REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
CanandaiguaJrAcad.(CLOSEDBLDG):
91-1297 Reconstruction 0-003-003 06/02/92 NO CHANGE ORDERS ON ELECTRONIC FILE
Primary School:
92-1427 Reconstruction 0-004-005 07/13/93 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0208 Additions and Alterations 0-004-007 03/30/00 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1052 Reconstruction 0-004-008 05/26/99 *CO No.* Amount Disallowed Received Approved Contractor
CO-GC-24 566 11/05/02 03/13/03 D'Agostino
CO-GC-35 2,172 11/05/02 03/13/03 D'Agostino
CO-GC-36 2,680 11/05/02 03/13/03 D'Agostino
EC-13 1,823 01/03/02 02/28/02 R. MacDonald Electric
EC-15 779 05/21/02 06/17/02 R. MacDonald Electric, Inc
EC-16 521 05/21/02 06/17/02 R. MacDonald Electric
GC-25 1,980 12/31/01 02/28/02 D'Agostino
GC-26 1,174 12/31/01 02/28/02 D'Agostino
GC-27 6,721 12/31/01 02/28/02 D'Agostino
GC-28 19,964 12/31/01 02/28/02 D'Agostino
GC-29 2,254 12/31/01 02/28/02 D'Agostino
GC-30 6,217 12/31/01 02/28/02 D'Agostino
GC-31 4,412 12/31/01 02/28/02 D'Agostino
GC-32 770 12/31/01 02/28/02 D'Agostino
MC-05 39,569 03/13/02 04/29/02 Faulks Plumbing
00-1249 Reconstruction 0-004-009 01/07/02 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1197SR Reconstruction 0-004-011 05/10/05 *CO No.* Amount Disallowed Received Approved Contractor
ELE - 26 22,534 09/18/07 02/23/08 EAST COAST ELECTRIC
HVAC -98 73,661 09/18/07 02/23/08 AMERING & JOHNSTON INC.
05-0288 Reconstruction 0-004-011 03/16/06 *CO No.* Amount Disallowed Received Approved Contractor
ELE - 20 3,305 10/26/07 10/29/07 EAST COAST ELECTRIC
Ele-31 8,526 11/16/07 11/26/07 East Coast Electric
FCG 3 1,210 1,210 12/28/06 08/29/07 Flower City
GT - 24 10,192 10/29/07 04/04/08 SPOLETA CONSTRUCTION LLC
GT-23A 0 11/16/07 / / Spoleta Construction -1249
GT-23A -1,249 11/16/08 04/04/08 SPOLETA CONSTRUCTION LLC
GT-5 723 723 12/28/06 08/29/07 Spoleta construction
HVAC 2 19,930 11/09/06 / / Amering
S2-01 0 10/17/06 12/18/06 Skantex
SITE-12 64,670 10/23/07 02/23/08 FERGUSON HALL CO. INC.
SITE-14 -4,230 10/23/07 02/23/08 FERGUSON HALL CO. INC.
Site-13B -14,500 11/16/07 04/04/08 Ferguson Hall Co. Inc.
Site-3 64,397 19,319 12/28/06 08/29/07 Ferguson Hall
02-0581FP Reconstruction 0-004-FP1 12/02/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Elementary School:
91-1298 Reconstruction 0-005-006 06/02/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1227 Reconstruction 0-005-007 05/23/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0006 Reconstruction 0-005-008 09/05/95 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0582FP Reconstruction 0-005-FP1 12/02/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Canandaigua Middle School:
90-1249 Reconstruction 0-007-003 04/24/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1009 Reconstruction 0-007-004 03/26/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0886 Reconstruction 0-007-005 04/14/93 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0887 Reconstruction 0-007-006 04/06/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1031 Reconstruction 0-007-007 04/25/94 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0646 Reconstruction 0-007-009 02/21/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0209 Additions and Alterations 0-007-011 03/31/00 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1053 Reconstruction 0-007-012 05/26/99 *CO No.* Amount Disallowed Received Approved Contractor
EC-14 244 05/22/02 06/17/02 R. MacDonald Electric
GC-33 800 05/14/02 05/22/02 D'Agostino
GC34 400 05/14/02 05/22/02 D'Agostino
MC-04 -8,194 12/31/01 03/01/02 Faulks Plumbing
00-1250 Reconstruction 0-007-013 01/07/02 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1198SR Additions and Alterations 0-007-015 05/10/05 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
0 / / / /
ELE - 19 15,859 09/18/07 02/23/08 EAST COAST ELECTRIC
ELE - 25 3,631 09/18/07 02/23/08 EAST COAST ELECTRIC
ELE-37 4,100 01/08/07 01/14/08 EAST COAST ELECTRIC
05-0289 Additions and Alterations 0-007-015 03/16/06 *CO No.* Amount Disallowed Received Approved Contractor
CASE - 4 3,606 10/26/07 02/23/08 NORTHEAST INTERIOR SYSTEMS, INC.
Case 2 6,876 12/28/06 02/21/07 Northeast Interior
Case-6 -51,000 03/10/08 03/19/08 Northeast Interior Systems, Incorp
Case-7 -5,000 03/10/07 03/19/08 Northeast Interior Systems, Incorp.
Case-9 3,355 03/10/08 03/19/08 Northeast Interior Systems, Incorp.
ELE - 14 3,476 09/06/07 04/04/08 EAST COAST ELECTRIC
ELE - 21 3,894 10/26/07 10/29/07 EAST COAST ELECTRIC
ELE 2 17,585 09/25/06 01/09/07 East Coast Electric
ELE 3 5,037 10/16/06 12/18/06 Eastcoast
ELE 9 1,978 03/30/07 04/04/07 East coast electric
ELE-35 -15,859 01/18/08 01/28/08 EAST COAST ELECTRIC
Ele 12 6,003 05/25/07 08/07/07 East Coast Electric
Ele 5 5,720 04/11/07 04/11/07 East Coast Electric
Ele 7 9,422 02/07/07 02/21/07 East Coast Electric
Ele 8 3,125 03/30/07 04/04/07 East Coast Electric
Ele-28 6,115 11/16/07 / / East Coast Electric
FCG-2 6,048 6,048 12/28/06 08/29/07 Flower City
GT 9 11,118 02/07/07 / / Spoleta Construction
GT-13 8,263 03/30/07 05/09/07 Spoleta Construction
GT-15 4,752 03/30/07 05/09/07 Spoleta Construction
GT-16 9,995 05/25/07 06/11/07 Spoleta Construction
GT-21 22,377 09/06/07 04/04/08 SPOLETA CONSTRUCTION LLC.
GT-23 -2,790 11/16/07 04/04/08 Spoleta Construction
GT-25 17,635 10/29/07 04/04/08 SPOLETA CONSTRUCTION LLC
GT-29 389 11/16/07 04/04/08 Spoleta Construction
GT-3 10,542 12/28/06 02/21/07 Spoleta Construction
GT-34 2,275 12/10/07 01/07/08 Spoleta Construction
GT-35a -6,134 02/08/08 03/08/08 SPOLETA CONSTRUCTION INC
GT-36 -5,655 02/08/08 03/19/08 SPOLETTA CONSTRUCTION INC
GT-37 891 02/28/08 03/08/08 SPOLETA CONSTRUCTION, LLC.
GT-4 12,813 06/15/06 10/05/06 D Agostino General Contractors
GT-4 3,257 12/28/06 02/21/07 Spoleta Construction
GT-7 10,622 3,619 12/28/06 08/29/07 Spoleta Construction
GT-8 54,540 12/28/06 02/21/07 Spoleta Construction
Gum Eq 4 525 10/29/07 04/04/08 Facilities Equipment & Service
HVAC 5 5,341 03/02/07 08/07/07 Amering Johnston Inc
HVAC1 2,735 09/25/06 12/18/06 Amering Johnston
HVAC3 3,182 11/09/06 01/09/07 Amering Johnston
Plum-2 -6,431 12/10/07 12/28/07 Landry Mechanical
ROOF - 3 -15,542 10/26/07 02/23/08 ELMER W. DAVIS, INC.
