ALFRED ALMOND CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-01-01-04
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
95-0516   Additions and Alterations    0-001-002  02/14/96  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            123             1,566                  11/26/02   11/27/02    Albany Specialties                  
                                                            133               -78                  11/26/02   11/27/02    O'Kane Assoc.                       
                                                            136             8,760                  11/26/02   11/27/02    Rondout Elec.                       
                                                            137            13,455                  11/26/02   11/27/02    Nicholas Bouras                     
                                                            138             2,434                  11/26/02   11/27/02    Albany Specialties                  
                                                            139            -1,566                  11/26/02   11/27/02    Albany Specialties                  
                                                            140            -2,027                  11/26/02   11/27/02    P. Germinario & Sons                
                                                            141            -2,715                  11/26/02   11/27/02    Thomas Kempton Jr.                  
                                                            143            -2,750                  11/26/02   11/27/02    Health & Educ. Equip.               
                                                            144            -5,000                  11/26/02   11/27/02    Health & Educ. Equip.               
                                                            145            -5,000                  11/26/02   11/27/02    Dover Elec.                         
                                                            146              -129                  11/26/02   11/27/02    Rondout Elec.                       
                                                            147           -24,615                  11/26/02   11/27/02    Rondout Elec.                       
                                                            148            -6,000                  11/26/02   11/27/02    Rondout Elec.                       
                                                            150           -13,080                  11/26/02   11/27/02    P. Germinario & Sons                
                                                            152            -5,000                  11/26/02   11/27/02    Landmark Flooring                   
                                                            153           -25,699                  11/26/02   11/27/02    A. Servidone, Inc.                  
                                                            154            10,000                  11/26/02   11/27/02    P. Germinario & Sons                
                                                            158             6,000                  03/18/03   03/18/03    Thomas Kempton                      
 
01-0159   Reconstruction               0-001-004  03/06/02  NO CHANGE ORDERS ON ELECTRONIC FILE
04-1265   Reconstruction               0-001-005  12/12/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-001          14,438                  05/23/07   08/28/07    Kaplan Schmidt Electric             
                                                            E-002         141,855                  08/13/07     /  /      KAPLAN - SCHMIDT, INC.              
                                                            E-002         141,855                  08/13/07     /  /      KAPLAN - SCHMIDT ELECTRIC, INC.     
                                                            FS-001        -10,329                  03/20/06   06/23/06    Main Ford General Supply            
                                                            FS-002         -2,450                  05/28/08     /  /      Main Ford General Supply Co.        
                                                            G-010           6,560                  06/01/07   06/18/07    Keuka Construction                  
                                                            GC-001          4,526                  06/26/06   08/11/06    Keuka Construction                  
                                                            GC-002          7,868                  08/03/06   08/25/06    Kuka Construction                   
                                                            GC-003          4,184                  08/03/06   08/25/06    Keuka Construction                  
                                                            GC-004          4,253                  09/18/06   12/14/06    Keuka Construction                  
                                                            GC-005          6,231                  09/18/06   12/14/06    Keuka Construction                  
                                                            GC-006          8,397                  09/18/06   12/14/06    Keuka Construction                  
                                                            GC-007          3,918                  12/13/06   01/19/07    Keuka Construction                  
                                                            GC-008        -10,000                  12/13/06   01/19/07    Keuka Construction                  
                                                            H-001          22,116                  06/06/06   01/24/07    Frey Campbell                       
                                                            H-002          29,269                  10/05/07     /  /      Frey & Campbell, Inc.               
                                                            P-001           7,568                  10/05/07     /  /      Frey and Campbell, Inc.             
 
02-1238FP Reconstruction               0-001-FP1  03/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE
02-1239FP Reconstruction               0-001-FP2  03/17/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
04-1266   Reconstruction               5-002-003  12/12/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            G-009           3,571                  01/06/07   01/23/07    Keuka Construction                  
                                                            P-002           1,374                  10/05/07     /  /      Frey and Campbell, Inc.             
 





BELMONT CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-05-01-04
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
93-1665   Reconstruction               0-001-003  08/04/94  NO CHANGE ORDERS ON ELECTRONIC FILE





ANDOVER CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-06-01-04
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________
96-1409   Reconstruction               0-001-003  05/12/97  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0111   Additions and Alterations    0-001-004  01/31/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-01          18,149                  01/23/02   03/04/02    USA Remediation                     
                                                            01-02         -35,811                  11/12/02   01/02/03    USA Remediation                     
                                                            02-02            -676                  06/12/02   07/10/02    Bakers of Jericho Hill              
                                                            02-03          10,962                  06/12/02   07/10/02    Bakers of Jericho Hill              
                                                            02-04          17,347                  06/12/02   07/10/02    Bakers of Jericho Hill              
                                                            02-05          23,483                  07/24/02   08/28/02    Bakers of Jericho Hill              
                                                            03-01          -5,326                  07/26/02   08/28/02    LeChase Const.                      
                                                            03-23         -24,000                  06/12/02   07/10/02    LeChase Const.                      
                                                            03-24          22,517                  06/12/02   07/10/02    LeChase Const.                      
                                                            03-25           1,262                  06/12/02   07/10/02    LeChase Const.                      
                                                            03-26          -1,000                  06/12/02   07/10/02    LeChase Const.                      
                                                            03-27           1,101                  07/24/02   08/28/02    LeChase Const.                      
                                                            03-28           1,025                  07/24/02   08/28/02    LeChase Const.                      
                                                            03-30             404                  11/12/02   01/02/03    LeChase Const.                      
                                                            03-31            -566                  11/12/02   01/02/03    LeChase Const.                      
                                                            03-32           4,848                  10/28/02   12/02/02    LeChase Const.                      
                                                            04-01          10,075                  07/26/02   08/28/02    Apple Roofing                       
                                                            04-02          -2,581                  04/17/02   05/10/02    Apple Roofing                       
                                                            04-03           2,045                  04/17/02   05/10/02    Apple Roofing                       
                                                            04-04            -344                  06/12/02   07/10/02    Apple Roofing                       
                                                            04-05            -619                  10/28/02   12/02/02    Apple Roofing                       
                                                            05-01           3,995                  07/26/02   08/28/02    Mader Const.                        
                                                            05-02          10,914                  12/04/01   02/21/02    Mader Const.                        
                                                            05-03          13,840                  01/23/02   03/04/02    Mader Const.                        
                                                            05-04           4,608                  01/23/02   03/04/02    Mader Const.                        
                                                            05-05           4,886                  01/23/02   03/04/02    Mader Const.                        
                                                            05-06           3,300                  01/23/02   03/04/02    Mader Const.                        
                                                            05-07           5,753                  02/25/02   04/18/02    Mader Const.                        
                                                            05-08           7,263                  04/17/02   05/10/02    Mader Const.                        
                                                            05-09          -1,882                  06/12/02   07/10/02    Mader Const.                        
                                                            05-10           4,325                  06/12/02   07/10/02    Mader Const.                        
                                                            05-11           4,706                  11/12/02   01/02/03    Mader Const.                        
                                                            05-12            -619                  10/28/02   12/02/02    Mader Const.                        
                                                            06-04          15,117                  02/25/02   04/18/02    CNP Mech.                           
                                                            06-05           8,008                  04/17/02   05/10/02    CNP Mech.                           
                                                            06-06           5,346                  04/17/02   05/10/02    CNP Mech.                           
                                                            06-07           1,263                  07/24/02   08/28/02    CNP Mech.                           
                                                            07-01           5,691                  12/04/01   08/28/02    Frey & Campbell                     
                                                            07-02           3,169                  01/23/02   03/04/02    Frey & Campbell                     
                                                            07-03           6,593                  02/25/02   04/18/02    Frey & Campbell                     
                                                            07-05           1,525                  02/25/02   04/18/02    Frey & Campbell                     
                                                            07-06          10,316                  04/17/02   05/10/02    Frey & Campbell                     
                                                            07-07           7,457                  04/17/02   05/10/02    Frey & Campbell                     
                                                            07-08          21,688                  06/12/02   07/10/02    Frey & Campbell                     
                                                            07-10           2,039                  06/12/02   08/28/02    Frey & Campbell                     
                                                            07-11           6,588                  07/24/02   08/28/02    Frey & Campbell                     
                                                            07-12            -959                  11/12/02   01/02/03    Frey & Campbell                     
                                                            07-13             117                  10/28/02   12/02/02    Frey & Campbell                     
                                                            08-08          11,398                  02/25/02   04/18/02    GVE                                 
                                                            08-09           1,970                  04/17/02   05/10/02    GVE                                 
                                                            08-10          18,638                  06/12/02   07/10/02    GVE                                 
                                                            08-11         254,686                  06/12/02   07/10/02    GVE                                 
                                                            08-13          24,616                  06/20/02   07/12/02    GVE                                 
                                                            08-14          16,126                  06/20/02   07/12/02    GVE                                 
                                                            08-15          16,005                  06/20/02   07/12/02    GVE                                 
                                                            08-16            -696                  07/24/02   08/28/02    GVE                                 
                                                            08-17         -29,684                  07/24/02   08/28/02    GVE                                 
                                                            08-18            -122                  07/24/02   08/28/02    GVE                                 
                                                            08-19          15,138                  07/24/02   08/28/02    GVE                                 
                                                            08-20          -5,909                  11/12/02   01/02/03    GVE                                 
                                                            08-21         112,181                  10/28/02   12/02/02    GVE                                 
                                                            2-1            20,634                  12/04/01   02/21/02    Bakers of Jericho Hill              
                                                            3-10            2,449                  01/23/02   03/04/02    LeChase Const.                      
                                                            3-11           11,758                  01/23/02   03/04/02    LeChase Const.                      
                                                            3-12           -5,000                  02/25/02   04/18/02    LeChase Const.                      
                                                            3-13           -2,615                  02/25/02   04/18/02    LeChase Const.                      
                                                            3-14           17,899                  02/25/02   04/18/02    LeChase Const.                      
                                                            3-15           12,135                  02/25/02   05/01/02    LeChase Const.                      
                                                            3-16           15,712                  02/25/02   04/18/02    LeChase Const.                      
                                                            3-17           17,795                  04/17/02   05/10/02    LeChase Const.                      
                                                            3-2           -10,000                  11/16/01   02/20/02    LeChase Const.                      
                                                            3-21            1,943                  06/12/02   07/10/02    LeChase Const.                      
                                                            3-22            6,765                  06/12/02   07/10/02    LeChase Const.                      
                                                            3-3             7,181                  11/16/01   02/20/02    LeChase Const.                      
                                                            3-4             2,869                  11/16/01   02/20/02    LeChase Const.                      
                                                            3-5            17,019                  12/04/01   02/21/02    LeChase Const.                      
                                                            3-6             8,438                  12/20/01   08/28/02    LeChase Const.                      
                                                            3-7            16,720                  01/23/02   03/04/02    LeChase Const.                      
                                                            3-8             4,314                  01/23/02   03/04/02    LeChase Const.                      
                                                            3-9             7,591                  01/23/02   03/04/02    LeChase Const.                      
                                                            6-2             2,416                  12/20/01   03/01/02    CNP Mech.                           
                                                            6-3             2,234                  12/20/01   03/01/02    CNP Mech.                           
                                                            8-1             1,299                  11/16/01   02/20/02    GVE                                 
                                                            8-1Revis        1,299                  02/25/02   04/18/02    GVE                                 
                                                            8-2               759                  11/16/01   02/20/02    GVE                                 
                                                            8-3            12,749                  12/04/01   02/21/02    GVE                                 
                                                            8-4             1,952                  01/23/02   03/04/02    GVE                                 
                                                            8-5            11,282                  01/23/02   08/28/02    GVE                                 
                                                            8-6            12,168                  01/23/02   06/24/03    GVE                                 
 
