Construction Project Status

Change Order Status

THE STATE EDUCATION DEPARTMENT

OFFICE OF FACILITIES PLANNING


UPDATED: 07/25/08 at 09:22:36




BEACON CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-02-00-01
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          High School:
90-1494   Reconstruction               0-001-007  06/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1458   Reconstruction               0-001-008  06/23/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0102   Reconstruction               0-001-009  08/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1448   Reconstruction               0-001-010  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0881   Reconstruction               0-001-011  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0727   Reconstruction               0-001-012  02/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0272SC Visual Structural Inspection 0-001-SC1  09/18/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          James Forrestal School:
92-0600   Reconstruction               0-002-005  02/26/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1603   Reconstruction               0-002-006  06/27/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0882   Reconstruction               0-002-008  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0728   Reconstruction               0-002-009  02/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0979   Reconstruction               0-002-010  05/09/96  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0629   Reconstruction               0-002-011  04/06/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            A & B          11,147                  01/09/01   02/06/02    Millers Minuteman Const.            
 
05-0495   Alterations                  0-002-012  05/08/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -2,217                  02/27/08     /  /      C.B strain & son                    
 
07-0761   Reconstruction               0-002-013  04/28/08  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0899SC Visual Structural Inspection 0-002-SC1  03/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          South Ave. School:
90-1495   Reconstruction               0-003-003  06/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1459   Reconstruction               0-003-004  06/23/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1449   Reconstruction               0-003-005  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0883   Reconstruction               0-003-006  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0729   Reconstruction               0-003-007  02/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0496   Alterations                  0-003-008  05/08/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              -3,447                  02/06/08   03/19/08    C.B. Strain & Son                   
 
07-0762   Reconstruction               0-003-009  04/28/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Rombout Junior High School:
90-1496   Reconstruction               0-004-003  06/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1604   Reconstruction               0-004-004  06/27/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0103   Reconstruction               0-004-005  08/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0884   Reconstruction               0-004-007  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0730   Reconstruction               0-004-008  02/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0980   Reconstruction               0-004-009  05/09/96  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1035   Additions and Alterations    0-004-010  05/17/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,283                  12/05/05     /  /      Environmental Remediation Service   
                                                            1              28,260                  12/21/05   10/05/06    Arris Contracting Co                
                                                            1               6,796                  02/23/06   04/20/06    P and D Electric                    
                                                            1               7,525                  07/05/06   07/13/06    Frank Lindy Plumbing                
                                                            1              11,000                  04/27/06   07/24/06    DeRosa Tennis Contracting           
                                                            1-REVI          6,796                  08/30/07   09/06/07    P & D ELECTRIC OF HUDSON VALLEY     
                                                            2              -5,000                  07/21/06   07/24/06    DeRosa Tennis Contractors           
                                                            2              32,585                  11/15/06   01/09/07    Sun Up Enterprises                  
                                                            2              -3,558                  05/10/07   05/16/07    Frank Lindy Plumbing                
                                                            3              13,900                  12/01/06   12/27/06    Sun Up Enterprises                  
                                                            7               3,250                  11/16/06   01/09/07    Arris Contracting                   
 
07-0763   Reconstruction               0-004-011  04/28/08  NO CHANGE ORDERS ON ELECTRONIC FILE
00-2000SC Visual Structural Inspection 0-004-SC1  06/29/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Glenham Elementary School:
90-1236   Reconstruction               0-006-007  04/24/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1450   Reconstruction               0-006-008  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0885   Reconstruction               0-006-009  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0731   Reconstruction               0-006-010  02/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0545   Additions and Alterations    0-006-011  12/31/97  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0497   Alterations                  0-006-013  05/08/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             -17,200                  05/10/07   09/11/07    Suburban Restoration                
                                                            3              -2,100                  05/10/07   05/16/07    CB Strain and Son                   
 
07-0764   Reconstruction               0-006-014  04/28/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Sargent Elementary School:
92-1460   Reconstruction               0-008-006  06/23/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1451   Reconstruction               0-008-007  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0886   Reconstruction               0-008-008  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0732   Reconstruction               0-008-009  02/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0546   Alterations                  0-008-010  12/31/97  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0498   Additions and Alterations    0-008-011  05/08/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2              15,525                  05/10/07   05/16/07    Suburban Restoration                
                                                            2                -420                  02/06/08     /  /      C.B. Strain & Son                   
                                                            3               8,925                  02/27/08     /  /      C.B strain & son                    
 
07-0765   Reconstruction               0-008-012  04/28/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Astor Day Care:
90-1497   Reconstruction               0-009-002  06/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          New High School:
99-0897   New Construction             0-020-001  05/04/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1             197,009                  03/22/02   05/06/02    Roehrs Const.                       
                                                            1              18,800                  08/05/02   08/16/02    F&D Sprinklers                      
                                                            1              -1,046                  09/10/02   01/08/03    Commercial Appliance                
                                                            1               1,932                  11/08/02   01/08/03    Nickerson                           
                                                            1              -5,188                  03/18/03   03/20/03    Adirondack Cabling                  
                                                            1                -822                  03/19/03   03/24/03    BMI  Supply                         
                                                            1             -13,364                  08/06/04   09/09/04    Northeast Interior Systems          
                                                            10             18,926                  03/07/02   04/05/02    UW Marx                             
                                                            11             19,378                  02/11/02   03/22/02    UW Marx                             
                                                            12             12,837                  02/11/02   03/22/02    UW Marx                             
                                                            13             18,197                  03/22/02   05/06/02    UW Marx                             
                                                            14             11,504                  03/22/02   05/06/02    UW Marx                             
                                                            15             53,159                  09/10/02   01/08/03    UW Marx                             
                                                            16             33,946                  03/19/03     /  /      UW Marx                             
                                                            17             18,618                  03/19/03   03/24/03    UW Marx                             
                                                            18             21,212                  03/19/03   03/28/03    UW Marx                             
                                                            19R            22,313                  05/13/03   05/23/03    UW Marx                             
                                                            2             -54,150                  01/29/01   01/14/03    P&D Elec.                           
                                                            2              -2,268                  06/19/03   07/11/03    CB Strain & Son                     
                                                            2             -36,227                  06/19/03   07/11/03    CB Strain & Son                     
                                                            2              -5,789                  08/06/04   09/09/04    Nickerson Corp                      
                                                            2             -10,153                  08/06/04   09/09/04    Coomercial Appliance Contracts      
                                                            3              -8,946                  08/06/04   09/09/04    Sucato Building                     
                                                            3-R            -6,747                  10/06/03   12/05/03    CB Strain & Son                     
                                                            4               4,620                  01/18/02   03/22/02    P&D Elec.                           
                                                            4             -21,264                  04/23/04   04/28/04    CB Strain & Sons                    
                                                            5              36,470                  02/27/02   05/06/02    P&D Elec.                           
                                                            6              13,067                  02/27/02   05/06/02    P&D Elec.                           
                                                            7              23,915                  05/05/03   05/07/03    P&D Elec.                           
                                                            8               9,900                  08/21/01   01/09/02    UW Marx                             
                                                            8               6,999                  03/19/03   03/24/03    P&D Elec.                           
                                                            9              88,882                  01/28/02   06/21/05    UW Marx                             
 
05-0499   Alterations                  0-020-002  05/08/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              21,750                  11/15/06   01/09/07    Sun Up Enterprises                  
                                                            2               1,550                  02/27/08     /  /      C.B strain & son                    
                                                            4              -1,000                  01/12/07   01/30/07    Sun Up Enterprises                  
 
07-0766   Reconstruction               0-020-003  04/28/08  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0373SC Visual Structural Inspection 0-020-SC1  10/02/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Building:
94-1452   Reconstruction               1-005-001  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0733   Reconstruction               1-005-002  02/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0887   Reconstruction               1-005-003  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0981   Reconstruction               1-005-004  05/09/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Materials Storage Shed-Maintenance:
95-0888   New Construction             2-019-001  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Maintenance Garage:
94-1453   Reconstruction               3-011-001  05/24/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0734   Reconstruction               3-011-002  02/16/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0889   Reconstruction               3-011-003  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Storage Facility:
95-1677   New Construction             4-020-001  06/12/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            4              80,830                  06/14/01   01/10/02    UW Marx, Inc.                       
 

          New Bus Maintenance/Storage:
95-1150   Additions and Alterations    5-018-001  06/12/96  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0700   Reconstruction               5-018-L01  06/11/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Press Box:
04-1459   New Construction             7-023-001  09/02/05  NO CHANGE ORDERS ON ELECTRONIC FILE





DOVER UFSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-05-02-02
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Dover Middle/High School:
91-1598   Reconstruction               0-001-004  07/17/92  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0688   Additions and Alterations    0-001-005  05/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0010   Reconstruction               0-001-006  07/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1173   Reconstruction               0-001-007  05/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HVAC-02        -1,000                  07/16/02   07/23/02    Dutchess Mech.                      
 