ROOF - 4 -479 10/29/07 04/04/08 ELMER W. DAVIS, INC.
Roof 1 0 12/28/06 / / Elmer Davis
Roof-2 1,344 08/03/07 12/13/07 Elmer W. Davis, Inc.
Roof-5 881 10/29/07 04/04/08 Elmer W. Davis
Roof-7 -1,024 12/10/07 01/07/08 Elmer W. Davis
S1-01 1,146 08/22/06 10/13/06 Babcock Enterprises
S1-02 4,376 04/07/06 06/23/06 Babcock Enteprises
S1-03 22,440 04/07/06 06/23/06 Babcock Enterprises
S1-04 -363 04/07/06 06/23/06 Babcock Enterprises
Site 5 23,493 03/30/07 05/09/07 Ferguson Hall Co
Site-13 -15,000 11/16/07 04/04/08 Ferguson Hall Co
Site-9 26,294 11/16/07 04/04/08 Ferguson Hall
Site4 4,400 03/30/07 05/09/07 Ferguson Hall Co
case 1 23,447 09/25/06 10/19/06 Northeast Interior Systems
ele 4 6,496 12/28/06 01/19/07 East Coast Electric
hvac 4 5,856 12/28/06 01/19/07 amering Johnston
plum 1 1,115 12/28/06 01/19/07 Landry mechanical
04-0082 Reconstruction 0-007-016 08/12/04 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0593FP Reconstruction 0-007-FP1 12/02/02 NO CHANGE ORDERS ON ELECTRONIC FILE
New Canandaigua Academy - SHS:
92-1348 Reconstruction 0-013-002 07/01/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1536 Reconstruction 0-013-003 06/26/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0211 Reconstruction 0-013-004 09/23/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0647 Reconstruction 0-013-005 02/21/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1054 Reconstruction 0-013-007 05/26/99 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1251 Reconstruction 0-013-008 01/07/02 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0290 Additions and Alterations 0-013-014 03/16/06 *CO No.* Amount Disallowed Received Approved Contractor
Case-5 4,880 10/29/07 04/04/08 Northeast Interior Systems
Case-8 -5,000 03/10/08 / / Northeast Interior Systems Incorp
ELE - 17 8,993 09/18/07 10/17/07 EAST COAST ELECTRIC
ELE - 18 -34,728 -34,728 09/18/07 02/23/08 EAST COAST ELECTRIC
ELE 1 -2,800 08/23/06 10/27/06 East Coast Electric
ELE-16 1,780 10/23/07 12/13/07 EAST COAST ELECTRIC
ELE-27 686 01/18/08 01/28/08 EAST COAST ELECTRIC
ELE-38 4,943 01/08/08 / / EAST COAST ELECTRIC
Ele 10 7,701 05/25/07 08/07/07 East Coast Electric
Ele 11 32,429 03/30/07 / / East Coast Electric
Ele 5 10,744 02/07/07 02/12/07 Schuler Haas Electric
Ele 6 9,282 02/07/07 02/21/07 East Coast Electric
Ele-15 9,585 08/03/07 12/13/07 East Coast Electric
Ele-30 -577 11/16/07 04/04/08 East Coast Electric
Ele-32 1,551 12/10/07 12/28/07 East Coast Electric
Ele-33 525 12/10/07 12/28/07 East Coast Electric
Ele-36 -34,728 01/07/08 / / East Coast Electric
Ele13 15,985 05/25/07 08/07/07 East Coast Electric
FCG - 4 4,505 09/06/07 04/04/08 FLOWER CITY GLASS
FCG 1 4,837 4,837 12/28/06 08/29/07 Flower City
FCG-5 8,932 12/10/07 01/07/08 Flower City Glass
G.T. #9 17,972 22,972 12/28/06 02/21/07 D' Agostino General Contractors, Inc
GT 10 4,908 02/07/07 03/12/07 Spoleta Construction
GT 17 4,472 05/25/07 06/11/07 Spoleta Construction
GT-11 19,308 10/29/07 04/04/08 Spoleta Construction
GT-12 9,089 03/02/07 03/23/07 Spoleta Construction
GT-14 16,927 03/30/07 05/09/07 Spoleta Construction
GT-18 2,241 06/05/07 06/18/07 Spoleta Construction
GT-19 18,470 08/03/07 / / Spoleta Construction
GT-2 -743 09/25/06 11/03/06 Spoleta Construction
GT-20 8,364 08/03/07 / / Spleta Construction
GT-22 33,124 01/07/08 / / Spoleta Construction
GT-23B -5,691 11/16/08 04/04/08 SPOLETA CONSTRUCTION LLC
GT-26 18,454 10/29/07 04/04/08 Spoleta Construction
GT-27 18,797 10/29/07 / / SPOLETA CONSTRUCTION LLC
GT-27 18,797 10/29/08 04/04/08 SPOLETA CONSTRUCTION LLC
GT-28 -5,458 11/16/07 04/04/08 Spoleta Construction
GT-30 6,233 11/16/07 04/04/08 Spoletta Construction
GT-32 1,498 12/10/07 01/07/08 Spoleta Construction
GT-33 1,517 12/10/07 01/07/08 Spoleta Construction
GT-35 -14,881 02/08/08 03/08/08 SPOLETA CONSTRUCTION LLC
GT-38 2,622 02/28/08 03/08/08 SPOLETA CONSTRUCTION, LLC.
GT-6 11,966 11,966 12/28/06 08/29/07 Spoleta Construction
GT1 -1,235 09/25/06 11/03/06 Spoleta Construction
GYM 1 2,005 09/25/06 11/03/06 Facilities Equipment
GYM EQ 5 19,906 10/29/07 04/04/08 FACILITIES EQUIPMENT & SERVICE INC.
GYM EQ 6 5,158 10/29/07 04/04/08 Facilities Equipment & Service
Gym EQ 2 5,515 12/28/06 02/21/07 Facilities Equipment
Gym Eq 7 -719 12/10/07 01/07/08 Facilities Equipment & Service Inc
HVAC 7 3,858 03/30/07 / / Amering Johnston
PLUM-2 -5,000 12/10/07 12/28/07 Landry Mechanical Contractor
PLUM-3 -13,308 12/10/07 12/28/07 Landry Mechanical
ROOF-6 -569 12/10/07 01/07/08 Elmer W. Davis
SITE-10 16,648 10/23/07 02/23/08 FERGUSON HALL CO.INC.
SITE-11 68,710 10/23/07 02/23/08 FERGUSON HALL CO.INC.
SITE-6 -650 12/10/07 01/07/08 Ferguson Hall
SITE-8 14,737 12/10/07 01/07/08 Ferguson Hall
Site-13A -18,649 11/16/07 04/04/08 Ferguson Hall Co.
Site-15 4,085 11/16/07 04/04/08 Ferguson Hall Co
hvac 6 7,362 03/30/07 04/04/07 Amering Johnston
site1 2,399 09/15/06 10/19/06 Ferguson Hall
site2 13,037 12/28/06 02/21/07 Ferguson Hall
04-0083 Reconstruction 0-013-015 08/12/04 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0594FP Reconstruction 0-013-FP1 12/02/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
92-0357 Reconstruction 5-001-003 11/02/92 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0648 Reconstruction 5-001-004 02/21/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1248 Reconstruction 5-001-005 01/07/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Transportation Facility:
04-1466 New Construction 5-021-001 09/13/05 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
0 / / / /
PLumb 6 -1,232 07/24/06 04/06/07 siracusa Mechanical
1 10,300 04/07/06 / / Schuler Haas Electric
10 -326 05/25/07 08/07/07 Siracusa Mechanical
2 1,500 04/07/06 06/26/06 Landmark Enterprises
2 1,500 04/07/06 / / siracusa Mechanical
2 3,350 06/15/06 11/30/06 Schuler Haas Electric
2 -9,433 02/22/07 03/14/07 AM Stern Inc
3 2,490 06/15/06 07/14/06 Landmark Enterprises
3 -3,110 06/15/06 07/14/06 D Agostino General
6 -17,900 05/25/07 06/21/07 Landmark Enterprises
ELE 10 3,969 03/30/07 04/04/07 Schular Haas Electric
ELE 6 2,092 12/28/06 / / schuler
ELE 7 16,932 12/28/06 / / Schuler
ELE 8 7,436 12/28/06 / / Schuler
ELE-12 -48,812 05/25/07 08/07/07 Schuler Haas Electric
ELe 11 -73 05/25/07 08/07/07 Schular Haas Electric
ELec4 17,822 08/22/06 / / Schuler Haas Electric
Ele-9 4,313 02/07/07 02/21/07 Schuler Haas Electric
G.T. #15 1,962 09/18/07 10/17/07 D'AGOSTINO GENERAL CONTRACTOS, INC.
