REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
93-0016 Reconstruction 0-001-006 07/22/93 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1110 Reconstruction 0-001-007 04/30/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1747 Additions and Alterations 0-001-008 11/30/01 *CO No.* Amount Disallowed Received Approved Contractor
AA1 1,625 01/10/03 03/13/03 Avala Contracting
AA2 -1,263 08/31/06 09/18/06 Avala Contracting
E-1 0 06/19/03 07/11/03 Huen New York
E-2 0 06/19/03 07/11/03 Huen New York
E-3 0 06/19/03 07/11/03 Huen New York
E-5 7,049 04/19/04 04/23/04 Huen New York
E-6 2,139 04/19/04 04/23/04 Huen New York
E4 80,525 09/26/03 09/18/06 Huen New York
GC-10 1,936 10/28/03 11/05/03 Contracting Management
GC-11 443 10/28/03 11/05/03 Cont. Mgmt.
GC-12 -425 11/12/04 11/19/04 Cont. Mgmt.
GC-3 1,487 04/01/03 04/18/03 Cont. Mgmt.
GC-4 11,122 06/19/03 07/11/03 Cont. Mgmt.
GC-5 1,448 06/19/03 07/11/03 Cont. Mgmt.
GC-7 2,777 06/19/03 07/11/03 Cont. Mgmt.
GC-8 1,893 06/19/03 07/11/03 Cont. Mgmt.
GC1 13,705 01/10/03 03/13/03 Cont. Mgmt.
GC2 8,158 01/10/03 03/13/03 Cont. Mgmt.
M-1 0 06/19/03 07/11/03 HJ Brandeles
M-3 -8,120 04/19/04 04/23/04 HJ Brandeles
P-1 0 06/19/03 07/11/03 Superior Plumbing
P-3 -6,365 04/19/04 04/23/04 Superior Plumbing
P2 -1,462 09/26/03 10/01/03 Superior Plumbing
03-1636 Reconstruction 0-001-010 07/23/04 *CO No.* Amount Disallowed Received Approved Contractor
E1 -2,425 06/09/05 06/29/05 Edgeline Electric Corp
P1 1,516 06/09/05 06/29/05 Bellucci Enterprises
02-1788FP Reconstruction 0-001-FP1 06/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Storage Garage:
00-1748 Additions and Alterations 4-005-001 11/30/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
97-1111 Reconstruction 5-004-001 04/30/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1749 Additions and Alterations 5-004-002 11/30/01 *CO No.* Amount Disallowed Received Approved Contractor
E-7 -514 04/19/04 04/23/04 Huen New York
GC-6 1,783 06/19/03 07/11/03 Contracting Mgmt.
GC-9 5,373 10/28/03 11/05/03 Contracting Mgmt.
M-2 0 06/19/03 07/11/03 HJ Brandeles
CAZENOVIA CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 25-02-01-06
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Burton Street School:
91-1131 Additions and Alterations 0-002-002 05/14/92 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
E-2 192 05/16/05 06/23/05 Engler Electric Inc
02-0986 Additions and Alterations 0-002-003 12/10/03 *CO No.* Amount Disallowed Received Approved Contractor
002 2,150 11/07/05 05/05/06 BUCCLI ENTERPRISES
5 4,044 12/23/04 01/10/05 Park City Builders
6 6,232 12/23/04 01/10/05 Park City Builders
AA-001 600 11/30/06 01/09/07 Midlantic Environmental
GC-2 4,200 08/31/04 09/17/04 Park City Builders
GC-3 3,658 10/18/04 / / Park City Builders
GC-7 -24,769 06/13/05 06/30/05 Park City Builders
P-1 2,741 10/18/04 10/25/04 Bellucci Enterprises
02-1251FP Reconstruction 0-002-FP1 04/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Junior Senior High:
94-1556 Additions and Alterations 0-004-003 07/31/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0828 Reconstruction 0-004-004 01/27/98 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0274SC Visual Structural Inspection 0-004-SC1 09/18/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Emory Avenue Complex (MS/HS):
92-0385 Additions and Alterations 0-005-001 12/01/92 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0987 Additions and Alterations 0-005-002 12/10/03 *CO No.* Amount Disallowed Received Approved Contractor
004 2,636 11/07/05 05/05/06 EDWARD JOY
005 2,073 11/07/05 05/05/06 EDWARD JOY
006 1,624 11/07/05 05/05/06 EDWARD JOY
2 2,945 12/23/04 01/10/05 Edward Joy Company
AA-002 3,000 11/30/06 01/09/07 Midalantic Environmental
AA-1 5,800 07/03/04 / / Summit Environ.
AA-1 950 12/06/04 12/17/04 Summit Environ.
E-1 4,551 10/18/04 / / Engler Elec.
GC-1 284 08/31/04 09/17/04 Park City Builders
GC-3 3,658 12/06/04 12/17/04 Park City Builders
GC-8 -2,700 06/13/05 / / Park City Builders of NY
GC-8 -2,700 06/13/05 08/03/05 Park City Builder of Ny
H-1 2,050 08/03/04 08/10/04 Edward Joy Company
H-2 1,204 12/23/04 01/10/05 Edward Joy Company
02-1056 Reconstruction 0-005-003 01/31/03 *CO No.* Amount Disallowed Received Approved Contractor
AA-1 0 07/21/03 07/25/03 Abscope Environ.
AA-2 7,256 07/21/03 07/25/03 Abscope Environ.
AA-3 -16,125 07/21/03 07/25/03 Abscope Environ.
AA-4 2,625 10/28/03 11/05/03 Abscope Environ.
GC-1 -1,632 10/28/03 11/05/03 R&S Assoc.
GC-2 11,691 10/28/03 11/05/03 R&S Assoc.
GC-3 3,546 10/28/03 11/05/03 R&S Assoc.
07-0591 Reconstruction 0-005-004 03/18/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1252FP Reconstruction 0-005-FP1 04/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
FFA Storage Building:
00-0096 New Construction 2-015-001 01/22/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage Maint:
01-0761 Reconstruction 5-001-L01 02/22/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
99-0788 Additions and Alterations 5-014-001 04/18/00 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1946 Reconstruction 5-014-002 01/04/02 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0070 Reconstruction 5-014-003 07/27/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Concession Stand-Fenner Rd. Complex:
98-1501 Additions and Alterations 7-012-001 09/27/99 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0988 Additions and Alterations 7-012-002 12/10/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Buckley Field Utility Bldg.:
98-0077 New Construction 7-013-002 10/06/98 NO CHANGE ORDERS ON ELECTRONIC FILE
Concession Stand 2-JSHS Site:
94-1557 New Construction 7-014-001 07/31/95 NO CHANGE ORDERS ON ELECTRONIC FILE
DERUYTER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 25-03-01-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building K-12:
91-0690 Reconstruction 0-001-003 02/13/92 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0517 Additions and Alterations 0-001-005 03/13/96 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0318 Reconstruction 0-001-006 11/03/94 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2423 Reconstruction 0-001-008 08/31/04 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0327 Reconstruction 0-001-009 10/29/04 *CO No.* Amount Disallowed Received Approved Contractor
R-01 1,146 06/28/06 07/13/06 Elmer Davis
02-0404FP Reconstruction 0-001-FP1 12/18/02 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0397SC Visual Structural Inspection 0-001-SC1 10/30/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Temporary CR Bldg '67:
02-2424 Reconstruction 0-004-002 08/31/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Annex Building:
95-0518 Reconstruction 0-007-002 03/13/96 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2425 Reconstruction 0-007-004 08/31/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Modular 2CR Building:
02-2426 Reconstruction 0-009-003 08/31/04 NO CHANGE ORDERS ON ELECTRONIC FILE
School Bus Garage:
92-0088 Reconstruction 5-002-001 07/31/92 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2427 Reconstruction 5-002-002 08/31/04 NO CHANGE ORDERS ON ELECTRONIC FILE
MORRISVILLE EATON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 25-04-01-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Elementary School:
90-1617 Reconstruction 0-003-004 06/25/91 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0805 Additions and Alterations 0-003-005 03/09/95 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1634 Additions and Alterations 0-003-006 08/10/00 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
E-2 11,710 11,710 12/24/04 01/10/05 Eppy Elec.