02-2450   Reconstruction               0-001-008  08/29/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               5,125                  09/02/04   09/07/04    American Petroleum Equipment Const  
 
05-0181   Reconstruction               0-001-009  01/30/06  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1277   Reconstruction               0-001-010  02/15/07  NO CHANGE ORDERS ON ELECTRONIC FILE
06-1084   Reconstruction               0-001-011  03/09/07  NO CHANGE ORDERS ON ELECTRONIC FILE
07-1529   Reconstruction               0-001-012  04/18/08  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1477FP Reconstruction               0-001-FP1  05/06/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Wingdale Elementary:
93-1712   Reconstruction               0-003-002  08/05/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1172   Reconstruction               0-003-003  05/29/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            2                 265                  12/20/01     /  /      Arris Contracting                   
                                                            EC-04             438                  10/31/01   01/08/02    Canale Elec.                        
                                                            FC-01           2,250                  11/27/01   01/08/02    J. Herbert                          
                                                            FC-02           5,200                  11/27/01   01/08/02    J. Herbert                          
                                                            GC-05             264                  12/20/01   03/21/02    Arris Contracting                   
                                                            HVAC-03        13,831                  10/22/02   10/28/02    Dutchess Mech.                      
                                                            SC-10          -4,100                  12/20/01   03/21/02    Sun Up Ent.                         
                                                            SC-11          -3,532                  10/22/02   10/28/02    Sun Up Ent.                         
 
07-1530   Reconstruction               0-003-004  04/18/08  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1478FP Reconstruction               0-003-FP1  05/07/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Dover Elem. School:
95-0689   Additions and Alterations    0-004-006  05/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1575   Reconstruction               0-004-007  07/15/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               1,137                  12/20/04   12/29/04    American Petroleum                  
 

          High School Garage:
95-0690   Additions and Alterations    4-005-001  05/06/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Athletic Bldg. / Bleachers:
05-1278   New Construction             7-009-001  02/15/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          concession stand@ms/hs:
05-1279   New Construction             7-010-001  02/15/07  NO CHANGE ORDERS ON ELECTRONIC FILE





HYDE PARK CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-08-01-06
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Haviland Middle School(JrHigh):
90-0715   Reconstruction               0-001-003  01/24/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0392   Reconstruction               0-001-004  12/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0369   Reconstruction               0-001-005  11/12/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0586   Reconstruction               0-001-006  02/28/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1579   Reconstruction               0-001-008  06/20/95  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1698   Reconstruction               0-001-009  07/27/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1220   Reconstruction               0-001-010  05/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0169   Reconstruction               0-001-011  03/24/03  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1741   Reconstruction               0-001-012  05/12/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1484   Reconstruction               0-001-013  07/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1125   Reconstruction               0-001-014  01/31/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         -13,500                  07/02/07   07/17/07    Ashley Mechanical                   
                                                            00001           4,903                  07/02/07   07/17/07    JC Millbank Construction            
                                                            00002           4,000                  07/02/07   07/17/07    JC Millbank Construction            
                                                            00003          13,977                  07/02/07   07/17/07    JC Millbank Construction            
                                                            00003           5,312                  07/02/07   07/17/07    Suburban Restoration                
                                                            00004           5,312                  07/02/07   07/17/07    Suburban Restoration                
                                                            00011          12,000                  07/02/07   07/17/07    Suburban Restoration                
                                                            00012          12,000                  07/02/07   07/17/07    Suburban Restoration                
                                                            00016          17,000                  07/02/07   07/17/07    Suburban Restoration                
                                                            00017           3,120                  07/02/07   07/17/07    Suburban Restoration                
                                                            00020           6,600                  07/02/07   07/17/07    Suburban Restoration                
 
04-1244   Reconstruction               0-001-016  06/24/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00003           3,062                  05/04/06   03/15/07    Dutchess mechancial                 
                                                            00004          16,240                  01/26/06   08/21/06    NAC Industries                      
                                                            0002            6,125                  05/04/06   03/15/07    Dutchess Mechanical                 
                                                            EC-02           3,265                  01/26/07   03/14/07    Pantel Contracting                  
                                                            SC-05           3,300                  11/03/06   12/28/06    NAC Industries                      
 
05-0017   Reconstruction               0-001-017  08/23/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RC-01           8,800                  02/05/07   03/09/07    Best Roofing of New Jersey          
 
05-0468   Reconstruction               0-001-018  04/06/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00003          -3,630                  01/29/08   03/19/08    meyer contracting                   
                                                            1A-01          17,100                  10/10/06   12/18/06    Foremost Development                
                                                            1A-02          17,100                  10/10/06   12/18/06    Foremost Development                
                                                            1A-03          17,100                  10/10/06   12/18/06    Foremost Development                
                                                            1A-04          17,100                  10/10/06   12/18/06    Foremost Development                
                                                            2-05            4,448                  11/02/06   12/18/06    William Manfredi Construction       
                                                            EC2-01          8,701                  09/12/06   10/30/06    Canale Electric                     
                                                            EC2-04            540                  01/31/07     /  /      Canale Electric                     
                                                            EC2-05          2,211                  01/31/07   02/22/07    Canale Electric                     
                                                            EC2-06          8,265                  01/31/07   02/22/07    Canale Electric                     
                                                            EC2-07          8,190                  01/31/07   02/22/07    Canale Electric                     
                                                            EC2-09         -4,350                  03/12/07   04/06/07    Canale Electric                     
                                                            EC2-10         17,680                  06/11/07   08/01/07    Canale electric                     
                                                            G2-04           3,128                  09/21/06   10/30/06    William Manfredi Construction       
                                                            GC-2-08         4,725                  12/05/07   01/07/08    WILLIAM MANFREDI,SR                 
                                                            GC2-02         31,640                  09/12/06   10/30/06    William Fredi                       
                                                            GC2-07           -380                  01/16/07   02/09/07    William Mandredi                    
                                                            HC-02           4,505                  09/21/06   01/09/07    General Mechanical Systems          
                                                            HC-03          26,958                  12/21/06   01/12/07    General Mechanical                  
                                                            HC-04           1,798                  12/05/07   01/07/08    GENERAL MECHANICAL SYSTEMS,INC      
                                                            Pc1-06            483                  01/16/07   01/24/07    General Mechanical                  
                                                            Sc-10           1,505                  01/16/07   02/09/07    Ben Ciccone Inc                     
 
02-0649FP Reconstruction               0-001-FP1  12/18/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Roosevelt High School:
93-0393   Reconstruction               0-002-005  12/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0384   Reconstruction               0-002-006  12/14/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0013   Reconstruction               0-002-009  07/17/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1221   Reconstruction               0-002-010  05/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0170   Reconstruction               0-002-011  03/24/03  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1742   Reconstruction               0-002-012  05/12/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1485   Reconstruction               0-002-013  07/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1245   Reconstruction               0-002-015  06/24/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01           3,086                  11/03/06   12/28/06    Pantel Contracting                  
 
05-0469   Reconstruction               0-002-016  04/06/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00004          -2,200                  01/29/08   03/19/08    meyer contracting                   
                                                            00005          -6,960                  01/29/08   04/02/08    meyer contracting                   
                                                            00007            -200                  01/29/08   04/02/08    meyer contracting                   
                                                            EC3-02         15,770                  09/12/06   01/09/07    Canale ELectric                     
                                                            EC3-03          2,206                  09/12/06   12/18/06    Canale electric                     
                                                            EC3-06          9,363                  01/31/07   02/22/07    Canale Electric                     
                                                            GC3-02          4,938                  09/12/06   10/30/06    William manfredi Construction       
                                                            GC3-07          9,294                  06/11/07   06/20/07    William manfredi Construction       
                                                            Gc3-06           -240                  01/16/07   02/09/07    William Manfredi                    
                                                            HC-01           1,142                  09/12/06   12/18/06    General mechanical Systems          
                                                            Pc1-07          1,966                  01/16/07   01/24/07    General Mechanical                  
                                                            SC-07           6,363                  10/18/06   12/18/06    Ben Ciccone                         
                                                            SC-08             820                  10/18/06   12/18/06    Ben Ciccone                         
 
05-0254   Reconstruction               0-002-017  10/11/05  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0650FP Reconstruction               0-002-FP1  12/18/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Ralph R. Smith Elementary:
91-0784   Reconstruction               0-003-003  02/28/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0394   Reconstruction               0-003-004  12/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0440   Reconstruction               0-003-005  12/16/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0543   Reconstruction               0-003-006  01/31/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1715   Reconstruction               0-003-008  07/10/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1699   Reconstruction               0-003-009  07/27/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1222   Reconstruction               0-003-010  05/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0171   Reconstruction               0-003-011  03/24/03  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1486   Reconstruction               0-003-012  07/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1246   Reconstruction               0-003-014  06/24/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -3,987                  05/04/06   06/02/06    Ashley Mechanical                   
                                                            0004            3,062                  05/04/06   11/22/06    Dutchess mechanical                 
                                                            SC-06           2,500                  11/03/06   01/09/07    NAC Industries                      
 