GT 13 -743 05/25/07 06/21/07 D Agostino General
GT 8 9,231 09/25/06 10/27/06 D Agostino General
GT-10 34,846 12/28/06 / / Dagostino
GT-9 17,972 12/28/06 12/13/07 DAgostino
GT1 6,000 04/07/06 06/26/06 D Agostino General Contractors
GT11 1,367 02/07/07 02/22/07 D Agostino General
GT12 4,396 03/30/07 05/09/07 D Agostino General Contractors
GT14 -22,890 06/05/07 06/20/07 D Agostino General Contractors
GT2 125,784 04/07/06 06/26/06 D Agostino General Contractors
GT5 4,155 07/11/06 08/08/06 D Agostino General Contractors
GT6 20,977 08/22/06 10/13/06 D Agostino General
GT7 -7,990 08/22/06 12/18/06 D Agostino General Contractors
HVAC 10 -17,560 05/25/07 08/07/07 Landry Mechanical
HVAC 6 4,199 12/28/06 / / Landry
HVAC 6 4,199 12/18/06 01/19/07 Landry mechanical
HVAC 8 -492 02/07/07 / / Landry Mechanical
HVAC 9 3,583 03/30/07 04/04/07 Landry Mechanical
HVAC5 17,837 09/25/06 / / Landry mechanical
PLUMB 1 164,830 04/07/06 05/09/06 Siracusa Mechanical
Plumb 12 -20,942 06/05/07 08/01/07 Siracusa mechanical
Plumb 3 4,202 07/11/06 08/09/06 Siracusa mechanical
Plumb 4 18,886 08/22/06 04/06/07 Siracusa mechanical
Plumb 7 13,230 08/25/06 / / Siracusa mechanical
SITE #7 -43,309 10/29/07 11/08/07 LANMARK ENTERPRISES
SITEWRK1 301,865 12/28/06 06/26/06 LANDMARK ENTERPRISES
Site 4 10,483 11/09/06 12/28/06 Landmark
elec 3 12,901 08/22/06 / / Schuler Haas Electric
hvac 1 0 04/07/06 05/09/06 Landry mechanical Contractor s
hvac 3 18,931 08/22/06 / / Landry Mechanical
hvac 4 1,004 08/22/06 12/18/06 Landry Mechanical
hvac 7 3,822 12/28/06 / / Landry mechanical
hvac2 6,931 08/22/06 01/19/07 Landry Mechanical
plumb 5 18,052 08/22/06 / / Siracusa Mechanical
plumb 8 3,852 02/07/07 02/12/07 Siracusa Mechanical
roof 1 22,964 04/07/06 06/26/06 AM Stern inc
Press Box @ Evans Field:
05-0291 New Construction 7-023-001 03/16/06 *CO No.* Amount Disallowed Received Approved Contractor
Ele-29 3,235 11/16/07 11/26/07 East Coast Electric
GT-31 1,190 11/16/07 04/04/08 Spoleta Construction
GYM EQ 3 -3,235 10/29/07 04/04/08 FACILITIES EQUIPMENT & SERVICE INC
Site-16 719 11/16/07 04/04/08 Ferguson Hall
District Wide:
90-1240 Reconstruction 7-999-001 04/24/91 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0378 Reconstruction 7-999-002 04/11/02 *CO No.* Amount Disallowed Received Approved Contractor
EC-01 10,877 02/12/03 02/19/03 Burns Elec.
HC-01 10,123 11/08/02 11/22/02 Amering & Johnston
HC-02 3,990 11/26/02 12/02/02 Amering & Johnston
HC-03 22,000 12/01/03 06/04/04 Amering & Johnston
HC-04 22,000 12/01/03 03/17/04 Amering & Johnston
TC-01 10,783 03/18/03 03/19/03 O'Connell Elec.
TC-02 19,972 07/24/03 08/27/03 O'Connell Elec.
TC-03 12,904 08/28/03 09/09/03 O'Connell Elec.
EAST BLOOMFIELD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 43-05-01-04
last updated on 07/24/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Jr. Sr. High School:
95-1112 Reconstruction 0-001-002 05/31/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0912 Reconstruction 0-001-003 04/25/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1031 Additions and Alterations 0-001-005 06/06/00 *CO No.* Amount Disallowed Received Approved Contractor
100 -35,700 01/29/02 03/25/02 Facilities Equipment and Service
101 -4,200 01/29/02 03/25/02 Lancet Arch
102 1,100 03/15/02 04/19/02 Frederico Const.
103 4,454 02/19/02 04/01/02 Kaplan-Schmidt Elec.
104 -496 02/11/02 03/25/02 Facilities Equip. & Service
105 3,402 03/19/02 04/19/02 Rochester Flooring Resource
106 -308 02/11/02 03/25/02 Eugene Sacket
106 308 03/19/02 04/19/02 Crosby-Brownlie
107 9,129 02/19/02 04/01/02 Rochester Davis-Fetch
108 310 02/19/02 04/01/02 Sigma Painting of NY
109 1,134 03/19/02 04/19/02 E&B Equipment and Furniture
11 -3,689 08/23/01 04/03/02 Delhi Steel
110 -891 05/15/02 06/04/02 NEP Glass
112 2,947 03/20/02 04/19/02 Kaplan-Schmidt Elec.
113 30,573 03/19/02 04/19/02 Hoffend and Sons
114 8,557 03/19/02 04/19/02 Rochester Davis-Fetch
115 106 03/19/02 04/19/02 Sigma Painting of NY
116 -551 03/19/02 04/19/02 Frederico Const.
118 -8,497 06/10/02 06/14/02 E&B Equipment and Furniture
119 840 06/10/02 06/14/02 AW Farrell and Son
12 175 08/23/01 04/03/02 Delhi Steel
120 1,712 06/27/02 07/15/02 Rochester Davis-Fetch
121 1,907 06/10/02 06/14/02 Kaplan-Schmidt Elec.
13 9,291 08/23/01 04/03/02 Edgeline Elec.
2 2,025 02/11/02 03/25/02 Hey's Enterprises
22 1,065 04/02/01 01/08/02 Kaplan-Schmidt Elec.
24 1,466 01/11/01 01/28/02 Kaplan-Schmidt Elec.
26 2,367 06/04/01 01/28/02 Eugene Sacket
27 4,871 08/29/02 09/05/02 Hey's Enterprises
28 3,660 04/02/01 01/08/02 Kaplan-Schmidt Elec.
29 857 05/22/02 06/04/02 USA Remediation Services
34 1,200 04/05/01 01/08/02 Hey's Enterprises
36 9,767 08/29/02 09/05/02 Lancet Arch
37 689 04/05/01 01/08/02 Kaplan-Schmidt Elec.
37 -689 08/20/01 04/03/02 Frederico Const.
38 1,030 04/05/01 01/08/02 Hey's Enterprises
42 5,288 04/05/01 01/15/02 Rochester Davis-Fetch
48 15,991 06/04/01 01/28/02 Kaplan-Schmidt Elec.