E-2 340 07/13/05 07/21/05 Eppy Electric
E-3 6,736 04/09/02 05/10/02 Eppy Elec.
E-4 3,700 07/13/05 07/21/05 Eppy Electric
E-7 -3,938 07/13/05 07/21/05 Eppy Electric
E-8 3,110 07/13/05 07/21/05 Eppy Electric
E9 190 07/13/05 07/21/05 Eppy Electric
FS-1 38,095 12/24/04 01/10/05 Maines Paper
FS-2 1,641 12/20/01 03/08/02 Maines Paper
FS-3 -6,625 02/22/02 04/01/02 Maines Paper
FS-4 -10,000 02/20/02 04/01/02 Maines Paper
FS-5 351 03/12/02 04/19/02 Maines Paper
FS-6 14,972 07/25/02 08/28/02 Maines Contract, Design & Install.
GC-1 2,472 12/24/04 01/10/05 RE Alexander Co
GC-10 -1,675 12/24/04 01/10/05 RE Alexander Co
GC-10 -936 09/01/05 09/08/05 RE Alexander Co
GC-11 -4,138 10/26/05 12/06/05 RE Alexander co
GC-13 667 12/24/04 01/10/05 RE Alexander Co
GC-14 1,459 12/24/04 01/10/05 RE Alexander Co
GC-15 3,200 12/24/04 01/10/05 RE Alexander Co
GC-2 5,529 12/24/04 01/10/05 RE Alexander Co
GC-3 4,010 12/24/04 01/10/05 RE Alexander Co
GC-3 20,842 12/24/04 01/10/05 RE Alexander Co
GC-4 5,969 01/05/04 03/11/05 RE Alexander Co
GC-6 1,000 12/24/04 01/10/05 RE Alexander Co
GC-7 -1,000 12/24/04 01/10/05 RE Alexander Co
GC-8 3,496 12/24/04 01/10/05 RE Alexander Co
GC-9 -1,568 12/24/04 01/10/05 RE Alexander Co
GC-9 -2,864 01/05/05 03/11/05 RE Alexander Co
H-1 -2,800 05/22/02 06/04/02 HJ Brandeles
H-2 -9,383 05/22/02 06/04/02 HJ Brandeles
H-3 -5,000 05/22/02 06/04/02 HJ Brandeles
H1 215 07/13/05 07/21/05 Hj Brandeles corp
H2 402 07/13/05 07/21/05 HJ brandeles Corp
P-2 4,517 04/13/05 07/21/05 HJ brandeles Corp
P-3 7,929 03/12/02 04/19/02 HJ Brandeles
P-4 -159 04/12/02 04/25/02 HJ Brandeles
P1 1,000 07/13/05 10/12/06 HJ brandeles Corp
P1 583 07/13/05 07/21/05 HJ Brandeles Corp
P3 3,126 07/13/05 10/12/06 HJ brandeles Corp
P5 296 07/13/05 07/21/05 HJ Brandeles Corp
P7 184 07/13/05 07/21/05 HJ Brandeles Corp
S-08 3,751 07/13/05 07/21/05 Ritter and Paratore Contracting
S-09 980 07/16/04 07/21/04 Ritter & Paratore
S-1 26,151 12/13/02 01/07/03 Ritter & Paratore
S-3 169,450 03/17/04 04/04/05 Ritter and Paratore
S-4 -169,450 10/04/04 10/25/04 Ritter & Paratore
S-5 3,060 07/13/05 07/21/05 Ritter and Paratore Contracting
S-5 -14,907 02/07/06 05/25/06 Ritter and Paratore Contracting
S07 14,374 07/13/05 10/12/06 Ritter Paratore Contracting
07-0470 Reconstruction 0-003-008 03/19/08 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1055 Reconstruction 0-003-009 03/22/07 *CO No.* Amount Disallowed Received Approved Contractor
RD-01 &F 24,394 03/21/08 04/28/08 DIAMOND ROOFING CO., INC.
06-1063 Reconstruction 0-003-010 03/30/07 *CO No.* Amount Disallowed Received Approved Contractor
BOILHV#1 612 03/12/08 03/31/08 C&S COMPANIES
ELEC-01& -1,907 03/21/08 03/31/08 MYRIAD ELECTRIC
Jr/Sr High School:
94-0806 Additions and Alterations 0-005-003 03/09/95 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0952 Additions and Alterations 0-005-004 08/14/01 *CO No.* Amount Disallowed Received Approved Contractor
04 5,051 06/18/03 06/25/03 Putrelo Const.
05 1,547 06/18/03 06/25/03 Putrelo Const.
06 11,707 06/18/03 06/25/03 Putrelo Const.
11 3,023 06/18/03 06/25/03 Ridley Elec.
12 767 06/18/03 06/25/03 Ridley Elec.
13 637 06/18/03 06/25/03 Ridley Elec.
ASB/H-01 2,100 04/30/03 05/05/03 Summit Environ.
BG-01 25,000 10/08/03 10/22/03 Lormar Enterprises
CO-S-10 -8,000 10/17/05 11/08/05 Oriska Insurance Co
E-1 890 11/05/02 01/10/03 Ridley Elec.
E-10 2,437 11/25/03 01/09/04 Ridley Elec.
E-12 1,570 12/03/03 04/23/04 Ridley Elec.
E-13 2,006 12/03/03 04/23/04 Ridley Elec.
E-14 2,032 12/10/03 05/09/06 Ridley Elec.
E-15 1,401 12/10/03 03/07/07 Ridley Elec.
E-16 2,849 12/23/03 12/31/03 Ridley Elec.
E-17 2,821 02/03/04 03/05/04 Ridley Elec.
E-18 761 02/03/04 03/05/04 Ridley Elec.
E-19 2,551 02/03/04 03/05/04 Ridley Elec.
E-2 11,837 11/05/02 01/10/03 Ridley Elec.
E-20 1,490 02/03/04 03/07/07 Ridley Elec.
E-21 3,233 02/17/04 03/04/04 Ridley Elec.
E-22 969 03/01/04 04/26/04 Ridley Elec.
E-23 7,520 03/01/04 04/26/04 Ridley Elec.
E-24 1,204 03/24/04 04/28/04 Ridley Elec.
E-25 1,036 03/17/04 04/26/04 Ridley Elec.
E-26 1,765 04/28/04 05/11/04 Ridley Elec.
E-27 570 06/03/04 06/09/04 Ridley Elec.
E-28 1,112 02/18/05 03/11/05 Ridley Electric
E-29 -1,000 02/18/05 03/11/05 Ridley Elec.
E-7 3,705 10/24/03 12/04/03 Ridley Elec.
E-9 240 11/25/03 01/09/04 Ridley Elec.
E/HS-02 4,387 10/23/02 10/29/02 Ridley Elec.
E/HS-03 1,431 10/23/02 10/29/02 Ridley Elec.
E/HS-06 3,025 10/23/02 10/29/02 Ridley Elec.
E/HS-08 2,297 03/26/03 04/17/03 Ridley Elec.
E/HS-10 3,823 05/29/03 06/03/03 Ridley Elec.
E/HS-18 1,087 11/25/03 01/09/04 Ridley Elec.
E28 1,112 02/07/06 08/08/06 Ridley Electric
GC-1 -22,000 10/07/02 11/06/02 Putrelo Const.
GC-2 -7,866 11/25/03 12/26/03 Putrelo Const.
