REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
95-0516 Additions and Alterations 0-001-002 02/14/96 *CO No.* Amount Disallowed Received Approved Contractor
123 1,566 11/26/02 11/27/02 Albany Specialties
133 -78 11/26/02 11/27/02 O'Kane Assoc.
136 8,760 11/26/02 11/27/02 Rondout Elec.
137 13,455 11/26/02 11/27/02 Nicholas Bouras
138 2,434 11/26/02 11/27/02 Albany Specialties
139 -1,566 11/26/02 11/27/02 Albany Specialties
140 -2,027 11/26/02 11/27/02 P. Germinario & Sons
141 -2,715 11/26/02 11/27/02 Thomas Kempton Jr.
143 -2,750 11/26/02 11/27/02 Health & Educ. Equip.
144 -5,000 11/26/02 11/27/02 Health & Educ. Equip.
145 -5,000 11/26/02 11/27/02 Dover Elec.
146 -129 11/26/02 11/27/02 Rondout Elec.
147 -24,615 11/26/02 11/27/02 Rondout Elec.
148 -6,000 11/26/02 11/27/02 Rondout Elec.
150 -13,080 11/26/02 11/27/02 P. Germinario & Sons
152 -5,000 11/26/02 11/27/02 Landmark Flooring
153 -25,699 11/26/02 11/27/02 A. Servidone, Inc.
154 10,000 11/26/02 11/27/02 P. Germinario & Sons
158 6,000 03/18/03 03/18/03 Thomas Kempton
01-0159 Reconstruction 0-001-004 03/06/02 NO CHANGE ORDERS ON ELECTRONIC FILE
04-1265 Reconstruction 0-001-005 12/12/05 *CO No.* Amount Disallowed Received Approved Contractor
E-001 14,438 05/23/07 08/28/07 Kaplan Schmidt Electric
E-002 141,855 08/13/07 / / KAPLAN - SCHMIDT, INC.
E-002 141,855 08/13/07 / / KAPLAN - SCHMIDT ELECTRIC, INC.
FS-001 -10,329 03/20/06 06/23/06 Main Ford General Supply
FS-002 -2,450 05/28/08 / / Main Ford General Supply Co.
G-010 6,560 06/01/07 06/18/07 Keuka Construction
GC-001 4,526 06/26/06 08/11/06 Keuka Construction
GC-002 7,868 08/03/06 08/25/06 Kuka Construction
GC-003 4,184 08/03/06 08/25/06 Keuka Construction
GC-004 4,253 09/18/06 12/14/06 Keuka Construction
GC-005 6,231 09/18/06 12/14/06 Keuka Construction
GC-006 8,397 09/18/06 12/14/06 Keuka Construction
GC-007 3,918 12/13/06 01/19/07 Keuka Construction
GC-008 -10,000 12/13/06 01/19/07 Keuka Construction
H-001 22,116 06/06/06 01/24/07 Frey Campbell
H-002 29,269 10/05/07 / / Frey & Campbell, Inc.
P-001 7,568 10/05/07 / / Frey and Campbell, Inc.
02-1238FP Reconstruction 0-001-FP1 03/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
02-1239FP Reconstruction 0-001-FP2 03/17/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
04-1266 Reconstruction 5-002-003 12/12/05 *CO No.* Amount Disallowed Received Approved Contractor
G-009 3,571 01/06/07 01/23/07 Keuka Construction
P-002 1,374 10/05/07 / / Frey and Campbell, Inc.
BELMONT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-05-01-04
last updated on 07/25/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
93-1665 Reconstruction 0-001-003 08/04/94 NO CHANGE ORDERS ON ELECTRONIC FILE
ANDOVER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-06-01-04
last updated on 07/25/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
96-1409 Reconstruction 0-001-003 05/12/97 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0111 Additions and Alterations 0-001-004 01/31/01 *CO No.* Amount Disallowed Received Approved Contractor
01-01 18,149 01/23/02 03/04/02 USA Remediation
01-02 -35,811 11/12/02 01/02/03 USA Remediation
02-02 -676 06/12/02 07/10/02 Bakers of Jericho Hill
02-03 10,962 06/12/02 07/10/02 Bakers of Jericho Hill
02-04 17,347 06/12/02 07/10/02 Bakers of Jericho Hill
02-05 23,483 07/24/02 08/28/02 Bakers of Jericho Hill
03-01 -5,326 07/26/02 08/28/02 LeChase Const.
03-23 -24,000 06/12/02 07/10/02 LeChase Const.
03-24 22,517 06/12/02 07/10/02 LeChase Const.
03-25 1,262 06/12/02 07/10/02 LeChase Const.
03-26 -1,000 06/12/02 07/10/02 LeChase Const.
03-27 1,101 07/24/02 08/28/02 LeChase Const.
03-28 1,025 07/24/02 08/28/02 LeChase Const.
03-30 404 11/12/02 01/02/03 LeChase Const.
03-31 -566 11/12/02 01/02/03 LeChase Const.
03-32 4,848 10/28/02 12/02/02 LeChase Const.
04-01 10,075 07/26/02 08/28/02 Apple Roofing
04-02 -2,581 04/17/02 05/10/02 Apple Roofing
04-03 2,045 04/17/02 05/10/02 Apple Roofing
04-04 -344 06/12/02 07/10/02 Apple Roofing
04-05 -619 10/28/02 12/02/02 Apple Roofing
05-01 3,995 07/26/02 08/28/02 Mader Const.
05-02 10,914 12/04/01 02/21/02 Mader Const.
05-03 13,840 01/23/02 03/04/02 Mader Const.
05-04 4,608 01/23/02 03/04/02 Mader Const.
05-05 4,886 01/23/02 03/04/02 Mader Const.
05-06 3,300 01/23/02 03/04/02 Mader Const.
05-07 5,753 02/25/02 04/18/02 Mader Const.
05-08 7,263 04/17/02 05/10/02 Mader Const.
05-09 -1,882 06/12/02 07/10/02 Mader Const.
05-10 4,325 06/12/02 07/10/02 Mader Const.
05-11 4,706 11/12/02 01/02/03 Mader Const.
05-12 -619 10/28/02 12/02/02 Mader Const.
06-04 15,117 02/25/02 04/18/02 CNP Mech.
06-05 8,008 04/17/02 05/10/02 CNP Mech.
06-06 5,346 04/17/02 05/10/02 CNP Mech.
06-07 1,263 07/24/02 08/28/02 CNP Mech.
07-01 5,691 12/04/01 08/28/02 Frey & Campbell
07-02 3,169 01/23/02 03/04/02 Frey & Campbell
07-03 6,593 02/25/02 04/18/02 Frey & Campbell
07-05 1,525 02/25/02 04/18/02 Frey & Campbell
07-06 10,316 04/17/02 05/10/02 Frey & Campbell
07-07 7,457 04/17/02 05/10/02 Frey & Campbell
07-08 21,688 06/12/02 07/10/02 Frey & Campbell
07-10 2,039 06/12/02 08/28/02 Frey & Campbell
07-11 6,588 07/24/02 08/28/02 Frey & Campbell
07-12 -959 11/12/02 01/02/03 Frey & Campbell
07-13 117 10/28/02 12/02/02 Frey & Campbell
08-08 11,398 02/25/02 04/18/02 GVE
08-09 1,970 04/17/02 05/10/02 GVE
08-10 18,638 06/12/02 07/10/02 GVE
08-11 254,686 06/12/02 07/10/02 GVE
08-13 24,616 06/20/02 07/12/02 GVE
08-14 16,126 06/20/02 07/12/02 GVE
08-15 16,005 06/20/02 07/12/02 GVE
08-16 -696 07/24/02 08/28/02 GVE
08-17 -29,684 07/24/02 08/28/02 GVE
08-18 -122 07/24/02 08/28/02 GVE
08-19 15,138 07/24/02 08/28/02 GVE
08-20 -5,909 11/12/02 01/02/03 GVE
08-21 112,181 10/28/02 12/02/02 GVE
2-1 20,634 12/04/01 02/21/02 Bakers of Jericho Hill
3-10 2,449 01/23/02 03/04/02 LeChase Const.