53 9,225 08/29/02 09/05/02 Unified Mech. Centers
53 9,225 06/04/01 01/14/03 Unified Mech. Centers
54A 948 08/20/01 04/03/02 Lancet Arch.
57 -685 08/20/01 04/03/02 Crosby-Brownlie
58 1,672 08/20/01 04/03/02 Crosby-Brownlie
59 -257 08/24/01 01/09/02 Lancet Arch.
59 -1,215 08/14/01 01/24/02 Iversen Const.
61 40,058 08/24/01 02/06/02 USA Remediation Services
63 6,260 08/20/01 04/03/02 Rochester Flooring Resource
64 14,090 08/24/01 01/09/02 Rochester Davis-Fetch
65 960 08/24/01 01/09/02 Lancet Arch.
66 3,143 08/20/01 04/03/02 Kaplan-Schmidt Elec.
67 878 09/14/01 05/23/02 Frederico Const.
68 10,339 08/14/01 01/24/02 Rochester Davis-Fetch
68 822 08/20/01 04/03/02 Lancet Arch.
68A 331 08/14/01 01/24/02 Sigma Painting of NY
69 10,063 08/14/01 01/24/02 Hey's Enterprises
70 1,236 08/24/01 02/06/02 USA Remediation
71 -1,300 08/14/01 01/24/02 Scholastic Furniture
73 1,342 08/14/01 01/24/02 Iversen Const.
73 -93 05/15/02 06/04/02 NEP Glass
73A -93 08/14/01 03/29/02 Unified Mech. Centers
73B -93 08/20/01 04/03/02 Kaplan-Schmidt Elec.
73C -372 08/20/01 04/03/02 Lancet Arch.
73D -93 08/20/01 04/03/02 Crosby-Brownlie
74 2,560 08/20/01 04/03/02 Rochester Davis-Fetch
75 19,205 08/20/01 04/03/02 Eugene Sacket
76 5,130 08/20/01 04/03/02 Crosby-Brownlie
82 1,552 09/19/01 01/14/02 Rochester Davis-Fetch
82 -776 03/15/02 04/19/02 Frederico Const.
85 4,687 11/07/01 02/08/02 Hey's Enterprises
86 10,010 11/07/01 02/08/02 Iversen Const.
87 3,460 02/19/02 04/01/02 Eugene Sacket
88 29,147 11/07/01 02/08/02 Kaplan-Schmidt Elec.
89 9,360 12/17/01 03/26/02 Crosby-Brownlie
90 8,319 12/11/01 03/01/02 Lancet Arch.
91 4,131 11/07/01 02/08/02 Unified Mech. Centers
92 2,789 12/17/01 03/26/02 Sigma Painting
93 1,305 02/19/02 04/01/02 Hey's Enterprises
94 -63 01/29/02 03/25/02 Crosby-Brownlie
94 -63 01/29/02 03/25/02 Rochester Flooring Resource
94 -63 01/29/02 09/05/02 Lancet Arch.
94 188 01/29/02 03/25/02 Rochester Davis-Fetch
95 1,196 01/17/02 03/26/02 Lancet Arch
96 3,091 02/11/02 03/25/02 Erie Steel
97 7,204 02/19/02 04/01/02 Rochester Davis-Fetch
98 11,018 02/19/02 04/01/02 Kaplan-Schmidt Elec.
99 3,675 02/19/02 04/01/02 Eugene Sacket
99-1169 Reconstruction 0-001-008 03/20/00 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0833 Reconstruction 0-001-009 04/11/05 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
0 / / / /
AA-3 -1,536 10/31/05 12/05/05 Excell Insulation
E-2 3,565 09/08/05 09/13/05 KR Lawrence Electric
E-4 480 11/25/05 01/11/06 KR lawrence Electric
GC-1 -450 10/31/05 12/05/05 Massa Construction
GC-4 1,453 04/07/06 06/02/06 Massa Construction
P-1 614 03/23/06 05/26/06 LANDRY MECHANICAL, INC.
R-4 10,700 08/22/05 08/25/05 Leo Roth Corp
R-5 7,390 09/10/05 09/15/05 Leo Roth Corp
R-6 -2,100 10/04/05 10/17/05 Leo Roth Corp
04-1039 Reconstruction 0-001-010 08/24/05 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0757 Reconstruction 0-001-011 08/07/06 *CO No.* Amount Disallowed Received Approved Contractor
EC-03 5,256 06/28/07 08/15/07 Billitier Electric
EC-06 1,170 10/01/07 01/16/08 BILLITIER ELECTRIC, INC.
GC-02 10,485 03/16/07 05/09/07 Betacon Construction
GC-06 945 07/13/07 07/17/07 Betacon Construction
RC-02 1,740 06/28/07 07/17/07 Spring Sheet Metal
RC-03 738 10/29/07 12/31/07 Spring Sheet Metal & Roofing
07-0958 Reconstruction 0-001-012 05/09/08 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0858 Reconstruction 0-001-013 01/04/08 *CO No.* Amount Disallowed Received Approved Contractor
R-1 5,309 07/01/08 / / APPLE ROOFING CORP
02-1670FP Reconstruction 0-001-FP1 04/10/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Elementary School:
95-1113 Reconstruction 0-006-002 05/31/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0913 Reconstruction 0-006-003 04/25/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0953 Additions and Alterations 0-006-004 04/28/99 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1394 Reconstruction 0-006-005 07/02/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1032 Reconstruction 0-006-006 06/06/00 *CO No.* Amount Disallowed Received Approved Contractor
115 886 04/18/02 05/10/02 Eugene G. Sacket
116 551 08/29/02 09/05/02 Facilities Equipment and Services
117 37,200 04/24/02 05/07/02 Facilities Equipment and Service
25 800 01/11/01 01/28/02 Kaplan-Schmidt Elec.
00-1819 Reconstruction 0-006-007 11/05/01 *CO No.* Amount Disallowed Received Approved Contractor
C1-01 2,862 09/05/02 10/21/02 Pooler Enterprises
C1-02 3,927 09/23/02 10/28/02 Pooler Enterprises
C1-03 1,108 10/29/02 02/05/03 Pooler Enterprises
C1-04 3,000 11/21/03 11/24/03 Pooler Enterprises
C1-05 3,300 05/24/04 06/10/04 Pooler Enterprises
C6-01 956 10/29/02 02/05/03 Concord Electric
C6-02 270 01/21/03 02/04/03 Concord Electric
99-1170 Reconstruction 0-006-008 03/20/00 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0834 Reconstruction 0-006-009 04/11/05 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
0 / / / /
AA-1 -3,000 09/19/05 10/04/05 Excell Insulation
AA-2 -1,321 10/31/05 12/05/05 Excell Insulation
E-3 -188 09/08/05 09/12/05 KR Larence Electric
E3 -188 09/08/05 09/13/05 Kr lawrence Electric
GC-2 -1,600 10/31/05 12/19/06 Massa Construction
GC-3 3,960 03/07/06 06/02/06 Massa Construction
GC-6 -853 04/17/06 / / Massa Construction
GC-6 -853 04/17/06 06/30/06 Massa Construction
S-1 1,771 08/29/05 09/01/05 Frank Marianacci Inc
04-1040 Reconstruction 0-006-010 08/24/05 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0758 Reconstruction 0-006-011 08/07/06 *CO No.* Amount Disallowed Received Approved Contractor
EC-01 8,210 05/03/07 09/11/07 Billitier Electric
EC-02 6,350 06/28/07 08/15/07 Billitier Electric
EC-04 1,096 07/13/07 10/17/07 Billitier Electric
EC-05 2,184 09/18/07 01/15/08 BILLITIER ELECTRIC, INC.
EC-07 9,050 10/01/07 01/16/08 BILLITIER ELECTRIC, INC.