05-0470   Reconstruction               0-003-015  04/06/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001             120                  01/29/08   04/02/08    meyer contracting                   
                                                            00003          -7,725                  01/29/08   03/07/08    S & O construction                  
                                                            00004          15,778                  01/29/08     /  /      S & O construction                  
                                                            00005          20,000                  01/29/08     /  /      wayne l kurlander                   
                                                            00005         -20,000                  01/29/08   03/07/08    S & O CONSTRUCTION SERVICES         
                                                            00006         -15,109                  02/20/08   03/06/08    S&O construction                    
                                                            00006            -700                  01/29/08   04/02/08    meyer contracting                   
                                                            00008            -626                  02/04/08   03/08/08    CANALE ELECTRIC CORP.ctirc          
                                                            0009           -2,111                  01/18/08   01/28/08    CANALE ELECTRIC CORP                
                                                            1-03           17,312                  12/21/06     /  /      General mechanical                  
                                                            3-04           -3,000                  10/10/06   12/18/06    William Manfredi                    
                                                            3-05            4,171                  11/02/06   12/18/06    William Manfredi                    
                                                            EC-3-08          -627                  01/07/08   01/09/08    Canale Electric Corp                
                                                            EC3-01        -12,344                  09/12/06   01/19/07    Canale Electric                     
                                                            EC3-04          2,403                  09/21/06     /  /      Canale Electric                     
                                                            EC3-05          1,105                  01/31/07   02/22/07    Canale Electric                     
                                                            EC3-07          2,581                  01/31/07     /  /      Canale Electric                     
                                                            GC3-01       -126,551                  09/12/06   10/30/06    William manfredi Construction       
                                                            Gc3-03            978                  09/21/06   10/30/06    William Mechanical                  
                                                            PC-1-09         2,000                  02/04/08   03/08/08    GENERAL MECHANICAL SYSTEMS, INC.    
 

          Violet Avenue Elementary:
92-0383   Reconstruction               0-004-004  11/06/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0395   Reconstruction               0-004-005  12/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1700   Reconstruction               0-004-007  07/27/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1223   Reconstruction               0-004-008  05/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1743   Reconstruction               0-004-009  05/12/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1487   Reconstruction               0-004-010  07/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0172   Reconstruction               0-004-011  03/24/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0444   Reconstruction               0-004-012  03/10/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         -13,500                  06/19/07   10/26/07    Ashley mechanical                   
                                                            00002           8,165                  06/19/07     /  /      Ashley Mechanical                   
                                                            00002           8,165                  07/02/07   10/28/07    Ashley Mechanical                   
                                                            00003          -4,530                  06/19/07     /  /      Ashley Mechanical                   
                                                            00003          -4,530                  07/02/07   10/29/07    Ashley Mechanical                   
                                                            00005           5,312                  07/02/07   07/17/07    Suburban Restoration                
                                                            00006           5,312                  07/02/07   07/17/07    Suburban Restoration Co             
                                                            00007           5,312                  07/02/07   07/17/07    Suburban Restoration                
                                                            00008           5,312                  07/02/07   07/17/07    Suburban restoration                
                                                            00010           6,000                  07/02/07   07/17/07    Suburban Restoration                
                                                            00013          12,000                  07/02/07   07/17/07    Suburban Restoration                
                                                            00014          12,000                  07/02/07   07/17/07    Suburban Restoration Co             
                                                            00015          12,000                  07/02/07   07/17/07    Suburban Restoration                
                                                            00018          11,637                  07/02/07   07/17/07    Suburban Restoration                
                                                            00019          19,800                  07/02/07   07/17/07    Suburban Restoration Co             
 
04-1247   Reconstruction               0-004-013  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0471   Reconstruction               0-004-014  04/06/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00011            -186                  02/04/08   03/08/08    CANALE ELECTRIC CORP.               
                                                            2-06             -565                  11/02/06   12/18/06    William Manfredi                    
                                                            EC-2-11          -186                  01/07/08   01/09/08    Canale Electric Corp.               
                                                            EC2-02          6,809                  09/12/06   01/09/07    Canale Electric                     
                                                            EC2-03           -398                  09/12/06   12/18/06    Canale Electric                     
                                                            EC2-08          5,915                  01/31/07   02/22/07    Canale Electric                     
                                                            GC2-01        -19,303                  09/12/06   10/30/06    William manfredi                    
                                                            GC2-03         -6,106                  09/12/06   10/30/06    William manfredi Construction       
                                                            PC1-01           -724                  09/12/06   12/18/06    General Mechanical Systems          
                                                            SC-04          -1,156                  09/21/06   10/30/06    Ben Ciccone Inc                     
 

          Hyde Park Elementary:
90-1330   Reconstruction               0-005-005  05/08/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0785   Reconstruction               0-005-006  02/28/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1489   Reconstruction               0-005-007  07/06/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0396   Reconstruction               0-005-008  12/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0014   Reconstruction               0-005-010  07/17/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1224   Reconstruction               0-005-011  05/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1744   Reconstruction               0-005-012  05/12/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1162   Reconstruction               0-005-013  03/16/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1488   Reconstruction               0-005-014  07/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0173   Reconstruction               0-005-015  03/24/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0445   Reconstruction               0-005-016  03/10/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001           5,312                  07/02/07   07/17/07    suburban Restoration                
                                                            00002           5,312                  07/02/07   07/17/07    Suburban Restoration                
                                                            00009          16,500                  07/02/07   07/17/07    Suburban Restoration                
 
04-0737   Reconstruction               0-005-017  02/03/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001          -3,000                  05/04/06   05/24/06    Arris Contracting Co                
 
04-1248   Reconstruction               0-005-018  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0472   Reconstruction               0-005-019  04/06/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00002             563                  01/29/08   04/02/08    meyer contracting                   
                                                            1-03           55,000                  10/10/06   12/18/06    Cali Brothers                       
                                                            1-04            5,964                  12/21/06   01/12/07    General Mechanical                  
                                                            1-05            7,592                  12/21/06   01/12/07    General mechanical                  
                                                            1-06            5,020                  10/10/06   12/18/06    Cali Brothers                       
                                                            EC-1            1,593                  12/05/07   01/07/08    PANTEL CONTRACTING CORP             
                                                            EC1-04         28,979                  01/31/07   02/22/07    Pantel Contracting                  
                                                            EC1-05         21,288                  01/31/07   02/22/07    Pantel Contracting                  
                                                            GC1-02          3,970                  01/16/07   02/09/07    Cali Brothers                       
                                                            GC1-04          2,845                  01/16/07   02/09/07    Cali Brothers                       
                                                            GC1-05          3,410                  01/16/07   02/09/07    Cali Brothers                       
                                                            GC1-11           -578                  01/16/06   02/09/07    Cali Brothers                       
                                                            PC1-02         10,700                  11/02/06     /  /      General mechanical                  
                                                            SC-02           2,969                  09/21/06   10/30/06    Ben Ciccone                         
                                                            SC-05           8,890                  09/21/06   10/30/06    Ben Ciccone                         
                                                            SC-06           8,461                  09/21/06   10/30/06    Ben Ciccone                         
 

          Netherwood Elementary School:
93-0397   Reconstruction               0-007-004  12/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0015   Reconstruction               0-007-006  07/17/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0102   Reconstruction               0-007-007  07/29/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0741   Reconstruction               0-007-008  02/10/97  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1716   Reconstruction               0-007-009  07/10/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1701   Reconstruction               0-007-010  07/27/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1225   Reconstruction               0-007-011  05/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0174   Reconstruction               0-007-012  03/24/03  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1489   Reconstruction               0-007-013  07/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1249   Reconstruction               0-007-014  06/24/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0473   Reconstruction               0-007-015  04/06/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-07           21,890                  10/10/06   12/18/06    Cali Brothers                       
                                                            EC-1         -154,690                  11/02/06   12/18/06    Pantel Contracting                  
                                                            EC1-03         41,021                  12/21/06   01/30/07    Pantel Contracting                  
                                                            EC1-06         -1,598                  01/31/07   02/22/07    Pantel Contracting                  
                                                            GC1-01       -129,600                  09/12/06   10/30/06    Cali Brothers                       
                                                            GC1-09           -528                  01/16/07   02/09/07    Cali Brothers                       
                                                            Gc1-15            925                  01/16/07   02/09/07    Cali brothers                       
                                                            PC-2-02        13,200                  10/10/06   10/19/06    CB Strain sons                      
                                                            PC-2-03        -7,138                  12/05/07   01/07/08    C.B STRAIN & SONS,INC               
                                                            PC1-08          2,115                  01/16/07   01/24/07    General Mechanical Systems          
                                                            PC2-01         -6,000                  09/12/06   10/30/06    Cb Strain and Sons                  
                                                            SC-01         -10,845                  09/12/06   10/30/06    Ben Ciccone                         
                                                            SC-03           2,721                  09/21/06   10/30/06    Ben Ciccone Inc                     
                                                            SC-09           3,183                  10/18/06   12/18/06    Ben Ciccone                         
                                                            SC-13          34,864                  01/16/07   03/13/07    Ben Ciccone Inc                     
                                                            SC-14          39,868                  01/16/07   03/13/07    Ben Ciccone Inc                     
                                                            Sc-11           4,105                  01/16/07   02/09/07    Ben Ciccone                         
                                                            Sc-12           3,181                  01/16/07   02/09/07    Ben Ciccone                         
 
