REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
High School:
90-1494 Reconstruction 0-001-007 06/20/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1458 Reconstruction 0-001-008 06/23/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0102 Reconstruction 0-001-009 08/05/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1448 Reconstruction 0-001-010 05/24/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0881 Reconstruction 0-001-011 05/14/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0727 Reconstruction 0-001-012 02/16/96 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0272SC Visual Structural Inspection 0-001-SC1 09/18/01 NO CHANGE ORDERS ON ELECTRONIC FILE
James Forrestal School:
92-0600 Reconstruction 0-002-005 02/26/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1603 Reconstruction 0-002-006 06/27/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0882 Reconstruction 0-002-008 05/14/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0728 Reconstruction 0-002-009 02/16/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0979 Reconstruction 0-002-010 05/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0629 Reconstruction 0-002-011 04/06/01 *CO No.* Amount Disallowed Received Approved Contractor
A & B 11,147 01/09/01 02/06/02 Millers Minuteman Const.
05-0495 Alterations 0-002-012 05/08/06 *CO No.* Amount Disallowed Received Approved Contractor
1 -2,217 02/27/08 08/05/08 C.B strain & son
07-0761 Reconstruction 0-002-013 04/28/08 *CO No.* Amount Disallowed Received Approved Contractor
00003 -2,000 02/09/09 02/27/09 UNITY MECHANCIAL
00003 -9,000 02/09/09 03/04/09 KOKO CONTRACTING, INC.
00004 4,687 02/09/09 03/05/09 MEYER CONTRACTING
00007 -5,250 12/04/08 04/22/09 EAST COAST HAZ MAT REMOVAL
00009 -783 08/28/09 09/17/09 MEYER CONTRACTING
01-0899SC Visual Structural Inspection 0-002-SC1 03/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
South Ave. School:
90-1495 Reconstruction 0-003-003 06/20/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1459 Reconstruction 0-003-004 06/23/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1449 Reconstruction 0-003-005 05/24/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0883 Reconstruction 0-003-006 05/14/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0729 Reconstruction 0-003-007 02/16/96 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0496 Alterations 0-003-008 05/08/06 *CO No.* Amount Disallowed Received Approved Contractor
1 -3,447 02/06/08 03/19/08 C.B. Strain & Son
07-0762 Reconstruction 0-003-009 04/28/08 *CO No.* Amount Disallowed Received Approved Contractor
00001 0 07/31/08 08/05/08 East Coast Haz Mat Removal
00001 -8,025 10/13/08 01/27/09 MEYER CONTRACTING
00001 -6,820 02/09/09 / / UNITY MECHANCIAL
00002 -3,300 08/27/08 10/21/08 East Coast Haz Mat Removal
00002 -805 12/18/08 01/30/09 CANALE ELECTRIC
00002 7,884 02/09/09 03/05/09 MEYER CONTRACTING
00002 -4,000 02/09/09 03/04/09 KOKO CONTRACTING, INC.
00003 -1,910 02/12/09 02/12/09 CANALE ELECTRIC
00003 13,017 02/09/09 03/05/09 MEYER CONTRACTING
00004 -7,320 11/14/08 01/30/09 EAST COST HAZ MAT REMOVAL
00004 -2,000 02/09/09 02/27/09 UNITY MECHANCIAL
00004 -2,200 04/15/09 08/06/09 CANALE ELECTRIC
00006 1,464 02/09/09 03/05/09 MEYER CONTRACTING
00006 40,800 10/23/09 11/20/09 UNITY MECHANICAL
00007 -641 04/01/09 07/21/09 MEYER CONTRACTING
00008 -9,850 12/04/08 04/22/09 EAST COAST HAZ MAT REMOVAL
00008 2,200 04/15/09 07/23/09 MEYER CONTRACTING
Rombout Junior High School:
90-1496 Reconstruction 0-004-003 06/20/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1604 Reconstruction 0-004-004 06/27/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0103 Reconstruction 0-004-005 08/03/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0884 Reconstruction 0-004-007 05/14/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0730 Reconstruction 0-004-008 02/16/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0980 Reconstruction 0-004-009 05/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1035 Additions and Alterations 0-004-010 05/17/05 *CO No.* Amount Disallowed Received Approved Contractor
1 3,283 12/05/05 / / Environmental Remediation Service
1 28,260 12/21/05 10/05/06 Arris Contracting Co
1 6,796 02/23/06 04/20/06 P and D Electric
1 7,525 07/05/06 07/13/06 Frank Lindy Plumbing
1 11,000 04/27/06 07/24/06 DeRosa Tennis Contracting
1-REVI 6,796 08/30/07 09/06/07 P & D ELECTRIC OF HUDSON VALLEY
2 -5,000 07/21/06 07/24/06 DeRosa Tennis Contractors
2 32,585 11/15/06 01/09/07 Sun Up Enterprises
2 -3,558 05/10/07 05/16/07 Frank Lindy Plumbing
3 13,900 12/01/06 12/27/06 Sun Up Enterprises
7 3,250 11/16/06 01/09/07 Arris Contracting
07-0763 Reconstruction 0-004-011 04/28/08 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
00001 -10,688 11/14/08 02/05/09 CANALE ELECTRIC
00001 -2,000 02/09/09 03/04/09 KOKO CONTRACTING, INC.
00006-R -2,450 12/04/08 04/22/09 EAST COAST HAZ MAT REMOVAL
09-0097 Reconstruction 0-004-013 09/30/09 NO CHANGE ORDERS ON ELECTRONIC FILE
00-2000SC Visual Structural Inspection 0-004-SC1 06/29/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Glenham Elementary School:
90-1236 Reconstruction 0-006-007 04/24/91 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1450 Reconstruction 0-006-008 05/24/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0885 Reconstruction 0-006-009 05/14/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0731 Reconstruction 0-006-010 02/16/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0545 Additions and Alterations 0-006-011 12/31/97 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0497 Alterations 0-006-013 05/08/06 *CO No.* Amount Disallowed Received Approved Contractor
1 -17,200 05/10/07 09/11/07 Suburban Restoration
3 -2,100 05/10/07 05/16/07 CB Strain and Son
07-0764 Reconstruction 0-006-014 04/28/08 *CO No.* Amount Disallowed Received Approved Contractor
00001 0 08/01/08 10/07/08 EAST COAST HAZ MAT REMOVAL
00003 22,500 11/14/08 01/30/09 EAST COAST HAZ MAT REMOVAL
00005 -283 02/09/09 / / MEYER CONTRACTING
00005 -283 02/09/09 03/05/09 MEYER CONTRACTING
00005 -954 05/06/09 07/29/09 CANALE ELECTRIC
00009 -2,450 12/04/08 04/22/09 EAST COAST HAZ MAT REMOVAL
Sargent Elementary School:
92-1460 Reconstruction 0-008-006 06/23/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1451 Reconstruction 0-008-007 05/24/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0886 Reconstruction 0-008-008 05/14/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0732 Reconstruction 0-008-009 02/16/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0546 Alterations 0-008-010 12/31/97 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0498 Additions and Alterations 0-008-011 05/08/06 *CO No.* Amount Disallowed Received Approved Contractor
2 15,525 05/10/07 05/16/07 Suburban Restoration
2 -420 02/06/08 08/12/08 C.B. Strain & Son
3 8,925 02/27/08 08/05/08 C.B strain & son
07-0765 Reconstruction 0-008-012 04/28/08 *CO No.* Amount Disallowed Received Approved Contractor
00005 -1,830 11/14/08 01/30/09 EAST COAST HAZ MAT REMOVAL
Astor Day Care:
90-1497 Reconstruction 0-009-002 06/20/91 NO CHANGE ORDERS ON ELECTRONIC FILE
New High School:
99-0897 New Construction 0-020-001 05/04/00 *CO No.* Amount Disallowed Received Approved Contractor
1 197,009 03/22/02 05/06/02 Roehrs Const.
1 18,800 08/05/02 08/16/02 F&D Sprinklers
1 -1,046 09/10/02 01/08/03 Commercial Appliance
1 1,932 11/08/02 01/08/03 Nickerson
1 -5,188 03/18/03 03/20/03 Adirondack Cabling
1 -822 03/19/03 03/24/03 BMI Supply
1 -13,364 08/06/04 09/09/04 Northeast Interior Systems
10 18,926 03/07/02 04/05/02 UW Marx
11 19,378 02/11/02 03/22/02 UW Marx
12 12,837 02/11/02 03/22/02 UW Marx
13 18,197 03/22/02 05/06/02 UW Marx
14 11,504 03/22/02 05/06/02 UW Marx
15 53,159 09/10/02 01/08/03 UW Marx
16 33,946 03/19/03 / / UW Marx
17 18,618 03/19/03 03/24/03 UW Marx
18 21,212 03/19/03 03/28/03 UW Marx
19R 22,313 05/13/03 05/23/03 UW Marx
2 -54,150 01/29/01 01/14/03 P&D Elec.
2 -2,268 06/19/03 07/11/03 CB Strain & Son
2 -36,227 06/19/03 07/11/03 CB Strain & Son
2 -5,789 08/06/04 09/09/04 Nickerson Corp
2 -10,153 08/06/04 09/09/04 Coomercial Appliance Contracts
3 -8,946 08/06/04 09/09/04 Sucato Building
3-R -6,747 10/06/03 12/05/03 CB Strain & Son
4 4,620 01/18/02 03/22/02 P&D Elec.
4 -21,264 04/23/04 04/28/04 CB Strain & Sons
5 36,470 02/27/02 05/06/02 P&D Elec.
6 13,067 02/27/02 05/06/02 P&D Elec.
7 23,915 05/05/03 05/07/03 P&D Elec.
8 9,900 08/21/01 01/09/02 UW Marx
8 6,999 03/19/03 03/24/03 P&D Elec.
9 88,882 01/28/02 06/21/05 UW Marx
05-0499 Alterations 0-020-002 05/08/06 *CO No.* Amount Disallowed Received Approved Contractor
1 21,750 11/15/06 01/09/07 Sun Up Enterprises
2 1,550 02/27/08 / / C.B strain & son
4 -1,000 01/12/07 01/30/07 Sun Up Enterprises
07-0766 Reconstruction 0-020-003 04/28/08 *CO No.* Amount Disallowed Received Approved Contractor
00002 -1,200 02/09/09 / / UNITY MECHANICAL
00005 9,538 04/01/09 08/14/09 UNITY MECHANICAL
03-0373SC Visual Structural Inspection 0-020-SC1 10/02/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Administration Building:
94-1452 Reconstruction 1-005-001 05/24/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0733 Reconstruction 1-005-002 02/16/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0887 Reconstruction 1-005-003 05/14/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0981 Reconstruction 1-005-004 05/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
Materials Storage Shed-Maintenance:
95-0888 New Construction 2-019-001 05/14/96 NO CHANGE ORDERS ON ELECTRONIC FILE
Maintenance Garage:
94-1453 Reconstruction 3-011-001 05/24/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0734 Reconstruction 3-011-002 02/16/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0889 Reconstruction 3-011-003 05/14/96 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Storage Facility:
95-1677 New Construction 4-020-001 06/12/96 *CO No.* Amount Disallowed Received Approved Contractor
4 80,830 06/14/01 01/10/02 UW Marx, Inc.
New Bus Maintenance/Storage:
95-1150 Additions and Alterations 5-018-001 06/12/96 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0700 Reconstruction 5-018-L01 06/11/02 NO CHANGE ORDERS ON ELECTRONIC FILE
New Press Box:
04-1459 New Construction 7-023-001 09/02/05 NO CHANGE ORDERS ON ELECTRONIC FILE
DOVER UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-05-02-02
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Dover Middle/High School:
91-1598 Reconstruction 0-001-004 07/17/92 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0688 Additions and Alterations 0-001-005 05/06/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0010 Reconstruction 0-001-006 07/28/95 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1173 Reconstruction 0-001-007 05/29/01 *CO No.* Amount Disallowed Received Approved Contractor
HVAC-02 -1,000 07/16/02 07/23/02 Dutchess Mech.
02-2450 Reconstruction 0-001-008 08/29/03 *CO No.* Amount Disallowed Received Approved Contractor
1 5,125 09/02/04 09/07/04 American Petroleum Equipment Const
05-0181 Reconstruction 0-001-009 01/30/06 NO CHANGE ORDERS ON ELECTRONIC FILE
05-1277 Reconstruction 0-001-010 02/15/07 *CO No.* Amount Disallowed Received Approved Contractor
1 -77,617 08/22/08 05/11/09 C. B. STRAIN & SONS, INC.
1 57,047 10/14/08 04/14/09 FASTRACS RENTRALS, INC.
06-1084 Reconstruction 0-001-011 03/09/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1529 Reconstruction 0-001-012 04/18/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1477FP Reconstruction 0-001-FP1 05/06/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Wingdale Elementary:
93-1712 Reconstruction 0-003-002 08/05/94 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1172 Reconstruction 0-003-003 05/29/01 *CO No.* Amount Disallowed Received Approved Contractor
2 265 12/20/01 / / Arris Contracting
EC-04 438 10/31/01 01/08/02 Canale Elec.
FC-01 2,250 11/27/01 01/08/02 J. Herbert
FC-02 5,200 11/27/01 01/08/02 J. Herbert
GC-05 264 12/20/01 03/21/02 Arris Contracting
HVAC-03 13,831 10/22/02 10/28/02 Dutchess Mech.
SC-10 -4,100 12/20/01 03/21/02 Sun Up Ent.
SC-11 -3,532 10/22/02 10/28/02 Sun Up Ent.
07-1530 Reconstruction 0-003-004 04/18/08 NO CHANGE ORDERS ON ELECTRONIC FILE
08-0601 Reconstruction 0-003-005 02/10/09 NO CHANGE ORDERS ON ELECTRONIC FILE
08-1764 Reconstruction 0-003-006 07/22/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1478FP Reconstruction 0-003-FP1 05/07/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Dover Elem. School:
95-0689 Additions and Alterations 0-004-006 05/06/96 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1575 Reconstruction 0-004-007 07/15/04 *CO No.* Amount Disallowed Received Approved Contractor
1 1,137 12/20/04 12/29/04 American Petroleum
06-0543 Reconstruction 0-004-008 06/15/09 NO CHANGE ORDERS ON ELECTRONIC FILE
Athletic Storage Building:
08-1419 New Construction 2-011-001 06/10/09 NO CHANGE ORDERS ON ELECTRONIC FILE
High School Garage:
95-0690 Additions and Alterations 4-005-001 05/06/96 NO CHANGE ORDERS ON ELECTRONIC FILE
Press Box / Bleachers:
05-1278 New Construction 7-009-001 02/15/07 *CO No.* Amount Disallowed Received Approved Contractor
1 -1,000 10/14/08 04/14/09 DANT CLAYTON CORP.
