REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Valley Elementary School:
90-1900 Reconstruction 0-004-004 08/16/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0390 Reconstruction 0-004-005 02/13/92 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1212 Reconstruction 0-004-006 05/10/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0872 Additions and Alterations 0-004-007 04/29/94 NO CHANGE ORDERS ON ELECTRONIC FILE
High School:
90-1901 Reconstruction 0-005-005 08/16/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0391 Reconstruction 0-005-006 02/13/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0873 Reconstruction 0-005-007 04/29/94 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0945 Additions and Alterations 0-005-010 03/20/08 *CO No.* Amount Disallowed Received Approved Contractor
101-001 19,431 10/06/08 01/30/09 EDGER ENTERPRISES OF ELMIRA
101-002 39,736 12/11/08 02/18/09 EDGER ENTERPRISES OF ELMIRA INC.
101-003 4,450 02/05/09 04/03/09 EDGER ENTERPRISES OF ELMIRA INC.
101-004 10,399 06/10/09 / / EDGER ENTERPRISES OF ELMIRA INC
101-005 12,840 06/10/09 07/14/09 EDGER ENTERPRISES OF ELMIRA INC
101-006 -1,174 10/15/09 11/17/09 EDGER ENTERPRISES OF ELMIRA INC
102-001 10,018 10/06/08 01/30/09 ENVIRONMENTAL REMEDIATION
102-003 125,000 02/05/09 04/03/09 ENVIRONMENTAL REMEDIATION SERVICES,
102-004 4,191 02/19/09 04/23/09 ENVIRONMENTAL REMEDIATION SERVICES,
102-005 7,559 04/03/09 07/28/09 ENVIRONMENTAL REMEDIATION SERVICES
102-006 900 06/10/09 07/14/09 ENVIRONMENTAL REMEDIATION SERVICES
102-007 11,943 08/28/09 09/17/09 ENVIRONMENTAL REMEDIATION SERVICES
103-001 27,652 06/10/09 07/14/09 HOLDSWORTH KLIMOWSKI CONSTRUCTION
103-002 9,593 06/10/09 07/14/09 HOLDSWORTH KLIMOWSKI CONSTRUCTION
103-003 1,215 06/10/09 07/14/09 HOLDSWORTH KLIMOWSKI CONSTRUCTION
103-004 42,840 08/06/09 09/03/09 HOLDSWORTH KLIMOWSKI CONSTRUCTION
103-005 222,411 08/28/09 09/17/09 HOLDSWORTH KLIMOWSKI CONSTRUCTION
103-006 31,712 08/28/09 09/17/09 HOLDSWORTH KLIMOWSKI CONSTRUCTION
103-007 13,927 08/28/09 09/17/09 HOLDSWORTH KLIMOWSKI CONSTRUCTION
105-001 -14,000 06/10/09 07/14/09 TOWER ROOFING CO. INC.
105-004 1,467 08/28/09 09/17/09 TOWER ROOFING CO INC
106-001 -9,850 08/06/09 09/03/09 JOSEPH FLIHAN COMPANY
107-001 7,946 06/10/09 07/16/09 SCHOONOVER PLUMBING AND HEATING
107-002 11,715 08/28/09 09/17/09 SCHOONOVER PLUMBING AND HEATING
108-001 12,798 08/28/09 09/17/09 FREY & CAMPBELL INC
109-001 8,556 05/12/09 07/29/09 G.O. WICK, INC.
109-002 2,326 09/24/09 10/13/09 G.O. WICK INC
110-001 -6,600 08/06/09 09/03/09 POLYVISION CORPORATION
02-2453FP Reconstruction 0-005-FP1 09/08/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Tuscarora Elementary:
90-1902 Reconstruction 0-006-004 08/16/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0392 Reconstruction 0-006-005 02/13/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0874 Additions and Alterations 0-006-006 04/29/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0062 Reconstruction 0-006-007 01/10/96 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0166 Reconstruction 0-006-008 05/05/05 *CO No.* Amount Disallowed Received Approved Contractor
EC-001 6,759 05/22/06 / / John Mills Electric
07-0946 Reconstruction 0-006-010 03/20/08 *CO No.* Amount Disallowed Received Approved Contractor
105-002 -14,000 06/10/09 07/14/09 TOWER ROOFING CO. INC
105-003 1,569 08/06/09 09/03/09 TOWER ROOFING CO INC
02-2454FP Reconstruction 0-006-FP1 09/08/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Elem. Storage (New):
94-0198 New Construction 2-014-001 10/27/94 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Storage:
90-1903 Reconstruction 4-002-001 08/16/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0875 Reconstruction 4-002-003 04/29/94 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
90-1904 Reconstruction 5-001-003 08/16/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0876 Reconstruction 5-001-004 04/29/94 NO CHANGE ORDERS ON ELECTRONIC FILE
AVOCA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-02-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Bldg:
91-0424 Reconstruction 0-002-004 12/20/91 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1380 Additions and Alterations 0-002-005 10/15/00 *CO No.* Amount Disallowed Received Approved Contractor
AA-2 16,849 12/04/02 01/03/03 Lambert's Asbestos Removal
EC-1 30,361 11/15/01 02/08/02 Burns Elec.
EC-10 3,858 11/27/02 01/03/03 Burns Elec.
EC-11 3,408 12/24/02 01/08/03 Burns Elec.
EC-12 1,486 01/29/03 02/11/03 Burns Elec.
EC-2(rev 6,166 04/24/02 05/07/02 Burns Elec.
EC-3(rev 13,292 04/24/02 05/07/02 Burns Elec.
EC-4 8,502 05/09/02 06/04/02 Burns Elec.
EC-5 1,827 07/30/02 08/28/02 Burns Elec.
EC-6 2,121 07/30/02 08/28/02 Burns Elec.
EC-7 2,536 06/22/09 / / R.G. BURNS ELECTRIC INC
EC-8 10,092 06/22/09 / / R.G. BURNS ELECTRIC INC
EC-9 rev -2,663 11/01/02 / / Burns Elec.
GC-1 -19,096 11/28/01 03/01/02 Saucke Bros. Const.
GC-2 6,890 11/28/01 / / Saucke Bros. Const.
GC-3 10,855 11/28/01 02/28/02 Saucke Bros. Const.
GC-4 11,776 01/28/02 03/08/02 Saucke Bros. Const.
HC-1 4,843 12/07/01 04/23/02 Faulks Plumbing
HC-2 9,957 12/03/01 01/10/02 Faulks Plumbing
HC-3 22,640 01/18/02 03/25/02 Faulks Plumbing
HC-4 8,083 01/18/02 03/25/02 Faulks Plumbing
HC-5 6,007 05/30/02 08/28/02 Faulks Plumbing
HC-6 1,454 04/12/02 04/25/02 Faulks Plumbing
HC-7 566 08/29/02 09/05/02 Faulks Plumbing
HC-8 6,917 06/26/03 07/01/03 Faulks Plumbing
PC-1 4,284 08/24/01 03/27/02 Frey & Campbell
PC-2 247 06/22/09 09/25/09 FREY & CAMPBELL INC
PC-3 1,939 01/28/02 03/08/02 Frey & Campbell
PC-4 3,063 03/20/02 04/18/02 Frey & Campbell
PC-5 1,279 04/18/02 04/18/02 Frey & Campbell
PC-6 3,530 07/30/02 08/28/02 Frey & Campbell
PC-7 2,021 07/30/02 08/28/02 Frey & Campbell
PC-8 5,112 07/30/02 08/28/02 Frey & Campbell
PC-9 -27,365 06/22/09 09/25/09 FREY & CAMPBELL INC
SC-1 4,100 04/18/01 01/08/02 AL Blades & Sons
SC-10 6,700 01/02/03 01/10/03 AL Blades & Sons
SC-11 25,924 09/22/03 10/03/03 AL Blades & Sons
SC-12 10,221 12/12/03 12/24/03 AL Blades & Sons
SC-2 3,200 06/22/09 08/13/09 A.L. BLADES & SONS INC
SC-3 3,700 02/19/02 04/01/02 AL Blades & Sons
SC-4 4,767 06/22/09 08/13/09 A.L. BLADES & SONS INC
SC-5 14,793 01/18/02 03/25/02 AL Blades & Sons
SC-6 2,536 03/28/02 04/26/02 AL Blades & Sons
SC-7 12,586 07/30/02 08/28/02 AL Blades & Sons
SC-7 0 06/22/09 / / A.L. BLADES & SONS
SC-8 12,030 08/13/02 09/05/02 AL Blades & Sons
SC-9 -5,509 11/08/02 12/11/02 AL Blades & Sons
06-0158 Additions and Alterations 0-002-008 01/22/07 *CO No.* Amount Disallowed Received Approved Contractor
301-001 3,102 10/22/07 10/26/07 HORNING CONSTRUCTION LLC
301-002 12,420 10/22/07 10/26/07 HORNING CONSTRUCTIONLLC
301-004 2,774 10/29/07 11/14/07 Horning Construction
301-005 4,914 10/29/07 11/14/07 Horning Construction
301-007 12,353 11/26/07 12/12/07 HORNING CONSTRUCTION INC.
301-008 7,434 11/26/07 02/23/08 HORNING CONSTRUCTION INC.
301-009 2,697 01/03/08 01/23/08 HORNING CONSTRUCTIOL LLC
301-010 16,198 01/03/08 04/08/08 HORNING CONSTRUCTION
301-011 16,198 01/03/08 04/08/08 HORNING CONSTRUCTION
301-012 4,853 01/03/08 01/23/08 HORNING CONSTRUCTION
301-013 4,647 01/03/08 01/23/08 HORNING CONSTRUCTION
301-014 10,422 01/03/08 01/23/08 HORNING CONSTRUCTION
301-015 11,508 03/10/08 03/19/08 Horning Construction, LLC.
301-016 10,059 01/03/08 09/29/08 HORNING CONSTRUCTION LLC
301-017 8,789 01/03/08 01/24/08 HORNING CONSTRUCTION LLC
301-018 12,334 01/29/08 03/08/08 HORNING CONSTRUCTION LLC
301-019 8,159 01/29/08 08/05/08 HORNING CONSTRUCTION INC.
301-020 4,240 03/10/08 03/19/08 Horning Construction, LLC.
301-021 11,163 03/10/08 03/19/08 Horning Construction LLC.
301-022 5,234 03/10/08 03/19/08 Horning Construction, LLC
301-023 12,127 03/10/08 03/19/08 Horning Construction, LLC
301-024 14,397 03/10/08 03/19/08 Horning Construction, LLC
301-025 10,833 03/10/08 04/11/08 Horning Construction, LLC
301-026 15,504 03/28/08 04/02/08 HORNING CONSTRUCTION LLC.
301-027 6,880 05/21/08 09/29/08 Horning Construction LLC
301-028 18,817 05/21/08 09/29/08 Horning Construction LLC
301-029 4,548 05/21/08 09/29/08 Horning Construction LLC
301-030 14,066 09/23/08 11/06/08 HORNING CONSTRUCTION LLC
301-031 10,226 06/18/08 08/26/08 HORNING CONSTRUCTION INC.
301-032 -458 06/18/08 08/26/08 HORNING CONSTRUCTION
301-034 75,238 02/24/09 04/03/09 HORNING CONSTRUCTION LLC
301-036 14,896 09/22/08 10/24/08 HORNING CONSTRUCTIN LLC
301-037 15,352 09/22/08 10/24/08 HORNING CONSTRUCTION, LLC.
301-039 -26,039 11/05/08 12/02/08 HORNING CONSTRUCTION LLC
301-040 2,760 01/12/09 03/30/09 HORNING CONSTRUCTION LLC
301-041 14,367 01/12/09 06/16/09 HORNING CONSTRUCTION LLC
301-042 13,142 01/12/09 06/16/09 HORNING CONSTRUCTION LLC
301-045 12,709 01/16/09 04/03/09 HORNING CONSTRUCTION LLC
301-046 1,489 01/16/09 06/08/09 HORNING CONSTRUCTION LLC
301-049 -1,282 05/04/09 07/28/09 HORNING CONSTRUCTION LLC
304 -004 2,236 11/06/07 01/16/08 FREY & CAMPBELL INC
304-005 5,224 05/21/08 05/11/09 Frey & Campbell
304-006 2,513 05/21/08 09/29/08 Frey & Campbell Inc.
304-007 2,654 05/21/08 05/11/09 Frey & Campbell Inc.
304-008 8,515 06/18/08 06/18/09 FREY & CAMPBELL INC
304-009 5,166 11/05/08 03/02/09 FREY & CAMPBELL INC.
304-01 1,716 10/22/07 10/26/07 FREY & CAMPBELL INC
304-02 12,340 10/22/07 10/26/07 FREY & CAMPBELL INC
305 -004 18,127 01/03/08 08/05/08 FREY & CAMPBELL INCORPORATED
305 -005 2,588 01/03/08 08/05/08 FREY & CAMPBELL INCORPORATED
305-001 11,832 10/22/07 10/26/07 FREY & CAMPBELL INC
305-002 1,296 10/22/07 01/28/08 FREY & CAMPBELL INC
305-003 5,509 01/03/08 04/09/08 FREY & CAMPBELL INC
305-006 3,186 04/18/08 01/27/09 FREY & CAMPBELL INC.
305-007 1,912 05/21/08 05/11/09 Frey & Campbell Inc.
305-008 13,102 05/21/08 03/02/09 Frey & Campbell Inc.
305-009 1,694 01/28/09 04/23/09 FREY CAMPBELL INC.
306 -006 1,403 01/03/07 08/05/08 BILLITIER ELECTRIC, INCORPORATED
306 -007 3,131 01/03/08 08/05/08 BILLITIER ELECTRIC, INCORPORATED
306-001 4,047 10/22/07 01/28/08 BILLITIER ELECTRIC INC
306-003 6,094 10/22/07 01/28/08 BILLITIER ELECTRIC, INC
306-004 1,465 10/22/07 01/17/08 BILLITER ELECTRIC .INC
306-005 6,207 10/29/07 03/06/09 Billitier Electric
306-005 6,207 11/25/08 05/15/09 BILLITIER ELECTRIC, INC.
306-009 4,291 03/10/08 03/15/08 Billitier Electric, Inc.
306-010 4,643 05/21/08 07/09/09 Billitier Electric, Inc.
306-011 1,607 05/21/08 03/02/09 Billitier Electric, Inc.
306-012 2,398 08/14/08 05/11/09 BILLITIER ELECTRIC, INC.
306-013 4,485 08/14/08 08/04/09 BILLITIER ELECTRIC, INC.
306-014 7,058 01/12/09 03/11/09 BILLITIER ELECTRIC, INC.
306-015 1,191 01/28/09 05/11/09 BILLITIER ELECTRIC, INC.
306-019 490 02/24/09 06/09/09 BILLITIER ELECTRIC, INC.
306-021 2,014 05/04/09 07/31/09 BILLITIER ELECTRIC INC
307-001 4,600 10/22/07 10/26/07 JUPITER ENVIRONMENTAL SERVICES INC
308-001 16,100 01/03/08 01/23/08 NICKERSON CORPORATION
308-002 10,132 01/03/08 03/19/08 NICKERSON CORP
308-003 2,814 10/22/07 10/26/07 NICKERSON CORPORATION
308-004 4,722 08/14/08 08/26/08 NICKERSON CORPORATION
308-005 15,533 09/22/08 10/27/08 NICKERSON CORPORATION
308-006 15,210 08/14/08 08/26/08 NICKERSON CORPORATION
07-1010 Additions and Alterations 0-002-009 04/17/08 *CO No.* Amount Disallowed Received Approved Contractor
401-001 12,161 01/12/09 03/30/09 STREETER ASSOCIATES
401-002 4,563 01/12/09 04/17/09 STREETER ASSOCIATES
401-003 3,466 02/24/09 04/13/09 STREETER ASSOCIATES
401-004 3,727 02/24/09 04/13/09 STREETER ASSOCIATES
401-005 2,899 03/31/09 07/03/09 STREETER ASSOICATES
401-006 11,083 05/04/09 07/28/09 STREETER ASSOCIATES
401-007 14,659 05/19/09 07/30/09 STREETER ASSOCIATES
401-008 -46,266 05/26/09 07/15/09 STREETER ASSOCIATES
401-009 9,545 07/22/09 08/24/09 STREETER ASSOCIATES INC
404-001 -2,983 11/05/08 12/12/08 FREY & CAMPBELL INC.
404-002 1,113 02/24/09 04/13/09 FREY & CAMPBELL INC.
405-001 10,495 11/05/08 12/02/08 FREY & CAMPBELL INC.
405-002 2,490 01/28/09 04/03/09 FREY & CAMPBELL INC.
405-003 5,288 03/31/09 07/03/09 FREY & CAMPBELL INC.
405-004 7,448 05/04/09 08/05/09 FREY & CAMPBELL INC
406-001 1,220 12/02/08 06/16/09 BILLITIER ELECTRIC INC.
406-002 1,576 01/16/09 02/26/09 BILLITIER ELECTRIC INC.
406-003 -2,453 03/31/09 07/03/09 BILLITIER ELECTRIC, INC.
406-004 1,659 04/20/09 08/04/09 BILLITIER ELECTRIC INC.
406-005 -29,689 04/20/09 08/04/09 BILLITIER ELECTRIC INC.
406-006 -52,551 05/19/09 08/07/09 BILLITIER ELECTRIC INC
406-007 10,844 05/19/09 08/07/09 BILLITIER ELECTRIC INC
406-008 -5,492 05/26/09 11/12/09 BILLITIER ELECTRIC INC
406-009 15,322 07/22/09 11/12/09 BILLITIER ELECTRIC
406-010 2,753 07/22/09 11/12/09 BILLITIER ELECTRIC
407-001 -1,040 01/28/09 04/03/09 ENVIRONMENTAL REMEDIATION SERVICES,
407-002 8,921 05/19/09 07/22/09 ENVIRONMENTAL REMEDIATION SERVICES
South Annex:
91-1563 Reconstruction 0-004-001 07/14/92 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Maintenance:
90-0943 Reconstruction 5-011-003 02/14/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0301 Reconstruction 5-011-004 10/22/92 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1381 Reconstruction 5-011-005 10/15/00 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0159 Additions and Alterations 5-011-006 01/22/07 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
301-003 12,420 10/22/07 10/26/07 HORNING CONSTRUCTION LLC
301-006 18,114 11/26/07 12/12/07 Horning construction
301-033 14,219 08/14/08 08/26/08 HORNING CONSTRUCTION LLC
301-035 8,688 09/22/08 10/24/08 HORNING CONSTRUCTIN LLC
301-038 4,251 11/05/08 12/12/08 HORNING CONSTRUCTION LLC
301-043 12,693 01/12/09 06/16/09 HORNING CONSTRUCTION LLC
301-044 8,125 01/12/09 06/16/09 HORNING CONSTRUCTION LLC
304-003 3,453 10/22/07 / / FREY & CAMPBELL INC
304-003 3,453 06/06/08 12/16/08 Frey & Campbell
304-010 1,532 01/28/09 07/07/09 FREY & CAMPBELL INC.