EC-08 3,900 10/29/07 01/16/08 Billitier Electric
GC-01 1,715 03/09/07 03/23/07 Betacon Construction
GC-03 10,460 06/21/07 07/17/07 Betacon Construction
GC-04 23,040 06/21/07 07/13/07 Betacon Construction
GC-05 4,375 07/13/07 07/17/07 Betacon Construction
GC-07 9,640 08/13/07 08/20/07 BETACON CONSTRUCTION INC.
GC-08 4,637 10/01/07 02/23/08 BETACON CONSTRUCTION INC.
GC-10 630 03/27/08 03/31/08 BETACON CONSTRUCTION INC.
HC - 04 8,143 08/30/07 / / LANDRY MECHANICAL, INC.
HC-01 -1,500 03/05/07 08/15/07 Landry mechanical
HC-02 7,837 07/17/07 08/28/07 Landry Mechanical
HC-03 12,623 08/30/07 01/15/08 LANDRY MECHANCIAL, INC.
HC-05 6,696 10/01/07 01/16/08 LANDRY MECHANICAL, INC.
PC-01 13,970 03/12/07 08/15/07 Landry mechanical
PC-02 16,519 06/21/07 / / Landry Mechanical
PC-03 1,903 09/07/07 01/15/08 LANDRY MECHANICAL, INC.
PC-04 2,000 10/29/07 01/16/08 Landry Mechanical
PC-05 576 10/29/07 01/16/08 Landry Mechanical
RC-01 2,525 06/28/07 07/17/07 Spring Sheet Metal
RC-04 3,909 10/29/07 12/31/07 Spring Sheet Metal & Roofing
07-0863 Reconstruction 0-006-012 05/09/08 NO CHANGE ORDERS ON ELECTRONIC FILE
NEW STORAGE BUILDING @ ELEMENTARY SC:
07-0864 New Construction 2-012-001 05/09/08 NO CHANGE ORDERS ON ELECTRONIC FILE
NEW STORAGE BUILDING @ HIGH SCHOOL S:
07-0865 New Construction 2-013-001 05/09/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage/Admin.:
93-0075 Reconstruction 5-002-002 09/09/93 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0911 Reconstruction 5-002-004 04/25/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1004 Reconstruction 5-002-005 03/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1497 Reconstruction 5-002-006 05/04/04 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 1,200 08/27/04 09/16/04 International Chimney Corp
RC-2 13,608 01/26/06 05/23/06 J & B INSTALLATIONS INC.
04-0835 Reconstruction 5-002-007 04/11/05 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
0 / / / /
0 / / / /
AA-4 -535 10/31/05 12/05/05 Excell Insulation
E-1 -145 09/08/05 09/13/05 Kr lawrence Electric
GC-5 -616 03/07/06 06/02/06 Massa Construction
R-1 14,590 07/19/05 08/05/05 Leo Roth Corp
R-2 36,544 08/09/05 12/19/06 Leo Roth Corp
R-3 10,730 08/22/05 08/25/05 Leo Roth Corp
04-1041 Reconstruction 5-002-008 08/24/05 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0859 Reconstruction 5-002-009 01/04/08 NO CHANGE ORDERS ON ELECTRONIC FILE
District Wide:
06-1500 Reconstruction 7-999-001 06/13/07 NO CHANGE ORDERS ON ELECTRONIC FILE
GENEVA CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 43-07-00-01
last updated on 07/24/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
West Street School:
91-0156 Additions and Alterations 0-001-004 10/17/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0932 Reconstruction 0-001-005 05/06/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1042 Reconstruction 0-001-006 05/22/96 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0404 Reconstruction 0-001-007 04/30/02 *CO No.* Amount Disallowed Received Approved Contractor
E-13 1,280 03/02/04 04/30/04 Kaplan Schmidt Elec.
E-16 3,166 04/02/04 04/30/04 Kaplan Schmidt Elec.
E-18 1,177 09/02/04 09/23/04 Kaplan Schmidt Elec.
E-19 1,003 05/28/04 06/04/04 Kaplan Schmidt Elec.
E-2 15,824 05/20/03 05/23/03 Kaplan-Schmidt Elec.
E-3 5,692 04/17/03 05/07/03 Kaplan-Schmidt Elec.
G-1 13,139 01/08/03 01/27/03 RF Hyland & Sons
G-10 12,552 04/17/03 05/07/03 RF Hyland & Sons
G-11a 224 09/30/03 11/19/03 RF Hyland & Sons
G-15 3,532 06/24/03 07/02/03 RF Hyland & Sons
G-22 3,183 10/16/03 10/23/03 RF Hyland & Sons
G-24 -7,087 10/16/03 10/23/03 RF Hyland & Sons
G-25 -11,257 09/30/03 10/03/03 RF Hyland & Sons
G-28 -12,104 10/16/03 10/23/03 RF Hyland & Sons
G-3 16,590 01/08/03 01/27/03 RF Hyland & Sons
G-32 856 09/30/03 10/03/03 RF Hyland & Sons
G-38 -2,343 09/30/03 10/03/03 RF Hyland & Sons
G-39 -4,000 09/30/03 11/04/03 RF Hyland & Sons
G-4 17,850 01/08/03 01/27/03 RF Hyland & Sons
G-44 10,611 04/02/04 04/07/04 RF Hyland & Sons
G-46 18,433 09/22/04 09/27/04 RF Hyland & Sons
G-5 19,845 01/08/03 01/27/03 RF Hyland & Sons
G-50 8,712 04/02/04 04/07/04 RF Hyland & Sons
G-51 -4,210 05/28/04 06/04/04 RF Hyland & Sons
G-53 13,073 05/28/04 06/04/04 RF Hyland & Sons
G-55 7,970 05/28/04 06/04/04 RF Hyland & Sons
G-56 504 05/28/04 06/04/04 RF Hyland & Sons
G-57 6,979 07/15/04 07/21/04 RF Hyland & Sons
G-59 10,100 08/30/04 09/24/04 RF Hyland & Sons
G-6 19,614 01/08/03 01/27/03 RF Hyland & Sons
G-64 2,810 02/08/05 03/02/05 Robert Hyland
G-7 6,947 05/20/03 05/23/03 RF Hyland & Sons
G-8 10,624 04/17/03 05/07/03 RF Hyland & Sons
G-9 17,600 04/17/03 05/07/03 RF Hyland & Sons
H-1 902 01/08/03 01/27/03 Monroe Piping
H-14 4,322 05/28/04 06/04/04 Monroe Piping
H-16 16,155 09/22/04 09/28/04 Monroe Piping
H-17 6,279 09/22/04 09/28/04 Monroe Piping
H-18 58,980 11/03/04 06/21/05 Monroe Piping
H-20 6,304 02/08/05 06/29/05 Monroe Piping and Sheet metal
H-3 3,925 04/17/03 05/07/03 Monroe Piping
H-4 1,391 06/24/03 07/02/03 Monroe Piping
H-6 15,942 10/16/03 10/23/03 Monroe Piping
H-7 1,348 10/16/03 10/23/03 Monroe Piping
H-9 3,055 02/03/04 03/05/04 Monroe Piping
P-1 2,641 01/08/03 01/27/03 Monroe Piping
P-10 10,028 09/30/03 10/03/03 Monroe Piping
P-13 3,126 10/16/03 10/23/03 Monroe Piping
P-18 3,350 04/02/04 04/30/04 Monroe Piping
P-2 4,903 04/17/03 05/07/03 Monroe Piping
P-20 5,907 05/28/04 06/04/04 Monroe Piping
P-22 7,535 05/28/04 06/04/04 Monroe Piping
P-24 3,250 09/22/04 09/28/04 Monroe Piping
P-3 5,758 04/17/03 05/07/03 Monroe Piping
P-4 7,708 04/17/03 05/07/03 Monroe Piping
P-7 1,535 10/16/03 10/23/03 Monroe Piping
S-17b 3,000 10/16/03 10/23/03 Pooler Ent.
S-2 18,942 11/15/02 11/21/02 Pooler Ent.
S-21 19,500 06/24/03 07/02/03 Pooler Ent.