02-0648FP Reconstruction               0-007-FP1  12/18/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          North Park Elementary School:
91-0886   Reconstruction               0-013-004  03/23/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0398   Reconstruction               0-013-005  12/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-1580   Reconstruction               0-013-007  06/20/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0016   Reconstruction               0-013-008  07/17/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1226   Reconstruction               0-013-010  05/19/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0175   Reconstruction               0-013-011  03/24/03  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1745   Reconstruction               0-013-012  05/12/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1490   Reconstruction               0-013-013  07/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1250   Reconstruction               0-013-015  06/24/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-08           17,440                  10/10/06   12/18/06    Cali Brothers Inc                   
 
05-0474   Reconstruction               0-013-016  04/06/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1-02        11,070                  11/02/06   12/18/06    Pantel Contracting                  
                                                            GC1-10           -553                  01/16/07   03/13/07    Cali Brothers                       
                                                            GC1-12          5,848                  01/16/07   02/09/07    Cali brothers                       
                                                            GC1-13          2,500                  01/16/07   02/09/07    Cali Brothers                       
                                                            Gc1-14          1,790                  01/16/07   02/09/07    Cali Brothers                       
 

          Bus Garage:
93-0399   Reconstruction               4-006-003  12/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1527   Reconstruction               4-006-005  05/15/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1491   Reconstruction               4-006-006  07/17/02  NO CHANGE ORDERS ON ELECTRONIC FILE





NORTHEAST (WEBUTUCK) CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-11-01-04
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Millerton Elementary School:
92-1323   Reconstruction               0-001-005  06/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1239   Reconstruction               0-001-006  08/14/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00006         -74,786                  11/04/04   06/14/05    Kingsley Arms                       
                                                            00006         -37,530                  11/04/04   06/14/05    Rok-Built Const.                    
 
05-0131   Reconstruction               0-001-007  08/30/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Webutuck Jr/Sr High School:
90-1580   Reconstruction               0-002-007  06/20/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1324   Reconstruction               0-002-008  06/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1479   Reconstruction               0-002-009  06/28/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1240   Additions and Alterations    0-002-011  08/14/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00001         135,000                  04/15/02   04/29/02    Kingsley Arms                       
                                                            00001          42,000                  04/01/02   05/01/02    Rok-Built Const.                    
                                                            00001           3,396                  11/04/04   11/05/04    CB Strain & Son                     
                                                            00001          28,519                  11/04/04   06/14/05    Rondout Elec.                       
                                                            00002          11,931                  04/15/02   04/29/02    Rok-Built Const.                    
                                                            00002         -18,476                  11/04/04   11/05/04    CB Strain & Son                     
                                                            00002          63,336                  11/04/04   07/25/05    Kingsley Arms                       
                                                            00002          -2,030                  11/04/04   11/05/04    Rondout Elec.                       
                                                            00002          63,336                  06/06/05   07/25/05    Kingsley Arms Inc.                  
                                                            00003          57,466                  11/04/04   06/14/05    Rok-Built Const.                    
                                                            00003          18,166                  11/04/04   11/05/04    Rondout Elec.                       
                                                            00003           6,838                  11/04/04   11/05/04    CB Strain & Son                     
                                                            00003          -1,238                  11/04/04   11/05/04    CB Strain & Son                     
                                                            00003          -5,781                  11/04/04   11/05/04    CB Strain & Son                     
                                                            00003         110,880                  11/04/04   07/25/05    Kingsley Arms                       
                                                            00004               0                  11/04/04   11/05/04    Rok-Built Const.                    
                                                            00004          28,889                  11/04/04   07/25/05    Kingsley Arms                       
                                                            00004         111,108                  06/06/05   07/25/05    Kingsley Arms Inc.                  
                                                            00004           7,288                  06/22/05   08/13/07    CB Strain& Son, Inc.                
                                                            00005          58,267                  11/04/04   07/25/05    Kingsley Arms                       
                                                            00005          -1,020                  11/04/04   11/05/04    Rok-Built Const.                    
                                                            00005          94,481                  06/06/05   07/25/05    Kingsley Arms Inc.                  
                                                            00006         -17,206                  11/04/04   06/06/05    Kingsley Arms                       
                                                            00006         -91,993                  06/06/05   07/25/05    Kingsley Arms Inc.                  
                                                            00007         -15,719                  11/04/04   11/05/04    Rok-Built Const.                    
                                                            00007         -41,946                  11/04/04   11/05/04    Kingsley Arms                       
 
03-1197   Reconstruction               0-002-012  07/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-05           2,125                  04/14/08     /  /      SAUSTO CONTRACTING, INC.            
                                                            GC-004         28,550                  12/08/05   06/06/06    CONSTRUCTION SERVICES, LLC          
                                                            GC-004        -33,978                  03/23/07   05/16/07    Construction Services               
                                                            GC-005         -2,645                  12/08/05   06/06/06    CONSTRUCTION SERVICES, LLC.         
                                                            GC-006         -7,230                  12/08/05   06/06/06    CONSTRUCTION SERVICES, LLC.         
                                                            PC-02          -2,865                  12/08/05   05/24/06    DUTCHESS MECHANICAL, INC.           
 

          Amenia Elementary School:
92-1325   Reconstruction               0-003-009  06/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1241   Reconstruction               0-003-011  08/14/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00004          58,382                  11/04/04   06/28/05    Kingsley Arms                       
                                                            00005          10,202                  11/04/04     /  /      Kingsley Arms                       
                                                            00005          94,481                  06/06/05   07/25/05    Kingsley Arms Inc.                  
 
03-1198   Reconstruction               0-003-012  07/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01         -11,007                  04/14/08     /  /      SAUSTO CONTRACTING, INC.            
                                                            GC-001         -1,939                  12/08/05   06/06/06    CONSTRUCTION SERVICES, LLC.         
                                                            GC-002        -12,978                  12/08/05   07/13/06    CONSTRUCTION SERVICES, LLC.         
                                                            HC-01           1,370                  12/08/05   05/24/06    ASHLEY MECHANICAL, INC.             
                                                            HC-02           3,665                  12/08/05   05/24/06    ASHELEY MECHANICAL, INC.            
                                                            HC-03          12,445                  12/08/05   05/24/06    ASHLEY MECHANICAL, INC.             
                                                            PC-01         -23,086                  12/08/05   05/24/06    DUTCHESS MECHANICAL, INC.           
                                                            PC-03            -211                  01/22/07   08/15/07    Dutchess Mechanical                 
 

          Webutuck Elementary School:
92-1326   Reconstruction               0-004-007  06/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1242   Additions and Alterations    0-004-010  08/14/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            00004          23,837                  11/04/04   01/04/05    Kingsley Arms                       
                                                            00005          26,012                  11/04/04   07/25/05    Kingsley Arms                       
 
03-1196   Reconstruction               0-004-011  07/01/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-02             564                  04/14/08     /  /      SAUSTO CONTRACTING INC.             
                                                            GC-003         -3,864                  12/08/05   06/06/06    CONSTRUCTION SERVICES, LLC          
                                                            GC-007         11,132                  12/08/05   06/06/06    CONSTRUCTION SERVICES               
                                                            GC-08           2,143                  02/26/07     /  /      Construction Services               
 

          Bus Garage:
93-1482   Additions and Alterations    5-006-003  06/28/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0998   Reconstruction               5-006-004  04/09/97  NO CHANGE ORDERS ON ELECTRONIC FILE





PAWLING CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-12-01-04
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Pawling Elementary School:
90-0503   Reconstruction               0-001-006  01/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0623   Reconstruction               0-001-007  01/28/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1866   Reconstruction               0-001-008  08/02/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1325   Additions and Alterations    0-001-009  07/12/94  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0002   Reconstruction               0-001-010  07/29/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0003   Reconstruction               0-001-011  07/29/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0659   Reconstruction               0-001-013  03/04/99  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0689   Reconstruction               0-001-014  02/04/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0063   Reconstruction               0-001-015  03/29/06  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0778   Reconstruction               0-001-017  03/09/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             5,750                  12/03/07   12/12/07    Leed Industries                     
                                                            002            17,876                  12/03/07   12/12/07    Leed Industries Corp                
                                                            003             1,800                  01/11/08   01/15/08    Leed Industries                     
                                                            004             4,160                  02/25/08   03/08/08    LEED INDUSTRIES CORP.               
 