GC-3 11,943 07/16/04 07/21/04 Putrelo Const.
GC-4 5,846 05/19/05 07/13/05 Puterlo Construction Contracting
GC-5 1,279 08/21/01 01/10/02 RE Alexander
GC-5 4,813 05/19/05 07/13/05 Puterlo Construction
GC-6 12,075 01/10/02 03/22/02 RE Alexander
GC-7 23,911 04/09/02 05/23/02 RE Alexander
GC/HS02R 998 04/30/03 05/05/03 Putrelo Const.
H-1 -1,980 09/01/05 09/07/05 Jand K Plumbing Heating
H-3 -33,910 09/01/05 09/08/05 Jand K Plumbing
H/HS-02 2,635 12/20/02 01/02/03 J&K Plumbing
H/HS-03 1,980 12/10/02 01/08/03 J&K Plumbing
H/HS-04 -914 04/30/03 05/05/03 J&K Plumbing
HS-01 2,689 02/07/06 / / Puterlo Construction
HS-01 1,717 02/07/06 05/25/06 S and D Enterprises
HS-01 713 02/07/06 08/08/06 Ridley Elecgtric
HS-01 898 06/19/06 / / J and k Plumbing
HS-02 10,206 10/27/03 12/04/03 Lormar Enterprises
HS-02 5,300 07/16/04 07/21/04 Summit Environ.
HS-03 19,294 05/19/03 05/23/03 Putrelo Const.
HS-03 4,483 10/08/03 10/22/03 Lormar Enterprises
HS-03 -2,600 11/01/04 12/21/04 Summit Environmental
HS-04 1,700 10/08/03 10/22/03 Lormar Enterprises
HS-04 2,541 02/07/06 / / Ridley Electric
HS-05 14,866 10/08/03 10/22/03 Lormar Enterprises
HS-05 4,122 01/02/03 01/21/04 J&K Plumbing
HS-05 735 02/22/06 07/21/06 Ridley Electric
HS-06 7,072 03/17/04 04/26/04 J&K Plumbing
HS-07 382 02/28/03 03/06/03 Ridley Elec.
HS-07 1,973 07/03/03 07/09/03 Putrelo Const.
HS-07 1,575 05/19/05 07/20/05 J and k Plumbing
HS-08 1,613 11/25/03 12/26/03 Putrelo Const.
HS-09 27,396 11/25/03 12/26/03 Putrelo Const.
HS-10 18,125 11/25/03 12/26/03 Putrelo Const.
HS-11 3,642 11/25/03 12/26/03 Putrelo Const.
HS-12 6,391 12/03/03 03/15/04 Putrelo Const.
HS-13 607 04/28/04 05/11/04 Putrelo Const.
HS-14 2,643 10/27/03 12/04/03 Ridley Elec.
HS-14 16,027 05/13/04 05/26/04 Putrelo Const.
HS-15 1,275 10/27/03 12/04/03 Ridley Elec.
HS-15 2,410 06/03/04 06/09/04 Putrelo Const.
HS-16 839 10/27/03 12/04/03 Ridley Elec.
HS-16 9,789 06/03/04 06/09/04 Putrelo Const.
HS-17 3,634 10/09/03 10/27/03 Ridley Elec.
HS-17 6,845 06/03/04 06/09/04 Putrelo Const.
HS-18 10,984 05/19/05 07/13/05 Puterlo Construction
HS-19 2,004 05/19/05 07/13/05 Puterlo Construction
HS-20 1,592 05/19/05 07/13/05 Puterlo Construction Co
HS-21 599 05/19/05 07/13/05 Puterlo Construction Co
HS-22 8,718 05/19/05 07/13/05 Puterlo Construction Co
Hs-08 3,722 05/19/05 07/13/05 J and K Plumbing Heating
L2/HS-01 18,745 10/23/02 10/29/02 Lormar Enterprises
P-1 12,018 11/05/02 01/07/03 S&D Enterprises
P-10 2,650 03/17/04 04/26/04 S&D Enterprises
P-11 3,264 12/24/04 02/01/05 Sand D Enterprises
P-2 12,471 04/30/03 05/05/03 S&D Enterprises
P-3 728 05/19/03 05/23/03 S&D Enterprises
P-4 5,532 05/19/03 05/23/03 S&D Enterprises
P-5 65,950 10/27/03 12/04/03 S&D Enterprises
P-6 5,299 10/27/03 12/04/03 S&D Enterprises
P-7 2,211 01/02/03 01/21/04 S&D Enterprises
P-9 1,875 02/03/04 03/05/04 S&D Enterprises
P/HS-02 9,658 10/23/02 10/29/02 S&D Enterprises
P/HS-03 6,671 01/16/03 02/12/03 S&D Enterprises
P/HS-04 2,342 04/30/03 05/02/03 S&D Enterprises
S-1 35,400 05/15/02 05/24/02 Lormar Enterprises
S-10 -8,000 03/29/05 05/02/05 LorMar Enterprises
S-2 3,000 06/19/02 08/15/02 Lormar Enterprises
S-3 2,105 06/19/02 08/15/02 Lormar Enterprises
S-4 25,016 08/29/02 10/29/02 Lormar Enterprises
S-5 1,320 02/07/09 05/25/06 LORMAR Enterprises
S-6 39,945 10/24/03 11/18/03 Lormar Enterprises
S-7 8,740 10/08/03 10/22/03 Lormar Enterprises
S-9 -175,000 03/29/05 05/02/05 Lormar Enterprises
99-1632 Additions and Alterations 0-005-005 08/10/00 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
AB-01 1,097 02/18/05 03/11/05 Puterlo Construction
E-09 1,776 04/30/03 05/05/03 Ridley Elec.
E-1 894 12/24/04 01/10/05 Eppy Elec.
E-10 6,947 07/13/05 07/21/05 Eppy Electric
E-3 897 07/13/05 07/21/05 Eppy Electric
E-4 1,911 10/07/02 12/02/02 Eppy Elec.
E-5 -4,697 10/07/02 12/02/02 Eppy Elec.
E-5 6,700 04/30/03 05/05/03 Ridley Elec.
E5 3,753 07/13/05 10/12/06 Eppy Electric
GC LS1 512 12/24/04 01/10/05 RE Alexander Co
GC-1 324 12/24/04 01/10/05 RE Alexander Co
GC-11 282 12/24/04 01/10/05 RE Alexander Co
GC-12 2,294 12/24/04 01/10/05 RE Alexander Co
GC-2 665 12/24/04 01/10/05 RE Alexander Co
GC-4 32,078 12/24/04 01/10/05 RE Alexander Co
GC-5 -3,000 12/24/04 01/10/05 RE Alexander Co
GC-8 -4,488 01/05/05 01/25/05 RE Alexander Co
GC7-A 651 12/24/04 01/10/05 RE Alexander Co
LS-1 2,303 07/13/05 10/12/06 Eppy Electric
P-1 7,500 12/24/04 01/10/05 HJ Brandeles
P4 765 07/13/05 07/21/05 HJ Brandeles Corp
P6 370 07/13/05 07/21/05 Hj brandeles Corp
S-1 4,856 07/13/05 07/21/05 Ritter and Paratore Contracting
S-2 22,448 07/13/05 10/12/06 Ritter and paratore Contracting
S-3 -12,750 07/13/05 07/21/05 Ritter and Paratore Contracting
S-4 -2,898 07/13/05 07/21/05 Ritter and Paratore Contracting
S-6 25,918 07/13/05 10/12/06 Ritter and Paratore Contracting
07-0471 Reconstruction 0-005-008 03/19/08 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1056 Reconstruction 0-005-009 03/22/07 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
RD-01 &F 24,349 03/21/08 04/28/08 DIAMOND ROOFING CO., INC.