304-011 4,602 05/26/09 07/15/09 FREY & CAMPBELL INC
304-047 6,261 02/24/09 04/03/09 HORNING CONSTRUCTION LLC
305-010 350 05/04/09 07/31/09 FREY & CAMPBELL INC
306 -008 2,623 01/03/08 08/05/08 BILLITIER ELECTRIC, INCORPORATED
306-002 2,105 10/22/07 01/28/08 BILLITIER ELECTRIC, INC
306-016 1,024 01/28/09 07/07/09 BILLITIER ELECTRIC, INC.
306-017 9,222 02/24/09 06/09/09 BILLITIER ELECTRIC, INC.
306-018 2,558 02/24/09 06/09/09 BILLITIER ELECTRIC, INC.
306-020 -2,087 02/24/09 06/09/09 BILLITIER ELECTRIC, INC.
BATH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-03-02-06
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Dana L Lyon Elementary:
90-0636 Reconstruction 0-004-003 01/07/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0558 Reconstruction 0-004-004 03/23/94 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0393 Reconstruction 0-004-005 11/24/97 NO CHANGE ORDERS ON ELECTRONIC FILE
Haverling Jr/Sr High:
90-0637 Reconstruction 0-006-006 01/07/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1014 Reconstruction 0-006-007 04/16/92 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0594 Additions and Alterations 0-006-009 05/10/00 *CO No.* Amount Disallowed Received Approved Contractor
1-19 2,574 01/24/02 03/04/02 LeChase Construction
1-22 7,990 03/15/02 04/19/02 LeChase Construction
1-24 17,526 03/15/02 04/19/02 LeChase Construction
1-25 17,334 03/15/02 04/19/02 LeChase Construction
1-26 7,794 04/12/02 04/25/02 LeChase Construction
1-27 15,611 04/26/02 05/17/02 LeChase Construction
1-28 11,187 04/26/02 05/17/02 LeChase Construction
1-29 4,088 04/19/02 05/17/02 LeChase Construction
1-30 17,580 05/23/02 07/15/02 LeChase Construction
1-32 17,446 05/23/02 06/05/02 LeChase Construction
1-33 12,419 05/23/02 06/04/02 LeChase Construction
1-34 12,893 05/23/02 06/05/02 LeChase Construction
1-35 12,937 06/19/02 07/12/02 LeChase Construction
1-36 10,709 06/19/02 07/12/02 LeChase Construction
1-37 4,457 07/03/02 07/15/02 LeChase Construction
1-38 1,519 08/02/02 08/16/02 LeChase Construction
1-39 15,826 08/27/02 09/06/02 LeChase Construction
1-40 16,887 10/17/02 12/02/02 LeChase Construction
1-41 19,888 11/20/02 01/02/03 LeChase Construction
1-42 18,289 10/17/02 12/02/02 LeChase Construction
1-43 17,497 10/17/02 12/02/02 LeChase Construction
1-44 6,426 11/20/02 01/02/03 LeChase Construction
1-45 17,142 11/20/02 01/02/03 LeChase Construction
1-46 2,527 11/20/02 01/02/03 LeChase Construction
1-47 5,413 11/20/02 01/02/03 LeChase Construction
1-48 18,666 02/10/03 02/14/03 LeChase Construction
1-49 3,066 09/09/03 09/19/03 LeChase Construction
1-5 -3,116 08/06/01 01/08/02 LeChase Construction
1-50 8,181 09/09/03 09/19/03 LeChase Construction
1-51 14,050 09/09/03 09/19/03 LeChase Construction
1-52 7,263 09/09/03 09/19/03 LeChase Construction
1-53 16,598 09/09/03 09/19/03 LeChase Construction
1-54 15,899 09/09/03 09/19/03 LeChase Construction
1-55 19,084 09/09/03 09/19/03 LeChase Construction
1-56 10,313 09/09/03 09/19/03 LeChase Construction
1-56 16,779 03/05/04 03/17/04 LeChase Construction
10-11 14,880 03/15/02 04/19/02 Cashette Electric
10-12 4,008 04/12/02 04/25/02 Cashette Electric
10-13 10,167 04/12/02 04/26/02 Cashette Electric
10-14 -2,266 04/26/02 05/07/02 Cashette Electric
10-15 19,894 06/19/02 07/12/02 Cashette Electric
10-17 8,122 07/03/02 07/15/02 Cashette Electric
10-18 9,571 08/02/02 08/16/02 Cashette Electric
10-19 3,392 08/27/02 09/05/02 Cashette Electric
10-20 6,871 09/26/02 11/01/02 Cashette Electric
10-21 10,018 10/15/02 12/02/02 Cashette Electric
10-22 7,556 11/20/02 01/03/03 Cashette Electric
10-23 11,829 11/20/02 01/03/03 Cashette Electric
10-24 19,513 11/20/02 01/03/03 Cashette Electric
10-25 16,246 11/20/02 01/03/03 Cashette Electric
10-26 13,280 11/20/02 01/03/03 Cashette Electric
10-27REV 1,824 03/10/03 03/18/03 Cashette Electric
10-28 18,376 03/10/03 03/18/03 Cashette Electric
10-29 4,540 03/10/03 03/18/03 Cashette Electric
10-30 6,869 03/10/03 03/18/03 Cashette Electric
10-31 7,542 04/29/03 05/05/03 Cashette Electric
10-32 11,387 06/24/03 06/30/03 Cashette Electric
10-33 14,138 06/24/03 06/30/03 Cashette Electric
10-34 10,933 06/24/03 06/30/03 Cashette Electric
10-35 9,999 06/24/03 06/30/03 Cashette Electric
10-36 14,448 06/24/03 06/30/03 Cashette Electric
10-37 3,800 04/23/04 04/28/04 Cashette Electric
10-38 3,716 04/23/04 04/28/04 Cashette electric
10-4 496 08/29/01 01/29/02 Cashette Electric
10-9 2,972 01/24/02 03/04/02 Cashette Electric
11-1 -61,050 02/10/03 02/14/03 Sound & Communications Div.
11-2 -23,175 06/24/03 06/30/03 Sound & Communications Div.
12-10 2,902 04/12/02 04/25/02 Frey & Campbell
12-11 8,886 04/12/02 04/25/02 Frey & Campbell
12-12 19,312 04/12/02 04/25/02 Frey & Campbell
12-13 18,798 04/19/02 05/07/02 Frey & Campbell
12-14 12,455 07/03/02 07/15/02 Frey & Campbell
12-15 3,575 08/27/02 09/05/02 Frey & Campbell
12-16 12,115 09/26/02 11/01/02 Frey & Campbell
12-17 10,872 10/17/02 12/02/02 Frey & Campbell
12-18 3,391 10/17/02 12/02/02 Frey & Campbell
12-19 17,139 03/10/03 03/19/03 Frey & Campbell
12-20 15,286 03/10/03 03/19/03 Frey & Campbell
12-21 1,911 03/10/03 03/19/03 Frey & Campbell
12-22 1,200 03/10/03 03/18/03 Frey & Campbell
12-23 10,960 04/29/03 05/05/03 Frey & Campbell
12-24 5,349 06/24/03 06/30/03 Frey & Campbell
12-25 4,316 06/24/03 06/30/03 Frey & Campbell
12-5 17,247 10/02/01 01/08/02 Frey & Campbell
12-9 2,816 03/15/02 04/19/02 Frey & Campbell
13-1 3,290 06/19/02 07/12/02 Patterson Stevens
13-2 9,950 07/03/02 07/15/02 Patterson Stevens
13-3 3,167 02/10/03 02/14/03 Patterson-Stevens
13-5 4,129 07/01/03 07/07/03 Patterson Stevens
13-6 2,444 04/23/04 04/30/04 Patterson Stevens
14-2 14,507 09/26/02 11/01/02 Kleen All of America
14-3 19,167 02/18/03 02/26/03 Kleen All of America
14-4 18,747 02/18/03 02/26/03 Kleen All of America
14-5 15,832 02/18/03 02/26/03 Kleen All of America
14-6 19,851 02/18/03 02/26/03 Kleen All of America
14-7 19,413 02/18/03 02/25/03 Kleen All of America
14-8 9,570 04/29/03 05/05/03 Kleen All of America
16-1 5,754 02/10/03 02/14/03 Burns Elec.
2-1 5,000 03/15/02 04/19/02 Amthor Steel
2-14 -5,780 04/29/03 05/05/03 Suite Kote Contracting
2-2 5,606 05/09/02 06/04/02 Amthor Steel
2-3 9,929 08/02/02 08/16/02 Amthor Steel
2-5 18,813 11/06/03 11/13/03 Amthor Steel
2-6 -1,500 03/26/04 04/12/04 Amother Steel
3-10 11,228 06/19/02 07/12/02 Hakes Const.
3-11 19,900 06/19/02 07/12/02 Hakes Const.
3-12 7,521 08/02/02 08/16/02 Hakes Const.
3-13 13,193 08/27/02 09/05/02 Hakes Const.
3-14 19,505 09/26/02 11/01/02 Hakes Const.
3-15 19,893 09/26/02 11/01/02 Hakes Const.
3-16 19,961 09/26/02 11/01/02 Hakes Const.
3-18 16,146 10/15/02 12/02/02 Hakes Const.
3-19 -13,589 11/05/02 12/02/02 Hakes Const.
3-2 21,231 10/02/01 01/08/02 Hakes Const.
3-20 4,042 02/10/03 02/14/03 Hakes Const.
3-21 3,798 09/09/03 09/19/03 Hakes Const.
3-22 -3,520 04/23/04 04/28/04 Hakes Const.
3-3 24,439 10/02/01 01/08/02 Hakes Const.
3-7 1,533 03/15/02 04/19/02 Hakes Const.
3-8 15,929 03/28/02 04/26/02 Hakes Const.
3-9 5,527 04/12/02 04/25/02 Hakes Const.
4-10 5,930 04/29/03 05/05/03 McLaughlin Roofing
4-11 3,097 04/29/03 05/05/03 McLaughlin Roofing
4-12 1,199 08/11/03 09/05/03 McLaughlin Roofing
4-13 2,357 06/24/03 06/30/03 McLaughlin Roofing
4-2 -529 11/06/01 02/08/02 McLaughlin Roofing
4-4 -4,254 04/12/02 04/25/02 McLaughlin Roofing
4-5 3,774 06/19/02 07/12/02 McLaughlin Roofing
4-6 4,510 08/27/02 09/05/02 McLaughlin Roofing
4-7 10,393 10/15/02 12/02/02 McLaughlin Roofing
4-8 7,981 11/20/02 01/03/03 McLaughlin Roofing
4-9 16,189 02/18/03 02/26/03 McLaughlin Roofing
4693 959 10/24/02 / / McLaughlin Roofing
5-3 3,240 04/26/02 05/17/02 Cortland Glass
5-4 3,922 07/03/02 07/15/02 Cortland Glass
5-5 3,439 10/17/02 12/02/02 Cortland Glass
5-6 3,602 10/24/02 12/02/02 Cortland Glass
5-7 850 03/27/03 04/03/03 Cortland Glass
5-8 925 04/29/03 05/05/03 Cortland Glass
5-9 -3,000 06/24/03 06/30/03 Cortland Glass
6-1 9,062 10/02/01 01/08/02 John C. Lowery
6-10 4,099 11/20/02 01/03/03 John C. Lowery
6-11 19,135 11/20/02 01/02/03 John C. Lowery
6-12 19,947 11/20/02 01/02/03 John C. Lowery
6-13 10,187 03/10/03 03/18/03 John C. Lowery
6-14 13,391 03/10/03 03/18/03 John C. Lowery
6-15 1,106 04/29/03 05/05/03 John C. Lowery
6-16 2,962 04/29/03 05/05/03 John C. Lowery
6-17 8,072 06/24/03 06/30/03 John C. Lowery
6-18 13,288 06/24/03 06/30/03 John C. Lowery
6-19 9,083 07/17/03 07/24/03 John C. Lowery
6-20 8,413 09/09/03 11/04/03 John C. Lowery
6-5 3,986 04/12/02 04/25/02 John C. Lowery
6-6 10,600 05/09/02 06/04/02 John C. Lowery
6-7 7,703 08/02/02 08/16/02 John C. Lowery
6-8 8,101 10/17/02 12/02/02 John C. Lowery
6-9 8,945 10/24/02 12/02/02 John C. Lowery
7-2 6,400 12/21/01 03/25/02 KSP Painting
7-4 13,620 08/27/02 09/05/02 KSP Painting
7-5 4,000 10/17/02 12/02/02 KSP Painting
7-6 6,312 07/17/03 07/24/03 KSP Painting
7-7 5,276 09/09/03 09/19/03 KSP Painting
7-8 2,700 12/20/04 12/28/04 KSP Painting
8-1 18,600 08/06/01 01/08/02 Jason Mfg.
8-2 -6,743 05/09/02 06/04/02 Jason Mfg.
8-3 5,290 11/20/02 01/03/03 Jason Mfg.
8-4 4,655 03/27/03 04/03/03 Jason Mfg.
8-5 0 06/24/03 06/30/03 Jason Mfg.
9-10 3,153 03/28/02 04/26/02 Ferrauilo Plumbing
9-11 2,737 04/12/02 04/25/02 Ferrauilo Plumbing
9-12 7,526 04/26/02 05/07/02 Ferrauilo Plumbing
9-14 3,687 07/03/02 07/15/02 Ferrauilo Plumbing
9-15 9,962 08/02/02 01/07/03 Ferrauilo Plumbing
9-16 11,734 08/27/02 09/05/02 Ferrauilo Plumbing
9-17 9,046 09/26/02 11/01/02 Ferrauilo Plumbing
9-20 5,078 03/27/03 04/03/03 Ferrauilo Plumbing
9-21 -575 03/10/03 03/18/03 Ferrauilo Plumbing
9-22 10,218 03/10/03 03/18/03 Ferrauilo Plumbing
9-23 7,955 04/29/03 05/05/03 Ferrauilo Plumbing
9-24 7,511 06/24/03 06/30/03 Ferrauilo Plumbing
9-25 17,892 06/24/03 06/30/03 Ferrauilo Plumbing
9-26 10,259 06/24/03 06/30/03 Ferrauilo Plumbing
9-27 7,428 09/09/03 09/19/03 Ferrauilo Plumbing
9-29 2,887 11/06/03 11/13/03 Ferrauilo Plumbing
9-8 4,314 01/24/02 03/04/02 Ferrauilo Plumbing
9-9 4,075 03/15/02 04/19/02 Ferrauilo Plumbing
03-0757FP Reconstruction 0-006-FP1 12/02/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Wightman Primary:
99-0595 Additions and Alterations 0-007-004 05/10/00 *CO No.* Amount Disallowed Received Approved Contractor
1 7,497 04/30/01 02/06/02 LeChase Const.
1-10 1,044 10/02/01 01/08/02 LeChase Const.
1-11 2,374 10/02/01 01/08/02 LeChase Const.
1-12 3,847 10/02/01 01/08/02 LeChase Const.
1-13 802 10/10/01 02/11/02 LeChase Const.
1-14 468 11/15/01 02/08/02 LeChase Const.
1-15 10,942 11/06/01 02/08/02 LeChase Const.
1-16 4,695 12/04/01 01/13/03 LeChase Const.
1-17 16,296 02/24/02 03/04/02 LeChase Const.
1-18 6,235 02/24/02 03/04/02 LeChase Const.
1-20 5,014 02/24/02 03/04/02 LeChase Const.
1-21 8,796 02/19/02 04/01/02 LeChase Const.
1-23 6,723 03/15/02 04/19/02 LeChase Const.
1-31 12,182 05/23/02 06/04/02 LeChase Const.
1-40 16,887 11/05/02 12/02/02 LeChase Const.
1-6 -6,600 08/29/01 01/15/02 LeChase Const.
1-7 863 10/02/01 01/08/02 LeChase Const.
1-8 5,623 10/02/01 01/08/02 LeChase Const.
1-9 2,208 10/02/01 01/08/02 LeChase Const.
10-10 9,894 02/19/02 04/01/02 Cashette Elec.
10-16 9,539 06/19/02 07/12/02 Cashette Elec.
10-5 570 10/02/01 01/08/02 Cashette Elec.
10-6 2,578 10/10/01 02/11/02 Cashette Elec.
10-7 1,051 10/10/01 02/11/02 Cashette Elec.
12-4 3,948 08/29/01 01/29/02 Frey & Campbell
12-7 18,087 11/06/01 02/08/02 Frey & Campbell
12-8 1,580 12/21/01 03/08/02 Frey & Campbell
3-5 12,009 11/15/01 02/08/02 Hakes Const.
3-6 10,470 11/19/01 02/11/02 Hakes Const.
4-1 -22,852 11/06/01 02/08/02 McLaughlin Roofing
4-14 7,543 09/25/03 10/03/03 McLaughlin Roofing
4-3 3,297 02/19/02 04/01/02 McLaughlin Roofing
5-1 1,506 08/29/01 01/15/02 Cortland Glass
5-10 -1,500 06/24/03 06/30/03 Cortland Glass
6-2 1,765 10/10/01 02/11/02 John Lowery
6-4 2,705 01/24/02 03/04/02 John Lowery
7-1 3,400 12/04/01 01/13/03 KSP Painting
7-3 8,800 04/19/02 05/07/02 KSP Painting
9-13 2,743 06/19/02 07/12/02 Ferrauilo Plumbing
9-18 13,833 09/26/02 11/01/02 Ferrauilo Plumbing
9-19 2,457 11/20/02 01/02/03 Ferrauilo Plumbing
9-2 1,445 10/02/01 01/08/02 Ferrauilo Plumbing
9-28 808 09/09/03 09/19/03 Ferrauilo Plumbing
9-3 891 10/10/01 02/11/02 Ferrauilo Plumbing
9-5 9,213 11/06/01 01/29/02 Ferrauilo Plumbing
9-6 2,668 11/19/01 02/11/02 Ferrauilo Plumbing
9-7 2,381 02/24/02 03/25/02 Ferrauilo Plumbing
09-0031 Reconstruction 0-007-008 09/24/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2202FP Reconstruction 0-007-FP1 08/06/03 NO CHANGE ORDERS ON ELECTRONIC FILE
New Athletic Storage Building:
94-0217 New Construction 2-015-001 10/03/94 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage Maintenance:
00-0282 Reconstruction 5-009-001 01/30/01 *CO No.* Amount Disallowed Received Approved Contractor
1-1 1,734 10/10/01 02/26/02 R Hyland & Son
1-10 8,282 04/26/02 05/30/02 R Hyland & Son
1-11 10,063 05/15/02 05/24/02 R Hyland & Son
1-12 1,432 06/19/02 08/15/02 R Hyland & Son
1-13 1,236 06/19/02 08/15/02 R Hyland & Son
1-16 13,887 12/06/02 01/02/03 R Hyland & Son
1-17 5,161 10/17/02 11/07/02 R Hyland & Son
1-18 10,401 02/10/03 02/27/03 R Hyland & Son
1-19 11,144 02/10/03 02/27/03 R Hyland & Son
2-10 -2,757 04/12/02 05/24/02 Suite Kote Contracting
2-12 12,771 12/06/02 01/02/03 Suite Kote Contracting
2-13 5,406 10/17/02 11/07/02 Suite Kote Contracting
2-9 3,675 03/28/02 05/24/02 Suite Kote Contracting
4-10 11,007 06/19/02 08/15/02 Burns Elec.
