REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Boonville Central:
90-1137 Reconstruction 0-002-003 04/04/91 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0981 Additions and Alterations 0-002-004 05/11/98 *CO No.* Amount Disallowed Received Approved Contractor
28 18,170 05/04/01 02/11/02 Murnane Bldg.
85 1,804 05/04/01 02/11/02 All-Phaze Elec.
86 4,237 05/04/01 02/11/02 All-Phaze Elec.
03-1123 Reconstruction 0-002-005 04/30/04 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1516 Reconstruction 0-002-006 08/11/08 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1573SC Visual Structural Inspection 0-002-SC1 06/13/07 NO CHANGE ORDERS ON ELECTRONIC FILE
West Leyden School:
90-1138 Reconstruction 0-013-003 04/04/91 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0887 Additions and Alterations 0-013-004 04/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1124 Reconstruction 0-013-005 04/30/04 *CO No.* Amount Disallowed Received Approved Contractor
03-01 -16,585 10/12/05 11/01/05 Puterlo Construction
07-1517 Reconstruction 0-013-006 08/11/08 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1572SC Visual Structural Inspection 0-013-SC1 06/13/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Forestport Elementary:
97-0888 Additions and Alterations 0-016-004 04/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1125 Reconstruction 0-016-005 04/30/04 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1518 Reconstruction 0-016-006 08/11/08 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1571SC Visual Structural Inspection 0-016-SC1 06/13/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Senior High School:
90-1139 Reconstruction 0-017-003 04/04/91 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0889 Additions and Alterations 0-017-004 04/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1162 Additions and Alterations 0-017-005 05/27/04 *CO No.* Amount Disallowed Received Approved Contractor
02-01 15,148 11/09/05 02/15/06 Murphy Excavating
02-02 6,000 11/09/05 01/17/06 Murphy Excavating Corp
02-03 -2,055 12/05/05 12/09/05 Murphy Excavating Corp
03-02 -40,000 12/05/05 12/09/05 Puterlo Construction
03-03 -1,575 08/14/06 09/05/06 Puterlo Construction
04-01 2,728 09/29/05 10/13/05 Pulver roofing
05-01 -4,670 09/29/05 10/18/05 Buffalo hotel Supply
05-02 -2,315 11/15/05 11/23/05 Buffalo Hotel Supply
05-03 -614 12/05/05 12/09/05 Buffalo Hotel Supply
06-01 614 10/12/05 10/19/05 m and Plumbing heating
07-01 8,601 10/06/05 10/18/05 Schmalzz Mechanical Contractors
07-02 448 10/12/05 10/25/05 Schmalz Mechan ical Contractors
07-03 -664 05/31/06 11/22/06 Schmalz Mechanical
08-01 -5,536 11/15/05 11/23/05 Huen New York
07-1519 Reconstruction 0-017-006 08/11/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2362FP Reconstruction 0-017-FP1 08/25/03 NO CHANGE ORDERS ON ELECTRONIC FILE
West Leyden Bus Garage(Now 4-022):
03-1126 Reconstruction 4-003-002 04/30/04 NO CHANGE ORDERS ON ELECTRONIC FILE
New West Leyden Bus Garage:
07-1520 New Construction 4-022-001 08/11/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
90-1140 Reconstruction 5-001-001 04/04/91 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1073 Additions and Alterations 5-001-002 06/29/98 *CO No.* Amount Disallowed Received Approved Contractor
00081 -1,877 05/04/01 01/30/02 All-Phaze Elec.
03-1163 Reconstruction 5-001-003 05/27/04 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1521 Reconstruction 5-001-004 08/11/08 NO CHANGE ORDERS ON ELECTRONIC FILE
CAMDEN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 41-06-01-04
last updated on 10/06/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Middle School:
90-1129 Reconstruction 0-001-004 04/10/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1215 Reconstruction 0-001-007 04/19/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0884 Reconstruction 0-001-008 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0364 Reconstruction 0-001-009 11/13/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1461 Reconstruction 0-001-010 06/04/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1257 Reconstruction 0-001-011 04/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0560 Additions and Alterations 0-001-012 05/12/00 *CO No.* Amount Disallowed Received Approved Contractor
01-TC21 -5,488 11/30/05 12/13/05 Siements Building Tech
01/GC21 7,866 10/07/02 10/25/02 Laurence Const.
01/H21 -4,825 10/23/03 11/05/03 Airtech Heating
02/E21 2,775 12/09/02 / / West Electric
02TC-21 -5,000 11/30/05 12/13/05 Siemens Building Tech
03/GC21 9,373 10/07/02 10/25/02 Laurence Const.
04/GC21 8,830 10/07/02 10/25/02 Laurence Const.
08/GC21 4,453 08/19/02 09/05/02 Laurence Const.
10/GC21 -9,972 10/14/04 11/19/04 Laurence Const.
11/GC21 -3,400 10/14/04 10/25/04 Laurence Const.
12/GC21 -3,690 5,310 10/14/04 10/25/04 Laurence Const.
13/GC21 -5,000 10/14/04 10/25/04 Laurence Const.
14/GC21 -1,169 10/14/04 10/25/04 Laurence Const.
P21-016B -12,082 02/19/03 11/06/03 HJ Brandeles
98-1224 Reconstruction 0-001-014 06/17/99 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 -17,693 06/01/00 12/02/03 Cortland Glass
00-1342 Reconstruction 0-001-015 10/13/01 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1492 Reconstruction 0-001-016 06/22/00 *CO No.* Amount Disallowed Received Approved Contractor
01HVAC5 -1,500 03/25/02 04/26/02 Schmalz Mech.
04ACM507 992 07/24/02 07/24/02 Summit Environ.
05ACM508 3,368 07/24/02 07/24/02 Summit Environ.
04-0758 Reconstruction 0-001-019 03/24/05 *CO No.* Amount Disallowed Received Approved Contractor
E-007 634 03/10/06 06/30/06 Huen new York
04-1051SR Additions and Alterations 0-001-020 04/01/05 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
0 / / / /
0 / / / /
GC-11-00 0 06/19/08 / / George A Nole
GC11-010 0 06/19/08 / / George A. Nole
GC11-011 0 06/19/08 / / George A Nole
GC11-012 0 06/19/08 / / George A Nole
GC11-013 0 06/19/08 / / George A Nole
P-11 0 11/26/07 / / Bellucci enterpirses
SE11-002 0 06/02/08 / / BOVIS LAND LEASE LMB, INC.
05-0466 Additions and Alterations 0-001-020 02/09/06 *CO No.* Amount Disallowed Received Approved Contractor
0006 -5,883 05/01/07 05/15/07 George Nole and Sons
001 -7,000 10/30/06 12/18/06 Syracuse Scenery and Stage Lighting
001 15,416 02/22/07 03/14/07 Airtech heating
002 -18,000 10/30/06 12/18/06 George nole
002 0 10/31/07 01/28/08 AIRTECH HEATING & A/C SYSTEMS INC
003 13,035 03/30/07 04/03/07 Patricia electric
003 0 10/31/07 01/28/08 AIRTECH HEATING & A/C SYSTEMS INC
004 -65,000 10/30/06 12/18/06 George Nole
004 9,835 08/02/07 10/29/07 Patricia Electric
005 -13,169 05/01/07 05/15/07 George Nole and Son
005 0 10/31/07 01/28/08 PATRICIA ELECTRIC INC
006 0 10/31/07 01/28/08 PATRIC IA ELETRIC INC
007 3,093 04/18/04 08/06/08 PATRICIA ELECTRIC, INC.
014 2,733 06/02/08 08/28/08 George A Nole & Sons,Inc
017 7,312 04/18/08 04/24/08 GEORGE A NOLE & SON, INC.
018 -1,501 06/02/08 08/28/08 George A Nole & Sons,Inc
019 0 07/31/08 / / GEORGE A. NOLE & SON, INC.
