REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Alexander Elementary:
91-1021 Reconstruction 0-001-002 05/26/92 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0650 Reconstruction 0-001-004 01/26/95 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1160 Additions and Alterations 0-001-005 08/09/00 *CO No.* Amount Disallowed Received Approved Contractor
Co-0001 58,000 12/29/06 01/16/07 Reindeer Environmental
Co-0001 13,500 12/29/06 01/16/07 Main Ford General Supply
Co-0002 4,982 12/29/06 01/16/07 Reindeer Environmental
F-1 -78,501 12/29/06 03/09/07 Jameson Roofing
J-2 3,756 10/10/06 12/11/06 Mollenberg-Betz Inc.
07-1329 Reconstruction 0-001-007 01/14/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2096FP Reconstruction 0-001-FP1 06/18/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Alexander Jr/Sr High School:
91-1555 Reconstruction 0-002-003 07/14/92 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0651 Reconstruction 0-002-004 01/26/95 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1510 Reconstruction 0-002-005 06/30/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0182 Reconstruction 0-002-006 08/31/94 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1161 Additions and Alterations 0-002-008 08/09/00 *CO No.* Amount Disallowed Received Approved Contractor
B-1 -5,265 10/10/06 12/11/06 STS Construction
C-1 -17,414 10/21/06 11/08/06 Summit Construction Group
CO-0004 22,850 12/29/06 01/16/07 Reindeer Environmental
Co-0003 1,605 12/29/06 01/16/07 Reindeer Ennvironmental
E-1 -124,893 10/10/06 12/11/06 Pepe Rodems Construction
E-2 -75,035 10/10/06 02/09/07 Pepe Rodems Construction
F-2 -10,918 359 12/15/06 12/18/06 Jameson Roofing
G-1 -17,811 10/10/06 02/09/07 Cortland Glass Co
H-1 -24,625 10/10/06 12/11/06 R Hengel Painting
I-2 -39,073 10/10/06 02/09/07 Main Ford General Supply
J-1 3,081 10/10/06 02/09/07 Mollenberg Betz Inc
K-1 -9,524 10/10/06 02/09/07 Numarco Inc
L-1 -7,740 4,249 10/10/06 02/09/07 Cashette Electric
94-1350EP Energy Project 0-002-E01 01/26/95 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2095FP Reconstruction 0-002-FP1 06/18/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
94-0652 Additions and Alterations 5-003-002 01/26/95 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1162 Additions and Alterations 5-003-003 08/09/00 NO CHANGE ORDERS ON ELECTRONIC FILE
BATAVIA CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 18-03-00-01
last updated on 07/24/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Batavia Middle School:
93-1398 Reconstruction 0-002-005 07/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1230 Reconstruction 0-002-006 05/23/94 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0934 Reconstruction 0-002-008 04/01/98 NO CHANGE ORDERS ON ELECTRONIC FILE
05-1076 Additions and Alterations 0-002-009 07/14/06 *CO No.* Amount Disallowed Received Approved Contractor
AA-1 16,177 10/19/07 01/23/08 MCS REMEDIAL SERVICES, INC.
EL - 3 10,687 03/07/08 / / Kaplan - Schmidt Electric Incorp.
EL-1 6,754 02/18/06 03/13/07 Kaplan Schmidt Electric
EL-2 0 10/19/07 01/23/08 9816
EL-4 10,093 05/12/08 / / KAPLAN-SCHMIDT ELECTRIC INC.
GC-1 8,965 11/28/06 03/14/07 Allied Builders
GC-2 13,641 05/03/07 05/15/07 Allied Builders
GC-3 68,523 05/31/07 06/20/07 Allied Builders
GC-4 5,543 05/12/08 / / ALLIED BUILDERS, INC.
GC-6 888 05/12/08 / / ALLIED BUILDERS,INC.
HV 4 69,342 02/01/08 03/19/08 LAWMAN HEATING COOLING INC.
HV 5 828 02/01/08 02/23/08 LAWMAN HEATING & COOLING INC.
HV-2 7,623 03/21/07 04/25/07 Lawman Heating Cooling
HV-7 5,906 03/21/08 04/23/08 Lawman Heating & Cooling Incorp.
HV-8 678 05/12/08 / / LAWMAN HEATING & COOLING, INC.
MS-1 15,290 02/01/08 03/06/08 DRISCOLL MASONRY RESTORATION CO
PB 3 3,217 02/01/08 02/23/08 THURSTON BROTHERS, INC
02-2094FP Reconstruction 0-002-FP1 06/18/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0657SC Visual Structural Inspection 0-002-SC1 12/02/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Robert Morris School:
92-1330 Reconstruction 0-005-002 06/29/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0770 Additions and Alterations 0-005-003 05/20/94 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0935 Reconstruction 0-005-004 04/01/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1487 Reconstruction 0-005-005 09/03/99 *CO No.* Amount Disallowed Received Approved Contractor
E-1 -12,537 07/02/01 01/10/02 Eastcoast Electric
S-1 -10,000 07/02/01 01/10/02 Della Penna Paving
S-2 52,424 07/02/01 01/10/02 Della Penna Paving
S-3 27,412 07/02/01 01/10/02 Della Penna Paving
S-4 2,204 07/02/01 01/10/02 Della Penna Paving
05-1077 Reconstruction 0-005-006 07/14/06 *CO No.* Amount Disallowed Received Approved Contractor
AA2 9,947 10/19/07 01/23/08 MCS REMEDIAL SERVICES, INC.
