REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
K-12 Building:
92-0399 New Construction 0-012-001 12/10/92 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1649FP Reconstruction 0-012-FP1 05/21/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
92-0400 New Construction 5-013-001 12/10/92 NO CHANGE ORDERS ON ELECTRONIC FILE
EDMESTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 47-05-01-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Central School:
93-1112 Reconstruction 0-001-003 05/06/94 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1296 Additions and Alterations 0-001-004 07/15/99 *CO No.* Amount Disallowed Received Approved Contractor
E-2 2,074 01/05/01 12/01/03 Edgeline Elec.
T-1 -5,537 11/16/01 01/08/02 Express Systems Integration
03-1318 Additions and Alterations 0-001-008 08/20/04 *CO No.* Amount Disallowed Received Approved Contractor
ACM-001 770 04/12/06 03/14/07 Midlantic environmental
ACM-002 1,380 11/23/05 12/06/05 Midlantic Environmental
E-001 -51,950 02/07/05 03/14/07 M gleason and Sons of Binghamton
E-002 -2,100 02/07/05 03/17/05 M Gleason and Son of Binghamton of N
E-003 -2,100 02/14/05 03/17/05 M Gleason and Sons of Binghamton
E-004 0 04/04/05 04/15/05 M Gleason Sons of Binghamton
E-005 9,360 04/20/05 06/21/05 M Gleason and Sons
E-006 0 08/10/05 06/05/06 M Gleason and Sons
E-007 0 03/10/06 / / M Gleason and Sons of Binghamton
E-007 0 06/13/07 06/18/07 M Gleason and Sons
E-008 472 01/30/06 07/24/06 M Gleason and Sons
FS-001 0 06/13/07 06/18/07 B and W Supply Co
FS-002 0 07/25/05 / / B and W Supply Co
FS-002 0 03/13/07 06/18/07 B and W Supply Co
FS-003 -6,392 07/20/06 08/09/06 B and W Supply
FS-004 -4,860 01/02/07 01/23/07 B and W Supply
GC-001 -10,000 11/03/04 11/23/04 Simmons Contraction
GC-002 4,967 01/04/05 01/10/05 Simmons Construction
GC-003 0 02/24/05 03/25/05 Simmons Construction
GC-004 0 04/12/06 03/14/07 simmons Construction
GC-005 0 07/25/05 / / Simmons construction
GC-005 0 06/13/07 06/18/07 Simmon Construction
GC-006 0 04/12/06 06/05/06 simmons construction
GC-007 0 11/23/05 12/06/05 Simmons Construction
GC-008 192,463 04/12/06 03/14/07 simons Construction
GC-009 0 11/23/05 12/06/05 Simmons construction
GC-010 0 12/21/05 01/06/06 Simmons Construction
GC-011 0 03/20/06 06/05/06 Simmson Construction
GC-012 0 03/20/06 06/05/06 simmons Construction
GC-013 -64,579 07/26/06 08/25/06 Simmons Construction
GC-014 58,898 12/21/06 01/19/07 Simmons Construction
H-001 0 02/07/05 08/09/06 Hj brandeles Corp
H-002 0 07/25/05 / / HJ Brandeles Corp
H-002 0 06/13/07 06/18/07 HJ Brandeles Corp
H-003 0 08/10/05 08/09/06 HJ Brandeles Corp
H-004 0 04/12/06 05/26/06 Hj Brandeles Corp
H-005 0 11/23/05 11/30/05 H.J. Brandeles Corporation
H-006 0 03/20/06 05/25/06 Hj brandeles Corp
H-007 -1,841 03/20/06 05/25/06 Hj brandeles Corp
P-001 3,766 11/22/04 12/17/04 HJ Brandeles
P-002 -4,310 03/06/06 08/09/06 HJ Brandeles Corp
P-003 -4,310 11/27/05 05/24/06 HJ Brandeles Corp
P-004 -1,100 03/06/06 06/30/06 HJ Brandeles Corp
R-001 -28,850 11/03/04 11/23/04 Pulver Roofing Co
R-002 1,215 02/14/05 03/17/05 Pulver Roofing Company
R-003 0 11/23/05 12/06/05 Pulver Roofing Co
R-004 -8,556 01/30/06 07/24/06 pulver Roofing
R-005 13,560 03/13/07 05/09/07 Pulver Roofing Co
02-2040FP Reconstruction 0-001-FP1 10/06/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Shop Bus Garage:
93-1113 Reconstruction 0-003-001 05/06/94 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1297 Reconstruction 0-003-002 07/15/99 NO CHANGE ORDERS ON ELECTRONIC FILE
LAURENS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 47-08-01-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
91-0123 Reconstruction 0-001-005 08/14/91 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1575 Reconstruction 0-001-007 10/16/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1157 Reconstruction 0-001-009 05/10/01 *CO No.* Amount Disallowed Received Approved Contractor
R-5 6,415 07/25/02 10/28/02 WeatherGuard Roofing
06-0462 Additions and Alterations 0-001-010 05/09/07 *CO No.* Amount Disallowed Received Approved Contractor
ACM-001 19,600 02/15/08 03/19/08 SIMMONS CONSTRUCTION
ACM-002 18,608 04/24/08 08/06/08 EXCEL INSULATION COMPANY, INC.
E-001 -15,450 06/19/08 / / Nelcorp Electrical Contracting
E-002 -12,985 06/19/08 / / Nelcorp Electrical Contracting
E-003 -6,792 06/19/08 / / Nelcorp Electrical Contracting
FS-001 -5,700 09/21/07 11/26/07 JOSEPH FLIHAN COMPANY
GC-001 -15,566 02/15/08 03/19/08 SIMMONS CONSTRUCTION
GC-002 -5,181 02/15/08 03/19/08 SIMMONS CONSTRUCTION
GC-003 -35,000 02/15/08 03/19/08 SIMMONS CONSTRUCTION
GC-004 -12,200 02/15/08 03/19/08 SIMMONS CONSTRUCTION
GC-005 0 02/15/08 03/19/08 SIMMOPNS CONSTRUCTION
GC-006 0 02/15/08 03/08/08 SIMMONS CONSTRUCTION
GC-007 -43,558 02/15/08 03/19/08 SIMMONS CONSTRUCTION
GC-008 0 02/15/08 03/19/08 SIMMONS CONSTRUCTION
GC-009 0 02/15/08 03/19/08 SIMMONS CONSTRUCTION
GC-010 0 02/15/08 03/19/08 SIMMONS CONSTRUCTION
GC-011 0 02/15/08 03/19/08 SIMMONS CONSTRUCTION
GC-012 0 02/15/08 03/19/08 SIMMONS CONSTRUCTION
GC-013 0 02/15/08 03/19/08 SIMMONS CONSTRUCTION
GC-014 80,000 02/15/08 03/19/08 SIMMONS CONTRACTING
GC-015 0 02/15/08 03/19/08 SIMMONS CONSTRUCTION
GC-016 0 03/21/08 08/07/08 SIMMONS CONSTRUCTION
GC-017 0 03/21/08 03/31/08 SIMMONS CONSTRUCTION
GC-018 0 03/21/08 04/08/08 SIMMONS CONSTRUCTION
GC-019 0 03/21/08 03/31/08 SIMMONS CONSTRUCTION
GC-020 0 03/21/08 03/31/08 SIMMONS CONSTRUCTION
GC-021 0 03/21/08 / / SIMMONS CONSTRUCTION
GC-022 0 03/21/08 03/31/08 SIMMONS CONSTRUCTION
GC-023 0 03/25/08 08/07/08 Simmons Construction
GC-024 0 03/25/08 08/07/08 SIMMONS CONSTRUCTION
GC-026 0 04/24/08 08/07/08 SIMMONS CONSTRUCTION
GC-028 0 06/19/08 08/26/08 Simmons Construction
GC-029 0 06/19/08 08/26/08 Simmons Construction
GC_025 0 04/24/08 08/07/08 SIMMONS CONSTRUCTION
L-001 -8,000 02/15/08 03/19/08 RITTER & PARATORE CONTRACTING, INC
L-002 70,700 02/15/08 03/19/08 RITTER & PARATORE CONTRACTING, INC.