00-0544   Reconstruction               0-001-005  12/13/00  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0402FP Reconstruction               0-001-FP1  11/07/02  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage Maintenance:
00-0112   Alterations                  5-002-001  01/31/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            02-06             800                  07/24/02   08/28/02    Bakers of Jericho Hill              
                                                            02-07          19,739                  10/28/02   12/02/02    Bakers of Jericho Hill              
                                                            02-08            -527                  10/28/02   12/02/02    Bakers of Jericho Hill              
                                                            03-29           3,432                  07/24/02   08/28/02    LeChase Const.                      
                                                            06-08             822                  07/24/02   08/28/02    CNP Mech.                           
                                                            06-09          -3,694                  01/10/03   01/16/03    CNP Mech.                           
                                                            06-10            -619                  01/10/03   01/16/03    CNP Mech.                           
                                                            07-04           1,384                  02/25/02   04/26/02    Frey & Campbell                     
                                                            07-09           6,645                  06/12/02   06/14/02    Frey & Campbell                     
                                                            08-07             327                  02/25/02   04/18/02    GVE                                 
                                                            08-12           1,249                  06/12/02   06/14/02    GVE                                 
                                                            3-18            6,365                  04/17/02   05/10/02    LeChase Const.                      
                                                            3-19            1,509                  04/17/02   05/10/02    LeChase Const.                      
                                                            3-20            3,995                  04/17/02   05/10/02    LeChase Const.                      
                                                            6-1            12,345                  12/04/01   02/21/02    CNP Mech.                           
                                                            8-2Revis          759                  02/25/02   04/18/02    GVE                                 
 





ANGELICA CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-07-01-04
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
93-0182   Reconstruction               0-001-004  10/12/93  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage New-1988:
93-0183   Reconstruction               5-006-002  10/12/93  NO CHANGE ORDERS ON ELECTRONIC FILE





GENESEE VALLEY CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-07-02-04
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          New Pre-K-12:
00-0827SR New Construction             0-012-001  02/20/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
 