GC-5 -2,248 05/12/08 / / ALLIED BUILDERS, INC.
GC-7 4,820 05/12/08 / / ALLIED BUILDERS, INC.
HV-1 6,440 04/05/07 03/13/07 Lawman Heating Cooling
HV-1 603 02/01/08 02/23/08 LAWMAN HEATING & COOLING INC.
PB 2 1,553 02/01/08 02/23/08 THURSTON BROTHERS, INC.
PB-1 6,386 12/24/07 02/23/08 THURSTON BROTHERS, INC
Jackson School:
92-1331 Reconstruction 0-007-001 06/29/93 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0760 Additions and Alterations 0-007-002 03/27/98 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0936 Reconstruction 0-007-003 04/01/98 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2092FP Reconstruction 0-007-FP1 06/18/03 NO CHANGE ORDERS ON ELECTRONIC FILE
John Kennedy School:
92-1332 Reconstruction 0-008-003 06/29/93 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0932 Reconstruction 0-008-005 04/01/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1656 Additions and Alterations 0-008-007 02/11/02 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
0 / / / /
0 / / / /
AS-1 1,286 01/12/06 06/02/06 Metro Contracting
AS-2 3,500 01/12/06 06/02/06 Metro Contracting
AS-3 4,350 01/12/06 06/02/06 2etro Contracting
AS-4 1,965 01/12/06 06/02/06 Metro Contracting
EC-2 8,734 01/12/06 12/20/06 Frey Electric Construction
EC-3 -341,300 01/12/06 10/06/06 Frey Electric Construction Co.,Inc.
EC-4 1,151 03/25/08 03/31/08 FREY ELECTRIC CONSTRUCTION CO.
EC-4 1,152 02/28/08 04/15/08 FREY CONSTRUCTION CO. INC.
EC-5 -713 01/12/06 12/20/06 Frey Electric Construction
G-1 18,068 23,594 02/23/07 04/03/07 LeChase Construction
G-30 7,526 03/25/08 / / CONCEPT CONSTRUCTION CORP.
G-31 1,363 03/25/08 / / CONCEPT CONSTRUCTION CORP.
H-9 -3,000 03/25/08 03/31/08 MOLLENBERG BETZ, INC.
HVAC-3 -1,318,100 01/12/06 10/06/06 D.V. Borwn & Associates,Inc.
HVAC-5 -24,469 01/12/06 10/05/06 DV brown Associates
PC-1 17,826 10/08/02 04/12/07 C&L Plumbing
PC-2 3,216 04/04/03 04/21/03 C&L Plumbing
PC-3 6,958 04/04/03 04/12/07 C&L Plumbing
PC-4 8,888 01/12/06 12/20/06 Cand L Plumbing
PC-6 17,440 01/12/06 12/20/06 C and L Plumbing
PC5 4,473 06/12/06 07/27/06 C and L Plumbing
RC-1 -418,277 01/12/06 10/06/06 Elmer W. Davis, Inc.
RC-2 -1,709 02/23/07 04/11/07 Elmer Davis
S-3 10,500 01/12/06 06/02/06 AD call Excavating
S2 -12,564 01/12/06 06/02/06 AD Call and Sons Excavating
SC-1 27,200 01/13/06 06/02/06 Ad Call and Son Excavating
00-0901 Reconstruction 0-008-008 02/11/02 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
HVAC-2 -16,992 04/04/03 04/21/03 DV Brown & Assoc.
HVAC-4 6,169 01/12/06 12/20/06 DV brown Associates
Senior High School:
91-0529 Reconstruction 0-015-003 01/28/92 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1333 Reconstruction 0-015-004 06/29/93 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0933 Reconstruction 0-015-006 04/01/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0059 Reconstruction 0-015-008 10/01/99 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 -2,000 07/02/01 02/06/02 Tunney Elec.