High School Bus Garage:
94-0807 Reconstruction 5-001-001 03/09/95 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0951 Additions and Alterations 5-001-002 08/14/01 *CO No.* Amount Disallowed Received Approved Contractor
BG-01 384 10/27/03 / / S&D Enterprises
BG-02 616 01/06/04 03/15/04 S&D Enterprises
E-11 5,833 12/03/03 04/23/04 Ridley Elec.
E-3 2,576 03/12/03 03/20/03 Ridley Elec.
E-6 3,839 10/24/03 03/07/07 Ridley Elec.
E-8 3,809 11/25/03 12/24/03 Ridley Elec.
GC-6 -7,000 03/02/07 03/07/07 Putrelo Construction Co.
H-2 -1,000 09/01/05 09/08/05 Jand K Plumbing Heating
P-8 372 01/06/04 03/15/04 S&D Enterprises
S-8 -565 02/07/06 05/25/06 LORMAR Enteprises
07-0472 Reconstruction 5-001-004 03/19/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Districtwide-Lan-Phone System:
99-1633 Reconstruction 7-999-001 08/10/00 *CO No.* Amount Disallowed Received Approved Contractor
WLAN-1 -1,440 12/24/04 01/10/05 Patricia Electric
HAMILTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 25-07-01-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Tech/Bus Garage:
96-1474 Additions and Alterations 0-002-001 05/29/97 NO CHANGE ORDERS ON ELECTRONIC FILE
K-12 Bldg:
96-1475 Additions and Alterations 0-003-005 05/29/97 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0763SR Reconstruction 0-003-006 03/20/07 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1156 Reconstruction 0-003-006 08/02/07 *CO No.* Amount Disallowed Received Approved Contractor
CO-E-01 397 06/25/08 / / Ridley Electric Co., Inc.
CO-GC-01 40,364 06/25/08 / / Putrelo Construction Co., Inc.
CO-M-01 3,257 06/25/08 / / Airtech Heating & A/C Systems, Inc.
CO-P-01 0 07/16/08 / / SUPERIOR PLUMBING & HEATING
CO-SE01 2,616 11/05/07 02/23/08 Patricia Electric
CO-SE03 -6,579 11/05/07 / / Patricia Electric
COSC2-01 0 07/16/08 10/07/08 MURPHY EXCAVATING CORPORATION
COSC2-02 0 08/04/08 / / MURPHY EXCAVATING CORPORATION
COSC2-03 9,500 08/04/08 / / MURPHY EXXCAVATING CORPORATION
SC!-01 0 05/23/08 / / W&D Smith & Sons Construction, Inc.
SC1-03 -9,525 06/02/08 / / W&D Smith & Sons Construction
07-0241 Reconstruction 0-003-007 11/28/07 NO CHANGE ORDERS ON ELECTRONIC FILE
08-0260 Reconstruction 0-003-008 09/16/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0522FP Reconstruction 0-003-FP1 11/21/02 NO CHANGE ORDERS ON ELECTRONIC FILE
press box:
06-1157 New Construction 7-009-001 03/21/07 *CO No.* Amount Disallowed Received Approved Contractor
CO-SE02 805 11/05/07 01/28/08 Patricia Electric
SC1-02 0 05/23/08 / / W&D Smith& Sons Construction, Inc.
Electrical Shed:
06-1158 New Construction 7-010-001 03/21/07 NO CHANGE ORDERS ON ELECTRONIC FILE
CANASTOTA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 25-09-01-06
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Roberts Street School Complex:
94-0521 Additions and Alterations 0-001-008 01/27/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0199 Reconstruction 0-001-009 09/06/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0752 Reconstruction 0-001-011 02/21/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1131 Reconstruction 0-001-012 05/25/00 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
25 9,552 06/01/06 06/05/06 Green Plumbing
36 -874 10/31/03 11/04/03 Cornerstone Elec.
37 -4,643 05/16/06 06/05/06 Green Plumbing
38 49,950 49,950 04/24/06 10/27/06 Cornerstone electric
60 36,866 03/12/02 04/19/02 Davis Wallbridge
62 178 07/28/03 08/04/03 HJ Brandeles
64 5,575 07/28/03 08/04/03 Davis Wallbridge
66 4,954 4,720 03/08/02 04/04/02 HJ Brandeles
69 5,270 03/08/02 04/04/02 HJ Brandeles
70A -957 03/28/03 04/03/03 RE Alexander
70B -40,000 03/28/03 04/03/03 RE Alexander
74 -10,000 07/08/03 07/23/03 RE Alexander
98-1416 Reconstruction 0-001-013 07/22/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0658 Reconstruction 0-001-014 02/28/02 *CO No.* Amount Disallowed Received Approved Contractor
R-1 1,913 11/04/02 12/10/02 Diamond Roofing
R-2 31,987 31,987 11/04/02 12/10/02 Diamond Roofing
R-3 2,573 11/04/02 12/10/02 Diamond Roofing
R-4 -3,130 11/04/02 12/10/02 Diamond Roofing
R-5 6,510 11/04/02 12/10/02 Diamond Roofing
R-6 -2,180 03/16/06 06/02/06 Diamond Roofing
R-7 3,497 05/12/03 05/23/03 Diamond Roofing
04-0108 Reconstruction 0-001-015 09/10/04 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1925 Reconstruction 0-001-016 06/18/03 *CO No.* Amount Disallowed Received Approved Contractor
1 7,697 11/28/03 12/02/03 Edward L Knight Wood Flooring
07-0161 Reconstruction 0-001-017 12/10/07 *CO No.* Amount Disallowed Received Approved Contractor
H-1 -10,000 06/19/08 08/05/08 King & King Mechanical
06-1035 Reconstruction 0-001-018 03/21/07 *CO No.* Amount Disallowed Received Approved Contractor
001 625 12/17/07 01/28/08 J&B INSTALLATION,INC
02-0790FP Reconstruction 0-001-FP1 03/07/03 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0436SC Visual Structural Inspection 0-001-SC1 11/24/04 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0437SC Visual Structural Inspection 0-001-SC2 11/24/04 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0438SC Visual Structural Inspection 0-001-SC3 11/24/04 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0147SC Visual Structural Inspection 0-001-SC4 08/07/06 NO CHANGE ORDERS ON ELECTRONIC FILE
Industrial Arts/Bus Garage:
94-0375 Reconstruction 0-002-004 11/17/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0520 Additions and Alterations 0-002-005 01/27/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0200 Reconstruction 0-002-006 09/06/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0753 Reconstruction 0-002-007 02/21/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1132 Reconstruction 0-002-008 05/25/00 NO CHANGE ORDERS ON ELECTRONIC FILE
South Side School:
96-0754 Reconstruction 0-004-005 02/21/97 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0657 Reconstruction 0-004-006 06/20/02 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 607 08/21/03 09/09/03 James & Son
GC-2 2,200 08/21/03 09/09/03 James & Son
GC-3 302 11/20/03 11/24/03 James & Son
GC-4 200 10/31/03 11/21/03 James & Son
H-1 2,022 10/23/03 10/30/03 Savoy Joseph
H-2 1,810 10/23/03 10/30/03 Savoy Joseph
P-1 1,105 09/22/03 09/25/03 Savoy Joseph
P-2 350 10/23/03 11/05/03 Savoy Joseph
Peterboro Street School:
94-0519 Additions and Alterations 0-005-007 01/27/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0755 Reconstruction 0-005-009 02/21/97 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0656 Reconstruction 0-005-010 06/20/02 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 216 12/17/03 12/31/03 James & Son Const.