4-12 -3,079 01/29/03 02/04/03 Burns Elec.
4-4 3,627 10/10/01 01/10/03 Burns Elec.
4-7 16,946 03/28/02 05/24/02 Burns Elec.
4-8 1,568 05/15/02 05/24/02 Burns Elec.
4-9 4,424 06/19/02 08/15/02 Burns Elec.
5-7 7,710 06/19/02 08/15/02 Frey & Campbell
5-8 16,652 04/28/03 05/05/03 Frey & Campbell
New Bus Garage & Maintenance Facilit:
00-0283 New Construction 5-017-001 01/30/01 *CO No.* Amount Disallowed Received Approved Contractor
1-14 17,602 08/02/02 08/16/02 R Hyland & Son
1-15 13,971 08/02/02 08/16/02 R Hyland & Son
1-2 6,900 10/10/01 02/26/02 R Hyland & Son
1-3 12,120 10/30/01 01/09/03 R Hyland & Son
1-4 7,924 11/19/01 05/22/02 R Hyland & Son
1-5 12,244 01/24/02 05/13/02 R Hyland & Son
1-6 12,190 01/24/02 05/13/02 R Hyland & Son
1-7 1,781 01/24/02 05/13/02 R Hyland & Son
1-8 10,550 03/07/02 04/04/02 R Hyland & Son
1-9 1,833 04/12/02 05/28/02 R Hyland & Son
2-11 8,635 05/23/02 05/29/02 Suit Kote Contracting
2-4 0 10/02/01 01/14/03 Suit-Kote Contracting
2-6 10,215 11/19/01 05/22/02 Suit-Kote Contracting
2-7 813 01/24/02 05/13/02 Suit-Kote Contracting
2-8 -4,002 01/24/02 05/13/02 Suit-Kote
4-11 7,308 08/02/02 08/16/02 Burns Elec.
4-3 5,422 01/24/02 05/13/02 Burns Elec.
4-5 2,321 10/30/01 01/09/03 Burns Elec.
4-6 15,133 03/07/02 04/04/02 Burns Elec.
5-2 1,298 12/21/01 03/29/02 Frey & Campbell
5-3 2,335 01/24/02 05/13/02 Frey & Campbell
5-4 8,561 01/24/02 05/13/02 Frey & Campbell
5-5 2,004 01/24/02 05/13/02 Frey & Campbell
5-6 12,983 04/12/02 05/24/02 Frey & Campbell
Soccer Field Press Box:
90-0688 New Construction 7-013-001 01/17/91 NO CHANGE ORDERS ON ELECTRONIC FILE
House/site purchase 41 Robie Street:
99-0196 New Construction 7-018-001 11/09/99 NO CHANGE ORDERS ON ELECTRONIC FILE
Concession Stand:
02-0051 New Construction 7-019-001 11/07/02 NO CHANGE ORDERS ON ELECTRONIC FILE
BRADFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-04-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
K-12:
92-1340 Reconstruction 0-001-002 07/13/93 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0128 Additions and Alterations 0-001-003 11/16/99 *CO No.* Amount Disallowed Received Approved Contractor
5 2,268 05/24/02 05/28/02 RC Daniel
AV-1 9,250 09/20/01 02/07/02 Delaware AV Dist.
AV-2 6,036 09/20/01 02/07/02 Delaware AV Dist.
C-1 359 05/24/02 05/28/02 O'Connell Elec.
C-2 2,646 05/24/02 05/28/02 O'Connell Elec.
C-3 3,282 05/24/02 05/28/02 O'Connell Elec.
E-18 849 08/03/01 01/30/02 RC Daniel
E-20 15,890 05/24/02 05/28/02 RC Daniel
E-20 15,890 08/15/01 01/14/03 RC Daniel
E-21 4,000 02/22/02 04/01/02 RC Daniel
E-22 4,563 05/24/02 05/28/02 RC Daniel
E-7 639 05/24/02 05/28/02 RC Daniel
G-1 2,599 05/24/02 05/28/02 Keuka Const.
G-2 693 05/24/02 05/28/02 Keuka Const.
G-3 2,181 05/24/02 05/28/02 Keuka Const.
G-4 842 05/24/02 05/28/02 Keuka Const.
G-8 2,523 05/24/02 05/28/02 Keuka Const.
G-9 742 05/24/02 05/28/02 Keuka Const.
H-1 6,610 08/03/01 01/30/02 Faulks Plumbing
P-1 1,168 05/24/02 05/28/02 Faulks Plumbing
P-2 750 08/03/01 01/30/02 Faulks Plumbing
S-1 6,000 05/24/02 05/28/02 RC Billings
00-0878 Additions and Alterations 0-001-005 07/17/01 *CO No.* Amount Disallowed Received Approved Contractor
E-1 3,120 03/04/02 05/23/02 Matco Elec.
E-2 3,737 03/04/02 05/23/02 Matco Elec.
E-3 13,585 05/30/02 08/15/02 Matco Elec.
E-4 2,861 06/13/02 11/04/02 Matco Elec.
E-5 6,895 09/27/02 11/06/02 Matco Elec.
E-6 9,767 07/17/03 07/24/03 Matco Elec.
E-7 754 07/17/03 07/24/03 Matco Elec.
GC-1 -61,100 06/22/04 06/22/04 Iversen Const.
GC-2 1,403 02/22/02 03/29/02 Iversen Const.
GC-4 3,873 06/22/04 06/22/04 Iversen Const.
GC-5 -4,426 05/31/02 02/13/03 Iversen Const.
GC-6 15,191 06/13/02 11/04/02 Iversen Const.
GC-7 564 06/22/04 06/22/04 Iversen Const.
GC-8 7,389 06/27/02 07/03/02 Iversen Const.
GC-9 18,867 09/16/02 01/08/03 Iversen Const.
H-1 1,002 04/09/02 05/23/02 Faulks Plumbing
H-2 7,856 10/24/02 11/07/02 Faulks Plumbing
P-1 5,782 02/22/02 03/29/02 Postler and Jaeckle
P-2 1,157 02/22/02 03/29/02 Postler and Jaeckle
P-3 1,054 03/04/02 05/23/02 Postler and Jaeckle
P-4 6,213 06/07/02 11/04/02 Postler and Jaeckle
S-1 -13,800 12/11/01 03/21/02 Scott's Const.
07-0542 Reconstruction 0-001-006 03/10/08 *CO No.* Amount Disallowed Received Approved Contractor
E-001 -10,959 08/25/08 03/09/09 G. O. WICK, INC.
E-002 12,457 10/27/08 04/14/09 G.O. WICK,INC
E-003 9,846 11/05/08 02/05/09 G.O. WICK, INC.
E-004 1,995 04/24/09 07/22/09 G.O. WICK INC
G-001 -50,938 08/25/08 11/18/08 CONMAS, INC.
G-002 -584 08/20/08 11/18/08 CONMAS, INC.
G-003 -1,432 09/08/08 05/12/09 CONMAS, INC.
G-004 -950 10/27/08 12/02/08 CONMAS,INC
G-006 5,187 11/07/08 12/02/08 CONMAS, INC.
G-007 -7,942 10/24/08 11/12/08 CONMAS INC
G-008 -1,620 02/10/09 05/18/09 CONMAS, INC.
G-009 2,585 02/10/09 05/18/09 CONMAS, INC.
G-010 754 03/27/09 07/20/09 CONMAS INC.
G-011 2,806 03/27/09 07/20/09 CON MAS INC.
G-012 15,608 03/27/09 07/20/09 CONMAS INC.
G-013 359 05/04/09 07/30/09 CONMAS INC
G-014 1,160 06/22/09 08/13/09 CONMAS INC
M-001 4,750 11/19/08 01/27/09 FREY & CAMPBELL, INC.
P-001 -24,389 07/28/08 01/30/09 FREU & CAMPBELL, INC.
P-002 -3,561 07/28/08 01/30/09 FREY & CAMPBELL, INC.
P-003 1,819 11/07/08 05/19/09 FREY & CAMPBELL, INC.
P-003 1,819 11/14/08 05/18/09 FREY & CAMPBELL, INC.
03-0085FP Reconstruction 0-001-FP1 10/14/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
92-1446 Reconstruction 5-002-003 07/13/93 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0879 Additions and Alterations 5-002-004 07/17/01 *CO No.* Amount Disallowed Received Approved Contractor
GC-3 15,928 05/30/02 08/15/02 Iverson Const.
Bus Garage / Maintenance Facility:
02-0302 New Construction 5-006-001 05/08/03 *CO No.* Amount Disallowed Received Approved Contractor
E-001 8,925 09/16/03 09/23/03 Kaplan Schmidt
E-002 2,311 10/15/04 10/25/04 Kaplan Schmidt
E-003 -2,000 10/15/04 10/25/04 Kaplan Schmidt
E-004 2,538 10/15/04 10/25/04 Kaplan Schmidt
E-005 1,508 07/01/05 07/20/05 Kaplan Schmidt Electric
G-001 -2,600 11/17/03 11/21/03 Streeter Associates
G-002 4,599 11/17/03 11/21/03 Streeter Associates
G-003 2,576 11/17/03 11/21/03 Streeter Associates
G-004 6,923 12/20/04 12/28/04 Streeter Associates
G-005 2,250 12/20/04 12/28/04 Streeter Associates
G-007 2,018 01/18/05 02/11/05 Streeter Associates
H-001 23,986 09/16/03 09/23/03 Kimble, Inc.
P-001 4,734 04/15/04 04/28/04 Finger Lakes Piping
CAMPBELL-SAVONA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-06-03-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Campbell 6-12:
92-1559 Reconstruction 0-001-001 08/12/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1396 Additions and Alterations 0-001-002 09/13/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1387 Reconstruction 0-001-004 06/25/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0951 Additions and Alterations 0-001-005 04/30/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0207 Reconstruction 0-001-007 01/11/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0317 Alterations 0-001-008 03/02/00 *CO No.* Amount Disallowed Received Approved Contractor
E-2 3,427 08/13/02 09/05/02 RG Burns, Inc
L-2 -2,522 12/17/01 03/05/02 RC Billings
00-1518 Additions and Alterations 0-001-009 11/07/01 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 10,610 03/18/02 04/29/02 John Mills Elec.
EC-2 5,916 12/24/02 02/14/03 John Mills Elec.
EC-7 -17,625 09/30/03 10/06/03 John Mills Elec.
GC-1 200,200 03/13/02 04/29/02 Streeter Assoc.
GC-2 8,999 05/05/03 05/07/03 Streeter Assoc.
GC-3 -32,181 12/22/03 12/31/03 Streeter Assoc.
HC-1 124,300 03/13/02 04/29/02 Frey and Campbell
HC-2 16,767 05/31/02 06/17/02 Frey and Campbell
HC-3 -96,006 11/01/02 02/05/03 Frey and Campbell
HC-4 -25,635 12/22/03 12/30/03 Frey and Campbell
PC-1 16,000 03/13/02 04/29/02 Frey and Campbell
PC-2 8,513 05/06/02 05/13/02 Frey and Campbell
PC-3 3,787 05/31/02 06/17/02 Frey and Campbell
PC-4 5,252 11/01/02 02/05/03 Frey and Campbell
PC-6 -3,000 12/22/03 12/30/03 Frey and Campbell
SC-1 10,046 08/13/02 10/28/02 Suite-Kote Contracting
SC-2 4,556 03/18/03 04/18/03 Suite-Kote Contracting
SFC-1 14,000 03/13/02 04/29/02 Suite-Kote Contracting
SFC-2 5,506 06/30/03 07/02/03 Suite-Kote Contracting
SFC-3 -11,356 08/06/03 08/26/03 Suite-Kote Contracting
SFC-4 2,299 11/06/03 11/20/03 Suit Kote Contracting
TC-1 0 03/20/02 04/29/02 Meson Network Services
TC-2 -12,682 06/30/03 07/02/03 Scientel Americal
02-1066 Reconstruction 0-001-010 05/20/03 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 21,958 02/02/04 / / John Mills Electric
EC-2 3,528 02/02/04 03/05/04 John Mills Electric
06-0966 Reconstruction 0-001-011 03/02/07 *CO No.* Amount Disallowed Received Approved Contractor
G-001 6,750 06/06/07 07/17/07 Archie Donougher Sanding
08-0081 Reconstruction 0-001-012 01/29/09 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2271 Reconstruction 0-001-013 06/23/08 *CO No.* Amount Disallowed Received Approved Contractor
S-001 11,850 11/28/08 06/17/09 MORSCH PIPELINE INC.
02-0792FP Reconstruction 0-001-FP1 12/24/02 NO CHANGE ORDERS ON ELECTRONIC FILE
K-5 Savona:
93-0089 Additions and Alterations 0-003-001 09/27/93 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1560 Reconstruction 0-003-002 08/12/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0555 Reconstruction 0-003-003 02/10/94 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1034 Reconstruction 0-003-004 04/25/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1593 Reconstruction 0-003-006 06/25/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0952 Reconstruction 0-003-008 04/30/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0208 Reconstruction 0-003-009 01/11/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0318 Reconstruction 0-003-010 03/02/00 *CO No.* Amount Disallowed Received Approved Contractor
E-1 963 02/04/02 03/25/02 RG Burns Elec.
00-1517 Additions and Alterations 0-003-011 11/07/01 *CO No.* Amount Disallowed Received Approved Contractor
EC-3 7,845 04/01/03 04/18/03 John Mills Elec.
EC-4 4,046 05/05/03 05/07/03 John Mills Elec.
EC-5 14,774 05/05/03 05/07/03 John Mills Elec.
EC-6 4,281 05/29/03 06/04/03 John Mills Elec.
PC-5 6,436 04/01/03 04/18/03 Frey & Campbell
SC-3 2,436 06/30/03 07/02/03 Suite-Kote Contracting
02-1067 Reconstruction 0-003-012 05/20/03 *CO No.* Amount Disallowed Received Approved Contractor
EC-3 1,888 03/03/04 / / John Mills Electric
EC-4 -1,606 03/15/05 03/31/05 John Mills Electric
08-0082 Reconstruction 0-003-013 01/29/09 *CO No.* Amount Disallowed Received Approved Contractor
AA-001 1,725 07/17/09 08/14/09 AAC CONTRACTING INC
GC-001 20,292 10/14/09 11/06/09 EDGER ENTERPRISES INC
GC-002 1,473 09/30/09 11/03/09 EDGER ENTERPRISES INC
GC-003 24,282 09/22/09 10/26/09 EDGER ENTERPRISES INC
GC-004 2,996 10/14/09 11/06/09 EDGER ENTERPRISES INC
GC-005 893 10/26/09 11/20/09 EDGER ENTERPRISES INC
GC-006 1,745 10/14/09 11/06/09 EDGER ENTERPRISES INC
GC-007 1,094 10/14/09 11/06/09 EDGER ENTERPRISES INC
GC-008 9,595 10/15/09 11/12/09 EDGER ENTERPRISES INC
GC-009 13,961 10/15/09 11/12/09 EDGER ENTERPRISES INC
T-001 2,475 09/30/09 11/03/09 STRUCTURED CABLING SYSTEMS LLC
T-002 4,114 09/30/09 11/03/09 STRUCTURED CABLING SYSTEMS LLC
T-003 14,232 09/25/09 10/09/09 STRUCTURED CABLING SYSTEMS LLC
T-004 10,098 09/30/09 11/03/09 STRUCTURED CABLING SYSTEMS LLC
02-0791FP Reconstruction 0-003-FP1 12/24/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Storage Garage:
00-1519 Reconstruction 2-004-001 11/07/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
92-0963 Reconstruction 5-002-001 04/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
New Bus Garage:
97-0007 New Construction 5-006-002 08/01/97 NO CHANGE ORDERS ON ELECTRONIC FILE
Campbell Press Box:
00-1520 New Construction 7-007-001 11/07/01 NO CHANGE ORDERS ON ELECTRONIC FILE
New Concession Stand:
03-1051 New Construction 7-009-001 09/17/04 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 1,340 08/08/05 08/15/05 John Mills Electric
PC-01 -1,000 01/05/06 03/14/06 GVE Inc
District Wide:
07-0983 Reconstruction 7-999-001 12/17/07 *CO No.* Amount Disallowed Received Approved Contractor
T-001 8,400 09/12/08 02/23/09 STRUCTORED CABLING SYSTEMS, LLC
T-003 11,000 03/10/09 06/08/09 Structured Cabling System
CANISTEO CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-07-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Junior Senior High School:
91-1148 Reconstruction 0-001-004 04/30/92 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0359 Reconstruction 0-001-005 12/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0936 Reconstruction 0-001-006 03/29/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1147 Reconstruction 0-001-007 06/03/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1179 Reconstruction 0-001-008 11/21/01 *CO No.* Amount Disallowed Received Approved Contractor
00001 -32,800 09/26/02 02/26/03 Environ. Protection Roofing
00001 -2,600 09/26/02 11/01/02 RE Krug
00001 -62,800 09/26/02 02/26/03 DeSprit Mosaic and Tile
00001 -26,641 09/26/02 02/26/03 Frey and Campbell
00001 -1,722 09/26/02 02/26/03 Blackmon-Farrell Elec.
00001 -50,712 09/26/02 02/26/03 Hey's Enterprises
00001 -14,825 09/26/02 02/26/03 Javen Const.
00002 1,068 10/10/02 12/02/02 Environ. Protection Roofing
00002 -5,000 02/18/03 02/26/03 Lamberts Asbestos Removal Service
00003 714 10/10/02 12/02/02 Javen Const.
00003 529 01/21/03 02/06/03 Frey & Campbell
00003 19,612 04/23/04 04/28/04 Lamberts Asbestos Removal
00004 282 10/10/02 12/02/02 Javen Const.
00004 957 10/10/02 12/02/02 Blackmon-Farrell Elec.
00004 2,007 01/21/03 02/06/03 Frey & Campbell
00004 -22,577 04/23/04 04/28/04 Hey's Enterprises
00005 1,042 10/10/02 12/02/02 Javen Const.
00005 907 01/21/03 02/06/03 Frey & Campbell
00006 3,776 12/23/02 01/08/03 Javen Const.
00007 6,214 12/23/02 01/10/03 Javen Const.
00008 930 12/23/02 01/10/03 Javen Const.
00009 219 12/23/02 01/10/03 Javen Const.
00010 546 12/23/02 01/10/03 Javen Const.
00012 -500 02/18/03 02/26/03 Javen Const.
00014 -2,450 02/26/03 03/11/03 Javen Const.
Elementary:
96-0358 Additions and Alterations 0-002-001 12/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1148 Reconstruction 0-002-002 06/03/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1180 Reconstruction 0-002-003 11/21/01 *CO No.* Amount Disallowed Received Approved Contractor
00001 -20,223 11/29/02 01/03/03 Hey's Enterprises
00001 -14,200 11/29/02 03/18/03 Javen Const.