00-1403   New Construction             0-012-001  06/13/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            01-08          10,057                  07/02/02   07/15/02    Bakers of Jericho Hill              
                                                            01-09          10,362                  10/30/02   12/02/02    Bakers of Jericho Hill              
                                                            01-10           7,428                  10/29/02   12/02/02    Bakers of Jericho Hill              
                                                            01-11           1,105                  10/06/03   11/05/03    Bakers of Jericho Hill              
                                                            01-12          11,550                  05/08/03   05/23/03    Bakers of Jericho Hill              
                                                            01-13A          9,793                  10/06/03   11/05/03    Bakers of Jericho Hill              
                                                            01-14           3,321                  05/08/03   05/23/03    Bakers of Jericho Hill              
                                                            01-16          25,926                  10/06/03   11/05/03    Bakers of Jericho Hill              
                                                            01-17          16,696                  01/27/04   02/18/04    Bakers of Jericho Hill              
                                                            01-17A          1,918                  05/17/05   06/07/05    Bakers of jericho hill              
                                                            01-18           2,666                  05/17/05   06/07/05    Bakers of Jericho Hill              
                                                            01-19          18,930                  05/17/05   06/07/05    Bakers of Jericho Hill              
                                                            01-20           4,293                  05/17/05   06/07/05    Baker of Jericho Hill               
                                                            02-01           1,308                  05/17/02   06/04/02    Delhi Steel                         
                                                            02-02             520                  07/02/02   07/15/02    Delhi Steel                         
                                                            02-03           1,557                  07/02/02   07/15/02    Delhi Steel                         
                                                            02-04            -400                  07/02/02   07/15/02    Delhi Steel                         
                                                            02-05             225                  12/23/02   01/08/03    Delhi Steel                         
                                                            02-06           1,717                  12/23/02   01/08/03    Delhi Steel                         
                                                            02-07             311                  12/23/02   01/08/03    Delhi Steel                         
                                                            02-08           2,098                  12/23/02   01/08/03    Delhi Steel                         
                                                            02-09           3,268                  12/23/02   01/08/03    Delhi Steel                         
                                                            02-10            -920                  12/23/02   01/08/03    Delhi Steel                         
                                                            02-11          15,667                  01/22/03   02/10/03    Delhi Steel                         
                                                            02-12           3,356                  01/22/03   02/10/03    Delhi Steel                         
                                                            02-13             660                  01/22/03   02/10/03    Delhi Steel                         
                                                            02-14             720                  01/22/03   02/10/03    Delhi Steel                         
                                                            02-15           1,421                  01/22/03   02/10/03    Delhi Steel                         
                                                            02-17          -1,578                  06/20/03   06/30/03    Delhi Steel                         
                                                            02-18          -9,684                  10/06/03   11/05/03    Delhi Steel                         
                                                            02-19           7,545                  11/05/03   11/12/03    Delhi Steel                         
                                                            02-20          -5,000                  01/27/04   02/18/04    Delhi Steel                         
                                                            03-02           3,672                  07/18/02   08/28/02    LeChase Construction                
                                                            03-04          -1,202                  08/21/02   09/04/02    LeChase Construction                
                                                            03-05           3,672                  08/21/02   09/04/02    LeChase Construction                
                                                            03-06           4,571                  08/21/02   09/04/02    LeChase Construction                
                                                            03-07          -4,488                  09/03/02   09/05/02    LeChase Construction                
                                                            03-08           9,515                  09/03/02   09/05/02    LeChase Construction                
                                                            03-09           1,575                  09/03/02   09/05/02    LeChase Construction                
                                                            03-10             732                  09/03/02   09/05/02    LeChase Construction                
                                                            03-11           1,023                  09/03/02   09/05/02    LeChase Construction                
                                                            03-12             825                  09/03/02   09/05/02    LeChase Construction                
                                                            03-13             343                  09/03/02   09/05/02    LeChase Construction                
                                                            03-14             584                  09/03/02   09/05/02    LeChase Construction                
                                                            03-15             747                  09/03/02   09/05/02    LeChase Construction                
                                                            03-16          18,709                  10/29/02   12/02/02    LeChase Construction                
                                                            03-17           5,902                  12/23/02   01/08/03    LeChase Construction                
                                                            03-18             186                  12/23/02   01/08/03    LeChase Construction                
                                                            03-19           5,224                  12/23/02   01/08/03    LeChase Construction                
                                                            03-20             920                  12/23/02   01/08/03    LeChase Construction                
                                                            03-21             236                  02/18/03   02/24/03    LeChase Construction                
                                                            03-22           1,182                  02/18/03   02/25/03    LeChase Construction                
                                                            03-23           1,019                  02/18/03   02/25/03    LeChase Construction                
                                                            03-24          19,881                  02/18/03   02/25/03    LeChase Construction                
                                                            03-25          20,098                  06/20/03   06/30/03    LeChase Construction                
                                                            03-27           6,560                  06/23/03   06/30/03    LeChase Construction                
                                                            03-28           8,905                  06/20/03   06/30/03    LeChase Construction                
                                                            03-29           4,084                  06/20/03   06/30/03    LeChase Construction                
                                                            03-30          22,064                  10/06/03   11/05/03    LeChase Construction                
                                                            03-31         -35,837                  01/27/04   02/18/04    LeChase Construction                
                                                            04-01           7,415                  05/23/02   06/04/02    Superior Interior Systems           
                                                            04-02           3,142                  05/23/02   06/04/02    Superior Interior Systems           
                                                            04-04           2,402                  07/02/02   07/15/02    Superior Interior Systems           
                                                            04-05             611                  07/02/02   07/15/02    Superior Interior Systems           
                                                            04-06             411                  07/02/02   07/15/02    Superior Interior Systems           
                                                            04-07           1,763                  10/29/02   12/02/02    Superior Interior Systems           
                                                            04-08             735                  10/29/02   12/02/02    Superior Interior Systems           
                                                            04-09           3,433                  01/22/03   02/10/03    Superior Interior Systems           
                                                            04-10           1,665                  01/22/03   02/10/03    Superior Interior Systems           
                                                            04-11             520                  01/22/03   02/10/03    Superior Interior Systems           
                                                            04-12           1,186                  01/22/03   02/10/03    Superior Interior Systems           
                                                            04-13           6,136                  01/22/03   02/10/03    Superior Interior Systems           
                                                            04-14           2,018                  01/22/03   02/10/03    Superior Interior Systems           
                                                            04-15           1,234                  01/22/03   02/10/03    Superior Interior Systems           
                                                            04-16           1,005                  12/23/02   01/08/03    Superior Interior Systems           
                                                            04-17           1,974                  01/22/03   02/10/03    Superior Interior Systems           
                                                            04-18             319                  02/18/03   02/25/03    Superior Interior Systems           
                                                            04-19             684                  02/18/03   02/25/03    Superior Interior Systems           
                                                            04-20           1,557                  02/18/03   02/24/03    Superior Interior Systems           
                                                            04-21             738                  02/18/03   02/24/03    Superior Interior Systems           
                                                            04-22          12,126                  02/18/03   02/24/03    Superior Interior Systems           
                                                            04-23          34,827                  02/18/03   12/28/04    Superior Interior Systems           
                                                            04-24           6,921                  05/08/03   05/23/03    Superior Interior Systems           
                                                            04-25             523                  05/08/03   05/23/03    Superior Interior Systems           
                                                            04-26           2,091                  05/08/03   05/23/03    Superior Interior Systems           
                                                            04-27           3,987                  05/08/03   05/23/03    Superior Interior Systems           
                                                            04-28            -503                  05/08/03   05/23/03    Superior Interior Systems           
                                                            04-29           9,000                  05/08/03   05/23/03    Superior Interior Systems           
                                                            04-30           4,147                  05/08/03   05/23/03    Superior Interior Systems           
                                                            04-31           1,624                  08/06/03   09/09/03    Superior Interior Systems           
                                                            04-32           2,201                  08/13/03   09/09/03    Superior Interior Systems           
                                                            04-33          21,341                  10/06/03   11/05/03    Superior Interior Systems           
                                                            06-02           3,605                  05/23/02   06/04/02    Infinity Architectural Window       
                                                            06-03             940                  09/03/02   09/05/02    Infinity Architectural Window       
                                                            06-04           5,520                  01/22/03   02/10/03    Infinity Architectural Window       
                                                            06-05           5,950                  01/27/04   02/18/04    Infinity Architectural Window       
                                                            07-01           5,400                  10/06/03   11/05/03    DeClerck Flooring                   
                                                            09-01          -2,160                  02/18/03   02/24/03    E&B Equipment                       
                                                            09-02           4,934                  08/06/03   09/09/03    E&B Equipment                       
                                                            1-4            34,125                  10/22/01   04/11/02    Bakers of Jericho Hill              
                                                            1-5                 0                  10/22/01   04/11/02    Bakers of Jericho Hill              
                                                            10-01           4,256                  01/22/03   02/10/03    Nickerson                           
                                                            10-02          18,484                  10/06/03   11/05/03    Nickerson                           
                                                            12-02            -650                  07/02/02   07/15/02    B&W Supply                          
                                                            12-03           7,823                  05/08/03   05/23/03    B&W Supply                          
                                                            12-04           1,885                  10/06/03   11/05/03    B&W Supply                          
                                                            13-03            -240                  09/03/02   09/05/02    Frey & Campbell                     
                                                            13-04         -28,505                  09/03/02   09/06/02    Frey & Campbell                     
                                                            13-05         -23,840                  09/03/02   09/05/02    Frey & Campbell                     
                                                            13-06          -8,221                  02/18/03   02/24/03    Frey & Campbell                     
                                                            13-07             672                  02/18/03   02/24/03    Frey & Campbell                     
                                                            13-08             414                  02/18/03   02/24/03    Frey & Campbell                     
                                                            13-09          15,146                  05/08/03   05/23/03    Frey & Campbell                     
                                                            13-11             814                  10/06/03   11/05/03    Frey & Campbell                     
                                                            13-12          -1,941                  01/27/04   02/04/04    Frey & Campbell                     
                                                            14-01           4,487                  10/29/02   12/02/02    North Central Mech.                 
                                                            14-02             626                  10/29/02   12/02/02    North Central Mech.                 
                                                            14-03          11,682                  06/20/03   06/30/03    North Central Mech.                 
                                                            14-04           2,906                  08/06/03   09/09/03    North Central Mech.                 
                                                            14-05           4,070                  01/27/04   02/04/04    North Central Mech.                 
                                                            15-01           3,931                  08/21/02   09/04/02    Industrial Power & Lighting         
                                                            15-02            -240                  08/06/03   09/09/03    Industrial Power & Lighting         
                                                            15-03          24,627                  08/06/03   09/09/03    Industrial Power & Lighting         
                                                            15-05          28,264                  08/26/03   02/18/04    Industrial Power & Lighting         
                                                            ST-21           2,606                  10/17/05   11/01/05    Bakers of Jericho hill              
                                                            ST-22         -47,000                  01/13/06   06/23/06    Bakers of Jerico Hill               
 
05-0027   Reconstruction               0-012-002  07/12/05  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Bus Garage:
00-0826SR New Construction             5-011-001  02/20/01  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1402   New Construction             5-011-001  06/13/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            001            -6,282                  06/29/04   07/09/04    Natures Way Environmental           
                                                            01-13           9,841                  10/06/03   11/05/03    Bakers of Jericho Hill              
                                                            01-15          21,828                  05/08/03   05/23/03    Bakers of Jericho Hill              
                                                            02-16           8,397                  05/08/03   05/23/03    Delhi Steel                         
                                                            03-01           2,650                  07/18/02   08/28/02    LeChase Const.                      
                                                            03-03             909                  07/18/02   08/28/02    LeChase Const.                      
                                                            03-26           1,400                  06/20/03   06/30/03    LeChase Const.                      
                                                            04-01           7,415                  05/23/02     /  /      Superior Interior Systems           
                                                            04-02           3,142                  05/23/02     /  /      Superior Interior Systems           
                                                            04-34          -2,000                  11/19/03   11/21/03    Superior Intertior Systems          
                                                            06-01          -2,500                  05/23/02   06/04/02    Infinity Architectural Window       
                                                            1-1           505,500                  10/22/01   04/11/02    Bakers of Jericho Hill              
                                                            1-2            50,250                  10/22/01   04/11/02    Bakers of Jericho Hill              
                                                            1-3             7,500                  10/22/01   04/11/02    Bakers of Jericho Hill              
                                                            1-6             3,154                  02/22/02   04/01/02    Bakers of Jericho Hill              
                                                            13-1            3,515                  04/26/02   05/07/02    Frey & Campbell                     
                                                            13-10          -2,972                  10/06/03   11/05/03    Frey & Campbell                     
                                                            13-2            1,389                  04/26/02   05/07/02    Frey & Campbell                     
                                                            15-04           3,864                  08/06/03   09/09/03    Industrial Power & Lighting         
                                                            15-06           1,291                  08/26/03   09/19/03    Industrial Power & Lighting         
 