GC-2 590 09/16/05 09/21/05 James and Son Construction
P-1 1,039 02/20/04 07/06/04 LaFrance Plumbing
P-2 177 02/20/04 03/12/04 LaFrance Plumbing
P-3 650 02/20/04 03/12/04 LaFrance Plumbing
Canastota Public Library:
90-1781 Additions and Alterations 6-009-001 05/12/92 NO CHANGE ORDERS ON ELECTRONIC FILE
New Press Box:
98-1417 New Construction 7-008-001 07/22/99 NO CHANGE ORDERS ON ELECTRONIC FILE
Districtwide/Telephone:
97-1538 Reconstruction 7-999-001 05/21/98 NO CHANGE ORDERS ON ELECTRONIC FILE
MADISON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 25-11-01-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
95-1704 Reconstruction 0-001-008 07/12/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1447 Reconstruction 0-001-009 05/15/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1359 Additions and Alterations 0-001-011 11/16/01 *CO No.* Amount Disallowed Received Approved Contractor
1 16,685 07/31/02 08/16/02 Park City Builders
1 12,835 03/20/03 04/01/03 Air Temp Heating
1 6,255 03/20/03 03/28/03 Roberts Office Interiors
10 1,273 12/12/02 01/07/03 Park City Builders
11 6,300 12/12/02 01/07/03 Park City Builders
12 16,537 03/20/03 04/07/03 Park City Builders
13 16,414 03/20/03 04/01/03 Park City Builders
14 10,698 03/20/03 04/01/03 Park City Builders
15 16,830 03/20/03 04/09/03 Park City Builders
16 18,846 03/20/03 04/07/03 Park City Builders
17 41,906 05/14/03 05/23/03 Park City Builders
18 18,150 08/27/03 09/19/03 Park City Builders
19 3,451 08/27/03 09/19/03 Park City Builders
2 14,026 07/31/02 08/16/02 Park City Builders
2 44,092 03/20/03 04/07/03 Patricia Electric
2 5,436 08/27/03 09/19/03 Roberts Office Interiors
20 4,970 08/27/03 09/19/03 Park City Builders
21 4,419 08/27/03 09/19/03 Park City Builders
22 3,183 08/27/03 09/19/03 Park City Builders
23 9,888 08/27/03 09/23/03 Park City Builders
3 18,432 07/31/02 08/16/02 Park City Builders
3 13,900 03/20/03 04/09/03 Patricia Electric
3 8,606 08/27/03 09/22/03 S&D Enterprises
4 4,725 08/16/02 09/05/02 March Associates
4 6,840 05/14/03 05/23/03 Patricia Electric
5 18,706 08/16/02 09/05/02 March Associates
5 8,946 12/05/03 12/24/03 Patricia Electric
6 6,229 11/06/02 01/07/03 Park City Builders
6 -500 03/17/04 04/28/04 Patricia Electric
7 4,724 11/06/02 12/11/02 Park City Builders
8 10,573 11/06/02 12/11/02 Park City Builders
9 -6,229 12/12/02 01/07/03 Park City Builders
E-1 4,740 03/20/03 04/01/03 Patricia Electric
GC-24 11,980 12/05/03 12/24/03 Park City Builders
GC-25 11,474 12/05/03 12/24/03 Park City Builders
GC-26 7,275 12/05/03 12/24/03 Park City Builders
GC-27 10,783 12/05/03 12/24/03 Park City Builders
GC-28 5,295 07/12/04 07/15/04 Park City Builders
H-1 8,700 12/12/02 01/07/03 S&D Enterprises
H-2 1,202 03/20/03 04/01/03 S&D Enterprises
H-3 4,526 08/27/03 09/22/03 S&D Enterprises
HVAC-4 4,210 12/05/03 12/24/03 S&D Enterprises
HVAC-5 12,130 03/17/04 04/28/04 S&D Enterprises
P-1 5,860 12/12/02 01/07/03 S&D Enterprises
P-2 1,596 03/20/03 04/01/03 S&D Enterprises
PLBG-4 6,135 12/05/03 12/24/03 S&D Enterprises
PLBG-5 1,154 03/17/04 04/28/04 S&D Enterprises
TC-2 4,587 08/27/03 09/22/03 Air Temp Heating
TC-3 5,029 09/17/04 10/01/04 Air Temp Heating
07-0982 Reconstruction 0-001-014 04/04/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0294FP Reconstruction 0-001-FP1 11/05/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage Combo./Agric./Ind.Art:
95-1705 Reconstruction 0-002-004 07/12/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1448 Reconstruction 0-002-005 05/15/97 NO CHANGE ORDERS ON ELECTRONIC FILE
Storage Building:
95-0291 New Construction 2-006-001 10/24/95 NO CHANGE ORDERS ON ELECTRONIC FILE
New Bus Garage:
00-0815 New Construction 5-008-001 05/30/01 *CO No.* Amount Disallowed Received Approved Contractor
1 -2,405 07/31/02 10/28/02 Eppy Electric
1 -3,128 07/31/02 10/28/02 Superior Plumbing
1 -13,580 07/31/02 10/28/02 Precision Site Work
GC-1 6,981 02/13/02 03/22/02 BF Yenny Const.
MC-1 -11,179 02/06/04 02/25/04 Superior Plumbing
MC-2 -2,844 07/31/02 10/28/02 Superior Plumbing
07-1499 Additions and Alterations 5-008-002 02/20/08 NO CHANGE ORDERS ON ELECTRONIC FILE
ONEIDA CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 25-13-00-01
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Senior High School:
91-0404 Reconstruction 0-001-001 01/15/92 NO CHANGE ORDERS ON ELECTRONIC FILE
90-0980 Reconstruction 0-001-002 03/18/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0405 Additions and Alterations 0-001-004 01/15/92 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0898 Reconstruction 0-001-006 04/19/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0618 Reconstruction 0-001-007 02/28/94 NO CHANGE ORDERS ON ELECTRONIC FILE
Seneca Street School:
92-0899 Reconstruction 0-006-004 04/19/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0619 Additions and Alterations 0-006-006 02/28/94 NO CHANGE ORDERS ON ELECTRONIC FILE
Power Shop Annex/Maint. Bldg.:
92-0900 Reconstruction 0-007-001 04/19/93 NO CHANGE ORDERS ON ELECTRONIC FILE
Oneida Castle Elementary:
90-0981 Reconstruction 0-009-003 03/18/91 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
93-0620 Reconstruction 5-013-002 02/28/94 NO CHANGE ORDERS ON ELECTRONIC FILE
District Wide:
90-0982 Reconstruction 7-999-001 03/18/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0187 Reconstruction 7-999-002 10/07/93 NO CHANGE ORDERS ON ELECTRONIC FILE
ONEIDA CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 25-14-00-01
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Senior High School:
94-0913 Reconstruction 0-001-001 03/06/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1189 Additions and Alterations 0-001-008 05/14/97 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0329 Reconstruction 0-001-009 08/01/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1019 Additions and Alterations 0-001-010 08/01/03 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
007 0 01/07/05 03/11/05 HJ brandeles Corp
010 1,973 02/07/05 03/16/05 Superior Plumbing Heating
012 2,031 02/07/05 03/14/05 HJ brandeles Corp
014 3,901 09/27/04 12/24/04 JD Taylor Const.
017 41,039 11/04/04 12/06/04 JD Taylor Const.
031 0 01/07/05 03/11/05 JD taylor Construction
033 1,734 01/07/05 03/11/05 JD taylor Construction
034 1,105 01/25/05 03/18/05 JD taylor Construction
035 2,015 01/07/05 03/11/05 JD Taylor Construction Corp
040 -2,575 01/06/05 03/11/05 JD Taylor Construction
041 2,974 01/06/05 03/11/05 JD taylor Construction
042 31,815 01/13/05 02/08/05 JD Taylor Construction
043 -7,608 01/06/05 03/11/05 JD Taylor Construction
045 765 01/06/05 03/11/05 JD Taylor Construction
046 1,591 01/06/05 03/11/05 JD Taylor Construction
054 627 02/07/05 03/02/05 JD Taylor Construction
055 -653 02/07/05 03/02/05 JD taylor Construction
062 23,685 08/17/05 08/31/05 JD taylor Construction
068 -1,305 08/17/05 08/31/05 JD taylor Construction
03-0157 Reconstruction 0-001-011 01/30/04 *CO No.* Amount Disallowed Received Approved Contractor
001 -3,640 01/18/05 03/17/05 M and N Plumbing Heating
001 -24,040 08/15/05 08/31/05 Richard Alexander Co
001 -5,884 08/29/05 09/01/05 HJ brandeles Corp
003 869 10/27/04 12/23/04 Kuhn Elec.
