REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Middle School:
95-0608 Additions and Alterations 0-002-003 04/04/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0898 Reconstruction 0-002-005 05/10/00 *CO No.* Amount Disallowed Received Approved Contractor
W&S-4 2,320 05/14/02 / / Cortland Glass
00-1119 Reconstruction 0-002-006 09/06/01 *CO No.* Amount Disallowed Received Approved Contractor
CW-2 6,715 01/08/03 01/16/03 Northeast Interior Systems
CW-4 -2,343 03/20/03 03/24/03 Northeast Interior Systems
EC-1 -8,070 07/01/02 07/03/02 M. Gleason & Sons
EC-4 2,881 03/06/03 03/24/03 M. Gleason & Sons
EC-5 1,504 03/06/03 03/24/03 M. Gleason & Sons
EC-6 312 05/22/03 05/27/03 M. Gleason & Sons
EC-8 387 05/22/03 05/27/03 M. Gleason & Sons
GC-1 5,475 07/22/02 08/16/02 Garbade Const.
GC-4 -4,760 11/04/02 03/28/03 Garbade Const.
GC-7 -1,500 12/11/02 01/08/03 Garbade Const.
GC-9 -1,700 03/10/03 03/24/03 Garbade Const.
PC-1 5,854 07/22/02 08/16/02 Evans Mech.
PC-4 2,343 03/20/03 03/24/03 Evans Mech.
02-0583 Reconstruction 0-002-007 04/11/03 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 9,240 07/24/03 08/27/03 S&W General Contractors
07-0330 Reconstruction 0-002-009 12/21/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0307 Reconstruction 0-002-010 12/28/07 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2399FP Reconstruction 0-002-FP1 08/25/03 NO CHANGE ORDERS ON ELECTRONIC FILE
John R. Harshaw:
95-0106 Reconstruction 0-003-002 08/29/95 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0900 Additions and Alterations 0-003-004 05/10/00 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 1,530 02/10/04 03/12/04 Blanding Elec.
EC-2 5,080 11/29/01 07/12/05 Blanding Electric, Inc.
EC-3 14,520 12/10/01 05/28/02 Blanding Elec.
F-1 3,900 05/14/02 05/24/02 Upstate Office Furniture
GC-10 2,042 07/22/02 08/16/02 Garbade Const.
GC-11 2,589 07/22/02 08/16/02 Garbade Const.
GC-12 1,460 07/22/02 08/16/02 Garbade Const.
GC-13 3,680 11/22/02 01/08/03 Garbade Const.
GC-14 1,887 11/22/02 01/08/03 Garbade Const.
GC-15 -15,045 08/29/03 10/06/03 Garbade Const.
GC-5 8,484 12/27/01 05/28/02 Garbade Const.
GC-7 13,787 02/01/02 05/13/02 Garbade Const.
GC-8 19,946 02/22/02 03/22/02 Garbade Const.
GC-9 -5,175 11/04/02 01/07/03 Garbade Const.
MC-1 2,859 11/19/01 05/22/02 James Lewis
MC-2 -3,725 11/04/02 01/07/03 James Lewis
PC-1 2,030 12/10/01 05/28/02 James Lewis
PC-2 7,093 12/24/01 03/26/02 James Lewis
RC-1 4,912 11/04/02 01/07/03 CFE, Inc
RC-2 -7,500 11/04/02 01/07/03 CFE, Inc
WS-4 2,320 02/10/04 03/03/04 Cortland Glass Company
00-1120 Reconstruction 0-003-005 09/06/01 *CO No.* Amount Disallowed Received Approved Contractor
CW-1 6,348 11/29/02 12/04/02 Northeast Interiors
EC-3 3,407 03/06/03 03/24/03 M. Gleason & Sons
GC-11 -5,069 07/02/03 07/09/03 Garbade Const.
GC-3 4,750 11/04/02 01/07/03 Garbade Const.
GC-8 5,916 03/10/03 03/24/03 Garbade Const.
PC-2 21,550 11/04/02 01/07/03 Evans Mech.
RC-1 1,305 12/06/02 01/02/03 AB Const.
02-0584 Reconstruction 0-003-006 04/11/03 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 8,000 07/24/03 08/27/03 Nelcorp Elec. Contracting
MC-1 24,000 09/22/03 09/25/03 Evans Mech.
04-1220 Reconstruction 0-003-007 05/25/05 NO CHANGE ORDERS ON ELECTRONIC FILE
07-0331 Reconstruction 0-003-008 12/21/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Jr/Sr High School:
95-0609 Reconstruction 0-004-007 04/04/96 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1264 Reconstruction 0-004-010 05/21/99 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0206 Reconstruction 0-004-011 11/05/98 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0901 Reconstruction 0-004-012 05/10/00 *CO No.* Amount Disallowed Received Approved Contractor
AA-2 -3,000 11/19/01 05/22/02 Reindeer Environ.
GC-4 -3,105 11/19/01 05/22/02 Garbade Const.
GC-6 4,752 01/18/02 03/29/02 Garbade Const.
W&S-3 -960 11/19/01 05/22/02 Cortland Glass
W&S-5 900 07/22/02 08/16/02 Cortland Glass
00-1121 Reconstruction 0-004-013 09/06/01 *CO No.* Amount Disallowed Received Approved Contractor
CW-3 1,457 01/08/03 01/16/03 Northeast Interior
CW-5 -3,131 05/22/03 05/27/03 Northeast Interior
EC-2 1,086 01/21/03 02/12/03 M. Gleason & Sons
GC-10 912 03/10/03 03/20/03 Garbade Const.
GC-5 18,916 11/15/02 01/08/03 Garbade Const.
GC-6 18,694 12/11/02 01/08/03 Garbade Const.
ITS-1 -2,663 07/24/03 08/01/03 ITS Communications
MC-1 -2,135 07/24/03 08/01/03 Kimble Inc
PC-3 12,280 11/15/02 01/08/03 Evans Mech.
PC-5 7,944 05/22/03 05/27/03 Evans Mech.
PC-6 7,150 07/24/03 08/01/03 Evans Mech.
PL-1 0 11/26/03 01/08/04 Blanding Elec.
SW-1 2,760 11/29/02 12/04/02 W&D Smith & Sons
02-0585 Reconstruction 0-004-014 04/11/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0586 Reconstruction 0-004-015 04/11/03 *CO No.* Amount Disallowed Received Approved Contractor
EC-2 7,861 01/15/04 02/04/04 Nelcorp Elec.
EC-3 -80 02/26/04 03/12/04 Nelcorp Elec.
GC-2 3,730 01/05/04 01/26/04 S&W General Contractors
MC-2 4,876 02/26/04 03/12/04 Evans Mech.
MC-3 15,170 03/18/04 11/09/06 Evans Mech.
04-1221 Reconstruction 0-004-016 05/25/05 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 -200 03/17/06 05/24/06 Nelcorp Electrical
Mc1 551 05/15/06 06/23/06 Evans Mechanical
07-0332 Additions and Alterations 0-004-017 12/21/07 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 6,681 07/22/08 / / DANIEL J. LYNCH, INC.
07-0308 Reconstruction 0-004-018 12/28/07 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 12,776 08/20/08 10/08/08 BLANDING ELECTRIC, INC.
EC-2 15,173 08/20/08 10/08/08 BLANDING ELECTRIC, INC.
SS-1 -2,905 08/20/08 10/08/08 BROWN SOUND EQUIPMENT CORP.
SW-1 9,000 07/14/08 08/26/08 SMITH SITE DEVELOPMENT, LLC
Charlotte Kenyon Elementary:
90-1168 Reconstruction 0-009-006 04/10/91 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
91-0032 Reconstruction 5-001-001 08/08/91 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0610 Reconstruction 5-001-003 04/04/96 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1122 Additions and Alterations 5-001-005 09/06/01 *CO No.* Amount Disallowed Received Approved Contractor
EC-7 290 05/22/03 05/27/03 M. Gleason & Sons
GC-2 1,813 11/04/02 01/07/03 Garbade Const.