          Junior Senior High School:
90-0504   Reconstruction               0-002-005  01/07/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0624   Reconstruction               0-002-006  01/28/91  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1282   Reconstruction               0-002-008  05/09/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0915   Reconstruction               0-002-009  03/30/99  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0103   Reconstruction               0-002-010  11/15/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               3,557                  06/13/03   06/13/03    William Manfredi Const.             
 
99-0894   Reconstruction               0-002-011  03/30/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            5              36,000                  12/09/02   12/10/02    CB Strain & Son                     
                                                            6                 754                  01/16/03   01/27/03    CB Strain & Son                     
                                                            7                 439                  01/16/03   01/27/03    CB Strain & Son                     
 
02-0662   Reconstruction               0-002-012  03/03/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1                -850                  03/03/04   04/07/04    Tech Elec.                          
                                                            2                 254                  03/03/04   03/05/04    Tech Elec.                          
                                                            3               1,213                  03/12/04   04/12/04    Tech Elec.                          
                                                            4                 790                  03/12/04   04/30/04    Tech Elec.                          
                                                            5                  50                  03/12/04   04/30/04    Tech Elec.                          
                                                            GC-1           -4,245                  03/03/04   03/17/04    Cali Brothers                       
                                                            GC-2           -1,000                  03/03/04   03/17/04    Cali Brothers                       
                                                            HVAC-1          2,478                  03/03/04     /  /      Southeast Mech.                     
                                                            HVAC-2          1,000                  03/03/04   03/11/04    Southeast Mech.                     
 
07-1616   Reconstruction               0-002-013  04/23/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Middle School:
99-0038   New Construction             0-006-001  11/15/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001             8,286                  06/13/03   06/13/03    CB Strain & Sons                    
                                                            005             4,900                  01/16/03   02/06/03    Huber Farms & Excavating            
                                                            007               708                  05/17/02   06/04/02    CB Strain & Sons                    
                                                            008             1,045                  05/17/02   06/04/02    CB Strain & Sons                    
                                                            015             3,246                  05/21/01   03/04/02    UW Marx                             
                                                            1-002          -2,500                  01/16/03   02/06/03    Huber Farms & Excavating            
                                                            1-003         -34,020                  01/16/03   02/06/03    Huber Farms & Excavating            
                                                            2CO-023         5,780                  06/13/03   06/13/03    UW Marx                             
                                                            2CO-028       -12,106                  06/13/03   06/13/03    UW Marx                             
                                                            2CO026          1,712                  09/24/02   10/30/02    UW Marx                             
                                                            2CO027            970                  09/24/02   10/30/02    UW Marx                             
                                                            2CO029          4,175                  09/24/02   10/30/02    UW Marx                             
                                                            2CO030          5,133                  09/24/02   10/30/02    UW Marx                             
                                                            2CO031         19,245                  09/24/02   10/30/02    UW Marx                             
                                                            4CO 002        26,900                  11/14/02   01/03/03    Telcar Group                        
                                                            CO1-001       -19,245                  06/13/03   06/13/03    Huber Farms & Excavating            
 
98-1480   Reconstruction               0-006-002  06/18/99  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            004               517                  06/13/02   06/17/02    Sun-Up Enterprises                  
 
07-0550   Reconstruction               0-006-003  10/19/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
07-1617   Reconstruction               3-003-003  04/23/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Leased Bus Garage:
05-0040   Reconstruction               5-009-L01  01/26/06  NO CHANGE ORDERS ON ELECTRONIC FILE





PINE PLAINS CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-13-01-04
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Seymour Smith School:
91-1518   Reconstruction               0-001-001  07/07/92  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0188   Reconstruction               0-001-002  10/21/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0544   Reconstruction               0-001-003  01/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1099   Reconstruction               0-001-004  06/05/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0591   Reconstruction               0-001-005  01/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1414   Reconstruction               0-001-006  05/01/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0435   Reconstruction               0-001-007  01/21/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1193   Reconstruction               0-001-008  05/18/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -1,992                  02/08/05   02/14/05    James Edgar roofing and sheet Metal 
 
07-0346   Reconstruction               0-001-012  09/12/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Cold Springs Elementary:
95-1100   Additions and Alterations    0-002-002  06/05/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0590   Reconstruction               0-002-003  01/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1066   Reconstruction               0-002-004  03/13/00  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1007   Reconstruction               0-002-005  06/03/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Stissing Mt Jr/Sr High School:
93-0545   Reconstruction               0-009-001  01/24/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1101   Reconstruction               0-009-002  06/05/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0592   Reconstruction               0-009-003  01/28/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0259   Additions and Alterations    0-009-004  02/21/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            1              -8,250                  02/27/02   05/06/02    David Christopher                   
                                                            1               6,475                  08/05/02   08/16/02    Netrix                              
                                                            1             -14,329                  10/17/02   11/07/02    Crisafulli Bros.                    
                                                            1              11,975                  05/02/03   05/07/03    Facilities Equipment and Services   
                                                            1               2,664                  05/05/03   05/07/03    Nickerson Corp.                     
                                                            1              -4,860                  11/14/03   12/22/03    Weisburgh Mech.                     
                                                            1               2,663                  05/28/04   06/09/04    J&J Sass Elec.                      
                                                            1             -22,355                  06/21/05   06/22/05    Delsignore Blacktop Paving          
                                                            2              -7,364                  06/06/02   08/15/02    David Christopher                   
                                                            2              -1,680                  10/09/02   10/30/02    Netrix                              
                                                            2              11,849                  01/08/03   02/12/03    Crisafulli Bros.                    
                                                            2             -13,365                  03/25/03   03/28/03    DelSignore Blacktop Paving          
                                                            2              11,515                  05/02/03   05/07/03    Facilities Equipment and Services   
                                                            2              23,500                  08/19/03   07/12/05    Nickerson Corp                      
                                                            2              -4,384                  05/28/04   06/09/04    J&J Sass Elec.                      
                                                            2-Revisd      -45,595                  09/27/05   10/14/05    Wesiburgh mechanical Electric       
                                                            3              -6,053                  06/19/02   08/15/02    David Christopher                   
                                                            3              -1,179                  07/14/03   07/24/03    Crisafulli Bros.                    
                                                            3               1,060                  09/18/03   07/12/05    Nickerson Corp.                     
                                                            3               4,400                  03/29/04   04/08/04    Facilities Equipment and Service    
                                                            4             -51,753                  06/12/06   12/12/06    David Christopher, Inc.             
                                                            5              -8,500                  05/23/06   12/12/06    David Christopher Inc               
 
01-0111   Reconstruction               0-009-007  08/02/01  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2316   Reconstruction               0-009-008  07/01/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1              27,200                  01/28/04   01/29/04    Frank Stevens & Sons Roofing        
                                                            2              -5,600                  01/28/04   01/29/04    Frank Stevens & Sons Roofing        
                                                            3              -4,918                  01/28/04   01/29/04    Frank Stevens & Sons Roofing        
                                                            4              -3,386                  01/28/04   01/29/04    Frank Stevens & Sons Roofing        
                                                            5              -1,446                  01/28/04   01/29/04    Frank Stevens & Sons Roofing        
                                                            6              -1,545                  01/28/04   01/29/04    Frank Stevens & Sons Roofing        
                                                            7              -1,086                  01/28/04   01/29/04    Frank Stevens & Sons Roofing        
                                                            8              -9,020                  01/28/04   01/29/04    Frank Stevens & Sons Roofing        
 
06-1355   Reconstruction               0-009-009  09/05/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            HC-01           1,145                  05/06/08     /  /      HARKINS MECHANICAL & CONSTRUCTION   
 

          Storage Shed:
06-1356   New Construction             2-011-001  09/05/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
92-1492   Reconstruction               5-004-001  07/29/93  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0117   Reconstruction               5-004-002  09/18/98  NO CHANGE ORDERS ON ELECTRONIC FILE

          Press Box:
06-1357   New Construction             7-010-001  09/05/07  NO CHANGE ORDERS ON ELECTRONIC FILE