2-009 9,880 10/31/07 / / STEVE GENERAL CONTRACTORS INC
2-010 4,432 10/31/07 / / STEVE GENERAL CONTRACTORS
4-15 4,408 10/31/07 / / BILLITIER ELETRIC INC
4-18 735 10/31/07 / / BILLITIER ELETRIC INC
E-11 -30,700 09/07/06 12/27/06 Patricia electric
E-11 30,800 10/04/06 10/24/06 patricia Electric
G-003 0 02/28/06 05/25/06 Ritter Paratore Contracting
G-004 0 06/30/06 07/31/06 Ritter Paratore
G-005 -19,355 06/30/06 07/31/06 Ritter paratore
GC-11 -51,140 09/07/06 10/27/06 george Nole and Son
GC-11 0 07/31/08 / / GEORGE A. NOLE & SON, INC.
GC-11 -12,872 07/31/08 / / GEORGE A. NOLE & SON, INC.
GC11-015 8,640 02/05/08 03/19/08 George A. Nole & Son Inc
GC11-016 11,277 02/05/08 03/19/08 Geroge A. Nole & Son Inc.
P-004 0 06/30/06 10/27/06 Orchard Earth and Pipe
P-005 -4,406 06/30/06 11/15/06 Orchard Earth Pipe
P-006 -23,500 06/30/06 10/27/06 Orchard earth Pipe
P-11 30,200 09/07/06 10/27/06 Bellucci Enterprises
P-11 -11,043 02/21/08 03/28/08 BOVIS LEND LEASE LMB, INC
02-1197FP Reconstruction 0-001-FP1 02/25/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Camden Elementary:
93-0885 Additions and Alterations 0-003-005 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0363 Reconstruction 0-003-006 11/13/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1022 Reconstruction 0-003-007 04/03/97 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1466 Reconstruction 0-003-008 06/04/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1555 Reconstruction 0-003-009 08/18/00 *CO No.* Amount Disallowed Received Approved Contractor
06/GC21 3,969 08/19/02 09/05/02 Laurence Const.
00-1344 Reconstruction 0-003-011 10/13/01 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1493 Reconstruction 0-003-012 06/22/00 *CO No.* Amount Disallowed Received Approved Contractor
03/ACM5 400 07/01/02 07/15/02 Summit Environ.
05/ACM5 3,368 07/01/02 07/15/02 Summit Environ.
06/ACM5 -3,700 07/01/02 07/15/02 Summit Environ.
04-0759 Reconstruction 0-003-014 03/24/05 *CO No.* Amount Disallowed Received Approved Contractor
E-004 0 02/28/06 06/30/06 Huen new York
06-0659 Reconstruction 0-003-015 05/04/07 *CO No.* Amount Disallowed Received Approved Contractor
001 37,421 07/30/08 08/05/08 R. E. ALEXANDER CO., INC.
E-21 -17,790 01/06/08 02/23/08 Knapp Electric
02-1185FP Reconstruction 0-003-FP1 02/25/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Annsville Area School:
96-1465 Reconstruction 0-004-006 06/04/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1553 Additions and Alterations 0-004-007 08/18/00 *CO No.* Amount Disallowed Received Approved Contractor
01/E21 6,379 08/19/02 09/05/02 West Elec.
02/GC21 4,937 10/07/02 10/25/02 Laurence Const.
05/GC21 2,080 08/19/02 09/05/02 Laurence Const.
07/GC21 3,277 08/19/02 09/05/02 Laurence Const.
00-1341 Reconstruction 0-004-009 10/13/01 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1494 Reconstruction 0-004-010 06/22/00 *CO No.* Amount Disallowed Received Approved Contractor
01/ACM5 261 07/01/02 07/15/02 Summit Environ.
01-0772 Reconstruction 0-004-011 04/10/02 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0760 Reconstruction 0-004-012 03/24/05 *CO No.* Amount Disallowed Received Approved Contractor
E-001 0 11/28/05 12/09/05 Huen new York
G-001 0 03/10/06 07/21/06 Richard Alexander
02-1200FP Reconstruction 0-004-FP1 02/25/03 NO CHANGE ORDERS ON ELECTRONIC FILE
North Bay Area School:
96-1463 Reconstruction 0-005-005 06/04/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1554 Additions and Alterations 0-005-006 08/18/00 *CO No.* Amount Disallowed Received Approved Contractor
01-PE21 -9,000 02/03/03 02/11/03 RE Woodson
09/GC21 4,959 10/07/02 10/25/02 Laurence Const.
00-1343 Reconstruction 0-005-008 10/13/01 *CO No.* Amount Disallowed Received Approved Contractor
01E61005 -16,545 07/24/02 10/24/02 Huen New York
01G61003 12,500 07/24/02 08/28/02 Richard Alexander
01H61002 -2,183 07/24/02 08/28/02 CMP Sheet Metal
01P61001 13,300 07/24/02 08/28/02 Superior Plumbing
01T61006 -2,207 07/24/02 08/28/02 KAMA Communications
02G61007 -10,632 07/24/02 08/28/02 Richard Alexander
02P61004 -837 07/24/02 08/27/02 Superior Plumbing
99-1495 Reconstruction 0-005-009 06/22/00 *CO No.* Amount Disallowed Received Approved Contractor
02ACM502 341 07/24/02 07/24/02 Summit Environ.
01-0773 Reconstruction 0-005-010 04/10/02 *CO No.* Amount Disallowed Received Approved Contractor
E2-004 -2,423 11/04/03 11/20/03 Huen New York
04-0761 Reconstruction 0-005-011 03/24/05 *CO No.* Amount Disallowed Received Approved Contractor
E-002 0 11/28/05 12/09/05 Huen new York
E-006 0 03/10/06 / / Huen new York
G-003 0 03/10/06 07/21/06 Richard Alexander
G-004 -2,776 06/30/06 08/11/06 Richard Alexandedr
02-1198FP Reconstruction 0-005-FP1 02/25/03 NO CHANGE ORDERS ON ELECTRONIC FILE
McConnellsville Elementary:
96-1460 Reconstruction 0-007-002 06/04/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0033 Additions and Alterations 0-007-003 11/24/99 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0762 Reconstruction 0-007-006 03/24/05 *CO No.* Amount Disallowed Received Approved Contractor
G-002 0 03/10/06 07/24/06 Ricahrd Alexander Co
02-1199FP Reconstruction 0-007-FP1 02/25/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Camden High School:
93-0886 Additions and Alterations 0-012-005 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0257 Reconstruction 0-012-006 11/08/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0365 Reconstruction 0-012-007 11/13/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1462 Reconstruction 0-012-008 06/04/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1550 Additions and Alterations 0-012-009 11/24/99 *CO No.* Amount Disallowed Received Approved Contractor
003AF -23,500 03/23/04 04/13/04 Siemens Building Tech
01/H11 1,078 12/02/02 01/02/03 Bovis Lend Lease
01/LC11 -10,224 10/07/02 11/06/02 Spencer Virnoche
03/H11 7,824 03/10/03 03/20/03 Airtech Heating
03P11029 -8,718 02/12/02 05/13/02 Superior Plumbing
04/ACM11 -11,664 02/19/02 04/04/02 Avala Contracting
05/E11 56,155 08/29/02 01/08/03 West Elec.
06/E11 21,888 08/29/02 01/08/03 West Elec.
07/E11 5,185 08/29/02 01/08/03 West Elec.
07/S11 -1,255 05/16/02 05/24/02 Ritter & Paratore
09/GC11 6,473 02/19/02 04/04/02 BF Yenny Const.
09E11 -4,152 11/30/05 12/13/05 West Electric
10/GC11 7,518 01/18/02 03/29/02 BF Yenny Const.
11/GC11 -3,616 02/14/02 03/21/02 BF Yenny Const.
E11 -9,765 11/08/05 06/30/06 West Electric
H11-037A 18,642 02/06/03 02/24/03 Airtech Heating
98-1220 Reconstruction 0-012-010 06/17/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1496 Reconstruction 0-012-012 06/22/00 *CO No.* Amount Disallowed Received Approved Contractor
01GC5009 -18,217 03/25/02 04/26/02 BF Yenny Const.