RC-1 1,305 11/29/02 12/04/02 AB Const. & Roofing
RC-1 -2,658 01/08/03 01/16/03 Apple Roofing
07-0333 Reconstruction 5-001-006 12/21/07 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1606 Reconstruction 5-001-007 06/29/07 *CO No.* Amount Disallowed Received Approved Contractor
BL-1 -2,522 06/18/08 08/18/08 Gary Dyer, Inc
BL-2 7,084 08/04/08 10/07/08 GARY DYER, INC.
EC-1 -500 11/02/07 11/13/07 M. GLEASON & SONS OF BING., NY, INC.
EC-2 -1,386 05/21/08 08/08/08 M. GLEASON & SONS OF BING., NY, INC.
New Press Box:
95-1676 New Construction 7-020-001 09/09/96 NO CHANGE ORDERS ON ELECTRONIC FILE
District wide:
96-1416 Reconstruction 7-999-001 05/08/97 NO CHANGE ORDERS ON ELECTRONIC FILE
BINGHAMTON CITY SCHOOLS STATUS REPORT ON CAPITAL PROJECTS
District No.: 03-02-00-01
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Calvin Coolidge Elementary:
90-1695 Reconstruction 0-001-004 08/05/91 NO CHANGE ORDERS ON ELECTRONIC FILE
94-1204 Reconstruction 0-001-007 03/11/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1565 Reconstruction 0-001-008 06/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1299 Reconstruction 0-001-009 12/13/02 *CO No.* Amount Disallowed Received Approved Contractor
A-1 6,268 02/02/04 02/17/04 S&S Environ.
A-2 951 02/02/04 02/17/04 S&S Environ.
A-3 15,052 02/02/04 02/17/04 S&S Environ.
A-4 21,397 02/02/04 02/17/04 S&S Environ.
A-5 824 02/02/04 02/17/04 S&S Environ.
A-6 -47,116 11/09/06 12/28/06 S and s Environemental
E-1 -12,282 01/05/03 01/20/04 Blanding Elec.
E-2 4,689 01/05/03 01/20/04 Blanding Elec.
E-2 12,340 02/02/04 / / S & S Environmental
E-3 1,447 12/26/03 / / Blanding Elec.
E-3 17,116 01/03/08 01/03/08 Blanding Electric
E-5 12,468 03/31/04 04/23/04 Blanding Elec.
FSE-1 1,198 02/02/04 02/17/04 Maines CDI
FSE-2 2,500 02/02/04 02/17/04 Maines CDI
GC-1 8,806 08/13/03 08/26/03 Garbade Const.
GC-11 13,502 02/02/04 02/17/04 Garbade Const.
GC-12 5,825 02/02/04 02/17/04 Garbade Const.
GC-14 22,951 02/02/04 02/17/04 Garbade Const.
GC-16A 13,191 10/30/06 12/18/06 Garbade Construction
GC-18 19,281 10/30/06 12/18/06 Garbade Construction
GC-28 21,055 03/31/04 04/06/04 Garbade Const.
GC-29 17,893 10/30/06 12/18/06 Garbade Construction
GC-33 3,132 11/15/06 / / Garbade Construction
GC-33B 3,132 10/30/06 12/18/06 Garbade Construction
GC-34 7,046 11/15/06 / / Garbade Construction
GC-4 71,884 11/07/03 11/20/03 Garbade Const.
GC-7 1,247 02/02/04 03/15/04 Garbade Const.
GC34D -7,046 10/30/06 12/18/06 Garbade Construction
H-2 22,957 03/31/04 04/23/04 Evans Mech.
H-4 19,911 12/26/03 11/24/04 Evans Mech.
H-5 1,921 02/02/04 03/08/04 Evans Mech.
H-7 5,638 11/02/06 01/09/07 Evans mechanical
P-3 12,275 12/26/03 10/23/07 Evans Mech.
P-3 19,601 11/02/06 01/09/07 Evans mechanical
P-4 4,688 12/26/03 01/12/04 Evans Mech.
W-3 3,431 02/02/04 02/17/04 Cortland Glass
W-4 -10,286 06/29/04 07/06/04 Cortland Glass
07-0558 Reconstruction 0-001-011 10/19/07 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 9,652 12/11/07 12/31/07 Consolidated Masonry Contractors
Columbus School:
95-1592 Alterations 0-002-001 08/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0164 Reconstruction 0-002-002 09/20/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-9999 Reconstruction 0-002-003 08/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1013 Reconstruction 0-002-004 05/19/99 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1231 Reconstruction 0-002-007 04/01/08 NO CHANGE ORDERS ON ELECTRONIC FILE
East Middle School(now 0-011):
94-0467 Reconstruction 0-003-005 12/20/94 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1007 Reconstruction 0-003-006 05/19/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1038 Reconstruction 0-003-007 05/24/00 *CO No.* Amount Disallowed Received Approved Contractor
1-1A -1,640 05/22/03 06/11/03 Fahs-Rolston Paving
1-1B 35,832 05/22/03 06/11/03 Fahs-Rolston Paving
1-1C 86,039 05/22/03 06/11/03 Fahs-Rolston Paving
1-1D 21,451 05/22/03 06/11/03 Fahs-Rolston Paving
1-1E 1,775 05/22/03 06/11/03 Fahs-Rolston Paving
1-1F 9,766 05/22/03 06/11/03 Fahs-Rolston Paving
1-1I 32,488 05/22/03 06/11/03 Fahs-Rolston Paving
1A 45,425 05/22/03 06/11/03 Nelcorp
1B 52,235 05/22/03 06/11/03 NelCorp
2-2A 9,820 05/22/03 07/23/03 Fahs-Rolston Paving
2-2B 39,770 39,770 05/22/03 07/23/03 Fahs-Rolston Paving
2-2D 37,827 37,827 05/22/03 07/23/03 Fahs-Rolston Paving
3-3B 19,153 05/22/03 06/11/03 Fahs-Rolston Paving
3-3C 5,712 05/22/03 06/11/03 Fahs-Rolston Paving
3-3E 4,070 05/22/03 06/11/03 Fahs-Rolston Paving
3-3F 7,306 05/22/03 06/11/03 Fahs-Rolston Paving
3-3G 7,939 05/22/03 06/11/03 Fahs-Rolston Paving
4-4F 1,000 05/22/03 06/11/03 Fahs-Rolston Paving
4-4G 2,500 05/22/03 06/11/03 Fahs-Rolston Paving
4-4H 1,050 05/22/03 06/11/03 Fahs-Rolston Paving
4-4J 3,500 05/22/03 06/11/03 Fahs-Rolston Paving
4-4M 4,300 05/22/03 06/11/03 Fahs-Rolston Paving
EC-2 65,453 05/22/03 06/11/03 NelCorp
01-1300 Reconstruction 0-003-008 12/13/02 *CO No.* Amount Disallowed Received Approved Contractor
A-2 951 02/02/04 02/17/04 S&S Environ.
E-2 5,459 01/05/04 01/20/04 Blanding Elec.
E-3 3,955 12/26/03 10/23/07 Blanding Elec.
E-4 4,260 02/02/04 10/23/07 Blanding Elec.
E-5 1,198 03/31/04 04/23/04 Blanding Elec.
FSE-2 2,500 02/02/04 02/17/04 Maines CDI
G-33 3,132 10/30/06 12/18/06 Garbade Construction
GC-27 1,042 03/31/04 04/06/04 Garbade Const.
H-3 5,058 12/26/03 01/12/04 Evans Mech.
P-3 2,930 12/26/03 01/14/04 Evans Mech.
P-4 5,322 12/26/03 01/12/04 Evans Mech.