01-0498 Additions and Alterations 0-015-009 07/18/02 *CO No.* Amount Disallowed Received Approved Contractor
AS-01 -2,144 11/25/05 11/29/05 KA and S construction
EC-1 25,466 11/25/05 / / Kaplan schmidt Electric
EC-1 25,466 02/23/07 / / Kaplan Schimdt
EC-2 13,000 11/25/05 11/29/05 Kaplan schmidt Electric
EC-3 4,327 11/25/05 11/29/05 Kaplan Schmidt
EC-4 -117 06/12/06 12/27/06 Kaplan schmidt Electric
GC-1 19,800 11/25/05 02/13/06 Horning Construcion
GC-10 4,180 11/25/05 02/13/06 Horning Construction
GC-11 10,395 11/25/05 02/13/06 Horning Construction
GC-12 4,000 11/25/05 02/13/06 Horning Construction
GC-13 31,665 11/25/05 02/13/06 Horning Construction
GC-14 7,165 11/25/05 02/13/06 Horning Construction
GC-15 -24,700 11/25/05 02/13/06 Horning Construction
GC-16 7,636 11/25/05 02/13/06 Horning Construction
GC-17 3,200 11/25/05 02/13/06 Horning Construction
GC-18 11,090 11/25/05 02/13/06 Horning Construction
GC-19 7,527 11/25/05 02/13/06 Horning Construction
GC-2 259,000 11/25/05 12/18/06 Horning Construction
GC-20 6,258 11/25/05 02/13/06 Horning Construction
GC-21 12,075 11/25/05 02/13/06 Horning Construction
GC-22 9,829 11/25/05 02/13/06 Horning Construction
GC-23 7,200 11/25/05 02/13/06 Horning Construction
GC-24 47,381 11/25/05 02/13/06 Horning Construction
GC-26 10,076 11/25/05 02/13/06 Corning Construction
GC-27 10,748 11/25/05 02/13/06 Horning Construction
GC-28 4,100 11/25/05 02/13/06 Horning Construction
GC-29 1,350 11/25/05 02/13/06 Horning Construction
GC-3 155,611 11/25/05 12/18/06 Horning Construction
GC-30 30,310 06/12/06 07/26/06 Horning Construction
GC-31 2,994 11/25/05 11/29/05 Horning Construction
GC-32 -1,300 11/25/05 02/13/06 horning Construction
GC-4 109,979 11/25/05 12/18/06 Horning Construction
GC-5 30,000 11/25/05 02/13/06 Horning Construction
GC-6 44,721 11/25/05 02/13/06 Horning Construction
GC-7 65,731 11/25/05 02/13/06 Horning Construction
GC-8 33,532 11/25/05 02/13/06 Horning Construction
GC-9 56,101 11/25/05 02/13/06 Horning Construction
HVAC 4 88,456 11/25/05 / / Lawman heating Cooling
HVAC 4 88,456 02/23/07 / / Lawman Heating Cooling
HVAC-1 38,181 11/25/05 / / Lawman heating Cooling
HVAC-2 6,815 11/25/05 06/30/06 Lawman heating Cooling
HVAC-3 3,637 11/25/05 06/30/06 Lawman heating Cooling
HVAC-5 24,844 11/25/05 06/30/06 Lawman heating and Coolin g
PC-1 17,259 11/25/05 / / Michael Ferrauilo Plumbing Heating
PC-1 17,259 02/23/07 / / MIchael Ferrauilo
PC-10 2,806 11/25/05 11/15/06 Michael Ferrauilo Plumbing heating
PC-11 1,902 11/25/05 12/20/06 Michael Ferrauilo Plumbing Heating
PC-12 1,268 11/25/05 01/17/06 Michael Ferrauilo Plumbing Heating
PC-2 15,241 11/25/05 11/16/06 Michael Ferrauilo Plumbing Heating
PC-3 23,162 11/25/05 11/16/06 Michael Ferrauilo Plumbing Heating
PC-4 5,500 11/25/05 04/12/06 Michael Ferrauilo Plumbing Heating
PC-5 16,490 11/25/05 11/16/06 Michael Ferrauilo Plumbing Heating
PC-6 6,214 11/25/05 04/12/06 Plumbing and Heating, Inc.
PC-7 5,221 11/25/05 11/16/06 Michael Ferrauilo Plumbing Heating
PC-8 18,802 11/25/05 11/16/06 Michael Ferrauilo Plumbing Heating
PC-9 3,295 11/25/05 11/16/06 Michael Ferrauilo Pluming heating
RC-1 28,210 11/25/05 12/18/06 sand L roofing sheetmetal
RC-2 -21,294 11/25/05 02/13/06 Sand L Roofing Sheetmetal
SC-1 27,324 11/25/05 12/18/06 Viscone construction
SC-10 13,761 11/25/05 02/13/06 Visone Construction
SC-11 2,583 11/25/05 02/13/06 Visone Construction
SC-2 17,223 11/25/05 02/13/06 Viscone construction
SC-3 25,200 11/25/05 02/13/06 visone Construction
SC-4 48,116 11/25/05 02/13/06 Visone Construction
SC-5 41,940 11/25/05 02/13/06 visone Construction
SC-6 16,102 11/25/05 02/13/06 visone Construction
SC-7 3,700 11/25/05 02/13/06 Visone Construction
SC-8 7,500 11/25/05 02/13/06 visone Construction
SC-9 76,798 11/25/05 02/13/06 Visone Construction
hvac 1 38,181 02/23/07 / / Lawman Heating Cooling
hvac 9 15,193 02/23/07 / / Lawman Heating Cooling
hvac6 4,544 06/12/06 07/27/06 Lawman heating Cooling
hvac7 4,415 06/12/06 07/27/06 Lawman heating
hvac8 4,048 06/12/06 07/27/06 Lawman heating
hvac9 15,193 06/12/06 / / Lawman heating Cooling
04-0330 Additions and Alterations 0-015-010 01/10/05 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
E-01 -5,000 06/12/06 09/29/06 Suburban Electric
G-01 3,429 06/12/06 07/26/06 Whitney East
G-02 -5,795 06/12/06 07/26/06 Whitney East
GC-01 24,205 06/12/06 07/14/06 Whitney East
M-01 -4,800 10/12/06 12/27/06 Lawman heating Cooling
P-01 5,000 02/05/07 02/12/07 Thurston Brothers
02-2093FP Reconstruction 0-015-FP1 06/18/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0658SC Visual Structural Inspection 0-015-SC1 12/02/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Administration Bldg.:
97-0931 Reconstruction 1-001-001 04/01/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1655 Reconstruction 1-001-002 02/11/02 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 8,306 04/04/03 04/21/03 Frey Elec. Const.