BELFAST CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-08-01-04
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
94-0566   Reconstruction               0-001-003  01/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1225   Additions and Alterations    0-001-004  04/30/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1570   Additions and Alterations    0-001-005  01/30/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-1            2,700                  06/07/02   06/14/02    Arric Corp.                         
                                                            AA-2            3,200                  09/18/02   11/01/02    Arric Corp.                         
                                                            AA-3           -1,500                  06/09/04   07/09/04    Arric Corp                          
                                                            EL-1          -17,892                  11/08/01   04/19/02    Kel-Kur Elec.                       
                                                            EL-2          -72,700                  02/11/02   03/26/02    Kel-Kur Elec.                       
                                                            EL-3              985                  02/19/02   04/01/02    Kel-Kur Elec.                       
                                                            EL-4          -22,210                  06/03/02   06/05/02    Kel-Kur Elec.                       
                                                            EL-5          -10,560                  06/03/02   06/12/02    Kel-Kur Elec.                       
                                                            EL-6          -15,195                  06/03/02   06/05/02    Kel-Kur Elec.                       
                                                            EL-7            7,664                  09/18/02   02/26/03    Kel-Kur Elec.                       
                                                            EL-8            1,082                  02/06/03   02/14/03    Kel-Kur Elec.                       
                                                            El-7            7,664                  02/20/03     /  /      Kel-Kur Elec.                       
                                                            GC-2          -34,774                  06/07/02   06/14/02    Barnhart Builders                   
                                                            GC-4            9,019                  02/11/02   03/25/02    Barnhart Builders                   
                                                            HV-1 rev      -79,700                  06/07/02   01/09/03    Mollenberg Betz                     
                                                            HV-2            1,535                  03/01/02   04/18/02    Mollenberg Betz                     
                                                            HV-3            3,310                  05/22/02   06/05/02    Mollenberg Betz                     
                                                            HV-4            2,850                  09/18/02   11/01/02    Mollenberg Betz                     
                                                            PB-1          -59,400                  06/07/02   06/14/02    JW Danforth                         
                                                            PB-2           62,994                  12/06/01   09/24/04    JW Danforth                         
                                                            PB-3            4,342                  01/28/02   03/06/02    JW Danforth                         
                                                            PB-4            3,423                  10/24/02   12/02/02    JW Danforth                         
 
00-0588   Alterations                  0-001-006  02/01/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-1           -9,862                  06/07/02   06/14/02    Barnhart Builders                   
                                                            GC-4              750                  12/28/01   03/04/02    Barnhart Builders                   
 
02-1245   Reconstruction               0-001-008  09/30/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RF-1            4,290                  06/02/03   06/04/03    General Roofing and Heating         
 
94-0567EP Energy Project               0-001-E01  01/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0028FP Reconstruction               0-001-FP1  10/03/03  NO CHANGE ORDERS ON ELECTRONIC FILE
04-0427SC Visual Structural Inspection 0-001-SC1  11/23/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Shop Bus Garage:
94-0568   Reconstruction               0-002-001  01/19/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1224   Reconstruction               0-002-002  04/30/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Bus Garage:
00-0587   New Construction             5-007-001  02/01/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            GC-2          -15,932                  06/07/02   06/14/02    Barnhart Builders                   
                                                            GC-3            4,500                  12/27/01   03/08/02    Barnhart Builders                   
                                                            GC-5              606                  02/11/02   03/25/02    Barnhart Builders                   
                                                            GC-6            5,500                  06/17/02   07/10/02    Barnhart Builders                   
                                                            HV-1           -3,000                  06/07/02   01/09/03    Mollenberg Betz                     
                                                            PB-2           -7,900                  02/11/02   03/25/02    JW Danforth                         
 





BOLIVAR CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-10-01-04
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
90-1319   Reconstruction               0-001-003  05/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
90-1320   Reconstruction               5-002-002  05/13/91  NO CHANGE ORDERS ON ELECTRONIC FILE





CANASERAGA CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-11-02-04
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
00-1077   Additions and Alterations    0-001-003  08/10/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AAC-01          3,450                  07/22/02   08/16/02    S&S Environmental                   
                                                            AAC-02          2,968                  08/29/02   10/29/02    S&S Environmental                   
                                                            EC-01             802                  06/27/02   12/18/06    Blackmon-Farrell Elec.              
                                                            EC-02           1,680                  06/27/02   07/03/02    Blackmon-Farrell Elec.              
                                                            EC-03             466                  08/29/02   10/29/02    Blackmon-Farrell Elec.              
                                                            EC-04             496                  08/29/02   10/29/02    Blackmon-Farrell Elec.              
                                                            EC-05           4,474                  09/30/02   11/05/02    Blackmon-Farrell Elec.              
                                                            EC-06           2,248                  09/30/02   11/05/02    Blackmon-Farrell Elec.              
                                                            EC-07           6,412                  09/30/02   11/05/02    Blackmon-Farrell Elec.              
                                                            EC-08             110                  09/30/02   11/05/02    Blackmon-Farrell Elec.              
                                                            EC-09           3,851                  11/29/02   12/04/02    Blackmon-Farrell Elec.              
                                                            EC-10           1,295                  11/29/02   12/04/02    Blackmon-Farrell Elec.              
                                                            EC-11             583                  11/29/02   12/04/02    Blackmon-Farrell Elec.              
                                                            EC-12           2,524                  05/21/03   05/27/03    Blackmon-Farrell Elec.              
                                                            EC-13           1,332                  05/21/03   05/27/03    Blackmon-Farrell Elec.              
                                                            EC-14             611                  05/21/03   05/27/03    Blackmon-Farrell Elec.              
                                                            EC-15             203                  05/21/03   05/27/03    Blackmon-Farrell Elec.              
                                                            EC-16             697                  05/21/03   05/27/03    Blackmon-Farrell Elec.              
                                                            EC-17             577                  05/21/03   05/27/03    Blackmon-Farrell Elec.              
                                                            EC-18           3,511                  05/21/03   05/27/03    Blackmon-Farrell Elec.              
                                                            EC-19           3,202                  05/21/03   05/27/03    Blackmon-Farrell Elec.              
                                                            EC-20           1,874                  05/21/03   05/27/03    Blackmon-Farrell Elec.              
                                                            EC-21           1,071                  05/21/03   05/27/03    Blackmon-Farrell Elec.              
                                                            EC-22             379                  05/21/03   05/27/03    Blackmon-Farrell Elec.              
                                                            EC-23           1,440                  05/21/03   05/27/03    Blackmon-Farrell Elec.              
                                                            EC-24             453                  05/21/03   05/27/03    Blackmon-Farrell Elec.              
                                                            EC-25             281                  05/21/03   05/27/03    Blackmon-Farrell Elec.              
                                                            EC-26          -1,392                  06/24/03   07/11/03    Blackmon-Farrell Elec.              
                                                            EC-27             952                  08/18/03   08/27/03    Blackmon-Farrell Elec.              
                                                            EC-28           1,623                  08/18/03   08/27/03    Blackmon-Farrell Elec.              
                                                            EC-29           1,252                  08/18/03   08/27/03    Blackmon-Farrell Elec.              
                                                            EC-30             873                  08/18/03   08/27/03    Blackmon-Farrell Elec.              
                                                            EC-31           1,441                  08/18/03   08/27/03    Blackmon-Farrell Elec.              
                                                            EC-32             347                  08/18/03   08/27/03    Blackmon-Farrell Elec.              
                                                            EC-33             156                  08/18/03   08/27/03    Blackmon-Farrell Elec.              
                                                            EC-34           1,744                  08/18/03   08/27/03    Blackmon-Farrell Elec.              
                                                            EC-35           2,223                  08/18/03   08/27/03    Blackmon-Farrell Elec.              
                                                            EC-36           1,305                  08/18/03   08/27/03    Blackmon-Farrell Elec.              
                                                            EC-37              78                  08/18/03   08/27/03    Blackmon-Farrell Elec.              
                                                            EC-38          70,237                  01/09/06   12/18/06    Blackmon Farrell Electric           
                                                            EC-39           6,300                  03/26/04   04/26/04    Blackmon Farrell Elec.              
                                                            EC-40           7,291                  08/02/04   09/23/04    Blackmon Farrell Electric           
                                                            EC-41            -204                  06/21/05   07/11/05    Blackmon Farrell Electric           
                                                            GC-01               0                  05/30/02   08/15/02    Javen Const.                        
                                                            GC-02               0                  05/30/02   08/15/02    Javen Const.                        
                                                            GC-03               0                  05/30/02   08/15/02    Javen Const.                        
                                                            GC-04           9,784                  06/27/02   07/03/02    Javen Const.                        
                                                            GC-05               0                  06/27/02   07/03/02    Javen Const.                        
                                                            GC-06           9,027                  06/27/02   07/03/02    Javen Const.                        
                                                            GC-07           4,966                  02/16/06   08/09/06    Javen Construction                  
                                                            GC-08           8,089                  02/17/06   08/09/06    Javen Construction                  
                                                            GC-09               0                  07/22/02   08/16/02    Javen Const.                        
                                                            GC-10           3,245                  09/30/02   11/05/02    Javen Const.                        
                                                            GC-11               0                  09/30/02   11/05/02    Javen Const.                        
                                                            GC-12           2,849                  09/30/02   11/05/02    Javen Const.                        
                                                            GC-13               0                  09/30/02   11/05/02    Javen Const.                        
                                                            GC-14           1,821                  09/30/02   11/05/02    Javen Const.                        
                                                            GC-15           6,220                  11/01/02   01/08/03    Javen Const.                        
                                                            GC-16           3,118                  11/01/02   01/08/03    Javen Const.                        
                                                            GC-17           9,934                  11/01/02   01/08/03    Javen Const.                        
                                                            GC-18           6,792                  11/01/02   01/08/03    Javen Const.                        
                                                            GC-19         100,587                  11/29/02   12/04/02    Javen Const.                        
                                                            GC-20           5,052                  05/21/03   05/27/03    Javen Const.                        
                                                            GC-21          -3,444                  05/21/03   05/27/03    Javen Const.                        
                                                            MC-01             758                  11/01/02   01/08/03    Faulks Plumbing                     
                                                            PC-01               0                  11/29/02   12/04/02    Frey & Campbell                     
                                                            PC-02               0                  11/29/02   12/04/02    Frey & Campbell                     
                                                            PC-03               0                  11/29/02   12/04/02    Frey & Campbell                     
                                                            PC-04               0                  11/29/02   12/04/02    Frey & Campbell                     
                                                            PC-05          27,200                  05/21/03   05/27/03    Frey & Campbell                     
                                                            PC-06             408                  05/21/03   05/27/03    Frey & Campbell                     
                                                            PC-07          -1,004                  05/21/03   05/27/03    Frey & Campbell                     
                                                            SC-01           7,375                  06/27/02   07/03/02    Pettit and Pettit                   
                                                            SC-02           8,294                  06/27/02   12/18/06    Pettit and Pettit                   
                                                            SC-03           3,822                  07/22/02   08/16/02    Pettit and Pettit                   
                                                            SC-04           4,235                  12/14/06   12/18/06    Pettit and Pettit Inc               
                                                            SC-05          28,000                  03/03/03   03/26/03    Pettit and Pettit                   
                                                            SC-06           7,596                  03/03/03   03/26/03    Pettit and Pettit                   
                                                            SC-07           1,546                  03/03/03   03/26/03    Pettit and Pettit                   
                                                            SC-08          10,318                  03/03/03   03/26/03    Pettit and Pettit                   
                                                            SC-09          12,900                  03/10/03   03/20/03    Pettit and Pettit                   
                                                            SC-10          -1,344                  05/21/03   05/27/03    Pettit and Pettit                   
                                                            SC-11           8,400                  06/24/03   07/11/03    Pettit and Pettit                   
                                                            SC-12          -1,300                  08/19/03   10/23/03    Pettit and Pettit                   
 