3-11 11,758 01/23/02 03/04/02 LeChase Const.
3-12 -5,000 02/25/02 04/18/02 LeChase Const.
3-13 -2,615 02/25/02 04/18/02 LeChase Const.
3-14 17,899 02/25/02 04/18/02 LeChase Const.
3-15 12,135 02/25/02 05/01/02 LeChase Const.
3-16 15,712 02/25/02 04/18/02 LeChase Const.
3-17 17,795 04/17/02 05/10/02 LeChase Const.
3-2 -10,000 11/16/01 02/20/02 LeChase Const.
3-21 1,943 06/12/02 07/10/02 LeChase Const.
3-22 6,765 06/12/02 07/10/02 LeChase Const.
3-3 7,181 11/16/01 02/20/02 LeChase Const.
3-4 2,869 11/16/01 02/20/02 LeChase Const.
3-5 17,019 12/04/01 02/21/02 LeChase Const.
3-6 8,438 12/20/01 08/28/02 LeChase Const.
3-7 16,720 01/23/02 03/04/02 LeChase Const.
3-8 4,314 01/23/02 03/04/02 LeChase Const.
3-9 7,591 01/23/02 03/04/02 LeChase Const.
6-2 2,416 12/20/01 03/01/02 CNP Mech.
6-3 2,234 12/20/01 03/01/02 CNP Mech.
8-1 1,299 11/16/01 02/20/02 GVE
8-1Revis 1,299 02/25/02 04/18/02 GVE
8-2 759 11/16/01 02/20/02 GVE
8-3 12,749 12/04/01 02/21/02 GVE
8-4 1,952 01/23/02 03/04/02 GVE
8-5 11,282 01/23/02 08/28/02 GVE
8-6 12,168 01/23/02 06/24/03 GVE
00-0544 Reconstruction 0-001-005 12/13/00 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0402FP Reconstruction 0-001-FP1 11/07/02 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage Maintenance:
00-0112 Alterations 5-002-001 01/31/01 *CO No.* Amount Disallowed Received Approved Contractor
02-06 800 07/24/02 08/28/02 Bakers of Jericho Hill
02-07 19,739 10/28/02 12/02/02 Bakers of Jericho Hill
02-08 -527 10/28/02 12/02/02 Bakers of Jericho Hill
03-29 3,432 07/24/02 08/28/02 LeChase Const.
06-08 822 07/24/02 08/28/02 CNP Mech.
06-09 -3,694 01/10/03 01/16/03 CNP Mech.
06-10 -619 01/10/03 01/16/03 CNP Mech.
07-04 1,384 02/25/02 04/26/02 Frey & Campbell
07-09 6,645 06/12/02 06/14/02 Frey & Campbell
08-07 327 02/25/02 04/18/02 GVE
08-12 1,249 06/12/02 06/14/02 GVE
3-18 6,365 04/17/02 05/10/02 LeChase Const.
3-19 1,509 04/17/02 05/10/02 LeChase Const.
3-20 3,995 04/17/02 05/10/02 LeChase Const.
6-1 12,345 12/04/01 02/21/02 CNP Mech.
8-2Revis 759 02/25/02 04/18/02 GVE
ANGELICA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-07-01-04
last updated on 07/25/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
93-0182 Reconstruction 0-001-004 10/12/93 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage New-1988:
93-0183 Reconstruction 5-006-002 10/12/93 NO CHANGE ORDERS ON ELECTRONIC FILE
GENESEE VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-07-02-04
last updated on 07/25/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
New Pre-K-12:
00-0827SR New Construction 0-012-001 02/20/01 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
00-1403 New Construction 0-012-001 06/13/01 *CO No.* Amount Disallowed Received Approved Contractor
01-08 10,057 07/02/02 07/15/02 Bakers of Jericho Hill
01-09 10,362 10/30/02 12/02/02 Bakers of Jericho Hill
01-10 7,428 10/29/02 12/02/02 Bakers of Jericho Hill
01-11 1,105 10/06/03 11/05/03 Bakers of Jericho Hill
01-12 11,550 05/08/03 05/23/03 Bakers of Jericho Hill
01-13A 9,793 10/06/03 11/05/03 Bakers of Jericho Hill
01-14 3,321 05/08/03 05/23/03 Bakers of Jericho Hill
01-16 25,926 10/06/03 11/05/03 Bakers of Jericho Hill
01-17 16,696 01/27/04 02/18/04 Bakers of Jericho Hill
01-17A 1,918 05/17/05 06/07/05 Bakers of jericho hill
01-18 2,666 05/17/05 06/07/05 Bakers of Jericho Hill
01-19 18,930 05/17/05 06/07/05 Bakers of Jericho Hill
01-20 4,293 05/17/05 06/07/05 Baker of Jericho Hill
02-01 1,308 05/17/02 06/04/02 Delhi Steel
02-02 520 07/02/02 07/15/02 Delhi Steel
02-03 1,557 07/02/02 07/15/02 Delhi Steel
02-04 -400 07/02/02 07/15/02 Delhi Steel
02-05 225 12/23/02 01/08/03 Delhi Steel
02-06 1,717 12/23/02 01/08/03 Delhi Steel
02-07 311 12/23/02 01/08/03 Delhi Steel
02-08 2,098 12/23/02 01/08/03 Delhi Steel
02-09 3,268 12/23/02 01/08/03 Delhi Steel
02-10 -920 12/23/02 01/08/03 Delhi Steel
02-11 15,667 01/22/03 02/10/03 Delhi Steel
02-12 3,356 01/22/03 02/10/03 Delhi Steel
02-13 660 01/22/03 02/10/03 Delhi Steel
02-14 720 01/22/03 02/10/03 Delhi Steel
02-15 1,421 01/22/03 02/10/03 Delhi Steel
02-17 -1,578 06/20/03 06/30/03 Delhi Steel
02-18 -9,684 10/06/03 11/05/03 Delhi Steel
02-19 7,545 11/05/03 11/12/03 Delhi Steel
02-20 -5,000 01/27/04 02/18/04 Delhi Steel
03-02 3,672 07/18/02 08/28/02 LeChase Construction
03-04 -1,202 08/21/02 09/04/02 LeChase Construction
03-05 3,672 08/21/02 09/04/02 LeChase Construction
03-06 4,571 08/21/02 09/04/02 LeChase Construction
03-07 -4,488 09/03/02 09/05/02 LeChase Construction
03-08 9,515 09/03/02 09/05/02 LeChase Construction
03-09 1,575 09/03/02 09/05/02 LeChase Construction
03-10 732 09/03/02 09/05/02 LeChase Construction
03-11 1,023 09/03/02 09/05/02 LeChase Construction
03-12 825 09/03/02 09/05/02 LeChase Construction
03-13 343 09/03/02 09/05/02 LeChase Construction
03-14 584 09/03/02 09/05/02 LeChase Construction
03-15 747 09/03/02 09/05/02 LeChase Construction
03-16 18,709 10/29/02 12/02/02 LeChase Construction
03-17 5,902 12/23/02 01/08/03 LeChase Construction
03-18 186 12/23/02 01/08/03 LeChase Construction
03-19 5,224 12/23/02 01/08/03 LeChase Construction
03-20 920 12/23/02 01/08/03 LeChase Construction
03-21 236 02/18/03 02/24/03 LeChase Construction
03-22 1,182 02/18/03 02/25/03 LeChase Construction
03-23 1,019 02/18/03 02/25/03 LeChase Construction
03-24 19,881 02/18/03 02/25/03 LeChase Construction
03-25 20,098 06/20/03 06/30/03 LeChase Construction
03-27 6,560 06/23/03 06/30/03 LeChase Construction
03-28 8,905 06/20/03 06/30/03 LeChase Construction
03-29 4,084 06/20/03 06/30/03 LeChase Construction