S-34 9,864 09/22/04 09/27/04 Pooler Ent.
S-35 3,158 09/22/04 09/27/04 Pooler Ent.
S-36 4,620 08/30/04 09/24/04 Pooler Ent.
S-38 -11,362 12/30/04 01/12/05 Pooler Ent.
S-7 12,278 01/08/03 01/27/03 Pooler Ent.
02-1441FP Reconstruction 0-001-FP1 03/31/03 NO CHANGE ORDERS ON ELECTRONIC FILE
05-1332SC Visual Structural Inspection 0-001-SC1 06/30/06 NO CHANGE ORDERS ON ELECTRONIC FILE
05-1354SC Visual Structural Inspection 0-001-SC2 06/30/06 NO CHANGE ORDERS ON ELECTRONIC FILE
Middle School:
90-1103 Reconstruction 0-005-003 04/09/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0774 Additions and Alterations 0-005-004 04/16/93 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1604 Reconstruction 0-005-005 08/27/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0933 Reconstruction 0-005-006 05/06/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1045 Reconstruction 0-005-007 05/22/96 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1438FP Reconstruction 0-005-FP1 03/31/03 NO CHANGE ORDERS ON ELECTRONIC FILE
North St. School:
91-0157 Additions and Alterations 0-006-003 10/17/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0934 Reconstruction 0-006-004 05/06/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1043 Reconstruction 0-006-007 05/22/96 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0405 Reconstruction 0-006-008 04/30/02 *CO No.* Amount Disallowed Received Approved Contractor
E-11 3,503 04/02/04 04/30/04 Kaplan Schmidt Elec.
E-12 1,246 04/02/04 04/30/04 Kaplan Schmidt Elec.
E-15 1,714 04/02/04 04/30/04 Kaplan Schmidt Elec.
E-17 2,248 1 06/28/04 06/07/04 Kaplan Schmidt Elec.
E-22 1,127 09/22/04 09/28/04 Kaplan Schmidt Elec.
E-23 5,414 09/22/04 09/28/04 Kaplan Schmidt Elec.
E-9 4,592 02/03/04 / / Kaplan Schmidt Elec.
E-9 4,592 01/12/06 05/25/06 Kaplan Schmidt Electric
G-20 -5,308 09/30/03 04/05/04 RF Hyland & Sons
G-33 15,457 10/22/03 11/19/03 RF Hyland & Sons
G-34 -1,212 09/30/03 11/04/03 RF Hyland & Sons
G-35 4,115 09/30/03 11/04/03 RF Hyland & Sons
G-36 -6,000 09/30/03 11/04/03 RF Hyland & Sons
G-37 -2,202 09/30/03 10/03/03 RF Hyland & Sons
G-40 12,304 10/22/03 11/04/03 RF Hyland & Sons
G-41 12,149 02/03/04 02/20/04 RF Hyland & Sons
G-42 8,187 04/02/04 04/07/04 RF Hyland & Sons
G-45 4,864 04/02/04 04/07/04 RF Hyland & Sons
G-47 -7,345 04/02/04 04/07/04 RF Hyland & Sons
G-49 9,939 04/02/04 04/07/04 RF Hyland & Sons
G-52 8,070 05/28/04 06/04/04 RF Hyland & Sons
G-58 5,000 07/15/04 07/21/04 RF Hyland & Sons
G-60 6,733 08/30/04 09/24/04 RF Hyland & Sons
G-61 17,000 08/30/04 09/24/04 RF Hyland & Sons
G-63 -60,300 11/03/04 11/19/04 RF Hyland & Sons
G-65 -4,108 02/04/05 03/02/05 Robert Hyland and Son
H-10 14,749 05/28/04 06/04/04 Monroe Piping
H-11 5,841 05/28/04 06/04/04 Monroe Piping
H-12 -2,363 04/02/04 05/05/04 Monroe Piping
H-13 15,336 05/28/04 10/22/04 Monroe Piping
H-19 -33,615 11/03/04 06/21/05 Monroe Piping
H-2 2,666 03/13/03 03/18/03 Monroe Piping
H-8 10,476 02/03/04 / / Monroe Piping
H-8 10,476 01/12/06 / / Monroe Piping
P-14 7,784 10/16/03 10/23/03 Monroe Piping
P-15 10,695 09/30/03 11/04/03 Monroe Piping
P-17 7,980 02/03/04 03/09/04 Monroe Piping
P-19 11,212 05/28/04 06/04/04 Monroe Piping
P-21 3,269 05/28/04 06/09/04 Monroe Piping
P-23 -7,784 11/30/04 / / Monroe Piping Sheet metal
P-23 -7,784 01/12/06 / / Monroe Piping Sheet metal
P-8 2,449 10/16/03 10/23/03 Monroe Piping
S-1 935 11/15/02 11/21/02 Pooler Ent.
S-17a 754 10/16/03 10/23/03 Pooler Ent.
S-24 10,729 10/16/03 10/23/03 Pooler Ent.
S-27 5,870 09/30/03 10/03/03 Pooler Ent.
S-8 17,693 05/20/03 05/23/03 Pooler Ent.
02-1440FP Reconstruction 0-006-FP1 03/31/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Senior High School:
92-1605 Reconstruction 0-010-003 08/27/93 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1044 Reconstruction 0-010-004 05/22/96 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0406 Additions and Alterations 0-010-005 05/02/02 *CO No.* Amount Disallowed Received Approved Contractor
C-1 -85,335 01/08/03 01/27/03 Universal Custom Millwork
C-10 -2,610 02/08/05 03/31/05 Universal Custom Millwork
C-11 5,922 02/08/05 03/02/05 Universal Custom Millwork
C-2 7,875 09/30/03 10/03/03 Universal Custom Millwork
C-3 2,330 09/30/03 10/03/03 Universal Custom Millwork
C-4 -12,778 09/30/03 10/03/03 Universal Custom Millwork
C-5 -11,720 04/02/04 04/07/04 Universal Custom Millwork
C-6 1,200 04/16/04 04/30/04 Universal Custom Millwork
C-7 2,080 05/28/04 06/07/04 Universal Custom Millwork
C-8 34,450 07/15/04 07/21/04 Universal Custom Millwork
C-9 -10,000 09/22/04 09/27/04 Universal Custom Millwork
D-1 3,569 06/24/03 07/07/03 Rochester Acoustical
D-10 -1,221 04/16/04 04/30/04 Rochester Acoustical
D-11 -24,085 04/16/04 04/30/04 Rochester Acoustical