POUGHKEEPSIE CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-15-00-01
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Columbus School #3:
90-1124   Reconstruction               0-001-001  04/03/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1412   Reconstruction               0-001-002  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0855   Reconstruction               0-001-003  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0943   Reconstruction               0-001-004  04/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0987   Reconstruction               0-001-006  05/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0819   Reconstruction               0-001-008  06/05/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-001         5,094                  12/04/03   03/15/04    Sun Up Enterprises                  
                                                            001-002        19,300                  12/04/03   03/15/04    Sun Up Enterprises                  
                                                            001-003       -28,502                  12/04/03   03/15/04    Sun Up Enterprises                  
                                                            001-006         1,711                  04/30/04   05/11/04    Sun Up Enterprises                  
                                                            002-003        -1,186                  04/12/04   04/16/04    Meyer Contracting                   
                                                            002-004         3,000                  04/12/04     /  /      Meyer Contracting                   
                                                            002-007           436                  06/17/04   06/28/04    Meyer Contracting                   
                                                            004-002         1,047                  04/06/04   04/28/04    Palombo Group                       
 
03-0301   Reconstruction               0-001-009  03/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            003-002        -5,236                  12/13/04     /  /      Weather Guard Roofing               
                                                            005-010         2,260                  06/28/05     /  /      CB Strain and Sons Inc              
                                                            005-011         2,260                  06/28/05     /  /      CB Strain and Son inc               
                                                            005-012         2,260                  06/28/05     /  /      CB Strain and Son inc               
                                                            006-008           710                  03/21/05   01/03/06    Hudson Valley Electrical            
 

          SFB Morse School #5:
90-1125   Reconstruction               0-002-002  04/03/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1413   Reconstruction               0-002-003  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0856   Reconstruction               0-002-004  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0944   Reconstruction               0-002-005  04/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0990   Reconstruction               0-002-007  05/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1039   Reconstruction               0-002-008  06/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0302   Reconstruction               0-002-009  03/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-001         2,100                  08/10/04   09/08/04    Sun Up Enterprises                  
                                                            001-006           750                  10/28/04   11/19/04    Sun Up Enterprises                  
                                                            001-007         2,736                  11/05/04   11/19/04    Sun Up Enterprises                  
                                                            001-014             0                    /  /       /  /                                          
                                                            001-014             1          17,997  09/05/05   10/25/05    Rhinebeck Architecture and Planning,
                                                            001-015        19,470                  08/09/05   11/08/05    THE PALOMBO GROUP                   
                                                            001-016        18,894                  08/09/05   11/08/05    THE POLMBO GROUP                    
                                                            001-017        15,703                  08/09/05   11/08/05    THE PALOMBO GROUP                   
                                                            001-018        19,918                  08/09/05   11/08/05    THE PALOMBO GROUP                   
                                                            001-0190       15,703                  08/09/05   11/08/05    THE PALOMBO GROUP                   
                                                            001-020        19,030                  08/09/05   11/08/05    THE PALOMBO                         
                                                            004-001         6,857                  04/18/05   07/14/05    Dutchess Mechanical                 
                                                            005-003         1,572                  11/05/04     /  /      CB Strain Son Inc                   
                                                            005-004         9,161                  12/17/04   06/23/05    CB Strain Son Inc                   
                                                            005-006           985                  01/24/05   06/29/05    CB Strain and Sons                  
                                                            005-010         2,261                  06/28/05     /  /      CB strain and Son inc               
                                                            005-011         2,261                  06/28/05     /  /      CB Strain and Sons                  
                                                            005-012         2,261                  06/28/05     /  /      CB Strain and Son inc               
                                                            005-016         2,356                  11/23/05     /  /      CB Strain and Son Inc               
                                                            005-017           549                  11/23/05     /  /      C.B. Strain & Son Inc.              
                                                            006-003        -2,442                  09/13/04   10/14/04    Hudson Valley Elec.                 
                                                            006-004         5,290                  09/27/04   10/28/04    Hudson Valley Elec.                 
                                                            006-006         3,275                  12/13/04   06/23/05    Hudson Valley electrical Constructio
                                                            006-008         4,056                  03/21/05   01/03/06    Hudson Valley Electrical Contr      
                                                            006-009         2,502                  03/21/05   01/04/06    Hudson Valley Electrical Cons       
                                                            006-011        -1,515                  05/24/05   06/24/05    Hudson Valley Electrical            
                                                            006-022         1,796                  12/19/05   04/21/06    Hudson valey electrical Construction
                                                            006-026         5,336                  04/25/06     /  /      Hudson Valley Electrical            
                                                            008-001         3,455                  10/12/04   10/22/04    Excel Insulation                    
                                                            2.4-008        43,345                  01/24/05   04/01/05    Glomar Construction                 
                                                            2.4-009         3,279                  01/25/05   02/08/05    Glomar Construction                 
                                                            2.4-010        18,136                  02/24/05     /  /      Glomar Construction                 
                                                            2.4-011           837                  03/02/05   07/25/05    Glomar Construction                 
                                                            2.4-012         7,113                  04/18/05   08/03/05    Glomar Construction                 
                                                            2.4-013         1,021                  04/18/05   08/03/05    Glomar Construction                 
                                                            2.4-015         2,030                  06/28/05     /  /      Glomar Construction                 
                                                            2.4-016         8,270                  08/09/05   11/08/05    GLOMAR CONSTRUCTION INC.            
                                                            2.4-022          -250                  06/29/06   07/24/06    Glomar Construction                 
                                                            2.4-024          -878                  06/29/06   07/24/06    Glomar Construction                 
                                                            2.4-026         3,238                  06/29/06   07/24/06    Glomar COnstruction                 
                                                            24-005          1,326                  11/19/04   12/13/04    Glomar Construction                 
 

          Gov. Clinton School #8:
90-1126   Reconstruction               0-004-001  04/03/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1414   Reconstruction               0-004-002  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0857   Reconstruction               0-004-003  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0945   Reconstruction               0-004-004  04/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0988   Reconstruction               0-004-006  05/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1040   Reconstruction               0-004-007  06/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-002          6,471                  01/15/03   01/27/03    Meyer Contracting                   
                                                            02-002            456                  01/15/03   01/27/03    Dutchess Mechanical                 
                                                            03-003          4,503                  01/15/03   01/27/03    Ashley Mechanical                   
 
02-0820   Reconstruction               0-004-008  06/05/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-001         3,151                  08/10/04   09/08/04    Sun Up Enterprises                  
                                                            002-002        -1,040                  02/18/04   03/03/04    Meyer Contracting                   
                                                            002-003        -1,186                  04/12/04   04/16/04    Meyer Contracting                   
                                                            002-004       -15,000                  04/12/04   04/16/04    Meyer Contracting                   
                                                            002-007           634                  06/17/04   06/28/04    Meyer Contracting                   
                                                            002-011        -1,000                  01/11/05   03/18/05    Meyer Contracting Corp              
                                                            004-002           162                  04/06/04   04/28/04    Ashley Mech.                        
                                                            005-001         1,362                  12/30/03   01/21/04    CB Strain & Sons                    
                                                            006-003         2,988                  03/16/04   04/26/04    Hudson Valley Elec.                 
 
03-0303   Reconstruction               0-004-009  03/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-001         3,151                  08/10/04     /  /      Sun Up Enterprises                  
                                                            001-008         2,075                  11/05/04   11/19/04    Sun Up Enterprises                  
                                                            001-013        17,235                  11/09/05   11/08/05    THA PALOMBO GROUP                   
                                                            005-010         2,261                  06/28/05     /  /      CB Strain and Son inc               
                                                            005-011         2,261                  06/28/05     /  /      CB Strain and son                   
                                                            005-012         2,261                  06/28/05     /  /      CB Strain and Son inc               
                                                            006-001           225                  08/30/04   09/24/04    Hudson Valley Elec.                 
                                                            006-008           749                  03/21/05   01/03/06    Hudson Valley Electrical            
                                                            006-016         1,112                  09/12/05   09/20/05    Hudson Valley Electrical Constructio
                                                            006-023         6,255                  04/25/06     /  /      Hudson Valley electrical Constructio
                                                            2.4-019        11,523                  09/26/05   10/18/05    Glomar Construction                 
                                                            2.4-025          -500                  06/29/06   07/24/06    Glomar Construction                 
                                                            2.4-027         1,794                  06/29/06   07/13/06    Glomar Construction                 
 

          C.B. Warring School #10:
91-0858   Reconstruction               0-005-002  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1064   Reconstruction               0-005-003  05/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0946   Reconstruction               0-005-004  04/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0991   Reconstruction               0-005-006  05/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1041   Reconstruction               0-005-007  06/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-005          3,537                  01/15/03   01/27/03    Meyer Contracting                   
 