Concession Stand @ MS/HS:
05-1279 New Construction 7-010-001 02/15/07 NO CHANGE ORDERS ON ELECTRONIC FILE
HYDE PARK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-08-01-06
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Haviland Middle School(JrHigh):
90-0715 Reconstruction 0-001-003 01/24/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0392 Reconstruction 0-001-004 12/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0369 Reconstruction 0-001-005 11/12/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0586 Reconstruction 0-001-006 02/28/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1579 Reconstruction 0-001-008 06/20/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1698 Reconstruction 0-001-009 07/27/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1220 Reconstruction 0-001-010 05/19/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0169 Reconstruction 0-001-011 03/24/03 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1741 Reconstruction 0-001-012 05/12/01 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1484 Reconstruction 0-001-013 07/17/02 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1125 Reconstruction 0-001-014 01/31/03 *CO No.* Amount Disallowed Received Approved Contractor
00001 -13,500 07/02/07 07/17/07 Ashley Mechanical
00001 4,903 07/02/07 07/17/07 JC Millbank Construction
00002 4,000 07/02/07 07/17/07 JC Millbank Construction
00003 13,977 07/02/07 07/17/07 JC Millbank Construction
00003 5,312 07/02/07 07/17/07 Suburban Restoration
00004 5,312 07/02/07 07/17/07 Suburban Restoration
00011 12,000 07/02/07 07/17/07 Suburban Restoration
00012 12,000 07/02/07 07/17/07 Suburban Restoration
00016 17,000 07/02/07 07/17/07 Suburban Restoration
00017 3,120 07/02/07 07/17/07 Suburban Restoration
00020 6,600 07/02/07 07/17/07 Suburban Restoration
04-1244 Reconstruction 0-001-016 06/24/05 *CO No.* Amount Disallowed Received Approved Contractor
00003 3,062 05/04/06 03/15/07 Dutchess mechancial
00004 16,240 01/26/06 08/21/06 NAC Industries
0002 6,125 05/04/06 03/15/07 Dutchess Mechanical
EC-02 3,265 01/26/07 03/14/07 Pantel Contracting
SC-05 3,300 11/03/06 12/28/06 NAC Industries
05-0017 Reconstruction 0-001-017 08/23/05 *CO No.* Amount Disallowed Received Approved Contractor
RC-01 8,800 02/05/07 03/09/07 Best Roofing of New Jersey
05-0468 Reconstruction 0-001-018 04/06/06 *CO No.* Amount Disallowed Received Approved Contractor
00003 -3,630 01/29/08 03/19/08 meyer contracting
1A-01 17,100 10/10/06 12/18/06 Foremost Development
1A-02 17,100 10/10/06 12/18/06 Foremost Development
1A-03 17,100 10/10/06 12/18/06 Foremost Development
1A-04 17,100 10/10/06 12/18/06 Foremost Development
2-05 4,448 11/02/06 12/18/06 William Manfredi Construction
EC2-01 8,701 09/12/06 10/30/06 Canale Electric
EC2-04 540 01/31/07 / / Canale Electric
EC2-05 2,211 01/31/07 02/22/07 Canale Electric
EC2-06 8,265 01/31/07 02/22/07 Canale Electric
EC2-07 8,190 01/31/07 02/22/07 Canale Electric
EC2-09 -4,350 03/12/07 04/06/07 Canale Electric
EC2-10 17,680 06/11/07 08/01/07 Canale electric
G2-04 3,128 09/21/06 10/30/06 William Manfredi Construction
GC-2-08 4,725 12/05/07 01/07/08 WILLIAM MANFREDI,SR
GC2-02 31,640 09/12/06 10/30/06 William Fredi
GC2-07 -380 01/16/07 02/09/07 William Mandredi
HC-02 4,505 09/21/06 01/09/07 General Mechanical Systems
HC-03 26,958 12/21/06 01/12/07 General Mechanical
HC-04 1,798 12/05/07 01/07/08 GENERAL MECHANICAL SYSTEMS,INC
Pc1-06 483 01/16/07 01/24/07 General Mechanical
Sc-10 1,505 01/16/07 02/09/07 Ben Ciccone Inc
07-2297 Reconstruction 0-001-019 11/26/08 NO CHANGE ORDERS ON ELECTRONIC FILE
08-0735 Reconstruction 0-001-020 03/12/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0649FP Reconstruction 0-001-FP1 12/18/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Roosevelt High School:
93-0393 Reconstruction 0-002-005 12/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0384 Reconstruction 0-002-006 12/14/93 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0013 Reconstruction 0-002-009 07/17/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1221 Reconstruction 0-002-010 05/19/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0170 Reconstruction 0-002-011 03/24/03 *CO No.* Amount Disallowed Received Approved Contractor
01 44,150 08/03/04 08/29/08 A. Colarusso & Son,Inc
02 28,500 12/01/04 08/29/08 A.Colarusso & Son,Inc
00-1742 Reconstruction 0-002-012 05/12/01 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1485 Reconstruction 0-002-013 07/17/02 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1245 Reconstruction 0-002-015 06/24/05 *CO No.* Amount Disallowed Received Approved Contractor
EC-01 3,086 11/03/06 12/28/06 Pantel Contracting
05-0469 Reconstruction 0-002-016 04/06/06 *CO No.* Amount Disallowed Received Approved Contractor
00004 -2,200 01/29/08 03/19/08 meyer contracting
00005 -6,960 01/29/08 04/02/08 meyer contracting
00007 -200 01/29/08 04/02/08 meyer contracting
EC3-02 15,770 09/12/06 01/09/07 Canale ELectric
EC3-03 2,206 09/12/06 12/18/06 Canale electric
EC3-06 9,363 01/31/07 02/22/07 Canale Electric
GC3-02 4,938 09/12/06 10/30/06 William manfredi Construction
GC3-07 9,294 06/11/07 06/20/07 William manfredi Construction
Gc3-06 -240 01/16/07 02/09/07 William Manfredi
HC-01 1,142 09/12/06 12/18/06 General mechanical Systems
Pc1-07 1,966 01/16/07 01/24/07 General Mechanical
SC-07 6,363 10/18/06 12/18/06 Ben Ciccone
SC-08 820 10/18/06 12/18/06 Ben Ciccone
05-0254 Reconstruction 0-002-017 10/11/05 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2298 Reconstruction 0-002-018 11/26/08 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2316 Reconstruction 0-002-019 08/26/08 NO CHANGE ORDERS ON ELECTRONIC FILE
09-0172 Reconstruction 0-002-020 08/31/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0650FP Reconstruction 0-002-FP1 12/18/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Ralph R. Smith Elementary:
91-0784 Reconstruction 0-003-003 02/28/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0394 Reconstruction 0-003-004 12/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0440 Reconstruction 0-003-005 12/16/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0543 Reconstruction 0-003-006 01/31/94 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1715 Reconstruction 0-003-008 07/10/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1699 Reconstruction 0-003-009 07/27/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1222 Reconstruction 0-003-010 05/19/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0171 Reconstruction 0-003-011 03/24/03 *CO No.* Amount Disallowed Received Approved Contractor
01 7,750 07/28/03 08/29/08 J.D Parrella Electric,Inc
00-1486 Reconstruction 0-003-012 07/17/02 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1246 Reconstruction 0-003-014 06/24/05 *CO No.* Amount Disallowed Received Approved Contractor
00001 -3,987 05/04/06 06/02/06 Ashley Mechanical
0004 3,062 05/04/06 11/22/06 Dutchess mechanical
SC-06 2,500 11/03/06 01/09/07 NAC Industries
05-0470 Reconstruction 0-003-015 04/06/06 *CO No.* Amount Disallowed Received Approved Contractor
00001 120 01/29/08 04/02/08 meyer contracting
00003 -7,725 01/29/08 03/07/08 S & O construction
00004 15,778 01/29/08 / / S & O construction
00005 20,000 01/29/08 / / wayne l kurlander
00005 -20,000 01/29/08 03/07/08 S & O CONSTRUCTION SERVICES
00006 -15,109 02/20/08 03/06/08 S&O construction
00006 -700 01/29/08 04/02/08 meyer contracting
00008 -626 02/04/08 03/08/08 CANALE ELECTRIC CORP.ctirc
0009 -2,111 01/18/08 01/28/08 CANALE ELECTRIC CORP
1-03 17,312 12/21/06 / / General mechanical
3-04 -3,000 10/10/06 12/18/06 William Manfredi
3-05 4,171 11/02/06 12/18/06 William Manfredi
EC-3-08 -627 01/07/08 01/09/08 Canale Electric Corp
EC3-01 -12,344 09/12/06 01/19/07 Canale Electric
EC3-04 2,403 09/21/06 / / Canale Electric
EC3-05 1,105 01/31/07 02/22/07 Canale Electric
EC3-07 2,581 01/31/07 / / Canale Electric
GC3-01 -126,551 09/12/06 10/30/06 William manfredi Construction
Gc3-03 978 09/21/06 10/30/06 William Mechanical
PC-1-09 2,000 02/04/08 03/08/08 GENERAL MECHANICAL SYSTEMS, INC.
07-2299 Reconstruction 0-003-016 11/26/08 NO CHANGE ORDERS ON ELECTRONIC FILE
08-0736 Reconstruction 0-003-017 03/12/09 NO CHANGE ORDERS ON ELECTRONIC FILE
Violet Avenue Elementary:
92-0383 Reconstruction 0-004-004 11/06/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0395 Reconstruction 0-004-005 12/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1700 Reconstruction 0-004-007 07/27/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1223 Reconstruction 0-004-008 05/19/00 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1743 Reconstruction 0-004-009 05/12/01 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1487 Reconstruction 0-004-010 07/17/02 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0172 Reconstruction 0-004-011 03/24/03 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0444 Reconstruction 0-004-012 03/10/05 *CO No.* Amount Disallowed Received Approved Contractor
00001 -13,500 06/19/07 10/26/07 Ashley mechanical
00002 8,165 06/19/07 / / Ashley Mechanical
00002 8,165 07/02/07 10/28/07 Ashley Mechanical
00003 -4,530 06/19/07 / / Ashley Mechanical
00003 -4,530 07/02/07 10/29/07 Ashley Mechanical
00005 5,312 07/02/07 07/17/07 Suburban Restoration
00006 5,312 07/02/07 07/17/07 Suburban Restoration Co
00007 5,312 07/02/07 07/17/07 Suburban Restoration
00008 5,312 07/02/07 07/17/07 Suburban restoration
00010 6,000 07/02/07 07/17/07 Suburban Restoration
00013 12,000 07/02/07 07/17/07 Suburban Restoration
00014 12,000 07/02/07 07/17/07 Suburban Restoration Co
00015 12,000 07/02/07 07/17/07 Suburban Restoration
00018 11,637 07/02/07 07/17/07 Suburban Restoration
00019 19,800 07/02/07 07/17/07 Suburban Restoration Co
04-1247 Reconstruction 0-004-013 06/24/05 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0471 Reconstruction 0-004-014 04/06/06 *CO No.* Amount Disallowed Received Approved Contractor
00011 -186 02/04/08 03/08/08 CANALE ELECTRIC CORP.
2-06 -565 11/02/06 12/18/06 William Manfredi
EC-2-11 -186 01/07/08 01/09/08 Canale Electric Corp.
EC2-02 6,809 09/12/06 01/09/07 Canale Electric
EC2-03 -398 09/12/06 12/18/06 Canale Electric
EC2-08 5,915 01/31/07 02/22/07 Canale Electric
GC2-01 -19,303 09/12/06 10/30/06 William manfredi
GC2-03 -6,106 09/12/06 10/30/06 William manfredi Construction
PC1-01 -724 09/12/06 12/18/06 General Mechanical Systems
SC-04 -1,156 09/21/06 10/30/06 Ben Ciccone Inc
07-2300 Reconstruction 0-004-015 11/26/08 NO CHANGE ORDERS ON ELECTRONIC FILE
08-0737 Reconstruction 0-004-016 03/12/09 NO CHANGE ORDERS ON ELECTRONIC FILE
Hyde Park Elementary:
90-1330 Reconstruction 0-005-005 05/08/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0785 Reconstruction 0-005-006 02/28/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1489 Reconstruction 0-005-007 07/06/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0396 Reconstruction 0-005-008 12/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0014 Reconstruction 0-005-010 07/17/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1224 Reconstruction 0-005-011 05/19/00 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1744 Reconstruction 0-005-012 05/12/01 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1162 Reconstruction 0-005-013 03/16/01 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1488 Reconstruction 0-005-014 07/17/02 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0173 Reconstruction 0-005-015 03/24/03 *CO No.* Amount Disallowed Received Approved Contractor
01 14,000 07/28/03 08/29/08 J.D Parrella Electric,Inc
04-0445 Reconstruction 0-005-016 03/10/05 *CO No.* Amount Disallowed Received Approved Contractor
00001 5,312 07/02/07 07/17/07 suburban Restoration
00002 5,312 07/02/07 07/17/07 Suburban Restoration
00009 16,500 07/02/07 07/17/07 Suburban Restoration
04-0737 Reconstruction 0-005-017 02/03/05 *CO No.* Amount Disallowed Received Approved Contractor
00001 -3,000 05/04/06 05/24/06 Arris Contracting Co
04-1248 Reconstruction 0-005-018 06/24/05 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0472 Reconstruction 0-005-019 04/06/06 *CO No.* Amount Disallowed Received Approved Contractor
00002 563 01/29/08 04/02/08 meyer contracting
1-03 55,000 10/10/06 12/18/06 Cali Brothers
1-04 5,964 12/21/06 01/12/07 General Mechanical
1-05 7,592 12/21/06 01/12/07 General mechanical
1-06 5,020 10/10/06 12/18/06 Cali Brothers
EC-1 1,593 12/05/07 01/07/08 PANTEL CONTRACTING CORP
EC1-04 28,979 01/31/07 02/22/07 Pantel Contracting
EC1-05 21,288 01/31/07 02/22/07 Pantel Contracting
GC1-02 3,970 01/16/07 02/09/07 Cali Brothers
GC1-04 2,845 01/16/07 02/09/07 Cali Brothers
GC1-05 3,410 01/16/07 02/09/07 Cali Brothers
GC1-11 -578 01/16/06 02/09/07 Cali Brothers
PC1-02 10,700 11/02/06 / / General mechanical
SC-02 2,969 09/21/06 10/30/06 Ben Ciccone
SC-05 8,890 09/21/06 10/30/06 Ben Ciccone
SC-06 8,461 09/21/06 10/30/06 Ben Ciccone
07-2301 Reconstruction 0-005-020 11/26/08 NO CHANGE ORDERS ON ELECTRONIC FILE
08-0738 Reconstruction 0-005-021 03/12/09 NO CHANGE ORDERS ON ELECTRONIC FILE
Netherwood Elementary School:
93-0397 Reconstruction 0-007-004 12/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0015 Reconstruction 0-007-006 07/17/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0102 Reconstruction 0-007-007 07/29/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0741 Reconstruction 0-007-008 02/10/97 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1716 Reconstruction 0-007-009 07/10/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1701 Reconstruction 0-007-010 07/27/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1225 Reconstruction 0-007-011 05/19/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0174 Reconstruction 0-007-012 03/24/03 *CO No.* Amount Disallowed Received Approved Contractor
01 1,000 07/28/03 08/29/08 J.D Parrella Electric,Inc
00-1489 Reconstruction 0-007-013 07/17/02 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1249 Reconstruction 0-007-014 06/24/05 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0473 Reconstruction 0-007-015 04/06/06 *CO No.* Amount Disallowed Received Approved Contractor
1-07 21,890 10/10/06 12/18/06 Cali Brothers
EC-1 -154,690 11/02/06 12/18/06 Pantel Contracting
EC1-03 41,021 12/21/06 01/30/07 Pantel Contracting
EC1-06 -1,598 01/31/07 02/22/07 Pantel Contracting
GC1-01 -129,600 09/12/06 10/30/06 Cali Brothers
GC1-09 -528 01/16/07 02/09/07 Cali Brothers
Gc1-15 925 01/16/07 02/09/07 Cali brothers
PC-2-02 13,200 10/10/06 10/19/06 CB Strain sons
PC-2-03 -7,138 12/05/07 01/07/08 C.B STRAIN & SONS,INC
PC1-08 2,115 01/16/07 01/24/07 General Mechanical Systems
PC2-01 -6,000 09/12/06 10/30/06 Cb Strain and Sons
SC-01 -10,845 09/12/06 10/30/06 Ben Ciccone
SC-03 2,721 09/21/06 10/30/06 Ben Ciccone Inc
SC-09 3,183 10/18/06 12/18/06 Ben Ciccone
SC-13 34,864 01/16/07 03/13/07 Ben Ciccone Inc
SC-14 39,868 01/16/07 03/13/07 Ben Ciccone Inc
Sc-11 4,105 01/16/07 02/09/07 Ben Ciccone
Sc-12 3,181 01/16/07 02/09/07 Ben Ciccone
07-2302 Reconstruction 0-007-016 11/26/08 NO CHANGE ORDERS ON ELECTRONIC FILE
08-0739 Reconstruction 0-007-017 03/12/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0648FP Reconstruction 0-007-FP1 12/18/02 NO CHANGE ORDERS ON ELECTRONIC FILE
North Park Elementary School:
91-0886 Reconstruction 0-013-004 03/23/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0398 Reconstruction 0-013-005 12/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1580 Reconstruction 0-013-007 06/20/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0016 Reconstruction 0-013-008 07/17/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1226 Reconstruction 0-013-010 05/19/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0175 Reconstruction 0-013-011 03/24/03 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1745 Reconstruction 0-013-012 05/12/01 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1490 Reconstruction 0-013-013 07/17/02 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1250 Reconstruction 0-013-015 06/24/05 *CO No.* Amount Disallowed Received Approved Contractor
1-08 17,440 10/10/06 12/18/06 Cali Brothers Inc
05-0474 Reconstruction 0-013-016 04/06/06 *CO No.* Amount Disallowed Received Approved Contractor
EC-1-02 11,070 11/02/06 12/18/06 Pantel Contracting
GC1-10 -553 01/16/07 03/13/07 Cali Brothers
GC1-12 5,848 01/16/07 02/09/07 Cali brothers
GC1-13 2,500 01/16/07 02/09/07 Cali Brothers
Gc1-14 1,790 01/16/07 02/09/07 Cali Brothers
07-2303 Reconstruction 0-013-017 11/26/08 NO CHANGE ORDERS ON ELECTRONIC FILE
08-0740 Reconstruction 0-013-018 03/13/09 NO CHANGE ORDERS ON ELECTRONIC FILE
Leased Administration:
07-2317 Reconstruction 1-016-002 08/26/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
93-0399 Reconstruction 4-006-003 12/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1527 Reconstruction 4-006-005 05/15/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1491 Reconstruction 4-006-006 07/17/02 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2318 Reconstruction 4-006-008 08/26/08 NO CHANGE ORDERS ON ELECTRONIC FILE
NORTHEAST (WEBUTUCK) CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-11-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Millerton Elementary School:
92-1323 Reconstruction 0-001-005 06/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1239 Reconstruction 0-001-006 08/14/01 *CO No.* Amount Disallowed Received Approved Contractor
00006 -74,786 11/04/04 06/14/05 Kingsley Arms
00006 -37,530 11/04/04 06/14/05 Rok-Built Const.
05-0131 Reconstruction 0-001-007 08/30/05 NO CHANGE ORDERS ON ELECTRONIC FILE
08-0892 Reconstruction 0-001-008 03/09/09 NO CHANGE ORDERS ON ELECTRONIC FILE
Webutuck Jr/Sr High School:
90-1580 Reconstruction 0-002-007 06/20/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1324 Reconstruction 0-002-008 06/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1479 Reconstruction 0-002-009 06/28/94 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1240 Additions and Alterations 0-002-011 08/14/01 *CO No.* Amount Disallowed Received Approved Contractor
00001 135,000 04/15/02 04/29/02 Kingsley Arms
00001 42,000 04/01/02 05/01/02 Rok-Built Const.
00001 3,396 11/04/04 11/05/04 CB Strain & Son
00001 28,519 11/04/04 06/14/05 Rondout Elec.
00002 11,931 04/15/02 04/29/02 Rok-Built Const.
00002 -18,476 11/04/04 11/05/04 CB Strain & Son
00002 63,336 11/04/04 07/25/05 Kingsley Arms
00002 -2,030 11/04/04 11/05/04 Rondout Elec.
00002 63,336 06/06/05 07/25/05 Kingsley Arms Inc.
00003 57,466 11/04/04 06/14/05 Rok-Built Const.
00003 18,166 11/04/04 11/05/04 Rondout Elec.
00003 6,838 11/04/04 11/05/04 CB Strain & Son
00003 -1,238 11/04/04 11/05/04 CB Strain & Son
00003 -5,781 11/04/04 11/05/04 CB Strain & Son
00003 110,880 11/04/04 07/25/05 Kingsley Arms
00004 0 11/04/04 11/05/04 Rok-Built Const.
00004 28,889 11/04/04 07/25/05 Kingsley Arms
00004 111,108 06/06/05 07/25/05 Kingsley Arms Inc.
00004 7,288 06/22/05 08/13/07 CB Strain& Son, Inc.
00005 58,267 11/04/04 07/25/05 Kingsley Arms
00005 -1,020 11/04/04 11/05/04 Rok-Built Const.
00005 94,481 06/06/05 07/25/05 Kingsley Arms Inc.
00006 -17,206 11/04/04 06/06/05 Kingsley Arms
00006 -91,993 06/06/05 07/25/05 Kingsley Arms Inc.
00007 -15,719 11/04/04 11/05/04 Rok-Built Const.
00007 -41,946 11/04/04 11/05/04 Kingsley Arms
03-1197 Reconstruction 0-002-012 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
EC-05 2,125 04/14/08 / / SAUSTO CONTRACTING, INC.
GC-004 28,550 12/08/05 06/06/06 CONSTRUCTION SERVICES, LLC
GC-004 -33,978 03/23/07 05/16/07 Construction Services
GC-005 -2,645 12/08/05 06/06/06 CONSTRUCTION SERVICES, LLC.
GC-006 -7,230 12/08/05 06/06/06 CONSTRUCTION SERVICES, LLC.
PC-02 -2,865 12/08/05 05/24/06 DUTCHESS MECHANICAL, INC.
08-0893 Reconstruction 0-002-013 03/09/09 NO CHANGE ORDERS ON ELECTRONIC FILE
Amenia Elementary School:
92-1325 Reconstruction 0-003-009 06/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1241 Reconstruction 0-003-011 08/14/01 *CO No.* Amount Disallowed Received Approved Contractor
00004 58,382 11/04/04 06/28/05 Kingsley Arms
00005 10,202 11/04/04 / / Kingsley Arms
00005 94,481 06/06/05 07/25/05 Kingsley Arms Inc.