03-30 22,064 10/06/03 11/05/03 LeChase Construction
03-31 -35,837 01/27/04 02/18/04 LeChase Construction
04-01 7,415 05/23/02 06/04/02 Superior Interior Systems
04-02 3,142 05/23/02 06/04/02 Superior Interior Systems
04-04 2,402 07/02/02 07/15/02 Superior Interior Systems
04-05 611 07/02/02 07/15/02 Superior Interior Systems
04-06 411 07/02/02 07/15/02 Superior Interior Systems
04-07 1,763 10/29/02 12/02/02 Superior Interior Systems
04-08 735 10/29/02 12/02/02 Superior Interior Systems
04-09 3,433 01/22/03 02/10/03 Superior Interior Systems
04-10 1,665 01/22/03 02/10/03 Superior Interior Systems
04-11 520 01/22/03 02/10/03 Superior Interior Systems
04-12 1,186 01/22/03 02/10/03 Superior Interior Systems
04-13 6,136 01/22/03 02/10/03 Superior Interior Systems
04-14 2,018 01/22/03 02/10/03 Superior Interior Systems
04-15 1,234 01/22/03 02/10/03 Superior Interior Systems
04-16 1,005 12/23/02 01/08/03 Superior Interior Systems
04-17 1,974 01/22/03 02/10/03 Superior Interior Systems
04-18 319 02/18/03 02/25/03 Superior Interior Systems
04-19 684 02/18/03 02/25/03 Superior Interior Systems
04-20 1,557 02/18/03 02/24/03 Superior Interior Systems
04-21 738 02/18/03 02/24/03 Superior Interior Systems
04-22 12,126 02/18/03 02/24/03 Superior Interior Systems
04-23 34,827 02/18/03 12/28/04 Superior Interior Systems
04-24 6,921 05/08/03 05/23/03 Superior Interior Systems
04-25 523 05/08/03 05/23/03 Superior Interior Systems
04-26 2,091 05/08/03 05/23/03 Superior Interior Systems
04-27 3,987 05/08/03 05/23/03 Superior Interior Systems
04-28 -503 05/08/03 05/23/03 Superior Interior Systems
04-29 9,000 05/08/03 05/23/03 Superior Interior Systems
04-30 4,147 05/08/03 05/23/03 Superior Interior Systems
04-31 1,624 08/06/03 09/09/03 Superior Interior Systems
04-32 2,201 08/13/03 09/09/03 Superior Interior Systems
04-33 21,341 10/06/03 11/05/03 Superior Interior Systems
06-02 3,605 05/23/02 06/04/02 Infinity Architectural Window
06-03 940 09/03/02 09/05/02 Infinity Architectural Window
06-04 5,520 01/22/03 02/10/03 Infinity Architectural Window
06-05 5,950 01/27/04 02/18/04 Infinity Architectural Window
07-01 5,400 10/06/03 11/05/03 DeClerck Flooring
09-01 -2,160 02/18/03 02/24/03 E&B Equipment
09-02 4,934 08/06/03 09/09/03 E&B Equipment
1-4 34,125 10/22/01 04/11/02 Bakers of Jericho Hill
1-5 0 10/22/01 04/11/02 Bakers of Jericho Hill
10-01 4,256 01/22/03 02/10/03 Nickerson
10-02 18,484 10/06/03 11/05/03 Nickerson
12-02 -650 07/02/02 07/15/02 B&W Supply
12-03 7,823 05/08/03 05/23/03 B&W Supply
12-04 1,885 10/06/03 11/05/03 B&W Supply
13-03 -240 09/03/02 09/05/02 Frey & Campbell
13-04 -28,505 09/03/02 09/06/02 Frey & Campbell
13-05 -23,840 09/03/02 09/05/02 Frey & Campbell
13-06 -8,221 02/18/03 02/24/03 Frey & Campbell
13-07 672 02/18/03 02/24/03 Frey & Campbell
13-08 414 02/18/03 02/24/03 Frey & Campbell
13-09 15,146 05/08/03 05/23/03 Frey & Campbell
13-11 814 10/06/03 11/05/03 Frey & Campbell
13-12 -1,941 01/27/04 02/04/04 Frey & Campbell
14-01 4,487 10/29/02 12/02/02 North Central Mech.
14-02 626 10/29/02 12/02/02 North Central Mech.
14-03 11,682 06/20/03 06/30/03 North Central Mech.
14-04 2,906 08/06/03 09/09/03 North Central Mech.
14-05 4,070 01/27/04 02/04/04 North Central Mech.
15-01 3,931 08/21/02 09/04/02 Industrial Power & Lighting
15-02 -240 08/06/03 09/09/03 Industrial Power & Lighting
15-03 24,627 08/06/03 09/09/03 Industrial Power & Lighting
15-05 28,264 08/26/03 02/18/04 Industrial Power & Lighting
ST-21 2,606 10/17/05 11/01/05 Bakers of Jericho hill
ST-22 -47,000 01/13/06 06/23/06 Bakers of Jerico Hill
05-0027 Reconstruction 0-012-002 07/12/05 NO CHANGE ORDERS ON ELECTRONIC FILE
New Bus Garage:
00-0826SR New Construction 5-011-001 02/20/01 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1402 New Construction 5-011-001 06/13/01 *CO No.* Amount Disallowed Received Approved Contractor
001 -6,282 06/29/04 07/09/04 Natures Way Environmental
01-13 9,841 10/06/03 11/05/03 Bakers of Jericho Hill
01-15 21,828 05/08/03 05/23/03 Bakers of Jericho Hill
02-16 8,397 05/08/03 05/23/03 Delhi Steel
03-01 2,650 07/18/02 08/28/02 LeChase Const.
03-03 909 07/18/02 08/28/02 LeChase Const.
03-26 1,400 06/20/03 06/30/03 LeChase Const.
04-01 7,415 05/23/02 / / Superior Interior Systems
04-02 3,142 05/23/02 / / Superior Interior Systems
04-34 -2,000 11/19/03 11/21/03 Superior Intertior Systems
06-01 -2,500 05/23/02 06/04/02 Infinity Architectural Window
1-1 505,500 10/22/01 04/11/02 Bakers of Jericho Hill
1-2 50,250 10/22/01 04/11/02 Bakers of Jericho Hill
1-3 7,500 10/22/01 04/11/02 Bakers of Jericho Hill
1-6 3,154 02/22/02 04/01/02 Bakers of Jericho Hill
13-1 3,515 04/26/02 05/07/02 Frey & Campbell
13-10 -2,972 10/06/03 11/05/03 Frey & Campbell
13-2 1,389 04/26/02 05/07/02 Frey & Campbell
15-04 3,864 08/06/03 09/09/03 Industrial Power & Lighting
15-06 1,291 08/26/03 09/19/03 Industrial Power & Lighting
BELFAST CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-08-01-04
last updated on 07/25/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
94-0566 Reconstruction 0-001-003 01/19/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1225 Additions and Alterations 0-001-004 04/30/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1570 Additions and Alterations 0-001-005 01/30/01 *CO No.* Amount Disallowed Received Approved Contractor
AA-1 2,700 06/07/02 06/14/02 Arric Corp.
AA-2 3,200 09/18/02 11/01/02 Arric Corp.
AA-3 -1,500 06/09/04 07/09/04 Arric Corp
EL-1 -17,892 11/08/01 04/19/02 Kel-Kur Elec.
EL-2 -72,700 02/11/02 03/26/02 Kel-Kur Elec.
EL-3 985 02/19/02 04/01/02 Kel-Kur Elec.
