & Son
1-6 12,190 01/24/02 05/13/02 R Hyland & Son
1-7 1,781 01/24/02 05/13/02 R Hyland & Son
1-8 10,550 03/07/02 04/04/02 R Hyland & Son
1-9 1,833 04/12/02 05/28/02 R Hyland & Son
2-11 8,635 05/23/02 05/29/02 Suit Kote Contracting
2-4 0 10/02/01 01/14/03 Suit-Kote Contracting
2-6 10,215 11/19/01 05/22/02 Suit-Kote Contracting
2-7 813 01/24/02 05/13/02 Suit-Kote Contracting
2-8 -4,002 01/24/02 05/13/02 Suit-Kote
4-11 7,308 08/02/02 08/16/02 Burns Elec.
4-3 5,422 01/24/02 05/13/02 Burns Elec.
4-5 2,321 10/30/01 01/09/03 Burns Elec.
4-6 15,133 03/07/02 04/04/02 Burns Elec.
5-2 1,298 12/21/01 03/29/02 Frey & Campbell
5-3 2,335 01/24/02 05/13/02 Frey & Campbell
5-4 8,561 01/24/02 05/13/02 Frey & Campbell
5-5 2,004 01/24/02 05/13/02 Frey & Campbell
5-6 12,983 04/12/02 05/24/02 Frey & Campbell
Soccer Field Press Box:
90-0688 New Construction 7-013-001 01/17/91 NO CHANGE ORDERS ON ELECTRONIC FILE
House/site purchase 41 Robie Street:
99-0196 New Construction 7-018-001 11/09/99 NO CHANGE ORDERS ON ELECTRONIC FILE
Concession Stand:
02-0051 New Construction 7-019-001 11/07/02 NO CHANGE ORDERS ON ELECTRONIC FILE
BRADFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-04-01-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
K-12:
92-1340 Reconstruction 0-001-002 07/13/93 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0128 Additions and Alterations 0-001-003 11/16/99 *CO No.* Amount Disallowed Received Approved Contractor
5 2,268 05/24/02 05/28/02 RC Daniel
AV-1 9,250 09/20/01 02/07/02 Delaware AV Dist.
AV-2 6,036 09/20/01 02/07/02 Delaware AV Dist.
C-1 359 05/24/02 05/28/02 O'Connell Elec.
C-2 2,646 05/24/02 05/28/02 O'Connell Elec.
C-3 3,282 05/24/02 05/28/02 O'Connell Elec.
E-18 849 08/03/01 01/30/02 RC Daniel
E-20 15,890 05/24/02 05/28/02 RC Daniel
E-20 15,890 08/15/01 01/14/03 RC Daniel
E-21 4,000 02/22/02 04/01/02 RC Daniel
E-22 4,563 05/24/02 05/28/02 RC Daniel
E-7 639 05/24/02 05/28/02 RC Daniel
G-1 2,599 05/24/02 05/28/02 Keuka Const.
G-2 693 05/24/02 05/28/02 Keuka Const.
G-3 2,181 05/24/02 05/28/02 Keuka Const.
G-4 842 05/24/02 05/28/02 Keuka Const.
G-8 2,523 05/24/02 05/28/02 Keuka Const.
G-9 742 05/24/02 05/28/02 Keuka Const.
H-1 6,610 08/03/01 01/30/02 Faulks Plumbing
P-1 1,168 05/24/02 05/28/02 Faulks Plumbing
P-2 750 08/03/01 01/30/02 Faulks Plumbing
S-1 6,000 05/24/02 05/28/02 RC Billings
00-0878 Additions and Alterations 0-001-005 07/17/01 *CO No.* Amount Disallowed Received Approved Contractor
E-1 3,120 03/04/02 05/23/02 Matco Elec.
E-2 3,737 03/04/02 05/23/02 Matco Elec.
E-3 13,585 05/30/02 08/15/02 Matco Elec.
E-4 2,861 06/13/02 11/04/02 Matco Elec.
E-5 6,895 09/27/02 11/06/02 Matco Elec.
E-6 9,767 07/17/03 07/24/03 Matco Elec.
E-7 754 07/17/03 07/24/03 Matco Elec.