R-2 13,040 01/05/04 01/16/04 Diamond Roofing
R-5 5,183 12/26/03 12/31/03 Diamond Roofing
R-6 3,053 04/26/04 05/07/04 Diamond Roofing
04-0357FP Reconstruction 0-003-FP1 11/18/04 NO CHANGE ORDERS ON ELECTRONIC FILE
West Middle School:
96-1571 Reconstruction 0-006-004 06/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1008 Reconstruction 0-006-005 05/19/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1039 Reconstruction 0-006-006 05/24/00 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1302 Reconstruction 0-006-007 12/13/02 *CO No.* Amount Disallowed Received Approved Contractor
E-1 -15,928 01/05/03 01/20/04 Blanding Elec.
E-2 5,459 01/05/03 01/20/04 Blanding Elec.
E-3 5,069 12/26/03 01/12/04 Blanding Elec.
E-4 4,018 02/02/04 02/25/04 Blanding Elec.
E-5 4,339 03/31/04 04/23/04 Blanding Elec.
E-9 -3,185 09/07/04 09/23/04 Blanding Elec.
FSE-2 2,500 02/02/04 02/17/04 Maines CDI
GC-10 707 02/02/04 02/17/04 Garbade Const.
GC-27 2,589 03/31/04 04/06/04 Garbade Const.
GC-34 -7,046 11/15/06 / / Garbade Construction
GC-4 71,884 11/07/03 11/20/03 Garbade Const.
GC-7 -3,296 02/02/04 03/15/04 Garbade Const.
GC34C -7,046 10/30/06 12/18/06 Garbade Construction
H-1A 19,980 12/26/03 / / Evans Mech.
H-5 12,462 02/02/04 11/24/04 Evans Mech.
H-6 5,140 04/26/04 05/07/04 Evans Mech.
P-2 21,378 01/05/03 01/20/04 Evans Mech.
P-3 334 12/26/03 01/14/04 Evans Mech.
P-4 6,709 12/26/03 01/12/04 Evans Mech.
P-5 2,476 04/26/04 05/07/04 Evans Mech.
R-1 3,578 01/05/04 01/16/04 Diamond Roofing
R-5 1,980 12/26/03 12/31/03 Diamond Roofing
07-1232 Reconstruction 0-006-009 04/01/08 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2320 Reconstruction 0-006-010 07/10/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Benjamin Franklin School:
96-1568 Reconstruction 0-008-005 06/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1009 Reconstruction 0-008-006 05/19/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1370 Reconstruction 0-008-007 04/19/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1719 Reconstruction 0-008-009 12/08/03 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0001-009 2,313 11/01/04 11/23/04 FE Jones Const.
0007-002 -4,000 10/18/04 11/24/04 AB Const. & Roofing
001-001 3,652 10/18/04 10/25/04 FE Jones Const.
001-021 7,947 03/29/05 04/01/05 FE Jones Construction
001-026 5,112 03/29/05 04/01/05 FE Jones Construction
001-027 8,738 03/29/05 04/01/05 FE jones Construction
001-029 12,876 02/17/05 05/02/05 FE Jones Construction
001-036 3,608 01/20/05 02/15/05 FE Jones Construction
001-041 7,587 01/20/05 02/15/05 FE Jones COnstruction
002-002 2,036 10/25/04 10/28/04 Matco Elec.
002-012 6,305 02/17/05 03/18/05 Matco Electric Co
002-013 3,170 01/20/05 / / Matco Electric Co
003-004 2,066 10/25/04 10/28/04 Ackerman Mech.
003-006 1,330 03/29/05 04/01/05 Ackerman Service
003-010 6,827 03/29/05 04/01/05 Ackerman Mechanical Service
004-006 5,796 03/29/05 04/01/05 Evans Mechanical
004-010 13,195 01/21/05 02/15/05 Evans Mechanical
007-008 1,800 03/29/05 04/01/05 AB Construction and Roofing
007-010 2,786 03/29/05 04/01/05 AB Construction and Roofing
42-6794 9,290 06/08/05 08/02/05 FE Jones Construction
426794 12,167 01/13/05 02/01/05 Evans mechanical
A-1 3,543 01/26/06 06/23/06 Fibertech Environmental
A-4 0 07/14/06 08/14/06 Fibertech Environmental
E-17 2,662 03/29/05 04/01/05 Matco Electric
E-21 748 07/07/05 07/21/05 Matco Electric
E-25 4,087 01/31/06 05/25/06 Matco Electric
E-30 1,991 03/02/06 06/23/06 Matco Electric
E-32 1,024 03/02/06 06/23/06 Matco electric
E-36 -12,000 08/04/06 12/27/06 Matco Electric
E17A 2,167 07/07/05 07/21/05 Matco Electric
FS-3 794 01/28/05 02/15/05 main Ford General Supply Co
GC-46 2,258 07/07/05 07/21/05 Fe jones Construction
GC-58 495 01/26/06 06/09/06 Fe jones Construction
GC-60 8,102 02/06/06 06/07/06 Fe Jones Construction
GC-64 19,156 03/02/06 06/07/06 Fe Jones Construction
GC-69 1,363 03/02/06 07/24/06 Fe jones Construction
GC-73 -9,244 08/04/06 08/21/07 Fe Jones Construction
GC44A 0 07/07/05 07/21/05 Fe Jones Construction
H-15 8,464 03/29/05 04/01/05 Evans mechanical
H-17 988 03/29/05 04/01/05 Evans Mechanical
H-23 0 03/02/06 06/23/06 Evans mechanical
H17A 988 07/07/05 07/21/05 Evans Mechanical
H18A -119 07/07/05 08/03/05 Evans Mechanical Inc
P-11 10,982 01/28/05 02/15/05 Ackerman Mechanical Service
P-17 0 04/07/05 07/21/05 Ackerman mechanical service
P-19 4,566 04/07/05 07/21/05 Ackerman mechanical Services
R-12 2,278 07/07/05 07/21/05 AB Construction and Roofing
07-1233 Reconstruction 0-008-011 04/01/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Thomas Jefferson Elem.:
96-1562 Reconstruction 0-009-003 06/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1301 Reconstruction 0-009-004 12/13/02 *CO No.* Amount Disallowed Received Approved Contractor
E-10 873 07/07/05 07/25/05 Blanding Electric
E-6 1,148 03/31/04 04/23/04 Blanding Elec.
GC-12 697 02/02/04 02/17/04 Garbade Const.
GC-2 0 11/07/03 11/20/03 Garbade Const.
07-1234 Reconstruction 0-009-005 04/01/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Theodore Roosevelt Elementary:
96-1567 Reconstruction 0-010-003 06/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1011 Reconstruction 0-010-004 05/19/99 NO CHANGE ORDERS ON ELECTRONIC FILE
01-1303 Reconstruction 0-010-006 12/13/02 *CO No.* Amount Disallowed Received Approved Contractor
34A -7,046 10/30/06 / / Garbade Construction
A-6 -47,116 11/03/06 12/28/06 S and S Environmental
E-1 164 01/05/04 01/20/04 Blanding Elec.
E-6 12,646 03/31/04 04/23/04 Blanding Elec.
E-8 1,620 06/28/04 07/06/04 Blanding Elec.
E-9 -3,185 09/07/04 09/23/04 Blanding Elec.
GC-1 3,052 08/13/03 08/26/03 Garbade Const.
GC-10 11,270 02/02/04 02/17/04 Garbade Const.
GC-12 9,890 02/02/04 02/17/04 Garbade Const.
GC-13 14,237 02/02/04 02/17/04 Garbade Const.
GC-15 19,435 1 10/30/06 12/18/06 Garbade Construction
GC-16B 13,191 10/31/06 12/18/06 garbade Construction
GC-17 17,304 10/30/06 12/18/06 Garbade Construction
GC-19 19,879 10/30/06 12/18/06 Garbade Construction
GC-20 18,991 10/30/06 12/18/06 Garbade Construction
GC-21 17,985 10/30/06 12/18/06 Garbade Construction
GC-22 12,234 10/30/06 12/18/06 Garbade Construction
GC-23 12,236 10/30/06 12/18/06 Garabde Construction
GC-24 11,417 03/31/04 04/06/04 Garbade Const.
GC-25 8,632 03/31/04 04/06/04 Garbade Const.
GC-26 18,605 03/31/04 04/06/04 Garbade Const.