03-1198 Reconstruction 0-003-012 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
EC-01 -11,007 04/14/08 06/18/09 SAUSTO CONTRACTING, INC.
GC-001 -1,939 12/08/05 06/06/06 CONSTRUCTION SERVICES, LLC.
GC-002 -12,978 12/08/05 07/13/06 CONSTRUCTION SERVICES, LLC.
HC-01 1,370 12/08/05 05/24/06 ASHLEY MECHANICAL, INC.
HC-02 3,665 12/08/05 05/24/06 ASHELEY MECHANICAL, INC.
HC-03 12,445 12/08/05 05/24/06 ASHLEY MECHANICAL, INC.
PC-01 -23,086 12/08/05 05/24/06 DUTCHESS MECHANICAL, INC.
PC-03 -211 01/22/07 08/15/07 Dutchess Mechanical
Webutuck Elementary School:
92-1326 Reconstruction 0-004-007 06/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1242 Additions and Alterations 0-004-010 08/14/01 *CO No.* Amount Disallowed Received Approved Contractor
00004 23,837 11/04/04 01/04/05 Kingsley Arms
00005 26,012 11/04/04 07/25/05 Kingsley Arms
03-1196 Reconstruction 0-004-011 07/01/04 *CO No.* Amount Disallowed Received Approved Contractor
EC-02 564 04/14/08 06/18/09 SAUSTO CONTRACTING INC.
GC-003 -3,864 12/08/05 06/06/06 CONSTRUCTION SERVICES, LLC
GC-007 11,132 12/08/05 06/06/06 CONSTRUCTION SERVICES
GC-08 2,143 02/26/07 / / Construction Services
08-0894 Reconstruction 0-004-012 03/09/09 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
93-1482 Additions and Alterations 5-006-003 06/28/94 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0998 Reconstruction 5-006-004 04/09/97 NO CHANGE ORDERS ON ELECTRONIC FILE
PAWLING CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-12-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Pawling Elementary School:
90-0503 Reconstruction 0-001-006 01/07/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-0623 Reconstruction 0-001-007 01/28/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1866 Reconstruction 0-001-008 08/02/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1325 Additions and Alterations 0-001-009 07/12/94 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0002 Reconstruction 0-001-010 07/29/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0003 Reconstruction 0-001-011 07/29/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0659 Reconstruction 0-001-013 03/04/99 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0689 Reconstruction 0-001-014 02/04/05 *CO No.* Amount Disallowed Received Approved Contractor
001 5,750 01/05/09 04/22/09 LEED INDUSTRIES CORP.
05-0063 Reconstruction 0-001-015 03/29/06 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0778 Reconstruction 0-001-017 03/09/07 *CO No.* Amount Disallowed Received Approved Contractor
001 5,750 12/03/07 12/12/07 Leed Industries
002 17,876 12/03/07 12/12/07 Leed Industries Corp
003 1,800 01/11/08 01/15/08 Leed Industries
004 4,160 02/25/08 03/08/08 LEED INDUSTRIES CORP.
09-0108 Reconstruction 0-001-018 08/11/09 NO CHANGE ORDERS ON ELECTRONIC FILE
Junior Senior High School:
90-0504 Reconstruction 0-002-005 01/07/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-0624 Reconstruction 0-002-006 01/28/91 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1282 Reconstruction 0-002-008 05/09/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0915 Reconstruction 0-002-009 03/30/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0103 Reconstruction 0-002-010 11/15/99 *CO No.* Amount Disallowed Received Approved Contractor
1 3,557 06/13/03 06/13/03 William Manfredi Const.
99-0894 Reconstruction 0-002-011 03/30/00 *CO No.* Amount Disallowed Received Approved Contractor
5 36,000 12/09/02 12/10/02 CB Strain & Son
6 754 01/16/03 01/27/03 CB Strain & Son
7 439 01/16/03 01/27/03 CB Strain & Son
02-0662 Reconstruction 0-002-012 03/03/03 *CO No.* Amount Disallowed Received Approved Contractor
1 -850 03/03/04 04/07/04 Tech Elec.
2 254 03/03/04 03/05/04 Tech Elec.
3 1,213 03/12/04 04/12/04 Tech Elec.
4 790 03/12/04 04/30/04 Tech Elec.
5 50 03/12/04 04/30/04 Tech Elec.
GC-1 -4,245 03/03/04 03/17/04 Cali Brothers
GC-2 -1,000 03/03/04 03/17/04 Cali Brothers
HVAC-1 2,478 03/03/04 / / Southeast Mech.
HVAC-2 1,000 03/03/04 03/11/04 Southeast Mech.
07-1616 Reconstruction 0-002-013 04/23/08 *CO No.* Amount Disallowed Received Approved Contractor
001 4,700 10/31/08 05/21/09 LEED INDUSTERIES CORP.
002 -3,203 10/31/08 05/21/09 LEED INDUSTRIES CORP.
1-003 1,569 10/31/08 / / CONTECH BUILDING SYSTEMS
New Middle School:
99-0038 New Construction 0-006-001 11/15/99 *CO No.* Amount Disallowed Received Approved Contractor
001 8,286 06/13/03 06/13/03 CB Strain & Sons
005 4,900 01/16/03 02/06/03 Huber Farms & Excavating
007 708 05/17/02 06/04/02 CB Strain & Sons
008 1,045 05/17/02 06/04/02 CB Strain & Sons
015 3,246 05/21/01 03/04/02 UW Marx
1-002 -2,500 01/16/03 02/06/03 Huber Farms & Excavating
1-003 -34,020 01/16/03 02/06/03 Huber Farms & Excavating
2CO-023 5,780 06/13/03 06/13/03 UW Marx
2CO-028 -12,106 06/13/03 06/13/03 UW Marx
2CO026 1,712 09/24/02 10/30/02 UW Marx
2CO027 970 09/24/02 10/30/02 UW Marx
2CO029 4,175 09/24/02 10/30/02 UW Marx
2CO030 5,133 09/24/02 10/30/02 UW Marx
2CO031 19,245 09/24/02 10/30/02 UW Marx
4CO 002 26,900 11/14/02 01/03/03 Telcar Group
CO1-001 -19,245 06/13/03 06/13/03 Huber Farms & Excavating
98-1480 Reconstruction 0-006-002 06/18/99 *CO No.* Amount Disallowed Received Approved Contractor
004 517 06/13/02 06/17/02 Sun-Up Enterprises
07-0550 Reconstruction 0-006-003 10/19/07 *CO No.* Amount Disallowed Received Approved Contractor
001 1,979 10/31/08 07/27/09 MENGLER MECHANICAL, INC.
Bus Garage:
07-1617 Reconstruction 3-003-003 04/23/08 *CO No.* Amount Disallowed Received Approved Contractor
001 1,360 10/15/08 11/06/08 DAY ELECTRICAL CONTRACTING CORP.
Leased Bus Garage:
05-0040 Reconstruction 5-009-L01 01/26/06 NO CHANGE ORDERS ON ELECTRONIC FILE
PINE PLAINS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-13-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Seymour Smith School:
91-1518 Reconstruction 0-001-001 07/07/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0188 Reconstruction 0-001-002 10/21/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0544 Reconstruction 0-001-003 01/24/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1099 Reconstruction 0-001-004 06/05/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0591 Reconstruction 0-001-005 01/28/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1414 Reconstruction 0-001-006 05/01/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0435 Reconstruction 0-001-007 01/21/00 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1193 Reconstruction 0-001-008 05/18/04 *CO No.* Amount Disallowed Received Approved Contractor
001 -1,992 02/08/05 02/14/05 James Edgar roofing and sheet Metal
07-0346 Reconstruction 0-001-012 09/12/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Cold Springs Elementary:
95-1100 Additions and Alterations 0-002-002 06/05/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0590 Reconstruction 0-002-003 01/28/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1066 Reconstruction 0-002-004 03/13/00 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1007 Reconstruction 0-002-005 06/03/05 NO CHANGE ORDERS ON ELECTRONIC FILE
Stissing Mt Jr/Sr High School:
93-0545 Reconstruction 0-009-001 01/24/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1101 Reconstruction 0-009-002 06/05/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0592 Reconstruction 0-009-003 01/28/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0259 Additions and Alterations 0-009-004 02/21/01 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
1 -8,250 02/27/02 05/06/02 David Christopher
1 6,475 08/05/02 08/16/02 Netrix
1 -14,329 10/17/02 11/07/02 Crisafulli Bros.
1 11,975 05/02/03 05/07/03 Facilities Equipment and Services
1 2,664 05/05/03 05/07/03 Nickerson Corp.
1 -4,860 11/14/03 12/22/03 Weisburgh Mech.
1 2,663 05/28/04 06/09/04 J&J Sass Elec.
1 -22,355 06/21/05 06/22/05 Delsignore Blacktop Paving
2 -7,364 06/06/02 08/15/02 David Christopher
2 -1,680 10/09/02 10/30/02 Netrix
2 11,849 01/08/03 02/12/03 Crisafulli Bros.
2 -13,365 03/25/03 03/28/03 DelSignore Blacktop Paving
2 11,515 05/02/03 05/07/03 Facilities Equipment and Services
2 23,500 08/19/03 07/12/05 Nickerson Corp
2 -4,384 05/28/04 06/09/04 J&J Sass Elec.
2-Revisd -45,595 09/27/05 10/14/05 Wesiburgh mechanical Electric
3 -6,053 06/19/02 08/15/02 David Christopher
3 -1,179 07/14/03 07/24/03 Crisafulli Bros.
3 1,060 09/18/03 07/12/05 Nickerson Corp.
3 4,400 03/29/04 04/08/04 Facilities Equipment and Service
4 -51,753 06/12/06 12/12/06 David Christopher, Inc.
5 -8,500 05/23/06 12/12/06 David Christopher Inc
01-0111 Reconstruction 0-009-007 08/02/01 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2316 Reconstruction 0-009-008 07/01/03 *CO No.* Amount Disallowed Received Approved Contractor
1 27,200 01/28/04 01/29/04 Frank Stevens & Sons Roofing
2 -5,600 01/28/04 01/29/04 Frank Stevens & Sons Roofing
3 -4,918 01/28/04 01/29/04 Frank Stevens & Sons Roofing
4 -3,386 01/28/04 01/29/04 Frank Stevens & Sons Roofing
5 -1,446 01/28/04 01/29/04 Frank Stevens & Sons Roofing
6 -1,545 01/28/04 01/29/04 Frank Stevens & Sons Roofing
7 -1,086 01/28/04 01/29/04 Frank Stevens & Sons Roofing
8 -9,020 01/28/04 01/29/04 Frank Stevens & Sons Roofing
06-1355 Reconstruction 0-009-009 09/05/07 *CO No.* Amount Disallowed Received Approved Contractor
GC-01 -6,846 05/15/09 08/31/09 TRANSITIONAL BUILDERS INC
GC-02 2,353 11/26/08 04/06/09 TRANSITIONAL BUILDERS, INC.
GC-03 -1,500 12/10/08 05/04/09 TRANSITIONAL BUILDERS
HC-01 1,145 05/06/08 08/07/08 HARKINS MECHANICAL & CONSTRUCTION
08-0097 Reconstruction 0-009-010 10/08/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Storage Shed:
06-1356 New Construction 2-011-001 09/05/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
92-1492 Reconstruction 5-004-001 07/29/93 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0117 Reconstruction 5-004-002 09/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
Press Box:
06-1357 New Construction 7-010-001 09/05/07 *CO No.* Amount Disallowed Received Approved Contractor
EC-01 -6,744 09/18/08 10/21/08 hudson Valley EC & M ,Inc
POUGHKEEPSIE CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-15-00-01
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Columbus School #3:
90-1124 Reconstruction 0-001-001 04/03/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1412 Reconstruction 0-001-002 06/06/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0855 Reconstruction 0-001-003 05/01/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0943 Reconstruction 0-001-004 04/03/92 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0987 Reconstruction 0-001-006 05/16/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0819 Reconstruction 0-001-008 06/05/03 *CO No.* Amount Disallowed Received Approved Contractor
001-001 5,094 12/04/03 03/15/04 Sun Up Enterprises
001-002 19,300 12/04/03 03/15/04 Sun Up Enterprises
001-003 -28,502 12/04/03 03/15/04 Sun Up Enterprises
001-006 1,711 04/30/04 05/11/04 Sun Up Enterprises
002-003 -1,186 04/12/04 04/16/04 Meyer Contracting
002-004 3,000 04/12/04 / / Meyer Contracting
002-007 436 06/17/04 06/28/04 Meyer Contracting
004-002 1,047 04/06/04 04/28/04 Palombo Group
03-0301 Reconstruction 0-001-009 03/04/04 *CO No.* Amount Disallowed Received Approved Contractor
003-002 -5,236 12/13/04 / / Weather Guard Roofing
005-010 2,260 06/28/05 / / CB Strain and Sons Inc
005-011 2,260 06/28/05 / / CB Strain and Son inc
005-012 2,260 06/28/05 / / CB Strain and Son inc
006-008 710 03/21/05 01/03/06 Hudson Valley Electrical
SFB Morse School #5:
90-1125 Reconstruction 0-002-002 04/03/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1413 Reconstruction 0-002-003 06/06/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0856 Reconstruction 0-002-004 05/01/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0944 Reconstruction 0-002-005 04/03/92 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0990 Reconstruction 0-002-007 05/16/00 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1039 Reconstruction 0-002-008 06/05/01 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0302 Reconstruction 0-002-009 03/04/04 *CO No.* Amount Disallowed Received Approved Contractor
001-001 2,100 08/10/04 09/08/04 Sun Up Enterprises
001-006 750 10/28/04 11/19/04 Sun Up Enterprises
001-007 2,736 11/05/04 11/19/04 Sun Up Enterprises
001-014 0 / / / /
001-014 1 17,997 09/05/05 10/25/05 Rhinebeck Architecture and Planning,
001-015 19,470 08/09/05 11/08/05 THE PALOMBO GROUP
001-016 18,894 08/09/05 11/08/05 THE POLMBO GROUP
001-017 15,703 08/09/05 11/08/05 THE PALOMBO GROUP
001-018 19,918 08/09/05 11/08/05 THE PALOMBO GROUP
001-0190 15,703 08/09/05 11/08/05 THE PALOMBO GROUP
001-020 19,030 08/09/05 11/08/05 THE PALOMBO
004-001 6,857 04/18/05 07/14/05 Dutchess Mechanical
005-003 1,572 11/05/04 / / CB Strain Son Inc
005-004 9,161 12/17/04 06/23/05 CB Strain Son Inc
005-006 985 01/24/05 06/29/05 CB Strain and Sons
005-010 2,261 06/28/05 / / CB strain and Son inc
005-011 2,261 06/28/05 / / CB Strain and Sons
005-012 2,261 06/28/05 / / CB Strain and Son inc
005-016 2,356 11/23/05 / / CB Strain and Son Inc
005-017 549 11/23/05 / / C.B. Strain & Son Inc.
006-003 -2,442 09/13/04 10/14/04 Hudson Valley Elec.
006-004 5,290 09/27/04 10/28/04 Hudson Valley Elec.
006-006 3,275 12/13/04 06/23/05 Hudson Valley electrical Constructio
006-008 4,056 03/21/05 01/03/06 Hudson Valley Electrical Contr
006-009 2,502 03/21/05 01/04/06 Hudson Valley Electrical Cons
006-011 -1,515 05/24/05 06/24/05 Hudson Valley Electrical
006-022 1,796 12/19/05 04/21/06 Hudson valey electrical Construction
006-026 5,336 04/25/06 / / Hudson Valley Electrical
008-001 3,455 10/12/04 10/22/04 Excel Insulation
2.4-008 43,345 01/24/05 04/01/05 Glomar Construction
2.4-009 3,279 01/25/05 02/08/05 Glomar Construction
2.4-010 18,136 02/24/05 / / Glomar Construction
2.4-011 837 03/02/05 07/25/05 Glomar Construction
2.4-012 7,113 04/18/05 08/03/05 Glomar Construction
2.4-013 1,021 04/18/05 08/03/05 Glomar Construction
2.4-015 2,030 06/28/05 / / Glomar Construction
2.4-016 8,270 08/09/05 11/08/05 GLOMAR CONSTRUCTION INC.
2.4-022 -250 06/29/06 07/24/06 Glomar Construction
2.4-024 -878 06/29/06 07/24/06 Glomar Construction
2.4-026 3,238 06/29/06 07/24/06 Glomar COnstruction
24-005 1,326 11/19/04 12/13/04 Glomar Construction
Gov. Clinton School #8:
90-1126 Reconstruction 0-004-001 04/03/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1414 Reconstruction 0-004-002 06/06/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0857 Reconstruction 0-004-003 05/01/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0945 Reconstruction 0-004-004 04/03/92 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0988 Reconstruction 0-004-006 05/16/00 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1040 Reconstruction 0-004-007 06/05/01 *CO No.* Amount Disallowed Received Approved Contractor
01-002 6,471 01/15/03 01/27/03 Meyer Contracting
02-002 456 01/15/03 01/27/03 Dutchess Mechanical
03-003 4,503 01/15/03 01/27/03 Ashley Mechanical
02-0820 Reconstruction 0-004-008 06/05/03 *CO No.* Amount Disallowed Received Approved Contractor
001-001 3,151 08/10/04 09/08/04 Sun Up Enterprises
002-002 -1,040 02/18/04 03/03/04 Meyer Contracting
002-003 -1,186 04/12/04 04/16/04 Meyer Contracting
002-004 -15,000 04/12/04 04/16/04 Meyer Contracting
002-007 634 06/17/04 06/28/04 Meyer Contracting
002-011 -1,000 01/11/05 03/18/05 Meyer Contracting Corp
004-002 162 04/06/04 04/28/04 Ashley Mech.
005-001 1,362 12/30/03 01/21/04 CB Strain & Sons
006-003 2,988 03/16/04 04/26/04 Hudson Valley Elec.
03-0303 Reconstruction 0-004-009 03/04/04 *CO No.* Amount Disallowed Received Approved Contractor
001-001 3,151 08/10/04 / / Sun Up Enterprises
001-008 2,075 11/05/04 11/19/04 Sun Up Enterprises
001-013 17,235 11/09/05 11/08/05 THA PALOMBO GROUP
005-010 2,261 06/28/05 / / CB Strain and Son inc
005-011 2,261 06/28/05 / / CB Strain and son
005-012 2,261 06/28/05 / / CB Strain and Son inc
006-001 225 08/30/04 09/24/04 Hudson Valley Elec.