00001 -9,900 11/29/02 01/03/03 DeSprit Mosaic & Tile
00001 -44,386 11/29/02 02/26/03 Frey & Campbell
00001 -3,998 11/29/02 02/26/03 Blackmon-Farrell Elec.
00002 4,270 10/10/02 12/02/02 Hey's Enterprises
00002 -3,602 10/10/02 12/02/02 Javen Const.
00002 19,782 10/10/02 12/02/02 Blackmon-Farrell Elec.
00002 10,262 01/21/03 02/06/03 Frey & Campbell
00003 480 10/10/02 12/02/02 Hey's Enterprises
00003 805 10/10/02 12/02/02 Blackmon-Farrell Elec.
00003 6,012 05/21/03 06/03/03 Environ. Prot. Roofing
00005 104,460 01/21/03 02/06/03 Blackmon-Farrell Elec.
00011 230 12/23/02 01/08/03 Javen Const.
00013 2,177 02/18/03 02/26/03 Javen Const.
00015 -2,095 02/26/03 03/11/03 Javen Const.
03-1384FP Reconstruction 0-002-FP1 06/07/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Preston House:
00-1181 Reconstruction 0-003-001 11/21/01 *CO No.* Amount Disallowed Received Approved Contractor
00001 -3,007 11/29/02 05/22/03 Hey's Enterprises
Maint. Bldg / High School:
00-1182 New Construction 3-018-001 11/21/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
95-1149 Reconstruction 5-004-003 06/03/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1185 Reconstruction 5-004-004 11/21/01 *CO No.* Amount Disallowed Received Approved Contractor
00001 5,308 09/26/02 11/01/02 Onsyr Inc
00001 -32,180 11/29/02 05/22/03 Javen Const.
00001 -15,899 11/29/02 01/03/03 Frey & Campbell
00001 -2,711 02/18/03 02/26/03 Blackmon-Farrell Elec.
BG-01 -5,250 02/18/03 02/26/03 Environmental Protection Roofing
BG-01 -20,214 02/18/03 02/26/03 Javen Const.
Concession Stand:
99-1347 New Construction 7-015-001 06/29/00 NO CHANGE ORDERS ON ELECTRONIC FILE
Press Box @ Elementary School:
00-1183 New Construction 7-016-001 11/21/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Concession/Restroom @ Elem.:
00-1184 New Construction 7-017-001 11/21/01 *CO No.* Amount Disallowed Received Approved Contractor
00001 -3,166 02/18/03 02/26/03 Blackmon-Farrell Elec.
00001 -12,262 02/18/03 02/26/03 Frey & Campbell
CS-01 -6,300 02/18/03 02/26/03 Environ. Protection Roofing
CS-01 -62,000 02/18/03 02/26/03 Javen Const.
COHOCTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-09-05-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Bus Garage See Reorg#57.30.02.04:
91-0471 Reconstruction 5-002-001 12/16/91 NO CHANGE ORDERS ON ELECTRONIC FILE
CORNING-PAINTED POST SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-10-00-01
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Fred Carder Elementary:
90-1173 Reconstruction 0-005-004 05/01/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0889 Reconstruction 0-005-006 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0617 Reconstruction 0-005-007 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0432 Reconstruction 0-005-008 11/28/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1866 Reconstruction 0-005-009 08/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0956 Reconstruction 0-005-010 04/01/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0596 Reconstruction 0-005-011 04/20/01 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 rev 19,802 05/14/02 06/04/02 John Mills Elec.
EC-2 15,221 05/14/02 06/04/02 John Mills Elec.
EC-4 3,542 02/20/03 03/18/03 John Mills Elec.
GC-05 8,760 05/14/02 06/04/02 Keuka Const.
GC-3 6,207 01/10/02 03/26/02 Keuka Const.
GC-4 49,401 01/10/02 03/26/02 Keuka Const.
GC-6 -454 01/14/03 02/06/03 Keuka Const.
HC-1 5,223 11/18/02 11/19/02 Kimble, Inc.
PC-1 5,443 05/14/02 06/04/02 Postler and Jaeckle
99-0226 Reconstruction 0-005-013 12/21/99 *CO No.* Amount Disallowed Received Approved Contractor
2 -46,894 06/24/02 / / Custom Energy
01-0814 Additions and Alterations 0-005-014 07/08/02 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1466 Reconstruction 0-005-015 06/04/04 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0840 Reconstruction 0-005-016 05/12/05 *CO No.* Amount Disallowed Received Approved Contractor
GC-4 1,991 05/19/06 06/23/06 Keuka Construction
05-0565 Reconstruction 0-005-017 06/13/06 *CO No.* Amount Disallowed Received Approved Contractor
MC-1 3,821 01/22/08 04/02/08 KIMBLE INC
MC-2 3,206 01/22/08 04/02/08 KIMBLE INC.
06-0444 Additions and Alterations 0-005-018 04/24/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2129 Reconstruction 0-005-019 03/25/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1869FP Reconstruction 0-005-FP1 05/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Corning Academy Middle School:
90-1174 Reconstruction 0-007-007 05/01/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0890 Reconstruction 0-007-008 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0618 Reconstruction 0-007-009 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0433 Reconstruction 0-007-010 11/28/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1674 Reconstruction 0-007-011 06/20/97 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0957 Reconstruction 0-007-012 04/01/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0227 Reconstruction 0-007-015 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1467 Reconstruction 0-007-018 06/04/04 *CO No.* Amount Disallowed Received Approved Contractor
GC-01 2,199 02/14/05 03/17/05 Massa construction Inc
RC-2 13,608 10/30/06 12/18/06 J and B Installations
05-0566 Reconstruction 0-007-019 06/13/06 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 7,507 01/22/08 04/04/08 STREETER ASSOCIATES
06-0445 Reconstruction 0-007-020 04/24/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2130 Reconstruction 0-007-021 03/25/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1873FP Reconstruction 0-007-FP1 05/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Erwin Valley Elementary:
92-1179 Reconstruction 0-009-005 06/09/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0891 Reconstruction 0-009-006 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0619 Additions and Alterations 0-009-008 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1874 Reconstruction 0-009-010 08/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0228 Reconstruction 0-009-013 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0815 Additions and Alterations 0-009-014 07/08/02 *CO No.* Amount Disallowed Received Approved Contractor
E-02 1,584 07/23/03 07/25/03 John Mills Elec.
E-05 4,984 10/31/03 01/08/04 John Mills Elec.
E-07 2,844 12/26/03 01/08/04 John Mills Elec.
E-08 -81 02/23/04 03/05/04 John Mills Elec.
E-09 1,918 02/23/04 03/05/04 John Mills Elec.
E-10 -74 04/20/04 04/23/04 John Mills Elec.
G-11 1,855 06/30/03 07/02/03 Keuka Const.
G-13 7,942 06/30/03 07/02/03 Keuka Const.
G-23 1,516 12/26/03 12/31/03 Keuka Const.
G-24 2,339 02/06/04 02/20/04 Keuka Const.
G-25 4,565 02/06/04 02/20/04 Keuka Const.
G-28 14,665 02/23/04 03/02/04 Keuka Const.
G-30 2,053 09/07/04 09/24/04 Keuka Const.
G-31 2,813 10/15/04 10/26/04 Keuka Const.
H-03 1,420 06/04/03 06/25/03 Postler and Jaeckle
03-1468 Reconstruction 0-009-015 06/04/04 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0446 Reconstruction 0-009-016 04/24/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2131 Reconstruction 0-009-017 03/25/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Hugh W. Gregg Elementary:
90-1175 Reconstruction 0-010-006 05/01/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0888 Reconstruction 0-010-007 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0620 Reconstruction 0-010-008 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1867 Reconstruction 0-010-009 08/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1876 Reconstruction 0-010-010 09/08/98 *CO No.* Amount Disallowed Received Approved Contractor
E2-2 38,993 02/26/01 01/14/03 Bouille Elec.
E2-4 -3,828 04/12/02 05/24/02 Bouille Elec.
EC-4 48,118 01/09/01 01/14/03 J. Mills Elec.
00-0598 Reconstruction 0-010-011 04/20/01 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0229 Reconstruction 0-010-013 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0816 Additions and Alterations 0-010-014 07/08/02 *CO No.* Amount Disallowed Received Approved Contractor
E-03 -5,635 08/19/03 09/09/03 John Mills Elec.
G-17 -3,102 09/09/03 09/16/03 Keuka Const.
04-0841 Reconstruction 0-010-015 05/12/05 *CO No.* Amount Disallowed Received Approved Contractor
Gc-1 -4,591 05/15/06 06/23/06 Keuka Construction
05-0567 Reconstruction 0-010-016 06/13/06 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0447 Reconstruction 0-010-017 04/24/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2132 Reconstruction 0-010-018 03/25/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1867FP Reconstruction 0-010-FP1 05/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Lindley-Presho Elementary School:
90-1176 Reconstruction 0-011-006 05/01/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1180 Reconstruction 0-011-007 06/09/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0892 Reconstruction 0-011-008 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0621 Reconstruction 0-011-009 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1870 Reconstruction 0-011-011 08/18/98 *CO No.* Amount Disallowed Received Approved Contractor
EC-3 44,753 01/09/01 01/14/03 John Mills Elec.
00-0597 Reconstruction 0-011-012 04/20/01 *CO No.* Amount Disallowed Received Approved Contractor
HC-1 420 11/18/02 / / Kimble, Inc.
99-0230 Reconstruction 0-011-014 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0817 Additions and Alterations 0-011-015 07/08/02 *CO No.* Amount Disallowed Received Approved Contractor
G-01 3,309 06/04/03 06/25/03 Keuka Const.
G-16 1,215 08/19/03 09/02/03 Keuka Const.
G-21 1,857 10/20/03 10/24/03 Keuka Const.
G-26 1,335 02/06/04 02/20/04 Keuka Const.
G-29 1,418 03/18/04 04/06/04 Keuka Const.
H-01 -2,214 06/04/03 06/25/03 Postler & Jaeckle
05-0568 Reconstruction 0-011-017 06/13/06 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0448 Reconstruction 0-011-018 04/24/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2133 Reconstruction 0-011-019 03/25/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Northside Blodgett Middle School:
93-0893 Reconstruction 0-013-007 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0622 Reconstruction 0-013-008 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0434 Reconstruction 0-013-009 11/28/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1677 Reconstruction 0-013-010 06/20/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1261 Reconstruction 0-013-011 08/09/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0231 Reconstruction 0-013-014 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0569 Reconstruction 0-013-017 06/13/06 *CO No.* Amount Disallowed Received Approved Contractor
PC-1 3,936 01/22/08 04/02/08 FREY & COMBPELL
06-0449 Reconstruction 0-013-018 04/24/07 *CO No.* Amount Disallowed Received Approved Contractor
PC-1 2,547 04/21/09 / / FREY & CAMPBELL,INC
07-2134 Reconstruction 0-013-019 03/23/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1871FP Reconstruction 0-013-FP1 05/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Phillips Elementary:
93-0894 Reconstruction 0-016-006 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0623 Reconstruction 0-016-007 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1868 Reconstruction 0-016-008 08/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1875 Reconstruction 0-016-009 09/08/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0595 Reconstruction 0-016-010 04/20/01 *CO No.* Amount Disallowed Received Approved Contractor
EC-3 598 02/20/03 02/26/03 John Mills Electric
99-0232 Reconstruction 0-016-012 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0818 Additions and Alterations 0-016-013 07/08/02 *CO No.* Amount Disallowed Received Approved Contractor
E-01 -570 07/23/03 07/25/03 John Mills Elec.
G-02 15,202 06/04/03 06/25/03 Keuka Const.
G-07 -2,553 06/04/03 06/25/03 Keuka Const.
G-12 1,060 06/30/03 07/02/03 Keuka Const.
G-22 2,364 12/26/03 12/31/03 Keuka Const.
H-02 -65 06/04/03 06/25/03 Postler and Jaeckle
05-0570 Reconstruction 0-016-014 06/13/06 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0450 Reconstruction 0-016-015 04/27/06 *CO No.* Amount Disallowed Received Approved Contractor
GC-2 30,000 04/21/09 06/05/09 LECHASE CONSTRUCTION SERVICES
07-2135 Reconstruction 0-016-016 03/25/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1832FP Reconstruction 0-016-FP1 05/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Frank F Pierce Elementary:
92-1181 Reconstruction 0-017-003 06/09/93 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0624 Reconstruction 0-017-004 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1869 Reconstruction 0-017-005 08/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0543 Reconstruction 0-017-006 03/02/04 *CO No.* Amount Disallowed Received Approved Contractor
EC-02 2,085 08/10/04 09/23/04 Matco Elec.
99-0233 Reconstruction 0-017-008 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0571 Reconstruction 0-017-009 06/13/06 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0451 Reconstruction 0-017-010 04/24/07 *CO No.* Amount Disallowed Received Approved Contractor
PC-2 2,994 04/21/09 / / FREY & CAMPBELL INC
07-2136 Reconstruction 0-017-011 03/25/08 NO CHANGE ORDERS ON ELECTRONIC FILE
E. Severn Elementary:
93-0895 Reconstruction 0-018-004 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0625 Additions and Alterations 0-018-005 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1871 Reconstruction 0-018-006 08/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0544 Reconstruction 0-018-007 03/02/04 *CO No.* Amount Disallowed Received Approved Contractor
EC-03 2,398 08/10/04 09/23/04 Matco Elec.
EC-05 10,708 06/13/05 07/08/05 matco Electric Corp
EC-08 252 10/18/06 12/18/06 Matco Electric
GC-02 12,166 12/08/04 12/24/04 Keuka Construction
GC-03 12,732 12/08/04 12/24/04 Keuka Construction
GC-04 13,159 01/11/05 01/24/05 Keuka Construction
GC-05 44,883 01/11/05 01/24/05 Keuka Construction
GC-06 9,267 01/11/05 01/24/05 Keuka Construction
GC-07 18,211 01/11/05 01/24/05 Keuka Construction
GC-08 15,983 01/11/05 01/24/05 Keuka Construction
GC-09 1,245 01/11/05 01/24/05 Keuka Construction
GC-10 3,986 01/11/05 01/24/05 Keuka Construction
GC-11 1,005 01/11/05 01/24/05 Keuka Construction
GC-12 6,389 05/05/05 06/02/05 Keuka Construction Corp
GC-13 37,100 37,100 06/30/05 10/05/06 Keuka Construction
HC-01 1,837 01/28/05 05/02/05 Kimble Mechanical Contractors
99-0234 Reconstruction 0-018-009 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0843 Reconstruction 0-018-012 05/12/05 *CO No.* Amount Disallowed Received Approved Contractor
EC-01 -377 08/14/08 05/11/09 BOUILLE ELETRIC INC.
GC-3 -2,804 05/19/06 06/23/06 Keuka Construction
MC-1 -2,774 08/14/08 10/21/08 POSTLER AND JAECKLE CORP
05-0572 Reconstruction 0-018-013 06/13/06 *CO No.* Amount Disallowed Received Approved Contractor
MC-3 2,495 01/22/08 04/02/08 KIMBLE
06-0452 Reconstruction 0-018-014 04/24/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2137 Reconstruction 0-018-015 03/25/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1870FP Reconstruction 0-018-FP1 05/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Calvin U Smith Elementary:
93-0896 Reconstruction 0-019-007 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0626 Reconstruction 0-019-008 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1872 Reconstruction 0-019-009 08/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1260 Reconstruction 0-019-011 08/09/99 *CO No.* Amount Disallowed Received Approved Contractor
C-4 630 06/20/02 / / Hakes Const.
EC-1 rev 9,863 11/10/00 01/14/03 RG Burns Elec.
EC-2 39,924 11/10/00 01/14/03 RG Burns Elec.
EC-3 22,141 11/10/00 01/14/03 RG Burns Elec.
EC-4 23,687 06/20/02 / / RG Burns Elec.
EC-5 2,711 06/20/02 / / RG Burns Elec.
G-3(rev) 31,742 06/20/02 10/23/03 Keuka Const.
G-5 5,262 01/15/02 03/26/02 Keuka Const.
HC-1 30,469 06/20/02 12/01/03 Kimble, Inc
HC-2 27,191 11/10/00 01/14/03 Kimble, Inc.
HC-3 7,805 06/14/01 01/10/02 Kimble, Inc.
JC-2 27,191 06/20/02 / / Kimble, Inc
PC-1 -2,942 06/14/01 01/10/02 Frey & Campbell
SC-3 41,281 06/20/02 / / Hakes Const.
SC-4 630 12/07/01 04/05/02 Hakes Const.
99-0235 Reconstruction 0-019-013 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0819 Additions and Alterations 0-019-014 07/08/02 *CO No.* Amount Disallowed Received Approved Contractor
E-04 1,161 08/19/03 09/02/03 John Mills Elec.
E-11 318 08/11/04 09/08/04 John Mills Elec.
G-04 9,881 06/04/03 06/25/03 Keuka Const.
G-05 1,580 06/04/03 06/25/03 Keuka Const.
G-06 681 06/04/03 06/25/03 Keuka Const.
G-09 8,049 06/04/03 06/25/03 Keuka Const.
G-10 -2,485 06/04/03 06/25/03 Keuka Const.
G-14 920 06/30/03 07/02/03 Keuka Const.
G-15 3,426 07/23/03 07/25/03 Keuka Const.
G-18 8,055 10/07/03 10/14/03 Keuka Const.
G-19 3,308 10/20/03 10/24/03 Keuka Const.
G-20 2,594 10/20/03 10/24/03 Keuka Const.
G-27 3,191 02/06/04 02/20/04 Keuka Const.
H-04 753 08/19/03 09/02/03 Postler & Jaeckle
06-0453 Reconstruction 0-019-015 04/23/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2138 Reconstruction 0-019-016 03/25/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Winfield Elementary School:
90-1177 Reconstruction 0-021-003 05/01/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0897 Reconstruction 0-021-004 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0627 Reconstruction 0-021-005 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0431 Reconstruction 0-021-006 11/28/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1873 Reconstruction 0-021-007 08/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0599 Reconstruction 0-021-008 04/20/01 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0236 Reconstruction 0-021-010 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0820 Additions and Alterations 0-021-011 07/08/02 *CO No.* Amount Disallowed Received Approved Contractor
E-06 2,165 12/26/03 01/08/04 John Mills Elec.
G-03 5,114 06/04/03 06/25/03 Keuka Const.
G-08 3,346 06/04/03 06/25/03 Keuka Const.
05-0573 Reconstruction 0-021-013 06/13/06 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0454 Reconstruction 0-021-014 04/24/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2139 Reconstruction 0-021-015 03/25/08 NO CHANGE ORDERS ON ELECTRONIC FILE
East High School:
91-0773 Reconstruction 0-023-007 03/27/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0831 Reconstruction 0-023-008 04/08/92 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0162 Reconstruction 0-023-009 08/25/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1233 Reconstruction 0-023-010 05/14/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0898 Reconstruction 0-023-012 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1020 Additions and Alterations 0-023-013 04/17/95 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0769 Reconstruction 0-023-014 02/17/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0628 Reconstruction 0-023-015 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1676 Reconstruction 0-023-017 06/20/97 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0954 Reconstruction 0-023-018 04/01/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1259 Reconstruction 0-023-019 08/09/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1521 Reconstruction 0-023-020 08/22/00 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 -8,930 05/14/02 06/04/02 GVE, Inc
SC-3 -3,139 05/14/02 06/04/02 AL Blades and Sons
SC-4 -3,337 05/14/02 06/04/02 AL Blades and Sons
00-0594 Reconstruction 0-023-021 04/20/01 *CO No.* Amount Disallowed Received Approved Contractor
HC-1 3,805 11/18/02 / / Kimble, Inc.