GC-27 9,886 03/31/04 04/06/04 Garbade Const.
GC-28 2,104 03/31/04 04/06/04 Garbade Const.
GC-31 15,424 10/30/06 12/18/06 Garbade Construction
GC-34 -7,046 11/15/06 12/18/06 garbade Construction
GC-4 71,884 11/07/03 11/20/03 Garbade Const.
GC-5 2,553 11/07/03 11/20/03 Garbade Const.
GC-6 19,752 11/07/03 11/20/03 Garbade Const.
GC-8 19,856 02/02/04 02/17/04 Garbade Const.
GC-9 16,295 02/02/04 02/17/04 Garbade Const.
GC33D 3,132 10/30/06 12/18/06 Garbade Construction
H-2 12,723 03/31/04 04/23/04 Evans Mech.
H-3 4,009 12/26/03 01/12/04 Evans Mech.
P-3 3,250 12/26/03 01/14/04 Evans Mech.
P-4 827 12/26/03 01/12/04 Evans Mech.
R-1 13,971 01/05/04 01/16/04 Diamond Roofing
R-2 7,606 01/05/04 01/16/04 Diamond Roofing
R-5 99 12/26/03 12/31/03 Diamond Roofing
R-6 3,053 04/26/04 05/07/04 Diamond Roofing
W-1 11,350 01/05/04 01/16/04 Cortland Glass
W-2 4,560 01/05/04 01/16/04 Cortland Glass
07-1235 Reconstruction 0-010-008 04/01/08 NO CHANGE ORDERS ON ELECTRONIC FILE
New East Middle School:
90-1696 Reconstruction 0-011-001 08/05/91 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0607 Additions and Alterations 0-011-003 03/08/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1561 Reconstruction 0-011-004 06/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
06-1546 Reconstruction 0-011-006 07/11/07 *CO No.* Amount Disallowed Received Approved Contractor
HVAC-1 -641 12/05/07 12/12/07 J&K Plumbing & Heating
HVAC-2 5,343 02/11/08 02/23/08 J&K plumbing & heating
HVAC-3 -5,000 02/11/08 02/23/08 J&K plumbing & heating
HVAC-4 4,948 02/11/08 02/23/08 J&K plumbing & heating
HVAC-5 1,782 05/12/08 08/05/08 J&K PLUMBING & HEATING CO., INC.
07-1236 Reconstruction 0-011-007 04/01/08 NO CHANGE ORDERS ON ELECTRONIC FILE
High School:
92-0125 Reconstruction 0-014-008 08/11/92 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0605 Reconstruction 0-014-010 02/26/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0614 Reconstruction 0-014-012 01/31/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1569 Reconstruction 0-014-014 06/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1006 Reconstruction 0-014-015 05/19/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1040 Reconstruction 0-014-016 05/24/00 *CO No.* Amount Disallowed Received Approved Contractor
1C 8,500 05/22/03 06/11/03 Nelcorp
3-3D 15,204 05/22/03 06/11/03 Fahs-Rolston Paving
4-4N 6,500 05/22/03 06/11/03 Fahs-Rolston Paving
02-1720 Reconstruction 0-014-017 12/08/03 *CO No.* Amount Disallowed Received Approved Contractor
0002-014 5,123 01/14/05 02/01/05 Matco Electric Co
0005-001 808 02/17/05 03/11/05 Main Ford General Supply
0007-001 -131,720 10/18/04 11/24/04 AB Const. & Roofing
001-002 3,728 10/18/04 10/25/04 FE Jones Const.
001-003 7,583 10/25/04 10/28/04 FE Jones Const.
001-005 3,568 10/25/04 10/28/04 FE Jones Const.
001-006 14,950 14,950 10/25/04 10/28/04 FE Jones Const.
001-015 4,813 03/29/05 04/01/05 FE jones Construction
001-020 1,898 03/29/05 04/01/05 FE Jones Construction
001-030 8,788 02/17/05 03/11/05 FE Jones Construction
001-040 9,609 01/14/05 02/15/05 Fe jones Construction
002-008 -3,868 03/29/05 04/27/05 Matco Electrical Company
002-009 7,725 03/29/05 04/27/05 Matco Electric Co
003-007 9,983 03/29/05 04/01/05 Ackerman Mechanical Service
004-005 1,522 03/29/05 04/01/05 Evans Mechanical
004-009 2,342 03/29/05 04/01/05 Evans Mechanical
004-012 12,239 01/20/05 02/15/05 Evans Mechanical
007-005 5,400 10/25/04 10/28/04 AB Const. & Roofing
007-006 13,600 10/25/04 10/28/04 AB Const. & Roofing
007-009 2,200 03/29/05 04/01/05 AB Construction Roofing
E-18 5,812 03/29/05 04/01/05 Matco Electric
E-18 4,859 03/29/05 04/01/05 Matco Electric
E-26 981 01/30/06 07/05/06 Matco Electric
E-29 -1,933 03/02/06 05/18/07 Matco Electric
E18B 4,859 07/07/05 07/21/05 Matco Electric
GC-45 0 07/07/05 07/21/05 Fe jones Construction
GC-62 -17,167 03/02/06 06/07/06 Fe Jones Construction
GC-70 511 03/02/06 06/07/06 Fe Jones Construction
GC-71 -48,952 08/04/06 08/21/07 Fe Jones Construction
GC-76 -3,160 02/02/07 03/09/07 FE Jones Construction
H-17 237 03/29/05 04/01/05 Evans Mechanical
H17E 237 07/07/05 07/21/05 Evans Mechanical Inc
P-15 1,625 01/28/05 02/15/05 Ackerman Mechanical Service
P-22 0 07/07/05 07/21/05 Ackerman Mechanical Service
R-11 0 07/07/05 07/21/05 AB Construction and Roofing
R-13 4,900 07/07/05 07/21/05 Ab Construction Roofing
06-0191 Reconstruction 0-014-018 05/07/07 *CO No.* Amount Disallowed Received Approved Contractor
E-1 1,915 12/05/07 12/12/07 Blanding Electric
H-1 0 12/05/07 12/12/07 Evans Mechanical
H-2 -1,273 12/13/07 01/07/08 Evans Mechanical
06-1547 Reconstruction 0-014-020 07/05/07 *CO No.* Amount Disallowed Received Approved Contractor
HVAC-1 -14,091 12/11/07 01/07/08 Evans Mechanical
HVAC-3 3,271 05/12/08 08/05/08 EVANS MECHANICAL, INC.
07-1237 Reconstruction 0-014-021 04/01/08 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0359FP Reconstruction 0-014-FP1 11/18/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Woodrow Wilson:
90-1698 Reconstruction 0-016-006 08/05/91 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0664 Reconstruction 0-016-008 02/27/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1570 Reconstruction 0-016-009 06/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1012 Reconstruction 0-016-010 05/19/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1372 Reconstruction 0-016-011 04/19/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1721 Reconstruction 0-016-013 12/08/03 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
0004-004 12,167 01/13/05 02/01/05 Evans Mechanical
001-004 3,667 10/25/04 10/28/04 FE Jones Const.
001-013 1,415 11/01/04 11/23/04 FE Jones Const.
001-019 7,625 03/29/05 04/01/05 FE Jones Construction
001-023 2,981 03/29/05 04/01/05 FE Jones Construction
001-028 3,512 03/29/05 04/01/05 FE Jones Construction
001-035 10,106 01/21/05 02/15/05 FE Jones Construction, Inc.
001-039 12,505 01/20/05 02/15/05 FE Jones Construction
002-004 4,113 10/25/04 10/28/04 Matco Elec.
002-010 8,016 03/29/05 04/27/05 Matco Electric
003-002 6,955 10/25/04 10/28/04 Ackerman Mech.
003-008 3,225 03/29/05 04/01/05 Akerman Mechanical Service
004-008 1,987 03/29/05 04/01/05 Evans Mechanical
004-013 5,104 01/20/05 02/15/05 Evans mechanical
005-002 3,661 02/17/05 03/11/05 Main Ford General Supply
426794 -1,750 10/18/04 11/24/04 AB Const.