EL-4 -22,210 06/03/02 06/05/02 Kel-Kur Elec.
EL-5 -10,560 06/03/02 06/12/02 Kel-Kur Elec.
EL-6 -15,195 06/03/02 06/05/02 Kel-Kur Elec.
EL-7 7,664 09/18/02 02/26/03 Kel-Kur Elec.
EL-8 1,082 02/06/03 02/14/03 Kel-Kur Elec.
El-7 7,664 02/20/03 / / Kel-Kur Elec.
GC-2 -34,774 06/07/02 06/14/02 Barnhart Builders
GC-4 9,019 02/11/02 03/25/02 Barnhart Builders
HV-1 rev -79,700 06/07/02 01/09/03 Mollenberg Betz
HV-2 1,535 03/01/02 04/18/02 Mollenberg Betz
HV-3 3,310 05/22/02 06/05/02 Mollenberg Betz
HV-4 2,850 09/18/02 11/01/02 Mollenberg Betz
PB-1 -59,400 06/07/02 06/14/02 JW Danforth
PB-2 62,994 12/06/01 09/24/04 JW Danforth
PB-3 4,342 01/28/02 03/06/02 JW Danforth
PB-4 3,423 10/24/02 12/02/02 JW Danforth
00-0588 Alterations 0-001-006 02/01/01 *CO No.* Amount Disallowed Received Approved Contractor
GC-1 -9,862 06/07/02 06/14/02 Barnhart Builders
GC-4 750 12/28/01 03/04/02 Barnhart Builders
02-1245 Reconstruction 0-001-008 09/30/02 *CO No.* Amount Disallowed Received Approved Contractor
RF-1 4,290 06/02/03 06/04/03 General Roofing and Heating
94-0567EP Energy Project 0-001-E01 01/19/95 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0028FP Reconstruction 0-001-FP1 10/03/03 NO CHANGE ORDERS ON ELECTRONIC FILE
04-0427SC Visual Structural Inspection 0-001-SC1 11/23/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Shop Bus Garage:
94-0568 Reconstruction 0-002-001 01/19/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1224 Reconstruction 0-002-002 04/30/97 NO CHANGE ORDERS ON ELECTRONIC FILE
New Bus Garage:
00-0587 New Construction 5-007-001 02/01/01 *CO No.* Amount Disallowed Received Approved Contractor
GC-2 -15,932 06/07/02 06/14/02 Barnhart Builders
GC-3 4,500 12/27/01 03/08/02 Barnhart Builders
GC-5 606 02/11/02 03/25/02 Barnhart Builders
GC-6 5,500 06/17/02 07/10/02 Barnhart Builders
HV-1 -3,000 06/07/02 01/09/03 Mollenberg Betz
PB-2 -7,900 02/11/02 03/25/02 JW Danforth
BOLIVAR CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-10-01-04
last updated on 07/25/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
90-1319 Reconstruction 0-001-003 05/13/91 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
90-1320 Reconstruction 5-002-002 05/13/91 NO CHANGE ORDERS ON ELECTRONIC FILE
CANASERAGA CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-11-02-04
last updated on 07/25/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
00-1077 Additions and Alterations 0-001-003 08/10/01 *CO No.* Amount Disallowed Received Approved Contractor
AAC-01 3,450 07/22/02 08/16/02 S&S Environmental
AAC-02 2,968 08/29/02 10/29/02 S&S Environmental
EC-01 802 06/27/02 12/18/06 Blackmon-Farrell Elec.
EC-02 1,680 06/27/02 07/03/02 Blackmon-Farrell Elec.
EC-03 466 08/29/02 10/29/02 Blackmon-Farrell Elec.
EC-04 496 08/29/02 10/29/02 Blackmon-Farrell Elec.
EC-05 4,474 09/30/02 11/05/02 Blackmon-Farrell Elec.
EC-06 2,248 09/30/02 11/05/02 Blackmon-Farrell Elec.
EC-07 6,412 09/30/02 11/05/02 Blackmon-Farrell Elec.
EC-08 110 09/30/02 11/05/02 Blackmon-Farrell Elec.
EC-09 3,851 11/29/02 12/04/02 Blackmon-Farrell Elec.
EC-10 1,295 11/29/02 12/04/02 Blackmon-Farrell Elec.
EC-11 583 11/29/02 12/04/02 Blackmon-Farrell Elec.
EC-12 2,524 05/21/03 05/27/03 Blackmon-Farrell Elec.
EC-13 1,332 05/21/03 05/27/03 Blackmon-Farrell Elec.
EC-14 611 05/21/03 05/27/03 Blackmon-Farrell Elec.
EC-15 203 05/21/03 05/27/03 Blackmon-Farrell Elec.
EC-16 697 05/21/03 05/27/03 Blackmon-Farrell Elec.
EC-17 577 05/21/03 05/27/03 Blackmon-Farrell Elec.
EC-18 3,511 05/21/03 05/27/03 Blackmon-Farrell Elec.
EC-19 3,202 05/21/03 05/27/03 Blackmon-Farrell Elec.
EC-20 1,874 05/21/03 05/27/03 Blackmon-Farrell Elec.
EC-21 1,071 05/21/03 05/27/03 Blackmon-Farrell Elec.
EC-22 379 05/21/03 05/27/03 Blackmon-Farrell Elec.
EC-23 1,440 05/21/03 05/27/03 Blackmon-Farrell Elec.
EC-24 453 05/21/03 05/27/03 Blackmon-Farrell Elec.
EC-25 281 05/21/03 05/27/03 Blackmon-Farrell Elec.
EC-26 -1,392 06/24/03 07/11/03 Blackmon-Farrell Elec.
EC-27 952 08/18/03 08/27/03 Blackmon-Farrell Elec.
EC-28 1,623 08/18/03 08/27/03 Blackmon-Farrell Elec.
EC-29 1,252 08/18/03 08/27/03 Blackmon-Farrell Elec.
EC-30 873 08/18/03 08/27/03 Blackmon-Farrell Elec.
EC-31 1,441 08/18/03 08/27/03 Blackmon-Farrell Elec.
EC-32 347 08/18/03 08/27/03 Blackmon-Farrell Elec.
EC-33 156 08/18/03 08/27/03 Blackmon-Farrell Elec.
EC-34 1,744 08/18/03 08/27/03 Blackmon-Farrell Elec.
EC-35 2,223 08/18/03 08/27/03 Blackmon-Farrell Elec.
EC-36 1,305 08/18/03 08/27/03 Blackmon-Farrell Elec.
EC-37 78 08/18/03 08/27/03 Blackmon-Farrell Elec.
EC-38 70,237 01/09/06 12/18/06 Blackmon Farrell Electric
EC-39 6,300 03/26/04 04/26/04 Blackmon Farrell Elec.
EC-40 7,291 08/02/04 09/23/04 Blackmon Farrell Electric
EC-41 -204 06/21/05 07/11/05 Blackmon Farrell Electric
GC-01 0 05/30/02 08/15/02 Javen Const.
GC-02 0 05/30/02 08/15/02 Javen Const.
GC-03 0 05/30/02 08/15/02 Javen Const.
GC-04 9,784 06/27/02 07/03/02 Javen Const.
GC-05 0 06/27/02 07/03/02 Javen Const.
GC-06 9,027 06/27/02 07/03/02 Javen Const.
GC-07 4,966 02/16/06 08/09/06 Javen Construction
GC-08 8,089 02/17/06 08/09/06 Javen Construction
GC-09 0 07/22/02 08/16/02 Javen Const.
GC-10 3,245 09/30/02 11/05/02 Javen Const.
GC-11 0 09/30/02 11/05/02 Javen Const.
GC-12 2,849 09/30/02 11/05/02 Javen Const.
GC-13 0 09/30/02 11/05/02 Javen Const.
GC-14 1,821 09/30/02 11/05/02 Javen Const.