06ACM510 -3,700 07/24/02 07/24/02 Summit Environ.
01-0774 Reconstruction 0-012-013 04/10/02 *CO No.* Amount Disallowed Received Approved Contractor
H2-001A -14,017 02/06/03 02/13/03 Airtech Heating
H2-003 -10,000 07/24/03 08/27/03 Airtech Heating
04-0763 Reconstruction 0-012-015 03/24/05 *CO No.* Amount Disallowed Received Approved Contractor
E-003 0 11/28/05 07/24/06 Huen New York
E-005 -3,000 02/28/05 06/30/06 Huen new York
E-008 545 06/30/06 11/28/06 Huen new York
H-001 0 11/28/05 12/09/05 Airtech heating and A/c Systems
H-002 0 12/21/05 01/19/06 Airtech heating A/c Systems
H-003 -10,761 07/26/06 01/24/07 Airtech heating and AC Systems
R-001 -23,140 09/23/05 06/12/06 Cobblestone Construction
R-002 0 02/28/06 06/12/06 Cobblestone Construction Co
R-003 -5,029 02/28/06 06/12/06 Cobblestone Construction
R-004 0 02/28/06 06/12/06 Cobblestone Construction
R-005 0 02/28/06 06/12/06 Cobblestone Construction
R-006 0 02/28/06 06/12/06 Cobblestone Construction
R-007 0 02/28/06 06/12/06 Cobblestone Construction
R-008 0 02/28/06 06/12/06 Cobblestone Construction
R-009 0 02/28/06 06/12/06 Cobblestone Construction
R-010 0 02/28/06 06/12/06 Cobblestone Construction
R-011 5,000 02/28/06 06/12/06 Cobblestone Construction
R-012 -13,061 07/26/06 08/10/06 Cobblestone Construction'
05-0467 Reconstruction 0-012-016 02/09/06 *CO No.* Amount Disallowed Received Approved Contractor
002 0 11/26/07 01/28/08 BELLUCCI ENTERPIRSES
002 0 11/26/07 01/28/08 BELLUCCI TNERPIRSES
007 11,673 08/02/07 08/20/07 George Nole and Sons
008 0 07/31/08 08/26/08 GEORGE A. NOLE & SON, INC.
GC-11 21,000 10/04/06 10/24/06 George Nole Sons
02-1196FP Reconstruction 0-012-FP1 02/25/03 NO CHANGE ORDERS ON ELECTRONIC FILE
:
96-1458 Reconstruction 1-002-001 06/04/97 NO CHANGE ORDERS ON ELECTRONIC FILE
Maintenance Bldg.:
96-1464 Reconstruction 3-009-001 06/04/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0216 Additions and Alterations 3-009-002 09/23/98 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Maintenance Facility:
91-0162 Reconstruction 5-008-002 08/23/91 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1459 Reconstruction 5-008-003 06/04/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1556 Additions and Alterations 5-008-004 08/18/00 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0113 Additions and Alterations 5-008-006 11/07/07 NO CHANGE ORDERS ON ELECTRONIC FILE
:
90-0898 Reconstruction 9-002-001 02/22/91 NO CHANGE ORDERS ON ELECTRONIC FILE
CLINTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 41-11-01-06
last updated on 10/06/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Chenango Elementary:
91-1216 Reconstruction 0-001-002 05/04/92 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1587 Reconstruction 0-001-003 07/25/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0050 Reconstruction 0-001-005 07/18/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1204 Additions and Alterations 0-001-006 09/20/01 *CO No.* Amount Disallowed Received Approved Contractor
GC-22 -3,625 03/13/06 05/25/06 George Nole and Sons
00-1861 Reconstruction 0-001-007 06/06/01 *CO No.* Amount Disallowed Received Approved Contractor
AA1 -11,667 03/11/04 03/17/04 Midlantic Environmental
Junior High:
94-1588 Reconstruction 0-002-003 07/25/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0051 Reconstruction 0-002-005 07/18/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1492 Reconstruction 0-002-006 05/15/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1205 Additions and Alterations 0-002-007 09/20/01 *CO No.* Amount Disallowed Received Approved Contractor
E-1 -700 01/09/04 04/26/04 Huen New York
E-10 -3,663 04/22/04 04/26/04 Huen New York
E-12 -4,951 04/22/04 04/26/04 Huen New York
E-13 -1,119 05/24/04 05/27/04 Huen New York
E-2 0 01/15/04 01/29/04 Huen New York
E-3 -52 01/15/04 / / Huen New York
E-4 -104 01/15/04 01/29/04 Huen New York
E-6 0 01/15/04 01/29/04 Huen New York
E-7 0 01/29/04 02/25/04 Huen New York
E-8 0 01/29/04 02/25/04 Huen New York
E15 -2,614 07/18/05 08/02/05 Huen new York
E17 3,339 07/18/05 08/02/05 Huen new York
GC-1 0 03/24/03 04/17/03 George Nole & Sons
GC-10 -57,788 09/19/03 10/03/03 George Nole & Sons
GC-11 3,309 03/02/04 03/08/04 George Nole & Sons
GC-12 8,738 03/02/04 03/08/04 George Nole & Sons
GC-14 2,925 04/22/04 04/26/04 George Nole & Sons
GC-15 8,527 04/22/04 04/26/04 George Nole & Sons
GC-17 1,912 04/22/04 04/26/04 George Nole & Sons
GC-19 352 04/22/04 04/26/04 George Nole & Sons
GC-2 -4,000 12/01/03 03/15/04 George Nole & Sons
GC-20 1,121 04/22/04 04/26/04 George Nole & Sons
GC-21 6,400 04/28/04 05/11/04 George Nole & Sons
GC-21 3,668 03/13/06 05/25/06 george Nole and Sons
GC-22 -1,168 07/02/04 07/27/04 George Nole & Sons
GC-24 1,597 07/02/04 07/27/04 George Nole & Sons
GC-25 2,801 07/02/04 07/27/04 George Nole & Sons
GC-26 11,806 07/18/05 08/02/05 George Nole and sons
GC-27 3,807 07/18/05 08/02/05 George Nole and Son
GC-28 3,612 08/18/05 08/02/05 george Nole and Son
GC-5 -2,603 09/19/03 10/03/03 George Nole & Sons
GC-6 0 09/19/03 10/03/03 George Nole & Sons
GC-7 -51 07/13/05 07/22/05 george nole and Son
GC-8 -1,067 09/19/03 10/03/03 George Nole & Sons
GC-9 -10,374 09/19/03 10/03/03 George Nole & Sons
M-1 14,339 12/05/02 12/09/02 HJ Brandeles
M-3 -2,250 01/15/04 02/26/04 HJ Brandeles
M-4 -5,149 05/21/04 05/27/04 HJ Brandeles
M-5 -778 05/21/04 05/27/04 HJ Brandeles
M-6 -554 05/21/04 05/27/04 HJ Brandeles
M7 -32,400 07/18/05 08/02/05 HJ Brandeles Corp
P-5 0 07/21/04 07/27/04 Bellucci Enterprises
P-6 32,979 07/21/04 07/27/04 Bellucci Enterprises
TE-1 7,540 03/28/06 07/21/06 Syracuse Scenery and Stage
00-1862 Reconstruction 0-002-008 06/06/01 *CO No.* Amount Disallowed Received Approved Contractor
AA3 0 03/11/04 03/17/04 Midlantic Environ.