99-0237 Reconstruction 0-023-022 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1469 Reconstruction 0-023-025 06/04/04 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0574 Reconstruction 0-023-026 06/13/06 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 5,330 01/22/08 04/02/08 JOHN MILLS ELECTRIC
PC-2 3,597 01/22/08 04/02/08 FREY & COMBELL
06-0455 Reconstruction 0-023-027 04/24/07 *CO No.* Amount Disallowed Received Approved Contractor
EC2-1 -994 04/21/09 / / BOUILLE ELECTRIC INC
GC-1 51,146 04/21/09 06/05/09 LECHASE CONSTRUCTION SERVICES
MC2-1 -9,174 04/21/09 / / KIMBLE INC
07-2140 Reconstruction 0-023-028 03/25/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1868FP Reconstruction 0-023-FP1 05/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
West High School:
90-1023 Reconstruction 0-024-006 03/12/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1521 Reconstruction 0-024-007 06/19/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1259 Reconstruction 0-024-008 04/25/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0330 Reconstruction 0-024-009 10/11/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0601 Additions and Alterations 0-024-010 03/19/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0899 Reconstruction 0-024-011 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0629 Reconstruction 0-024-012 02/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0435 Reconstruction 0-024-013 11/28/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1675 Reconstruction 0-024-014 06/20/97 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0955 Reconstruction 0-024-015 04/01/97 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0545 Reconstruction 0-024-016 03/02/04 *CO No.* Amount Disallowed Received Approved Contractor
EC-01 44,158 08/10/04 09/23/04 Matco Elec.
EC-04 60,443 08/19/04 07/17/07 Matco Elec.
EC-06 -2,318 06/30/05 07/21/05 Matco Electric Corp
EC-07 5,802 10/18/06 03/23/07 Matco electric
HC-02 108 02/14/05 03/17/05 Kimble Mechanical Contractors
98-1258 Reconstruction 0-024-017 08/09/99 *CO No.* Amount Disallowed Received Approved Contractor
Ec-4 23,688 03/09/01 01/14/03 RG Burns Elec.
99-0238 Reconstruction 0-024-019 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0171 Reconstruction 0-024-021 10/02/01 *CO No.* Amount Disallowed Received Approved Contractor
RC-1 19,268 03/18/03 03/20/03 J&B Installation
03-1470 Reconstruction 0-024-022 06/04/04 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0575 Reconstruction 0-024-023 06/13/06 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0456 Reconstruction 0-024-024 04/24/07 *CO No.* Amount Disallowed Received Approved Contractor
MC-1 21,463 04/21/09 / / KIMBLE INC
07-2141 Reconstruction 0-024-025 03/25/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1872FP Reconstruction 0-024-FP1 05/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
New High School:
02-0267SR New Construction 0-052-001 09/24/02 *CO No.* Amount Disallowed Received Approved Contractor
001 16,373 01/29/03 02/04/03 Glen Hawbaker
Adm Bldg Warehouse:
99-0239 Reconstruction 1-001-004 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1465 Reconstruction 1-001-005 06/04/04 *CO No.* Amount Disallowed Received Approved Contractor
RC-1 20,051 02/17/05 04/28/05 J and B Installations
RC-3 -1,000 10/30/06 12/18/06 J and B Installation
Bus Garage:
92-1188 Reconstruction 5-015-001 06/09/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0900 Reconstruction 5-015-002 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1877 Reconstruction 5-015-003 09/08/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0240 Reconstruction 5-015-004 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0845 Reconstruction 5-015-005 05/12/05 *CO No.* Amount Disallowed Received Approved Contractor
GC-2 5,404 05/19/06 06/23/06 Keuka Construction
E.H.S. Stadium:
90-1178 Reconstruction 7-026-003 05/01/91 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0241 Reconstruction 7-026-004 12/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1471 Reconstruction 7-026-005 06/04/04 NO CHANGE ORDERS ON ELECTRONIC FILE
District Wide Tech/Network:
03-1472 Reconstruction 7-999-002 06/04/04 *CO No.* Amount Disallowed Received Approved Contractor
1 -19,969 02/11/08 04/08/08 Ronco Communications & electronics
GREENWOOD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-15-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
94-0293 Reconstruction 0-001-004 11/14/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1482 Reconstruction 0-001-005 06/26/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1672 Additions and Alterations 0-001-006 07/22/97 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0284 Additions and Alterations 0-001-007 06/24/03 *CO No.* Amount Disallowed Received Approved Contractor
003 2,852 03/22/05 03/31/05 Lobar Inc
004 2,769 03/22/05 03/31/05 Lobar Inc
005 4,638 03/22/05 03/31/05 Lobar Inc
E-001 -2,196 02/14/05 03/02/05 Blackmon Farrell Electric
E-002 321 03/10/05 03/23/05 Blackmon Farrell electric
E-003 -2,500 03/30/06 07/21/06 Blackmon Farrell Electric
G-001 787 06/18/04 06/22/04 Lobar Inc
G-002 630 10/18/04 10/26/04 Lobar Inc
G-006 13,790 03/22/05 03/31/05 Lobar Inc
G-007 -10,000 03/10/05 03/23/05 Lobar Inc
G-008 -2,217 04/10/06 06/26/06 Lobar Inc
H-001 3,919 10/18/04 10/26/04 Kimble Inc
H-002 4,169 10/18/04 10/26/04 Kimble Inc
H-003 -4,355 06/06/05 07/19/05 Kimble Inc
P-001 3,386 10/06/04 10/18/04 Nairy Mech.
P-002 -2,500 03/10/05 03/23/05 Nairy Mechanical
04-0508 Additions and Alterations 0-001-008 02/15/05 *CO No.* Amount Disallowed Received Approved Contractor
E-001 1,461 06/23/05 07/21/05 GVE Inc
E-002 -1,939 03/10/06 06/30/06 GVE Inc
E-003 -3,000 04/10/06 05/26/06 GVE Inc
GC-001 -1,014 10/24/05 11/08/05 Lobar inc
P-001 -1,000 10/13/05 10/25/05 Frey Campbell inc
03-0027FP Reconstruction 0-001-FP1 09/18/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
94-0294 Reconstruction 5-002-002 11/14/94 NO CHANGE ORDERS ON ELECTRONIC FILE
CANISTEO-GREENWOOD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-15-02-06
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Junior Senior High School:
07-0953 Reconstruction 0-001-002 06/27/08 *CO No.* Amount Disallowed Received Approved Contractor
E-001 4,921 09/03/09 09/18/09 BLACKMON-FARRELL ELECTRIC INC
G-001 23,944 09/03/09 09/18/09 HOLDSWORTH-KLIMOWSKI CONSTRUCTION
G-007 5,049 10/01/09 11/16/09 HOLDSWORTH-KLIMOWSKI CONSTRUCTION
M-002 -4,173 09/03/09 09/18/09 PICCIRILLI-SLAVIK & VINCENT P&H INC
T-001 7,715 09/03/09 09/18/09 O'CONNELL ELECTRIC
Elementary:
07-0954 Reconstruction 0-002-001 06/27/08 *CO No.* Amount Disallowed Received Approved Contractor
E-002 1,630 09/03/09 09/18/09 BLACKMON-FARRELL ELECTRIC INC
G-002 -17,090 09/03/09 09/18/09 HOLDSWORTH-KLIMOWSKI CONSTRUCTION
G-006 46,682 10/01/09 11/16/09 HOLDSWORTH-KLIMOWSKI CONSTRUCTION
M-003 1,473 10/01/09 11/16/09 PICCIRILLI-SLAVIK & VINCENT P/H INC
T-003 9,276 09/03/09 09/18/09 O'CONNELL ELECTRIC
Greenwood Middle Sch.(frmrly Main):
07-0955 Reconstruction 0-020-002 06/27/08 *CO No.* Amount Disallowed Received Approved Contractor
G-005 4,944 09/03/09 09/18/09 HOLDSWORTH-KLIMOWSKI CONSTRUCTION
G-008 52,339 10/01/09 11/16/09 HOLDSWORTH-KLIMOWSKI CONSTRUCTION
M-001 5,355 09/03/09 / / PICCIRILLI-SLAVIK & VINCENT P/H
M-004 2,941 10/01/09 11/16/09 PICCIRILLI-SLAVIK & VINCENT P/H INC
T-002 2,766 09/03/09 09/18/09 O'CONNELL ELECTRIC
New Storage Building:
05-1243 New Construction 2-025-001 09/25/06 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
07-0956 Reconstruction 5-004-001 06/27/08 *CO No.* Amount Disallowed Received Approved Contractor
E-003 3,629 09/03/09 09/18/09 BLACKMON-FARRELL ELECTRIC INC
G-003 16,050 09/03/09 10/02/09 HOLDSWORTH-KLIMOWSKI CONSTRUCTION
T-004 273 09/03/09 09/18/09 O'CONNELL ELECTRIC
07-0957 Reconstruction 5-021-001 06/27/08 *CO No.* Amount Disallowed Received Approved Contractor
E-004 482 09/03/09 09/18/09 BLACKMON-FARRELL ELECTRIC INC
G-004 15,562 09/03/09 09/18/09 HOLDSWORTH-KLIMOWSKI CONSTRUCTION
HORNELL CITY SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-18-00-01
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Intermediate School:
91-1382 Reconstruction 0-003-005 07/02/92 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1047 Reconstruction 0-003-008 03/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1200 Reconstruction 0-003-009 04/24/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1254 Reconstruction 0-003-010 10/18/01 *CO No.* Amount Disallowed Received Approved Contractor
001 16,067 08/20/02 11/01/02 Pettit and Pettit
002 8,646 04/24/03 05/05/03 Javen Construction
006 4,221 04/24/03 05/05/03 Postler & Jaeckle
006 3,342 04/24/03 05/05/03 Postler & Jaeckle
007 8,582 01/07/05 03/11/05 Javen Construction
009 1,268 06/16/03 07/11/03 Postler & Jaeckle
009 2,647 08/26/03 10/23/03 Postler & Jaeckle
009 231 12/20/04 12/30/04 Finger Lake Roofing
010 1,390 06/16/03 07/11/03 Postler & Jaeckle
010 5,542 03/10/05 03/23/05 Javen Construction
012 10,537 06/16/03 07/11/03 Postler & Jaeckle
012 2,462 03/10/05 03/23/05 Javen Construction
014 2,834 06/16/03 07/11/03 Postler & Jaeckle
016 20,825 09/24/03 12/09/03 Postler & Jaeckle
019 2,435 12/20/04 12/30/04 Postler & Jaeckle
021 4,755 12/20/04 12/30/04 Postler & Jaeckle
18 -20,718 06/26/08 08/27/08 Javen Construction
20 85,867 06/26/08 08/27/08 Javen Construction
3 1,705 12/31/02 01/16/03 Javen Construction
ACM-001 437 02/03/03 02/27/03 S&S Environmental
ACM-002 231 02/03/03 02/27/03 S&S Environmental
E-21 7,339 07/02/03 07/09/03 Matco Electric
E21-006 2,720 02/03/03 02/27/03 Matco Electric
H21-005 2,808 02/03/03 02/27/03 Postler & Jaeckle
W21-003 -1,470 06/23/05 07/20/05 John Cadwallder inc
06-1641 Reconstruction 0-003-011 07/03/07 *CO No.* Amount Disallowed Received Approved Contractor
P-001 -9,900 09/10/07 10/18/07 WILLIAM L. WATSON CO., INC.
02-1417FP Reconstruction 0-003-FP1 03/14/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Bryant Elementary:
92-0666 Reconstruction 0-007-005 04/27/93 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1255 Reconstruction 0-007-007 10/18/01 *CO No.* Amount Disallowed Received Approved Contractor
003 6,235 04/11/03 04/21/03 S&S Environ.
006 13,088 07/02/03 07/09/03 S&S Environ.
007 2,905 12/31/02 01/16/03 Pettit & Pettit
007 12,973 05/20/04 05/27/04 S&S Environ.
007 870 05/20/04 05/27/04 Finger Lakes Roofing
008 18,202 05/20/04 05/27/04 S&S Environ.
010 2,647 08/26/03 10/23/03 Postler & Jaeckle
010B 21,339 03/10/05 03/23/05 Javen Construction
012A 16,892 10/15/03 10/23/03 Matco Elec.
012B 4,074 10/15/03 10/23/03 Matco Elec.
013 19,454 10/15/03 10/23/03 Matco Elec.
014 12,617 09/24/03 12/09/03 Matco Elec.
014 2,192 03/30/04 04/26/04 Postler & Jaeckle
015 2,637 09/24/03 12/09/03 Matco Elec.
017 18,706 09/24/03 12/09/03 Matco Elec.
ACM-21 -4,840 11/21/05 02/13/06 S and S Environmental
H-21 1,134 12/20/04 12/30/04 Postler & Jaeckle
H-21 5,730 12/07/05 08/09/06 Postler Jaeckle
H21-008 574 04/24/03 05/05/03 Postler & Jaeckle
H21-024 565 03/04/05 03/24/05 Postler Jaeckle Corp
bcif-017 -4,756 06/26/08 12/03/08 JAVEN CONSTRUCTION
08-0463 Reconstruction 0-007-008 04/01/09 *CO No.* Amount Disallowed Received Approved Contractor
E-001 4,612 10/26/09 / / BILLITIER ELECTRIC INC
E-002 5,245 10/26/09 / / BILLITIER ELECTRIC INC
GC-001 10,054 10/26/09 / / LECHASE CONSTRUCTION SERVICES LLC
GC-002 52,829 10/26/09 / / LECHASE CONSTRUCTION SERVICES LLC
GC-003 33,706 10/26/09 / / LECHASE CONSTRUCTION SERVICES LLC
GC-004 2,920 10/26/09 / / LECHASE CONSTRUCTION SERVICES LLC
GC-005 2,325 10/26/09 / / LECHASE CONSTRUCTION SERVICES LLC
GC-006 1,418 10/26/09 / / LECHASE CONSTRUCTION SERVICES LLC
GC-007 2,163 10/26/09 / / LECHASE CONSTRUCTION SERVICES LLC
GC-008 9,009 10/26/09 / / LECHASE CONSTRUCTION SERVICES LLC
GC-009 5,313 10/26/09 / / LECHASE CONSTRUCTION SERVICES LLC
GC-010 6,234 10/26/09 / / LECHASE CONSTRUCTION SERVICES LLC
North Hornell Elementary:
00-1256 Additions and Alterations 0-012-004 10/18/01 *CO No.* Amount Disallowed Received Approved Contractor
001 5,000 09/20/02 10/24/02 Javen Const.
001 900 09/20/02 10/24/02 Postler & Jaeckle
001 2,333 09/20/02 10/24/02 Matco Elec.
001 4,300 09/20/02 10/24/02 Postler & Jaeckle
002 -86,800 09/20/02 10/24/02 Postler & Jaeckle
002 -4,210 12/31/02 08/01/06 Finger Lakes Roofing
003 35,000 09/20/02 10/24/02 Pettit & Pettit
003 140,000 09/20/02 10/24/02 Postler & Jaeckle
003 -8,937 09/20/02 10/24/02 Matco Elec.
004 14,928 09/20/02 10/24/02 Pettit & Pettit
004 4,930 09/20/02 10/24/02 Matco Elec.
004 1,252 04/28/03 05/05/03 Postler & Jaeckle
005 2,069 09/20/02 10/24/02 Pettit & Pettit
005 810 03/18/04 04/07/04 Finger Lakes Piping
006 7,204 01/07/05 03/11/05 Javen Construction
009 13,623 05/20/04 05/27/04 S&S Environ.
011 4,308 06/16/03 07/11/03 Postler & Jaeckle
011 2,224 03/10/05 03/23/05 Javen Construction
012 3,749 03/18/04 04/28/04 Postler & Jaeckle
015 13,408 08/26/03 10/23/03 Postler & Jaeckle
017 7,612 09/24/03 12/09/03 Postler & Jaeckle
19 -9,053 06/26/08 10/07/08 Javen Construction
H-21 026 430 04/26/05 06/10/05 Postler Jaeckle
H21-004 2,220 02/03/03 02/27/03 Postler & Jaeckle
P21-003 1,411 02/03/03 02/27/03 Postler & Jaeckle
R-21 1,580 03/30/04 04/07/04 Finger Lakes Roofing
02-1415FP Reconstruction 0-012-FP1 03/14/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Senior High School:
92-0667 Reconstruction 0-013-004 04/27/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1048 Reconstruction 0-013-005 03/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1201 Reconstruction 0-013-006 04/24/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1257 Additions and Alterations 0-013-007 10/18/01 *CO No.* Amount Disallowed Received Approved Contractor
001 8,475 10/17/02 11/07/02 Finger Lakes Roofing
001 -8,015 12/20/04 12/30/04 John Cadwallder
003 10,980 12/04/03 03/15/04 Finger Lakes Roofing
004 7,180 04/11/03 04/21/03 S&S Environ.
004 10,820 07/30/03 08/01/03 Javen Const.
004 1,136 03/18/04 04/07/04 Finger Lakes Roofing
005 9,350 07/30/03 08/01/03 Javen Const.
007 8,256 04/24/03 05/05/03 Postler & Jaeckle
007 16,145 06/16/03 07/11/03 Postler & Jaeckle
008 12,600 06/16/03 07/11/03 Matco Elec.
008 6,521 06/16/03 07/11/03 Postler & Jaeckle
008 -222 12/20/04 12/30/04 Finger Lakes Roofing
008 19,180 02/04/05 03/14/05 Javen Construction
009 6,182 06/16/03 07/11/03 Matco Elec.
009 8,346 07/02/03 07/09/03 Pettit & Pettit
009 15,029 02/04/05 03/14/05 Javen Construction
010 12,617 05/20/04 05/27/04 S&S Environ.
010 -29,235 12/07/05 05/25/06 Pettit and Pettit
010a 2,737 03/10/05 03/23/05 Javen Construction
011 7,088 07/02/03 07/09/03 Matco Elec.
011 1,135 03/18/04 04/28/04 Postler & Jaeckle
011 28,962 05/20/04 05/27/04 S&S Environ.
011 3,199 12/07/05 05/25/06 Pettit and Pettit
012 12,602 05/20/04 05/27/04 S&S Environ.
013 8,198 06/16/03 07/11/03 Postler & Jaeckle
013 3,710 03/30/04 04/26/04 Postler & Jaeckle
013 5,909 12/20/04 12/30/04 S&S Environ.
014 1,952 08/31/04 09/23/04 S&S Environ.
015 839 07/12/04 07/19/04 Postler & Jaeckle
015 6,087 12/20/04 12/30/04 S&S Environ.
016 19,427 12/20/04 12/30/04 S&S Environ.
016A 9,775 10/15/03 10/23/03 Matco Elec.