HVAC-1 21,058 04/04/03 04/21/03 DV Brown & Assoc.
Richmond Memorial Library:
97-0930 Reconstruction 6-003-001 04/01/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0412 Reconstruction 6-003-002 01/12/99 NO CHANGE ORDERS ON ELECTRONIC FILE
05-1078 Reconstruction 6-003-003 07/14/06 NO CHANGE ORDERS ON ELECTRONIC FILE
Districtwide Computer Tech. Project:
97-0937 Reconstruction 7-999-001 04/01/98 NO CHANGE ORDERS ON ELECTRONIC FILE
BYRON-BERGEN CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 18-07-01-04
last updated on 07/24/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Jr/Sr High School:
93-1642 Reconstruction 0-002-004 08/03/94 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0941 Additions and Alterations 0-002-005 06/02/00 *CO No.* Amount Disallowed Received Approved Contractor
AA-4 1,237 04/30/01 02/06/02 AAC Contracting
AA-5 2,154 09/07/01 01/08/02 AAC Contracting
AA-6 3,838 10/05/01 04/16/02 AAC Contracting
CG-3 -114,200 03/19/01 01/14/03 JW Danforth
CGM-10 8,170 02/19/03 03/04/03 JW Danforth
CGM-6 6,578 09/14/01 04/08/02 JW Danforth
CGM-7 14,886 11/28/01 03/01/02 JW Danforth
CGM-8 18,996 04/03/02 04/18/02 JW Danforth
EL-10 5,712 11/15/01 02/08/02 Blackmon-Farrell
EL-6 3,693 04/30/01 02/06/02 Blackmon-Farrell
EL-8 -1,671 08/28/01 01/29/02 Blackmon-Farrell
EL-9 1,905 09/20/01 01/08/02 Blackmon-Farrell
El-12 18,706 01/25/02 03/25/02 Blackmon-Farrell
FL-5 2,222 10/05/01 01/08/02 Rochester Flooring Resource
FL-6 11,698 11/28/01 03/01/02 Rochester Flooring Resource
GC-2 290,000 01/30/01 01/08/02 Manning Squires Hennig
GC-3 120,000 01/30/01 01/08/02 Manning Squires Hennig
GC-9 14,827 02/27/02 04/18/02 Manning Squires Hennig
HV-8 4,226 02/19/03 03/04/03 JW Danforth
HV9 681 02/19/03 03/04/03 JW Danforth
PB-5 16,272 09/14/01 04/08/02 JW Danforth
PB-8 15,515 04/03/02 04/18/02 JW Danforth
ST-3 173,000 11/17/00 12/01/03 Della Penna Paving
ST-5 5,293 04/30/01 02/06/02 Della Penna Paving
ST-7 1,200 / / 01/15/02 Della Penna Paving
ST-8 102,012 03/25/02 05/10/02 Della Penna Paving
TC-3 3,840 12/12/01 01/09/02 Johnson Controls
WN-2 105,800 11/03/00 05/27/03 NEP Glass
WN-3 3,425 07/09/01 01/15/02 NEP Glass
02-2257FP Reconstruction 0-002-FP1 05/28/03 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0039SC Visual Structural Inspection 0-002-SC1 07/16/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Elementary School:
93-1643 Reconstruction 0-005-001 08/03/94 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0942 Reconstruction 0-005-002 06/02/00 *CO No.* Amount Disallowed Received Approved Contractor
CGA-4 24,005 06/20/01 01/08/02 JW Danforth
E-5 14,926 06/26/01 01/08/02 Blackmon-Farrell
EL-2 164,885 164,885 11/28/00 12/01/03 Blackmon-Farrell
EL-4 -4,555 02/13/01 01/14/03 Blackmon-Farrell
FL-1 -72,105 11/17/00 12/01/03 Rochester Flooring
GC-10 1,564 02/19/03 06/18/03 Manning Squires Hennig
PB-2 20,350 11/17/00 12/01/03 JW Danforth
ST-6 3,744 06/20/01 01/08/02 Della Penna Paving
02-1779FP Reconstruction 0-005-FP1 05/27/03 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0040SC Visual Structural Inspection 0-005-SC1 07/16/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Natatorium:
93-1644 Reconstruction 0-006-001 08/03/94 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0943 Reconstruction 0-006-002 06/02/00 *CO No.* Amount Disallowed Received Approved Contractor
CG-3 6,983 03/14/01 01/14/03 Blackmon-Farrell
CGE-7 9,156 03/29/02 05/10/02 Blackmon-Farrell
CGM-9 8,605 02/19/03 03/04/03 JW Danforth
EC-4 4,365 04/30/01 02/06/02 Blackmon-Farrell
EL-11 4,560 12/10/01 02/28/02 Blackmon-Farrell
EL-15 1,259 02/24/03 03/11/03 Blackmon-Farrell
GC-6 33,847 07/09/01 01/15/02 Manning Squires Hennig
HV-2 262,940 262,940 11/17/00 12/01/03 JW Danforth
HV-6 2,792 12/10/01 02/28/02 JW Danforth
HV-7 1,118 02/13/02 03/25/02 JW Danforth
PB-6 1,627 11/28/01 03/01/02 JW Danforth
PB-7 4,161 12/10/01 02/28/02 JW Danforth
07-0041SC Visual Structural Inspection 0-006-SC1 07/16/07 NO CHANGE ORDERS ON ELECTRONIC FILE
New Bus Maintenance Facility:
99-0940 New Construction 5-008-001 06/02/00 *CO No.* Amount Disallowed Received Approved Contractor
001 46,793 10/05/06 01/09/07 Blackmon Farrell inc
CG-2 114,435 114,435 11/17/00 12/01/03 JW Danforth
EL-14 3,104 02/19/03 03/04/03 Blackmon-Farrell Elec.