006-008 749 03/21/05 01/03/06 Hudson Valley Electrical
006-016 1,112 09/12/05 09/20/05 Hudson Valley Electrical Constructio
006-023 6,255 04/25/06 / / Hudson Valley electrical Constructio
2.4-019 11,523 09/26/05 10/18/05 Glomar Construction
2.4-025 -500 06/29/06 07/24/06 Glomar Construction
2.4-027 1,794 06/29/06 07/13/06 Glomar Construction
C.B. Warring School #10:
91-0858 Reconstruction 0-005-002 05/01/92 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1064 Reconstruction 0-005-003 05/01/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0946 Reconstruction 0-005-004 04/03/92 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0991 Reconstruction 0-005-006 05/16/00 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1041 Reconstruction 0-005-007 06/05/01 *CO No.* Amount Disallowed Received Approved Contractor
01-005 3,537 01/15/03 01/27/03 Meyer Contracting
02-0821 Reconstruction 0-005-008 06/05/03 *CO No.* Amount Disallowed Received Approved Contractor
001-002 19,300 12/04/03 03/15/04 Sun Up Ent.
001-004 11,712 12/30/03 03/15/04 Sun Up Ent.
001-005 7,198 03/05/04 04/07/04 Sun Up Ent.
001-007 -8,242 08/10/04 09/09/04 Sun Up Ent.
002-001 -1,606 12/30/03 03/15/04 Meyer Contracting
002-002 2,187 02/18/04 03/03/04 Palombo Group
002-003 -2,174 04/12/04 04/16/04 Meyer Contracting
002-004 3,000 04/12/04 / / Meyer Contracting
002-007 6,257 06/17/04 06/28/04 Meyer Contracting
002-008 5,655 08/30/04 09/23/04 Meyer Contracting
002-009 717 10/12/04 10/18/04 Meyer Contracting
004-001 14,926 03/05/04 04/26/04 Ashley Mech.
004-003 -1,855 07/15/04 07/21/04 Ashley Mech.
005-002 2,431 01/13/04 01/26/04 CB Strain & Sons
005-003 -7,163 03/02/04 04/26/04 CB Strain & Sons
006-001 582 12/30/03 01/21/04 Hudson Valley Elec.
006-003 1,480 03/16/04 04/26/04 Hudson Valley Elec.
006-004 706 05/19/04 05/27/04 Hudson Valley Elec.
006-005 -5,209 11/19/04 05/02/05 Hudson Valley Electrical
03-0304 Reconstruction 0-005-009 03/04/04 *CO No.* Amount Disallowed Received Approved Contractor
005-010 2,261 06/28/05 / / CB Strain and Sons
005-011 2,261 06/28/05 / / Cb strain and Son
005-012 2,261 06/28/05 / / CB Strain and Son inc
007-002 7,700 09/07/05 09/12/05 Buffalo Hotel Supply
Krieger School No. 11:
90-1127 Reconstruction 0-006-002 04/03/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1415 Reconstruction 0-006-003 06/06/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0859 Reconstruction 0-006-004 05/01/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0853 Reconstruction 0-006-005 03/20/92 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1304 Reconstruction 0-006-006 06/12/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0989 Reconstruction 0-006-007 05/16/00 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1042 Reconstruction 0-006-008 06/05/01 *CO No.* Amount Disallowed Received Approved Contractor
01-003 570 01/15/03 01/27/03 Meyer Contracting
03-0305 Reconstruction 0-006-009 03/04/04 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
0 / / / /
001-002 2,600 09/27/04 10/04/04 Sun Up Enterprises
001-006 750 10/28/04 11/19/04 Sun Up Enterprises
001-007 2,685 11/05/04 11/19/04 Sun Up Enterprise
001-008 2,000 11/05/04 11/19/04 Sun Up Enterprises
001-009 4,105 11/19/04 11/29/04 Sun Up Enterprises
004-001 6,857 04/18/05 07/14/05 Dutchess Mechanical Inc
005-007 1,498 03/02/05 01/03/06 CB Strain and Son Inc
005-009 894 05/24/05 06/30/05 CB Strain and Son Inc
005-012 2,261 06/28/05 / / CB Strain and Son Inc
006-002 3,754 08/30/04 09/23/04 Hudson Valley Elec.
006-005 1,148 11/19/04 06/21/05 Hudson Valley Elec.
006-007 6,416 02/15/05 07/26/05 Hudson Valley Electrical Constructio
006-008 710 03/21/05 01/03/06 Hudson Valley Electrical
006-010 5,166 04/18/05 06/03/05 Hudson Valley Electrical
006-011 327 05/24/05 06/24/05 Hudson Valley Electrical
006-015 6,413 08/09/05 10/25/05 Rhinebeck Arch. and Planning, P.C.
006-017 377 09/12/05 09/20/05 Hudson Valley Electrical
006-024 2,176 04/25/06 / / Hudson Valley Electrical
006-026 1,771 04/25/06 / / Hudson Valley Electrical
007-001 233 12/13/04 12/24/04 Buffalo Hotel Supply
2.4-002 3,317 09/10/04 09/27/04 Glomar Construction
2.4-003 2,200 09/10/04 09/27/04 Glomar Construction
2.4-006 736 01/24/05 02/08/05 glomar Construction
2.4-007 3,969 01/24/05 02/08/05 Glomar Construction
2.4-009 2,532 01/25/05 02/08/05 Glomar Construction
2.4-012 2,264 04/18/05 08/03/05 Glomar Construction
2.4-014 8,519 04/27/05 06/03/05 Glomar Construction Inc
2.4-015 9,919 06/28/05 / / Glomar Construction
2.4-019 741 09/26/05 10/18/05 Glomar Construction
2.4-022 -250 06/29/06 07/24/06 Glomar Construction
2.4-023 4,830 06/29/06 07/13/06 Glomar Construction
2.4-026 18,101 06/29/06 07/24/06 Glomar Construction
2.4025 -1,550 06/29/06 07/24/06 Glomar Construction
4-004 1,457 09/13/04 10/04/04 Glomar Construction
5-002 3,347 09/13/04 10/14/04 CB Strain & Sons
Junior/Senior High School:
91-0860 Reconstruction 0-007-001 05/01/92 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1416 Reconstruction 0-007-003 06/06/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1123 Reconstruction 0-007-004 04/03/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0854 Reconstruction 0-007-005 03/20/92 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0834 Reconstruction 0-007-006 03/31/93 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1030 Reconstruction 0-007-007 06/07/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0580 Reconstruction 0-007-008 02/02/94 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0992 Reconstruction 0-007-010 05/16/00 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0306 Reconstruction 0-007-012 03/04/04 *CO No.* Amount Disallowed Received Approved Contractor
001-010 19,390 08/09/05 11/08/05 THE PALOMBO GROUP
001-011 19,833 08/09/05 11/08/05 THE PALOMBO GROUP
001-012 19,586 08/09/05 11/09/05 THE PALOMBO
001-021 73,000 09/26/05 10/18/05 Sun Up Enterprises
003-001 3,570 08/30/04 09/24/04 WeatherGuard Roofing
003-002 -2,472 12/13/04 12/24/04 WeatherGuard Roofing
004-002 7,514 06/14/05 06/30/05 Dutchess Mechanical
004-003 3,599 08/19/05 08/25/05 Dutchess Mechanical
004-007 19,647 03/12/06 / / Dutchess Mechanical Inc.
005-001 -15,000 08/10/04 09/08/04 CB Strain & Son
005-003 923 11/05/04 06/21/05 CB Strain & Son
005-005 10,132 12/17/04 06/23/05 CB Strain & Sons
005-008 1,839 04/18/05 06/07/05 CB Strain and Son Inc
005-010 22,261 06/28/05 / / CB Strain and sons
005-011 2,261 06/28/05 / / CB Strain and sons Inc
005-012 2,261 07/28/05 / / CB Strain and Son inc
005-013 1,532 09/05/05 10/25/05 Rhinebeck Arch. and planning, P.C.
005-014 787 09/12/05 09/20/05 CB Strain Son Inc
006-001 -1,072 08/30/04 09/24/04 Hudson Valley Elec.
006-005 -1,037 11/19/04 06/21/05 Hudson Valley Elec.
006-007 345 02/15/05 07/26/05 Hudson Valley Electrical
006-008 1,146 03/21/05 01/03/06 Hudson Valley Electrical Construct
006-010 1,174 04/18/05 06/03/05 Hudson Valley Electrical Construct
006-011 3,180 05/24/05 06/24/05 Hudson Valley Electrical
006-012 2,225 06/28/05 07/21/05 Hudson Valley Electrical
006-018 8,081 09/12/05 09/20/05 Hudson valley electrical Constructio
006-018 8,081 09/12/05 / / Hudson Valley electrical
006-019 24,260 09/26/05 10/04/05 Hudson Valley electrical
006-025 3,775 04/25/06 / / Hudson Valley Electrical
006-026 1,491 04/25/06 / / Hudson Valley Electrical
2.4-001 22,039 22,039 09/10/04 09/28/04 Glomar Construction
2.4-006 -10,000 01/24/05 02/08/05 Glomar Construction
2.4-009 3,182 01/25/05 02/08/05 Glomar Construction
2.4-010 1,683 02/24/05 03/31/05 Glomar Construction
2.4-011 16,281 03/02/05 07/25/05 Glomar Construction Inc
2.4-012 1,117 04/18/05 08/03/05 Glomar Construction
2.4-013 15,493 04/18/05 08/03/05 Glomar Construction
2.4-015 5,015 06/28/05 / / glomar Construction
2.4-017 0 11/09/05 11/08/05 GLOMAR CONSTRUCTION INC.
2.4-021 -7,420 06/29/06 07/13/06 Glomar Construction
2.4-022 14,146 06/29/06 07/24/06 Glomar Construction
2.4-025 -1,268 06/29/06 07/24/06 Glomar Construction
2.4-026 -2,400 06/29/06 07/24/06 Glomar Construction
24-005 5,998 11/19/04 12/13/04 Glomar Construction
24-018 24,713 09/26/05 10/12/05 Glomar Construction
04-1394SC Visual Structural Inspection 0-007-SC1 06/10/05 NO CHANGE ORDERS ON ELECTRONIC FILE
W.W. Smith Elementary:
90-1128 Reconstruction 0-008-001 04/03/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1417 Reconstruction 0-008-007 06/06/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0861 Reconstruction 0-008-008 05/01/92 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0993 Reconstruction 0-008-011 05/16/00 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1044 Reconstruction 0-008-012 06/05/01 *CO No.* Amount Disallowed Received Approved Contractor
01-004 13,282 01/15/03 01/27/03 Meyer Contracting
02-003 811 01/15/03 01/27/03 Dutchess Mechanical
03-004 16,692 08/19/03 08/27/03 Ashley Mech.
03-005 7,474 08/19/03 08/27/03 Ashley Mech.
04-002 320 01/15/03 01/27/03 Canale Electric
02-0822 Reconstruction 0-008-013 06/05/03 *CO No.* Amount Disallowed Received Approved Contractor
0002-004 3,000 04/12/04 / / Meyer Contracting
0002-007 -385 06/17/04 06/28/04 Meyer Contracting
002-003 -1,185 04/12/04 04/16/04 Meyer Contracting
002-008 1,420 08/30/04 09/23/04 Meyer Contracting
004-002 1,772 04/06/04 04/28/04 Palombo Group
006-003 2,987 03/16/04 04/26/04 Hudson Valley Elec.
006-005 -6,669 11/19/04 05/02/05 Hudson Valley Construction
03-0307 Reconstruction 0-008-014 03/04/04 *CO No.* Amount Disallowed Received Approved Contractor
0001-006 14,700 10/28/04 11/19/04 Sun Up Enterprises
001-003 17,500 10/12/04 10/22/04 Sun Up Enterprises
001-004 8,575 10/18/04 10/26/04 Sun Up Enterprises
001-005 9,801 10/18/04 10/26/04 Sun Up Enterprises
001-007 8,240 11/05/04 11/19/04 Sun Up Enterprise
001-008 5,825 11/05/04 11/19/04 Sun Up Enterprises
005-010 2,261 06/28/05 / / CB Strain and Son
005-011 2,261 06/28/05 / / Cb strain and Son
005-012 2,261 06/28/05 / / CB Strain and Son Inc
006-027 3,582 06/08/06 08/24/06 Hudson Valley Electrical
2.4-024 10,539 06/29/06 07/24/06 Glomar Construction
Middle School:
91-0862 Reconstruction 0-015-001 05/01/92 NO CHANGE ORDERS ON ELECTRONIC FILE
90-0483 Reconstruction 0-015-004 02/15/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1418 Reconstruction 0-015-005 06/06/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1065 Reconstruction 0-015-006 05/01/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0947 Reconstruction 0-015-007 04/03/92 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0598 Reconstruction 0-015-008 02/26/93 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1031 Reconstruction 0-015-009 06/07/93 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0994 Reconstruction 0-015-011 05/16/00 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1045 Reconstruction 0-015-012 06/05/01 *CO No.* Amount Disallowed Received Approved Contractor
03-002 13,748 01/15/03 01/27/03 Ashley Mechanical
04-003 3,557 02/24/03 03/13/03 Canale Electric
02-0823 Reconstruction 0-015-013 06/05/03 *CO No.* Amount Disallowed Received Approved Contractor
002-003 -1,186 04/12/04 04/16/04 Meyer Contracting
002-004 3,000 04/15/04 04/16/04 Meyer Contracting
002-005 823 04/05/04 04/07/04 Meyer Contracting
002-006 2,446 04/24/06 04/24/06 Meyer Contracting Corp.
002-008 1,440 08/30/04 09/23/04 Meyer Contracting
002-010 12,197 10/12/04 10/18/04 Meyer Contracting
006-002 19,493 03/05/04 04/26/04 Hudson Valley Elec.
006-003 2,989 03/16/04 04/26/04 Hudson Valley Elec.
007-001 -7,827 01/14/03 03/09/04 Sheen and Shine Ent.
03-0308 Reconstruction 0-015-014 03/04/04 *CO No.* Amount Disallowed Received Approved Contractor
004-004 2,500 03/23/06 04/20/06 DUTCHESS MECHANICAL
005-010 2,261 06/28/05 / / CB Strain and Sons
005-011 2,261 06/28/05 / / CB Strain and Sons
005-012 2,261 06/28/05 / / CB Strain and Son inc
005-015 879 09/12/05 09/20/05 Cb Strain and Son
006-008 710 03/21/05 01/03/06 Hudson Valley Electrical
006-026 1,942 04/25/06 / / Hudson Valley Electrical
007-003 2,073 11/02/05 12/09/05 Buffalo Hotel supply
2.4-013 -2,422 04/18/05 08/03/05 Glomar Construction
2.4-020 13,221 09/26/05 / / Glomar Construction
2.4-025 -1,750 06/29/06 07/24/06 Glomar Construction
04-1395SC Visual Structural Inspection 0-015-SC1 06/10/05 NO CHANGE ORDERS ON ELECTRONIC FILE
Administration Building:
92-0831 Reconstruction 1-003-001 03/31/93 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1046 Reconstruction 1-003-002 06/05/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Clinton Elem. Storage Bldg.:
91-0863 New Construction 2-012-001 05/01/92 NO CHANGE ORDERS ON ELECTRONIC FILE
Morse Elem. Storage Shed:
91-0864 New Construction 2-013-001 05/01/92 NO CHANGE ORDERS ON ELECTRONIC FILE
District Wide:
01-0544 Reconstruction 7-999-002 01/25/02 *CO No.* Amount Disallowed Received Approved Contractor
1 4,883 10/22/02 10/24/02 NEC Business Network Solutions
2 8,296 03/17/03 06/02/03 NEC Business Network Solutions
Nativity School Building:
01-1370 Reconstruction 8-019-L01 05/29/02 NO CHANGE ORDERS ON ELECTRONIC FILE
ARLINGTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-16-01-06
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Arlington Middle School:
90-0817 Reconstruction 0-002-005 02/11/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-0781 Reconstruction 0-002-006 02/05/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1258 Reconstruction 0-002-007 06/07/93 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1415 Reconstruction 0-002-008 06/21/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1519 Reconstruction 0-002-009 07/06/94 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1463 Reconstruction 0-002-010 10/25/99 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0349 Reconstruction 0-002-011 05/30/03 *CO No.* Amount Disallowed Received Approved Contractor
GC-02 17,340 12/13/04 12/23/04 William Manfredi Construction
GC-03 9,800 12/13/04 12/23/04 William Manfredi Construction
GC-04 16,000 12/13/04 12/23/04 William Manfredi Construction
GC-06 17,125 12/13/04 12/23/04 William Manfredi Construction
PC-01 -10,000 10/24/05 10/27/05 dutchess Mechanical
06-0390 Reconstruction 0-002-012 02/27/07 *CO No.* Amount Disallowed Received Approved Contractor
CO-EC-08 -3,254 08/07/09 11/12/09 P&D ELECTRIC OF HUDSON VALLEY INC
CO-GC-01 -35,000 05/20/09 08/13/09 FERRARI & SONS INC
CO-GC-06 5,632 05/20/09 / / FERRARI & SONS INC
EC-001 20,137 01/23/08 04/04/08 P&D ELECTRIC OF HUDSON VALLEY
SC-01 -68,000 06/04/09 07/29/09 A. COLARUSSO & SON INC
SC-02 -10,000 / / 07/29/09 A. Colarusso & son
02-2085FP Reconstruction 0-002-FP1 06/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Raymond Ave. Grade School:
90-1742 Reconstruction 0-003-003 08/06/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1475 Reconstruction 0-003-004 06/29/92 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0783 Reconstruction 0-003-005 04/06/93 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1587 Reconstruction 0-003-006 08/19/93 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1461 Reconstruction 0-003-008 05/15/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1467 Reconstruction 0-003-009 10/25/99 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0350 Alterations 0-003-010 05/30/03 *CO No.* Amount Disallowed Received Approved Contractor
site 3 -5,000 05/20/04 05/27/04 Blacktop Maintenance
site2 29,380 05/20/04 05/27/04 Blacktop Maintenance
06-0391 Reconstruction 0-003-011 02/27/07 *CO No.* Amount Disallowed Received Approved Contractor
CO-EC-06 -1,200 08/07/09 11/12/09 P&D ELECTRIC OF HUDSON VALLEY INC
CO-GC-04 -1,980 05/20/09 08/13/09 FERRARI & SONS INC
Overlook Elementary School:
90-0782 Reconstruction 0-004-003 02/05/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1743 Reconstruction 0-004-006 08/06/91 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1461 Reconstruction 0-004-009 10/25/99 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0392 Reconstruction 0-004-010 02/27/07 *CO No.* Amount Disallowed Received Approved Contractor
CO-EC-04 290 05/20/09 11/12/09 P&D ELECTRIC OF HUDSON VALLEY INC
RC-2 -14,769 12/11/07 01/09/08 Needham Roofing,Inc.