Senior High:
94-1589 Reconstruction 0-005-002 07/25/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0052 Reconstruction 0-005-004 07/18/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1206 Additions and Alterations 0-005-005 09/20/01 *CO No.* Amount Disallowed Received Approved Contractor
E-1 0 01/15/04 01/29/04 Huen New York
E-11 -3,663 04/22/04 04/26/04 Huen New York
E-14 -1,678 05/22/04 05/27/04 Huen New York
E-16 9,874 07/18/05 08/02/05 Huen new York
E-2 0 01/15/04 01/29/04 Huen New York
E-5 -569 01/15/04 / / Huen New York
E-9 -2,205 03/11/04 04/26/04 Huen New York
E3 7,765 07/13/05 07/22/05 Huen New York
E4 8,193 07/13/05 07/22/05 Huen new York
E5 1,545 07/13/05 07/22/05 Huen New York
E6 634 07/13/05 07/22/05 Huen new York
GC-1 0 12/01/03 03/15/04 George Nole & Sons
GC-10 -665 07/13/05 07/22/05 george Nole and Son
GC-11 -6,686 07/13/05 07/22/05 George Nole and Sons
GC-12 0 07/13/05 07/22/05 George Nole and Son
GC-13 4,833 04/22/04 04/26/04 George Nole & Sons
GC-14 3,551 07/13/05 07/22/05 George Nole and Sons
GC-15 21,842 03/13/06 05/25/06 George Nole and Sons
GC-16 1,054 04/22/04 04/26/04 George Nole & Sons
GC-16 -1,270 03/13/06 05/25/06 george Nole and sons
GC-17 3,950 03/13/06 05/25/06 George Nole Sons
GC-18 -14,000 04/22/04 04/26/04 George Nole & Sons
GC-18 -14,802 03/13/06 05/25/06 george Nole and sons
GC-19 203 03/13/06 05/25/06 George Nole and sons
GC-2 44,000 03/24/03 04/17/03 George Nole & Sons
GC-20 1,650 03/13/06 05/25/06 George Nole and Sons
GC-23 -3,000 07/02/04 07/27/04 George Nole & Sons
GC-23 -3,995 03/13/06 05/25/06 george Nole And Sons
GC-24 -9,353 03/13/06 05/26/06 George nole and Sons
GC-3 8,726 03/24/03 04/17/03 George Nole & Sons
GC-3 -1,662 05/21/04 05/27/04 George Nole & Sons
GC-4 5,062 03/24/03 04/17/03 George Nole & Sons
GC-4 -401 05/21/04 05/27/04 George Nole & Sons
GC-6 -1,209 07/13/05 07/22/05 George Nole and Son
GC-7 -3,168 09/19/03 10/03/03 George Nole & Sons
GC-8 0 08/13/05 07/22/05 George Nole and Son
GC-9 0 08/13/05 07/22/05 George Nole and Sons
GC5 0 07/13/05 07/22/05 George nole Son
Gc-13 -832 07/13/05 07/22/05 george Nole and Son
M-1 0 05/07/03 05/08/03 Giruzzi Plumbing
M-2 4,670 12/05/02 12/09/02 HJ Brandeles
M-2 -2,144 01/15/04 05/09/06 Giruzzi Plumbing
M-3 -3,000 01/15/04 01/29/04 Giruzzi Plumbing
M-4 -3,565 03/07/05 03/24/05 Giruzzi Plumbing Heating
P-1 0 12/01/03 03/15/04 Bellucci Ent.
P-2 0 04/11/03 04/21/03 Bellucci Ent.
P-3 -5,565 03/02/04 04/22/04 Bellucci Ent.
P-4 0 07/21/04 07/27/04 Bellucci Ent.
P2 0 05/24/05 07/21/05 Bellucci Enterprises
P3 -5,074 05/24/05 07/21/05 Bellucci Enterprises
00-1863 Reconstruction 0-005-006 06/06/01 *CO No.* Amount Disallowed Received Approved Contractor
AA2 -4,520 03/11/04 03/17/04 Midlantic Environmental
07-1273 Reconstruction 0-005-007 09/16/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Pool Changing Rm & Service Bldg.:
00-1208 New Construction 7-008-001 09/20/01 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1864 Reconstruction 7-008-002 06/06/01 *CO No.* Amount Disallowed Received Approved Contractor
AA-4 -14,000 05/24/05 06/21/05 Midlantic Environmental
Toilet & Service Bldg.:
00-1207 New Construction 7-009-001 09/20/01 NO CHANGE ORDERS ON ELECTRONIC FILE
NEW HARTFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 41-15-01-06
last updated on 10/06/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Oxford Rd. ES/SHS:
92-1110 Reconstruction 0-005-003 06/03/93 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1023 Reconstruction 0-005-004 05/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1517 Reconstruction 0-005-005 06/24/94 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1340 Reconstruction 0-005-007 05/28/98 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1811 Reconstruction 0-005-008 08/25/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1346 Reconstruction 0-005-009 09/19/01 *CO No.* Amount Disallowed Received Approved Contractor
012 0 07/16/04 07/21/04 Bilbern Construction
013 5,088 07/16/04 07/21/04 Bilbern Construction
E-005 9,030 06/20/02 07/05/02 Edgeline Elec.
E-008 2,190 08/29/02 01/08/03 Edgeline Elec.
E-009 31,000 08/29/02 01/08/03 Edgeline Elec.
E-010 1,572 08/29/02 01/08/03 Edgeline Elec.
E-013 2,270 05/16/06 07/27/06 Edgeline Electric
E/Allow1 991 08/29/02 01/08/03 Edgeline Elec.
GC-001 -9,345 08/15/02 11/01/02 Bilbern Construction
GC-006 0 05/14/03 05/21/03 Bilbern Construction
GC-012 0 07/16/04 09/16/04 Bilbern Construction
GC-013 10,176 07/16/04 09/16/04 Bilbern Construction
GC-014 -4,486 07/16/04 07/21/04 Bilbern Construction
P-002 9,767 02/24/03 03/06/03 Scharf Plumbing
P-002 9,767 02/24/03 04/24/03 Scharf Plumbing
P/Allow 313 08/15/02 02/10/03 Scharf Plumbing
P/Allow2 1,090 02/10/03 02/24/03 Scharf Plumbing
S-001 9,674 12/16/02 01/09/03 Delaney Construction
S-002 3,575 12/16/02 01/09/03 Delaney Construction
S-004 0 01/22/03 02/05/03 Delaney Construction
S-006 0 01/22/03 02/05/03 Delaney Construction
S-007 805 01/22/03 02/05/03 Delaney Construction
S-008 0 01/22/03 02/05/03 Delaney Construction
S-009 0 01/22/03 02/05/03 Delaney Construction
S-011 0 01/22/03 02/05/03 Delaney Construction
S-012 0 03/19/03 03/24/03 Delaney Construction
S-013 0 03/19/03 03/24/03 Delaney Construction
S-014 296 02/04/03 02/10/03 Delaney Construction
S-015 4,767 02/04/03 02/10/03 Delaney Construction
S-016 3,020 02/04/03 02/10/03 Delaney Construction
S-017 2,899 03/19/03 03/24/03 Delaney Construction
S-018 10,579 11/19/04 12/06/04 Delaney Construction
S-019 451 11/19/04 12/06/04 Delaney Construction
S-022 14,809 11/19/04 12/06/04 Delaney Construction
S-023 1,225 06/16/03 07/11/03 Delaney Construction
S-026 1,328 11/19/04 12/06/04 Delaney Construction
S-027 2,878 11/19/04 12/06/04 Delaney Construction
S-028 -900 11/19/04 12/06/04 Delaney Construction
S-029 500 11/19/04 12/06/04 Delaney Construction
01-0442 Reconstruction 0-005-010 06/24/02 *CO No.* Amount Disallowed Received Approved Contractor
E2-001 0 06/16/03 07/11/03 Kogut Electric
E2-002 0 06/16/03 07/11/03 Kogut Electric
E2-006 0 08/10/04 09/09/04 Kogut Electric
E2-009 10,457 08/10/04 09/09/04 Kogut Electric
E2-016 0 08/10/04 09/09/04 Kogut Electric
E2-018 0 08/10/04 09/27/04 Kogut Electric
E2-019 0 08/10/04 09/27/04 Kogut Electric
E2-022 0 08/10/04 09/27/04 Kogut Electric
E2-023 -3,000 06/30/08 / / Kogut Electric
E2-024 -1,609 08/10/04 09/09/04 Kogut Electric
GC2-002 0 05/15/03 05/23/03 Putrelo Const.