GC-1 -61,100 06/22/04 06/22/04 Iversen Const.
GC-2 1,403 02/22/02 03/29/02 Iversen Const.
GC-4 3,873 06/22/04 06/22/04 Iversen Const.
GC-5 -4,426 05/31/02 02/13/03 Iversen Const.
GC-6 15,191 06/13/02 11/04/02 Iversen Const.
GC-7 564 06/22/04 06/22/04 Iversen Const.
GC-8 7,389 06/27/02 07/03/02 Iversen Const.
GC-9 18,867 09/16/02 01/08/03 Iversen Const.
H-1 1,002 04/09/02 05/23/02 Faulks Plumbing
H-2 7,856 10/24/02 11/07/02 Faulks Plumbing
P-1 5,782 02/22/02 03/29/02 Postler and Jaeckle
P-2 1,157 02/22/02 03/29/02 Postler and Jaeckle
P-3 1,054 03/04/02 05/23/02 Postler and Jaeckle
P-4 6,213 06/07/02 11/04/02 Postler and Jaeckle
S-1 -13,800 12/11/01 03/21/02 Scott's Const.
07-0542 Reconstruction 0-001-006 03/10/08 *CO No.* Amount Disallowed Received Approved Contractor
P-001 -24,389 07/28/08 / / FREU & CAMPBELL, INC.
P-002 -3,561 07/28/08 / / FREY & CAMPBELL, INC.
03-0085FP Reconstruction 0-001-FP1 10/14/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
92-1446 Reconstruction 5-002-003 07/13/93 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0879 Additions and Alterations 5-002-004 07/17/01 *CO No.* Amount Disallowed Received Approved Contractor
GC-3 15,928 05/30/02 08/15/02 Iverson Const.
Bus Garage / Maintenance Facility:
02-0302 New Construction 5-006-001 05/08/03 *CO No.* Amount Disallowed Received Approved Contractor
E-001 8,925 09/16/03 09/23/03 Kaplan Schmidt
E-002 2,311 10/15/04 10/25/04 Kaplan Schmidt
E-003 -2,000 10/15/04 10/25/04 Kaplan Schmidt
E-004 2,538 10/15/04 10/25/04 Kaplan Schmidt
E-005 1,508 07/01/05 07/20/05 Kaplan Schmidt Electric
G-001 -2,600 11/17/03 11/21/03 Streeter Associates
G-002 4,599 11/17/03 11/21/03 Streeter Associates
G-003 2,576 11/17/03 11/21/03 Streeter Associates
G-004 6,923 12/20/04 12/28/04 Streeter Associates
G-005 2,250 12/20/04 12/28/04 Streeter Associates
G-007 2,018 01/18/05 02/11/05 Streeter Associates
H-001 23,986 09/16/03 09/23/03 Kimble, Inc.
P-001 4,734 04/15/04 04/28/04 Finger Lakes Piping
CAMPBELL-SAVONA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-06-03-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Campbell 6-12:
92-1559 Reconstruction 0-001-001 08/12/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1396 Additions and Alterations 0-001-002 09/13/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1387 Reconstruction 0-001-004 06/25/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0951 Additions and Alterations 0-001-005 04/30/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0207 Reconstruction 0-001-007 01/11/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0317 Alterations 0-001-008 03/02/00 *CO No.* Amount Disallowed Received Approved Contractor
E-2 3,427 08/13/02 09/05/02 RG Burns, Inc
L-2 -2,522 12/17/01 03/05/02 RC Billings
00-1518 Additions and Alterations 0-001-009 11/07/01 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 10,610 03/18/02 04/29/02 John Mills Elec.
EC-2 5,916 12/24/02 02/14/03 John Mills Elec.
EC-7 -17,625 09/30/03 10/06/03 John Mills Elec.
GC-1 200,200 03/13/02 04/29/02 Streeter Assoc.
GC-2 8,999 05/05/03 05/07/03 Streeter Assoc.
GC-3 -32,181 12/22/03 12/31/03 Streeter Assoc.