005 567 02/08/05 03/14/05 EW kuhn Electric
AD E-3 -12,741 10/01/04 12/24/04 Kuhn Elec.
AD E-5 -112 10/15/04 12/21/04 Kuhn Elec.
AD GC-03 1,610 10/27/04 12/23/04 Richard Alexander
AD GC06 5,540 12/01/04 03/22/05 Richard Alexander
AD H-4 937 10/12/04 10/18/04 HJ Brandeles
AD P-1 1,360 10/12/04 10/18/04 M&N Plumbing
GC-04 3,959 10/18/04 10/26/04 Richard Alexander
GC-05 4,804 10/27/04 12/23/04 Richard Alexander
07-1450 Reconstruction 0-001-012 10/08/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0739FP Reconstruction 0-001-FP1 12/24/02 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0879SC Visual Structural Inspection 0-001-SC1 03/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Willard F Prior Elementary:
94-0914 Reconstruction 0-004-001 03/06/95 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1020 Additions and Alterations 0-004-002 08/01/03 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
001 0 11/04/04 12/06/04 Madonia Elec.
002 0 09/27/04 12/24/04 HJ Brandeles
003 53,247 09/27/04 12/24/04 JD Taylor Const.
003 0 10/15/04 10/26/04 Superior Plumbing
005 32,960 09/27/04 12/24/04 JD Taylor Const.
005 0 06/07/05 07/19/05 Madonia Electric
008 1,569 02/07/05 03/14/05 Superior Plumbign Heating
010 3,474 09/27/04 12/24/04 JD Taylor Const.
011 5,971 09/27/04 12/24/04 JD Taylor Const.
011 0 01/25/05 03/18/05 HJ brandeles Corp
014 1,954 02/07/05 03/14/05 Superior Plumbing heating
018 19,320 11/04/04 12/06/04 JD Taylor Const.
020 -6,266 11/09/04 12/06/04 JD Taylor Const.
022 3,799 11/09/04 12/06/04 JD Taylor Const.
023 0 01/06/05 03/11/05 JD taylor Construction Corp
025 0 01/06/05 03/11/05 JD Taylor Construction
026 -4,455 01/06/05 03/11/05 JD Taylor Construction
051 22,596 02/07/05 03/02/05 JD Taylor Construction
061 1,936 08/16/05 09/02/05 JD Taylor Construction
064 3,066 08/16/05 / / JD taylor Construction
065 1,195 08/16/05 / / JD taylor Construction
069 -3,000 08/17/05 08/31/05 JD Taylor Construction
070 494 09/26/05 10/13/05 JD taylor Construction
071 372 09/26/05 10/13/05 JD taylor Construction
02-0330 Reconstruction 0-004-003 08/01/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0158 Reconstruction 0-004-004 01/30/04 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1451 Reconstruction 0-004-005 10/08/08 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0882SC Visual Structural Inspection 0-004-SC1 03/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
North Broad Street:
94-0915 Reconstruction 0-005-001 03/06/95 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1463 Reconstruction 0-005-006 07/14/95 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0890 Additions and Alterations 0-005-007 08/01/03 *CO No.* Amount Disallowed Received Approved Contractor
001 0 09/27/04 12/24/04 HJ Brandeles
002 13,043 09/27/04 12/24/04 JD Taylor Const.
002 0 06/17/05 07/12/05 Madonia Electric
003 0 01/13/05 02/08/05 Hj brandeles Corp
004 0 01/07/05 03/11/05 HJ Brandeles Corp
005 0 10/15/04 10/26/04 Superior Plumbing
005 0 01/07/05 03/11/05 HJ brandeles Corp
006 51,460 09/27/04 12/24/04 JD Taylor Const.
006 0 01/07/05 03/11/05 HJ brandeles Corp
006 0 06/07/05 07/19/05 Madonia Electric
007 3,011 02/07/05 03/14/05 Superior Plumbign Heating
007 0 07/01/05 07/19/05 Madonia Electric
008 0 09/27/04 12/24/04 JD Taylor Const.
008 -14,862 07/01/05 07/19/05 Madonia Electric
009 0 01/07/05 03/11/05 HJ brandeles Corp
009 1,947 02/07/05 03/14/05 Superior Plumbing heating
011 1,509 02/07/05 03/16/05 Superior Plumbign heating
012 2,643 09/27/04 12/24/04 JD Taylor Const.
013 5,665 09/27/04 12/24/04 JD Taylor Const.
013 2,054 02/07/05 03/16/05 Superior Plumbing Heating
013 52,969 07/01/05 07/20/05 HJ Brandeles Corp
016 502 05/02/05 07/19/05 Superior Plumbing Heating
018 1,380 06/07/05 07/19/05 superior Plumbing Heating
019 1,065 06/07/05 07/19/05 Superior Plumbing Heating
021 6,126 11/09/04 12/06/04 JD Taylor Const.
028 4,196 01/06/05 03/11/05 JD taylor Construction
029 18,855 01/25/05 03/18/05 JD Taylor Construction
030 6,484 01/07/05 03/11/05 Jd taylor Construction
032 11,515 01/07/05 03/11/05 JD Taylor Construction
036 5,347 01/07/05 03/11/05 JD taylor Construction
037 0 01/07/05 03/11/05 JD taylor Construction
038 2,522 01/07/05 03/11/05 JD taylor Construction
039 3,348 01/07/05 03/11/05 Jd Taylor Construction
044 14,272 01/06/05 03/11/05 JD Taylor Construction Corp
047 518 01/06/05 03/11/05 JD taylor Construction
048 -3,200 01/06/05 03/11/05 JD Taylor Construction
049 4,044 02/07/05 03/07/05 JD Taylor Construction
050 2,885 02/07/05 03/07/05 JD taylor Construction
053 5,232 02/15/05 03/02/05 JD Taylor Construction Corp
056 2,298 02/07/05 03/02/05 JD taylor construction Corp
057 2,004 02/15/05 03/02/05 JD Taylor Construction
059 1,718 02/07/05 03/02/05 JD taylor Construction Corp
063 3,242 09/02/05 09/02/05 JD taylor Construction
066 9,918 08/16/05 / / Jd Taylor Construction
072 691 09/26/05 10/13/05 Jd Taylor Construction
02-0331 Reconstruction 0-005-008 08/01/03 *CO No.* Amount Disallowed Received Approved Contractor
001 16,531 10/01/04 02/07/05 EW Kuhn Elec.
AD GC01 1,447 08/13/04 09/27/04 Richard Alexander Co
07-1452 Reconstruction 0-005-011 10/08/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0740FP Reconstruction 0-005-FP1 12/24/02 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0884SC Visual Structural Inspection 0-005-SC1 03/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Seneca Street School:
94-0916 Reconstruction 0-006-001 03/06/95 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1021 Reconstruction 0-006-005 08/01/03 *CO No.* Amount Disallowed Received Approved Contractor
002 0 09/27/04 12/24/04 Superior Plumbing
004 0 06/07/05 07/19/05 Madonia Electric
058 279 02/07/05 03/02/05 JD taylor Construction
02-0332 Reconstruction 0-006-006 08/01/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0160 Reconstruction 0-006-007 01/30/04 *CO No.* Amount Disallowed Received Approved Contractor
AD H-5 3,940 10/06/04 10/18/04 HJ Brandeles
AD H-6 543 12/09/04 12/23/04 HJ Brandeles
07-1453 Reconstruction 0-006-008 10/08/08 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0881SC Visual Structural Inspection 0-006-SC1 03/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Power Shop Annex/Maint. Bldg.:
96-1187 Reconstruction 0-007-001 04/22/97 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0333 Reconstruction 0-007-002 08/01/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1022 Reconstruction 0-007-003 08/01/03 *CO No.* Amount Disallowed Received Approved Contractor
003 0 06/17/05 07/12/05 Madonia Electric
006 8,700 10/15/04 10/26/04 Superior Plumbing
010 0 01/07/05 04/28/05 HJ Brandeles Corp
012 519 02/07/05 03/16/05 superior Plumbing heating
019 5,687 11/09/04 12/06/04 JD Taylor Const.