GC2-005 0 06/30/08 / / Putrelo Construction
GC2-008 0 01/08/04 03/17/04 Putrelo Const.
GC2-009 0 01/08/04 03/17/04 Putrelo Const.
GC2-010 4,563 01/08/04 03/17/04 Putrelo Const.
GC2-015 3,704 01/08/04 03/17/04 Putrelo Const.
GC2-017 3,275 02/13/04 04/07/04 Putrelo Const.
GC2-018 6,196 02/13/04 04/07/04 Putrelo Const.
H2-002 0 10/31/03 09/09/04 HJ Brandeles
H2-004 0 11/25/03 01/09/04 HJ Brandeles
H2-006 0 12/31/03 01/21/04 HJ Brandeles
H2-008 0 08/10/04 09/09/04 HJ Brandeles
H2-009 0 08/10/04 09/09/04 HJ Brandeles
H2-010 -1,883 06/30/08 08/27/08 H.J. Brandeles
LE2-001 0 01/21/04 01/28/04 Kernan Library Office Group
P2-003 8,761 01/02/03 01/21/04 HJ Brandeles
02-0517 Additions and Alterations 0-005-011 07/09/03 *CO No.* Amount Disallowed Received Approved Contractor
5,814 05/22/06 07/14/06 Puterlo Construction Co
0 / / / /
E3-001 16,733 10/04/04 10/18/04 Madonia Elec.
E3-002 0 04/04/05 06/21/05 Madonia electric
E3-004 0 05/04/05 06/21/05 Madonia electric
E3-005 0 04/04/05 06/21/05 Madonia Electric
E3-006 0 04/04/05 05/02/05 Madonia Electric
E3-008 0 06/30/08 / / Madonia Electric
E3-009 0 06/30/08 / / Madonia Electric
E3-010 1,844 03/15/07 10/23/07 Madonia Electric
E3-011 1,591 06/15/07 10/23/07 Madonia electric
E3-014a 8,184 07/16/07 10/23/07 Madonia Electric
E3-014b 6,824 07/16/07 10/23/07 Madonia Electric
E3-018 847 07/16/07 10/23/07 Madonia Electric
E3-020 1,959 07/16/07 10/23/07 Madonia Electric
E3-023 -3,000 07/16/07 10/23/07 Madonia Electric
GC3-002 1,425 07/28/04 09/09/04 Putrelo Const.
GC3-003 1,756 07/28/04 09/09/04 Putrelo Const.
GC3-004 1,920 07/28/04 09/09/04 Putrelo Const.
GC3-008 0 04/04/05 06/21/05 Puterlo Construction
GC3-009 0 04/04/05 06/21/05 Puterlo Construction Co
GC3-011 1,638 04/04/05 06/21/05 Puterlo Construction
GC3-012 6,380 05/22/06 07/14/06 Puterlo Construction
GC3-014 3,707 05/04/05 06/21/05 Puterlo Construction
GC3-015 2,217 04/04/05 06/21/05 Puterlo Construction
GC3-021 1,502 05/22/06 07/14/06 Puterlo Construction
GC3-023 3,090 05/22/06 07/14/06 Puterlo Construction
GC3-024 5,430 05/22/06 07/14/06 Puterlo Construction
GC3-025 4,623 05/22/06 07/14/06 Puterlo Construction
GC3-026 3,478 05/22/06 07/14/06 Puterlo Construction
GC3-027 2,793 05/22/06 07/14/06 Puterlo Construction
GC3-028 1,484 05/22/06 07/14/06 Puterlo Construction
GC3-029 2,095 05/22/06 07/14/06 Puterlo Construction
GC3-031` 440 05/22/06 07/14/06 Puterlo Construction
GC3-032 14,239 05/22/06 07/14/06 Puterlo Construction
GC3-041 5,246 06/25/07 07/17/07 Puterlo Construction
GC3-042 9,660 06/25/07 07/17/07 Puterlo Construction
GC3-043 -2,100 06/25/07 / / Puterlo Construction
H3-001 2,205 07/28/04 09/09/04 CNY Mech.
H3-002 6,028 12/06/04 12/10/04 CNY Mech.
H3-004 1,773 12/06/04 12/10/04 CNY Mech.
H3-005 1,942 11/15/04 12/06/04 CNY Mech.
H3-006 1,755 11/15/04 12/06/04 CNY Mech.
H3-008 1,073 11/08/04 12/06/04 CNY Mech.
H3-010 658 11/08/04 12/06/04 CNY Mech.
H3-012 2,674 11/08/04 12/06/04 CNY Mech.
H3-014 0 04/04/05 06/21/05 CNY Mechanical Associates
H3-016 24,428 02/02/05 03/18/05 CNY mechanical Associates
H3-018 0 04/04/05 06/21/05 CNY Mechanical Associates
H3-13 0 04/04/05 06/21/05 CNY Mechanical Associates
P3-003 2,907 06/15/07 10/23/07 LaFrance Plumbing Heating
P3-005 0 09/14/04 12/24/04 LaFrance Plumbing
P3-006 0 06/25/07 10/26/07 LaFrance Plumbing Heating
P3-010 3,660 06/25/07 10/26/07 LAFrance Plumbing Heating
P3-014 16,440 06/25/07 10/26/07 LaFrance Plumbing Heating
P3-015 15,317 06/25/07 10/26/07 LAFrance Plumbing Heating
P3-016 7,500 06/25/07 10/26/07 LaFrance Plumbing
S3-004 5,920 06/30/08 / / Roberts Construction
S3-008 3,749 06/30/08 / / Roberts Construction
S3-011 2,875 06/30/08 / / Roberts Construction
S3-014 -3,000 06/30/08 / / Roberts Construction
S3-015 26,169 06/30/08 / / Roberts Construction
03-1644 Reconstruction 0-005-013 06/25/04 *CO No.* Amount Disallowed Received Approved Contractor
1 -1,602 05/31/05 06/21/05 Two Brothers Contracting
05-1135 Reconstruction 0-005-014 09/22/06 *CO No.* Amount Disallowed Received Approved Contractor
E4-01 8,000 12/31/07 04/03/08 Patricia Electric
E4-02 3,508 12/31/07 04/03/08 Patricia Electric
G4-01 2,930 01/28/08 03/19/08 PUTRELO CONSTRUCTION CO. INC
G4-06 -43,306 06/27/08 08/26/08 Putrelo Construction
H4-01 -1,400 01/28/08 08/12/08 SCHMALZ MECHANICAL CONTRACTORS, INC
H4-02 3,255 01/28/08 08/12/08 SCHMALZ MECHANICAL CONTRACTORS
H4-05 858 02/08/08 08/08/08 schalz mechical contractors
07-0694 Additions and Alterations 0-005-015 05/13/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Hughes Elementary:
92-1111 Reconstruction 0-006-004 06/03/93 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1024 Reconstruction 0-006-005 05/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1341 Reconstruction 0-006-006 05/28/98 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1812 Reconstruction 0-006-007 08/25/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1345 Reconstruction 0-006-008 09/19/01 *CO No.* Amount Disallowed Received Approved Contractor
1-001 -1,399 04/17/02 05/13/02 Edgeline Elec.
E-001 20,184 04/30/02 05/24/02 Edgeline Elec.
E-002 2,430 05/21/02 05/29/02 Edgeline Elec.
E-003 51,076 06/04/02 08/15/02 Edgeline Elec.
E-004 21,870 06/13/02 11/04/02 Edgeline Elec.
E-006 16,862 06/30/08 / / Edgeline Elec.
E-007 4,927 08/29/02 01/08/03 Edgeline Elec.
E-011 17,779 08/29/02 01/08/03 Edgeline Elec.
E-012 1,813 05/16/06 07/27/06 Edgeline electric
E-014 3,420 06/30/08 / / Edgeline Elec.
E/Allow1 1,785 08/29/02 01/08/03 Edgeline Elec.