LaGrange Elementary School:
90-0783 Reconstruction 0-005-003 02/05/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-0818 Reconstruction 0-005-008 02/11/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1744 Reconstruction 0-005-009 08/06/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1500 Reconstruction 0-005-010 07/27/93 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0954 Reconstruction 0-005-012 05/17/00 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0393 Reconstruction 0-005-013 02/27/07 *CO No.* Amount Disallowed Received Approved Contractor
CO-EC-02 1,088 05/20/09 11/12/09 P&D ELECTRIC OF HUDSON VALLEY
RC-04 -15,014 12/11/07 01/09/08 Needham Roofing,Inc.
Beekman Elementary School:
92-1501 Reconstruction 0-006-006 07/27/93 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1466 Reconstruction 0-006-008 10/25/99 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0394 Reconstruction 0-006-009 02/27/07 *CO No.* Amount Disallowed Received Approved Contractor
CO-EC-07 -4,500 08/07/09 11/12/09 P&D ELECTRIC OF HUDSON VALLEY INC
Traver Road Primary:
90-0784 Reconstruction 0-007-006 02/05/91 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1464 Reconstruction 0-007-009 10/25/99 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0395 Reconstruction 0-007-010 02/27/07 *CO No.* Amount Disallowed Received Approved Contractor
CO-EC-03 3,146 05/20/09 11/12/09 P&D ELECTRIC OF HUDSON VALLEY INC
CO-EC-05 360 05/20/09 11/12/09 P&D ELECTRIC OF HUDSON VALLEY INC
CO-GC-05 -7,920 05/20/09 08/13/09 FERRARI & SONS INC
CO-GC-11 -2,840 06/02/09 08/13/09 FERRARI & SONS INC
CO-GC-12 -5,435 06/02/09 08/13/09 FERRARI & SONS INC
RC-05 -8,489 12/11/07 01/09/08 Needham Roofing,Inc.
North Campus HS:
90-0785 Reconstruction 0-008-004 02/05/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-0819 Reconstruction 0-008-006 02/11/91 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0475 Additions and Alterations 0-008-007 12/10/96 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1349 Reconstruction 0-008-008 07/27/05 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0839 Additions and Alterations 0-008-009 06/21/07 *CO No.* Amount Disallowed Received Approved Contractor
CO-AC-01 -1,800 01/23/08 03/28/08 NIRAM INC
SC-01 -35,000 01/25/08 08/06/08 AROLD PAVING COMPANNY
SC-02 6,000 05/20/08 08/07/08 AROLD PAVING COMPANY, INC.
SC-03 -30,000 05/20/08 08/04/08 AROLD PAVING COMPANY, INC.
SC-04 9,030 05/20/08 08/04/08 AROLD PAVING COMPANY, INC.
SC-05 4,260 05/20/08 09/29/08 AROLD PAVING COMPANY, INC.
07-0426 Reconstruction 0-008-010 12/26/07 *CO No.* Amount Disallowed Received Approved Contractor
CO-AA-01 -209,000 05/26/09 08/31/09 DSA SERVICES INC
CO-AA-02 -7,500 05/26/09 08/31/09 DSA SERVICES INC
CO-AA-03 18,494 05/26/09 08/31/09 DSA SERVICES INC
CO-CW-01 73,242 08/11/09 / / AFI GLASS & ARCHITECTURAL METAL INC
CO-CW-02 79,615 08/11/09 / / AFI GLASS & ARCHITECTURAL METAL INC
CO-GC-01 -12,000 05/26/09 07/28/09 FERRARI & SONS INC
CO-GC-02 -12,177 05/26/09 07/28/09 FERRARI & SONS INC
CO-GC-03 -5,068 10/13/09 11/17/09 FERRARI & SONS INC
CO-GC-04 16,269 10/13/09 11/17/09 FERRARI & SONS INC
CO-GC-05 27,990 10/13/09 11/17/09 FERRARI & SONS INC
CO-GC-06 15,261 10/13/09 11/17/09 FERRARI & SONS INC
CO-GC-07 1,407 10/13/09 11/17/09 FERRARI & SONS INC
CO-GC-08 16,441 10/13/09 11/17/09 FERRARI & SONS INC
CO-GC-09 1,617 10/13/09 11/17/09 FERRARI & SONS INC
CO-GC-10 15,040 10/13/09 11/17/09 FERRARI & SONS INC
CO-GC-11 4,631 10/13/09 11/17/09 FERRARI & SONS INC
CO-GC-12 1,448 10/13/09 11/17/09 FERRARI & SONS INC
CO-GC-13 4,678 10/13/09 11/17/09 FERRARI & SONS INC
CO-GC-14 4,339 10/13/09 11/17/09 FERRARI & SONS INC
CO-MC-01 -166,000 05/26/09 09/22/09 GENERAL MECHANICAL SYSTEMS INC
CO-MC-02 -32,000 05/26/09 09/22/09 GENERAL MECHANICAL SYSTEMS INC
CO-MC-03 -19,640 05/26/09 09/22/09 GENERAL MECHANICAL SYSTEMS INC
CO-MC-04 -41,000 05/26/09 09/22/09 GENERAL MECHANICAL SYSTEMS INC
CO-MC-05 5,166 08/11/09 / / GENERAL MECHANICAL SYSTEMS INC
CO-MC-06 1,332 08/11/09 / / GENERAL MECHANICAL SYSTEMS INC
CO-MC-07 14,584 08/11/09 / / GENERAL MECHANICAL SYSTEMS INC
CO-MC-08 3,996 08/11/09 / / GENERAL MECHANICAL SYSTEMS INC
CO-MC-09 3,609 08/11/09 / / GENERAL MECHANICAL SYSTEMS INC
CO-MC-10 4,276 08/11/09 / / GENERAL MECHANICAL SYSTEMS INC
CO-MC-11 2,790 10/13/09 11/17/09 GENERAL MECHANICAL SYSTEMS INC
CO-MC-12 19,898 10/13/09 11/17/09 GENERAL MECHANICAL SYSTEMS INC
CO-MC-13 25,185 10/13/09 11/17/09 GENERAL MECHANICAL SYSTEMS INC
CO-MC-14 3,996 10/13/09 11/17/09 GENERAL MECHANICAL SYSTEMS INC
CO-MC-15 4,649 10/13/09 11/17/09 GENERAL MECHANICAL SYSTEMS INC
CO-MC-16 4,409 10/13/09 11/17/09 GENERAL MECHANICAL SYSTEMS INC
CO-MC-17 600 10/13/09 11/17/09 GENERAL MECHANICAL SYSTEMS INC
CO-MC-18 3,241 10/13/09 11/17/09 GENERAL MECHANICAL SYSTEMS INC
CO-PC-01 3,980 05/26/09 09/22/09 DUTCHESS MECHANICAL INC
CO-PC-02 2,008 05/26/09 / / DUTCHESS MECHANICAL INC
CO-PC-03 8,100 05/26/09 09/22/09 DUTCHESS MECHANICAL INC
CO-RC-01 -30,610 10/13/09 11/17/09 WB ROOFING & SHEETMETAL INC
CO-RC-02 -19,640 10/13/09 11/17/09 WB ROOFING & SHEETMETAL INC
CO-RC-03 36,300 10/13/09 11/17/09 WB ROOFING & SHEETMETAL INC
CO-RC-04 3,646 10/13/09 11/17/09 WB ROOFING & SHEETMETAL INC
CO-RC-05 2,492 10/13/09 11/17/09 WB ROOFING & SHEETMETAL INC
CO-RC-06 1,524 10/13/09 11/17/09 WB ROOFING & SHEETMETAL INC
CO-RC-07 7,944 10/13/09 11/17/09 WB ROOFING & SHEETMETAL INC
CO-SC-01 37,926 05/26/09 07/28/09 AROLD CONSTRUCTION COMPANY INC
CO-SC-02 4,924 05/26/09 07/28/09 AROLD CONSTRUCTION COMPANY INC
CO-SC-03 74,480 05/26/09 07/28/09 AROLD CONSTRUCTION COMPANY INC
CO-SC-04 4,200 05/26/09 07/28/09 AROLD CONSTRUCTION COMPANY INC
CO-SC-05 7,089 05/26/09 07/28/09 AROLD CONSTRUCTION COMPANY INC
CO-SC-06 2,152 05/26/09 07/28/09 AROLD CONSTRUCTION COMPANY INC
CO-SC-07 1,282 05/26/09 07/28/09 AROLD CONSTRUCTION COMPANY INC
CO-SC-08 4,277 05/26/09 07/28/09 AROLD CONSTRUCTION COMPANY INC
CO-SC-09 9,121 05/26/09 07/28/09 AROLD CONSTRUCTION COMPANY INC
CO-SC-10 1,744 05/26/09 07/28/09 AROLD CONSTRUCTION COMPANY INC
CO-SC-11 7,053 05/26/09 07/28/09 AROLD CONSTRUCTION COMPANY INC
CO-SC-12 1,204 05/26/09 07/28/09 AROLD CONSTRUCTION COMPANY INC
CO-SC-13 6,112 05/26/09 07/28/09 AROLD CONSTRUCTION COMPANY INC
SC-14 2,748 06/02/09 09/01/09 AROLD CONSTRUCTION CO., INC.
SC-15 1,300 06/02/09 09/01/09 AROLD CONSTRUCTION CO., INC.
SC-16 4,544 06/02/09 09/01/09 AROLD CONSTRUCTION CO., INC.
02-2084FP Reconstruction 0-008-FP1 06/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
LaGrange MS(fmlySouth Campus):
90-0786 Reconstruction 0-009-002 02/05/91 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0955 Reconstruction 0-009-004 05/17/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0351 Reconstruction 0-009-005 05/30/03 *CO No.* Amount Disallowed Received Approved Contractor
EC-01 7,724 12/13/04 12/23/04 JD Parrella Electric
EC-02 632 03/16/05 03/31/05 JD Parella electric
GC-01 20,695 12/13/04 12/23/04 William Manfredi Construction
HC-01 16,540 03/16/05 03/31/05 CB Strain and Son inc
PC-01 -1,902 03/16/05 03/31/05 Dutchess mechanical
Site 1 59,326 09/26/03 11/26/03 Blacktop Maintenance
site 4 -5,000 05/20/04 05/27/04 Blacktop Maintenance
06-0396 Reconstruction 0-009-006 02/27/07 *CO No.* Amount Disallowed Received Approved Contractor
CO-GC-02 -5,000 05/20/09 08/13/09 FERRARI & SONS INC
CO-GC-03 -1,000 05/20/09 08/13/09 FERRARI & SONS INC
CO-GC-07 2,600 05/20/09 08/13/09 FERRARI & SONS INC
CO-GC-08 1,301 05/20/09 08/13/09 FERRARI & SONS INC
CO-GC-09 -4,600 05/20/09 08/13/09 FERRARI & SONS INC
RC-01 -4,180 12/11/07 01/09/08 Needham Roofing,Inc.
02-2081FP Reconstruction 0-009-FP1 06/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Titusville Elementary School:
90-0820 Reconstruction 0-010-005 02/11/91 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1465 Reconstruction 0-010-007 10/25/99 *CO No.* Amount Disallowed Received Approved Contractor
07 -6,000 11/26/01 05/28/02 A. Colarusso & Son
E-01 -16,900 03/13/02 05/24/02 Canale Elec.
P-02 -22,997 01/28/02 04/01/02 S&O Const.
06-0397 Reconstruction 0-010-008 02/27/07 *CO No.* Amount Disallowed Received Approved Contractor
CO-GC-10 1,539 05/20/09 08/13/09 FERRARI & SONS INC
RC-03 -14,467 12/11/07 01/09/08 Needham Roofing,Inc.
02-2088FP Reconstruction 0-010-FP1 06/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
West Road Elem. School:
99-0956 Reconstruction 0-012-005 05/17/00 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0398 Reconstruction 0-012-006 02/27/07 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2087FP Reconstruction 0-012-FP1 06/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Noxon Road Elem. School:
99-0957 Reconstruction 0-013-002 05/17/00 *CO No.* Amount Disallowed Received Approved Contractor
R-03-R -864 03/13/02 04/19/02 Best Roofing of NJ
06-0399 Reconstruction 0-013-003 02/27/07 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2086FP Reconstruction 0-013-FP1 06/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
New Middle School:
01-0499 New Construction 0-036-001 07/15/02 *CO No.* Amount Disallowed Received Approved Contractor
AC-01 -634 06/14/04 06/25/04 Schumacher Systems
AC-05 1,605 02/17/05 03/02/05 Schumacher Systems
AE-03 -4,000 12/09/05 12/15/05 Nickerson Corp
CAS-03 -1,500 12/09/05 12/15/05 Nickerson Corp
EL-01 -11,012 05/27/03 06/02/03 Canale Elec.
EL-02 833 02/04/04 03/03/04 Canale Elec.
EL-03 2,501 02/06/04 03/12/04 Canale Elec.
EL-05 6,192 02/06/04 03/19/04 Canale Elec.
EL-07 16,939 02/04/04 09/08/04 Canale Elec.
EL-09 2,526 06/14/04 06/25/04 Canale Elec.
EL-11 4,529 06/14/04 06/25/04 Canale Elec.
EL-12 3,250 08/13/04 09/28/04 Canale Elec.
EL-14 7,616 08/13/04 09/28/04 Canale Elec.
EL-17 972 08/11/04 09/08/04 Canale Elec.
EL-18 1,467 08/13/04 09/28/04 Canale Elec.
EL-19 8,140 11/04/04 01/03/05 Canale Elec.
EL-22 15,497 11/04/04 10/03/05 Canale Elec.
EL-23 -4,445 03/01/05 06/21/05 Canale Electric Corp
EL-25 575 03/01/05 06/21/05 canale Electric Corp
EL-27 7,240 03/01/05 02/21/07 Canale Electric Corp
EL-28 475 03/01/05 05/02/05 Canale Electric Corp
ES-04 -5,000 12/09/05 07/31/06 Singer Equipment
FS-01 4,400 06/14/04 06/25/04 Singer Equipment
FS-02 -4,000 06/06/05 06/29/05 singer Equipment Co
FT-01 -3,500 08/18/04 09/27/04 Northeast Petroleum Tech
GC-01 -17,500 05/27/03 06/02/03 UW Marx
GC-02 8,739 07/07/03 07/11/03 UW Marx
GC-03 20,482 07/07/03 07/11/03 UW Marx
GC-06 13,853 02/06/04 06/15/04 UW Marx
GC-07 10,090 02/04/04 06/14/04 UW Marx
GC-09 3,103 03/12/04 03/15/04 UW Marx
GC-11 -20,850 03/12/04 03/15/04 UW Marx
GC-12 2,278 05/10/04 05/14/04 UW Marx
GC-14 2,531 05/10/04 05/14/04 UW Marx
GC-15 1,780 05/10/04 05/14/04 UW Marx
GC-18 62,222 06/14/04 08/13/04 UW Marx
GC-19 28,005 17,952 08/13/04 09/28/04 UW Marx
GC-21 10,597 08/13/04 09/27/04 UW Marx
GC-22 13,086 11/04/04 11/19/04 UW Marx
GC-25 25,387 11/04/04 12/06/04 UW Marx
GC-27 -39,058 02/17/05 03/02/05 UW Marx inc
GC-29 -3,604 04/07/05 04/26/05 UW Marx inc
HVAC-01 21,000 07/07/03 07/11/03 J&M Heating
HVAC-02 -2,278 01/13/06 06/26/06 J and M heating Air COnd
HVAC-04 -10,928 08/13/04 09/28/04 J&M Heating
HVAC-05 3,370 08/18/04 09/28/04 J&M Heating
HVAC-07 -6,000 01/13/06 01/19/06 J and M heating air Cond
L-01 -5,535 05/27/03 06/03/03 Linda Holding
L-01 25,693 11/04/04 12/06/04 Nickerson Corp
L-2 22,500 11/26/03 12/04/03 Linda Holding
LO-02 1,750 12/09/05 / / Nickerson corp
LO-03 13,478 01/11/05 01/25/05 Linda Holding
PA-01 -6,000 05/27/03 06/03/03 Dutchess Tel Audio
PA-02 6,100 08/18/04 09/27/04 Dutchess Tel Audio
PA-03 -7,000 03/01/05 06/21/05 Dutchess tel Audio Inc
PL-01 11,670 07/07/03 07/11/03 S&O Const.
PL-02 14,440 02/06/04 04/12/04 S&O Const.
PL-04 10,764 08/13/04 09/28/04 S&O Const.
PS-01 4,400 06/14/04 / / Singer Equipment
PW-02 15,644 11/04/04 11/19/04 McNamee Const.
PW-04 750 11/04/04 11/19/04 McNamee Const.
PW-05 -13,550 08/13/07 08/20/07 KEYSTONE CONSTRUCTION CLERKS & MANAG
PW-07 37,800 08/13/07 08/20/07 KEYSTONE CONSTRUCTION CLERKS & MANGE
RO-01 20,850 03/12/04 03/15/04 Best Roofing of New Jersey
RO-02 -40,604 08/11/04 09/08/04 Best Roofing of New Jersey
RO-05 -2,033 12/18/06 01/30/07 Best Roofing
RO-06 1,392 12/18/06 01/30/07 Best Roofing
SAC-01 4,750 08/18/04 09/27/04 Nickerson Corp
SAC-02 625 11/04/04 11/19/04 Nickerson Corp
TI-01 592 06/14/04 06/25/04 Control Network Communications
TI-03 -2,584 12/27/04 01/03/05 Control Network Communications
TL-01 -3,750 05/27/03 06/03/03 Tri-Co Elec.
TL-02 640 08/18/04 09/28/04 Control Network Communications
TL-02 -3,500 11/04/04 11/29/04 Tri-Co Elec.
TR-01 -5,000 04/07/05 04/26/05 Sun-UP Enterprises
New Elementary School:
01-0500 New Construction 0-037-001 07/15/02 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
AC-02 -2,282 06/14/04 06/25/04 Schumacher Systems
AC-03 861 08/18/04 09/27/04 Schumacher Systems
AC-04 3,187 02/17/05 03/02/05 Schumacher Systems Inc
AE-01 3,574 08/18/04 09/27/04 Nickerson Corp
AE-02 -1,000 12/09/05 12/15/05 Nickerson Corp
CAS-01 9,725 08/18/04 09/27/04 Nickerson Corp
CAS-02 -1,000 12/09/05 12/15/05 Nickerson Corp
EL-01 -1,468 05/27/03 06/02/03 Canale Elec.
EL-04 1,647 02/06/04 03/12/04 Canale Elec.
EL-06 3,191 02/04/04 09/08/04 Canale Elec.
EL-08 -10,945 05/10/04 05/14/04 Canale Elec.
EL-10 1,716 06/14/04 06/25/04 Canale Elec.
EL-13 850 08/13/04 09/28/04 Canale Elec.
EL-15 4,125 08/13/04 09/28/04 Canale Elec.
EL-16 3,454 08/13/04 09/28/04 Canale Elec.
EL-20 7,031 11/04/04 11/29/04 Canale Elec.