020 2,333 06/07/05 07/19/05 superior Plumbing Heating
027 0 01/06/05 03/11/05 JD Taylor Construction
07-1454 Reconstruction 0-007-004 10/08/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Durhamville Elementary School:
94-0917 Reconstruction 0-008-001 03/06/95 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0334 Reconstruction 0-008-003 08/01/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1023 Reconstruction 0-008-004 08/01/03 *CO No.* Amount Disallowed Received Approved Contractor
0001 0 09/27/04 12/24/04 Superior Plumbing
001 15,303 09/27/04 12/24/04 JD Taylor Const.
004 46,026 09/27/04 12/24/04 JD Taylor Const.
009 36,315 09/27/04 12/24/04 JD Taylor Const.
015 4,489 11/04/04 12/06/04 JD Taylor Const.
015 664 02/07/05 03/14/05 Superior Plumbing Heating
016 0 11/04/04 12/06/04 JD Taylor Const.
017 304 05/02/05 07/19/05 Superior Plumbing Heating
024 0 01/06/05 03/11/05 JD taylor Construction
052 4,631 02/07/05 03/02/05 JD Taylor Construction Corp
060 2,667 08/16/05 09/02/05 JD Taylor Construction
067 -2,000 08/16/05 / / JD Taylor Construction
03-0161 Reconstruction 0-008-005 01/30/04 *CO No.* Amount Disallowed Received Approved Contractor
002 3,272 10/12/04 10/18/04 EW Kuhn Elec.
004 5,289 11/19/04 12/06/04 EW Kuhn Elec.
AD E-2 -214 08/03/04 09/09/04 EW Kuhn Elec.
AD E-6 -145 10/18/04 10/26/04 EW Kuhn Elec.
AD H-1 1,683 10/01/04 12/24/04 HJ Brandeles
AD H-3 11,120 10/01/04 12/24/04 HJ Brandeles
AD H-7 1,703 12/15/04 12/23/04 HJ Brandeles
E-1 196 06/29/04 07/27/04 Turner Const.
06-1510 Reconstruction 0-008-006 05/24/07 *CO No.* Amount Disallowed Received Approved Contractor
001 -2,160 05/02/08 08/05/08 WCA ROOFING & SHEET METAL CO., INC.
07-1455 Reconstruction 0-008-007 10/08/08 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0885SC Visual Structural Inspection 0-008-SC1 03/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Oneida Castle Elementary:
94-0918 Reconstruction 0-009-001 03/06/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0319 Additions and Alterations 0-009-004 12/21/95 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0335 Reconstruction 0-009-006 08/01/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0162 Reconstruction 0-009-008 01/30/04 *CO No.* Amount Disallowed Received Approved Contractor
AD E-4 -1,266 10/01/04 12/24/04 Kuhn Elec.
AD GC-02 8,600 10/12/04 10/18/04 Richard Alexander Co
H-8 1,719 06/17/05 07/12/05 HJ brandeles Coep
07-1456 Reconstruction 0-009-009 10/08/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0741FP Reconstruction 0-009-FP1 12/24/02 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0883SC Visual Structural Inspection 0-009-SC1 03/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Middle School:
94-0919 Reconstruction 0-010-001 03/06/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1488 Additions and Alterations 0-010-003 07/16/96 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0336 Reconstruction 0-010-005 08/01/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0742FP Reconstruction 0-010-FP1 12/24/02 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0880SC Visual Structural Inspection 0-010-SC1 03/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Sylvan Verona Beach Elem.:
94-0465 Reconstruction 0-022-001 12/16/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0920 Reconstruction 0-022-002 03/06/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0047 Additions and Alterations 0-022-003 09/15/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0037 Reconstruction 0-022-004 08/06/97 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0337 Reconstruction 0-022-005 08/01/03 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0163 Reconstruction 0-022-006 01/30/04 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0886SC Visual Structural Inspection 0-022-SC1 03/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Admin Building:
02-0338 Reconstruction 1-019-001 08/01/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Maintenance Warehouse:
02-0339 Reconstruction 3-012-001 08/01/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1025 Reconstruction 3-012-002 08/01/03 *CO No.* Amount Disallowed Received Approved Contractor
004 0 10/15/04 10/26/04 Superior Plumbing
007 0 09/27/04 12/24/04 JD Taylor Construction
008 0 01/07/05 03/11/05 HJ Brandeles Corp
Bus Garage:
94-0921 Reconstruction 5-013-001 03/06/95 NO CHANGE ORDERS ON ELECTRONIC FILE
New Bus Garage:
01-0711SR New Construction 5-024-001 03/29/02 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
01-1188 New Construction 5-024-001 03/29/02 *CO No.* Amount Disallowed Received Approved Contractor
001 0 12/24/02 01/09/03 Ritter & Paratore
001 15,278 10/07/03 10/22/03 Northland Assoc.
001 28,673 10/07/03 10/22/03 DC Elec. Co.
001 13,283 01/08/04 / / HJ Brandeles
001 0 01/08/04 09/24/04 HJ Brandeles
002 -4,920 12/24/02 01/08/03 Ritter & Paratore
002 15,266 10/07/03 10/22/03 Northland Assoc.
002 19,664 10/07/03 10/22/03 DC Elec. Co.
002 -29,975 12/07/04 12/10/04 HJ Brandeles
002 5,291 12/13/04 12/23/04 HJ Brandeles
003 12,321 10/07/03 10/22/03 Ritter & Paratore
003 11,852 10/07/03 10/22/03 Northland Assoc.
003 5,112 12/13/04 12/23/04 HJ Brandeles
004 33,738 10/07/03 10/22/03 Northland Assoc.
004 0 11/30/04 03/22/05 Ritter & Paratore
004 5,000 12/13/04 12/23/04 HJ Brandeles
005 21,395 10/29/03 11/18/03 Northland Assoc.
005 0 11/30/04 03/22/05 Ritter & Paratore
005 -2,824 12/13/04 12/23/04 HJ Brandeles
006 51,750 06/17/04 06/22/04 Northland Assoc.
006 -13,684 11/30/04 03/22/05 Ritter & Paratore
007 13,527 09/09/04 09/24/04 Northland Assoc.
015 0 11/02/04 12/23/04 Northland Assoc.
016 0 11/02/04 12/23/04 Northland Assoc.
017 17,820 11/30/04 03/22/05 Northland Assoc.
018 4,958 01/07/05 03/11/05 Northland Associates
019 2,300 01/07/05 03/11/05 Northland Associates
020 3,100 01/07/05 03/11/05 Northland Associates
021 1,120 01/07/05 03/11/05 Northland Associates
022 6,265 3 01/07/05 03/11/05 Northland Associates
023 4,122 01/07/05 03/11/05 Northland Associates Incorp
024 3,150 01/07/05 03/11/05 Northland Associate
025 1,284 02/07/05 03/14/05 Northland Associates
026 2,735 02/07/05 03/14/05 Northland Associates
027 400 02/07/05 03/14/05 Northland Associates
028 11,623 02/07/05 03/14/05 Northland Associates
029 2,578 02/07/05 03/14/05 Northland Associates
030 1,528 02/15/05 03/02/05 Northland Associates Incorp
031 9,854 08/10/05 08/15/05 Northland Associates
032 3,344 06/17/05 07/12/05 Northland Associates
033 1,169 08/10/05 08/15/05 Northland Associates
034 400 08/11/05 08/31/05 Northland Associates
AD008 0 10/18/04 10/26/04 Northland Assoc.