L-003 0 03/21/08 08/07/08 RITTER & PARATORE CONTRACTING, INC.
L-004 0 03/21/08 / / RITTER & PARATORE CONTRACTING, INC.
L-005 0 03/21/08 08/07/08 RITTER & PARATORE CONTRACTING, INC.
LE-001 31,616 02/22/08 03/08/08 BRODART COMPANY
M-001 -11,000 02/15/08 04/04/08 PICCIRILLI-SLAVIK & VINCENT PLUMBING
M-002 -8,000 02/15/08 04/04/08 PICCIRILLI-SLAVIK & VINCENT PLUMBING
M-003 -5,426 02/15/08 04/04/08 PICCIRILLI-SLAVIK & VINCENT PLUMBING
M-004 0 05/05/08 06/12/08 PICCIRILLI-SLAVIK & VINCENT PLUMBING
M-005 0 05/05/08 06/12/08 PICCIRILLI-SLAVIK & VINCENT PLUMBING
M-006 0 05/05/08 06/12/08 PICCIRILLI-SLAVIK & VINCENT PLUMBING
M-007 0 05/05/08 06/12/08 PICCIRILLI-SLAVIK & VINCENT
P-001 -41,250 10/01/07 10/23/07 LOUIS N. PICCIANO & SONS, INC.
P-002 -38,700 10/01/07 10/23/07 LOUIS N. PICCIANO & SONS, INC.
P-003 0 02/15/08 04/04/08 LOUIS N. PICCIANO & SON, INC
P-004 0 03/21/08 08/07/08 LOUIS N. PICCIANO & SONS, INC.
P-005 0 03/21/08 08/07/08 LOUIS N. PICCIANO & SONS, INC.
SE-001 6,198 02/22/08 03/08/08 THE JANSON INDUSTRIRES
SE-002 11,524 03/21/08 03/31/08 THE JANSON INDUSTRIES
02-0811FP Reconstruction 0-001-FP1 06/06/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1143SC Visual Structural Inspection 0-001-SC1 02/20/04 NO CHANGE ORDERS ON ELECTRONIC FILE
SCHENEVUS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 47-09-01-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Andrew Draper School:
01-0545 Reconstruction 0-001-006 06/18/02 *CO No.* Amount Disallowed Received Approved Contractor
AA2 -5,635 02/02/04 04/07/04 Avala Contracting
E-6 -219 05/17/05 07/13/05 Panko Electrical Maintenance
GC-3 -782 02/02/04 04/07/04 Simmons Const.
GC-4 17,238 08/13/04 09/23/04 Simmons Const.
GC-4 -17,238 06/22/06 07/13/06 Simmons Construction
GC-5 -44,077 05/18/05 07/13/05 Simmons Construction
M-2 -3,544 09/29/05 10/13/05 WJV Mechanical
P-2 13,210 06/22/06 02/01/07 A Treffeisen and Sons
P-3 61 12/12/03 12/26/03 A Treffeisen & Sons
P2 13,210 12/12/03 11/01/06 A Treffeisen & Sons
P2 13,210 04/12/06 11/01/06 A Treffeisen and Sons
00-0483 Reconstruction 0-001-007 01/24/01 *CO No.* Amount Disallowed Received Approved Contractor
AE1 -3,160 06/17/02 08/15/02 Utica Glass
PG1 -1,000 11/28/01 03/27/02 RE Woodson
SW-1 0 10/23/01 02/26/02 Sunrise Enterprises
SW2 -2,852 11/01/02 01/08/03 Sunrise Enterprises
07-2268 Reconstruction 0-001-008 08/08/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0200FP Reconstruction 0-001-FP1 12/19/02 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0779SC Visual Structural Inspection 0-001-SC1 01/18/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Shop Building/Bus Garage:
91-0033 Reconstruction 0-002-002 08/09/91 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0546 Reconstruction 0-002-003 06/18/02 *CO No.* Amount Disallowed Received Approved Contractor
AA1 0 04/02/03 04/21/03 Avala Contracting
Bus Garage & Maint. Facility:
01-0547 New Construction 5-007-001 06/18/02 *CO No.* Amount Disallowed Received Approved Contractor
E-1 0 01/19/05 03/17/05 Panko Electrical Maintenance Inc
E-2 0 01/19/05 03/17/05 Panko electrical Maintenance Inc
E-3 -3,311 01/19/05 03/17/05 Panko Electrical Maintenance Inc
E-4 0 01/19/05 03/17/05 Panko Electrical Maintenance
E-5 5,867 05/17/05 07/14/05 Panko Electrical Maintenance
E-8 3,441 05/17/05 07/13/05 Panko Electrical Maintence
E7 -1,036 05/17/05 07/14/05 Panko electrical Maintenance
GC-1 1,400 01/23/04 03/08/04 Simmons Const.
GC-2 -5,616 02/02/04 04/07/04 Simmons Const.
M1 2,273 09/28/05 10/13/05 WJV mechanical
P-1 -6,300 12/12/03 04/19/04 A Treffeisen & Sons
P-4 -10,760 02/02/04 03/05/04 A Treffeisen & Sons
P5 2,487 04/04/04 05/11/04 A Treffeisen & Sons
Hogan Bus Garage Building:
02-0240 Reconstruction 5-008-L01 09/18/02 NO CHANGE ORDERS ON ELECTRONIC FILE
MILFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 47-11-01-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Milford Central School:
00-0549 Additions and Alterations 0-010-004 03/13/01 *CO No.* Amount Disallowed Received Approved Contractor
1 0 12/20/01 / / Court Street Co.
1 54,780 12/20/01 03/26/02 Court Street Co.
1 -3,485 01/17/02 03/25/02 Bagnall Elec.
1 -2,500 08/30/02 09/04/02 Auchinachie Plumbing
1 2,800 12/03/01 01/14/03 Auchinachie Plumbing
2 13,300 12/11/01 03/01/02 Auchinachie Plumbing
2 1,975 02/13/02 03/25/02 Auchinachie Plumbing
2 2,225 02/13/02 03/25/02 Bagnall Elec.
2 18,982 08/07/02 08/16/02 Court Street Co.
3 616 05/09/02 06/04/02 Bagnall Elec.
3 6,799 08/07/02 08/16/02 Auchinachie Plumbng
4 1,245 08/07/02 08/16/02 Bagnall Elec.
5 1,135 08/27/02 09/05/02 Bagnell Elec.