FRIENDSHIP CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-16-01-04
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________
94-0079   Reconstruction               0-001-006  08/22/94  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0681   Additions and Alterations    0-001-007  02/28/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0469   Reconstruction               0-001-008  11/27/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0213   Reconstruction               0-001-009  10/12/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0022   Reconstruction               0-001-010  07/11/96  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0091   Reconstruction               0-001-011  07/25/96  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0509   Additions and Alterations    0-001-012  07/28/05  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AC-1           -5,800                  07/24/06   08/10/06    Epic Contracting                    
                                                            AC-2            8,625                  07/24/06   08/10/06    Epic Contracting                    
                                                            AC-3           -5,643                  06/19/08     /  /      Epic Contracting                    
                                                            EC-1           -9,408                  03/30/06     /  /      CIR Electrical Construction         
                                                            EC-2                0                  07/05/06   10/23/07    CIR Electrical Construction         
                                                            EC-3                0                  07/24/06   01/09/07    Cir Electrical Construction         
                                                            EC-4                0                  09/29/06   12/18/06    Cir Electrical                      
                                                            EC-5            1,393                  12/19/07   12/28/07    CIR ELECTRICAL CONSTRUCTION CORP    
                                                            EC-6            5,700                  12/19/07   12/28/07    CIR ELECTRICALCONSTRUCTION CORP     
                                                            EC-7           11,500                  12/19/07   12/28/07    CIR ELECTRICAL CONSTRUCTION CORP    
                                                            EC-8            3,220                  12/19/07   12/28/07    CIR ELECTRICAL CONSTRUCTION CORP    
                                                            EC-9            1,793                  12/19/07   12/28/07    CIR ELECTRICAL CONSTRUCTION CORP    
                                                            GC-1          -53,900                  11/25/05   12/05/05    Lobar Inc                           
                                                            GC-10           2,003                  09/29/06   10/24/06    lobar inc                           
                                                            GC-11             660                  09/29/06   10/24/06    Lobar Inc                           
                                                            GC-12           2,711                  11/03/06   12/28/06    Lobar Inc                           
                                                            GC-13           3,793                  11/03/06   12/28/06    Lobar Inc                           
                                                            GC-14           6,341                  11/03/06   12/28/06    Lobar Inc                           
                                                            GC-15          -2,324                  01/22/07   03/14/07    Lobar Inc                           
                                                            GC-16          48,080                  01/29/07   02/22/07    Lobar Inc                           
                                                            GC-17          11,151                  01/29/07   02/22/07    Lobar Inc                           
                                                            GC-18           6,672                  05/15/07   06/22/07    Lobar Inc                           
                                                            GC-2                0                  03/30/06   06/06/06    Lobar Inc                           
                                                            GC-3                0                  03/30/06   06/06/06    Lobar Inc                           
                                                            GC-4           -4,600                  03/30/06     /  /      Lobar Inc                           
                                                            GC-5                0                  04/03/06   06/06/06    Lobar Inc                           
                                                            GC-6           -1,755                  04/03/06   06/06/06    Lobar Inc                           
                                                            GC-7             -519                  07/24/06   08/10/06    Lobar                               
                                                            GC-8                0                  07/24/06   08/10/06    Lobar Inc                           
                                                            GC-9            2,994                  07/24/06   08/10/06    Lobar Inc                           
                                                            HC-1          -14,310                  07/24/06     /  /      Frey Campbell                       
                                                            HC-2           -7,411                  07/24/06   01/09/07    Frey Campbell                       
                                                            HC-3          -25,450                  12/21/06   01/12/07    Frey Campbell                       
                                                            PC-1          -16,400                  11/16/05   11/25/05    MLP Plumbing Mechanical             
                                                            PC-2           -4,719                  04/03/06   05/09/06    MLP Plumbing Mechanical             
                                                            PC-3            2,886                  01/22/07   01/30/07    MLP Plumbing Mechanical             
                                                            PC-4          -11,363                  01/22/07     /  /      MLP Plumbing Mechanical             
                                                            PC-5            3,689                  08/30/07   09/06/07    MLP PLUMBING & MECHANICAL, INC.     
                                                            PC-6               77                  05/15/08     /  /      MLP PLUMBING & MECHANICAL, INC.     
 
05-0228   Reconstruction               0-001-013  10/21/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0814   Reconstruction               0-001-014  03/20/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-1          -12,916                  12/21/06     /  /      GVE Inc                             
 
06-0314   Reconstruction               0-001-015  12/23/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-1275   Additions and Alterations    0-001-016  05/18/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            MC-1          -25,000                  09/19/06     /  /      METRO CONTRACTING ENVIROMENTAL      
 
06-0435   Additions and Alterations    0-001-017  02/09/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-2            1,143                  11/06/07   01/15/08    REED & CULBRET eLECTRIC, INC.       
                                                            EC-4            2,003                  01/16/08     /  /      Reed & Cubert Electric              
                                                            EC-5            7,760                  01/16/08     /  /      Reed & Cubert Electric              
                                                            EC-6            2,166                  04/24/08     /  /      REED & CUBERT ELECTRIC, INC.        
                                                            GC-1                0                  10/11/07   10/23/07    Kirst Construction                  
                                                            GC-3           -8,633                  12/07/07   12/31/07    Kirst Construction                  
                                                            GC-4           39,086                  12/07/07     /  /      Kirst Construction                  
                                                            GC-5           -1,821                  12/07/07   01/28/08    Kirst Construction                  
                                                            GC-6                0                  02/14/08   03/19/08    KIRST CONSTRUCTION                  
                                                            GC-7          -17,638                  04/09/08     /  /      KIRST CONSTRUCTION, INC.            
                                                            MC-1                0                  10/22/07   01/28/08    JOHN W DANFORTH COMPANY             
                                                            MC-3`          58,800                  12/07/07     /  /      John W. Danforth Company            
                                                            MC-5            5,828                  06/16/08     /  /      John W. Danforth                    
                                                            MC2                 0                  10/22/07   01/28/08    JOHN W DANFORTH COMPANY             
 