E/Allow1 1,109 08/29/02 01/08/03 Edgeline Elec.
E/Allow1 525 08/29/02 01/08/03 Edgeline Elec.
GC-002 0 02/10/03 02/26/03 Bilbern Construction
GC-003 0 02/10/03 02/24/03 Bilbern Construction Company
GC-005 0 05/14/03 05/21/03 Bilbern Construction
GC-007 0 05/14/03 05/21/03 Bilbern Construction
GC-008 0 05/14/03 05/21/03 Bilbern Construction
GC-009 0 05/14/03 05/21/03 Bilbern Construction Company
GC-010 0 05/14/03 05/21/03 Bilbern Construction Company
GC-011 -3,000 07/16/04 07/21/04 Bilbern Construction
GC-013 5,088 07/16/04 07/21/04 Bilbern Construction
H-001 0 02/24/03 03/06/03 Scharf Plumbing
H-002 0 02/24/03 03/06/03 Scharf Plumbing
H-003 230 05/16/06 07/27/06 Scharf Plumbing Heating
H-004 -15,000 05/16/06 07/14/06 Scharf Plumbing
H-005 855 05/16/06 07/27/06 Scharf Plumbing Heating
H/Allow 1,328 02/10/03 02/10/03 Scharf Plumbing
H2-001 0 06/30/08 / / Scharf Plumbing
P-001 1,389 08/15/02 11/01/02 Scharf Plumbing
P-003 0 05/16/06 07/27/06 Scharf Plumbing Heating
P-004 1,777 05/16/06 07/27/06 Scharf Plumbing Heating
P-005 6,806 05/16/06 07/27/06 Scharf Plumbing
S-002 1,525 01/22/03 02/05/03 Delaney Construction
S-003 1,500 01/22/03 02/05/03 Delaney Construction
S-003 0 02/04/03 02/10/03 Delaney Construction
S-005 33,944 01/22/03 02/05/03 Delaney Construction
S-008 0 01/22/03 03/10/03 Delaney Construction
S-010 0 01/22/03 02/05/03 Delaney Construction
S-020 14,101 11/19/04 12/06/04 Delaney Construction
S-021 788 11/19/04 12/06/04 Delaney Construction
S-024 2,435 06/16/03 07/11/03 Delaney Construction
S-025 840 11/19/04 12/06/04 Delaney Construction
05-1136 Reconstruction 0-006-010 09/22/06 *CO No.* Amount Disallowed Received Approved Contractor
E4-03 646 12/31/07 04/03/08 Patricia Electric
G4-02 0 01/28/08 03/19/08 PUTRELO CONSTRUCTION CO. INC
H4-03 1,368 02/08/08 08/08/08 schmalz mechanical contractors
H4-04 1,576 02/08/08 08/08/08 schmalz mechanical contractors
P4-01 6,758 12/31/07 04/03/08 Schmalz Mechanical Contractors
Robert E. Myles Elementary:
92-1112 Reconstruction 0-007-004 06/03/93 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1025 Reconstruction 0-007-005 05/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1342 Reconstruction 0-007-006 05/28/98 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1813 Reconstruction 0-007-007 08/25/98 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0443 Reconstruction 0-007-008 06/24/02 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
E2-001 0 08/10/04 / / Kogut Electric
E2-003 0 06/30/08 08/27/08 Kogut Electric
E2-005 0 08/10/04 09/27/04 Kogut Electric
E2-010 0 06/30/08 / / Kogut Electric
E2-013 0 08/10/04 09/09/04 Kogut Electric
E2-014 0 08/10/04 09/09/04 Kogut Electric
E2-017 0 08/10/04 09/09/04 Kogut Electric
E2-020 0 08/10/04 09/09/04 Kogut Electric
E2-021 0 08/10/04 09/23/04 Kogut Electric
E2-024 -4,827 08/10/04 09/09/04 Kogut Electric
E2-026 -4,414 08/10/04 09/09/04 Kogut Electric
E2-12 0 01/03/07 01/19/07 Kogut Electric
GC2-001 1,576 05/15/03 05/23/03 Putrelo Const.
GC2-003 2,448 05/15/03 05/23/03 Putrelo Const.
GC2-004 0 06/30/08 / / Putrelo Const.
GC2-006 0 06/30/08 / / Putrelo Construction
GC2-007 5,202 01/08/04 04/07/04 Putrelo Const.
GC2-011 9,345 01/08/04 04/07/04 Putrelo Const.
GC2-012 9,874 01/08/04 04/07/04 Putrelo Const.
GC2-014 5,187 01/08/04 03/17/04 Putrelo Const.
GC2-019 4,200 02/13/04 04/07/04 Putrelo Const.
GC2-031 3,234 06/15/07 06/20/07 Puterlo Construction
H2-005 0 11/25/03 01/09/04 HJ Brandeles
H2-007 0 12/31/03 01/21/04 HJ Brandeles
H2-010 -1,883 06/30/08 08/27/08 HJ Brandeles
Le2-001 0 01/21/04 / / Kernan Library Office Group
Le2-002 -3,512 06/30/08 / / Kernan Library Office Group
P2-002 0 12/31/03 01/21/04 HJ Brandeles
P2-004 115 08/10/04 09/09/04 HJ Brandeles
S2-001 7,485 07/28/03 08/14/03 Murphy Excavating
S2-002 0 07/18/06 07/27/06 Murphy Excavating
S2-003 4,744 07/18/06 07/27/06 Murphy Excavating
S2-004 0 07/18/06 07/27/06 Murphy Excavating
S2-004 0 01/03/07 01/30/07 Murphy Exvacating
S2-005 -13,750 01/03/07 01/30/07 Murphy Excavating
05-1137 Reconstruction 0-007-010 09/22/06 *CO No.* Amount Disallowed Received Approved Contractor
H4-03 1,368 02/08/08 08/08/08 schmalz mechanical contractors
Ralph W. Perry Jr. High:
92-1113 Reconstruction 0-008-002 06/03/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1151 Reconstruction 0-008-003 05/09/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1026 Reconstruction 0-008-004 05/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1343 Reconstruction 0-008-005 05/28/98 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0444 Reconstruction 0-008-006 06/24/02 *CO No.* Amount Disallowed Received Approved Contractor
E2-004 0 08/10/04 09/09/04 Kogut Electric
E2-007 95,000 08/10/04 09/09/04 Kogut Electric
E2-008 0 08/10/04 09/09/04 Kogut Electric
E2-011 0 01/03/07 01/19/07 Kogut Electric
E2-015 0 08/10/04 09/27/04 Kogut Electric
E2-016 0 08/10/04 09/27/04 Kogut Electric
E2-024 -4,827 08/10/04 09/27/04 Kogut Electric
E2-025 -10,000 08/10/04 09/27/04 Kogut Electric
GC2-013 1,362 01/08/04 03/15/04 Putrelo Const.
GC2-016 8,496 02/13/04 04/07/04 Putrelo Const.
H2-003 0 10/31/03 12/01/03 HJ Brandeles
H2-010 -1,883 06/30/08 08/27/08 HJ Brandeles
P2-001 0 12/31/03 01/21/04 HJ Brandeles
02-0518 Additions and Alterations 0-008-007 07/09/03 *CO No.* Amount Disallowed Received Approved Contractor
3-030 3,104 05/22/06 07/14/06 Puterlo Construction
3-13 0 05/22/06 07/14/06 Puterlo Construction
3-33 15,991 05/22/06 07/14/06 Puterlo Construction
E3-003 0 04/04/05 06/21/05 Madonia Electric
E3-007 0 07/16/07 10/23/07 Madonia ELectric
E3-012 15,740 07/18/06 12/27/06 Madonia Electric
E3-013 9,591 06/30/08 / / Madonia Electric
E3-015 0 07/16/07 10/23/07 Madonia Electric
E3-016 0 07/16/07 10/23/07 Madonia Electric
E3-019 1,820 07/16/07 10/23/07 Madonia Electric
E3-021 1,005 07/16/07 10/23/07 Madonia Electric
E3-022 909 07/16/07 10/23/07 Madonia Electric
GC3-001 15,733 11/15/04 12/06/04 Putrelo Const.