05-0707 Additions and Alterations 0-010-005 05/30/06 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
1 6,029 01/16/07 02/12/07 Nelcorp Electrical
1 10,185 01/16/07 02/21/07 W and D Smith and Sons
1 49,407 04/17/07 05/09/07 Puterlo Construction
1 2,286 11/28/07 / / Piccirlli slavik & vincent plumbing
1 2,286 11/28/07 01/28/08 Piccirilli slavik &vincent plumbing
2 18,260 04/17/07 05/25/07 Nelcorp Electrical
2 8,099 04/17/07 05/09/07 Puterlo Construction
2 14,213 07/19/07 08/07/07 Henderson Johnson Co
3 2,105 04/17/07 05/25/07 Nelcorp electrical
3 14,031 07/19/07 08/07/07 Puterlo Construction
3 3,201 11/28/07 12/14/07 Henderson-Johnson Company
4 8,380 07/19/07 10/23/07 Nelcorp Electrical
Roof 1 10,803 01/16/07 02/21/07 Henderson Johnson
07-2079 Reconstruction 0-010-006 05/05/08 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0862SC Visual Structural Inspection 0-010-SC1 02/06/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
05-0708 Additions and Alterations 5-009-001 05/30/06 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0205 Reconstruction 5-009-002 06/11/08 NO CHANGE ORDERS ON ELECTRONIC FILE
MORRIS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 47-12-01-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Morris Central School:
92-1366 Additions and Alterations 0-001-004 07/26/93 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0163 Reconstruction 0-001-005 09/04/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1562 Additions and Alterations 0-001-006 11/15/01 *CO No.* Amount Disallowed Received Approved Contractor
1 74,519 05/23/02 10/30/02 Marcy Excavation Company
1 18,900 05/23/02 07/30/02 Murnane Building Contractors
10-1 6,112 10/07/02 11/08/02 Facilities Equipment
10-2 -3,400 10/28/02 11/08/02 Facilities Equipment
11-1 -69,302 05/23/02 07/12/02 E&B Equipment
11-2 6,904 05/23/02 07/12/02 E&B Equipment
11-3 2,939 07/08/03 07/15/03 E&B Equipment
11-4 1,853 09/11/02 10/30/02 E&B Equipment
11-5 106 09/27/02 02/17/04 E&B Equipment
11-6 5,164 12/30/02 01/08/03 E&B Equipment
12-1 2,272 05/23/02 07/12/02 Buffalo Hotel Supply
12-2 1,110 05/23/02 07/12/02 Buffalo Hotel Supply
12-3 1,270 05/23/02 07/12/02 Buffalo Hotel Supply
12-4 2,035 05/23/02 07/12/02 Buffalo Hotel Supply
13-1 56,700 05/23/02 08/16/02 Henderson-Johnson
13-2 4,405 05/23/02 03/28/03 Henderson-Johnson
13-3 7,560 05/23/02 08/16/02 Henderson-Johnson
13-4 2,220 07/31/02 08/16/02 Star Northeast
13-5 3,518 07/08/03 07/15/03 Henderson-Johnson
13-6 12,150 09/09/02 02/05/03 Henderson-Johnson
13-7 -350 09/27/02 02/17/04 Henderson-Johnson
14-1 28,900 05/23/02 07/12/02 KSP Painting
14-2 15,500 15,500 07/08/03 07/15/03 KSP Painting
14-3 8,960 09/11/02 10/30/02 KSP Painting
14-4 4,060 12/30/02 01/08/03 KSP Painting
14-5 -1,000 01/31/03 02/26/03 KSP Painting
15-1 6,800 07/08/03 07/15/03 Piccirilli-Slavik
15-2 5,314 09/16/02 10/30/02 Piccirilli-Slavik
15-3 -290 09/27/02 02/17/04 Piccirilli-Slavik
16-1 11,821 05/23/02 06/13/02 M&N Plumbing
16-3 39,041 09/09/02 10/30/02 M&N Plumbing
16-4 47,662 10/07/02 11/08/02 M&N Plumbing
16-5 4,102 01/22/03 02/06/03 M&N Plumbing
16-6 3,138 01/31/03 02/11/03 M&N Plumbing
16-9 3,071 02/28/03 03/11/03 M&N Plumbing
17-1 6,636 05/23/02 07/10/02 Matco Elec.
17-2 33,229 07/08/03 07/15/03 Matco Elec.
17-4 27,405 12/30/02 01/08/03 Matco Elec.
18-1 1,000 05/23/02 07/10/02 Old Castle Precast
19-1 -9,968 05/23/02 08/16/02 Kelley Brothers
19-2 1,870 05/23/02 10/21/02 Kelley Brothers
19-3 885 07/08/03 07/15/03 Kelley Brothers
19-4 -876 09/27/02 02/17/04 Kelley Brothers
2 33,038 05/23/02 10/30/02 Marcy Excavation Company
2 -3,000 05/05/03 06/09/03 STS Steel
2-3 -4,177 05/23/02 07/30/02 Murnane Bldg. Contractors
2-5 1,661 09/05/02 09/06/02 Murnane Bldg. Contractors
3 118,223 05/23/02 10/30/02 Marcy Excavation Company
3-1 1,242 05/23/02 07/10/02 Raulli & Sons
3-2 2,898 05/23/02 07/10/02 Raulli & Sons
3-3 3,473 07/08/03 07/15/03 Raulli & Sons
3-4 851 07/08/03 07/15/03 Raulli & Sons
4 90,176 05/23/02 02/05/03 Marcy Excavation Company
4-1 25,330 05/23/02 07/10/02 Hopkins and Reilly Mason
4-2 13,337 09/09/02 10/30/02 Hopkins and Reilly Mason
5 1,950 09/11/02 10/30/02 Marcy Excavation Company
5-1 -314,537 05/23/02 07/12/02 Murnane Bldg. Contractors
5-2 1,839 05/23/02 07/24/02 Murnane Bldg. Contractors
5-3 1,787 05/23/02 09/15/04 Murnane Bldg. Contractors
5-4 12,128 05/23/02 07/30/02 Murnane Bldg. Contractors
5-5 4,336 07/08/03 07/15/03 Murnane Bldg. Contractors
5-6 8,886 09/16/02 02/05/03 Murnane Bldg. Contractors
5-7 10,952 12/30/02 01/08/03 Murnane Bldg. Contractors
5-8 -2,000 01/31/03 02/26/03 Murnane Bldg. Contractors
6 31,273 02/28/03 03/11/03 Marcy Excavation Company
6-1 -10,000 05/23/02 06/13/02 Dewald Roofing
6-2 -330 05/23/02 06/13/02 Dewald Roofing
6-3 13,337 07/08/03 07/15/03 Dewald Roofing
6-4 12,420 07/08/03 07/15/03 Dewald Roofing
6-5 23,380 07/08/03 07/15/03 Dewald Roofing
6-6 7,700 09/27/02 02/17/04 Dewald Roofing
6-7 19,200 09/09/02 10/30/02 Dewald Roofing
6-8 550 06/03/03 06/09/03 Dewald Roofing
7-1 -2,400 05/23/02 07/24/02 Johnson-Howard Associates
7-2 -14,230 05/23/02 07/24/02 Johnson-Howard Associates
7-3 7,500 09/09/02 02/05/03 Johnson-Howard Associates
7-4 -290 09/27/02 10/30/02 Johnson-Howard Associates
8-1 10,683 09/27/02 02/17/04 Brownies, Inc
8-2 -100 09/27/02 02/17/04 Brownies, Inc
9-1 -4,600 05/23/02 06/13/02 Western NY Floor Co
9-2 8,878 09/11/02 10/30/02 Western NY Floor Co.
9-3 5,648 10/18/02 11/08/02 Western NY Floor Co
00-1581SR Additions and Alterations 0-001-006 04/13/01 NO CHANGE ORDERS ON ELECTRONIC FILE
05-1260 Reconstruction 0-001-008 07/19/06 *CO No.* Amount Disallowed Received Approved Contractor
HVAC-001 -3,200 06/25/08 08/18/08 Louis N. Picciano & Son, Inc.
Custodial/Maintenance(former I.A.):
92-1367 Reconstruction 0-002-002 07/26/93 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1563 Reconstruction 0-002-003 11/15/01 *CO No.* Amount Disallowed Received Approved Contractor
16-2 3,000 07/08/03 07/15/03 M&N Plumbing
16-7 27,834 01/31/03 02/11/03 M&N Plumbing
16-8 6,122 01/31/03 02/11/03 M&N Plumbing
17-3 1,195 12/30/02 01/08/03 Matco Elec.