EL-21 5,713 11/04/04 11/29/04 Canale Elec.
EL-24 -4,000 03/01/05 06/21/05 canale Electric Corp
EL-26 1,311 03/01/05 / / Canale Electric Corp
FS-03 -2,000 06/06/05 06/29/05 Singer Equipment Co
FT-02 -1,500 08/18/04 09/27/04 Northeast Petroleum Tech
GC-04 34,748 07/07/03 07/11/03 UW Marx
GC-05 1,748 01/22/04 01/29/04 UW Marx
GC-08 12,451 02/04/04 02/20/04 UW Marx
GC-10 8,639 03/12/04 03/17/04 UW Marx
GC-13 2,278 05/10/04 05/14/04 UW Marx
GC-16 2,045 05/10/04 05/14/04 UW Marx
GC-17 24,761 06/14/04 06/25/04 UW Marx
GC-20 43,187 30,457 08/13/04 09/28/04 UW Marx
GC-23 3,171 11/04/04 11/19/04 UW Marx
GC-24 137,098 11/04/04 11/19/04 UW Marx
GC-26 14,965 11/04/04 12/06/04 UW Marx
GC-28 -28,708 02/17/05 03/02/05 UW Marx Inc
GC-30 -70,978 04/07/05 04/26/05 UW Marx Inc
GC-31 -20,000 02/12/07 03/14/07 UW Marx Inc
HVAC-03 -2,278 01/13/06 06/26/06 J and M heating Air Cond
HVAC-06 1,288 08/18/04 09/28/04 J&M Heating
HVAC-08 -55,885 01/13/06 01/19/06 J and M heating Air Cond
L-01 -3,405 05/27/03 06/03/03 Linda Holding
LO-04 -2,000 01/11/05 01/25/05 Linda Holding
PA-01 -4,000 05/27/03 06/03/03 Dutchess Tel Audio
PA-04 -3,000 03/01/05 03/25/05 Dutchess Tel Audio Inc
PL-03 14,440 02/06/04 04/12/04 S&O Const. Services
PL-05 3,794 11/04/04 01/03/05 S&O Const. Services
PL-06 21,591 03/01/05 / / S and I Construction Service
PL-07 -3,804 03/01/05 06/21/05 S and I Construction Service
PW-01 -194,487 06/14/04 06/25/04 McNamee Const.
PW-03 15,938 11/04/04 11/19/04 McNamee Const.
PW-06 -7,775 08/13/07 08/20/07 KEYSTONE CONSTRUCTION CLERKS & MANAG
RO-03 -16,284 08/11/04 09/08/04 Best Roofing of New Jersey
RO-04 -1,154 12/18/06 01/30/07 Best Roofing of New Jersey
RO-07 196 12/18/06 01/30/07 Best Roofing
TI-04 -1,500 12/27/04 01/03/05 Control Network Communication
TL-01 -3,750 05/27/03 06/03/03 Tri-Co Elec.
TL-03 -1,500 11/04/04 11/29/04 Tri-Co Elec.
Grounds Garage:
06-0840 Reconstruction 2-023-001 12/26/07 NO CHANGE ORDERS ON ELECTRONIC FILE
LaGrange Bus Garage:
97-1462 Reconstruction 5-011-002 05/15/98 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
97-1463 Reconstruction 5-014-002 05/15/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1462 Reconstruction 5-014-003 10/25/99 NO CHANGE ORDERS ON ELECTRONIC FILE
Athletic Storage/Concession:
98-1468 New Construction 7-038-001 08/01/00 NO CHANGE ORDERS ON ELECTRONIC FILE
Districtwide:
98-1460 Reconstruction 7-999-001 10/25/99 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1473EP Energy Project 7-999-E01 05/22/95 NO CHANGE ORDERS ON ELECTRONIC FILE
SPACKENKILL UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-16-02-02
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Martha W. Lawrence Elementary:
93-0937 Reconstruction 0-001-001 04/28/94 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0322 Reconstruction 0-001-003 01/03/05 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1002 Reconstruction 0-001-004 03/02/07 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1643 Reconstruction 0-001-005 07/06/07 *CO No.* Amount Disallowed Received Approved Contractor
001 -18,722 03/17/08 04/29/08 PITTSFIELD PIPERS, INC.
Todd Junior High School:
93-1175 Reconstruction 0-002-005 05/09/94 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1501 Reconstruction 0-002-006 06/15/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1471 Reconstruction 0-002-007 06/18/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1481 Reconstruction 0-002-008 06/13/96 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0277 Additions and Alterations 0-002-009 12/30/98 *CO No.* Amount Disallowed Received Approved Contractor
E-002 7,620 06/19/02 06/20/02 Hudson Valley Elec.
E-004 1,327 06/19/02 06/20/02 Hudson Valley Elec.
E-005 285 06/19/02 06/20/02 Hudson Valley Elec.
G-006 31,637 06/19/02 06/20/02 Meyer Contracting
G-007 14,262 06/19/02 06/20/02 Meyer Contracting
G-008 38,525 06/19/02 06/20/02 Meyer Contracting
K-01 625 06/19/02 06/20/02 Dutchess Restaurant Equip.
ST-004 105,500 06/19/02 06/20/02 HB Wiltse Excavating
02-0012 Reconstruction 0-002-010 07/26/02 *CO No.* Amount Disallowed Received Approved Contractor
GC-01 1,425 01/08/03 01/16/03 Profex, Inc.
04-0323 Reconstruction 0-002-011 01/03/05 *CO No.* Amount Disallowed Received Approved Contractor
GC-08 24,478 12/21/06 01/30/07 Meyer Contracting
02-1727FP Reconstruction 0-002-FP1 05/21/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Nassau Road Elementary:
93-1176 Reconstruction 0-003-006 05/09/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1472 Reconstruction 0-003-007 06/18/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0640 Reconstruction 0-003-008 02/15/01 *CO No.* Amount Disallowed Received Approved Contractor
G-03 21,519 10/24/01 05/28/02 Meyer Contracting
04-0324 Reconstruction 0-003-009 01/03/05 NO CHANGE ORDERS ON ELECTRONIC FILE
Hagan Elementary School:
92-1313 Reconstruction 0-004-005 06/07/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1177 Reconstruction 0-004-006 05/09/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1473 Reconstruction 0-004-007 06/18/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0641 Reconstruction 0-004-009 02/15/01 *CO No.* Amount Disallowed Received Approved Contractor
G-02 5,300 10/10/01 02/26/02 Meyer Contracting
04-0325 Reconstruction 0-004-010 01/03/05 NO CHANGE ORDERS ON ELECTRONIC FILE
08-1657 Reconstruction 0-004-011 06/25/09 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1728FP Reconstruction 0-004-FP1 05/21/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Spackenkill High School:
93-1178 Additions and Alterations 0-005-007 05/09/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1327 Reconstruction 0-005-008 05/16/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1474 Reconstruction 0-005-009 06/18/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1542 Reconstruction 0-005-010 06/14/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1186 Reconstruction 0-005-011 04/17/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0642 Reconstruction 0-005-012 02/15/01 *CO No.* Amount Disallowed Received Approved Contractor
E-01 9,900 10/10/01 02/26/02 P&D Electric
E-02 2,399 10/24/01 05/28/02 P&D Electric
G-01 6,053 10/10/01 03/08/02 Meyer Contracting
01-1259 Reconstruction 0-005-014 05/16/02 *CO No.* Amount Disallowed Received Approved Contractor
1 2,448 02/11/03 02/13/03 Dutchess Tel-Audio
05-0647 Reconstruction 0-005-015 10/19/06 *CO No.* Amount Disallowed Received Approved Contractor
EC-001 14,814 11/26/07 01/28/08 P&D Electric of hudson
GC-001 4,245 04/09/07 05/15/07 Meyer Contracting Corp
GC-002 -4,520 05/14/07 06/22/07 Meyer Contracting Corp
GC-003 555 07/17/07 08/20/07 Meyer Contracting
GC-004 1,815 08/07/07 08/20/07 Meyer Contracting Corporation
GC-005 4,818 09/20/07 11/08/07 MEYER CONTRACTING CORPORATION
GC-006 -13,414 09/20/07 11/08/07 MEYER CONTRACTING CORPORATION
GC-007 65,589 10/03/07 11/08/07 Meyer Contracting Corp.
MC-001 -15,000 03/03/08 08/12/08 ASHLEY MECHANICAL, INC.
PC-001 -746 10/03/07 11/07/07 JAC Mechanical Services,Inc
PC-002 5,711 10/03/07 11/07/07 11/07/07anical Services,Inc.
PC-003 -5,000 03/03/08 08/12/08 JAC MECHANICAL SERIVICES, INC.
RC-001 -13,750 06/23/09 08/19/09 EVERFOAM INSULATION SERVICE
SC-001 -2,975 08/28/07 10/22/07 SUN UP ENTERPRISES, INC.
02-1726FP Reconstruction 0-005-FP1 05/21/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Portable-Todd Middle School:
97-1666 New Construction 0-008-001 07/07/98 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Storage Garage:
96-0121 Additions and Alterations 4-007-002 08/05/96 NO CHANGE ORDERS ON ELECTRONIC FILE
Districtwide:
02-1552 Reconstruction 7-999-001 01/28/04 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
1 -1,927 05/18/05 12/04/06 NY power Authority
Martha Lawrence School:
00-0643 Reconstruction 8-009-003 02/15/01 NO CHANGE ORDERS ON ELECTRONIC FILE
RED HOOK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-17-01-06
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Annex Shop:
97-1326 Reconstruction 0-002-002 04/17/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1374 Additions and Alterations 0-002-003 05/09/00 NO CHANGE ORDERS ON ELECTRONIC FILE
Linden Ave Middle School:
99-1375 Additions and Alterations 0-003-004 05/09/00 *CO No.* Amount Disallowed Received Approved Contractor
1-001 75,652 12/07/01 02/21/02 DSA Services
1-003 14,878 12/21/01 03/08/02 DSA Services
1-004 -503 05/14/04 05/17/04 DSA Services
10-003 2,574 03/12/02 04/19/02 Crisafulli Bros.
10-004 3,353 09/23/02 10/21/02 Crisafulli Bros.
10-005 1,285 05/20/02 06/04/02 Crisafulli Bros.
10-009 763 01/03/03 01/08/03 Crisafulli Bros.
11-001 -4,200 05/14/04 / / Crisafulli Bros.
11-003 -954 12/04/01 02/21/02 Crisafulli Bros.
11-005 -319 09/23/02 10/21/02 Crisafulli Bros.
12-001 -16,619 07/02/01 02/06/02 Hudson Valley Elec.
12-004 -9,275 12/04/01 01/13/03 Hudson Valley Elec.
12-007 -3,800 01/11/02 03/06/02 Hudson Valley Elec.
12-010 1,930 02/26/02 04/17/02 Hudson Valley Elec.
12-013 2,618 02/26/02 04/17/02 Hudson Valley Elec.
12-017 2,112 09/23/02 10/21/02 Hudson Valley Elec.
12-018 3,489 05/20/02 06/04/02 Hudson Valley Elec.
12-021 2,289 05/31/02 06/04/02 Hudson Valley Elec.
12-022 -158 07/23/02 08/28/02 Hudson Valley Elec.
12-025 440 09/23/02 01/07/03 Hudson Valley Elec.
12-026 2,857 09/17/02 10/21/02 Hudson Valley Elec.
12-028 -1,780 09/17/02 10/21/02 Hudson Valley Elec.
12-029 599 01/03/02 01/08/03 Hudson Valley Elec.
12-030 2,122 01/03/03 01/08/03 Hudson Valley Elec.
12-032 -917 01/03/03 01/08/03 Hudson Valley Elec.
12-033 6,063 01/16/03 02/06/03 Hudson Valley Elec.
12-036 -200 02/18/03 02/25/03 Hudson Valley Elec.
12-037 7,659 12/16/03 / / Hudson Valley Elec.
13-001 19,761 12/04/01 01/13/03 Johnson Controls
13-002 -4,513 05/14/03 05/23/03 Johnson Controls
13-003 1,996 01/08/04 01/20/04 Johnson Controls
16-002 -1,606 09/17/02 10/21/02 Northeast Interior Systems
16-003 -20,000 02/18/03 02/25/03 Northeast Interior Systems
16-004 894 01/12/04 01/13/04 Northeast Interior Systems
17-001 -5,000 02/18/03 02/25/03 Telcar Group
19-001 7,520 01/29/02 03/25/02 Nickerson
19-003 -5,000 01/16/03 02/06/03 Nickerson
20-001 6,875 02/26/02 04/17/02 Telcar Group
20-002 -5,000 01/16/03 02/06/03 Telcar Group
23-001 -18,900 01/08/04 01/13/04 NEP Glass Company
3-003 14,624 12/04/01 02/21/02 A. Colarusso & Son
3-005 1,725 01/11/02 03/06/02 A. Colarusso & Son
3-007 1,282 09/23/02 10/21/02 A. Colarusso & Son
3-009 308 07/23/02 08/28/02 A. Colarusso & Son
3-010 721 09/17/02 10/21/02 A. Colarusso & Son
3-011 2,546 01/03/03 01/21/04 A. Colarusso & Son
3-013 2,044 10/22/02 01/08/03 A. Colarusso & Son
3-014 -504 01/16/03 02/06/03 A. Colarusso & Son
3-015 8,598 01/16/03 02/06/03 A. Colarusso & Son
3-016 -4,307 02/18/03 01/13/04 A. Colarusso & Son
3-018 2,884 05/14/03 05/23/03 A. Colarusso & Son
4-008 -966 12/04/01 02/21/02 Fastracs Rentals
6-003 -1,080 09/23/02 10/21/02 STS Steel
6-004 6,432 09/23/02 10/21/02 STS Steel
6-005 -590 09/23/02 10/21/02 STS Steel
6-006 14,300 06/27/02 07/15/02 STS Steel
6-007 7,740 07/23/02 08/28/02 STS Steel
6-009 1,880 09/23/02 10/21/02 STS Steel
6-010 839 01/03/02 01/08/03 STS Steel
6-013 2,321 01/03/03 01/08/03 STS Steel
6-016 968 01/16/03 02/06/03 STS Steel
7-004 21,145 21,145 12/16/03 01/21/04 Superior Roofing Of Ulster County
8-005 -430 12/04/01 02/21/02 UW Marx
8-008 -558 12/20/01 03/06/02 UW Marx
8-009 366 01/29/02 03/25/02 UW Marx
8-012 -6,702 09/23/02 10/21/02 UW Marx
8-015 -26,388 07/23/02 01/07/03 UW Marx
8-018 -516 09/17/02 10/21/02 UW Marx
8-021 11,566 09/17/02 10/21/02 UW Marx
8-022 -2,189 09/17/02 10/21/02 UW Marx
8-022 -2,189 09/17/02 10/21/02 UW Marx
8-023 3,463 01/03/03 01/10/03 UW Marx
8-025 538 01/03/03 01/10/03 UW Marx
8-028 200 03/17/03 03/19/03 UW Marx
07-1053 Reconstruction 0-003-005 04/24/08 *CO No.* Amount Disallowed Received Approved Contractor
1.001 2,871 03/18/09 07/06/09 CB STRAIN & SON, INC.
1.001 2,871 03/18/09 04/08/09 CB STRAIN & SON, INC.
GC-1.002 19,962 09/18/08 10/21/08 Euggene Dilorenzo ,Inc
HVAC1002 595 01/22/09 04/10/09 CB STRAIN & SON, INC.
HVAC1003 667 04/20/09 06/02/09 CB STAIN & SON INC
M-E-1001 4,957 09/18/08 07/08/09 Pantel Contracting Corp.
M-HVAC-1 1,382 08/25/08 06/18/09 CB Strain & Son, Inc.
MGC-1.01 14,000 08/11/08 10/21/08 EUGENE DILORENZO, INC.
MGC1.003 26,597 23,032 01/22/09 07/09/09 EUGENE DILORENZO, INC.
MRR1.001 0 01/22/09 03/05/09 KOKO CONTRACTING,INC.
07-1382SC Visual Structural Inspection 0-003-SC1 01/17/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Senior High School:
95-0757 Reconstruction 0-005-003 03/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1328 Reconstruction 0-005-004 04/17/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1299 Additions and Alterations 0-005-005 05/04/00 *CO No.* Amount Disallowed Received Approved Contractor
1-002 -32,500 12/21/01 03/08/02 DSA Services
10-001 -291 12/05/01 02/20/02 Crisafulli Bros.
10-002 -140 02/26/02 04/17/02 Crisafulli Bros.
10-006 13,055 07/23/02 08/28/02 Crisafulli Bros
10-010 691 10/22/02 01/08/03 Crisafulli Bros
11-002 -3,150 05/14/04 / / Crisafulli Bros.
12-002 -16,619 07/02/01 02/06/02 Hudson Valley Elec.
12-003 -31,858 12/04/01 01/13/03 Hudson Valley Elec.
12-005 -5,867 12/04/01 01/13/03 Hudson Valley Elec.
12-006 291 12/05/01 02/20/02 Hudson Valley Elec.
12-008 -3,800 01/11/02 03/06/02 Hudson Valley Elec.
12-009 526 02/26/02 04/17/02 Hudson Valley Elec.
12-011 -140 02/26/02 04/17/02 Hudson Valley Elec.
12-015 4,615 03/20/02 04/19/02 Hudson Valley Elec.
12-019 1,850 05/20/02 06/04/02 Hudson Valley Elec.
12-020 923 05/31/02 06/04/02 Hudson Valley Elec.
12-023 219 07/23/02 08/28/02 Hudson Valley Elec.
12-024 736 09/23/02 10/21/02 Hudson Valley Elec.
12-027 990 09/17/02 10/21/02 Hudson Valley Elec.
12-031 1,479 10/21/02 01/08/03 Hudson Valley Elec.
12-034 725 01/16/03 02/06/03 Hudson Valley Elec.
12-035 -51 01/16/03 02/06/03 Hudson Valley Elec.
12-038 5,777 12/16/03 / / Hudson Valley Elec.