02-0821   Reconstruction               0-005-008  06/05/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-002        19,300                  12/04/03   03/15/04    Sun Up Ent.                         
                                                            001-004        11,712                  12/30/03   03/15/04    Sun Up Ent.                         
                                                            001-005         7,198                  03/05/04   04/07/04    Sun Up Ent.                         
                                                            001-007        -8,242                  08/10/04   09/09/04    Sun Up Ent.                         
                                                            002-001        -1,606                  12/30/03   03/15/04    Meyer Contracting                   
                                                            002-002         2,187                  02/18/04   03/03/04    Palombo Group                       
                                                            002-003        -2,174                  04/12/04   04/16/04    Meyer Contracting                   
                                                            002-004         3,000                  04/12/04     /  /      Meyer Contracting                   
                                                            002-007         6,257                  06/17/04   06/28/04    Meyer Contracting                   
                                                            002-008         5,655                  08/30/04   09/23/04    Meyer Contracting                   
                                                            002-009           717                  10/12/04   10/18/04    Meyer Contracting                   
                                                            004-001        14,926                  03/05/04   04/26/04    Ashley Mech.                        
                                                            004-003        -1,855                  07/15/04   07/21/04    Ashley Mech.                        
                                                            005-002         2,431                  01/13/04   01/26/04    CB Strain & Sons                    
                                                            005-003        -7,163                  03/02/04   04/26/04    CB Strain & Sons                    
                                                            006-001           582                  12/30/03   01/21/04    Hudson Valley Elec.                 
                                                            006-003         1,480                  03/16/04   04/26/04    Hudson Valley Elec.                 
                                                            006-004           706                  05/19/04   05/27/04    Hudson Valley Elec.                 
                                                            006-005        -5,209                  11/19/04   05/02/05    Hudson Valley Electrical            
 
03-0304   Reconstruction               0-005-009  03/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            005-010         2,261                  06/28/05     /  /      CB Strain and Sons                  
                                                            005-011         2,261                  06/28/05     /  /      Cb strain and Son                   
                                                            005-012         2,261                  06/28/05     /  /      CB Strain and Son inc               
                                                            007-002         7,700                  09/07/05   09/12/05    Buffalo Hotel Supply                
 

          Krieger School No. 11:
90-1127   Reconstruction               0-006-002  04/03/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1415   Reconstruction               0-006-003  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0859   Reconstruction               0-006-004  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0853   Reconstruction               0-006-005  03/20/92  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1304   Reconstruction               0-006-006  06/12/98  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0989   Reconstruction               0-006-007  05/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1042   Reconstruction               0-006-008  06/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-003            570                  01/15/03   01/27/03    Meyer Contracting                   
 
03-0305   Reconstruction               0-006-009  03/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            001-002         2,600                  09/27/04   10/04/04    Sun Up Enterprises                  
                                                            001-006           750                  10/28/04   11/19/04    Sun Up Enterprises                  
                                                            001-007         2,685                  11/05/04   11/19/04    Sun Up Enterprise                   
                                                            001-008         2,000                  11/05/04   11/19/04    Sun Up Enterprises                  
                                                            001-009         4,105                  11/19/04   11/29/04    Sun Up Enterprises                  
                                                            004-001         6,857                  04/18/05   07/14/05    Dutchess Mechanical Inc             
                                                            005-007         1,498                  03/02/05   01/03/06    CB Strain and Son Inc               
                                                            005-009           894                  05/24/05   06/30/05    CB Strain and Son Inc               
                                                            005-012         2,261                  06/28/05     /  /      CB Strain and Son Inc               
                                                            006-002         3,754                  08/30/04   09/23/04    Hudson Valley Elec.                 
                                                            006-005         1,148                  11/19/04   06/21/05    Hudson Valley Elec.                 
                                                            006-007         6,416                  02/15/05   07/26/05    Hudson Valley Electrical Constructio
                                                            006-008           710                  03/21/05   01/03/06    Hudson Valley Electrical            
                                                            006-010         5,166                  04/18/05   06/03/05    Hudson Valley Electrical            
                                                            006-011           327                  05/24/05   06/24/05    Hudson Valley Electrical            
                                                            006-015         6,413                  08/09/05   10/25/05    Rhinebeck Arch. and Planning, P.C.  
                                                            006-017           377                  09/12/05   09/20/05    Hudson Valley Electrical            
                                                            006-024         2,176                  04/25/06     /  /      Hudson Valley Electrical            
                                                            006-026         1,771                  04/25/06     /  /      Hudson Valley Electrical            
                                                            007-001           233                  12/13/04   12/24/04    Buffalo Hotel Supply                
                                                            2.4-002         3,317                  09/10/04   09/27/04    Glomar Construction                 
                                                            2.4-003         2,200                  09/10/04   09/27/04    Glomar Construction                 
                                                            2.4-006           736                  01/24/05   02/08/05    glomar Construction                 
                                                            2.4-007         3,969                  01/24/05   02/08/05    Glomar Construction                 
                                                            2.4-009         2,532                  01/25/05   02/08/05    Glomar Construction                 
                                                            2.4-012         2,264                  04/18/05   08/03/05    Glomar Construction                 
                                                            2.4-014         8,519                  04/27/05   06/03/05    Glomar Construction Inc             
                                                            2.4-015         9,919                  06/28/05     /  /      Glomar Construction                 
                                                            2.4-019           741                  09/26/05   10/18/05    Glomar Construction                 
                                                            2.4-022          -250                  06/29/06   07/24/06    Glomar Construction                 
                                                            2.4-023         4,830                  06/29/06   07/13/06    Glomar Construction                 
                                                            2.4-026        18,101                  06/29/06   07/24/06    Glomar Construction                 
                                                            2.4025         -1,550                  06/29/06   07/24/06    Glomar Construction                 
                                                            4-004           1,457                  09/13/04   10/04/04    Glomar Construction                 
                                                            5-002           3,347                  09/13/04   10/14/04    CB Strain & Sons                    
 

          Junior/Senior High School:
91-0860   Reconstruction               0-007-001  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1416   Reconstruction               0-007-003  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1123   Reconstruction               0-007-004  04/03/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0854   Reconstruction               0-007-005  03/20/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0834   Reconstruction               0-007-006  03/31/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1030   Reconstruction               0-007-007  06/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0580   Reconstruction               0-007-008  02/02/94  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0992   Reconstruction               0-007-010  05/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0306   Reconstruction               0-007-012  03/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001-010        19,390                  08/09/05   11/08/05    THE PALOMBO GROUP                   
                                                            001-011        19,833                  08/09/05   11/08/05    THE PALOMBO GROUP                   
                                                            001-012        19,586                  08/09/05   11/09/05    THE PALOMBO                         
                                                            001-021        73,000                  09/26/05   10/18/05    Sun Up Enterprises                  
                                                            003-001         3,570                  08/30/04   09/24/04    WeatherGuard Roofing                
                                                            003-002        -2,472                  12/13/04   12/24/04    WeatherGuard Roofing                
                                                            004-002         7,514                  06/14/05   06/30/05    Dutchess Mechanical                 
                                                            004-003         3,599                  08/19/05   08/25/05    Dutchess Mechanical                 
                                                            004-007        19,647                  03/12/06     /  /      Dutchess Mechanical Inc.            
                                                            005-001       -15,000                  08/10/04   09/08/04    CB Strain & Son                     
                                                            005-003           923                  11/05/04   06/21/05    CB Strain & Son                     
                                                            005-005        10,132                  12/17/04   06/23/05    CB Strain & Sons                    
                                                            005-008         1,839                  04/18/05   06/07/05    CB Strain and Son Inc               
                                                            005-010        22,261                  06/28/05     /  /      CB Strain and sons                  
                                                            005-011         2,261                  06/28/05     /  /      CB Strain and sons Inc              
                                                            005-012         2,261                  07/28/05     /  /      CB Strain and Son inc               
                                                            005-013         1,532                  09/05/05   10/25/05    Rhinebeck Arch. and planning, P.C.  
                                                            005-014           787                  09/12/05   09/20/05    CB Strain Son Inc                   
                                                            006-001        -1,072                  08/30/04   09/24/04    Hudson Valley Elec.                 
                                                            006-005        -1,037                  11/19/04   06/21/05    Hudson Valley Elec.                 
                                                            006-007           345                  02/15/05   07/26/05    Hudson Valley Electrical            
                                                            006-008         1,146                  03/21/05   01/03/06    Hudson Valley Electrical Construct  
                                                            006-010         1,174                  04/18/05   06/03/05    Hudson Valley Electrical Construct  
                                                            006-011         3,180                  05/24/05   06/24/05    Hudson Valley Electrical            
                                                            006-012         2,225                  06/28/05   07/21/05    Hudson Valley Electrical            
                                                            006-018         8,081                  09/12/05   09/20/05    Hudson valley electrical Constructio
                                                            006-018         8,081                  09/12/05     /  /      Hudson Valley electrical            
                                                            006-019        24,260                  09/26/05   10/04/05    Hudson Valley electrical            
                                                            006-025         3,775                  04/25/06     /  /      Hudson Valley Electrical            
                                                            006-026         1,491                  04/25/06     /  /      Hudson Valley Electrical            
                                                            2.4-001        22,039          22,039  09/10/04   09/28/04    Glomar Construction                 
                                                            2.4-006       -10,000                  01/24/05   02/08/05    Glomar Construction                 
                                                            2.4-009         3,182                  01/25/05   02/08/05    Glomar Construction                 
                                                            2.4-010         1,683                  02/24/05   03/31/05    Glomar Construction                 
                                                            2.4-011        16,281                  03/02/05   07/25/05    Glomar Construction Inc             
                                                            2.4-012         1,117                  04/18/05   08/03/05    Glomar Construction                 
                                                            2.4-013        15,493                  04/18/05   08/03/05    Glomar Construction                 
                                                            2.4-015         5,015                  06/28/05     /  /      glomar Construction                 
                                                            2.4-017             0                  11/09/05   11/08/05    GLOMAR CONSTRUCTION INC.            
                                                            2.4-021        -7,420                  06/29/06   07/13/06    Glomar Construction                 
                                                            2.4-022        14,146                  06/29/06   07/24/06    Glomar Construction                 
                                                            2.4-025        -1,268                  06/29/06   07/24/06    Glomar Construction                 
                                                            2.4-026        -2,400                  06/29/06   07/24/06    Glomar Construction                 
                                                            24-005          5,998                  11/19/04   12/13/04    Glomar Construction                 
                                                            24-018         24,713                  09/26/05   10/12/05    Glomar Construction                 
 