AD009 0 10/18/04 10/26/04 Northland Assoc.
AD010 0 10/18/04 10/26/04 Northland Assoc.
AD011 31,656 10/18/04 10/26/04 Northland Assoc.
AD012 0 10/18/04 10/26/04 Northland Assoc.
AD013 0 10/18/04 10/26/04 Northland Assoc.
AD014 0 10/18/04 10/26/04 Northland Assoc.
New Bus Storage Facility:
01-0712SR New Construction 5-025-001 03/29/02 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1189 New Construction 5-025-001 03/29/02 NO CHANGE ORDERS ON ELECTRONIC FILE
STOCKBRIDGE VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 25-15-01-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Stockbridge Valley Central:
02-0609FP Reconstruction 0-003-FP1 12/04/02 NO CHANGE ORDERS ON ELECTRONIC FILE
(New) K-12 Building:
95-0646 New Construction 0-010-001 04/18/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0662 Alterations 0-010-002 04/06/00 *CO No.* Amount Disallowed Received Approved Contractor
E-1 -19,929 07/01/02 07/03/02 Eppy Electric
E-2 517 07/01/02 07/03/02 Eppy Electric
GC-1 -104,955 07/01/02 07/03/02 George A. Nole and Son
GC-2 -18,748 07/01/02 07/03/02 George A. Nole and Son
HVAC-1 2,104 07/01/02 07/03/02 B&H Air Conditioning
P-1 3,298 07/01/02 07/03/02 Schmalz Mechanical
06-1159 Reconstruction 0-010-003 04/27/07 *CO No.* Amount Disallowed Received Approved Contractor
GC-001 0 12/24/07 / / RICHARD E. ALEXANDER CO. INC.
GC-001 0 12/24/07 01/14/08 RICHARD E ALEXANDER CO INC
GC-002 -2,448 06/05/08 08/07/08 Richard E. Alexander co.
03-0948SC Visual Structural Inspection 0-010-SC1 01/14/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Greenhouse/Ag. Lab:
97-0469 New Construction 0-014-001 11/20/97 NO CHANGE ORDERS ON ELECTRONIC FILE
Agricultural Storage Facility:
06-0967 New Construction 1-016-001 07/30/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Custodial Storage Bldg.:
99-0664 New Construction 2-015-001 04/06/00 NO CHANGE ORDERS ON ELECTRONIC FILE
Agricultural Storage Bldg.:
99-0663 New Construction 2-016-001 04/06/00 NO CHANGE ORDERS ON ELECTRONIC FILE
New Bus Garage:
97-1473 New Construction 5-013-001 06/24/98 *CO No.* Amount Disallowed Received Approved Contractor
E-2 6,800 06/27/02 06/27/02 DMEC, Inc.
E-3 745 06/27/02 06/27/02 DMEC, Inc.
CHITTENANGO CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 25-16-01-06
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
High School:
90-1303 Reconstruction 0-001-002 05/08/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1025 Reconstruction 0-001-003 05/01/92 *CO No.* Amount Disallowed Received Approved Contractor
00018 603 03/16/06 07/24/06 ridley Electric
00019 4,105 03/16/06 08/09/06 ridley Electric
00020 479 03/16/06 06/23/06 Ridley Electric
92-1512 Reconstruction 0-001-004 07/06/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0743 Reconstruction 0-001-007 02/27/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1208 Additions and Alterations 0-001-008 06/19/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1532 Reconstruction 0-001-009 06/04/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0632 Additions and Alterations 0-001-011 03/31/00 *CO No.* Amount Disallowed Received Approved Contractor
1 0 04/27/01 01/09/02 KSP Painting
1 33,499 12/03/01 01/10/02 Leitz Ent.
10 3,601 12/03/01 01/10/02 M&N Plumbing
10 3,662 12/03/01 01/10/02 E. Schalk & Son
11 5,930 12/03/01 01/10/02 E. Schalk & Son
11 1,433 07/16/02 10/30/02 Bellucci Ent.
12 11,691 12/03/01 01/10/02 E. Schalk & Son
12 -982 08/29/02 01/08/03 Bellucci Ent.
13 3,843 01/28/03 02/05/03 M&N Plumbing
14 -639 12/03/01 01/10/02 Delhi Steel
14 3,895 01/28/03 02/05/03 E. Schalk & Son
15 100 02/04/02 03/21/02 Delhi Steel
16 -3,338 09/05/01 01/24/02 Purcell Const.
18 -4 12/03/01 01/10/02 Purcell Const.
18 1,643 12/03/01 01/10/02 Edgeline Elec.
19 4,394 01/02/02 03/26/02 Edgeline Elec.
20 5,214 12/03/01 01/10/02 Purcell Const.
20 220 02/04/02 03/21/02 Edgeline Elec.
21 1,215 02/04/02 03/21/02 Purcell Const.
21 3,905 03/05/02 04/05/02 Edgeline Elec.
22 2,063 03/05/02 04/05/02 Purcell Const.
24 2,279 07/16/02 10/30/02 Purcell Const.
3 5,892 07/16/02 10/30/02 EV Roofing Const.
4 5,200 05/18/01 01/14/02 Bellucci Ent.
6 3,921 08/29/01 01/09/02 Cortland Glass
6 8,475 05/18/01 01/14/02 M&N Plumbing
6 2,135 08/23/01 04/03/02 Shaw Contract Flooring
7 -2,389 12/03/01 01/10/02 Avala Contracting
7 3,980 12/03/01 01/10/02 Cortland Glass
7 15,603 07/16/01 01/29/02 M&N Plumbing
8 19,603 08/29/01 01/09/02 E. Schalk & Son
8 1,494 12/03/01 01/10/02 Northeast Interior
8 18,187 05/07/01 02/06/02 Edgeline Elec.
8 1,093 03/29/02 05/23/02 Schneid Const.
9 -882 12/03/01 01/10/02 Bellucci Ent.
9 785 01/02/02 03/26/02 Northeast Interior
9 854 03/29/02 05/23/02 Shaw Contract Flooring
99-0876 Reconstruction 0-001-012 02/24/00 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1674 Reconstruction 0-001-013 11/23/04 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
00005 5,590 11/30/05 05/24/06 Bette Cring
00006 3,843 04/03/06 05/09/06 Bellucci Enteprises
00009 13,583 12/27/05 07/21/06 Bette Cring
00010 12,505 09/10/07 10/18/07 RIDLEY ELCTRIC CO., INC.
00011 -1,478 09/19/06 12/18/06 CNY mechanical
00011 8,330 09/10/07 10/18/07 RIDLEY ELECTRIC CO., INC.
00012 2,274 09/19/06 12/18/06 CNY mechanical Associates
00012 14,324 09/10/07 10/18/07 RIDLEY ELECTRIC CO., INC.
00013 2,177 03/01/06 03/14/06 RIDLEY ELECTRIC CO., INC.
00016 326 03/13/06 04/20/06 Ridley Electric
00017 -500 09/19/07 10/18/07 CNY MECHANICAL ASSOCIATES, INC.
00021 1,784 04/03/06 05/09/06 Ridley Electric
00025 -445 07/31/06 08/10/06 Bette Cring
00026 -853 07/31/06 08/14/06 Bette Cring
00029 5,405 09/12/06 10/27/06 Bette Cring
00030 17,463 09/12/06 10/27/06 Bette Cring
00031