A-5 -4,317 07/14/06 08/14/06 Fibertech Environmental
E-17 497 03/29/05 04/01/05 Matco Electric
E-19 915 03/29/05 04/01/05 Matco Electric
E-19 915 07/07/05 07/21/05 Matco Electric
E-20 9,942 07/07/05 08/03/05 Matco Electric
E-22 1,304 01/31/06 05/25/06 Matco Electric
E-27 1,492 01/30/06 06/29/06 MATCO ELECTRIC
E-28 2,413 03/02/06 06/19/06 Matco Electric
E-33 5,604 03/02/06 06/19/06 Matco Electric
E-35 2,760 06/09/06 08/25/06 Matco Electric
E17C 0 07/07/05 07/21/05 Matco Electric
GC-44 0 03/29/05 / / FE Jones Construction
GC-48 10,121 07/07/05 08/03/05 Fe jones Construction
GC-49 12,530 07/07/05 07/21/05 Fe Jones Construction
GC-50 9,386 07/07/05 08/03/05 Fe jones Construction
GC-51 -3,730 01/26/06 06/09/06 Fe jones Construction
GC-54 -3,110 01/26/06 06/09/06 Fe jones Construction
GC-55 12,935 01/26/06 06/09/06 Fe jones Construction
GC-57 5,592 01/26/06 06/09/06 Fe jones Construction
GC-63 13,017 03/02/06 06/07/06 Fe jones Construction
GC-66 3,071 03/02/06 06/07/06 Fe Jones Construction
GC-67 4,651 03/02/06 06/07/06 Fe Jones Construction
GC-75 -58,149 08/04/06 08/21/07 Fe Jones Construction
GC42 D 0 07/07/05 12/18/06 Fe Jones Construction
GC44D 0 07/07/05 07/21/05 Fe Jones Construction
H-17 1,317 03/29/05 04/01/05 Evans Mechanical
H-19 10,264 01/30/06 06/29/06 EVANS MECHANICAL, INC.
H-21 16,045 01/30/06 06/29/06 EVANS MECHANICAL, INC.
H-22 2,427 03/02/06 06/19/06 Evans Mecahnical
H-24 6,396 06/09/06 08/25/06 Evans Mechanical
H-25 -469 06/09/06 08/25/06 Evans Mechanical
H17D 1,317 07/07/05 07/21/05 Evans Mechanical Inc
H18C 119 07/07/05 07/21/05 Evans mechanical
P-13 15,151 01/28/05 02/15/05 Ackermanm Mechanical Service
P-14 14,603 01/28/05 02/15/05 Ackerman mechanical Service
P-16 10,481 01/28/05 02/24/05 Ackermanm Mechanical Service
P-18 2,602 07/07/05 07/21/05 Ackerman mechanical service
P-21 -463 07/07/05 07/21/05 Ackerman Mechanical Services
R-14 3,200 07/07/05 07/21/05 Ab Construction Roofing
07-1238 Reconstruction 0-016-016 04/01/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Thomas Jefferson Elem.:
02-1722 Reconstruction 0-019-004 12/08/03 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
0 / / / /
001-010 8,633 11/01/04 11/23/04 FE Jones Construction
001-011 6,266 11/01/04 11/23/04 FE Jones Construction
001-017 1,181 03/29/05 04/01/05 FE jones Construction
001-022 4,709 03/29/05 04/01/05 FE Jones Construction
001-024 -1,945 03/29/05 04/01/05 FE Jones Construction
001-031 9,272 02/17/05 03/11/05 FE jones Construction
001-033 15,653 01/14/05 02/01/05 Fe Jones Construction
001-038 9,843 01/14/05 02/01/05 Fe Jones Construction
002-003 -2,872 10/25/04 10/28/04 Matco Elec.
002-005 5,495 03/29/05 04/27/05 Matco Electric CO
002-006 -4,134 03/29/05 04/27/05 Matco Electric Co
002-007 -7,933 03/29/05 04/27/05 Matco Electric Co
002-015 6,680 01/14/05 02/01/05 Matco Electric Co
003-001 -1,884 10/25/04 10/28/04 Ackerman Mech.
003-009 3,783 03/29/05 04/01/05 Ackerman Mechanical Service
004-002 2,734 10/25/04 10/28/04 Evans Mech.
004-003 5,400 10/25/04 10/28/04 Evans Mech.
004-007 1,362 03/29/05 04/01/05 Evans Mechanical
004-014 3,257 01/20/05 02/15/05 Evans Mechanical
007-003 -4,500 10/18/04 11/24/04 AB Const. & Roofing
007-007 4,126 03/29/05 04/01/05 AB Construction and Roofing
E-24 4,348 01/30/06 05/25/06 Matco Electric
E18A 5,812 07/07/05 07/21/05 Matco electric
GC-61 831 03/02/06 06/07/06 Fe jones Construction
GC-68 -1,721 03/02/06 06/07/06 Fe jones Construction
GC-72 -11,686 08/04/06 08/21/07 Fe Jones Construction
GC42C 0 07/07/05 07/21/05 Fe Jones Construction
H-17 688 03/29/05 04/01/05 Evans Mechanical
H17B 688 07/07/05 07/21/05 Evans mechanical
H18B -30 07/07/05 07/21/05 Evans mechanical Inc
MacArthur Elementary:
96-1563 Reconstruction 0-020-005 06/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1010 Reconstruction 0-020-006 05/19/99 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1041 Reconstruction 0-020-007 05/24/00 *CO No.* Amount Disallowed Received Approved Contractor
2-2C 3,313 05/22/03 07/23/03 Fahs-Rolston Paving
2-2E 4,318 05/22/03 07/23/03 Fahs-Rolston Paving
4-4D 3,750 05/22/03 06/11/03 Fahs-Rolston Paving
4-4K 3,500 05/22/03 06/11/03 Fahs-Rolston Paving
4-4L 2,400 05/22/03 06/11/03 Fahs-Rolston Paving
GC-5 -4,720 05/22/03 06/11/03 Fahs-Rolston Paving
HVAC1 -3,005 05/22/03 06/11/03 Louis N. Picciano and Son
PC-1 7,848 05/22/03 06/11/03 Evans Mech.
PC-3 2,164 05/22/03 06/11/03 Evans Mech.
PC-3 6,484 06/10/03 06/11/03 Evans Mech.
SFC-1 -16,090 05/22/03 06/11/03 Gorick Const.
SFC-2 20,655 05/22/03 06/11/03 Gorick Const.
01-1304 Reconstruction 0-020-008 12/13/02 *CO No.* Amount Disallowed Received Approved Contractor
33A 3,132 10/30/06 12/18/06 Garbade Construction
34B -7,046 10/30/06 / / Garbade Construction
A-1 3,200 02/02/04 02/17/04 S&S Environ.
A-1 3,200 02/02/04 02/02/04 S & S Environmental
A-2 6,527 02/02/04 02/17/04 S&S Environ.
A-2 6,527 02/02/04 02/02/04 S &S Environmental
A-5 4,730 02/02/04 02/17/04 S&S Environ.
A-5 4,730 02/02/04 02/02/04 S & S Environmental
E-1 3,318 01/05/04 01/20/04 Blanding Elec.
E-1 3,318 01/05/04 01/05/04 Blanding electric
E-2 5,459 01/05/04 01/20/04 Blanding Elec.
E-2 5,459 01/05/04 01/05/04 Blanding Electric
E-3 6,645 12/26/03 01/12/04 Blanding Elec.
E-3 6,645 12/26/03 12/26/03 Blanding Electric
E-4 8,199 02/02/04 02/17/04 Blanding Elec.
E-4 8,199 02/02/04 02/02/04 Blanding Electric
E-7 7,984 03/31/04 04/23/04 Blanding Elec.
E-7 7,984 03/31/04 03/31/04 Blanding Electric
E-9 3,185 09/07/04 09/23/04 Blanding Elec.