GC-15 6,220 11/01/02 01/08/03 Javen Const.
GC-16 3,118 11/01/02 01/08/03 Javen Const.
GC-17 9,934 11/01/02 01/08/03 Javen Const.
GC-18 6,792 11/01/02 01/08/03 Javen Const.
GC-19 100,587 11/29/02 12/04/02 Javen Const.
GC-20 5,052 05/21/03 05/27/03 Javen Const.
GC-21 -3,444 05/21/03 05/27/03 Javen Const.
MC-01 758 11/01/02 01/08/03 Faulks Plumbing
PC-01 0 11/29/02 12/04/02 Frey & Campbell
PC-02 0 11/29/02 12/04/02 Frey & Campbell
PC-03 0 11/29/02 12/04/02 Frey & Campbell
PC-04 0 11/29/02 12/04/02 Frey & Campbell
PC-05 27,200 05/21/03 05/27/03 Frey & Campbell
PC-06 408 05/21/03 05/27/03 Frey & Campbell
PC-07 -1,004 05/21/03 05/27/03 Frey & Campbell
SC-01 7,375 06/27/02 07/03/02 Pettit and Pettit
SC-02 8,294 06/27/02 12/18/06 Pettit and Pettit
SC-03 3,822 07/22/02 08/16/02 Pettit and Pettit
SC-04 4,235 12/14/06 12/18/06 Pettit and Pettit Inc
SC-05 28,000 03/03/03 03/26/03 Pettit and Pettit
SC-06 7,596 03/03/03 03/26/03 Pettit and Pettit
SC-07 1,546 03/03/03 03/26/03 Pettit and Pettit
SC-08 10,318 03/03/03 03/26/03 Pettit and Pettit
SC-09 12,900 03/10/03 03/20/03 Pettit and Pettit
SC-10 -1,344 05/21/03 05/27/03 Pettit and Pettit
SC-11 8,400 06/24/03 07/11/03 Pettit and Pettit
SC-12 -1,300 08/19/03 10/23/03 Pettit and Pettit
FRIENDSHIP CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-16-01-04
last updated on 07/25/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
94-0079 Reconstruction 0-001-006 08/22/94 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0681 Additions and Alterations 0-001-007 02/28/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0469 Reconstruction 0-001-008 11/27/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0213 Reconstruction 0-001-009 10/12/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0022 Reconstruction 0-001-010 07/11/96 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0091 Reconstruction 0-001-011 07/25/96 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0509 Additions and Alterations 0-001-012 07/28/05 *CO No.* Amount Disallowed Received Approved Contractor
AC-1 -5,800 07/24/06 08/10/06 Epic Contracting
AC-2 8,625 07/24/06 08/10/06 Epic Contracting
AC-3 -5,643 06/19/08 / / Epic Contracting
EC-1 -9,408 03/30/06 / / CIR Electrical Construction
EC-2 0 07/05/06 10/23/07 CIR Electrical Construction
EC-3 0 07/24/06 01/09/07 Cir Electrical Construction
EC-4 0 09/29/06 12/18/06 Cir Electrical
EC-5 1,393 12/19/07 12/28/07 CIR ELECTRICAL CONSTRUCTION CORP
EC-6 5,700 12/19/07 12/28/07 CIR ELECTRICALCONSTRUCTION CORP
EC-7 11,500 12/19/07 12/28/07 CIR ELECTRICAL CONSTRUCTION CORP
EC-8 3,220 12/19/07 12/28/07 CIR ELECTRICAL CONSTRUCTION CORP
EC-9 1,793 12/19/07 12/28/07 CIR ELECTRICAL CONSTRUCTION CORP
GC-1 -53,900 11/25/05 12/05/05 Lobar Inc
GC-10 2,003 09/29/06 10/24/06 lobar inc
GC-11 660 09/29/06 10/24/06 Lobar Inc
GC-12 2,711 11/03/06 12/28/06 Lobar Inc
GC-13 3,793 11/03/06 12/28/06 Lobar Inc
GC-14 6,341 11/03/06 12/28/06 Lobar Inc
GC-15 -2,324 01/22/07 03/14/07 Lobar Inc
GC-16 48,080 01/29/07 02/22/07 Lobar Inc
GC-17 11,151 01/29/07 02/22/07 Lobar Inc
GC-18 6,672 05/15/07 06/22/07 Lobar Inc
GC-2 0 03/30/06 06/06/06 Lobar Inc
GC-3 0 03/30/06 06/06/06 Lobar Inc
GC-4 -4,600 03/30/06 / / Lobar Inc
GC-5 0 04/03/06 06/06/06 Lobar Inc
GC-6 -1,755 04/03/06 06/06/06 Lobar Inc
GC-7 -519 07/24/06 08/10/06 Lobar
GC-8 0 07/24/06 08/10/06 Lobar Inc
GC-9 2,994 07/24/06 08/10/06 Lobar Inc
HC-1 -14,310 07/24/06 / / Frey Campbell
HC-2 -7,411 07/24/06 01/09/07 Frey Campbell
HC-3 -25,450 12/21/06 01/12/07 Frey Campbell
PC-1 -16,400 11/16/05 11/25/05 MLP Plumbing Mechanical
PC-2 -4,719 04/03/06 05/09/06 MLP Plumbing Mechanical
PC-3 2,886 01/22/07 01/30/07 MLP Plumbing Mechanical
PC-4 -11,363 01/22/07 / / MLP Plumbing Mechanical
PC-5 3,689 08/30/07 09/06/07 MLP PLUMBING & MECHANICAL, INC.
PC-6 77 05/15/08 / / MLP PLUMBING & MECHANICAL, INC.
05-0228 Reconstruction 0-001-013 10/21/05 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0814 Reconstruction 0-001-014 03/20/06 *CO No.* Amount Disallowed Received Approved Contractor
EC-1 -12,916 12/21/06 / / GVE Inc
06-0314 Reconstruction 0-001-015 12/23/05 NO CHANGE ORDERS ON ELECTRONIC FILE
05-1275 Additions and Alterations 0-001-016 05/18/06 *CO No.* Amount Disallowed Received Approved Contractor
MC-1 -25,000 09/19/06 / / METRO CONTRACTING ENVIROMENTAL
06-0435 Additions and Alterations 0-001-017 02/09/07 *CO No.* Amount Disallowed Received Approved Contractor
EC-2 1,143 11/06/07 01/15/08 REED & CULBRET eLECTRIC, INC.
EC-4 2,003 01/16/08 / / Reed & Cubert Electric
EC-5 7,760 01/16/08 / / Reed & Cubert Electric
EC-6 2,166 04/24/08 / / REED & CUBERT ELECTRIC, INC.
GC-1 0 10/11/07 10/23/07 Kirst Construction
GC-3 -8,633 12/07/07 12/31/07 Kirst Construction
GC-4 39,086 12/07/07 / / Kirst Construction
GC-5 -1,821 12/07/07 01/28/08 Kirst Construction
GC-6 0 02/14/08 03/19/08 KIRST CONSTRUCTION
GC-7 -17,638 04/09/08 / / KIRST CONSTRUCTION, INC.
MC-1 0 10/22/07 01/28/08 JOHN W DANFORTH COMPANY
MC-3` 58,800 12/07/07 / / John W. Danforth Company
MC-5 5,828 06/16/08 / / John W. Danforth
MC2 0 10/22/07 01/28/08 JOHN W DANFORTH COMPANY
07-1383 Reconstruction 0-001-019 03/10/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0930FP Reconstruction 0-001-FP1 06/08/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
06-0436 Reconstruction 4-002-004 02/09/07 *CO No.* Amount Disallowed Received Approved Contractor
EC - 1 0 11/06/07 / / REED & CULBERT ELECTRIC, INC.