GC3-010 5,472 04/04/05 06/21/05 Puterlo Construction
GC3-017 8,043 05/22/06 07/14/06 Puterlo Construction
GC3-020 0 05/22/06 07/14/06 Puterlo Construction
H3-003 1,945 12/06/04 12/10/04 CNY Mech.
H3-007 134 11/08/04 12/06/04 CNY Mech.
H3-009 492 11/08/04 12/06/04 CNY Mech.
H3-011 660 11/08/04 12/06/04 CNY Mech.
H3-019 0 04/04/05 06/21/05 CNY mechanical Associates
P3-001 2,304 11/15/04 12/06/04 LaFrance Plumbing
P3-002 7,500 11/15/04 12/06/04 LaFrance Plumbing
P3-004 0 06/15/07 10/23/07 LaFrance Plumbing heating
P3-007 0 06/25/07 10/26/07 LaFrance Plumbing heating
P3-008 0 06/25/07 10/26/07 LAFrance Plumbing
P3-009 482 06/25/07 10/26/07 LaFrance Plumbing
P3-011 1,094 06/25/07 10/26/07 LaFrance Plumbing
P3-012 3,314 06/25/07 10/26/07 LaFrance Plumbing heating
P3-013 4,743 06/25/07 10/26/07 LaFrance Plumbing
S3-001 40,000 12/10/04 12/23/04 Roberts Construction
S3-002 0 06/30/08 / / Roberts Construction
S3-003 4,004 06/30/08 / / Roberts Construction
S3-005 5,100 06/30/08 / / Roberts Construction
S3-006 8,431 06/30/08 / / Roberts Construction
S3-007 9,563 06/30/08 / / Roberts Construction
S3-009 600 06/30/08 / / Roberts Construction
S3-010 8,170 06/30/08 / / Roberts Construction
S3-012 -9,465 06/30/08 / / Roberts Construction
S3-013 1,400 06/30/08 / / Roberts Construction
S3-016 1,700 06/30/08 / / Roberts Construction
05-1138 Reconstruction 0-008-008 09/22/06 NO CHANGE ORDERS ON ELECTRONIC FILE
Storage Building @ Perry Jr. High:
96-0297 New Construction 2-012-001 10/24/96 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1171 Additions and Alterations 2-012-002 07/08/05 NO CHANGE ORDERS ON ELECTRONIC FILE
Lower Bus Garage:
07-0695 Reconstruction 4-002-002 05/13/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
92-1114 Reconstruction 5-001-001 06/03/93 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0696 Reconstruction 5-001-003 05/13/08 NO CHANGE ORDERS ON ELECTRONIC FILE
New Press Box at SHS:
94-1682 New Construction 7-012-001 07/18/95 NO CHANGE ORDERS ON ELECTRONIC FILE
District Wide:
01-0445 Reconstruction 7-999-003 06/24/02 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0190FP Reconstruction 7-999-FP1 10/14/03 NO CHANGE ORDERS ON ELECTRONIC FILE
NEW YORK MILLS UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 41-15-04-02
last updated on 10/06/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
K-12 School:
99-0554 Additions and Alterations 0-002-005 04/05/00 *CO No.* Amount Disallowed Received Approved Contractor
ASB-5 1,980 05/24/01 01/14/02 Avala Contracting
E-1 5,485 05/24/01 01/14/02 Panko Elec.
E-2 7,306 05/24/01 01/14/02 Panko Elec.
E-3 25,013 05/24/01 01/14/02 Panko Elec.
E-4 20,516 05/02/02 05/10/02 Panko Elec.
E-5 5,443 02/04/02 04/01/02 Panko Elec.
GC-7 3,201 09/11/01 01/08/02 George Nole & Son
H-2 4,260 05/02/02 05/10/02 HJ Brandeles
H-3 6,434 05/02/02 05/10/02 HJ Brandeles
H-4 387 09/11/01 04/10/02 HJ Brandeles
P-1 9,068 05/24/01 01/14/02 LaFrance Plumbing
P-3 -2,300 05/02/02 05/10/02 LaFrance Plumbing
SITE-2 1,040 05/24/01 01/14/02 Hanna Const.
SITE-3 700 05/02/02 05/10/02 Hanna Const.
W1 5,525 05/02/02 05/10/02 Utica Glass
W2 2,530 05/02/02 05/10/02 Utica Glass
W3 1,250 02/04/02 04/01/02 Utica Glass
94-1455 Reconstruction 0-002-006 05/22/95 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1297 Reconstruction 0-002-007 05/29/02 *CO No.* Amount Disallowed Received Approved Contractor
1 -14,081 04/24/03 05/07/03 Associated Const.
1 -716 06/19/03 07/11/03 Roma Const.
2 -500 04/24/03 05/07/03 Associated Const.
02-0450FP Reconstruction 0-002-FP1 11/13/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Beekman Gym:
98-1618 Reconstruction 0-005-002 10/05/99 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 900 05/02/02 05/10/02 Poncell Const.
GC-2 19,200 01/10/02 03/15/02 Poncell Const.
GC-2 19,200 03/05/02 / / Poncell Const.
P-1 -674 05/02/02 05/10/02 Superior Plumbing
R-1 -2,000 05/02/02 05/10/02 Henderson-Johnson
94-1456 Reconstruction 0-005-003 05/22/95 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1349 Reconstruction 0-005-004 06/08/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Relocatable purch from BOCES:
95-0040 New Construction 0-007-001 08/02/95 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
94-1457EP Reconstruction 5-003-001 05/22/95 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1619 Reconstruction 5-003-002 10/05/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1298 Reconstruction 5-003-003 05/29/02 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
04-0003 Additions and Alterations 5-003-005 08/25/04 *CO No.* Amount Disallowed Received Approved Contractor
E-001 -2,958 07/28/06 12/18/06 Usmail Electric
GC-001 -11,630 11/28/05 08/08/06 Puterlo Construction
SAUQUOIT VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 41-16-03-04
last updated on 10/06/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Sulphur Springs Elementary:
94-0815 Additions and Alterations 0-002-006 02/28/95 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1287 Reconstruction 0-002-007 04/19/00 *CO No.* Amount Disallowed Received Approved Contractor
F-1 -3,012 06/12/03 07/11/03 Hummels Office Plus
99-1569 Reconstruction 0-002-008 06/06/00 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0797 Reconstruction 0-002-009 05/08/02 *CO No.* Amount Disallowed Received Approved Contractor
E1 1,055 12/11/02 12/13/02 Madonia Elec.
P1 3,750 02/07/03 02/13/03 HJ Brandeles
05-0606 Reconstruction 0-002-010 05/30/06 *CO No.* Amount Disallowed Received Approved Contractor
001 6,300 11/17/06 01/09/07 Smith Site Development
002 6,020 11/17/06 01/09/07 Smith Site Development
002 6,590 12/18/06 01/09/07 Ridley Electric
002 12,512 01/29/07 / / Scharf Plumbing Heating
003 3,546 12/19/06 01/30/07 smith Site Development
004 19,360 12/18/06 01/30/07 Smith site Development
004 -828 03/26/07 04/02/07 HJ Brandeles Corp
005 11,027 12/18/06 01/30/07 Smith Site Development
005 5,922 01/16/07 02/01/07 Ridley Electric
006 1,713 01/29/07 02/22/07 Smith Site Development
006 8,969 07/30/07 08/20/07 HJ brandeles Corp
006 3,420 02/25/08 04/02/08 cobblestone construction
007 13,981 03/02/07 03/13/07 Smith Site Development
007 2,142 05/11/07 05/16/07 Puterlo Construction
007 698 11/13/07 01/28/08 Scharf Plumbing & Heating
008 1,759 03/02/07 03/13/07 Ridley Electric
008 29,711 05/23/07 06/21/07 Smith site Development
009 1,380 05/11/07 05/16/07 Puterlo Construction
013 484 07/14/08 / / HJ BRANDELES CORP.