FSE-2 2,500 02/02/04 02/17/04 Maines CDI
GC-1 4,726 08/13/03 08/26/03 Garbade Const.
GC-1 1,449 10/25/04 10/28/04 Procon Contracting
GC-10 7,133 02/02/04 03/15/04 Garbade Const.
GC-10 7,133 02/02/04 02/02/04 Garbade Construction company
GC-11 6,372 02/02/04 02/17/04 Garbade Const.
GC-11 6,372 02/02/04 02/02/04 Garbade Construction Company
GC-12 1,794 02/02/04 02/17/04 Garbade Const.
GC-12 1,794 02/02/04 02/02/04 Garbade Construction Corporation
GC-13 3,333 02/02/04 02/17/04 Garbade Const.
GC-13 3,333 02/02/04 02/02/04 Garbade Construction Company
GC-2 1,920 10/25/04 10/28/04 Procon Contracting
GC-24 4,173 03/31/04 04/06/04 Garbade Const.
GC-25 3,135 03/31/04 04/06/04 Garbade Const.
GC-27 685 03/31/04 04/06/04 Garbade Const.
GC-28 3,125 03/31/04 04/06/04 Garbade Const.
GC-3 -80,000 11/07/03 11/20/03 Garbade Const.
GC-30 19,363 10/30/06 12/18/06 Garbade Construction
GC-32 18,818 10/30/06 12/18/06 Gerbade Construction
GC-34 -7,046 11/15/06 12/18/06 Garbade Construction
GC-5 2,553 11/07/03 11/20/03 Garbade Const.
GC-6 19,752 11/07/03 11/20/03 Garbade Const.
GC-7 19,882 02/02/04 02/17/04 Garbade Const.
H-1A -5,774 12/26/03 / / Evans Mech.
H-2 6,142 03/31/04 04/23/04 Evans Mech.
H-3 2,240 12/26/03 01/12/04 Evans Mech.
P-1 7,311 01/05/04 01/20/04 Evans Mech.
P-2 21,378 01/05/04 11/14/05 Evans Mech.
P-3 812 12/26/03 01/14/04 Evans Mech.
P-4 2,102 12/26/03 01/12/04 Evans Mech.
R-1 -5,482 01/05/04 01/16/04 Diamond Roofing
W-1 6,552 01/05/04 01/16/04 Cortland Glass
W-3 2,538 02/02/04 02/17/04 Cortland Glass
06-0190 Reconstruction 0-020-010 09/01/06 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1239 Reconstruction 0-020-014 04/01/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Horace Mann School:
96-1566 Reconstruction 0-022-007 06/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1373 Reconstruction 0-022-008 04/19/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1723 Reconstruction 0-022-009 12/08/03 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0004-004 12,167 01/13/05 02/01/05 Evans Mechanical
001-002 18,635 02/17/05 03/11/05 FE Jones Construction
001-007 -321 10/25/04 10/28/04 FE Jones Const.
001-014 1,365 11/01/04 11/23/04 FE Jones Const.
001-016 3,267 03/29/05 04/01/05 FE jones Construction
001-025 9,624 03/29/05 04/01/05 FE Jones Construction
001-034 -1,137 01/14/05 02/01/05 Fe Jones Construction
001-037 6,645 01/14/05 02/01/05 Fe Jones Construction
002-001 -130 10/25/04 10/28/04 Matco Elec.
002-011 2,631 03/29/05 04/27/05 Matco Electric
002-016 13,965 01/14/05 02/01/05 Matco Electric Co
003-003 -4,344 10/25/04 10/28/04 Ackerman Mech.
003-005 9,867 03/29/05 04/01/05 Ackerman Mechanical Service
004-001 -1,231 10/25/04 10/28/04 Evans Mech.
004-011 8,974 01/20/05 02/15/05 Evans Mechanical
A-2 -1,169 01/26/06 06/09/06 fibertech Environemental
A-3 -2,635 07/14/06 08/14/06 Fibertech Environmental
A-6 -5,399 06/09/06 12/15/06 Fibertech Environmental
E-17 5,543 03/29/05 04/01/05 Matco Electric
E-23 4,180 01/31/06 05/25/06 Matco Electric
E-31 1,001 03/02/06 06/23/06 Matco Electric
E-34 2,355 03/02/06 06/23/06 Matco Electric
E17B 5,047 07/07/05 07/21/05 Matco Electric
GC-43 0 07/07/05 07/21/05 Fe Jones Construction
GC-52 -2,954 01/26/06 06/09/06 Fe jones Construction
GC-53 20,209 01/23/06 06/09/06 Fe jones
GC-56 10,167 01/26/06 06/09/06 Fe jones construction
GC-59 1,694 01/26/06 06/09/06 Fe jones Construction
GC-65 3,322 03/02/06 07/24/06 Fe Jones Construction
GC-74 -13,034 08/04/06 08/21/07 Fe Jones Construction
GC42B 0 07/07/05 08/04/05 Fe Jones Construction
GC44C 0 07/07/05 07/21/05 Fe jones Construction
H-16 1,639 03/29/05 04/01/05 Evans Mechanical
H-17 506 03/29/05 04/01/05 Evans Mechanical
H-20 -1,151 01/30/06 06/29/06 EVANS MEACHANICAL, INC.
H17C 506 07/07/05 07/21/05 Evans Mechanical
P-12 2,041 01/28/05 02/15/05 Ackerman Mechanical Service
P-20 4,364 07/07/05 07/21/05 Ackerman Mechanical Service
02-1638 Reconstruction 0-022-010 03/21/03 *CO No.* Amount Disallowed Received Approved Contractor
R-1 19,400 01/05/03 01/16/04 AB Construction and Roofing
R-2 7,079 4,403 03/31/04 04/12/04 AB Construction Roofing
07-1240 Reconstruction 0-022-012 04/01/08 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0358FP Reconstruction 0-022-FP1 11/18/04 NO CHANGE ORDERS ON ELECTRONIC FILE
East Middle Storage 1 (South):
99-1042 New Construction 2-031-001 05/24/00 NO CHANGE ORDERS ON ELECTRONIC FILE
East Middle Storage 2 (North):
99-1043 New Construction 2-032-001 05/24/00 NO CHANGE ORDERS ON ELECTRONIC FILE
Maintenance Building:
96-1564 Reconstruction 3-004-001 06/16/97 NO CHANGE ORDERS ON ELECTRONIC FILE
08-0136 Additions and Alterations 3-004-003 09/22/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Fieldhouse Concession:
99-1044 Reconstruction 7-012-001 05/24/00 *CO No.* Amount Disallowed Received Approved Contractor
1-1G 18,020 05/22/03 06/11/03 Fahs-Rolston Paving
4-4C 900 05/25/03 06/11/03 Fahs-Rolston Paving
Fieldhouse:
99-1045 Additions and Alterations 7-021-001 05/24/00 *CO No.* Amount Disallowed Received Approved Contractor
04-4A 2,250 05/22/03 06/11/03 Fahs-Rolston Paving
04-4B 6,500 05/22/03 06/11/03 Fahs-Rolston Paving
04-4E 850 05/22/03 06/11/03 Fahs-Rolston Paving
04-4I 6,500 05/22/03 06/11/03 Fahs-Rolston Paving
06-6A 10,990 05/22/03 06/11/03 Fahs-Rolston Paving
PC-2 798 05/22/03 06/11/03 Evans Mech.
PC-3 529 06/10/03 / / Evans Mech.
Pc-3 2,689 05/22/03 / / Evans Mech.
East Middle Press Box(Home):
99-1046 New Construction 7-025-001 05/24/00 NO CHANGE ORDERS ON ELECTRONIC FILE
East Middle Pressbox(Visitor):
99-1047 New Construction 7-026-001 05/24/00 NO CHANGE ORDERS ON ELECTRONIC FILE
East Middle Concessions/Ticket House:
99-1048 New Construction 7-027-001 05/24/00 *CO No.* Amount Disallowed Received Approved Contractor
PC-3 529 05/22/03 06/11/03 Evans Mech.