FL_-4 2,273 09/26/01 01/08/02 Rochester Flooring Resource
GC-11 497 02/19/03 03/04/03 Manning Squires Hennig
GC-8 6,435 11/28/01 03/01/02 Manning Squires Hennig
PB-4 2,330 08/27/01 01/29/02 JW Danforth
ST 7 3,479 11/18/02 01/03/03 Della Penna Paving
ST-2 401,542 11/17/00 12/01/03 Della Penna Paving
07-0042SC Visual Structural Inspection 5-008-SC1 07/16/07 NO CHANGE ORDERS ON ELECTRONIC FILE
ELBA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 18-09-01-04
last updated on 07/24/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building K-12:
93-0185 Reconstruction 0-001-004 10/08/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0600 Reconstruction 0-001-005 02/01/95 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1789 Additions and Alterations 0-001-006 11/09/99 *CO No.* Amount Disallowed Received Approved Contractor
A-2 5,513 06/21/02 07/12/02 S&S Environ.
A-3 1,680 06/21/02 07/12/02 S&S Environ.
EC-10 7,252 06/21/02 07/12/02 Webster Elec.
EC-11 -28,000 01/16/04 01/20/04 Webster Elec.
EC-5 3,641 07/31/01 01/30/02 Webster Elec.
EC-5 3,641 06/21/02 07/12/02 Webster Elec.
EC-6 3,654 07/31/01 01/30/02 Webster Elec.
EC-6 3,641 06/21/02 07/12/02 Webster Elec.
EC-7 4,378 07/31/01 01/30/02 Webster Elec.
EC-7 4,378 06/21/02 07/12/02 Webster Elec.
EC-8 11,531 06/21/02 07/12/02 Webster Elec.
EC-9 7,927 06/21/02 07/12/02 Webster Elec.
GC-10 12,933 06/21/02 07/12/02 Javen Const.
GC-11 18,089 06/21/02 07/12/02 Javen Const.
GC-12 7,690 06/21/02 07/12/02 Javen Const.
GC-13 14,094 06/21/02 07/12/02 Javen Const.
GC-14 6,390 06/21/02 07/12/02 Javen Const.
GC-15 2,133 06/21/02 07/12/02 Javen Const.
GC-16 11,866 06/21/02 07/12/02 Javen Const.
GC-17 8,723 06/21/02 07/12/02 Javen Const.
GC-2 9,710 01/16/04 01/20/04 Javen Const.
GC-2 9,710 01/16/04 01/20/04 Javen Const.
GC-8 20,558 06/21/02 07/12/02 Javen Const.
GC-9 5,828 07/31/01 01/30/02 Javen Const.
H&V-10 4,802 06/21/02 07/12/02 Lawman Heating
H&V-11 5,375 06/21/02 07/12/02 Lawman Heating
H&V-5 7,511 06/21/02 07/12/02 Lawman Heating
H&V-6 17,637 06/21/02 07/12/02 Lawman Heating
H&V-7 12,490 06/21/02 07/12/02 Lawman Heating
H&V-8 2,540 06/21/02 07/12/02 Lawman Heating
H&V-9 -8,994 06/21/02 07/12/02 Lawman Heating
HV-5 7,511 07/31/01 01/30/02 Lawman Heating
HV-8 2,540 07/31/01 01/30/02 Lawman Heating
PC-4 3,227 07/31/01 01/30/02 Thurston Bros.
PC-4 3,227 06/21/02 07/12/02 Thurston Bros.
PC-5 3,619 06/21/02 07/12/02 Thurston Bros.
SW-5 24,824 06/21/02 07/12/02 Keeler Const.
SW-6 3,996 06/21/02 07/12/02 Keeler Const.
SW-7 1,714 06/21/02 07/12/02 Keeler Const.
SW-8 5,520 06/21/02 02/27/04 Keeler Const.
06-0664 Reconstruction 0-001-007 04/10/07 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0599EP Energy Project 0-001-E02 02/01/95 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1444FP Reconstruction 0-001-FP1 03/31/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Annex:
94-0602 Reconstruction 0-002-002 02/01/95 NO CHANGE ORDERS ON ELECTRONIC FILE
LEROY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 18-10-01-06
last updated on 07/24/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Wolcott Street School:
91-0051 Reconstruction 0-001-003 08/09/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0488 Reconstruction 0-001-004 01/20/93 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1002 Reconstruction 0-001-006 09/11/01 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
0 / / / /
B-016 3,653 02/12/04 02/20/04 Manning Squires Hennig
B-016 3,653 05/19/04 07/09/04 Manning Squires Hennig
B-019 3,490 05/09/06 11/30/06 ManninG Squires Henning
07-0132 Reconstruction 0-001-007 12/19/07 NO CHANGE ORDERS ON ELECTRONIC FILE
LeRoy High School(connected to 001):
92-0489 Additions and Alterations 0-002-006 01/20/93 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1429 Reconstruction 0-002-009 08/10/99 *CO No.* Amount Disallowed Received Approved Contractor
GC-6 -8,124 04/24/02 05/30/02 Robert F. Hyland and Sons
00-1001 Reconstruction 0-002-010 09/11/01 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
B-011 20,127 01/02/04 03/15/04 Manning Squires Hennig
B-015 16,906 02/12/04 02/20/04 Manning Squires Hennig
B-019 47,046 30,746 05/09/06 10/13/06 Manning Squires Henning
B-022 741 05/03/04 05/12/04 Mannign Squires Hennig
G-002 56,376 02/12/04 04/27/04 Billitier Elec.