HC-1 124,300 03/13/02 04/29/02 Frey and Campbell
HC-2 16,767 05/31/02 06/17/02 Frey and Campbell
HC-3 -96,006 11/01/02 02/05/03 Frey and Campbell
HC-4 -25,635 12/22/03 12/30/03 Frey and Campbell
PC-1 16,000 03/13/02 04/29/02 Frey and Campbell
PC-2 8,513 05/06/02 05/13/02 Frey and Campbell
PC-3 3,787 05/31/02 06/17/02 Frey and Campbell
PC-4 5,252 11/01/02 02/05/03 Frey and Campbell
PC-6 -3,000 12/22/03 12/30/03 Frey and Campbell
SC-1 10,046 08/13/02 10/28/02 Suite-Kote Contracting
SC-2 4,556 03/18/03 04/18/03 Suite-Kote Contracting
SFC-1 14,000 03/13/02 04/29/02 Suite-Kote Contracting
SFC-2 5,506 06/30/03 07/02/03 Suite-Kote Contracting
SFC-3 -11,356 08/06/03 08/26/03 Suite-Kote Contracting
SFC-4 2,299 11/06/03 11/20/03 Suit Kote Contracting
TC-1 0 03/20/02 04/29/02 Meson Network Services
TC-2 -12,682 06/30/03 07/02/03 Scientel Americal
02-1066 Reconstruction 0-001-010 05/20/03 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 21,958 02/02/04 / / John Mills Electric
EC-2 3,528 02/02/04 03/05/04 John Mills Electric
06-0966 Reconstruction 0-001-011 03/02/07 *CO No.* Amount Disallowed Received Approved Contractor
G-001 6,750 06/06/07 07/17/07 Archie Donougher Sanding
07-2271 Reconstruction 0-001-013 06/23/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0792FP Reconstruction 0-001-FP1 12/24/02 NO CHANGE ORDERS ON ELECTRONIC FILE
K-5 Savona:
93-0089 Additions and Alterations 0-003-001 09/27/93 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1560 Reconstruction 0-003-002 08/12/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0555 Reconstruction 0-003-003 02/10/94 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1034 Reconstruction 0-003-004 04/25/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1593 Reconstruction 0-003-006 06/25/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0952 Reconstruction 0-003-008 04/30/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0208 Reconstruction 0-003-009 01/11/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0318 Reconstruction 0-003-010 03/02/00 *CO No.* Amount Disallowed Received Approved Contractor
E-1 963 02/04/02 03/25/02 RG Burns Elec.
00-1517 Additions and Alterations 0-003-011 11/07/01 *CO No.* Amount Disallowed Received Approved Contractor
EC-3 7,845 04/01/03 04/18/03 John Mills Elec.
EC-4 4,046 05/05/03 05/07/03 John Mills Elec.
EC-5 14,774 05/05/03 05/07/03 John Mills Elec.
EC-6 4,281 05/29/03 06/04/03 John Mills Elec.
PC-5 6,436 04/01/03 04/18/03 Frey & Campbell
SC-3 2,436 06/30/03 07/02/03 Suite-Kote Contracting
02-1067 Reconstruction 0-003-012 05/20/03 *CO No.* Amount Disallowed Received Approved Contractor
EC-3 1,888 03/03/04 / / John Mills Electric
EC-4 -1,606 03/15/05 03/31/05 John Mills Electric
02-0791FP Reconstruction 0-003-FP1 12/24/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Storage Garage:
00-1519 Reconstruction 2-004-001 11/07/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
92-0963 Reconstruction 5-002-001 04/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
New Bus Garage:
97-0007 New Construction 5-006-002 08/01/97 NO CHANGE ORDERS ON ELECTRONIC FILE
Campbell Press Box:
00-1520 New Construction 7-007-001 11/07/01 NO CHANGE ORDERS ON ELECTRONIC FILE
New Concession Stand:
03-1051 New Construction 7-009-001 09/17/04 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 1,340 08/08/05 08/15/05 John Mills Electric
PC-01 -1,000 01/05/06 03/14/06 GVE Inc
District Wide:
07-0983 Reconstruction 7-999-001 12/17/07 NO CHANGE ORDERS ON ELECTRONIC FILE
CANISTEO CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-07-01-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Junior Senior High School:
91-1148 Reconstruction 0-001-004 04/30/92 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0359 Reconstruction 0-001-005 12/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0936 Reconstruction 0-001-006 03/29/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1147 Reconstruction 0-001-007 06/03/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1179 Reconstruction 0-001-008 11/21/01 *CO No.* Amount Disallowed Received Approved Contractor
00001 -32,800 09/26/02 02/26/03 Environ. Protection Roofing
00001 -2,600 09/26/02 11/01/02 RE Krug
00001 -62,800 09/26/02 02/26/03 DeSprit Mosaic and Tile
00001 -26,641 09/26/02 02/26/03 Frey and Campbell
00001 -1,722 09/26/02 02/26/03 Blackmon-Farrell Elec.