016B 11,207 10/15/03 10/23/03 Matco Elec.
018 10,539 08/31/04 09/23/04 Postler & Jaeckle
018 -14,301 04/26/06 05/24/06 MATCO ELECTRIC CORPORATION
019 -2,992 01/05/06 05/01/06 S&S ENVIROMENTAL
020 54,621 08/31/04 09/23/04 Postler & Jaeckle
023 3,973 12/20/04 12/30/04 Postler & Jaeckle
16 -7,077 06/26/08 08/27/08 Javen Construction
2 1,100 12/31/02 01/16/03 Matco Elec.
511-006 3,250 12/31/02 01/16/03 Pettit & Pettit
511-008 10,700 12/31/02 01/16/03 Pettit & Pettit
ACM-21 -2,992 11/21/05 02/13/06 S and S Ennvironmental
ACM-21 -1,438 11/21/05 11/23/05 S and S Enviornmental
E21-005 5,165 12/31/02 01/16/03 Matco Elec.
E21-007 8,447 04/24/03 05/05/03 Matco Elec.
H-21 887 04/26/05 06/10/05 Postler Jaeckle
P21-002 15,394 02/03/03 02/27/03 Postler & Jaeckle
P21-005 1,415 04/24/03 05/05/03 Postler & Jaeckle
S-11-002 3,225 08/28/02 10/29/02 Pettit & Pettit
W-21 002 -384 06/23/05 07/20/05 John Cadwallder Inc
08-0255 Reconstruction 0-013-009 09/08/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1416FP Reconstruction 0-013-FP1 03/14/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Columbian Elementary:
00-1253 Reconstruction 0-015-004 10/18/01 *CO No.* Amount Disallowed Received Approved Contractor
005 1,094 04/11/03 04/21/03 S&S Environmental
016 2,210 07/12/04 07/19/04 Postler & Jaeckle
Bldgs And Grounds Building:
91-0118 Reconstruction 3-004-002 08/27/91 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
91-1383 Reconstruction 5-002-003 06/23/92 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1252 Additions and Alterations 5-002-004 10/18/01 *CO No.* Amount Disallowed Received Approved Contractor
011 3,001 06/16/03 07/11/03 Postler&Jaeckle
District Wide:
08-0762 Reconstruction 7-999-001 12/19/08 *CO No.* Amount Disallowed Received Approved Contractor
E-001 1,046 10/26/09 / / BILLITIER ELECTRIC INC
GC-001 9,754 10/26/09 / / KUITEMS CONSTRUCTION INC
H-001 762 10/26/09 / / JOHN W. DANFORTH COMPANY
H-002 2,789 10/26/09 / / JOHN W. DANFORTH COMPANY
T-001 162 10/26/09 / / BILLITIER ELECTRIC INC
T-002 1,007 10/26/09 / / BILLITIER ELECTRIC INC
T-003 2,421 10/26/09 / / BILLITIER ELECTRIC INC
ARKPORT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-19-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Central School:
91-0812 Reconstruction 0-001-004 03/26/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0258 Additions and Alterations 0-001-005 11/30/93 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0257 Reconstruction 0-001-006 12/03/96 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1161 Additions and Alterations 0-001-007 06/25/99 *CO No.* Amount Disallowed Received Approved Contractor
E-03 912 06/03/03 06/03/03 Connors Haas
E-04 3,303 06/03/03 06/03/03 Connors Haas
E-24 1,042 05/06/01 02/06/02 Connors-Haas
E-25 6,282 05/15/01 01/29/02 Connors-Haas
GC-06 8,926 06/03/03 06/03/03 Welliver McGuire
GC-30 1,480 04/27/01 01/10/02 Welliver McGuire
GC-31 8,715 04/27/01 01/10/02 Welliver McGuire
GC-32 761 04/27/01 01/10/02 Welliver McGuire
GC-33 790 04/27/01 01/10/02 Welliver McGuire
GC-34 0 04/27/01 01/10/02 Welliver McGuire
GC-35 1,216 04/27/01 01/10/02 Welliver McGuire
GC-36 1,266 04/27/01 01/10/02 Welliver McGuire
GC-37 4,242 04/27/01 01/10/02 Welliver McGuire
GC-38 -12,340 05/15/01 01/29/02 Welliver McGuire
GC-40 -9,593 05/29/01 01/14/02 Welliver McGuire
M-08 4,577 06/03/03 06/03/03 Amering & Johnston
P-04 6,484 06/03/03 06/03/03 Frey & Campbell
P-11 345 05/12/01 02/06/02 Frey & Campbell
P-12 -5,305 03/18/02 05/24/02 Frey & Campbell
03-0249 Reconstruction 0-001-008 09/05/03 *CO No.* Amount Disallowed Received Approved Contractor
H-005 2,263 03/12/05 04/27/05 Amering Johnston Inc
H-005 2,263 04/29/05 06/10/05 Amering and Johnston
H-006 15,878 03/22/05 03/31/05 Amering Johnston
H-007 798 04/29/05 06/10/05 Amering and Johnston
H-008 7,309 09/07/05 09/15/05 Amering Johnston Inc
H-1 17,284 03/12/04 04/30/04 Amering & Johnston
H-2 17,328 04/16/04 04/26/04 Amering & Johnston
H-3 35,414 04/16/04 04/26/04 Amering & Johnston
H-4 5,033 08/31/04 09/23/04 Amering & Johnston
08-0432 Reconstruction 0-001-010 01/27/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1414FP Reconstruction 0-001-FP1 03/10/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Athletic Field Stor. Bldg.:
98-1615 New Construction 7-006-001 06/25/99 NO CHANGE ORDERS ON ELECTRONIC FILE
PRATTSBURGH CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-23-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
90-0519 Additions and Alterations 0-001-002 01/10/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1182 Reconstruction 0-001-003 05/11/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1648 Reconstruction 0-001-004 08/04/94 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0367 Reconstruction 0-001-005 12/06/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0283 Additions and Alterations 0-001-006 03/22/00 *CO No.* Amount Disallowed Received Approved Contractor
AA-1 4,100 09/12/03 09/16/03 Lambert's Asbestos Removal
AA-2 9,688 12/04/01 02/20/02 Lambert's Asbestos Removal
E-10 12,494 10/03/01 04/16/02 RG Burns
E-11 4,827 12/04/01 02/20/02 RG Burns
E-12 10,582 01/29/02 03/25/02 RG Burns
E-13 395 03/19/02 04/19/02 RG Burns
E-14 10,447 04/08/02 04/26/02 RG Burns
E-15 7,250 06/27/02 07/15/02 RG Burns
E-16 799 05/07/03 05/21/03 RG Burns
E-17 1,013 09/10/03 09/16/03 RG Burns
E-2 23,945 11/10/00 01/17/03 RG Burns
E-6 45,453 05/02/01 01/14/03 RG Burns
E-7 21,210 06/28/01 01/08/02 RG Burns
E-8 32,969 09/12/03 09/16/03 RG Burns
E-9 18,319 08/17/01 01/14/02 RG Burns
GC-10 45,543 01/29/02 03/25/02 Streeter Assoc.
GC-11 6,911 03/19/02 02/14/03 Streeter Assoc,
GC-12 3,060 08/16/02 09/05/02 Streeter Assoc.
GC-13 11,404 10/15/02 12/02/02 Streeter Assoc.
GC-14 1,152 10/06/03 11/05/03 Streeter Assoc.
GC-9 1,040 11/30/01 01/28/02 Streeter Assoc.
GC2 rev. 53,251 03/19/02 04/19/02 Streeter Assoc.
H-2 6,046 03/23/01 01/14/03 Finger Lakes Piping
H-4 1,944 06/19/01 01/08/02 Finger Lakes Piping
H-5 12,365 08/17/01 01/14/02 Finger Lakes Piping
H-6 45,923 12/04/01 01/13/03 Finger Lakes Piping
H-7 10,253 04/08/02 04/26/02 Finger Lakes Piping
P-5 10,652 02/13/02 03/25/02 Faulks Plumbing
WT-1 262 09/17/02 10/30/02 Home Comfort
WT-2 1,486 11/08/02 12/12/02 Home Comfort
WT-3 1,456 03/06/03 03/19/03 Home Comfort
04-0390 Additions and Alterations 0-001-007 02/07/05 *CO No.* Amount Disallowed Received Approved Contractor
A-1 1,950 08/24/05 09/01/05 Lamberts Asbestos Removal Services
A-2 8,688 11/23/05 02/13/06 Lamberts Asbestos Removal
E-01 9,035 11/15/05 / / John Mills Electric
E-01 9,035 02/29/08 04/15/08 JOHN MILLS ELECTRIC, INC
E-01 9,035 03/03/08 04/15/08 JOHN MILLS ELECTRC, INC.
E-02 12,775 08/04/06 06/04/09 John Mills Electric
GC-2 9,321 08/24/05 09/01/05 Edger Enterprises of Elmira
GC-3 33,800 11/15/05 12/02/05 Edger Enterprises of Elmira Co
GC-5 12,316 02/09/06 04/15/08 Edger Enterprises of Elmira
GC-5 12,316 02/29/08 / / EDGER ENTERPRISES OF ELMIRA, INC
GC-5 12,317 03/03/08 04/15/08 EDGER ENTERPRISES OF ELMIRA, INC.
GC-6 2,664 02/09/06 03/15/08 Edger Enterprises
GC-6 2,665 02/29/08 / / EDGER ENTERPRISES OF ELMIRA, INC
GC-6 2,665 03/03/08 03/15/08 EDGER ENTERPRISES OF ELMIRA, INC.
GC-7 -1,500 03/22/06 06/23/06 Edger Enterprises of Elmira
HVAC-1 2,613 11/15/05 / / Frey Campbell
HVAC-1 2,613 02/29/08 04/15/08 FREY & CAMPBELL, INC
HVAC-1 2,613 03/03/08 04/15/08 FREY & CAMPBELL, INC.
HVAC2 2,482 09/11/06 01/09/07 Frey Campbell
LR-1 -1,558 08/24/05 09/01/05 E and B Equipement
P-1 -920 12/21/05 12/29/05 Frey Campbell
P-2 8,400 10/03/06 06/04/09 Frey Campbell
05-0337 Reconstruction 0-001-008 03/01/06 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0836 Reconstruction 0-001-009 05/23/07 *CO No.* Amount Disallowed Received Approved Contractor
E-10 7,156 02/09/09 04/10/09 JOHN MILLS ELECTRIC, INC.
E-10 7,156 02/09/09 / / JOHN MILLS ELECTRIC, INC.
E-11 523 05/06/09 07/28/09 HOHN MILLS ELECTRIC, INC.
E-2 6,332 10/30/07 01/16/08 John Mills Electric
E-3 4,371 04/10/08 01/30/09 JOHN MILLS ELECTRIC, INC.
E-4 625 04/10/08 / / JOHN MILLS ELECTRIC, INC.
E-7 10,419 11/03/08 02/27/09 JOHN MILLS ELECTRIC, INC
E-8 12,030 11/24/08 05/19/09 JOHN MILLS ELECTRIC, INC.
GC-10 276 10/30/08 01/22/09 KEUKA CONSTRUCTION CORPORATION
GC-12 3,583 10/30/08 01/22/09 KEUKA CONSTRUCTION CORPORATION
GC-2 6,618 10/30/07 11/14/07 Keuka Construction Corp
GC-5 23,248 01/09/08 01/23/08 KEUKA CONSTRUCTION CORP
GC-6 9,154 02/06/08 / / KEUKA CONSTRUCTION CORP
GC-6 9,154 02/06/08 / / KEUKA CONSTRUCTION CORPORATION
GC-7 25,315 04/10/08 08/07/08 KEUKA CONSTRUCTION CORPORATION
GC-8 16,711 06/20/08 10/07/08 KEUKA CONSTRUCTION CORPORATION
HVAC-1 3,484 10/30/07 01/16/08 Frey & Campbell
HVAC-3 1,327 01/09/08 04/09/08 FREY&CAMPBELL,INC
HVAC-4 565 06/20/08 05/11/09 Frey & Campbell
P-1 9,275 10/30/07 / / Frey & Campbell
P-3 10,408 01/09/08 03/19/08 FREY & CAMPBELL
P-5 4,312 06/20/08 05/11/09 Frey & Campbell
08-1024 Reconstruction 0-001-010 06/01/09 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 -2,700 09/03/09 10/30/09 IVERSON CONSTRUCTION CORPORATION
GC-4 3,646 10/13/09 11/17/09 IVERSEN CONSTRUCTION CORPORATION
HVAC-1 2,926 10/13/09 11/17/09 FREY & CAMPBELL INC
P-2 2,083 10/19/09 11/18/09 FREY & CAMPBELL INC
02-1609FP Reconstruction 0-001-FP1 05/02/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Agriculture Shop-Auxiliary CR:
93-1649 Reconstruction 0-002-002 08/04/94 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0429 Reconstruction 0-002-003 12/06/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1119 Additions and Alterations 0-002-004 03/22/00 *CO No.* Amount Disallowed Received Approved Contractor
E-3 -9,921 11/10/00 06/09/03 RG Burns
E-4 421 11/10/00 06/09/03 RG Burns
06-0837 Reconstruction 0-002-006 05/23/07 *CO No.* Amount Disallowed Received Approved Contractor
E-1 150 10/30/07 01/16/08 John Mills Electric
E-4 625 04/10/09 02/10/09 JOHN MILLS ELECTRIC INC.
E-9 2,018 11/24/08 05/19/09 JOHN MILLS ELECTRIC, INC.
GC-11 7,901 10/30/08 01/22/09 KEUKA CONSTRUCTION CORPORATION
GC-3 3,673 10/30/07 11/14/07 Keuka Construction Corp
GC-9 888 09/26/08 02/10/09 KEUKA CONSTRUCTION CORPORATION
HVAC-2 316 10/30/07 01/16/08 Frey & Campbell
P-2 607 10/30/07 01/16/08 Frey & Campbell
P-4 1,166 01/09/08 04/09/08 FREY & CAMPBELL
93-1650EP Energy Project 0-002-E01 08/04/94 NO CHANGE ORDERS ON ELECTRONIC FILE
Agricultural Classroom:
91-1183 New Construction 0-008-001 05/11/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1651 Additions and Alterations 0-008-002 08/04/94 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0392 Additions and Alterations 0-008-003 02/07/05 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 3,383 08/24/05 09/01/05 Edger Enterprises of elmira
GC-4 -2,555 11/15/05 / / Edger Enterprises of elmira
R-1 -1,288 03/22/06 06/23/06 J and B Installations
06-0838 Reconstruction 0-008-004 05/23/07 *CO No.* Amount Disallowed Received Approved Contractor
E-5 330 04/10/08 02/10/09 JOHN MILLS ELECTRIC, INC.
E-6 2,791 10/31/08 / / JOHN MILLS ELECTRIC, INC.
GC-4 3,960 01/09/08 01/23/08 KEUKA CONSTRUCTION CORP.
08-1025 Reconstruction 0-008-005 06/01/09 *CO No.* Amount Disallowed Received Approved Contractor
GC-2 1,860 09/03/09 10/30/09 IVERSON CONSTRUCTION CORPORATION
P-1 714 10/13/09 11/17/09 FREY & CAMPBELL INC
Maintenance Storage Shed:
99-1120 Reconstruction 2-006-002 03/22/00 *CO No.* Amount Disallowed Received Approved Contractor
E-1 4,674 11/10/00 06/09/03 RG Burns
JASPER-TROUPSBURG CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-27-02-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Jasper-Troupsburg Elem.:
91-1143 Additions and Alterations 0-001-001 06/01/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0585 Reconstruction 0-001-003 01/27/92 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1877 Reconstruction 0-001-004 08/14/91 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0599 Reconstruction 0-001-006 01/23/97 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0056 Reconstruction 0-001-007 07/19/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1403 Reconstruction 0-001-008 06/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0760 Additions and Alterations 0-001-009 05/22/01 *CO No.* Amount Disallowed Received Approved Contractor
C-1 565 03/29/02 05/10/02 E&B Equip.
C-3 564 07/12/02 07/24/02 E&B Equip.
C-4 450 07/12/02 07/24/02 E&B Equip.
C-6 328 08/20/02 09/04/02 E&B Equip.
C-7 -3,259 12/24/02 01/08/03 E&B Equip.
C-8 1,598 12/10/02 01/06/03 E&B Equip.
E-2 11,742 12/12/01 09/04/02 John Mills Electric
E-7 2,350 06/17/02 07/10/02 John Mills Electric
G-10 5,338 01/24/02 03/04/02 Streeter Assoc.
G-15 4,762 05/22/02 06/05/02 Streeter Assoc.
G-17 -725 06/17/02 07/10/02 Streeter Assoc.
G-21 9,713 07/12/02 07/24/02 Streeter Assoc.
G-22 4,644 08/20/02 09/04/02 Streeter Assoc.
G-23 4,938 08/20/02 09/04/02 Streeter Assoc.
G-25 -575 08/30/02 09/05/02 Streeter Assoc.
G-27 2,835 10/24/02 12/02/02 Streeter Assoc.
G-28 4,343 10/24/02 / / Streeter Assoc.
G-28 1,056 03/20/03 03/28/03 Streeter Assoc.
G-29 743 10/24/02 12/02/02 Streeter Assoc.
G-30 6,307 01/17/03 02/05/03 Streeter Assoc.
G-31 20,160 01/17/03 01/23/03 Streeter Assoc.
G-32 494 01/17/03 01/23/03 Streeter Assoc.
G-33 728 01/17/03 02/05/03 Streeter Assoc.
G-34A 968 01/17/03 02/03/03 Streeter Assoc.
G-35 7,512 12/24/02 01/08/03 Streeter Assoc.
G-37 599 01/30/03 02/11/03 Streeter Assoc.
G-38 -489 03/05/03 03/19/03 Streeter Assoc.
G-6 5,636 01/24/02 03/04/02 Streeter Assoc.
G-6 328 08/20/02 09/04/02 E&B Equip.
G-7 2,720 01/24/02 03/04/02 Streeter Assoc.
G-8 6,851 01/24/02 03/04/02 Streeter Assoc.
G-9 -1,118 01/24/02 03/04/02 Streeter Assoc.
GC-7 564 06/17/02 07/10/02 Iverson Const.
H-1 -1,157 06/27/02 07/15/02 Faulks Plumbing
H-2 1,994 06/27/02 07/15/02 Faulks Plumbing
H-3 -27,293 08/20/02 / / Faulks Plumbing
H-5 547 04/11/03 04/21/03 Faulks Plumbing
P-3 -1,266 04/11/03 04/21/03 Faulks Plumbing
T-5 6,105 06/17/02 07/10/02 VDV Communications
T-8 8,287 12/24/02 01/08/03 VDV Communications
02-1532 Reconstruction 0-001-010 04/26/03 *CO No.* Amount Disallowed Received Approved Contractor
E-001 -18,529 08/14/03 08/19/03 John Mills Elec.
E-003 2,456 01/15/04 02/04/04 John Mills Elec.