D-12 4,330 04/16/04 04/30/04 Rochester Acoustical
D-13 12,298 06/21/04 06/24/04 Rochester Acoustical
D-14 6,764 06/24/04 06/25/04 Rochester Acoustical
D-15 13,634 06/21/04 06/30/04 Rochester Acoustical
D-16 -4,587 06/21/04 06/24/04 Rochester Acoustical
D-17 2,515 05/28/04 06/07/04 Rochester Acoustical
D-18 7,236 05/28/04 06/07/04 Rochester Acoustical
D-19 3,671 06/14/04 06/25/04 Rochester Acoustical
D-2 1,421 06/24/03 07/07/03 Rochester Acoustical
D-20 2,514 07/15/04 07/21/04 Rochester Acoustical
D-21 1,374 07/15/04 07/21/04 Rochester Acoustical
D-22 3,199 07/15/04 07/21/04 Rochester Acoustical
D-23 8,601 07/15/04 07/21/04 Rochester Acoustical
D-24 621 09/22/04 09/27/04 Rochester Acoustical
D-25 1,137 09/22/04 09/27/04 Rochester Acoustical
D-26 1,656 09/22/04 09/27/04 Rochester Acoustical
D-27 -146 09/22/04 09/28/04 Rochester Acoustical
D-28 3,815 11/03/04 11/19/04 Rochester Acoustical
D-29 1,327 11/03/04 11/19/04 Rochester Acoustical
D-3 13,844 06/24/03 07/07/03 Rochester Acoustical
D-30 -6,300 11/03/04 11/19/04 Rochester Acoustical
D-31 1,994 11/03/04 11/19/04 Rochester Acoustical
D-32 3,632 11/03/04 11/19/04 Rochester Acoustical
D-33 923 11/03/04 11/19/04 Rochester Acoustical
D-34 3,627 11/03/04 11/19/04 Rochester Acoustical
D-35 9,008 11/03/04 11/19/04 Rochester Acoustical
D-36 5,884 12/30/04 01/12/05 Rochester Acoustical
D-38 1,251 12/30/04 01/12/05 Rochester Acoustical
D-39 10,177 12/30/04 01/12/05 Rochester Acoustical
D-4 15,732 09/30/03 10/03/03 Rochester Acoustical
D-40 11,629 12/30/04 01/12/05 Rochester Acoustical
D-41 4,902 05/04/05 06/21/05 Rochester Acoustical Corp
D-5 13,766 09/30/03 10/03/03 Rochester Acoustical
D-6 18,986 09/30/03 11/04/03 Rochester Acoustical
D-7 14,529 09/30/03 11/04/03 Rochester Acoustical
D-8 -150 09/30/03 11/04/03 Rochester Acoustical
D-9 4,271 02/03/04 02/20/04 Rochester Acoustical
DA-1 15,002 04/17/03 05/07/03 LeChase Data
DA-10 10,225 09/22/04 09/28/04 LeChase Data
DA-11 2,325 09/22/04 09/28/04 LeChase Data
DA-12 2,055 12/30/04 05/25/06 LeChase Data
DA-13 900 02/08/05 07/29/05 LeChase Data telcom Services
DA-14 1,685 02/08/05 07/29/05 LeChase Data telcom Service
DA-15 1,190 02/08/05 07/29/05 Lechase Data Telcom Services
DA-17 2,055 01/12/06 / / LeChase Data Telcom
DA-2 16,608 04/17/03 05/07/03 LeChase Data
DA-3 1,378 06/24/03 07/07/03 LeChase Data
DA-4 2,665 04/02/04 04/30/04 LeChase Data
DA-5 5,680 06/21/04 06/24/04 LeChase Data
DA-6 1,096 06/21/04 06/24/04 LeChase Data
DA-7 1,895 06/21/04 06/24/04 LeChase Data
DA-8 890 06/14/04 06/25/04 LeChase Data
DA-9 2,291 07/15/04 07/21/04 LeChase Data
E-1 -8,024 05/20/03 05/23/03 Kaplan-Schmidt Elec.
E-10 17,006 04/02/04 04/30/04 Kaplan Schmidt Elec.
E-11 19,714 04/02/04 04/30/04 Kaplan Schmidt Elec.
E-12 14,239 04/02/04 04/30/04 Kaplan Schmidt Elec.
E-13 19,904 04/16/04 04/30/04 Kaplan Schmidt Elec.
E-14 1,500 04/02/04 04/30/04 Kaplan Schmidt Elec.
E-15 19,285 06/21/04 06/24/04 Kaplan Schmidt Elec.
E-16 11,679 06/21/04 06/24/04 Kaplan Schmidt Elec.
E-17 19,176 06/21/04 06/24/04 Kaplan Schmidt Elec.
E-18 11,590 06/14/04 06/25/04 Kaplan Schmidt Elec.
E-19 4,685 05/28/04 06/07/04 Kaplan Schmidt Elec.
E-2 3,114 04/24/03 05/07/03 Kaplan-Schmidt Elec.
E-20 16,954 05/28/04 06/07/04 Kaplan Schmidt Elec.
E-21 16,750 06/21/04 06/24/04 Kaplan Schmidt Elec.
E-22 18,016 06/21/04 06/24/04 Kaplan Schmidt Elec.
E-25 6,926 09/22/04 09/28/04 Kaplan Schmidt Elec.
E-26 4,504 08/30/04 09/23/04 Kaplan Schmidt Elec.
E-27 13,212 08/30/04 09/23/04 Kaplan Schmidt Elec.
E-28 7,800 08/27/04 09/23/04 Kaplan Schmidt Elec.
E-29 2,097 08/30/04 09/23/04 Kaplan Schmidt Elec.
E-3 1,707 06/24/03 07/02/03 Kaplan-Schmidt Elec.
E-30 65,375 08/30/04 09/23/04 Kaplan Schmidt Elec.
E-31 1,512 09/22/04 09/28/04 Kaplan Schmidt Elec.
E-32 3,705 09/22/04 09/28/04 Kaplan Schmidt Elec.
E-33 1,258 09/29/04 10/14/04 Kaplan Schmidt Elec.
E-34 931 11/03/04 06/21/05 Kaplan Schmidt Elec.
E-35 9,490 11/03/04 06/21/05 Kaplan Schmidt Elec.
E-36 3,181 12/30/04 06/21/05 Kaplan Schmidt Elec.
E-37 333 12/30/04 06/21/05 Kaplan Schmidt Elec.
E-38 16,254 02/08/05 07/07/05 Kaplan Schmidt Electric
E-39 17,752 02/08/05 / / Kaplan Schmidt
E-39 17,752 01/12/06 05/25/06 Kaplan Schmidt Electric
E-4 1,935 09/30/03 10/03/03 Kaplan-Schmidt Elec.
E-40 3,721 02/08/05 07/26/05 Kaplan Schmidt
E-41 9,339 02/08/05 07/26/05 Kaplan Schmidt
E-42 9,500 02/08/05 07/07/05 Kaplan Schmidt electric
E-43 6,027 02/08/05 07/07/05 Kaplan Schmidt Electric
E-44 1,470 02/16/05 06/29/05 Kaplan Schmidt Electric
E-45 2,277 02/16/05 07/26/05 Kaplan Schmidt Electric
E-5 15,730 09/30/03 10/03/03 Kaplan-Schmidt Elec.
E-6 3,968 09/30/03 10/03/03 Kaplan-Schmidt Elec.
E-7 -11,323 09/30/03 10/03/03 Kaplan-Schmidt Elec.
E-8 4,635 02/03/04 03/09/04 Kaplan-Schmidt Elec.
E-9 10,545 02/03/04 02/20/04 Kaplan-Schmidt Elec.