00001 -50,712 09/26/02 02/26/03 Hey's Enterprises
00001 -14,825 09/26/02 02/26/03 Javen Const.
00002 1,068 10/10/02 12/02/02 Environ. Protection Roofing
00002 -5,000 02/18/03 02/26/03 Lamberts Asbestos Removal Service
00003 714 10/10/02 12/02/02 Javen Const.
00003 529 01/21/03 02/06/03 Frey & Campbell
00003 19,612 04/23/04 04/28/04 Lamberts Asbestos Removal
00004 282 10/10/02 12/02/02 Javen Const.
00004 957 10/10/02 12/02/02 Blackmon-Farrell Elec.
00004 2,007 01/21/03 02/06/03 Frey & Campbell
00004 -22,577 04/23/04 04/28/04 Hey's Enterprises
00005 1,042 10/10/02 12/02/02 Javen Const.
00005 907 01/21/03 02/06/03 Frey & Campbell
00006 3,776 12/23/02 01/08/03 Javen Const.
00007 6,214 12/23/02 01/10/03 Javen Const.
00008 930 12/23/02 01/10/03 Javen Const.
00009 219 12/23/02 01/10/03 Javen Const.
00010 546 12/23/02 01/10/03 Javen Const.
00012 -500 02/18/03 02/26/03 Javen Const.
00014 -2,450 02/26/03 03/11/03 Javen Const.
Elementary:
96-0358 Additions and Alterations 0-002-001 12/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1148 Reconstruction 0-002-002 06/03/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1180 Reconstruction 0-002-003 11/21/01 *CO No.* Amount Disallowed Received Approved Contractor
00001 -20,223 11/29/02 01/03/03 Hey's Enterprises
00001 -14,200 11/29/02 03/18/03 Javen Const.
00001 -9,900 11/29/02 01/03/03 DeSprit Mosaic & Tile
00001 -44,386 11/29/02 02/26/03 Frey & Campbell
00001 -3,998 11/29/02 02/26/03 Blackmon-Farrell Elec.
00002 4,270 10/10/02 12/02/02 Hey's Enterprises
00002 -3,602 10/10/02 12/02/02 Javen Const.
00002 19,782 10/10/02 12/02/02 Blackmon-Farrell Elec.
00002 10,262 01/21/03 02/06/03 Frey & Campbell
00003 480 10/10/02 12/02/02 Hey's Enterprises
00003 805 10/10/02 12/02/02 Blackmon-Farrell Elec.
00003 6,012 05/21/03 06/03/03 Environ. Prot. Roofing
00005 104,460 01/21/03 02/06/03 Blackmon-Farrell Elec.
00011 230 12/23/02 01/08/03 Javen Const.
00013 2,177 02/18/03 02/26/03 Javen Const.
00015 -2,095 02/26/03 03/11/03 Javen Const.
03-1384FP Reconstruction 0-002-FP1 06/07/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Preston House:
00-1181 Reconstruction 0-003-001 11/21/01 *CO No.* Amount Disallowed Received Approved Contractor
00001 -3,007 11/29/02 05/22/03 Hey's Enterprises
Maint. Bldg / High School:
00-1182 New Construction 3-018-001 11/21/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
95-1149 Reconstruction 5-004-003 06/03/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1185 Reconstruction 5-004-004 11/21/01 *CO No.* Amount Disallowed Received Approved Contractor
00001 5,308 09/26/02 11/01/02 Onsyr Inc
00001 -32,180 11/29/02 05/22/03 Javen Const.