07-1383   Reconstruction               0-001-019  03/10/08  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0930FP Reconstruction               0-001-FP1  06/08/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
06-0436   Reconstruction               4-002-004  02/09/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC - 1              0                  11/06/07     /  /      REED & CULBERT ELECTRIC, INC.       
                                                            EC-3            7,733                  01/16/08     /  /      Reed & Cubert Electric              
                                                            GC-2                0                  10/11/07   10/23/07    Kirst Construction                  
                                                            MC-4              492                  06/16/08     /  /      John W. Danforth                    
 

          New Bus Garage:
00-1753   New Construction             5-005-001  01/07/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EC-01          -4,274                  02/26/04   04/22/04    CIR Elec.                           
                                                            GC-01               0                  05/21/03   06/02/03    Building Innovations                
                                                            GC-02           7,084                  05/21/03   06/02/03    Building Innovations                
                                                            GC-03            -374                  11/28/03   01/05/04    Building Innovations Group          
                                                            GC-04               0                  11/28/03   12/04/03    Building Innovations Group          
                                                            GC-05          12,352                  02/26/04   03/03/04    Building Innovations Group          
                                                            GC-06           2,106                  02/26/04   03/03/04    Building Innovations Group          
                                                            MC-01          -7,005                  02/26/04   04/22/04    Faulks Plumbing                     
                                                            PC-01          -1,464                  11/28/03   01/05/04    Numarco Inc                         
                                                            PC-02          -9,257                  02/26/04   04/22/04    Numarco Inc                         
 





FILLMORE CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-20-01-04
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Fillmore Main Building:
91-0689   Reconstruction               0-001-001  02/13/92  NO CHANGE ORDERS ON ELECTRONIC FILE
91-0316   Reconstruction               0-001-002  10/04/91  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0756   Additions and Alterations    0-001-003  05/14/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0936   Reconstruction               0-001-004  03/08/96  NO CHANGE ORDERS ON ELECTRONIC FILE
02-2391   Reconstruction               0-001-005  03/09/04  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0617   Additions and Alterations    0-001-006  03/20/07  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-1            9,360                  02/13/08   03/08/08    EPIC CONTRACTING LLC                
                                                            EL-1          -26,300                  02/25/08   04/15/08    blackmon-farrell electric           
                                                            GC-1         -167,414                  05/19/08     /  /      CONCEPT CONSTRUCTION CORP.          
                                                            GC-2         -119,114                  05/19/08     /  /      CONCEPT CONSTRUCTION CORP.          
                                                            GC-3          -54,210                  05/19/08     /  /      CONCEPT CONSTRUCTION CORP.          
                                                            GC-4          -25,155                  05/19/08     /  /      CONCEPT CONSTRUCTION CORP.          
                                                            GC-5          -66,648                  05/19/08     /  /      CONCEPT CONSTRUCTION, CORP.         
                                                            GC-6          -49,125                  05/19/08     /  /      CONCEPT CONSTRUCTION CORP.          
                                                            HV-1          -46,113                  02/13/08     /  /      millenberg betz                     
                                                            HV-2          -11,900                  02/13/08     /  /      mollenberg betz                     
                                                            P 1           -15,327                  02/13/08   03/28/08    MKS plumbing corp                   
                                                            St-1         -130,350                  02/25/08   04/02/08    greenauer blacktop                  
 

          Maintenance Building:
06-0618   New Construction             3-004-001  03/20/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
91-0099   Reconstruction               5-002-001  08/15/91  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0572   Additions and Alterations    5-002-002  04/17/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            EL-2           -4,658                  06/06/06   07/25/06    Blackmon-Farrell Electric           
                                                            EL-4              221                  08/24/01   03/27/02    Blackmon-Farrell                    
                                                            GC-4            1,551                  06/06/06   07/25/06    Kirst Construction                  
                                                            GC2-1          -3,500                  12/18/01   02/28/02    H&K Services                        
                                                            PB-1           -9,849                  09/14/01   01/14/03    Roy's Plumbing                      
                                                            PB-3          -13,250                  06/06/06   07/25/06    Roy's Plumbing, Inc                 
                                                            PB-4            4,553                  06/06/06   07/25/06    Roy's Plumbing, Inc.                
                                                            PB-5           -4,200                  12/03/02   01/03/03    Roy's Plumbing                      
 





WHITESVILLE CENTRAL SCHOOL STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-21-01-04
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
90-1122   Reconstruction               0-001-001  02/28/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1536   Reconstruction               0-001-002  08/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0695   Additions and Alterations    0-001-004  03/20/98  NO CHANGE ORDERS ON ELECTRONIC FILE
00-0936   Additions and Alterations    0-001-005  04/13/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            E-1            18,450                  08/01/02     /  /      Oyer Elec.                          
                                                            E-10            4,286                  09/10/03   09/16/03    Oyer Elec.                          
                                                            E-11           -4,286                  08/06/04   08/10/04    Oyer Elec.                          
                                                            E-2            20,000                  08/01/02   08/16/02    Oyer Elec.                          
                                                            E-3             2,566                  09/30/02   11/01/02    Oyer Elec.                          
                                                            E-4 Rev.       28,000                  10/03/02   11/01/02    Oyer Elec.                          
                                                            E-5             1,634                  11/22/02   01/02/03    Oyer Elec.                          
                                                            E-6             3,715                  11/22/02   01/02/03    Oyer Elec.                          
                                                            E-7             3,365                  11/22/02   01/02/03    Oyer Elec.                          
                                                            E-8             2,645                  01/28/03   02/11/03    Oyer Elec.                          
                                                            FS-1              670                  01/14/03   02/06/03    B&W Supply Company                  
                                                            G-1             1,455                  08/01/02   08/16/02    Duggan & Duggan                     
                                                            G-2            35,586                  11/18/02   01/03/03    Duggan & Duggan                     
                                                            G-3             3,378                  11/18/02   01/03/03    Duggan & Duggan                     
                                                            G-4            14,666                  02/24/03   03/11/03    Duggan & Duggan                     
                                                            G-5            -9,178                  02/24/03   03/11/03    Duggan & Duggan                     
                                                            H-1             1,209                  05/02/03   05/21/03    Faulks Plumbing                     
                                                            H-2            -1,021                  03/17/05   04/14/05    Faulks Plumbing heating             
                                                            P-1             1,177                  12/02/02   01/03/03    Frey and Campbell                   
                                                            P-2               203                  12/02/02   03/28/03    Frey and Campbell                   
                                                            P-3              -185                  12/02/02   01/03/03    Frey and Campbell                   
                                                            P-4             3,468                  04/21/03   05/02/03    Frey and Campbell                   
                                                            T-1             1,035                  03/26/03   04/03/03    Structured Cabling                  
 
07-0008   Additions and Alterations    0-001-007  02/04/08  NO CHANGE ORDERS ON ELECTRONIC FILE
02-0812FP Reconstruction               0-001-FP1  03/05/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:
92-1537   Reconstruction               5-002-001  08/10/93  NO CHANGE ORDERS ON ELECTRONIC FILE

          NEW BUS GARAGE:
07-0009   New Construction             5-009-001  02/04/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Library:
93-0592   New Construction             6-007-001  04/19/94  NO CHANGE ORDERS ON ELECTRONIC FILE