2-2 556 05/23/02 06/04/02 Murnane Bldg. Contractors
2-4 626 05/23/02 06/04/02 Murnane Bldg. Contractors
05-1261 Reconstruction 0-002-004 07/19/06 *CO No.* Amount Disallowed Received Approved Contractor
1-001 -14,275 06/25/08 08/26/08 Dewald Roofing
1-002 1,325 06/25/08 08/26/08 Dewald Roofing
Bus Garage:
92-1368 Reconstruction 5-005-003 07/26/93 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1564 Additions and Alterations 5-005-004 11/15/01 *CO No.* Amount Disallowed Received Approved Contractor
1 3,500 05/23/02 06/04/02 STS Steel, Inc
ONEONTA CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 47-14-00-01
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Valley View Elementary:
01-0604 Reconstruction 0-004-003 07/12/02 *CO No.* Amount Disallowed Received Approved Contractor
ETC-005 -7,788 06/22/07 10/23/07 Blanding Electric
ETC-04 7,011 01/08/07 01/24/07 Blanding Electric
01-0357 Reconstruction 0-004-004 01/08/02 *CO No.* Amount Disallowed Received Approved Contractor
AA1 -2,000 11/21/02 11/22/02 USA Remediation
GC-1 -5,197 11/21/02 11/22/02 Eastman Assoc.
GC-2 250 04/21/03 05/07/03 Eastman Assoc.
SC-1 5,392 11/21/02 11/22/02 Eastman Assoc.
03-0728 Reconstruction 0-004-005 04/25/04 *CO No.* Amount Disallowed Received Approved Contractor
AAC-001 5,084 10/05/04 10/12/04 Two Brothers Contracting
AAC-004 13,600 09/01/05 09/09/05 Two Brother Contracting
EC-004 1,230 09/07/06 12/27/06 Blanding ELectric
GC-17 9,893 10/13/05 11/08/05 Fahs Rolston paving Corp
GC-30 62,945 12/30/05 06/09/06 Fahs Rolston Paving Corp
GC-33 -2,112 04/13/06 06/23/06 Fahs Rolston Paving
HC-001 11,312 09/10/04 09/23/04 Louis Picciano and Son
HC-008 -3,034 03/07/06 06/23/06 Louis Piccano and Sons
RC-001 14,355 09/10/04 10/22/04 DeWald Roofing
05-0922 Reconstruction 0-004-006 08/24/06 *CO No.* Amount Disallowed Received Approved Contractor
GC - 01R 5,069 09/25/07 10/18/07 CHRISTA CONSTRUCTION, LLC.
07-1205 Reconstruction 0-004-007 06/27/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Center Street Elementary:
92-1419 Reconstruction 0-006-003 07/21/93 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0917 Reconstruction 0-006-004 03/28/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0094 Reconstruction 0-006-005 11/03/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0605 Reconstruction 0-006-006 07/12/02 *CO No.* Amount Disallowed Received Approved Contractor
ETC-001 8,124 01/08/07 01/24/07 Blanding Electric
ETC-1 11,800 09/15/03 09/19/03 Blanding Electric
ETC2A -9,350 01/20/04 02/03/04 Blanding Electric
02-2058 Reconstruction 0-006-008 09/12/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0729 Reconstruction 0-006-009 04/25/04 *CO No.* Amount Disallowed Received Approved Contractor
GC-18 4,172 10/13/05 11/08/05 fahs rolston Paving
GC-28 2,974 12/23/05 06/09/06 Fahs Rolston Paving Corp
GC-34 -2,500 03/24/06 06/05/06 Fahs rolston Paving
HC-010 2,431 09/28/06 01/09/07 Louis Picciano and sons
PC-001 6,729 03/24/06 06/23/06 Louis Piccano and Sons
RC-005 1,963 12/23/05 06/09/06 DeWald Roofing Co
05-0923 Reconstruction 0-006-010 08/24/06 *CO No.* Amount Disallowed Received Approved Contractor
GC-005 -500 07/02/08 10/07/08 CHRISTA CONSTRUCTION, LLC
07-1206 Reconstruction 0-006-011 06/27/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0640FP Reconstruction 0-006-FP1 12/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Oneonta Jr/Sr High:
94-0387 Reconstruction 0-014-005 11/23/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0153 Additions and Alterations 0-014-006 10/16/95 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0202 Reconstruction 0-014-007 08/26/93 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1027 Reconstruction 0-014-008 05/14/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1393 Reconstruction 0-014-009 05/06/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0942 Reconstruction 0-014-010 03/31/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0095 Reconstruction 0-014-011 11/03/99 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0416 Reconstruction 0-014-012 01/23/01 *CO No.* Amount Disallowed Received Approved Contractor
AAC2 rev -4,404 11/21/01 05/28/02 Sunstream
BC1 23,748 11/16/01 05/28/02 Dant-Clayton
GC-1rev 7,574 09/28/01 05/22/02 Jones-Marinich
GC-2rev 2,056 09/28/01 05/22/02 Jones-Marinich
GC-3 -2,393 09/01/05 09/07/05 Jones Marinich Inc
SC-1 19,500 12/10/01 05/28/02 Orchard Earth & Pipe
03-0595 Reconstruction 0-014-014 03/15/04 *CO No.* Amount Disallowed Received Approved Contractor
001 18,000 10/21/04 11/03/04 Clark Companies
EC-001 3,144 01/21/05 02/07/05 Nelcorp Electrical Contracting
GC-002 4,150 12/24/04 01/03/05 Clark Companies
GC-003 4,378 06/14/05 06/29/05 Clark Companies
GC-004 10,500 03/17/06 07/14/06 Clark Companies
03-0730 Reconstruction 0-014-015 04/25/04 *CO No.* Amount Disallowed Received Approved Contractor
0 3 / / / /
AAC-005 -3,600 03/24/06 06/05/06 two brothers Contracting
EC-001 3,945 07/25/05 07/26/05 Blanding Electric
EC-002 7,953 02/13/06 08/09/06 Blanding Electric
EC-005 4,778 09/07/06 12/27/06 Blanding Electric
GC-12 7,683 06/28/05 07/21/05 Fahs Rolston Paving
GC-14 69,057 07/25/05 08/10/05 Fahs Rolston Paving Corp
GC-19 49,384 10/13/05 11/08/05 Fahs Rolston Paving Corp
GC-21 2,148 10/13/05 11/08/05 Fahs Rolston paving Corp
GC-22 3,472 10/13/05 11/08/05 Fahs Rolston Paving Corp
GC-23 6,354 10/13/05 11/08/05 fahs Rolston Paving Corp
GC-24 1,355 12/23/05 06/09/06 Fahs Rolston Paving Corp
GC-25 1,443 12/23/05 06/09/06 Fahs Rolston Paving
GC-29 2,013 12/23/05 06/09/06 Fahs rolston Paving
GC-31 1,553 02/23/06 06/05/06 Fahs Rolston Paving
GC-35 830 03/24/06 06/05/06 Fahs Rolston Paving
GC-36 4,502 03/24/06 06/05/06 Fahs rolston paving
GC-38 2,780 03/24/06 06/05/06 Fahs RolstonPaving
GC-39 3,564 04/13/06 06/23/06 Fahs Rolston Paving
GC-44 -2,500 05/03/07 05/09/07 Fahs Rolston paving
HC-004 39,786 39,786 06/16/05 04/16/07 Louis Picciano and Son
HC-009 -839 04/20/06 06/30/06 Louis Picciano and Sons
HC-011 1,847 07/05/06 12/27/06 Louis Pifcciano and Sons
gc-16 9,274 07/29/05 08/03/05 Fahs-Rolston Paving Corp.