13-004 1,298 12/16/03 01/07/04 Johnson Controls
16-001 -1,916 03/20/02 04/19/02 Northeast Interior Systems
19-002 -133,139 02/26/02 04/17/02 Nickerson
22-001 -840 05/20/02 06/04/02 Nickerson
22-002 -4,032 05/14/03 05/23/03 Nickerson
3-002 13,800 12/04/01 02/21/02 A. Colarusso & Son
3-004 6,897 01/11/02 03/06/02 A. Colarusso & Son
3-006 626 01/29/02 03/25/02 A. Colarusso & Son
3-008 1,605 09/23/02 10/21/02 A. Colarusso & Son
3-012 1,300 10/22/02 01/08/03 A. Colarusso & Son
3-017 -3,536 02/18/03 02/25/03 A. Colarusso & Son
4-003 42,230 07/17/01 01/28/02 Fastracs Rentals
4-006 199 12/04/01 02/21/02 Fastracs Rentals
6-002 -252 09/23/02 10/21/02 STS Steel
6-008 1,743 09/23/02 10/21/02 STS Steel
6-011 6,534 09/17/02 01/08/03 STS Steel
6-012 1,822 10/24/02 01/08/03 STS Steel
6-014 -223 05/14/04 05/17/04 STS Steel
6-015 790 01/16/03 02/06/03 STS Steel
6-017 -700 02/18/03 02/25/03 STS Steel
7-002 252 12/04/01 02/21/02 Superior Roofing
7-003 -5,130 12/16/03 12/30/03 Superior Roofing
8-006 -430 12/04/01 02/21/02 UW Marx
8-010 -206 03/12/02 04/19/02 UW Marx
8-011 -85 03/26/02 04/26/02 UW Marx
8-014 17,206 05/31/02 06/04/02 UW Marx
8-017 -5,412 09/17/02 10/21/02 UW Marx
8-019 4,158 09/17/02 01/21/04 UW Marx
8-020 -2,186 09/17/02 10/21/02 UW Marx
8-024 6,076 09/06/02 01/08/03 UW Marx
8-026 1,012 10/21/02 01/08/03 UW Marx
05-0343 Reconstruction 0-005-006 03/03/06 *CO No.* Amount Disallowed Received Approved Contractor
EC-001 0 05/23/07 06/07/07 Sausto Construction
EC-002 -2,474 05/23/07 06/07/07 Sausto Construction
GC-001 0 08/03/06 10/13/06 Hudson Valley Electrical
GC-002 -1,878 09/15/06 10/19/06 Hudson Valley
07-1054 Reconstruction 0-005-007 04/24/08 *CO No.* Amount Disallowed Received Approved Contractor
H-GC-1.1 44,000 08/11/08 10/21/08 EUGENE DILORENZO, INC.
H-GC1005 19,008 04/20/09 08/04/09 EUGENE DILORENZO INC
H-P-1001 0 04/20/09 06/02/09 CB STAIN & SON INC
H-RR-1 0 08/25/08 10/21/08 KOKO Contracting, Inc.
HGC1.002 106,559 01/12/09 05/22/09 EUGENE DILORENZO, INC.
HGC1.003 22,293 01/22/09 03/05/09 EUGENE DILORENZO, INC.
HGC1.004 -944 01/22/09 03/05/09 EUGENE DILORENZO, INC.
HVAC-1.0 67,661 08/25/08 / / CB STRAIN & SON, INC.
HVAC1002 1,627 01/22/09 04/10/09 CB STRAIN & SON, INC.
HVAC1002 8,281 04/20/09 06/02/09 CB STAIN & SON INC
HVAC1003 1,980 01/22/09 04/10/09 CB STRAIN & SON, INC.
HVAC1004 1,342 04/20/09 06/02/09 CB STAIN & SON INC
HVAC1005 15,888 04/20/09 06/02/09 CB STAIN & SON INC
02-1254FP Reconstruction 0-005-FP1 03/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0746SC Visual Structural Inspection 0-005-SC1 06/07/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Mill Rd. Elementary:
92-1216 Reconstruction 0-006-002 06/10/93 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1325 Reconstruction 0-006-003 04/17/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1021 Additions and Alterations 0-006-004 05/04/00 *CO No.* Amount Disallowed Received Approved Contractor
10-008 12,192 01/03/03 01/08/03 Crisafulli Bros.
12-012 400 02/26/02 04/17/02 Hudson Valley Elec.
12-016 1,435 03/20/02 04/19/02 Hudson Valley Elec.
18-002 -5,000 02/26/02 04/17/02 Facilities Equip. & Service
2-001 -2,570 07/02/01 02/06/02 Delsignore Paving
2-002 -797 02/18/03 02/24/03 Delsignore Paving
2-003 -4,000 02/18/03 02/25/03 Delsignore Paving
4-005 1,601 08/03/01 01/30/02 Fastracs Rentals
4-007 405 12/04/01 02/21/02 Fastracs Rentals
6-001 -2,218 12/04/01 02/21/02 STS Steel
8-004 -430 12/04/01 02/21/02 UW Marx
8-007 -1,500 12/04/01 02/21/02 UW Marx
8-013 -400 09/23/02 10/21/02 UW Marx
8-016 -2,000 09/17/02 10/21/02 UW Marx
05-0049 Reconstruction 0-006-005 07/15/05 *CO No.* Amount Disallowed Received Approved Contractor
AAC-001 4,000 10/07/05 10/17/05 Edgeco Environmental
AAC-002 -2,000 10/07/05 10/17/05 Edgeco Environmental
AAC-003 -500 11/01/05 11/04/05 Edgeco Environmental
P-001 0 02/13/06 03/02/06 CB Strain and Sons
P-002 0 04/13/06 05/26/06 CB strain and Sons
P-003 -3,046 04/13/06 05/26/06 Cb Strain and Sons
06-0616 Reconstruction 0-006-006 12/28/06 *CO No.* Amount Disallowed Received Approved Contractor
P-001 0 06/18/07 08/07/07 Noreaster heating
P-002 -8,469 07/19/07 08/07/07 Noreaster heating
07-1055 Reconstruction 0-006-007 04/24/08 *CO No.* Amount Disallowed Received Approved Contractor
E-GC-1&1 151,000 08/11/08 10/21/08 EUGENE DILORENZO, INC.
E-HVAC-1 38,106 08/25/08 / / CB Strain & Son, Inc.
EGC1&2.3 10,884 6,470 01/22/09 / / EUGENE DILORENZO, INC.
EGC1&2.4 20,375 01/22/09 03/05/09 EUGENE DILORENZO,INC.
EHVAC1.2 3,732 01/22/09 04/10/09 CB STAIN & SON, INC.
Gc-1&2 157,516 53,517 09/18/08 07/09/09 Eugene DiLorenzo
02-1255FP Reconstruction 0-006-FP1 03/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1380SC Visual Structural Inspection 0-006-SC1 01/17/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Portable at Linden:
98-1680 Additions and Alterations 0-011-001 10/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
Portable @ High School:
98-1679 Additions and Alterations 0-012-001 10/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
Districtwide telecomm. wiring:
95-0758 Reconstruction 0-999-001 03/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
Mill Rd. Bus Garage:
97-1327 Reconstruction 4-008-001 04/17/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1020 Reconstruction 4-008-002 05/04/00 NO CHANGE ORDERS ON ELECTRONIC FILE
Linden Ave Bus Garage:
97-1324 Reconstruction 5-007-002 04/17/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1376 Additions and Alterations 5-007-004 05/09/00 *CO No.* Amount Disallowed Received Approved Contractor
12-014 -942 03/12/02 01/07/04 Hudson Valley Elec.
3-011 2,546 01/03/03 01/08/03 A. Colarusso & Son
07-0273 Reconstruction 5-007-005 10/05/07 *CO No.* Amount Disallowed Received Approved Contractor
GC-001 44,541 06/02/08 08/08/08 Total Tool,LTD
07-1381SC Visual Structural Inspection 5-007-SC1 01/17/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Pump House:
99-1635 New Construction 7-013-001 05/04/00 NO CHANGE ORDERS ON ELECTRONIC FILE
:
05-0226 Reconstruction 7-020-001 10/03/05 NO CHANGE ORDERS ON ELECTRONIC FILE
RHINEBECK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-18-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
High School:
90-1817 Reconstruction 0-002-006 07/08/91 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0908 Additions and Alterations 0-002-007 05/20/96 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0039 Reconstruction 0-002-008 08/08/94 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0756 Reconstruction 0-002-010 02/02/01 *CO No.* Amount Disallowed Received Approved Contractor
1 19,762 01/18/02 03/06/02 Citizens Communications
2 2,076 05/23/03 05/23/03 Citizens Communications
3 1,800 01/18/02 03/06/02 Citizens Communications
97-1650 Reconstruction 0-002-011 07/03/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1270 Reconstruction 0-002-012 06/22/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1157 Reconstruction 0-002-013 05/24/00 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0886 Additions and Alterations 0-002-014 04/22/05 *CO No.* Amount Disallowed Received Approved Contractor
001 12,590 02/12/07 03/13/07 Gross Electric
001A 8,080 04/05/06 04/10/06 LHV Precast Inc
002 72,222 04/05/06 04/10/06 Meyer Contracting
002 8,382 02/12/07 03/12/07 Gross Electric
002 583 02/12/07 / / Meyer Contracting
003 5,162 04/05/06 04/10/06 Meyer Contracting
003 7,392 02/12/07 03/12/07 Gross Electric
004 14,639 04/05/06 04/10/06 Meyer Contracting
004 5,694 02/12/07 03/12/07 Gross Electric
005 5,324 04/05/06 04/10/06 Meyer Contracting
005 8,007 02/12/07 03/12/07 Gross Electric
006 3,494 04/05/06 04/10/06 Meyer Contracting
007 2,814 04/05/06 04/10/06 Meyer Contracting
008 11,412 04/05/06 04/10/06 Meyer Contracting
009 3,286 04/05/06 04/10/06 Meyer Contracting
01 18,595 04/05/06 04/10/06 Meyer Contracting
010 1,329 09/05/06 10/12/06 Meyer Contracting
011 6,023 09/05/06 04/11/07 Meyer Contracting
012 10,733 09/05/06 10/12/06 Meyer Contracting
013 1,262 09/05/06 10/12/06 Meyer Contracting
014 -2,538 09/05/06 10/12/06 Meyer Contracting
015 2,707 09/05/06 10/12/06 Meyer Contracting
016 -1,535 09/05/06 10/12/06 Meyer Contracting
017 1,192 09/05/06 10/12/06 Meyer Contracting
018 1,655 09/05/06 10/12/06 Meyer Contracting
019 1,242 09/05/06 10/12/06 Meyer Contracting
020 1,993 09/05/06 10/12/06 Meyer Contracting
021 2,067 09/05/06 10/12/06 Meyer Contracting
023 2,162 09/05/06 10/12/06 Meyer Contracting
024 5,661 09/05/06 10/12/06 Meyer Contracting
025 5,848 09/05/06 10/12/06 Meyer Contracting
026 3,178 09/05/06 10/12/06 Meyer Contracting
027 7,002 10/24/06 12/14/06 Meyer Contracting
028 9,654 10/24/06 12/14/06 Meyer Contracting
029 1,227 10/24/06 / / Meyer Contracting
030 1,323 10/24/06 12/14/06 Meyer Contracting
031 23,914 10/24/06 12/14/06 Meyer Contracting
032 14,868 10/24/06 12/14/06 Meyer Contracting
033 1,082 10/24/06 12/14/06 Meyer Contracting
034 2,118 10/24/06 12/14/06 Meyer Contracting
035 -15,000 10/24/06 12/14/06 Meyer Contracting
036 -480 10/24/06 12/14/06 Meyer Contracting
037 6,386 12/08/06 01/30/07 Meyer Contracting
038 3,603 12/08/06 01/30/07 Meyer Contracting
039 1,979 12/08/06 01/30/07 Meyer Contracting
040 3,140 12/08/06 01/30/07 Meyer Contracting
041 10,176 12/08/06 01/30/07 Meyer Contracting
042 112,167 12/08/06 / / Meyer Contracting
044 1,314 12/08/06 01/30/07 Meyer Contracting
045 154,269 12/08/06 / / Meyer Contracting
047 944 12/08/06 01/30/07 Meyer Contracting
048 1,974 12/08/06 01/30/07 Meyer Contracting
050 10,764 12/08/06 01/30/07 Meyer Contracting
051 -1,341 12/08/06 / / Meyer Contracting
052 21,523 02/12/07 03/14/07 Meyer Contracting
053 7,662 12/08/06 01/30/07 Meyer Contracting
054 15,286 02/12/07 03/14/07 Meyer Contracting
055 -1,999 02/12/07 03/14/07 Meyer Contracting
057 3,858 02/12/07 03/14/07 Meyer Contracting
058 1,170 02/12/07 03/14/07 Meyer Contracting
059 1,433 02/12/07 03/14/07 Meyer Contracting
060 10,127 02/12/07 03/14/07 Meyer Contracting
062 583 02/12/07 03/14/07 Meyer Contracting
063 1,402 02/12/07 03/14/07 Meyer Contracting
064 2,998 02/12/07 03/14/07 Meyer Contracting
066 1,022 02/12/07 03/14/07 Meyer Contracting
067 4,869 02/12/07 03/14/07 Meyer Contracting
068 4,895 02/12/07 03/14/07 Meyer Contracting
069 7,490 02/12/07 03/14/07 Meyer Contracting
070 2,137 02/12/07 03/14/07 Meyer Contracting
05-1123 Reconstruction 0-002-015 10/12/06 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1367 Reconstruction 0-002-016 01/28/08 *CO No.* Amount Disallowed Received Approved Contractor
EC-001 1,500 07/15/08 08/26/08 Richers Electric, Inc
EC-002 0 08/25/08 09/29/08 Richers Electric, Inc.
EC-003 -5,430 03/17/09 04/03/09 RICHERS ELECTRIC
GC-001 -5,029 06/29/08 09/29/08 MEYER CONTRACTING CORPORATION
GC-002 41,894 07/15/08 09/29/08 Meyer Contracting Corp.
GC-003 2,061 07/15/08 09/29/08 Meyer Contracting Corporation
GC-005 0 08/12/08 09/29/08 MEYER CONTRACTING CORPORATION
GC-007 2,014 01/02/09 02/27/09 MEYER CONTRACTING CORPORATION
02-0749FP Reconstruction 0-002-FP1 01/13/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Livingston Elem. School:
96-0162 Additions and Alterations 0-004-006 09/11/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1158 Reconstruction 0-004-009 05/24/00 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0755 Alterations 0-004-010 02/02/01 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0887 Additions and Alterations 0-004-011 04/22/05 *CO No.* Amount Disallowed Received Approved Contractor
005 8,450 02/12/07 03/14/07 Jupiter Environmental
046 8,207 12/08/06 01/30/07 Meyer Contracting
049 928 12/08/06 01/30/07 Meyer Contracting
052 21,523 02/12/07 / / Meyer Contracting
056 11,447 02/12/07 03/14/07 Meyer Contracting
061 13,914 02/12/07 03/14/07 Meyer Contracting
065 2,847 02/12/07 03/14/07 Meyer Contracting
05-1124 Reconstruction 0-004-012 10/12/06 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1368 Reconstruction 0-004-013 01/28/08 *CO No.* Amount Disallowed Received Approved Contractor
EC-002 0 08/25/08 / / Richers Electric, Inc.
GC-004 340 07/28/08 09/29/08 MEYER CONTRACTING CORPORATION
GC-006 1,921 08/25/08 10/24/08 Meyer Contracting Corporation
SC-002 -5,000 10/27/08 03/10/09 CON-TECH CONSTRUCTION
02-0750FP Reconstruction 0-004-FP1 12/24/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Chancellor Livingston Modular:
01-1488 New Construction 0-008-001 07/11/02 *CO No.* Amount Disallowed Received Approved Contractor
1 -76,450 01/08/03 02/03/03 Arold Paving
2 14,000 01/08/03 01/23/03 Arold Paving
3 400 01/08/03 02/03/03 Arold Paving
RHINECLIFF UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-18-02-02
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Field House:
91-0745 Reconstruction 0-003-002 02/26/92 NO CHANGE ORDERS ON ELECTRONIC FILE
WAPPINGERS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-21-01-06
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Fishkill Plains Elementary:
92-0380 Reconstruction 0-001-005 11/09/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1284 Reconstruction 0-001-006 06/06/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0548 Reconstruction 0-001-007 01/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
Kinry Road Elementary:
93-1701 Reconstruction 0-002-006 06/24/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0549 Reconstruction 0-002-008 01/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1160 Reconstruction 0-002-010 06/06/02 *CO No.* Amount Disallowed Received Approved Contractor
1 10,118 07/02/04 07/13/04 H Osterhoudt Excavating
2 3,400 07/02/04 07/13/04 H Osterhoudt Excavating
3 12,400 07/02/04 07/13/04 H Osterhoudt Excavating
07-0817 Reconstruction 0-002-013 02/04/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Evans Elementary School:
93-1252 Reconstruction 0-003-008 05/24/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0550 Reconstruction 0-003-009 01/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1516 Reconstruction 0-003-011 05/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1557 Reconstruction 0-003-012 06/25/98 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1480 Reconstruction 0-003-016 08/09/05 *CO No.* Amount Disallowed Received Approved Contractor
1 -500 01/18/07 02/01/07 RLJ Electric
07-0130 Reconstruction 0-003-017 09/12/07 *CO No.* Amount Disallowed Received Approved Contractor
GC-01R 6,150 10/21/08 05/14/09 AMERICAN GLASS CO. OF ALBANY INC.
Junior High School:
90-1375 Reconstruction 0-004-009 05/17/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0381 Reconstruction 0-004-011 11/09/92 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1173 Reconstruction 0-004-012 04/30/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0551 Reconstruction 0-004-013 01/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0054 Reconstruction 0-004-015 08/01/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1558 Reconstruction 0-004-018 06/25/98 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1162 Reconstruction 0-004-019 06/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0749 Reconstruction 0-004-020 03/31/99 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0382 Reconstruction 0-004-024 11/01/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1897FP Reconstruction 0-004-FP1 07/08/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Fishkill Elementary School:
90-1376 Reconstruction 0-005-005 05/17/91 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0552 Reconstruction 0-005-008 01/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1517 Reconstruction 0-005-010 05/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1163 Reconstruction 0-005-011 06/06/02 *CO No.* Amount Disallowed Received Approved Contractor
1 -37,095 10/17/02 10/23/02 Barrett Roofing & Supply
3 12,000 03/26/03 04/03/03 Barrett Roofing & Supply
4 -3,087 07/07/04 07/13/04 Barrett Roofing & Supply
Vassar Road Elementary:
92-0382 Reconstruction 0-008-008 11/09/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1253 Reconstruction 0-008-009 05/24/94 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1285 Reconstruction 0-008-010 06/06/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0553 Reconstruction 0-008-012 01/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0300 Reconstruction 0-008-017 10/25/06 *CO No.* Amount Disallowed Received Approved Contractor
RC-03 -4,931 12/03/07 12/12/07 Best Roofing of NJ
07-0818 Reconstruction 0-008-018 02/04/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Ketcham Senior High School:
93-1286 Reconstruction 0-012-011 06/06/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0554 Reconstruction 0-012-012 01/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1518 Reconstruction 0-012-014 05/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0750 Reconstruction 0-012-015 03/31/99 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1425 Additions and Alterations 0-012-018 10/04/01 *CO No.* Amount Disallowed Received Approved Contractor
1 50,275 05/01/02 05/30/02 Meyer Contracting
1 27,006 06/27/02 07/03/02 Mid-Orange Mech.