CUBA-RUSHFORD CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-23-02-04
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Cuba Campus K-5 Bldg:
93-0240   Reconstruction               0-001-001  10/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
92-0537   Reconstruction               0-001-003  01/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0470   Reconstruction               0-001-004  01/12/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0289   Additions and Alterations    0-001-005  10/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1269   Reconstruction               0-001-006  05/30/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1417   Reconstruction               0-001-007  09/07/00  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2063   Reconstruction               0-001-009  06/10/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Cuba Elementary:
92-0538   Reconstruction               0-002-001  01/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0664   Reconstruction               0-002-002  04/09/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            AA-1           13,775                  10/15/04   10/22/04    Arric Corp                          
                                                            EL-1           20,500                  04/27/05   06/21/05    Blackmon Farrell Electric           
                                                            EL-2          -28,697                  08/05/05   08/15/05    Blackmon Farrell Electric           
                                                            EL-3          -25,000                  08/05/05   03/13/06    Blackmon Farrell Electric           
                                                            EL-4           -9,355                  08/05/05   08/15/05    Blackmon Farrell Electric           
                                                            EL-5              282                  08/15/05   03/13/06    Blackmon Farrell Electric           
                                                            GC-1           15,276                  10/15/04   10/22/04    LC Whitford                         
                                                            GC-10               0                  12/02/05     /  /      The LC Whitford Co                  
                                                            GC-10               0                  03/15/06   06/02/06    The LC Whitford Co                  
                                                            GC-2            3,322                  10/15/04   10/22/04    LC Whitford                         
                                                            GC-3           13,007                  01/11/05   01/20/05    The LC Whitford Co                  
                                                            GC-4            3,153                  01/11/05   01/20/05    The LC Whitford                     
                                                            GC-5            1,844                  01/11/05   01/20/05    The LC Whitford Co                  
                                                            GC-6            6,859                  02/08/05   02/24/05    The LC Whitford Co                  
                                                            GC-7            4,498                  06/13/05   06/29/05    The Lc Whitford                     
                                                            GC-8            3,176                  06/13/05   06/29/05    The LC Whitford Co                  
                                                            GC-9            7,742                  07/07/05   07/21/05    The LC Whitford Co                  
                                                            HV-1           98,800                  11/17/04   11/22/04    Hoot LLC                            
                                                            HV-2            8,574                  10/15/04   10/22/04    Hoot LLC                            
                                                            HV-3            4,175                  12/30/04   03/13/06    Hoot LLC                            
                                                            HV-3            4,175                  08/18/05   08/25/05    Hoot LLC                            
                                                            HV-4            3,764                  12/30/04   03/13/06    Hoot LLC                            
                                                            HV-4            3,764                  08/18/05   03/13/06    HOOT LLC                            
                                                            HV-5              471                  03/10/05   03/17/05    hoot LLC                            
                                                            PB-1          -20,000                  06/08/05   06/21/05    Ackerman Mechanical Service         
                                                            PB-2            4,943                  06/08/05   03/13/06    Ackerman Mechanical Service         
                                                            PB-3              823                  06/08/05   06/21/05    Ackerman Mechanical Services        
 
03-0225SC Visual Structural Inspection 0-002-SC1  08/28/03  NO CHANGE ORDERS ON ELECTRONIC FILE

          Cuba Annex E C'hood fmr AG-IA Shop:
96-0290   Reconstruction               0-003-001  10/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
07-2064   Reconstruction               0-003-002  06/10/08  NO CHANGE ORDERS ON ELECTRONIC FILE

          Relocatable Classroom:
96-0293   Reconstruction               0-004-001  10/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage:Cuba:
92-0539   Reconstruction               0-005-001  01/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE

          Rushford K-5 Building:
92-0540   Reconstruction               0-015-001  01/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0241   Reconstruction               0-015-002  10/28/93  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0471   Reconstruction               0-015-003  01/12/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0291   Reconstruction               0-015-004  10/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1270   Reconstruction               0-015-005  05/30/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1418   Reconstruction               0-015-006  09/07/00  NO CHANGE ORDERS ON ELECTRONIC FILE
03-1553   Reconstruction               0-015-007  05/21/04  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            RF-1           13,939                  12/15/04   12/30/04    Patterson Stevens Inc               
                                                            RF-2           12,059                  12/15/04   12/30/04    Patterson Stevens Inc               
 
04-0609   Reconstruction               0-015-008  12/31/04  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0227SC Visual Structural Inspection 0-015-SC1  09/28/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Temporary Classroom:
96-0294   Reconstruction               0-016-001  10/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          Shop/Ag + Bus G:Rushford:
94-0472   Reconstruction               0-018-001  01/12/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-0292   Reconstruction               0-018-002  10/28/96  NO CHANGE ORDERS ON ELECTRONIC FILE

          New MS/HS 6-12:
94-0858   New Construction             0-020-001  03/10/95  NO CHANGE ORDERS ON ELECTRONIC FILE
95-1271   Reconstruction               0-020-002  05/30/96  NO CHANGE ORDERS ON ELECTRONIC FILE
99-1419   Reconstruction               0-020-003  09/07/00  NO CHANGE ORDERS ON ELECTRONIC FILE
06-0457   Reconstruction               0-020-004  11/21/06  NO CHANGE ORDERS ON ELECTRONIC FILE
03-0226SC Visual Structural Inspection 0-020-SC1  09/28/04  NO CHANGE ORDERS ON ELECTRONIC FILE

          Outdoor Educ. Classroom Bldg.:
00-1103   New Construction             0-022-001  09/25/01  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Garage - Cuba:
94-0473   Reconstruction               5-005-002  01/12/95  NO CHANGE ORDERS ON ELECTRONIC FILE

          New Bus Garage '96:
96-0910   New Construction             5-021-001  03/25/97  NO CHANGE ORDERS ON ELECTRONIC FILE





SCIO CSD STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-24-01-04
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Main Building:
91-0506   Reconstruction               0-001-003  12/23/91  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0878   Additions and Alterations    0-001-004  05/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
95-0157   Reconstruction               0-001-005  09/14/95  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1119   Reconstruction               0-001-007  05/12/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0656   Reconstruction               0-001-008  03/13/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            S-102-1        16,566                  06/22/01   01/30/02    Greenauer Blacktop                  
                                                            S-102-2        17,818                  06/22/01   01/30/02    Greenauer Blacktop                  
                                                            S-102-3        28,790                  03/26/03   04/03/03    Greenauer Blacktop                  
                                                            S-102-4        -9,987                  10/27/03   11/12/03    Greenauer Blacktop                  
                                                            S-103-1        75,113                  06/22/01   01/30/02    GVE, Inc.                           
                                                            S-103-1       103,264                  12/20/02   01/14/03    GVE, Inc.                           
                                                            S-103-2        62,829                  06/22/01   01/30/02    GVE, Inc.                           
                                                            S-103-3         5,981                  06/22/01   01/30/02    GVE, Inc.                           
                                                            S-103-4        14,799                  10/27/03   11/12/03    GVE, Inc.                           
                                                            S-104-1        -9,879                  10/27/03   11/12/03    Frey & Campbell                     
                                                            S-105-1        34,580                  04/11/02   06/30/03    Kipphut & Neumann                   
                                                            S-105-2         7,340                  06/22/01   01/30/02    Kipphut & Neumann                   
                                                            S-105-3         6,131                  06/22/01   01/30/02    Kipphut & Neumann                   
                                                            S-105-4         9,297                  03/28/02   06/30/03    Kipphut & Neumann                   
                                                            S-106-1        16,818                  06/22/01   01/30/02    Chase Pitkin                        
                                                            S-106-2        12,542                  06/22/01   01/30/02    Chase Pitkin                        
 
99-0381   Reconstruction               0-001-009  11/16/99  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1270   Reconstruction               0-001-010  06/27/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            S-301-1         4,175                  08/01/02   08/06/02    GVE, Inc.                           
                                                            S301-2          4,976                  07/14/03   07/16/03    GVE, Inc.                           
 
05-0194   Reconstruction               0-001-011  09/30/05  NO CHANGE ORDERS ON ELECTRONIC FILE
05-0967   Reconstruction               0-001-012  08/10/06  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            1-01            1,510                  06/06/07   08/28/07    Patricia electric                   
                                                            1-02              681                  06/06/07   08/28/07    Patricia Electric                   
                                                            EC - 3          7,704                  01/07/08     /  /      FREY ELECTRICAL CONSTRUCTION COMPANY
                                                            EC - 4          4,224                  01/07/08     /  /      FREY ELECTRICAL CONSTRUCTION COMPANY
                                                            EC-1            2,940                  09/26/07   01/16/08    FREY ELECTRICAL CONSTRUCTION CO.    
                                                            EC-2              225                  09/26/07   01/16/08    FREY ELECTRICAL CONSTRUCTION CO.    
                                                            EC-5            2,015                  02/01/08     /  /      FREY ELECTRICAL CONSTRUCTION CO.    
                                                            EC-6           14,081                  02/01/08     /  /      FREY ELECTRICAL CONSTRUCTION CO.    
                                                            EC-6           14,081                  02/01/08     /  /      FREY ELECTRICIAL CONSTRUCTION CO.   
                                                            EC-7           10,451                  02/01/08     /  /      FREY ELECTRICAL CONSTRUCTION CO.    
                                                            EC-8           10,126                  02/01/08     /  /      FREY ELECTRICAL CONSTRUCTION CO.    
                                                            GC-1                0                  03/12/07   03/14/07    Lobar Inc                           
                                                            GC-10          15,853                  10/11/07   11/13/07    Lobar Inc                           
                                                            GC-11          10,986                  10/11/07   11/13/07    Lobar Inc                           
                                                            GC-12           8,802                  12/12/07   01/09/08    Lobar,Inc.                          
                                                            GC-13          10,161                  12/12/07   01/09/08    Lobar, Inc.                         
                                                            GC-14           2,663                  12/12/07   01/09/08    Lobar, Inc.                         
                                                            GC-15          19,751                  12/12/07   01/09/08    Lobar,Inc.                          
                                                            GC-16          15,846                  12/12/07   01/09/08    Lobar,Inc.                          
                                                            GC-17          12,038                  12/12/07   01/09/08    Lobar, Inc.                         
                                                            GC-18           9,304                  01/24/08   04/04/08    LOBAR INC                           
                                                            GC-19          -7,932                  04/24/08     /  /      LOBAR, INC.                         
                                                            GC-2                0                  06/06/07   06/20/07    Lobar Inc                           
                                                            GC-3                0                  06/06/07   06/20/07    Lobar Inc                           
                                                            GC-4              399                  06/06/07   06/20/07    Lobar Inc                           
                                                            GC-5                0                  06/20/07   07/17/07    Lobar Inc                           
                                                            GC-6           16,893                  07/23/07   08/20/07    Lobar Inc                           
                                                            GC-7                0                  09/26/07   11/08/07    LOBAR, INC.                         
                                                            GC-8           18,910                  09/26/07   11/08/07    LOBAR, INC.                         
                                                            GC-9            2,964                  10/11/07   11/13/07    Lobar Inc                           
                                                            HC-1                0                  02/22/07   08/15/07    Mollenberg Betz Inc                 
                                                            HC-2                0                  03/17/08     /  /      MOLLENBERG-BETZ, INC.               
                                                            HC-3           -7,090                  05/27/08     /  /      Mollenberg-Betz                     
                                                            PC - 1              0                  01/07/08     /  /      FREY & CAMPBELL, INCORPORATED       
                                                            PC-2            7,335                  03/17/08     /  /      FREY & CAMPBELL, INC.               
 