02-0805FP Reconstruction 0-002-FP1 01/07/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Lapp Building(connected to 001):
92-0490 Reconstruction 0-006-002 01/20/93 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1777 Reconstruction 0-006-004 07/10/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1003 Reconstruction 0-006-005 09/11/01 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
0 / / / /
B-019 -7,452 05/09/06 11/30/06 Manning Squires Henning
Jr/Sr High School 7-12:
00-0999 New Construction 0-017-001 09/11/01 *CO No.* Amount Disallowed Received Approved Contractor
A-001 52,602 11/04/03 12/24/03 RJ Taylor Inc
A-002 61,546 11/04/03 12/24/03 RJ Taylor Inc
A-003 19,805 11/20/03 01/09/04 RJ Taylor Inc
A-004 14,263 11/20/03 01/09/04 RJ Taylor Inc
A-005 10,598 11/20/03 01/09/04 RJ Taylor Inc
A-006 -72,000 11/20/03 01/09/04 RJ Taylor Inc
A-007 4,346 11/20/03 01/09/04 RJ Taylor Inc
A-008 2,394 11/20/03 01/12/04 RJ Taylor Inc
A-009 4,440 12/09/03 12/24/03 RJ Taylor Inc
A-010 2,573 01/13/04 02/18/04 RJ Taylor Inc
A-011 4,252 11/04/03 01/09/04 RJ Taylor Inc
A-012 10,865 11/04/03 12/24/03 RJ Taylor Inc
A-013 6,901 11/04/03 12/24/03 RJ Taylor Inc
A-014 3,489 11/04/03 12/24/03 RJ Taylor Inc
B-001 24,461 12/09/03 12/24/03 Manning Squires Hennig
B-002 2,287 12/09/03 12/24/03 Manning Squires Hennig
B-003 2,389 12/09/03 12/24/03 Manning Squires Hennig
B-004 2,942 01/13/04 02/18/04 Manning Squires Hennig
B-005 42,024 42,024 01/02/03 01/09/04 Manning Squires Hennig
B-006 21,465 01/02/03 01/09/04 Manning Squires Hennig
B-007 124,955 52,955 08/27/04 09/17/04 Manning Squires Hennig
B-008 2,373 01/02/03 01/09/04 Manning Squires Hennig
B-010 1,857 01/02/03 01/09/04 Manning Squires Hennig
B-012 50,000 01/13/04 02/18/04 Manning Squires Hennig
B-013 7,220 01/13/04 02/18/04 Manning Squires Hennig
B-014 1,185 01/13/04 02/18/04 Manning Squires Henning
B-017 4,567 02/12/04 02/20/04 Manning Squires Hennig
B-018 -15,834 01/13/04 02/18/04 Manning Squires Hennig
B-020 1,912 05/09/06 05/20/06 Manning Squires Henning
B-021 2,616 05/03/04 05/12/04 Manning Squires Hennig
C-001 -8,700 01/13/04 02/18/04 AM Stern
C-002 -2,330 05/09/06 05/20/06 Am Stern Inc
C-003 5,060 05/03/04 05/12/04 AM Stern
D-001 -10,000 01/13/04 02/18/04 Rochester Colonial
D-002 -3,405 01/13/04 02/18/04 Rochester Colonial
E-01 -11,769 12/07/05 12/09/05 Crosby Brownlie
F-001 2,540 03/04/04 04/28/04 CNP Mech.
F-002 428 03/04/04 04/28/04 CNP Mech.
G-001 18,936 05/09/06 07/21/06 Billitier Electric
G-003 -13,602 10/01/04 10/25/04 Billitier Elec.
07-0134 Reconstruction 0-017-002 12/19/07 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0779SC Visual Structural Inspection 0-017-SC1 02/22/06 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1377 Visual Structural Inspection 0-017-SC2 01/16/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Portables @ Lapp Building:
00-1423 New Construction 0-019-001 05/15/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
92-0491 Reconstruction 5-004-003 01/20/93 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage/Fuel Facility:
00-1000 New Construction 5-018-001 09/11/01 *CO No.* Amount Disallowed Received Approved Contractor
B-009 1,773 01/02/03 01/09/04 Manning Squires Hennig
F-003 1,413 05/03/04 05/12/04 CNP Mech.
07-0135 Additions and Alterations 5-018-002 12/19/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Woodward Memorial Library:
07-0133 Additions and Alterations 6-003-002 12/19/07 NO CHANGE ORDERS ON ELECTRONIC FILE
OAKFIELD-ALABAMA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 18-11-01-04
last updated on 07/24/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
MS/HS 6-12:
95-0045 Additions and Alterations 0-005-007 09/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1405 Additions and Alterations 0-005-008 09/13/01 *CO No.* Amount Disallowed Received Approved Contractor
EL-1 10,198 11/05/02 01/10/03 CIR Elec.