EC-3 7,733 01/16/08 / / Reed & Cubert Electric
GC-2 0 10/11/07 10/23/07 Kirst Construction
MC-4 492 06/16/08 / / John W. Danforth
New Bus Garage:
00-1753 New Construction 5-005-001 01/07/02 *CO No.* Amount Disallowed Received Approved Contractor
EC-01 -4,274 02/26/04 04/22/04 CIR Elec.
GC-01 0 05/21/03 06/02/03 Building Innovations
GC-02 7,084 05/21/03 06/02/03 Building Innovations
GC-03 -374 11/28/03 01/05/04 Building Innovations Group
GC-04 0 11/28/03 12/04/03 Building Innovations Group
GC-05 12,352 02/26/04 03/03/04 Building Innovations Group
GC-06 2,106 02/26/04 03/03/04 Building Innovations Group
MC-01 -7,005 02/26/04 04/22/04 Faulks Plumbing
PC-01 -1,464 11/28/03 01/05/04 Numarco Inc
PC-02 -9,257 02/26/04 04/22/04 Numarco Inc
FILLMORE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-20-01-04
last updated on 07/25/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Fillmore Main Building:
91-0689 Reconstruction 0-001-001 02/13/92 NO CHANGE ORDERS ON ELECTRONIC FILE
91-0316 Reconstruction 0-001-002 10/04/91 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0756 Additions and Alterations 0-001-003 05/14/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0936 Reconstruction 0-001-004 03/08/96 NO CHANGE ORDERS ON ELECTRONIC FILE
02-2391 Reconstruction 0-001-005 03/09/04 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0617 Additions and Alterations 0-001-006 03/20/07 *CO No.* Amount Disallowed Received Approved Contractor
AA-1 9,360 02/13/08 03/08/08 EPIC CONTRACTING LLC
EL-1 -26,300 02/25/08 04/15/08 blackmon-farrell electric
GC-1 -167,414 05/19/08 / / CONCEPT CONSTRUCTION CORP.
GC-2 -119,114 05/19/08 / / CONCEPT CONSTRUCTION CORP.
GC-3 -54,210 05/19/08 / / CONCEPT CONSTRUCTION CORP.
GC-4 -25,155 05/19/08 / / CONCEPT CONSTRUCTION CORP.
GC-5 -66,648 05/19/08 / / CONCEPT CONSTRUCTION, CORP.
GC-6 -49,125 05/19/08 / / CONCEPT CONSTRUCTION CORP.
HV-1 -46,113 02/13/08 / / millenberg betz
HV-2 -11,900 02/13/08 / / mollenberg betz
P 1 -15,327 02/13/08 03/28/08 MKS plumbing corp
St-1 -130,350 02/25/08 04/02/08 greenauer blacktop
Maintenance Building:
06-0618 New Construction 3-004-001 03/20/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
91-0099 Reconstruction 5-002-001 08/15/91 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0572 Additions and Alterations 5-002-002 04/17/00 *CO No.* Amount Disallowed Received Approved Contractor
EL-2 -4,658 06/06/06 07/25/06 Blackmon-Farrell Electric
EL-4 221 08/24/01 03/27/02 Blackmon-Farrell
GC-4 1,551 06/06/06 07/25/06 Kirst Construction
GC2-1 -3,500 12/18/01 02/28/02 H&K Services
PB-1 -9,849 09/14/01 01/14/03 Roy's Plumbing
PB-3 -13,250 06/06/06 07/25/06 Roy's Plumbing, Inc
PB-4 4,553 06/06/06 07/25/06 Roy's Plumbing, Inc.
PB-5 -4,200 12/03/02 01/03/03 Roy's Plumbing
WHITESVILLE CENTRAL SCHOOL STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-21-01-04
last updated on 07/25/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
90-1122 Reconstruction 0-001-001 02/28/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1536 Reconstruction 0-001-002 08/10/93 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0695 Additions and Alterations 0-001-004 03/20/98 NO CHANGE ORDERS ON ELECTRONIC FILE
00-0936 Additions and Alterations 0-001-005 04/13/01 *CO No.* Amount Disallowed Received Approved Contractor
E-1 18,450 08/01/02 / / Oyer Elec.
E-10 4,286 09/10/03 09/16/03 Oyer Elec.
E-11 -4,286 08/06/04 08/10/04 Oyer Elec.
E-2 20,000 08/01/02 08/16/02 Oyer Elec.
E-3 2,566 09/30/02 11/01/02 Oyer Elec.
E-4 Rev. 28,000 10/03/02 11/01/02 Oyer Elec.
E-5 1,634 11/22/02 01/02/03 Oyer Elec.
E-6 3,715 11/22/02 01/02/03 Oyer Elec.
E-7 3,365 11/22/02 01/02/03 Oyer Elec.
E-8 2,645 01/28/03 02/11/03 Oyer Elec.
FS-1 670 01/14/03 02/06/03 B&W Supply Company
G-1 1,455 08/01/02 08/16/02 Duggan & Duggan
G-2 35,586 11/18/02 01/03/03 Duggan & Duggan
G-3 3,378 11/18/02 01/03/03 Duggan & Duggan
G-4 14,666 02/24/03 03/11/03 Duggan & Duggan
G-5 -9,178 02/24/03 03/11/03 Duggan & Duggan
H-1 1,209 05/02/03 05/21/03 Faulks Plumbing
H-2 -1,021 03/17/05 04/14/05 Faulks Plumbing heating
P-1 1,177 12/02/02 01/03/03 Frey and Campbell
P-2 203 12/02/02 03/28/03 Frey and Campbell
P-3 -185 12/02/02 01/03/03 Frey and Campbell
P-4 3,468 04/21/03 05/02/03 Frey and Campbell
T-1 1,035 03/26/03 04/03/03 Structured Cabling
07-0008 Additions and Alterations 0-001-007 02/04/08 NO CHANGE ORDERS ON ELECTRONIC FILE
02-0812FP Reconstruction 0-001-FP1 03/05/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:
92-1537 Reconstruction 5-002-001 08/10/93 NO CHANGE ORDERS ON ELECTRONIC FILE
NEW BUS GARAGE:
07-0009 New Construction 5-009-001 02/04/08 NO CHANGE ORDERS ON ELECTRONIC FILE
New Library:
93-0592 New Construction 6-007-001 04/19/94 NO CHANGE ORDERS ON ELECTRONIC FILE
CUBA-RUSHFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-23-02-04
last updated on 07/25/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Cuba Campus K-5 Bldg:
93-0240 Reconstruction 0-001-001 10/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
92-0537 Reconstruction 0-001-003 01/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0470 Reconstruction 0-001-004 01/12/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0289 Additions and Alterations 0-001-005 10/28/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1269 Reconstruction 0-001-006 05/30/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1417 Reconstruction 0-001-007 09/07/00 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2063 Reconstruction 0-001-009 06/10/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Cuba Elementary:
92-0538 Reconstruction 0-002-001 01/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0664 Reconstruction 0-002-002 04/09/04 *CO No.* Amount Disallowed Received Approved Contractor
AA-1 13,775 10/15/04 10/22/04 Arric Corp
EL-1 20,500 04/27/05 06/21/05 Blackmon Farrell Electric
EL-2 -28,697 08/05/05 08/15/05 Blackmon Farrell Electric
EL-3 -25,000 08/05/05 03/13/06 Blackmon Farrell Electric
EL-4 -9,355 08/05/05 08/15/05 Blackmon Farrell Electric
EL-5 282 08/15/05 03/13/06 Blackmon Farrell Electric