G-1 -29,510 01/08/03 01/27/03 LeChase Construction
G-10 19,866 04/17/03 05/07/03 LeChase Construction
G-11 18,854 04/17/03 05/07/03 LeChase Construction
G-12 12,517 07/09/03 07/25/03 LeChase Construction
G-13 18,506 07/09/03 07/25/03 LeChase Construction
G-14 18,721 07/09/03 07/25/03 LeChase Construction
G-15 18,814 07/09/03 07/25/03 LeChase Construction
G-16 11,672 07/09/03 07/25/03 LeChase Construction
G-17 13,081 09/30/03 10/03/03 LeChase Construction
G-18 3,259 09/30/03 10/03/03 LeChase Construction
G-19 17,585 09/30/03 10/03/03 LeChase Construction
G-2 -19,192 01/08/03 01/27/03 LeChase Construction
G-20 16,237 07/09/03 07/25/03 LeChase Construction
G-21 7,596 09/30/03 10/03/03 LeChase Construction
G-22 16,527 09/30/03 08/08/06 LeChase Construction
G-22 16,527 01/12/06 / / LeChase Construction
G-23 11,695 09/30/03 10/03/03 LeChase Construction
G-24 -6,488 09/30/03 10/03/03 LeChase Construction
G-25 10,039 09/30/03 10/03/03 LeChase Construction
G-26 -35,000 09/30/03 11/04/03 LeChase Construction
G-27 11,011 09/30/03 11/19/03 LeChase Construction
G-28 16,601 09/30/03 10/03/03 LeChase Construction
G-29 16,553 09/30/03 11/19/03 LeChase Construction
G-3 16,095 01/08/03 01/27/03 LeChase Construction
G-30 11,069 10/16/03 10/23/03 LeChase Construction
G-31 11,000 10/16/03 10/23/03 LeChase Construction
G-32 16,914 10/16/03 10/23/03 LeChase Construction
G-33 11,891 04/02/04 04/07/04 LeChase Construction
G-34 15,404 04/02/04 04/07/04 LeChase Construction
G-35 13,038 04/02/04 04/07/04 LeChase Construction
G-36 11,897 04/02/04 04/07/04 LeChase Construction
G-37 8,559 04/02/04 04/07/04 LeChase Construction
G-38 13,650 04/16/04 04/30/04 LeChase Construction
G-39 18,974 04/16/04 04/30/04 LeChase Construction
G-4 12,806 05/20/03 05/23/03 LeChase Construction
G-40 2,772 04/16/04 04/30/04 LeChase Construction
G-41 17,622 04/16/04 04/30/04 LeChase Construction
G-42 14,804 04/16/04 04/30/04 LeChase Construction
G-43 14,282 04/16/04 04/30/04 LeChase Construction
G-44 18,381 04/16/04 05/05/04 LeChase Construction
G-45 18,503 04/16/04 04/30/04 LeChase Construction
G-46 11,797 04/16/04 04/30/04 LeChase Construction
G-47 13,877 04/16/04 04/30/04 LeChase Construction
G-48 15,052 2,389 04/16/04 04/30/04 LeChase Construction
G-49 18,841 05/28/04 06/07/04 LeChase Construction
G-5 7,243 05/20/03 05/23/03 LeChase Construction
G-50 6,159 05/28/04 06/07/04 LeChase Construction
G-51 -121,084 05/28/04 06/07/04 LeChase Construction
G-52 13,906 05/28/04 10/20/04 LeChase Construction
G-53 4,622 05/28/04 06/07/04 LeChase Construction
G-54 -2,590 05/28/04 06/07/04 LeChase Construction
G-56 11,000 06/14/04 06/25/04 LeChase Construction
G-57 7,560 06/21/04 06/24/04 LeChase Construction
G-58 18,421 06/21/04 06/24/04 LeChase Construction
G-59 9,267 06/25/04 06/25/04 LeChase Construction
G-6 19,005 05/20/03 05/23/03 LeChase Construction
G-60 8,300 07/15/04 07/21/04 LeChase Construction
G-61 -4,347 07/15/04 07/21/04 LeChase Construction
G-62 9,099 07/15/04 07/21/04 LeChase Construction
G-63 5,174 07/15/04 07/21/04 LeChase Construction
G-64 3,227 07/15/04 07/21/04 LeChase Construction
G-65 -5,841 07/15/04 07/21/04 LeChase Construction
G-66 0 07/15/04 07/21/04 LeChase Construction
G-67 14,692 08/30/04 10/22/04 LeChase Construction
G-68 14,543 08/30/04 09/24/04 LeChase Construction
G-69 13,930 08/30/04 09/24/04 LeChase Construction
G-7 7,999 05/20/03 05/23/03 LeChase Construction
G-70 16,680 08/30/04 09/24/04 LeChase Construction
G-71 3,706 08/30/04 09/24/04 LeChase Construction
G-72 5,090 08/30/04 09/24/04 LeChase Construction
G-73 -14,080 09/22/04 09/27/04 LeChase Construction
G-74 13,883 09/22/04 09/27/04 LeChase Construction
G-75 7,916 09/22/04 09/27/04 LeChase Construction
G-76 4,615 09/22/04 09/27/04 LeChase Construction
G-77 8,476 10/21/04 10/28/04 LeChase Construction
G-78 13,090 10/21/04 10/28/04 LeChase Construction
G-8 12,417 05/20/03 05/23/03 LeChase Construction
G-9 8,042 03/13/03 03/18/03 LeChase Construction
H-1 19,800 04/17/03 05/07/03 O'Grady McCormick Mech.
H-10 2,970 09/30/03 01/14/04 O'Grady McCormick Mech.
H-11 10,583 09/30/03 10/03/03 O'Grady McCormick Mech.
H-12 4,659 09/30/03 10/03/03 O'Grady McCormick Mech.
H-13 5,426 09/30/03 10/03/03 O'Grady McCormick Mech.
H-14 15,018 10/16/03 10/23/03 O'Grady McCormick Mech.
H-15 3,152 09/30/03 10/03/03 O'Grady McCormick Mech.
H-16 10,709 09/30/03 10/03/03 O'Grady McCormick Mech.
H-17 9,885 10/22/03 11/04/03 O'Grady McCormick Mech.
H-18 7,821 02/03/04 03/09/04 O'Grady McCormick Mech.
H-19 6,334 04/02/04 04/30/04 O'Grady McCormick Mech.
H-2 11,226 04/17/03 05/07/03 O'Grady McCormick Mech.
H-20 9,687 04/02/04 04/30/04 O'Grady McCormick Mech.
H-21 9,094 04/02/04 04/30/04 O'Grady McCormick Mech.
H-22 10,799 04/02/04 04/30/04 O'Grady McCormick Mech.
H-23 1,500 06/21/04 06/24/04 O'Grady McCormick Mech.
H-24 4,000 06/14/04 06/25/04 O'Grady McCormick Mech.
H-25 10,180 06/14/04 06/25/04 O'Grady McCormick Mech.
H-26 1,663 05/28/04 06/07/04 O'Grady McCormick Mech.
H-27 5,132 07/20/04 07/27/04 O'Grady McCormick Mech.
H-28 6,808 07/20/04 07/27/04 O'Grady McCormick Mech.
H-29 18,774 07/20/04 / / O'Grady McCormick Mech.
H-3 15,165 04/17/03 05/07/03 O'Grady McCormick Mech.
H-30 19,320 09/22/04 11/01/05 O'Grady McCormick Mech.
H-31 4,104 07/15/04 07/21/04 O'Grady McCormick Mech.
H-32 708 09/22/04 09/28/04 O'Grady McCormick Mech.
H-34 17,741 12/17/04 01/19/06 O'GRADY McCORMICK MECHANICAL CONTRAC
H-35 16,011 09/14/04 10/12/04 O'Grady McCormick Mech.
H-36 6,296 07/20/04 07/27/04 O'Grady McCormick Mech.
H-37 7,605 08/30/04 09/27/04 O'Grady McCormick Mech.
H-38 -43,990 09/22/04 09/28/04 O'Grady McCormick Mech.
H-39 2,158 09/22/04 09/28/04 O'Grady McCormick Mech.
H-4 6,422 04/17/03 05/07/03 O'Grady McCormick Mech.
H-40 -6,021 12/30/04 / / O'Grady McCormick Mech.
H-40 -6,021 01/12/06 / / OGrady McCormick mechanical
H-41 233 12/30/04 06/21/05 O'Grady McCormick Mech.
H-42 275 02/08/05 07/07/05 OGrady MCCormick
H-43 11,430 02/08/05 07/07/05 OGrady Mechanical
H-44 17,757 02/08/05 07/07/05 OGrady McCormick Mechanical
H-45 1,324 02/08/05 07/07/05 OGrady McCormick mechanical
H-46 2,071 03/22/05 01/04/06 O Grady McCormick
H-46 2,071 01/12/06 05/25/06 OGrady McCormick mechanical
H-47 486 03/22/05 01/04/06 O Grady McCormick Mechanical
H-47 486 01/12/06 / / OGrady McCormick Mechanical
H-48 19,813 10/20/05 / / OGrady McCormick Mechancial
H-48 19,813 01/12/06 / / OGrady McCormick mechanical
H-5 19,513 06/24/03 / / O'Grady McCormick Mech.
H-5 19,513 01/12/06 / / OGrady McCormick mechanical
H-6 6,965 06/24/03 07/07/03 O'Grady McCormick Mech.
H-7 5,641 06/24/03 07/07/03 O'Grady McCormick Mech.
H-8 1,450 09/30/03 10/03/03 O'Gr