014 7,946 11/08/07 11/08/07 Smith Site Development
015 2,066 2,066 11/13/07 01/08/08 Smith Site Development
019 1,039 11/13/07 01/28/08 Ridley Electric Co
020 -1,300 1,300 12/24/07 / / RIDLEY ELECTRIC CO. INC.
025 8,525 12/24/07 02/23/08 RIDLEY ELECTRIC CO. INC.
026 23,118 11/08/07 11/08/07 Putrelo Construction
028 570 02/25/08 04/15/08 ridley electric
029 1,970 02/25/08 04/15/08 ridley electric
030 18,590 07/14/08 / / RIDLEY ELECTRIC CO. INC.
17 1,278 07/23/07 08/20/07 Puterlo Construction
E-009 6,340 03/26/07 04/25/07 Ridley electric
GC-001 42,266 10/26/06 12/18/06 Puterlo Construction
GC-005 57,750 04/16/07 / / Puterlo Construction
GC-020 1,234 08/28/07 11/14/07 PUTRELO CONSTRUCTION CO.
GC-029 2,835 12/24/07 01/07/08 PUTRELO CONSTRUCTION CO.
GC-033 25,000 01/07/08 01/07/08 Putrelo Construction
GC-038 672 01/07/08 01/07/08 Putrelo Construction
H - 02 28,163 03/02/08 08/08/08 HJ BRANDELES CORP.
SITE 012 5,044 08/28/07 / / SMITH SITE CONSTRUCTION
SITE 013 17,062 08/28/07 / / SMITH SITE CONSRTUCTION
SITE011 9,407 08/28/07 / / SMITH SITE DEVELOPMENT
02-1886FP Reconstruction 0-002-FP1 05/30/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Jr/Sr High School:
94-0816 Additions and Alterations 0-003-005 02/28/95 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1288 Reconstruction 0-003-006 04/19/00 *CO No.* Amount Disallowed Received Approved Contractor
F-1 -3,483 06/16/03 07/11/03 Hummels Office Plus
99-1568 Reconstruction 0-003-007 06/06/00 *CO No.* Amount Disallowed Received Approved Contractor
G-6 -4,821 12/13/01 03/25/02 Richard Alexander
L-3 3,400 01/08/03 11/21/03 Jemcoat, Inc
L-4R -1,150 01/13/03 02/05/03 Jemcoat, Inc
L2R1 -830 01/08/03 11/21/03 Jemcoat, Inc
01-0798 Reconstruction 0-003-008 05/08/02 *CO No.* Amount Disallowed Received Approved Contractor
04 16,500 01/08/04 01/16/04 MARS, Inc
B-1 0 12/12/02 12/19/02 MARS, Inc
B-2 0 11/25/03 12/01/03 MARS, Inc
B-3 5,932 11/25/03 12/01/03 MARS, Inc
E-2 460 02/21/03 03/04/03 Madonia Elec.
E-3 1,093 07/17/03 07/25/03 Madonia Elec.
E-4 540 01/08/04 04/05/04 Madonia Elec.
G-1 0 12/04/02 12/10/02 Lupini Const.
G-2 0 02/19/03 03/04/03 Lupini Const.
G-3 -8,350 05/05/03 05/07/03 Lupini Const.
G-4 0 08/07/03 08/12/03 Lupini Const.
G-5 21,080 11/25/03 12/05/03 Lupini Const.
G-6 -11,962 11/25/03 12/01/03 Lupini Const.
05-0607 Reconstruction 0-003-009 05/30/06 *CO No.* Amount Disallowed Received Approved Contractor
001 9,462 11/17/06 01/09/07 ridley Electric
002 -12,898 10/23/06 12/18/06 Cobblestone Construction
002 35,000 01/17/07 02/09/07 HJ brandeles Corp
002 19,525 03/26/07 04/02/07 Puterlo Construction
003 -30,647 12/18/06 01/09/07 Ridley Electric
003 3,640 02/20/07 03/08/07 Scharf Plumbing
003 -8,250 03/02/07 03/13/07 HJ Brandeles Corp
003 16,982 03/26/07 04/02/07 Puterlo Construction
003 40 05/11/07 05/16/07 Cobblestone Construction
004 -11,500 12/18/06 01/09/07 Ridley Electric
004 4,173 03/26/07 04/25/07 Scharf Plumbing
004 16,329 06/15/07 06/20/07 Cobblestone Construction
005 -16,000 05/29/07 06/20/07 HJ Brandeles Corp
005 400 11/08/07 01/28/08 Scharf Plumbing & Heating
006 23,099 04/16/07 05/15/07 Puterlo Construction
008 20,747 05/11/07 05/16/07 Puterlo Construction
008 11,453 11/13/07 01/28/08 HJ Brandeles Corp
008 400 11/13/07 01/28/08 Scharf Plumbing & Heating
009 1,068 11/13/07 01/28/08 Scharf Plumbing & Heating
010 313 03/26/07 04/25/07 Ridley Electric
010 22,520 05/23/07 06/21/07 Puterlo Construction
011 -3,569 04/16/07 05/25/07 Ridley Electric
012 38,000 04/16/07 05/25/07 Ridley Electric
014 2,300 07/09/07 10/28/07 Ridley Electric
014 598 07/14/08 / / HJ BRANDELES CORP.
015 56,800 07/09/07 07/17/07 Puterlo Construction
016 91,211 07/09/07 07/17/07 Puterlo Construction
017 1,000 11/08/07 01/28/08 Ridley Electric Company
018 2,771 11/13/07 01/28/08 Ridley Electric
024 28,989 12/24/07 02/23/08 RIDLEY ELECTRIC CO. INC.
027 5,765 02/08/08 02/23/08 Ridley Electic
028 23,870 11/13/07 12/27/07 Putrelo Construction
032 3,200 07/14/08 / / RIDLEY ELECTRIC CO. INC.
E-021 1,713 01/07/08 02/23/08 Ridley Electric
E-022 8,022 01/07/08 02/23/08 Ridley Electric
E-023 10,799 01/07/08 02/23/08 Ridley Electric
ELE-15 6,581 08/28/07 11/14/07 RIDLEY ELECTRIC CO., INC.
GC - 018 5,856 09/04/07 11/07/07 PUTRELO CONSTRUCTION CO.
GC - 022 18,200 08/28/07 / / PUTRELO CONSTRUCTION CO.
GC - 023 19,133 08/28/07 / / PUTRELO CONSTRUCTION CO.
GC - 025 84,172 08/28/07 11/15/07 PUTERLO CONSTRUCTION CO.
GC-011 19,198 06/15/07 06/20/07 Puterlo Construction
GC-013 51,593 06/01/07 06/20/07 Puterlo Construction
GC-019 9,389 09/04/07 11/08/07 PUTRELO CONSTRUCTION CO.
GC-030 2,940 01/07/08 01/07/08 Putrelo Construction
GC-034 5,229 01/07/08 01/07/08 Putrelo Construction
GC-035 14,047 01/07/08 01/07/08 Putrelo Construction
GC-036 -1,966 01/07/08 01/07/08 Putrelo Construction
GC-039 34,104 02/25/08 04/02/08 putrelo construction
GC-040 33,474 02/25/08 04/02/08 putrelo construction
GC-21 13,276 08/28/07 11/14/07 PUTERLO CONSTRUCTIOM CO.
GC-31 19,950 12/24/07 01/07/08 PUTRELO CONSTRUCTION CO.
H-009 1,177 01/07/08 02/23/08 HJ Bradeles Corp
H-010 4,273 01/07/08 02/23/08 HJ Brandeles Corp
HAVAC007 10,423 08/28/07 11/14/07 HJ BRANDELES CORP.
P-011 1,719 01/07/08 02/23/08 Scharf Plumbing & Heating
P-012 7,469 01/07/08 02/23/08 Scharf Plumbing & Heating