EL-2 -3,861 02/06/03 02/24/03 CIR Elec.
GC-1 2,600 08/15/02 11/01/02 Sear-Brown
GC-2 23,395 08/23/02 11/01/02 Sear-Brown
GC-3 5,816 11/05/02 01/10/03 Sear-Brown
GC-4 4,273 06/18/03 06/25/03 Sear-Brown
GC-5 -400 03/03/04 04/07/04 Sear-Brown
GS-1 -30,000 11/05/02 01/10/03 J.S. McHugh, Inc.
HV-1 1,854 11/20/02 01/07/03 Ferrauilo Plumbing
PB-1 754 06/19/02 08/15/02 C&L Plumbing
PB-2 -5,510 01/31/03 02/27/03 C&L Plumbing
PB-3 6,031 06/18/03 06/25/03 C&L Plumbing
SL-1 350 11/10/03 12/22/03 Clarkson Elec.
SP-1 4,410 10/24/03 11/18/03 American Paving Excavating
SP-2 3,309 10/24/03 11/18/03 American Paving Excavating
ST-1 21,524 11/05/02 01/10/03 Building Solutions
ST-2 2,238 11/05/02 01/10/03 Building Solutions
ST-3 844 12/24/02 01/09/03 Building Solutions
WW-1 1,900 04/14/03 04/22/03 C&L Plumbing
02-0432FP Reconstruction 0-005-FP1 11/13/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Pre-K-5 Elementary School:
92-0170 Reconstruction 0-006-002 08/25/92 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0046 Additions and Alterations 0-006-003 09/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1404 Reconstruction 0-006-004 09/13/01 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0433FP Reconstruction 0-006-FP1 11/13/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
95-0047 Additions and Alterations 5-001-003 09/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
New Press Box:
01-1417 New Construction 7-007-001 06/18/02 *CO No.* Amount Disallowed Received Approved Contractor
GS-1 -30,000 11/05/02 01/10/03 JS McHugh, Inc
Football Concession Stand:
95-0048 New Construction 7-008-001 09/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
Softball Concession Stand:
95-0049 New Construction 7-009-001 09/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
PAVILION CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 18-12-01-04
last updated on 07/24/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Jr/Sr High School:
95-1478 Reconstruction 0-001-003 06/25/96 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0892 Reconstruction 0-001-004 05/19/99 *CO No.* Amount Disallowed Received Approved Contractor
26 3,784 09/14/01 01/14/02 Rochester Davis-Fetch
ASB-2 22,208 07/12/02 11/05/03 USA Remediation Services
AUD-1 3,642 07/12/02 10/30/02 Professional Furnishings
ELEC 20 2,561 11/08/02 01/08/03 O'Connell Electric
ELEC 21 2,931 11/08/02 01/08/03 O'Connell Electric
ELEC 22 23,650 11/08/02 01/08/03 O'Connell Electric
ELEC 23 24,940 11/08/02 01/08/03 O'Connell Electric
ELEC 24 42,951 11/08/02 01/08/03 O'Connell Electric
ELEC 25 3,413 11/08/02 01/08/03 O'Connell Electric
ELEC 26 5,519 11/08/02 01/08/03 O'Connell Electric
ELEC 35 24,951 04/30/01 02/06/02 O'Connell Electric
ELEC 43 2,796 11/08/02 01/08/03 O'Connell Electric
ELEC-29 5,502 07/12/02 10/30/02 O'Connell Electric
ELEC-42 15,135 09/14/01 01/14/02 O'Connell Electric
ELEC-45 0 04/24/02 05/30/02 St. Paul Surety
ELEC-7 -1,507 10/10/02 11/06/02 Hendler Elec.
ELEC-8 -1,816 10/10/02 11/06/02 Hendler Elec.
FLOOR-7 2,171 08/07/02 10/30/02 Shaw Contract Flooring, Inc
FLOOR-8 2,666 11/21/01 05/28/02 Shaw Contract Flooring
FOOD-4 10,061 04/30/01 02/06/02 Buffalo Hotel Supply
FURN-5 1,500 12/27/01 03/26/02 E&B Equip.
G/A 11 -12,200 02/22/02 03/29/02 Rochester Davis-Fetch Corp
G/A 13 9,806 02/22/02 03/29/02 Rochester Davis-Fetch Corp
GT 19 -428 02/22/02 03/29/02 Javen Construction
GT 20 765 02/22/02 11/05/03 Javen Construction
GT 21 0 02/22/02 03/29/02 Javen Construction
GT 22 -3,511 02/22/02 03/29/02 Javen Construction
GT 23 -4,957 02/22/02 03/29/02 Javen Construction
GT 24 0 02/22/02 03/29/02 Javen Construction
GYPS-12 5,069 07/12/02 10/30/02 Rochester Davis-Fetch Corp
GYPS-17 46,547 07/12/02 10/30/02 Rochester Davis-Fetch Corp
GYPS-19 57,579 07/12/02 10/30/02 Rochester Davis-Fetch Corp
GYPS-20 49,345 07/12/02 10/30/02 Rochester Davis-Fetch Corp
GYPS-21 34,978 07/12/02 10/30/02 Rochester Davis-Fetch Corp
GYPS-23 15,560 01/28/02 04/01/02 Rochester Davis-Fetch
GYPS-24 11,800 01/28/02 04/01/02 Rochester Davis-Fetch
GYPS-27 2,050 08/07/02 10/30/02 Rochester Davis-Fetch Corp
GYPS-28 43,091 12/27/01 03/26/02 Rochester Davis-Fetch
GYPS-29 12,667 12/27/01 03/26/02 Rochester Davis-Fetch
GYPS-30 14,386 12/27/01 03/26/02 Rochester Davis-Fetch
HVAC#12 -13,130 03/22/02 05/06/02 Kimble
HVAC-11 -500 12/27/01 03/26/02 Kimble
HVAC16-8 -49,153 11/21/01 05/28/02 Kimble
HVAC16-9 -782 11/21/01 05/28/02 Kimble
PAINT-10 15,275 01/28/02 04/01/02 Werner Painting
PAINT-11 10,083 01/28/02 04/01/02 Werner Painting
PAINT-13 2,298 08/07/02 10/30/02 Werner Painting
PLUMB-21 5,406 09/14/01 04/08/02 Donals Mech.