GC-1 15,276 10/15/04 10/22/04 LC Whitford
GC-10 0 12/02/05 / / The LC Whitford Co
GC-10 0 03/15/06 06/02/06 The LC Whitford Co
GC-2 3,322 10/15/04 10/22/04 LC Whitford
GC-3 13,007 01/11/05 01/20/05 The LC Whitford Co
GC-4 3,153 01/11/05 01/20/05 The LC Whitford
GC-5 1,844 01/11/05 01/20/05 The LC Whitford Co
GC-6 6,859 02/08/05 02/24/05 The LC Whitford Co
GC-7 4,498 06/13/05 06/29/05 The Lc Whitford
GC-8 3,176 06/13/05 06/29/05 The LC Whitford Co
GC-9 7,742 07/07/05 07/21/05 The LC Whitford Co
HV-1 98,800 11/17/04 11/22/04 Hoot LLC
HV-2 8,574 10/15/04 10/22/04 Hoot LLC
HV-3 4,175 12/30/04 03/13/06 Hoot LLC
HV-3 4,175 08/18/05 08/25/05 Hoot LLC
HV-4 3,764 12/30/04 03/13/06 Hoot LLC
HV-4 3,764 08/18/05 03/13/06 HOOT LLC
HV-5 471 03/10/05 03/17/05 hoot LLC
PB-1 -20,000 06/08/05 06/21/05 Ackerman Mechanical Service
PB-2 4,943 06/08/05 03/13/06 Ackerman Mechanical Service
PB-3 823 06/08/05 06/21/05 Ackerman Mechanical Services
03-0225SC Visual Structural Inspection 0-002-SC1 08/28/03 NO CHANGE ORDERS ON ELECTRONIC FILE
Cuba Annex E C'hood fmr AG-IA Shop:
96-0290 Reconstruction 0-003-001 10/28/96 NO CHANGE ORDERS ON ELECTRONIC FILE
07-2064 Reconstruction 0-003-002 06/10/08 NO CHANGE ORDERS ON ELECTRONIC FILE
Relocatable Classroom:
96-0293 Reconstruction 0-004-001 10/28/96 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage:Cuba:
92-0539 Reconstruction 0-005-001 01/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
Rushford K-5 Building:
92-0540 Reconstruction 0-015-001 01/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0241 Reconstruction 0-015-002 10/28/93 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0471 Reconstruction 0-015-003 01/12/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0291 Reconstruction 0-015-004 10/28/96 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1270 Reconstruction 0-015-005 05/30/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1418 Reconstruction 0-015-006 09/07/00 NO CHANGE ORDERS ON ELECTRONIC FILE
03-1553 Reconstruction 0-015-007 05/21/04 *CO No.* Amount Disallowed Received Approved Contractor
RF-1 13,939 12/15/04 12/30/04 Patterson Stevens Inc
RF-2 12,059 12/15/04 12/30/04 Patterson Stevens Inc
04-0609 Reconstruction 0-015-008 12/31/04 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0227SC Visual Structural Inspection 0-015-SC1 09/28/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Temporary Classroom:
96-0294 Reconstruction 0-016-001 10/28/96 NO CHANGE ORDERS ON ELECTRONIC FILE
Shop/Ag + Bus G:Rushford:
94-0472 Reconstruction 0-018-001 01/12/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-0292 Reconstruction 0-018-002 10/28/96 NO CHANGE ORDERS ON ELECTRONIC FILE
New MS/HS 6-12:
94-0858 New Construction 0-020-001 03/10/95 NO CHANGE ORDERS ON ELECTRONIC FILE
95-1271 Reconstruction 0-020-002 05/30/96 NO CHANGE ORDERS ON ELECTRONIC FILE
99-1419 Reconstruction 0-020-003 09/07/00 NO CHANGE ORDERS ON ELECTRONIC FILE
06-0457 Reconstruction 0-020-004 11/21/06 NO CHANGE ORDERS ON ELECTRONIC FILE
03-0226SC Visual Structural Inspection 0-020-SC1 09/28/04 NO CHANGE ORDERS ON ELECTRONIC FILE
Outdoor Educ. Classroom Bldg.:
00-1103 New Construction 0-022-001 09/25/01 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Garage - Cuba:
94-0473 Reconstruction 5-005-002 01/12/95 NO CHANGE ORDERS ON ELECTRONIC FILE
New Bus Garage '96:
96-0910 New Construction 5-021-001 03/25/97 NO CHANGE ORDERS ON ELECTRONIC FILE
SCIO CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-24-01-04
last updated on 07/25/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Main Building:
91-0506 Reconstruction 0-001-003 12/23/91 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0878 Additions and Alterations 0-001-004 05/03/94 NO CHANGE ORDERS ON ELECTRONIC FILE
95-0157 Reconstruction 0-001-005 09/14/95 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1119 Reconstruction 0-001-007 05/12/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0656 Reconstruction 0-001-008 03/13/00 *CO No.* Amount Disallowed Received Approved Contractor
S-102-1 16,566 06/22/01 01/30/02 Greenauer Blacktop
S-102-2 17,818 06/22/01 01/30/02 Greenauer Blacktop
S-102-3 28,790 03/26/03 04/03/03 Greenauer Blacktop
S-102-4 -9,987 10/27/03 11/12/03 Greenauer Blacktop
S-103-1 75,113 06/22/01 01/30/02 GVE, Inc.
S-103-1 103,264 12/20/02 01/14/03 GVE, Inc.
S-103-2 62,829 06/22/01 01/30/02 GVE, Inc.
S-103-3 5,981 06/22/01 01/30/02 GVE, Inc.
S-103-4 14,799 10/27/03 11/12/03 GVE, Inc.
S-104-1 -9,879 10/27/03 11/12/03 Frey & Campbell
S-105-1 34,580 04/11/02 06/30/03 Kipphut & Neumann
S-105-2 7,340 06/22/01 01/30/02 Kipphut & Neumann
S-105-3 6,131 06/22/01 01/30/02 Kipphut & Neumann
S-105-4 9,297 03/28/02 06/30/03 Kipphut & Neumann
S-106-1 16,818 06/22/01 01/30/02 Chase Pitkin
S-106-2 12,542 06/22/01 01/30/02 Chase Pitkin
99-0381 Reconstruction 0-001-009 11/16/99 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1270 Reconstruction 0-001-010 06/27/01 *CO No.* Amount Disallowed Received Approved Contractor
S-301-1 4,175 08/01/02 08/06/02 GVE, Inc.
S301-2 4,976 07/14/03 07/16/03 GVE, Inc.
05-0194 Reconstruction 0-001-011 09/30/05 NO CHANGE ORDERS ON ELECTRONIC FILE
05-0967 Reconstruction 0-001-012 08/10/06 *CO No.* Amount Disallowed Received Approved Contractor
1-01 1,510 06/06/07 08/28/07 Patricia electric
1-02 681 06/06/07 08/28/07 Patricia Electric
EC - 3 7,704 01/07/08 / / FREY ELECTRICAL CONSTRUCTION COMPANY
EC - 4 4,224 01/07/08 / / FREY ELECTRICAL CONSTRUCTION COMPANY
EC-1 2,940 09/26/07 01/16/08 FREY ELECTRICAL CONSTRUCTION CO.
EC-2 225 09/26/07 01/16/08 FREY ELECTRICAL CONSTRUCTION CO.
EC-5 2,015 02/01/08 / / FREY ELECTRICAL CONSTRUCTION CO.
EC-6 14,081 02/01/08 / / FREY ELECTRICAL CONSTRUCTION CO.
EC-6 14,081 02/01/08 / / FREY ELECTRICIAL CONSTRUCTION CO.
EC-7 10,451 02/01/08 / / FREY ELECTRICAL CONSTRUCTION CO.
EC-8 10,126 02/01/08 / / FREY ELECTRICAL CONSTRUCTION CO.
GC-1 0 03/12/07 03/14/07 Lobar Inc
GC-10 15,853 10/11/07 11/13/07 Lobar Inc
GC-11 10,986 10/11/07 11/13/07 Lobar Inc
GC-12 8,802 12/12/07 01/09/08 Lobar,Inc.
GC-13 10,161 12/12/07 01/09/08 Lobar, Inc.