00001 -15,899 11/29/02 01/03/03 Frey & Campbell
00001 -2,711 02/18/03 02/26/03 Blackmon-Farrell Elec.
BG-01 -5,250 02/18/03 02/26/03 Environmental Protection Roofing
BG-01 -20,214 02/18/03 02/26/03 Javen Const.
Concession Stand:
99-1347 New Construction 7-015-001 06/29/00 NO CHANGE ORDERS ON ELECTRONIC FILE
Press Box @ Elementary School:
00-1183 New Construction 7-016-001 11/21/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Concession/Restroom @ Elem.:
00-1184 New Construction 7-017-001 11/21/01 *CO No.* Amount Disallowed Received Approved Contractor
00001 -3,166 02/18/03 02/26/03 Blackmon-Farrell Elec.
00001 -12,262 02/18/03 02/26/03 Frey & Campbell
CS-01 -6,300 02/18/03 02/26/03 Environ. Protection Roofing
CS-01 -62,000 02/18/03 02/26/03 Javen Const.
COHOCTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-09-05-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Bus Garage See Reorg#57.30.02.04:
91-0471 Reconstruction 5-002-001 12/16/91 NO CHANGE ORDERS ON ELECTRONIC FILE
CORNING-PAINTED POST SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-10-00-01
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Fred Carder Elementary:
90-1173 Reconstruction 0-005-004 05/01/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0889 Reconstruction 0-005-006 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0617 Reconstruction 0-005-007 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0432 Reconstruction 0-005-008 11/28/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1866 Reconstruction 0-005-009 08/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0956 Reconstruction 0-005-010 04/01/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0596 Reconstruction 0-005-011 04/20/01 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 rev 19,802 05/14/02 06/04/02 John Mills Elec.
EC-2 15,221 05/14/02 06/04/02 John Mills Elec.
EC-4 3,542 02/20/03 03/18/03 John Mills Elec.
GC-05 8,760 05/14/02 06/04/02 Keuka Const.
GC-3 6,207 01/10/02 03/26/02 Keuka Const.
GC-4 49,401 01/10/02 03/26/02 Keuka Const.
GC-6 -454 01/14/03 02/06/03 Keuka Const.
HC-1 5,223 11/18/02 11/19/02 Kimble, Inc.
PC-1 5,443 05/14/02 06/04/02 Postler and Jaeckle
99-0226 Reconstruction 0-005-013 12/21/99 *CO No.* Amount Disallowed Received Approved Contractor
2 -46,894 06/24/02 / / Custom Energy
01-0814 Additions and Alterations 0-005-014 07/08/02 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1466 Reconstruction 0-005-015 06/04/04 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0840 Reconstruction 0-005-016 05/12/05 *CO No.* Amount Disallowed Received Approved Contractor
GC-4 1,991 05/19/06 06/23/06 Keuka Construction
05-0565 Reconstruction 0-005-017 06/13/06 *CO No.* Amount Disallowed Received Approved Contractor
MC-1 3,821 01/22/08 04/02/08 KIMBLE INC
MC-2 3,206 01/22/08 04/02/08 KIMBLE INC.
06-0444 Additions and Alterations 0-005-018 04/24/07 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1869FP Reconstruction 0-005-FP1 05/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Corning Academy Middle School:
90-1174 Reconstruction 0-007-007 05/01/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0890 Reconstruction 0-007-008 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0618 Reconstruction 0-007-009 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0433 Reconstruction 0-007-010 11/28/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1674 Reconstruction 0-007-011 06/20/97 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0957 Reconstruction 0-007-012 04/01/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0227 Reconstruction 0-007-015 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1467 Reconstruction 0-007-018 06/04/04 *CO No.* Amount Disallowed Received Approved Contractor
GC-01 2,199 02/14/05 03/17/05 Massa construction Inc
RC-2 13,608 10/30/06 12/18/06 J and B Installations
05-0566 Reconstruction 0-007-019 06/13/06 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 7,507 01/22/08 04/04/08 STREETER ASSOCIATES
06-0445 Reconstruction 0-007-020 04/24/07 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1873FP Reconstruction 0-007-FP1 05/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Erwin Valley Elementary:
92-1179 Reconstruction 0-009-005 06/09/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0891 Reconstruction 0-009-006 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0619 Additions and Alterations 0-009-008 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1874 Reconstruction 0-009-010 08/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0228 Reconstruction 0-009-013 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0815 Additions and Alterations 0-009-014 07/08/02 *CO No.* Amount Disallowed Received Approved Contractor
E-02 1,584 07/23/03 07/25/03 John Mills Elec.