04-1394SC Visual Structural Inspection 0-007-SC1  06/10/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          W.W. Smith Elementary:
90-1128   Reconstruction               0-008-001  04/03/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1417   Reconstruction               0-008-007  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0861   Reconstruction               0-008-008  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0993   Reconstruction               0-008-011  05/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1044   Reconstruction               0-008-012  06/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-004         13,282                  01/15/03   01/27/03    Meyer Contracting                   
                                                            02-003            811                  01/15/03   01/27/03    Dutchess Mechanical                 
                                                            03-004         16,692                  08/19/03   08/27/03    Ashley Mech.                        
                                                            03-005          7,474                  08/19/03   08/27/03    Ashley Mech.                        
                                                            04-002            320                  01/15/03   01/27/03    Canale Electric                     
 
02-0822   Reconstruction               0-008-013  06/05/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0002-004        3,000                  04/12/04     /  /      Meyer Contracting                   
                                                            0002-007         -385                  06/17/04   06/28/04    Meyer Contracting                   
                                                            002-003        -1,185                  04/12/04   04/16/04    Meyer Contracting                   
                                                            002-008         1,420                  08/30/04   09/23/04    Meyer Contracting                   
                                                            004-002         1,772                  04/06/04   04/28/04    Palombo Group                       
                                                            006-003         2,987                  03/16/04   04/26/04    Hudson Valley Elec.                 
                                                            006-005        -6,669                  11/19/04   05/02/05    Hudson Valley Construction          
 
03-0307   Reconstruction               0-008-014  03/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            0001-006       14,700                  10/28/04   11/19/04    Sun Up Enterprises                  
                                                            001-003        17,500                  10/12/04   10/22/04    Sun Up Enterprises                  
                                                            001-004         8,575                  10/18/04   10/26/04    Sun Up Enterprises                  
                                                            001-005         9,801                  10/18/04   10/26/04    Sun Up Enterprises                  
                                                            001-007         8,240                  11/05/04   11/19/04    Sun Up Enterprise                   
                                                            001-008         5,825                  11/05/04   11/19/04    Sun Up Enterprises                  
                                                            005-010         2,261                  06/28/05     /  /      CB Strain and Son                   
                                                            005-011         2,261                  06/28/05     /  /      Cb strain and Son                   
                                                            005-012         2,261                  06/28/05     /  /      CB Strain and Son Inc               
                                                            006-027         3,582                  06/08/06   08/24/06    Hudson Valley Electrical            
                                                            2.4-024        10,539                  06/29/06   07/24/06    Glomar Construction                 
 

          Middle School:
91-0862   Reconstruction               0-015-001  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0483   Reconstruction               0-015-004  02/15/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1418   Reconstruction               0-015-005  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-1065   Reconstruction               0-015-006  05/01/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0947   Reconstruction               0-015-007  04/03/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0598   Reconstruction               0-015-008  02/26/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1031   Reconstruction               0-015-009  06/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0994   Reconstruction               0-015-011  05/16/00  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1045   Reconstruction               0-015-012  06/05/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            03-002         13,748                  01/15/03   01/27/03    Ashley Mechanical                   
                                                            04-003          3,557                  02/24/03   03/13/03    Canale Electric                     
 
02-0823   Reconstruction               0-015-013  06/05/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            002-003        -1,186                  04/12/04   04/16/04    Meyer Contracting                   
                                                            002-004         3,000                  04/15/04   04/16/04    Meyer Contracting                   
                                                            002-005           823                  04/05/04   04/07/04    Meyer Contracting                   
                                                            002-006         2,446                  04/24/06   04/24/06    Meyer Contracting Corp.             
                                                            002-008         1,440                  08/30/04   09/23/04    Meyer Contracting                   
                                                            002-010        12,197                  10/12/04   10/18/04    Meyer Contracting                   
                                                            006-002        19,493                  03/05/04   04/26/04    Hudson Valley Elec.                 
                                                            006-003         2,989                  03/16/04   04/26/04    Hudson Valley Elec.                 
                                                            007-001        -7,827                  01/14/03   03/09/04    Sheen and Shine Ent.                
 
03-0308   Reconstruction               0-015-014  03/04/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            004-004         2,500                  03/23/06   04/20/06    DUTCHESS MECHANICAL                 
                                                            005-010         2,261                  06/28/05     /  /      CB Strain and Sons                  
                                                            005-011         2,261                  06/28/05     /  /      CB Strain and Sons                  
                                                            005-012         2,261                  06/28/05     /  /      CB Strain and Son inc               
                                                            005-015           879                  09/12/05   09/20/05    Cb Strain and Son                   
                                                            006-008           710                  03/21/05   01/03/06    Hudson Valley Electrical            
                                                            006-026         1,942                  04/25/06     /  /      Hudson Valley Electrical            
                                                            007-003         2,073                  11/02/05   12/09/05    Buffalo Hotel supply                
                                                            2.4-013        -2,422                  04/18/05   08/03/05    Glomar Construction                 
                                                            2.4-020        13,221                  09/26/05     /  /      Glomar Construction                 
                                                            2.4-025        -1,750                  06/29/06   07/24/06    Glomar Construction                 
 
04-1395SC Visual Structural Inspection 0-015-SC1  06/10/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          Administration Building:
92-0831   Reconstruction               1-003-001  03/31/93  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1046   Reconstruction               1-003-002  06/05/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Clinton Elem. Storage Bldg.:
91-0863   New Construction             2-012-001  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE

          Morse Elem. Storage Shed:
91-0864   New Construction             2-013-001  05/01/92  NO CHANGE ORDERS ON ELECTRONIC FILE

          District Wide:
01-0544   Reconstruction               7-999-002  01/25/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1               4,883                  10/22/02   10/24/02    NEC Business Network Solutions      
                                                            2               8,296                  03/17/03   06/02/03    NEC Business Network Solutions      
 

          Nativity School Building:
01-1370   Reconstruction               8-019-L01  05/29/02  NO CHANGE ORDERS ON ELECTRONIC FILE





ARLINGTON CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 13-16-01-06
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Arlington Middle School:
90-0817   Reconstruction               0-002-005  02/11/91  NO CHANGE ORDERS ON ELECTRONIC FILE
90-0781   Reconstruction               0-002-006  02/05/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1258   Reconstruction               0-002-007  06/07/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1415   Reconstruction               0-002-008  06/21/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-1519   Reconstruction               0-002-009  07/06/94  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1463   Reconstruction               0-002-010  10/25/99  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0349   Reconstruction               0-002-011  05/30/03  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-02          17,340                  12/13/04   12/23/04    William Manfredi Construction       
                                                            GC-03           9,800                  12/13/04   12/23/04    William Manfredi Construction       
                                                            GC-04          16,000                  12/13/04   12/23/04    William Manfredi Construction       
                                                            GC-06          17,125                  12/13/04   12/23/04    William Manfredi Construction       
                                                            PC-01         -10,000                  10/24/05   10/27/05    dutchess Mechanical                 
 
06-0390   Reconstruction               0-002-012  02/27/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                            EC-001         20,137                  01/23/08   04/04/08    P&D ELECTRIC OF HUDSON VALLEY       
 
02-2085FP Reconstruction               0-002-FP1  06/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Raymond Ave. Grade School:
90-1742   Reconstruction               0-003-003  08/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
91-1475   Reconstruction               0-003-004  06/29/92  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0783   Reconstruction               0-003-005  04/06/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1587   Reconstruction               0-003-006  08/19/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-1461   Reconstruction               0-003-008  05/15/98  NO CHANGE ORDERS ON ELECTRONIC FILE
98-1467   Reconstruction               0-003-009  10/25/99  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0350   Alterations