GC-14 2,663 12/12/07 01/09/08 Lobar, Inc.
GC-15 19,751 12/12/07 01/09/08 Lobar,Inc.
GC-16 15,846 12/12/07 01/09/08 Lobar,Inc.
GC-17 12,038 12/12/07 01/09/08 Lobar, Inc.
GC-18 9,304 01/24/08 04/04/08 LOBAR INC
GC-19 -7,932 04/24/08 / / LOBAR, INC.
GC-2 0 06/06/07 06/20/07 Lobar Inc
GC-3 0 06/06/07 06/20/07 Lobar Inc
GC-4 399 06/06/07 06/20/07 Lobar Inc
GC-5 0 06/20/07 07/17/07 Lobar Inc
GC-6 16,893 07/23/07 08/20/07 Lobar Inc
GC-7 0 09/26/07 11/08/07 LOBAR, INC.
GC-8 18,910 09/26/07 11/08/07 LOBAR, INC.
GC-9 2,964 10/11/07 11/13/07 Lobar Inc
HC-1 0 02/22/07 08/15/07 Mollenberg Betz Inc
HC-2 0 03/17/08 / / MOLLENBERG-BETZ, INC.
HC-3 -7,090 05/27/08 / / Mollenberg-Betz
PC - 1 0 01/07/08 / / FREY & CAMPBELL, INCORPORATED
PC-2 7,335 03/17/08 / / FREY & CAMPBELL, INC.
06-1613 Reconstruction 0-001-013 08/02/07 NO CHANGE ORDERS ON ELECTRONIC FILE
Bus Storage Building:
99-1538 New Construction 4-003-001 06/28/00 *CO No.* Amount Disallowed Received Approved Contractor
s201-1 4,668 03/15/04 / / Kirst Construction
Bus Garage:
92-0784 Reconstruction 5-002-002 04/06/93 NO CHANGE ORDERS ON ELECTRONIC FILE
93-0879 Additions and Alterations 5-002-003 05/03/94 NO CHANGE ORDERS ON ELECTRONIC FILE
96-1120 Reconstruction 5-002-004 05/12/97 NO CHANGE ORDERS ON ELECTRONIC FILE
99-0657 Additions and Alterations 5-002-005 03/13/00 NO CHANGE ORDERS ON ELECTRONIC FILE
WELLSVILLE CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-26-01-06
last updated on 07/25/08
REVIEW BUILDING NAME/ BLDG./ SED C. O. C.O. Disallowed C. O. C. O.
No. PROJECT SCOPE PROJ. NO. APPROVAL Number Amount Amount Received Approved Contractor
__________________________________________________________________________________________________________________________________________
Wellsville Middle School:
90-1440 Reconstruction 0-001-004 06/06/91 NO CHANGE ORDERS ON ELECTRONIC FILE
92-1303 Additions and Alterations 0-001-006 06/25/93 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0471 Reconstruction 0-001-008 10/24/97 NO CHANGE ORDERS ON ELECTRONIC FILE
Washington Primary/Inter.:
90-1441 Reconstruction 0-003-005 06/06/91 NO CHANGE ORDERS ON ELECTRONIC FILE
94-0173 Additions and Alterations 0-003-006 10/04/94 NO CHANGE ORDERS ON ELECTRONIC FILE
00-1958 Additions and Alterations 0-003-007 12/11/01 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
103-004 3,594 11/09/06 01/09/07 David Ogiony Development
103-008 339 11/29/02 12/06/02 David Ogiony
103-010 1,903 11/29/02 12/06/02 David Ogiony
103-013 2,838 06/05/03 09/16/03 David Ogiony
103-015 5,681 06/05/03 09/16/03 David Ogiony
103-34 6,494 04/06/06 07/26/06 Ingalls Site Development
104-005 1,650 12/23/02 01/10/03 DiMarco Constructors
104-008 6,257 05/05/03 05/21/03 DiMarco Constructors
104-012 1,522 07/24/03 08/05/03 DiMarco Constructors
104-020 15,956 11/24/03 11/26/03 DiMarco Constructors
105-002 4,580 03/03/03 03/11/03 JW Danforth
105-007 3,066 12/30/03 01/21/04 JW Danforth
106-002 5,502 03/24/03 03/28/03 JW Danforth
106-004 2,272 07/09/03 07/23/03 JW Danforth
106-005 3,925 07/09/03 07/23/03 JW Danforth
106-015 5,911 04/13/04 04/28/04 JW Danforth
107-003 11,036 11/09/06 01/09/07 Blackmon Farrell
107-005 407 12/23/02 01/10/03 Blackmon-Farrell Elec.
107-006 5,105 12/23/02 01/10/03 Blackmon-Farrell Elec.
RF-1 3,000 12/06/04 12/17/04 AW Farrell and Son
ST-1 1,035 09/08/04 09/17/04 David Ogiony
High School/Middle School:
90-1442 Reconstruction 0-004-006 06/06/91 NO CHANGE ORDERS ON ELECTRONIC FILE
97-0472 Reconstruction 0-004-008 10/24/97 NO CHANGE ORDERS ON ELECTRONIC FILE
98-0332 Reconstruction 0-004-009 11/12/98 NO CHANGE ORDERS ON ELECTRONIC FILE
01-0506 Additions and Alterations 0-004-010 01/16/02 *CO No.* Amount Disallowed Received Approved Contractor
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
0 / / / /
00001 2,100 06/05/03 08/29/03 Kleen All of America
00001 -1,000 09/17/04 09/28/04 W&B Supply
00002 1,680 06/20/03 07/11/03 Kleen All of America
00003 4,900 06/20/03 07/11/03 Kleen All of America
00004 7,450 08/11/03 08/26/03 Kleen All of America
00005 1,200 10/24/03 11/04/03 Kleen All of America
101-006 39,000 01/21/04 03/13/06 Kleen All of America
101-007 10,135 12/30/03 01/20/04 Kleen All of America
101-024 112,831 04/06/06 04/24/06 DiMarco Constructors
102-001 1,790 09/16/03 09/19/03 Cambria Contracting
102-002 1,811 08/16/04 09/27/04 Cambria Contracting
102-003 -2,666 06/19/06 06/30/06 Cambria Contracting
103-001 17,435 11/09/06 01/09/07 David Ogiony Development
103-002 91,046 11/09/06 01/09/07 David Ogiony Development
103-003 4,000 11/09/06 01/09/07 David ogiony Development
103-005 55,203 11/09/06 01/09/07 David Ogiony Development
103-006 9,800 11/09/06 01/09/07 David Ogiony Development
103-007 1,999 11/29/02 03/13/03 David Ogiony Develop.
103-009 582 11/29/02 03/13/03 David Ogiony Develop.
103-011 1,437 01/27/03 02/14/03 David Ogiony Develop.
103-012 16,946 05/02/03 05/07/03 David Ogiony Develop.
103-014 25,856 06/17/03 07/11/03 David Ogiony Develop.
103-016 15,720 06/20/03 07/11/03 David Ogiony Develop.
103-017 2,792 09/05/03 09/16/03 David Ogiony Develop.
103-018 5,015 09/05/03 09/16/03 David Ogiony Develop.
103-019 21,275 11/03/03 11/20/03 David Ogiony Develop.
103-020 17,358 10/24/03 11/04/03 David Ogiony Develop.
103-021 2,535 10/24/03 11/04/03 David Ogiony Develop.
103-022 19,165 11/03/03 11/20/03 David Ogiony Develop.
103-023 2,662 11/03/03 11/20/03 David Ogiony Develop.
103-024 10,580 11/03/03 11/20/03 David Ogiony Develop.
103-025 10,217 11/03/03 11/20/03 David Ogiony Develop.
103-026 2,785 11/10/03 11/21/03 David Ogiony Develop.
103-027 1,050 12/08/03 12/31/03 David Ogiony Develop.