E-05 4,984 10/31/03 01/08/04 John Mills Elec.
E-07 2,844 12/26/03 01/08/04 John Mills Elec.
E-08 -81 02/23/04 03/05/04 John Mills Elec.
E-09 1,918 02/23/04 03/05/04 John Mills Elec.
E-10 -74 04/20/04 04/23/04 John Mills Elec.
G-11 1,855 06/30/03 07/02/03 Keuka Const.
G-13 7,942 06/30/03 07/02/03 Keuka Const.
G-23 1,516 12/26/03 12/31/03 Keuka Const.
G-24 2,339 02/06/04 02/20/04 Keuka Const.
G-25 4,565 02/06/04 02/20/04 Keuka Const.
G-28 14,665 02/23/04 03/02/04 Keuka Const.
G-30 2,053 09/07/04 09/24/04 Keuka Const.
G-31 2,813 10/15/04 10/26/04 Keuka Const.
H-03 1,420 06/04/03 06/25/03 Postler and Jaeckle
03-1468 Reconstruction 0-009-015 06/04/04 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0446 Reconstruction 0-009-016 04/24/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Hugh W. Gregg Elementary:
90-1175 Reconstruction 0-010-006 05/01/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0888 Reconstruction 0-010-007 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0620 Reconstruction 0-010-008 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1867 Reconstruction 0-010-009 08/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1876 Reconstruction 0-010-010 09/08/98 *CO No.* Amount Disallowed Received Approved Contractor
E2-2 38,993 02/26/01 01/14/03 Bouille Elec.
E2-4 -3,828 04/12/02 05/24/02 Bouille Elec.
EC-4 48,118 01/09/01 01/14/03 J. Mills Elec.
00-0598 Reconstruction 0-010-011 04/20/01 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0229 Reconstruction 0-010-013 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0816 Additions and Alterations 0-010-014 07/08/02 *CO No.* Amount Disallowed Received Approved Contractor
E-03 -5,635 08/19/03 09/09/03 John Mills Elec.
G-17 -3,102 09/09/03 09/16/03 Keuka Const.
04-0841 Reconstruction 0-010-015 05/12/05 *CO No.* Amount Disallowed Received Approved Contractor
Gc-1 -4,591 05/15/06 06/23/06 Keuka Construction
05-0567 Reconstruction 0-010-016 06/13/06 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0447 Reconstruction 0-010-017 04/24/07 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1867FP Reconstruction 0-010-FP1 05/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Lindley-Presho Elementary School:
90-1176 Reconstruction 0-011-006 05/01/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1180 Reconstruction 0-011-007 06/09/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0892 Reconstruction 0-011-008 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0621 Reconstruction 0-011-009 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1870 Reconstruction 0-011-011 08/18/98 *CO No.* Amount Disallowed Received Approved Contractor
EC-3 44,753 01/09/01 01/14/03 John Mills Elec.
00-0597 Reconstruction 0-011-012 04/20/01 *CO No.* Amount Disallowed Received Approved Contractor
HC-1 420 11/18/02 / / Kimble, Inc.
99-0230 Reconstruction 0-011-014 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0817 Additions and Alterations 0-011-015 07/08/02 *CO No.* Amount Disallowed Received Approved Contractor
G-01 3,309 06/04/03 06/25/03 Keuka Const.
G-16 1,215 08/19/03 09/02/03 Keuka Const.
G-21 1,857 10/20/03 10/24/03 Keuka Const.
G-26 1,335 02/06/04 02/20/04 Keuka Const.
G-29 1,418 03/18/04 04/06/04 Keuka Const.