05-0924 Reconstruction 0-014-016 08/24/06 *CO No.* Amount Disallowed Received Approved Contractor
AAC-01 5,000 12/26/07 01/07/08 Redboldt
AAC-02 -2,500 01/18/08 01/28/08 REDBOLT DBA ACTION CLEANERS
EC-001 11,880 04/07/08 / / A. TREFFEISEN & SONS, LLC
GC-002 16,532 04/07/08 04/18/08 CHRISTA CONSTRUCTION, LLC
GC-003 -200 04/07/08 04/18/08 CHRISTA CONSTRUCTION, LLC
GC-004 4,275 04/07/08 04/18/08 CHRISTA CONSTRUCTION, LLC
MC-001 6,515 04/07/08 / / A. TREFFEISEN & SONS, INC.
PC-001 -4,343 04/07/08 / / A. TREFFEISEN & SONS, LLC
07-1207 Reconstruction 0-014-017 06/27/08 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1858 Reconstruction 0-014-020 05/28/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0643FP Reconstruction 0-014-FP1 12/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Great Plains Elementary:
92-0159 Reconstruction 0-017-003 08/25/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0229 Reconstruction 0-017-004 10/27/93 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0096 Reconstruction 0-017-005 11/03/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0606 Reconstruction 0-017-006 07/12/02 *CO No.* Amount Disallowed Received Approved Contractor
ETC-002 6,210 01/08/07 01/24/07 Blanding Electric
02-2059 Reconstruction 0-017-007 09/12/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0731 Reconstruction 0-017-008 04/25/04 *CO No.* Amount Disallowed Received Approved Contractor
AAC-003 38,965 03/29/05 05/02/05 Two Brothers Contracting
GC-002 8,935 12/24/04 01/03/05 Fahs Rolston Paving
GC-007 -6,905 03/29/05 05/02/05 Fahs Rolston Paving Corp
GC-009 25,234 03/10/05 04/15/05 Fahs Rolston Paving Corp
GC-010 30,535 06/16/05 06/30/05 Fahs Rolston Paving Corp
GC-11 33,822 06/02/05 06/30/05 Fahs Rolston Paving Corp
GC-13 6,870 07/25/05 07/26/05 Fahs Rolston Paving Corp
GC-20 14,588 10/13/05 11/08/05 Fahs Riolston Paving Corp
GC-26 1,227 12/23/05 06/09/06 Fahs Rolston paving Corp
GC-27 2,697 12/23/05 06/09/06 Fahs Rolston Paving Corp
GC-32 5,911 02/23/06 07/14/06 fahs Rolston Paving
GC-37 7,784 03/24/06 06/05/06 Fahs RolstonPaving
HC-003 3,591 12/02/04 12/08/04 Louis Picciano & Son
HC-005 8,034 12/23/05 12/29/05 Louis Picciano
HC-006 11,874 12/23/05 12/29/05 Louis Picciano
HC-007 17,472 02/01/06 06/30/06 louis Picciano and sons
RC-003 5,200 12/09/04 06/23/05 DeWald Roofing Co
05-0925 Reconstruction 0-017-009 08/24/06 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1208 Reconstruction 0-017-010 06/27/08 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1162 Reconstruction 0-017-011 03/18/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0641FP Reconstruction 0-017-FP1 12/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Riverside Elementary:
92-0160 Reconstruction 0-018-002 08/25/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0230 Reconstruction 0-018-003 10/27/93 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0097 Reconstruction 0-018-005 11/03/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0607 Reconstruction 0-018-006 07/12/02 *CO No.* Amount Disallowed Received Approved Contractor
ETC-003 8,923 01/08/07 01/24/07 Blanding Electric
02-2060 Reconstruction 0-018-007 09/12/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0732 Reconstruction 0-018-008 04/25/04 *CO No.* Amount Disallowed Received Approved Contractor
AAC-02 32,400 03/29/05 05/02/05 Two Brothers Contracting
GC-001 11,659 10/21/04 11/15/04 Fahs Rolston Paving
GC-003 26,096 12/24/04 01/03/05 Fahs Rolston Paving
GC-004 17,423 12/27/04 01/03/05 Fahs Rolston Paving
GC-005 9,625 01/21/05 06/29/05 Fahs Rolston Paving Corp
GC-006 15,268 03/10/05 04/15/05 Fahs Rolston Paving Corp
GC-008 21,873 03/10/05 05/02/05 Fahs Rolston Paving
GC-009 350 03/10/05 04/15/05 Fahs Rolston Paving Corp
GC-15 3,563 07/25/05 07/26/05 Fahs Rolston Paving Corp
HC-002 9,562 10/21/04 06/21/05 Louis Picciano & Sons
HC-003 3,078 12/02/04 12/08/04 Louis Picciano & Son
RC-002 3,900 09/10/04 09/24/04 DeWald Roofing
05-0926 Reconstruction 0-018-009 08/24/06 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1209 Reconstruction 0-018-010 06/27/08 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1163 Reconstruction 0-018-011 03/18/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0642FP Reconstruction 0-018-FP1 12/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage Reconstruction:
01-0578 Reconstruction 5-001-L01 01/30/02 NO CHANGE ORDERS ON ELECTRONIC FILE
New Bus Garage:
00-0126 New Construction 5-019-001 10/26/00 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 2,979 02/12/02 05/13/02 A. Treffeisen & Sons
GC-5 -14,095 02/12/02 05/13/02 Eastman Assoc.
MC1 -1,087 07/22/02 08/28/02 B&H Air Conditioning
PC-1 -2,000 02/12/02 05/13/02 Auchinachie Plumbing
07-1210 Reconstruction 5-019-002 06/27/08 NO CHANGE ORDERS ON ELECTRONIC FILE
UNATEGO (OTEGO-UNADILLA) CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 47-16-01-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Otego Elementary School:
96-0844 Additions and Alterations 0-001-003 04/02/97 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0531 Additions and Alterations 0-001-004 06/11/02 *CO No.* Amount Disallowed Received Approved Contractor
00002 39,556 11/29/02 12/06/02 Leitz Ent.
00003 264 11/29/02 12/06/02 Leitz Ent.
00007 -3,238 11/29/02 12/06/02 Leitz Ent.
02-00008 -3,160 11/29/02 12/06/02 Leitz Ent.
02-00012 391 11/29/02 12/06/02 Leitz Ent.
02-00014 61 03/06/03 03/11/03 Leitz Ent.
EC-11 688 03/11/04 04/12/04 Nelcorp Elec.
EC-15 1,743 05/19/04 06/04/04 Nelcorp Elec.
EC-22 699 08/19/04 09/27/04 Nelcorp Elec.
EC-26 5,212 11/04/04 11/29/04 Nelcorp Elec.
EC-30 1,067 02/26/05 06/15/05 Nelcorp Electrical Contracting
EC-32 383 12/08/04 01/03/05 Nelcorp Elec.
EC-35 54,985 01/26/05 10/03/05 Nelcorp Electrical Contracting
EC-41 245 04/28/05 06/21/05 Nelcorp Electrical Contracting
EC-43 -5,025 06/08/05 06/29/05 Nelcorp Electrical Contracting
EC-5 2,671 12/16/03 01/08/04 Nelcorp Elec.