06-1613   Reconstruction               0-001-013  08/02/07  NO CHANGE ORDERS ON ELECTRONIC FILE

          Bus Storage Building:
99-1538   New Construction             4-003-001  06/28/00  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                            s201-1          4,668                  03/15/04     /  /      Kirst Construction                  
 

          Bus Garage:
92-0784   Reconstruction               5-002-002  04/06/93  NO CHANGE ORDERS ON ELECTRONIC FILE
93-0879   Additions and Alterations    5-002-003  05/03/94  NO CHANGE ORDERS ON ELECTRONIC FILE
96-1120   Reconstruction               5-002-004  05/12/97  NO CHANGE ORDERS ON ELECTRONIC FILE
99-0657   Additions and Alterations    5-002-005  03/13/00  NO CHANGE ORDERS ON ELECTRONIC FILE





WELLSVILLE CENTRAL SCHOOL DISTRICT STATUS REPORT ON CAPITAL PROJECTS
District No.: 02-26-01-06
last updated on 07/25/08
REVIEW    BUILDING NAME/               BLDG./       SED     C. O.          C.O.        Disallowed  C. O.      C. O.                
No.       PROJECT SCOPE                PROJ. NO.  APPROVAL  Number         Amount      Amount      Received   Approved    Contractor
__________________________________________________________________________________________________________________________________________

          Wellsville Middle School:
90-1440   Reconstruction               0-001-004  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
92-1303   Additions and Alterations    0-001-006  06/25/93  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0471   Reconstruction               0-001-008  10/24/97  NO CHANGE ORDERS ON ELECTRONIC FILE

          Washington Primary/Inter.:
90-1441   Reconstruction               0-003-005  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
94-0173   Additions and Alterations    0-003-006  10/04/94  NO CHANGE ORDERS ON ELECTRONIC FILE
00-1958   Additions and Alterations    0-003-007  12/11/01  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            103-004         3,594                  11/09/06   01/09/07    David Ogiony Development            
                                                            103-008           339                  11/29/02   12/06/02    David Ogiony                        
                                                            103-010         1,903                  11/29/02   12/06/02    David Ogiony                        
                                                            103-013         2,838                  06/05/03   09/16/03    David Ogiony                        
                                                            103-015         5,681                  06/05/03   09/16/03    David Ogiony                        
                                                            103-34          6,494                  04/06/06   07/26/06    Ingalls Site Development            
                                                            104-005         1,650                  12/23/02   01/10/03    DiMarco Constructors                
                                                            104-008         6,257                  05/05/03   05/21/03    DiMarco Constructors                
                                                            104-012         1,522                  07/24/03   08/05/03    DiMarco Constructors                
                                                            104-020        15,956                  11/24/03   11/26/03    DiMarco Constructors                
                                                            105-002         4,580                  03/03/03   03/11/03    JW Danforth                         
                                                            105-007         3,066                  12/30/03   01/21/04    JW Danforth                         
                                                            106-002         5,502                  03/24/03   03/28/03    JW Danforth                         
                                                            106-004         2,272                  07/09/03   07/23/03    JW Danforth                         
                                                            106-005         3,925                  07/09/03   07/23/03    JW Danforth                         
                                                            106-015         5,911                  04/13/04   04/28/04    JW Danforth                         
                                                            107-003        11,036                  11/09/06   01/09/07    Blackmon Farrell                    
                                                            107-005           407                  12/23/02   01/10/03    Blackmon-Farrell Elec.              
                                                            107-006         5,105                  12/23/02   01/10/03    Blackmon-Farrell Elec.              
                                                            RF-1            3,000                  12/06/04   12/17/04    AW Farrell and Son                  
                                                            ST-1            1,035                  09/08/04   09/17/04    David Ogiony                        
 

          High School/Middle School:
90-1442   Reconstruction               0-004-006  06/06/91  NO CHANGE ORDERS ON ELECTRONIC FILE
97-0472   Reconstruction               0-004-008  10/24/97  NO CHANGE ORDERS ON ELECTRONIC FILE
98-0332   Reconstruction               0-004-009  11/12/98  NO CHANGE ORDERS ON ELECTRONIC FILE
01-0506   Additions and Alterations    0-004-010  01/16/02  *CO No.*       Amount      Disallowed  Received   Approved    Contractor
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                                                0                    /  /       /  /                                          
                                                            00001           2,100                  06/05/03   08/29/03    Kleen All of America                
                                                            00001          -1,000                  09/17/04   09/28/04    W&B Supply                          
                                                            00002           1,680                  06/20/03   07/11/03    Kleen All of America                
                                                            00003           4,900                  06/20/03   07/11/03    Kleen All of America                
                                                            00004           7,450                  08/11/03   08/26/03    Kleen All of America                
                                                            00005           1,200                  10/24/03   11/04/03    Kleen All of America                
                                                            101-006        39,000                  01/21/04   03/13/06    Kleen All of America                
                                                            101-007        10,135                  12/30/03   01/20/04    Kleen All of America                
                                                            101-024       112,831                  04/06/06   04/24/06    DiMarco Constructors                
                                                            102-001         1,790                  09/16/03   09/19/03    Cambria Contracting                 
                                                            102-002         1,811                  08/16/04   09/27/04    Cambria Contracting                 
                                                            102-003        -2,666                  06/19/06   06/30/06    Cambria Contracting                 
                                                            103-001        17,435                  11/09/06   01/09/07    David Ogiony Development            
                                                            103-002        91,046                  11/09/06   01/09/07    David Ogiony Development            
                                                            103-003         4,000                  11/09/06   01/09/07    David ogiony Development            
                                                            103-005        55,203                  11/09/06   01/09/07    David Ogiony Development            
                                                            103-006         9,800                  11/09/06   01/09/07    David Ogiony Development            
                                                            103-007         1,999                  11/29/02   03/13/03    David Ogiony Develop.               
                                                            103-009           582                  11/29/02   03/13/03    David Ogiony Develop.               
                                                            103-011         1,437                  01/27/03   02/14/03    David Ogiony Develop.               
                                                            103-012        16,946                  05/02/03   05/07/03    David Ogiony Develop.               
                                                            103-014        25,856                  06/17/03   07/11/03    David Ogiony Develop.               
                                                            103-016        15,720                  06/20/03   07/11/03    David Ogiony Develop.               
                                                            103-017         2,792                  09/05/03   09/16/03    David Ogiony Develop.               
                                                            103-018         5,015                  09/05/03   09/16/03    David Ogiony Develop.               
                                                            103-019        21,275                  11/03/03   11/20/03    David Ogiony Develop.               
                                                            103-020        17,358                  10/24/03   11/04/03    David Ogiony Develop.               
                                                            103-021         2,535                  10/24/03   11/04/03    David Ogiony Develop.               
                                                            103-022        19,165                  11/03/03   11/20/03    David Ogiony Develop.               
                                                            103-023         2,662                  11/03/03   11/20/03    David Ogiony Develop.               
                                                            103-024        10,580                  11/03/03   11/20/03    David Ogiony Develop.               
                                                            103-025        10,217                  11/03/03   11/20/03    David Ogiony Develop.               
                                                            103-026         2,785                  11/10/03   11/21/03    David Ogiony Develop.               
                                                            103-027         1,050                  12/08/03   12/31/03    David Ogiony Develop.