PLUMB-22 -5,000 07/01/02 07/03/02 C O P
SITEWK22 36,725 10/10/02 11/06/02 Northeast Diversification
STEWK-23 62,334 07/12/02 10/30/02 Northeast Diversification
06-0374 Reconstruction 0-001-005 01/04/08 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0152FP Reconstruction 0-001-FP1 08/24/04 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0330SC Visual Structural Inspection 0-001-SC1 11/08/05 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Main Agr. Ind. Bldg.:
95-1479 Reconstruction 0-002-001 06/25/96 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0893 Reconstruction 0-002-002 05/19/99 NO CHANGE ORDERS ON ELECTRONIC FILE
Elementary School:
95-1480 Reconstruction 0-004-005 06/25/96 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0894 Additions and Alterations 0-004-006 05/19/99 *CO No.* Amount Disallowed Received Approved Contractor
G-12 -1,574 03/27/06 03/28/06 Javen Construction
GT-25 -500 12/27/01 03/26/02 Javen Const.
GT-26 -250 12/27/01 03/26/02 Javen Const.
GT-27 -500 12/27/01 03/26/02 Javen Const.
GT-28 -24,182 12/27/01 03/26/02 Javen Const.
sitewk21 13,649 10/10/02 11/06/02 Northeast Diversification
window12 -500 07/16/02 10/30/02 Infinity Architectural Window
window13 -500 07/16/02 10/30/02 Infinity Architectural Window
window14 -500 07/16/02 10/30/02 Infinity Architectural Window
window15 -500 07/16/02 10/30/02 Infinity Architectural Window
98-1051 Reconstruction 0-004-007 05/18/99 *CO No.* Amount Disallowed Received Approved Contractor
5 444 09/14/01 01/14/02 Spring Sheet Metal & Roofing
7 536 01/25/02 03/21/02 SSM & RC
E-14 0 07/12/02 10/30/02 O'Connell Electric
E-27 10,820 07/16/02 10/30/02 O'Connell Electric
E-9 0 07/12/02 10/30/02 O'Connell Electric
HVAC 4 0 07/12/02 10/30/02 Kimble, Inc
HVAC10 -500 01/25/02 03/21/02 Kimble, Inc.
foodsvc3 2,071 08/07/02 10/30/02 Buffalo Hotel Supply
gyp 18 33,018 07/12/02 10/30/02 Rochester Davis-Fetch
roof 6 32,620 07/12/02 10/30/02 SSM & RC
04-0153FP Reconstruction 0-004-FP1 08/24/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Track Storage Bldg:
06-1057 New Construction 2-007-001 07/05/07 NO CHANGE ORDERS ON ELECTRONIC FILE
New Bus Garage:
01-0166 Reconstruction 5-003-L01 08/20/01 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1088 Reconstruction 5-003-L02 04/05/05 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1089 Reconstruction 5-003-L03 04/05/05 NO CHANGE ORDERS ON ELECTRONIC FILE
Concession Stand:
06-1058 New Construction 7-008-001 07/05/07 NO CHANGE ORDERS ON ELECTRONIC FILE
PEMBROKE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 18-13-02-04
last updated on 07/24/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
East Pembroke Primary:
90-0522 Reconstruction 0-001-002 01/04/91 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0020 Reconstruction 0-001-003 08/09/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0597 Reconstruction 0-001-004 02/13/96 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1275 Additions and Alterations 0-001-005 12/20/06 NO CHANGE ORDERS ON ELECTRONIC FILE
Pembroke Intermediate:
90-0523 Reconstruction 0-002-002 01/04/91 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0598 Reconstruction 0-002-003 02/13/96 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2201FP Reconstruction 0-002-FP1 08/06/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Jr. Sr. High School:
90-0524 Reconstruction 0-003-002 01/04/91 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0599 Reconstruction 0-003-003 02/13/96 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2200FP Reconstruction 0-003-FP1 08/06/03 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1397SC Visual Structural Inspection 0-003-SC1 06/10/05 NO CHANGE ORDERS ON ELECTRONIC FILE
East Pembroke Bus Garage Storage:
90-0525 Reconstruction 4-005-001 01/04/91 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
90-0526 Reconstruction 5-004-001 01/04/91 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0600 Reconstruction 5-004-002 02/13/96 NO CHANGE ORDERS ON ELECTRONIC FILE