GC-12 14,490 03/11/04 03/15/04 Murnane Bldg Contractors
GC-27 3,130 07/07/04 07/13/04 Muranne Bldg Contractors
GC-30 39,779 07/22/04 07/27/04 Murnane Bldg Contractors
GC-42 15,241 11/10/04 11/19/04 Murnane Bldg Contractors
GC-44 1,610 01/05/04 01/25/05 Murnane Bldg Contractors
GC-7 917 12/16/03 12/30/03 Murnane Bldg Contractors
HC-1 7,553 11/14/03 01/14/04 Kimble Inc
HC-16 1,824 03/11/04 04/12/04 Kimble Inc
HC-20 4,123 03/11/04 04/12/04 KImble Inc
HC-22 530 04/20/04 04/23/04 Kimble Inc
HC-25 1,236 06/17/04 06/25/04 Kimble Inc
HC-29 7,231 07/22/04 09/27/04 Kimble Inc
HC-37 7,321 12/20/04 01/03/05 Kimble Inc
HC-39 10,445 12/20/04 01/03/05 Kimble Inc
HC-41 7,307 12/20/04 01/03/05 Kimble Inc
HC-49 2,361 05/12/05 06/07/05 Kimble Inc
HC-53 839 04/28/05 06/21/05 Kimble Inc
HC-9 412 12/02/03 12/09/03 Kimble Inc
PC-7 929 11/17/04 11/29/04 Evans Mech.
SC-17 -5,225 08/14/03 08/27/03 Leitz Ent.
SC-21 -2,671 12/05/03 12/09/03 Leitz Ent.
Unadilla Elementary School:
92-0078 Reconstruction 0-009-004 07/29/92 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0843 Additions and Alterations 0-009-005 04/02/97 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0532 Additions and Alterations 0-009-006 06/11/02 *CO No.* Amount Disallowed Received Approved Contractor
00001 29,931 11/29/02 12/06/02 Leitz Ent.
00004 475 11/29/02 12/06/02 Leitz Ent.
00006 -4,326 11/29/02 12/06/02 Leitz Ent.
02-00010 20,682 02/12/03 02/19/03 Leitz Ent.
02-00011 892 11/29/02 12/06/02 Leitz Ent.
02-00013 391 12/11/02 12/13/02 Leitz Ent.
02-0009 -3,745 11/29/02 12/06/02 Leitz Ent.
AAC-4 4,761 09/24/03 10/02/03 S&S Environ.
EC-12 127 03/11/04 04/12/04 Nelcorp Elec.
EC-13 2,421 03/03/04 10/07/08 NELCORP ELECTRICAL CONTRACTING CORP.
EC-20 459 07/13/04 07/13/04 Nelcorp Elec.
EC-23 4,989 12/08/04 01/03/05 Nelcorp Elec.
EC-3 2,357 12/16/03 01/08/04 Nelcorp Elec.
EC-39 491 08/22/08 / / NELCORP ELECTRICAL CONTRACTION CORP.
EC-40 4,516 08/22/08 / / NELCORP ELECTRICAL CONTRACTING CORP.
GC-11 32,682 03/11/04 03/15/04 Murnane Bldg Contractors
GC-16 4,078 04/09/04 04/20/04 Murnane Bldg Contractors
GC-21 13,024 06/17/04 06/25/04 Murnane Bldg Contractors
GC-22 1,495 05/25/04 06/10/04 Murnane Bldg Contractors
GC-26 2,129 07/07/04 07/13/04 Murnane Bldg Contractors
GC-3 31,890 03/25/04 04/06/04 Murnane Bldg Contractors
GC-34 26,988 05/05/05 06/21/05 Murnane Building Contractors
GC-35 20,160 09/30/04 11/15/04 Murnane Bldg Contractors
GC-4 58,555 02/09/04 02/20/04 Murnane Bldg Contractors
GC-41 286 11/04/04 11/19/04 Murnane Bldg Contractors
GC-8 16,613 03/11/04 03/15/04 Murnane Bldg Contractors
GC-9 4,813 12/18/03 12/30/03 Murnane Bldg Contractors
HC-10 3,679 12/16/03 04/08/04 Kimble Inc
HC-15 3,833 03/11/04 04/12/04 Kimble Inc
HC-17 10,188 03/17/04 / / Kimble Inc
HC-18 3,170 03/11/04 / / Kimble Inc
HC-2 11,458 11/14/03 01/08/04 Kimble Inc
HC-21 1,161 04/20/04 04/23/04 Kimble Inc
HC-27 4,031 07/15/04 07/21/04 Kimble Inc
HC-3 716 11/24/03 01/08/04 Kimble Inc
HC-31 3,087 07/15/04 07/21/04 Kimble Inc
HC-32 10,040 09/02/04 09/23/04 Kimble Inc
HC-40 9,400 12/20/04 01/03/05 Kimble Inc
HC-45 4,333 08/22/08 / / KIMBLE, INC.
HC-48 3,768 05/12/05 06/07/05 Kimble Inc
HC-51 9,284 05/12/05 06/07/05 Kimble Inc
HC-52 3,504 04/28/05 06/21/05 Kimble Inc
HC-55 858 04/28/05 06/21/05 Kimble Inc
HC-6 2,130 11/18/03 01/08/04 Kimble Inc
SC-16 -5,330 08/14/03 08/27/03 Leitz Ent.
Unatego Jr/Sr High:
91-0285 Reconstruction 0-015-004 10/08/91 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0845 Alterations 0-015-005 04/02/97 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0533 Additions and Alterations 0-015-006 06/11/02 *CO No.* Amount Disallowed Received Approved Contractor
00005 2,464 11/29/02 12/06/02 Leitz Ent.
AAC-1 1,455 08/14/03 08/28/03 S&S Environ.
AAC-2 5,232 08/14/03 08/28/03 S&S Environ.
AAC-3 1,369 09/24/03 10/02/03 S&S Environ.
EC-1 -8,734 11/18/03 01/08/04 Nelcorp Elec.
EC-10 1,605 03/11/04 / / Nelcorp Elec.
EC-14 936 03/03/04 04/12/04 Nelcorp Elec.
EC-16 -243 06/17/04 06/25/04 Nelcorp Elec.
EC-17 4,630 07/07/04 07/13/04 Nelcorp Elec.
EC-18 2,740 2,740 07/07/04 / / Nelcorp Elec.
EC-19 3,646 07/07/04 07/13/04 Nelcorp Elec.
EC-21 2,551 08/19/04 09/27/04 Nelcorp Elec.
EC-24 1,064 08/19/04 09/27/04 Nelcorp Elec.
EC-27 6,088 11/04/04 01/03/05 Nelcorp Elec.
EC-28 5,556 11/04/04 11/29/04 Nelcorp Elec.
EC-29 10,154 11/04/04 01/03/05 Nelcorp Elec.
EC-31 3,134 11/10/04 11/29/04 Nelcorp Elec.
EC-33 2,228 12/20/04 01/03/05 Nelcorp Elec.
EC-34 4,625 12/20/04 01/03/05 Nelcorp Elec.
EC-37 1,166 02/26/05 06/15/05 Nelcorp Electrical Contracting
EC-4 1,076 12/16/03 01/08/04 Nelcorp Elec.
EC-42 444 04/28/05 06/21/05 Nelcorp Electrical Contracting
EC-6 4,443 12/16/03 01/08/04 Nelcorp Elec.
EC-7 9,105 12/30/03 / / Nelcorp Elec.
EC-8 2,145 12/18/03 12/29/03 Nelcorp Elec.
EC-9 3,836 12/18/03 12/29/03 Nelcorp Elec.