PC-3 1,112 06/10/03 06/11/03 Evans Mech.
East Middle Ticket Booth(Southeast):
99-1049 New Construction 7-028-001 05/24/00 *CO No.* Amount Disallowed Received Approved Contractor
1-1H 784 06/10/03 06/11/03 Fahs-Rolston
3-3A 532 05/22/03 06/11/03 Fahs-Rolston
East Middle Ticket Booth#2(south):
99-1050 New Construction 7-029-001 05/24/00 NO CHANGE ORDERS ON ELECTRONIC FILE
East Middle Ticket Booth 3(North):
99-1051 New Construction 7-030-001 05/24/00 NO CHANGE ORDERS ON ELECTRONIC FILE
East Middle Team Room/Toliets 1(Sou):
99-1052 New Construction 7-033-001 05/24/00 NO CHANGE ORDERS ON ELECTRONIC FILE
East Middle Team Room/Toliets 2(No):
99-1053 New Construction 7-034-001 05/24/00 NO CHANGE ORDERS ON ELECTRONIC FILE
Security Booth #1 @ HS:
03-1614 New Construction 7-035-001 07/16/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Security Booth #2 @ HS:
03-1615 New Construction 7-036-001 07/16/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Security Booth #3 @ HS:
03-1616 New Construction 7-037-001 07/16/04 NO CHANGE ORDERS ON ELECTRONIC FILE
District Wide:
96-0863 Reconstruction 7-999-002 04/03/97 NO CHANGE ORDERS ON ELECTRONIC FILE
HARPURSVILLE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 03-05-01-04
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Jr/Sr High School:
91-1117 Reconstruction 0-001-005 05/04/92 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1033 Additions and Alterations 0-001-007 06/05/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-1137 Reconstruction 0-001-008 03/25/98 *CO No.* Amount Disallowed Received Approved Contractor
WC-04 -6,356 12/10/01 03/05/02 RD McCarthy Co.
00-0883 Reconstruction 0-001-009 07/31/01 *CO No.* Amount Disallowed Received Approved Contractor
EC-01 3,845 05/14/02 05/24/02 Blanding Elec.
EC-02 370 05/14/02 05/24/02 Blanding Elec.
EC-03 781 05/14/02 05/24/02 Blanding Elec.
EC-04 831 06/27/02 07/03/02 Blanding Elec.
EC-05 225 06/27/02 07/03/02 Blanding Elec.
EC-06 2,385 06/27/02 07/03/02 Blanding Elec.
EC-07 -2,666 07/12/02 11/04/02 Blanding Elec.
EC-08 1,988 08/19/02 11/01/02 Blanding Elec.
EC-09 69 08/19/02 11/01/02 Blanding Elec.
EC-11 11,996 09/30/02 11/05/02 Blanding Elec.
EC-12 248 09/30/02 11/05/02 Blanding Elec.
EC-13 106 09/30/02 11/05/02 Blanding Elec.
EC-14 351 09/30/02 11/05/02 Blanding Elec.
EC-16 588 10/24/02 10/29/02 Blanding Elec.
EC-17 728 10/24/02 10/29/02 Blanding Elec.
EC-18 679 10/24/02 10/29/02 Blanding Elec.
EC-19 1,006 10/24/02 10/29/02 Blanding Elec.
EC-20 991 11/29/02 12/04/02 Blanding Elec.
EC-21 1,590 11/29/02 12/04/02 Blanding Elec.
EC-22 1,818 11/29/02 12/04/02 Blanding Elec.
EC-23 190 01/24/03 02/05/03 Blanding Elec.
EC-24 297 01/24/03 02/05/03 Blanding Elec.
EC-25 280 01/24/03 02/05/03 Blanding Elec.
EC-26 7,536 02/12/03 02/27/03 Blanding Elec.
EC-27 522 02/12/03 02/27/03 Blanding Elec.
EC-28 480 08/08/03 08/14/03 Blanding Elec.
EC-29 16,180 05/03/04 05/11/04 Blanding Elec.
GC-01 -2,150 04/26/02 05/30/02 Mancini Assoc.
GC-02 1,621 04/26/02 05/30/02 Mancini Assoc.
GC-03 1,647 05/14/02 05/24/02 Mancini Assoc.
GC-04 1,155 05/14/02 05/24/02 Mancini Assoc.
GC-05 275 05/14/02 05/24/02 Mancini Assoc.
GC-06 1,705 05/14/02 05/24/02 Mancini Assoc.
GC-07 -4,200 05/29/02 05/30/02 Mancini Assoc.
GC-08 2,253 06/27/02 07/03/02 Mancini Assoc.
GC-10 1,474 06/27/02 07/03/02 Mancini Assoc.
GC-11 0 06/27/02 07/03/02 Mancini Assoc.
GC-14 1,309 07/23/02 08/16/02 Mancini Assoc.
GC-15 6,495 08/19/02 11/01/02 Mancini Assoc.
GC-16 3,149 08/19/02 11/01/02 Mancini Assoc.
GC-17 5,933 09/30/02 11/05/02 Mancini Assoc.
GC-18 4,253 09/30/02 11/05/02 Mancini Assoc.
GC-19 21,715 09/30/02 11/05/02 Mancini Assoc.
GC-21 719 09/30/02 11/05/02 Mancini Assoc.
GC-22 8,064 09/30/02 11/05/02 Mancini Assoc.
GC-23 16,000 09/30/02 11/05/02 Mancini Assoc.
GC-24 1,398 09/30/02 11/05/02 Mancini Assoc.
GC-26 7,687 09/30/02 11/05/02 Mancini Assoc.
GC-27 630 09/30/02 11/05/02 Mancini Assoc.
GC-28 409 09/30/02 11/05/02 Mancini Assoc.
GC-29 9,087 09/30/02 11/05/02 Mancini Assoc.
GC-30 528 09/30/02 11/05/02 Mancini Assoc.
GC-31 1,095 09/30/02 11/05/02 Mancini Assoc.
GC-32 -2,279 09/30/02 11/05/02 Mancini Assoc.
GC-33 14,727 09/30/02 11/05/02 Mancini Assoc.
GC-34 784 10/24/02 10/29/02 Mancini Assoc.
GC-35 258 10/24/02 10/29/02 Mancini Assoc.
GC-37 632 10/24/02 10/29/02 Mancini Assoc.
GC-38 6,870 10/24/02 10/29/02 Mancini Assoc.
GC-39 6,617 10/24/02 10/29/02 Mancini Assoc.
GC-40 2,347 11/29/02 12/04/02 Mancini Assoc.
GC-41 2,192 11/29/02 12/04/02 Mancini Assoc.
GC-42 2,866 11/29/02 12/04/02 Mancini Assoc.
GC-43 2,352 11/29/02 12/04/02 Mancini Assoc.
GC-44 1,200 11/29/02 12/04/02 Mancini Assoc.
GC-45 9,649 11/29/02 12/04/02 Mancini Assoc.
GC-46 -362 11/29/02 12/04/02 Mancini Assoc.
GC-47 1,079 01/24/03 02/05/03 Mancini Assoc.
GC-48 332 01/24/03 02/05/03 Mancini Assoc.
GC-49 2,272 01/24/03 02/05/03 Mancini Assoc.
GC-50 694 01/24/03 02/05/03 Mancini Assoc.
GC-51 -3,149 01/24/03 02/05/03 Mancini Assoc.
GC-52 13,290 01/24/03 02/05/03 Mancini Assoc.
GC-53 658 01/24/03 02/05/03 Mancini Assoc.
GC-54 22,150 01/24/03 02/05/03 Mancini Assoc.
GC-55 13,721 01/24/03 02/05/03 Mancini Assoc.
GC-56 660 01/24/03 02/05/03 Mancini Assoc.
GC-57 1,704 05/08/03 05/27/03 Mancini Assoc.
GC-58 5,868 05/08/03 05/27/03 Mancini Assoc.
GC-59 2,062 05/08/03 05/27/03 Mancini Assoc.