1 -24,250 06/25/02 07/03/02 Health & Educational Equip.
1 -3,440 06/25/02 07/03/02 Filingeri Elec.
1 6,600 07/02/04 07/27/04 H Osterhoudt Excavating
1 -164 07/07/04 07/27/04 Adirondack Cabling
1 -5,000 07/07/04 07/19/04 Health & Educational Equip.
12 24,000 07/25/03 07/29/03 Meyer Contracting
14 6,235 07/25/03 07/29/03 Meyer Contracting
15 8,833 07/25/03 07/29/03 Meyer Contracting
16 5,936 07/25/03 07/29/03 Meyer Contracting
18 7,104 07/25/03 07/29/03 Meyer Contracting
19 660 07/25/03 07/29/03 Meyer Contracting
2 4,239 05/01/02 05/30/02 Meyer Contracting
2 (rev) -6,250 12/03/02 12/09/02 Filingeri Elec.
3 25,500 03/08/03 / / Health & Educational Equip.
4 -386 02/06/03 04/03/03 Meyer Contracting
5 17,101 01/07/03 01/16/03 Filingeri Elec.
6 15,919 02/06/03 02/24/03 Meyer Contracting
6 -2,500 07/07/04 07/19/04 Health & Educational Equip.
02-0808 Reconstruction 0-012-019 12/27/02 *CO No.* Amount Disallowed Received Approved Contractor
1 0 02/20/03 03/13/03 Royal Cont corp of NY
03-0435 Reconstruction 0-012-020 04/09/04 *CO No.* Amount Disallowed Received Approved Contractor
1 -5,000 12/23/05 12/28/05 Netrix inc
1 -6,896 06/29/07 07/17/07 Glomar Construction
07-0129 Reconstruction 0-012-021 11/13/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0145 Reconstruction 0-012-022 10/25/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1771 Reconstruction 0-012-023 09/22/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1898FP Reconstruction 0-012-FP1 10/21/03 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0099SC Visual Structural Inspection 0-012-SC1 08/06/04 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0335SC Visual Structural Inspection 0-012-SC2 12/01/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Brinckerhoff Elementary:
92-1461 Reconstruction 0-013-007 07/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0555 Reconstruction 0-013-009 01/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1519 Reconstruction 0-013-011 05/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0301 Reconstruction 0-013-016 10/25/06 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0819 Reconstruction 0-013-017 02/04/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1904FP Reconstruction 0-013-FP1 07/08/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Oak Grove Elementary:
94-0556 Reconstruction 0-014-009 01/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1520 Reconstruction 0-014-011 05/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1161 Reconstruction 0-014-012 06/06/02 *CO No.* Amount Disallowed Received Approved Contractor
1 14,639 07/02/04 07/13/04 H Osterhoudt Excavating
07-0820 Reconstruction 0-014-015 02/04/08 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0808 Reconstruction 0-014-016 11/21/07 *CO No.* Amount Disallowed Received Approved Contractor
RC-01 -6,683 12/10/08 02/19/09 MARPAT CONSTRUCTION COMPANY
02-1901FP Reconstruction 0-014-FP1 07/08/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Gayhead Elementary:
94-0557 Reconstruction 0-016-008 01/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1537 Reconstruction 0-016-009 06/05/96 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0575 Reconstruction 0-016-014 01/10/05 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0150 Reconstruction 0-016-015 08/09/06 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0821 Reconstruction 0-016-016 02/04/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1902FP Reconstruction 0-016-FP1 10/20/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Van Wyck Junior High School:
93-1225 Reconstruction 0-017-008 05/20/94 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1287 Reconstruction 0-017-009 06/06/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0558 Reconstruction 0-017-010 01/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1524 Reconstruction 0-017-011 05/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1164 Reconstruction 0-017-013 06/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0086 Reconstruction 0-017-014 08/28/02 *CO No.* Amount Disallowed Received Approved Contractor
1 10,200 07/08/04 07/13/04 P&D Elec.
04-1338 Reconstruction 0-017-016 08/10/05 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0525 Reconstruction 0-017-017 12/01/06 *CO No.* Amount Disallowed Received Approved Contractor
PC-01 -16,260 10/29/08 03/09/09 THOMAS GLEASON
03-0191FP Reconstruction 0-017-FP1 10/14/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Sheafe Road Elementary:
92-0580 Reconstruction 0-018-005 02/23/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0559 Reconstruction 0-018-006 01/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1165 Reconstruction 0-018-009 06/06/02 *CO No.* Amount Disallowed Received Approved Contractor
2 -14,095 10/17/02 10/23/02 Barrett Roofing and Supply
07-0822 Reconstruction 0-018-012 02/04/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1900FP Reconstruction 0-018-FP1 07/08/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Myers Corners Elementary:
93-1254 Reconstruction 0-019-006 05/24/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0560 Reconstruction 0-019-007 01/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1521 Reconstruction 0-019-009 05/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1559 Reconstruction 0-019-010 06/25/98 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1166 Reconstruction 0-019-011 06/06/02 *CO No.* Amount Disallowed Received Approved Contractor
1 7,232 07/02/04 07/13/04 H Osterhoudt Excavating
2 17,600 07/02/04 07/13/04 H Osterhoudt Excavating
98-0751 Reconstruction 0-019-012 03/31/99 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0823 Reconstruction 0-019-016 02/04/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1903FP Reconstruction 0-019-FP1 07/08/03 NO CHANGE ORDERS ON ELECTRONIC FILE
John Jay High School:
92-0292 Reconstruction 0-020-010 10/02/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-1542 Reconstruction 0-020-012 07/13/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1226 Reconstruction 0-020-013 05/20/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0561 Reconstruction 0-020-015 01/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0055 Reconstruction 0-020-016 08/10/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0043 Reconstruction 0-020-017 07/11/96 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0752 Reconstruction 0-020-019 03/31/99 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1426 Additions and Alterations 0-020-022 10/04/01 *CO No.* Amount Disallowed Received Approved Contractor
11 24,125 07/25/03 07/29/03 Meyer Contracting
13 5,140 07/25/03 07/29/03 Meyer Contracting
17 3,371 07/25/03 07/29/03 Meyer Contracting
2 5,422 07/02/03 07/09/03 Health & Educational Equip.
2(rev) -6,250 12/03/02 12/09/02 Filingeri Elec.
20 660 07/25/03 07/29/03 Meyer Contracting
21 49,700 09/04/03 10/06/03 Meyer Contracting
2A 226,900 02/12/03 04/21/03 General Mech. Systems
2B 226,900 02/12/03 04/21/03 General Mech. Systems
3 7,592 06/25/02 07/03/02 Meyer Contracting
3 3,258 02/06/03 02/24/03 General Mech. Systems
4 8,794 02/06/03 02/24/03 Filingeri Elec.
4 21,235 03/19/03 / / Health & Educational Equip.
5 29,300 02/06/03 04/21/03 Meyer Contracting
7 7,169 02/06/03 02/24/03 Meyer Contracting
7 -2,500 07/07/04 07/19/04 Health & Educational Equip.
8 21,673 02/06/03 02/24/03 Meyer Contracting
02-0807 Reconstruction 0-020-023 12/27/02 *CO No.* Amount Disallowed Received Approved Contractor
2 3,629 07/09/04 07/13/04 Royal Contracting
04-1339 Reconstruction 0-020-024 08/10/05 NO CHANGE ORDERS ON ELECTRONIC FILE
05-1416 Reconstruction 0-020-025 07/15/02 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1772 Additions and Alterations 0-020-026 09/22/08 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1747 Reconstruction 0-020-027 05/14/08 *CO No.* Amount Disallowed Received Approved Contractor
PC-03 12,797 06/24/09 08/14/09 ROEHRS CONSTRUCTION
PC-05 -1,740 09/17/09 / / ROEHRS CONSTRUCTION
02-1899FP Reconstruction 0-020-FP1 03/22/04 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0046SC Visual Structural Inspection 0-020-SC1 08/09/06 NO CHANGE ORDERS ON ELECTRONIC FILE
Modulars 1 & 2 @ Van Wyck Jr. HS:
03-1517 New Construction 0-040-001 06/15/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Mods. 1 & 2 @ Gayhead Elem.:
03-1518 New Construction 0-041-001 06/15/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Portable #1 @ Fishkill ES:
07-1624 New Construction 0-046-001 04/02/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Athletic Storage @ Ketcham HS:
04-1102 New Construction 2-043-001 06/15/05 NO CHANGE ORDERS ON ELECTRONIC FILE
Central Warehouse:
97-1126 Reconstruction 3-015-003 04/06/98 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1522 Reconstruction 3-015-004 05/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
Main Garage #1:
92-0462 Reconstruction 5-007-001 12/18/92 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1702 Reconstruction 5-007-002 08/15/94 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1523 Reconstruction 5-007-004 05/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
Main Garage #2:
92-0798 Reconstruction 5-011-002 03/09/93 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage (lease):
04-0483 Reconstruction 5-038-L02 11/23/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Districtwide:
94-1338EP Energy Project 7-999-E01 03/30/95 NO CHANGE ORDERS ON ELECTRONIC FILE
MILLBROOK CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-22-01-04
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Junior/Senior High School:
02-2403 Reconstruction 0-008-002 06/25/03 *CO No.* Amount Disallowed Received Approved Contractor
GC-01 -77,000 02/22/05 04/04/05 Laumar Roofing Co
97-0227 Reconstruction 0-008-003 08/21/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1006 Additions and Alterations 0-008-004 05/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0043 Reconstruction 0-008-006 07/26/04 *CO No.* Amount Disallowed Received Approved Contractor
CO-001 -11,136 03/27/08 04/02/08 TUSCAN CONTRACTORS & CONSULTANTS
GC-01 3,000 01/05/05 01/20/05 Netrix Inc
07-1996 Reconstruction 0-008-008 05/22/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0314FP Reconstruction 0-008-FP1 11/07/02 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0609SC Visual Structural Inspection 0-008-SC1 06/25/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Elm Drive Elementary School:
90-1560 Reconstruction 0-010-004 06/18/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0146 Additions and Alterations 0-010-005 09/12/91 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1528 Reconstruction 0-010-007 05/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1106 Reconstruction 0-010-009 01/31/03 *CO No.* Amount Disallowed Received Approved Contractor
M-01 14,967 08/22/03 09/05/03 PIttsfield Pipers
04-0044 Reconstruction 0-010-010 07/26/04 *CO No.* Amount Disallowed Received Approved Contractor
GC-02 1,075 01/05/05 01/20/05 Netrix inc
06-0611SC Visual Structural Inspection 0-010-SC1 06/25/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Alden Place Elementary:
90-1882 Reconstruction 0-011-001 07/08/91 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0145 Additions and Alterations 0-011-001 09/12/91 NO CHANGE ORDERS ON ELECTRONIC FILE
90-1561 Reconstruction 0-011-004 06/18/91 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1529 Reconstruction 0-011-006 05/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1506 Reconstruction 0-011-007 05/13/97 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1725 Reconstruction 0-011-009 05/13/08 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0610SC Visual Structural Inspection 0-011-SC1 06/25/07 NO CHANGE ORDERS ON ELECTRONIC FILE
New High School:
04-0602 New Construction 0-031-001 03/07/05 *CO No.* Amount Disallowed Received Approved Contractor
CO-FEC01 -2,696 11/08/07 11/08/07 Buffalo Hotel Supply Company
CO-M008 10,104 12/31/07 01/09/08 General Mechanical Systems
EC-002 19,839 04/09/07 04/23/07 P and D Electric of the Hudson Valle
EC-003 10,210 11/13/07 / / P&D Electric of Hudson Valley
EC-003 10,210 04/14/08 / / P&D ELECTRIC OF HUDSON VALLEY INC.
EC-01 19,910 04/09/07 04/23/07 P and D Electric of the Hudson Valle
GC-002 23,050 10/03/06 11/03/06 Ferrari and Sons
GC-003 59,936 10/03/06 11/03/06 Ferrari and Sons
GC-004 5,000 10/03/06 10/10/06 Ferrari and sons
GC-004 5,000 04/14/08 / / FERRARI & SONS, INC.
GC-005 29,435 10/03/06 11/03/06 Ferrari Sons
GC-006 35,425 10/03/06 11/03/06 Ferrari and Sons
GC-007 32,900 10/03/06 11/03/06 Ferrari sons
GC-008 2,498 04/09/07 05/15/07 Ferrari and Sons
GC-009 19,982 04/09/07 05/15/07 Ferrari and Sons
GC-01 190,000 01/17/06 06/30/06 Ferrari and Sons
M-001 129,929 10/03/06 / / General Mechanical systems
M-001 129,929 04/14/08 / / GENERAL MECHANCIAL SYSTEMS, INC.
M-002 15,526 04/09/07 04/23/07 General Mechanical Systems
M-003 2,917 04/09/07 04/23/07 General Mechanical Systems
M-004 19,525 04/09/07 04/23/07 General Mechanical Systemssr
M-005 11,353 04/09/07 08/07/07 General Mechanical Systems
M-006 13,861 04/09/07 04/23/07 General Mechanical Systems
M-007 7,315 05/18/07 08/01/07 General Mechanical
PC-01 5,210 05/18/07 08/01/07 General Mechanical
PC-02 9,142 05/18/07 08/01/07 General Mechanical Systems
S-002 34,000 10/03/06 02/13/09 SUN UP ENTERPRISES
S-002 34,000 04/14/08 / / SUN UP ENETERPRISES, INC.
S-003 182,000 10/03/06 / / Sun Up Enterprises
S-003 182,000 04/14/08 / / SUN UP ENTERPRISES, INC.
S-004 23,400 10/03/06 10/24/06 sun Up enterprises
S-005 17,650 04/09/07 05/15/07 Sun Up Enterprises
S-006 4,125 04/09/07 05/15/07 Sun Up Enterprises
S-007 21,885 04/09/07 05/15/07 Sun Up Enterprises
S-008 19,350 04/09/07 05/15/07 Sun Up Enterprises
S-01 113,282 01/17/06 06/30/06 Sun Up Enterprises
BOCES DUTCHESS STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-90-00-00
last updated on 11/24/09
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Salt Point Center(frmly Spec ed ctr):
91-0782 Reconstruction 0-001-008 02/28/92 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1107 Reconstruction 0-001-009 05/14/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1667 Reconstruction 0-001-011 08/04/94 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0982 Reconstruction 0-001-012 10/02/02 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 9,292 10/10/03 10/14/03 West Bank Contracting
MC-1 -6,360 10/09/03 10/14/03 Westech International
MC-2 9,090 10/09/03 10/14/03 Westech International
95-1420 Reconstruction 0-001-013 06/13/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0790 Reconstruction 0-001-014 02/21/97 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1638 Reconstruction 0-001-015 08/29/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1283 Reconstruction 0-001-016 05/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1404 Reconstruction 0-001-017 07/29/99 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1527 Reconstruction 0-001-018 11/28/01 *CO No.* Amount Disallowed Received Approved Contractor
1-EC 763 01/17/03 02/06/03 P&D Elec.
3-EC 2,495 01/17/03 02/06/03 P&D Elec.
3-GC 1,325 09/17/03 09/23/03 Profex, Inc.
5-EC 5,877 04/16/03 06/30/03 P&D Elec.
EC-6 1,752 08/26/03 09/19/03 P&D Elec.
05-0781 Reconstruction 0-001-020 04/20/06 *CO No.* Amount Disallowed Received Approved Contractor
1-001 -22,000 06/08/06 07/26/06 William Manfredi Construction
1-002 -6,825 06/15/06 06/30/06 William Manfredi Construction
2-001 -2,195 06/08/06 09/29/06 CB Strain and Sons
3-001 -3,950 06/08/06 09/29/06 CB Strain and Son
4-001 -2,800 06/08/06 09/29/06 Sausto Contracting
4-002 6,825 06/15/06 09/29/06 Sausto contracting
5-001 -5,262 08/16/06 09/06/06 Kittredge Equipment
06-0078 Reconstruction 0-001-022 11/07/06 *CO No.* Amount Disallowed Received Approved Contractor
001 1,376 02/05/09 03/11/09 HUDSON VALLEY ECM INC.
002 -8,575 05/21/09 08/19/09 HUDSON VALLEY ELECTRICAL CONSTRUCTIO
06-0076 Reconstruction 0-001-023 10/26/06 *CO No.* Amount Disallowed Received Approved Contractor
001 5,000 12/17/07 01/07/08 C.B. Strain
001 -3,655 02/14/08 03/19/08 FRAN CORP DBA ALL BRIGHT ELECTRIC
1 -7,180 02/14/08 03/19/08 UNITY MECHANICAL CORP
08-1605 Reconstruction 0-001-024 05/14/09 *CO No.* Amount Disallowed Received Approved Contractor
001 2,300 10/19/09 11/18/09 MILCON CONSTRUCTION CORPORATION
Area Occupational Center:
90-1381 Reconstruction 0-003-008 06/06/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1109 Reconstruction 0-003-011 05/14/93 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1108 Reconstruction 0-003-012 05/14/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-1668 Reconstruction 0-003-013 08/04/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0991 Reconstruction 0-003-014 04/01/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0792 Reconstruction 0-003-015 02/21/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1284 Reconstruction 0-003-017 05/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1405 Reconstruction 0-003-018 07/29/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0983 Reconstruction 0-003-019 10/02/02 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1528 Reconstruction 0-003-020 11/28/01 *CO No.* Amount Disallowed Received Approved Contractor
GC-2 6,820 12/13/04 / / Westbank Contracting
06-0077 Reconstruction 0-003-022 10/26/06 *CO No.* Amount Disallowed Received Approved Contractor
001 -3,655 02/05/09 08/21/09 FRAN CORP. DBA ALL BRIGHT ELECTRIC
001 -5,000 02/05/09 08/21/09 C.B. STRAIN & SON, INC.
HV-2 12,655 03/20/08 04/04/08 Unity Mechanical Corp.
Administration Bldg.:
01-0984 Reconstruction 1-002-005 10/02/02 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0791 Reconstruction 1-002-007 02/21/97 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1637 Reconstruction 1-002-008 08/29/97 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1285 Reconstruction 1-002-009 05/18/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1529 Reconstruction 1-002-010 11/28/01 *CO No.* Amount Disallowed Received Approved Contractor
GC-01 5,142 5,142 09/13/04 10/26/04 Westbank Contracting
Education & Training Academy:
00-1530 Reconstruction 8-014-008 11/28/01 *CO No.* Amount Disallowed Received Approved Contractor
1-GC 4,402 01/17/03 02/06/03 Profex
2-EC 8,831 01/17/03 02/06/03 P&D Elec.
2-GC 1,404 09/05/03 09/19/03 Profex
4-EC 2,687 01/17/03 02/06/03 P&D Elec.