GC-1 3,291 08/14/03 08/28/03 Murnane Bldg Contractors
GC-10 7,683 03/11/04 03/15/04 Murnane Bldg Contractors
GC-13 4,057 03/11/04 03/15/04 Murnane Bldg Contractors
GC-14 13,716 03/11/04 06/10/04 Murnane Bldg Contractors
GC-15 3,065 03/11/04 / / Murnane Bldg Contractors
GC-17 3,703 04/09/04 04/13/04 Murnane Bldg Contractors
GC-18 4,725 02/18/04 02/23/04 Murnane Bldg Contractors
GC-19 4,570 03/25/04 04/06/04 Murnane Bldg Contractors
GC-2 5,071 11/24/03 12/04/03 Murnane Bldg Contractors
GC-20 3,065 06/07/04 06/10/04 Murnane Bldg Contractors
GC-23 14,902 06/17/04 06/25/04 Murnane Bldg Contractors
GC-24 1,431 05/25/04 06/10/04 Murnane Bldg Contractors
GC-25 1,022 06/17/04 06/25/04 Murnane Bldg Contractors
GC-28 6,069 07/22/04 09/28/04 Murnane Bldg Contractors
GC-29 2,558 07/07/04 / / Murnane Bldg Contractors
GC-31 16,748 09/30/04 10/04/04 Murnane Bldg Contractors
GC-32 3,516 07/15/04 07/21/04 Murnane Bldg Contractors
GC-33 8,057 09/02/04 09/24/04 Murnane Bldg Contractors
GC-36 23,468 09/30/04 10/04/04 Murnane Bldg Contractors
GC-38 5,379 11/04/04 11/19/04 Murnane Bldg Contractors
GC-39 -8,093 11/15/04 11/19/04 Murnane Bldg Contractors
GC-40 5,113 11/04/04 11/19/04 Murnane Bldg Contractors
GC-43 9,286 12/20/04 01/20/05 Murnane Bldg Contractors
GC-45 2,573 01/26/05 02/08/05 Murnane Building Contractors
GC-46 1,247 04/28/05 06/21/05 Murnane Building Contractors
GC-5 3,237 12/05/03 12/09/03 Murnane Bldg Contractors
GC-6 10,314 12/05/03 12/09/03 Murnane Bldg Contractors
HC-11 5,508 12/30/03 01/14/04 Kimble Inc
HC-12 772 03/11/04 04/12/04 Kimble Inc
HC-13 13,943 03/17/04 04/06/04 Kimble Inc
HC-14 4,807 03/11/04 04/12/04 Kimble Inc
HC-19 2,201 03/03/04 03/05/04 Kimble Inc
HC-23 588 04/20/04 04/23/04 Kimble Inc
HC-24 2,231 05/19/04 06/04/04 Kimble Inc
HC-26 1,981 07/07/04 07/13/04 Kimble Inc
HC-28 3,214 07/15/04 07/21/04 Kimble Inc
HC-30 440 07/15/04 07/21/04 Kimble Inc
HC-33 11,139 09/02/04 09/24/04 Kimble Inc
HC-34 12,470 11/04/04 06/21/05 Kimble Inc
HC-35 5,556 11/04/04 11/29/04 Kimble Inc
HC-36 1,370 11/04/04 11/29/04 Kimble Inc
HC-38 6,345 12/08/04 01/03/05 Kimble inc
HC-4 4,862 11/24/03 01/08/04 Kimble Inc
HC-43 2,370 12/20/04 01/03/05 Kimble Inc
HC-44 3,204 01/05/05 06/30/05 Kimble Inc
HC-54 10,266 05/05/05 06/21/05 Kimble Inc
HC-57 7,258 05/05/05 06/21/05 Kimble Inc
HC-58 13,950 05/05/05 06/21/05 Kimble Inc
HC-60 9,236 06/08/05 06/29/05 Kimble Inc
HC-7 4,629 11/18/03 01/08/04 Kimble Inc
HC-8 5,429 12/05/03 12/09/03 Kimble Inc
PC-1 2,920 08/14/03 08/28/03 Evans Mech.
PC-10 6,459 01/05/05 06/30/05 Evans Mechanical Inc
PC-2 10,227 11/24/03 01/08/04 Evans Mech.
PC-3 2,916 03/25/04 04/13/04 Evans Mech.
PC-4 4,485 03/25/04 04/13/04 Evans Mech.
PC-5 3,073 08/19/04 09/27/04 Evans Mech.
PC-6 496 11/17/04 11/29/04 Evans Mech.
PC-8 1,321 11/15/04 11/29/04 Evans Mech.
SC-15 17,893 08/14/03 08/28/03 Leitz Ent.
SC-18 5,718 08/14/03 08/28/03 Leitz Ent.
SC-19 1,354 11/24/03 12/02/03 Leitz Ent.
SC-20 9,122 11/24/03 12/04/03 Leitz Ent.
SC-22 0 03/17/04 04/06/04 Leitz Ent.
SC-23 9,163 07/22/04 07/27/04 Leitz Ent.
SC-24 2,500 07/15/04 07/21/04 Leitz Ent.
SC-25 884 08/19/04 09/27/04 Leitz Ent.
SC-26 1,909 11/04/04 11/19/04 Leitz Ent.
SC-27 50,513 11/04/04 10/03/05 Leitz Ent.
07-1464 Reconstruction 0-015-011 02/28/08 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0525 Reconstruction 0-015-012 10/11/07 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2109FP Reconstruction 0-015-FP1 06/18/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Old Kindgtn House:
96-0431 Reconstruction 2-002-001 11/08/96 NO CHANGE ORDERS ON ELECTRONIC FILE
Agriculture Bldg:
99-0104 Reconstruction 2-005-001 08/31/00 NO CHANGE ORDERS ON ELECTRONIC FILE
NEW STORAGE #1:
01-0534 New Construction 2-016-001 06/11/02 NO CHANGE ORDERS ON ELECTRONIC FILE
NEW STORAGE #2:
01-0535 New Construction 2-017-001 06/11/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
01-0537 Reconstruction 5-006-003 06/11/02 *CO No.* Amount Disallowed Received Approved Contractor
EC-2 8,165 11/24/03 / / Nelcorp Elec.
EC-36 822 01/26/05 06/29/05 Nelcorp electrical Contracting
HC-42 3,038 12/20/04 01/03/05 Kimble Inc
HC-5 50,692 12/05/03 12/09/03 Kimble Inc
HC-50 4,641 05/12/05 06/07/05 Kimble Inc
HC-56 -2,140 04/28/05 06/21/05 Kimble Inc
HC-59 1,267 05/24/06 01/30/07 Kimble Inc
PC-11 13,885 12/08/04 01/03/05 Evans Mech.
PC-9 42,964 11/10/04 10/03/05 Evans Mech.
05-1299 Reconstruction 5-006-004 07/11/06 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 0 12/12/06 01/09/07 Matco Electric
GC-1 10,103 05/01/07 08/07/07 Orchard Earth and Pipe
GC-2 40,772 05/14/07 08/07/07 Orchard Earth and Pipe
GC-3 20,125 05/14/08 09/29/08 ORCHARD EARTH & PIPE CORP.
Concession Stand:
01-0536 New Construction 7-018-001 06/11/02 *CO No.* Amount Disallowed Received Approved Contractor
EC-25 285 11/01/04 11/29/04 Nelcorp Elec.
COOPERSTOWN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 47-17-01-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Elementary School:
94-0331 Additions and Alterations 0-002-005 11/29/94 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1429 Reconstruction 0-002-006 06/26/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1113 Reconstruction 0-002-007 07/19/00 *CO No.* Amount Disallowed Received Approved Contractor
EC-2 -18,450 09/14/01 01/08/02 Panko Elec.
EC-3 -4,784 04/30/02 05/24/02 Panko Elec.
GC-3 -13,700 09/14/01 01/08/02 Mancini Assoc.
GC-8 12,963 03/25/02 05/23/02 Mancini Assoc.
GC-9 -444 05/17/02 05/24/02 Mancini Assoc.