H-01 -2,214 06/04/03 06/25/03 Postler & Jaeckle
05-0568 Reconstruction 0-011-017 06/13/06 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0448 Reconstruction 0-011-018 04/24/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Northside Blodgett Middle School:
93-0893 Reconstruction 0-013-007 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0622 Reconstruction 0-013-008 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0434 Reconstruction 0-013-009 11/28/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1677 Reconstruction 0-013-010 06/20/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1261 Reconstruction 0-013-011 08/09/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0231 Reconstruction 0-013-014 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0569 Reconstruction 0-013-017 06/13/06 *CO No.* Amount Disallowed Received Approved Contractor
PC-1 3,936 01/22/08 04/02/08 FREY & COMBPELL
06-0449 Reconstruction 0-013-018 04/24/07 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1871FP Reconstruction 0-013-FP1 05/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Phillips Elementary:
93-0894 Reconstruction 0-016-006 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0623 Reconstruction 0-016-007 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1868 Reconstruction 0-016-008 08/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1875 Reconstruction 0-016-009 09/08/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0595 Reconstruction 0-016-010 04/20/01 *CO No.* Amount Disallowed Received Approved Contractor
EC-3 598 02/20/03 02/26/03 John Mills Electric
99-0232 Reconstruction 0-016-012 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0818 Additions and Alterations 0-016-013 07/08/02 *CO No.* Amount Disallowed Received Approved Contractor
E-01 -570 07/23/03 07/25/03 John Mills Elec.
G-02 15,202 06/04/03 06/25/03 Keuka Const.
G-07 -2,553 06/04/03 06/25/03 Keuka Const.
G-12 1,060 06/30/03 07/02/03 Keuka Const.
G-22 2,364 12/26/03 12/31/03 Keuka Const.
H-02 -65 06/04/03 06/25/03 Postler and Jaeckle
05-0570 Reconstruction 0-016-014 06/13/06 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0450 Reconstruction 0-016-015 04/27/06 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1832FP Reconstruction 0-016-FP1 05/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Frank F Pierce Elementary:
92-1181 Reconstruction 0-017-003 06/09/93 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0624 Reconstruction 0-017-004 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1869 Reconstruction 0-017-005 08/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0543 Reconstruction 0-017-006 03/02/04 *CO No.* Amount Disallowed Received Approved Contractor
EC-02 2,085 08/10/04 09/23/04 Matco Elec.
99-0233 Reconstruction 0-017-008 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0571 Reconstruction 0-017-009 06/13/06 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0451 Reconstruction 0-017-010 04/24/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Wm E. Severn Elementary:
93-0895 Reconstruction 0-018-004 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0625 Additions and Alterations 0-018-005 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1871 Reconstruction 0-018-006 08/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0544 Reconstruction 0-018-007 03/02/04 *CO No.* Amount Disallowed Received Approved Contractor
EC-03 2,398 08/10/04 09/23/04 Matco Elec.
EC-05 10,708 06/13/05 07/08/05 matco Electric Corp
EC-08 252 10/18/06 12/18/06 Matco Electric
GC-02 12,166 12/08/04 12/24/04 Keuka Construction
GC-03 12,732 12/08/04 12/24/04 Keuka Construction
GC-04 13,159 01/11/05 01/24/05 Keuka Construction
GC-05 44,883 01/11/05 01/24/05 Keuka Construction
GC-06 9,267 01/11/05 01/24/05 Keuka Construction
GC-07 18,211 01/11/05 01/24/05 Keuka Construction
GC-08 15,983 01/11/05 01/24/05 Keuka Construction
GC-09 1,245 01/11/05 01/24/05 Keuka Construction
GC-10 3,986 01/11/05 01/24/05 Keuka Construction
GC-11 1,005 01/11/05 01/24/05 Keuka Construction
GC-12 6,389 05/05/05 06/02/05 Keuka Construction Corp
GC-13 37,100 37,100 06/30/05 10/05/06 Keuka Construction
HC-01 1,837 01/28/05 05/02/05 Kimble Mechanical Contractors
99-0234 Reconstruction 0-018-009 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0843 Reconstruction 0-018-012 05/12/05 *CO No.* Amount Disallowed Received Approved Contractor
EC-01 -377 08/14/08 / / BOUILLE ELETRIC INC.