Main Building Jasper:
91-1144 Additions and Alterations 0-002-001 06/01/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0586 Reconstruction 0-002-002 01/27/92 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1878 Reconstruction 0-002-003 08/14/91 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0600 Reconstruction 0-002-005 01/23/97 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0057 Reconstruction 0-002-006 07/19/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1402 Reconstruction 0-002-007 06/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1666 Reconstruction 0-002-008 07/06/99 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0759 Additions and Alterations 0-002-009 05/22/01 *CO No.* Amount Disallowed Received Approved Contractor
BL-1 4,074 01/10/02 03/26/02 Beavers Petroleum Equip.
C-2 984 04/16/02 05/10/02 E&B Equip.
C-5 3,070 07/12/02 07/24/02 E&B Equip.
E-10 -791 03/05/03 03/19/03 John Mills Elec.
E-11 6,203 12/24/02 01/08/03 John Mills Elec.
E-12 8,681 12/24/02 01/08/03 John Mills Elec.
E-13 -3,174 01/30/03 02/11/03 John Mills Elec.
E-15 -11,965 01/30/03 02/11/03 John Mills Elec.
E-16 10,498 04/03/03 04/17/03 John Mills Elec.
E-17 2,304 06/25/03 07/01/03 John Mills Elec.
E-18 2,615 06/25/03 07/01/03 John Mills Elec.
E-3 4,538 12/12/01 09/04/02 John Mills Elec.
E-4 -20,150 03/05/02 04/18/02 John Mills Elec.
E-6 534 08/20/02 09/04/02 John Mills Elec.
E-8 25,136 08/20/02 09/04/02 John Mills Elec.
E-9 26,313 08/20/02 09/04/02 John Mills Elec.
G-11 3,655 03/05/02 04/18/02 Streeter Assoc.
G-12 31,580 03/20/02 04/18/02 Streeter Assoc.
G-13 1,154 04/30/02 05/07/02 Streeter Assoc.
G-14 450 05/09/02 06/04/02 Streeter Assoc.
G-18 4,613 06/27/02 07/15/02 Streeter Assoc.
G-19 591 06/27/02 07/15/02 Streeter Assoc.
G-20 1,507 06/27/02 07/15/02 Streeter Assoc.
G-26 14,328 10/07/02 12/02/02 Streeter Assoc.
G-28a 3,287 03/20/03 03/28/03 Streeter Assoc.
G-3 2,969 12/11/01 03/26/02 Streeter Assoc.
G-34 3,246 01/17/03 02/03/03 Streeter Assoc.
G-36 -2,883 12/24/02 01/08/03 Streeter Assoc.
G-5 2,140 01/10/02 03/26/02 Streeter Assoc.
G31-A 4,467 01/17/03 01/23/03 Streeter Assoc.
G33-A 322 01/17/03 02/05/03 Streeter Assoc.
H-6 -2,557 04/11/03 04/21/03 Faulks Plumbing
P-2 3,406 01/27/03 02/11/03 Faulks Plumbing
P-5 138 04/11/03 05/08/03 Faulks Plumbing
T-1 -748 11/13/01 04/19/02 VDV Communications
T-2 715 12/11/01 03/26/02 VDV Communications
T-3 -7,166 01/10/02 03/26/02 VDV Communications
T-4 1,039 05/09/02 06/04/02 VDV Communications
T-6 1,003 08/20/02 09/04/02 VDV Communications
T-7 2,061 08/20/02 09/04/02 VDV Communications
02-1533 Reconstruction 0-002-010 04/26/03 *CO No.* Amount Disallowed Received Approved Contractor
E-002 -46,012 08/14/03 08/19/03 John Mills Elec.
E-004 3,164 01/15/04 02/04/04 John Mills Elec.
08-0541 Reconstruction 0-002-013 10/21/08 *CO No.* Amount Disallowed Received Approved Contractor
M-001 1,997 06/08/09 09/23/09 FREY & CAMPBELL INC
08-1030 Reconstruction 0-002-014 01/09/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1166FP Reconstruction 0-002-FP1 02/26/03 NO CHANGE ORDERS ON ELECTRONIC FILE
New Bus Garage Storage:
96-0597 New Construction 4-009-001 01/23/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1401 Reconstruction 4-009-002 06/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage Service:
93-0342 Reconstruction 5-004-002 12/06/93 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0598 Additions and Alterations 5-004-003 01/23/97 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0516 Reconstruction 5-004-004 12/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0762 Reconstruction 5-004-005 05/22/01 *CO No.* Amount Disallowed Received Approved Contractor
E-14 -3,246 01/30/03 02/11/03 John Mills Elec.
G-16 1,800 05/22/02 06/05/02 Streeter Assoc.
G-24 2,147 08/20/02 09/04/02 Streeter Assoc.
G31-B 6,659 01/17/03 01/23/03 Streeter Assoc.
H-7 2,629 05/19/03 06/03/03 Faulks Plumbing
Bus Garage Main:
96-0515 Reconstruction 5-005-001 12/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0058 Reconstruction 5-005-002 07/19/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1400 Reconstruction 5-005-003 06/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
Concession Stand:
00-0761 New Construction 7-012-001 05/22/01 *CO No.* Amount Disallowed Received Approved Contractor
G-34B 1,481 01/17/03 01/23/03 Streeter Assoc.
G-4 5,367 12/12/01 01/28/02 Streeter Assoc.
G31C 3,135 01/17/03 01/23/03 Streeter Assoc.
P-1 3,936 05/09/02 06/04/02 Faulks Plumbing
P-4 507 04/11/03 04/21/03 Faulks Plumbing
HAMMONDSPORT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-29-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Curtiss School:
95-0146 Reconstruction 0-001-004 09/12/95 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0978 Additions and Alterations 0-001-005 06/21/00 *CO No.* Amount Disallowed Received Approved Contractor
003 14,293 01/24/03 01/24/03 Suite Kote
06-0999 Reconstruction 0-001-006 05/14/07 *CO No.* Amount Disallowed Received Approved Contractor
E-004 -14,395 05/19/08 03/02/09 Blackmon-Farrell Electric,Inc
GC-01 11,000 12/31/07 01/09/08 Edger Enterpirses of Elmira
GC-01 11,000 03/19/08 04/21/08 Edger Enterprises of Elmira, Incorp.
GC-03 31,198 03/19/08 04/21/08 Edger Enterprises of Elmira, Incorp.
08-0105 Reconstruction 0-001-007 01/15/09 *CO No.* Amount Disallowed Received Approved Contractor
005 -1,943 10/22/09 / / STREETER ASSOCIATES INC
High School:
91-0095 Reconstruction 0-002-003 08/19/91 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1109 Reconstruction 0-002-007 04/11/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0979 Additions and Alterations 0-002-008 06/21/00 *CO No.* Amount Disallowed Received Approved Contractor
001 36,286 01/24/03 01/24/03 SuiteKote
002 24,032 01/24/03 01/24/03 SuiteKote
004 32,100 01/24/03 01/24/03 SuiteKote
005 4,000 01/24/03 01/24/03 E&B Equip.
006 110 01/24/03 01/24/03 GVE
007 1,834 01/24/03 01/24/03 Frey & Campbell
008 1,194 01/24/03 01/24/03 Frey & Campbell
009 2,066 01/24/03 01/24/03 Frey & Campbell
010 394 01/24/03 01/24/03 GVE
011 2,712 01/24/03 01/24/03 SuiteKote
012 864 01/24/03 01/24/03 Frey & Campbell
013 1,462 01/24/03 01/24/03 Frey & Campbell
014 960 01/24/03 01/24/03 Frey & Campbell
06-1000 Additions and Alterations 0-002-010 05/14/07 *CO No.* Amount Disallowed Received Approved Contractor
E-006 15,371 11/14/08 05/18/09 BLACKMON-FARRELL ELECTRIC, INC.
E-02 26,500 12/31/07 08/05/08 Blackmon-Farrell Electric
E-7 1,119 11/24/08 05/15/09 BLACKMON-FARRELL ELECTRIC, INC.
EC-005 1,431 05/19/08 03/02/09 Blackmon-Farrell Electric, Inc.
GC-009 1,634 08/28/08 02/05/09 Edgar Enterprises Of Elmira, Inc.
GC-02 3,250 12/31/07 01/09/08 Edger Enterprises of Elmira
GC-02 3,250 03/19/08 04/25/08 Edger Enterprises of Elmira, Incorp.
08-0106 Reconstruction 0-002-011 01/15/09 *CO No.* Amount Disallowed Received Approved Contractor
001 4,520 08/24/09 11/10/09 STREETER ASSOCIATES
002 51,985 08/24/09 11/10/09 STREETER ASSOCIATES
003 2,886 08/24/09 11/10/09 STREETER ASSOCIATES
004 -5,529 10/22/09 / / STREETER ASSOCIATES INC
03-0164FP Reconstruction 0-002-FP1 10/14/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
91-0096 Reconstruction 5-003-002 08/19/91 NO CHANGE ORDERS ON ELECTRONIC FILE
New Bus Garage:
06-1001 New Construction 5-006-001 05/14/07 *CO No.* Amount Disallowed Received Approved Contractor
E-008 12,846 12/02/08 05/15/09 BLACKMON-FARRELL ELECTRIC, INC.
E-01 17,105 12/31/07 04/03/08 Blackmon-Farrell Electric
EC-003 12,483 05/19/08 / / Blackmon-Farrrell Electric,Inc
GC-004 5,163 03/03/08 04/14/08 EDGER ENTERPRISES OF ELMIRA, INC.
GC-005 7,601 03/03/08 04/14/08 EDGER ENTERPRISES OF ELMIRA, INC.
GC-007 209,082 07/14/08 11/18/08 EDGER ENTERPRISES OF ELMIRA, INC.
GC-008 2,612 08/28/08 10/27/08 Edger Enterprises of Elmira, Inc.
GC-010 18,800 09/26/08 05/12/09 EDGER ENTERPRISES OF ELMIRA, INC.
GC-011 5,694 09/26/08 05/12/09 EDGER ENTERPRISES OF ELMIRA, INC.
GC-03 31,198 12/31/07 01/09/08 Edger Enterprises of Elmira
GC0-006 16,199 06/09/08 04/14/09 Edger Enterprises of Elmira
HVAC-001 2,031 03/03/08 08/05/08 FREY & CAMPBELL, INC.
P-002 10,233 06/09/08 10/07/08 B&B MECHANICAL CONTRACTORS, INC
P-01 11,786 12/31/07 04/03/08 B & B Mechanical Contractors
WAYLAND CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-30-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building See Reorg#57.30.02.04:
91-1046 Reconstruction 0-001-006 04/17/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1413 Reconstruction 0-001-007 07/05/94 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage-See Reorg#57.30.02.04:
92-1454 Reconstruction 5-002-003 07/30/93 NO CHANGE ORDERS ON ELECTRONIC FILE
WAYLAND-COHOCTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-30-02-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Cohocton Elementary:
94-0168 Reconstruction 0-001-001 10/05/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1361 Additions and Alterations 0-001-002 07/08/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0918 Reconstruction 0-001-004 03/18/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0145 Reconstruction 0-001-005 12/06/00 *CO No.* Amount Disallowed Received Approved Contractor
2-12 -10,000 07/18/02 08/28/02 Babcock Ent.
2-18 -4,594 08/17/01 03/04/02 Babcock Ent.
3-25 1,080 01/17/02 03/25/02 Sear-Brown Product Delivery
3-37 12,300 04/19/02 05/07/02 Sear Brown Product Delivery
3-41 5,562 06/19/02 07/12/02 Sear Brown Product Delivery
3-44 275 06/19/02 07/12/02 Sear Brown Product Delivery
3-48 1,166 10/24/02 12/02/02 Sear Brown Product Delivery
3-50 2,740 10/24/02 12/02/02 Sear Brown Product Delivery
6-26 2,224 01/07/02 03/06/02 GVE
99-0966 Reconstruction 0-001-006 04/06/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2441 Reconstruction 0-001-007 01/23/04 *CO No.* Amount Disallowed Received Approved Contractor
2-003 -1,050 10/18/04 11/03/04 Massa Construction
07-0207 Reconstruction 0-001-008 11/28/07 *CO No.* Amount Disallowed Received Approved Contractor
301-006 -808 03/10/09 06/08/09 Streeter Associates
305-007 12,138 06/12/09 09/23/09 HMI MECHANICAL SYSTEMS INC
306-013 1,471 07/20/09 11/12/09 BILLITIER ELECTRIC INC
Main Building - Wayland:
94-0169 Additions and Alterations 0-005-001 10/05/94 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1608 Reconstruction 0-005-002 07/20/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1360 Additions and Alterations 0-005-003 07/08/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0919 Reconstruction 0-005-004 03/18/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0141 Additions and Alterations 0-005-005 12/06/00 *CO No.* Amount Disallowed Received Approved Contractor
2-14 5,566 07/18/02 08/28/02 Babcock Ent.
2-16 2,749 07/18/02 08/28/02 Babcock Ent.
2-19 2,950 07/18/02 08/28/02 Babcock Ent.
2-22 18,550 04/15/02 04/26/02 Babcock Ent.
2-23 9,000 04/15/02 04/26/02 Babcock Ent.
2-24 2,450 04/15/02 04/25/02 Babcock Ent.
2-26 2,100 10/16/02 10/30/02 Babcock Ent.
3-17 19,249 11/28/01 05/10/02 Sear-Brown Prod. Delivery
3-18 5,400 11/28/01 03/04/02 Sear-Brown Prod. Delivery
3-19 877 12/18/01 03/06/02 Sear-Brown Prod. Delivery
3-20 13,500 12/18/01 05/10/02 Sear-Brown Prod. Delivery
3-21 4,197 12/18/01 03/06/02 Sear-Brown Prod. Delivery
3-23 -3,100 01/17/02 03/25/02 Sear-Brown Prod. Delivery
3-24 9,990 01/17/02 03/25/02 Sear-Brown Prod. Delivery
3-26 -60,000 03/05/02 04/18/02 Sear Brown Prod. Delivery
3-28 1,992 03/05/02 04/18/02 Sear Brown Prod. Delivery
3-30 992 03/05/02 04/18/02 Sear Brown Prod. Delivery
3-31 -16,711 03/05/02 04/18/02 Sear Brown Prod. Delivery
3-35 1,296 04/01/02 05/09/02 Sear Brown Prod. Delivery
3-38 1,995 04/19/02 05/07/02 Sear Brown Prod. Delivery
3-39 1,200 04/19/02 05/07/02 Sear Brown Prod. Delivery
3-40 986 05/30/02 06/04/02 Sear Brown Prod. Delivery
3-42 1,237 06/19/02 07/12/02 Sear Brown Prod. Delivery
3-45 3,721 07/12/02 07/24/02 Sear Brown Prod. Delivery
3-46 644 08/12/02 09/05/02 Sear Brown Prod. Delivery
3-51 -2,500 10/24/02 12/02/02 Sear Brown Prod. Delivery
3-52 -15,584 10/24/02 12/02/02 Sear Brown Prod. Delivery
3-53 1,630 10/24/02 12/02/02 Sear Brown Prod. Delivery
3-54 -629 10/24/02 12/02/02 Sear Brown Prod. Delivery
3-55 15,370 10/24/02 12/02/02 Sear Brown Prod. Delivery
3-56 19,610 10/24/02 12/02/02 Sear Brown Prod. Delivery
4-10 1,587 01/17/02 03/25/02 Ferrauilo Plumbing
4-12 2,209 01/17/02 03/25/02 Ferrauilo Plumbing
4-13 706 03/01/02 04/17/02 Ferrauilo Plumbing
4-17 3,957 05/13/02 06/04/02 Ferrauilo Plumbing
4-18 1,995 06/19/02 07/12/02 Ferrauilo Plumbing
4-19 1,661 06/19/02 07/12/02 Ferrauilo Plumbing
4-2 272 07/18/02 08/28/02 Ferrauilo Plumbing
4-21 345 08/07/02 08/16/02 Ferrauilo Plumbing
4-22 -15,000 08/21/02 09/04/02 Ferrauilo Plumbing
4-23 6,093 01/28/03 02/11/03 Ferrauilo Plumbing
4-7 1,774 11/28/01 01/30/04 Ferrauilo Plumbing
4-8 4,686 12/18/01 03/06/02 Ferrauilo Plumbing
4-9 1,004 12/18/01 03/26/02 Ferrauilo Plumbing
4A-1 1,977 10/24/02 12/04/03 Crosby Brownlie
5-1 791 03/01/02 04/17/02 Invensys-Pritchett
5-3 14,200 05/13/02 06/04/02 Invensys-Pritchett
6-22 908 11/28/01 03/04/02 GVE
6-23 9,512 11/28/01 01/30/04 GVE
6-24 14,931 11/28/01 03/06/02 GVE
6-25 6,829 01/07/02 03/06/02 GVE
6-27 11,042 01/07/02 03/06/02 GVE
6-28 1,322 03/01/02 04/17/02 GVE
6-29 5,819 03/01/02 04/17/02 GVE
6-30 1,896 03/01/02 04/17/02 GVE
6-31 1,073 03/01/02 04/17/02 GVE
6-32 6,656 03/01/02 04/17/02 GVE
6-33 2,609 03/01/02 04/17/02 GVE
6-35 333 03/01/02 04/17/02 GVE
6-36 708 03/01/02 04/17/02 GVE
6-38 1,457 03/01/02 04/17/02 GVE
6-39 1,006 03/01/02 04/23/02 GVE
6-40 5,871 04/15/02 04/25/02 GVE
6-41 3,589 04/19/02 05/07/02 GVE
6-42 5,112 06/19/02 07/12/02 GVE
6-45 1,565 06/19/02 07/12/02 GVE
6-46 6,249 07/12/02 07/24/02 GVE
6-47 19,589 08/07/02 08/16/02 GVE
6-48 7,189 08/07/02 08/16/02 GVE
6-49 6,953 08/07/02 08/27/02 GVE
6-51 917 10/24/02 12/02/02 GVE
6-52 -12,452 01/13/03 02/05/03 GVE
6-53 12,299 01/13/03 02/05/03 GVE
7-10 3,230 05/24/02 06/04/02 Frey & Campbell
7-13 3,261 05/30/02 06/04/02 Frey & Campbell
7-14 4,675 08/21/02 09/06/02 Frey & Campbell
7-15 1,053 02/20/03 02/26/03 Frey & Campbell
7-4 13,011 03/21/02 04/18/02 Frey & Campbell
7-5 4,605 03/21/02 04/18/02 Frey & Campbell
7-7 273 03/28/02 05/07/02 Frey & Campbell
7-8 3,127 05/24/02 06/04/02 Frey & Campbell
8-01 3,131 07/18/02 08/28/02 Vanderlinde Elec.
8-2 2,140 07/18/02 08/28/02 Vanderlinde Elec.
8-3 1,181 04/15/02 04/25/02 Vanderlinde Elec.
8-4 1,595 04/15/02 04/25/02 Vanderlinde Elec.
8-5 4,290 05/13/02 06/04/02 Vanderlinde Elec.
8-6 -2,487 12/17/02 01/09/03 Vanderlinde Elec.