MC-1 -2,733 02/12/02 04/05/02 B&H Air Conditioning Co
PC-1 5,990 09/14/01 01/08/02 Auchinachie Plumbing
05-0478 Reconstruction 0-002-008 04/03/06 *CO No.* Amount Disallowed Received Approved Contractor
EC-2 7,050 01/02/07 01/19/07 M Gleason Plumbing
RC-2 34,876 10/20/06 11/03/06 Murnane Building
RC-3 14,467 10/20/06 11/03/06 Murnane Building
RC-5 16,800 10/20/06 11/03/06 Murnane Building
RC-7 2,501 04/21/08 08/06/08 MURNANE BUILDING CONT., INC.
07-1077 Reconstruction 0-002-010 05/28/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0691FP Reconstruction 0-002-FP1 01/22/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Junior/Senior High School:
94-0333 Additions and Alterations 0-006-003 11/29/94 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1427 Reconstruction 0-006-004 06/26/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1114 Reconstruction 0-006-005 07/19/00 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0479 Reconstruction 0-006-006 04/03/06 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 18,000 10/27/06 01/09/07 M Gleason and Sons
EC-3 -2,986 02/22/07 03/08/07 M Gleason and Sons
RC-1 16,485 10/20/06 11/03/06 Murnane Building
RC-4 17,772 10/20/06 11/03/06 Murnane Building
RC-6 -17,355 01/24/07 03/14/07 Murnane Building
07-1078 Reconstruction 0-006-008 05/28/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0677FP Reconstruction 0-006-FP1 01/22/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
93-0096 Reconstruction 5-003-004 09/16/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0332 Reconstruction 5-003-005 11/29/94 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1428 Reconstruction 5-003-006 06/26/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1112 Reconstruction 5-003-007 07/19/00 *CO No.* Amount Disallowed Received Approved Contractor
GC-5 9,533 10/09/01 05/23/02 Mancini Assoc.
GC-6 8,610 10/09/01 05/23/02 Mancini Assoc.
07-1079 Reconstruction 5-003-009 05/28/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Press Box:
00-0009 New Construction 7-008-001 07/18/00 NO CHANGE ORDERS ON ELECTRONIC FILE
RICHFIELD SPRINGS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 47-20-01-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
91-1507 Reconstruction 0-001-007 07/07/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0606 Reconstruction 0-001-008 03/07/94 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0737 Reconstruction 0-001-009 03/23/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0002 Reconstruction 0-001-010 07/21/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1264 Reconstruction 0-001-011 05/17/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1124 Reconstruction 0-001-012 05/14/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1686 Reconstruction 0-001-013 07/13/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0633 Reconstruction 0-001-014 05/18/99 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0877 Additions and Alterations 0-001-015 07/27/01 *CO No.* Amount Disallowed Received Approved Contractor
AA-5 11,215 05/26/04 07/21/04 Avala Contracting
AA-6 11,456 05/26/04 07/21/04 Avala Contracting
AA-7 323 05/26/04 07/21/04 Avala Contracting
AA1 8,950 11/21/02 01/02/03 Avala Contracting
AA2 14,664 11/21/02 01/02/03 Avala Contracting
AA3 687 05/16/03 05/27/03 Avala Contracting
AA4 2,200 05/16/03 05/27/03 Avala Contracting
E-3 2,504 06/13/03 07/01/03 DC Elec.
E-4 2,964 06/13/03 07/01/03 DC Elec.
E1 53,174 01/06/03 01/10/03 DC Elec.
E2 -2,073 06/13/03 07/01/03 DC Elec.
E5 4,111 08/28/03 11/06/03 DC Elec.
GC-10 4,578 01/22/04 01/02/08 Bette & Cring
GC-11 5,210 01/22/04 02/18/04 Bette & Cring
GC-12 14,556 05/26/04 01/02/08 Bette & Cring
GC-13 7,829 05/26/04 01/02/08 Bette & Cring
GC-14 3,233 05/26/04 01/02/08 Bette & Cring
GC-3 22,894 01/13/03 02/06/03 Bette & Cring
GC-4 2,525 01/06/03 01/10/03 Bette & Cring
GC-5 47,971 01/13/03 02/06/03 Bette & Cring
GC-6 3,579 05/16/03 05/27/03 Bette & Cring
GC-7 18,152 06/02/03 06/09/03 Bette & Cring
GC-8 -26,914 06/02/03 06/09/03 Bette & Cring
GC-9 1,166 06/02/03 06/09/03 Bette & Cring
GC1 0 07/23/02 08/28/02 Bette & Cring
GC2 -59,838 01/06/03 01/10/03 Bette & Cring
M-11 4,690 04/13/05 01/02/08 Schamlz Mechanical Contractors
M-12 1,437 04/13/05 04/26/05 Schamlz mechanical Contractors
M-6 -1,152 05/26/04 01/02/08 Schmalz Mech. Contractors
M-7 -4,574 05/26/04 01/02/08 Schmalz Mech. Contractors
M-8 -111 05/26/04 07/21/04 Schmalz Mech. Contractors
M1 232 05/16/03 05/27/03 Schmalz Mech. Contractors
M10 0 04/13/05 01/02/08 Schmalz Mechanical Contractors
M2 4,098 05/16/03 06/03/03 Schmalz Mech. Contractors
M3 346 05/16/03 06/02/03 Schmalz Mech. Contractors
M4 0 05/16/03 06/03/03 Schmalz Mech. Contractors
M5 -6,342 01/23/04 01/30/04 Schmalz Mech. Contractors
M9 0 04/20/05 04/26/05 Schmalz Mechanical Contractors
P-2 13,910 04/11/03 04/17/03 Superior Plumbing
P-3 20,144 04/11/03 04/17/03 Superior Plumbing
P-4 8,998 04/11/03 04/17/03 Superior Plumbing
P-5 10,141 04/11/03 04/17/03 Superior Plumbing
P-6 1,488 04/14/04 04/28/04 Superior Plumbing
P-7 6,861 04/14/04 04/28/04 Superior Plumbing
P-8 6,282 04/14/04 04/28/04 Superior Plumbing
P1 -44 06/17/02 07/10/02 Superior Plumbing
99-1088 Reconstruction 0-001-016 05/01/00 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0746 Reconstruction 0-001-017 02/14/08 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1374 Reconstruction 0-001-018 10/06/08 NO CHANGE ORDERS ON ELECTRONIC FILE
CHERRY VALLEY-SPRINGFIELD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 47-22-02-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Build. del./FSU/Sold:
04-1188 Reconstruction 0-001-004 07/11/05 *CO No.* Amount Disallowed Received Approved Contractor
GC-01 1,500 10/27/06 12/19/06 Billbern Construction
PC-01 4,622 03/10/06 06/23/06 Orchard Earth pipe
PC-02 17,290 08/14/06 / / Orchard Earth and Pipe
02-1341 Reconstruction 0-001-FP1 03/18/03 NO CHANGE ORDERS ON ELECTRONIC FILE
New Main Building:
93-0433 Additions and Alterations 0-004-001 01/14/94 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1631 Reconstruction 0-004-002 07/26/99 NO CHANGE ORDERS ON ELECTRONIC FILE
New Transportation Bldg.:
93-0472 New Construction 5-012-001 02/16/94 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1189 Reconstruction 5-012-002 07/11/05 NO CHANGE ORDERS ON ELECTRONIC FILE
WORCESTER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 47-25-06-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
96-1081 Reconstruction 0-001-004 04/11/97 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0197 Reconstruction 0-001-006 10/26/05 *CO No.* Amount Disallowed Received Approved Contractor
1-1 -2,370 05/04/05 07/21/06 Hopkins Reilly mason Contrators
03-0119FP Reconstruction 0-001-FP1 10/14/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1840SC Visual Structural Inspection 0-001-SC1 04/07/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Annex/Bus Garage:
91-0066 Reconstruction 0-002-002 09/05/91 NO CHANGE ORDERS ON ELECTRONIC FILE