GC-3 -2,804 05/19/06 06/23/06 Keuka Construction
MC-1 -2,774 08/14/08 / / POSTLER AND JAECKLE CORP
05-0572 Reconstruction 0-018-013 06/13/06 *CO No.* Amount Disallowed Received Approved Contractor
MC-3 2,495 01/22/08 04/02/08 KIMBLE
06-0452 Reconstruction 0-018-014 04/24/07 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1870FP Reconstruction 0-018-FP1 05/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Calvin U Smith Elementary:
93-0896 Reconstruction 0-019-007 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0626 Reconstruction 0-019-008 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1872 Reconstruction 0-019-009 08/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1260 Reconstruction 0-019-011 08/09/99 *CO No.* Amount Disallowed Received Approved Contractor
C-4 630 06/20/02 / / Hakes Const.
EC-1 rev 9,863 11/10/00 01/14/03 RG Burns Elec.
EC-2 39,924 11/10/00 01/14/03 RG Burns Elec.
EC-3 22,141 11/10/00 01/14/03 RG Burns Elec.
EC-4 23,687 06/20/02 / / RG Burns Elec.
EC-5 2,711 06/20/02 / / RG Burns Elec.
G-3(rev) 31,742 06/20/02 10/23/03 Keuka Const.
G-5 5,262 01/15/02 03/26/02 Keuka Const.
HC-1 30,469 06/20/02 12/01/03 Kimble, Inc
HC-2 27,191 11/10/00 01/14/03 Kimble, Inc.
HC-3 7,805 06/14/01 01/10/02 Kimble, Inc.
JC-2 27,191 06/20/02 / / Kimble, Inc
PC-1 -2,942 06/14/01 01/10/02 Frey & Campbell
SC-3 41,281 06/20/02 / / Hakes Const.
SC-4 630 12/07/01 04/05/02 Hakes Const.
99-0235 Reconstruction 0-019-013 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0819 Additions and Alterations 0-019-014 07/08/02 *CO No.* Amount Disallowed Received Approved Contractor
E-04 1,161 08/19/03 09/02/03 John Mills Elec.
E-11 318 08/11/04 09/08/04 John Mills Elec.
G-04 9,881 06/04/03 06/25/03 Keuka Const.
G-05 1,580 06/04/03 06/25/03 Keuka Const.
G-06 681 06/04/03 06/25/03 Keuka Const.
G-09 8,049 06/04/03 06/25/03 Keuka Const.
G-10 -2,485 06/04/03 06/25/03 Keuka Const.
G-14 920 06/30/03 07/02/03 Keuka Const.
G-15 3,426 07/23/03 07/25/03 Keuka Const.
G-18 8,055 10/07/03 10/14/03 Keuka Const.
G-19 3,308 10/20/03 10/24/03 Keuka Const.
G-20 2,594 10/20/03 10/24/03 Keuka Const.
G-27 3,191 02/06/04 02/20/04 Keuka Const.
H-04 753 08/19/03 09/02/03 Postler & Jaeckle
06-0453 Reconstruction 0-019-015 04/23/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Winfield Elementary School:
90-1177 Reconstruction 0-021-003 05/01/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0897 Reconstruction 0-021-004 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0627 Reconstruction 0-021-005 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0431 Reconstruction 0-021-006 11/28/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1873 Reconstruction 0-021-007 08/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0599 Reconstruction 0-021-008 04/20/01 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0236 Reconstruction 0-021-010 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0820 Additions and Alterations 0-021-011 07/08/02 *CO No.* Amount Disallowed Received Approved Contractor
E-06 2,165 12/26/03 01/08/04 John Mills Elec.
G-03 5,114 06/04/03 06/25/03 Keuka Const.
G-08 3,346 06/04/03 06/25/03 Keuka Const.
05-0573 Reconstruction 0-021-013 06/13/06 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0454 Reconstruction 0-021-014 04/24/07 NO CHANGE ORDERS ON ELECTRONIC FILE
East High School:
91-0773 Reconstruction 0-023-007 03/27/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0831 Reconstruction 0-023-008 04/08/92 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0162 Reconstruction 0-023-009 08/25/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1233 Reconstruction 0-0