99-0967 Reconstruction 0-005-006 04/06/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2442 Reconstruction 0-005-007 01/23/04 *CO No.* Amount Disallowed Received Approved Contractor
1-001 1,110 09/27/04 10/04/04 Suit-Kote Contracting
1-002 3,591 10/07/04 10/12/04 Suit Kote Contracting
1-003 -27,391 10/07/04 10/12/04 Suit Kote Contracting
1-004 -7,039 10/07/04 10/12/04 Suit Kote Contracting
1-005 3,500 12/20/04 02/11/05 Suit Kote Contracting
2-001 6,409 09/13/04 10/04/04 Massa Construction
2-002 340 09/13/04 10/04/04 Massa Construction
2-004 -4,000 11/05/04 11/08/04 Massa Construction
2-005 -488 11/05/04 11/08/04 Massa Construction
2-006 -5,000 11/05/04 11/08/04 Massa Construction
2-007 1,510 01/04/05 02/07/05 Massa Construction
2-008 5,398 03/08/05 03/17/05 Massa Construction Inc
3-001 4,076 10/18/04 11/03/04 Lawman Heating
3-002 11,937 10/07/04 / / Lawman Heating
3-002 11,937 03/06/06 10/12/06 Lawman Heating Cooling
3-003 16,035 10/18/04 / / Lawman Heating
3-003 16,035 03/06/06 10/12/06 Lawman heating Cooling
4-002 2,421 09/23/04 09/27/04 Blackmon Farrell Elec.
4-003 -92 10/18/04 11/03/04 Blackmon Farrell Elec.
4-004 1,140 01/04/05 02/07/05 Blackmon Farrell Electric
4-005 1,603 01/04/05 02/07/05 Blackmon Farrell Electric
4-01 3,996 08/30/04 09/24/04 Blackmon Farrell Elec.
5-001 2,150 08/30/04 09/24/04 Thurston Brothers
5-002 488 10/18/04 11/03/04 Thurston Brothers
06-1416 Reconstruction 0-005-008 05/17/07 *CO No.* Amount Disallowed Received Approved Contractor
001-001 3,133 10/30/07 01/28/08 Crosby-Brownlie,Inc.
001-002 -7,500 10/30/07 01/28/08 Crosby-Brownlie, Inc.
07-0208 Reconstruction 0-005-009 11/28/07 *CO No.* Amount Disallowed Received Approved Contractor
301-001 771 07/11/08 08/26/08 STREETER ASSOCIATES
301-002 -120 10/01/08 11/06/08 STREETER ASSOCIATES
301-003 1,260 01/23/09 03/05/09 STREETER ASSOCIATES
301-004 3,979 02/04/09 07/02/09 STREETER ASSOCIATES
301-005 13,466 03/05/09 05/26/09 STREETER ASSOCIATES
301-007 17,598 04/27/09 07/22/09 STREETER ASSOCIATES
301-008 22,360 03/10/09 06/08/09 Streeter Associates
301-009 2,536 07/16/09 08/28/09 STREETER ASSOCIATES
301-013 8,523 09/08/09 09/21/09 STREETER ASSOCIATES
301-014 9,549 07/20/09 11/12/09 STREETER ASSOCIATES
301-015 324 08/06/09 09/03/09 STREETER ASSOCIATES
301-016 5,224 09/18/09 10/19/09 STREETER ASSOCIATES
304-002 1,305 12/22/08 06/24/09 UNIFIED MECHANICAL
304-003 3,940 09/08/09 09/21/09 UNIFIED MECHANICAL
304-004 9,427 10/07/09 10/30/09 UNIFIED MECHANICAL
304-005 2,779 10/21/09 / / UNIFIED MECHANICAL
305-001 3,812 07/01/08 11/06/08 HMI MECHANICAL SYSTEMS, INC
305-002 -7,890 08/06/08 09/29/08 HMI MECHANICAL SYSTEMS, INC.
305-003 1,027 12/17/08 04/14/09 HMI MECHANICAL SYSTEMS, INC.
305-004 744 05/18/09 09/22/09 HMI MECHANICAL SYSTEMS INC
305-005 907 05/18/09 09/22/09 HMI MECHANICAL SYSTEMS
305-006 3,885 07/14/09 11/12/09 HMI MECHANICAL SYSTEMS INC
306-001 20,091 07/11/08 08/26/08 BILLITITIER ELECTRIC, INC.
306-002 2,940 10/01/08 / / BILLITIER ELECTRIC
306-003 8,884 04/27/09 09/23/09 BILLITIER ELECTRIC INC
306-004 19,387 01/08/09 06/24/09 BILLITIER ELECTRIC, INC.
306-005 15,159 12/19/08 06/17/09 BILLITIER ELECTRIC INC.
306-006 6,260 12/19/08 06/17/09 BILLITIER ELECTRIC INC.
306-007 8,192 01/08/09 06/24/09 BILLITIER ELECTRIC INC.
306-008 13,032 01/29/09 03/06/09 BILLITIER ELECTRIC INC.
306-009 8,649 02/04/09 03/06/09 BILLITIER ELECTRIC INC.
306-010 2,368 07/14/09 11/12/09 BILLITIER ELECTRIC INC
306-012 1,115 07/14/09 11/12/09 BILLITIER ELECTRIC INC
306-014 930 07/20/09 / / BILLITIER ELECTRIC INC
401-001 11,247 10/21/09 / / MASSA CONSTRUCTION INC
07-0209 Reconstruction 0-005-010 11/28/07 *CO No.* Amount Disallowed Received Approved Contractor
301-010 879 07/01/09 08/28/09 STREETER ASSOCIATES
301-011 6,395 06/30/09 08/14/09 STREETER ASSOCIATES
301-012 15,021 07/16/09 08/28/09 STREETER ASSOCIATES
304-001 6,220 10/14/08 01/26/09 UNIFIED MECHANCIAL
306-011 5,898 06/10/09 08/18/09 BILLITIER ELECTRIC INC
02-0313FP Reconstruction 0-005-FP1 11/13/02 NO CHANGE ORDERS ON ELECTRONIC FILE
New Bus Storage:
00-0143 New Construction 4-010-001 12/06/00 *CO No.* Amount Disallowed Received Approved Contractor
4-16 400 03/28/02 05/07/02 Ferrauilo Plumbing
6-34 1,149 03/01/02 04/17/02 GVE
6-43 1,240 06/19/02 07/12/02 GVE
Bus Garage - Cohocton:
94-0170 Reconstruction 5-002-001 10/05/94 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0144 Reconstruction 5-002-003 12/06/00 *CO No.* Amount Disallowed Received Approved Contractor
2-15 3,200 07/18/02 08/28/02 Babcock Ent.
Bus Garage - Wayland:
94-0171 Reconstruction 5-006-001 10/05/94 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0146 Additions and Alterations 5-006-004 12/06/00 *CO No.* Amount Disallowed Received Approved Contractor
2-3 -6,966 07/19/01 07/20/01 Babcock Ent.
2-4 29,537 08/02/01 08/03/01 Babcock Ent.
2-7 24,822 08/02/01 08/03/01 Babcock Ent.
3-36 17,950 04/19/02 05/07/02 Sear Brown Product Delivery
3-43 617 06/19/02 07/12/02 Sear Brown Product Delivery
3-47 1,475 08/12/02 09/05/02 Sear Brown Product Delivery
3-57 2,000 10/24/02 12/02/02 Sear Brown Product Delivery
6-006 800 07/12/01 07/13/01 GVE
7-12 459 05/30/02 06/04/02 Frey & Campbell
99-0968 Reconstruction 5-006-005 04/06/00 NO CHANGE ORDERS ON ELECTRONIC FILE
New W-C Bus Garage:
00-0142 New Construction 5-009-001 12/06/00 *CO No.* Amount Disallowed Received Approved Contractor
2-25 5,630 07/12/02 07/24/02 Babcock Ent.
3-22 2,700 12/18/01 03/06/02 Sear-Brown Product Delivery
3-27 885 03/05/02 04/18/02 Sear Brown Product Delivery
3-29 3,940 03/05/02 04/18/02 Sear Brown Product Delivery
3-32 2,372 03/21/02 04/18/02 Sear Brown Product Delivery
3-34 1,393 04/01/02 05/09/02 Sear Brown Product Delivery
3-49 1,482 10/24/02 12/02/02 Sear Brown Product Delivery
3=33 5,750 04/01/02 05/09/02 Sear Brown Product Delivery
4-11 2,604 01/17/02 03/25/02 Ferrauilo Plumbing
4-14 1,920 03/01/02 04/17/02 Ferrauilo Plumbing
4-15 5,398 03/01/02 04/17/02 Ferrauilo Plumbing
4-20 6,901 08/07/02 08/16/02 Ferrauilo Plumbing
4-24 -867 01/28/03 02/11/03 Ferrauilo Plumbing
5-2 630 05/13/02 06/04/02 Invensys-Pritchett
5-4 -1,482 10/24/02 12/02/02 Invensys-Pritchett
6-37 1,802 03/01/02 04/17/02 GVE
6-44 2,164 06/19/02 07/12/02 GVE
6-50 1,723 10/24/02 12/02/02 GVE
7-11 20,680 05/24/02 06/04/02 Frey & Campbell
7-6 869 03/22/02 04/18/02 Frey & Campbell
7-9 1,798 05/24/02 06/04/02 Frey & Campbell
BOCES STEUBEN-ALLEGANY STATUS REPORT ON CAPITAL PROJECTS
District No.: 57-90-00-00
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Wildwood Bldg.#7-Culinary Arts:
95-1337 Reconstruction 0-010-003 06/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0630 Reconstruction 0-010-004 03/14/05 NO CHANGE ORDERS ON ELECTRONIC FILE
Coopers Automotive Bldg 1:
91-1277 Reconstruction 0-019-001 06/10/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1269 Reconstruction 0-019-002 06/02/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1338 Reconstruction 0-019-003 06/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0631 Reconstruction 0-019-004 03/14/05 *CO No.* Amount Disallowed Received Approved Contractor
H-002 3,232 06/23/06 / / Kimble Inc
\ildwood Bldg #1/Admin/Dist.Learning:
90-1635 Reconstruction 0-020-001 05/23/91 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1339 Reconstruction 0-020-002 06/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1041 Reconstruction 0-020-003 04/11/97 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0040 Reconstruction 0-020-004 02/20/02 *CO No.* Amount Disallowed Received Approved Contractor
E-1 700 04/21/03 05/07/03 Reed&Culbert
E-2 1,415 04/21/03 05/07/03 Reed&Culbert
E-3 6,508 04/21/03 05/07/03 Reed&Culbert
04-0632 Reconstruction 0-020-006 03/16/05 *CO No.* Amount Disallowed Received Approved Contractor
G - 001 25,211 09/21/07 01/14/08 ACE UNLIMITED
G - 002 564 09/10/07 01/14/08 ACE UNLIMITED
Wildwood Bldg#2 Auto Body/Auto Tech.:
91-0343 Reconstruction 0-021-001 10/25/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1308 Reconstruction 0-021-003 06/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1236 Reconstruction 0-021-004 05/24/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1340 Reconstruction 0-021-005 06/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1042 Reconstruction 0-021-006 04/11/97 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0041 Reconstruction 0-021-007 02/20/02 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0633 Reconstruction 0-021-008 03/16/05 *CO No.* Amount Disallowed Received Approved Contractor
GC-001 1,208 10/05/06 11/29/06 streeter Associates
GC-002 10,903 11/30/06 12/28/06 Streeter Associates
Wildwood Bldg#3 Cosmetology/Nursing/:
90-1636 Reconstruction 0-023-001 05/23/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1396 Reconstruction 0-023-002 06/11/92 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1689 Reconstruction 0-023-004 06/20/00 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0042 Reconstruction 0-023-005 02/20/02 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0021 Reconstruction 0-023-006 01/13/03 *CO No.* Amount Disallowed Received Approved Contractor
GT-2 717 02/18/04 03/23/04 John H. Cook Painting
GT-3 13,406 13,406 06/04/04 07/22/04 John H. Cook Painting
GT-4 1,173 06/04/04 07/22/04 John H. Cook Painting
S-1 2,000 2,000 02/09/04 03/23/04 Hakes Const.
02-1186 Reconstruction 0-023-007 06/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0634 Reconstruction 0-023-008 03/14/05 NO CHANGE ORDERS ON ELECTRONIC FILE
Wildwood Bldg.#4/Career Majors/Compu:
91-0344 Reconstruction 0-025-001 10/25/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1150 Reconstruction 0-025-002 06/08/93 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1341 Reconstruction 0-025-003 06/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1043 Reconstruction 0-025-004 04/11/97 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1187 Reconstruction 0-025-006 06/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0635 Reconstruction 0-025-007 03/14/05 *CO No.* Amount Disallowed Received Approved Contractor
G-003 -8,727 01/14/08 01/28/08 Ace Unlimited
Wildwood Bldg. #5/Bldg. Trades/Weldi:
95-1342 Reconstruction 0-026-002 06/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1044 Reconstruction 0-026-003 04/11/97 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1188 Reconstruction 0-026-004 06/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0636 Reconstruction 0-026-005 03/14/05 *CO No.* Amount Disallowed Received Approved Contractor
M-001 -600 05/22/07 08/28/07 Kimble Inc
Coopers Bldg#2/Heavy Equipt/Conserva:
95-1343 Reconstruction 0-028-001 06/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1045 Reconstruction 0-028-002 04/11/97 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0637 Reconstruction 0-028-003 03/14/05 *CO No.* Amount Disallowed Received Approved Contractor
H-001 1,613 06/23/06 / / Kimble Inc
S-002 9,407 10/28/05 12/05/05 Streeter associates
Coopers Bldg.#3 Intro. to Career Maj:
02-1189 Reconstruction 0-029-004 06/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0638 Reconstruction 0-029-005 03/14/05 *CO No.* Amount Disallowed Received Approved Contractor
GC-004 8,161 10/28/05 12/05/05 Streeter associates
Coopers Bldg# 4 Machine Shop:
93-1270 Reconstruction 0-030-001 06/02/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1344 Reconstruction 0-030-002 06/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1046 Reconstruction 0-030-003 04/11/97 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0043 Reconstruction 0-030-004 02/20/02 *CO No.* Amount Disallowed Received Approved Contractor
HV-1 30,210 11/13/02 11/18/02 Mazza Sheet Metal
02-1190 Reconstruction 0-030-006 06/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0639 Reconstruction 0-030-008 03/14/05 NO CHANGE ORDERS ON ELECTRONIC FILE
Coopers Bldg#5/Computer Graphics/Edu:
95-1345 Reconstruction 0-031-001 06/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1047 Reconstruction 0-031-002 04/11/97 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1191 Reconstruction 0-031-003 06/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0640 Reconstruction 0-031-004 03/14/05 NO CHANGE ORDERS ON ELECTRONIC FILE
Coopers Bldg# 6 Cosmetolgy:
91-1278 Reconstruction 0-032-001 06/10/92 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1048 Reconstruction 0-032-003 04/11/97 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1192 Reconstruction 0-032-004 06/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0641 Reconstruction 0-032-005 03/14/05 NO CHANGE ORDERS ON ELECTRONIC FILE
Coopers Bldg#7/Culinary Arts/Nursing:
92-1202 Reconstruction 0-033-001 06/10/93 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1276 Reconstruction 0-033-003 06/10/92 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0044 Reconstruction 0-033-004 02/20/02 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1193 Reconstruction 0-033-005 06/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0642 Reconstruction 0-033-006 03/14/05 *CO No.* Amount Disallowed Received Approved Contractor
GC-001 1,391 10/07/05 10/28/05 Streeter Associates
GC-002 1,453 10/28/05 12/05/05 Streeter Associates
S-001 2,502 10/28/05 12/05/05 Streeter Associates
Coopers Campus Building #8:
95-1347 Reconstruction 0-034-004 06/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0045 Reconstruction 0-034-005 02/20/02 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0643 Reconstruction 0-034-006 03/14/05 *CO No.* Amount Disallowed Received Approved Contractor
GC-003 589 10/28/05 12/05/05 Streeter associates
Wildwood #6 Heavy Equipt/Conservator:
92-1309 Reconstruction 0-035-002 06/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1237 Reconstruction 0-035-003 05/24/94 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1049 Reconstruction 0-035-005 04/11/97 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1194 Reconstruction 0-035-006 06/30/03 *CO No.* Amount Disallowed Received Approved Contractor
GT-1 6,112 02/09/04 03/03/04 Streeter Assoc.
GT-10 600 05/03/04 05/11/04 Streeter Assoc.
GT-2 8,500 02/09/04 03/03/04 Streeter Assoc.
GT-4 -2,242 02/09/04 03/03/04 Streeter Assoc.
GT-5 4,478 02/09/04 03/03/04 Streeter Assoc.
GT-6 11,533 02/09/04 03/03/04 Streeter Assoc.
GT-7 -975 03/02/04 03/08/04 Streeter Assoc.
GT-8 -851 05/03/04 05/11/04 Streeter Assoc.
GT-9 -519 05/03/04 05/11/04 Streeter Assoc.
HVAC-1 52,803 52,803 02/20/07 03/15/07 Kimble, Inc.
HVAC-2 485 03/25/04 03/15/07 Kimble Inc
HVAC-3 3,608 05/06/04 03/15/07 Kimble Inc
P-2 -406 04/19/04 04/26/04 Mazza Sheetmetal
04-0644 Reconstruction 0-035-007 03/14/05 NO CHANGE ORDERS ON ELECTRONIC FILE
Wildwood/Portable Classrooms:
96-1050 Reconstruction 0-044-002 04/11/97 NO CHANGE ORDERS ON ELECTRONIC FILE
Criminal Justice Building #18:
01-0308 New Construction 0-053-001 03/28/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Modular classroom Bldg.16 @ Coopers:
05-0794 New Construction 0-055-001 10/23/06 NO CHANGE ORDERS ON ELECTRONIC FILE
Criminal Justice Storage Bldg:
97-0343 New Construction 2-050-001 10/10/97 NO CHANGE ORDERS ON ELECTRONIC FILE
Wildwood/Equip. Room:
97-1010 Additions and Alterations 2-051-001 04/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
Coopers Campus/Equip. Room:
97-1011 Additions and Alterations 2-052-001 04/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
Maintenance Bldg. 11:
04-0645 Reconstruction 3-018-002 03/14/05 NO CHANGE ORDERS ON ELECTRONIC FILE
Coopers Bldg.#9 Print Shop:
04-0646 Reconstruction 3-022-001 03/14/05 NO CHANGE ORDERS ON ELECTRONIC FILE
WB19 Maintenance Pole Base:
98-0653 New Construction 3-049-001 03/18/99 NO CHANGE ORDERS ON ELECTRONIC FILE
District Wide:
97-1012 Reconstruction 7-999-001 04/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1640 Reconstruction 7-999-002 05/15/91 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1482 Reconstruction 7-999-003 06/27/02 *CO No.* Amount Disallowed Received Approved Contractor
EC-002 7,028 04/11/05 10/11/05 Oyer Electric
EC-1 25,324 02/09/04 03/19/04 Over Electric
02-0410 Reconstruction 7-999-004 01/08/03 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0281 Reconstruction 7-999-005 11/02/04 NO CHANGE ORDERS ON ELECTRONIC FILE