GC-60 -6,002 05/08/03 05/27/03 Mancini Assoc.
MC-02 2,675 08/19/02 11/01/02 Evans Mech.
MC-03 1,543 09/30/02 11/05/02 Evans Mech.
MC-04 2,238 09/30/02 11/05/02 Evans Mech.
MC-05 3,910 09/30/02 11/05/02 Evans Mech.
MC-06 16,502 09/30/02 11/05/02 Evans Mech.
MC-07 2,799 10/24/02 10/29/02 Evans Mech.
MC-08 1,452 10/24/02 10/29/02 Evans Mech.
MC-09 11,212 10/24/02 10/29/02 Evans Mech.
MC-10 323 11/29/02 12/04/02 Evans Mech.
MC-11 461 01/24/03 02/05/03 Evans Mech.
MC-12 2,534 01/24/03 02/05/03 Evans Mech.
MC-13 1,584 02/28/03 03/06/03 Evans Mech.
MC-14 4,272 05/08/03 05/27/03 Evans Mech.
PC-01 2,657 05/14/02 05/24/02 American Ambient Mech.
PC-02 -532 06/12/02 11/04/02 American Ambient Mech.
PC-04 0 09/30/02 11/05/02 American Ambient Mech.
PC-06 764 08/19/02 11/01/02 American Ambient Mech.
PC-07 377 10/24/02 10/29/02 American Ambient Mech.
PC-08 775 10/24/02 10/29/02 American Ambient Mech.
PC-09 730 11/29/02 12/04/02 American Ambient Mech.
PC-10 2,741 01/24/03 02/05/03 American Ambient Mech.
PC-11 92 01/24/03 02/05/03 American Ambient Mech.
PC-12 3,944 02/28/03 03/06/03 American Ambient Mech.
PC-13 360 02/28/03 03/06/03 American Ambient Mech.
PC-14 289 02/28/03 03/06/03 American Ambient Mech.
SC-01 8,136 05/14/02 05/24/02 W&D Smith
SC-02 7,326 07/12/02 11/04/02 W&D Smith
SC-03 669 09/30/02 11/05/02 W&D Smith
SC-04 2,213 10/24/02 10/29/02 W&D Smith
SC-05 7,191 11/29/02 12/04/02 W&D Smith
SC-06 2,116 11/29/02 12/04/02 W&D Smith
SC-07 5,336 11/29/02 12/04/02 W&D Smith
SC-08 11,045 11/29/02 12/04/02 W&D Smith
SC-09 19,435 11/29/02 12/04/02 W&D Smith
SC-10 7,171 01/24/03 02/05/03 W&D Smith
SC-11 5,826 02/12/03 02/27/03 W&D Smith
SC-12 -10,500 05/08/03 05/27/03 W&D Smith
SC-13 6,166 05/08/03 05/27/03 W&D Smith
07-0280 Reconstruction 0-001-010 10/09/07 NO CHANGE ORDERS ON ELECTRONIC FILE
07-1549 Reconstruction 0-001-011 10/06/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Agricultural Industrial Arts Shop:
00-0884 Reconstruction 0-005-002 07/31/01 *CO No.* Amount Disallowed Received Approved Contractor
EC-10 631 08/19/02 11/01/02 Blanding Elec.
EC-15 2,215 09/30/02 11/05/02 Blanding Elec.
GC-09 546 06/27/02 07/03/02 Mancini Assoc.
GC-12 2,219 06/27/02 07/03/02 Mancini Assoc.
GC-13 0 07/23/02 08/16/02 Mancini Assoc.
GC-20 647 09/30/02 11/05/02 Mancini Assoc.
GC-25 1,935 09/30/02 11/05/02 Mancini Assoc.
GC-36 344 10/24/02 10/29/02 Mancini Assoc.
MC-01 709 07/12/02 11/04/02 Evans Mech.
PC-03 397 06/12/02 11/04/02 American Ambient Mech.
PC-05 231 08/19/02 11/01/02 American Ambient Mech.
Olmsted Elementary School:
92-0523 Reconstruction 0-006-002 12/17/92 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1034 Additions and Alterations 0-006-003 06/05/96 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
91-1118 Reconstruction 5-008-001 05/04/92 NO CHANGE ORDERS ON ELECTRONIC FILE
Press Box/Storage:
97-0632 New Construction 7-010-001 02/11/98 NO CHANGE ORDERS ON ELECTRONIC FILE
SUSQUEHANNA VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 03-06-01-06
last updated on 10/10/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Brookside Elementary:
95-0822 Reconstruction 0-003-002 03/14/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0274 Reconstruction 0-003-003 12/21/99 *CO No.* Amount Disallowed Received Approved Contractor
EC-7 218 10/26/01 02/26/02 Billitier Elec.
GC-10 12,963 07/22/02 08/16/02 S&W General Contractors
GC-7 6,142 01/25/02 03/21/02 S&W General Contractors
GC-9 436 01/25/02 03/21/02 S&W General Contractors
HVAC-7 485 01/25/02 03/21/02 Evans Mech.
PC-4 480 10/26/01 02/26/02 James Lewis
PC-5 1,980 12/11/01 03/29/02 James Lewis
95-1718 Reconstruction 0-003-005 07/10/96 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0381 Reconstruction 0-003-006 09/23/97 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1512FP Reconstruction 0-003-FP1 04/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Cedarhurst Elem. School:
96-0353 Reconstruction 0-005-001 10/23/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0275 Reconstruction 0-005-002 12/21/99 *CO No.* Amount Disallowed Received Approved Contractor
GC-12 14,978 06/03/03 06/25/03 S&W General Contractors
GC-13 9,950 06/03/03 06/25/03 S&W General Contractors
GC-14 6,800 08/29/03 10/06/03 S&W General Contractors
07-1614 Reconstruction 0-005-005 04/11/08 *CO No.* Amount Disallowed Received Approved Contractor
FT-1 -2,305 09/18/08 09/29/08 Orchard Earth and Pipe Corp
02-1514FP Reconstruction 0-005-FP1 04/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Susquehanna Valley High School:
90-1340 Reconstruction 0-006-003 05/10/91 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0786 Reconstruction 0-006-004 03/14/96 NO CHANGE ORDERS ON ELECTRONIC FILE
98-1510 Additions and Alterations 0-006-005 08/12/99 *CO No.* Amount Disallowed Received Approved Contractor
AA-7 -5,888 11/09/01 02/08/02 Midlantic Environ.
CF-11 950 05/09/02 05/14/02 Northeast Interior Systems
CF-9 -286 12/11/01 03/29/02 Northeast Interior Systems
EC-13 5,848 10/26/04 11/29/04 Billitier Elec.
EC-14 795 10/26/01 02/28/02 Billitier Elec.
GC-24 6,872 10/26/01 02/28/02 Garbade Const.
GC-25 2,221 11/07/01 05/22/02 Garbade Const.
GC-26 5,676 11/19/01 05/22/02 Garbade Const.
GC-27 1,052 12/11/01 03/29/02 Garbade Const.
HVAC-8 387 11/07/01 05/22/02 Kimble, Inc.
PC-11 837 03/29/02 05/23/02 Evans Mech.
PC-12 273 03/29/02 05/23/02 Evans Mech.
PC-13 4,958 03/29/02 05/23/02 Evans Mech.
SC-3 -4,000 02/26/03 03/06/03 Raulli & Sons
TEL-3 1,316 12/11/01 03/29/02 Blanding Elec.
TS-2 -2,500 11/22/02 01/02/03 STC Group
02-1513FP Reconstruction 0-006-FP1 04/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Donnely Elementary:
90-1017 Reconstruction 0-010-005 03/12/91 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0778 Reconstruction 0-010-006 03/14/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0273 Reconstruction 0-010-007 12/21/99 *CO No.* Amount Disallowed Received Approved Contractor
GC-11 12,401 06/03/03 06/25/03 S&W General Contractors of Tioga
GC-15 9,400 08/29/03 10/06/03 S&W General Contractors